Text extracted from the city's file for reading and search. Open the original on riversideca.legistar1.com. That file is the official record.

PCO #010
Date:

FAX No.

1. Prestige Electric Services, Inc. 6,016.01$
Subtotal A: 6,016.01$
Subtotal C: 601.60$
Subtotal D: 120.32$
6,737.93$
3 OVERHEAD AND PROFIT
BOND PREMIUM AT 2%
GRAND TOTAL (A+B+C+D)
Owner:

Signature Title Date
Signature Title Date
The proposed change is not included with the construction schedule on the Contract.

Contractor:

The proposed change would increase the Final Completion Date by working days after approval of this COP.

The proposed change does NOT affect the Final Completion Date required by the Contract.

This Change Order Proposal is effective for calendar days Description of work:

Subcontractor's Cost
Provide power to future exterior building signage via overhead/roof level conduits and j-box(es). See enclosed estimate for Subcontractor's inclusions.

POTENTIAL CHANGE ORDER/CHANGE ORDER PROPOSAL
Power to Exterior Sign
Project Name Riverside Access Center Renovation June 26, 2026 Project Location
The following is an itemized quotation regarding proposed modifications to the contract documents. 2880 Hulen Place, Riverside, CA
Owner City of Riverside Attention Kurtis Sharp, City of Riverside From (Contractor) Cal-City Construction, Inc. Initiator Jasen Lee Jasen Lee
Digitally signed by Jasen
Lee
DN: C=US,
[email protected],
O="Cal-City Construction,
Inc.", CN=Jasen Lee
Date: 2026.06.29
22:32:05-07'00'
Prestige Electric Services
4545 W 154Th St
Lawndale, Ca 90260
License # 1043897
DRI # 2000000422
Cal-City Construction (Riverside Access Center)
16605 Norwalk Blvd,
Cerritos Ca 90703
Change Order
Quote # 0000231
Quote Date 06/24/2026
Item Description Unit Price Quantity Amount
Product 3/4" Rigid conduit 4.20 180.00 756.00
Product 3/4" Rigid couplings 3.40 6.00 20.40
Product 3/4" 1 Hole straps 0.65 40.00 26.00
Product 3/4" Rigid 90 9.30 2.00 18.60
Product 3/4" Rigid 45 8.95 2.00 17.90
Product 4/S Bell box 16.80 2.00 33.60
Product 4/S Bell box cover 5.45 2.00 10.90
Product #10 Wire 0.59 540.00 318.60
Product 20a Breaker 19.90 1.00 19.90
Product Astronomical timer 355.20 1.00 355.20
Product 3/4" Roof flashing 20.49 1.00 20.49
Product 2 Boxes of blue screws 23.85 2.00 47.70
Product Material Subtotal 1645.29 0.00 0.00
Product Material Tax 160.41 1.00 160.41
Product Material Total 1805.70 0.00 0.00

Service Labor 22h 2 Man 86.99 44.00 3,827.56
Service O&P 10% 382.75 1.00 382.75
Service Total Labor 4210.31 0.00 0.00
NOTES: Provide power for future sing.

Subtotal 6,016.01
Total 6,016.01
Amount Paid 0.00
Quote $6,016.01
1 Jasen Lee
From: Sharp, Kurtis <[email protected]>
Sent: Monday, May 11, 2026 12:33 PM
To: Japji Singh
Cc: Jasen Lee; Alex Renteria; Stoye, Megan; Gomez, Socorro Subject: RE: [EXTERNAL] Re: CO 9 – Power for (2) Wall Signs – Access Center Hi Japii,
This image is from google maps and is not current with the new lighting installed.

Either way, they are still placing the j-box on the inside wall within 10ft of the sign so we should be good.

Thx

From: Japji Singh <[email protected]>
Sent: Monday, May 11, 2026 12:18 PM
To: Sharp, Kurtis <[email protected]>
Cc: Jasen Lee <[email protected]>; [email protected]; Stoye, Megan <[email protected]>; Gomez, Socorro <[email protected]>
Subject: [EXTERNAL] Re: CO 9 – Power for (2) Wall Signs – Access Center

Hi Kurtis Jus t wanted to chime in here If I recall- we wer e going to put the JB where the existing speaker was(circl ed in ora nge in the scree ns hot below ) On Mon, May 11, 2026 at 10: 05 A M Sharp, Kurtis <KSharp@ riversideca. gov> wrote: Hi ZjQcmQR YFpfptBa nnerStart

CAUTION: This email originated from outside the City of Riverside. It was not sent by any City official or staff. Use caution when opening attachments or links.

Report Suspicious

ZjQcmQR YFpfptBa nner End
Hi Kurtis
Just wanted to chime in here
If I recall- we were going to put the JB where the existing speaker was(circled in orange in the screenshot below)

2 On Mon, May 11, 2026 at 10:05 AM Sharp, Kurtis <[email protected]> wrote:

Hi Jasen,
See diagram for electrical requirements below.

Basically, we will need junction boxes mounted on the back side of the parapet wall, with EMT conduit and conductors routed back to the electrical room and terminated into the subpanel on a dedicated 20-amp circuit labeled with a manual timer installed.

The sign vendor will remove the two existing wall-mounted light fixtures as needed for pathway access through the wall and will run their own conduit and conductors from the junction boxes to the signs.

Let me know if you have any concerns with the routing or tie-in approach.

Thanks,
Kurtis

3 4
Kurtis Sharp
General Services Department
Capital Projects Manager
Cell: (951) 373-0188
City of Riverside Corporate Yard
8095 Lincoln Ave., Riverside CA 92504
8095 Lincoln Ave, Riverside, Ca 92504ncoln Ave, Riverside, Ca 92504 8095 Lincoln Ave, Riverside, Ca 92504 [email protected] | www.riversideca.gov

Stay in-the-know with all things Riverside! Connect with us at RiversideCA.gov/Connect.

--
Japsimran(Japji) Singh
Office: 951-789-0843
Cell: 951-333-3526
9950 Indiana Ave Unit 3, Riverside CA 92503

← All documents from this meeting