2024/2025 CDBG WARD 7 – BID 8139 FORMER HOLE LAKE PERIMETER FENCINGCity CouncilApril 8, 2025Public Works Department RiversideCA.gov2
1. On July 13, 2010, the City Council adopted a MitigatedNegative Declaration requiring 5.31 acres ofriparian/wetland habitat mitigation for the Jurupa AveExtension street improvements.2. On September 22, 2015, the City Council approved aService Agreement with RCRCD and granted aConservation Easement within former Hole Lake.3. On October 22, 2024, The City Council approved the FirstAmendment to the Service Agreement with RCRCD inthe additional amount of $3,758,016.08 as a result in thedelays experienced with the homeless encampmentswithin the Former Hole Lake area.BACKGROUND1 2 3/25/2025
2 RiversideCA.gov3
4. The City has agreed to provide cleanup services toaccompany RCRCD’s mitigation efforts and to installperimeter fencing to reduce the pedestrian foottraffic and illegal dumping within the conservationeasement.5. The City received partial federal funding through theUnited Stated Department of Housing and UrbanDevelopment (HUD) which is administered throughthe Housing and Human Services DevelopmentDepartment to install the fencing.BACKGROUND RiversideCA.gov4
1. Install 4,300 linear feet of 8-foot tall, anti-scale steelsecurity fencing.2. Install swinging gates with multi-latch, locking systemsat 6 locations for authorized vehicular access and 1location for authorized personnel access.3. Install bollards at two locations on the Santa AnaRiver Trail bike path and provide minor modifications .CURRENT PROJECT3 4 3/25/2025
3 RiversideCA.gov5
4. Construct concrete driveway approaches for threeof the authorized vehicular access locations.5. Provide minor modifications to the signing andstriping for the Santa Ana River Trail bike signs andrelocate existing perimeter access restriction signs, asnecessary.CURRENT PROJECT RiversideCA.gov6
LOCATION MAP
5 6
3/25/2025
4 RiversideCA.gov7
•Strategic Priority No. 6 Infrastructure, Mobility and Connectivity and GoalNo. 6.2 – Maintain, protect, and improve assets and infrastructure withinthe City’s built environment to ensure and enhance reliability, resiliency,sustainability, and facilitate connectivity.•This item aligns with each thread for Community Trust, Equity, FiscalResponsibility, Innovation, and Sustainability & Resiliency.Cross-Cutting Threads
STRATEGIC PLAN ALIGNMENT
RiversideCA.gov8
1. Award a construction contract for Bid No. 8139 for theconstruction of Fiscal Year 2024/25 CommunityDevelopment Block Grant Ward 7 Former Hole LakePerimeter Fencing to Ibarra General Engineering, Inc. ofRiverside, California, in the amount of $1,357,100; and.2. Authorize the City Manager, or designee, to execute theconstruction contract with Ibarra General Engineering,Inc., including making minor and non-substantive changes,subject to the availability of budgeted funds.RECOMMENDATIONS7 8