Wetlands
U.S. Fish and Wildlife Service, National Standards and Support Team, [email protected]
Wetlands
Estuarine and Marine Deepwater
Estuarine and Marine Wetland
Freshwater Emergent Wetland
Freshwater Forested/Shrub Wetland
Freshwater Pond
Lake
Other
Riverine
December 2, 2019
00 .055 0 .110.0275 mi
0 0.09 0.180.045 km
1:3,417
This page was produced by the NWI mapper
National Wetlands Inventory (NWI)
This map is for general reference only. The US Fish and Wildlife Service is not responsible for the accuracy or currentness of t he base data shown on this map. All wetlands related data should be used in accordance with the layer metadata found on the Wetlands Mapper web site.
■
□
□
■
□
■
□
1 Corbet, Lauren
From: Corbet, Lauren
Sent: Monday, December 2, 2019 10:02 AM
To: [email protected]
Subject: Public Records Request
Hello,

This firm is performing a Phase I Environmental Site Assessment for the property located at the following addresses:

Southeast Corner of Victoria Ave. and La Sierra Ave., Riverside, CA 92503

We are requesting any information from your department pertaining to the above property.

Please feel free to contact Kevin Ballesteros with any questions or concerns at 310-854-6300 or [email protected]. Thank you for your assistance with this information.

Regards,

Lauren Corbet | Environmental Specialist
EFI Global, Inc.

Los Angeles, CA
DIRECT 310.854.6300 | FAX 310.854.0199
CELL: 323.326.6124 | EMAIL: [email protected] CSLB License #: 885902
www.efiglobal.com | Caring counts®

&lob'al
1 Ballesteros, Kevin EFI
From: Corbet, Lauren
Sent: Tuesday, December 10, 2019 12:25 PM
To: Ballesteros, Kevin EFI
Subject: FW: Public Records Request
Follow Up Flag: Follow up
Flag Status: Flagged
Categories: Client Respond
045.02270

Hi Kevin,

Let me know if I should reply to the below email saying that the property is vacant and has no physical address associated with it.

Regards,

Lauren Corbet | Environmental Specialist
EFI Global, Inc.

Los Angeles, CA
DIRECT 310.854.6300 | FAX 310.854.0199
CELL: 323.326.6124 | EMAIL: [email protected] CSLB License #: 885902
www.efiglobal.com | Caring counts®

From: WB‐RB8‐FileReview8 <[email protected]> Sent: Tuesday, December 10, 2019 12:21 PM
To: Corbet, Lauren <[email protected]>
Subject: RE: Public Records Request

Good afternoon,

Unfortunately, we do not use APN numbers or cross streets to maintain our files. We only use facility names and/or physical address numbers to locate files. If you can provide a numerical address or facility name, we can carry out your request.

If we can be of further assistance, please do not hesitate to contact us again.

Thank you,
File Review Desk
3737 Main St. Suite 500
Riverside, CA 92501

From: Corbet, Lauren <[email protected]>
Sent: Monday, December 2, 2019 10:02 AM
lobal
2 To: WB‐RB8‐FileReview8 <[email protected]> Subject: Public Records Request

Hello,

This firm is performing a Phase I Environmental Site Assessment for the property located at the following addresses:

Southeast Corner of Victoria Ave. and La Sierra Ave., Riverside, CA 92503

We are requesting any information from your department pertaining to the above property.

Please feel free to contact Kevin Ballesteros with any questions or concerns at 310-854-6300 or [email protected]. Thank you for your assistance with this information.

Regards,

Lauren Corbet | Environmental Specialist
EFI Global, Inc.

Los Angeles, CA
DIRECT 310.854.6300 | FAX 310.854.0199
CELL: 323.326.6124 | EMAIL: [email protected] CSLB License #: 885902
www.efiglobal.com | Caring counts®

Any personal data acquired, processed or shared by us will be lawfully processed in line with applicable data protection legislation. If you have any questions regarding how we process personal data refer to our Privacy Notice https://www.sedgwick.com/global‐privacy‐policy. Any communication including this email and files/attachments transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If this message has been sent to you in error, you must not copy, distribute or disclose of the information it contains and you must notify us immediately (contact is within the privacy policy) and delete the message from your system.

State of California

STATE WATER RESOURCES CONTROL BOARD

2010-2011

ANNUAL REPORT
FOR

STORM WATER DISCHARGES ASSOCIATED

WITH CONSTRUCTION ACTIVITIES

Reporting Period July 1, 2010 through June 30, 2011

In compliance with the Construction General Permit (CGP) an annual report is required to be submitted electronically via SMARTS by September 1 of each year. This document must be certified and signed, under penalty of perjury, by the appropriate official of your company.

If you have any questions, please contact your Regional Board Storm Water Permit Contact. The names, telephone numbers and e-mail addresses of the Regional Board contacts, as well as the Regional Board office addresses can be found at:
http://www.waterboards.ca.gov/water_issues/programs/stormwater/contact.shtml To find your Regional Board information, match the first digit of your WDID number with the corresponding number that appears in parenthesis on the first line of each Regional Board office.

GENERAL INFORMATION:

A.

Site WDID No:

Owner’s Name: Contact Person:

Physical Address: e-mail:

City: __ Zip: Phone:

Site Name: Contact Person:

Mailing Address: e-mail:

City: State: Zip: Phone:

B. Site Information:

C. General Information:

Was Construction active for three months or longer within this annual reporting period?:

Explanation:

Property Owner Information:

Certification:
still in plan check
Riverside
Hitesh Patel
CA
CA
[email protected]
[email protected]
Hitesh Patel
92307
TTM 36713
Hitesh Patel
Managing Member
La Sierra VIctoria Development LLC
760-963-3475
760-963-3475
Intersection of La Sierra Ave and Victoria Ave
No
apple valley
92503
19215 wild mustang court
2019
2019
2019-08-15 13:01:29.711
2018
2018
8 33C379764
e

State of California

STATE WATER RESOURCES CONTROL BOARD

2010-2011

ANNUAL REPORT
FOR

STORM WATER DISCHARGES ASSOCIATED

WITH CONSTRUCTION ACTIVITIES

Reporting Period July 1, 2010 through June 30, 2011

In compliance with the Construction General Permit (CGP) an annual report is required to be submitted electronically via SMARTS by September 1 of each year. This document must be certified and signed, under penalty of perjury, by the appropriate official of your company.

If you have any questions, please contact your Regional Board Storm Water Permit Contact. The names, telephone numbers and e-mail addresses of the Regional Board contacts, as well as the Regional Board office addresses can be found at:
http://www.waterboards.ca.gov/water_issues/programs/stormwater/contact.shtml To find your Regional Board information, match the first digit of your WDID number with the corresponding number that appears in parenthesis on the first line of each Regional Board office.

GENERAL INFORMATION:

A.

Site WDID No:

Owner’s Name: Contact Person:

Physical Address: e-mail:

City: __ Zip: Phone:

Site Name: Contact Person:

Mailing Address: e-mail:

City: State: Zip: Phone:

B. Site Information:

C. General Information:

Was Construction active for three months or longer within this annual reporting period?:

Explanation:

Property Owner Information:

Certification:

Still in plan check
Riverside
Hitesh Patel
CA
CA
[email protected]
[email protected]
Hitesh Patel
92307
TTM 36713
Hitesh Patel
Managing Member
La Sierra VIctoria Development LLC
760-963-3475
760-963-3475
Intersection of La Sierra Ave and Victoria Ave
No
apple valley
92503
19215 wild mustang court
2018
2018
2018-08-22 11:08:51.052
2017
2017
8 33C379764
e
State Water Resources Control Board

NOTICE OF INTENT

GENERAL PERMIT TO DISCHARGE STORM WATER

ASSOCIATED WITH CONSTRUCTION ACTIVITY
(WQ ORDER No. 2009-0009-DWQ)

0.24 La Sierra VIctoria Development LLC
[email protected]
[email protected]
Hitesh Patel

1.25 8.81 Acres
Region 8 - Santa Ana
Intersection of La Sierra Ave and Victoria Ave
[email protected]
951-782-4130
19215 wild mustang court

33.887564
Riverside
October 01, 2018
October 01, 2018
Managing Member
Managing Member
apple valley CA 92307
Sam Akbarpour
Hitesh Patel
Managing Member
23412
-117.46214
Santa Ana River
Riverside CA 92503
Hitesh Patel
Hitesh Patel
TTM 36713
No
Managing Member
*Residential
Level1
La Sierra VIctoria Development LLC
apple valley CA 92307
760-963-3475
760-963-3475
760-963-3475
[email protected]

28.88 October 01, 2019
May 09, 2017
Private Business

8.81 Acres
19215 wild mustang court
e
Attachments Meta Data Information:

Attachment ID File Name File Description File Hash File Size Date Attached Attachment Type 1913710 RISK RISK 18bcf507620bc251
bf349b5c4b02d75f
e20be80dfc4d9b16
86d31c6211c1
23040 2017-04-26
15:23:55.0
Laboratory Results
1913785 ARIAL ARIAL 4cd1b1fe6fe93442
4cb13bd834a4e40
a49cd1983e54986
868840cedb6181d
6 1262923 2017-04-26
16:36:51.0
Photograph
1913786 RISK RISK 18bcf507620bc251
bf349b5c4b02d75f
e20be80dfc4d9b16
86d31c6211c1
23040 2017-04-26
16:36:51.0
Laboratory Results
1913787 WPCD 1 WPCD 1 a35c61628d63fa7c
559f7471bb92238b
9b6b2784d2bcfc5d
6565866135904f
143251 2017-04-26
16:36:53.0
Facility/Site Map
1913788 WPCD 2 WPCD 2 b1caf4b222c84012
96adace06c678cd5
252431f551101bae
e887188735a3aac
1 136491 2017-04-26
16:36:54.0
Facility/Site Map
1913789 WPCD 3 WPCD 3 745193955a74aa8f
85fd7096ca30b615
9873a5a95246e11
dedb9e9bd642d3a
115021 2017-04-26
16:36:55.0
Facility/Site Map
1913790 WPCD 4 WPCD 4 58c7a27bb0d5734
164a077bf21a3842
64719ce89fb846cd
5e43dc64ba4ecbd3
123015 2017-04-26
16:36:57.0
Facility/Site Map
1913791 SWPPP SWPPP 9dbcadead771eb7
4deab5cdc133e308
d4b7af78dc1f94d5
b8123232fe43b8be
784006 2017-04-26
16:37:04.0
SWPPP
1913792 ARIAL ARIAL 4cd1b1fe6fe93442
4cb13bd834a4e40
a49cd1983e54986
868840cedb6181d
6 1262923 2017-04-26
16:38:16.0
Facility/Site Map
1913793 VICINITY MAP VICINTY MAP 8bbfd460df6c32ed
4f367ba8a6f3ecf32
7944b05ea787208
eea5a1255f46
24736 2017-04-26
16:38:17.0
Facility/Site Map
1914515 NOI Fee Statement
pdf
1058353 2017-04-27
18:27:49.0
Fee Statement PDF
Fee Statement
Application Id #
Facility/Site
Thank you for submitting Permit Registration Documents (PRDs) for the facility/site referenced above.

The application fee for this submittal is
Please note the application fee is due upon submittal of the PRDs. Permit coverage begins on receipt of payment and a WDID number is assigned. If payment is not received within 60 days the application

will be automatically returned as incomplete.

Please make checks payable to: SWRCB
Mail this Fee Statement and to:

Regular Mailing Address:

SWRCB
Storm Water Section
PO Box 1977
Sacramento, CA 95812-1977
Overnight Mailing Address:

SWRCB
Storm Water Section
1001 I Street – 15
th Floor
Sacramento, CA 95814
If you have questions or want to check on the status of the application, email us at [email protected] or call 1-866-563-3107.

Thank You,
Storm Water Help Desk
www.waterboards.ca.gov, ph:1-866-563-3107, fax:(916) 341-5543 1001 I Street, PO Box 1977, Sacramento, California, 95812 EDMUND G. BROWN JR.

FELICIA MARCUS, CHAIR
Riverside CA 92503
TTM 36713

THOMAS HOWARD, EXECUTIVE OFFICER

MATTHEW RODRIQUEZ
April 27, 2017
Intersection of La Sierra Ave
485872
$909.00
$909.00
State Water Resources Control Board
Water Boards
0 RECYCLED PAPER

GOVEANOA

SECRETARY FOR

ENV IRONMENTAL PROTECTION
Fee Statement
Application Id #
Facility/Site
Thank you for submitting Permit Registration Documents (PRDs) for the facility/site referenced above.

The application fee for this submittal is
Please note the application fee is due upon submittal of the PRDs. Permit coverage begins on receipt of payment and a WDID number is assigned. If payment is not received within 60 days the application

will be automatically returned as incomplete.

Please make checks payable to: SWRCB
Mail this Fee Statement and to:

Regular Mailing Address:

SWRCB
Storm Water Section
PO Box 1977
Sacramento, CA 95812-1977
Overnight Mailing Address:

SWRCB
Storm Water Section
1001 I Street – 15
th Floor
Sacramento, CA 95814
If you have questions or want to check on the status of the application, email us at [email protected] or call 1-866-563-3107.

Thank You,
Storm Water Help Desk
www.waterboards.ca.gov, ph:1-866-563-3107, fax:(916) 341-5543 1001 I Street, PO Box 1977, Sacramento, California, 95812 EDMUND G. BROWN JR.

FELICIA MARCUS, CHAIR
Riverside CA 92503
TTM 36713

THOMAS HOWARD, EXECUTIVE OFFICER

MATTHEW RODRIQUEZ
May 09, 2017
Intersection of La Sierra Ave
485872
$909.00
$909.00
State Water Resources Control Board
Water Boards
0 RECYCLED PAPER

GOVEANOA

SECRETARY FOR

ENV IRONMENTAL PROTECTION

State of California

STATE WATER RESOURCES CONTROL BOARD

2010-2011

ANNUAL REPORT
FOR

STORM WATER DISCHARGES ASSOCIATED

WITH CONSTRUCTION ACTIVITIES

Reporting Period July 1, 2010 through June 30, 2011

In compliance with the Construction General Permit (CGP) an annual report is required to be submitted electronically via SMARTS by September 1 of each year. This document must be certified and signed, under penalty of perjury, by the appropriate official of your company.

If you have any questions, please contact your Regional Board Storm Water Permit Contact. The names, telephone numbers and e-mail addresses of the Regional Board contacts, as well as the Regional Board office addresses can be found at:
http://www.waterboards.ca.gov/water_issues/programs/stormwater/contact.shtml To find your Regional Board information, match the first digit of your WDID number with the corresponding number that appears in parenthesis on the first line of each Regional Board office.

GENERAL INFORMATION:

A.

Site WDID No:

Owner’s Name: Contact Person:

Physical Address: e-mail:

City: __ Zip: Phone:

Site Name: Contact Person:

Mailing Address: e-mail:

City: State: Zip: Phone:

B. Site Information:

C. General Information:

Was Construction active for three months or longer within this annual reporting period?:

Explanation:

Property Owner Information:

Certification:

Plans are in plan check
Riverside
Hitesh Patel
CA
CA
[email protected]
[email protected]
Hitesh Patel
92307
TTM 36713
Hitesh Patel
Managing Member
La Sierra VIctoria Development LLC
760-963-3475
760-963-3475
Intersection of La Sierra Ave and Victoria Ave
No
apple valley
92503
19215 wild mustang court
2017
2017
2017-08-02 16:43:02.297
2016
2016
8 33C379764
e

STORMWATER POLLUTION PREVENTION PLAN

for

[TTM 36713]

RI
SK LEVEL 1

Le
gally Responsible Person [LRP):
[La Sierra Victoria Development LLC]
[19215 Wild Mustang Ct. Apple Valley, CA 92307]
[Hitesh Patel]
[760-963-3475]

Ap
proved Signatory:
[Hitesh Patel]
[760-963-3475]

Prepared for: [H itesh Patel]
[La Sierra Victoria Development LLC]
[19215 Wild Mustang Ct. Apple Valley, CA 92307]

Pr
oject Address:
[Intersection of La Sierra Ave & Victoria Ave.]

SW
PPP Prepared by:
[Sake Engineers Inc.]
[400 S. Ramona Ave. Ste. 202 Corona, Ca 92879]
[Sam Akbarpour]

SW
PPP Preparation Date
[4-25-2017]

Es
timated Project Dates:

Start of Construction 10-1-2018 Completion of Construction 10-1-2019

-
CASQA SWPPP Template i January 2011
Table of Contents
Table of Contents ...................................................................................................................... i Q
ualified SWPPP Developer ................................................................................................... 1 Legally Responsible Person ..................................................................................................... 2 Amendment Log ....................................................................................................................... 3 Section 1 SWPPP Requirements .......................................................................................... 4

1.1 Introduction .................................................................................................................4

1.2 Permit Registration Documents ....................................................................................4

1.3 SWPPP Availability and Implementation .....................................................................5

1.4 SWPPP Amendments ..................................................................................................5

1.5 Retention of Records ...................................................................................................6

1.6 Required Non-Compliance Reporting ..........................................................................8

1.7 Annual Report .............................................................................................................9

1.8 Changes to Permit Coverage ........................................................................................9

1.9 Notice of Termination ..................................................................................................9 Section 2 Project Information .............................................................................................10

2.1 Project and Site Description ....................................................................................... 10

2.1.1 Site Description ..................................................................................................... 10

2.1.2 Existing Conditions................................................................................................ 10

2.1.3 Existing Drainage .................................................................................................. 10

2.1.4 Geology and Groundwater ..................................................................................... 10

2.1.5 Project Description ................................................................................................ 10

2.1.6 Developed Condition ............................................................................................. 11

2.2 Permits and Governing Documents ............................................................................ 11

2.3 Stormwater Run-On from Offsite Areas ..................................................................... 11

2.4 Findings of the Construction Site Sediment and Receiving Water Risk Determination ...................................................................................................................... 12

2.5 Construction Schedule ............................................................................................... 13

2.6 Potential Construction Activity and Pollutant Sources ............................................... 13

2.7 Identification of Non-Stormwater Discharges ............................................................ 13

2.8 Required Site Map Information .................................................................................. 14

CA
SQA SWPPP Template ii January 2011

Se
ction 3 Best Management Practices .................................................................................16

3.1 Schedule for BMP Implementation ............................................................................ 16

3.2 Erosion and Sediment Control ................................................................................... 18

3.2.1 Erosion Control...................................................................................................... 19

3.2.2 Sediment Controls ................................................................................................. 23

3.3 Non-Stormwater Controls and Waste and Materials Management .............................. 27

3.3.1 Non-Stormwater Controls ...................................................................................... 29

3.3.2 Materials Management and Waste Management..................................................... 32

3.4 Post construction Stormwater Management Measures ................................................ 35 Section 4 BM P Inspection, [and] Maintenance [, and Rain Event Action Plans] ..............37

4.1 BMP Inspection and Maintenance .............................................................................. 37

4.2 Rain Event Action Plans ............................................................................................ 37 Section 5 Training ................................................................................................................39 Section 6 Responsible Parties and Operators .....................................................................40

6.1 Responsible Parties .................................................................................................... 40

6.2 Contractor List ........................................................................................................... 41 Section 7 Construction Site Monitoring Program ..............................................................42

7.1 Purpose .................................................................................................................. 42

7.2 Applicability of Permit Requirements .................................................................... 42

7.3. Weather and Rain Event Tracking .......................................................................... 43

7.3.1 Weather Tracking............................................................................................... 43

7.3.2 Rain Gauges ....................................................................................................... 43

7.4 Monitoring Locations ............................................................................................. 43

7.5 Safety and Monitoring Exemptions ........................................................................ 43

7.6 Visual Monitoring .................................................................................................. 45

7.6.1 Routine Observations and Inspections ................................................................ 46

7.6.1.1 Routine BMP Inspections ...........................................................................46

7.6.1.2 Non-Stormwater Discharge Observations ...................................................46

7.6.2 Rain-Event Triggered Observations and Inspections........................................... 46

7.6.2.1 Visual Observations Prior to a Forecasted Qualifying Rain Event ...............47

7.6.2.2 BMP Inspections During an Extended Storm Event ....................................47

7.6.2.2 Visual Observations Following a Qualifying Rain Event ............................47 1111

C
ASQA SWPPP Template iii January 2011

7.6.3 V isual Monitoring Procedures ............................................................................ 48

7.6.4 Visual Monitoring Follow-Up and Reporting ..................................................... 48

7.6.5 Visual Monitoring Locations .............................................................................. 48

7.7 Water Quality Sampling and Analysis .................................................................... 49

7.7.1 Sampling and Analysis Plan for Non-Visible Pollutants in Stormwater Runoff Discharges ..................................................................................................................... 49

7.7.1.1 Sampling Schedule .....................................................................................51

7.7.1.2 Sampling Locations ....................................................................................51

7.7.1.3 Monitoring Preparation ..............................................................................54

7.7.1.4 Analytical Constituents ..............................................................................55

7.7.1.5 Sample Collection ......................................................................................58

7.7.1.6 Sample Analysis .........................................................................................58

7.7.1.7 Data Evaluation and Reporting ...................................................................61

7.7.2 Sampling and Analysis Plan for pH and Turbidity in Stormwater Runoff Discharges ..................................................................................................................... 61

7.7.2.1 Sampling Schedule .....................................................................................61

7.7.2.2 Sampling Locations ....................................................................................62

7.7.2.3 Monitoring Preparation ..............................................................................63

7.7.2.4 Field Parameters .........................................................................................64

7.7.2.5 Sample Collection ......................................................................................64

7.7.2.6 Field Measurements ...................................................................................65

7.7.2.7 Data Evaluation and Reporting ...................................................................65

7.7.3 Additional Monitoring Following an NEL Exceedance ...................................... 67

7.7.3.1 Sampling and Analysis Plan for Suspended Sediment Concentration in Stormwater Runoff Discharges ..................................................................................67

7.7.3.2 Sampling and Analysis Plan for pH, Turbidity, and SSC in Receiving Water ...................................................................................................................69

7.7.4 Sampling and Analysis Plan for Non-Stormwater Discharges ............................. 72

7.7.4.1 Sampling Schedule .....................................................................................72

7.7.4.2 Sampling Locations ....................................................................................72

7.7.4.3 Monitoring Preparation ..............................................................................73

7.7.4.4 Analytical Constituents ..............................................................................74

7.7.4.5 Sample Collection ......................................................................................75

7.7.4.6 Sample Analysis .........................................................................................75

C
ASQA SWPPP Template iv January 2011

7.7.4.7 D ata Evaluation and Reporting ...................................................................75

7.7.5 Sampling and Analysis Plan for Other Pollutants Required by the Regional Water Board .................................................................................................................. 77

7.7.5.1 Sampling Schedule .....................................................................................77

7.7.5.2 Sampling Locations ....................................................................................77

7.7.5.3 Monitoring Preparation ..............................................................................78

7.7.5.4 Sample Collection ......................................................................................79

7.7.5.5 Sample Analysis .........................................................................................79

7.7.5.6 Data Evaluation and Reporting ...................................................................81

7.7.6 Training of Sampling Personnel ......................................................................... 81

7.7.7 Sample Collection and Handling ........................................................................ 81

7.7.7.1 Sample Collection ......................................................................................81

7.7.7.2 Sample Handling ........................................................................................82

7.7.7.3 Sample Documentation Procedures ............................................................83

7.8 Active Treatment System Monitoring .................................................................... 83

7.9 Bioassessment Monitoring ..................................................................................... 83

7.10 Watershed Monitoring Option ................................................................................ 83

7.11 Quality Assurance and Quality Control .................................................................. 84

7.11.1 Field Logs .......................................................................................................... 84

7.11.2 Clean Sampling Techniques ............................................................................... 84

7.11.3 Chain of Custody ............................................................................................... 84

7.11.4 QA/QC Samples ................................................................................................ 84

7.11.4.1 Field Duplicates .........................................................................................85

7.11.4.2 Equipment Blanks......................................................................................85

7.11.4.3 Field Blanks...............................................................................................85

7.11.4.4 Travel Blanks ............................................................................................85

7.11.5 Data Verification ................................................................................................ 85

7.12 Records Retention .................................................................................................. 86 CSMP Attachment 1: Weather Reports.................................................................................88 CSMP Attachment 2: Monitoring Records ...........................................................................90 CSMP Attachment 3: Example Forms ..................................................................................92 CSMP Attachment 4: Field Meter Instructions ................................................................... 103 CSMP Attachment 5: Supplemental Information ................................................................ 105

C
ASQA SWPPP Template v January 2011

S
ection 8 References .......................................................................................................... 107 Appendix A: Calculations ..................................................................................................... 108 Appendix B: Site Maps ......................................................................................................... 110 Appendix C: Permit Registration Documents ........................................................................ 112 Appendix D: SWPPP Amendment Certifications ................................................................... 114 Appendix E: Submitted Changes to PRDs ............................................................................. 117 Appendix F: Construction Schedule ..................................................................................... 119 Appendix G: Construction Activities, Materials Used, and Associated Pollutants ................. 121 Appendix H: CASQA Stormwater BMP Handbook Portal: Construction Fact Sheets ............ 125 Appendix I: BMP Inspection Form ...................................................................................... 127 Appendix J: Project Specific Rain Event Action Plan Template ........................................... 135 Appendix K: Training Reporting Form ................................................................................. 139 Appendix L: Responsible Parties .......................................................................................... 141 Appendix M: Contractors and Subcontractors ....................................................................... 145 Appendix N: Construction General Permit ........................................................................... 146

CASQA SWPPP Template 1 J anuary 2011

Q
ualified SWPPP Developer
Approval and Certification of the Stormwater Pollution Prevention Plan

P
roject Name: TTM 36713

Project Number/ID [if applicable]

“
This Stormwater Pollution Prevention Plan and Attachments were prepared under my direction to meet the requirements of the California Construction General Permit (SWRCB Orders No. 2009-009- DWQ as amended by Order 2010-0014-DWQ). I certify that I am a Qualified SWPPP Developer in good standing as of the date signed below.”

QSD Signature
Sam Akbarpour
Date
23412
QSD Name
C
ivil Engineer
QSD Certificate Number
(951) 279-4041
Title and Affiliation
S
[email protected]
Telephone Number
Email

CA
SQA SWPPP Template 2 January 2011

Le
gally Responsible Person
Approval and Certification of the Stormwater Pollution Prevention Plan Pr
oject Name: TTM 36713

Project Number/ID [if
applicable]

“I
certify under penalty of law that this document and all Attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, to the best of my knowledge and belief, the information submitted is, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

Legally Responsible Person [if organization]

Signature of [Authorized Representative of] Legally
Re
sponsible Person or Approved Signatory
Date

Name of [Authorized Representative of] Legally
Re
sponsible Person or Approved Signatory
Telephone Number

-■

C
ASQA SWPPP Template 3 January 2011

A
mendment Log

P
roject Name: TTM 36713

Project Number/ID [if applicable]

A
mendment
No. Date Brief Description of Amendment, include
section and page number
Prepared and Approved
By
Name:

QSD#
Name:

QSD#
Name:

QSD#
Name:

QSD#
Name:

QSD#
Name:

QSD#
Name:

QSD#
Name:

QSD#
Name:

QSD#

CA
SQA SWPPP Template 4 January 2011
Section 1 SWPPP Requirements

1.1 INTRODUCTION
The [TTM 36713] project comprises approximately [8.81 acres] and is located [intersection of La Sierra Ave. & Victoria Ave.] in [Riverside], California. The property is owned by [La Sierra Victoria Development LLC ] and is being developed by [La Sierra Victoria Development LLC].

The projects location is shown on the Site Map in Appendix B.

Thi
s Stormwater Pollution Prevention Plan (SWPPP) is designed to comply with California’s General Permit for Stormwater Discharges Associated with Construction and Land Disturbance Activities (General Permit) Order No. 2009-0009-DWQ as amended by Order No. 2010-0014-DWQ (NPDES No. CAS000002) issued by the State Water Resources Control Board (State Water Board). This SWPPP has been prepared following the SWPPP Template provided on the California Stormwater Quality Association Stormwater Best Management Practice Handbook Portal: Construction (CASQA, 2010). In accordance with the General Permit, Section XIV, this SWPPP is designed to address the following:
• Pollutants and their sources, including sources of sediment associated with construction, construction site erosion and other activities associated with construction activity are controlled;
• Where not otherwise required to be under a Regional Water Quality Control Board (Regional Water Board) permit, all non-stormwater discharges are identified and either eliminated, controlled, or treated;
• Site BMPs are effective and result in the reduction or elimination of pollutants in stormwater discharges and authorized non-stormwater discharges from construction activity to the Best Available Technology/Best Control Technology (BAT/BCT) standard;
Calculations and design details as well as BMP controls for are complete and correct, Appendix A.

1. 2 PERMIT REGISTRATION DOCUMENTS
Required Permit Registration Documents (PRDs) shall be submitted to the State Water Board via the Stormwater Multi Application and Report Tracking System (SMARTS) by the Legally Responsible Person (LRP), or authorized personnel (i.e., Approved Signatory) under the direction of the LRP. The project-specific PRDs include:

1. Notice of Intent (NOI);

2. Risk Assessment (Construction Site Sediment and Receiving Water Risk Determination);

3. Site Map;

4. Annual Fee;

5. Signed Certification Statement (LRP Certification is provided electronically with SMARTS PRD submittal); and

6. SWPPP.
--
-

CA
SQA SWPPP Template 5 January 2011
Site Maps can be found in Appendix B. A copy of the submitted PRDs shall also be kept in Appendix C along with the Waste Discharge Identification (WDID) confirmation.

Add
itional PRDs may be required depending on the construction type and location. Modify and include the below test to address items as applicable.
• Post-construction water balance calculation;
• Active Treatment System (ATS) plan; and
• Dischargers proposing an alternate soil erodibility factor must submit justification (documentation of methods used [e.g. soil particle size analysis].

1. 3 SWPPP AVAILABILITY AND IMPLEMENTATION
The discharger shall make the SWPPP available at the construction site during working hours (see Section 7.5 of CSMP for working hours) while construction is occurring and shall be made available upon request by a State or Municipal inspector. When the original SWPPP is retained by a crewmember in a construction vehicle and is not currently at the construction site, current copies of the BMPs and map/drawing will be left with the field crew and the original SWPPP shall be made available via a request by radio/telephone. (CGP Section XIV.C) The SWPPP shall be implemented concurrently with the start of ground disturbing activities.

1.4 SWPPP AMENDMENTS
The SWPPP should be revised when:
• If there is a General Permit violation.
• When there is a reduction or increase in total disturbed acreage (General Permit Section II Part C).
• BMPs do not meet the objectives of reducing or eliminating pollutants in stormwater discharges.

Consider including the following text; modified accordingly Additionally, the SWPPP shall be amended when:
• The
re is a change in construction or operations which may affect the discharge of pollutants to surface waters, groundwater(s), or a municipal separate storm sewer system (MS4);
• When there is a change in the project duration that changes the project’s risk level; or • When deemed necessary by the QSD. The QSD has determined that the changes listed in Table 1.1 can be field determined by the QSP. All other changes shall be made by the QS
D as formal amendments to the SWPPP.

The following text should be modified accordingly
The following items shall be included in each amendment:
• Who
requested the amendment;
• The location of proposed change;
- -
-

CA
SQA SWPPP Template 6 January 2011
• The reason for change;
•
The original BMP proposed, if any; and
• The new BMP proposed.

Amendment shall be logged at the front of the SWPPP and certification kept in Appendix D.

Th
e SWPPP text shall be revised replaced, and/or hand annotated as necessary to properly convey the amendment. SWPPP amendments must be made by a QSD. The following changes have been designated by the QSD as "to be field determined” and constitute minor changes that the QSP may implement based on field conditions.

The QSD shall expand or reduce table as needed for construction sit e
Table 1.1 List of Changes to be Field Determined
Cand
idate changes for field location or
determination by QSP(1)
Check changes that can be field located
or field determined by QSP
Increase quantity of an Erosion or Sediment Control
Me
asure X
Relocate/Add stockpiles or stored materials X
Relocate or add toilets X
Relocate vehicle storage and/or fueling locations X
Relocate areas for waste storage X
Relocate water storage and/or water transfer location X Changes to access points (entrance/exits) X
Change type of Erosion or Sediment Control Measure X
Changes to location of erosion or sediment control X
Minor changes to schedule or phases X
Changes in construction materials X
(1) Any field changes not identified for field location or field determination by QSP must be approved by
QSD

1.5 RETENTION OF RECORDS
Pa
per or electronic records of documents required by this SWPPP shall be retained for a minimum of three years from the date generated or date submitted, whichever is later, for the following items:
• [NONE]
• [NONE]

-
I
I
I
I
I
I
I
I
--

C
ASQA SWPPP Template 7 January 2011
These records shall be available at the Site until construction is complete. Records assisting in t
he determination of compliance with the General Permit shall be made available within a reasonable time, to the Regional Water Board, State Water Board or U.S. Environmental Protection Agency (EPA) upon request. Requests by the Regional Water Board for retention of records for a period longer than three years shall be adhered to.

C
ASQA SWPPP Template 8 January 2011

1 .6 REQUIRED NON-COMPLIANCE REPORTING
If a discharge violation occurs the QSP shall immediately notify the LRP and the LRP shall file a violation report electronically to the Regional Water Board [within 30 days] of identification of n
on-compliance using SMARTS. Corrective measures will be implemented immediately following the discharge or written notice of non-compliance from the Regional Water Board.

Discharges and corrective actions will be documented on the NAL/NEL Exceedance Site Evaluation Report Form in CSMP Attachment 3 “Example Forms.” T
he report to the LRP and to the Regional Water Board will contain the following items:
• The date, time, location, nature of operation and type of unauthorized discharge. • The cause or nature of the notice or order.
• The control measures (BMPs) deployed before the discharge event, or prior to receiving notice or order.

The date of deployment and type of control measures (BMPs) deployed after the discharge event, or after receiving the notice or order, including additional measures installed or planned to reduce or prevent re-occurrence.
[Include the Regional Water Board requirements if any]

CA
SQA SWPPP Template 9 January 2011

1. 7 ANNUAL REPORT
The General Permit requires that permittees prepare, certify, and electronically submit an Annual Report no later than September 1st of each year. Reporting requirements are identified in Section XVI of the General Permit. Annual reports will be filed in SMARTS and in accordance with information required by the on-line forms.

1.8 CHANGES TO PERMIT COVERAGE
The General Permit allows for the reduction or increase of the total acreage covered under the General Permit when: a portion of the project is complete and/or conditions for termination of coverage have been met; when ownership of a portion of the project is purchased by a different entity; or when new acreage is added to the project.

Modified PRDs shall be filed electronically within 30 days of a reduction or increase in total disturbed area if a change in permit covered acreage is to be sought. The SWPPP shall be modified appropriately, shall be logged at the front of the SWPPP and cetrification of SWPPP amendments are to be kept in Appendix D. Updated PRDs submitted electronically via SMARTS can be found in Appendix E.

1. 9 NOTICE OF TERMINATION
A Notice of Termination (NOT) must be submitted electronically by the LRP via SMARTS to terminate coverage under the General Permit. The NOT must include a final Site Map and representative photographs of the project site that demonstrate final stabilization has been achieved. The NOT shall be submitted within 90 days of completion of construction. The Regional Water Board will consider a construction site complete when the conditions of the General Permit, Section II.D have been met.
--

CA
SQA SWPPP Template 10 January 2011

Se
ction 2 Project Information

2.1 PROJECT AND SITE DESCRIPTION

2. 1.1 Site Description
The [TTM 36713] project site comprises approximately [8.81 acres] and is located [intersection of La Sierra Ave. & Victoria Ave.] in [Riverside], California. The project site is located approximately [1.00 mile south] of [Interstate-91. The project site is located approximately [0.97 mile south] of [Arlington Valley Channel]. The project is located at [Lat = 33.887564 / Long = - 117.462140] and is identified on the Site Map in Appendix B.

2. 1.2 Existing Conditions
As of the initial date of this SWPPP, the project site is [existing orange groves]. The project site was previously developed with [land use= LDR]. Historic sources of contamination include:
[there are no known historic sources of contamination at the site].

2. 1.3 Existing Drainage
The project site is [slopes to the north]. The elevation of the project site ranges from [833 to 812] feet above mean sea level (msl). Surface drainage at the site currently flows to the [north], towards [storm drain inlet]. Stormwater is conveyed through [storm drain system]. Stormwater discharges, from the site, [are not] considered direct discharges, as defined by the State Water Board [Santa Ana River]. Existing site topography, drainage patterns, and stormwater conveyance systems are shown on [W.P.C.D. Pg. 4].

The project discharges to [Santa Ana River] that [is not] listed for water quality impairment on the most recent 303(d)-list [for:
• [LIST]
• [LIST]

2 .1.4 Geology and Groundwater
The site is underlain by [alluvial soils consisting of silty sand, sandy silt and silty clay.].

Groundwater occurs beneath the site at approximately [+/-10] feet below ground surface.

2. 1.5 Project Description
Project grading will occur on approximately [8.81 acres] of the project, which comprises approximately [100] percent of the total area. The limits of grading are shown on [W.P.C.D. Pg. 4] in Appendix B. Grading will include [both cut and fill activities], with the total graded material estimated to be [number] cubic yards. Approximately [number] cubic yards of fill ma
terial will be imported during grading activities. Graded materials are expected to be [balanced onsite/hauled away]. Soil will be stockpiled [describe locations] as shown on [W.P.C.D. Pg. 4] in Appendix B.
--
--
■ ...I -
-

CA
SQA SWPPP Template 11 January 2011

2.1.6 Developed Condition
Post construction surface drainage will be directed to the [north] as surface flow through stormwater conveyance systems [sheet flow] towards and will discharge [public storm drain system].

Post construction drainage patterns and conveyance systems are presented on [W.P.C.D. Pg. 4] in Appendix B.

Ta
ble 2.1 Construction Site Estimates
Con
struction site area 8.81 acres
Percent impervious before construction 1 %
Runoff coefficient before construction
Percent impervious after construction 7 %
Runoff coefficient after construction

2.2 PERMITS AND GOVERNING DOCUMENTS
In
addition to the General Permit, the following documents have been taken into account while preparing this SWPPP
• Regional Water Board requirements
• Basin Plan requirements
• Contract Documents
• Air Quality Regulations and Permits
• Federal Endangered Species Act
• National Historic Preservation Act/Requirements of the State Historic Preservation Office
• State of California Endangered Species Act
• Clean Water Act Section 401 Water Quality Certifications and 404 Permits • CA Department of Fish and Game 1600 Streambed Alteration Agreement 2 .3 STORMWATER RUN-ON FROM OFFSITE AREAS
There is no anticipated offsite run-on to this construction site because [Describe reasons for no offsite run-on [e.g., existing BMPs or stormwater conveyance system to prevent on-site flow, no up-gradient drainage area, etc.)].
- - -
-
~
'
-
- -
-

I I I I

CA
SQA SWPPP Template 12 January 2011

2.4 FINDINGS OF THE CONSTRUCTION SITE SEDIMENT AND
RE

CEIVING WATER RISK DETERMINATION
Part A
A c
onstruction site risk assessment has been performed for the project and the resultant risk level is Risk Level [1].

The risk level was determined though the use of the [SMARTS]. The risk level is based on pro
ject duration, location, proximity to impaired receiving waters and soil conditions. A copy of the Risk Level determination submitted on SMARTS with the PRDs is included in Appendix C.

Par
t B
Table 2.2 and Table 2.3 summarize the sediment and receiving wa ter risk factors and document the sources of information used to derive the factors.

Table 2.2 Summary of Sediment Risk
RUSLE
Factor Val ue Method for establishing value
R 28.88 SMARTS
K 0.24 SMARTS
LS 1.25393343 SMARTS
Total Predicted Sediment Loss (tons/acre) 8.6912633900 16

Overall Sediment Risk
Low
Sediment Risk < 15 tons/ acre
Medium Sediment Risk >= 15 and < 75 tons/acre
High Sediment Risk >= 75 tons/acre
Low
Medium
High

Runoff from the project site discharges into [Santa Ana river] that discharge into [water body, and eventually into the water body].

Ta
ble 2.3 Summary of Receiving Water Risk
Receiving Water Name
303(d) Listed for
Sediment Related
Po
llutant(1)
TMDL for Sediment
Related Pollutant(1)
Beneficial Uses of
COLD, SPAWN, and
MI
GRATORY(1)
[Santa Ana river] Yes No Yes No Yes No
Overall Receiving Water Risk Low
High
(1) If yes is selected for any option the Receiving Water Risk is High

For
all SWPPPs select the appropriate Risk Level and modify accor dingly Risk Level 1
■
- -

CA
SQA SWPPP Template 13 January 2011
Risk Level 1 sites are subject to the narrative effluent limitations specified in the General Permit.

The narrative effluent limitations require stormwater discharges associated with construction activity to minimize or prevent pollutants in stormwater and authorized non-stormwater through the use of controls, structures, and best management practices. This SWPPP has been prepared to address Risk Level 1 requirements (General Permit Attachment C).

2.5 CONSTRUCTION SCHEDULE
The site sediment risk was determined based on construction taking place between [10-1-2018] and [10-1-2019]. Modification or extension of the schedule (start and end dates) may affect risk det
ermination and permit requirements. The LRP shall contact the QSD if the schedule changes during construction to address potential impact to the SWPPP. The estimated schedule for planned work can be found in Appendix F.
[Include additional descriptions of significant grading phases and work near drainages or receiving water.]

2. 6 POTENTIAL CONSTRUCTION ACTIVITY AND POLLUTANT SOURCES Appendix G includes a list of construction activities and associated materials that are anticipated to be used onsite. These activities and associated materials will or could potentially contribute pollutants, other than sediment, to stormwater runoff.

The anticipated activities and associated pollutants were used in Section 3 to select the Best Ma
nagement Practices for the project. Location of anticipated pollutants and associated BMPs are show on the Site Map in Appendix B.

Fo
r sampling requirements for non-visible pollutants associated with construction activity please refer to Section 7.7.1. For a full and complete list of onsite pollutants, refer to the Material Sa
fety Data Sheets (MSDS), which are retained onsite at the construction trailer.

2.7 IDENTIFICATION OF NON-STORMWATER DISCHARGES
Non-stormwater discharges consist of discharges which do not originate from precipitation events. The General Permit provides allowances for specified non-stormwater discharges that do not cause erosion or carry other pollutants.

Non-stormwater discharges into storm drainage systems or waterways, which are not authorized under the General Permit and listed in the SWPPP, or authorized under a separate NPDES permit, are prohibited.

Non-stormwater discharges that are authorized from this project site include the following:
• [NONE]
• [NONE]

T
hese authorized non-stormwater discharges will be managed with the stormwater and non- stormwater BMPs described in Section 3 of this SWPPP and will be minimized by the QSP.

Ac
tivities at this site that may result in unauthorized non-stormwater discharges include:
- -
--
-- -

CA
SQA SWPPP Template 14 January 2011
• [NONE]
• [NONE]

S
teps will be taken, including the implementation of appropriate BMPs, to ensure that unauthorized discharges are eliminated, controlled, disposed, or treated on-site.

Discharges of construction materials and wastes, such as fuel or paint, resulting from dumping, spills, or direct contact with rainwater or stormwater runoff, are also prohibited.

Consider including the following text, not required by CGP The following discharge(s) have been authorized by (a) regi onal NPDES permit(s):
• [LIST Discharge and Governing Permit or State NONE]
2 .8 REQUIRED SITE MAP INFORMATION
The construction project’s Site Map(s) showing the project location, surface water boundaries, geographic features, construction site perimeter and general topography and other requirements identified in Attachment B of the General Permit is located in Appendix B. Table 2.6 identifies Ma
p or Sheet Nos. where required elements are illustrated.

Table 2.6 Required Map Information
Included on
Map/Plan Sheet
No. ( 1)
Required Element
Pg. 1 The project’s surrounding area (vicinity)
Pg. 4 Site layout
Pg. 4 Construction site boundaries
Pg. 3 Drainage areas
N/A Discharge locations
N/A Sampling locations
N/A Areas of soil disturbance (temporary or permanent)
Pg. 4 Active areas of soil disturbance (cut or fill)
Pg. 4 Locations of runoff BMPs
Pg. 4 Locations of erosion control BMPs
Pg. 4 Locations of sediment control BMPs
N/A ATS location (if applicable)
Pg. 4 Lo cations of sensitive habitats, watercourses, or other features which are not to be disturbed
Pg. 4 Locations of all post construction BMPs
Pg. 4 Waste storage areas
--
--

C
ASQA SWPPP Template 15 January 2011
Table 2.6 Required Map Information
Included on
Map/Plan Sheet
No. (1)
Required Element
Pg. 4 Vehicle storage areas
Pg. 4 Material storage areas
Pg. 1 Entrance and Exits
Pg. 4 Fueling Locations
Notes: (1) Indicate maps or drawings that information is included on (e.g., Vicinity Map, Site Map, Drainage Plans, G
rading Plans, Progress Maps, etc.)

C
ASQA SWPPP Template 16 January 2011

S
ection 3 Best Management Practices

3.1 SCHEDULE FOR BMP IMPLEMENTATION
[Include additional descriptions of significant grading phases and work near drainages or receiving water.]

C
ASQA SWPPP Template 17 January 2011

T
able 3.1 BMP Implementation Schedule
BMP Implementation Duration
Erosion
Control
EC-1, Scheduling Prior to Construction Entirety of Project

Sediment Control
SE-7 Street Sweeping and Vacuuming During the Construction Entirety of Project SE-8 Sandbag Barrier Start of Construction Entirety of Project

Tracking
Control
TC-1 Stabilized Construction
Entrance/Exit Start of Construction Entirety of Project

Wind
Erosion

C
ASQA SWPPP Template 18 January 2011

3.2 EROSION AND SEDIMENT CONTROL
E
rosion and Sediment Control Worksheet
General Permit BMP Requirements A pplicable
to Project?
CGP
Pg #
Associated
CASQA
BM
Ps
Selected
BMPs
BMP Requirements for Erosion and Sediment Control (Attachment C, D, & E parts D and E) Implement effective wind erosion control. N O Pg 5 of Att.

C, D & E WE-1
Provide effective soil cover for inactive areas and finished s
lopes, open space, utility backfill, and completed lots. NO Pg 5 of Att.

C, D & E
EC-5
EC-16
Limit the use of plastic materials when more sustainable, e
nvironmentally friendly alternatives exist. Where plastic materials are deemed necessary, the QSD shall consider the use of plastic materials resistant to solar degradation.

NO
Pg 5 of Att.

C, D & E WM-3
Establish and maintain effective perimeter controls and s
tabilize construction entrances and exits to sufficiently control erosion and sediment discharges from the site.

YES
Pg 5 of Att.

C, D & E
SE-1 ,SE-5
SE-7, TC-1
TC-2, TC-
3 WM-3
SE-7, TC-1
On sites where sediment basins are to be used, at a
m
inimum, design sediment basins according to the method
provided in Stormwater BMP Handbook Portal:

Construction.

NO
Pg 5 of Att.

C, D & E SE-02
Implement appropriate erosion control BMPs (runoff
c
ontrol and soil stabilization) in conjunction with sediment control BMPs for areas under active
4 construction.

YES
Pg 5 of Att.

C, D & E
EC-1, EC-
2 EC-5, EC-
9 EC-10,
EC-16
SE-1, SE-4
SE-5,
EC-1
Apply linear sediment controls along the toe of the slope; f
ace of the slope; and at the grade breaks of exposed slopes to comply with sheet flow lengths in accordance with
General Permit.

RL 2 and 3
only
Pg 5 of Att.

D & E SE-1 ,SE-5
SE-7
Ensure that construction activity traffic to and from the pr
oject is limited to entrances and exits that employ
effective controls to prevent offsite tracking of sediment.

RL 2 and 3
only
Pg 6 of Att.

D & E
TC-1
TC-2
TC-3
SE-7

C
ASQA SWPPP Template 19 January 2011
Erosion and Sediment Control Worksheet
General Permit BMP Requirements A pplicable
to Project?
CGP
Pg #
Associated
CASQA
BM
Ps
Selected
BMPs
Ensure that storm drain inlets and perimeter controls,
r
unoff control BMPs, and pollutant controls at entrances and exits (e.g. tire wash-off locations) are maintained and protected from activities that reduce their effectiveness.

RL 2 and 3
only
Pg 6 of Att.

D & E
All BMPs
Inspect on a daily basis immediate access roads. At a
m
inimum daily (when necessary) and prior to a rain event.

The LRP shall remove sediment or other construction
activity-related materials that are deposited on the roads (by vacuuming or sweeping).

RL 2 and 3
only
Pg 6 of Att.

D & E
TC-1
TC-2
TC-3
SE-7

The Regional Water Board may require implementation of
a
dditional site-specific sediment control requirements if the implementation of the other requirements in this section is not adequately protecting the receiving waters.

Pg 5 Att. C
Pg 6 Att. D
& E
N/A
BMP Requirements for Run-on and Runoff Controls (Attachment C, D, & E parts F) Effectively manage run-on, runoff within the site and
r
unoff that discharge off the site.

Pg 5 Att. C
Pg 6 Att. D
& E

Run-on from off-site shall be directed away from disturbed a
reas or shall collectively be in compliance with the
effluent limitation in the CGP.

Pg 5 Att. C
Pg 6 Att. D
& E

BMP Requirements for Air Deposition (Attachment C, D, & E parts B.6) Control the air deposition of site materials and from site o
perations. Such particulates can include, but are not
limited to, sediment, nutrients, trash, metals, bacteria, oil and grease and organics.

No
Pg 4 of Att.

C, D & E WE-1

E
rosion and sediment controls are required by the General Permit to provide effective reduction or elimination of sediment related pollutants in stormwater discharges and authorized non- stormwater discharges from the Site. Applicable BMPs are identified in this section for erosion control, sediment control, tracking control, and wind erosion control.

3.2.1 Erosion Control
Erosion control, also referred to as soil stabilization, consists of source control measures that are designed to prevent soil particles from detaching and becoming transported in stormwater runoff. Erosion control BMPs protect the soil surface by covering and/or binding soil particles.

This construction project will implement the following practices to provide effective temporary and final erosion control during construction:

CA
SQA SWPPP Template 20 January 2011

1. Preserve existing vegetation where required and when feasible.

2. T
he area of soil disturbing operations shall be controlled such that the Contractor is able to implement erosion control BMPs quickly and effectively.

3. Stabilize non-active areas within 14 days of cessation of construction activities or sooner if stipulated by local requirements.

4. Control erosion in concentrated flow paths by applying erosion control blankets, check dams, erosion control seeding or alternate methods.

5. Prior to the completion of construction, apply permanent erosion control to remaining disturbed soil areas.

Sufficient erosion control materials shall be maintained onsite to allow implementation in conformance with this SWPPP.

The following temporary erosion control BMP selection table indicates the BMPs that shall be implemented to control erosion on the construction site. Fact Sheets for temporary erosion control BMPs are provided in Appendix H.
-

CASQA SWPPP Template 21 January 2011
Table 3.2 Temporary Erosion Control BMPs
CASQA
Fact
Sheet
BMP Name
Meets a
Minimum
Requirement(1)
BMP Used
If not used, state reason
YES NO
EC-1 Scheduling  X
EC-2 Preservation of Existing
Vegetation  X Not Required for Project
EC-3 Hydraulic Mulch (2 ) X Not Required for Project EC-4 Hydroseed (2 ) X Not Required for Project
EC-5 Soil Binders (2 ) X Not Required for Project
EC-6 Straw Mulch (2 ) X Not Required for Project
EC-7 Geotextiles and Mats (2 ) X Not Required for Project EC-8 Wood Mulching (2 ) X Not Required for Project
EC-9 Earth Dike and Drainage Swales (3 ) X Not Required for Project EC-10 Velocity Dissipation Devices X Not Required for Project EC-11 Slope Drains X Not Required for Project
EC-12 Stream Bank Stabilization X Not Required for Project EC-14 Compost Blankets (2 ) X Not Required for Project EC-15 Soil Preparation-Roughening X Not Required for Project EC-16 Non-Vegetated Stabilization (2 ) X Not Required for Project WE-1 Wind Erosion Control  X Not Required for Project Alternate BMPs Used: If used, state reason:

(1) Applicability to a specific project shall be determined by the QSD. (2) The QSD shall ensure implementation of one of the minimum measures listed or a combination thereof to achieve and maintain the Risk Level requirements.
(3) Run-on from offsite shall be directed away from all disturbed areas, diversion of offsite flows may require design/analysis by a licensed civil engineer and/or additional environmental permitting

CA
SQA SWPPP Template 22 January 2011
These temporary erosion control BMPs shall be implemented in conformance with the following guidelines and as outlined in the BMP Factsheets provided in Appendix H. If there is a conflict be
tween documents, the Site Map will prevail over narrative in the body of the SWPPP or guidance in the BMP Fact Sheets. Site specific details in the Site Map prevail over standard details included in the Site Map. The narrative in the body of the SWPPP prevails over guidance in the BMP Fact Sheets.

Scheduling
-Avoid rainy periods. Schedule major grading operations during dry months when practical.

Allow enough time before rainfall begins to stabilize the soil with vegetation or physical means or to install sediment trapping devices.

-Plan the project and develop a schedule showing each phase of construction. Clearly show how the rainy season relates to soil disturbing and re-stabilization activities. Incorporate the construction schedule into the SWPPP.

-Include on the schedule, details on the rainy season implementation and deployment of:

-Erosion control BMPs
-Sediment control BMPs
-Tracking control BMPs
-Wind erosion control BMPs
-Non-stormwater BMPs
-Waste management and materials pollution control BMPs

-Include dates for activities that may require non-stormwater discharges such as dewatering, sawcutting, grinding, drilling, boring, crushing, blasting, painting, hydro-demolition, mortar mixing, pavement cleaning, etc.

-Work out the sequencing and timetable for the start and completion of each item such as site clearing and grubbing, grading, excavation, paving, foundation pouring utilities installation, etc., to minimize the active construction area during the rainy season.

-Sequence trenching activities so that most open portions are closed before new trenching begins.
-Incorporate staged seeding and re-vegetation of graded slopes as work progresses. -Schedule establishment of permanent vegetation during appropriate planting time for specified vegetation.

-Non-active areas should be stabilized as soon as practical after the cessation of soil disturbing activities or one day prior to the onset of precipitation.

-Monitor the weather forecast for rainfall.

-When rainfall is predicted, adjust the construction schedule to allow the implementation of soil stabilization and sediment treatment controls on all disturbed areas prior to the onset of rain. -Be prepared year round to deploy erosion control and sediment control BMPs. Erosion may be caused during dry seasons by un-seasonal rainfall, wind, and vehicle tracking. Keep the site -

CA
SQA SWPPP Template 23 January 2011
stabilized year round, and retain and maintain rainy season sediment trapping devices in operational condition.

-Apply permanent erosion control to areas deemed substantially complete during the project’s defined seeding window.

3. 2.2 Sediment Controls
Sediment controls are temporary or permanent structural measures that are intended to complement the selected erosion control measures and reduce sediment discharges from active construction areas. Sediment controls are designed to intercept and settle out soil particles that have been detached and transported by the force of water.

The following sediment control BMP selection table indicates the BMPs that shall be implemented to control sediment on the construction site. Fact Sheets for temporary sediment control BMPs are provided in Appendix H.
-

CASQA SWPPP Template 24 January 2011
Table 3.3 Temporary Sediment Control BMPs
CASQA
Fact
Sheet
BMP Name
Meets a
Minimum
Requirement(1)
BMP used
If not used, state reason
YES NO
SE-1 Silt Fence (2) (3) X Not Required for Project
SE-2 Sediment Basin X Not Required for Project
SE-3 Sediment Trap X Not Required for Project
SE-4 Check Dams X Not Required for Project
SE-5 Fiber Rolls (2)(3) X Not Required for Project
SE-6 Gravel Bag Berm (3) X Not Required for Project
SE-7 Street Sweeping  X
SE-8 Sandbag Barrier X
SE-9 Straw Bale Barrier X Not Required for Project
SE-10 Storm Drain Inlet Protection  RL 2&3 X Not Required for Project SE-11 ATS X Not Required for Project
SE-12 Temporary Silt Dike X Not Required for Project
SE-13 Compost Sock and Berm (3) X Not Required for Project SE-14 Biofilter Bags (3) X Not Required for Project
TC-1 Stabilized Construction Entrance and Exit  X
TC-2 Stabilized Construction Roadway X Not Required for Project TC-3 Entrance Outlet Tire Wash X Not Required for Project Alternate BMPs Used: If used, state reason:

(1) Applicability to a specific project shall be determined by the QSD (2) The QSD shall ensure implementation of one of the minimum measures listed or a combination thereof to achieve and maintain the Risk Level requirements
(3)Risk Level 2 &3 shall provide linear sediment control along toe of slope, face of slope, and at the grade breaks of exposed slope

CA
SQA SWPPP Template 25 January 2011
These temporary sediment control BMPs shall be implemented in conformance with the following guidelines and in accordance with the BMP Fact Sheets provided in Appendix H. If th
ere is a conflict between documents, the Site Map will prevail over narrative in the body of the SWPPP or guidance in the BMP Fact Sheets. Site specific details in the Site Map prevail over standard details included in the Site Map. The narrative in the body of the SWPPP prevails over guidance in the BMP Fact Sheets.

Street Sweeping
-Controlling the number of points where vehicles can leave the site will allow sweeping and vacuuming efforts to be focused, and perhaps save money. - Inspect potential sediment tracking locations daily.

-Visible sediment tracking should be swept or vacuumed on a daily basis.

-Do not use kick brooms or sweeper attachments. These tend to spread the dirt rather than remove it.

-If not mixed with debris or trash, consider incorporating the removed sediment back into the project
San
dbag Barrier
General
A sandbag barrier consists of a row of sand-filled bags placed on a level contour. When appropriately placed, a sandbag barrier intercepts and slows sheet flow runoff, causing temporary ponding. The temporary ponding allows sediment to settle. Sand-filled bags have limited porosity, which is further limited as the fine sand tends to quickly plug with sediment, limiting or completely blocking the rate of flow through the barrier. If a porous barrier is desired, consider SE-1, Silt Fence, SE-5, Fiber Rolls, SE-6, Gravel Bag Berms or SE-14, Biofilter Bags. Sandbag barriers also interrupt the slope length and thereby reduce erosion by reducing the tendency of sheet flows to concentrate into rivulets which erode rills, and ultimately gullies, into disturbed, sloped soils. Sandbag barriers are similar to gravel bag berms, but less porous. Generally, sandbag barriers should be used in conjunction with temporary soil stabilization controls up slope to provide effective erosion and sediment control.

St
abilized Construction Entrance and Exit
-Entrances and exits require periodic top dressing with additional stones.

-This BMP should be used in conjunction with street sweeping on adjacent public right of way.

-Entrances and exits should be constructed on level ground only.

-Stabilized construction entrances are rather expensive to construct and when a wash rack is included, a sediment trap of some kind must also be provided to collect wash water runoff.

-

C
ASQA SWPPP Template 26 January 2011
A stabilized construction entrance is a pad of aggregate underlain with filter cloth located at any point where traffic will be entering or leaving a construction site to or from a public right of way, street, alley, sidewalk, or parking area. The purpose of a stabilized construction entrance is to reduce or eliminate the tracking of sediment onto public rights of way or streets. Reducing tracking of sediments and other pollutants onto paved roads helps prevent deposition of sediments into local storm drains and production of airborne dust.

Where traffic will be entering or leaving the construction site, a stabilized construction entrance should be used. NPDES permits require that appropriate measures be implemented to prevent tracking of sediments onto paved roadways, where a significant source of sediments is derived from mud and dirt carried out from unpaved roads and construction sites.

Stabilized construction entrances are moderately effective in removing sediment from equipment leaving a construction site. The entrance should be built on level ground. Advantages of the Stabilized Construction Entrance/Exit is that it does remove some sediment from equipment and serves to channel construction traffic in and out of the site at specified locations. Efficiency is greatly increased when a washing rack is included as part of a stabilized construction entrance/exit.

C
ASQA SWPPP Template 27 January 2011

3.3 NON-STORMWATER CONTROLS AND WASTE AND MATERIALS
M

ANAGEMENT
Non-Stormwater, Construction Materials & Waste Management Worksheet BMP Requirements A pplicable
to Project? CGP Pg#
Associated
CASQA
BMPs
BMP
selected for
SWPPP
BMP Requirements for Waste Management (Attachment C, D and E part B.2) Prevent disposal of rinse or wash waters or materials on i
mpervious or pervious site surfaces or into the storm drain system.

YES Pg 2, Att. C,
D & E
NS-1, NS-3
NS-8, NS-12
NS-13

NS-8
Ensure the containment of sanitation facilities (e.g., portable t
oilets) to prevent discharges of pollutants to the stormwater drainage system or receiving water.

YES Pg 2, Att. C,
D & E WM-9 WM-9
Clean or replace sanitation facilities and inspecting them r
egularly for leaks and spills. YES Pg 2, Att. C,
D & E WM-9 WM-9
Cover waste disposal containers at the end of every business day a
nd during a rain event. NO Pg 2, Att. C,
D & E
WM-1 , M-2
WM-4 , M-5
WM-6, WM-7
WM-10

Prevent discharges from waste disposal containers to the s
tormwater drainage system or receiving water. YES Pg 2, Att. C, D & E
WM-1, WM-2
WM-4, WM-5
WM-6, WM-7
WM-9, WM-10
WM-9
Contain and securely protect stockpiled waste material from w
ind and rain at all times unless actively being used. NO Pg 2, Att. C, D & E WM-3
Implement procedures that effectively address hazardous and n
on-hazardous spills. NO Pg 2, Att. C,
D & E WM-4
Develop a spill response and implementation element of the S
WPPP prior to commencement of construction activities. The SWPPP shall require that: Equipment and materials for cleanup of spills shall be available onsite and that spills and leaks shall be cleaned up immediately and disposed of properly; and appropriate spill response personnel are assigned and trained.

NO Pg 2, Att. C,
D & E WM-4
Ensure the containment of concrete washout areas and other w
ashout areas that may contain additional pollutants so there is no discharge into the underlying soil and onto the surrounding areas.

YES Pg 3, Att. C,
D & E WM-8 WM-8
BMP Requirements for Construction Material (Attachment C, D, and E part B.1) Conduct an inventory of the products used and/or expected to be us
ed and the end products that are produced and/or expected to be produced.

Pg 1, Att. C,
D & E

C
ASQA SWPPP Template 28 January 2011
Non-Stormwater, Construction Materials & Waste Management Worksheet BMP Requirements A pplicable
to Project? CGP Pg#
Associated
CASQA
BMPs
BMP
selected for
SWPPP
Cover and berm loose stockpiled construction materials that are n
ot actively being used (i.e. soil, spoils, aggregate, fly-ash, stucco, hydrated lime, etc.).

NO Pg 1, Att. C,
D & E WM-3
Store chemicals in watertight containers (with appropriate s
econdary containment to prevent spillage or leakage) or in a storage shed (completely enclosed).

NO Pg 2, Att. C,
D & E
WM-1, WM-2
WM-4, WM-6
Minimize exposure of construction materials to precipitation. NO P g 2, Att. C, D & E
WM-1, WM-2
WM-4, WM-5
WM-6, WM-7
WM-10

Implement BMPs to prevent the off-site tracking of loose c
onstruction and landscape materials. YES Pg 2, Att. C,
D & E
TC-1
TC-2
TC-3
TC-1
BMP Requirements for Vehicle Storage and Maintenance (Attachment C, D and E, part B.3) Prevent oil, grease, or fuel from leaking into the ground, storm dra
ins or surface waters. NO Pg 3, Att. C,
D & E
NS-9
NS-10
Place equipment or vehicles, which are to be fueled, maintained a
nd stored in a designated area fitted with appropriate BMPs. NO Pg 2, Att. C, D & E
WM-2, WM-4
NS-9, NS-10
Clean leaks immediately and disposing of leaked materials pr
operly. NO Pg 2, Att. C,
D & E WM-4
BMP Requirements to Control Non-Stormwater Discharges (Attachment C, D and E part C) Implement measures to control non-stormwater discharges duri
ng construction. YES Pg 4, Att. C,
D & E
NS-3, NS-8
NS-9, NS-10
NS-12, NS-13
TC-1, TC-2
TC-3

Wash vehicles in such a manner as to prevent non-stormwater di
scharges to surface waters or MS4 drainage systems. YES Pg 4, Att. C, D & E NS-8
Clean streets in such a manner as to prevent non-stormwater di
scharges from reaching surface water or MS4 drainage
systems.

YES Pg 4, Att. C,
D & E
TC-1, TC-2
TC-3, SE-7

CA
SQA SWPPP Template 29 January 2011

3.3.1 Non-Stormwater Controls
No
n-stormwater discharges into storm drainage systems or waterways, which are not authorized under the General Permit, are prohibited. Non-stormwater discharges for which a separate NPDES permit is required by the local Regional Water Board are prohibited unless coverage under the separate NPDES permit has been obtained for the discharge. The selection of non- stormwater BMPs is based on the list of construction activities with a potential for non- stormwater discharges identified in Section 2.7 of this SWPPP.

Th
e following non-stormwater control BMP selection table indicates the BMPs that shall be implemented to control sediment on the construction site. Fact Sheets for temporary non- stormwater control BMPs are provided in Appendix H.
--

CASQA SWPPP Template 30 January 2011
Table 3.4 Temporary Non-Stormwater BMPs
CASQA Fact
Sheet BMP Name
Meets a
Minimum
Requirement(1)
BMP used
If not used, state reason
YES NO
NS-1 Water Conservation Practices  X Not Required for Project NS-2 Dewatering Operation X Not Required for Project
NS-3 Paving and Grinding Operation X Not Required for Project NS-4 Temporary Stream Crossing X Not Required for Project NS-5 Clear Water Diversion X Not Required for Project NS-6 Illicit Connection- Illegal Discharge
Connection  X
Not Required for Project
NS-7 Potable Water Irrigation Discharge
Detection X Not Required for Project
NS-8 Vehicle and Equipment Cleaning  X
NS-9 Vehicle and Equipment Fueling  X Not Required for Project NS-10 Vehicle and Equipment Maintenance  X Not Required for Project NS-11 Pile Driving Operation X Not Required for Project NS-12 Concrete Curing X Not Required for Project
NS-13 Concrete Finishing X Not Required for Project
NS-14 Material and Equipment Use Over Water X Not Required for Project NS-15 Demolition Removal Adjacent to Water X Not Required for Project NS-16 Temporary Batch Plants X Not Required for Project Alternate BMPs Used: If used, state reason:
(1) Applicability to a specific project shall be determined by the QSD

CA
SQA SWPPP Template 31 January 2011
Non-stormwater BMPs shall be implemented in conformance with the following guidelines and in accordance with the BMP Fact Sheets provided in Appendix H. If there is a conflict between doc
uments, the Site Map will prevail over narrative in the body of the SWPPP or guidance in the BMP Fact Sheets. Site specific details in the Site Map prevail over standard details included in the Site Map. The narrative in the body of the SWPPP prevails over guidance in the BMP Fact Sheets.

Vehicle and Equipment Cleaning
-Other options to washing equipment onsite include contracting with either an offsite or mobile commercial washing business. These businesses may be better equipped to handle and dispose of the wash waters properly. Performing this work offsite can also be economical by eliminating the need for a separate washing operation onsite.
-If washing operations are to take place onsite, then:
-Use phosphate-free, biodegradable soaps.
-Educate employees and subcontractors on pollution prevention measures. -Do not permit steam cleaning onsite. Steam cleaning can generate significant pollutant concentrates.
-Cleaning of vehicles and equipment with soap, solvents or steam should not occur on the project site unless resulting wastes are fully contained and disposed of. Resulting wastes should not be discharged or buried, and must be captured and recycled or disposed according to the requirements of WM-10, Liquid Waste Management or WM-6, Hazardous Waste Management, depending on the waste characteristics. Minimize use of solvents. Use of diesel for vehicle and equipment cleaning is prohibited.
-All vehicles and equipment that regularly enter and leave the construction site must be cleaned offsite.
-When vehicle and equipment washing and cleaning must occur onsite, and the operation cannot be located within a structure or building equipped with appropriate disposal facilities, the outside cleaning area should have the following characteristics:
-Located away from storm drain inlets, drainage facilities, or watercourses -Paved with concrete or asphalt and bermed to contain wash waters and to prevent runon and runoff
-Configured with a sump to allow collection and disposal of wash water -No discharge of wash waters to storm drains or watercourses -Used only when necessary
-When cleaning vehicles and equipment with water:
-Use as little water as possible. High-pressure sprayers may use less water than a hose and should be considered
-Use positive shutoff valve to minimize water usage
-

CA
SQA SWPPP Template 32 January 2011
-Facility wash racks should discharge to a sanitary sewer, recycle system or other approved discharge system and must not discharge to the storm drainage system, watercourses, or to groundwater

3. 3.2 Materials Management and Waste Management
Materials management control practices consist of implementing procedural and structural BMPs for handling, storing and using construction materials to prevent the release of those materials into stormwater discharges. The amount and type of construction materials to be utilized at the Site will depend upon the type of construction and the length of the construction period. The materials may be used continuously, such as fuel for vehicles and equipment, or the materials may be used for a discrete period, such as soil binders for temporary stabilization.

Waste management consist of implementing procedural and structural BMPs for handling, storing and ensuring proper disposal of wastes to prevent the release of those wastes into stormwater discharges. [If applicable to the project site, waste management should be conducted in accordance with the Project’s Construction Waste Management Plan.] Ma
terials and waste management pollution control BMPs shall be implemented to minimize stormwater contact with construction materials, wastes and service areas; and to prevent materials and wastes from being discharged off-site. The primary mechanisms for stormwater contact that shall be addressed include:
• Direct contact with precipitation
• Contact with stormwater run-on and runoff
• Wind dispersion of loose materials
• Direct discharge to the storm drain system through spills or dumping • Extended contact with some materials and wastes, such as asphalt cold mix and treated wood products, which can leach pollutants into stormwater.

A list of construction activities is provided in Section 2.6. The following Materials and Waste Ma
nagement BMP selection table indicates the BMPs that shall be implemented to handle materials and control construction site wastes associated with these construction activities. Fact Sheets for Materials and Waste Management BMPs are provided in Appendix H.

- -

CASQA SWPPP Template 33 January 2011
Table 3.5 Temporary Materials Management BMPs
CASQA Fact
Sheet BMP Name
Meets a
Minimum
Requirement(1)
BMP used
If not used, state reason
YES NO
WM-01 Material Delivery and Storage  X Not Required for Project WM-02 Material Use  X Not Required for Project
WM-03 Stockpile Management  X Not Required for Project WM-04 Spill Prevention and Control  X Not Required for Project WM-05 Solid Waste Management  X Not Required for Project WM-06 Hazardous Waste Management  X Not Required for Project WM-07 Contaminated Soil Management X Not Required for Project WM-08 Concrete Waste Management  X
WM-09 Sanitary-Septic Waste
Management  X

WM-10 Liquid Waste Management X Not Required for Project Alternate BMPs Used: If used, state reason:

(1) Applicability to a specific project shall be determined by the QSD.

CA
SQA SWPPP Template 34 January 2011
Material management BMPs shall be implemented in conformance with the following guidelines and in accordance with the BMP Fact Sheets provided in Appendix H. If there is a conflict be
tween documents, the Site Map will prevail over narrative in the body of the SWPPP or guidance in the BMP Fact Sheets. Site specific details in the Site Map prevail over standard details included in the Site Map. The narrative in the body of the SWPPP prevails over guidance in the BMP Fact Sheets.

Concrete Waste Management
-The following steps will help reduce stormwater pollution from concrete wastes:
-Incorporate requirements for concrete waste management into material supplier and subcontractor agreements.
-Store dry and wet materials under cover, away from drainage areas. Refer to WM-1, Material Delivery and Storage for more information.
-Avoid mixing excess amounts of concrete.
-Perform washout of concrete trucks in designated areas only, where washout will not reach stormwater.
-Do not wash out concrete trucks into storm drains, open ditches, streets, streams or onto the ground. Trucks should always be washed out into designated facilities. -Do not allow excess concrete to be dumped onsite, except in designated areas. -For onsite washout:
- On larger sites, it is recommended to locate washout areas at least 50 feet from storm drains, open ditches, or water bodies. Do not allow runoff from this area by constructing a temporary pit or bermed area large enough for liquid and solid waste. - Washout wastes into the temporary washout where the concrete can set, be broken up, and then disposed properly.
- Washout should be lined so there is no discharge into the underlying soil. -Do not wash sweepings from exposed aggregate concrete into the street or storm drain.

Collect and return sweepings to aggregate base stockpile or dispose in the trash. -See typical concrete washout installation details at the end of this fact sheet.

San
itary-Septic Waste Management
-Sanitary or septic wastes should be treated or disposed of in accordance with state and local requirements. In many cases, one contract with a local facility supplier will be all that it takes to make sure sanitary wastes are properly disposed.

Sto
rage and Disposal Procedures
-Temporary sanitary facilities should be located away from drainage facilities, watercourses, and from traffic circulation. If site conditions allow, place portable facilities a minimum of 50 feet from drainage conveyances and traffic areas. When subjected to high winds or risk of high winds, temporary sanitary facilities should be secured to prevent overturning. -
-

CA
SQA SWPPP Template 35 January 2011
-Temporary sanitary facilities must be equipped with containment to prevent discharge of pollutants to the stormwater drainage system of the receiving water.

-Consider safety as well as environmental implications before placing temporary sanitary facilities.

-Wastewater should not be discharged or buried within the project site.

-Sanitary and septic systems that discharge directly into sanitary sewer systems, where permissible, should comply with the local health agency, city, county, and sewer district requirements.

-Only reputable, licensed sanitary and septic waste haulers should be used.

-Sanitary facilities should be located in a convenient location.

-Temporary septic systems should treat wastes to appropriate levels before discharging.

-If using an onsite disposal system (OSDS), such as a septic system, local health agency requirements must be followed.

-Temporary sanitary facilities that discharge to the sanitary sewer system should be properly connected to avoid illicit discharges.

-Sanitary and septic facilities should be maintained in good working order by a licensed service.

-Regular waste collection by a licensed hauler should be arranged before facilities overflow.

-If a spill does occur from a temporary sanitary facility, follow federal, state and local regulations for containment and clean-up.

3. 4 POST CONSTRUCTION STORMWATER MANAGEMENT MEASURES
Post construction BMPs are permanent measures installed during construction, designed to reduce or eliminate pollutant discharges from the site after construction is completed.

This site is located in an area subject to a Phase I or Phase II Municipal Separate Storm Sewer System (MS4) permit approved Stormwater Management Plan. Yes No [If yes, state:

Post construction runoff reduction requirements have been satisfied through the MS4 program, this project is exempt from provision XIII A of the General Permit.] [If no: Identify specific local stormwater requirements (e.g. SUSUMP requirements). Describe results of runoff reduction calculator and the BMPs selected to meet the runoff reduction requirements.]
□

C
ASQA SWPPP Template 36 January 2011
The following source control post construction BMPs to comply with General Permit Section X
III.B and local requirements have been identified for the site:
• [ LIST or State NONE]
• [ LIST or State NONE]

A plan for the post construction funding and maintenance of these BMPs has been developed to address at minimum five years following construction. The post construction BMPs that are described above shall be funded and maintained by the [LRP or other]. If required, post c
onstruction funding and maintenance will be submitted with the NOT.

CA
SQA SWPPP Template 37 January 2011

Section 4 BMP Inspection, [and] Maintenance [,
and Rain Event Action Plans]

4.1 BMP INSPECTION AND MAINTENANCE
Th
e General Permit requires routine weekly inspections of BMPs, along with inspections before, during, and after qualifying rain events. A BMP inspection checklist must be filled out for inspections and maintained on-site with the SWPPP. The inspection checklist includes the necessary information covered in Section 7.6. A blank inspection checklist can be found in Appendix I. Completed checklists shall be kept in CSMP Attachment 2 “Monitoring Records.

BM
Ps shall be maintained regularly to ensure proper and effective functionality. If necessary, corrective actions shall be implemented within 72 hours of identified deficiencies and associated amendments to the SWPPP shall be prepared by the QSD.

Specific details for maintenance, inspection, and repair of Construction Site BMPs can be found in the BMP Factsheets in Appendix H.

4. 2 RAIN EVENT ACTION PLANS
Risk Level 1
Rain Event Action Plans (REAPs) are not required for Risk Level 1 projects.

Ri
sk Level 2 or 3
The Rain Event Action Plans (REAP) is written document designed to be used as a planning tool by the QSP to protect exposed portions of project sites and to ensure that the discharger has adequate materials, staff, and time to implement erosion and sediment control measures. These measures are intended to reduce the amount of sediment and other pollutants that could be generated during the rain event. It is the responsibility of the QSP to be aware of precipitation forecast and to obtain and print copies of forecasted precipitation from NOAA’s National Weather Service Forecast Office.

The SWPPP includes REAP templates but the QSP will need to customize them for each rain event. Site-specific REAP templates for each applicable project phase can be found in Appendix J. The QSP shall maintain a paper copy of completed REAPs in compliance with the record retention requirements Section 1.5 of this SWPPP. Completed REAPs shall be maintained in Appendix J.

The QSP will develop an event specific REAP 48 hours in advance of a precipitation event forecast to have a 50% or greater chance of producing precipitation in the project area. The REAP will be onsite and be implemented 24 hours in advance of any the predicted precipitation event.

At minimum the REAP will include the following site and phase-specific information:

1. Site Address;

2. Calculated Risk Level (2 or 3);
I
- -
-

C
ASQA SWPPP Template 38 January 2011

3. S ite Stormwater Manager Information including the name, company and 24-hour emergency telephone number;

4. E rosion and Sediment Control Provider information including the name, company and 24-hour emergency telephone number;

5. S tormwater Sampling Agent information including the name, company, and 24-hour emergency telephone number;

6. A ctivities associated with each construction phase;

7. T rades active on the construction site during each construction phase;

8. T rade contractor information; and

9. R ecommended actions for each project phase.

CA
SQA SWPPP Template 39 January 2011

Se
ction 5 Training
The following text should be modified accordingly
Appendix L identifies the QSPs for the project. To promote stormwater management awareness spe
cific for this project, periodic training of job-site personnel shall be included as part of routine project meetings (e.g. daily/weekly tailgate safety meetings), or task specific trainings as needed.

The QSP shall be responsible for providing this information at the meetings, and subsequently completing the training logs shown in Appendix K, which identifies the site-specific stormwater to
pics covered as well as the names of site personnel who attended the meeting. Tasks may be delegated to trained employees by the QSP provided adequate supervision and oversight is provided. Training shall correspond to the specific task delegated including: SWPPP implementation; BMP inspection and maintenance; and record keeping.

Documentation of training activities (formal and informal) is retained in SWPPP Appendix K. -
-
-

CA
SQA SWPPP Template 40 January 2011

Se
ction 6 Responsible Parties and Operators

6.1 RESPONSIBLE PARTIES
Approved Signatory(ies) who are responsible for SWPPP implementation and have authority to sign permit-related documents [is/are] listed below. Written authorizations from the LRP for these individuals are provided in Appendix L. The Approved Signatory(ies) assigned to this project [is/are]:

Na
me Title Phone Number
Hitesh Patel 760-963- 3475

QSPs identified for the project are identified in Appendix L. The QSP shall have primary re
sponsibility and significant authority for the implementation, maintenance and inspection/monitoring of SWPPP requirements. The QSP will be available at all times throughout the duration of the project. Duties of the QSP include but are not limited to:
• Implementing all elements of the General Permit and SWPPP, including but not limited to:
o Ensuring all BMPs are implemented, inspected, and properly maintained; o Performing non-stormwater and stormwater visual observations and inspections; o Performing non-stormwater and storm sampling and analysis, as required; o Performing routine inspections and observations;
o Implementing non-stormwater management, and materials and waste management activities such as: monitoring discharges; general Site clean-up; vehicle and equipment cleaning, fueling and maintenance; spill control; ensuring that no materials other than stormwater are discharged in quantities which will have an adverse effect on receiving waters or storm drain systems; etc.;
• The QSP may delegate these inspections and activities to an appropriately trained employee, but shall ensure adequacy and adequate deployment. • Ensuring elimination of unauthorized discharges.
• The QSPs shall be assigned authority by the LRP to mobilize crews in order to make immediate repairs to the control measures.
• Coordinate with the Contractor(s) to assure all of the necessary corrections/repairs are made immediately and that the project complies with the SWPPP, the General Permit and approved plans at all times.
1111
-
1111
-

C
ASQA SWPPP Template 41 January 2011
• N otifying the LRP or Authorized Signatory immediately of off-site discharges or other non-compliance events.

6.2 CONTRACTOR LIST
Contractor
Name:

Title:

Company:

Address:

Phone Number:

Number (24/7):

CA
SQA SWPPP Template 42 January 2011

Se
ction 7 Construction Site Monitoring Program

7.1 Purpose
Thi
s Construction Site Monitoring Program was developed to address the following objectives:

1. To demonstrate that the site is in compliance with the Discharge Prohibitions of the Construction General Permit;

2. To determine whether non-visible pollutants are present at the construction site and are causing or contributing to exceedances of water quality objectives;

3. To determine whether immediate corrective actions, additional Best Management Practices (BMP) implementation, or SWPPP revisions are necessary to reduce pollutants in stormwater discharges and authorized non-stormwater discharges;

4. To determine whether BMPs included in the SWPPP are effective in preventing or reducing pollutants in stormwater discharges and authorized non-stormwater discharges.

7.2 Applicability of Permit Requirements
This project has been determined to be a Risk Level [1] project. The General Permit identifies the following types of monitoring as being applicable for a Risk Level [1] project.

Risk Level 1
• Visual inspections of Best Management Practices (BMPs); • Visual monitoring of the site related to qualifying storm events; • Visual monitoring of the site for non-stormwater discharges; • Sampling and analysis of construction site runoff for non-visible pollutants when applicable; and
• Sampling and analysis of construction site runoff as required by the Regional Water Board when applicable.
■
■
-

C
ASQA SWPPP Template 43 January 2011

7 .3. Weather and Rain Event Tracking
Visual monitoring and inspections requirements of the General Permit are triggered by a qualifying rain event. The General Permit defines a qualifying rain event as any event that produces ½ inch of precipitation. A minimum of 48 hours of dry weather will be used to distinguish between separate qualifying storm events.

7.3.1 Weather Tracking
The QSP should daily consult the National Oceanographic and Atmospheric Administration (NOAA) for the weather forecasts. These forecasts can be obtained at http://www.srh.noaa.gov/.

Weather reports should be printed and maintained with the SWPPP in CSMP Attachment 1 “Weather Reports”.
[Optionally, identify any other tools, in addition to NOAA probability of precipitation that the QSP will use to track weather.]
7 .3.2 Rain Gauges
The QSP shall install [Enter Number and General Location for On-site Gauges] rain gauge(s) on t
he project site. Locate the gauge in an open area away from obstructions such as trees or overhangs. Mount the gauge on a post at a height of 3 to 5 feet with the gauge extending several inches beyond the post. Make sure that the top of the gauge is level. Make sure the post is not in an area where rainwater can indirectly splash from sheds, equipment, trailers, etc.

The rain gauge(s) shall be read daily during normal site scheduled hours. The rain gauge should be read at approximately the same time every day and the date and time of each reading recorded. Log rain gauge readings in CSMP Attachment 1 “Weather Records”. Follow the rain ga
uge instructions to obtain accurate measurements.

Once the rain gauge reading has been recorded, accumulated rain shall be emptied and the gauge reset. [Alternatively, include instructions for an automated recording rain gauge if used.] F
or comparison with the site rain gauge, the nearest appropriate governmental rain gauge(s) is located at [Insert location and web site of the applicable governmental rain gauge(s)]. 7 .4 Monitoring Locations
Monitoring locations are shown on the Site Maps in Appendix B. Monitoring locations are described in the Sections 7.6 and 7.7.

W
henever changes in the construction site might affect the appropriateness of sampling locations, the sampling locations shall be revised accordingly. All such revisions shall be implemented as soon as feasible and the SWPPP amended. Temporary changes that result in a one-time additional sampling location do not require a SWPPP amendment.

7.5 Safety and Monitoring Exemptions
Safety practices for sample collection will be in accordance with the [ENTER TITLE AND

PUBLICATION DATE OF CONTRACTOR'S HEALTH AND SAFETY PLAN FOR THE

CA
SQA SWPPP Template 44 January 2011
PROJECT OR PROVIDE SPECIFIC REQUIREMENTS IN THIS SECTION]. A summary of th
e safety requirements that apply to sampling personnel is provided below. •
•
•
•

Thi
s project is not required to collect samples or conduct visual observations (inspections) under the following conditions:
• During dangerous weather conditions such as flooding and electrical storms. • Outside of scheduled site business hours.

Scheduled site business hours are: [SPECIFY SITE BUSINESS DAYS AND HOURS].

If
monitoring (visual monitoring or sample collection) of the site is unsafe because of the dangerous conditions noted above then the QSP shall document the conditions for why an exception to performing the monitoring was necessary. The exemption documentation shall be filed in CSMP Attachment 2 “Monitoring Records”.
---
-

CA
SQA SWPPP Template 45 January 2011

7. 6 Visual Monitoring
Visual monitoring includes observations and inspections. Inspections of BMPs are required to identify and record BMPs that need maintenance to operate effectively, that have failed, or that could fail to operate as intended. Visual observations of the site are required to observe storm water drainage areas to identify any spills, leaks, or uncontrolled pollutant sources.

Table 7.1 identifies the required frequency of visual observations and inspections. Inspections and observations will be conducted at the locations identified in Section 7.6.3. -

CA
SQA SWPPP Template 46 January 2011

Ta
ble 7.1 Summary of Visual Monitoring and Inspections
Type of Inspection Frequency
Routine Inspections
BMP Inspections We ekly1
BMP Inspections – Tracking Control Da ily
[Biswale] [Quartley]
Non-Stormwater Discharge Observations Quarterly during daylight hours Rain Event Triggered Inspections
Site Inspections Prior to a Qualifying Event Within 48 hours of a qualifying event 2 BMP Inspections During an Extended Storm Event Every 24-hour period of a rainevent 2 Site Inspections Following a Qualifying Event Within 48 hours of a qualifying event 2 1 M ost BMPs must be inspected weekly; those identified below must be inspected more frequently. 2 Inspections are only required during scheduled site operating hours. Note however, these inspections are required daily regardless of the amount of precipitation.

7.6.1 Routine Observations and Inspections
Ro
utine site inspections and visual monitoring are necessary to ensure that the project is in compliance with the requirements of the Construction General Permit.

7.6.1.1 Routine BMP Inspections
Inspections of BMPs are conducted to identify and record:
• BMPs that are properly installed;
• BMPs that need maintenance to operate effectively;
• BMPs that have failed; or
• BMPs that could fail to operate as intended.

7.6.1.2 Non-Stormwater Discharge Observations
Each drainage area will be inspected for the presence of or indications of prior unauthorized and authorized non-stormwater discharges. Inspections will record:
• Presence or evidence of any non-stormwater discharge (authorized or unauthorized); • Pollutant characteristics (floating and suspended material, sheen, discoloration, turbidity, odor, etc.); and
• Source of discharge.

7.6.2 Rain-Event Triggered Observations and Inspections Visual observations of the site and inspections of BMPs are required prior to a qualifying rain event; following a qualifying rain event, and every 24-hour period during a qualifying rain event. - -

CA
SQA SWPPP Template 47 January 2011
Pre-rain inspections will be conducted after consulting NOAA and determining that a pre
cipitation event with a 50% or greater probability of precipitation has been predicted.

7.6.2.1 Visual Observations Prior to a Forecasted Qualifying Rain Event Within 48-hours prior to a qualifying event a stormwater visual monitoring site inspection will include observations of the following locations:
• Stormwater drainage areas to identify any spills, leaks, or uncontrolled pollutant sources; • BMPs to identify if they have been properly implemented; • Any stormwater storage and containment areas to detect leaks and ensure maintenance of adequate freeboard.
[BMP inspections and visual monitoring will be triggered by a NOAA prediction of rain in the project area.]
or
Consistent with guidance from the State Water Resources Control Board, pre-rain BMP inspections and visual monitoring will be triggered by a NOAA forecast that indicates a probability of precipitation of 50% or more in the project area. or
BMP inspections and visual monitoring will be triggered by a NOAA quantitative predicted forecast (QPF) that indicates ½-inch or more of rain will occur in the project area.]

7. 6.2.2 BMP Inspections During an Extended Storm Event During an extended rain event BMP inspections will be conducted to identify and record:
• BMPs that are properly installed;
• BMPs that need maintenance to operate effectively;
• BMPs that have failed; or
• BMPs that could fail to operate as intended.

If the construction site is not accessible during the rain event, the visual inspections shall be performed at all relevant outfalls, discharge points, downstream locations. The inspections should record any projected maintenance activities.

7.6.2.2 Visual Observations Following a Qualifying Rain Event Within 48 hours following a qualifying rain event (0.5 inches of rain) a stormwater visual monitoring site inspection is required to observe:
• Stormwater drainage areas to identify any spills, leaks, or uncontrolled pollutant sources; • BMPs to identify if they have been properly designed, implemented, and effective; • Need for additional BMPs;
• Any stormwater storage and containment areas to detect leaks and ensure maintenance of adequate freeboard; and
• Discharge of stored or contained rain water.

I
I

CA
SQA SWPPP Template 48 January 2011

7.6.3 Visual Monitoring Procedures
Vi
sual monitoring shall be conducted by the QSP or staff trained by and under the supervision of the QSP.

The name(s) and contact number(s) of the site visual monitoring personnel are listed below and their training qualifications are provided in Appendix K.

Assigned inspector: Sam Akbarpour Contact phone: 951-279-4041 Alternate inspector: NAME OF INSPECTOR Contact phone: TELEPHONE NUMBER St
ormwater observations shall be documented on the Visual Inspection Field Log Sheet (see CSMP Attachment 3 “Example Forms”). BMP inspections shall be documented on the site spe
cific BMP inspection checklist. Any photographs used to document observations will be referenced on stormwater site inspection report and maintained with the Monitoring Records in Attachment 2.

The QSP shall within [3] days of the inspection submit copies of the completed inspection report to [Name].

The completed reports will be kept in CSMP Attachment 2 “Monitoring Records”.

7. 6.4 Visual Monitoring Follow-Up and Reporting
Correction of deficiencies identified by the observations or inspections, including required repairs or maintenance of BMPs, shall be initiated and completed as soon as possible.

If identified deficiencies require design changes, including additional BMPs, the implementation of changes will be initiated within 72 hours of identification and be completed as soon as possible. When design changes to BMPs are required, the SWPPP shall be amended to reflect the changes.

Deficiencies identified in site inspection reports and correction of deficiencies will be tracked on the Inspection Field Log Sheet or BMP Inspection Report and shall be submitted to the QSP and shall be kept in CSMP Attachment 2 “Monitoring Records”.

Th
e QSP shall within [3] days of the inspection submit copies of the completed Inspection Field Log Sheet or BMP Inspection Report with the corrective actions to [Name].

Results of visual monitoring must be summarized and reported in the Annual Report.

7.6.5 Visual Monitoring Locations
The inspections and observations identified in Sections 7.6.1 and 7.6.2 will be conducted at the lo
cations identified in this section.

BMP locations are shown on the Site Maps in SWPPP Appendix A.

There are [Enter Number] drainage area(s) on the project site and the contractor’s yard, staging areas, and storage areas. Drainage area(s) are shown on the Site Maps in Appendix B and Table

7.2 identifies each drainage area by location.

Ta
ble 7.2 Site Drainage Areas
-
-
■
-
■ -

CA
SQA SWPPP Template 49 January 2011
Location
No.

Location

Th
ere are [Enter Number] stormwater storage or containment area(s) are on the project site.

Stormwater storage or containment area(s) are shown on the Site Maps in Appendix B and Table

7.3 identifies each stormwater storage or containment area by location.

Ta
ble 7.3 Stormwater Storage and Containment Areas
Location
No.

Location

There are [Enter Number] discharge location(s) on the project site. Site stormwater discharge location(s) are shown on the Site Maps in Appendix B and Table 7.4 identifies each stormwater di
scharge location.

Table 7.4 Site Stormwater Discharge Locations
Location
No. Location

7.7 Water Quality Sampling and Analysis

7. 7.1 Sampling and Analysis Plan for Non-Visible Pollutants in Stormwater Runoff Discharges
This Sampling and Analysis Plan for Non-Visible Pollutants describes the sampling and analysis strategy and schedule for monitoring non-visible pollutants in stormwater runoff discharges from the project site.

Sampling for non-visible pollutants will be conducted when (1) a breach, leakage, malfunction, or spill is observed; and (2) the leak or spill has not been cleaned up prior to the rain event; and (3) there is the potential for discharge of non-visible pollutants to surface waters or drainage system.

The following construction materials, wastes, or activities, as identified in Section 2.6, are pote
ntial sources of non-visible pollutants to stormwater discharges from the project. Storage, use, and operational locations are shown on the Site Maps in Appendix B. - -- -
■ -
- -- - -
- -- -
-

CA
SQA SWPPP Template 50 January 2011
• [NONE]
• [NONE]

The following existing site features, as identified in Section 2.6, are potential sources of non- vis
ible pollutants to stormwater discharges from the project. Locations of existing site features contaminated with non-visible pollutants are shown on the Site Maps in Appendix B. • [NONE]
• [NONE]

T
he following soil amendments have the potential to change the chemical properties, engineering properties, or erosion resistance of the soil and will be used on the project site. Locations of soil amendment application are shown on the Site Maps in Appendix B. • [NONE]
• [NONE]

-- ---
--

CA
SQA SWPPP Template 51 January 2011

7.7 .1.1 Sampling Schedule
Samples for the potential non-visible pollutant(s) and a sufficiently large unaffected background sample shall be collected during the first two hours of discharge from rain events that result in a sufficient discharge for sample collection. Samples shall be collected during the site’s scheduled hours and shall be collected regardless of the time of year and phase of the construction.

Collection of discharge samples for non-visible pollutant monitoring will be triggered when any of the following conditions are observed during site inspections conducted prior to or during a rain event.
• Materials or wastes containing potential non-visible pollutants are not stored under watertight conditions. Watertight conditions are defined as (1) storage in a watertight container, (2) storage under a watertight roof or within a building, or (3) protected by temporary cover and containment that prevents stormwater contact and runoff from the storage area.
• Materials or wastes containing potential non-visible pollutants are stored under watertight conditions, but (1) a breach, malfunction, leakage, or spill is observed, (2) the leak or spill is not cleaned up prior to the rain event, and (3) there is the potential for discharge of non-visible pollutants to surface waters or a storm drain system. • A construction activity, including but not limited to those in Section 2.6, with the pot
ential to contribute non-visible pollutants (1) was occurring during or within 24 hours prior to the rain event, (2) BMPs were observed to be breached, malfunctioning, or improperly implemented, and (3) there is the potential for discharge of non-visible pollutants to surface waters or a storm drain system.
• Soil amendments that have the potential to change the chemical properties, engineering properties, or erosion resistance of the soil have been applied, and there is the potential for discharge of non-visible pollutants to surface waters or a storm drain system. • Stormwater runoff from an area contaminated by historical usage of the site has been observed to combine with stormwater runoff from the site, and there is the potential for discharge of non-visible pollutants to surface waters or a storm drain system.

7.7.1.2 Sampling Locations
Sampling locations are based on proximity to planned non-visible pollutant storage, occurrence or use; accessibility for sampling, and personnel safety. Planned non-visible pollutant sampling locations are shown on the Site Maps in Appendix B and include the locations identified in Table

7.5 through 7.10.
[Enter Number] sampling location(s) on the project site and the contractor’s yard have been ide
ntified for the collection of samples of runoff from planned material and waste storage areas and areas where non-visible pollutant producing construction activities are planned. [If applicable]
-
1111

C
ASQA SWPPP Template 52 January 2011
Table 7.6 Non-Visible Pollutant Sample Locations – Contractors’ Yard S
ample Location
Number Sample Location Description
Sample Location Latitude and
Longitude
(Decimal Degrees)
[Enter Number] [Enter Location] [Enter Latitude]
[Enter Longitude]
[Enter Number] [Enter Location] [Enter Latitude]
[Enter Longitude]

[Enter number of locations] sampling locations have been identified for the collection of samples o
f runoff from drainage areas where soil amendments will be applied that have the potential to affect water quality.
[If applicable]
T
able 7.7 Non-Visible Pollutant Sample Locations – Soil Amendment Areas Sample Location
Number Sample Location
Sample Location Latitude and
Longitude
(Decimal Degrees)
[Enter Number] [Enter Location] [Enter Latitude]
[Enter Longitude]
[Enter Number] [Enter Location] [Enter Latitude]
[Enter Longitude]

[Enter number of locations] sampling locations have been identified for the collection of samples o
f runoff from drainage areas contaminated by historical usage of the site.

C
ASQA SWPPP Template 53 January 2011

[If applicable]
T
able 7.8 Non-Visible Pollutant Sample Locations – Areas of Historical Contamination Sample Location
Number Sample Location
Sample Location Latitude and
Longitude
(Decimal Degrees)
[Enter Number] [Enter Location] [ Enter Latitude]
[Enter Longitude]
[Enter Number] [Enter Location] [ Enter Latitude]
[Enter Longitude]

[
Enter Number] sampling location(s) has been identified for the collection of an uncontaminated sample of runoff as a background sample for comparison with the samples being analyzed for non-visible pollutants. This location(s) was selected such that the sample will not have come in contact with the operations, activities, or areas identified in Section 7.7.1 or with disturbed soils a
reas.
[If applicable]
Table 7.9 Non-Visible Pollutant Sample Locations – Background (Unaffected Sample) Sample Location
Number Sample Location
Sample Location Latitude and
Longitude
(Decimal Degrees)
[Enter Number] [Enter Location] [ Enter Latitude]
[Enter Longitude]
[Enter Number] [Enter Location] [ Enter Latitude]
[Enter Longitude]

Table 7.10 Non-Visible Pollutant Sample Locations – Site Run-On Sample Location
Number Sample Location
Sample Location Latitude and
Longitude
(Decimal Degrees)
[Enter Number] [Enter Location] [ Enter Latitude]
[Enter Longitude]
[Enter Number] [Enter Location] [ Enter Latitude]
[Enter Longitude]

CA
SQA SWPPP Template 54 January 2011
If a stormwater visual monitoring site inspection conducted prior to or during a storm event ide
ntifies the presence of a material storage, waste storage, or operations area with spills or the potential for the discharge of non-visible pollutants to surface waters or a storm drain system that is at a location not listed above and has not been identified on the Site Maps, sampling locations will be selected by the QSP using the same rationale as that used to identify planned locations.

Non-visible pollutant sampling locations shall be identified by the QSP on the pre-rain event inspection form [and/or Rain Event Action Plan] prior to a forecasted qualifying rain event.

7. 7.1.3 Monitoring Preparation
Non-visible pollutant samples will be collected by:

Contractor Yes No
Co
nsultant Yes No
La
boratory Yes No
Sa
mples on the project site will be collected by the following contractor sampling personnel:

Name/Telephone Number:

Al
ternate(s)/Telephone Number:

An
adequate stock of monitoring supplies and equipment for monitoring non-visible pollutants will be available on the project site prior to a sampling event. Monitoring supplies and equipment will be stored in a cool temperature environment that will not come into contact with rain or direct sunlight. Sampling personnel will be available to collect samples in accordance with the sampling schedule. Supplies maintained at the project site will include, but are not limited to, clean powder-free nitrile gloves, sample collection equipment, coolers, appropriate number and volume of sample bottles, identification labels, re-sealable storage bags, paper towels, personal rain gear, ice, and Effluent Sampling Field Log Sheets and Chain of Custody (CoC) forms, which are provided in CSMP Attachment 3 “Example Forms”. □ □
□ □
□ □
--

CA
SQA SWPPP Template 55 January 2011

Samples on the project site will be collected by the following [specify laboratory or environmental consultant]:

Co
mpany Name:

St
reet Address:

Ci
ty, State Zip:

Te
lephone Number:

Po
int of Contact:

Na
me of Sampler(s):

Na
me of Alternate(s):

The QSP or his/her designee will contact [specify name of laboratory or environmental consultant] 24 hours prior to a predicted rain event or for an unpredicted event, as soon as a rain ev
ent begins if one of the triggering conditions is identified during an inspection to ensure that adequate sample collection personnel and supplies for monitoring non-visible pollutants are available and will be mobilized to collect samples on the project site in accordance with the sampling schedule.

7.7.1.4 Analytical Constituents
Table 7.11 lists the specific sources and types of potential non-visible pollutants on the project si
te and the water quality indicator constituent(s) for that pollutant.

Table 7.11 Potential Non-Visible Pollutants and Water Quality Indicator Constituents Pollutant Source Pollutant Water Quality Indicator
Constituent

------
--
-

C
ASQA SWPPP Template 56 January 2011

INSTRUCTIONS: RESOURCE – USE TO CREATE PROJECT

SPECIFIC TABLE
Co
mmon Non-Visible Pollutants and Water Quality Indicator Constituents Worksheet General Work Activity/Potential
P
ollutants
Water Quality Indicators of Potential
Constituents
(Review product literature and Material Safety Data
Sheets to confirm potential constituents)
Adhesives C OD, Phenols, SVOCs
Asphalt Work V OCs
Cleaning
Acids pH
Bleaches R esidual chlorine
TSP P hosphate
Solvents V OCs, SVOCs
Detergents M BAS
Concrete / Masonry Work
Sealant (Methyl methacrylate) SVOC
Curing compounds V OCs, SVOCs, pH
Ash, slag, sand pH , Al, Ca, Va, Zn
Drywall C u, Al, General Minerals
Framing / Carpentry
Treated Wood C u, Cr, As, Zn
Particle board F ormaldehyde
Untreated wood B OD
Grading / Earthworks
Gypsum / Lime amendments pH
Contaminated Soil C onstituents specific to known contaminants, check with Laboratory
Heating, Ventilation, Air Conditioning F reon
Insulation A l, Zn
Landscaping
Pesticides/Herbicides P roduct dependent, see label and check with Laboratory
Fertilizers T KN, NO3, BOD, COD, DOC, Sulfate, NH3,

C
ASQA SWPPP Template 57 January 2011
Common Non-V isible Pollutants and Water Quality Indicator Constituents Worksheet General Work Activity/Potential
P
ollutants
Water Quality Indicators of Potential
Constituents
(Review product literature and Material Safety Data
Sheets to confirm potential constituents)
Phosphate, Potassium
Aluminum sulfate A l, TDS, Sulfate
Liquid Waste C onstituents specific to materials, check with Laboratory
Painting
Resins C OD, SVOCs
Thinners C OD, VOCs
Paint strippers V OCs, SVOCs, metals
Lacquers, varnishes, enamels COD, VOCs, SVOCs
Sealants C OD
Adhesives P henols, SVOCs
Planting / Vegetation Management
Vegetation stockpiles B OD
Fertilizers T KN, NO3, BOD, COD, DOC, sulfate, NH3,
Phosphate, Potassium
Pesticides/Herbicides P roduct dependent, see label and check with Laboratory
Plumbing
Solder, flux, pipe fitting C u, Pb, Sn, Zn
Pools and Fountains R esidual chlorine, Cu, chloramines Removal of existing structures Z n, VOCs, PCBs (see also other applicable activity categories, e.g., grading, painting)
Roofing C u, Pb, VOCs
Sanitary Waste
S
ewer line breaks and Portable Toilets
(using clear fluid – blue fluid is visible if
discharged)
BOD, Total/Fecal coliform
Soil Preparation / Amendments/Dust
C
ontrol
Polymer/Co-polymers T KN, NO3, BOD, COD, DOC, Sulfate, Ni Lignin sulfate T DS, alkalinity
Psyllium C OD, TOC

CA
SQA SWPPP Template 58 January 2011
Common Non-Vi sible Pollutants and Water Quality Indicator Constituents Worksheet General Work Activity/Potential
Po
llutants
Water Quality Indicators of Potential
Constituents
(Review product literature and Material Safety Data
Sheets to confirm potential constituents)
Guar/Plant Gums CO D, TOC, Ni
Solid Waste (leakage) BO D
Utility Line Testing and Flushing Re sidual chlorine, chloramines Vehicle and Equipment Use
Batteries Sul furic acid; Pb, pH
Adapted from At tachment S, Caltrans SWPPP/WPCP Preparation Manual, February 2003, and CASQA Construction BMP Handbook, 2003

7.7.1.5 Sample Collection
Sam
ples of discharge shall be collected at the designated non-visible pollutant sampling locations shown on the Site Maps in Appendix B or in the locations determined by observed br
eaches, malfunctions, leakages, spills, operational areas, soil amendment application areas, and historical site usage areas that triggered the sampling event.

Grab samples shall be collected and preserved in accordance with the methods identified in the Table, “Sample Collection, Preservation and Analysis for Monitoring Non-Visible Pollutants” provided in Section 7.7.1.6. Only the QSP, or personnel trained in water quality sampling under th
e direction of the QSP shall collect samples.

Sample collection and handling requirements are described in Section 7.7.7.

7. 7.1.6 Sample Analysis
Samples shall be analyzed using the analytical methods identified in the Table 7.12.

Sa
mples will be analyzed by:

Laboratory Name:

St
reet Address:

Ci
ty, State Zip:

Te
lephone Number:

Po
int of Contact:

EL
AP Certification
Number:

-------

CA
SQA SWPPP Template 59 January 2011

Sa
mples will be delivered to the laboratory by:

Driven by Contractor Yes No
Pi
cked up by Laboratory Courier Yes No
Shi
pped Yes No

□ □
□ □
□ □

CASQA SWPPP Template 60 January 2011

Table 7.12 Sample Collection, Preservation and Analysis for Monitoring Non-Visible Pollutants Constituent Analytical Method
Minimum
Sample
Volume
Sample Containers Sample Preservation Reporting
Limit
Maximum
Holding
Time

Notes:

- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - --

CA
SQA SWPPP Template 61 January 2011

7.7.1.7 Data Evaluation and Reporting
Th
e QSP shall complete an evaluation of the water quality sample analytical results.

Runoff/downgradient results shall be compared with the associated upgradient/unaffected results and any associated run-on results. Should the runoff/downgradient sample show an increased level of the tested analyte relative to the unaffected background sample, which cannot be explained by run-on results, the BMPs, site conditions, and surrounding influences shall be assessed to determine the probable cause for the increase.

As determined by the site and data evaluation, appropriate BMPs shall be repaired or modified to mitigate discharges of non-visible pollutant concentrations. Any revisions to the BMPs shall be recorded as an amendment to the SWPPP.

The General Permit prohibits the storm water discharges that contain hazardous substances equal to or in excess of reportable quantities established in 40 C.F.R. §§ 117.3 and 302.4. The results of any non-stormwater discharge results that indicate the presence of a hazardous substance in excess of established reportable quantities shall be immediately reported to the Regional Water Board and other agencies as required by 40 C.F.R. §§ 117.3 and 302.4.

Results of non-visible pollutant monitoring shall be reported in the Annual Report.

7.7.2 Sampling and Analysis Plan for pH and Turbidity in Stormwater Runoff Discharges
Sampling and analysis of runoff for pH and turbidity is not required for Risk Level 1 projects.

7.7.2.1 Sampling Schedule
Stormwater runoff samples shall be collected for turbidity from all qualifying rain events that result in a discharge from the project site. At minimum, turbidity samples will be collected from each site discharge location draining a disturbed area. A minimum of three samples will be collected per day of discharge during a qualifying event. Samples should be representative of the total discharge from the project each day of discharge during the qualifying event. Typically representative samples will be spaced in time throughout the daily discharge event.

Stormwater runoff samples shall be collected for pH from all qualifying rain events that result in a discharge from the project site. At minimum, pH samples will be collected from each site discharge location during project phases and drainage areas with a high risk of pH discharge. A minimum of three samples will be collected per day of discharge during a qualifying event.

Samples should be representative of the total discharge from the location each day of discharge during the qualifying event. Typically representative samples will be spaced in time throughout the daily discharge event.

Stored or collected water from a qualifying storm event when discharged shall be tested for turbidity and pH (when applicable). Stored or collected water from a qualifying event may be sampled at the point it is released from the storage or containment area or at the site discharge location.

Run-on samples shall be collected whenever the QSP identifies that run-on has the potential to contribute to an exceedance of a NAL [or a NEL].
-

CA
SQA SWPPP Template 62 January 2011

7.7.2.2 Sampling Locations
Sa
mpling locations are based on the site runoff discharge locations and locations where run-on enters the site; accessibility for sampling; and personnel safety. Planned pH and turbidity sampling locations are shown on the Site Maps in Appendix B and include the locations identified in Table 7.13 and Table 7-14.
[Enter Number] sampling location(s) on the project site and the contractor’s yard have been identified for the collection of runoff samples. Table 7.13 also provides an estimate of the site’s ar
ea that drains to each location.

Table 7.13 Turbidity and pH Runoff Sample Locations
Sample Location
Number Sample Location Estimate of Site
Drainage [Factor] (%)
[Enter Number] [Enter Location] [Enter Percent]
[Enter Number] [Enter Location] [Enter Percent]

- -
-

CA
SQA SWPPP Template 63 January 2011

T
ab
le 7.14 Turbidity and pH Run-On Sample Locations
Sample Location
Number Sample Location
Sample Location Latitude and
Longitude
(Decimal Degrees)
[Enter Number] [Enter Location] [E nter Latitude]
[Enter Longitude]
[Enter Number] [Enter Location] [E nter Latitude]
[Enter Longitude]

Th
e project does not receive run-on with the potential to exceed NALs or NELs.

7.7.2.3 Monitoring Preparation
Turbidity and pH samples will be collected and analyzed by:

Contractor Yes No
Co
nsultant Yes No
La
boratory Yes No
Sa
mples on the project site will be collected by the following contractor sampling personnel:

Name/Telephone Number:

Al
ternate(s)/Telephone Number:

An
adequate stock of monitoring supplies and equipment for monitoring turbidity and will be available on the project site prior to a sampling event. Monitoring supplies and equipment will be stored in a cool temperature environment that will not come into contact with rain or direct sunlight. Sampling personnel will be available to collect samples in accordance with the sampling schedule. Supplies maintained at the project site will include, but are not limited to, field meters, extra batteries; clean powder-free nitrile gloves, sample collection equipment, appropriate sample containers, paper towels, personal rain gear, and Effluent Sampling Field Log Sheets and CoC forms provided in CSMP Attachment 3 “Example Forms”.

The contractor will obtain and maintain the field testing instruments, as identified in Section

7.7.2.6, for analyzing samples in the field by contractor sampling personnel.

Samples on the project site will be collected by the following [specify laboratory or environmental consultant]:

Co
mpany Name:

St
reet Address:
□ □
□ □
□ □
-- -
--

CA
SQA SWPPP Template 64 January 2011
City, State, Zip:

Te
lephone Number:

Po
int of Contact:

Na
me of Sampler(s):

Na
me of Alternate(s):

The QSP or his/her designee will contact [specify name of laboratory or environmental consultant] 24 hours prior to a predicted rain event or for an unpredicted event, as soon as a rain ev
ent begins to ensure that adequate sample collection personnel, supplies for monitoring pH and turbidity are available and will be mobilized to collect samples on the project site in accordance with the sampling schedule.

7.7.2.4 Field Parameters
Samples shall be analyzed for the constituents indicated in the table below “Sample Collection, and Analysis for Monitoring Turbidity and pH.”
Table 7.15 Sample Collection and Analysis for Monitoring Turbidity and pH Parameter Test Method
Minimum
Sample
Volume(1)
Sample Collection
Container Type
Detection
Limit
(minimum)
Turbidity Fi eld meter/probe with
calibrated portable instrument 500 mL
Polypropylene or Glass
(Do not collect in meter
sample cells)
1 NTU
pH
Fi
eld meter/probe with
calibrated portable instrument
or calibrated pH test kit
100 mL Polypropylene 0.2 pH units
Notes: 1 M inimum sample volume recommended. Specific volume requirements will vary by instrument; check instrument manufacturer instructions.

L – Liter
mL – Milliliter
NTU – Nephelometric Turbidity Unit

7.7.2.5 Sample Collection
Sa
mples of discharge shall be collected at the designated runoff and run-on sampling locations shown on the Site Maps in Appendix B. Run-on samples shall be collected within close pro
ximity of the point of run-on to the project.

Only personnel trained in water quality sampling and field measurements working under the direction of the QSP shall collect samples.

Sample collection and handling requirements are described in Section 7.7.7. ------

CA
SQA SWPPP Template 65 January 2011

7.7.2.6 Field Measurements
Sa
mples collected for field analysis, collection, analysis and equipment calibration shall be in accordance with the field instrument manufacturer’s specifications.

Immediately following collection, samples for field analysis shall be tested in accordance with the field instrument manufacturer’s instructions and results recorded on the Effluent Sampling Field Log Sheet.

The field instrument(s) listed in Table 7.16 will be used to analyze the following constituents:

Ta
ble 7.16 Field Instruments
Field Instrument
(Manufacturer and Model) Constituent
pH
Tu rbidity

The manufacturers’ instructions are included in CSMP Attachment 4 “Field Meter Instructions”.

Fi
eld sampling staff shall review the instructions prior to each sampling event and follow the instructions in completing measurement of the samples.
• The instrument(s) shall be maintained in accordance with manufacturer’s instructions. • The instrument(s) shall be calibrated before each sampling and analysis event. • Maintenance and calibration records shall be maintained with the SWPPP.

The QSP may authorize alternate equipment provided that the equipment meets the Construction General Permit’s requirements and the manufacturers’ instructions for calibration and use are added to CSMP Attachment 4 “Field Meter Instructions”.

7. 7.2.7 Data Evaluation and Reporting
Immediately upon completing the measurements for the sampling event, provide the Effluent Sampling Field Log Sheets to the QSP for evaluation.

Table 7.17 Numeric Action Levels
Parameter Unit Daily Average
pH pH units Lower NAL = 6.5
Upper NAL = 8.5
Turbidity NT U 250 NTU

The QSP shall within [Enter Number] days of the sample collection submit copies of the completed Ef fluent Sampling Field Log Sheets to [Name of Owners Representative].

In the event that the pH or turbidity NAL is exceeded, the QSP shall immediately notify [Name of Owners Representative] and investigate the cause of the exceedance and identify corrective ac
tions.
-
--
-

CA
SQA SWPPP Template 66 January 2011
Exceedances of NALs shall be electronically reported to the State Water Board by [Name of Owners Representative] through the SMARTs system within 10 days of the conclusion of the st
orm event. If requested by the Regional Board, a NAL Exceedance report will be submitted.

The NAL Exceedance Report must contain the following information:
• Analytical method(s), method reporting unit(s), and MDL(s) of each parameter; • Date, place, time of sampling, visual observation, and/or measurements, including precipitation; and
• Description of the current BMPs associated with the sample that exceeded the NAL and the proposed corrective actions taken.

Table 7.18 Numeric Effluent Limits Levels
Parameter Unit Daily Average
pH pH units Lower NEL = 6.0
Upper NEL = 9.0
Turbidity NT U 500 NTU

All pH and turbidity data shall be electronically reported to the State Water Board by [Name of Owners Representative] through SMARTS within 5 days of the conclusion of each storm event.

In the event that the pH or turbidity NEL is exceeded, the QSP shall immediately notify [Name of Owners Representative] and investigate the cause of the exceedance and identify corrective ac
tions. Based on the results of the investigation, the QSP shall complete a NEL Violation Report.
[Name of Owners Representative] shall implement the NEL exceedance reporting procedures. [Name of Owners Representative] shall electronically submit a NEL Violation Report through SM
ARTS within 24 hours identifying the exceedance. The NEL Violation Report must contain the following information:
• Analytical method(s), method reporting unit(s), and MDL(s) of each parameter; • Date, place, time of sampling, visual observation, and/or measurements, including precipitation; and
• Description of the current BMPs associated with the sample that exceeded the NEL and the proposed corrective actions taken.

In the event that an NEL was exceeded during a storm event equal to or larger than the compliance storm event ([Enter Number from Section 7.3] inches of rain in a 24 hour period), th
e NEL report entered in to SMARTS must also contain readings from the on-site rain gauge and nearby governmental rain gauge readings for verification.

In the event that the NEL exceedance was caused by run-on from a natural disaster (such as a forest fire) a NEL exemption justification shall be submitted with NEL report entered into SMARTS.
-
--

CA
SQA SWPPP Template 67 January 2011

7. 7.3 Additional Monitoring Following an NEL Exceedance

7.7.3.1 Sampling and Analysis Plan for Suspended Sediment Concentration in Stormwater Runoff Discharges

7.7.3.1.1. Sampling Schedule and Locations
When required, stormwater runoff discharge samples shall be collected for SSC from all qualifying rain events that result in a discharge from the project site. At minimum, SSC samples will be collected from each site discharge location where turbidity samples are collected. A minimum of three representative samples will be collected per day of discharge from a qualifying event.

Sampling locations are listed in Section 7.7.2.2.

7.7. 3.1.2. Monitoring Preparation
SSC samples will be collected by:

Contractor Yes No
Co
nsultant Yes No
La
boratory Yes No
Sa
mples on the project site will be collected by the following contractor sampling personnel:

Name/Telephone Number:

Al
ternate(s)/Telephone Number:

An
adequate stock of monitoring supplies and equipment for monitoring SSC will be available on the project site prior to a sampling event. Monitoring supplies and equipment will be stored in a cool temperature environment that will not come into contact with rain or direct sunlight.

Sampling personnel will be available to collect samples in accordance with the sampling schedule. Supplies maintained at the project site will include, but are not limited to, clean powder-free nitrile gloves, sample collection equipment, appropriate sample containers, paper towels, personal rain gear, and Effluent Sampling Field Log Sheets and CoC forms provided in CSMP Attachment 3 “Example Forms”.

Samples on the project site will be collected by the following [specify laboratory or environmental consultant]:

Co
mpany Name:

St
reet Address:

Ci
ty, State, Zip:

Te
lephone Number:

Po
int of Contact:

Na
me of Sampler(s):
□ □
□ □
□ □
--
------

CA
SQA SWPPP Template 68 January 2011
Name of Alternate(s):

The QSP or his/her designee will contact [specify name of laboratory or environmental consultant] 24 hours prior to a predicted rain event or for an unpredicted event, as soon as a rain ev
ent begins to ensure that adequate sample collection personnel, supplies for monitoring SSC are available and will be mobilized to collect samples on the project site in accordance with the sampling schedule.

7.7.3.1.3. Sample Collection and Analysis
Samples of runoff discharge shall be collected at the designated sampling locations shown on the Site Maps in Appendix B.

Gr
ab samples shall be collected and preserved in accordance with the methods identified in the Table 7.19. Only personnel trained in water quality sampling under the direction of the QSP sha
ll collect samples.

Sample collection and handling requirements are described in Section 7.7.7. --
-

CA
SQA SWPPP Template 69 January 2011

Ta
ble 7.19 Sample Collection, Preservation and Analysis for Monitoring Suspended Sediment Concentration (SSC)
Parameter Test Method Sample
Preservation
Minimum
Sample
Volume(1)
Sample
Bottle
Maximum
Holding
Time
Detection
Limit
(minimum)
Suspended
Se
diment
Concentration
(SSC)
ASTM
D3977-97
Store at 4˚ C
(39.2˚ F) 200 mL Contact
Laboratory 7 days 5 mg/L

Sa
mples will be analyzed by:

Laboratory Name:

St
reet Address:

Ci
ty, State Zip:

Te
lephone Number:

Po
int of Contact:

Sa
mples will be delivered to the laboratory by:

Driven by Contractor Yes No
Pi
cked up by Laboratory Courier Yes No
Shi
pped Yes No

7.7. 3.1.4. Data Evaluation
There are no regulatory limitations on SSC in runoff. SSC data shall be reported with the Annual Report.

7.7.3.2 Sampling and Analysis Plan for pH, Turbidity, and SSC in Receiving Water Following the exceedance of an NEL receiving water monitoring is required.

7.7.3.2.1. Sampling Schedule and Locations
Following the exceedance of the pH NEL receiving water samples shall be collected for pH and any parameters required by the Regional Water Board.

Following the exceedance of the turbidity NEL receiving water samples shall be collected for turbidity, SSC, and any parameters required by the Regional Water Board.

Receiving water samples will be collected [Enter Sampling Frequency].

Sam
pling locations are based on the site discharge locations into the receiving water, location accessibility for sampling, and personnel safety. Planned sampling locations Site Maps in Appendix B and include the locations identified below.
□ □
□ □
□ □
-

CA
SQA SWPPP Template 70 January 2011
[Enter Number] sampling location(s) have been identified for the collection of receiving water sa
mples.

Table 7.20 Receiving Water Sample Locations
Upstream/Upgradient/Background
(This location(s) is a representative and accessible location located as close as possible and upstream from the runoff discharge point)
Sample location number(s) Sample Location Description Sa mple Location Latitude and Longitude
[Enter Number] [Enter Location] [Enter Latitude]
[Enter Longitude]
[Enter Number] [Enter Location] [Enter Latitude]
[Enter Longitude]
Downstream/downgradient
(T
his location(s) is a representative and accessible location located as close as possible and downstream from the runoff discharge point)
Sample location number(s) Sample Location Sa mple Location Latitude and Longitude
[Enter Number] [Enter Location] [Enter Latitude]
[Enter Longitude]
[Enter Number] [Enter Location] [Enter Latitude]
[Enter Longitude]

7.7. 3.2.2. Monitoring Preparation
Rec
eiving water samples will be collected and analyzed by:

Contractor Yes No
Co
nsultant Yes No
La
boratory Yes No
Sa
mples on the project site will be collected by the following contractor sampling personnel:

Name/Telephone Number:

Al
ternate(s)/Telephone Number:

An
adequate stock of monitoring supplies and equipment for monitoring the receiving will be available on the project site prior to a sampling event. Monitoring supplies and equipment will be stored in a cool temperature environment that will not come into contact with rain or direct sunlight. Sampling personnel will be available to collect samples in accordance with the sampling schedule. Supplies maintained at the project site will include, but are not limited to, clean powder-free nitrile gloves, sample collection equipment, field meters, appropriate sample □ □
□ □
□ □
--

CA
SQA SWPPP Template 71 January 2011
containers, paper towels, personal rain gear, and Re ceiving Water Sampling Field Log Sheets and CoC forms provided in CSMP Attachment 3 “Example Forms”.

Samples on the project site will be collected by the following [specify laboratory or environmental consultant]:

Co
mpany Name:

St
reet Address:

Ci
ty, State, Zip:

Te
lephone Number:

Po
int of Contact:

Na
me of Sampler(s):

Na
me of Alternate(s):

The QSP or his/her designee will contact [specify name of laboratory or environmental consultant] 24 hours prior to a planned receiving water sampling event to ensure that adequate sa
mple collection personnel, supplies for monitoring are available and will be mobilized to collect samples on the project site in accordance with the sampling schedule.

7.7.3.2.3. Sample Collection and Analysis
Receiving water samples shall be collected at the designated sampling locations shown on the Site Maps in Appendix B and as identified in Section 7.7.3.2.1.

Onl
y personnel trained in water quality sampling under the direction of the QSP shall collect samples.

SSC grab samples for laboratory analysis shall be collected and preserved in accordance with the methods identified in the Table, “Sample Collection, Preservation and Analysis for Monitoring SSC” table provided in Section 7.7.3.1.3. Samples will be shipped to the laboratory identified in Section 7.7.3.1.3.

Samples for field parameters shall be analyzed for the constituents indicated in Section 7.7.2.4, “S
ample Collection, and Analysis for Monitoring Turbidity and pH.” Turbidity and pH samples shall be analyzed immediately.

Grab samples for parameters required by the Regional Water Board shall be collected and preserved in accordance with the methods identified Section 7.7.5.5. Samples will be shipped to the laboratory identified in Section 7.7.1.6.

Sample collection and handling requirements are described in Section 7.7.7.

7.7. 3.2.3. Data Evaluation and Reporting
The QSP shall complete an evaluation of the receiving water quality sample analytical results.

Downgradient results shall be compared with the associated upgradient/background results and any associated construction runoff results. Should the downgradient sample show an increased level of the tested analyte relative to the upgradient/background sample, the QSP shall initiate an --------

CA
SQA SWPPP Template 72 January 2011
evaluation of the BMPs, site conditions, and surrounding influences shall be assessed to det
ermine the probable cause for the increase in the receiving water.

As determined by the evaluation, appropriate BMPs shall be repaired or modified to mitigate discharges of non-visible pollutant concentrations. Any revisions to the BMPs shall be recorded as an amendment to the SWPPP.

Receiving water data shall be reported in the Annual Report.

7.7.4 Sampling and Analysis Plan for Non-Stormwater Discharges This project is not subject to the non-stormwater sampling and analysis requirements of the General Permit because it is a Risk Level 1 project.

Sampling of non-stormwater discharges will be conducted when an authorized or unauthorized non-stormwater discharge is observed discharging from the project site. In the event that non-stormwater discharges run-on to the project site from offsite locations, and this run-on has the potential to contribute to a violation of a NAL [or NEL], the run-on will also be sampled.

The following authorized non-stormwater discharges identified in Section 2.7, have the potential to
be discharged from the project site.
• [NONE]
• [NONE]

I
n addition to the above authorized stormwater discharges, some construction activities have the potential to result in an unplanned (unauthorized) non-stormwater discharge if BMPs fail. These activities include:

• [NONE]
• [NONE]
7 .7.4.1 Sampling Schedule
Samples of authorized or unauthorized non-stormwater discharges shall be collected when they are observed.

7.7.4.2 Sampling Locations
Samples shall be collected from the discharge point of the construction site where the non-stormwater discharge is running off the project site. Site discharge locations are shown on the Site Maps in SWPPP Appendix A and include the locations identified below. [E
nter Number] sampling location(s) on the project site and the contractor’s yard have been identified where non-stormwater discharges may runoff from the project site. [If applicable]
- ---
--

CA
SQA SWPPP Template 73 January 2011
Sample Location
Nu
mber Sample Location
Sample Location Latitude and
Longitude
(Decimal Degrees)
[Enter Number] [Enter Location] [E nter Latitude]
[Enter Longitude]
[Enter Number] [Enter Location] [E nter Latitude]
[Enter Longitude]

[Enter number of locations] sampling locations have been identified for the collection of no
n-stormwater discharges that run-on to the project site.

Sample Location
Number Sample Location
Sample Location Latitude and
Longitude
(Decimal Degrees)
[Enter Number] [Enter Location] [Enter Latitude]
[Enter Longitude]
[Enter Number] [Enter Location] [Enter Latitude]
[Enter Longitude]

7. 7.4.3 Monitoring Preparation
Non-stormwater discharge samples will be collected by:

Contractor Yes No
Co
nsultant Yes No
La
boratory Yes No
Sa
mples on the project site will be collected by the following contractor sampling personnel:

Name/Telephone Number:

Al
ternate(s)/Telephone Number:

An
adequate stock of monitoring supplies and equipment for monitoring non-stormwater discharges will be available on the project site. Monitoring supplies and equipment will be stored in a cool temperature environment that will not come into contact with rain or direct sunlight. Personnel trained in sampling will be available to collect samples in accordance with the sampling schedule. Supplies maintained at the project site will include, but are not limited to, clean powder-free nitrile gloves, sample collection equipment, field meters, coolers, appropriate number and volume of sample bottles, identification labels, re-sealable storage bags, paper towels, personal rain gear, ice, and Effluent Sampling Field Log Sheets and CoC forms provided in CSMP Attachment 3 “Example Forms”.

The contractor will obtain and maintain the field testing instruments, as identified in Section

7.7.2, for analyzing samples in the field by contractor sampling personnel. □ □
□ □
□ □
--
-
1111 -

CA
SQA SWPPP Template 74 January 2011
Samples on the project site will be collected by the following [specify laboratory or environmental consultant]:

Co
mpany Name:

St
reet Address:

Ci
ty, State Zip:

Te
lephone Number:

Po
int of Contact:

Na
me of Sampler(s):

Na
me of Alternate(s):

The QSP or his/her designee will contact [specify name of laboratory or environmental consultant], 24 hours prior to a planned non-stormwater discharge or as soon as an unplanned no
n-stormwater discharge is observed to ensure that adequate sample collection personnel, supplies for non-stormwater discharge monitoring are available and will be mobilized to collect samples on the project site in accordance with the sampling schedule.

7.7.4.4 Analytical Constituents
All non-stormwater discharges that flow through a disturbed area shall, at minimum, be monitored for turbidity.

All non-stormwater discharges that flow through an area where they are exposed to pH altering materials shall be monitored for pH.

The QSP shall identify additional pollutants to be monitored for each non-stormwater discharge incident based on the source of the non-stormwater discharge. If the source of an unauthorized non-stormwater discharge is not known, monitoring for pH, turbidity, MBAS, TOC, and residual chlorine or chloramines is recommended to help identify the source of the discharge.

Non-stormwater discharge run-on shall be monitored, at minimum, for pH and turbidity. The QSP shall identify additional pollutants to be monitored for each non-stormwater discharge incident based on the source of the non-stormwater discharge. If the source of an unauthorized non-stormwater discharge is not known, monitoring for pH, turbidity, MBAS, TOC, and residual chlorine or chloramines is recommended to help identify the source of the discharge.

Table 7.21 lists the specific sources and types of potential non-visible pollutants on the project si
te and the water quality indicator constituent(s) for that pollutant.

Table 7.21 Potential Non-Stormwater Discharge Pollutants and Water Quality Indicator Constituents
Pollutant Source Pollutant Water Quality Indicator
Constituent
Disturbed Areas Se diment Turbidity
Concrete Work pH pH
--------
-

CA
SQA SWPPP Template 75 January 2011
Table 7.21 Potential Non-Stormwater Discharge Pollutants and Water Quality Indicator Co
nstituents
Pollutant Source Pollutant Water Quality Indicator
Constituent

7. 7.4.5 Sample Collection
Samples shall be collected at the discharge locations where the non-stormwater discharge is leaving the project site. Potential discharge locations are shown on the Site Maps in Appendix B and identified in Section 7.7.4.2.

Gr
ab samples shall be collected and preserved in accordance with the methods identified in Table 7.22. Only personnel trained in water quality sampling under the direction of the QSP sha
ll collect samples.

Sample collection and handling requirements are described in Section 7.7.7.

7. 7.4.6 Sample Analysis
Samples shall be analyzed using the analytical methods identified in Table 7.22.

7. 7.4.7 Data Evaluation and Reporting
The QSP shall complete an evaluation of the water quality sample analytical results.

Turbidity and pH results shall be evaluated for compliance with NALs [and NELs] as identified in Section 7.7.2.7.

Run
off results shall also be evaluated for the constituents suspected in the non-stormwater discharge. Should the runoff sample indicate the discharge of a pollutant which cannot be explained by run-on results, the BMPs, site conditions, and surrounding influences shall be assessed to determine the probable cause for the increase.

As determined by the site and data evaluation, appropriate BMPs shall be repaired or modified to mitigate discharges of non-visible pollutant concentrations. Any revisions to the BMPs shall be recorded as an amendment to the SWPPP.

Non-storm water discharge results shall be submitted with the Annual Report.

The General Permit prohibits the non-storm water discharges that contain hazardous substances equal to or in excess of reportable quantities established in 40 C.F.R. §§ 117.3 and 302.4. The results of any non-stormwater discharge results that indicate the presence of a hazardous substance in excess of established reportable quantities shall be immediately reported to the Regional Water Board.

- - -- - -- - -
-
-
-

CASQA SWPPP Template 76 January 2011

Table 7.22 Sample Collection, Preservation and Analysis for Monitoring Pollutants in Non-Stormwater Discharges Constituent Analytical Method
Minimum
Sample
Volume
Sample Bottle Sample Preservation Reporting
Limit
Maximum
Holding
Time

Notes:

- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - --

CA
SQA SWPPP Template 77 January 2011

7.7.5 Sampling and Analysis Plan for Other Pollutants Required by the Regional Wa
ter Board
The Regional Water Board has specified monitoring for the following additional pollutants:
•
•

Thi
s Sampling and Analysis Plan describes the sampling and analysis strategy and schedule for monitoring additional pollutants as specified in the communication from the Regional Water Board dated [Enter Date]. This communication is included in CSMP Attachment 5 “Supplemental Information”.

7. 7.5.1 Sampling Schedule
Runoff samples shall be collected for [Enter Pollutants] from all qualifying rain events that result in
a discharge from the project site. At minimum, samples will be collected from each site discharge location. A minimum of [Enter Number of Samples]samples will be collected per day of
discharge from a qualifying event. Samples should be representative of the total discharge from the location each day of discharge during the qualifying event. Typically representative samples will be spaced in time throughout the daily discharge event.

Stored or collected water from a qualifying storm event will be sampled when discharged. Stored or collected water from a qualifying event may be sampled at the point it is release from the storage or containment area or at the site discharge location.

7.7.5.2 Sampling Locations
Sampling locations are based on the site discharge locations; accessibility for sampling; and personnel safety. Planned sample locations are shown on the Site Maps in Appendix B and inc
lude the locations identified below.
[Enter Number] sampling location(s) on the project site and the contractor’s yard have been identified for the collection of runoff samples.

Table 7.23 Runoff Sample Locations for Other Pollutants Required by the Regional Water Board
Sample Location
Number Sample Location
Sample Location Latitude and
Longitude
(Decimal Degrees)
[Enter Number] [Enter Location] [E nter Latitude]
[Enter Longitude]
[Enter Number] [Enter Location] [E nter Latitude]
[Enter Longitude]
--

CA
SQA SWPPP Template 78 January 2011
Sample Location
Nu
mber Sample Location
Sample Location Latitude and
Longitude
(Decimal Degrees)
[Enter Number] [Enter Location] [E nter Latitude]
[Enter Longitude]
[Enter Number] [Enter Location] [E nter Latitude]
[Enter Longitude]

7.7.5.3 Monitoring Preparation
Sa
mples will be collected by:

Contractor Yes No
Co
nsultant Yes No
La
boratory Yes No
Sa
mples on the project site will be collected by the following contractor sampling personnel:

Name/Telephone Number:

Al
ternate(s)/Telephone Number:

An adequate stock of monitoring supplies and equipment for monitoring [Enter Pollutants] will be
available on the project site prior to a sampling event. Monitoring supplies and equipment will be stored in a cool temperature environment that will not come into contact with rain or direct sunlight. Sampling personnel will be available to collect samples in accordance with the sampling schedule. Supplies maintained at the project site will include, but are not limited to, field meters, and backup; extra batteries; clean powder-free nitrile gloves, sample collection equipment, appropriate sample containers, paper towels, personal rain gear, and Effluent Sampling Field Log Sheets a nd CoC forms provided in CSMP Attachment 3 “Example Forms”.

The contractor will obtain and maintain the field testing instruments, as identified in Section

7.7.2, for analyzing samples in the field by contractor sampling personnel.

Samples on the project site will be collected by the following [specify laboratory or environmental consultant]:

Co
mpany Name:

St
reet Address:

Ci
ty, State, Zip:

Te
lephone Number:

Po
int of Contact:

Na
me of Sampler(s):

Na
me of Alternate(s):

□ □
□ □
□ □
--
1111 -
-------

CA
SQA SWPPP Template 79 January 2011
The QSP or his/her designee will contact [specify name of laboratory or environmental consultant] 24 hours prior to a predicted rain event or for an unpredicted event, as soon as a rain event begins to ensure that adequate sample collection personnel, supplies for monitoring [Enter Pollutants] are available and will be mobilized to collect samples on the project site in ac
cordance with the sampling schedule.

7.7.5.4 Sample Collection
Runoff samples of discharge shall be collected at the designated sampling locations as identified above and shown on the Site Maps in Appendix B and as identified in Section 7.7.5.2.

Gr
ab samples shall be collected and preserved in accordance with the methods identified in Table 7.24. Only personnel trained in water quality sampling under the direction of the QSP sha
ll collect samples.

Sample collection and handling requirements are described in Section 7.7.7.

7. 7.5.5 Sample Analysis
Samples shall be analyzed using the analytical methods identified in Table 7.24.

-- -
-
-

CASQA SWPPP Template 80 January 2011
Table 7.24 Sample Collection, Preservation and Analysis for Monitoring Regional Board Required Pollutants Constituent Analytical Method
Minimum
Sample
Volume
Sample Bottle Sample Preservation Reporting
Limit
Maximum
Holding
Time

Notes:

- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - -- - - - - - --

CA
SQA SWPPP Template 81 January 2011

7.7.5.6 Data Evaluation and Reporting

7. 7.6 Training of Sampling Personnel
Sampling personnel shall be trained to collect, maintain, and ship samples in accordance with the Surface Water Ambient Monitoring program (SWAMP) 2008 Quality Assurance Program Plan (QAPrP). Training records of designated contractor sampling personnel are provided in Appendix K.

Th
e stormwater sampler(s) and alternate(s) have received the following stormwater sampling training:

Name Training

INSERT LIST OF TRAINING COURSES

INSERT LIST OF TRAINING COURSES

Th
e stormwater sampler(s) and alternates have the following stormwater sampling experience:

Name Experience

INSERT LIST OF STORMWATER SAMPLING EXPERIENCE

INSERT LIST OF STORMWATER SAMPLING EXPERIENCE

7. 7.7 Sample Collection and Handling

7.7.7.1 Sample Collection
Samples shall be collected at the designated sampling locations shown on the Site Maps and listed in the preceding sections. Samples shall be collected, maintained and shipped in accordance with the SWAMP 2008 Quality Assurance Program Plan (QAPrP).

Grab samples shall be collected and preserved in accordance with the methods identified in preceding sections.

To maintain sample integrity and prevent cross-contamination, sample collection personnel shall follow the protocols below.
• Collect samples (for laboratory analysis) only in analytical laboratory-provided sample containers;
• Wear clean, powder-free nitrile gloves when collecting samples; • Change gloves whenever something not known to be clean has been touched; • Change gloves between sites;
• Decontaminate all equipment (e.g. bucket, tubing) prior to sample collection using a trisodium phosphate water wash, distilled water rinse, and final rinse with distilled water. (Dispose of wash and rinse water appropriately, i.e., do not discharge to storm drain or receiving water). Do not decontaminate laboratory provided sample containers; • Do not smoke during sampling events;
• Never sample near a running vehicle;
-
--
--

CA
SQA SWPPP Template 82 January 2011
• Do not park vehicles in the immediate sample collection area (even non-running v
ehicles);
• Do not eat or drink during sample collection; and
• Do not breathe, sneeze, or cough in the direction of an open sample container.

The most important aspect of grab sampling is to collect a sample that represents the entire runoff stream. Typically, samples are collected by dipping the collection container in the runoff flow paths and streams as noted below.
i. For small streams and flow paths, simply dip the bottle facing upstream until full. ii. For larger stream that can be safely accessed, collect a sample in the middle of the flow stream by directly dipping the mouth of the bottle. Once again making sure that the opening of the bottle is facing upstream as to avoid any contamination by the sampler. iii. For larger streams that cannot be safely waded, pole-samplers may be needed to safely access the representative flow.
iv. Avoid collecting samples from ponded, sluggish or stagnant water. v. Avoid collecting samples directly downstream from a bridge as the samples can be affected by the bridge structure or runoff from the road surface.

Note, that depending upon the specific analytical test, some containers may contain preservatives. These containers should never be dipped into the stream, but filled indirectly from the collection container.

7.7.7.2 Sample Handling
Turbidity and pH measurements must be conducted immediately. Do not store turbidity or pH samples for later measurement.

Samples for laboratory analysis must be handled as follows. Immediately following sample collection:
• Cap sample containers;
• Complete sample container labels;
• Sealed containers in a re-sealable storage bag;
• Place sample containers into an ice-chilled cooler;
• Document sample information on the Effluent Sampling Field Log Sheet; and • Complete the CoC.

All samples for laboratory analysis must be maintained between 0-6 degrees Celsius during delivery to the laboratory. Samples must be kept on ice, or refrigerated, from sample collection through delivery to the laboratory. Place samples to be shipped inside coolers with ice. Make sure the sample bottles are well packaged to prevent breakage and secure cooler lids with packaging tape.

Ship samples that will be laboratory analyzed to the analytical laboratory right away. Hold times are measured from the time the sample is collected to the time the sample is analyzed. The General Permit requires that samples be received by the analytical laboratory within 48 hours of the physical sampling (unless required sooner by the analytical laboratory).

Laboratory Name:

-

CA
SQA SWPPP Template 83 January 2011
Address:

Ci
ty, State Zip:

Te
lephone Number:

Po
int of Contact:

7. 7.7.3 Sample Documentation Procedures
All original data documented on sample bottle identification labels, Effluent Sampling Field Log Sheet, and CoCs shall be recorded using waterproof ink. These shall be considered accountable documents. If an error is made on an accountable document, the individual shall make corrections by lining through the error and entering the correct information. The erroneous information shall not be obliterated. All corrections shall be initialed and dated.

Duplicate samples shall be identified consistent with the numbering system for other samples to prevent the laboratory from identifying duplicate samples. Duplicate samples shall be identified in the Effluent Sampling Field Log Sheet.

Sample documentation procedures include the following:

Sample Bottle Identification Labels: Sampling personnel shall attach an identification label to each sample bottle. Sample identification shall uniquely identify each sample location.

Fi
eld Log Sheets: Sampling personnel shall complete the Effluent Sampling Field Log Sheet and Receiving Water Sampling Field Log Sheet f or each sampling event, as appropriate.

Chain of Custody: Sampling personnel shall complete the CoC for each sampling event for which samples are collected for laboratory analysis. The sampler will sign the CoC when the sa
mple(s) is turned over to the testing laboratory or courier.

7.8 Active Treatment System Monitoring
An Active Treatment System (ATS) will be deployed on the site? Yes No

7. 9 Bioassessment Monitoring
This project is not subject to bioassessment monitoring because it is not a Risk Level 3 project.

This project is subject to bioassessment monitoring requirements. The bioassessment monitoring program is specified in [Insert the name of plan where the bioassessment monitoring plan is documented].

Thi
s project is subject to bioassessment monitoring requirements. The Regional Water Board has approved a bioassessment sampling exception for the project. Documentation of the sampling exception approval and payment to the SWAMP fund is included in CSMP Attachment 5 “Supplemental Information”.

7. 10 Watershed Monitoring Option
This project is not participating in a watershed monitoring option.

This project is participating in a watershed monitoring option. ----
□

CA
SQA SWPPP Template 84 January 2011
[Insert summary of the watershed monitoring and Regional Board approval of the program]

7. 11 Quality Assurance and Quality Control
An effective Quality Assurance and Quality Control (QA/QC) plan shall be implemented as part of the CSMP to ensure that analytical data can be used with confidence. QA/QC procedures to be initiated include the following:
• Field logs;
• Clean sampling techniques;
• CoCs;
• QA/QC Samples; and
• Data verification.

Each of these procedures is discussed in more detail in the following sections.

7.11.1 Field Logs
The purpose of field logs is to record sampling information and field observations during monitoring that may explain any uncharacteristic analytical results. Sampling information to be included in the field log include the date and time of water quality sample collection, sampling personnel, sample container identification numbers, and types of samples that were collected.

Field observations should be noted in the field log for any abnormalities at the sampling location (color, odor, BMPs, etc.). Field measurements for pH and turbidity should also be recorded in the field log. A Visual Inspection Field Log, an Effluent Sampling Field Log Sheet, [and a Receiving Water Sampling Field Log Sheet] are included in CSMP Attachment 3 “Example Forms”.

7. 11.2 Clean Sampling Techniques
Clean sampling techniques involve the use of certified clean containers for sample collection and clean powder-free nitrile gloves during sample collection and handling. As discussed in Section

7.7.7, adoption of a clean sampling approach will minimize the chance of field contamination an
d questionable data results.

7.11.3 Chain of Custody
The sample CoC is an important documentation step that tracks samples from collection through analysis to ensure the validity of the sample. Sample CoC procedures include the following:
• Proper labeling of samples;
• Use of CoC forms for all samples; and
• Prompt sample delivery to the analytical laboratory.

Analytical laboratories usually provide CoC forms to be filled out for sample containers. An example CoC is included in CSMP Attachment 3 “Example Forms”.

7. 11.4 QA/QC Samples
QA/QC samples provide an indication of the accuracy and precision of the sample collection; sample handling; field measurements; and analytical laboratory methods. The following types of QA/QC will be conducted for this project:
-
1111 -

CA
SQA SWPPP Template 85 January 2011
Field Duplicates at a frequency of [5 percent or 1 duplicate minimum per sampling event] (R
equired for all sampling plans with field measurements or laboratory analysis) Equipment Blanks at a frequency of [Insert frequency required by method] (O
nly needed if equipment used to collect samples could add the pollutants to sample) Field Blanks at a frequency of [Insert frequency required by method] (O
nly required if sampling method calls for field blanks) Travel Blanks at a frequency of [Insert frequency required by method] (R
equired for sampling plans that include VOC laboratory analysis)

7.11.4.1 Field Duplicates
Field duplicates provide verification of laboratory or field analysis and sample collection.

Duplicate samples shall be collected, handled, and analyzed using the same protocols as primary samples. The sample location where field duplicates are collected shall be randomly selected from the discharge locations. Duplicate samples shall be collected immediately after the primary sample has been collected. Duplicate samples must be collected in the same manner and as close in time as possible to the original sample. Duplicate samples shall not influence any evaluations or conclusion.

7.11.4.2 Equipment Blanks
Equipment blanks provide verification that equipment has not introduced a pollutant into the sample. Equipment blanks are typically collected when:
• New equipment is used;
• Equipment that has been cleaned after use at a contaminated site; • Equipment that is not dedicated for surface water sampling is used; or • Whenever a new lot of filters is used when sampling metals.

7.11.4.3 Field Blanks
Field blanks assess potential sample contamination levels that occur during field sampling activities. De-ioninzed water field blanks are taken to the field, transferred to the appropriate container, and treated the same as the corresponding sample type during the course of a sampling event.

7.11.4.4 Travel Blanks
Travel blanks assess the potential for cross-contamination of volatile constituents between sample containers during shipment from the field to the laboratory. De-ioninzed water blanks are taken along for the trip and held unopened in the same cooler with the VOC samples.

7.11.5 Data Verification
After results are received from the analytical laboratory, the QSP shall verify the data to ensure that it is complete, accurate, and the appropriate QA/QC requirements were met. Data must be verified as soon as the data reports are received. Data verification shall include:
□
□
□
□

C
ASQA SWPPP Template 86 January 2011
• C heck the CoC and laboratory reports.

Make sure all requested analyses were performed and all samples are accounted for in the reports.
• Check laboratory reports to make sure hold times were met and that the reporting levels meet or are lower than the reporting levels agreed to in the contract. • Check data for outlier values and follow up with the laboratory.

Occasionally typographical errors, unit reporting errors, or incomplete results are reported and should be easily detected. These errors need to be identified, clarified, and corrected quickly by the laboratory. The QSP should especially note data that is an order of magnitude or more different than similar locations, or is inconsistent with previous data from the same location.
• Check laboratory QA/QC results.

EPA establishes QA/QC checks and acceptable criteria for laboratory analyses. These data are typically reported along with the sample results. The QSP shall evaluate the reported QA/QC data to check for contamination (method, field, and equipment blanks), precision (laboratory matrix spike duplicates), and accuracy (matrix spikes and laboratory control samples). When QA/QC checks are outside acceptable ranges, the laboratory must flag the data, and usually provides an explanation of the potential impact to the sample results.
• Check the data set for outlier values and, accordingly, confirm results and re-analyze samples where appropriate.

Sample re-analysis should only be undertaken when it appears that some part of the QA/QC resulted in a value out of the accepted range. Sample results may not be discounted unless the analytical laboratory identifies the required QA/QC criteria were not met and confirms this in writing.

Field data including inspections and observations must be verified as soon as the field logs are received, typically at the end of the sampling event. Field data verification shall include:
• Check field logs to make sure all required measurements were completed and appropriately documented;
• Check reported values that appear out of the typical range or inconsistent; Follow-up immediately to identify potential reporting or equipment problems, if appropriate, recalibrate equipment after sampling;
• Verify equipment calibrations;
• Review observations noted on the field logs; and
• Review notations of any errors and actions taken to correct the equipment or recording errors.

7.12 Records Retention
All records of stormwater monitoring information and copies of reports (including Annual Reports) must be retained for a period of at least three years from date of submittal or longer if required by the Regional Water Board.

Results of visual monitoring, field measurements, and laboratory analyses must be kept in the SWPPP along with CoCs, and other documentation related to the monitoring.

Records are to be kept onsite while construction is ongoing. Records to be retained include:

C
ASQA SWPPP Template 87 January 2011
• T he date, place, and time of inspections, sampling, visual observations, and/or measurements, including precipitation;
• The individual(s) who performed the inspections, sampling, visual observation, and/or field measurements;
• The date and approximate time of field measurements and laboratory analyses; • The individual(s) who performed the laboratory analyses; • A summary of all analytical results, the method detection limits and reporting limits, and the analytical techniques or methods used;
• Rain gauge readings from site inspections;
• QA/QC records and results;
• Calibration records;
• Visual observation and sample collection exemption records; • The records of any corrective actions and follow-up activities that resulted from analytical results, visual observations, or inspections; [and] • [ NAL Exceedance Reports]; [and]
• [ NEL Violation Reports].

C
ASQA SWPPP Template 88 January 2011
CSMP Attachment 1: Weather Reports

C
ASQA SWPPP Template 89 January 2011

INSTRUCTIONS
Pl
ace printed NOAA weather forecasts in this Attachment.

C
ASQA SWPPP Template 90 January 2011
CSMP Attachment 2: Monitoring Records

C
ASQA SWPPP Template 91 January 2011

INSTRUCTIONS
Pl
ace completed BMP Inspection Forms, Visual Monitoring, Effluent Sampling and Receiving Water Field Logs, Monitoring Exceptions, and NAL/NEL Exceedance Reports in this Attachment.

C
ASQA SWPPP Template 92 January 2011
CSMP Attachment 3: Example Forms

C
ASQA SWPPP Template 93 January 2011

INSTRUCTIONS
Pl
ace example forms and check lists, e.g., Rain Gauge Logs, Field Logs, NAL/NEL Exceedance Reports, CoCs, in this Attachment.

C
ASQA SWPPP Template 94 January 2011

Rain Gauge Log Sheet
Construction Site Name:

WDID #:

Date
(
mm/dd/yy)
Time
(24-hr) Initials Rainfall Depth
(Inches) N otes:

CA
SQA SWPPP Template 95 January 2011
Risk Level 1, 2, 3
Visual Inspection Field Log Sheet
Date and Time of Inspection: Re port Date:

Inspection Type: □ W eekly □ Before
predicted
rain
□ During
rain event
□
Following
qualifying
rain event
□ Contained
stormwater
release
□ Quarterly
non-
stormwater
Site Information
Construction Site Name:

Construction stage and
com
pleted activities:

Approximate area
of exposed site:

Weather and Observations
Date Rain Predicted to Occur: Pr edicted % chance of rain:

Estimate storm beginning:

(date and time)
Est
imate storm
duration:_________
(hours)
Estimate time since
last storm:
________
(days or hours)
Rain gauge
reading: _______
(inches)
Observations: If yes identify location
Odors Ye s □ No □
Floating material Yes □ N o □
Suspended Material Yes □ N o □
Sheen Ye s □ No □
Discolorations Yes □ N o □
Turbidity Ye s □ No □
Site Inspections
Outfalls or BMPs Evaluated Deficiencies Noted
(add additional sheets or attached detailed BMP Inspection Checklists)

Photos Taken: Ye s □ No □ Photo Reference IDs:

Corrective Actions Identified (note if SWPPP/REAP change is needed)

Inspector Information
Inspector Name: In spector Title:

Signature: Da te:

I
I
-
I I
I

CA
SQA SWPPP Template 96 January 2011
Risk Level 2
Effluent Sampling Field Log Sheets
Construction Site Name: Da te: Time Start:

Sampler:

Sampling Event Type: □ Stormwater □ Non-stormwater □ Non-visible pollutant Field Meter Calibration
pH Meter ID No./Desc.:

Ca
libration Date/Time:

Turbidity Meter ID No./Desc.:

Calibration Date/Time:

Field pH and Turbidity Measurements
Discharge Location Description pH Turbidity Time

Grab Samples Collected
Discharge Location Description Sample Type Time

Additional Sampling Notes:

Time End:

I

CA
SQA SWPPP Template 97 January 2011

Risk Level 3
Effluent Sampling Field Log Sheets
Construction Site Name: Da te: Time Start:

Sampler:

Sampling Event Type: □ S tormwater □ Non-stormwater □ Non-visible pollutant
□ Post NEL
Exceedance
Field Meter Calibration
pH Meter ID No./Desc.:

Ca
libration Date/Time:

Turbidity Meter ID No./Desc.:

Calibration Date/Time:

Field pH and Turbidity Measurements
Discharge Location Description pH Turbidity Time

Grab Samples Collected
Discharge Location Description SSC Other (specify) Time

Additional Sampling Notes:

Time End:

I

CA
SQA SWPPP Template 98 January 2011

Risk Level 3
Receiving Water Sampling Field Log Sheets
Construction Site Name: Da te: Time Start:

Sampler:

Receiving Water Description and Observations
Receiving Water Name/ID:

Observations:

Odors Ye s □ No □
Floating material Yes □ N o □
Suspended Material Yes □ N o □
Sheen Ye s □ No □
Discolorations Yes □ N o □
Turbidity Ye s □ No □
Field Meter Calibration
pH Meter ID No./Desc.:

Ca
libration Date/Time:

Turbidity Meter ID No./Desc.:

Calibration Date/Time:

Field pH and Turbidity Measurements and SSC Grab Sample Upstream Location
Type Result Time Notes
pH

Turbidity

SSC Co llected
Yes □ No □

Downstream Location
Type Result Time Notes
pH

Turbidity

SSC Co llected
Yes □ No □

Additional Sampling Notes:

Time End:

I I

C
ASQA SWPPP Template 99 January 2011

CA
SQA SWPPP Template 100 January 2011
NAL or NEL Exceedance Evaluation Summary Report Pag e __ of __ Project Name
Project WDID
Project Location
Date of Exceedance
Type of Exceedance
NA
L Daily Average pH Turbidity
NEL
Daily Average pH Turbidity

Other (specify)
Measurement or
An
alytical Method
Field meter
(Sen
sitivity: )
Lab method (specify)
(Reporting Limit: )
(MDL: )
Calculated Daily
Av
erage
pH pH units
Turbidity NTU
Rain Gauge
Mea
surement inches
Compliance Storm
Eve
nt inches (5-year, 24-hour event)
Visual Observations
on
Day of
Exceedance

□ □
□ □
□
□
□
-
□ -
□ -

C
ASQA SWPPP Template 101 January 2011
NAL or NEL Exceedance Evaluation Summary Report Pa ge __ of __ Description of BMPs
i
n Place at Time of
Event

Initial Assessment of
C
ause

Corrective Actions
T
aken (deployed
after exceedance)

Additional Corrective
A
ctions Proposed

Report Completed By

(Print Name, Title)
Signature

CASQA SWPPP Template 102 January2011

CHAIN-OF-CUSTODY

DATE:

Lab ID:

DESTINATION LAB:

REQUESTED
ANALYSIS Notes:

ATTN:

ADDRESS:

Office Phone:

Cell Phone:

SAMPLED BY:

Contact:

Project Name

Client Sample ID Sample Sample Sample Container
Date Time Matrix # Type Pres.

SENDER COMMENTS:

RELINQUISHED
BY

Signature:

Print:

Company:

Date: TIME:

LABORATORY COMMENTS: RECEIVED BY
Signature:

Print:

Company:

Date: TIME:

I

C
ASQA SWPPP Template 103 January 2011
CSMP Attachment 4: Field Meter Instructions

C
ASQA SWPPP Template 104 January 2011

INSTRUCTIONS
Pl
ace instructions for field meters that will be used by contractor personnel in this Attachment.

C
ASQA SWPPP Template 105 January 2011
CSMP Attachment 5: Supplemental Information

C
ASQA SWPPP Template 106 January 2011

INSTRUCTIONS
Pl
ace documents related to Regional Board required monitoring, watershed monitoring option approval, and bioassessment exception approval in this Attachment.

CA
SQA SWPPP Template 107 January 2011
Section 8 References
Project Plans and Specifications No. [TTM 36713] dated [4-26-2017], prepared by [Sake Engineers Inc.]
St
ate Water Resources Control Board (2009). Order 2009-0009-DWQ, NPDES General Permit No. CAS000002: National Pollutant Discharges Elimination System (NPDES) California General Permit for Storm Water Discharge Associated with Construction and Land Disturbing Activities. Available on-line at:
http://www.waterboards.ca.gov/water_issues/programs/stormw ater/construction.shtml.

St
ate Water Resources Control Board (2010). Order 2010-0014-DWQ, NPDES General Permit No. CAS000002: National Pollutant Discharges Elimination System (NPDES) California General Permit for Storm Water Discharge Associated with Construction and Land Disturbing Activities. Available on-line at:
http://www.waterboards.ca.gov/water_issues/programs/stormw ater/construction.shtml.

[Include additional references as needed]
Exam
ple
CAS
QA 2009, Stormwater BMP Handbook Portal: Construction, November 2009, www.casqa.org
- -

C
ASQA SWPPP Template 108 January 2011
Appendix A: Calculations

C
ASQA SWPPP Template 109 January 2011

INSTRUCTIONS
• Inc
lude calculations here

C
ASQA SWPPP Template 110 January 2011

Appendix B: Site Maps

C
ASQA SWPPP Template 111 January 2011

INSTRUCTIONS
• Inc
lude maps here

C
ASQA SWPPP Template 112 January 2011

Appendix C: Permit Registration Documents

C
ASQA SWPPP Template 113 January 2011

P
ermit Registration Documents included in this Appendix

Y/N Permit Registration Document
Y Notice of Intent
Y Risk Assessment
N Certification
N Post Construction Water Balance
Y Copy of Annual Fee Receipt
N ATS Design Documents
Y Site Map, see Appendix B

C
ASQA SWPPP Template 114 January 2011

Appendix D: SWPPP Amendment Certifications

C
ASQA SWPPP Template 115 January 2011

INSTRUCTIONS
• Include certification statements for each SWPPP amendment.

C
ASQA SWPPP Template 116 January 2011

SW
PPP Amendment No.

P
roject Name: TTM 36713

Project Number:

Q
ualified SWPPP Developer’s Certification of the
Stormwater Pollution Prevention Plan Amendment
“This Stormwater Pollution Prevention Plan and attachments were prepared under my direction to meet the requirements of the California Construction General Permit (SWRCB Order No. 2009-009-DWQ as amended by 2010-0014-DWQ). I certify that I am a Qualified SWPPP Developer in good standing as of the date signed below.”

QSD’s Signature Date
QSD Name Q SD Certificate Number
Title and Affiliation T elephone
Address E mail

C
ASQA SWPPP Template 117 January 2011

Appendix E: Submitted Changes to PRDs

CA
SQA SWPPP Template 118 January 2011

Log
of Updated PRDs
The General Permit allows for the reduction or increase of the total acreage covered under the General Permit when a portion of the project is complete and/or conditions for termination of coverage have been met; when ownership of a portion of the project is purchased by a different entity; or when new acreage is added to the project.

Modified PRDs shall be filed electronically within 30 days of a reduction or increase in total disturbed area if a change in permit covered acreage is to be sought. The SWPPP shall be modified appropriately, with revisions and amendments recorded in Appendix C. Updated PRDs subm
itted electronically via SMARTS can be found in this Appendix.

This appendix includes all of the following updated PRDs (check all that apply):

Revised Notice of Intent (NOI);

Revised Site Map;

Revised Risk Assessment;

New landowner’s information (name, address, phone number, email address); and

New signed certification statement.

Legally Responsible Person [if organization]

Signature of [Authorized Representative of] Legally
Re
sponsible Person or Approved Signatory
Date

Name of [Authorized Representative of] Legally
Re
sponsible Person or Approved Signatory
Telephone Number

□
□
□
□
□
-

C
ASQA SWPPP Template 119 January 2011

Appendix F: Construction Schedule

C
ASQA SWPPP Template 120 January 2011

INSTRUCTIONS
• Inc
lude a copy of construction schedule

C
ASQA SWPPP Template 121 January 2011

Appendix G: Construction Activities, Materials Used,
and Associated Pollutants

CA
SQA SWPPP Template 122 January 2011

INSTRUCTIONS
• Lis
t construction materials that will be used and construction activities that will have the potential to contribute to the discharge of pollutants to stormwater. • List construction activities (i.e., construction or demolition activity, including, but not limited to, clearing, grading, grubbing, or excavation) that have the potential to contribute sediment or other pollutants to stormwater discharges.
• Delete phases that are not applicable to Project
• Insert as many lines to Table G.1 as necessary to complete the list, use Table G.a below to assist in the completion of Table G.1
• Po
llutant Categories identified are consistent with the CASQA BMP Handbook Portal:

Construction: Sediment, Nutrients, Bacteria and Viruses, Oil and Grease, Metals, Synthetic Organics, Pesticides, Gross Pollutants, and Vector Production • For sampling requirements for non-visible pollutants associated with construction site activity please refer to Section 7.7.1.

Table G.a POLLUTANTS ASSOCIATED WITH CONSTRUCTION ACTIVITIES General Work Activity/
Products With Potential
Stormwater Pollutants
Specific Work Activity/Products With
Potential Stormwater Pollutants Pollutant Categories
Adhesives • Adhesives, glues, resins, epoxy synthetics, P
VC cement
• Caulks, sealers, putty, sealing agents and
• Coal tars (naphtha, pitch)
Oil and Grease, Synthetic
Organics1
Asphalt paving/curbs • Hot and cold mix asphalt Oil and Grease Cleaners • Polishes (metal, ceramic, tile)
• E
tching agents
• Cleaners, ammonia, lye, caustic sodas,
bleaching agents and chromate salts
Metals, Synthetic Organics
Concrete / Masonry • Cement and brick dust
• Co
lored chalks
• Concrete curing compounds
• Glazing compounds
• Surfaces cleaners
• Saw cut slurries
• Tile cutting
Metals, Synthetic Organics
Drywall • Saw-cutting drywall Metals
Framing/Carpentry • Sawdust, particle board dust, and treated w
oods
• Saw cut slurries
Metals, Synthetic Organics
Heating, Ventilation, Air
Conditioning
• Demolition or construction of air condition
a
nd heating systems
Metals, Synthetic Organics
Insulation • Demolition or construction involving
i
nsulation, venting systems
Metals, Synthetic Organics
-

C
ASQA SWPPP Template 123 January 2011
Table G.a POLLUTANTS ASSOCIATED WITH CONSTRUCTION ACTIVITIES General Work Activity/
Products With Potential
Stormwater Pollutants
Specific Work Activity/Products With
Potential Stormwater Pollutants Pollutant Categories
Liquid waste • W ash waters
• Irrigation line testing/flushing
Metals, Synthetic Organics
Painting • P aint thinners, acetone, methyl ethyl ketone, stripper paints, lacquers, varnish, enamels,
turpentine, gum spirit, solvents, dyes,
stripping pigments and sanding
Metals, Synthetic Organics
Planting / Vegetation Management • V egetation control (pesticides/herbicides) • Planting
• Plant maintenance
• Vegetation removal
Nutrients, Metals,
Synthetic Organics
Plumbing • S older (lead, tin), flux (zinc chloride), pipe fitting
• Galvanized metal in nails, fences, and electric
wiring
Metals, Synthetic Organics
Pools/fountains • Chl orinated water Synthetic Organics Removal of existing structures • D emolition of asphalt, concrete, masonry, framing, roofing, metal structures.

Metals, Oil and Grease,
Synthetic Organics
Roofing • F lashing
• Saw cut slurries (tile cutting)
• Shingle scrap and debris
Metals, Oil and Grease,
Synthetic Organics
Sanitary waste • P ortable toilets
• Disturbance of existing sewer lines.

Nutrients
Soil preparation/amendments • U se of soil additives/amendments Nutrients Solid waste • L itter, trash and debris
• Vegetation
Gross Pollutants
Utility line testing and flushing • H ydrostatic test water • Pipe flushing
Synthetic Organics
Vehicle and equipment use • E quipment operation
• Equipment maintenance
• Equipment washing
• Equipment fueling
Oil and Grease
1 Synthetic Organics are defined in Table 1.2 of the CASQA Stormwater BMP Handbook Portal: Construction as adhesives, cleaners, sealants, solvents, etc. These are generally categorized as VOCs or SVOCs.

C
ASQA SWPPP Template 124 January 2011

T
able G.1 Construction Activities and Associated Pollutants Phase Activity Associated Materials or
Pollutants P ollutant Category(1)
Grading and Land
Development

Streets and Utilities
Phase

Vertical
Construction Phase

Landscaping and Site
Stabilization Phase

(1) Ca tegories per CASQA BMP Handbook (i.e., Sediment, Nutrients, Bacteria and Viruses, Oil and Grease, Metals, Synthetic Organics, Pesticides, Gross Pollutants, and Vector Production)

C
ASQA SWPPP Template 125 January 2011

Appendix H: CASQA Stormwater BMP Handbook
Portal: Construction Fact Sheets

C
ASQA SWPPP Template 126 January 2011

INSTRUCTIONS
• Include Fact Sheets for BMPs identified in Section 3 of this SWPPP

C
ASQA SWPPP Template 127 January 2011

Appendix I: BMP Inspection Form

C
ASQA SWPPP Template 128 January 2011

INSTRUCTIONS
• Identify Risk Level, for Risk Level 2 or 3 include highlighted te xt

C
ASQA SWPPP Template 129 January 2011

B

MP INSPECTION REPORT

Date and Time of Inspection: Date Report Written:

Inspection Type:
(C
ircle one)
Weekly
Complete Parts
I,II,III and VII
Pre-Storm
Complete Parts
I,II,III,IV and VII
During Rain Event
Complete Parts I, II,
III, V, and VII
Post-Storm
Complete Parts
I,II,III,VI and VII
Part I. General Information
Site Information
Construction Site Name:

Construction stage and
completed activities:

Approximate area
of site that is exposed:

Photos Taken:
(Circle one) Ye s No
Photo Reference IDs:

Weather
Estimate storm beginning:
(date and time)
Estimate storm duration:
(hours)
Estimate time since last storm:
(days or hours)
Rain gauge reading and location:
(in)
Is a “Qualifying Event” predicted or did one occur (i.e., 0.5” rain with 48-hrs or greater between events)? (Y/N) If yes, summarize forecast:

Exemption Documentation (explanation required if inspection could not be conducted). Vi sual inspections are not required outside of business hours or during dangerous weather conditions such as flooding or electrical storms.

Inspector Information
Inspector Name: I nspector Title:

Signature: D ate:

C
ASQA SWPPP Template 130 January 2011
Part II. BMP Observations. D escribe deficiencies in Part III.

Minimum BMPs for Risk Level _____ Sites
F
ailures or
other short
comings
(yes, no, N/A)
Action
Required
(yes/no)
Action
Implemented
(Date)
Good Housekeeping for Construction Materials
Inventory of products (excluding materials designed to be o
utdoors)
Stockpiled construction materials not actively in use are co
vered and bermed
All chemicals are stored in watertight containers with
a
ppropriate secondary containment, or in a completely
enclosed storage shed

Construction materials are minimally exposed to precipitation BMPs preventing the off-site tracking of materials are
i
mplemented and properly effective
Good Housekeeping for Waste Management
Wash/rinse water and materials are prevented from being d
isposed into the storm drain system
Portable toilets are contained to prevent discharges of waste Sanitation facilities are clean and with no apparent for leaks a
nd spills
Equipment is in place to cover waste disposal containers at t
he end of business day and during rain events
Discharges from waste disposal containers are prevented from d
ischarging to the storm drain system / receiving water
Stockpiled waste material is securely protected from wind and ra
in if not actively in use
Procedures are in place for addressing hazardous and non- h
azardous spills
Appropriate spill response personnel are assigned and trained Equipment and materials for cleanup of spills is available o
nsite
Washout areas (e.g., concrete) are contained appropriately to p
revent discharge or infiltration into the underlying soil Good Housekeeping for Vehicle Storage and Maintenance
Measures are in place to prevent oil, grease, or fuel from l
eaking into the ground, storm drains, or surface waters All equipment or vehicles are fueled, maintained, and stored in a
designated area with appropriate BMPs
Vehicle and equipment leaks are cleaned immediately and d
isposed of properly

C
ASQA SWPPP Template 131 January 2011

Part II. BMP Observations Continued. Describe deficiencies in Part III.

Minimum BMPs for Risk Level _____ Sites
A
dequately
designed,
implemented and
effective
(yes, no, N/A)
Action
Required
(yes/no)
Action
Implemented
(Date)
Good Housekeeping for Landscape Materials
Stockpiled landscape materials such as mulches and topsoil a
re contained and covered when not actively in use
Erodible landscape material has not been applied 2 days b
efore a forecasted rain event or during an event
Erodible landscape materials are applied at quantities and ra
tes in accordance with manufacturer recommendations
Bagged erodible landscape materials are stored on pallets and co
vered
Good Housekeeping for Air Deposition of Site Materials
Good housekeeping measures are implemented onsite to
co
ntrol the air deposition of site materials and from site operations

Non-Stormwater Management
Non-Stormwater discharges are properly controlled
Vehicles are washed in a manner to prevent non-stormwater d
ischarges to surface waters or drainage systems
Streets are cleaned in a manner to prevent unauthorized non- s
tormwater discharges to surface waters or drainage
systems.

Erosion Controls
Wind erosion controls are effectively implemented

Effective soil cover is provided for disturbed areas inactive (i
.e., not scheduled to be disturbed for 14 days) as well as finished slopes, open space, utility backfill, and completed lots

The use of plastic materials is limited in cases when a more s
ustainable, environmentally friendly alternative exists.

Sediment Controls
Perimeter controls are established and effective at controlling e
rosion and sediment discharges from the site
Entrances and exits are stabilized to control erosion and s
ediment discharges from the site
Sediment basins are properly maintained
Linear sediment control along toe of slope, face of slope an at grade breaks (Risk Level 2 & 3 Only)
Limit construction activity to and from site to entrances and exits that employ effective controls to prevent offsite tracking (Risk Level 2 & 3 Only)

C
ASQA SWPPP Template 132 January 2011
Ensure all storm, drain inlets and perimeter controls, runoff control BMPs and pollutants controls at entrances and exits are maintained and protected from activities the reduce their effectiveness (Risk Level 2 & 3 Only)

Inspect all immediate access roads daily (Risk Level 2 & 3 Only)
Run-On and Run-Off Controls
Run-on to the site is effectively managed and directed away f
rom all disturbed areas.

Other
Are the project SWPPP and BMP plan up to date, available on-site a
nd being properly implemented?

Part III. Descriptions of BMP Deficiencies
Deficiency
Repairs Implemented:

Note - Repairs must begin within 72 hours of identification and, complete repairs as soon as possible.

Start Date Action

1. 2.

3. 4.

Part IV. Additional Pre-Storm Observations. Note the presence or absence of floating and suspended materials, sheen, discoloration, turbidity, odors, and source(s) of pollutants(s).

Y es, No, N/A
Do stormwater storage and containment areas have adequate freeboard? If no, complete Part III.

Are drainage areas free of spills, leaks, or uncontrolled pollutant sources? If no, complete Part VII a
nd describe below.

Notes:

Are stormwater storage and containment areas free of leaks? If no, complete Parts III and/or VII a
nd describe below.

CA
SQA SWPPP Template 133 January 2011
Notes:

Part V. Additional During Storm Observations. If BMPs cannot be inspected during inclement weather, list the results of visual inspections at all relevant outfalls, discharge points, and downstream locations. Note odors or visible sheen on the surface of discharges. Complete Part VII (Corrective Actions) as needed.

Outfall, Discharge Point, or Other Downstream Location
Location De scription
Location De scription
Location De scription
Location De scription
Location De scription
Location De scription
Location De scription
Location De scription

I

C
ASQA SWPPP Template 134 January 2011

Part VI. Additional Post-Storm Observations. Visually observe (inspect) stormwater discharges at all discharge locations within two business days (48 hours) after each qualifying rain event, and observe (inspect) the discharge of stored or contained stormwater that is derived from and discharged subsequent to a qualifying rain event producing precipitation of ½ inch or more at the time of discharge. Complete Part VII (Corrective Actions) as needed.

Discharge Location, Storage or
Containment Area
Visual Observation

Part VII. Additional Corrective Actions Required. Identify additional corrective actions not included with BMP Deficiencies (Part III) above. Note if SWPPP change is required.

Required Actions Implementation Date

C
ASQA SWPPP Template 135 January 2011

Appendix J: Project Specific Rain Event Action Plan
Template

C
ASQA SWPPP Template 136 January 2011

INSTRUCTIONS
• QSD
should modify the CASQA REAP template for use by the QSP • The QSP will modify the project specific template for each phase/rain event • File REAPs completed by the QSP in this Appendix

C
ASQA SWPPP Template 137 January2011
Rain Event Action Plan (REAP)
Date of REAP BW DID Number:

Date Rain Predicted to Occur: P redicted % chance of rain:

Predicted Rain Event Triggered Actions
Below is a list of suggested actions and items to review for this project. Each active Trade should check all material storage a
reas, stockpiles, waste management areas, vehicle and equipment storage and maintenance, areas of active soil disturbance, and areas of active work to ensure the proper implementation of BMPs. Project-wide BMPs should be checked and cross- referenced to the BMP progress map.

Trade or Activity Suggested action(s) to perform / item(s) to review prior to rain event  Information & Scheduling

 Inform trade supervisors of predicted rain
 C heck scheduled activities and reschedule as needed
 Alert erosion/sediment control provider
 Alert sample collection contractor (if applicable)
 Schedule staff for extended rain inspections (including weekends & holidays)  Check Erosion and Sediment Control (ESC) material stock  Review BMP progress map
 Other:___________________________________
 ________________________________________
 ________________________________________

 Material storage areas

 Material under cover or in sheds (ex: treated woods and metals)  P erimeter control around stockpiles
 Other:___________________________________
 ________________________________________
 __________________________________
 Waste management areas

 Dumpsters closed
 D rain holes plugged
 Recycling bins covered
 Sanitary stations bermed and protected from tipping
 Other:___________________________________
 ________________________________________
 ________________________________________
 Trade operations

 Exterior operations shut down for event (e.g., no concrete pours or paving)  S oil treatments (e.g.,: fertilizer) ceased within 24 hours of event  Materials and equipment (ex: tools) properly stored and covered  Waste and debris disposed in covered dumpsters or removed from site  Trenches and excavations protected
 Perimeter controls around disturbed areas
 Fueling and repair areas covered and bermed
 Other:___________________________________
 ________________________________________
 __________________________________
 Site ESC BMPs

 Adequate capacity in sediment basins and traps
 S ite perimeter controls in place
 Catch basin and drop inlet protection in place and cleaned  Temporary erosion controls deployed
 Temporary perimeter controls deployed around disturbed areas and stockpiles  Roads swept; site ingress and egress points stabilized  Other:___________________________________
 ________________________________________
 __________________________________
 Concrete rinse out area

 Adequate capacity for rain
 W ash-out bins covered
 Other:___________________________________
 ________________________________________
 __________________________________
 Spill and drips

 All incident spills and drips, including paint, stucco, fuel, and oil cleaned  D rip pans emptied
 Other:___________________________________
 ________________________________________
 __________________________________

C
ASQA SWPPP Template 138 January2011

C
ontinued on next page.
 Other / Discussion /
Diagrams

 ________________________________________
 _ _______________________________________
 ________________________________________
 ________________________________________
 ________________________________________
 ________________________________________
 ________________________________________
 ________________________________________
 ________________________________________
 ________________________________________
 ________________________________________
 ________________________________________
 ________________________________________

Attach a printout of the weather forecast from the NOAA website to the REAP.

I certify under penalty of law that this Rain Event Action Plan (REAP) will be performed in accordance with the General Permit b
y me or under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

_
_____________________________________________________Date: __________________________ Qualified SWPPP Practitioner (Use ink please)

C
ASQA SWPPP Template 139 January 2011
Appendix K: Training Reporting Form

C
ASQA SWPPP Template 140 January 2011
Trained Contractor Personnel Log
S
tormwater Management Training Log and Documentation

Project Name: TTM 36713
WDID #:

Stormwater Management Topic: (check as appropriate)

Erosion Control Sediment Control
Wind Erosion Control Tracking Control
Non-Stormwater Management Waste Management and Materials Pollution Control Stormwater Sampling

S
pecific Training Objective: Good House Keeping

L
ocation: Our Office Date: 4-26-2017 _

I
nstructor: Sam Akbarpour Telephone: 951-279-4041

C
ourse Length (hours): 1.5

A
ttendee Roster (Attach additional forms if necessary)
Name Company Phone
Hitesh Patel 760- 963-3475

As needed, add proof of external training (e.g., course completion certificates, credentials for Q
SP, QSD).

C
ASQA SWPPP Template 141 January 2011

Appendix L: Responsible Parties

C
ASQA SWPPP Template 142 January 2011

A
uthorization of Approved Signatories
Project Name: TTM 36713
WDID #:

N
ame of
Personnel
Project Role Company Signature Date

____________________________ ______________________________ L
RP’s Signature Date

____________________________ ______________________________ LRP Name and Title Telephone Number

C
ASQA SWPPP Template 143 January 2011

I
dentification of QSP
Project Name: TTM 36713
WDID #:

T
he following are QSPs associated with this project

Name of Personnel(1) Company Date
Sam Akbarpour S ake Engineer Inc.
(1) If additional QSPs are required on the job site add additional lines and include information here

C
ASQA SWPPP Template 144 January 2011

O

PTIONAL
Authorization of Data Submitters

Pr
oject Name: TTM 36713
WDID #:

N
ame of
Personnel
Project Role Company Signature Date

___________________________ ______________________________ A
pproved Signatory’s Signature Date

____________________________ ______________________________ Approved Signatory Telephone Number
Name and Title

C
ASQA SWPPP Template 145 January 2011

Appendix M: Contractors and Subcontractors

C
ASQA SWPPP Template 146 January 2011

Appendix N: Construction General Permit

C
ASQA SWPPP Template 147 January 2011

INSTRUCTIONS
• Inc
lude a copy of the General Permit, or reference permanent location of General Permit that is kept on the construction site.

Notice Of Intents Search Results
Following are the results that matched with your search criteria. To refine or start a new search, click Back button on the browser.

Export to Excel
App ID WDID Application
Type
Status Status
Date
Owner/Operator
Name & Address
Site/Facility
Name &
Address
NOI
Form
Attachments Receipt
Letter503492 Region 8
MS4 CIPs Active 11/15/2018
City of Riverside
3900 Main Street
Riverside California
92522
Tequesquite
Arroyo Trunk
Sewer
Replacement
Phase IIB
Brockton Ave,
Magnolia Ave,
Olivewood Ave,
Victoria Ave,
Sed Riverside
California 92501
NOI
Form
View
Attachments
Receipt
Letter
485872 8 33C379764 Construction Active 05/09/2017
La Sierra VIctoria
Development LLC
19215 wild
mustang court
apple valley
California 92307
TTM 36713
Intersection of
La Sierra Ave
and Victoria Ave
Riverside
California 92503
NOI
Form
View
Attachments
Receipt
Letter
485242 8 33C380737 Construction Active 08/14/2017
Western Municipal
Water District
14205 Meridian
Pkwy Riverside
California 92518
Victoria
Recharge Basin
Victoria Ave &
Jackson St
Riverside
California 92506
NOI
Form
View
Attachments
Receipt
Letter
480069 8 33C378036 Construction Terminated 09/10/2018 ROBERT JONES Jones
Residence
11033

VICTORIA
AVENUE
Riverside
California 92503
View
Attachments
471466 8 33W002565 Construction Expired 04/13/2016
Dudek
605 Third Street
Encinitas California
92024
Victoria
Recharge Basin
9120 Victoria
Avenue
Riverside
California 92508
NOI
Form
View
Attachments
Receipt
Letter
454475 Region 8
MS4 CIPs Terminated 05/25/2016
City of Riverside
3900 Main Street
Riverside California
92522
Victoria Avenue
Storm Drain
Project
Victoria Avenue
and Myers
Street Riverside
California 92503
NOI
Form
View
Attachments
Receipt
Letter
284475 8 33C333372 Construction Terminated 05/22/2006
Riverside Victoria
LLC
660 Newport
Center Dr Ste 1050
Newport Beach
California 92660
Tract Map No
32128
N Of Victoria
Ave W Of Lyon
Ave Riverside
California
NOI
Form
View
Attachments
Receipt
Letter
210522 8 33C329067 Construction Terminated 08/21/2006 Edward Hendricksen
2615 Grace St
Hendricksen
Residence
7576 Victoria
NOI
Form
View
Attachments
Receipt
Letter
First Prev Next Last Current Page:1 Total Pages:1

Page 1 of 2 ends

12/2/2019https://smarts.waterboards.ca.gov/smarts/faces/PublicDataAccess/PublicNoiSearch.xhtml l-Vi1ter Boai·ds Storin l-Vate1·,.lvfultip__J'2i,App__licatian .. 'A,; App ID WDID Application
Type
Status Status
Date
Owner/Operator
Name & Address
Site/Facility
Name &
Address
NOI
Form
Attachments Receipt
Letter
Riverside California
92504
Ave Riverside
California 92504
209941 8 33C319513 Construction Terminated 12/13/2006
Taylor Woodrow
Homes - Irvine
16745 W Bernardo
Dr Ste 140 San
Diego California
92127
Victoria Heights
11355 Victoria
Ave Riverside
California 92503
NOI
Form
View
Attachments
Receipt
Letter
209828 8 33C316901 Construction Terminated 04/11/2006
Brehm Co
1935 Camino Vida
Roble #200
Carlsbad California
92008
Tract 29386
Victoria Grove
Tract 29386
Victoria Grove
Riverside
California
NOI
Form
View
Attachments
Receipt
Letter
First Prev Next Last Current Page:1 Total Pages:1 © 2019 State of California. Conditions of Use Privacy Policy

Page 2 of 2 ends

12/2/2019https://smarts.waterboards.ca.gov/smarts/faces/PublicDataAccess/PublicNoiSearch.xhtml - - -- -
- - -- -

I I I I I
1 Corbet, Lauren
From: Corbet, Lauren
Sent: Monday, December 2, 2019 10:07 AM
To: [email protected]
Subject: Public Records Request
Hello,

This firm is performing a Phase I Environmental Site Assessment for the property located at the following addresses:

Southeast Corner of Victoria Ave. and La Sierra Ave., Riverside, CA 92503 APN: 136-220-016

We are requesting any information from your department pertaining to the above property.

Please feel free to contact Kevin Ballesteros with any questions or concerns at 310-854-6300 or [email protected]. Thank you for your assistance with this information.

Regards,

Lauren Corbet | Environmental Specialist
EFI Global, Inc.

Los Angeles, CA
DIRECT 310.854.6300 | FAX 310.854.0199
CELL: 323.326.6124 | EMAIL: [email protected] CSLB License #: 885902
www.efiglobal.com | Caring counts®

efl global
1 Ballesteros, Kevin EFI
From: Corbet, Lauren
Sent: Thursday, December 5, 2019 9:23 AM
To: Ballesteros, Kevin EFI
Subject: FW: VICTORIA AVE/LA SIERRA AVE, RIVERSIDE (PR4-120219-2) Follow Up Flag: Follow up
Flag Status: Flagged
Categories: Client Respond
045.02270

Regards,

Lauren Corbet | Environmental Specialist
EFI Global, Inc.

Los Angeles, CA
DIRECT 310.854.6300 | FAX 310.854.0199
CELL: 323.326.6124 | EMAIL: [email protected] CSLB License #: 885902
www.efiglobal.com | Caring counts®

From: CypressFileRoom@DTSC <[email protected]> Sent: Wednesday, December 4, 2019 1:32 PM
To: Corbet, Lauren <[email protected]>
Subject: VICTORIA AVE/LA SIERRA AVE, RIVERSIDE (PR4‐120219‐2)

Hi Lauren.  According to our files we have no records for the attached email.

From: Corbet, Lauren <[email protected]>
Sent: Monday, December 2, 2019 10:07 AM
To: CypressFileRoom@DTSC <[email protected]>
Subject: Public Records Request

Hello,

This firm is performing a Phase I Environmental Site Assessment for the property located at the following addresses:

Southeast Corner of Victoria Ave. and La Sierra Ave., Riverside, CA 92503 APN: 136-220-016

We are requesting any information from your department pertaining to the above property.

Please feel free to contact Kevin Ballesteros with any questions or concerns at 310-854-6300 or [email protected]. Thank you for your assistance with this information.

Regards,

efiiglobal
2 Lauren Corbet | Environmental Specialist
EFI Global, Inc.

Los Angeles, CA
DIRECT 310.854.6300 | FAX 310.854.0199
CELL: 323.326.6124 | EMAIL: [email protected] CSLB License #: 885902
www.efiglobal.com | Caring counts®

Any personal data acquired, processed or shared by us will be lawfully processed in line with applicable data protection legislation. If you have any questions regarding how we process personal data refer to our Privacy Notice https://www.sedgwick.com/global‐privacy‐policy. Any communication including this email and files/attachments transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. If this message has been sent to you in error, you must not copy, distribute or disclose of the information it contains and you must notify us immediately (contact is within the privacy policy) and delete the message from your system.
efiiglobal
Jared Blumenfeld
Secretary for
Environmental Protection
Department of Toxic Substances Control
Meredith Williams, Ph.D.

Acting Director
1001 "I" Street
P.O. Box 806
Sacramento, California 95812-0806
Gavin Newsom
Governor
Facility:

Search on:

Street:

Zip:

Status:

Sort Direction:

Sorted By:

Records Found:

Physical Address
Victoria
92503
Active and Inactive
asc
Address
4 Facility Search Results
Selection Criteria:

EPA ID Number Name Address City Zip
CAC002745175 MOHAMAD ISHAQ 10091 VICTORIA AVE RIVERSIDE 92503 CAC002356807 HUEY QUAN 10171 VICTORIA AVE RIVERSIDE 925030000 CAC002859910 CPT KERRY STEVENS 10225 VICTORIA AVE RIVERSIDE 925036145 CAC002614179 FABIO ROJAS 10348 VICTORIA AVE RIVERSIDE 92503 The Department of Toxics Substances Control (DTSC) takes every precaution to ensure the accuracy of data in the Hazardous Waste Tracking System (HWTS). However, because of the large number of manifests handled, inaccuracies in the submitted data, limitations of the manifest system and the technical limitations of the database, DTSC cannot guarantee that the data accurately reflect what was actually transported or produced.

Report Generation Date: 12/02/2019

Page 1 of 1 ends

12/2/2019https://hwts.dtsc.ca.gov/hwts_Reports/ReportPages/Report01.aspx?epaid=&id_test=equals...

Jared Blumenfeld
Secretary for
Environmental Protection
Department of Toxic Substances Control
Meredith Williams, Ph.D.

Acting Director
1001 "I" Street
P.O. Box 806
Sacramento, California 95812-0806
Gavin Newsom
Governor
Facility:

Search on:

Street:

Zip:

Status:

Sort Direction:

Sorted By:

Records Found:

Physical Address
La Sierra
92503
Active and Inactive
asc
Address
36 Facility Search Results
Selection Criteria:

EPA ID Number Name Address City Zip
CAC000001073 1X SHELL OIL CO #2046-552-2603 11090 MAGNOLIA LA SIERRA RIVERSIDE 925030000 CAL000275934 TAYLOR PACIFIC 11846 LA SIERRA AVE RIVERSIDE 92503 CAC000778464 1X FRED WAUGH 17460 LA SIERRA RIVERSIDE 925030000 CAL000129105 KUNZE INC 17480 LA SIERRA AVE RIVERSIDE 925030000 CAD981425358 MWD LAKE MATHEWS RESERVOIR 18250 LA SIERRA AVE RIVERSIDE 925030000 CAC002410583 JF SHEA 18256 LA SIERRA AVE RIVERSIDE 925030000 CAC002530215 ERWIN LLC 2292 LA SIERRA AVE RIVERSIDE 925030000 CAC002555639 ERWIN LLC 2292 LA SIERRA AVE RIVERSIDE 925030000 CAC002584457 ERWIN FAMILY LLC 2292 LA SIERRA AVE RIVERSIDE 925035916 CAL000320360 RALPHS GROCERY #98 3350 LA SIERRA AVE RIVERSIDE 925035228 CAL000326924 LA SIERRA VERDE CLEANERS 3380 LA SIERRA AVE STE 103 RIVERSIDE 925035225 CAL000317489 LA SIERRA VERDE CLEANERS 3380 LA SIERRA AVE STE 103 RIVERSIDE 92503 CAL000312874 WEST COAST DENTAL OF RIVERSIDE 3380 LA SIERRA AVE STE 108,109,110
RIVERSIDE 925035228
CAL000441186 LA SIERRA VERDE CLEANERS 3380 LA SIERRA AVE UNIT #103
RIVERSIDE 92503
CAD983642315 CHEVRON 200734 3390 LA SIERRA AVE RIVERSIDE 925035228 CAL000207076 AUTOZONE #5578 3400 LA SIERRA #G RIVERSIDE 925030000 CAC002226449 LYON PROPERTIES 3400 LA SIERRA AVE RIVERSIDE 925030000 CAL000098860 CHIEF AUTO PARTS #29816 3400 LA SIERRA SUITE G RIVERSIDE 925030000 CAL000293026 LA SIERRA FAMILY DENTISTRY 3410 LA SIERRA AVE STE D RIVERSIDE 92503 CAL000334512 STATER BROS MARKETS #115 3420 LA SIERRA AVE RIVERSIDE 92503 CAL000125361 ALPHA CLEANERS 3430 LA SIERRA RIVERSIDE 925030000 CAL000040779 ALPHA CLEANERS 3430 LA SIERRA RIVERSIDE 925030000 CAL000441170 ALPHA CLEANERS 3430 LA SIERRA AVE #A RIVERSIDE 925030000 CAL000256514 ALPHA CLEANERS 3430 LA SIERRA AVE STE A RIVERSIDE 925030000 CAL000295545 ALPHA CLEANERS 3430 LA SIERRA AVE STE A RIVERSIDE 925035226 CAL000373879 ALPHA CLEANERS 3430 LA SIERRA AVE STE A RIVERSIDE 92503 CAL000124641 ALPHA CLEANERS 3430 LA SIERRA AVENUE RIVERSIDE 925030000 CAD983610023 ALPHA CLEANERS 3430 LA SIERRA UNIT A RIVERSIDE 925030000 CAL000033800 ALPHA CLEANERS 3430 LA SIERRA UNIT A RIVERSIDE 925030000 CAR000231993 CVS PHARMACY # 9910 3440 LA SIERRA AVE RIVERSIDE 925035204 CAL000356493 CVS PHARMACY # 9910 3440 LA SIERRA AVE RIVERSIDE 92503 cal000238646 LONGS DRUG STORE #283 3440 LA SIERRA AVE RIVERSIDE 925035204 CAL000412163 COSMOPROF BEAUTY 3480 LA SIERRA AVE # A RIVERSIDE 925035204 CAD982484644 FOTOMAT CORPORATION #0C809 3860 LA SIERRA RIVERSIDE 925030000 CAC002596977 STEVEN WALKER COMMUNITIES 5164(B&C),5170,5202 LA

SIERRA AVE
RIVERSIDE 92503
CAC002329913 INLAND COMMUNTIES LLC EL SOBRANTE & LA SIERRA RIVERSIDE 925030000

Page 1 of 2 ends

12/2/2019https://hwts.dtsc.ca.gov/hwts_Reports/ReportPages/Report01.aspx?epaid=&id_test=equals...

The Department of Toxics Substances Control (DTSC) takes every precaution to ensure the accuracy of data in the Hazardous Waste Tracking System (HWTS). However, because of the large number of manifests handled, inaccuracies in the submitted data, limitations of the manifest system and the technical limitations of the database, DTSC cannot guarantee that the data accurately reflect what was actually transported or produced.

Report Generation Date: 12/02/2019

Page 2 of 2 ends

12/2/2019https://hwts.dtsc.ca.gov/hwts_Reports/ReportPages/Report01.aspx?epaid=&id_test=equals... 12/2/2019 PR - PR Request
https://onbase-pub.aqmd.gov/sAppNet/UnityForm.aspx?key=UFKey 1/3

PUBLIC RECORDS REQUEST FORM
Request Information
Attention Requestor
Please fill out this form completely. You may include an attachment to the form, if necessary.

Requestor Information
Type of Requested Record(s).

REQUESTED RECORDS. Please be as specific as possible in describing the records you are seeking. The more specific you are, the easier it will be to determine if such records exist in District files. Please contact the Public Records Unit if you need assistance in identifying District records.

Note: Permits to Operate, Equipment Lists, Notices of Violation, Notices to Comply, and Emissions Summaries are available through SCAQMD's FIND page at http://www3.aqmd.gov/webappl/fim/prog/search.aspx (you need to copy and paste this link into your browser).

Time Period of Documents Requested
Requested Facility or Site Information (if applicable)
Note: You may only include one Facility or Site per Form.

Date Stored
Public Record Request Nbr
Time Stored
Public Record Request Tracking Nbr
105421
Requestor Name
Kevin Ballesteros 045.02270
Requestor Company
EFI Global
Requestor Email *
[email protected]
Requestor Phone
(310)854-6300
Requestor Address
5261 West Imperial Highway
Requestor City
Los Angeles
Requestor State
California
Requestor Zip Code
90045
Please Enter a description of the records you are requesting here: * We are requesting any information from your departments pertaining to air emissions, including permits to operate, equipment lists and notices of violation.

Start Date *
01/01/1900
End Date *
12/2/2019
Facility ID (if known)
Facility Name (if known)
Address
Southeast Corner of Victoria Ave. and La Sierra Ave.

City
Riverside
Zip Code
92503
12/2/2019 PR - PR Request
https://onbase-pub.aqmd.gov/sAppNet/UnityForm.aspx?key=UFKey 2/3 Requested Application or Permit List. (if applicable)
Please click the Add Button to the right to enter a Application/Permit Number Authorization Letter Attachment
Authorization Letter
Note: Please use the above button for attaching an Authorization Letter from the facility to release confidential information for your public records request.

Supplemental Attachments
Supplemental Documents
Note: Please use the above button for attaching additional documents that will help define your public records request.

I I
12/2/2019 PR - PR Request
https://onbase-pub.aqmd.gov/sAppNet/UnityForm.aspx?key=UFKey 3/3

INSTRUCTIONS FOR REQUESTING RECORDS
(California Public Records Act, Govt. Code Sections 6250-6276.48)

1. In order to expedite your request, please fill out the form completely. Requests may also be submitted by phone at (909) 396-3700, by facsimile to (909) 396-3330, or by email to [email protected].

2. Requests must be for records prepared, owned, used, or retained by the District (Gov. Code Sec. 6252(e)). Requests should be for clearly identifiable records. The District is not required to create a new record in response to a request.

The District will assist the requestor in making a request that describes reasonably identifiable records (Gov. Code Sec. 6253.1). Documents will not be provided if disclosure would infringe upon a copyright, trade secret, or is otherwise exempt in accordance with state law.

3. A search for facility records can only be conducted by one or all of the following:
-- a) Facility Name, Address, or Identification Number
-- b) Facility Application Number, or Permit to Operate Number; or -- c) Facility Notice of Violation/Notice to Comply Number.

4. You will be notified within ten (10) days whether your request seeks copies of disclosable public records prepared, owned, used, or retained by this agency. In some cases, the District may need an additional 14 days to respond. If so, you will be notified in writing. You will also be provided an estimated date of when the records will be made available.

5. Communications regarding your request, and any records, will be provided by email, unless specified otherwise.

6. If the search for records finds the records voluminous, you will be notified of the approximate number of pages and/or length of time it will take to process your request.

7. If the records you requested have been marked confidential by the source of the record, you will be notified and given the option of continuing with the District’s Trade Secret process.

8. If your request is to review records, rather than receive copies, the District will notify you once the records are gathered, and arrangements will be made for your review.

9. The charge for the direct cost of duplication is as follows: Paper Copies, $0.15/page each over 10 pages (first 10 pages are free); Copied CD’s or flash drives, no charge; and Copied Audio Tapes, $5.00 each. After a preliminary estimate, advance payment may be required.

10. If the request is for information in an electronic format, the requestor shall bear the cost of producing a copy of the record, including the cost to construct the record and the cost of programming and computer services necessary to produce a copy of the record, when either of the following applies: (1) the District would be required to produce a copy of an electronic record and the record is one that is produced only at otherwise regularly scheduled intervals, or (2) the request would require data compilation, extraction, or programming to produce the record. (Gov. Code Sec. 6253.9(b)). The transfer of gathered electronic records onto CD, DVD or flash drive typically costs $10.00 each. An invoice will accompany your records when completed.

Note: For further information, please refer to the District’s Guidelines for Implementing the California Public Records Act. The Guidelines are available in the lobby of the District Headquarters or on the District’s web site at www.aqmd.gov.

Note: If you have questions pertaining to the submittal of a Public Records Act request, you may contact the Public Records Unit, (909) 396-3700, Tuesday through Friday, 7:00 a.m. to 5:30 p.m. Our Fax number is (909) 396-3330. Our email address is [email protected].

KEVIN BALLESTEROS

EFI GLOBAL
5261 W. IMPERIAL HWY.,
LOS ANGELES, CA 90045
Ref.: CONTROL NO: 1399540
Information Management
Public Records Unit
Direct Dial (909) 396-3700
Fax:(909) 396-3330
December 03, 2019

P/O'S, EQL'S, & NOV'S FOR SE CORNER OF VICTORIA A VE & LA SIERRA A VE,

RIVERSIDE, CA
This is in regard to your public records request dated December 03, 2019. The District is unable to process your request as submitted because the record you have requested:

IS TOO VAGUE. PLEASE PROVIDE SPECIFIC INDIVIDUAL ADDRESSES, OR A

COMP ANY NAME, IDENTIFICATION NUMBER OR PERMIT NUMBER (ONE FACILITY PER REQUEST).

If you have any questions, please do not hesitate to contact me at (909) 396-2311. :lt
Sincerely,
LORA TRAPP x2854
For COLLEEN PAINE
Public Records Coordinator