PCO #011
Date:
FAX No.
3,060.00$
2,035.00$
764.25$ Subtotal A: 5,859.25$
NA)
NA)
5/8" Gypsum Wallboard, Mud, Tape
Taxes at 8.75%
NA)
Subtotal C: 585.93$
Subtotal D: 117.19$
6,562.36$
5 30
GRAND TOTAL (A+B+C+D)
1. Paint Blast US - Item 1
2. Paint Blast US - Item 2
of Material
Equipment
OVERHEAD AND PROFIT
BOND PREMIUM AT 2%
Owner:
Signature Title Date
Signature Title Date
The proposed change is not included with the construction schedule on the Contract.
Contractor:
The proposed change would increase the Final Completion Date by calendar days after approval of this COP.
The proposed change does NOT affect the Final Completion Date required by the Contract.
This Change Order Proposal is effective for calendar days Description of work:
Subcontractor's Cost (Includes subcontractor overhead and profit.)
3. Paint Blast US - Subcontractor's OH&P
Per OAC Meeting 6/24/2026:
1. Prep, prime, and paint 17 new wood doors (door panels only, no frames).
2. Prep, prime, and paint 11 existing wood doors (door panels only, no frames).
General Contractor's Cost
Labor:
Subtotal B: $
Material:
POTENTIAL CHANGE ORDER/CHANGE ORDER PROPOSAL
Paint Interior Doors
Project Name Riverside Access Center Renovation June 26, 2026 Project Location
The following is an itemized quotation regarding proposed modifications to the contract documents. 2880 Hulen Place, Riverside, CA
Owner City of Riverside Attention Kurtis Sharp, City of Riverside From (Contractor) Cal-City Construction, Inc. Initiator Jasen Lee Jasen Lee
Digitally signed by Jasen
Lee
DN: C=US,
[email protected],
O="Cal-City Construction,
Inc.", CN=Jasen Lee
Date: 2026.06.29
22:32:05-07'00'
P aint Blast US
PO Box 1196 • Sunset Beach, CA 90742 • Phone: (714) 395-6173 Contractor License: CA Lic # 1084260
PW-1034 Riverside Access Center
Cal-City Construction
Phone: 714.319.1455
Cell: +17143191455
P aint door s
Change Order ID: P W-1034-2
Prep, prime and paint new and existing door panels. No interior or exterior frames should be painted under this C O.
Alternate: T wo exterior HM door frames: $150
Please review and approve this Change Order.
Job Address:
2880 Hulen Place
Riverside , CA 92507
Pr int Dat e: 6-24-2026
It ems Description Qty/Unit Unit
Price
Price
P aint
01 - Prevailing
W age
Prep, prime and paint 17 new wood doors. Labor and material included. 17 $180.00 $3,060.00 P aint
01 - Prevailing
W age
Prep, prime and paint 11 existing wood doors. Labor and material included. 11 $185.00 $2,035.00 OH&P @ 15%
Buildertrend Flat
Rate
1 $764.25 $764.25
T otal cost: $5,859.25
T otal pr ice: $5,859.25
6/24/26, 8:30 AM Buildertrend
https://buildertrend.net/app/ChangeOrder/Print?ids=10048993 1/2 I confirm that my action here represents my electronic signature and is binding.
R equir ed clients
Signatur e Name Dat e
6/24/26, 8:30 AM Buildertrend
https://buildertrend.net/app/ChangeOrder/Print?ids=10048993 2/2 CBA
BYREVISIONTITLEDATESCALE:APPROVED:DATE:SHEET:DRAWN BY:SHEETSOF PROJECT :OWNER :
SEAL/SIGNATURE
E: [email protected]: (714) 309-7444 6101 BALL RD. #205, CYPRESS, CA 90630
CONSULTANT
SOURCE ARCHITECTURECONSTRUCTIONDESIGN/BUILD
RIVERSIDE ACCESS CENTER RENOVATION2880 HULEN PL, RIVERSIDE, CA 92507THE CITY OF RIVERSIDE 10/31/25
A-2.2(N) FLOORPLAN
(N) FLOOR PLAN LEGEND
1SCALE: 1/4" = 1'-0"(N) FLOOR PLANN
(N)(N) FLOOR PLAN GENERAL NOTES
01/16/26
SUPPLEMENTAL
2 1
2 2
Change Order Request
Please itemize:
1. (16 qty.) New doors painted black (doors only, no frames)
2. (11 qty.) Existing doors painted black (doors only, no frames)
3. Submittal for black paint finish