Cities Index.
Grant & Local Match Summary

Riverside City Council
April 22, 2025

Document
Grant & Local Match Summary
Meeting
April 22, 2025
Body
Riverside City Council
Original file
206 KB
Text extracted from the city's file for reading and search. Open the original on riversideca.legistar1.com. That file is the official record.

Original
Application ID Location of Work Description of Work Project Cost HSIP Funds Local Match Funds
Percent of Local
Match
Application
Category*
Funding Type
(State/Federal)
08-Riverside-1160 signalized Intersections
citywide.

Replace existing antiquated signal
controllers with new 2070 signal
controllers with updated software.
$ 1,597,600 $ 798,800 $ 798,800 50% BCR State 08-Riverside-2
Various signalized
intersections, roadway
segments and nonsignalized
multi-way stop-controlled
intersections citywide.

Install pedestrian median fencing,
upgrade pedestrian crossings with
enhanced safety features, and
upgrade multi-way stop controlled
intersections.
$ 5,664,100 $ 5,097,690 $ 566,410 10% BCR Federal 08-Riverside-3
Van Buren Boulevard between
Arlington Avenue and Magnolia
Avenue.

Install / convert existing Class II bike
lane to Class II buffered bike lane,
including striping removals, new
striping installation, pavement
legends, bicycle detection, and
signage modifications.
$ 348,200 $ 313,380 $ 34,820 10% SA-BikeSafety State Total Amounts (All 3 Combined) 7,609,900$ 6,209,870$ 1,400,030$ Project Cost HSIP Funds Local Match
Funds
Total Percentages (All 3 Combined)100.00% 81.60% 18.40% * Application Category: BCR = Benefit-Cost Ratio; SA-Bike Safety = Set-aside for Bike Safety Improvement.

Highway Safety Improvement Program (HSIP) Cycle 12 - City of Riverside Project List & Grant Summary

← All documents from this meeting