City of Riverside
HUD Annual Action Plan
2024-2025
FY 2024-2025
Adopted June
18, 2024
DRAFT
REVISED
Date: 6-18-24
Item No.: 4
HUD Annual Action Plan,
Revised pages 39, and
57 through 59
Annual Action Plan 38
OMB Control No: 2506-0117 (exp. 09/30/2021)
24 City of Riverside Public Works - ADA Footpath Improvements 25 City of Riverside Public Works - Goodview Ave (Imperial to Washington), Dorlen St (Lincoln to Lydia) Collingwood St, Amanda Ct Lydia Ave.; Cadet St.; Fiesta Ave., and Imperial St
26 City of Riverside Public Works -
Ellen St. (Picker to Philbin); Campbell Ave. (Ellen to Picket); and Picker St. (Wells to Philbin) Larry Way. (Ellen to Picker), and Gramercy Place. (Ellen to Picker) 27 City of Riverside CDBG Administration
28 HOPWA 2024-2025 HOPWA Administration
29 HOPWA 2024-2025 Foothill AIDS Project
30 HOPWA 2024-2025 Lutheran Social Services
31 HOPWA 2024-2025 Riverside County Housing Authority
32 HOPWA 2024-2025 TruEvolution
33 ESG Administration
34 HOME Administration
Table 3 - Project Information
Describe the reasons for allocation priorities and any obstacles to addressing underserved needs
The primary objective of the City's federal programs is to develop viable urban communities by providing decent, safe, and sanitary housing, and expanding economic opportunities principally for persons of low and moderate -income. The mission of meeting and addressing these community, social and economic development needs of low -income persons and their communities is of importance to the City. Unfortunately, there are barriers and challenges that hinder the development and implementation of important progra ms intended to serve those most in need.
One of the most important steps in addressing obstacles to community development is identification and evaluation. In the City of Riverside, obstacles for federally funded activities Annual Action Plan 57
OMB Control No: 2506-0117 (exp. 09/30/2021)
Planned Activities Ward 7 Hole Lake- Perimeter Fencing /Barriers 23 Project Name City of Riverside Public Works – ADA Footpath Improvement Target Area Ward 1 CDBG Target Area
Goals Supported Infrastructure
Needs Addressed Infrastructure
Funding CDBG: $200,000
Description This Project will build new pedestrian ramps at various locations throughout the City. The pedestrian ramps will be constructed at locations where ramps currently do not exist. The concrete ramps will be constructed per current ADA standards and will include truncated domes and grooves for the visually impaired
Target Date 6/30/2026
Estimate the number and
type of families that will
benefit from the
proposed activities
Approximately 560 residents of the GEOID: 060650302005 Block Group 5, Census Tract 414.08, of which 225 are low- to moderate-income
Location Description Ward 1 ADA Footpath Improvements
Planned Activities Laderna Ln to Sixth St; Quadrant: N,W (DWY) 2 ramps 24 Project Name City of Riverside Public Works – Ward 4 Street Improvements Target Area WARD 4 CDBG TARGET AREA
Goals Supported Infrastructure
Needs Addressed Infrastructure
Funding CDBG: $650,000
Annual Action Plan 58
OMB Control No: 2506-0117 (exp. 09/30/2021)
Description This project ent ails the street improvements including new pavement; upgrading pedestrian ramps; constructing new sidewalk, cub gutter, driveway approaches, and cross gutter; removing trees when required; and replacing signing and striping as necessary Target Date 6/30/2026
Estimate the number and
type of families that will
benefit from the
proposed activities
Approximately 1385 residents of the GEOID: 060650317011 Block Group 1, Census Tract 317.01 of which 775 are low- to moderate-income
Location Description Ward 4 Street improvements
Planned Activities Goodview Ave (Imperial to Washington), Dorlen St (Lincoln to Lydia) Collingwood St, Amanda Ct
Lydia Ave.; Cadet St.; Fiesta Ave., and Imperial St
25 Project Name City of Riverside Public Works – Ward 6 Street Improvements Target Area WARD 6 CDBG TARGET AREA
Goals Supported Infrastructure
Needs Addressed Infrastructure
Funding CDBG: $780,467.30
Description This project entails the street improvements including new pavement; upgrading pedestrian ramps; constructing new sidewalk, curb, gutter, driveway approaches, and cross gutter; removing trees when required; and replacing signing and stripping as necessary.
Target Date 6/30/2026
Annual Action Plan 59
OMB Control No: 2506-0117 (exp. 09/30/2021)
Estimate the number and
type of families that will
benefit from the
proposed activities
Approximately 1055 residents of the GEOID: 060650412023 Block Group 3, Census Tract 412.02, of which 675 are low- to moderate-income
Location Description Ward 6 Street Improvements
Planned Activities
26 Project Name
Ellen St.(Picker to Philbin);Campbell Ave.(Ellen to Picket); Picker St.(Wells to Philbin) Larry Way(Ellen to Picker), and Gramercy Place. (Ellen to Picker)
City of Riverside-CDBG Administration
Target Area CITYWIDE ALL COUNCIL WARDS
Goals Supported Community Services
Infrastructure
Community Facilities
Needs Addressed Community Services
Funding CDBG: $555,528,40
Description Administration of the CDBG Program for the City of Riverside Target Date 6/30/2025
Estimate the number and
type of families that will
benefit from the
proposed activities
Administration of the CDBG Program at the City of Riverside Location Description Citywide
Planned Activities Administration of the CDBG Program at the City of Riverside. 27 Project Name HOPWA City of Riverside Administration 2024-2027 Target Area CITYWIDE ALL COUNCIL WARDS