Original
Application ID Location of Work Description of Work Project Cost HSIP Funds Local Match Funds
Percent of Local
Match
Application
Category*
Funding Type
(State/Federal)
08-Riverside-1160 signalized Intersections
citywide.
Replace existing antiquated signal
controllers with new 2070 signal
controllers with updated software.
$ 1,597,600 $ 798,800 $ 798,800 50% BCR State 08-Riverside-2
Various signalized
intersections, roadway
segments and nonsignalized
multi-way stop-controlled
intersections citywide.
Install pedestrian median fencing,
upgrade pedestrian crossings with
enhanced safety features, and
upgrade multi-way stop controlled
intersections.
$ 5,664,100 $ 5,097,690 $ 566,410 10% BCR Federal 08-Riverside-3
Van Buren Boulevard between
Arlington Avenue and Magnolia
Avenue.
Install / convert existing Class II bike
lane to Class II buffered bike lane,
including striping removals, new
striping installation, pavement
legends, bicycle detection, and
signage modifications.
$ 348,200 $ 313,380 $ 34,820 10% SA-BikeSafety State Total Amounts (All 3 Combined) 7,609,900$ 6,209,870$ 1,400,030$ Project Cost HSIP Funds Local Match
Funds
Total Percentages (All 3 Combined)100.00% 81.60% 18.40% * Application Category: BCR = Benefit-Cost Ratio; SA-Bike Safety = Set-aside for Bike Safety Improvement.
Highway Safety Improvement Program (HSIP) Cycle 12 - City of Riverside Project List & Grant Summary