AGREEMENT FOR CONSTRUCTION
14th ST AND VINE ST STORM DRAIN IMPROVEMENTS
PORTABLE STORM SYSTEM
ACC & ENGINEERING LLC
This Agreement for Construction ("Agreement") is entered into on this 10th day of _, 2025, by and between the CITY OF RIVERSIDE, a California charter city and a municipal corporation ("City") and ACC & ENGINEERING LLC, a California limited liability company, 1130 N. Kraemer Blvd. #I, Anaheim, CA 92806; State Contractor's License No. 1073807 ("Contractor"). Hereinafter, the City and the Contractor may be referred to collectively is the "Parties." The Parties mutually agree as follows: Contractor shall furnish all labor upment and materials for. and perform the work of 14th St and Vine St Storm Drail Improvements Portable Storm System, which is covered in the Contractor's Bid Proposal (the "Work"), in accordance with the provisions and requirements in the Contract Documents as defined by this Agreement.
ARTICLE 1 - CONTRACT DOCUMENTS
1.1 Definitions. The meanings of all capitalized terms used herein and in the Contract Documents and not otherwise defined in this document shall be the same as those definitions set forth in the Special Provisions Section 1-2.
1.2 Contract Documents.
The "Contract Documents," except for Modifications issued after execution of this Agreement, consist of the following documents, all of which are either attached hereto as exhibits or are incorporated herein by this reference, are intended to be correlative and constitute Contractor's performance obligations:
(1) Permits from the City's Building, Fire, Planning, Public Works and Public Utilities Departments and similar Governmental Approvals for the Work required by applicable law.
(2) Change Orders and other Modifications issued after execution of the Agreement. (3) This Agreement, as signed by the Parties, including the following exhibit, as well as any other exhibits, attachments, and Certificates of Insurance and Additional insured endorsements for Contractor:
Exhibit "A" - Workers' Compensation Certification
(4) Addenda with later Addenda having priority over earlier Addenda issued as follows: N/A
1 (5) Contractor's Bid Proposal, for the above-referenced Bid No. 8156 (comprised of Notice Inviting Bids, Instructions to Bidders and attachments, Electronic Bid Schedule of Prices, Electronic List of Subcontractors, Proposal, Signature Certification/Authorization, Bid Guaranty, and where applicable, Contractor Qualification Statement and/or Subcontractor Qualification Statement. (6) Special Provisions and Standard Specifications
(7) City and other agencies' Standard Drawings.
(8) All documents, maps, texts and items referred to in the foregoing documents.
1.3 Interpretation. In the event of any conflict between any of the Contract Documents, the document highest in the order of precedent shall control. The order of precedent shall be the same as that set forth in Section 3.7-2 of the 2021 Edition of the Standard Specifications for Public Works Construction, unless otherwise revised in the Special Provisions.
1.4 Entire Agreement. This Agreement together with all other Contract Documents represents the entire and integrated agreement between City and Contractor and supersedes any prior written or oral agreements between them concerning the subject matter contained in the Contract Documents. There are no representations, agreements, arrangements or understandings, oral or written, between the Parties hereto, relating to the subject matter contained in the Contract Documents, which are not fully expressed herein.
ARTICLE 2 - CONTRACT PRICE AND PAYMENT
2.1 Contract Price. City shall pay Contractor the Contract Price of One Hundred One Thousand One Hundred Thirty-Eight Dollars and Twenty Cents ($101,138.20), which includes all California sales or use tax and County and City taxes, in consideration for the Contractor's full, complete and timely performance of all of the Work required by the Contract Documents. The Contract Price includes any Alternative/Additive Bid Items which were awarded with the Contract.
Contractors agree to allocate the use tax derived from contracts or subcontracts of $5 million or more directly to the job site location by obtaining a sub-permit of the Contractor's seller's permit for the jobsite and allocating the local tax to the jobsite address on Schedule C of applicable sales tax returns, in accordance with State Board of Equalization Operations Memo 1023. Contractor shall provide City with proof of such filing prior to City's issuance of the Notice to Proceed.
In accordance with Section 22300 of the California Public Contract Code, Contractor may substitute securities for any monies withheld by City to ensure performance of the Contract. Such substitution shall be made at the request and expense of Contractor. Securities equivalent to the amount withheld may be deposited with City or with a state or federally chartered bank as escrow agent. Securities eligible for substitution shall include those listed in Section 16430 of the Government Code, bank or saving and loan certificates of deposit, interest bearing demand 2 deposit accounts, standby letters of credit, or any other security mutually agreed to by Contractor and City.
2.2 Changes to the Contract Price. Contractor shall not be compensated for any extra materials used or time expended over and above the Contract Price, unless prior written approval for the same has been granted by the City.
2.3 Payment Procedures.
Within sixty (60) calendar days after City accepts final completion of the work and issues the Notice of Completion, excluding Plant Establishment, if applicable, City shall pay Contractor the amounts City deducted and retained from Contractor's progress payments, except such sums which are required by applicable law or authorized by the Contract to be further retained. In the event of a dispute between City and Contractor concerning the amount of final payment due, the City may withhold from final payment, including Liquidated Damages provided forth in the Contract Documents, together with an amount not to exceed 150% of the value of disputed amounts for ARTICLE 3 - TIME FOR PERFORMANCE
3.1 Date of Commencement/Notice to Proceed. The date of commencement of the Work shall be established in a written Notice to Proceed issued by the City. The City will not issue a Notice to Proceed to the Contractor until this Agreement, bonds and insurance documents have been executed and/or approved by the City.
3.2 Contract Time. Contractor shall perform the Work in a diligent manner and shall complete all of the Work of the Contract, excluding any Plant Establishment, if applicable, within forty (40) working days after the date specified to Contractor in the Notice to Proceed issued by City.
ARTICLE 4 - LIQUIDATED DAMAGES
4.1 Amounts of Liquidated Damages.
4.1.1 Delay in Substantial Completion of the Work. Failure of Contractor to complete the Work within the time allowed will result in damages being sustained by City. Such damages are, and will continue to be, impracticable and extremely difficult to determine. For each consecutive calendar day in excess of the time specified for the completion of Work, as adjusted in accordance with Section 6-3 of the Standard Specifications, Contractor shall pay to City, or have withheld from monies due Contractor, the sum of Five Hundred Dollars ($500.00). Execution of this Agreement shall constitute agreement by City and Contractor that said sum is the minimum value of the costs and actual damage caused by the failure of Contractor to complete the Work within the allotted time. Such sum is liquidated damages and shall not be construed as a penalty and may be deducted from payments due Contractor if such delay occurs. 3 Additional liquidated damages shall be assessed in the amount One Thousand Dollars ($1,000.00) per incident that the updated weekly schedule is not submitted as specified in Section 6-1.1 of these Special Provisions.
Additional liquidated damages shall be assessed in the amount of One Thousand Dollars ($1,000.00) per incident that the Contractor reduces the traveled way width and/or stores construction equipment within public streets and right of way beyond the hours specified in Section 600 of these Special Provisions. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due Contractor if such incidents occur.
Additional liquidated damages shall be assessed in the amount of Five Hundred Dollars ($500.00) per incident that the Contractor fails to install the Best Management Practices (BMP's) within twenty-four (24) hours of notification as described in Section 3-12.6.5 of the Special Provisions. These liquidated damages are in addition to the right of the City to suspend work as described in Section 6-6. Such sum is liquidated damages and shall not be construed as a penalty, and may be deducted from payments due Contractor if such incidents occur.
Additional liquidated damages shall be assessed in the amount of Two Thousand Dollars ($2,000.00) per incident that the Contractor fails to pour concrete after the commencement of excavation work for all new sidewalks, pedestrian ramps, and/or curb and gutter; or fails to complete the asphalt repair for the open slots within the allotted time requirements as described in associated sections within Part 3 of these Special Provisions.
ARTICLE 5 - CLAIMS AND DISPUTES
5.1 Notice of Claims. Contractor acknowledges and agrees that its failure to submit any claim arising under this Contract in accordance with the Special Provisions, shall constitute a waiver of Contractor's right to additional compensation and/or extension of time.
Government Code Claims Procedures. Contractor further acknowledges that notwithstanding Contractor's compliance with the claims procedures set forth in the Special Provisions, Contractor must also comply with the claims procedures set forth in Government Code sections 900 et seq. prior to filing a lawsuit against the City for any such claim. Failure to submit a Government Code claim or comply with the claims provision contained in the Special Provisions shall bar Contractor from bringing and maintaining a valid lawsuit against the City.
ARTICLE 6 - LOCAL BUSINESS LICENSE, TAXES AND FEES
6.1 Business Tax Certificate and Governmental Approvals. As a condition of the Contract, Contractor and all subcontractors shall, during the term of this Agreement, secure and annually renew business tax certificates pursuant to Chapter 5.04 of the Riverside Municipal Code to operate in the City of Riverside, and shall also secure and maintain at all times during performance of the Work, any other licenses, fees, permits or similar Governmental Approvals required by Applicable law.
4 6.2 Offsets. Contractor acknowledges and agrees that with respect to any business tax or penalties thereon, utility charges, invoiced fee or other debt which is owed, or which becomes owed, by Contractor to City, City reserves the right to withhold and offset said amounts from any payments, refunds or reimbursements owed by City to Contractor under the Contract. Notice of such withholding and offset shall promptly be given to Contractor by City in writing. In the event of a dispute as to the amount owed or whether such amount is owed to City, City will hold such disputed amount until either the appropriate appeal process has been completed or until the dispute has been resolved.
ARTICLE 7 - BONDS
7.1 Performance and Payment Bonds. Prior to City's execution of this Agreement, Contractor shall furnish to the City two (2) duly executed surety bonds using the forms included within the Bidding Requirements, one (1) as security for the faithful performance of the Contract and one (1) as security for the payment of all persons performing labor and furnishing materials in connection with the Contract. Both bonds shall be in the amount of one hundred percent (100%) of the Contract Price and shall be subscribed by an Admitted Surety Insurer which is authorized to transact surety insurance business in the State of California with a policy holder's rating of A or higher and a Financial Class of VII or larger. Should any bond or surety become insufficient, Contractor shall furnish City a new bond within ten (10) days after receiving notice from City. No payments will be due or paid under the Contract until any and all bond deficiencies have been remedied. Contractor, by execution of this Agreement acknowledges that the bonds are not Contract Documents but are separate obligations.
ARTICLE 8 - WORKERS' COMPENSATION INSURANCE
Contractor cerie Chat Constraitor insure of and will comply vieting this Athe ment, Code of the State of California requiring every employer to be insured against liability for workers' compensation or to undertake self-insurance before commencing any of the Work. Contractor shall comply with Labor Code Section 1861 by signing and filing the workers' compensation certification attached hereto as Exhibit "A" and incorporated herein by reference.
8.2 Evidence of Coverage. Prior to the City's execution of this agreement, Contractor shall file with the City either 1) a certificate of insurance or self-insurance evidencing that such insurance is in effect, or that Contractor is self-insured for such coverage; or 2) a certified statement that Contractor has no employees, and acknowledging that if Contractor does employ any person, the necessary certificate of insurance will immediately be filed with City. Any Certificate filed with the City shall provide that City shall be given ten (10) days prior written notice before modification or cancellation thereof.
Carrier Rating. Contractor's workers' compensation insurance carrier shall be authorized to transact insurance business in the State of California with a policy holder's rating of A or higher and a Financial Class of VII or larger.
5 8.4 Subcontractor Workers' Compensation Insurance. Contractor shall require each of its Subcontractors to obtain and maintain for the duration of this Agreement, complete workers' compensation insurance, meeting or exceeding the coverage's and amounts that California law requires.
ARTICLE 9 - CONTRACTOR'S LIABILITY INSURANCE
9.1 Minimum Scope. Prior to City's execution of this Agreement and Contractor's commencement of Work, Contractor shall secure, submit proof of and shall thereafter maintain without interruption, until completion of the Contract, such commercial general and automobile liability insurance as shall protect Contractor, its Subcontractors and the Additional Insured's from any and all claims for damages for personal injury, including accidental death, as well as any and all claims for property damage which may arise from or which may concern operations under the Contract, whether such operations be by or on behalf of Contractor, any subcontractor or anyone directly or indirectly employed by, connected with or acting for or on behalf of any of them.
9.2 Carrier Ratings. All liability insurance shall be issued by an insurance company or companies authorized to transact liability insurance business in the State of California with a policy holder's rating of A or higher and a Financial Class of VIl or larger.
9.3 Minimum Limits. Contractor shall maintain minimum limits of insurance as follows:
9.3.1 Commercial General Liability: Contractor's commercial general liability insurance policy shall cover both bodily injury (including death) and property damage (including, but not limited to, premises operations liability, products-completed operations liability, independent contractor's liability, personal injury liability, and contractual liability) in an amount not less than $1,000,000 per occurrence, an aggregate limit for products/completed operations in the amount not less than $2,000,000.
9.3.2 Automobile Liability Insurance: Contractor's automobile liability policy shall occurrent and i agrand prop no less a same Aloes actor alone- and/or commercial general liability insurance policies shall cover all vehicles used in connection with Contractor's performance of this Agreement, which vehicles shall include, but are not limited to, Contractor owned vehicles, Contractor leased vehicles, Contractor's employee vehicles, non- Contractor-owned vehicles and hired vehicles.
9.3.3 No Limitation on Indemnification. These minimum amounts of coverage shall not constitute any limitation or cap on Contractor's indemnification obligation.
9.3.4 Installation Floater Insurance. Contractor shall obtain, at Contractor's expense, and keep in effect during the term of this Agreement, Installation Floater insurance for coverage of Contractor's labor, materials and equipment to be used for completion of the work performed under this Agreement. The minimum amount of coverage to be carried shall be equal to the full amount of the Contractor's labor, equipment, materials, or fixtures to be installed, in transit, or stored off-site or on-site during the performance of this Agreement. The policy shall include as loss payee, the City of Riverside, the Contractor, and its sub-contractors as their interest may appear. The City shall not be responsible for the theft of any materials, equipment in the possession and control of Contractor.
9.4 Notice of Cancellation and Renewals. The policies shall not be canceled unless thirty (30) days' prior written notification of intended cancellation has been given to City by certified or registered mail (this obligation may be satisfied in the alternative by requiring such notice to be provided by Contractor's insurance broker and set forth on its Certificate of Insurance provided to City). Contractor agrees that upon receipt of any notice of cancellation or alteration of the policies, Contractor shall procure within five (5) days, other policies of insurance similar in all respects to the policy or policies to be cancelled or altered. Contractor shall furnish to the City copies of any endorsements that are subsequently issued amending coverage or limits within fourteen (14) days of the amendment.
9.5 All Coverages. The insurance policy or policies shall also comply with the following provisions:
a. Policies shall include premises/operations, products completed operations, independent contractors, owners and contractors' protection, explosion, collapse, underground hazard, broad form contractual, personal injury with employment exclusion deleted, and broad form property damage.
b. The policy shall be endorsed to waive any right of subrogation against the City and its subconsultants, employees, officers, agents and directors for work performed under this Agreement.
If policies are written on a claims-made basis, the certificate should so specify and the policy must continue in force for five (5) years after completion of the Project.
The retroactive date of the coverage must also be listed. d. The policy shall specify that the insurance provided by Contractor will be considered primary and not contributory to any other insurance available to the City of Riverside. Contractor shall provide Form No. CG 20010413 to City. e. All policies of insurance shall name the City as an Additional Insured and shall contain the following language: "Solely with respect to work done by and on behalf of the name insured for the City of Riverside, it is agreed that the City of Riverside, and its officers and employees are added as additional insureds under this policy."
9.6 Certificates of Insurance, Additional Insured Endorsements and Deductibles. Prior to execution of the Agreement, and thereafter upon City's request, Contractor shall furnish City with original certificates of insurance and additional insured endorsements setting forth evidence of all insurance coverage required by this Article. Each certificate and endorsement is to be signed by a person authorized by that insurer to bind coverage on its behalf. The City of Riverside, its City Council and all of its respective officials, officers, directors, employees, managers, commission members, representatives, agents and council members shall be named as additional insureds under each policy.
7 9.7 Contractor's Failure to Provide Required Insurance. Failure to maintain required insurance at all times shall constitute a default and material breach. In such event, Contractor shall immediately notify City and cease all performance under this Contract until further directed by the City. In the absence of satisfactory insurance coverage, City may, at its discretion and sole option:
(a) procure insurance with collection rights for premiums, attorneys' fees and costs against Contractor by way of set-off or recoupment from sums due Contractor; (b) immediately terminate or suspend Contractor's performance of the Contract; (c) pay Contractor's premiums for renewal of Contractor's coverage; or (d) self-insure the risk, with all damages and costs incurred, by judgment, settlement or otherwise, including attorneys' fees and costs, being collectible from Contractor, by way of set-off or recoupment from any sums due Contractor. Upon demand, Contractor shall repay City for all sums that City paid to obtain, renew, reinstate or replace the insurance, or City may offset the cost against any monies that the City may owe Contractor.
9.8 Verification of Coverage. City shall have the right to obtain complete and certified copies of Contractor's and Subcontractors' insurance policies (including, but not limited to, the declarations page, form list and riders), endorsements or certificates required under the Contractor Documents, upon request (including, but not limited to, the declarations page, form list and riders).
9.9 Reassessment of Insurance Requirements. At any time during the duration of this Contract, the City may require that Contractor obtain, pay for, and maintain more or less insurance depending on the City's assessment of any one or more of the following factors: (1) the City's risk of liability or exposure arising out of, or in any way connected with, Contractor's services under this Contract; (2) the nature or number of accidents, claims, or lawsuits arising out of, or in any way connected with, Contractor's services under this Contract; or (3) the availability, or affordability, or both, of increased liability insurance coverage.
9.10 Contractor's Insurance for Other Losses. The Contractor and its Subcontractors of every tier shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's (or Subcontractors') employee-owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or Subcontractors as well as to any temporary structures, scaffolding and protective fences.
9.11 No Limitation. Contractor's maintenance of insurance as required by the Contract Documents shall not be construed to limit the liability of the Contractor or its Subcontractors of any tier to the coverage provided by such insurance or otherwise limit the City's recourse to any remedy available at law or in equity.
9.12 Subcontractors' Insurance. The Contractor shall include in all subcontracts a requirement that the Subcontractors of every tier shall obtain and maintain, at a minimum, all insurance required by Articles 9 and 10 of this Agreement except that the limits of liability and deductibles shall be in amounts determined by the Contractor, based on the degree of hazardous exposure according to the Work performed by each Subcontractor and the size of each subcontract.
Contractor shall ensure that any professional engineer retained on its behalf to provide supplemental plans and engineering calculations required in conjunction with the Work, maintains professional liability insurance during the entire term of this Agreement. Such insurance shall be in the minimum amount of $1,000,000 to protect City from claims resulting from the 8 engineers) activities. This minimum amount of coverage shall not constitute any limitation or cap on Contractor's indemnification obligations set forth herein.
The City reserves the right to request certificates of insurance from the Contractor for each Subcontractor. The Contractor acknowledges that regardless of insurance obtained by its Subcontractors, the Contractor will be responsible to the City for any and all acts of its Subcontractors.
ARTICLE 10 - INDEMNITY/DUTY TO DEFEND
10.1 Indemnity. Except as to the sole negligence, active negligence or willful misconduct of the City, Contractor assumes liability for and agrees, at Contractor's sole cost and expense, to promptly and fully indemnify and hold the City, its City Council, and all of its respective officials, officers, directors, employees, managers, commission members, representatives, agents, council members, ("Indemnitees"), harmless from and against any and all loss, damage, claims, allegations, actions, suits, arbitrations, administrative proceedings, regulatory proceedings, or other legal proceedings, causes of action, demands, costs, judgments, liens, stop notices, penalties, damages, losses, anticipated losses of revenue, expenses (including, but not limited to, any fees of accountants, attorneys, experts or other professionals, or investigation expenses), costs, including attorneys' fees, or losses of any kind or nature whatsoever, whether actual, threatened or alleged, arising out of, resulting from or is in any way (either directly or indirectly) related to, or is in any manner connected with, the performance of Work, the Project, activities, operations or duties of Contractor, or anyone employed by or working under Contractor, and from all claims by anyone employed by or working under Contractor for services rendered to Contractor in the performance of this Agreement ("Indemnity Claims"), notwithstanding that the City may have benefited from their services. This indemnification provision shall apply to any acts or omissions, willful misconduct or negligent conduct, whether active or passive, on the part of Contractor or of anyone employed by or working under Contractor.
The parties expressly agree that any payment, attorneys' fees, costs or expense that the City incurs or makes to or on behalf of an injured employee under the City's self-administered workers' compensation is included as a loss, expense or cost for the purposes of this Section, and that this Section shall survive the expiration or early termination of the Agreement.
10.2 Duty to Defend. Contractor agrees, at its sole cost and expense, to promptly defend the Indemnitees from all Indemnity Claims. The duty of the Contractor to indemnify and hold harmless the Indemnitees includes the separate and independent duty to defend the Indemnitees, which duty arises immediately upon receipt by Contractor of the tender of any Indemnity Claim from an Indemnitee. The Contractor's obligation to defend the Indemnitees shall be at Contractor's sole expense and not be excused because of Contractor's inability to evaluate liability or because the Contractor evaluates liability and determines that the Contractor is not liable. This duty to defend shall apply whether or not an Indemnity Claim has merit or is meritless, or which involves claims or allegations that any or all of the Indemnitees were actively, passively or concurrently negligent, or which otherwise assert that the Indemnitees are responsible, in whole or in part, for any Indemnity Claim. Contractor agrees to provide this defense immediately upon 9 written notice from the City, and with well qualified, adequately insured and experienced legal counsel acceptable to the City.
10.3 Subcontractor Requirements. In addition to the requirements set forth hereinabove, Contractor shall ensure, by written subcontract agreement, that each of Contractor's Subcontractors of every tier shall protect, defend, indemnify and hold harmless the Indemnitees with respect to Indemnity Claims arising out of, in connection with, or in any way related to each such Subcontractors' Work on the Project in the same manner in which Contractor is required to protect, defend, indemnify and hold the Indemnitees harmless. In the event Contractor fails to obtain such defense and indemnity obligations from others as required herein, Contractor agrees to be fully responsible to the Indemnitees according to the terms of this Article.
10.4 No Limitation or Waiver of Rights. Contractor's obligations under this Article are in addition to any other rights or remedies which the Indemnitees may have under the law or under the Contract Documents. Contractor's indemnification and defense obligations set forth in this Article are separate and independent from the insurance provisions set forth in the Agreement and do not limit, in any way, the applicability, scope, or obligations set forth in such insurance provisions. The purchase of insurance by the Contractor with respect to the obligations required herein shall in no event be construed as fulfillment or discharge of such obligations. In any and all claims against the Indemnitees by any employee of the Contractor, any Subcontractor, any supplier of the Contractor or Subcontractors, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the obligations under this Article shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any Subcontractor or any supplier of either of them, under workers' or workmen's compensation acts, disability benefit acts or other employee benefit acts. Failure of the City to monitor compliance with these requirements imposes no additional obligations on the City and will in no way act as a waiver of any rights hereunder.
10.5 Withholding to Secure Obligations. In the event an Indemnity Claim arises prior to final payment to Contractor, the City may, in its sole discretion, reserve, retain or apply any monies due Contractor for the purpose of resolving such Indemnity Claims; provided, however, the City may release such funds if the Contractor provides the City with reasonable assurances of protection of the Indemnitees' interests. The City shall, in its sole discretion, determine whether such assurances are reasonable.
10.6 Survival of Indemnity Obligations. Contractor's obligations under this Article are binding on Contractor's and its Subcontractors' successors, heirs and assigns and shall survive the completion of the Work or termination of the Contractor's performance of the Work.
10.7 Independent Contractor. Contractor shall at all times during its performance of the Work retain its status as an independent contractor. Contractor's employees and agents shall under no circumstances be considered or held to be employees or agents of City and City shall have no obligation to pay or withhold state or federal taxes or provide workers' compensation or unemployment insurance for or on behalf of Contractor or its employees and agents. 10 ARTICLE 11 - PREVAILING WAGES
11.1 Public Work Project.
This Project is a public work as defined in California Labor Code Section 1720. Contractor and all Subcontractors of any tier are required to pay all workers employed in the execution of the Work not less than the general prevailing wage rates of per diem wages and overtime and holiday wages determined by the Director of the Department of Industrial Relations ("DIR") under Section 1720 et seq. of the California Labor Code and implemented by Resolution No. 13346 of the City Council of the City of Riverside. The Director's determination of prevailing rates is available on- line at www.dir.ca.gov/dlsr/DPreWageDetermination.htm and is referred to and made a part hereof; the wage rates therein ascertained, determined and specified are referred to and made a part hereof as though fully set forth herein. Per Senate Bill 854(2014), Contactor and subcontractors shall register with the Department of Industrial Relations (DIR) in order to bid and perform public works projects. Contractors and subcontractors on all public works projects shall submit electronic certified payrolls to the Labor Commissioner and City unless excused from this requirement.
11.2 California Labor Code. Contractor is aware of and stipulates that Contractor will also comply with the following sections of the California Labor Code:
a. Section 1775 prescribing sanctions for failure to pay prevailing wage rates; b. Section 1776 requiring the making, keeping and disclosing of detailed payroll records and prescribing sanctions for failure to do so; C. Section 1777.5 prescribing the terms and conditions for employing registered apprentices;
d. Section 1810 providing that eight hours of labor shall be a day's work; and e. Section 1813 prescribing sanctions for violations of the provisions concerning eight-hour work days and forty-hour work weeks.
f. Sections 1725.5 and 1771.1 requiring all general contractors and subcontractors to be registered with DIR. Registration can be accomplished through the DIR website by using this link: http://www.dir.ca.gov/Public- Works/PublicWorks.html.
ARTICLE 12 - MISCELLANEOUS
12.1 Non-Discrimination. Except as provided in Section 12940 of the California Government Code, during Contractor's performance of the Agreement, Contractor shall not discriminate on the grounds of race, religious creed, color, national origin, ancestry, age, physical handicap, medical condition including the medical condition of Acquired Immune Deficiency Syndrome (AIDS) or any condition related thereto, marital status, sex or sexual orientation, genetic information, gender, gender identity, or gender expression, in the selection and retention of employees and subcontractors and the procurement of materials and equipment. Contractor shall also comply with the requirements of the Americans with Disabilities Act in the performance of the Agreement.
12.2 Notice. Whenever any provision of the Contract Documents requires the giving of written notice, including notices, bills, invoices or other documents required or permitted under this 11 Agreement, service shall be sufficient if sent by one party to the other by overnight courier, or by registered, certified or United States first class mail, postage prepaid and addressed as follows:
City Contractor
City of Riverside ACC & Engineering LLC
Attn: Public Works Director Attn: Ben Hammed
3900 Main Street 1130 N. Kraemer Blvd., #I
Riverside, CA 92522 Anaheim, CA 92806
12.3 City's Right to Access and Audit Contractor's Project Documents.
A. If the Contractor submits a claim to the City for additional compensation, the City shall have the right, as a condition to considering the claim, and as a basis for evaluation of the claim, and until the claim has been settled, to audit the Contractor's books to the extent they are relevant. This right shall include the right to examine books, records, documents, and other evidence and accounting procedures and practices, sufficient to discover and verify all direct and indirect costs of whatever nature claimed to have been incurred or anticipated to be incurred and for which the claim has been submitted. The right to audit shall include the right to inspect the Contractor's plant, or such parts thereof, as may be or have been engaged in the performance of the Work. The Contractor further agrees that the right to audit encompasses all subcontracts and is binding upon Subcontractors. The rights to examine and inspect herein provided for shall be exercisable through such representatives as the City deems desirable during the Contractor's normal business hours at the office of the Contractor. The Contractor shall make available to the City for auditing, all relevant accounting records and documents, and other financial data, and upon request, shall submit true copies of requested records to the City.
B. The City and/or its authorized auditors or representatives, shall have access to and the right to examine, audit, excerpt, transcribe, and reproduce any of the Contractor's records for a period of at least three (3) years after termination of the Contract and/or Final Payment. Such records include without limitation, journals, ledgers, records of accounts payable and receivable, profit and loss statements, bank statements, invoices, receipts, subcontracts, agreements, notes, correspondence, memoranda, and any documents generated and received in Contractor's performance of this Contract. Upon written notice by the City, Contractor shall promptly make all such records available to Owner and/or its authorized auditors or representatives and cooperate with the Owner and its authorized auditors or representatives in examining, auditing, excerpting, transcribing and reproducing the records.
12.4 Venue and Attorneys' Fees. Any action at law or in equity brought by either of the parties hereto for the purpose of enforcing a right or rights provided for by this Agreement shall be tried in a court of competent jurisdiction in the County of Riverside, State of California, and the parties hereby waive all provisions of law providing for a change of venue in such proceedings to any other county. In the event either party hereto shall bring suit to enforce any term of this Agreement or to recover any damages for and on account of the breach of any term or condition of this Agreement, it is mutually agreed all parties shall bear their own attorneys' fees. 12 12.5 No Estoppel or Waiver by City. No action or failure to act by the City shall constitute a waiver of any right or duty afforded City under this Agreement, nor shall any such action or failure to act constitute an approval of or acquiescence in any breach thereunder, except as may be specifically provided in this Agreement or as may be otherwise agreed in writing. The waiver by the City of any breach or violation of any term, covenant or condition of this Agreement or of any provision, ordinance, or law shall not be deemed to be a waiver of any other term, covenant, condition, ordinance, or law or of any subsequent breach or violation of the same or of any other term, covenant, condition, ordinance, or law. The subsequent payment of any monies or fee by the City which may become due hereunder shall not be deemed to be a waiver of any preceding breach or violation by Contractor or any term, covenant, condition of this Agreement or of any applicable law or ordinance.
12.6 Signature Authority. The individuals executing this Agreement and the instruments referenced herein on behalf of Contractor each represent and warrant that they have the legal power, right and actual authority to bind Contractor to the terms and conditions hereof and thereof.
Severability. Each provision, term, condition, covenant and/or restriction, in whole and in part, in this Agreement shall be considered severable. In the event any provision, term, condition, covenant and/or restriction, in whole and/or in part, in this Agreement is declared invalid, unconstitutional, or void for any reason, such provision or part thereof shall be severed from this Agreement and shall not affect any other provision, term, condition, covenant and/or restriction of this Agreement and the remainder of the Agreement shall continue in full force and effect.
[SIGNATURES ON FOLLOWING PAGE.]
13 IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed on the day and year first above written.
CITY OF RIVERSIDE, a California and ACC & ENGINEERING LLC, a California municipal corporation limited liability company
By: By:
City Manager Print Name: Ben Hamed (Amr Hamed)
Title:_CEO & Principal Engineer
Attest:
City Clerk
By:
Certified as to Availability of Funds: Print Name:
Title:
By: vida
Asst.Chief Financial Officer
APPROVED AS TO FORM:
Tarren A. Torres
Deputy City Attorney
\IRc-citylawlcycom\WPDOCS\D007P051\00940511.DOCX
25-0584 TAT 05/08/25
14 EXHIBIT "A"
WORKERS' COMPENSATION CERTIFICATION
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. 06/10/2025
DATED: ACC & ENGINEERING LLC,
a California limited liability company
By
Ben Hamed (Amr_Hamed)
CEO & Principal Engineer
Printed Name and Title
THE FINAL PREMIUM IS This bond was issued in two (2)
PREDICATED ON THE original counterparts
FINAL CONTRACT AMOUNT
PERFORMANCE BOND
Bond No. 024286034
Bid No. 8156
Premium: $2,528.00
KNOW ALL PERSONS BY THESE PRESENTS THAT:
WHEREAS, on _ 2025, the CITY OF RIVERSIDE ("CITY") awarded to ACC & ENGINEERING LLC, a California limited liability company, 1130 N. Kraemer Blvd. #I, Anaheim, CA 92806; State Contractor's License No. 1073807 ("PRINCIPAL") a contract for performance of the work described as 14* ST AND VINE ST STORM DRAIN IMPROVEMENTS PORTABLE STORM SYSEM ("CONTRACT"), the terms and conditions of which are incorporated herein by reference; and
WHEREAS, the CONTRACT requires PRINCIPAL to furnish this Performance Bond ("BOND") to guarantee PRINCIPAL's faithful performance of all provisions of the CONTRACT; and WHEREAS, The Ohio Casualty Insurance Company _("SURETY"), a corporation legally authorized to execute and furnish performance bonds as sole surety in the State of California, is willing to act as PRINCIPAL's SURETY in the making and giving of this BOND.
NOW, THEREFORE, we PRINCIPAL and SURETY hereby hold and firmly bind ourselves to pay to CITY in lawful United States currency the principal sum of One Hundred One Thousand One Hundred Thirty-Eight Dollars and Twenty Cents ($101,138.20), for which payment well and truly to be made to CITY or CITY's successors or assigns we hereby bind ourselves and our heirs, legal representatives, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS BOND IS THAT IF PRINCIPAL or PRINCIPAL's heirs, legal representatives, successors or assigns shall in all things stand to, abide by, and well and truly keep and faithfully perform all of the covenants, conditions and promises in the CONTRACT, including its work Guaranty, and all alterations thereof made as therein provided on PRINCIPAL's part to be kept and performed at the time and in the manner specified therein, and in all respects according to heir true intent and meaning, and shall indemnify and save harmless CITY and CITY's officers mployees and agents as therein specified, then this obligation shall become null and void otherwise, it shall be and remain in full force and binding effect.
SURETY hereby agrees that no change in the terms of the CONTRACT or the work to be performed hereunder, or any extension of time tor completion thereot, shall in any way relleve it of it:
›bligations under this BOND, and hereby waives notice of any change or extension thereof, anc further waives the provisions of California Civil Code sections 2819 and 2845. ///
///
11/
///
1 IN WITNESS WHEREOF, we sign and seal this BOND on June 18th _ 2025.
Correspondence or claims relating to ACC & ENGINEERING LLC, a California this BOND should be sent to SURETY at limited liability company the following address:
The Ohio Casualty Insurance Company By: Ban Hamed (Aur Hered seal) 790 The City Drive South, Suite 200
Typed Name anet Title
Orange, CA 92868 The Ohio Casualty Insurance Company
_(Seal)
Typed Name and Title
Telephone No. (714) 937-1400
Note: Signatures of those executing for
SURETY must be acknowledged, and a
Power of Attorney attached.
Approved as to Form:
Cuter Came bauma
By:
Deputy City Attorney
Rev: August 22, 2018
2 ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
State of California
County of Orange
On _ 06/18/2025 before me, _ Melissa Ann Vaccaro, Notary Public (insert name and title of the officer)
personally appeared Adrian Langrell
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
MELISSA ANN VACCARO
WITNESS my hand and official seal. COMM. #2401942
Notary Public-California
ORANGE COUNTY
My Comm. Expires May 12, 2026K
signate Dishlaccon (sal)
Melissa Ann Vaccaro
Bond No. 024286034
Liberty POWER OF ATTORNEY
Mutual. Liberty Mutual Insurance Company Certificate No: 8213134-969561 SURETY The Ohio Casualty Insurance Company
West American Insurance Company
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Adrian Langrell; Arturo Ayala; Ben Stong; Benjamin Wolfe; Chelsea Liberatore; Daniel Huckabay; Dwight Reilly; Frank Morones; Magdalena R. Wolfe; Michael D. Stong; R. Nappi; Shaunna Rozelle Ostrom
all of the city of _ each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons.
IN WITNESS WHEREOF, this Power of Attorey has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 13th day of February 2025
Liberty Mutual Insurance Company
INSURAN INSURA The Ohio Casualty Insurance Company
ERICAN West American Insurance Company
1912 1919 1991
112991) OHIO
1S3M ANVa By:
Nathan J. Zangerle, Assistant Secretary
value guarantees. State of PENNSYLVANIA
sS verification inquiries,
County of MONTGOMERY
On this 13th day of February
loan, letter of credit,
therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written.
POA
TERESA nealth of Pansylvania • Notary Sea
Teresa Pastella, Notary Public
interest rate or residual Montgo tastello please call 610-832-8240 or email [email protected].
My ssion expires March 28,2029 By:
Commission number 1126044
febber, Pennsyvania. Asso Teresa Pastella, Notary Public NOTARY
This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Not valid for mortgage, note, Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows:
For bond and/or Power of Attorney
ARTICLE IV - OFFICERS: Section 12. Power of Attorney.
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the currency rate, President may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney-in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.
ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary.
Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Nathan J. Zangerle, Assistant Secretary to appoint such attorneys-in-fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations.
Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed.
1, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 18th day of June ,2025 MUTUAZ «CORPORATE CASUALT CORPORATE ERICAN СОКРОВАНИ
1912 1919 1991
By:
1482911 INDIANA Renee C. Llewellyn, Assistant Secretary 183M
LMS-12873 LMIC OC/C WAIC Multi Co 02/24
THE FINAL PREMIUM IS This bond was issued in two (2)
PREDICATED ON THE original counterparts
FINAL CONTRACT AMOUNT
PAYMENT BOND
Bond No. 024286034
Bid No. 8156
Premium: Included in Perf. Bond
KNOW ALL PERSONS BY THESE PRESENTS THAT:
WHEREAS, on June 10th _ 2025, the CITY OF RIVERSIDE ("CITY") awarded to ACC & ENGINEERING LLC, a California limited liability company, 1130 N. Kraemer Blvd. #I, Anaheim, CA 92806; State Contractor's License No. 1073807 ("PRINCIPAL"') a contract for performance of the work described as 14th ST AND VINE ST STORM DRAIN IMPROVEMENTS PORTABLE STORM SYSEM ("CONTRACT"), the terms and conditions of which are incorporated herein by reference; and
WHEREAS, the CONTRACT requires PRINCIPAL to furnish this Payment Bond ("BOND"') to secure payment of the claims of persons described in California Civil Code section 9554(b); and WHEREAS, The Ohio Casualty Insurance Company ("SURETY"'), a corporation legally authorized to execute and furnish payment bonds as sole surety in the State of California, is willing to act as PRINCIPAL's SURETY in the giving of this BOND.
NOW, THEREFORE, we PRINCIPAL and SURETY hereby hold and firmly bind ourselves to pay to CITY in lawful United States currency the principal sum of One Hundred One Thousand One Hundred Thirty-Eight Dollars and Twenty Cents ($101,138.20), for which payment well and truly to be made to CITY or CITY's successors or assigns we hereby bind ourselves and our heirs, legal representatives, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS BOND IS THAT IF PRINCIPAL or PRINCIPAL's successors, assigns, or subcontractors fail to pay any of the persons described in California Civil Code section 9100, any amounts due under the California Unemployment Insurance Code with respect to work or labor performed under the CONTRACT or any amounts required to be deducted, withheld and paid over to the California Employment Development Department from the wages of employees of PRINCIPAL and PRINCIPAL's subcontractors pursuant to California Unemployment Insurance Code section 13020 with respect to such work and labor, SURETY will pay for the same in an amount not exceeding the sum stated above, plus all costs and reasonable attorney's fees awarded by any court of competent jurisdiction in any lawsuit brought upon this BOND.
THIS BOND SHALL INURE TO the benefit of all persons and entities described in California Civil Code section 9554(b) so as to give them or their assigns a right of action in any lawsuit brought upon this BOND, and is executed and filed to comply with the Public Works Payment Bond provisions of Chapter 5, Title 3, Part 6, Division 4 of the California Civil Code (commencing at Section 9550) and all amendments thereto, which provisions are incorporated herein by this reference.
///
1 IN WITNESS WHEREOF, we sign and seal this BOND on June 18th _ 2025.
Correspondence or claims relating to ACC & ENGINEERING LLC, a California this BOND should be sent to SURETY at limited liability company the following address:
The Ohio Casualty Insurance Company Principal
790 The City Drive South, Suite 200 By: Ben Hamed (Amn Horad(Seal) Orange, CA 92868
Typed Name and Title
The Ohio Casualty Insurance Company
(Seal)
Attorney-In-Fact
Telephone No. (714) 937-1400 Adrian Langrel, Attorney-in-Fact Typed Name and Title
Note: Signatures of those executing for
SURETY must be acknowledged, and a
Power of Attorney attached.
Approved as to Form:
By:. 1 Cene Secum
Anthony L. Beaumon
Deputy City Attorney
25-0048 SDW 1/16/25
2 ACKNOWLEDGMENT
A notary public or other officer completing this
ertificate verifies only the identity of the individua
vho signed the document to which this certificate i
attached, and not the truthfulness, accuracy, or
State of California
County of Orange
On _ 06/18/2025 before me, _ Melissa Ann Vaccaro, Notary Public (insert name and title of the officer)
personally appeared Adrian Langrell
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal. MELISSA AN MACCARO
COMM. #2401942
Notary Public-California FRS3
ORANGE COUNTY
My Comm. Expires May 12, 2026K
signature Messalmacan (sel)
Melissa Ann Vaccaro
Bond No. 024286034
Liberty POWER OF ATTORNEY
Mutual. Certiicate No: 8213134-969561
Liberty Mutual Insurance Company
SURETY The Ohio Casualty Insurance Company
West American Insurance Company
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Adrian Langrell; Arturo Ayala; Ben Stong; Benjamin Wolfe; Chelsea Liberatore; Daniel Huckabay; Dwight Reilly; Frank Morones; Magdalena R. Wolfe; Michael D. Stong R. Nappi; Shaunna Rozelle Ostrom
all of the city of Orange state of CA each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 13th day of February 2025
Liberty Mutual Insurance Company
ASUALTY INSUp The Ohio Casualty Insurance Company
ERICAN CORPORATE West American Insurance Company
1912 1919 1991
ANYANOS OIHO
sery 1S3M By:
Nathan J. Zangerle, Assistant Secretary
State of PENNSYLVANIA
County of MONTGOMERY verification inquiries,
letter of credit, On this 13th day of February 2025 before me personally appeared Nathan J. Zangerle, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written.
POA
PAS>
TERESA wealth of Penins
currency rate, interest rate or residual value guarantees. Teresa Pas Pastella please call 610-832-8240 or email [email protected].
My commission e arch 28,2029 By:
Commission number 1126049
ember, Pennsylvania Ass Teresa Pastella, Notary Public
Not valid for mortgage, note, loan, This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: For bond and/or Power of Attorney ARTICLE IV - OFFICERS: Section 12. Power of Attorney.
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.
ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary.
Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes Nathan J. Zangerle, Assistant Secretary to appoint such attorneys-in-fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations.
Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed.
1, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 18th _day of June ,2025
INSURAN RICAN CAN
CORPORATE (CORPORATEL CORPORATE
1912 1919 1991
ANYAWOR HAT HAMP BRAN By:
483911 INDIANA Renee C. Llewellyn, Assistant Secretary
LSEN ANTON
LMS-12873 LMIC OCIC WAIC Multi Co 02/24
CALIFORNIA ACKNOWLEDGMENT CIVIL CODE § 1189
(88838888888848:8888888880888888888808088888088B888888888888838888898888898889898888888888838988868888888888888988808080808080888888888886889888883818 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California
County of Orange
on 06/18/2025 before me, Mary Habib, Notary Public
Date Here Insert Name and Title of the Office,
personally appeared Amr Hamed
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the
wwwwwwww
MARY HABIB laws of the State of California that the foregoing COMM. #2471181 paragraph is true and correct.
NOTARY PUBLIC • CALIFORNIA
OR/.NGE COUNTY
Comm. Expires Nov. 13, 2027 WITNESS my hand and official seal. signature Mortalil
Place Notary Seal and/or Stamp Above Signature of Notary Public - OPTIONAL
Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.
Description of Attached Document
Title or Type of Document:
Document Date: Number of Pages:
Signer(s) Other Than Named Above: _
Capacity(ies) Claimed by Signer(s)
Signer's Name: Signer's Name:
• Corporate Officer - Title(s): • Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:
Signer is Representing: _ Signer is Representing: _
388888888888888888888888888888888888838888888088888080808988808 ©2019 National Notary Association