Detailed Itemization – Phases 1–3
Phase SOV No. Description Amount ($)
1 1-01.01 Demolition 4,541.85
1-09.01 (Alt 1a) Flooring upgrade to 20 MIL LVP 15,948.80 1-09.02 Painting (omit) 0.00
1-01.02 Cleanup & Protection 2,874.22
Alt 2 Office furniture management & protection 2,500.00 Phase 1 Subtotal 25,864.87
2 2-01.01 Demolition 4,190.49
2-09.01 (Alt 1a) Flooring upgrade to 20 MIL LVP 14,697.90 2-09.02 Painting (omit) 0.00
2-01.02 Cleanup & Protection 2,850.00
Alt 2 Office furniture management & protection 2,500.00 Phase 2 Subtotal 24,238.39
3 3-01.01 Demolition 6,091.67
3-09.01 (Alt 1a) Flooring upgrade to 20 MIL LVP 21,110.68 3-09.02 Painting (omit) 0.00
3-01.02 Cleanup & Protection 2,850.00
Alt 2 Office furniture management & protection 2,500.00 Phase 3 Subtotal 32,552.35
Exhibit A1 Standalone– Furniture removal
(Phases 1–3 combined) 9,999.00
Subtotal (Phases 1–3 + Exhibit A1) 92,654.61
Phase 4 – Original Scope
SOV No. Description Amount ($)
Base Bid Subtotal All base SOV items 35,389.38
Alt 1b Flooring upgrade to 20 MIL LVP 3,095.55
Alt 2 Office furniture management & protection 2,500.00 Alt 3 Removal & disposal of 146 filing boxes 2,500.00
Subtotal Phases 4 43,484.93
Client Name: City Of Riverside
Project Name: City Attorny Office Bid No. 8179
Location 3750 University Ave
Change Order 001 - Tile Cost Delta Date: 11/20/2025
No Item Description Unit Quantity Unit Price Total Price $0.00
$0.00
$16,458.30
Matrial Cost Delta. $16,458.30
$0.00
$2,098.43
YMC OH&P 10% $1,645.83
Subcontractor Work 5% $0.00
Bond 2.5% $452.60
Total Change $18,556.73
Approved By: John Meine
Date: Date
OH&P - Bond and Insurance
Material
Equipments
Labor / Supervision
SubContractor Works
Tiles cost delta due to the tile change - The old pricing and new qoute are provided
Purview 20
100 Bone
105 Antler
110 Ecru
200 Patina
500 Mineral
505 Samovar
510 Jasper
515 Cast Core
520 Gunmetal
505 Samovar
700 Serengeti
705 Nomadic
710 Sedona
715 Marron
720 Urbane Khaki
1 800.241.4692 | philadelphiacommercial.com
For reference purposes only if printed or downloaded.
Recommended Installation Method
Ashlar
Brick
Herringbone
Stagger
Performance Testing
Test Reports may be included or listed by the manufacturing/inventory style number as opposed to the noted selling style number.
Warranties
Environmental
Specifications are subject to nominal manufacturing variance.
Material supply and/or manufacturing processes may necessitate changes without notice.
Purview 20
Packaging
Style Name Purview 20
Style Number 5036V
Construction High Performance Luxury Vinyl Tile
Class / ASTM F1700Class III Printed Film Vinyl Tile, Type B (embossed)
Finish ExoGuard+®
U.S. Metric
Nominal Dimensions6 in w, 48 in l 15 cm w, 122 cm l
Actual Dimensions5.96 in w, 48 in l 15.14 cm w, 121.92 cm l
Wear Layer Thickness20 mil (0.02 in) 0.51 mm
Overall Thickness0.098 in 2.5 mm
Installation Direct Glue
Recommended /
Required Adhesive
4200 (236MM 4G, 235MM 1G), S150 (5406V) or
4252 (461MM)
Pieces per box 21 pcs
Area per box 41.72 sq ft 3.88 sq m
Weight per box 35.44 lbs 16.08 kg
Static Load (ASTM F970) Passes (Modified), *750 lbs
Resistance to Heat (ASTM F1514) Passes
Resistance to Light (ASTM F1515) Passes
Resistance to Chemicals (ASTM F925)Passes
Radiant Panel (ASTM E648) Passes, Class I
Slip Resistance (ASTM D2047) ADA compliant
Commercial Limited Underbed Bond Warranty S150/4151/LokWorx+ Resilient Resilient 15 Year Commercial Limited
Indoor Air Quality FloorScore® Certified
Recycled Content Pre-consumer - 0%, Post-consumer - 0%
1 800.241.4692 | philadelphiacommercial.com
For reference purposes only if printed or downloaded.