JURUPA AVE TRAILHEAD
JURUPA AVE TRAILHEAD:

MASTER PLAN
200 CITY OF RIVERSIDE

JURUPA AVE TRAILHEAD

DESIGN NARRATIVE
The proposed improvements to the area of focus include a new parking lot that will provide 31 new parking spots and accommodate equestrian trailors.

The existing Santa Ana River Trail will be slightly rerouted to take visitors to a nature play area, demonstration garden and great lawn.

A secondary path system allows the visitors to meander along the ridge to an outlook overlooking the Santa Ana River.

Additional connections are proposed to improve access
to Rutland Park just south of the site as well as the adjacent neighborhood on the western edge of the side.

NATURE

PLAYGROUND

MUSIC PLAY AREA

HORSEBACK
RIDING

OPEN MEADOW

FOR ACTIVITIES

VIEWING
TOWER

POLLINATOR GARDEN
202 203CITY OF RIVERSIDE RIVERSIDE GATEWAY PROJECT SUITE

JURUPA AVE TRAILHEAD

SUMMARY OF COMMUNITY FEEDBACK

SURVEY SUMMARY
&RPPXQLW\PHPEHUVIHOWPRVWIDYRUDEO\WRZDUGVVHHLQJÁRZHUVDQGQDWLYHSODQWVDQGVKDGHVWUXFWXUHVRUVKDGHWUHHVDWWKHWUDLOKHDG They would also like to see restrooms, lighting, and drinking fountains to use before heading onto the trail. Some respondents stated they were unfamiliar with the trailhead, or did not use the trailhead because of its lack of amenities, or because they felt unsafe in the area.

OPINION OF PROBABLE COST

PRODUCTIVE

HARD COSTS
Demonstration
Gardens
$27,000
ACTIVE
Arroyo plaza and
Play Area
Nature play area
New bike path
alignment
$263,375
$75,250
$75,000

NATURE & CULTURE
Great Lawn
Music Play Area
Planting Areas
$122,220
$90,000
$2,558,700

FACILITIES
Parking
Overlook w/signage
and benches
Decomposed granite
path
Bike Hub with
restrooms and plaza
Park Gateway and
Pedestrian connection
Interpretive Signage
Large shade structures
$273,000
$40,000
$65,000
$262,500
$75,000
$75,000
$300,000

SOFT COSTS
Design Drawings 10%
General Conditions 15%
Annual Escalation 7%
Design Contingency 10%
Prevailing Wage 12%
General Contractor Fee 10%
Construction Management 20%
$344,163.60
$645,306.75
$301,143.15
$430,204.50
$516,245.40
$430,204.50
$860,409.00
$7,829,721.90

TOTAL HARD COSTS
= $4,302,045.00

TOTAL SOFT COSTS
= $3,527,676.90
=
+
205RIVERSIDE GATEWAY PROJECT SUITE

JURUPA AVE TRAILHEAD
70 FT

NATIVE PLAE PLANTINGNTINGG

SEEDED ARED AREAA

GREATAT LAWNLAW - MOOWED W

PERIOERIODICALCALLY

DECOMDECOMPOSEDPOSED GRANGR ITE T

PEDESPEDESPEDESPEDESTRIANTRIANTRIANTRIAN PATHPATHPATHPATH

ADJACADJ ENT TO BIKBIKEWAYEWAY
MUSICMUS PLAY + DGDG

W/ TRW/ T EES

OUTLOLOOK W/OK W/

BENCHCHES & ES & SIGSIGNAIGNAGEEG

BOULDERS -

VEHICH ULAR BARRIBARRIERER

DEMONDEMONSTRATSTRA ION

GARDEGARDENN

BIKE KE HUB WHUB W//

RESTRES OOMS

NEW VNEW VEGETAGET TION

BUFFEBUFFERR

PARK PAR GATEWAY

MOMENENTT

EMERGENCY ACCESS

VEHICULAR ACCESS

PEDESTRIAN ACCESS

VEHICULAR ACCESS GATE /

SART SAFETY CHECK POINT

PEPEDESTRIANTR

CONNEN CTIONCT TO TO
JURUPRUPA AVEAA V ENUE.UE

NATIVVE PLAE NT SEEDEDD AREA
N

BIOLOB GICAL AVOIAVOIDANCE ZONE
B

LARGE SHADE STRUCTURES

NATURE PLAY
ARROYO PLAZA + PLAY AREA

INTERPRETIVE

SIGNAGE RAILING

SIDEWALK W/ PLANTED
BUFFER

ENTRY MONUMENT SIGN

NEW BIKE PATH ALIGNMENT

DECOMPOSED GRANITE PATH

VEHICULAR ACCESS GATE /SART

SAFETY CHECK POOINT
VAN BUREN BLVD .

HOLE LAKE
JURUPA AVE.

JURUPA AVE TRAILHEAD

JUJURUPAPA AAAVVVENUEE TRAIAILHLHEAEAD MASTER PPPLALANN

JUJURURURURUPAPAPA AAAAAVEVEVEEEVVV NUNUUNUNUNNUEEEEE TRTRTTTRTRAIAILHLHEAEAD D - MAASTSTSTSTSTERERERERR PPPPPPPPLALALALLALALALAANNNNNNNNNNN