Ward Quadrant / Dwy Ramps
1 SE, SW, NW 3
1 Dwy 1
1 E, W 2
1 NE, NW 2
2 NE, SE 2
2 N, E, S 3
2 W, S 2
3 NW, SW 2
3 NW, SW 2
3 NW, SW, Dwy 3
5 NE, NW 2
Total Ramps 24
Ward Class Scope Street Start End Miles
5 Minor Asphalt GOODVIEW AV IMPERIAL ST WASHINGTON ST 0.113 5 Minor Asphalt DORLEN ST LYDIA AV FIESTA AV 0.052
5 Minor Asphalt DORLEN ST FIESTA AV LINCOLN AV 0.054
5 Minor Asphalt COLLINGWOOD ST LYDIA AV AMANDA CT 0.052 5 Minor Asphalt COLLINGWOOD ST AMANDA CT LINCOLN AV 0.053 5 Minor Asphalt AMANDA CT COLLINGWOOD ST EOP 0.034
5 Minor Asphalt LYDIA AV COLLINGWOOD ST DORLEN ST 0.086 5 Minor Asphalt LYDIA AV DORLEN ST CADET ST 0.067
5 Minor Asphalt CADET CT LYDIA AV EOP 0.027
5 Minor Asphalt FIESTA AV DORLEN ST IMPERIAL ST 0.120
5 Minor Asphalt FIESTA AV IMPERIAL ST EOP 0.057
5 Minor Asphalt IMPERIAL ST GOODVIEW AV FIESTA AV 0.053 Total Miles 0.766
Ward Class Scope Street Start End Miles
6 Minor Asphalt PICKER ST ELLEN ST LARRY WY 0.053
6 Minor Asphalt PICKER ST LARRY WY GRAMERCY PL 0.053
6 Minor Asphalt PICKER ST GRAMERCY PL CAMPBELL AV 0.053 6 Minor Asphalt PICKER ST CAMPBELL AV PHILBIN AV 0.055
6 Minor Asphalt LARRY WY ELLEN ST PICKER ST 0.074
6 Minor Asphalt GRAMERCY PL ELLEN ST PICKER ST 0.101
6 Minor Asphalt CAMPBELL AV ELLEN ST PICKER ST 0.131
6 Minor Asphalt ELLEN ST LARRY WY PICKER ST 0.097
6 Minor Asphalt ELLEN ST LARRY WY GRAMERCY PL 0.053
6 Minor Asphalt ELLEN ST GRAMERCY PL CAMPBELL AV 0.079
6 Minor Asphalt ELLEN ST CAMPBELL AV PHILBIN AV 0.055
Total Miles 0.804
Halsted St.
2024/2025 CDBG Ward 6 Street Improvements
2024/2025 CDBG ADA Footpath Improvements
Street 1 Street 2/ Address
Mt. Rubidoux Dr.
Mt. Rubidoux Dr.
Mt. Rubidoux Dr.
Mt. Rubidoux Dr.
Via Donoso
Via Zapata
Via Zapata
Nottingham Rd.
Nottingham Rd
Victoria Ave.
Diana Ave.
Sixth St.
2024/2025 CDBG Ward 4 Street Improvements (Adopted to Ward 5 in July 2023) 3601
3607, 3611, 3637 (Private Road)
Laderna Ln.
Via Nuevo
Via La Paloma
Via Dos Cerros
Hampshire Rd.
Devonshire Rd
Persimmon Pl., 5575 (Frontange Road)