1/9/2025
1 RiversideCA.gov1
RiversideCA.gov
Award BID 8044FY 2023/2024 ARTERIAL AND MINOR STREET MAINTENANCE, PHASE 1City CouncilJanuary 28, 2025Public Works Department RiversideCA.gov2
1. The Public Works Department utilizes a Pavement Management Program and receives service requests from residents to plan various maintenance improvements throughout the City. 2. Every fiscal year, the Public Works Department budgets a portion of State Gas Tax, County Measure A, and City Measure Z revenues for street rehabilitation of City arterial and minor streets. This project will focus on rehabilitation of streets in poor condition.BACKGROUND1 2 1/9/2025
2 RiversideCA.gov3
3. On January 11, 2024, the Infrastructure Committee received a list of proposed maintenance locations to be completed with the various Fiscal Year 2023/2024 funding sources. 4. The maintenance improvements included Bid 8044 were locations included in the complete list provided in the report from January 2024. The remaining locations outlined in that list are included in other projects. BACKGROUND RiversideCA.gov4
1. Resurface 1.5 miles on four collector roads including:•Main Street from 15thSt to 10thSt•Strong Street from Orange St to La Cadena Dr•Ivy Street from Monterey Rd to Myrtle Ave•Myrtle Ave from Victoria Ave to Victoria Ave2. Resurface 1.0 miles of local roads within two different neighborhoods. CURRENT PROJECT3 4 1/9/2025
3 RiversideCA.gov5
3. Construct new pavement of the Alley N/O Third St in between of Cedar St and Pine St;4. Reconstruct the pavement of the Alley N/O University in between Lemon St and Lime St;5. Pavement preservation on Central Avenue from Canyon Crest Drive to Quail Run Road;6. Pavement preservation on local streets;7. Street improvements on Lincoln Ave and Victoria Ave intersectionCURRENT PROJECT RiversideCA.gov6
8. Storm drain improvements on Tract 396759. Traffic signing and striping improvements at the Trautwein Rd and Alessandro Blvd intersection.10.Install Accessible Pedestrian Push-Button (APS) enhancements at 4 Signalized Intersections11.Install LED Edge-Lit Chevron signage at Alessandro Boulevard near Royal Hill Drive facing southbound trafficCURRENT PROJECT5 6 1/9/2025
4 RiversideCA.gov7
12.Install LED Edge-Lit Stop Signs at 17 stop-controlled intersections Citywide13.Install Solar-Powered Speed Feedback Signs at 17 locations Citywide14.Reconstruct damaged concrete curbs, gutters, sidewalks, driveways, and non-compliant pedestrian ramps within all rehabilitation locations.15.Install new signing and striping throughout, as necessary.CURRENT PROJECT RiversideCA.gov8
PRIMARY LOCATION MAP
7 8
1/9/2025
5 RiversideCA.gov9
EXISTING CONDITIONS
MAIN STREET ALAMO STREET
RiversideCA.gov10
EXISTING CONDITIONSALLEY N/O THIRD ST ALLEY N/O UNIVERSITY AVE 9 10
1/9/2025
6 RiversideCA.gov11
Strategic Priority No. 6 Infrastructure, Mobility and ConnectivityGoal No. 6.2 – Maintain, protect, and improve assets and infrastructure within the City’s built environment to ensure and enhance reliability, resiliency, sustainability, and facilitate connectivity.Cross-Cutting Threads
STRATEGIC PLAN ALIGNMENT
RiversideCA.gov12
1. Award a construction contract for Bid No. 8044 for FY 2023/2024 Arterial and Minor Streets Maintenance, Phase 1 to Onyx Paving Company, Inc., of Anaheim, California, in the amount of $3,456,000; and2. Authorize the City Manager, or his designee, to execute the construction contract, including making minor non-substantial changes.RECOMMENDATIONS11 12