20090416-0029 FERC PDF (Unofficial) 04/15/2009
I EIEDisON

VIA FEDERALEXPRESS
OR\G\NAL
April 15, 2009
RebeccaA_ Fa.....

Attamcy
robec:c:[email protected]
HonorableKimberlyD. Bose
Secretary
Federal EnergyRegulatoryCommission
888 First Street,NE
Washington,DC 20426
Re: Docket No. ER08-1231
ReplacementSheet No. 13
-,
r \ ....

C-~ g (/;
c-r1
"'"
, .
,-r:1 '.-:'",::,-0 -~ :'j ~'':'
:.....;~ ..", :-"'1 f'
0:".;1 ;X:l -.
-,~:;:: ~;.....,:;..
~·~;ur·-<,.- (11
(I) -<=-nrTl (0' ,.
02 »
-0'·-
:T.rTl 0 ......
--, :a:-:~c, ~ ='=~-< &:
,.,
,:-..

Dear SecretaryBose:

On March 16,2009, SCE filed a settlementdocumentsin the above-referencedocket The SettlementAgreementincluded,as AttachmentA, a revised InterconnectionFacilities Agreement (IFA) betweenThe City of Riverside and SouthernCalifornia Edison Company.

SCE was informedby the SettlementJudge, Carmen Cintron, that there was a mistake to Section 9.4 of the revised IFA. Section 9.4 erroneouslyreferredto the Riverside Wildlife Substation. However,the reference should be to the RiversideWilderness Substation (as the Wildlife Substationwill be owned and operatedby SCE). Therefore, SCE is filing a clean and redlined copy of this revised sheet 13.

SCE has discussed the revision with the City of Riversideand they agree that Section 9.4 should properlyreferencethe Riverside Wilderness Substation. CommissionTrial Staff filed comments on April 2, 2009, in support of the settlementbetweenthe City of Riverside and SCE.

Commission Trial Staffhas also agreedthat the revision to Section 9.4 is proper.

SCE respectfullyrequests, pursuant to Section 35.11, waiver of the 60 day prior notice requirementsspecifiedin Section 35.3 and requests that the Commission assign an effective date of September6, 2008, or whatever date the Commissionfinds that the Amended interconnection FacilitiesAgreementto be effective, whichever is later.

If you have any questions,please call me at the number below.

Your courtesy in this matter is appreciated.

P.O. Box 800 2244 WalnutGroveAve. Roscmcod.California91770 (626) 302-3475 Fax (626)302·1935 20090416-0029 FERC PDF (Unofficial) 04/15/2009
,
Wallin&ton.DC 20426
1'18<2
April 15. 2009
RF:rf:Letterl.doc
Enclosure(s)
;;;;;~
RebeccaAustinFurman
20090416-0029 FERC PDF (Unofficial) 04/15/2009
Revised Sheet to the
Interconnection Facilities Agreement Between
Southern California Edison Company
and
The City of Riverside
(Clean and Redlined Versions)
20090416-0029 FERC PDF (Unofficial) 04/15/2009
SouthernCaIifomiaEdisonCompany
FERC ElectricTariff, SecODdRevisedVolumeNo.6
Service AgreementNo. 59 SecODdSubstituteOriginal Sheet No. 13 liable to Riverside for any loss, danlage, claim, cost, charge or expense arising from or related to this Agreement.

9. Interconnected Operations:

9.1. SCE shall, at its expense, operate and maintain the ISO Controlled Facilities in accordance with the applicable Transmission Control Agreement provisions, WECC and NERC reliability criteria, established SCE operating and maintenance procedures and GoodUtility Practice as they may change from time to time.

9.2. SCE shall operate and maintain the SCE Interconnection Facilities in accordance with the applicable Transmission Control Agreement provisions, WECC and NERC reliability criteria, established SCE operating and maintenance procedures and Good Utility Practice as they may change from time to time, and Riverside shall pay SCE to perform such operation and maintenance ofthe SCE Interconnection Facilities, pursuant to Section 14.

9.3. Riverside shall, at its expense, operate and maintain the Riverside Wilderness Substation in accordance with the applicable ISO Tariff provisions and protocols, TO Tariff provisions, WECC and NERC reliability criteria, jointly established operating procedures, established Riverside operating procedures and Good Utility Practice as they may change from time to time.

9.4. Riverside shall comply with all Applicable Reliability Criteria for the Riverside Interconnection Facilities and Riverside Wilderness Substation. SCE shall have DO responsibility for complying with mandatory reliability standards for such facilities.

9.5. SCE shall comply with all Applicable Reliability Criteria for the SCE Interconnection Facilities, Wildlife Substation and the Mira Loma-Vista 220 kV Line Loop.

9.6. Riverside shall maintain reactive flow at grid interface points within a specified power factor band of 0.97 lag to 0.99 lead, or as otherwise established by the ISO. Riverside shall not be compensated for the service of maintaining the power factor at required levels within the bandwidth.

9.7. The Riverside Wilderness Substation shall be operated so as to prevent or protect against the following adverse conditions on SCE's electric system:
inadvertent and unwanted re-energizing of the SCE Interconnection Facilities; interconnection while out of synchronization; overcurrent; voltage imbalance; ground faults; generated alternating current frequency outside permitted safe limits; poor power factor or reactive power outside permitted limits; and abnormal waveforms.

9.8. The SCE Interconnection Facilities shall be operated so as to prevent the following adverse conditions on Riverside's electric system: inadvertent and unwanted re-energizing of the Riverside Interconnection Facilities, interconnection while out of synchronization; overcurrent; voltage imbalance; ground faults; generated alternating current frequency outside permitted safe Iasuedby: JamesA. CUi1lier
DiIector of FERC Rates& RcguIation
Iasuedon: April 15, 2009 Effective: Septeni>er6, 2008
20090416-0029 FERC PDF (Unofficial) 04/15/2009
SoutbcmCaliforniaEdisonC~y
FERC Electric Tariff, Second Revised Volume No.6
Service Agreellll:ntNo. 59 ~Substitu1eOriginalSheet No. 13 liable to Riverside for any loss, damage, claim, cost, charge or expense arising from or related to this Agreement.

9. Interconnected Operations:

9.1. SCE shall, at its expense, operate and maintain the ISO Controlled Facilities in accordance with the applicable Transmission Control Agreement provisions, WECC and NERC reliability criteria, established SCE operating and maintenance procedures and Good Utility Practice ss they may change from time to time.

9.2. SCE shall operate and maintain the SCE Interconnection Facilities in accordance with the applicable Transmission Control Agreement provisions, WECC and NERC reliability criteria, established SCE operating and maintenance procedures and Good Utility Practice as they may change from time to time, and Riverside shall pay SCE to perform such operation and maintenance of the SCE Interconnection Facilities, pursuant to Section 14.

9.3. Riverside shall, at its expense, operate and maintain the Riverside Wilderness Substation in accordance with the applicable ISO Tariff provisions and protocols, TO Tariff provisions, WECC and NERC reliability criteria, jointly established operatingprocedures, established Riverside operating procedures and Good Utility Practice as they may change from time to time.

9.4. Riverside shall comply with all Applicable Reliability Criteria for the Riverside Interconnection Facilities and Riverside WildemessWildlife Substation. SCE shall have no responsibility for complying with mandatory reliability standards for such facilities.

9.S. SCE shall comply with all Applicable Reliability Criteria for the SCE Interconnection Facilities, Wildlife Substation and the Mira Loma-Vista 220 kV Line Loop.

9.6. Riverside shall maintain reactive flow at grid interface points within a specified power factor band of 0.97 lag to 0.99 lead, or as otherwise established by the ISO. Riverside shall not be compensated for the service of maintaining the power factor at required levels within the bandwidth.

9.7. The Riverside Wilderness Substation shall be operated so as to prevent or protect against the following adverse conditions on SCE's electric system:
inadvertent and unwanted re-energizing of the SCE Interconnection Facilities; interconnection while out of synchronization; overcurrent; voltage imbalance; ground faults; generated alternating current frequency outside permitted safe limits; poor power factor or reactive power outside permitted limits; and abnormal waveforms.

9.8. The SCE Interconnection Facilities shall be operated so as to prevent the following adverse conditions on Riverside's electric system: inadvertent and unwanted re-energizing of the Riverside Interconnection Facilities, interconnection while out of synchronization; overcurrent; voltage imbalance; ground faults; generated alternating current frequency outside permitted safe IlIIIUCdby: lames A. Cuillier
Din:ctor of FERC Raa & Regulation
Iaued on: April 15M.",h 16,2009 Effective: September6, 2008