Cities Index.
Exterior Building Painting

Riverside City Council
September 1, 2026

Document
Exterior Building Painting
Meeting
September 1, 2026
Body
Riverside City Council
Original file
311 KB
Text extracted from the city's file for reading and search. Open the original on riversideca.legistar1.com. That file is the official record.

PCO #009
Date:

FAX No.

1. Paint Blast US 24,524.00$
Subtotal A: 24,524.00$
Subtotal C: 2,452.40$
Subtotal D: 490.48$
27,466.88$
10 Project Name Riverside Access Center Renovation June 30, 2026 Project Location
The following is an itemized quotation regarding proposed modifications to the contract documents. 2880 Hulen Place, Riverside, CA
Owner City of Riverside Attention Kurtis Sharp, City of Riverside From (Contractor) Cal-City Construction, Inc. Initiator Jasen Lee

POTENTIAL CHANGE ORDER/CHANGE ORDER PROPOSAL
Paint Building Exterior
Description of work:

Subcontractor's Cost

1. Refresh exterior paint:

Pressure wash, prep/cover, and paint stucco on the entire building, one exterior door, metal ladder, and (T&G) soffit.

The proposed change would increase the Final Completion Date by working days after approval of this COP.

The proposed change does NOT affect the Final Completion Date required by the Contract.

This Change Order Proposal is effective for calendar days Contractor:

Owner:

Signature Title Date

OVERHEAD AND PROFIT
BOND PREMIUM AT 2%
GRAND TOTAL (A+B+C+D)
Signature Title Date
The proposed change is not included with the construction schedule on the Contract.

Jasen Lee
Digitally signed by Jasen
Lee
DN: C=US,
[email protected],
O="Cal-City Construction,
Inc.", CN=Jasen Lee
Date: 2026.06.29
22:32:05-07'00'
P aint Blast US
PO Box 1196      •      Sunset Beach, CA 90742      •      Phone: (714) 395-6173 Contractor License: CA Lic # 1084260
PW-1034 Riverside Access Center
P aint Ext erior
Change Order ID: P W-1034-3
Pressure wash, prep/cover and paint stucco on the entire building, one exterior door, metal ladder, and (T&G) soffit.

Please review and approve this Change Order.

Cal-City Constr uction | Phone: 714.319.1455 | Cell: +17143191455 Job Address:
2880 Hulen Place
Riverside , CA 92507
Pr int Dat e: 6-26-2026
It ems Description Qty/Unit Unit Price Price
P aint
01 - Prevailing
W age
Pressure washing, prep/cover, painting, clean up. 1 $14,200.00 $14,200.00 Mat erial
A - P aint Material
P aint and sundries. 1 $3,250.00 $3,250.00
Lif t
B - R ental
Equipment
Boom Lift. 1 $3,875.00 $3,875.00
OH&P @ 15%
Buildertrend Flat
Rate
1 $3,199.00 $3,199.00
T otal cost: $24,524.00
T otal pr ice: $24,524.00
6/26/26, 2:29 PM Buildertrend
https://buildertrend.net/app/ChangeOrder/Print?ids=10061102 1/2 I confirm that my action here represents my electronic signature and is binding.

R equir ed clients
Signatur e Name Dat e
6/26/26, 2:29 PM Buildertrend
https://buildertrend.net/app/ChangeOrder/Print?ids=10061102 2/2

← All documents from this meeting