Cities Index.
Proposed Fees Schedule

Riverside City Council
May 21, 2024

Document
Proposed Fees Schedule
Meeting
May 21, 2024
Body
Riverside City Council
Pages
90
Original file
4.2 MB
Text extracted from the city's file for reading and search. Open the original on riversideca.legistar1.com. That file is the official record.

PROPOSED

SCHE DULE OF

FEES AND

CHARGES

FISCAL YEARS
2024 - 2025
2 Arts and Cultural Affairs……………………………….……………………………………………………… … 3 Building and Safety……………………………….…………………………………………………………… 4 Code Enforcement……………………………………………………………………………………………
… 11
Planning………………………………………………………………………………………………………… … 13
19 20
30 34
35 36
51 Animal and Pet Licensing…………………………………………………………………………………… … 56
Engineering and Maintenance…………………………………………………………………………… … 60 Public Parking…………………………………………………………………………………………………… 74 Electric…...................................................................................................................... ............ 82 Water…......................................................................................................................... .......... 86

PUBLIC UTILITIES
PARKS, RECREATION, AND COMMUNITY SERVICES……………………………………………………………… … POLICE DEPARTMENT………………………………………………………………………………………………… …

PUBLIC WORKS
FINANCE DEPARTMENT………………………………………………………………………………………………… FIRE DEPARTMENT……………………………………………………………………………………………………… … LIBRARY…………………………………………………………………………………………………………….…… …
MUSEUM………………………………………………………………………………………………………………… …

TABLE OF CONTENTS
SURCHARGES…………………………………………………………………………………………………………… …

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT
OFFICE OF THE CITY CLERK…………………………………………………………………………………………… … CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact
2764 GENERAL PLAN MAINTENANCE FEE (Surcharge)
Permit Fee Permit Fee x 10% Permit Fee x 10% 0% - $
Plan Check Plan Check Fee x 10% Plan Check Fee x 10% 0% - $ 2602 TECHNOLOGY FEE (Surcharge)
Permit Fee Permit Fee x 4% Permit Fee x 4% 0% - $
Plan Check Plan Check Fee x 4% Plan Check Fee x 4% 0% - $ Legend:
^ 14% surcharge will be added to the listed price
° 14% surcharge is included in the listed price
A 14% total surcharge representing the General Plan Maintenance Fee and Technology Fee

FEE DESCRIPTION

SURCHARGES

Page 2 ends

CODE FEE DESCRIPTION FY 2023/24
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact
2500 FESTIVAL OF LIGHTS AND OTHER SPECIA L EVENTS VENDORS 18% of vendor sales 2500 FACILITY RENTALS DEPOSIT
Grier Pavilion $ 500.00 $ 500.00 0% $ - The Box / Showcase $ 500.00 $ 500.00 0% $ - 5301 FILM PERMIT
Student Film No Charge 5 $ 25.00 0% $ 125 Non-Profit No Charge 10 $ 100.00 0% $ 1,000 Requires Street Closure $ 414.00 7 $ 600.00 45% $ 1,302 No Street Closure $ 204.00 30 $ 400.00 96% $ 5,880

CANCELLATION FEE
Student / Non-Profit N/A $ 75.00 0% $ - Large Production N/A $ 300.00 0% $ - 2500 HORSE CARRIAGE PERMIT $ 53.75 12 $ 100.00 86% $ 555 2500 SPECIAL EVENT PERMIT
Residential / Neighborhood Block Party
Permit Fee $ 26.75 20 $ 50.00 87% $ 465 Late Fee (in addition to the Permit Fee) $ 300.00 $ 30.00 -90% $ - Non-Profit Organizations
Permit Fee $ 80.50 100 $ 100.00 24% $ 1,950 Late Fee (in addition to the Permit Fee) $ 300.00 $ 300.00 0% $ - Professional Corporation, Businesses, and Other Organizations Permit Fee $ 107.00 8 $ 500.00 367% $ 3,144 Late Fee (in addition to the Permit Fee) $ 300.00 $ 300.00 0% $ -

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT

ARTS & CULTURAL AFFAIRS

Page 3 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

BUILDING PERMIT AND INSPECTION
2602 PERMIT ISSUANCE FEE^

32.25$ $ 32.25 0% $ - 2601 BUILDING PLAN CHECK^
322.50$ $ 322.50 0% $ - Each repetitive building (of such discrete model)
2602 BUILDING PERMITS^ (PER SQUARE FEET)
A-1: Auditorium, Theatres 102.40 $ $ 102.40 0% $ - A-2: Restaurants, Bars 113.52 $ $ 113.52 0% $ - A-3: Churches, Halls 99.57 $ $ 99.57 0% $ - A-4: Arenas, Stadiums 102.40 $ $ 102.40 0% $ - B: Offices, Banks, etc. 95.31 $ $ 95.31 0% $ - E: Educational, Schools 98.03 $ $ 98.03 0% $ - F: Industrial, Factory, Etc. 51.68 $ $ 51.68 0% $ - H: Hazardous 63.07$ $ 63.07 0% $ - I-4: Daycare Facilities 118.37 $ $ 118.37 0% $ - M: Retail, Market, Gas 76.03 $ $ 76.03 0% $ - Service Canopies 33.11 $ $ 33.11 0% $ - R-1: Hotels, Motels 98.15 $ $ 98.15 0% $ - R-2: Apartments and Condominiums 102.88 $ $ 102.88 0% $ - R-3: Single Family, Duplex 100.04 $ $ 100.04 0% $ - Room Additions 77.40 $ $ 77.40 0% $ - Garage Conversions 21.50 $ $ 21.50 0% $ - Home Remodels 53.75 $ $ 53.75 0% $ - R-4: Residential Care 108.20 $ $ 108.20 0% $ - S: Storage, Warehouse 40.44 $ $ 40.44 0% $ - U: Utility, Private Garages, Accessory, Etc. 28.73 $ $ 28.73 0% $ - Special Uses:

I-2.1: Licensed Clinics 118.37 $ $ 118.37 0% $ - R-3.1: Licensed Residential Assisted Living 108.20 $ $ 108.20 0% $ -

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT

BUILDING AND SAFETY

FEE DESCRIPTION

Page 4 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT

BUILDING AND SAFETY

FEE DESCRIPTION
Miscellaneous
Storage Shed, Greenhouses 15.48 $ $ 15.48 0% $ - Decks, Balconies, and Stairways 21.50 $ $ 21.50 0% $ - Patio Cover - Lattice 8.60 $ $ 8.60 0% $ - Patio Cover - Solid 10.75 $ $ 10.75 0% $ - Retaining Walls (Per Linear Feet) 8.60 $ $ 8.60 0% $ - Block Walls (Per Linear Feet) 6.45 $ $ 6.45 0% $ - Swimming Pools Per Contract Per Contract 0% $ - Sings Per Contract Per Contract 0% $ - Demolitions Per Contract Per Contract 0% $ - Re-Roof

Overlays (2 maximum) 1.61 $ $ 1.61 0% $ - Tear Off and Re-Roof 2.15 $ $ 2.15 0% $ - Tear Off, New Sheathing, and Re-Roof 2.69 $ $ 2.69 0% $ - Tenant Improvements 75.25 $ $ 75.25 0% $ - 2602 BUILDING PERMIT VALUATION^
$1 - $500 30.00$ $ 30.00 0% $ - $501 - $2,000
First $500 30.00$ $ 30.00 0% $ - $ 10.00 $ 10.00 0% $ - including $2,000
$2,001 - $25,000
First $2,000 60.00$ $ 60.00 0% $ - $ 9.00 $ 9.00 0% $ - including $25,000
$25,001 - $50,000
First $25,000 267.00 $ $ 267.00 0% $ - $ 65.00 $ 65.00 0% $ - including $50,000
$50,001 - $100,000
First $50,000 429.50 $ $ 429.50 0% $ - $ 45.00 $ 45.00 0% $ - including $100,000
Each additional $10,000 or fraction thereof, to and
Each additional $10,000 or fraction thereof, to and
Each additional $500 or fraction thereof, to and
Each additional $1,000 or fraction thereof, to and

Page 5 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT

BUILDING AND SAFETY

FEE DESCRIPTION
$100,000 - $500,000
First $100,000 654.50 $ $ 654.50 0% $ - $ 35.00 $ 35.00 0% $ - including $500,000
$500,001 - $1,000,000
First $500,000 2,054.50 $ $ 2,054.50 0% $ -

30.00$ $ 30.00 0% $ - including $1,000,000
$1,000,001+
First $1,00,000 3,554.50 $ $ 3,554.50 0% $ - Each additional $10,000 or fraction thereof 20.00 $ $ 20.00 0% $ - 2602 CALIFORNIA BUILDING STANDARDS COMMISSION FEE 1.00 $ $ 1.00 0% $ - Per every $25,000 or portion thereof in construction valuation 2911 $ 2.00 $ 2.00 0% $ - Per sheet of plans, calculations, and related documents 2601 PLAN CHECK FEE^ - POOLS 80.63$ $ 80.63 0% $ - 2602 STRONG MOTION INSTRUMENTATION PROGRAM (SMIP)
Residential Structures Valuation x $0.00013 Valuation x $0.00013 0% $ - Commercial Structures Valuation x $0.00028 Valuation x $0. 00028 0% $ - 2606 TENTS, GRANDSTANDS, OR OT HER TEMPORARY STRUCTURES 53.75 $ $ 53.75 0% $ - 2602 TRANSFER OF ISSUED PERMIT 32.25 $ $ 32.25 0% $ - 2602 PERMIT REFUND FEE^ 32.25 $ $ 32.25 0% $ - 2607 BUILDING MODIFICATION/ALTERNATE MATERIALS REVIEW 596.00 $ $ 596.00 0% $ - 2608 APPEAL OF BUILDING OFFICIAL 1,130.00 $ $ 1,130.00 0% $ - Each additional $10,000 or fraction thereof, to and
Each additional $10,000 or fraction thereof, to and

MICROFILM FEE

Page 6 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT

BUILDING AND SAFETY

FEE DESCRIPTION

ELECTRICAL
2602 PERMIT ISSUANCE FEE^ (EACH) 32.25$ $ 32.25 0% $ - 2602 DWELLINGS RE-WIRE
Partial 53.75$ $ 53.75 0% $ - Full 80.63$ $ 80.63 0% $ - 2602 MOTORS, GENERATORS, TRANSFORMERS, AND APPLIANCES - H.P./K.W./K.V.A. (EACH)
0 - 3 8.06$ $ 8.06 0% $ - 3 - 50 21.50$ $ 21.50 0% $ - 51+ 43.00$ $ 43.00 0% $ - 2602 MOVED BUILDINGS (EACH) 80.63 $ $ 80.63 0% $ - 2602 OUTLETS AND RECEPTACLES (EACH) 0.54 $ $ 0.54 0% $ - 2602 SERVICE
0 - 200A 53.75$ $ 53.75 0% $ - 201A - 1,000A 64.50$ $ 64.50 0% $ - 1,000+ A 80.63$ $ 80.63 0% $ - 2773 SIGNS (EACH) 32.25$ $ 32.25 0% $ - 2602 SWIMMING POOLS OR SPAS (EACH) 32.25 $ $ 32.25 0% $ - 2602 SWIMMING POOLS AND SPAS (EACH) 53.75 $ $ 53.75 0% $ - 2602 SWITCHBOARD SUB-PANELS (EACH)
0 - 600V 32.25$ $ 32.25 0% $ - 600+ V 64.50$ $ 64.50 0% $ -

Page 7 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT

BUILDING AND SAFETY

FEE DESCRIPTION
2602 TEMPORARY POWER POLES (EACH) 21.50 $ $ 21.50 0% $ - Additional Poles With Fixtures and/or Outlets (Each) 8.06 $ $ 8.06 0% $ - 2602 YARD LIGHTING STANDARDS (EACH) 5.38 $ $ 5.38 0% $ -

MECHANICAL
2602 PERMIT ISSUANCE FEE^ (EACH) 32.25 $ $ 32.25 0% $ - 2602 ALTER SYSTEMS - DUCTS, ETC. (EACH) 16.13 $ $ 16.13 0% $ - 2602 APPLIANCE VENTS - APPLIANCE NOT INCLUDED (EACH) 10.75 $ $ 10.75 0% $ - 2602 BOILERS AND AIR CONDITIONING UNITS (EACH)
0 - 3 HP / Tons OR 100,000 BTU 43.00 $ $ 43.00 0% $ - 3 - 50 HP / Tons OR 100,000 - 175,000 BTU 53.75 $ $ 53.75 0% $ - 50+ HP/ Tons or 175,000+ BTU 80.63 $ $ 80.63 0% $ - Air Handler 43.00$ $ 43.00 0% $ - 2602 COMMERCIAL INCINERATORS (EACH) 69.75 $ $ 69.75 0% $ - 2602 FURNANCES (EACH) 43.00 $ $ 43.00 0% $ - 2602 MECHANICAL EXHAUST HOODS (EACH)
Commercial 80.63$ $ 80.63 0% $ - Residential 10.75$ $ 10.75 0% $ - 2602 OTHER HEATERS (EACH) 43.00 $ $ 43.00 0% $ - 2602 VENTILATION FANS (EACH) 10.75 $ $ 10.75 0% $ - 2602 NOT OTHERWISE LISTED (EACH) 10.75 $ $ 10.75 0% $ -

Page 8 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT

BUILDING AND SAFETY

FEE DESCRIPTION

CALCULATION METHOD FOR PER SQUARE FEET METHOD
Dwellings 0.03$ $ 0.03 0% $ - Residential Parking Garages 0.02 $ $ 0.02 0% $ - Restaurants 0.06$ $ 0.06 0% $ - Industrial Plants 0.09 $ $ 0.09 0% $ - Stores, Churches, and Offices 0.01 $ $ 0.01 0% $ - Service Stations / Mini-Marts 0.01 $ $ 0.01 0% $ - Warehouses, Canopies, Covered Parking Structures, and Aircraft Hangers Aircraft Hangers (Per Fixture)
0 - 50,000 Square Feet 0.02 $ $ 0.02 0% $ - 50,001+ Square Feet 0.02 $ $ 0.02 0% $ - Not Otherwise Listed 0.04 $ $ 0.04 0% $ -

PLUMBING
2602 PERMIT ISSUANCE FEE^ (EACH) 32.25 $ 32.25 $ 0% $ - 2602 BACKFLOW PROTECTION DEVICES (EACH) 2.15 $ $ 2.15 0% $ - 2602 BUILDING SEWERS (EACH)
Non-Residential 75.25 $ $ 75.25 0% $ - Residential 37.63$ $ 37.63 0% $ - 2602 DRAINS, SINKS, AND ETC. (EACH) 5.38 $ $ 5.38 0% $ - 2602 DWELLINGS RE-PIPE (FULL) 53.75 $ $ 53.75 0% $ - 2602 GARBAGE DISPOSALS OR DISHWASHERS (EACH) 5.38 $ $ 5.38 0% $ - 2602 GAS OUTLETS (EACH) 1.08 $ $ 1.08 0% $ - 2602 MOVED BUILDINGS (EACH) 53.75 $ $ 53.75 0% $ -

Page 9 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT

BUILDING AND SAFETY

FEE DESCRIPTION
2602 PRIVATE SEWAGE SYSTEMS (EACH) 75.25 $ $ 75.25 0% $ - 2602 RAINWATER SYSTEMS (Per Drain) 5.38 $ $ 5.38 0% $ - 2602 REPAIR OR ALTERATION OF DRAINS OR VENTS (EACH) 5.38 $ $ 5.38 0% $ - 2602 SAND TRAPS OR GREASE TRAPS (EACH) 50.00 $ $ 50.00 0% $ - 2602 TRAPS (EACH) 5.38$ $ 5.38 0% $ - 2602 WATER HEATERS
Up to 100,000 BTU 9.68 $ $ 9.68 0% $ - 100,001 - 1,000,000 BTU 24.19 $ $ 24.19 0% $ - 1,000,001+ BTU 60.74 $ $ 60.74 0% $ - Water Heater Gas Vent (Each) 10.75 $ $ 10.75 0% $ - 2602 WATER PIPING (EACH) 5.38 $ $ 5.38 0% $ - 2602 WATER SERVICE 53.75$ $ 53.75 0% $ - 2602 WATER SOFTENERS (EACH) 32.25 $ $ 32.25 0% $ - 2602 YARD SPRINKLERS (EACH) 8.60 $ $ 8.60 0% $ -

Page 10 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact
4113 DANGEROUS BUILDING INSPECTIONS - DEMOLITIONS
Original Inspection No Charge 3 942.00 $ - $ 2,826 Per Re-Inspection for Non-Compliance (no additional fee 118.00 $ 1 336.00 $ 185% $ 218 if corrected)
Per Abatement (Administrative) 4,394.00 $ 1 3,808.00 $ -13% $ (586) Plus cost of contractor Actual Cost Actual Cost - $ - Summary Abatement - Without Notice 4,394.00 $ 1 $ 2,755.00 -37% $ (1,639) Plus cost of contractor Actual Cost Actual Cost - $ - Title Release Process - All Abatements 177.00 $ 1 $ 297.00 68% $ 120 Plus county recording fees Actual Cost Actual Cost - $ - Plus Building Official Review and Sign Off 1,286.00 $ 1 $ 1,779.00 38% $ 493 4116 TRASH/NUISANCE ABATEMENT
Original Inspection No Charge 1,300 $ 437.00 - $ 568,100 Per Re-Inspection for Non-Compliance (no additional fee 118.00 $ 1,300 $ 383.00 225% $ 344,500 if corrected)
Per Abatement (Administrative) 177.00 $ 30 $ 297.00 68% $ 3,600 Plus cost of contractor Actual Cost Actual Cost - $ - Summary Abatement - Without Notice 355.00 $ 20 $ 1,920.00 441% $ 31,300 Plus cost of contractor Actual Cost Actual Cost - $ - 4112 VEHICLE ABATEMENT
Original Property Inspection No Charge 250 $ 354.00 - $ 88,500 2nd Inspection
If violation is corrected No Charge 140 $ 300.00 - $ 42,000 If continued investigation is required No Charge 50 $ 300.00 - $ 15,000 3rd Inspection
If violation is corrected No Charge 40 $ 300.00 - $ 12,000 If continued investigation is required No Charge 15 $ 300.00 - $ 4,500 Final Inspection and Removal 236.00 $ 5 $ 724.00 207% $ 2,440 Additional Charge Per Vehicle Over 1 Vehicle 56.00 $ 2 $ 64.75 16% $ 18 Removal and Disposal of Vehicles Actual Cost Actual Cost - $ -

FEE DESCRIPTION

CODE ENFORCEMENT

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT

Page 11 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

CODE ENFORCEMENT

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT
4110 WEED ABATEMENT
Original Inspection No Charge 240 $ 519.00 - $ 124,560 Abatement (Administrative) 177.00 $ 20 $ 379.00 114% $ 4,040

Plus cost of contractor Actual Cost Actual Cost - $ - OTHER
Hearing Officer No Charge 120 $ 214.00 - $ 25,680

Page 12 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ADMINISTRATIVE
2796 ALCOHOL LICENSE REVIEW (PER APPLICATION) $ 1,507.00 $ 1,507.00 0% $ - 2739 DAY CARE PERMIT° (PER APPLICATION) $ 864.00 $ 864.00 0% $ - 2747 NON-CONFORMING STATUS REVIEW (PER APPLICATION) $ 3,252. 00 $ 3,252.00 0% $ - 2746 RECYCLING PERMIT° (PER APPLICATION) $ 1,102.00 $ 1,102.00 0% $ - 2795 SUMMARY VACATION REVIEW (PER APPLICATION) $ 2,293.00 $ 2,293.00 0% $ - 2746 TEMPORARY USE PERMIT° (PER APPLICATION)
Mino
r $ 215.00 $ 215.00 0% $ - Major $ 1,102.00 $ 1,102.00 0% $ - 2705 ZONING LETTER (PER APPLICATION) $ 235.25 $ 235.25 0% $ - 2705 ZONING REBUILD LETTER $ 697.25 $ 697.25 0% $ - APPEALS, TIME EXTENSIONS, ENVIRONMENTAL, and MISCELLANEOUS

APPEALS
2758 Airport Land Use Commission (ALUC) $ 1,439.00 $ 1,439.00 0% $ - 2790 Planning Commission and Zoning Administrator Cases $ 2,719.00 $ 2,719.00 0% $ - 2797 COPY OF ZONING OR GENERAL PLAN MAPS $25.00 + Sales Tax $25.00 + Sales Tax 0% $ - 2753 ENVIRONMENTAL IMPACT REPORT (MINIMUM REVIEW FEE) $ 101,400.00 $ 101,400.00 0% $ -

FEE DESCRIPTION

PLANNING

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT

Page 13 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

PLANNING

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT
2752 ENVIRONMENTAL INITIAL STUDY
New Development (Completed by City) $ 7,373.00 $ 7,373.00 0% $ - Existing Development (Completed by City) $ 5,061.00 $ 5,061.00 0% $ - Peer Review by Outside Consultant $ 2,312.00 $ 2,312.00 0% $ - 2745 MODIFICATIONS/CLARIFICATION OF CONDITIONS (PER A PPLICATION) $ 1,707.00 $ 1,707.00 0% $ - 2702 PLANNING RE-INSPECTION (PER INSPECTION) $ 462.25 $ 462.25 0% $ - 2797 PRINTED OR PHOTO COPIES OF PRINTED MATERIALS (PER PAGE) $ 0.10 $ 0.10 0% $ - 2703 PUBLIC HEARING ADVERTISEMENTS / RE-ADVERTISEMENTS $ 504.00 $ 504.00 0% $ - SPECIALIZED REPORT REQUESTS (PER 30 MINUTES OR PORTION) $ 26.75 $ 26.75 0% $ - 2712 TIME EXTENSIONS
Per Application $ 755.00 $ 755.00 0% $ - Public Hearing $ 1,880.00 $ 1,880.00 0% $ - 2798 WILLIAMSON ACT CONTRACT REVIEW (PER APPLICATION) $ 1,265.00 $ 1,265.00 0% $ -

DESIGN REVIEW
2770 CONCEPTUAL DEVELOPMENT REVIEW (PER SUBMITTAL) $ 1,840.00 $ 1,840.00 0% $ - 2770 GENERAL (PER SUBMITTAL)
Commercial, Industrial, and Multi-Family $ 3,827.00 $ 3,827.00 0% $ - Commercial, Industrial, and Multi-Family Revision / Substantial $ 2,453.00 $ 2,453.00 0% $ - Conformance

Page 14 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

PLANNING

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT
2771 LANDSCAPE AND IRRIGATION (SUBJECT TO WELO)
Commercial, Industrial, and Multi-Family $ 988.00 $ 988.00 0% $ - Single Family Residential $ 408.50 $ 408.50 0% $ - 2777 SINGLE FAMILY RESIDENTIAL $ 524.75 $ 524.75 0% $ - RC Zones, Manufactured Dwellings, and Subdivisions

DEVELOPMENT
2701 AMENDMENT TO ZONING TEXT/INTERPRET ATION OF ZONING $ 5,719.00 $ 5,719.00 0% $ -

TEXT (PER APPLICATION)
2748 CONDOMINIUM CONVERSION (PER APPLICATION) $ 10,967.00 $ 10,967.00 0% $ - 2760 DEVELOPMENT AGREEMENT
Per Application $ 14,043.00 $ 14,043.00 0% $ - Revisions $ 9,710.00 $ 9,710.00 0% $ - 2764 GENERAL PLAN AMENDMENT REVIEW (Per Application) $ 10,678.00 $ 10,678.00 0% $ - LOCAL DEVELOPMENT MITIGATION FEE (LDMF) (1)
Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP) Residential
Up to 8 Dwelling Units Per Acre (DUAC) $ 3,635.00 $ 4,358.00 20% $ - 8 to 14 Dwelling Units Per Acre (DUAC) $ 1,515.00 $ 1,817.00 20% $ - More than 14 Dwelling Units Per Acre (DUAC) $ 670.00 $ 803.00 20% $ - Commercial (Per Acre) $ 16,358.00 $ 19,615.00 20% $ - Industrial (Per Acre) $ 16,358.00 $ 19,615.00 20% $ - 2725 PLANNED RESIDENTIAL DEVELOPMENT (PER APPLICAT ION) $ 14,672.00 $ 14,672.00 0% $ -

Page 15 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

PLANNING

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT
2730 RE-ZONING REQUEST (PER APPLICATION) $ 7,383.00 $ 7,383.00 0% $ - 2706 SITE PLAN REVIEW
Per Initial Application $ 15,198.00 $ 15,198.00 0% $ - Revision to Application $ 10,487.00 $ 10,487.00 0% $ -

SPECIFIC PLAN REVIEW
2766 Per Application or Actual Cost (whichever is greater) $ 29,805.00 $ 29,805.00 0% $ - 2767 Revision To Existing Specific Plan $ 19,943.00 $ 19,943.00 0% $ - 2793 STREET NAME CHANGE $ 6,737.00 $ 6,737.00 0% $ - 2719 TENTATIVE TRACT/REVERSION TO ACRE AGE MAP REVIEW (PER APPLICATION) 10 Lots or Less $ 11,305.00 $ 11,305.00 0% $ - Revision to Application $ 7,551.00 $ 7,551.00 0% $ - More Than 10 Lots $ 16,336.00 $ 16,336.00 0% $ - Revision to Application $ 11,489.00 $ 11,489.00 0% $ - 2743 TRAFFIC PATTERN MODIFICATION (PER APPLICATION) $ 11,525.00 $ 11,525.00 0% $ - 2743 VACATION OF STREETS, ALLEYS, OR PEDESTRIAN WALKWAYS $ 12,189.00 $ 12,189.00 0% $ - 2723 VESTING MAP REVIEW (PER APPLICATION)
10 Lots or Less $ 18,907.00 $ 18,907.00 0% $ - More Than 10 Lots $ 27,083.00 $ 27,083.00 0% $ -

HISTORIC PRESERVATION
2799 CERTIFICIATE OF APPROPRIATENESS No Charge No Charge 0% $ -

Page 16 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

PLANNING

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT
2799 INSPECTION SERVICES
Initial Inspection No Charge No Charge 0% $ - Re-Inspections $ 159.00 $ 159.00 0% $ - 2792 MILLS ACT PRESERVATION REVIEW
Per Application $ 404.00 $ 404.00 0% $ - Per Contract, Review, or Initiation Process $ 3,274.00 $ 3,274.00 0% $ - SIGNS
2772 ADMINISTRATIVE SIGN REVIEW (PER APPLICATION) $ 189.00 $ 189.00 0% $ - 2772 ESTABLISHING SIGN CRITERIA (PER APPLICATION) $ 988.00 $ 988.00 0% $ - 2772 NEW OR REPLACEMENT SIGNS (EACH) $ 272.00 $ 272.00 0% $ -

VARIANCES, MODIFICATIONS, EXCEPTIONS, AND FAIR HOUSING REQUESTS 2740 WITH SIGNATURES - RESIDENTIAL ZONES ONLY $ 1,854.00 $ 1,854.00 0% $ - 2740 WITHOUT SIGNATURES - ALL ZONES $ 2,780.00 $ 2,780.00 0% $ -

ZONING PLAN CHECK WITH BUILDING PERMITS
2779 PLAN CHECK - AFTER HOURS° (PER HOUR) $ 210.00 $ 210.00 0% $ - 2779 COMMERCIAL, INDUSTRIAL, AND MULTI-FAMILY TENANT $ 323.00 $ 323.00 0% $ -

IMPROVEMENTS, MINOR ADDITIONS, OR EXTERIOR
REMODEL° (PER SUBMITTAL)

Page 17 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

PLANNING

COMMUNITY AND ECONOMIC DEVELOPMENT DEPARTMENT
2779 LANDSCAPE/IRRIGATION - MINOR° $ 54.00 $ 54.00 0% $ - Not Subject to WELO or WQMP Requirements
2779 NEW CONSTRUCTION° (PER SUBMITTAL)
Commercial, Industrial, and Multi-Family $ 578.00 $ 578.00 0% $ - Single-Family Residential $ 289.00 $ 289.00 0% $ - 2779 PATIO COVERS, ETC.° $ 54.00 $ 54.00 0% $ -

OTHER FEES
2708 CONDITIONAL USE PERMIT° (PER APPL ICATION) $ 9,261.00 $ 9,261.00 0% $ - 2707 MINOR CONDITIONAL USE PERMIT° (PER APPLICATION) $ 4,233.00 $ 4,233.00 0% $ - 2713 PARCEL MAP/WAIVER OF PARCEL MAP (PER APPLICATION) $ 8,734.00 $ 8,734.00 0% $ - New Application $ 5,898.00 $ 5,898.00 0% $ - Revised Application $ 3,952.00 $ 3,952.00 0% $ - 2713 PARCEL MAP REVISION $ 5,906.00 $ 5,906.00 0% $ - (1) Fees set by Western Riverside County Regional Conservation Authority

Page 18 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact
2304 CLOSE-OUT SALE REGULATION / PERMIT
License Fee (First 10 days) 24.50 $ 24.50 $ - - $ Each Additional Day 7.50 $ 7.50 $ - - $ Extension Fee (Extend License Term) 7.50 $ 7.50 $ - - $ Each Additional Day 7.50 $ 7.50 $ - - $ 2306 NON-SUFFICIENT FUNDS (NSF) PROCESSING FEE (CITYWIDE FEE) Initial Non-Sufficient Funds Fee 26.75 $ 146 30.00 $ 12% 475 $ Subsequent Non-Sufficient Funds Fee (Each) 37.50 $ 14 45.00 $ 20% 105 $ 2303 STREET VENDOR REGULATION / PERMIT
New Applicant / Business
1 Cart (Per Year) 37.00 $ 5 30.00 $ -19% (35) $ Each Additional Cart (Per Year) 9.50 $ 0 7.50 $ -21% - $ Renewal Applicant / Business
1 Cart (Per Year) 32.25 $ 17 28.75 $ -11% (60) $ Each Additional Cart (Per Year) 9.50 $ 0 7.50 $ -21% - $ 2302 TAXICAB FRANCHISE APPLICATION
Per Initial Application 543.00 $ 543.00 $ - - $ Per Renewal Application 543.00 $ 543.00 $ - - $ 2301 TRANSIT PERMIT
New Application 95.00 $ 24 83.00 $ -13% (288) $ Renewal (Valid for 3 Years) 81.50 $ 14 41.50 $ -49% (560) $

THE FOLLOWING FEES ARE INCLUDED IN BUSINESS TAX RATES SCHEDULE DUPLICATE BUSINESS TAX REGISTRATION NOTICE AND/OR 14.00 $ 200 12.75 $ -9% (250) $ CERTIFICATE (RMC 5.04.190)
REFUND PROCESSING CHARGE TO COVER ADMINISTRATIVE 31.00 $ 30 31.00 $ 0% - $ COSTS (RMC 5.04.230)
TAX-FREE CERTIFICATE PROCESSING FEE (RMC 5.04.090) 12.00 $ 600 25.00 $ 108% 7,800 $

FINANCE DEPARTMENT

FEE DESCRIPTION

Page 19 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ADMINISTRATIVE
3537 AMBULANCE FRANCHISE APPLICATION (PER APPLICATION) 1,997.25 $ 4,711.00 $ 136% - $ 3539 AMBULANCE PERMIT INSPECTION 100.00 $ 79.00 $ -21% - $ 3538 FIRE FACILITY RENTAL (8 HOURS PER RESERVATION)
Training Classrooms
Large 134.25$ 134.25 $ 0% - $
Small 64.50$ 64.50 $ 0% - $
Drill Ground Props
Auto Extrication 53.75 $ 53.75 $ 0% - $ Class A 107.50$ 107.50 $ 0% - $
Confined Space 161.25 $ 161.25 $ 0% - $ Drafting Pit 107.50 $ 107.50 $ 0% - $ Drill Tower 161.25 $ 161.25 $ 0% - $ Flashover 107.50$ 107.50 $ 0% - $
Forcible Entry 53.75 $ 53.75 $ 0% - $ Hazmat 161.25$ 161.25 $ 0% - $
LARRO 107.50$ 107.50 $ 0% - $
Rescue Systems 1 161.25 $ 161.25 $ 0% - $ Trench Rescue 161.25 $ 161.25 $ 0% - $ Vehicle Fire Area 107.50 $ 107.50 $ 0% - $ Vent Over Fire 107.50 $ 107.50 $ 0% - $ Ventilation - Roof 134.25 $ 134.25 $ 0% - $

ADMINISTRATIVE CITATION
3506 ADMINISTRATIVE CITATION (PER VIOLATION)
Warning No Charge No Charge 0% $ -
1st Citation $ 100.00 $ 100.00 0% - $ 2nd Citation $ 200.00 $ 200.00 0% - $ 3rd Citation $ 500.00 $ 500.00 0% - $ Subsequent Citations (Each) $ 500.00 $ 500.00 0% - $

FEE DESCRIPTION

RIVERSIDE FIRE DEPARTMENT

Page 20 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE FIRE DEPARTMENT
3506 ADMINISTRATIVE CITATION WITH SIGNIFICANT RISK (PER VIOLATION) 1st Citation $ 500.00 $ 500.00 0% - $ Subsequent Citations (Each) $ 500.00 $ 500.00 0% - $ 3506 ADMINISTRATIVE CIVIL PENALTY (PER VIOLATION, PER DAY) $ 1,075.00 $ 1,075.00 0% - $ (Maximum amount $100,000, plus interest on unpaid penalties) 3505 HAZARDOUS MATERIALS ADMINISTRATIVE CITATION (PER VIOLATION) Warning No Charge No Charge 0% $ -
1st Citation $ 100.00 $ 100.00 0% - $ 2nd Citation $ 200.00 $ 200.00 0% - $ 3rd Citation $ 500.00 $ 500.00 0% - $ Subsequent Citations (Each) $ 500.00 $ 500.00 0% - $ 3505 HAZARDOUS MATERIALS ADMINISTRATIVE CITATION WITH

SIGNIFICANT RISK (PER VIOLATION)
1st Citation $ 500.00 $ 500.00 0% - $ Subsequent Citations (Each) $ 500.00 $ 500.00 0% - $ 3509 ILLEGAL FIREWORK ADMINISTRATIVE CITATION (PER VIOLATION) 1st Citation $ 1,000.00 $ 1,000.00 0% - $ Subsequent Citations (Each) $ 1,000.00 $ 1,000.00 0% - $ Additional Response Cost (Per Incident) Actual Cost Actual Cost 0% $ - HEARING OFFICER Actual Cost Actual Cost 0% $ -

EMERGENCY RESPONSE COST RECOVERY
3526 ELECTRICAL HAZARD RESPONSE Actual Cost Actual Cost 0% $ - Full hourly and burden rate of responding RFD personnel

Page 21 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE FIRE DEPARTMENT
3532 HAZARDOUS MATERIAL RESPONSE Actual Cost Actual Cost 0% $ - Full hourly and burden rate of responding RFD personnel 3525 ILLEGAL BURN RESPONSE Actual Cost Actual Cost 0% $ - Full hourly and burden rate of responding RFD personnel 3522 MEDICAL AID RESPONSE Negotiated Contract Negotiated Contract 0% $ - 3107 DRIVING UNDER THE INFLUENCE (DUI) ACCIDENT RESPONSE COST Actual Cost Actual Cost 0% $ -

RECOVERY
Full hourly and burden rate of responding RFD personnel 3107 EMERGENCY RESPONSE FROM CRIMINAL OR NEGLIGENT ACTIVITIES Actual Cost Actual Cost 0% $ - Full hourly and burden rate of responding RFD personnel

INVESTIGATIONS
3505 HAZARDOUS MATERIALS INVESTIGATION Actual Cost Actual Cost 0% $ - Full hourly and burden rate of responding RFD personnel 3510 REQUESTED FIRE INVESTIGATION Actual Cost Actual Cost 0% $ - Full hourly and burden rate of responding RFD personnel

PLAN CHECK AND INSPECTION FEES
3518 ABOVE GROUND FUEL TANK INSTALLATION / REMOVAL
^
Single tank 507.00$ 2 537.00 $ 6% 60 $ Additional tank(s) (Each) 211.00 $ 157.00 $ -26% - $ 3519 UNDERGROUND FUEL TANK INSTALLATION / REMOVAL^
Single tank 1,182.00 $ 6 748.00 $ -37% (2,604) $ Additional tank(s) (Each) 380.00 $ 175.00 $ -54% - $

Page 22 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE FIRE DEPARTMENT
2601 AFTER HOURS PLAN CHECK (Per Hour; 1 Hour Minimum @ 2.5 x Rate ) 136.41$ 40 121.00$ -11% (616)$ 2601 AFTER HOURS INSPECTION (Per Hour; 1 Hour Minimum @ 2.5 x Rate ) 107.07$ 40 153.00$ 43% 1,837$ 3516 CALIFORNIA FIRE CODE (CFC) - WITHOUT INSPECTION 91.25$ 29 173.00$ 90% 2,371$ THIRD AND SUBSEQUENT PLAN REVIEW SUBMITTAL - Per Hour (NEW FY 2024/25) N/A 153.00$ 0% $ - FINAL AS-BUILT (REVISION) PLAN CHECK - Per Hour (NEW FY 2024/25) N/A 153.00$ 0% $ - 2601 THIRD AND SUBSEQUENT INSPECTIONS Actual Cost Actual Cost 0% $ - 3517 CALIFORNIA FIRE CODE INSPECTION (CFC) / PERMIT
Small - Issuance of permit with field inspection 363.25$ 112 506.00$ 39% 15,988$ Large - Issuance of permit with field inspection 635.25$ 10 813.00$ 28% 1,778$ Additional RFD stand-by time (if necessary) Actual Cost Actual Cost 0% $ - 3529 FIRE ALARM SYSTEM PLAN CHECK^
1 - 10 devices 473.00$ 46 380.00$ -20% (4,278)$ 11+ devices (Per 10 Devices) 244.00$ 126 262.00$ 7% 2,268$ 3533 REQUESTED FIRE INSPECTION SERVICE (PER INSPECTION) 211.00$ 50 210.00$ 0% (50)$ FIRE PROTECTION PLAN (FPP) REVIEW (NEW FY 2024/25) N/A 3 602.00$ 0% 1,806$ HAZARDOUS MATERIAL ANALYSIS REPORT (NEW FY 2024/25) N/A 5 740.00$ 0% 3,700$ HIGH PILE (NEW FY 2024/25)
0 to 20,000 square feet N/A 3 329.00$ 0% 987$ 20,000+ square feet N/A 29 668.00$ 0% 19,372$ DEFENSIBLE SPACE REVIEW / INSPECTION (NEW FY 2024/25) N/A 167.00$ 0% -$

Page 23 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE FIRE DEPARTMENT
PERFORMANCE BASED REVIEW (NEW FY 2024/25) N/A 3 637.00 $ 0% 1,911 $ ALTERNATIVE MEANS AND METHOD REVIEW (NEW FY 2024/25) N/A 30 661.00 $ 0% 19,830 $ ROCKET LAUNCH (NEW FY 2024/25) N/A 1 76.75 $ 0% 77 $ BURN PERMIT (NEW FY 2024/25) N/A 2 148.00 $ 0% 296 $ BLASTING PERMIT (NEW FY 2024/25) N/A 3 415.00 $ 0% 1,245 $ FIRE ALARM CONTROL PANEL / COMMUNICATOR (CHARGE OUT ONLY) N/A 40 236.00 $ 0% 9,440 $ (NEW FY 2024/25)
SPRINKLER SYSTEM PLAN CHECK^ / INSPECTION
3527 Fire Sprinkler System - New Installation; Residential and Commercial 1 - 199 Sprinklers 445.00 $ 158 655.00 $ 47% 33,180 $ 100 - 199 Sprinklers 826.50$ DELETE 0% - $
200+ Sprinklers (Per 100 Sprinklers) 381.50 $ 21 352.00 $ -8% (620) $ 3528 Fire Sprinkler System - Tenant Improvements; Residential and Commercial 1 - 199 Sprinklers 254.75 $ 61 368.00 $ 44% 6,908 $ 100 - 199 Sprinklers 508.25$ DELETE 0% - $
200+ Sprinklers (Per 100 Sprinklers) 381.50 $ 352.00 $ -8% - $ 5-Year Certification 190.25 $ 190.25 $ 0% - $ 3514 FIXED EXTINGUISHING SYSTEMS PLAN CHECK^
Hood Systems (Single System)
New $ 414.00 18 $ 419.00 1% 90 $
Tenant Improvements $ 355.00 $ 250.00 -30% - $ Clean Agent Systems (Single System)
New $ 499.00 $ 537.00 8% - $
Tenant Improvements $ 355.00 9 $ 368.00 4% 117 $

Page 24 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE FIRE DEPARTMENT
3530 FIRE PROTECTION UNDERGROUND SYSTEM PLAN CHECK^
Small (Per Plan) 499.00 $ 26 537.00 $ 8% 988 $ Large (Per Plan) 946.00 $ 11 1,009.00 $ 7% 693 $ 3506 FIRE SAFETY INSPECTIONS
Group A
A-1 Theaters, Concert Halls 204.25 $ 6 250.00 $ 22% 275 $ A-2 Banquet Halls, Bars 96.75 $ 120 199.00 $ 106% 12,270 $ A-3 Arcades, Churches, Bowling 96.75 $ 136 199.00 $ 106% 13,906 $ A-4 Indoor Sporting, Skating Rink 113.95 $ 1 301.00 $ 164% 187 $ A-5 Outdoor Amusement Park 324.00 $ 1 352.00 $ 9% 28 $ Group B
Multi-Story (Per Floor) 54.00 $ 51.25 $ -5% - $ Office Type: 0 - 299 Square Feet 58.05 $ 2,100 96.25 $ 66% 80,220 $ Office Type: 300 - 9,999 Square Feet 96.75 $ 14 199.00 $ 106% 1,432 $ Office Type: 10,000+ Square Feet 173.08 $ 5 301.00 $ 74% 640 $ Group E
1 - 100 Students 113.95 $ 133 148.00 $ 30% 4,529 $ 101 - 500 Students 204.25 $ 14 250.00 $ 22% 641 $ 500 - 1,500 Students 371.00 $ 12 403.00 $ 9% 384 $ 1,500+ Students 528.00 $ 4 557.00 $ 5% 116 $ Group F - Factory and Manufacturing 173.08 $ 168 301.00 $ 74% 21,491 $ Group H - Hazardous 204.25 $ 3 352.00 $ 72% 443 $ Group I - Institutional Jails 294.55 $ 5 455.00 $ 54% 802 $ Group M - Retail Sales
0 - 9,999 Square Feet 96.75 $ 433 250.00 $ 158% 66,357 $ 10,000+ Square Feet 173.08 $ 455.00 $ 163% - $ Group R - Apartments, Condominiums, Hotels, and Motels
3 - 4 Rooms 58.05 $ 10 96.25 $ 66% 382 $ 5 - 10 Rooms 77.40 $ 59 96.25 $ 24% 1,112 $ 11 - 20 Rooms 96.75 $ 18 148.00 $ 53% 923 $ 21 - 30 Rooms 134.38 $ 168 199.00 $ 48% 10,857 $ 31 - 50 Rooms 173.08 $ 1,250 250.00 $ 44% 96,156 $ 51 - 100 Rooms 250.48 $ 352.00 $ 41% - $ 100+ Rooms 326.80 $ 455.00 $ 39% - $

Page 25 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE FIRE DEPARTMENT
Group R-3 - Residential Licensed Facility
1 - 6 Persons No Charge 173.00 $ 0% $ - 7 - 30 Persons 204.25 $ 25 250.00 $ 22% 1,144 $ 31+ Persons 294.55 $ 352.00 $ 20% - $ Group S - Storage Facilities 173.08 $ 286 250.00 $ 44% 22,001 $ Group U - Garages and Miscellaneous Buildings
0 - 300 Square Feet 58.05 $ 50 96.25 $ 66% 1,910 $ 301 - 10,000 Square Feet 96.75 $ 50 148.00 $ 53% 2,563 $ 10,001+ Square Feet 134.38 $ 301.00 $ 124% - $ Fire Safety Certifications (FSC; Per Year) 45.15 $ 70.75 $ 57% - $ Fire and Life Safety Self-Certification Inspection (New FY 2024/25) N/A 64.00 $ 0% - $ 3509 FIREWORKS DISPLAY INSPECTION / PERMIT
Fee Category Determined by Riverside Fire Department
Small Display (0 - 4 Hours) 592.00 $ 4 569.00 $ -4% (92) $ Large Display (4 - 8 Hours) 1,064.00 $ 2 978.00 $ -8% (172) $ Extra Large Display (8+ Hours) 1,892.00 $ 2 1,797.00 $ -5% (190) $ Full hourly and burden rate of RFD personnel on stand-by if Actual Cost Actual Cost 0% $ - determined necessary by Chief of Fire

HAZARDOUS MATERIALS USAGE / PERMIT (BUSINESS EMERGENCY PLAN) 3502 Plan I 532.00$ 459 578.00 $ 9% 21,114 $ 3503 Plan II 610.00$ 269 668.00 $ 10% 15,602 $ 3504 Plan III 727.00$ 147 803.00 $ 10% 11,172 $ 3541 Plan IV 1,078.00$ 42 1,209.00 $ 12% 5,502 $ 3542 Plan IV 1,195.00$ 253 1,345.00 $ 13% 37,950 $ Above ground Petroleum Storage Act (APSA)
3543 Tier I 649.00$ 73 713.00 $ 10% 4,672 $ 3544 Tier II 805.00$ 20 893.00 $ 11% 1,760 $ 3545 Tier III 961.00$ 2 1,074.00 $ 12% 226 $

Page 26 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE FIRE DEPARTMENT
3536 NEW CONSTRUCTION PLAN CHECK, INSPECTION, AND RE-INSPECTION Apartments
500 Square Feet 254.78 $ 301.00 $ 18% - $ 5,000 Square Feet 414.00 $ 352.00 $ -15% - $ 10,000 Square Feet 650.00 $ 671.00 $ 3% - $ 100,000 Square Feet 1,359.00 $ 1,214.00 $ -11% - $ Commercial
500 Square Feet 190.28 $ 301.00 $ 58% - $ 5,000 Square Feet 381.63 $ 419.00 $ 10% - $ 10,000 Square Feet 627.00 $ 671.00 $ 7% - $ 100,000 Square Feet 1,301.00 $ 1,112.00 $ -15% - $ Commercial Tenant Improvements
500 Square Feet 190.28 $ 250.00 $ 31% - $ 5,000 Square Feet 355.00 $ 368.00 $ 4% - $ 10,000 Square Feet 601.00 $ 645.00 $ 7% - $ 100,000 Square Feet 1,301.00 $ 1,009.00 $ -22% - $ Hotels and Motels
500 Square Feet $ 190.28 301.00 $ 58% - $ 5,000 Square Feet $ 381.63 419.00 $ 10% - $ 10,000 Square Feet $ 624.00 671.00 $ 8% - $ 100,000 Square Feet $ 1,537.00 1,214.00 $ -21% - $ Hotel and Motel Tenant Improvements
500 Square Feet $ 190.28 $ 301.00 58% - $ 5,000 Square Feet $ 381.63 $ 419.00 10% - $ 10,000 Square Feet $ 624.00 $ 671.00 8% - $ 100,000 Square Feet $ 1,301.00 $ 1,009.00 -22% - $ Industrial
500 Square Feet $ 190.28 DELETE 0% - $
5,000 Square Feet $ 381.63 DELETE 0% - $
10,000 Square Feet $ 592.00 DELETE 0% - $
100,000 Square Feet $ 1,301.00 DELETE 0% - $
Low and Moderate Hazard Storage
500 Square Feet $ 317.13 $ 368.00 16% - $ 5,000 Square Feet $ 592.00 $ 537.00 -9% - $ 10,000 Square Feet $ 1,005.00 $ 824.00 -18% - $

Page 27 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE FIRE DEPARTMENT
100,000 Square Feet $ 1,596.00 $ 1,214.00 -24% - $ Parking Structures (New FY 2024/25)
500 Square Feet N/A $ 144.00 0% $ - 5,000 Square Feet N/A $ 211.00 0% $ - 10,000 Square Feet N/A $ 329.00 0% $ - 100,000+ Square Feet N/A $ 514.00 0% $ - Residential Remodels and Additions No Charge $ 228.00 0% $ - Single Family Dwellings and Duplexes No Charge $ 177.00 0% $ - Accessory Dwelling Unit (New FY 2024/25) N/A $ 144.00 0% $ - Shell Buildings For All Commercial Uses
500 Square Feet $ 254.78 $ 199.00 -22% - $ 5,000 Square Feet $ 508.48 $ 266.00 -48% - $ 10,000 Square Feet $ 762.18 $ 466.00 -39% - $ 100,000 Square Feet $ 1,335.15 $ 600.00 -55% - $ 3531

PETROLEUM TANK INSPECTION - ABOVE GROUND (APSA)
Inspection fee per site with tank capacity:

Less than 10,000 Gallons $ 113.95 DELETE 0% - $ 10,001 to 100,000 Gallons $ 181.68 DELETE 0% - $ 100,000+ Gallons $ 318.20 DELETE 0% - $
2702 PLANNING APPLICATION REVIEW - ALL APPLICATION TYPES (per applicatio $ 148.00 $ 134.00 -9% - $ Additional Fees for Environmental Review
Initial Environmental Study $ 381.50 $ 942.00 147% - $ Environmental Impact Report $ 636.25 $ 1,099.00 73% - $

OTHER FEES
3119 COPY FEES
First page 0.65$ 0.65 $ 0% - $ Additional page(s) (Each) 0.10 $ 0.10 $ 0% - $

Page 28 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE FIRE DEPARTMENT
3544 FALSE ALARM RESPONSE PENALTIES (WITHIN A 12 MONTH PERIOD) 1st Response No Charge No Charge 0% $ - 2nd Response No Charge No Charge 0% $ - 3rd Response $ 376.25 $ 376.25 0% - $ 4th Response $ 430.00 $ 430.00 0% - $ 5th Response $ 559.00 $ 559.00 0% - $ Subsequent Response (Each) $ 935.25 $ 935.25 0% - $ 3521 HAZARDOUS MATERIALS RECORDS SEARCH (PER HOUR) $ 181.50 $ 181.50 0% - $ 2906 INCIDENT REPORT COPY FEES $ 5.35 $ 39.25 634% - $ 3543 IN-HOUSE BEP SUBMITTAL SUPPORT $ 127.00 $ 90.25 -29% - $

Page 29 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact
5111 DAMAGED MATERIAL REPAIRS Actual Cost Actual Cost 0% $ - 5112 HISTORIC PHOTOGRAPH REQUEST Actual Cost Actual Cost 0% $ - If no negative exists, requesting party shall pay for the production of the negative; it shall become Library property
5103 INTER-LIBRARY BOOK RETRIEVAL (PER BOOK) $ 2.00 39 $ 2.00 0% $ - 5101 LIBRARY ROOM RENTAL

MAIN LIBRARY
Room Rental
Reservation Processing Fee (Non-Refundable) $ 25.00 16 $ 27.25 9% $ 36.00 PA System (flat rate) $ 50.00 7 $ 50.00 0% $ - Podium (flat rate) $ 50.00 2 $ 50.00 0% $ - Projector and Screen (flat rate) $ 50.00 7 $ 50.00 0% $ - TV and DVD (flat rate) $ 75.00 2 $ 75.00 0% $ - After Hours Staff Fee $ 40.00 37 $ 40.00 0% $ - Per Library employee; Minimum 2; $40 per hour per employee Alcohol Service (ABC License required) $ 125.00 $ 125.00 0% $ - Community Room and Covered Arcade
Deposit $ 500.00 $ 500.00 0% $ - Group 1 - Non Profit Organization within the City limits and $ 200.00 $ 200.00 0% $ - Riverside Public Schools (per hour)
Group 2 - City of Riverside residents, for-profit organizations $ 250.00 $ 250.00 0% $ - within the City, and non-profit organization outside of City limits (per hour)
Group 3 - Non-Resident and for-profit organizations $ 350.00 $ 350.00 0% $ - located outside City limits (per hour)
Main Community Room
Deposit $ 500.00 12 $ 500.00 0% $ - Group 1 - Non Profit Organization within the City limits and $ 105.00 5 $ 105.00 0% $ - Riverside Public Schools (per hour)

FEE DESCRIPTION

RIVERSIDE PUBLIC LIBRARY

Page 30 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE PUBLIC LIBRARY
Group 2 - City of Riverside residents, for-profit organizations $ 130.00 4 $ 130.00 0% $ - within the City, and non-profit organization outside of City limits (per hour) 2
Group 3 - Non-Resident and for-profit organizations $ 180.00 $ 180.00 0% $ - located outside City limits (per hour)
Main Covered Arcade
Deposit $ 500.00 1 $ 500.00 0% $ - Group 1 - Non Profit Organization within the City limits and $ 160.00 $ 160.00 0% $ - Riverside Public Schools (per hour)
Group 2 - City of Riverside residents, for-profit organizations $ 200.00 $ 200.00 0% $ - within the City, and non-profit organization outside of City limits (per hour)
Group 3 - Non-Resident and for-profit organizations $ 280.00 $ 280.00 0% $ - located outside City limits (per hour)
Multi-Purpose Room / Event Terrace
Deposit $ 500.00 $ 500.00 0% $ - Group 1 - Non Profit Organization within the City limits and $ 105.00 $ 105.00 0% $ - Riverside Public Schools (per hour)
Group 2 - City of Riverside residents, for-profit organizations $ 130.00 $ 130.00 0% $ - within the City, and non-profit organization outside of City limits (per hour)
Group 3 - Non-Resident and for-profit organizations $ 180.00 $ 180.00 0% $ - located outside City limits (per hour)
Archive Reading Room (Off-Hour Events Only)
Deposit $ 250.00 $ 250.00 0% $ - Group 1 - Non Profit Organization within the City limits and $ 30.00 $ 30.00 0% $ - Riverside Public Schools (per hour)
Group 2 - City of Riverside residents, for-profit organizations $ 40.00 $ 40.00 0% $ - within the City, and non-profit organization outside of City limits (per hour)

Page 31 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE PUBLIC LIBRARY
Group 3 - Non-Resident and for-profit organizations $ 55.00 $ 55.00 0% $ - located outside City limits (per hour)
5101 LIBRARY ROOM RENTAL
ALL OTHER BRANCHES: ARLINGTON, ARLANZA, LA SIERRA, ORANGE TERRACE, SPC JESUS S. DURAN EASTSIDE LIBRARY, AND
SSGT SALVADOR J. LARA CASA BLANCA LIBRARY
Reservation (Non-Refundable) $ 21.50 29 $ 24.75 15% $ 94.25 Cleaning Fee $ 21.50 32 $ 28.50 33% $ 224.00 Required if refreshments are served and/or use of craft materials Group 1 - Non Profit Organization within the City limits and No Charge No Charge 0% $ - Riverside Public Schools (per hour)
Group 2 - City of Riverside residents, for-profit organizations $ 107.50 5 $ 107.50 0% $ - within the City, and non-profit organization outside of City limits (per hour)
5113 OVERDUE COLLECTION FINE No Charge No Charge 0% $ - 5110 OVERDUE MATERIALS PROCESSING FINES (PER ITEM PER DAY) No Charge No Charge 0% $ - 2906 PRINTING / COPY SERVICES
Black and white $ 0.15 94,318 $ 0.15 0% $ - Color $ 0.20 8,546 $ 0.20 0% $ - Walk-Up (black and white or color) $ 0.20 61,281 $ 0.20 0% $ - 5105 REPLACEMENT OF LOST CARDS (PER CARD) No Charge 3,541 No Charge 0% $ - 5106 REPLACEMENT OF LOST LIBRARY ITEMS (PER ITEM)
City Processing $ 10.75 176 $ 10.75 0% $ - Collection fee (if required) $ 10.00 179 $ 10.25 3% $ 44.75 Item replacement Actual Cost Actual Cost 0% $ - 5102 RESERVATION OF LIBRARY MATERIALS No Charge No Charge 0% $ -

Page 32 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE PUBLIC LIBRARY
5104 RETRIEVAL OF PERIODICALS
Per periodical No Charge No Charge 0% $ - Per Microfilm/Microfiche No Charge No Charge 0% $ - 5114 3D PRINTING (PER GRAM/FILAMENT) $ 0.10 178 $ 0.10 0% $ -

Page 33 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact
5301 ADMISSION
Main Museum (Closed) N/A - N/A - - $
Heritage House (suggested donation of $5.00 per person) No Charge - No Charge - - $

FEE DESCRIPTION

MUSEUM OF RIVERSIDE

Page 34 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact
1202 CANDIDATE NOMINATION FILING
City Council 25.00$ 25.00 $ - - $ Mayor 25.00$ 25.00 $ - - $
1206 CANDIDATE STATEMENT FILING No Charge No Charge - - $ 1201 DOCUMENT CERTIFICATION (EACH) 9.50 $ 10.00 $ 5% - $ 1204 DOCUMENT DUPLICATION (PER COPY) 0.10 $ 0.11 $ 10% - $ 1204 ELECTRONIC DATA RECORDS REQUEST
Per CD 0.43$ 1.00 $ 133% - $ Per Flash Drive 0.48$ 3.00 $ 525% - $ 1207 PASSPORT APPLICATION EXECUTION FEE (PER APPLICATION) 35.00 $ 35.00 $ - - $ 1208 PASSPORT PHOTO (PER PERSON) 8.00 $ 6,000 6.00 $ -25% (12,000) $ 1205 POLITICAL REFORM ACT LATE FILING (PER DAY; MAXIMUM $100.00) 10.00 $ 10.00 $ - - $

OFFICE OF THE CITY CLERK

FEE DESCRIPTION

Page 35 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

RECREATION
5214 ADULT CONTRACT CLASSES (RMC 3.30.030) Actual Cost Actual Cost 0% $ - 5222 ADULT SPORTS PROGRAMS (RMC 3.30.030) Actual Cost Actual Cost 0% $ - Adult Basketball 300.00 $ 120 $ 349.00 16% $ 5,880.00 Fitness Center Daily Rate 3.00 $ 25 $ 3.00 0% $ - Pay and Play Basketball Daily Rate 3.00 $ 1,250 $ 3.00 0% $ - Pay and Play Volleyball Daily Rate 3.00 $ 200 $ 3.00 0% $ - Fitness Center 1 Month Membership 15.00 $ 100 $ 16.00 7% $ 100.00 5228 CHALLENGED CITIZEN ACTIVITIES (RMC 3.30.030) Actual Cost Actual Cost 0% $ - Friendly Stars 60.00$ 175 $ 80.00 33% $ 3,500.00 5225 CITYWIDE SPECIAL EVENTS (RMC 3.30.030) No Charge No Charge 0% $ - 5212 DAY CAMP AND OTHER YOUTH CLASS PROGRAMS (RMC 3.30.030) Actual Cost Actual Cost 0% $ - 1 Day Holiday Camp 15.00 $ 40 $ 29.00 93% $ 560.00 3 Day Holiday Camps 60.00 $ 100 $ 81.00 35% $ 2,100.00 4 Day Holiday Camps 80.00 $ 150 $ 85.00 6% $ 750.00 5 day Holiday Camps 100.00 $ 375 $ 102.00 2% $ 750.00 Summer Day Camp (5 day) 99.00 $ 600 $ 101.00 2% $ 1,200.00 Teen Venture Camp 80.00 $ 150 $ 89.00 11% $ 1,350.00 Splash Day Camp 118.00 $ 1,120 $ 120.00 2% $ 2,240.00 After School
First Child 50.00$ 750 $ 65.00 30% $ 11,250.00 Additional Siblin
g(s) (each) (New FY 2024/25) N/A $ 30.00 0% $ - Afterschool - Extended Care 10.00 $ 400 $ 12.00 20% $ 800.00 Afterschool Program - Late Pick-Up 5.00 $ $ 8.00 60% $ - Cheer Program 45.00 $ 420 $ 51.00 13% $ 2,520.00 Dance Program 45.00 $ 300 $ 51.00 13% $ 1,800.00 Youth & Adult Boxing Club 15.00 $ 815 $ 20.00 33% $ 4,075.00 Teen Dance No Charge $ 6.00 0% $ - RAP Dance 70.00$ 135 $ 80.00 14% $ 1,350.00

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT

Page 36 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
RAP Music 70.00$ 135 $ 81.00 16% $ 1,485.00 RAP ART 70.00$ 180 $ 82.00 17% $ 2,160.00 5227 SENIOR CITIZEN PROGRAMS (RMC 3.30.030) Actual Cost Actual Cost 0% $ - Senior Computer Class No Charge No Charge 0% $ - Senior ESL Class No Charge No Charge 0% $ - Senior Ballroom Social 3.00 $ 450 $ 9.00 200% $ 2,700.00 Senior Excursions 60.00 $ 500 $ 69.00 15% $ 4,500.00 Senior Art Program No Charge No Charge 0% $ - Senior Special Events - Major 10.00 $ 500 $ 26.00 160% $ 8,000.00 Senior Special Events -Minor 3.00 $ 650 $ 11.00 267% $ 5,200.00 5245 SENIOR NUTRITION PROGRAM (RMC 3.30.030)
Breakfast Club 2.00$ 720 $ 7.00 250% $ 3,600.00 Senior Holiday Luncheons 3.00 $ 1,440 $ 9.00 200% $ 8,640.00 5232 SWIMMING LESSONS (PER SESSION)
Lifeguard and Title 22 Training 65.00 $ 55 $ 78.00 20% $ 715.00 Water Safety Instructor Course 140.00 $ 10 $ 153.00 9% $ 130.00 First Aid, CPR, AED Course 30.00 $ 15 $ 46.00 53% $ 240.00 Junior Lifeguard 80.00 $ 35 $ 85.00 6% $ 175.00 Swim Lessons 50.00$ 1,500 $ 60.00 20% $ 15,000.00 5213 YOUTH CENTER SPECIAL EVENTS (RMC 3.30.030) Actual Cost Actual Cost 0% $ - 5210 YOUTH CONTRACT CLASSES (RMC 3.30.030) Actual Cost Actual Cost 0% $ - 5221 YOUTH SPORTS PROGRAMS (RMC 3.30.030) Actual Cost Actual Cost 0% $ - Sports for Tots 35.00$ 55 $ 60.00 71% $ 1,375.00 PeeWee Flag Football 55.00 $ 300 $ 63.00 15% $ 2,400.00 PeeWee Basketball 55.00 $ 450 $ 62.00 13% $ 3,150.00 PeeWee Soccer 55.00 $ 720 $ 63.00 15% $ 5,760.00 Youth Flag Football 60.00 $ 400 $ 70.00 17% $ 4,000.00 Youth Basketball 60.00 $ $ 73.00 22% $ - Teen Basketball 70.00 $ 80 $ 91.00 30% $ 1,680.00

Page 37 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
5230 YOUTH SUMMER FOOD PROGRAM (RMC 3.30.030) Actual Cost Actual Cost 0% $ -

RENTALS
5235 BOATHOUSE BOAT RENTALS
Residents - Pedal Boat Rentals
Per Hour (60 Minutes) 15.00 $ $ 31.00 107% $ - Per Half-Hour (30 Minutes) 8.50 $ $ 17.50 106% $ - Non-Residents - Pedal Boat Rentals
Per Hour (60 Minutes) 22.50 $ $ 46.50 107% $ - Per Half-Hour (30 Minutes) 11.75 $ $ 24.25 106% $ - Non-Motorized Boats Permit Fee - Valid from date of issuance 30 Days 7.50$ $ 10.00 33% $ - 3 Months 16.00$ $ 21.50 34% $ - 6 Months 38.50$ $ 51.75 34% $ - 1 Year 70.75$ $ 95.25 35% $ - Group Discount - Per Boat Per Hour; Riverside based groups 20% Discount 20% Discount 0% $ - of 10 or more people
5220 COMMUNITY CENTER RENTALS
Reservation Processing (All Tiers) 26.75 $ 26.75 $ 0% $ - Security Deposit (All Tiers) $250 - $500 $250 - $500 0% $ - Alcohol Service (All Tiers) 134.25 $ 134.25 $ 0% $ - Park Staffing Requirements - Full hourly and burden rate of 24.25 $ 24.25 $ 0% $ - PRCSD personnel
Recreation Personnel Actual Cost Actual Cost 0% $ - Optional Equipment Rental (Each)
Courtyard Umbrellas 43.00 $ 43.00 $ 0% $ - E-Z Up 43.00$ $ 43.00 0% $ - Portable Bar 53.75 $ $ 53.75 0% $ - Projector and Screen 134.25 $ $ 134.25 0% $ - Public Address System 53.75 $ $ 53.75 0% $ - Speaker Podium 53.75 $ $ 53.75 0% $ - Stage or Dance Floor 161.25 $ $ 161.25 0% $ -

Page 38 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
TV and DVD Player 80.50 $ $ 80.50 0% $ - Chairs 1.25$ $ 2.00 60% $ - 5236 TIER 1 FACILITIES - La Sierra Senior Center, Orange Terrace Park, Youth Innovation Center, and Hunter Park
Group 1 - Qualified Non-Profit Organizations
Large Rooms
Grand Ballroom (includes Kitchen) - Full 187.75 $ $ 207.00 10% $ - Grand Ballroom (includes Kitchen) - Half 123.50 $ $ 136.25 10% $ - Gym - Full 97.00$ $ 107.00 10% $ - Gym - Half 59.00 $ $ 65.00 10% $ - Kitchen (Commercial Catering) 102.25 $ $ 112.75 10% $ - Small Rooms
Arts & Crafts / Dance / Homework Rooms 43.25 $ $ 93.75 117% $ - Classroom / Meeting Room 38.00 $ $ 82.50 117% $ - Conference Room 59.00 $ $ 128.00 117% $ - Teen Lounge 53.50 $ $ 116.00 117% $ - Group 2 - Residents and Other Non-Profit Organizations
Large Rooms
Grand Ballroom (includes Kitchen) - Full 236.50 $ $ 260.75 10% $ - Grand Ballroom (includes Kitchen) - Half 156.25 $ $ 172.25 10% $ - Gym - Full 118.25 $ $ 130.25 10% $ - Gym - Half 69.50 $ $ 76.50 10% $ - Kitchen (Commercial Catering) 128.50 $ $ 141.75 10% $ - Small Rooms
Arts & Crafts / Dance / Homework Rooms 53.50 $ $ 116.00 117% $ - Classroom / Meeting Room 47.50 $ $ 103.00 117% $ - Conference Room 69.50 $ $ 150.75 117% $ - Teen Lounge 65.25 $ $ 141.50 117% $ - Group 3 - Non-Residents and Commercial Businesses
Large Rooms
Grand Ballroom (includes Kitchen) - Full 332.50 $ $ 366.50 10% $ -

Page 39 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
Grand Ballroom (includes Kitchen) - Half 219.50 $ $ 242.00 10% $ - Gym - Full 166.75 $ $ 183.75 10% $ - Gym - Half 102.25 $ $ 112.75 10% $ - Kitchen (Commercial Catering) 182.50 $ $ 201.25 10% $ - Small Rooms
Arts & Crafts / Dance / Homework Rooms 74.75 $ $ 162.00 117% $ - Classroom / Meeting Room 69.50 $ $ 150.75 117% $ - Conference Room 97.00 $ $ 210.25 117% $ - Teen Lounge 90.75 $ $ 196.75 117% $ - All Groups - Gazebo, Courtyard, and Rose Garden Rentals 118.25 $ $ 208.00 76% $ - 5236 TIER 2 FACILITIES - Dales Senior Center (White)*, Lakeside Room (Fairmount), Springbrook Clubhouse*, Stratton Center, Bordwell, and Ysmael Villegas Center
* Note: Dales Senior Center and Springbrook Clubhouse banquet rooms are charged at gym rates due to limited parking or reduced amenities Group 1 - Qualified Non-Profit Organizations
Large Rooms
Banquet Room (Includes Kitchen) 139.75 $ $ 172.00 23% $ - Gym - Full 91.25 $ $ 112.25 23% $ - Gym - Half 91.25 $ $ 112.25 23% $ - Kitchen (Commercial Catering) 96.75 $ $ 119.00 23% $ - Small Rooms
Arts & Crafts / Dance / Homework Rooms 43.00 $ $ 80.50 87% $ - Classroom / Meeting Room 37.50 $ $ 70.25 87% $ - Conference Room 53.75 $ $ 100.75 87% $ -

Page 40 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
Group 2 - Residents and Other Non-Profit Organizations
Large Rooms
Banquet Room (Includes Kitchen) 177.25 $ $ 218.00 23% $ - Gym - Full 112.75 $ $ 138.75 23% $ - Gym - Half 112.75 $ $ 138.75 23% $ - Kitchen (Commercial Catering) 123.50 $ $ 152.00 23% $ - Small Rooms
Arts & Crafts / Dance / Homework Rooms 48.25 $ $ 90.50 88% $ - Classroom / Meeting Room 48.25 $ $ 90.50 88% $ - Conference Room 64.50 $ $ 120.75 87% $ - Group 3 - Non-Residents and Commercial Businesses
Large Rooms
Banquet Room (Includes Kitchen) 247.25 $ $ 304.25 23% $ - Gym - Full 155.75 $ $ 191.50 23% $ - Gym - Half 155.75 $ $ 191.50 23% $ - Kitchen (Commercial Catering) 172.00 $ $ 211.50 23% $ - Small Rooms
Arts & Crafts / Dance / Homework Rooms 69.75 $ $ 130.75 87% $ - Classroom / Meeting Room 64.50 $ $ 120.75 87% $ - Conference Room 91.25 $ $ 171.00 87% $ - All Groups - Gazebo, Courtyard, and Rose Garden Rentals 118.25 $ $ 208.00 76% $ - 5236 TIER 3 FACILITIES - Bryang Park, Bonds Park, La Sierra park, and Youth Opportunity Center (Bonds)
Group 1 - Qualified Non-Profit Organizations
Large Rooms
Auditorium 96.75 $ $ 124.25 28% $ - Gym 86.00$ $ 110.50 28% $ - Large Multi-Purpose Room - Full 86.00 $ $ 110.50 28% $ - Large Multi-Purpose Room - Half 53.75 $ $ 69.00 28% $ -

Page 41 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
Small Rooms
Arts & Crafts / Dance / Homework Rooms 37.50 $ $ 54.75 46% $ - Group 2 - Residents and Other Non-Profit Organizations
Large Rooms
Auditorium 123.50 $ $ 158.75 29% $ - Gym 107.50$ $ 138.25 29% $ - Large Multi-Purpose Room - Full 107.50 $ $ 138.25 29% $ - Large Multi-Purpose Room - Half 64.50 $ $ 83.00 29% $ - Small Rooms
Arts & Crafts / Dance / Homework Rooms 48.25 $ $ 70.50 46% $ - Group 3 - Non-Residents and Commercial Businesses
Large Rooms
Auditorium 172.00 $ $ 221.00 28% $ - Gym 150.50$ $ 193.50 29% $ - Large Multi-Purpose Room - Full 150.50 $ $ 193.50 29% $ - Large Multi-Purpose Room - Half 91.25 $ $ 117.25 28% $ - Small Rooms
Arts & Crafts / Dance / Homework Rooms 69.75 $ $ 101.75 46% $ - All Groups - Gazebo, Courtyard, and Rose Garden Rentals 118.25 $ $ 208.00 76% $ - 5236 TIER 4 FACILITIES - Izaak walton (Fairmount), Joyce Jackson Center (Nichols), Ruth Lewis Center (Reid), Solander Center (Bryant), and Lincoln Park Group 1 - Qualified Non-Profit Organizations
Large Rooms
Gym 75.25$ $ 130.00 73% $ - Multi-Purpose Room 75.25 $ $ 130.00 73% $ - Small Rooms
Counseling Office / Exam Room 16.00 $ $ 23.75 48% $ - Multi-Purpose Room 48.25 $ $ 71.75 49% $ - Group 2 - Residents and Other Non-Profit Organizations

Page 42 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
Large Rooms
Gym 91.25$ $ 157.75 73% $ - Multi-Purpose Room 91.25 $ $ 157.75 73% $ - Small Rooms
Counseling Office / Exam Room 21.50 $ $ 32.00 49% $ - Multi-Purpose Room 53.75 $ $ 79.75 48% $ - Group 3 - Non-Residents and Commercial Businesses
Large Rooms
Gym 123.50$ $ 213.50 73% $ - Multi-Purpose Room 123.50 $ $ 213.50 73% $ - Small Rooms
Counseling Office / Exam Room 32.25 $ $ 48.00 49% $ - Multi-Purpose Room 75.25 $ $ 111.75 49% $ - All Groups - Gazebo, Courtyard, and Rose Garden Rentals 118.25 $ $ 208.00 76% $ - 5236 FAIRMOUNT GOLF COURSE
Weekdays
First Round (9 Holes)
Resident 15.00$ $ 16.00 7% $ - Non-Resident 16.00 $ $ 17.00 6% $ - Seniors (Ages 55 and over)
Residents 11.00 $ $ 12.00 9% $ - Non-Residents 13.00 $ $ 14.00 8% $ - Juniors (Ages 17 and under) 12.00 $ $ 13.00 8% $ - Twilight (Times vary throughout the year) 10.75 $ $ 11.75 9% $ - Tournament (By appointment only) 20.00 $ $ 21.00 5% $ - Second Round (18 Holes)
Resident 23.00$ $ 24.00 4% $ - Non-Resident 25.00 $ $ 26.00 4% $ - Seniors (Ages 55 and over)
Residents 15.00 $ $ 16.00 7% $ - Non-Residents 19.00 $ $ 20.00 5% $ - Juniors (Ages 17 and under) 17.00 $ $ 18.00 6% $ -

Page 43 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
Twilight (Times vary throughout the year) 16.00 $ $ 17.00 6% $ - Tournament (By appointment only) 30.00 $ $ 31.00 3% $ - Weekends and Holidays
First Round (9 Holes)
Resident 17.00$ $ 18.00 6% $ - Non-Resident 19.00 $ $ 20.00 5% $ - Seniors (Ages 55 and over)
Residents 17.00 $ $ 18.00 6% $ - Non-Residents 19.00 $ $ 20.00 5% $ - Juniors (Ages 17 and under)
Before 12:00 p.m. 15.00 $ $ 16.00 7% $ - After 12:00 p.m. 11.75 $ $ 12.75 9% $ - Twilight (Times vary throughout the year) 11.75 $ $ 12.75 9% $ - Tournament (By appointment only) 20.00 $ $ 21.00 5% $ - Second Round (18 Holes)
Resident 27.00$ $ 28.00 4% $ - Non-Resident 31.00 $ $ 32.00 3% $ - Seniors (Ages 55 and over)
Residents 27.00 $ $ 28.00 4% $ - Non-Residents 31.00 $ $ 32.00 3% $ - Juniors (Ages 17 and under)
Before 12:00 p.m. 23.00 $ $ 24.00 4% $ - After 12:00 p.m. 18.00 $ $ 19.00 6% $ - Twilight (Times vary throughout the year) 18.00 $ $ 18.00 0% $ - Tournament (By appointment only) 33.00 $ $ 33.00 0% $ - Cart Rental 10.00$ $ 10.00 0% $ - Pull Carts (Per Day) 5.00 $ $ 5.00 0% $ - Club Rentals 10.00$ $ 10.00 0% $ - Range Cards
10 Buckets 65.00$ $ 65.00 0% $ - 20 Buckets 120.00$ $ 120.00 0% $ -

Page 44 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
Range Buckets
Small 5.00$ $ 5.00 0% $ - Large 8.00$ $ 8.00 0% $ - Foot Golf
Resident 11.75$ $ 11.75 0% $ - Non-Resident 12.75$ $ 12.75 0% $ - Junior 8.50$ $ 8.50 0% $ - Rental Ball 5.25$ $ 5.25 0% $ - Cart Rental 6.25$ $ 6.25 0% $ - Martha McLean Disc Golf Tournament
Deposit 250.00$ $ 250.00 0% $ - Processing Fee 26.50 $ $ 26.50 0% $ - 1 - 36 Participants; 2 hours 64.50 $ $ 64.50 0% $ - 37 - 72 Participants; 3 hours 193.50 $ $ 193.50 0% $ - 73 - 81 Participants; 4 hours 258.00 $ $ 258.00 0% $ - Additional 1 hour for all groups 32.25 $ $ 32.25 0% $ - 5260 MOBILE STAGE RENTAL
Application Processing 26.75 $ $ 35.00 31% $ - Security Deposit 1,000.00 $ $ 1,000.00 0% $ - Delivery and Set-Up 645.00 $ $ 845.25 31% $ - Park Staffing Requirements 19.25 $ $ 25.25 31% $ - Full hourly and burden rate of PRCSD personnel
Recreation Personnel Actual Cost Actual Cost 0% $ - Group 1 - Qualified Non Profit Organizations
Base Fee (8 Hours) 924.50 $ $ 1,211.50 31% $ - Additional Hours (Per Hour) 107.50 $ $ 140.75 31% $ - Group 2 - Residents and Other Non-Profit Organizations
Base Fee (8 Hours) 1,156.00 $ $ 1,514.75 31% $ - Additional Hours (Per Hour) 129.00 $ $ 169.00 31% $ - Group 3 - Non-Residents and Commercial Businesses
Base Fee (8 Hours) 1,618.00 $ $ 2,120.25 31% $ - Additional Hours (Per Hour) 150.50 $ $ 197.25 31% $ - 5217 PICNIC FACILITY RENTALS

Page 45 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
Reservation Processing 26.75 $ $ 35.00 31% $ - Security Deposit 50.00 $ $ 50.00 0% $ - Will be refunded less amount retained by City for damages Moon Bounce Site Permit (All Groups) 21.50 $ $ 21.50 0% $ - Processing Refund Request of Rental Fees
Recreation Personnel Actual Cost Actual Cost 0% $ - Standard Picnic Shelter - Less than 8 tables
Group 1 - Qualified Non-Profits 69.75 $ $ 140.00 101% $ - Group 2 - Residents and Other Non-Profits 91.25 $ $ 183.25 101% $ - Group 3 - Non-Residents and Commercial Businesses 123.50 $ $ 248.00 101% $ - Large Picnic Shelter - More than 8 tables
Group 1 - Qualified Non-Profits 107.50 $ $ 215.75 101% $ - Group 2 - Residents and Other Non-Profits 129.00 $ $ 259.00 101% $ - Group 3 - Non-Residents and Commercial Businesses 170.00 $ $ 341.25 101% $ - 5233 POOL RENTALS - Priority given to residents
Security Deposit 250.00 $ $ 250.00 0% $ - 2 Hours of Use
1 - 124 People 387.00 $ $ 597.25 54% $ - 125 - 150 People 516.00 $ $ 796.50 54% $ - 151 - 240 People 645.00 $ $ 995.50 54% $ - Additional Hours (Each)
1 - 124 People 193.50 $ $ 298.75 54% $ - 125 - 150 People 258.00 $ $ 398.25 54% $ - 151 - 240 People 323.00 $ $ 498.50 54% $ - Additional lifeguard(s) per hour/varies based of fully burdened rate 31.75$ $ 49.00 54% $ - Alvord Unified School District 20% Discount 20% Discount 0% $ - Non-Profit Organizations Based in the City of Riverside 20% Discount 20% Discount 0% $ - Riverside Unified School District 20% Discount 20% Discount 0% $ - 5256 ADULT GROUP FIELD LIGHTING
Qualified Resident Groups
Unlit Field 21.50$ $ 21.75 1% $ - Lit Field 21.50$ $ 21.75 1% $ - Other Adult Groups

Page 46 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
Unlit Field 32.25$ $ 32.75 2% $ - Lit Field 32.25$ $ 32.75 2% $ - Penalty For Unauthorized Lighting Use (All Groups) 53.75 $ $ 54.50 1% $ - Plus Per Hour Per Field 29.00 $ $ 29.50 2% $ - 5255 YOUTH GROUP FIELD LIGHTING
Qualified Youth Groups
Unlit Field Rate 3.00 $ $ 4.00 33% $ - Lit Field Rate 9.00 $ $ 12.00 33% $ - Game / Competitive Use (Per hour, per field, and prorated in 21.50 $ $ 29.00 35% $ - 30 minute increments)
Penalty For Unauthorized Lighting Use (All Groups) 53.75 $ $ 72.25 34% $ - Plus Per Hour Per Field 29.00 $ $ 39.00 34% $ - 5253 PRIVATE YOUTH GROUP FIELD USAGE
Security Deposit (if rental fee is more than $50.00) 268.75 $ $ 268.75 0% $ - Other Youth Groups
Unlit Field Rate 7.50 $ $ 7.75 3% $ - Lit Field Rate 20.25 $ $ 20.75 2% $ - Game / Competitive Use (Per Hour Per Field) 21.50 $ $ 29.00 35% $ - Penalty For Unauthorized Lighting Use (All Groups) 53.75 $ $ 55.00 2% $ - Plus Per Hour Per Field 29.00 $ $ 29.75 3% $ - 5237 USE OF OTHER DEPARTMENT FACILITIES
Application Processing (All Groups) 26.75 $ $ 38.75 45% $ - Security Deposit (Refundable)
If rental is less than $50.00 25.00 $ $ 36.25 45% $ - If rental is more than $50.00 250.00 $ $ 361.25 45% $ - Alcohol Service (All Groups) 134.25 $ $ 194.00 45% $ - Bobby Bonds Park Artificial Turf Field Complex (per hour; no lights) No Lights (Per Hour) 55.75 $ $ 80.50 44% $ - With Lights (Per Hour) 77.25 $ $ 111.75 45% $ - Court Rentals (All Groups)
Security Deposit (Refundable) 50.00 $ $ 50.00 0% $ - Tennis Court (Per Hour) 10.75 $ $ 15.50 44% $ -

Page 47 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
Basketball Half-Court (Per Hour) 5.25 $ $ 7.50 43% $ - Pickle Ball Court 10.75 $ $ 15.50 44% $ - Sand Volleyball Court 10.75 $ $ 15.50 44% $ - Film Studio (New FY 2024/25) N/A 10 $ 117.00 0% $ 1,170.00 Sound Studio (New FY 2024/25) N/A 8 $ 117.00 0% $ 936.00 SmartHub (New FY 2024/25) N/A 20 $ 144.00 0% $ 2,880.00 Mult-Media Package Use of Studios (New FY 2024/25) N/A 35 $ 860.00 0% $ 30,100.00 Makerspace (New FY 2024/25) N/A 20 $ 150.00 0% $ 3,000.00 Amphitheatre/Patio (New FY 2024/25) N/A 30 $ 139.00 0% $ 4,170.00 5237 OPEN SPACE EVENT FACILTIES - Sites and availability to be determined by Director of Parks, Recreation, and Community Services
Security Deposit
If rental fee is less than $800 and participation estimated at:
1 - 100 people $ 250.00 $ 275.50 10% $ - 101 - 500 people $ 500.00 $ 551.25 10% $ - 501+ people $ 750.00 $ 826.75 10% $ - If rental fee is between $800 to $1,300 and participation is estimated at:
1 - 100 people $ 500.00 $ 551.25 10% $ - 101 - 500 people $ 750.00 $ 826.75 10% $ - 501+ people $ 1,000.00 $ 1,102.25 10% $ - If rental fee is more than $1,300 and participation is estimated at:
1 - 100 people $ 750.00 $ 826.75 10% $ - 101 - 500 people $ 1,000.00 $ 1,102.25 10% $ - 501+ people $ 1,250.00 $ 1,378.00 10% $ - Group 1 - Qualified Non-Profit Organizations
Base Fee (8 Hours) $ 860.00 $ 948.00 10% $ - Additional hours (Per Hour) $ 37.50 $ 41.25 10% $ - Group 2 - Residents and Other Non-Profit Organizations
Base Fee (8 Hours) $ 1,021.00 $ 1,125.50 10% $ - Additional hours (Per Hour) $ 48.25 $ 53.25 10% $ - Group 3 - Non-Residents and Commercial Businesses
Base Fee (8 Hours) $ 1,398.00 $ 1,541.00 10% $ - Additional hours (Per Hour) $ 64.50 $ 71.00 10% $ - Non-Compliance Charge (All Groups) $ 53.75 $ 59.25 10% $ -

Page 48 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
Fenced Parks - White Park, Arlington Heights Sports Park, and North Park Group 1 - Qualified Non-Profit Organizations
Base Fee (8 Hours) 1,075.00 $ $ 1,129.75 5% $ - Additional hours (Per Hour) 37.50 $ $ 39.50 5% $ - Group 2 - Residents and Other Non-Profit Organizations
Base Fee (8 Hours) 1,204.00 $ $ 1,265.50 5% $ - Additional hours (Per Hour) 48.25 $ $ 50.75 5% $ - Group 3 - Non-Residents and Commercial Businesses
Base Fee (8 Hours) 1,747.00 $ $ 1,836.25 5% $ - Additional hours (Per Hour) 64.50 $ $ 67.75 5% $ - Non-Compliance Charge (All Groups) $ 53.75 $ 55.00 2% $ -

MEMBERSHIP FEES
Bourns Family Youth Innovation Center
Residents
Adult (Ages 19-59) 26.75 $ $ 29.00 8% $ - Senior (Age 60+) 16.00 $ $ 17.25 8% $ - Youth (Ages 11-18) 16.00 $ $ 17.25 8% $ - Family Plan (2 Adults and 2 Youth) 73.00 $ $ 79.25 9% $ - Family Plan Additional Youth (Under Age 18) 13.50 $ $ 14.75 9% $ - Child (Under Age 10) No Charge No Charge 0% $ - Non-Residents
Adult (Ages 19-59) 40.00 $ $ 43.50 9% $ - Senior (Age 60+) 24.00 $ $ 26.00 8% $ - Youth (Ages 11-18) 24.00 $ $ 26.00 8% $ - Family Plan (2 Adults and 2 Youth) 109.50 $ $ 119.00 9% $ - Family Plan Additional Youth (Under Age 18) 20.00 $ $ 21.75 9% $ - Child (Under Age 10) No Charge No Charge 0% $ -

Page 49 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PARKS, RECREATION, AND COMMUNITY SERVICES DEPARTMENT
Classes
Experiment Tuesday's (New FY 2024/25) 25.00 $ $ 65.00 160% $ - Intro to Tinkercad (New FY 2024/25) 45.00 $ $ 83.00 84% $ - Chemistry for Kids (New FY 2024/25) 40.00 $ $ 77.00 93% $ - Space Club (New FY 2024/25) 40.00 $ $ 75.00 88% $ - STEAM Club (New FY 2024/25) 40.00 $ $ 75.00 88% $ - Homeschool Adventures (New FY 2024/25) 65.00 $ $ 102.00 57% $ - Intro to Sewing (New FY 2024/25) 40.00 $ $ 75.00 88% $ - Robotics for Kids (New FY 2024/25) 40.00 $ $ 75.00 88% $ - Beginning to Music Production (New FY 2024/25) 40.00 $ $ 75.00 88% $ - Intro to Open Broadcast (New FY 2024/25) 45.00 $ $ 75.00 67% $ - Web Design (New FY 2024/25) 25.00 $ $ 75.00 200% $ - OTHER

RIVERSIDE CONNECT FEE
General One Way Fare 3.00 $ $ 3.50 17% $ - Medical One Way Fare 2.00 $ $ 2.50 25% $ - Monthly Subscription Service 140.00 $ $ 166.50 19% $ -

Page 50 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PERMITS
3128 BINGO PERMITS
New Application 48.00 $ 100.00 $ 108% - $ Renewal 48.00$ 69.25 $ 44% - $
50% of fee will be refunded if application is denied
3113 CONCEALED WEAPON BACKGROUND INVESTIGATION / PERMIT (California Penal Code 26150-26225)
Initial application 100.00 $ 16 100.00 $ 0% - $ Renewal 25.00$ 19 25.00 $ 0% - $ Amended License 10.00 $ 10.00 $ 0% - $ Psychological Testing (maximum $150.00) Actual Cost 2 Actual Cost 0% - $ 3126 REGULATORY LICENSE / SPECIAL PERMITS
Adult Oriented Businesses
New application 919.00 $ 561.00 $ -39% - $ Renewal 584.00$ 561.00 $ -4% - $
Fortune Telling / Occult Arts
New application 500.00 $ 561.00 $ 12% - $ Renewal 250.00$ 5 449.00 $ 80% 995 $ License to Sell Weapons
New application 583.00 $ 6 561.00 $ -4% (132) $ Renewal 108.00$ 19 561.00 $ 419% 8,607 $ Entertainment Permit
New application 1,224.50 $ 561.00 $ -54% - $ Renewal 649.00$ 561.00 $ -14% - $
Live Performance
New application 294.00 $ 561.00 $ 91% - $ Renewal 294.00$ 449.00 $ 53% - $
Massage Establishments
New application 919.00 $ 8 561.00 $ -39% (2,864) $ Renewal 584.00$ 29 561.00 $ -4% (667) $

FEE DESCRIPTION

RIVERSIDE POLICE DEPARTMENT

Page 51 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE POLICE DEPARTMENT
Massage Therapists
New application 217.00$ DELETE 0% - $
Renewal 118.00$ DELETE 0% - $
Poolroom
New application 877.00 $ 561.00 $ -36% - $ Renewal 580.00$ 2 561.00 $ -3% (38) $ Second Hand Dealer
New application 871.00 $ 3 561.00 $ -36% (930) $ Renewal 759.00$ 9 561.00 $ -26% (1,782) $ Taxicab or Ambulance Operators
New application 288.00 $ 5 561.00 $ 95% 1,365 $ Renewal 289.00$ 1 561.00 $ 94% 272 $ Tobacco Retail Establishment Permit
New application 211.00 $ 73 561.00 $ 166% 25,550 $ Renewal 211.00$ 560.00 $ 165% - $
3111 SECURITY ALARM REGULATION / PERMIT (PER YEAR) 16.00 $ 34 91.25 $ 470% 2,559 $ (RMC 5.58.070, 5.58.210)

ENFORCEMENT AND SERVICES
3108 BACKGROUND INVESTIGATIONS (PER INVESTIGATION 25.00 $ 355 25.00 $ 0% - $ 3121 CALIFORNIA VEHICLE CODE ENFORCEMENT
Fines as stated in California Vehicle Code except:

Base Fine
Expired registration 116.00 $ 116.00 $ 0% - $ License plate missing 66.00 $ 66.00 $ 0% - $ License plate month/year tabs 76.00 $ 76.00 $ 0% - $ Above fines reduced with proof of correction 20.00 $ 20.00 $ 0% - $ Delinquent Fine
Expired registration 25.00 $ 25.00 $ 0% - $ License plate missing 25.00 $ 25.00 $ 0% - $ License plate month/year tabs 50.00 $ 50.00 $ 0% - $

Page 52 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE POLICE DEPARTMENT
3107 DRIVING UNDER THE INFLUENCE (DUI) ACCIDENT RESPONSE Actual Cost Actual Cost 0% - $ INVESTIGATION / REPORTING - Limited to $12,000 per accident 3104 FALSE ALARM RESPONSE PENALTIES
Permitted
1st Response No Charge 13,171 No Charge 0% - $
2nd Response No Charge No Charge 0% - $
3rd Response 100.00 $ 100.00 $ 0% - $ 4th Response 150.00 $ 150.00 $ 0% - $ 5th Response 200.00 $ 200.00 $ 0% - $ 6th Response 250.00 $ 250.00 $ 0% - $ Non-Permitted
1st Response No Charge No Charge 0% - $
2nd Response 350.00 $ 350.00 $ 0% - $ 3rd Response 400.00 $ 400.00 $ 0% - $ 4th Response 450.00 $ 450.00 $ 0% - $ 5th Response 500.00 $ 500.00 $ 0% - $ 6th Response 500.00 $ 500.00 $ 0% - $ 3109 FINGERPRINT PROCESSING (PER REQUEST) 15.00 $ 9 31.00 $ 107% 144 $ INCIDENT RESPONSE INVESTIGATION / REPORTING Actual Cost Actual Cost 0% - $ (Hazardous materials, explosions, other)
3120 PARKING ENFORCEMENT FINES
Base fine per violation of RMC titles 9, 10, and 16, except: 41.00 $ 41.00 $ 0% - $ Certain commercial vehicle and trailer parking 116.00 $ 116.00 $ 0% - $ Commercial & recreational vehicle parking 71.00 $ 71.00 $ 0% - $ Commercial vehicle, disabled 71.00 $ 71.00 $ 0% - $ Dwelling / residing in vehicle 116.00 $ 116.00 $ 0% - $ Fire hydrant, prohibited parking, fire lane 46.00 $ 46.00 $ 0% - $ Handicapped parking 341.00 $ 341.00 $ 0% - $ Leaving child or animal in vehicle 121.00 $ 121.00 $ 0% - $ One / two hour parking limits 37.00 $ 37.00 $ 0% - $ Resident - GVW 10,000 lbs.; unpaved lot and City Parks 116.00 $ 116.00 $ 0% - $

Page 53 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE POLICE DEPARTMENT
Vehicles for-sale parked on streets or public land 116.00 $ 116.00 $ 0% - $ Delinquent fine, in addition to base fine above, if citation is 55.00 $ 55.00 $ 0% - $ not resolved per CVC section 40207; statutory time limits for RMC titles 9, 10, and 16, except:

Certain commercial vehicle & trailer parking 100.00 $ 100.00 $ 0% - $ Commercial & recreational vehicle parking 80.00 $ 80.00 $ 0% - $ Commercial vehicle, disabled 105.00 $ 105.00 $ 0% - $ Dwelling / residing in vehicle 200.00 $ 200.00 $ 0% - $ Fire hydrant, prohibited parking, fire lane 55.00 $ 55.00 $ 0% - $ Handicapped parking 25.00 $ 25.00 $ 0% - $ Leaving child or animal in vehicle 23.00 $ 23.00 $ 0% - $ One / two hour parking limits 45.00 $ 45.00 $ 0% - $ Resident - GVW 10,000 lbs.; unpaved lot and City Parks 100.00 $ 100.00 $ 0% - $ Vehicles for-sale parked on streets or public land 100.00 $ 100.00 $ 0% - $ 3119 POLICE REPORT COPYING
Traffic Incident Reports 12.90 $ 2,738 20.00 $ 55% 19,440 $ Non-Traffic Incident Reports
First page 0.65$ 840 0.67 $ 3% 17 $ Subsequent page(s) (each) 0.10 $ 0.33 $ 230% - $ 3103 POLICE SECURITY SERVICE - REQUESTED BY SPECIAL EVENT (PER HOUR) Actual Cost Actual Cost 0% - $

ACTUAL COST PLUS
Non-Public Entities 40% of Actual Cost 40% of Actual Cost 0% - $ Public Agencies 20% of Actual Cost 20% of Actual Cost 0% - $ Special events when security is deemed necessary Actual Cost Actual Cost 0% - $ by Chief of Police
3129 POLICE TAPE DUPLICATION
Public Record Recordings
Duplication of 911 audio recording (per call) 8.49 $ 150 36.00 $ 324% 4,127 $ Investigative Recordings
Officer belt recorder audio (per tape) 28.00 $ 100 17.75 $ -37% (1,025) $ Patrol unit video per ten (10) minute recording 50.00 $ 200 49.25 $ -2% (150) $

Page 54 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

RIVERSIDE POLICE DEPARTMENT
3132 REPOSSESSED VEHICLE PROCESSING 15.00 $ 1,041 15.00 $ 0% - $ 3117 REPRODUCTION OF CRIME SCENE PHOTOS
Public Records Act Request
Photo negative first print 6.99 $ 10 6.99 $ 0% - $ Additional photo negative print (each) 0.48 $ 0.48 $ 0% - $ Digital photo print 4.46 $ 22.50 $ 404% - $ Additional digital print (each) 0.11 $ 3.00 $ 2627% - $ CD with images from film negatives 34.13 $ 5 79.00 $ 131% 224 $ CD with images from digital source 13.38 $ 50 5.75 $ -57% (382) $ Subpoena Request
Photo negative first print 8.39 $ 10 51.00 $ 508% 426 $ Additional photo negative print (each) 0.38 $ 8.25 $ 2071% - $ Digital photo print 5.81 $ 17.75 $ 206% - $ Additional digital print (each) 0.13 $ 3.00 $ 2208% - $ CD with images from film negatives 29.35 $ 43.75 $ 49% - $ CD with images from digital source 14.67 $ 340 17.75 $ 21% 1,047 $ 3115 SPECIAL COMPUTER PRINT-OUT SERVICE (PER REQUEST) Actual Cost Actual Cost 0% - $ Computer search of calls and similar services
3134 TOWING REFERRAL SERVICES
Per Vehicle 70.00$ 4,262 70.00 $ 0% - $ Low Value Vehicle No Charge 530 69.75 $ 0% 36,968 $ Result of Prior Request by Vehicle Owner/Driver No Charge 1,460 69.75 $ 0% 101,835 $ Official RPD Towing Company Contracted by AAA to No Charge No Charge 0% - $ Provide Service
3110 VEHICLE CITATION CORRECTION INSPECTION (PER INSPECTION) 16.13 $ 363 16.25 $ 1% 44 $ 3130 VEHICLE RELEASE
Safe Streets Act Tows (per vehicle) 372.00 $ 194 372.00 $ 0% - $ Vehicle release for all other tows 20.00 $ 2,394 119.50 $ 498% 238,203 $

Page 55 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact
2910 ADOPTION FEE (PER ANIMAL)
Adoption Fee
Dogs $ 105.00 $ 105.00 0% $ - Cats $ 65.00 $ 65.00 0% $ - Last Chance Adoption Fee
Dogs $ 10.00 $ 10.00 0% $ - Cats $ 5.00 $ 5.00 0% $ - Adoption at Events
Dogs $ 30.00 $ 30.00 0% $ - Cats $ 20.00 $ 20.00 0% $ - Adoption by Senior or Disabled Persons
Dogs 50% Discount 50% Discount 0% $ - Cats 50% Discount 50% Discount 0% $ - 2910 ENFORCEMENT
$ 22.50 $ 22.50 0% $ - Administrative Fee (per animal)
Clearing Violation of RMC 6.08.280 within 10 days $ 64.50 $ 64.50 0% $ - Clearing home quarantine violation within 10 days $ 53.75 $ 53.75 0% $ - Hearing Appeal Processing Fee - potentially dangerous animals $ 21.50 $ 21.50 0% $ - (RMC 6.16)
Recoupment of Enforcement Costs (per hour) $ 57.00 Actual Cost 0% $ - 2910 EUTHANASIA AND DISPOSAL (PER ANIMAL) $ 25.00 $ 25.00 0% $ - Dog, Cat, and Small Animals; Service provided by the
County of Riverside at the owner's request
2910 FINES
Imposed by the State of California or County of Riverside Failure to produce animal for immediate seizure $100.00 - $1,000.00 $100.00 - $1,000.00 0% $ - after demand

FEE DESCRIPTION
Administrative Fee for Citation (each)

ANIMAL AND PET LICENSING

PUBLIC WORKS

Page 56 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

ANIMAL AND PET LICENSING

PUBLIC WORKS
Unaltered Fine - State mandated (F&A §30804.7 and 31751.7) 1st Impound (per animal) $ 35.00 $ 35.00 0% $ - 2nd Impound (per animal) $ 50.00 $ 50.00 0% $ - 3rd Impound (per animal) $ 100.00 $ 100.00 0% $ - Violation of home quarantine, failure to produce animal $100.00 - $1,000.00 $100.00 - $1,000.00 0% $ - for quarantine or interfering with rabies investigation; fee is charged per day and may also include up to
1 year of imprisonment
2910 IMPOUNDS
Dogs and Cats
1st offense within 1 year $ 50.00 $ 50.00 0% $ - 2nd offense within 1 year $ 100.00 $ 100.00 0% $ - 3rd offense within 1 year $ 150.00 $ 150.00 0% $ - After-Hours Fee (per animal) $ 90.00 $ 90.00 0% $ - Animal returned to owner by Field Officer (not taken to shelter) $ 40.00 $ 40.00 0% $ - Boarding Fee per animal (per day or any part thereof) $ 15.00 $ 15.00 0% $ - Large Animals - horse, cow, etc. (per animal) $ 75.00 $ 75.00 0% $ - Maintenance of fowl per day (per animal per day) $ 5.00 $ 5.00 0% $ - Maintenance of horses and cattle per day (per animal per day) $ 20.00 $ 20.00 0% $ - Maintenance of pones per day (per animal per day) $ 20.00 $ 20.00 0% $ - Maintenance of swine, goats, and sheep per day (per animal $ 12.00 $ 12.00 0% $ - per day)
Medium Animals - pig, sheep, etc. (per animal) $ 60.00 $ 60.00 0% $ - Senior Citizen discount for altered dog / cat 50% Discount 50% Discount 0% $ - Small Animals (per animal) $ 5.00 $ 5.00 0% $ - 2910 KENNELS (PER YEAR)
Commercial Kennel / Cattery License $ 532.00 $ 541.00 2% $ - Residential Kennel / Cattery License $ 107.50 $ 121.00 13% $ - License Late Fee (New FY 2024/25) N/A $ 50.00 0% $ -

Page 57 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

ANIMAL AND PET LICENSING

PUBLIC WORKS
2910 LICENSES
Altered Dog License
1 year $ 17.00 10,139 $ 26.75 57% $ 98,855 2 years $ 26.75 2,260 $ 38.00 42% $ 25,425 3 years $ 37.50 4,500 $ 46.00 23% $ 38,250 Unaltered Dog License
1 year $ 100.00 2,274 $ 125.00 25% $ 56,850 2 years $ 200.00 139 $ 200.00 0% $ - 3 years $ 300.00 97 $ 300.00 0% $ - Senior Citizen (age 60+) Altered Dog License
1 year $ 10.75 2,711 $ 16.00 49% $ 14,233 2 years $ 16.00 700 $ 19.00 19% $ 2,100 3 years $ 21.50 2,300 $ 23.00 7% $ 3,450 Senior Citizen Late Fee $ 16.00 $ 15.00 -6% $ - Cat License $ 3.00 30 $ 3.00 0% $ - Dangerous or Vicious Animal License (1 Year) $ 134.00 $ 184.00 37% $ - Potbelly Pigs $ 8.00 9 $ 26.75 234% $ 169 Replacement Tag for Dog License $ 6.25 $ 8.75 40% $ - Transfer of Ownership Fee $ 6.25 $ 6.75 8% $ - Late Fee $ 25.00 $ 25.00 0% $ - 2910 MICROCHIP FEE (PER ANIMAL)
Implant at time of adoption $ 12.00 $ 12.00 0% $ - Implant at any other time other than adoption $ 21.00 $ 21.00 0% $ - 2910 OWNER SURRENDER (PER ANIMAL)
Animal picked up by field officer $ 30.00 $ 30.00 0% $ - Animal turned in at a County of Riverside shelter $ 20.00 $ 20.00 0% $ - 2910 QUARANTINE (PER ANIMAL)
Home Quarantine $ 50.00 $ 50.00 0% $ - County of Riverside Shelter (per day and boarding fees) $ 10.00 $ 10.00 0% $ -

Page 58 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
ImpactFEE DESCRIPTION

ANIMAL AND PET LICENSING

PUBLIC WORKS
2910 SPAY AND NEUTER (PER ANIMAL)
Spay and Neuter
Dogs $ 75.00 $ 75.00 0% $ - Cats $ 35.00 $ 35.00 0% $ - State Mandated Spay and Neuter Deposit (F&A §30503)
Dogs $ 40.00 $ 40.00 0% $ - Cats $ 40.00 $ 40.00 0% $ - 2910 TRAP SERVICE
First 5 Days $ 20.00 $ 20.00 0% $ - Each Additional Day $ 2.00 $ 2.00 0% $ - Lost or Destroyed Traps $ 90.00 $ 90.00 0% $ -

Page 59 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

DEVELOPMENT
2744 CERTIFICATE OF COMPLIANCE $ 636.03 $ 636.03 0% $ - 2794 LOT LINE ADJUSTMENT, MERGER, CONSOLIDATION, OR $ 3,504. 93 $ 3,504.93 0% $ -

WAIVER OF PARCEL MAP
OVERLOOK PARKWAY DEVELOPMENT FEE (PER DWELLING) $ 635.00 $ 635.00 0% $ - 2601 PLAN CHECK FEE^
Offsite improvements except for individual single family building permits $0 - $24,999.99 $ 2,393.40 $ 2,393.40 0% $ - $25,000 - $99,999.99
First $25,000 $ 3,455.91 $ 3,455.91 0% $ - Excess of $25,000 1.54% of ECC 1.54% of ECC 0% $ - $100,000 - $199,999.99
First $25,000 $ 4,785.58 $ 4,785.58 0% $ - Excess of $100,000 1.21% of ECC 1.21% of ECC 0% $ - $200,000 - $299,999.99
First $200,000 $ 6,115.25 $ 6,115.25 0% $ - Excess of $200,000 1.21% of ECC 1.21% of ECC 0% $ - $300,000+
First $300,000 $ 7,444.91 $ 7,444.91 0% $ - Excess of $300,000 2.20% of ECC 2.20% of ECC 0% $ - Multiple Plans Submitted as Set
Base Fee $ 2,393.40 $ 2,393.40 0% $ - Additional type of plans (each) $ 513.21 $ 513.21 0% $ - Revision of previously approved plan (each) $ 1,329.67 $ 1,329.67 0% $ - or 7.06% of ECC, whichever is less 0% $ -

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION

Page 60 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION

STEPHENS' KANGAROO RAT PRESERVATION FEE
A) Grading permit, building permit for new development, or $ 500.00 $ 500.00 0% $ - initial mobile home setup permit except as in (B) and (C) below (per gross acre or prorated for smaller parcels)
B) Grading permit or building permit for new development where $ 250.00 $ 250.00 0% $ - all lots within the development are for single-family use and are greater than 1/2 gross acre in size (per unit/lot)
C) Grading permit, building permit, or initial mobile home setup 25% of 25% of 0% $ -

permit for non-profit entities meeting the requirements of Applicable Fee Applicable Fee 26 U.S.C Section 501(c)(3)
D) Grading permit or building permit for new development for $ 250.00 $ 250.00 0% $ - agriculture, wholesale nurseries and similar uses in the Arlington Heights Greenbelt Residential Agricultural (RA-5) Zone (per parcel) SURVEY MONUMENT GUARANTEE FEE (REFUNDABLE) See Description See Description 0% $ - Fee is based on Engineer / Surveyor's written estimate; Fee is refundable after the City Surveyor has checked the final monumentation of the recorded map and found it acceptable (RMC 18.48.010)

TRANSPORTATION IMPACT FEE
Developed mobile home space (per space) $ 420.00 $ 420.00 0% $ - Multiple family dwelling unit (per unit) $ 420.00 $ 420.00 0% $ - One (1) or Two (2) family dwelling unit (per unit) $ 525.00 $ 525.00 0% $ -

TRAFFIC AND RAILROAD SIGNAL MITIGATION FEE
Developed mobile home space (per space) $ 125.00 $ 125.00 0% $ - Multiple family dwelling unit (per unit) $ 125.00 $ 125.00 0% $ - Non-Residential (per square feet of building area) $ 0.25 $ 0.25 0% $ - One (1) or Two (2) family dwelling unit (per unit) $ 190.00 $ 190.00 0% $ -

Page 61 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION

TRANSPORTATION UNIFORM MITIGATION FEE (TUMF)
Class A and Class B Office (per square foot) $ 2.45 $ 2.45 0% $ - Industrial (per square foot) $ 1.86 $ 1.86 0% $ - Multi-Family Residential (per unit) $ 6,580.00 $ 6,580.00 0% $ - Retail Commercial (per square foot) $ 7.73 $ 7.73 0% $ - Service Commercial (per square foot) $ 4.89 $ 4.89 0% $ - Single Family Residential (per unit) $ 10,104.00 $ 10,104.00 0% $ -

ENGINEERING
2601 BUILDING PLAN REVIEW
^ $ 116.00 $ 116.00 0% $ - 4127 DETERMINATION OF COMPLIANCE^ $ 291.25 $ 291.25 0% $ - ELECTRONIC SUBMITTAL PROCESSING FEE^ No Charge No Charge 0% $ - 4132 ENGINEERING PLAN CHECK^
Single plan (street, sewer, or storm drain) $ 1,633.50 $ 1,633.50 0% $ - Multiple plans submitted as set $ 2,099.25 $ 2,099.25 0% $ - Plus each additional type of plan $ 466.50 $ 466.50 0% $ - Revision of approved plan $ 1,166.25 $ 1,166.25 0% $ - 4319 EXPEDITED REVIEW $ 122.50 $ 122.50 0% $ - 4137 GRADING INSPECTION
^
Inspection Fee Per Hour $ 116.00 $ 116.00 0% $ - Permit Issuance Fee $ 1,429.50 $ 1,429.50 0% $ - 4136 GRADING PLAN CHECK^
Base Fee: 0 - 500 CY $ 933.00 $ 933.00 0% $ - Plus 501 - 5,000 CY (each additional 500 CY or $ 105.25 $ 105.25 0% $ - fraction thereof)
Plus 5,001 - 50,000 CY (each additional 5,000 CY or $ 105.25 $ 105.25 0% $ - fraction thereof)

Page 62 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION
Plus 50,001 - 100,000 CY (each additional 10,000 CY or $ 139.75 $ 139.75 0% $ - fraction thereof)
Plus 100,001 - 200,000 CY (each additional 10,000 CY or $ 17.00 $ 17.00 0% $ - fraction thereof)
Plus 200,001+ CY (each additional 10,000 CY or $ 11.75 $ 11.75 0% $ - fraction thereof)
2771 LANDSCAPE PLAN REVIEW AND INSPECTION^
First 500 linear feet $ 1,148.00 $ 1,148.00 0% $ - 4143 LANE CLOSURE PERMIT / INSPECTION
Per Application $ 232.00 $ 232.00 0% $ - Per hour for Field Inspection Service $ 116.00 $ 116.00 0% $ - 4131 MAP CHECKING FEES
^
Base Fee $ 4,489.00 $ 4,489.00 0% $ - Per each number and lettered lot $ 54.00 $ 54.00 0% $ - 2602 OTHER THAN INDIVIDUAL SINGLE-FAMILY BUILDING PERMIT^ $0 - $24,999.99 ECC - Base Fee $ 2,099.00 $ 2,099.00 0% $ - $25,000.00 -$99,999.99 Estimated Construction Cost (ECC) First $25,000 $ 3,032.00 $ 3,032.00 0% $ - Plus each $1,000 or potion thereof over $25,000 $ 15.00 $ 15.00 0% $ - $100,000.00 - $199,999.99 ECC
First $100,000 $ 4,198.00 $ 4,198.00 0% $ - Plus each $1,000 or potion thereof over $100,000 $ 11.75 $ 11.75 0% $ - $200,000.00 - $299,999.99 ECC
First $200,000 $ 5,364.00 $ 5,364.00 0% $ - Plus each $1,000.00 or potion thereof $ 11.75 $ 11.75 0% $ -

Page 63 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION
$300,000+ ECC
City Engineering / Land Development Services $ 6,531.00 $ 6,531.00 0% $ - Traffic Engineering $ 21.50 $ 21.50 0% $ - 4130 PARCEL MAP CHECK^
$0-$24,999.99 Estimated Construction Cost (ECC) $ 2,099.00 $ 2,099.00 0% $ - $25,000.00 - $99,999.99 (ECC)
First $25,000 $ 3,032.00 $ 3,032.00 0% $ - Plus each $1,000.00 or potion thereof over $25,000 $ 15.00 $ 15.00 0% $ - $100,000.00 - $199,999.99 ECC
First $100,000 $ 4,198.00 $ 4,198.00 0% $ - Plus each $1,000.00 or potion thereof over $100,000 $ 11.75 $ 11.75 0% $ - $200,000.00 - $299,999.99 ECC
First $200,000 $ 5,364.00 $ 5,364.00 0% $ - Plus each $1,000.00 or potion thereof over $200,000 $ 11.75 $ 11.75 0% $ - $300,000+ ECC
First $300,000 $ 6,531.00 $ 6,531.00 0% $ - Plus each $1,000.00 or potion thereof over $300,000 $ 21.50 $ 21.50 0% $ - 4133 PRIVATE DEVELOPMENT INSPECTION
^
Permit issuance / processing fee $ 2,721.00 $ 2,721.00 0% $ - Per hour inspection fee $ 116.00 $ 116.00 0% $ - 4125 PROCESSING FEES^
Case Finalization
With bonds required $ 582.50 $ 582.50 0% $ - With
bonds, documents, or descriptions required $ 1,085.00 $ 1,085.00 0% $ - Without bonds, documents, or descriptions required $ 582.50 $ 582.50 0% $ - Commercial or Land Development $ 1,166.25 $ 1,166.25 0% $ - Document Processing
No Description $ 582.50 $ 582.50 0% $ - And description preparation $ 1,166.25 $ 1,166.25 0% $ -

Page 64 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION
4126 PUBLIC IMPROVEMENT TIME EXTENSIONS^
Projects not requiring modification to bonds or documentation $ 233.25 $ 233.25 0% $ - Projects requiring modification to bonds, documentation, or $ 758.00 $ 758.00 0% $ - other unusual problems
SPECIAL EVENT^ (per hour) $ 116.00 $ 116.00 0% $ - 4134 STREET ENCROACHMENT REQUEST^
Single-family home owner permit $ 175.00 $ 175.00 0% $ - Non-single family home owner permit $ 700.00 $ 700.00 0% $ - 4135 STREET OPENING PERMIT / INSPECTION^
Utility Blanket Permit (quarterly) $ 116.00 $ 116.00 0% $ - Permit Issuance and Project Processing Fee $ 787.00 $ 787.00 0% $ - Inspection Services ($108 per hour; 2 hour minimum) $ 232. 00 $ 232.00 0% $ - 4138 STREET TREES PLAN CHECK AND INSPECTION^
Non-Tract - Base Fee $ 55.75 $ 55.75 0% $ - Non-Tract - Per Linear Foot of Frontage $ 0.56 $ 0.56 0% $ - Tract - Base Fee $ 55.75 $ 55.75 0% $ - Tract - Per Linear Foot of Frontage $ 0.56 $ 0.56 0% $ - 4128 SUBDIVISION PLAN CHECK
^
$0 - $24,999.99 Estimated Construction Cost (ECC) $ 2,099.00 $ 2,099.00 0% $ - $25,000.00 - $99,999.99 ECC
First $25,000 $ 3,032.00 $ 3,032.00 0% $ - Plus each $1,000.00 or potion thereof over $25,000 $ 15.00 $ 15.00 0% $ - $100,000.00 - $199,999.99 ECC
First $100,000 $ 4,198.00 $ 4,198.00 0% $ - Plus each $1,000.00 or potion thereof over $100,000 $ 11.75 $ 11.75 0% $ -

Page 65 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION
$200,000.00 - $299,999.99 ECC
First $200,000 $ 5,364.00 $ 5,364.00 0% $ - Plus each $1,000.00 or potion thereof over $200,000 $ 11.75 $ 11.75 0% $ - $300,000+ ECC
First $300,000 $ 6,531.00 $ 6,531.00 0% $ - Plus each $1,000.00 or potion thereof over $300,000 $ 21.50 $ 21.50 0% $ -

TRAFFIC IMPACT ANALYSIS
^
Scoping Agreement $ 271.00 $ 271.00 0% $ - Projects over 100 vehicle trips per peak hour $ 2,519.00 $ 2,519.00 0% $ - Projects under 100 vehicle trips per peak hour $ 1,215.00 $ 1,215.00 0% $ - 4122 TRAFFIC PLAN REVIEW^ (per application)
0 - 5 sheets $ 408.00 $ 408.00 0% $ - 6+ sheets $ 1,633.00 $ 1,633.00 0% $ -

GRADING
4137 EROSION / SEDIMENT CONTROL See Desc ription See Description 0% $ - 4137 ESTIMATED GRADING PERMIT AND INSPECTION FEES° (cubic yards) - 50 $ 1,795.36 $ 1,795.36 0% $ - - 100 $ 1,805.77 $ 1,805.77 0% $ - - 150 $ 1,816.19 $ 1,816.19 0% $ - - 200 $ 1,826.61 $ 1,826.61 0% $ - - 250 $ 1,837.02 $ 1,837.02 0% $ - - 300 $ 1,847.44 $ 1,847.44 0% $ - - 350 $ 1,857.86 $ 1,857.86 0% $ - - 400 $ 1,868.27 $ 1,868.27 0% $ - - 450 $ 1,878.69 $ 1,878.69 0% $ - 301
entrance to provide tracking control; Fee formula: LF x $2.00 + $1,000.00 0 Calculation is based on a fee of $2.00 per foot is estimated for placement of perimeter protection (silt fence, straw wattles, etc.); A flat rate of $1,000.00 is estimated for installation of a stabilized 351
401
51 101
151
201
251

Page 66 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION
- 500 $ 1,889.11 $ 1,889.11 0% $ - - 600 $ 1,899.53 $ 1,899.53 0% $ - - 700 $ 1,915.46 $ 1,915.46 0% $ - - 800 $ 1,931.39 $ 1,931.39 0% $ - - 900 $ 1,947.32 $ 1,947.32 0% $ - - 1,000 $ 1,963.25 $ 1,963.25 0% $ - - 1,500 $ 1,982.86 $ 1,982.86 0% $ - - 2,000 $ 2,002.47 $ 2,002.47 0% $ - - 2,500 $ 2,022.08 $ 2,022.08 0% $ - - 3,000 $ 2,041.68 $ 2,041.68 0% $ - - 3,500 $ 2,061.29 $ 2,061.29 0% $ - - 4,000 $ 2,080.90 $ 2,080.90 0% $ - - 4,500 $ 2,100.51 $ 2,100.51 0% $ - - 5,000 $ 2,120.12 $ 2,120.12 0% $ - - 6,000 $ 2,138.50 $ 2,138.50 0% $ - - 7,000 $ 2,156.88 $ 2,156.88 0% $ - - 8,000 $ 2,175.26 $ 2,175.26 0% $ - - 9,000 $ 2,193.64 $ 2,193.64 0% $ - - 10,000 $ 2,212.03 $ 2,212.03 0% $ - - 15,000 $ 2,247.57 $ 2,247.57 0% $ - - 20,000 $ 2,283.11 $ 2,283.11 0% $ - - 25,000 $ 2,318.65 $ 2,318.65 0% $ - - 30,000 $ 2,354.19 $ 2,354.19 0% $ - - 35,000 $ 2,389.73 $ 2,389.73 0% $ - - 40,000 $ 2,425.26 $ 2,425.26 0% $ - - 45,000 $ 2,460.80 $ 2,460.80 0% $ - - 50,000 $ 2,496.34 $ 2,496.34 0% $ - - 60,000 $ 2,558.84 $ 2,558.84 0% $ - - 70,000 $ 2,621.34 $ 2,621.34 0% $ - - 80,000 $ 2,683.84 $ 2,683.84 0% $ - - 90,000 $ 2,746.35 $ 2,746.35 0% $ - - 100,000 $ 2,808.85 $ 2,808.85 0% $ - - 110,000 $ 2,848.06 $ 2,848.06 0% $ - - 120,000 $ 2,887.28 $ 2,887.28 0% $ - 60,001
70,001
80,001
90,001
100,001
110,001
25,001
30,001
35,001
40,001
45,001
50,001
7,001
8,001
9,001
10,001
15,001
20,001
3,001
3,501
4,001
4,501
5,001
6,001
801
901
1,001
1,501
2,001
2,501
451
501
601
701

Page 67 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION
- 130,000 $ 2,926.49 $ 2,926.49 0% $ - - 140,000 $ 2,965.71 $ 2,965.71 0% $ - - 150,000 $ 3,004.93 $ 3,004.93 0% $ - - 160,000 $ 3,044.14 $ 3,044.14 0% $ - - 170,000 $ 3,083.36 $ 3,083.36 0% $ - - 180,000 $ 3,122.57 $ 3,122.57 0% $ - - 190,000 $ 3,161.79 $ 3,161.79 0% $ - - 200,000 $ 3,201.01 $ 3,201.01 0% $ - - 210,000 $ 3,240.22 $ 3,240.22 0% $ - - 220,000 $ 3,279.44 $ 3,279.44 0% $ - - 230,000 $ 3,318.65 $ 3,318.65 0% $ - - 240,000 $ 3,357.87 $ 3,357.87 0% $ - - 250,000 $ 3,397.09 $ 3,397.09 0% $ - - 260,000 $ 3,436.30 $ 3,436.30 0% $ - - 270,000 $ 3,475.52 $ 3,475.52 0% $ - - 280,000 $ 3,514.73 $ 3,514.73 0% $ - - 290,000 $ 3,553.95 $ 3,553.95 0% $ - - 300,000 $ 3,593.17 $ 3,593.17 0% $ - - 310,000 $ 3,632.38 $ 3,632.38 0% $ - - 320,000 $ 3,671.60 $ 3,671.60 0% $ - - 330,000 $ 3,710.81 $ 3,710.81 0% $ - - 340,000 $ 3,750.03 $ 3,750.03 0% $ - - 350,000 $ 3,789.25 $ 3,789.25 0% $ - - 360,000 $ 3,828.46 $ 3,828.46 0% $ - - 370,000 $ 3,867.68 $ 3,867.68 0% $ - - 380,000 $ 3,906.89 $ 3,906.89 0% $ - - 390,000 $ 3,946.11 $ 3,946.11 0% $ - - 400,000 $ 3,985.33 $ 3,985.33 0% $ - + $ 4,024.54 $ 4,024.54 0% $ - Additional 10,000 cubic yards or fraction thereof $ 35.43 $ 35.43 0% $ - 4137 PERMT REVIEW
° (cubic yards)
- 500 $ 1,063.73 $ 1,063.73 0% $ - - 1,000 $ 1,183.83 $ 1,183.83 0% $ - 501 390,001
400,001
0 300,001
340,001
350,001
360,001
370,001
380,001
310,001
320,001
330,001
240,001
250,001
260,001
270,001
280,001
290,001
180,001
190,001
200,001
210,001
220,001
230,001
120,001
130,001
140,001
150,001
160,001
170,001

Page 68 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION
- 1,500 $ 1,303.93 $ 1,303.93 0% $ - - 2,000 $ 1,424.03 $ 1,424.03 0% $ - - 2,500 $ 1,544.13 $ 1,544.13 0% $ - - 3,000 $ 1,664.23 $ 1,664.23 0% $ - - 3,500 $ 1,784.33 $ 1,784.33 0% $ - - 4,000 $ 1,904.43 $ 1,904.43 0% $ - - 4,500 $ 2,024.53 $ 2,024.53 0% $ - - 5,000 $ 2,144.63 $ 2,144.63 0% $ - - 10,000 $ 2,264.72 $ 2,264.72 0% $ - - 15,000 $ 2,384.82 $ 2,384.82 0% $ - - 20,000 $ 2,504.92 $ 2,504.92 0% $ - - 25,000 $ 2,625.02 $ 2,625.02 0% $ - - 30,000 $ 2,745.12 $ 2,745.12 0% $ - - 35,000 $ 2,865.22 $ 2,865.22 0% $ - - 40,000 $ 2,985.32 $ 2,985.32 0% $ - - 45,000 $ 3,105.42 $ 3,105.42 0% $ - - 50,000 $ 3,255.52 $ 3,255.52 0% $ - - 60,000 $ 3,384.83 $ 3,384.83 0% $ - - 70,000 $ 3,544.15 $ 3,544.15 0% $ - - 80,000 $ 3,703.46 $ 3,703.46 0% $ - - 90,000 $ 3,862.78 $ 3,862.78 0% $ - - 100,000 $ 4,022.09 $ 4,022.09 0% $ - - 110,000 $ 4,041.70 $ 4,041.70 0% $ - - 120,000 $ 4,061.31 $ 4,061.31 0% $ - - 130,000 $ 4,080.92 $ 4,080.92 0% $ - - 140,000 $ 4,100.52 $ 4,100.52 0% $ - - 150,000 $ 4,120.13 $ 4,120.13 0% $ - - 160,000 $ 4,139.74 $ 4,139.74 0% $ - - 170,000 $ 4,159.35 $ 4,159.35 0% $ - - 180,000 $ 4,178.96 $ 4,178.96 0% $ - - 190,000 $ 4,198.56 $ 4,198.56 0% $ - - 200,000 $ 4,218.17 $ 4,218.17 0% $ - - 210,000 $ 4,231.65 $ 4,231.65 0% $ - - 220,000 $ 4,245.13 $ 4,245.13 0% $ - 170,001
180,001
190,001
200,001
210,001
110,001
120,001
130,001
140,001
150,001
160,001
50,001
60,001
70,001
80,001
90,001
100,001
20,001
25,001
30,001
35,001
40,001
45,001
3,501
4,001
4,501
5,001
10,001
15,001
1,001
1,501
2,001
2,501
3,001

Page 69 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION
- 230,000 $ 4,258.61 $ 4,258.61 0% $ - - 240,000 $ 4,272.09 $ 4,272.09 0% $ - - 250,000 $ 4,285.57 $ 4,285.57 0% $ - - 260,000 $ 4,299.05 $ 4,299.05 0% $ - - 270,000 $ 4,312.53 $ 4,312.53 0% $ - - 280,000 $ 4,326.02 $ 4,326.02 0% $ - - 290,000 $ 4,339.50 $ 4,339.50 0% $ - - 300,000 $ 4,352.98 $ 4,352.98 0% $ - - 310,000 $ 4,366.46 $ 4,366.46 0% $ - - 320,000 $ 4,379.94 $ 4,379.94 0% $ - - 330,000 $ 4,393.42 $ 4,393.42 0% $ - - 340,000 $ 4,406.90 $ 4,406.90 0% $ - - 350,000 $ 4,420.38 $ 4,420.38 0% $ - - 360,000 $ 4,433.86 $ 4,433.86 0% $ - - 370,000 $ 4,447.34 $ 4,447.34 0% $ - - 380,000 $ 4,460.82 $ 4,460.82 0% $ - - 390,000 $ 4,474.30 $ 4,474.30 0% $ - - 400,000 $ 4,487.78 $ 4,487.78 0% $ - - 410,000 $ 4,501.26 $ 4,501.26 0% $ - - 420,000 $ 4,514.74 $ 4,514.74 0% $ - - 430,000 $ 4,528.22 $ 4,528.22 0% $ - - 440,000 $ 4,541.70 $ 4,541.70 0% $ - - 450,000 $ 4,555.18 $ 4,555.18 0% $ - - 460,000 $ 4,568.66 $ 4,568.66 0% $ - - 470,000 $ 4,582.14 $ 4,582.14 0% $ - - 480,000 $ 4,595.63 $ 4,595.63 0% $ - - 490,000 $ 4,609.11 $ 4,609.11 0% $ - - 500,000 $ 4,622.59 $ 4,622.59 0% $ - + $ 4,622.59 $ 4,622.59 0% $ - $ 8.28 $ 8.28 0% $ - 4137 REMEDIAL GRADING
Calculation is estimated to involve 20% of the total See Description See Description 0% $ - proposed earthwork volume for soil stabilization, establishing 290,001
300,001
310,001
320,001
330,001
340,001
230,001
240,001
440,001
250,001
260,001
270,001
280,001
450,001
460,001
470,001
350,001
360,001
370,001
380,001
390,001
400,001
410,001
420,001
430,001
220,001
480,001
490,001
500,001
Additional 10,000 cubic yards or fraction thereof

Page 70 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION
proper surface drainage, and preparation for re-vegetation; Fee formula: CY x 20% x $4.00 or $250.00 minimum
$ 268.75 $ 268.75 0% $ - minimum hourly charges)
4137 RE-VEGETATION See Description See Description 0 % $ - Calculation is based on a fee of $0.05 per foot is estimated for for placement of hydro-seeding; A flat rate of $500.00 is estimated for temporary watering to germinate the seed mixture; Fee formula: AC/43,560 x $0.05 + $500.00
WATER QUALITY MANAGEMENT PROGRAM (WQMP; per permit)
2750 Preliminary project specific review $ 1,791.68 $ 1,791.68 0% $ - 4123 Final Review $ 1,595.60 $ 1,595.60 0% $ -

MAINTENANCE
4141 GENERAL UTILITY STREET USAGE/ FRANCHISE FEE Contract Contract 0% $ - 4146 HAZARDOUS MATERIAL CLEAN-UP
Full hourly and burden rate of responding PW personnel Actual Cost Actual Cost 0% $ - 4142 RIGHT-OF-WAY CLEAN-UP Actual Cost Actual Co st 0% $ - Full hourly and burden rate of responding PW personnel
4140 WIDE, OVERWEIGHT, AND LONG LOAD PERMIT REVIEW (EACH) Single Trip Permit $ 16.00 $ 16.00 0% $ - Annual Permit $ 90.00 $ 90.00 0% $ - 2500 BANNER PERMITS 53.75 $ $ 53.75 0% $ - Horizontal banners, per location, per week
Minimum fee for smaller jobs (for equipment move-in and

Page 71 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION

SUPPORT TO PLANNING APPLICATION REVIEW
2758 AIRPORT LAND USE COMMISSION (ALUC) APPEAL No Charge No Charge 0% $ - 2701 AMENDMENT TO ZONING TEXT No Charge No Charge 0% $ - 2788 ANNEXATION PROCESSING^ $ 13,177.00 $ 13,177.00 0% $ - 2714 CONDITIONAL USE PERMIT (CUP) No Charge No Char ge 0% $ - Alcohol, Entertainment, and Housing
2708 CONDITIONAL USE PERMIT REVIEW^ $ 466.75 $ 466.75 0% $ - 2748 CONDOMINIUM CONVERSION No Charge No Charge 0% $ - 2760 DEVELOPMENT AGREEMENT^ $ 466.75 $ 466.75 0% $ - 2753 ENVIRONMENTAL IMPACT REPORT^ $ 1,400.00 $ 1,400.00 0% $ - 2764 GENERAL PLAN AMENDMENT REVIEW^ $ 233.00 $ 233.00 0% $ - 2752 INITIAL ENVIRONMENTAL STUDY No Charge No Charge 0% $ - 2792 MILLS ACT PRESERVATION REVIEW No Charge No Char ge 0% $ - 2745 MODIFICATION OF CONDITIONS REVIEW No Charge No Charge 0% $ - 2713 PARCEL MAP OR WAIVER REVIEW $ 1,031.00 $ 1,031.00 0% $ - 2725 PLANNED RESIDENTIAL DEVELOPMENT PERMIT REVIEW
^ $ 582.00 $ 582.00 0% $ - 2790 PLANNING APPEAL No Charge No Charge 0% $ - 2730 RE-ZONING REQUEST REVIEW^ $ 262.00 $ 262.00 0% $ -

Page 72 ends

CODE
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

ENGINEERING AND MAINTENANCE

PUBLIC WORKS

FEE DESCRIPTION
2732 RE-ZONING REQUEST TIME EXTENSION WITH HEARING No Charge No Charge 0% $ - 2706 SITE PLAN REVIEW^ $ 466.00 $ 466.00 0% $ - 2766 SPECIFIC PLAN REVIEW^ $ 1,866.00 $ 1,866.00 0% $ - 2743 STREET / ALLEY VACATION AND TRAFFIC PATTERN $ 4,773.00 $ 4,773.00 0% $ - MODIFICATION REVIEW^
2793 STREET NAME CHANGE No Charge No Charge 0% $ - 2719 TENTATIVE TRACT / REVERSION TO ACREAGE MAP REVIEW^ $ 1,031.00 $ 1,031.00 0% $ - 2723 VESTING MAP REVIEW^ $ 1,031.00 $ 1,031.00 0% $ -

Page 73 ends

CODE FEE DESCRIPTION FY 2023/24
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact
4149 EQUIPMENT REGISTRATION / CORRECTION (CVCs 5204, 5200,4000(a)(1)) Application Fee No Charge No Charge
Inspection Fee $ 25.00 $ 25.00 0% $ - 2309 FAILURE TO DISPLAY DISABLED PLACARD RE SULTING IN DISMISSAL $ 25.00 $ 25.00 0% $ - (PER CITATION; California Vehicle Code (CVC) 40226)

BUSINESS PARKING PERMITS
Limit three (3) permits per 1,000 square feet of building space per mont h No Charge No Charge
Additional permits (per month) $ 35.00 $ 64.00 83% $ - 4148 PREFERENTIAL PARKING ZONE (PPZ) PERMIT APPLICATION (RMC 10.52.140) $ 42.00 416 $ 64.00 52% $ 9,152 PPZ Permit Replacement $ 19.00 32 $ 52.00 174% $ 1,056 RESIDENTIAL PARKING PERMIT (PER MONTH) $ 42.00 12 $ 64.00 52% $ 264 4147 TEMPORARY CONSTRUCTION PARKING PERMIT (RMC 10.52.145) $ 17.00 $ 17.00 0% $ - 4150 PARKING ENCROACHMENTS
Temporary No Parking Application Fee (RMC 13.08.015) No Charge 12 $ 15.00 0% $ 180 Encroachment for Special Events, City-Sponsored Events, No Charge No Charge 0% $ - Government Events, Religious Events, and Non-Profit
Organization Events during the weekdays or weekends
GARAGES: DAILY RATE AND HOURS OF OPERATION
Hourly Rate: Each thirty (30) minutes 1.25 $ 1.25 $ 0% $ -

PUBLIC WORKS

PUBLIC PARKING

Page 74 ends

CODE FEE DESCRIPTION FY 2023/24
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PUBLIC WORKS

PUBLIC PARKING
Daily Max 15.00$ 15.00 $ 0% $ - LOTS: DAILY RATE AND HOURS OF OPERATION
Hourly Rate: Each thirty (30) minutes (Justice Center Lots) $ 1.50 $ 1.50 0% $ - Hourly Rate: Each thirty (30) minutes (All other Downtown Lots) $ 1.50 $ 1.50 0% $ - ON-STREET METERED SPACES: DAILY RATE AND HOURS OF OPERATION Hourly Rate: Each thirty (30) minutes (Justice Center On-Street $ 1.50 $ 1.50 0% $ - Metered Spaces)
Hourly Rate: Each thirty (30) minutes (All other Downtown On-Street $ 1.50 $ 1.50 0% $ - Metered Spaces)
PARKING YOUR WAY PROGRAM No Charge No Charge
DISCOUNTED EMPLOYEE PERMIT PROGRAM (DEPP; PER MONTH) (1) $ 24.00 $ 28.00 17% $ - Late fee per permit will apply on the 5th of each month $ 20.00 $ 20.00 0% $ - Replacement fee for keycards or permits if applicable (per occurrence ) $ 25.00 $ 25.00 0% $ - DOWNTOWN 24/7 PERMIT PROGRAM (PER MONTH) (2) $ 115.00 $ 130.00 13% $ - Late fee per permit will apply on the 5th of each month 20.00 $ 20.00 $ 0% $ - Replacement fee for keycards or permits (per occurrence) 25.00 $ 25.00 $ 0% $ - NIGHTLY FLAT RATE $ 10.00 $ 10.00 0% $ -

FESTIVAL OF LIGHTS (FOL)
Pre-paid FOL rate $ 10.00 $ 10.00 0% $ - Pay at FOL rate $ 15.00 $ 15.00 0% $ -

Page 75 ends

CODE FEE DESCRIPTION FY 2023/24
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PUBLIC WORKS

PUBLIC PARKING

SPECIAL EVENT RATE
All Garages (City-Owned) and Lots (City-Owned)
Pre-paid event rate $ 10.00 $ 10.00 0% $ - Pay at event rate $ 15.00 $ 15.00 0% $ - Bus parking rate per 24-hours (includes $25 encroachment $ 75.00 $ 75.00 0% $ - application fee)
MONTHLY UNRESERVED WEEKDAY PERMIT PROGRAM (2)
Garages 1, 2 and 6 85.00 $ 100.00 $ 18% $ - Garage 3 85.00$ 100.00 $ 18% $ - Garage 7 85.00$ 100.00 $ 18% $ - Late fee per permit will apply on the 5th of each month $ 20.00 $ 20.00 0% $ - Replacement fee for keycards or permits (per occurrence) $ 25.00 $ 25.00 0% $ - MONTHLY RESERVED WEEKDAY PERMIT PROGRAM (PER MONTH) (3) 150.00 $ 170.00 $ 13% $ - Late fee per permit will apply on the 5th day of each month $ 20.00 $ 20.00 0% $ - Replacement fee for keycards or permits (per occurrence) $ 25.00 $ 25.00 0% $ -

OPTIONAL PARKING VALIDATION PROGRAM
City Council/Committee/Commission Meetings, City Agreements No Charge No Charge 0% $ - and Obligations shall receive a 100% discount off the posted hourly rate with no time limit
Businesses and event organizers shall receive a 50% discount off 50% Discount 50% Discount 0% $ - off the posted hourly rate up to 60 minutes
Garage Hourly Rate (60 minutes) $ 1.25 $ 1.25 0% $ - Lot Hourly Rate (60 minutes) $ 1.50 $ 1.50 0% $ -

Page 76 ends

CODE FEE DESCRIPTION FY 2023/24
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PUBLIC WORKS

PUBLIC PARKING
Validations will be made available upon request to address: No Charge No Charge 0% $ - City Council Meetings, City-sponsored activities, business-sponsored events, special events, leases and agreements
1)
2) On April 18, 2023, the City Council approved a new Parking Ra te and Hour Schedule, which included a $15 annual increase in rate effective July 1. 3) On April 18, 2023, the City Council approved a new Parking Ra te and Hour Schedule, which included a $20 annual increase in rate effective July 1.

Amount is adjusted annually based on U.S. Department of Housing and Urban Development Low Income Limit for an Individual in Riverside-San Bernardino-Ontario, CA for FY24/25 (published annually on May 15th). HUD Income Limit: $57,400 annually or $27.59 per hour ($28 per hour rounded up). DEPP Monthly Rate shall adjust July 1st of each year and match the qualifying wage rate.

Page 77 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact
4000 (a) (1) CVC EXPIRED REGISTRATION ($10.00 WITH PROOF OF CORRECTION) $ 116.00 $ 116.00 0% $ - 4463 (c) CVC DISPLAYS FORGED, COUNTERFEIT, OR FALSE DP PLACARD $ 341.00 341.00 $ 0% $ - 4464 CVC ALTERED LICENSE PLATE $ 116.00 $ 116.00 0% $ - 5200 (a) CVC LICENSE PLATE MISSING ($10.00 WITH PROOF OF CORRECTION) $ 66.00 $ 66.00 0% $ - 5201(c) CVC LICENSE PLATE COVER $ 66.00 $ 66.00 0% $ - 5201(d) CVC CASING/SHIELD/FRAME/BORDER/PRODUCT/DEVICE TO OBSTRUCT OR

IMPAIR RECOGNITION OF LICENSE PLATE INFORMATION
$ 66.00 $ 66.00 0% $ - 15620 (a) CVC UNATTENDED CHILD $ 121.00 121.00 $ 0% $ - 21209 (a) (1) CVC NO PARKING BIKE LANE $ 41.00 41.00 $ 0% $ - 22500 (a) CVC PARKED WITHIN AN INTERSECTION $ 46.00 46.00 $ 0% $ - 22500 (b) CVC PARKED BLOCKING CROSSWALK $ 41.00 41.00 $ 0% $ - 22500 (c) CVC PARKED IN A RED ZONE $ 46.00 46.00 $ 0% $ - 22500 (d) CVC PARKED WITHIN 15' OF DRIVEWAY OF FIRE STATION $ 46.00 46.00 $ 0% $ - 22500 (e) CVC BLOCKING DRIVEWAY $ 41.00 $ 41.00 0% $ - 22500 (f) CVC BLOCKING SIDEWALK $ 41.00 41.00 $ 0% $ - 22500 (g) CVC PARKED BLOCKING TRAFFIC AT STREET OR HIGHWAY EXCAVATION $ 41.00 41.00 $ 0% $ - 22500 (h) CVC DOUBLE PARKED $ 41.00 41.00 $ 0% $ - 22500 (k) CVC PARKED BLOCKING BRIDGE $ 41.00 41.00 $ 0% $ - 22500 (l) CVC PARKED BLOCKING SIDEWALK WHEELCHAIR ACCESS $ 250.00 250.00 $ 0% $ - 22500 (n) CVC PROHIBITING THE STOPPING, STANDING, OR PARKING OF A VEHICLE WITHIN 20' OF THE VEHICLE APPROACH SIDE OF AN UNMARKED OR MARKED CROSSWALK, OR 15 FT OF ANY CROSSWALK WHERE A CURB EXTENSION IS PRESENT (WARNING UNTIL JANUARY 1, 2025)
$ 121.00 121.00 $ 0% $ - 22500.1 CVC PARKED UNLAWFULLY IN A FIRE LANE $ 46.00 46.00 $ 0% $ - 22502 (a) CVC PARKED OVER 18" FROM CURB $ 41.00 41.00 $ 0% $ - 22502 (e) (1) CVC PARKING ON ONE-WAY STREETS $ 41.00 $ 41.00 0% $ - 22507.8 (c) CVC PARKED BLOCKING DISABLED PERSONS ACCESS $ 341.00 $ 341.00 0% $ - 22511 (a) CVC PARKED OFF-STREET ELECTRIC CHARGING STATION $ 41.00 41.00 $ 0% $ - 22514 CVC FIRE HYDRANT, PARKED UNATTENDED VEHICLE WITHIN 15' $ 46.00 $ 46.00 0% $ -

9.08.110 RMC PARKS CLOSED 10PM TO 5AM $ 41.00 41.00 $ 0% $ -

9.08.150 RMC VEHICLE MAINTENANCE PROHIBITED IN ANY PARK $ 41.00 41.00 $ 0% $ -

9.08.160 RMC VEHICLES PROHIBITED ON SURFACES OTHER THAN ROADS FOR PUBLIC USE
$ 41.00 41.00 $ 0% $ -

PUBLIC WORKS

PARKING BAIL

Page 78 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PUBLIC WORKS

PARKING BAIL

9.08.165 RMC PARKING OF RECREATIONAL VEHICLES IN CITY PARKS WITHOUT PERMIT
$ 116.00 116.00 $ 0% $ -

10.52.015 (a) RMC MANNER OF PARKING ON STREETS - ALONG CURB AGAINST TRAFFIC $ 41.00 41.00 $ 0% $ -

10.52.015 (b) RMC MANNER OF PARKING ON STREETS - OCCUPYING MORE THAN ONE $ 41.00 41.00 $ 0% $ -

10.52.015 (c) RMC MANNER OF PARKING ON STREETS - PARKING CONTRARY TO POSTED $ 41.00 41.00 $ 0% $ -

10.52.020 RMC NO STOPPING, STANDING, OR PARKING ON OR WITHIN PARKWAY $ 41.00 41.00 $ 0% $ -

10.52.025 RMC NO STOPPING, STANDING, OR PARKING ON SIGNED CITY

RECREATIONAL TRAILS
$ 41.00 41.00 $ 0% $ -

10.52.030 (a) RMC NO STOPPING, STANDING, OR PARKING DURING POSTED STREET

SWEEPING DAYS/HRS
$ 41.00 41.00 $ 0% $ -

10.52.030 (b) RMC NO PARKING - CERTAIN DAYS / CERTAIN HOURS $ 41.00 41.00 $ 0% $ -

10.52.030 (c) RMC NO PARKING - POSTED STREETS ADJACENT TO SCHOOL PROPERTY $ 41.00 41.00 $ 0% $ -

10.52.030 (d) RMC NO STREET PARKING - BEYOND LIMITED TIME PER DAY, NO SHUFFLING

IN SAME BLOCK
$ 41.00 41.00 $ 0% $ -

10.52.030 (e) RMC NO PARKING, STANDING, OR PARKING WHEN SIGNED OR MARKED $ 41.00 41.00 $ 0% $ -

10.52.032 RMC 72 HR STORAGE ON STREETS - OCCUPIED OR NOT $ 41.00 41.00 $ 0% $ -

10.52.040 RMC NO PARKING FOR WASHING, MAINTENANCE OR REPAIR OF VEHICLE $ 41.00 41.00 $ 0% $ -

10.52.043 (a) RMC NO PARK, STAND, BLOCK, OBSTRUCT A DP SPACE WITHOUT VALID DP

PLACARD / PLATE
$ 341.00 341.00 $ 0% $ -

10.52.045 (b) RMC MISUSE OF DP PLACARD / PLATE - REPORTED LOST / STOLEN OR DECEASED >60 DAYS
$ 341.00 343.00 $ 1% $ -

10.52.050 (a) RMC NO PARKING ON LEFT SIDE OF DIVIDED HIGHWAY - UNLESS PERMITTED

BY SIGNS
$ 41.00 41.00 $ 0% $ -

10.52.055 (a) RMC NO STANDING UNATTENDED WITHOUT STOPPING ENGINE/REMOVING

THE IGITION KEY
$ 41.00 41.00 $ 0% $ -

10.52.060 (c) RMC NO PARKING OR STANDING OTHER THAN ANGLE PARKING ON STREET

AS MARKED
$ 41.00 41.00 $ 0% $ -

10.52.065 (b) RMC NO PARKING ON NARROW STREETS WHEN SIGNED OR MARKED $ 41.00 41.00 $ 0% $ -

10.52.070 RMC PARKING NOT ALLOWING 10' OF TRAVEL $ 41.00 41.00 $ 0% $ -

10.52.075 (a) RMC NO STOPPING, STANDING OR PARKING IN ALLEY - EXCEPT FOR

EXPEDITIOUS LOADING / UNLOADING
$ 41.00 41.00 $ 0% $ -

10.52.080 RMC NO PARKING ON HILL WITHOUT BLOCKING WHEELS AGAINST CURB $ 41.00 41.00 $ 0% $ -

10.52.090 (a) RMC PARKING ON PRIVATE PROPERTY PROHIBITED WITHOUT CONSETNT OF OWNER
$ 41.00 41.00 $ 0% $ -

Page 79 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PUBLIC WORKS

PARKING BAIL

10.52.090 (b) RMC PARKING ON PRIVATE PROPERTY ADJACENT TO NO-CRUISING STREET ZONE
$ 41.00 41.00 $ 0% $ -

10.52.100 (c) RMC TEMPORARY NO PARKING, SPECIAL EVENTS OR EMERGENCY

PARKING SIGNS
$ 41.00 41.00 $ 0% $ -

10.52.110 (a) RMC UNLAWFUL PARKING BY PEDDLERS AND VENDORS $ 41.00 41.00 $ 0% $ -

10.52.112 RMC METERED PARKING $ 41.00 41.00 $ 0% $ -

10.52.140 (c) RMC PARKING WITHOUT PERMIT IN POSTED PREFERENTIAL PARKING ZONES $ 41.00 41.00 $ 0% $ -

10.52.145 (a) RMC PARKING EXEMPTION TO TIME LIMITATIONS - PERMIT REQUIRED $ 41.00 41.00 $ 0% $ -

10.52.150 RMC DISPLAY WARNING DEVICES WHEN COMMERCIAL VEHICLE DISABLED $ 41.00 41.00 $ 0% $ -

10.52.155 (a) RMC PARKING OF CERTAIN COMMERCIAL VEHICLES, TRAILERS, SEMI-

TRAILERS AND STORAGE / POD CONTAINERS PROHIBITED
$ 116.00 116.00 $ 0% $ -

10.52.160 RMC PARKING OF CERTAIN COMMERCIAL VEHICLES PROHIBITED IN

RESIDENTIAL DISTRICTS
$ 71.00 71.00 $ 0% $ -

10.52.170 RMC RESTRICTIONS TO ALL NIGHT PARKING RECREATIONAL OR OTHERS

VEHICLES
$ 71.00 71.00 $ 0% $ -

10.52.175 RMC USE OF VEHICLES FOR DWELLING PURPOSES PROHIB $ 116.00 116.00 $ 0% $ -

10.52.190 (b) RMC NO PARKING ON CITY PROPERTY CONTRARY TO POSTED SIGNS $ 41.00 41.00 $ 0% $ -

10.52.220 RMC NO STOP, STAND, PARK IN CURBSIDE PASSENGER LOADING ZONE FOR >3 MINUTES
$ 41.00 41.00 $ 0% $ -

10.52.230 (a) RMC NO STOP, STAND, PARK IN FREIGHT CURB LOADING ZONE >20

MINUTES
$ 41.00 41.00 $ 0% $ -

10.52.250 (a) RMC NO STANDING OR PARKING OF PUBLIC BUSES OUTSIDE OF

DESIGNATED BUS STAND
$ 41.00 41.00 $ 0% $ -

10.52.250 (b) RMC NO STOOPING PUBLIC BUSES OUTSIDE DESIGNATED BUS STAND FOR (UN)LOADING
$ 41.00 41.00 $ 0% $ -

10.52.250 (c) RMC NO STOPPING OF PUBLIC BUSES 18" FROM CURB WHEN (UN)LOADING $ 41.00 41.00 $ 0% $ -

10.52.250 (d) RMC NO STANDING OR PARKING OF TAXICABS OUTSIDE OF DESIGNATED

TAXI STAND
$ 41.00 41.00 $ 0% $ -

10.52.250 (e) RMC NO STOPPING, STANDING, AND PARKING IN DESIGNATED BUS AND

TAXICAB STANDS
$ 41.00 41.00 $ 0% $ -

10.60.020 (a) RMC UNLAWFUL TO PARK MUNICIPAL FACILITY WITHOUT PROPER PAYMENT

AND PERMIT
$ 41.00 41.00 $ 0% $ -

Page 80 ends

CODE FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

PUBLIC WORKS

PARKING BAIL

10.60.020 (b) RMC UNLAWFUL TO PARK MUNICIPAL FACILITY OUTSIDE OF TIME

RESTRICTIONS
$ 41.00 41.00 $ 0% $ -

10.60.040 (a) RMC PARKING IN MUNICIPAL FACILITY WITHOUT RECEIVING AND

ACCEPTING A CLAIM TICKET
$ 41.00 41.00 $ 0% $ -

10.60.040 (b) RMC VEHICLE EXITING A MUNI FACILITY WITHOUT SURRENDERING AND

PAYING CLAIM TICKET
$ 41.00 $ 41.00 0% $ -

10.60.060 RMC MANNER OF PARKING IN MUNI FACILITY - DRIVEWAY, AISLE, WALK

AND TWO SPACES
$ 41.00 $ 41.00 0% $ -

10.66.040 RMC ON-STREET VEHICLE SALES PROHIBITED $ 116.00 116.00 $ 0% $ -

16.32.285 RMC OBSTRUCTION OF FIRE APPARATUS ACCESS ROADS $ 46.00 46.00 $ 0% $ -

Page 81 ends

RULE
NO. FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

MINIMUM DEPOSIT
4 Residential $ 100.00 23,666 $ 200.00 100% (1) 4 All Other Classes $ 100.00 536 $ 200.00 100% (1) 4 Reconnection / All Classes of Service $ 100.00 4,095 $ 200.00 100% (1)

SERVICE TURN-ON CHARGE
4 Next Day $ 21.50 13,157 $ 48.50 126% $ 355,239 4 Same Day $ 37.50 802 $ 62.75 67% $ 20,251 4 After Hours $ 53.75 $ 77.00 43% $ - 4 Customers with AMI (New FY 2024/25) N/A $ 6.00 0% $ - 4 Special Appointment $ 10.75 DELETE 0% $ - NON-SUFFICIENT FUNDS (NSF) PROCESSING FEE (CITYWIDE FEE) (2) 5 Initial Non-Sufficient Funds Fee $ 25.00 717 $ 30.00 20% $ 3,585 Subsequent Non-Sufficient Funds Fee (Each) $ 30.00 $ 45.00 50% $ -

METER TEST
6 Second Request Within 1 Year Period $ 107.50 10 $ 364.00 239% $ 2,565 6 Re-Read/Second Request Within 6 Months $ 26.75 10 $ 48.50 81% $ 218

FIELD NOTIFICATION
7 48-Hour Field Notification $ 21.50 120,000 $ 31.75 48% $ 1,230,000 7 48-Hour Field Notification (each additional notice per account) $ 1.00 5 $ 6.50 550% $ 28 7 FUND VERIFICATION FEE $ 5.25 DELETE 0% $ - 7 TRIP CHARGE FOR ADDITIONAL FIELD VISIT $ 16.00 $ 34.50 116% $ - (CUT-OFF FOR NON PAYMENT, ETC.)

SERVICE RECONNECTION (TURN-ON) CHARGE
7 Next Day $ 43.00 $ 48.50 13% $ - 7 Same Day $ 64.50 7,238 $ 62.75 -3% $ (12,667) 7 Same Day (Low-Income)
$ 53.75 DELETE 0% $ -
7 After Hours $ 79.50 $ 77.00 -3% $ -

RIVERSIDE PUBLIC UTILTIES - ELECTRIC

Page 82 ends

RULE
NO. FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

RIVERSIDE PUBLIC UTILTIES - ELECTRIC
7 Customers with AMI (New FY 2024/25) N/A $ 6.00 0% $ - 7 Additional fee if customer has self-restored Actual Cost 92 Actual Cost 0% $ -

RECONNECTION CHARGE/ADDITIONAL
7 Overhead service terminated by Electrical Crew $ 322.50 3 $ 460.00 43% $ 413 7 Underground Service terminated by Electrical Crew $ 430.00 5 $ 902.00 110% $ 2,360 7 Overhead service drop removed by Electrical Crew $ 483.75 6 $ 460.00 -5% $ (143) 7 Underground service cable removed by Electrical Crew $ 677.25 1 $ 902.00 33% $ 225 8 TEMPORARY OVERHEAD ELECTRIC SERVICE $ 397.75 15 $ 955.00 140% $ 8,359 8 Additional - Transformer Required $ 1,182.50 5 $ 1,310.00 11% $ 638 8 TEMPORARY UNDERGROUND ELECTRIC SERVICE $ 1,010.50 3 $ 1,200.00 19% $ 569 8 Additional - Temporary Pad Mounted Transformer Required Actual Cost 3 Actual Cost 0% $ - 8 Temporary Service Larger than 200 amps Actual Cost 4 Ac tual Cost 0% $ - TEMPORARY METER REMOVAL FOR MAIN BREAKER REPAIR N/A 100 $ 177.50 0% $ 17,750 (NEW FY 2024/25)

LINE EXTENSIONS
10 New or Increased Loads - Deposit $ 500.00 16 $ 500.00 0% $ - 10 New or Increased Loads Actual Cost 5 Actual Cost 0% $ -

DESIGN DEPOSIT
11 Multi-family Residential (100 units or less) $ 2,687.50 7 $ 4,068.00 51% (1) 11 Multi-family Residential (101 units or more) $ 5,375.00 4 $ 6,785.00 26% (1) 11 Commercial (0-200A) $ 537.50 99 $ 748.00 39% (1) 11 Commercial and Industrial (400A-800A) $ 1,075.00 37 $ 1,815.00 69% (1) 11 Commercial and Industrial (1000A-3000A) $ 2,687.50 22 $ 2,687.00 0% (1) 11 Commercial and Industrial (4000A and above) $ 5,375.00 2 $ 7,897.00 47% (1) 13 APPOINTMENT BASED METER READS $ 26.75 $ 28.50 7% $ - 13 MONTHLY RENTAL OF REMOTE METERING TO RESOLVE $ 2.50 DELETE 0% $ -

ACCESS ISSUE

Page 83 ends

RULE
NO. FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

RIVERSIDE PUBLIC UTILTIES - ELECTRIC

TEMPORARY TURN ON OR TURN OFF OF ELECTRIC SERVICE

FOR REPAIR
14 Normal Working Hours - first aggregate hour is free $ 102.00 $ 162.00 59% $ - 14 After Normal Working Hours - $130.00 minimum for first hour $ 139.75 $ 182.00 30% $ -

STREET LIGHTING - UNIT OF BENEFIT CHARGE
15 Residential Streets $ 3,416.25 1 $ 19,695.00 477% $ 16,279 15 Arterial Streets $ 3,725.75 3 $ 22,435.00 502% $ 56,128 19 COST TO INVESTIGATE ENERGY DIVERSION
Higher of $161.25 plus material or time and material $ 161.25 8 $ 571.00 254% $ 3,278 plus material and/or time plus material and/or time

DISTRIBUTED GENERATION APPLICATION AND PROCESSING FEE
Net Energy Metering Initial Review
22 Residential $ 241.75 600 $ 260.00 8% $ 10,950 22 Commercial - Flat and Demand $ 387.00 57 $ 722.00 87% $ 19,095 22 Commercial - Time of Use (TOU) $ 929.75 6 $ 722.00 -22% $ (1,247) 22 Initial Review $ 860.00 16 $ 722.00 -16% $ (2,208) 22 Supplemental Review $ 645.00 3 $ 722.00 12% $ 231 22 Full System Study Actual Cost 1 Actual Cost 0% $ -

METER SPOT
Disconnect or Reconnect $ 215.00 850 $ 1,133.00 427% $ 780,300 Midspan $ 483.75 150 $ 1,133.00 134% $ 97,388 Initial Inspection (New FY 2024/25) N/A 1,000 $ 92.75 0% $ 92,750 PLAN CHECK FOR BUILDING AND PUBLIC WORKS (NEW FY 2024/25) N/A 1,400 $ 519.00 0% $ 726,600 CEQA REVIEW (NEW FY 2024/25) N/A 6 $ 1,650.00 0% $ 9,900 CANCELLATION FEE (NEW FY 2024/25) N/A $ 819.00 0% $ -

Page 84 ends

RULE
NO. FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

RIVERSIDE PUBLIC UTILTIES - ELECTRIC
EV METER ADAPTER PERMIT (NEW FY 2024/25)
Adapter Permit $ 725.50 15 $ 903.00 24% $ 2,663 Existing 240v Outlet $ 107.50 $ 214.00 99% $ - New 240v Outlet $ 136.50 15 $ 214.00 57% $ 1,163 (1) Deposits are excluded from projected revenue total. (2) Fee established by Finance Department for Non-Sufficient Funds (NSF) Processing.

Page 85 ends

RULE
NO. FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

MINIMUM DEPOSIT
4 Residential $ 40.00 10 $ 40.00 0% (1) 4 All Other Classes $ 40.00 10 $ 40.00 0% (1) 4 Reconnection / All Classes of Service $ 40.00 15,095 $ 40.00 0% (1)

SERVICE TURN-ON CHARGE
4 Next Day $ 21.50 2,102 $ 48.50 126% $ 56,754 4 Same Day $ 37.50 101 $ 62.75 67% $ 2,550 4 After Hours $ 53.75 $ 77.00 43% $ - 4 Special Appointment $ 10.75 DELETE 0% $ - 5 NON-SUFFICIENT FUNDS (NSF) PROCESSING FEE (CITYWIDE FEE) (2) Initial Non-Sufficient Funds Fee 25.00 $ $ 30.00 20% $ - Subsequent Non-Sufficient Funds Fee (Each) 30.00 $ $ 45.00 50% $ -

METER TEST
6 Second Request Within 1 Year Period $ 107.50 10 $ 328.75 206% $ 2,213 6 Re-Read/Second Request Within 6 Months $ 26.75 10 $ 48.50 81% $ 218

FIELD NOTIFICATION
7 48-Hour Field Notification $ 21.50 $ 31.75 48% $ - 7 48-Hour Field Notification (each additional notice $ 1.00 95 $ 6.50 550% $ 523 per account)
7 FUND VERIFICATION FEE $ 5.25 DELETE 0% $ - 7 TRIP CHARGE FOR ADDITIONAL FIELD VISIT $ 16.00 4,445 $ 34.50 116% $ 82,233 (CUT-OFF FOR NON PAYMENT, ETC.)

SERVICE RECONNECTION CHARGE
7 Next Day $ 43.00 $ 48.50 13% $ - 7 Same Day $ 64.50 2 $ 62.75 -3% $ (4) 7 Same Day (Low-Income) $ 53.75 $ 53.75 0% $ - 7 After Hours $ 75.90 $ 77.00 1% $ -

RIVERSIDE PUBLIC UTILTIES - WATER

Page 86 ends

RULE
NO. FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

RIVERSIDE PUBLIC UTILTIES - WATER
7 Additional fee if customer has self-restored Actual Cost 17 Actual Cost 0% $ - 7 RECONNECTION CHARGE/ADDITIONAL - METER REMOVED $ 86.00 95 $ 277.00 222% $ 18,145 8 TEMPORARY WATER SERVICE Actual Cost Actual Cost 0% $ - 8 Fire Hydrant Water Meter Processing Fee $ 43.00 471 $ 88.75 106% $ 21,548 8 Fire Hydrant Water Meter Deposit $ 2,000.00 80 $ 2,000.00 0% $ - 8 SET, MOVE OR RELOCATION OF TEMPORARY FIRE HYDRANT Actual Cost 97 Actual Cost 0% $ -

WATER METER
8 REFUSAL TO ALLOW MONTHLY METER READ FOR FLOATING $ 55.91 $ 55.91 0% $ -

HYDRANT METERS
8 ANNUAL TESTING OF CITY DEPARTMENT WA TER METER $ 10.75 $ 55.25 414% $ - 8 REMOVAL OF FIRE HYDRANT OPERATING NUT $ 32.25 $ 55.25 71% $ -

RENTAL OF BACKFLOW PREVENTION ASSEMBLY
8 Per Assembly Processing Fee $ 40.00 DELETE 0% $ - 8 Per Assembly Deposit $ 1,000.00 DELETE 0% $ - 8 DAILY RENTAL CHARGE - 2" BACKFLOW PREVENTER $ 5.00 DELETE 0% $ - 8 SET OR MOVE BACKFLOW PREVENTION ASSEMBLY FROM No Charge DELETE 0% $ -

LOCATION TO LOCATION
10 COVENANT AND AGREEMENT CHARGE - PREPARATION $ 1,075.00 4 $ 553.00 -49% $ (2,088) CHARGE

INSPECTION FEE
10 Base Fee $ 247.25 5 $ 2,281.00 823% $ 10,169 10 Per lineal foot of pipeline $ 1.00 10, 773 $ 2.50 150% $ 16,160

Page 87 ends

RULE
NO. FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

RIVERSIDE PUBLIC UTILTIES - WATER
10 FIRE HYDRANT INSPECTION (EACH) $ 86.00 23 $ 76.25 -11% $ (224)

SERVICE INSPECTION (EACH)
10 1" $ 18.25 74 $ 34.00 86% $ 1,166 10 2" $ 53.75 12 $ 51.00 -5% $ (33) 10 4" or Larger $ 494.50 7 $ 407.25 -18% $ (611) 10 INITIAL PRESSURE TEST (EACH) $ 215.00 6 $ 1,324.00 516% $ 6,654 10 PRESSURE TEST (EACH AFTER INITIAL RE-TEST) $ 155.75 $ 311.00 100% $ - 10 EXTENDED CONSTRUCTION $ 1.00 $ 2.50 150% $ - 10 ADDITIONAL INSPECTION VISITS $ 72.00 $ 102.00 42% $ - 10 FOR EACH WET TAP WITNESSED BY WATER UTILITY INSPECTORS $ 215.00 $ 407.00 89% $ - 10 WATER SERVICE CONNECTIONS FOR INDIVIDUAL PREMISES OF $ 500.00 $ 500.00 0% $ - 4" OR LARGER, CASH REFUNDABLE BOND (PER CONNECTION)

TO GUARANTEE FINAL COMPLETION BY PRIVATE CONTRACTOR

WATER METER CHARGES
10 3/4" Meter $ 81.50 22 $ 97.50 20% $ 352 10 1" Meter $ 94.50 160 $ 109.00 15% $ 2,320 10 1 1/2" Meter $ 218.00 6 $ 276.00 27% $ 348 10 2" Meter $ 264.25 23 $ 322.00 22% $ 1,328 10 3" Meter or Larger Actual Cost Actual Cost 0% $ -

WATER MAIN OVERSIZING REIMBURSEMENT
10 8" Standard - 12" Oversized $ (16.00) $ (24.00) 50% $ - 10 12" Standard - 16" Oversized $ (24.00) $ (193.00) 704% $ - 11 BACTERIOLOGICAL TESTING FOR WATER METERS 2" AND $ 215.00 $ 438.00 104% $ -

LARGER FLUSHING TESTING CHARGE

Page 88 ends

RULE
NO. FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

RIVERSIDE PUBLIC UTILTIES - WATER

REQUEST FOR LARGER METER LATERAL PLACEMENT
11 5/8" to 3/4 " Meter (in addition to any other $ 21.50 DELETE 0% $ - applicable charges)
11 3/4" to 1" Meter (in addition to any other $ 16.00 $ 73.75 361% $ - applicable charges)
11 No Lateral Replacement (in addition to any other $ 34.25 $ 61.75 80% $ - applicable charges)
11 RELOCATION OF FIRE HYDRANTS Actual Cost Actual Cost 0% $ - 11 REPAIR OF WATER FACILITIES $ 53.75 $ 122.00 127% $ -

WATER SERVICE CONNECTION CHARGES
11 3/4" Meter (residential; 2 lane street) $ 1, 402.75 8 $ 8,077.00 476% $ 53,394 11 3/4" Meter (non-residential; 4 lane street) N/A $ 10,065.00 0% $ - 11 1" Meter (residential; 2 lane street) $ 1,419.00 35 $ 8,088.00 470% $ 233,415 11 1" Meter (non-residential; 4 lane street) N/A $ 10,077.00 0% $ - 11 1 1/2" Meter $ 2,423.00 7 Actual Cost 0% $ - 11 2" Meter $ 2,466.00 18 Actual Cost 0% $ - 11 3" Meter Actual Cost Actual Cost 0% $ - 11 FIRE SERVICE CONNECTION ABOVE GROUND (2 " AND Actual Cost Actual Cost 0% $ -

LARGER)
13 TEST/REPAIR OF BACKFLOW ASSEMBLY (PENALTY) $ 537.50 $ 537.50 0% $ - PLUS Actual Cost PLUS Actual Cost 0% $ -

TURN-ON AND TURN-OFF WATER SERVICE FOR REPAIR BY CUSTOMER 14 Monday through Friday: 6:00 pm to 10:00 pm $ 48.25 62 $ 67.25 39% $ 1,178 14 Monday through Friday: 10:00 pm to 7:30 am $ 91.25 18 $ 128.00 40% $ 662 14 Weekends and Holidays: 3:30 pm to 7:30 pm $ 48.25 53 $ 67.25 39% $ 1,007 14 Weekends and Holidays: 7:30 pm to 7:30 am $ 91. 25 21 $ 67.25 -26% $ (504) 16 GAGE CANAL COMPANY (CONTRACTS ONLY) $ 107.50 $ 169.00 57% $ -

Page 89 ends

RULE
NO. FEE DESCRIPTION
FY 2023/24
Current Fee
FY 2022/23
Volume
FY 2024/25
Proposed Fee
%
Change
Projected
Revenue
Impact

RIVERSIDE PUBLIC UTILTIES - WATER
19 COST TO INVESTIGATE WATER DIVERSION (PENALTY) $ 53.75 $ 53.75 0% $ - PLUS Actual Cost PLUS Actual Cost 0% $ - 20 APPOINTMENT BASED METER READS $ 26.75 $ 28.50 7% $ - 20 MONTHLY RENTAL OF REMOTE METERING TO RESOLVE $ 2.50 $ 34.75 1290% $ -

ACCESS ISSUES

FIRE PROTECTION SERVICE MAINTENANCE OF BELOW GROUND

DETECTOR ASSEMBLY
Inside City
4" $ 53.00 1,224 $ 212.00 300% $ 194,616 6" $ 79.25 2,568 $ 242.00 205% $ 417,942 8" $ 106.00 2,100 $ 272.00 157% $ 348,600 10" $ 132.50 336 $ 302.00 128% $ 56,952 12" $ 159.00 $ 332.00 109% $ - Outside City
4" $ 79.50 36 $ 224.00 182% $ 5,202 6" $ 119.00 108 $ 254.00 113% $ 14,580 8" $ 159.00 156 $ 284.00 79% $ 19,500 10" $ 198.50 $ 314.00 58% $ - 12" $ 238.50 $ 251.00 5% $ - WATER SUPPLY ASSESSMENT (NEW FY 2024/25) N/A 1 $ 5,670.00 0% $ 5,670 FIRE FLOW TEST (NEW FY 2024/25) N/A 121 $ 191.00 0% $ 23,111

PLAN CHECK FOR BUILDING AND PUBLIC WORKS
(NEW FY 2024/25 N/A 473 $ 45.50 0% $ 21,522 (1) Deposits are excluded from projected revenue total. (2) Fee established by Finance Department for Non-Sufficient Funds (NSF) Processing.

Page 90 ends
← All documents from this meeting