PR-2023-001469 General Plan Amendment, Specific Plan Amendment, Rezone, Site Plan Review, Tentative Tract Map 38624,
Certificate of Appropriateness
Iron Lofts
A
ppendix D
A
ppendix D – Geotechnical Investigation Proposed Residential Development – Iron Lofts NEC Mission Inn Avenue and
Commerce Street
Geotechnical Professionals, Inc
July 28, 2025
GEOTECHNICAL INVESTIGATION
PROPOSED RESIDENTIAL DEVELOPMENT – IRON LOFTS
NEC MISSION INN AVENUE AND COMMERCE STREET
RIVERSIDE, CALIFORNIA
Prepared for:
Iron Lofts, LLC
c/o Realm
1201 Dove Street
Newport Beach, California 92660
Prepared by:
Geotechnical Professionals Inc.
5736 Corporate Avenue
Cypress, California 90630
(714) 220-2211
Project No. 3044.I July 28, 2025
3044-1I-01L.doc (7/25)
July 28, 2025
Ir
on Lofts, LLC
c/o REALM
1201 Dove Street
Newport Beach, CA 92660
At
tention: Mr. Todd Cadwell
Subj
ect: Report of Geotechnical Investigation
Proposed Residential Development – Iron Lofts
NEC Mission Inn Avenue and Commerce Street
Riverside, California
GPI Project No. 3044.I
Dear M
r. Cadwell:
Tr
ansmitted herewith is our report of geotechnical investigation for the subject project. The report presents the results of our evaluation of the subsurface conditions at the site and recommendations for design and construction. This report has been updated from our 2023 report to include the current site plan and site description.
We appr
eciate the opportunity of offering our services on this project and look forward to seeing the project through its successful completion. Please contact us if you have questions regarding our report or need further assistance.
Very t
ruly yours,
Geotechnical Professionals Inc.
Pat
rick McGervey, G.E. Donald A. Cords, G.E.
Senior Engineer Principal
Di
stribution: Addressee (PDF)
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I 3044-I-01R.doc (7/25)
T
ABLE OF CONTENTS
PAGE
1.0 INTRODUCTION 1
1.1 GENERAL 1
1.2 PROJECT DESCRIPTION 1
1.3 PURPOSE OF INVESTIGATION 2
2.0 SCOPE OF WORK 3
3.0 SITE CONDITIONS 4
3.1 SURFACE CONDITIONS 4
3.2 SUBSURFACE SOILS 4
3.3 GROUNDWATER AND CAVING 4
4.0 CONCLUSIONS AND RECOMMENDATIONS 6
4.1 GENERAL 6
4.2 SEISMIC CONSIDERATIONS 6
4.2.1 General 6
4.2.2 Strong Ground Motion Potential 7
4.2.3 Potential for Ground Rupture 7
4.2.4 Liquefaction 7
4.2.5 Seismic Ground Subsidence 7
4.3 EARTHWORK 8
4.3.1 Clearing and Grubbing 8
4.3.2 Excavations 8
4.3.3 Subgrade Preparation 10
4.3.4 Material for Fill 10
4.3.5 Placement and Compaction of Fills 11
4.3.6 Shrinkage and Subsidence 11
4.3.7 Trench/Wall Backfill 11
4.3.8 Observation and Testing 11
4.4 COLLAPSE POTENTIAL 12
4.5 FOUNDATIONS 12
4.5.1 Foundation Type 12
4.5.2 Post- Tensioned Slab Foundations 12
4.5.3 Shallow Foundations 13
4.5.4 Lateral Load Resistance 14
4.5.5 Carport Foundations 14
4.5.6 Foundation Concrete 16
4.5.7 Foundation Inspection 16
4.6 SLABS-ON- GRADE 16
4.7 LATERAL EARTH PRESSURES 16
4.8 CORROSIVITY 17
4.9 S WIMMING POOL 17
4.10 DRAINAGE 18
4.11 STORM WATER INFILTRATION 18
4.12 EXTERIOR CONCRETE AND MASONRY FLATWORK 18
4.13 PAVED AREAS 18
4.14 GEOTECHNICAL OBSERVATION AND TESTING 19
5.0 LIMITATIONS 20
R
EFERENCES
AP
PENDICES
A CONE PENETRATION TESTS
B EXPLORATORY BORINGS
C LABORATORY TEST RESULTS
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I 3044-I-01R.doc (7/25)
L
IST OF FIGURES
F
IGURE NO.
1 Site Location Map
2 Site Plan (Proposed)
3 Site Plan (Existing)
A
PPENDIX A
A-1 C
one Penetrometer Diagram
A-2 to A-6 Cone Penetration Test Results
A
PPENDIX B
B-1 t
o B-6 Logs of Borings
A
PPENDIX C
C-1 t
o C-3 Direct Shear Test Results
Table 1 Corrosivity Test Results
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I 3044-I-01R.doc (7/25)
1 .0 INTRODUCTION
1. 1 GENERAL
T
his report presents the results of a geotechnical investigation performed by Geotechnical Professionals Inc. (GPI) for the proposed apartment development located at the northeast corner of Mission Inn Avenue and Commerce Street in Riverside, California. The general site location is shown on the Site Location Map, Figure 1.
1. 2 PROJECT DESCRIPTION
T
he project consists of a proposed residential development located at the subject 7-acre site.
T
he preliminary plan for the development consists of 300 residential units surrounded by at-grade parking. Building A is planned to be a 4-story wood frame structure, and Building C will consist of 2-story townhomes. Basements or subterranean levels are not planned.
P
reliminary plans indicate that the apartment building will be extend over 2 blocks along Commerce Street from Mission Inn Avenue to 5th Street. The townhomes (Building C) will front Mission Inn Avenue. Two existing historical buildings (Buildings D and E) along Commerce Street and Mission Inn Avenue will remain for renovation as part of the project. The remainder of the abandoned buildings along Commerce Street will be demolished. The preliminary site configuration is shown on Figure 2, Site Plan.
O
ther improvements include at-grade parking (378 spaces), drive aisles, carports, EV charging stations, a swimming pool, a spa, and landscape areas. In general, the apartment buildings will front Commerce Street with at-grade parking to the east.
T
he existing site was formerly a metal recycling facility until ceasing operations in 2015 and subsequent demolition. Based on information provided by you, we understand that a Remedial Action Plan (RAP) prepared for the Department of Toxic Substance Control for the site (GSI, 2020) requires an environmental cleanup program with excavations and removal from the site of the near-surface impacted soils to depths of approximately 2 feet. The recycling facility formerly maintained underground storage tanks on the western portion of the site (GSI, 2020).
B
ased on information provided by the Project Structural Engineer, VCA, we understand the new buildings will be supported on a post -tensioned mat foundation system. The apartment building loads are anticipated to be on the order of 380 psf uniformly distributed across the post-tensioned slab, with point loads of less than 150 kips and wall loads on the order of 3.5 to
5.5 kip/ft. The townhome (Building C) loads are anticipated to be on the order of 190 psf uniformly distributed across the post-tensioned slab, with point loads of less than 50 kips and wall loads on the order of 2 to 3 kips/ft.
O
ur recommendations are based upon the above structural and grading information. We should be notified if the actual loads and/or grades change during the project design to either confirm or modify our recommendations. Also, when the project grading and foundation plans become available, we should be provided with copies for review and comment.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
2 1.3 PURPOSE OF INVESTIGATION
The primary purpose of this investigation and report is to provide an evaluation of the existing geotechnical conditions at the site as they relate to the design and construction of the proposed development. More specifically, this investigation was aimed at providing geotechnical recommendations for earthwork, and design of foundations.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
3 2.0 SCOPE OF WORK
Our scope of work for this investigation consisted of review of existing information, field exploration, laboratory testing, engineering analysis, and the preparation of this report.
Our subsurface exploration for this site consisted of five cone penetration tests (CPTs) and six hollow stem auger borings. The CPTs were advanced to depths of 50 feet below existing grades and the exploratory borings were drilled to depths of 16 to 31 feet below existing grades. A description of field procedures and logs of the explorations are presented in the attached Appendices A and B. The approximate locations of the subsurface explorations are shown on the Proposed Site Plan and Existing Site Plan, Figures 2 and 3 respectively.
Laboratory soil tests were performed on selected representative samples as an aid in soil classification and to evaluate the engineering properties of the soils. The geotechnical laboratory testing program included determinations of moisture content and dry density, fines content, shear strength, collapse potential , maximum density/optimum moisture, and soil corrosivity. Laboratory testing procedures and results are summarized in Appendix C.
Soil corrosivity testing was performed by HDR. R-value testing was performed by Geologic Associates. This work was performed under subcontract to GPI. Their test results are presented in Appendix C.
Engineering evaluations were performed to provide earthwork criteria, foundation and slab design parameters and assessments of seismic hazards. The results of our evaluations are presented in the remainder of the report.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
4 3.0 SITE CONDITIONS
3.1 SURFACE CONDITIONS
The site currently contains vacant lots, single-story commercial buildings, asphalt concrete pavement in poor condition, surficial storage, and sparsely vegetated earth. Based on historical photographs (HistoricAerials), the site has been used for commercial purposes with similar structures since around 1948 (earliest available photograph).
The site is bound to the northwest by Commerce Street adjacent to the former Riverside Canal and railroad tracks, southwest by Mission Inn Avenue, northeast by 5th Street, and southeast by single family residential homes. A residential development completed in 2019 by REALM is located directly across Mission Inn Avenue.
In general, the site is relatively flat and slopes gently downward from east to west , with a change in ground surface elevation from about Elevation +881 feet to +876 feet across the site.
3.2 SUBSURFACE SOILS
Our field investigation disclosed a subsurface profile consisting of undocumented fills overlying natural soils. Detailed descriptions of the subsurface conditions encountered in our explorations are provided in Appendices A and B . A brief summary of the subsurface conditions are provided below.
To minimize contact and spreading of potentially contaminated soils, we didn’t sample within the upper 5 feet of the soil profile. Undocumented fill s soils were encountered in our explorations within the upper 5 to 5½ feet below existing site grades. Deeper undocumented fill soils may be present and associated with the existing buildings onsite, or the previous underground storage tanks within the western portion of the site. Where sampled, t he fills consist of sandy silts, silty sands and sandy clays. The fill soils consisting of silty sands and sandy silts were difficult to distinguish from the underlying natural soils. Documentation regarding the placement and compaction of the fill soils was not provided.
The natural soils consist predominantly of interbedded layers of sandy silts, silty sands, silts, clays and sands. In general, the sandy soils were loose to medium dense, and the fine grained soils were stiff to hard. The silty sands and sandy silts varied from slightly moist to very moist.
The natural soils have moderate strength and low to moderate compressibility characteristics.
The near surface soils, in general, exhibit low expansion potential. The hydrocollapse potential of tested in
-place sandy silts was found to be low (approximately 0.2 percent).
3.3 GROUNDWATER AND CAVING
Groundwater was not measured in our explorations to a depth of 50 feet below existing grade.
Groundwater was reported by others (GSI 2020) to be greater than 100 feet below existing grade in 2009 at a nearby property. Groundwater is not anticipated to be encountered during grading or to adversely impact the development.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
5 Due to the methods of drilling, the potential for caving was difficult to determine but dry, loose to medium dense, granular soils can be anticipated to exhibit caving.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
6 4.0 CONCLUSIONS AND RECOMMENDATIONS
4.1 GENERAL
Based on the results of our investigation, it is our opinion that from a geotechnical viewpoint it is feasible to develop the site as proposed.
Prior to development of the site, we understand that a remedial action plan for an environmental cleanup program will be implemented with excavations and export of the near- surface impacted soils to depths of approximately 2 feet below existing grades.
After the completion of the remedial action plan, the following geotechnical issues should be incorporated into the design and construction of the proposed structures:
• Prior to placement of fills or construct ion of the building foundations , undocumented fills, disturbed soils, and a portion of the compressible natural soils should be removed and replaced as properly compacted fill. The depth of removals for each building and details regarding grading are provided in “Earthwork” section of this report.
• The proposed buildings may be supported on post-tensioned slab foundations after completion of remedial grading. The use of conventional foundations for the apartment and townhome buildings is feasible, but we understand that post- tensioned slabs are the preferred foundation alternative for the buildings.
• Carport structures are typically supported on drilled pier foundations. Based on the density and moisture content of the soils encountered, the caving potential of the soils is considered to be moderate to high in the dry sands. The drilled pile contractor should evaluate the potential drilling conditions when planning the installation methods.
• If storm water infiltration is used for the subject site, there is a risk of settlement/subsidence in the pavement areas. Infiltration systems should not be constructed within 30 feet of the buildings. We recommend the underground infiltration systems be located at least 10 feet horizontally from the drilled pile foundations. If infiltration systems are located closer to the drilled pile foundations, there is a potential for settlement of the carports.
• Resistivity testing of the on-site soils indicates that they are severely corrosive to metal.
Our recommendations related to the geotechnical aspects of the development of the site are presented in the subsequent sections of this report.
4.2 SEISMIC CONSIDERATIONS
4.2.1 General
The site is in a seismically active area of Southern California and is likely to be subjected to strong ground shaking due to earthquakes on nearby faults.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
7 We assume the seismic design of the proposed development will be in accordance with the 2022 California Building Code (CBC) criteria. For the 2022 CBC, a Site Class D may be used.
Using the Site Class, which is dependent on geotechnical issues, and the appropriate seismic design maps, the corresponding seismic design parameters from the CBC are as follows:
2022 CBC:
SS = 1.5g SMS = Fa * SS = 1.5g SDS = 2/3 * SMS = 1.0g S1 = 0.6g SM1 = FV * S1 = 1.0g SD1 = 2/3 * SM1 = 0.68g
The above seismic code values should be confirmed by the Project Structural Engineer using the Site Class above and the pertinent internet website and tables from the building code.
4.2.2 Strong Ground Motion Potential
Based on published information (geohazards.usgs.gov), the most significant fault in the proximity of the site is the San Jacinto Fault, which is located about 7 miles from the site.
During the life of the project, the site will likely be subject to strong ground motions due to earthquakes on nearby faults. Based on the USGS website (earthquake.usgs.gov), we computed that the site could be subjected to a peak ground acceleration (PGA M) of 0.60g for a
mean magnitude 6.9 earthquake. This acceleration has been computed using the mapped Maximum Considered Geometric Mean peak ground acceleration from the ASCE 7-16 (for 2022 CBC) and a site coefficient (F PGA) based on Site Class. The predominant earthquake magnitude was determined using a 2-percent probability of exceedance in a 50-year period, or an average return period of 2,475 years. The structural design will need to incorporate measures to mitigate the effects of strong ground motion.
4.2.3 Potential for Ground Rupture
There are no known active faults crossing or projecting through the site. The site is not located in an Alquist -Priolo Earthquake Fault Zone. Therefore, ground rupture due to faulting is considered unlikely at this site.
4.2.4 Liquefaction
The State of California has not yet prepared seismic hazard zone maps for the C ity of Riverside. The site is located within an area shown as having a low potential for soil liquefaction as determined by the City of Riverside (Riverside, 2018).
Soil liquefaction is not likely to occur at the project site due to the deep groundwater.
4.2.5 Seismic Ground Subsidence
Seismic ground subsidence (not related to liquefaction induced settlements) occurs when strong earthquake shaking results in the densification of loose to medium dense sandy soils above groundwater. We estimate the total magnitude of subsidence would be up to ¾-inch.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
8 We estimate differential settlement due to subsidence across a 40 foot span may be on the order of one-half the total subsidence. The majority of the subsidence will occur in soils at depths from 10 to 35 feet below the existing ground surface.
4.3 EARTHWORK
The earthwork anticipated at the project site will consist of clearing, overexcavation of undocumented fills and disturbed soils, subgrade preparation, and placement and compaction of fill.
4.3.1 Clearing and Grubbing
The areas to be developed will be stripped of any vegetation and cleared of debris and pavements during the remedial grading for environmental cleanup. Buried obstructions below the remedial grading, such as footings, utilities, and tree roots should be removed. Deleterious material generated during the clearing operation should be removed from the site. Inert demolition debris, such as concrete and asphalt may be crushed for reuse in engineered fills, in accordance with the criteria presented in the “Materials for Fill” section of this report.
Although not encountered, we understand that underground storage tanks were located in the western portion of the site. U nderground storage tanks, cesspools or septic systems encountered during grading should be removed in their entirety. The resulting excavation should be backfilled as recommended in the “Subgrade Preparation” and “Placement and Compaction of Fill” sections of this report. As an alternative, any cesspools can be backfilled with a lean sand-cement slurry. At the conclusion of the clearing operations, a GPI representative should observe and accept the site prior to any further grading.
4.3.2 Excavations
Excavations at this site will include removals of undocumented fill soils, removals of disturbed/compressible soils, footing excavations, and trenching for proposed utility lines.
Removal Depths
We understand that the upper at least two feet of soils at the site will be removed and replaced with imported soils as part of the remedial environmental cleanup.
Prior to placement of fills or construction of the building foundations, undocumented fills , disturbed soils, and a portion of the compressible natural soils should be removed and replaced as properly compacted fill. These materials require densification to provide adequate support of foundations.
For planning purposes, we recommend the removal/replacement for the apartment building to extend to a minimum depth of 5 feet below existing grades or 3 feet below the bottom of the post-tensioned slab, whichever is deeper. For footings of minor lightly-loaded structures, such as small walls and trash enclosures, we recommend the removals and replacement extend to at least 2 feet below the bottom of footings.
Removals are not required under new or modified footings associated with the retrofit of the existing buildings (Buildings D and E). We recommend that in-place density tests be performed in the existing soils at the footing excavations by a representative of GPI to verify the soils have Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
9 a relative compaction of at least 90 percent of the maximum dry density in accordance with ASTM D1557. For planning purposes, remedial compaction of the footing bottoms should be anticipated to achieve the above compaction requirements.
If not removed during the remedial grading, we recommend removals in pavement areas extend 1-foot below existing or proposed grades, whichever is deeper.
The actual depths of removals should be determined in the field during grading by a representative of GPI.
Lateral Limits
Where space is available, the base of the removals should extend laterally a minimum of 5 feet beyond the building lines or the depth of removal, whichever is greater. Building lines include the footprint of the building and other foundation supported improvements, elevator pits, stairwells, screen walls, loading docks, ramps, and canopies. Prior to grading, the corners of the areas to be overexcavated should be accurately staked in the field by the project surveyor.
The project surveyor should confirm the limits of removal relative to the actual building to confirm that the recommended remedial excavations have been performed. GPI does not practice surveying; therefore, we cannot confirm any lines, grades, or limits of excavations.
Existing Utilities
Where not removed by the aforementioned excavations, existing utility trench backfill should be removed and replaced as properly compacted fill within the proposed building pads. The limits of removal should be confirmed in the field. We recommend known utilities be shown on the grading plan.
Caving Potential and Cuts
The sandy soils at the site are expected to have a moderate to severe caving potential when exposed in open cuts. We recommend the following maximum slope inclinations for temporary excavations:
Excavation Height (ft) Slope (h:v)
≤5 Vertical
≤8 ¾:1
≤15 1:1
If cuts greater than 15 feet are planned, we should be contacted to provide further recommendations. The allowable slope inclinations are measured from the toe to the top of the cut. Even at these inclinations, some raveling should be anticipated. The exposed slope face should be kept moist (but not saturated) during construction to reduce local sloughing.
Surcharge loads should not be permitted within a horizontal distance equal to the height of cut from the top of the excavation or 5 feet from the top of the slopes, whichever is greater, unless the cut is properly shored. Excavations that extend below an imaginary plane inclined at 45 degrees below the edge of adjacent existing site facilities should be properly shored to maintain support of adjacent elements. Excavations and shoring systems should meet the minimum requirements given in the State of California Occupational Safety and Health Standards.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
10 Slot Cuts
Deeper removals along property lines or adjacent to existing improvements will require shoring or slot cuts. Recommendations for shoring are provided in the “Retaining Structures” section of the report. Removals that will undermine existing adjacent pavements or hardscape may utilize “ABC” slot cuts to depths not greater than 8 feet. Unsurcharged slot cuts up to 8 feet in height should not be wider than 4 feet and should be backfilled to finished grade prior to excavation of the adjacent four slots (two on each side of the excavated slot). We can provide slot widths for other slot heights if required. A test slot should be performed prior to production slots to confirm the stability of the planned cuts.
4.3.3 Subgrade Preparation
After removals are complete and prior to placing any fills or construction of the proposed structure, the subgrade soils should be scarified to a depth of 12 inches, moisture-conditioned, and compacted to at least 90 percent (95 percent for granular soils) of the maximum dry density in accordance with ASTM D 1557 and to a firm and unyielding condition.
In areas to receive pavements, the top 12 inches below the pavement base should be compacted to a minimum of 95 percent of the maximum dry density.
4.3.4 Material for Fill
The on-site soils are, in general, suitable for use as compacted fill under the buildings, pavement, and flatwork, and behind retaining/ramp walls. Clayey soils, if encountered at the site, should not be used within 12 inches of concrete pavements, or flatwork and are not suitable for use as retaining wall backfill.
Imported fill material should be predominately granular (contain between 10 and 40 percent fines-portion passing No. 200 sieve), and relatively non-expansive (an Expansion Index of less than 20). GPI should be provided with a sample (at least 50 pounds) and notified at least 72 hours in advance of the location of soils proposed for import. Each proposed import source should be sampled, tested and accepted for use prior to delivery of the soils to the site. Soils imported prior to acceptance by GPI may be rejected if not suitable.
If on-site concrete or asphalt are crushed/pulverized to re-use as aggregate base or general fill, it should be crushed to a maximum particle size of 3 inches. If used as general fill, the materials may need to be mixed with on-site soils before placement if significant voids are present in the crushed materials. If used to support pavements, it should be crushed to meet the specifications of Caltrans Class II or Greenbook crushed miscellaneous base (CMB).
In backfill areas where mechanical compaction of soil backfill is impractical due to space constraints, sand-cement slurry may be substituted for compacted backfill. The slurry should contain two sacks of cement per cubic yard and have a maximum slump of 5 inches.
If open-graded rock is used as backfill, the material should be placed in lifts and mechanically densified. Open-graded rock should be separated from the on-site soils by a suitable filter fabric (Mirafi 140N or equivalent).
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
11 4.3.5 Placement and Compaction of Fills
Fill soils should be placed in horizontal lifts, moisture-conditioned, and mechanically compacted to at least 90 percent (95 percent for granular soils) of maximum dry density in accordance with ASTM D-1557. The optimum lift thickness will depend on the compaction equipment used and can best be determined in the field. The following uncompacted lift thickness can be used as preliminary guidelines.
Plate compactors 4-6 inches
Small vibratory or static rollers (5-ton±) 6-8 inches Scrapers and heavy loaders 8-12 inches
The maximum lift thickness should not be greater than 12 inches and each lift should be thoroughly compacted and accepted prior to placement of subsequent lifts.
The moisture content of the on-site materials should be between 0 to 2 percent over the optimum moisture content to readily achieve the required degree of compaction.
During backfill of excavations, the fill should be properly benched into the construction slopes as it is placed in lifts.
4.3.6 Shrinkage and Subsidence
Shrinkage is the loss of soil volume caused by compaction of fills to a higher density than before grading. Subsidence is the settlement of in-place subgrade soils caused by loads generated by large earthmoving equipment. For earthwork volume estimating purposes, an average shrinkage value of 10 to 15 percent and subsidence of 0.1 feet may be assumed for the surficial soils (depths of 2 to 5 feet). These values are estimates only and exclude losses due to removal of vegetation or debris. Actual shrinkage and subsidence will depend on the types of earthmoving equipment used and should be determined during grading.
4.3.7 Trench/Wall Backfill
Utility trench backfill should be mechanically compacted in lifts. Wall backfill should consist of on-site or imported, non-expansive sandy soils. Lift thickness should not exceed those values given in the "Compacted Fill" section of this report. Jetting or flooding of trench or wall backfill materials should not be permitted. A representative of GPI should observe and test trench and wall backfill as they are placed.
4.3.8 Observation and Testing
A representative of GPI should observe excavations, subgrade preparation, and fill placement activities. Sufficient in-place field density tests should be performed during fill placement to evaluate the overall compaction of the soils. Soils that do not meet minimum compaction requirements should be reworked and tested prior to placement of any additional fill.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
12 4.4 COLLAPSE POTENTIAL
Although not encountered during our onsite testing, the apartment development to the southwest of the site (GPI, 2014) contained soils with a moderate potential for collapse (2.2%).
A collapsible soil will undergo a reduction in volume upon wetting. Collapsible soil will typically have a low dry density and low moisture content. Collapsible soils may support large pressures with low compressibility when dry but experience significant compression upon wetting without an increase in pressure. Fine grained, aeolian or alluvial soils deposited in a semi-arid to arid climate tend to be the most susceptible to collapse.
To lessen the potential impacts of collapsible soils at the site, consideration should be given to minimizing the potential for wetting of soils underlying structures and other improvements. We recommend landscaping requiring significant irrigation be avoided within 10 feet of buildings to help mitigate potential for infiltration of water under the structures. If this setback is not feasibly, lining the bottom of the landscape areas should be considered.
Stormwater infiltration systems should not be constructed within 30 feet of the buildings.
4.5 FOUNDATIONS
4.5.1 Foundation Type
The proposed apartment and townhome buildings and may be supported on post-tensioned slab foundations, provided the subsurface soils are prepared in accordance with the recommendations given in this report. The use of conventional foundations for the apartment buildings is feasible; however, we understand that post -tensioned slabs are the preferred foundation alternative for the apartment buildings.
The post-tensioned slab foundations should be supported on compacted fill. Footings for minor at-grade structures, such as the pool shade structures , screen or retaining walls, or trash enclosures, should also be supported on properly compacted fill. Carport structures are typically supported on drilled pier foundations.
4.5.2 Post-Tensioned Slab Foundations
A post -tensioned slab foundation can be used to support the apartment and townhome buildings. The post-tensioned slab can be placed directly on engineered fills derived from the on-site or import silty sand soils with very low potential (E.I. < 20).
Based upon loading provided by the Project Structural Engineer, the post-tension slabs for the apartment and townhome buildings will impose an average pressure of approximately 380 and 190 psf, respectively. These pressures are significantly less than the allowable bearing capacity of the compacted fill and natural soils underlying the buildings.
We estimate that the ground surface under the center of a loaded area of the apartment buildings (Buildings A and B) having applied pressures of approximately 380 psf will settle approximately ½-inch. The edges and corners of this area under the same loading conditions are expected to settle ¼ -inch and less than ¼ -inch for the above applied pressures, respectively. We estimate that the ground surface under the center of a loaded area of the townhome buildings (Building C) having applied pressures of approximately 190 psf will settle Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
13 approximately ¼-inch. The edges and corners of this area under the same loading conditions are expected to settle less than ¼-inch for the above applied pressures, respectively.
Since the on-site or import soils underlying the post -tensioned slabs will have a very low expansion potential, the structural engineer needs not consider the soil shrinkage or swelling in the design of the post-tensioned slab.
These settlements assume a uniformly applied pressure and do not include the effects of the post-tension slab. The actual settlement of the post-tension slab will probably be less and will depend on the stiffness of the slab and its ability to distribute the loads and should be determined by the Structural Engineer.
For the structural analysis of the post -tensioned slab foundation, we recommend using an uncorrected modulus of subgrade reaction of 200 pci. This value is based on a 1-foot square bearing area and silty clays and clays underlying the foundation level. We recommend this modulus be reduced by 75 percent value to a value of 50 pci to account for the size of the post- tensioned slab foundation.
The allowable soil bearing pressure will be significantly greater than the average bearing pressures required for the post-tensioned slab foundation as discussed above. At localized or thickened areas of the slab, such as continuous footings, columns and point of load applications, a static allowable net bearing pressure of 2,000 pounds per square foot may be used with a minimum width of 24 inches and minimum embedment depth of 24 inches. These allowable bearing pressures are for dead-plus-live loads, and may be increased one-third for short-term, transient, wind and seismic loading. The total static settlement under the thickened portions of the post-tensioned slab will be on the order of 1 inch or less.
4.5.3 Shallow Foundations
Based on the shear strength and elastic settlement characteristics of the compacted fill derived from on-site soils, minor lightly-loaded structures, including retaining walls, site walls, and trash enclosures, a static allowable net bearing pressure of up to 2,000 pounds per square foot (psf) may be used for both continuous footings and isolated column footings. Based on the shear strength and elastic settlement characteristics of the natural on-site soils, a static allowable net bearing pressure of up to 1,500 pounds per square foot (psf) may be used for both continuous footings and isolated column footings for the retrofitting of the existing buildings.
The actual bearing pressure used may be less, such that economics and structural loads will determine the minimum width for footings as discussed below. These bearing pressures are for dead-plus-live loads, and may be increased one-third for short -term, transient, wind and seismic loading. The maximum edge pressures induced by eccentric loading or overturning moments should not be allowed to exceed these recommended values.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
14 The following minimum footing widths and embedments are recommended for the corresponding allowable bearing pressures.
STATIC BEARING
PRESSURE
(psf)
MINIMUM FOOTING
WIDTH
(inches)
MINIMUM FOOTING*
EMBEDMENT
(inches)
Minor Structures
2,000 24 18
1,500 18 18
1,000 15 15
Retrofitting of Existing Buildings
1,500 24 18
1,000 18 18
* Refers to minimum depth below lowest adjacent grade at the time of foundation construction. If the top floor slab is in-place prior to fully loading the footings, depth of interior footings may be taken from the top of the floor slab.
A minimum footing width and depth of 15 inches should be used even if the actual bearing pressure is less than 1,000 psf.
Maximum total static settlement will depend on the loads imposed on the foundations. In general, the total static settlements anticipated for wall loads of lightly-loaded structures will be limited to less than ½-inch. Maximum differential settlements are expected to be less than ¼- inch over a span of 40 feet. Total static settlement of isolated pad or continuous wall footings (up to 50 kips for columns and 6 kips per lineal foot for walls) for the retrofitting of the existing building is expected to be on the order of 1 inch or less. Differential static settlement between similarly loaded column footings or along a 40-foot span of a continuous footing is expected to be on the order of ½-inch or less.
The above estimates are based on the assumption that the recommended earthwork will be performed and that the footings will be sized in accordance with our recommendations. The project structural engineer should consider the total and differential settlement due to the above sources when designing the foundations of the minor, lightly-loaded structures.
4.5.4 Lateral Load Resistance
Soil resistance to lateral loads will be provided by a combination of frictional resistance between the bottom of post-tensioned slabs or spread footings and underlying soils and by passive soil pressures acting against the embedded sides of the slabs or footings. For frictional resistance, a coefficient of friction of 0.35 may be used for design. In addition, an allowable lateral bearing pressure equal to an equivalent fluid weight of 300 pounds per cubic foot may be used, provided the footings are poured tight against undisturbed natural soils or compacted fill. These values may be used in combination without reduction.
4.5.5 Carport Foundations
Carport structures can be supported on drilled pier foundations in accordance with the recommendations provided below.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
15 Drilled pile foundations will develop their frictional capacity with relatively small deflection (about ¼-inch). The allowable capacities will depend on the pile diameter and the total depth of the pile below the pile cap. The downward vertical capacities shown below do not include capacity for end bearing, as it is difficult to adequately clean the base of small diameter drilled shafts. The values presented are for static loads, and can be increased by one-third for short- term wind and seismic loads. The allowable uplift capacity for a given pile may be taken as one-half of the compressive capacity provided below. We recommend a minimum pile depth of 8 feet.
DEPTH BELOW
PILE CAP
(feet)
ALLOWABLE COMPRESSIVE CAPACITY (kips)
24-inch Diameter 30-inch Diameter
8 12 16
10 18 24
12 24 32
14 30 40
16 36 48
If other diameters of piles are considered, an allowable frictional resistance of 150 pounds per square feet can be used for downward static loads in the upper 5 feet of the soil profile and 500 pounds per square foot for soils below 5 feet.
Soil resistance to lateral loads can be provided by the piles. The design of the piles will be governed by lateral force considerations. For design by the simplified pole formula presented in Section 1807A.3.2.1 of the 2022 California Building Code, a unit passive resistance of 300 pounds per square foot per foot (to a maximum of 3,000 pounds per square foot) may be used for the piles with level ground in lieu of the presumptive lateral bearing values presented in Table 1806A.2. As stated in the code, a passive resistance of 600 pounds per square foot per foot (to a maximum of 6,000 pounds per square foot) may be used for isolated piles as determined by the Project Structural Engineer. We recommend that the upper 1-foot of the subgrade soils be ignored in determining the required depth of embedment to allow for surface disturbance adjacent to the pile unless the pile is located within a paved surface.
Pile excavations should be filled with concrete on the same day they are drilled. Concrete mix designs should include provisions to minimize shrinkage, which can lead to lower frictional resistance of the pile shaft and reduced allowable capacity. The concrete should be placed with special equipment so that it is not allowed to fall freely more than 5 feet or strike the walls of the excavations. Drilling for piles should not be performed within 5 feet of recently excavated or recently poured piles until the concrete has been allowed to set for at least 6 hours. The piles should be poured in a manner that will not result in concrete flowing into adjacent drilled pile excavations and prevent segregation of aggregate. Drilled pile construction should be performed in accordance with the latest edition of ACI 336.1, “Standard Specifications for the Construction of Drilled Piles.”
Based on the density and moisture content of the soils encountered, the caving potential of the soils is considered to be moderate to high in the dry sands. The drilled pile contractor should evaluate the potential drilling conditions when planning the installation methods. We do not anticipate encountering groundwater during the installation of piles.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
16 Since the drilled piles will be designed to derive resistance from friction only, rigorous cleaning of loose material from the bottom of the excavation prior to placement of steel and concrete is not considered essential. Every effort should be made to clean the bottom with the drill rig- mounted equipment.
Downhole inspection of drilled pile excavations (by lowering an inspector into the excavation) is not needed as the piles are designed as frictional elements. However, pile and footing excavations should be observed by a representative of GPI to confirm and document the depth, diameter, and embedment in suitable materials.
4.5.6 Foundation Concrete
Laboratory testing by HDR (Appendix C) on a selected combined sample indicates that the near surface soils exhibit a soluble sulfate content of 1,890 mg/kg. For the 2022 CBC, foundation concrete should conform to the requirements outlined in ACI 318, Section 4.3 for sulfate exposure Category S 1. Chloride levels in the sample of the upper soils tested were found to be 173 mg/kg, and is considered Category C1 due to the potential to be exposed to moisture.
4.5.7 Foundation Inspection
Prior to placement of concrete and steel, a representative of GPI should be observe and approve all foundation excavations.
4.6 SLABS-ON-GRADE
A vapor/moisture retarder should be placed under any slabs (including post-tensioned slabs) that are to be covered with moisture-sensitive floor coverings (parquet, vinyl tile, etc.).
Currently, common practice is to use a 15-mil polyolefin product such as Stego Wrap for this purpose. The need or a sand layer with the vapor barrier is not a geotechnical issue and is a decision for the Project Architect.
It should be noted that the material used as a vapor retarder is only one of several factors affecting the prevention of moisture accumulation under floor coverings. Other factors include effective sealing of joints edges (particularly at pipe penetration) as well as excess moisture in the concrete. The manufacturer of floor coverings should be consulted for establishing acceptable criteria for the condition of floor surface prior to placing moisture-sensitive floor coverings.
For lateral resistance design, a coefficient of friction value of 0. 35 between select fill and concrete may be used. For a slab on a visqueen moisture barrier, a coefficient of 0.1 should be used.
4.7 LATERAL EARTH PRESSURES
Based on information available to us at the time this report was prepared, no major retaining walls or basements were planned for the site. The following recommendations are provided for walls less than 6 feet in height. We recommend that retaining walls be backfilled with on-site or imported non-expansive, granular (sandy) soils. On-site silty or clayey soils should not be used as wall backfill.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
17 Active earth pressures can be used for designing walls that can yield at least 1-inch laterally in 10 feet of wall height under the imposed loads. For level backfill comprised of on-site or imported granular soils (no more than 40 percent passing No. 200 U.S. standard sieve), the magnitude of active pressures are equivalent to the pressures imposed by a fluid weighing 35 pounds per cubic foot (pcf). The Structural Engineer should indicate on the plans the type of backfill recommended above.
At-rest pressures should be used for restrained walls that remain rigid enough to be essentially non-yielding. At -rest pressures for on-site or imported granular soils are equivalent to the pressures imposed by a fluid weighing 52 pounds per cubic foot.
Walls subject to surcharge loads should be designed for an additional uniform lateral pressure equal to one-third and one-half the anticipated surcharge pressure for unrestrained and restrained walls, respectively.
The recommended pressures are based on the assumption that the supported earth will be fully drained, preventing the build-up of hydro-static pressures. For traditional backfilled retaining walls, a drain consisting of perforated pipe surrounded by gravel and wrapped in filter fabric should be used. As a minimum, one cubic foot of rock should be used for each lineal foot of drain. The fabric (non-woven filter fabric, Mirafi 140N or equivalent) should be lapped at the top.
Retaining wall footings should be designed as discussed in the "Shallow Foundations" section.
4.8 CORROSIVITY
Resistivity testing (Appendix C) of representative samples of the on-site soils indicates that they are severely corrosive to metals. Should the use of buried metallic structures be proposed, a corrosion engineer such as HDR should be retained to provide recommendations to protect these elements from corrosion. GPI does not practice corrosion engineering.
4.9 SWIMMING POOL
The depth of the swimming pool is anticipated to range from approximately 3½ to 5 feet below finished grade. Due to the potential for low density soils at those depths, we recommend that the swimming pools should be supported on properly compacted subgrade soils as recommended in Section 4.3.3 of this report.
The expansion potential of the soils anticipated in the upper 5 feet of the soil profile is very low.
Lateral earth pressures provided in Section 4.6 of this report should be used, as a minimum, for the swimming pool design. Pool walls should be designed to resist lateral surcharge pressures from adjacent footings or structures in addition to lateral earth pressures. If the surcharge load is at least 5 feet or the depth of the pool, whichever is greater, away from the edge of pool, the surcharge load can be ignored.
The soils within the bottom and side excavations should be moistened and maintained at elevated moisture contents of 1 to 2 (sands) percentage points above optimum, until the pool is constructed. We recommend that the moisture-conditioning of the pool excavation on a daily basis until placement of shotcrete. Caving of the sandy soils may occur if moisture is not maintained.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I 3044-I-01R.doc (7/25)
18 We recommend a representative of GPI observe and approve the soils within the pool excavation immediately prior to covering the soil with shotcrete for the pool structure.
T
he pool deck, including concrete flatwork and pavers, if used, should be properly drained in order to help prevent excessive infiltration or seepage into the underlying subgrade soils.
M
easures should be taken to reduce the potential for water to infiltrate into the subgrade soils around the pool. Such measures should include proper sealant of construction joints in the pool decking and surrounding hardscape.
4.10 DRAI
NAGE
P
ositive surface gradients should be provided adjacent to structures so as to direct surface water run-off and roof drainage away from foundations and slabs toward suitable discharge facilities. Long-term ponding of surface water should not be allowed on pavements or adjacent to buildings.
C
areful efforts should be made to provide methods of transporting runoff water to collection devices and preventing runoff water from infiltrating soils within the vicinity of the buildings or other improvements. Proper measures should also be take reduce the potential for future pipe leakage and/or landscape irrigation infiltration into the soils near the buildings or other proposed improvements.
4. 11 STORMWATER INFILITRATION
C
urrent regulations require that stormwater be infiltrated in the site soils of new developments when possible. GPI performed an infiltrations study for the proposed development and presented the results in a report dated June 16, 2023 (GPI, 2023).
4. 12 EXTERIOR CONCRETE FLATWORK (PEDESTRIAN HARDSCAPE) E
xterior concrete pads and pedestrian hardscape should be supported on non- expansive, compacted fill, which appears readily available onsite. This includes exterior sidewalks, stamped concrete, non-traffic pavement, and pavers. Prior to placement of concrete, the subgrade should be prepared as recommended in the "Subgrade Preparation" section of this report.
4. 13 PAVED AREAS
B
ased on the soils encountered near the existing grades in our explorations and our understanding that the upper soils onsite will be replaced with imported sandy soils, we have assumed an R-value of 3 0 for the preliminary design of new pavements. Based on the subgrade soils anticipated, we recommend the following pavement sections for the various levels of traffic (traffic indices) anticipated:
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01R.doc (7/25)
19 ASPHALT CONCRETE PAVEMENT
PAVEMENT AREA TRAFFIC INDEX SECTION THICKNESS (inches)
Asphalt Concrete Aggregate Base Course
Auto Parking 4 3 4
Circulation Drives 5 3 6
Truck Drives 6 3.5 8
PORTLAND CEMENT CONCRETE PAVEMENT
PAVEMENT AREA
TRAFFIC
INDEX
SECTION THICKNESS (inches)
f’c = 3,500 psi
PCC Aggregate Base
Auto Parking 4 6.0 ---
Circulation Drives 5 6.5 ---
Truck Drives 6 7.5 ---
If vehicular pavers are to be used for the project, the paver and leveling sand may be supported on the thickness of aggregate base for flexible pavements shown above for the appropriate traffic index. Pavers for vehicular traffic should be a minimum of 31/8 inches (80 mm) thick.
The pavement subgrade underlying the aggregate base or concrete should be properly prepared and compacted in accordance with the recommendations outlined under "Subgrade Preparation".
The pavement base course (as well as the top 12 inches of the subgrade soils) should be compacted to at least 95 percent of the maximum dry density (ASTM D-1557). Aggregate base should conform to the requirements of Section 26 of the California Department of Transportation Standard Specifications for Class II aggregate base (three-quarter inch maximum) or Section 200-2 of the Standard Specifications for Public Works Construction (Green Book) for untreated base materials, excluding processed miscellaneous base.
The above recommendations are based on the assumption that the base course and compacted subgrade will be properly drained. The design of paved areas should incorporate measures to prevent moisture build-up within the base course which can otherwise lead to premature pavement failure. For example, curbing adjacent to landscaped areas should be deep enough to act as a barrier to infiltration of irrigation water into the adjacent base course.
4.14 GEOTECHNICAL OBSERVATION AND TESTING
We recommend that a representative of GPI observe all earthwork during construction to confirm that the recommendations provided in our report are applicable during construction.
The earthwork activities include grading, compaction of fills and subgrade preparation, as well as foundation construction. If conditions are different than expected, we should be afforded the opportunity to provide an alternate recommendation based on the actual conditions encountered.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I 3044-I-01R.doc (7/25)
20 5
.0 LIMITATIONS
T
he report, exploration logs, and other materials resulting from GPI's efforts were prepared exclusively for use by Iron Lofts, LLC and their consultants in designing the proposed development. The report is not intended to be suitable for reuse on extensions or modifications of the project or for use on any project other than the currently proposed development as it may not contain sufficient or appropriate information for such uses. If this report or portions of this report are provided to contractors or included in specifications, it should be understood that they are provided for information only. This report cannot be utilized by another entity without the express written permission of GPI. This report is an instrument of our services and remains the property of GPI.
S
oil deposits may vary in type, strength, and many other important properties between points of exploration due to non -uniformity of the geologic formations or to man-made cut and fill operations. While we cannot evaluate the consistency of the properties of materials in areas not explored, the conclusions drawn in this report are based on the assumption that the data obtained in the field and laboratory are reasonably representative of field conditions and are conducive to interpolation and extrapolation.
F
urthermore, our recommendations were developed with the assumption that a proper level of field observation and construction review will be provided during grading, excavation, and foundation construction by GPI. If field conditions during construction appear to be different than is indicated in this report, we should be notified immediately so that we may assess the impact of such conditions on our recommendations. If construction phase services are performed by others they must accept full responsibility (as Project Geotechnical Engineer) for all geotechnical aspects of the project including this report.
O
ur investigation and evaluations were performed using generally accepted engineering approaches and principles available at this time and the degree of care and skill ordinarily exercised under similar circumstances by reputable Geotechnical Engineers practicing in this area. No other representation, either express or implied, is included or intended in our report.
R
espectfully submitted,
Geotechnical Professionals Inc.
Pa
trick I.F. McGervey, G.E. Donald A. Cords, G.E.
Senior Engineer Principal
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I 3044-I-01R.doc (7/25)
RE
FERENCES
A
merican Society of Civil Engineers (ASCE) (2017), “Minimum Design Loads and Associated Criteria for Buildings and Other Structures,” ASCE/SEI 7-16 C
alifornia Geological Survey, 1998, Seismic Hazard Zone Report for the Anaheim 7.5- minute Quadrangle, California, Seismic Hazard Zone Report 003.
C
alifornia Department of Water Resources, Water Data Library, http://www.water.ca.gov/waterdatalibrary/
C
alifornia Office of Statewide Health Planning and Development (OSHPD), Seismic Design Maps Website, https://seismicmaps.org/
C
ity of Riverside, Community Development Department, “Liquefaction Zones, Riverside General Plan, 2025, Public Safety Element”, Figure PS-2, plan dated November 2007.
Geotechnical Professionals Inc (GPI, 2014) “ Proposed Mission Lofts, SEC Mission Inn Avenue and Commerce Street, Riverside California” Project No. 2591.I dated February 17, 2014 Geotechnical Professionals Inc (GPI, 2023) “ Infiltration Study, Proposed Residential Development – Iron Lofts, NEC Mission Inn Avenue and Commerce Street, Riverside, California” Project No. 3044.1I dated June 16, 2023
GSI Environmental, 2020, “Revised Remedial Action Plan, Riverside Scrap Iron & Metal, 2993 Sixth Street, Riverside, California 2507” GSI Job No. 4790, dated January 2, 2020 http://www.historicaerials.com, Aerial Photography from the Past and Present”, National Environmental Title Research, LLC.
United States Geologic Survey, Earthquake Ground Motion Parameters Application, http://earthquake.usgs.gov/research/hazmaps/design
U
nited States Geological Survey (2014), 2008 National Seismic Hazard Maps, Source Parameters, https://earthquake.usgs.gov/cfusion/hazfaults_2008_search/query_main.cfm
SITE LOCATION MAP
FIGURE 1
IRON LOFTS
GPI PROJECT NO.: 3044.I
GEOTECHNICAL
PROFESSIONALS, INC.
N
SCALE: 1" = 2000'
0 2000 4000 FEET
BASE MAP REPRODUCED FROM CALTOPO @ 2021
SITE
LOCATION
5th St
Commerce St
Mission Inn Avenue
6th St
FIGURE 2GPI PROJECT NO.: 3044.I
GEOTECHNICAL
PROFESSIONALS, INC.
IRON LOFTS
SCALE: 1" = 100'
BASE PLAN REPRODUCED FROM SITE PLAN (A1-3) PROVIDED BY KTGY ARCHITECTURE DATED: 11-08-24 N
0 100 200 FEET
SITE PLAN
(Proposed)
EXPLANATION
APPROXIMATE LOCATION AND NUMBER
OF EXPLORATORY BORING
APPROXIMATE LOCATION AND NUMBER
OF CONE PENETRATION TEST
B-6
C-5
B-6
B-5
C-5
B-4
C-4
B-3
C-3
C-2 B-1
B-2
C-1
BUILDING A
BUILDING A
BUILDING A
BUILDING C
EXISTING
BUILDING D
5th St
Commerce St
Mission Inn Avenue
6th St
FIGURE 3GPI PROJECT NO.: 3044.I
GEOTECHNICAL
PROFESSIONALS, INC.
IRON LOFTS
SCALE: 1" = 100'
BASE PLAN REPRODUCED FROM GOOGLE EARTH DATED: 03-20-25
N
0 100 200 FEET
SITE PLAN
(Existing)
EXPLANATION
APPROXIMATE LOCATION AND NUMBER
EXPLORATORY BORING
APPROXIMATE LOCATION AND NUMBER
OF CONE PENETRATION TEST
B-6
C-5
B-6
B-5
C-5
B-4
C-4
B-3
C-3
C-2 B-1
B-2
C-1
APPENDIX A
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01X.doc (7/25) A-1
APPENDIX A
CONE PENETRATION TESTS
The subsurface conditions were investigated by performing five Cone Penetration Tests (CPTs) at the site. The CPT’s were advanced to depths of about 5 0 feet below existing grades. The locations of the CPTs are shown on Site Plans, Figures 2 and 3.
The Cone Penetration Test consists of pushing a cone-tipped probed into the soil deposit while simultaneously recording the cone tip resistance and side friction resistance of the soil to penetration (refer to Figure A -1). The CPTs described in this report were conducted in general accordance with ASTM specifications (ASTM D5778) using an electric cone penetrometer.
The CPT equipment consists of a cone assembly mounted at the end of a series of hollow sounding rods. A set of hydraulic rams is used to push the cone and rods into the soil while a continuous record of cone and friction resistance versus depth is obtained in both analog and digital form at the ground surface. A specially designed track-mounted limited-access rig is used to transport and house the test equipment and to provide a 30-ton reaction to the thrust of the hydraulic rams.
Standard data obtained during a CPT consists of continuous stratigraphic information with close vertical resolution. Stratigraphic interpretation is based on relationships between cone tip resistance and friction resistance. The calculated friction ratio ( CPT friction sleeve resistance divided by cone tip resistance) is used as an indicator of soil type. Granular soils typically have low friction ratios and high cone resistance, while cohesive or organic soils have high friction ratios and low cone resistance. These stratigraphic material categories form the basis for all subsequent calculations which utilize the CPT data.
Computer plots of the reduced CPT data acquired for this investigation is presented in Figures A-2 to A -6 of this appendix. The field testing and computer processing was performed by Kehoe Testing and Engineering under subcontract to Geotechnical Professionals Inc. (GPI).
The interpreted soils descriptions were prepared by GPI.
The CPT locations were laid out in the field by measuring from existing site features. Upon completion, the un-caved portions of the CPT holes were backfilled with bentonite chips.
Ground surface elevations at the exploration locations were estimated from the preliminary grading plan by KHR Associates and should be considered approximate. /G43/G4F/G4E/G45/G20/G50/G45/G4E/G45/G54/G52/G4F/G4D/G45/G54/G45/G52 /G46/G49/G47/G55/G52/G45/G20/G41/G2D/G31
/G47/G45/G4F/G54/G45/G43/G48/G4E/G49/G43/G41/G4C
/G50/G52/G4F/G46/G45/G53/G53/G49/G4F/G4E/G41/G4C/G53/G2C/G20/G49/G4E/G43/G2E
SILTY SAND (SM) medium denseto dense
SANDY SILT (ML) stiff to very stiff@ 12 feet, lens of SANDY CLAY(CL)SILTY SAND (SM) medium denseCLAYEY SAND (SC) mediumdenseSILTY CLAY (CL) hardSANDY SILT (ML) hardCLAYEY SILT (ML) very stiff tohardSILTY SAND (SM) medium dense@ 40 feet, medium dense to denseSAND WITH SILT (SP-SM) verydense@ 49 feet, lens of CLAYEY SILT(ML)Terminated at 50 feet TEf EV250CONE RESISTANCET
other locations and may change at this location with the passage of time. 0 8)IH O0P( I 4300I PR(%)05101520253035404550556065707580 .SOILDESCRIPTIONI Ff 26 E( CCN50 ET
PROJECT NO.: 3044.1I
NR D100)24
This summary applies only at the location of this cone penetration test 8 T350
and at the time of the exploration. Subsurface conditions may differ atThe interpreted soil description is derived from the friction ratio and coneresistance and is a simplification of actual conditions encountered. e I(F L150 RRATIORt F E T)) E880875870865860855850845840835830825820815810805 200DE0 (EOtsfT
Date
set N6
LOG OF CPT NO. C-1FIGURE A-2IRON LOFTSperformed:12-16-22 SANDY SILT (ML) firmSILTY SAND (SM) medium dense@ 11 feet, lens of CLAY (CL) hardSANDY SILT (ML) very stiffInterbedded SANDY SILT (ML)and SILTY SAND (SM) hard andmedium dense SILTY SAND (SM) medium denseto denseSANDY SILT (ML) hardSAND WITH SILT (SP-SM) denseto very dense Terminated at 50 feet
TEf EV250CONE RESISTANCET
other locations and may change at this location with the passage of time. 0 8)IH O0P( I 4300I PR(%)05101520253035404550556065707580 .SOILDESCRIPTIONI Ff 26 E( CCN50 ET
PROJECT NO.: 3044.1I
NR D100)24
This summary applies only at the location of this cone penetration test 8 T350
and at the time of the exploration. Subsurface conditions may differ atThe interpreted soil description is derived from the friction ratio and coneresistance and is a simplification of actual conditions encountered. e I(F L150 RRATIORt F E T)) E880875870865860855850845840835830825820815810805800 200DE0 (EOtsfT
Date
set N6
LOG OF CPT NO. C-2FIGURE A-3IRON LOFTSperformed:12-16-22 SANDY SILT (ML) stiff to very stiffSILTY SAND (SM) medium denseInterbedded SILT (ML) and SILTYSAND (SM) very stiff to hard andmedium dense SAND WITH SILT (SP-SM) dense@ 42 and 43 feet, lenses of SILTYCLAY (CL)Terminated at 50 feet TEf EV250CONE RESISTANCET
other locations and may change at this location with the passage of time. 0 8)IH O0P( I 4300I PR(%)05101520253035404550556065707580 .SOILDESCRIPTIONI Ff 26 E( CCN50 ET
PROJECT NO.: 3044.1I
NR D100)24
This summary applies only at the location of this cone penetration test 8 T350
and at the time of the exploration. Subsurface conditions may differ atThe interpreted soil description is derived from the friction ratio and coneresistance and is a simplification of actual conditions encountered. e I(F L150 RRATIORt F E T)) E880875870865860855850845840835830825820815810805 200DE0 (EOtsfT
Date
set N6
LOG OF CPT NO. C-3FIGURE A-4IRON LOFTSperformed:12-16-22 SANDY CLAY (CL) hardSANDY SILT (ML) hardSILTY CLAY (CL) hardSANDY SILT (ML) very stiffSILTY CLAY (CL) hardSANDY SILT (ML) very stiffCLAYEY SILT (ML) very stiff tohardSILTY SAND (SM) medium denseSANDY SILT (ML) hardSILTY SAND (SM) denseCLAYEY SILT (ML) very stiffSAND WITH SILT (SP-SM) verydenseTerminated at 50 feet TEf EV250CONE RESISTANCET
other locations and may change at this location with the passage of time. 0 8)IH O0P( I 4300I PR(%)05101520253035404550556065707580 .SOILDESCRIPTIONI Ff 26 E( CCN50 ET
PROJECT NO.: 3044.1I
NR D100)24
This summary applies only at the location of this cone penetration test 8 T350
and at the time of the exploration. Subsurface conditions may differ atThe interpreted soil description is derived from the friction ratio and coneresistance and is a simplification of actual conditions encountered. e I(F L150 RRATIORt F E T)) E880875870865860855850845840835830825820815810805 200DE0 (EOtsfT
Date
set N6
LOG OF CPT NO. C-4FIGURE A-5IRON LOFTSperformed:12-16-22 SANDY SILT (ML) firm to stiff@ 6 feet, hard@ 10 feet, very stiffCLAY (CL) hardSANDY SILT (ML) hardSAND WITH SILT (SP-SM) denseInterbedded CLAYEY SILT (ML)and SANDY SILT (ML) very stiff tohard Terminated at 50 feet
TEf EV250CONE RESISTANCET
other locations and may change at this location with the passage of time. 0 8)IH O0P( I 4300I PR(%)05101520253035404550556065707580 .SOILDESCRIPTIONI Ff 26 E( CCN50 ET
PROJECT NO.: 3044.1I
NR D100)24
This summary applies only at the location of this cone penetration test 8 T350
and at the time of the exploration. Subsurface conditions may differ atThe interpreted soil description is derived from the friction ratio and coneresistance and is a simplification of actual conditions encountered. e I(F L150 RRATIORt F E T)) E880875870865860855850845840835830825820815810805 200DE0 (EOtsfT
Date
set N6
LOG OF CPT NO. C-5FIGURE A-6IRON LOFTSperformed:12-16-22
APPENDIX B
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01X.doc (7/25) B-1
APPENDIX B
EXPLORATORY BORINGS
The subsurface conditions at the site were investigated by drilling and sampling six exploratory borings. The borings were advanced to depths ranging from 16 to 31 feet below the existing ground surface. The locations of the explorations are shown on the Site Plans, Figures 2 and 3.
The exploratory borings were drilled using truck mounted hollow-stem auger drill equipment.
Relatively undisturbed samples were obtained using a brass -ring lined sampler (ASTM D3550). The brass -rings have an inside diameter of 2.42 inches. The ring samples were driven into the soil by a 140-pound hammer dropping 30 inches. The number of blows needed to drive the sampler into the soil was recorded as the penetration resistance.
The field explorations for the investigation were performed under the continuous technical supervision of GPI's representative, who visually inspected the site, maintained detailed logs of the borings, classified the soils encountered, and obtained relatively undisturbed samples for examination and laboratory testing. The soils encountered in the borings were classified in the field and through further examination in the laboratory in accordance with the Unified Soils Classification System. Detailed logs of the borings are presented in Figures B-1 to B-6 in this appendix.
The boring locations were laid out in the field by measuring from existing site features. Ground surface elevations at the exploration locations were estimated from the preliminar y grading plan by KHR Associates and should be considered approximate.
Fill: SILTY SAND (SM) brown
Natural: SANDY SILT (ML) brown, slightly moist, stiff
SILT (ML) brown, moist, very stiff, with sand
SANDY SILT (ML) brown, moist, stiff
SILTY SAND (SM) brown, moist, medium dense
SANDY SILT (ML) brown, wet, stiff
Total Depth 31 feet
108
106
105
113
106
107
D
D
D
D
D
D
20 27
19 26
18 15
9.1 12.6
12.2 11.7
18.6 14.7
SAMPLE TYPES
(PCF)
Standard Split SpoonMOISTUREDESCRIPTION OF SUBSURFACE MATERIALS
SAMPLE TYPE
Bulk SampleTube Sample (%)
Bulk SampleS B-112-27-22
(%)
Drive Sample
DRY DENSITY(BLOWS/FOOT)
ELEVATION(FEET)This summary applies only at the location of this boring and at the time of drilling.Subsurface conditions may differ at other locations and may change at thislocation with the passage of time. The data presented is a simplification of actualconditions encountered.
FIGUREB
This summary applies only at the location of this boring and at the time of drilling.Subsurface conditions may differ at other locations and may change at thislocation with the passage of time. The data presented is a simplification of actualconditions encountered.
Standard Split SpoonDrive Sample
SAMPLE TYPE
FIGURE
DEPTH
S
ELEVATION
GROUNDWATER LEVEL (ft):PROJECT NO.:NOT ENCOUNTERED
0 5
10 15
20 25
30 880
875
870
865
860
855
D DATE DRILLED:EQUIPMENT USED:EQUIPMENT USED:(FEET)
T 3044.1I
MOISTURE
8 " HOLLOW STEM AUGERPENETRATIONRESISTANCEDESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock CoreDB 3044.1IB-1
DATE DRILLED:IRON LOFTSTube Sample
(FEET)
LOG OF BORING NO. B-1Rock CoreSAMPLE TYPESTC
880
875
870
865
860
855
C NOT ENCOUNTERED
(FEET)0
5 10
15 20
25 30
Fill: SILTY SAND (SM) brown
Natural: SILTY SAND (SM) brown, moist, loose to
medium dense
@ 7 feet, wet, very dense
SANDY SILT (ML) brown, moist, very stiff
@ 15 feet, stiff
Total Depth 16 feet
90 108
103
D
D
D
D
15 50/5"
37 17
9.1 19.8
11.1 10.3
SAMPLE TYPES
(PCF)
Standard Split Spoon
MOISTURE
DESCRIPTION OF SUBSURFACE MATERIALS
SAMPLE TYPE
Bulk Sample
Tube Sample
(%)
Bulk Sample
S
B-2
12-27-22
(%)
Drive Sample
DRY DENSITY
(BLOWS/FOOT)
ELEVATION
(FEET)This summary applies only at the location of this boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.
FIGURE
B
This summary applies only at the location of this boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.
Standard Split Spoon
Drive Sample
SAMPLE TYPE
FIGURE
DEPTH
S
ELEVATION
GROUNDWATER LEVEL (ft):
PROJECT NO.:
NOT ENCOUNTERED
0 5
10 15
875
870
865
D
DATE DRILLED:
EQUIPMENT USED:EQUIPMENT USED:
(FEET)
T
3044.1I
MOISTURE
8 " HOLLOW STEM AUGER
PENETRATION
RESISTANCE
DESCRIPTION OF SUBSURFACE MATERIALS
DEPTH
Rock Core
D
B
3044.1I
B-2
DATE DRILLED:
IRON LOFTS
Tube Sample
(FEET)
LOG OF BORING NO. B-2
Rock Core
SAMPLE TYPES
T
C
875
870
865
C
NOT ENCOUNTERED
(FEET)
0 5
10 15
Fill: SILTY SAND (SM) orange-brown
Natural: SANDY SILT (ML) orange-brown, slightlymoist, hard@ 7 feet, moist, very stiff@ 10 feet, brown, hard @ 15 feet, slightly moist, stiff
@ 20 feet, slightly moist to moist, very stiffSILTY SAND (SM) brown, moist, medium denseSANDY SILT (ML) brown, very moist, very stiff @ 30 feet, stiff to very stiffTotal Depth 31 feet
102100113
101
111
102
92 DDD
D
D
D
D
50/6"4056
18 33
34 22
8.711.110.9
9.7 9.9
15.8 17.5
SAMPLE TYPES
(PCF)
Standard Split SpoonMOISTUREDESCRIPTION OF SUBSURFACE MATERIALS
SAMPLE TYPE
Bulk SampleTube Sample (%)
Bulk SampleS B-312-27-22
(%)
Drive Sample
DRY DENSITY(BLOWS/FOOT)
ELEVATION(FEET)This summary applies only at the location of this boring and at the time of drilling.Subsurface conditions may differ at other locations and may change at thislocation with the passage of time. The data presented is a simplification of actualconditions encountered.
FIGUREB
This summary applies only at the location of this boring and at the time of drilling.Subsurface conditions may differ at other locations and may change at thislocation with the passage of time. The data presented is a simplification of actualconditions encountered.
Standard Split SpoonDrive Sample
SAMPLE TYPE
FIGURE
DEPTH
S
ELEVATION
GROUNDWATER LEVEL (ft):PROJECT NO.:NOT ENCOUNTERED
0 5
10 15
20 25
30 875
870
865
860
855
850
D DATE DRILLED:EQUIPMENT USED:EQUIPMENT USED:(FEET)
T 3044.1I
MOISTURE
8 " HOLLOW STEM AUGERPENETRATIONRESISTANCEDESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock CoreDB 3044.1IB-3
DATE DRILLED:IRON LOFTSTube Sample
(FEET)
LOG OF BORING NO. B-3Rock CoreSAMPLE TYPESTC
875
870
865
860
855
850
C NOT ENCOUNTERED
(FEET)0
5 10
15 20
25 30
Fill: SILTY SAND (SM) brown, moist, dense
Natural: SANDY SILT (ML) brown, moist, hard@ 7 feet, slightly moist, very stiffSILT (ML) brown, slightly moist, very stiff, with sand @ 15 feet, stiffTotal Depth 16 feet
10197104100
96 DDD
D
522625
19 8.913.37.37.0
8.7 SAMPLE TYPES
(PCF)
Standard Split SpoonMOISTUREDESCRIPTION OF SUBSURFACE MATERIALS
SAMPLE TYPE
Bulk SampleTube Sample (%)
Bulk SampleS B-412-27-22
(%)
Drive Sample
DRY DENSITY(BLOWS/FOOT)
ELEVATION(FEET)This summary applies only at the location of this boring and at the time of drilling.Subsurface conditions may differ at other locations and may change at thislocation with the passage of time. The data presented is a simplification of actualconditions encountered.
FIGUREB
This summary applies only at the location of this boring and at the time of drilling.Subsurface conditions may differ at other locations and may change at thislocation with the passage of time. The data presented is a simplification of actualconditions encountered.
Standard Split SpoonDrive Sample
SAMPLE TYPE
FIGURE
DEPTH
S
ELEVATION
GROUNDWATER LEVEL (ft):PROJECT NO.:NOT ENCOUNTERED
0 5
10 15
880
875
870
D DATE DRILLED:EQUIPMENT USED:EQUIPMENT USED:(FEET)
T 3044.1I
MOISTURE
8 " HOLLOW STEM AUGERPENETRATIONRESISTANCEDESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock CoreDB 3044.1IB-4
DATE DRILLED:IRON LOFTSTube Sample
(FEET)
LOG OF BORING NO. B-4Rock CoreSAMPLE TYPESTC
880
875
870
C NOT ENCOUNTERED
(FEET)0
5 10
15 Fill: SILTY SAND (SM) brown, slightly moist
Natural: SANDY SILT (ML) brown, moist, stiff@ 7 feet, firm@ 10 feet, stiff SILTY SAND (SM) brown, dry, medium dense, coarsegrainedSAND (SP) light brown, dry, medium denseTotal Depth 16 feet 11096101
105
DDD
D
18719
23 11.111.312.9
2.6 SAMPLE TYPES
(PCF)
Standard Split SpoonMOISTUREDESCRIPTION OF SUBSURFACE MATERIALS
SAMPLE TYPE
Bulk SampleTube Sample (%)
Bulk SampleS B-512-27-22
(%)
Drive Sample
DRY DENSITY(BLOWS/FOOT)
ELEVATION(FEET)This summary applies only at the location of this boring and at the time of drilling.Subsurface conditions may differ at other locations and may change at thislocation with the passage of time. The data presented is a simplification of actualconditions encountered.
FIGUREB
This summary applies only at the location of this boring and at the time of drilling.Subsurface conditions may differ at other locations and may change at thislocation with the passage of time. The data presented is a simplification of actualconditions encountered.
Standard Split SpoonDrive Sample
SAMPLE TYPE
FIGURE
DEPTH
S
ELEVATION
GROUNDWATER LEVEL (ft):PROJECT NO.:NOT ENCOUNTERED
0 5
10 15
880
875
870
D DATE DRILLED:EQUIPMENT USED:EQUIPMENT USED:(FEET)
T 3044.1I
MOISTURE
8 " HOLLOW STEM AUGERPENETRATIONRESISTANCEDESCRIPTION OF SUBSURFACE MATERIALS DEPTH
Rock CoreDB 3044.1IB-5
DATE DRILLED:IRON LOFTSTube Sample
(FEET)
LOG OF BORING NO. B-5Rock CoreSAMPLE TYPESTC
880
875
870
C NOT ENCOUNTERED
(FEET)0
5 10
15 Fill: SILTY SAND (SM) brown
Natural: SILTY SAND (SM) brown, very moist, medium
dense
SANDY SILT (ML) brown, slightly moist, hard
SILTY SAND (SM) brown, moist, dense
@ 15 feet, slightly moist, medium dense
SANDY SILT (ML) brown, very moist, stiff
SILTY SAND (SM) brown, very moist to wet, medium
dense
SANDY SILT (ML) brown, moist, very stiff
@ 30 feet, slightly moist
Total Depth 31 feet
115
108
113
109
99 109
114
D
D
D
D
D
D
D
34 47
64 19
21 25
29 13.9
9.8 9.9
5.5 16.0
10.9 9.6
SAMPLE TYPES
(PCF)
Standard Split Spoon
MOISTURE
DESCRIPTION OF SUBSURFACE MATERIALS
SAMPLE TYPE
Bulk Sample
Tube Sample
(%)
Bulk Sample
S
B-6
12-27-22
(%)
Drive Sample
DRY DENSITY
(BLOWS/FOOT)
ELEVATION
(FEET)This summary applies only at the location of this boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.
FIGURE
B
This summary applies only at the location of this boring and at the time of drilling.
Subsurface conditions may differ at other locations and may change at this location with the passage of time. The data presented is a simplification of actual conditions encountered.
Standard Split Spoon
Drive Sample
SAMPLE TYPE
FIGURE
DEPTH
S
ELEVATION
GROUNDWATER LEVEL (ft):
PROJECT NO.:
NOT ENCOUNTERED
0 5
10 15
20 25
30 880
875
870
865
860
855
D
DATE DRILLED:
EQUIPMENT USED:EQUIPMENT USED:
(FEET)
T
3044.1I
MOISTURE
8 " HOLLOW STEM AUGER
PENETRATION
RESISTANCE
DESCRIPTION OF SUBSURFACE MATERIALS
DEPTH
Rock Core
D
B
3044.1I
B-6
DATE DRILLED:
IRON LOFTS
Tube Sample
(FEET)
LOG OF BORING NO. B-6
Rock Core
SAMPLE TYPES
T
C
880
875
870
865
860
855
C
NOT ENCOUNTERED
(FEET)
0 5
10 15
20 25
30 APPENDIX C
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01X.doc (7/25) C-1
APPENDIX C
LABORATORY TESTS
INTRODUCTION
Representative undisturbed soil samples and bulk samples were carefully packaged in the field and sealed to prevent moisture loss. The samples were then transported to our Cypress office for examination and testing assignments. Laboratory tests were performed on selected representative samples as an aid in classifying the soils and to evaluate the physical properties of the soils affecting foundation design and construction procedures. Detailed descriptions of the laboratory tests are presented below under the appropriate test headings.
Test results are presented in the figures that follow.
MOISTURE CONTENT AND DRY DENSITY
Moisture content and dry density were determined from a number of the ring samples. The samples were first trimmed to obtain volume and wet weight and then were dried in accordance with ASTM D2216. After drying, the weight of each sample was measured, and moisture content and dry density were calculated. Moisture content and dry density values are presented on the boring logs in Appendix B.
PERCENT PASSING NO. 200 SIEVE
Selected soil samples were dried, weighed, soaked in water until individual soil particles were separated, and then washed on the No. 200 sieve. That portion of the material retained on the No. 200 sieve was oven-dried and weighed to determine the percentage of the material passing the No. 200 sieve. The percentages passing the No. 200 sieve are tabulated below.
BORING
NO.
DEPTH
(ft) SOIL DESCRIPTION PERCENT PASSING
No. 200 SIEVE
B-1 10 Silt (ML) with sand 75
B-3 10 Sandy Silt (ML) 70
B-4 10 Silt (ML) with sand 76
B-6 25 Sandy Silt (ML) 53
DIRECT SHEAR
Direct shear tests were performed on undisturbed and remolded samples in accordance with ASTM D3080. The remolded samples were remolded to approximately 90 percent of maximum density (ASTM D1557). The samples were placed in the shear machine, and a normal load comparable to the in-situ overburden stress was applied. The samples were inundated, allowed to consolidate, and then were sheared to failure. The tests were repeated on additional test specimens under increased normal loads. Shear stress and sample deformation were monitored throughout the test. The results of the direct shear tests are presented in Figures C-1 to C-3.
Iron Lofts, LLC July 28, 2025
Proposed Apartment Development, Riverside, California GPI Project No. 3044.I
3044-I-01X.doc (7/25) C-2
HYDROCONSOLIDATION
One-dimensional consolidation testing was performed on an undisturbed sample in accordance with ASTM D5333. After trimming the ends, the sample was placed in the consolidometer and loaded to 0.4 ksf. Thereafter, the samples were incrementally loaded to a maximum load of 1.6 ksf at the in-situ moisture content and then saturated. Sample deformation was measured to 0.0001 inch. The amount of collapse is shown below as percent compression of the sample.
BORING
NO.
DEPTH
(ft)
SOIL DESCRIPTION
TOTAL
COLLAPSE (%)
B-1 15 Silty Sand (SM) 0.2
B-6 7 Sandy Silt (ML) 0.1
COMPACTION TEST
A maximum dry density/optimum moisture test was performed in accordance with ASTM D1557 on a representative bulk sample of the site soils. The test results are as follows:
BORING
NO.
DEPTH
(ft)
SOIL DESCRIPTION
MAXIMUM
DRY DENSITY
(pcf)
OPTIMUM
MOISTURE
(%)
Combined B-3,4,5,6 5-7 Silty Sand (SM) 131 8
CORROSIVITY
Soil corrosivity testing was performed by HDR a soil sample provided by GPI. The test results are summarized in Table 1 of this Appendix.
0 1,000
2,000
3,000
4,000
5,000
6,000
0 1,0002,0003,0004,0005,0006,000
FIGURE C-1IRON LOFTSPROJECT NO.:PROJECT:
ULTIMATE STRENGTHCohesion= 42 psfFriction Angle= 31 degreesSILTY SAND (SM)Sample Location 3044.1I
SHEAR STRENGTH, psf
NORMAL PRESSURE, psfCohesion= 42 psfPEAK STRENGTH
DIRECT SHEAR TEST RESULTS
5.0 MC,%Friction Angle= 31 degreesDD,pcf9.1ClassificationB-2 90 0 1,000
2,000
3,000
4,000
5,000
6,000
0 1,0002,0003,0004,0005,0006,000
FIGURE C-2IRON LOFTSPROJECT NO.:PROJECT:
ULTIMATE STRENGTHCohesion= 360 psfFriction Angle= 31 degreesSANDY SILT (ML)Sample Location 3044.1I
SHEAR STRENGTH, psf
NORMAL PRESSURE, psfCohesion= 168 psfPEAK STRENGTH
DIRECT SHEAR TEST RESULTS
10.0 MC,%Friction Angle= 29 degreesDD,pcf9.9ClassificationB-6 113 0 1,000
2,000
3,000
4,000
5,000
6,000
0 1,000 2,000 3,000 4,000 5,000 6,000
PROJECT:
Cohesion= 90 psf
Classification
PEAK STRENGTH
DIRECT SHEAR TEST RESULTS
FIGURE C-3
3044.1I
SHEAR STRENGTH, psf
NORMAL PRESSURE, psf
SANDY SILT (ML)
Note: Samples remolded to 90% of maximum dry density
Friction Angle= 28 degrees
MC,%
Friction Angle= 28 degrees
DD,pcfSample Location
IRON LOFTS PROJECT NO.:
Cohesion= 90 psf
ULTIMATE STRENGTH
B-3/4/5/6 112 11.05-7
Sample ID
B-3 @ 5
Resistivity Units
as-received ohm-cm 15,200
saturated ohm-cm 800
pH 7.0
Electrical
Conductivity mS/cm 0.87
Chemical Analyses
Cations
calcium Ca2+ mg/kg 321
magnesiumMg2+ mg/kg 295
sodium Na1+ mg/kg 272
potassiumK1+ mg/kg 9.0
ammoniumNH41+ mg/kg ND
Anions
carbonateCO32- mg/kg ND
bicarbonateHCO31-mg/kg 149
fluoride F1- mg/kg 2.3
chloride Cl1- mg/kg 173
sulfate SO42- mg/kg 1,890
nitrate NO31- mg/kg 2.2
phosphatePO43- mg/kg ND
Other Tests
sulfide S2- qual na
Redox mV na
Resistivity per ASTM G187, pH per ASTM G51, Cations per ASTM D6919, Anions per ASTM D4327, and Alkalinity per APHA 2320-B.
Electrical conductivity in millisiemens/cm and chemical analyses were made on a 1:5 soil-to-water extract. mg/kg = milligrams per kilogram (parts per million) of dry soil.
Redox = oxidation-reduction potential in millivolts
ND = not detected
na = not analyzed
Table 1 - Laboratory Tests on Soil Samples
IRON LOFTS
Your #3044.1I, HDR Lab #23-0013LAB
10-Jan-23
Geotechnical Professionals, Inc.
431 West Baseline Road ∙ Claremont, CA 91711
Phone: 909.962.5485 ∙ Fax: 909.626.3316 Page 2 of 2