RIVERSIDE

PUBLIC UTILITIES

PHYSICAL SECURITY
PLAN

PUBLIC REPORT ON RIVERSIDE PUBLIC UTILITIES

POWER UTILITY PHYSICAL SECURITY PROGRAM FOR

DISTRIBUTION-LEVEL FACILITIES

November 1, 2025

Contents of this document have been redacted in public forum

2 TABLE OF CONTENTS
I. OVERVIEW ...................................................................................................................................... 4 A. GOAL OF POWER UTILITY SECURITY PLAN .............................................................................. 4 B. DESCRIPTION OF RIVERSIDE PUBLIC UTILIES ........................................................................... 4 C. RESULTS OF POWER UTILITY SECURITY PLAN ASSESSMENT ................................................. 4 II. BACKGROUND ................................................................................................................................ 5 III. PLAN DEVELOPMENT PROCESS .................................................................................................... 6 A. PHYSICAL SECURITY PRINCIPLES .............................................................................................. 6 B. POWER UTILITY SECURITY PLAN DEVELOPMENT PROCESS ................................................... 6 STEP 1: ASSESSMENT/PLAN DEVELOPMENT ................................................................................ 7 STEP 1A: IDENTIFY COVERED DISTRIBUTION FACILITIES ............................................................. 7 STEP 1B: PERFORM RISK ASSESSMENT ......................................................................................... 7 STEP 1C: DEVELOP MITIGATION PLAN .......................................................................................... 7 STEP 2: INDEPENDENT REVIEW ..................................................................................................... 7 STEP 3: VALIDATION ....................................................................................................................... 8 STEP 4: ADOPTION ......................................................................................................................... 8 STEP 5: MAINTENANCE .................................................................................................................. 8 STEP 6: REPEAT PROCESS .............................................................................................................. 8 IV. IDENTIFICATION OF COVERED DISTRIBUTION FACILIITES (STEP 1A)........................................... 9 A. IDENTIFICATION FACTORS ........................................................................................................ 9 B. IDENTIFICATION ANALYSIS ..................................................................................................... 10 V. RISK ASSESSMENT (STEP 1B) ....................................................................................................... 12 A. METHODOLOGY ...................................................................................................................... 12 B. MITIGATION MEASURES STUDIED .......................................................................................... 12 C. RISK ASSESSMENT ................................................................................................................... 13 VI. COVERED DISTRIBUTION FACILITY MITIGATION PLANS (STEP 1C) ............................................ 18 3 VII. INDEPENDENT EVALUATION AND RESPONSE (STEP 2) ............................................................. 19 A. REQUIREMENTS FOR QUALIFIED THIRD-PARTY REVIEW ...................................................... 19 B. IDENTIFICATION OF THIRD-PARTY REVIEWER ....................................................................... 20 C. PUBLIC RESULTS OF THIRD-PARTY EVALUATION.................................................................. 20 D. RIVERSIDE PUBLIC UTILITIES RESPONSE ................................................................................ 22 VIII. VALIDATION (STEP 3) ................................................................................................................... 24 A. SELECTION OF QUALIFIED AUTHORITY .................................................................................. 24 B. Plan as adequate.RESULTS OF QUALIFIED AUTHORITY REVIEW ..................................... 24 IX. ADOPTION (STEP 4) ...................................................................................................................... 24 X. MAINTENANCE (STEP 5) ............................................................................................................... 24 XI. REPEAT PROCESS (STEP 6) .......................................................................................................... 24

APPENDIX – A: CONDITIONAL ASSESSMENT
APPENDIX – B: RISK ASSESSMENT
APPENDIX – B.1: RISK ASSESSMENT WORKSHEETS
APPENDIX – B.2: RISK ASSESSMENT CUSTOMER OUTAGE COSTS
APPENDIX – C: MITIGATION PLAN
APPENDIX – D: QUALIFIED THIRD-PARTY SUGGESTIONS - RPU RESOLUTIONS Confidential
4 I. OVERVIEW
A. GOAL OF POWER UTILITY SECURITY PLAN
Ensuring the safety of its facilities is a top priority for Riverside Public Utilities (RPU), and RPU prioritizes safety in all aspects of its design, operation, and maintenance practices. The overarching goal of this Power Utility Security Plan is to describe RPU’s risk management approach toward distribution system physical security, with appropriate consideration of resiliency, impact, and cost.

RPU recognizes the importance of securing the safety and reliability of its electric system and RPU offers the following in response to CPUC Decision 19-01-018 for “Covered Distribution Facilities”.

B. DESCRIPTION OF RIVERSIDE PUBLIC UTILIES
Established in 1895, Riverside Public Utilities (RPU) provides high quality, reliable services to over 81 square miles to 113,000 metered electric customers and almost 67,000 metered water customers throughout Riverside. A dedicated staff of almost 600 people operate, maintain, and support a complex electric and water infrastructure that is worth more than $3.3 billion dollars1. RPU owns 13,912 distribution transformers, 16 substations, more than 1,300 circuit miles of distribution cables connecting them with more than 22,000 poles overhead and more systems underground. The transmission system has almost 100 miles of cable. The 16 substations that serve each neighborhood in the city, have a total of 65 transformers and 54 switchgears.

C. RESULTS OF POWER UTILITY SECURITY PLAN ASSESSMENT
Riverside Public Utilities gathered the requisite information to determine which of its 16 substations meet one or more of the CPUC’s criteria for a “Covered Distribution Facilities” as defined in the CPUC Decision 19-01-018. Of the 16 facilities, only 3 substations met one or more of the CPUC’s identification criteria. Out of these 3 substations, after conducting a Risk Assessment on each one of them, it was determined that each one should implement a Mitigation Plan, as detailed in sections V and VI of this Physical Security Plan.

This physical security plan has been reviewed by a qualified third party, and RPU has incorporated their comments as applicable.

1 Popular Annual Financial Report Page 6 Capital Assets available at:
https://riversideca.gov/finance/PDF/PAFR%20Final%20FY24.pdf Confidential
5 II. BACKGROUND
On April 16, 2013, one or more individuals attacked equipment located within Pacific Gas and Electric Company’s (PG&E) Metcalf Transmission Substation, ultimately damaging 17 transformers. These individuals also cut nearby fiber-optic telecommunication cables owned by AT&T. In response to the attack, the Federal Energy Regulatory Commission (FERC) directed the North American Electric Reliability Corporation (NERC) to develop new physical security requirements, resulting in the creation of CIP-014.

At the state level, Senator Jerry Hill authored SB 699 (2014), directing the CPUC to “consider adopting rules to address the physical security risks to the distribution systems of electrical corporations.” In response to SB 699, the CPUC’s Safety and Enforcement Division, Risk Assessment and Safety Advisory Section (RASA) prepared a white paper proposing a new requirement for investor-owned utilities (IOUs) and publicly owned utilities (POUs) to develop security plans that would identify security risks to their distribution and transmission systems and propose methods to mitigate those risks. The CPUC hosted a series of workshops to better understand the state of utility physical security protections and to seek input on refining their proposal.

To support a statewide improvement of how utilities address distribution level physical security risks, the California Municipal Utilities Association (CMUA), which is the statewide trade association for POUs, coordinated with the state’s IOUs to develop a comprehensive Straw Proposal2 (Joint IOU/POU Straw Proposal) for a process to identify at-risk facilities and, if necessary, develop physical security mitigation plans. The Joint POU/IOU Straw Proposal set out a process for the following: (1) identifying if the utility has any high priority distribution facilities; (2) evaluating the potential risks to those high priority distribution facilities; (3) for the distribution facilities where the identified risks are not effectively mitigated through existing resilience/security measures, developing a mitigation plan; (4) obtaining third party reviews of the mitigation plans; (5) adopting a document retention policy; (6) ensuring a review process established by RPU’s governing board; and (7) implementing information sharing protocols.

RASA filed a response3 to the Joint IOU/POU Straw Proposal that recommended various modifications and clarifications, including a six-step process. Additionally, RASA recommended that the utility mitigation plans include: (1) an assessment of supply chain vulnerabilities; (2) training programs for law enforcement and utility staff to improve communication during physical security events; and (3) assessment of any nearby communication utility infrastructure that supports priority distribution substations.

2 Straw Proposal available at:
https://www.cpuc.ca.gov/uploadedFiles/CPUCWebsite/Content/Safety/Risk_Assessment/physicalsecurity/R1506009- Updated%20Joint%20Straw%20Proposal%20and%20Cover%20083117%20Filing.pdf. 3 RASA Response available at:
https://www.cpuc.ca.gov/uploadedFiles/CPUCWebsite/Content/Safety/Risk_Assessment/physicalsecurity/Final%20Staff%20Recomm endation%20for%20Commission%20Consideration%20010318.pdf.

Confidential
6 In early 2019, the CPUC approved Decision (D.) 19-01-018, which adopted the Joint IOU/POU Straw Proposal as modified by the RASA proposal, with additional clarifications and guidance. D.19-01-018 clarified that where there is a conflict between the Straw Proposal and the RASA proposal, then it is the rule in the RASA proposal that controls.4
D.19-01-018 asserted that the POUs should utilize the Utility Security Plan process described therein.

RPU is following the process and issuing this report at this time to reflect its existing commitment to safety and to protecting its ratepayers’ investment by taking reasonable and cost-effective measures in an effort to safeguard key assets of its distribution system.

III. PLAN DEVELOPMENT PROCESS
A. PHYSICAL SECURITY PRINCIPLES
The Joint IOU/POU Straw Proposal seeks to support the creation of a risk management approach toward power distribution system physical security, with appropriate considerations of resilience, impact, and cost. In order to accomplish this risk-based approach, the Joint IOU/POU Straw Proposal identifies several principles to guide the development of each individual utility’s program. These principles are the following:

1. Distribution systems are not subject to the same physical security risks and associated consequences, including threats of physical attack by terrorists, as the transmission system.

2. Distribution utilities will not be able to eliminate the risk of a physical attack occurring, but certain actions can be taken to reduce the risk and/or consequences of a significant attack.

3. A one size fits all standard or rule will not work. Distribution utilities should have the flexibility to address physical security risks in a manner that works best for their systems and unique situations, consistent with a risk management approach.

4. Protecting the distribution system should consider both physical security protection and operational resiliency or redundancy.

5. The focus should not be on all Distribution Facilities, but only those whose risks dictate additional measures.

6. Planning and coordination with the appropriate federal and state regulatory and law enforcement authorities will help prepare for attacks on the electrical distribution system and thereby help reduce or mitigate the potential consequences of such attacks.

B. POWER UTILITY SECURITY PLAN DEVELOPMENT PROCESS

4 D.19-01-018 at 43, footnote 58 (“Should there be any question of which shall predominate should there be any incongruity or conflict between a utility or SED RASA recommended rule, the SED RASA rule shall apply.”).

Confidential
7 RPU utilized a multi-step process to develop this Power Utility Security Plan that is consistent with the Joint IOU/POU Straw Proposal and D.19-01-018. The relevant six steps of that process are the following:

STEP 1: ASSESSMENT/PLAN DEVELOPMENT
RPU staff and consultants prepared a Draft Power Utility Security Plan through the process set forth in Steps 1A, 1B, and 1C.

STEP 1A: IDENTIFY COVERED DISTRIBUTION FACILITIES
RPU evaluated all distribution-level facilities in its service territory that are subject to its control to determine if any facility meets D.19-01-018’s definition of a “Covered Distribution Facility” using the seven factors identified in the Joint IOU/POU Straw Proposal.

STEP 1B: PERFORM RISK ASSESSMENT
For every individual Covered Distribution Facility identified pursuant to Step 1A, RPU performed an evaluation of the potential risks associated with a successful physical attack on that Covered Distribution Facility, and whether existing grid resiliency, back-up generation, and/or physical security measures appropriately mitigate identified risks.

STEP 1C: DEVELOP MITIGATION PLAN
If there are any individual Covered Distribution Facilities where the Risk Assessment performed pursuant to Step 1B finds that the existing mitigation and/or resiliency measures do not effectively mitigate the identified risks, then RPU will develop a Mitigation Plan for that Covered Distribution Facility. The Mitigation Plan will use a risk-based approach to select reasonable and cost- effective measures that can either be security focused (e.g., walls or alarms) or resiliency focused (e.g., adequate spare parts).

STEP 2: INDEPENDENT REVIEW
For every Power Utility Security Plan cycle, RPU will document the results of the identification process, risk assessment, and Mitigation Plan development performed pursuant to Steps 1A, 1B, and 1C. This documentation in combination with narrative description in Section IX below, constitutes RPU’s Draft Power Utility Security Plan. Each Draft Power Utility Security Plan is submitted to a Qualified Third Party for Independent Review. The Qualified Third-Party Reviewer will then issue an evaluation that identifies any potential deficiencies in the Draft Power Utility Security Plan as well as Confidential
8 recommendations for improvements. RPU will then modify its plan to address any identified deficiencies or recommendations or will document the reasons why any recommendations were not adopted. The combination of the Draft Power Utility Security Plan, the non-confidential conclusions of the Qualified Third-Party Reviewer, and RPU’s responses to the Qualified Third-Party Review will constitute RPU’s Utility Security Plan.

STEP 3: VALIDATION
RPU will submit its Power Utility Security Plan to a qualified authority for review. Such entity will provide additional feedback and evaluation of RPU’s Power Utility Security Plan and, to the extent that this entity is authorized, such entity deems the Power Utility Security Plan as adequate.

STEP 4: ADOPTION
RPU’s Power Utility Security Plan will be presented to the City of Riverside’s Board of Public Utilities and Riverside City Council for approval.

STEP 5: MAINTENANCE
RPU will refine and update the Power Utility Security Plan as appropriate and as necessary to preserve plan integrity.

STEP 6: REPEAT PROCESS
RPU will repeat this six-step process at least once every five years.

Confidential
9 IV. IDENTIFICATION OF COVERED DISTRIBUTION FACILIITES (STEP 1A)
As described in Section III, Step 1A of the Utility Security Plan process involves assessing all distribution-level facilities that are subject to the control of RPU to determine which facilities are “Covered Distribution Facilities” subject to the need for a risk assessment. This Section describes the factors that RPU used to evaluate its distribution facilities and the results of its evaluation.

A. IDENTIFICATION FACTORS
The Joint IOU/POU Straw Proposal defines seven screening factors to determine if a facility is a “Covered Distribution Facility.” Some factors require additional definitions and/or clarifications in order to be applied to RPU’s facilities. Table 1 provides the Joint IOU/POU Straw Proposal’s Identification Factors as modified/clarified by CMUA and adopted by RPU.

Table 1: Joint IOU/POU Straw Proposal's Identification Factors. Adopted by RPU No. Joint IOU/POU Straw Proposal Description Additional Clarification 1 Distribution Facility necessary for crank path, black start, or capability essential to the restoration of
regional electricity service that are not subject to
the California Independent System Operator’s
(CAISO) operational control and/or subject to
North American Electric Reliability Corporation
(NERC) Reliability Standard CIP-014-2 or its
successors
No additional clarification.
2 Distribution Facility that is the primary source of
electrical service to a military installation essential to national security and/or emergency response
services (may include certain airfields, command
centers, weapons stations, emergency supply
depots)
No additional clarification.
3 Distribution Facility that serves installations
necessary for the provision of regional drinking
water supplies and wastewater services (may
include certain aqueducts, well fields, groundwater
pumps, and treatment plants)
An installation provides “regional
drinking water supplies and wastewater
services” if it is the primary source of
drinking water supply or wastewater
services for over 40,000 customer
accounts for an area with a population of
over 100,000.
4 Distribution Facility that serves a regional public
safety establishment (may include County
Emergency Operations Centers; county sheriff’s
department and major city police department
headquarters; major state and county fire service
headquarters; county jails and state and federal
prisons; and 911 dispatch centers)
RPU defines “regional public safety
establishment” as any of the following:
(1) Headquarters of a major police or fire
department serving 1.5 million
population with at least 1,000 sworn
officers; (2) County Sheriff’s Department
Headquarters; (3) County Emergency
Confidential
10 Operations Center; (4) County/State Fire
headquarters; (5) a California State
Prison; (5) a United States Penitentiary;
or (6) a Federal Correctional Institute.
5 Distribution Facility that serves a major
transportation facility (may include International
Airport, Mega Seaport, other air traffic control
center, and international border crossing)
In addition to the facilities listed in the
Joint IOU/POU Straw Proposal, RPU
defines a “major transportation facility”
as any transportation facility that has (1)
an average of 600 or more flights per
day; or (2) over 50,000 passengers
arriving or departing per day.
6 Distribution Facility that serves as a Level 1 Trauma Center as designated by the Office of Statewide
Health Planning and Development
No additional clarification.
7 Distribution Facility that serves over 60,000 meters No additional clarification.

B. IDENTIFICATION ANALYSIS
In performing this identification analysis, RPU is assessing all distribution level facilities that are subject to its exclusive control, or if the facility is jointly owned, the joint ownership agreement identifies RPU as the entity responsible for operation and maintenance. The specific types of facilities include all RPU’s distributing substations, as well as Riverside Energy Resource Center (RERC) switching station, and two customer substations – ROHR substation for a co-generation plant, and Clearwater substation for a sewer plant.

Based on this scope, RPU has identified all these 16 substations that are subject to this identification analysis. Of these 16 substations, three substations fall within one of the categories listed above. Table 25 summarizes the results of RPU’s identification analysis for the “Covered Distribution Facilities”. Facilities that meet the criteria for any category are indicated by an ‘X’.

Table 2: Results for Identification of Covered Distribution Facilities Facility ID

1. Crank
Path,
Black
Start

2. Military
Installation

3. Regional
Drinking
Water/
Wastewater
Services

4. Regional
Public
Safety

5. Major
Transportation
Facility

6. Level 1
Trauma
Center

7. Over
60,000
Meters
Facility 1 –
La Colina X
Facility 2 –
Mt. View X
Facility 3 –
Riverside X X

5 Due to security reasons, names of the facilities have been removed.

Confidential
11 Facility 4 –
RERC1
Facility 5 –
ROHR
Facility 6 -
Clearwater

Facility 7 –
Plaza

Facility 8 –
Casa Blanca

Facility 9 –
Freeman

Facility 10 - Kaiser
Facility 11 –
Lynn

Facility 12 –
Orangecrest

Facility 13 –
Springs

Facility 14 –
University

Facility 15 –
Hunter

Facility 16 -
Alumax

1. RERC has been removed as a covered distribution facility. It is not on the generation blackstart cranking path for CAISO.

Confidential
12 V. RISK ASSESSMENT (STEP 1B)
A. METHODOLOGY
Pursuant to the process identified in the Joint IOU/POU Straw Proposal and D.19-01-018, RPU assessed the potential risks associated with a successful physical attack on each of the Covered Distribution Facilities identified in Section IV above. For purpose of this analysis, a physical attack is limited to the following: (1) theft; (2) vandalism/sabotage; and (3) discharge of a firearm. A “successful physical attack” is limited to circumstances where a theft, vandalism/sabotage, and/or the discharge of a firearm has directly led to the failure of any elements of the Covered Distribution Facility that are necessary to provide uninterrupted service to the specific load identified in Section IV.

In order to perform this risk analysis, RPU evaluates the relative risk that (1) a physical attack on a Covered Distribution Facility will be successful considering the protective measures in place; or (2) that the impacts of a successful attack will be mitigated due to resiliency and other measures in place.

B. MITIGATION MEASURES STUDIED
D.19-01-018 identifies the specific mitigation measures that a utility should consider when performing this risk analysis.

Table 3 lists these mitigation measures and provides additional clarifications that are adopted by RPU from CMUA that are necessary to apply these measures to the RPU’s territory.

Table 3: Description of Mitigation Measures Studied
Measure D.19-01-018 Description Additional Clarification 1 The existing system resiliency and/or
redundancy solutions. (e.g., switching the load
to another substation or circuit capable of
serving the load, temporary circuit ties, mobile
generation and/or storage solutions).

No additional clarification.
2 The availability of spare assets to restore a
particular load.

No additional clarification.
3 The existing physical security protections to
reasonably address the risk.

No additional clarification.
4 The potential for emergency responders to
identify and respond to an attack in a timely
manner.

Each facility is evaluated based on the
likelihood that a law enforcement officer
would generally be able to arrive at the
Covered Distribution Facility within 15
minutes of a report from the public of a
break-in or attack, or of RPU notifying the
law enforcement agency of triggering of
an alarm at the facility.

Confidential
13 5
Location and physical surroundings, including
proximity to gas pipelines and geographical
challenges, and impacts of weather.

RPU evaluated this element based on the
proximity of the Covered Distribution
Facility to populated areas and the extent
to which the interior of the facility is
shielded from view and access due to
walls, vegetation, or other physical
obstructions.
6 History of criminal activity at the Distribution
Facility and in the area.

RPU evaluated the property crime rates in
the immediate vicinity of the Covered
Distribution Facility and compared those
crimes rates to property crime rates for
the county and the state to determine if
the area is subject to a higher-than-
average incidence of property related
crimes.
7 The availability of other sources of energy to
serve the load (e.g., customer owned back-up
generation or storage solutions).

No additional clarification.
8 The availability of alternative ways to meet the
health, safety, or security.

No additional clarification.
9 Requirements served by the load (e.g., back up
command center or water storage facility).

No additional clarification.

C. RISK ASSESSMENT
Based on the process described in the Joint IOU/POU Straw Proposal and the direction provided in D.19-01-018, RPU has determined that of the three (3) Covered Distribution Facilities identified in Section IV, the existing programs and measures effectively mitigate the risks of a physical attack for all the Covered Distribution Facilities.

A risk evaluation was conducted, using existing conditions and mitigation measures present at each substation, to ascertain the risk level for each facility.

To this end, a Conditional Assessment of the existing substation conditions was conducted at each facility, including electrical system conditions, physical security conditions, crime rates of the particular areas, as well as history of crime at the substations.

The result of this conditional assessment shows that all three covered facilities feature high resiliency even under the loss of a single element due to its redundant electrical configuration, as well as strongly secured facilities due to physical protection measures. The electrical system has been built to continue operating successfully at rated capacity even under the loss of a single element, i.e., N-1 contingency scenario. The distribution system is fully redundant with back up feeds for the loss of any circuit of the system. There is also an on-going conversion from ceramic insulators to polymer insulators. Finally, the SCADA system is being upgraded to include a Distribution Automation system to remotely operate distribution Confidential
14 switches to expedite power restoration. Appendix A of this report provides a more detailed description of the survey conducted for this Conditional Assessment of the facilities covered.

A detailed Risk Analysis was conducted at each of the four covered substations. Details of this analysis can be found in Appendix B of this report. The analysis concludes that the level of risk for any threat of attack (theft, vandalism/sabotage, or firearm discharge) at any of the three facilities is either Low or Mid. This is mainly due to the strong physical security measures in place. However, if an attack were to defeat the security measures in place, the strong resiliency and redundant characteristic of the electrical system will minimize the impact of the attack in terms of outage time to critical loads. These features of all three covered substations make any probability and/or impact of a successful attack relatively low. However, there are areas where improvements could further enhance physical security at these substations.

Mitigating measures have been recommended for these cases.

The tables 4 through 7 below summarize the results of the Risk Assessment conducted at each of the covered facilities and present the risk level at each of the areas where vulnerability of a physical attack to the facility has been analyzed.

Confidential
15 Table 4: Risk Index Results for La Colina Substation

SUCCESSFUL PHYSICAL ATTACK1. Grid ResiliencyLOW1.1 Capability of Switching the load to another substation LOW1.2 Circuit Ties Capable of Serving the load LOW1.3 Mobile Transformer LOW2. Spare AssetsLOW2.1 Minimum Critical Spare Parts Stock on site LOW2.2 Spare Parts Stock in a warehouse LOW3. Existing Physical SecurityLOW3.1 Concrete block masonry walls/Chain Link Fence LOW3.2 Security Cameras LOW3.3 Lighting LOW3.4 Motion Detection LOW3.5 Access Control LOW4. Emergency RespondersLOW4.1 Local Police Agreement for Emergencies MID4.2 Distance from police/fire dept. and time to respond LOW5. LocationLOW5.1 Geographical Challenges LOW5.2 Impacts of Weather Events LOW6. Criminal HistoryLOW6.1 Property Crime Rates at Substation Area LOW6.2 Substation Property Crime Incident last 5 years LOW7. Back Up GenerationLOW7.1 Customer-Owned Back-up Generation LOW7.2 Essential Loads with Back-up Generation LOW8. Alternate Ways for Health, Safety, and SecurityLOW8.1 Condition of existing assets and structures LOW8.2 Private Security Services MID8.3 Additional measures to preserve Safety of Staff/Visitors LOW9. Critical LoadsLOW9.1 Critical Loads LOW LA COLINA SUBSTATIONRisk Index1The existing system resiliency and/or redundancy solutions (e.g., switching the load to another substation or circuit capable of serving the load, temporary circuit ties, mobile generation and/or storage solutions).2The availability of spare assets to restore a particular load.3The existing physical security protections to reasonably address the risk.4The potential for emergency responders to identify and respond to an attack in a timely manner.5Location and physical surroundings, including proximity to gas pipelines and geographical challenges, and impacts of weather.9Requirements served by the load (e.g., back up command center or water storage facility). 6History of criminal activity at the Distribution Facility and in the area.7The availability of other sources of energy to serve the load (e.g., customer owned back-up generation or storage solutions).8The availability of alternative ways to meet the health, safety, or security.

Confidential
16 Table 5: Risk Index Results for Mt. View Substation

SUCCESSFUL PHYSICAL ATTACK1. Grid ResiliencyLOW1.1 Capability of Switching the load to another substation LOW1.2 Circuit Ties Capable of Serving the load LOW1.3 Mobile Transformer LOW2. Spare AssetsLOW2.1 Minimum Critical Spare Parts Stock on site LOW2.2 Spare Parts Stock in a warehouse LOW3. Existing Physical SecurityLOW3.1 Concrete block masonry walls/Chain Link Fence LOW3.2 Security Cameras LOW3.3 Lighting LOW3.4 Motion Detection LOW3.5 Access Control LOW4. Emergency RespondersLOW4.1 Local Police Agreement for Emergencies MID4.2 Distance from police/fire dept. and time to respond LOW5. LocationLOW5.1 Geographical Challenges LOW5.2 Impacts of Weather Events LOW6. Criminal HistoryLOW6.1 Property Crime Rates at Substation Area LOW6.2 Substation Property Crime Incident last 5 years LOW7. Back Up GenerationLOW7.1 Customer-Owned Back-up Generation LOW7.2 Essential Loads with Back-up Generation LOW8. Alternate Ways for Health, Safety, and SecurityLOW8.1 Condition of existing assets and structures LOW8.2 Private Security Services MID8.3 Additional measures to preserve Safety of Staff/Visitors LOW9. Critical LoadsLOW9.1 Critical Loads LOW9Requirements served by the load (e.g., back up command center or water storage facility). 6History of criminal activity at the Distribution Facility and in the area.7The availability of other sources of energy to serve the load (e.g., customer owned back-up generation or storage solutions).8The availability of alternative ways to meet the health, safety, or security. 3The existing physical security protections to reasonably address the risk.4The potential for emergency responders to identify and respond to an attack in a timely manner.5Location and physical surroundings, including proximity to gas pipelines and geographical challenges, and impacts of weather.

Risk Index1The existing system resiliency and/or redundancy solutions (e.g., switching the load to another substation or circuit capable of serving the load, temporary circuit ties, mobile generation and/or storage solutions).2The availability of spare assets to restore a particular load.MT. VIEW SUBSTATION Confidential
17 Table 6: Risk Index Results for Riverside Substation

RIVERSIDE SUBSTATION

SUCCESSFUL

PHYSICAL
ATTACK

Risk Index
1 The existing system resiliency and/or
redundancy solutions (e.g., switching the load
to another substation or circuit capable of
serving the load,
temporary circuit ties, mobile
generation and/or storage
solutions)

1. Grid Resiliency LOW

1.1 Capability of Switching the load to another substation LOW

1.2 Circuit Ties Capable of Serving the load LOW

1.3 Mobile Transformer LOW
2 The availability of spare assets
to restore a particular load.

2. Spare Assets LOW

2.1 Minimum Critical Spare Parts Stock on site LOW

2.2 Spare Parts Stock in a warehouse LOW
3 The existing physical security
protections to reasonably
address the risk.

3. Existing Physical Security LOW

3.1 Concrete block masonry walls/Chain Link Fence LOW

3.2 Security Cameras LOW

3.3 Lighting LOW

3.4 Motion Detection LOW

3.5 Access Control MID
4 The potential for emergency
responders to identify and
respond to an attack in a timely
manner.

4. Emergency Responders MID

4.1 Local Police Agreement for Emergencies MID

4.2 Distance from police/fire dept. and time to respond LOW 5 Location and physical
surroundings, including
proximity to gas pipelines and
geographical challenges, and
impacts of weather.

5. Location LOW

5.1 Geographical Challenges LOW

5.2 Impacts of Weather Events LOW
6 History of criminal activity at the
Distribution Facility and in the
area.

6. Criminal History MID

6.1 Property Crime Rates at Substation Area MID

6.2 Substation Property Crime Incident last 5 years LOW 7 The availability of other sources
of energy to serve the load (e.g.,
customer owned back-up
generation or storage solutions).

7. Back Up Generation LOW

7.1 Customer-Owned Back-up Generation LOW

7.2 Essential Loads with Back-up Generation LOW
8 The availability of alternative
ways to meet the health, safety,
or security.

8. Alternate Ways for Health, Safety, and Security MID

8.1 Condition of existing assets and structures LOW

8.2 Private Security Services MID

8.3 Additional measures to preserve Safety of Staff/Visitors MID 9 Requirements served by the load
(e.g., back up command center
or water storage facility).

9. Critical Loads LOW

9.1 Critical Loads LOW

Confidential
18 VI. COVERED DISTRIBUTION FACILITY MITIGATION PLANS
(STEP 1C)
Pursuant to the process identified in the Joint IOU/POU Straw Proposal and D.19-01-018, RPU has determined that the present level of risk at the three covered substations is not critical. However, there are some areas where the vulnerability of a physical attack to the facility could be improved.

All Mid-risk level cases were addressed with mitigation measures, and some Low-risk level cases, where the assessment identify room for improvements, also mitigation measures were presented, even though the risk was rated low.

These recommendations are discretionary and not mandatory for the security fitness of the substations. Appendix C contains a detailed analysis of the recommended mitigating measures for these covered facilities. Table 8 below presents a summary of the mitigation measures per facility.

Table 7: Recommended Mitigation Measures.

AREAS OF ACTION MITIGATION MEASURES

FACILITY
F1. La Colina
Sub
F2. Mt.

View Sub
F3.

Riverside
Sub

DETERRENCE
A1 Improve security signage   
A2 Improve lighting in certain areas inside the substation    A3 Improve pad locks and chains   
A4 Install/Improve screening on fencing/wall   

DETECTION
A5 Complement CCTV with exterior monitoring capability    A6 Improve the 24/7 Monitoring of the Security System    A7 Improve gate opening alarm and monitoring   
Confidential
19 A8 Vegetation management program   
DELAY
A9 Relocate structures away from perimeter wall   
A10 Restricted keyed locks for all transformers oil drain valves   
COMMUNICATE A11 Install speakers/PA system   
RESPONSE A12 Improve relationship with RPD   

VII. INDEPENDENT EVALUATION AND RESPONSE (STEP 2)
A. REQUIREMENTS FOR QUALIFIED THIRD-PARTY REVIEW
D.19-01-018 specifies the following criteria for a Qualified Third-Party Reviewer:

Independence: A Qualified Third-Party Reviewer cannot be a division of the RPU. A governmental entity can select as the third-party reviewer another governmental entity within the same political subdivision, so long as the entity has the appropriate expertise, and is not a division of the POU that operates as a functional unit, i.e., a municipality could use its police department as its third-party reviewer if it has the appropriate expertise.

Adequate Qualifications: A Qualified Third Party Reviewer must be an entity or organization with electric industry physical security experience and whose review staff has appropriate physical security expertise, which means that it meets at least one of the following: (1) an entity or organization with at least one member who holds either an ASIS International Certified Protection Professional (CPP) or Physical Security Professional (PSP) certification; (2) an entity or organization with demonstrated law enforcement, government, or military physical security expertise; or (3) an entity or organization approved to do physical security assessments by the CPUC, Electric Reliability Organization, or similar electrical industry regulatory body.

Confidential
20 B. IDENTIFICATION OF THIRD-PARTY REVIEWER
RPU has selected, as its Third-Party Reviewer, Riverside Police Department (RPD). RPD has significant experience in Threat, Risk, and Vulnerability Assessments. RPD also provides high- quality, professional police services to address security concerns vigilantly seeking ways to reduce the incidences of crimes through competent investigations, identification of emerging trends, and directed proactive enforcement. While RPD does have affiliation with the City of Riverside, it does not have any affiliation with Riverside Public Utilities, staying in compliance with the adequate qualifications stated in D.19-01-018.

The RPD team that conducted the third-party review was made up of the following three RPD resources:
 Kevin Townsend – Police Captain (Riverside Police Department)  Eric Meier – Police Lieutenant (Riverside Police Department)  Chad Callopy – Police Lieutenant (Riverside Police Department) C. PUBLIC RESULTS OF THIRD-PARTY EVALUATION
It is RPD’s opinion that City of Riverside Public Utilities incorporate the changes identified regarding the City of Riverside Public Utilities Physical Security Plan (PSP) report. The recommended changes are not a requirement and do not prevent RPD from agreeing with findings of the PSP.

RPU’s Third-Party reviewer, RPD has reviewed the Physical Security Plan developed by Riverside Public Utility and the following is a public summary of the conclusion and recommendations.

The PSP describes RPU’s risk management approach toward distribution system physical security, factoring in the appropriate consideration of resiliency, impact, and cost.

RPU conducted a detailed assessment of their distribution facilities to identify the “Covered” Distribution facilities that may merit special protection. For each one of the identified Covered Distribution facilities, RPU conducted a comprehensive physical security risk assessment to identify any potential threats and vulnerabilities and identified the associated mitigation measures to address the identified threats and vulnerabilities. The physical security risk assessment factored in existing grid resiliency, available back-up generation, spare parts and redundance to supply for the critical loads.

Although RPU has strong resilience due to the redundant characteristic of their electrical distribution system, the strong redundant will help minimize the impact of a potential outage causes by a physical attack but will not minimize a potential physical attack from occurring.

In RPD’s review of the PSP, several additional observations were made with regards to processes, people and technology as it relates to physical security which RPU should consider Confidential
21 implementing. The suggested recommendations focus on strengthening RPU’s physical security program to deter an event from occurring that could lead to an outage. It was also observed that exterior lighting, barbed wire on top of walls, removal of tall trees surrounding substations, gating of employee parking lots, and replacing chain link fence sections with brick walls could all offer higher levels of physical security.

The following is a summary of the observations and suggested recommendations:

Riverside Substation:
 Observations:
o Several visible signs stating “Voltage” and “No Trespassing” posted on all four sides of the facility. Entry/Exit gates to the facility are electronic and appeared as if all other doors had locks on them. The main door to the office is protected by a roll up door and I did not see any security issues. The landscaping is fine; the only potential issue I see is on the east side there are large trees that someone could climb and potentially access the property. Security cameras appear to cover all four sides of the property. Employee parking is not gated and publicly accessible.
 Recommendations:
o Although the walls are approximately 12 feet tall, consider barbed wire on the top, especially on the east side that borders Mulberry St. There are trees close enough for someone to climb and scale the adjacent brick wall. If you do not want to get barbed wire, consider removing that tree or replacing it with something that someone cannot use to help scale the wall.
o Consider gating the employee parking lot on the west side of the building. I realize this is expensive, but the employee parking lot is open to the public and not gated at all; it makes it easily accessible to transients and/or criminals looking to steal from and/or damage the RPU property.
o Lighting appears adequate inside the facility itself but consider additional exterior lights to better be able to identify suspicious behavior and as a deterrent to criminals.

La Colina
 Observations:
o Several visible signs stating “Voltage” and “No Trespassing” posted on all sides of the facility. Entry/Exit gates are electronic and well-fortified. It appears as if there are cameras covering all quadrants of the facility. There is adequate lighting within the facility itself, however; I did not see any exterior lighting. Like the 3920 Mulberry property, exterior lighting here would assist in being able to identify suspicious behavior and as a deterrent to criminals.  Recommendations:

Confidential
22 o Consider lighting on the exterior of the property. o Consider working with the apartment complex to trimming the shrubs/bushes on the rear of the property to prevent people from possibly concealing themselves within the bushes.

Mt. View
 Observations:
o Smallest of the three facilities we surveyed. Only one Entry/Exit gate on the west side of the facility. The gate is electronic and there are no security concerns. Two thirds of the facility is lined with concrete walls approximately 12 feet high. On the rear side that butts up to the railroad tracks, it is chain link fence. The chain link fence does have barb wire on it. The lighting inside the facility itself is adequate, however, does not appear to have much lighting on the exterior.  Recommendations:
o As stated in the previous facilities, the more lighting the better. o Consider exchanging the chain link fence on the side that borders the railroad tracks for a cement wall to prevent subjects from cutting through the fence line and accessing the property. It appears as if there have been previous “patch jobs” of the fence line. The reason we generally prefer block walls or metal fencing is because chain link is easily cut or otherwise damaged, giving people access to the property.
o Consider contacting BNSF and coordinating getting the trees/shrubs trimmed or removed entirely to prevent subjects from hiding and/or setting up camp against the facility.

D. RIVERSIDE PUBLIC UTILITIES RESPONSE
RPU has reviewed the comments and mitigations proposed by RPD. RPU agrees that lighting, landscaping, and more secure fencing/walls will aide in stronger physical security.

The following is a response to the points raised by RPD.

Riverside Substation:
 RPU will consider both options (cutting trees or adding barbed wire) and evaluate which one is more feasible.
 The parking lot of the west side of the substation is for the POE building and not used for Substation parking.
 To avoid light pollution and nuisance to communities surrounding the substation, exterior lighting is kept to a minimum. RPU relies on interior lighting for physical security.

Confidential
23 La Colina
 To avoid light pollution and nuisance to communities surrounding the substation, exterior lighting is kept to a minimum. RPU relies on interior lighting for physical security.  RPU will approach the apartment complex management to see if trimming of the shrubs/bushes can be achieved.

Mt. View
 To avoid light pollution and nuisance to communities surrounding the substation, exterior lighting is kept to a minimum. RPU relies on interior lighting for physical security.  RPU will plan a CIP project to replace the chain link fence with a security mesh fence or block wall.
 RPU will look to coordinate the landscaping of overgrown shrubs near the substation walls.

Confidential
24 VIII. VALIDATION (STEP 3)
A. SELECTION OF QUALIFIED AUTHORITY
This Physical Security Plan was submitted to Riverside Public Utilities (RPU) for further review and validation. RPU evaluated and validated the plan.

B. PLAN AS ADEQUATE.RESULTS OF QUALIFIED AUTHORITY REVIEW

IX. ADOPTION (STEP 4)
The RPU Physical Security Plan will be presented to the Board of Public Utilities and to the Council for adoption.

X. MAINTENANCE (STEP 5)
RPU will refine and update its Physical Security Plan as appropriate and as necessary to preserve the plan’s integrity.

XI. REPEAT PROCESS (STEP 6)
RPU will repeat this six-step process at least once every five years.