May 2, 2024

Attn: Mr. Thuy Nguyen, PE
City of Riverside Public Works Department, Engineering Division 3900 Main Street
Riverside, CA 92522

Subject: Dexter and Fairgrounds Lift Station Final Design Services for Inline Overwatch System Dear Mr. Nguyen:

As discussed with you, LEE + RO is pleased to submit this proposal for preparing final design engineering services for two (2) lift stations: Dexter LS and Fairgrounds LS . The two designs will be based on the In -Line Overwatch System per the City’s request. The final design will expand on current preliminary research efforts and will consist of new 90% and 100% submittals. Both designs assume that the existing lift stations will be demolished, and the new upgraded lift stations will be constructed in their place.

Please note that based on our conversation with you, the Overwatch based system will not have 2 hours of physical storage for the wastewater. Instead, battery storage capacity to provide a minimum of two hours of pumping capacity will be provided during SCE power outage event.

The proposed tasks requested for authorization per each lift station include the following:

1. Project Management, Administration, and QAQC for the duration of the project.

2. Preparation of final design documents for two (2) separate lift stations. Final design will include calculations, hydraulic analyses, and vendor coordination for the desired Overwatch system.

3. Preparation of construction ready drawings for the alternatives identified including site, mechanical, and electrical layouts at the 90 and 100% submittal phases including associated technical specifications.

4. Preparation of preliminary engineering estimates of probable construction costs.

FEE
LEE + RO proposes a total not-to-exceed fee of $142,546. We have enclosed a fee breakdown for the proposed work as Exhibit A. Thank you for this, and every opportunity. If you have any questions, please feel free to contact me via email at [email protected] or (626) 667-5309. We are including the Opinion of Probably Construction Costs for both the stations based on the current design we have and the Overwatch system that will help you understand the cost savings that the City can realize using the Overwatch system.

Respectfully submitted,

LEE + RO, Inc.

Principal-In-Charge / Chief Executive Officer
[email protected]

Enclosures: Exhibit A Manhours and Fee Breakdown and Opinion of Probable Construction Costs

5/2/2024
Labor Category: E8 Managing Engineer; E7 Supervising Engineer;E5 Senior Engineer; E4 Engineer; E3 Associate Engineer; E2 Assistant Engineer; T4 Designer; T2 Assistant Designer; A1 Administrative Assistant/Word Processor E8 E7 E5 E4 E2 T4 T2 A1 Project Tasks $305 $273 $205 $189 $126 $155 $115 $91
Task 1: Dexter LS Design Services

1. Project Management, Coordination, and QAQC 6 6 6 18 $3,510 $3,510

2. Preliminary Design, Calculations, and Vendor Coordination 2 4 12 8 26 $4,706 $4,706

3. Prepare Final Design Documents

3.b Submit 90% Design Plans and Specs 10 20 20 60 20 60 190 $35,770 $35,770

3.c Submit 100% Design Plans and Specs 2 8 8 16 16 40 90 $15,674 $500 $16,174

4. Prepare Specifications and Opinion of Probable Construction Costs 2 16 24 8 50 $7,386 $7,386 Subtotal Task 1, Dexter LS Design Services 22 28 32 110 68 100 0 14 374 $67,046 $500 $0 $67,546 Task 2: Fairgrounds LS Design Services

1. Project Management, Coordination, and QAQC 8 8 8 24 $4,680 $4,680

2. Preliminary Design, Calculations, and Vendor Coordination 2 4 12 8 26 $4,706 $4,706

3. Prepare Final Design Documents

3.b Submit 90% Design Plans and Specs 16 20 24 60 24 60 204 $38,924 $38,924

3.c Submit 100% Design Plans and Specs 4 8 8 24 24 40 108 $18,804 $500 $19,304

4. Prepare Specifications and Opinion of Probable Construction Costs 2 16 24 8 50 $7,386 $7,386 Subtotal Task 2, Fairgrounds LS Design Services 32 28 36 120 80 100 0 16 412 $74,500 $500 $0 $75,000 TOTAL NOT-TO-EXCEED 54 56 68 230 148 200 0 30 786 $141,546 $1,000 $0 $142,546 Exhibit A: Request for Optional Services Fee Breakdown
City of Riverside, Dexter and Fairgrounds Sewer Lift Station Replacement Project TOTALTotal
Hours Total Labor Other Direct
Costs
Sub-
Consultant
Fees
J:\PROJ\1213 City of Riverside, Fairgrounds St. & Dexter Dr. Wastewater LS\1PROJ\C Contract\Overwatch Design Fee Proposal\Rev2\1213 Exhibit 1 - Fee.xlsx LEE & RO, Inc.