Cities Index.
Attachment 1u - Appendix F - Hydrology and WQMPPart-5

Riverside City Council
September 15, 2026

Document
Attachment 1u - Appendix F - Hydrology and WQMPPart-5
Meeting
September 15, 2026
Body
Riverside City Council
Pages
10
Original file
2.2 MB
Text extracted from the city's file for reading and search. Open the original on riversideca.legistar1.com. That file is the official record.

- 35 -

Appendix 9: O&M
Operation and Maintenance Plan and Documentation of Finance, Maintenance and Recording Mechanisms

TO BE PROVIDED DURING FINAL DESIGN
- 6 -

Appendix 10: Educational Materials
BMP Fact Sheets, Maintenance Guidelines and Other End-User BMP Information Riverside County - Low Impact Development BMP Design Handbook rev. 2/2012

Page 1 ends

3.5  Bioretention Facility

Description
Bioretention  Facilities  are  shallow,  vegetated  basins  underlain  by  an  engineered  soil  media.

Healthy plant and biological activity in the root zone maintain and renew the macro‐pore space in  the  soil  and  maximize  plant  uptake  of  pollutants  and  runoff.  This  keeps  the  Best Management  Practice  (BMP)  from  becoming  clogged  and  allows  more  of  the  soil  column  to function as both a sponge (retaining water) and a highly effective and self‐maintaining biofilter.

In  most  cases,  the  bottom  of  a  Bioretention  Facility  is  unlined,  which  also  provides  an opportunity for infiltration to the extent the underlying onsite soil can accommodate. When the infiltration  rate  of  the  underlying  soil  is  exceeded,  fully  biotreated  flows  are  discharged  via underdrains.  Bioretention  Facilities  therefore  will  inherently  achieve  the  maximum  feasible level  of  infiltration  and  evapotranspiration  and  achieve  the  minimum  feasible  (but  highly biotreated) discharge to the storm drain system.

Siting Considerations
These facilities work best when they are designed in a relatively level area. Unlike other BMPs, Bioretention Facilities can be used in smaller landscaped spaces on the site, such as:
 Parking islands
 Medians
 Site entrances
Landscaped  areas  on  the  site  (such  as  may  otherwise  be  required  through  minimum landscaping  ordinances),  can  often  be  designed  as  Bioretention  Facilities.  This  can  be accomplished by:

 Depressing landscaped areas below adjacent impervious surfaces, rather than elevating those areas
 Grading the site to direct runoff from those impervious surfaces into the Bioretention Facility, rather than away from the landscaping
 Sizing  and  designing  the  depressed  landscaped  area  as  a  Bioretention  Facility  as described in this Fact Sheet

Type of BMP  LID – Bioretention
Treatment Mechanisms  Infiltration, Evapotranspiration, Evaporation, Biofiltration Maximum Drainage Area  This BMP is intended to be integrated into a project’s landscaped area in a distributed manner. Typically, contributing drainage areas to Bioretention Facilities range from less than 1 acre to a maximum of around 10 acres.

Other Names  Rain Garden, Bioretention Cell, Bioretention Basin, Biofiltration Basin, Landscaped Filter Basin, Porous Landscape Detention
Riverside County - Low Impact Development BMP Design Handbook rev. 2/2012

Page 2 ends

Bioretention Facilities should however not be used downstream of areas where large amounts of  sediment  can  clog  the  system.  Placing  a  Bioretention  Facility  at  the  toe  of  a  steep  slope should also be avoided due to the potential for clogging the engineered soil media with erosion from the slope, as well as the potential for damaging the vegetation.

Design and Sizing Criteria
The recommended cross section necessary for a Bioretention Facility includes:

 Vegetated area
 18' minimum depth of engineered soil media
 12'  minimum  gravel  layer  depth with  6'  perforated  pipes (added  flow control  features such as orifice plates may be required to mitigate for HCOC conditions)

While  the  18‐inch  minimum  engineered  soil  media  depth  can  be  used  in  some  cases,  it  is recommended to use 24 inches or a preferred 36 inches to provide an adequate root zone for the  chosen  plant  palate.  Such  a  design  also  provides  for  improved  removal  effectiveness  for nutrients.  The  recommended  ponding  depth  inside  of  a  Bioretention  Facility  is  6  inches; measured from the flat bottom surface to the top of the water surface as shown in Figure 1.

Because this BMP is filled with an engineered soil media, pore space in the soil and gravel layer is assumed to provide storage volume. However, several considerations must be noted:

 Surcharge  storage  above  the  soil  surface  (6  inches)  is  important  to  assure  that  design flows do not bypass the BMP when runoff exceeds the soil’s absorption rate.  In cases where the Bioretention Facility contains engineered soil media deeper than 36 inches, the pore space within the engineered soil media can only be counted to the 36‐ inch depth.
 A  maximum  of  30  percent  pore  space  can  be  used  for  the  soil  media  whereas  a maximum of 40 percent pore space can be use for the gravel layer.

Figure 1: Standard Layout for a Bioretention Facility

BIORETENTION FACILITY BMP FACT SHEET

Riverside County - Low Impact Development BMP Design Handbook rev. 2/2012

Page 3 ends

Engineered Soil Media Requirements
The engineered soil media shall be comprised of 85 percent mineral component and 15 percent organic component, by volume, drum mixed prior to placement. The mineral component shall be a Class A sandy loam topsoil that meets the range specified in Table 1 below. The organic component shall be nitrogen stabilized compost1, such that nitrogen does not leach from the media.

Table 1: Mineral Component Range Requirements
Percent Range  Component
70‐80  Sand
15‐20  Silt
5‐10  Clay
The trip ticket, or certificate of compliance, shall be made available to the inspector to prove the engineered mix meets this specification.

Vegetation Requirements
Vegetative  cover  is  important  to  minimize  erosion  and  ensure  that  treatment  occurs  in  the Bioretention  Facility.  The  area  should  be  designed  for  at  least  70  percent  mature  coverage throughout  the  Bioretention  Facility.  To  prevent  the  BMP  from  being  used  as  walkways, Bioretention  Facilities  shall  be  planted  with  a  combination  of  small  trees,  densely  planted shrubs, and natural grasses. Grasses shall be native or ornamental; preferably ones that do not need to be mowed. The application of fertilizers and pesticides should be minimal. To maintain oxygen  levels  for  the  vegetation  and  promote  biodegradation,  it  is  important  that  vegetation not  be  completely  submerged  for  any  extended  period  of  time.  Therefore,  a  maximum  of  6 inches of ponded water shall be used in the design to ensure that plants within the Bioretention Facility remain healthy.

A 2 to 3‐inch layer of standard shredded aged hardwood mulch shall be placed as the top layer inside  the  Bioretention  Facility.  The  6‐inch  ponding  depth  shown  in  Figure  1  above  shall  be measured from the top surface of the 2 to 3‐inch
mulch layer.

Curb Cuts
To allow water to flow into the Bioretention Facility, 1‐foot‐wide (minimum) curb cuts should be placed approximately every 10 feet around the perimeter of the Bioretention Facility. Figure 2 shows a curb cut in a Bioretention Facility. Curb cut flow lines must be at or above the VBMP
water surface level.

1 For more information on compost, visit the US Composting Council website at: http://compostingcouncil.org/

BIORETENTION FACILITY BMP FACT SHEET

Riverside County - Low Impact Development BMP Design Handbook rev. 2/2012

Page 4 ends

Figure 2: Curb Cut located in a Bioretention Facility

To  reduce  erosion,  a  gravel  pad  shall  be  placed at  each  inlet  point  to  the  Bioretention  Facility.

The  gravel  should  be  1‐  to  1.5‐inch  diameter  in size.  The  gravel  should  overlap  the  curb  cut
opening a minimum of 6 inches. The gravel pad
inside  the  Bioretention  Facility  should  be  flush
with  the  finished  surface  at  the  curb  cut  and
extend to the bottom of the slope.

In addition, place an apron of stone or concrete,
a  foot  square  or  larger,  inside  each  inlet  to
prevent  vegetation  from  growing  up  and
blocking the inlet.  See Figure 3.

Terracing the Landscaped
Filter Basin
It is recommended that Bioretention Facilities be level. In the event the facility site slopes and lacks proper design, water would fill the lowest point of the BMP and then discharge from the basin  without  being  treated.  To  ensure  that  the  water  will  be  held  within  the  Bioretention Facility on sloped sites, the BMP must be terraced with nonporous check dams to provide the required storage and treatment capacity.

The terraced version of this BMP shall be used on non‐flat sites with no more than a 3 percent slope. The surcharge depth cannot exceed 0.5 feet, and side slopes shall not exceed 4:1. Table 2 below shows the spacing of the check dams, and slopes shall be rounded up (i.e., 2.5 percent slope shall use 10' spacing for check dams).

Table 2: Check Dam Spacing
6” Check Dam Spacing
Slope  Spacing
1%  25'
2%  15'
3%  10'
Figure 3: Apron located in a Bioretention Facility

BIORETENTION FACILITY BMP FACT SHEET

Riverside County - Low Impact Development BMP Design Handbook rev. 2/2012

Page 5 ends

Roof Runoff
Roof  downspouts  may  be  directed  towards  Bioretention  Facilities.  However,  the  downspouts must discharge onto a concrete splash block to protect the Bioretention Facility from erosion.

Retaining Walls
It is recommended that Retaining Wall Type 1A, per Caltrans Standard B3‐3 or equivalent, be constructed around the entire perimeter of the Bioretention Facility. This practice will protect the  sides  of  the  Bioretention  Facility  from  collapsing  during  construction  and  maintenance  or from high service loads adjacent to the BMP. Where such service loads would not exist adjacent to the BMP, an engineered alternative may be used if signed by a licensed civil engineer.

Side Slope Requirements

Bioretention Facilities Requiring Side Slopes
The  design  should  assure  that  the  Bioretention  Facility  does  not  present  a  tripping  hazard.

Bioretention Facilities proposed near pedestrian areas, such as areas parallel to parking spaces or along a walkway, must have a gentle slope to the bottom of the facility. Side slopes inside of a Bioretention Facility shall be 4:1. A typical cross section for the Bioretention Facility is shown in Figure 1.

Bioretention Facilities Not Requiring Side Slopes
Where cars park  perpendicular  to  the  Bioretention  Facility,  side  slopes  are  not  required.  A  6‐ inch maximum drop may be used, and the Bioretention Facility must be planted with trees and shrubs to prevent pedestrian access. In this case, a curb is not placed around the Bioretention Facility,
but  wheel  stops  shall  be  used  to  prevent  vehicles  from  entering  the  Bioretention  Facility,  as shown in Figure 4.

Figure 4: Bioretention Facility Layout without Side Slopes

BIORETENTION FACILITY BMP FACT SHEET

Riverside County - Low Impact Development BMP Design Handbook rev. 2/2012

Page 6 ends

Planter Boxes
Bioretention  Facilities  can  also  be  placed  above  ground  as  planter  boxes.  Planter  boxes  must have a minimum width of 2 feet, a maximum surcharge depth of 6 inches, and no side slopes are necessary. Planter boxes must be constructed so as to ensure that the top surface of the engineered  soil  media  will  remain  level.  This  option  may  be  constructed  of  concrete,  brick, stone  or  other  stable  materials  that  will  not  warp  or  bend.  Chemically  treated  wood  or galvanized steel, which has the ability to contaminate stormwater, should not be used. Planter boxes must be lined with an impermeable liner on all sides, including the bottom. Due to the impermeable liner, the inside bottom of the planter box shall be designed and constructed with a cross fall, directing treated flows within the subdrain layer toward the point where subdrain exits  the  planter  box,  and  subdrains  shall  be  oriented  with  drain  holes  oriented  down.  These provisions will help avoid excessive stagnant water within the gravel underdrain layer. Similar to  the  in‐ground  Bioretention  Facility  versions,  this  BMP  benefits  from  healthy  plants  and biological activity in the root zone. Planter boxes should be planted with appropriately selected vegetation.

Figure 5: Planter Box
Source: LA Team Effort
Overflow
An  overflow  route  is  needed  in  the  Bioretention  Facility  design  to  bypass  stored  runoff  from storm events larger than VBMP or in the event of facility or subdrain clogging. Overflow systems must connect to an acceptable discharge point, such as a downstream conveyance system as shown in Figure 1 and Figure 4. The inlet to the overflow structure shall be elevated inside the Bioretention Facility to be flush with the ponding surface for the design capture volume (VBMP) as  shown  in  Figure  4.  This  will  allow  the  design  capture  volume  to  be  fully  treated  by  the Bioretention Facility, and for larger events to safely be conveyed to downstream systems. The overflow inlet shall not be located in the entrance of a Bioretention Facility, as shown in Figure

6. BIORETENTION FACILITY BMP FACT SHEET

Riverside County - Low Impact Development BMP Design Handbook rev. 2/2012

Page 7 ends

Underdrain Gravel and Pipes
An underdrain gravel layer and pipes shall be provided in accordance with Appendix B – Underdrains.

Figure 6: Incorrect Placement of an Overflow Inlet.

Inspection and Maintenance Schedule
The  Bioretention  Facility  area  shall  be  inspected  for  erosion,  dead  vegetation,  soggy  soils,  or standing  water.  The  use  of  fertilizers  and  pesticides  on  the  plants  inside  the  Bioretention Facility should be minimized.

Schedule  Activity
Ongoing
 Keep adjacent landscape areas maintained. Remove clippings from landscape maintenance activities.
 Remove trash and debris
 Replace damaged grass and/or plants
 Replace surface mulch layer as needed to maintain a 2‐3 inch soil cover.

After storm events   Inspect areas for ponding
Annually   Inspect/clean inlets and outlets

Riverside County - Low Impact Development BMP Design Handbook rev. 2/2012

Page 8 ends

Bioretention Facility Design Procedure

1) Enter the area tributary, AT, to the Bioretention Facility.

2) Enter the Design Volume, VBMP, determined from Section 2.1 of this Handbook.

3) Select the type of design used. There are two types of Bioretention Facility designs: the standard design used for most project sites that include side slopes, and the modified design  used  when  the  BMP  is  located  perpendicular  to  the  parking  spaces  or  with planter boxes that do not use side slopes.

4) Enter  the  depth  of  the  engineered  soil  media,  dS.  The  minimum  depth  for  the engineered soil media can be 18' in limited cases, but it is recommended to use 24' or a preferred 36' to provide an adequate root zone for the chosen plant palette. Engineered soil media deeper than 36' will only get credit for the pore space in the first 36'.

5) Enter the top width of the Bioretention Facility.

6) Calculate  the  total  effective  depth,  dE,  within  the  Bioretention  Facility.  The  maximum allowable pore space of the soil media is 30% while the maximum allowable pore space for the gravel layer is 40%.  Gravel layer deeper than 12' will only get credit for the pore space in the first 12'.

a. For the design with side slopes the following equation shall be used to determine the total effective depth. Where, dP is the depth of ponding within the basin. d୉ሺftሻ ൌ

0.3 ൈ ቂ൫w୘ሺftሻ ൈd ୗሺftሻ൯൅4 ൫ d୔ሺftሻ൯
ଶ
ቃ ൅ 0.4 ൈ 1ሺftሻ ൅d ୔ሺftሻൣ4d୔ሺftሻ ൅൫ w୘ሺftሻ െ8 d୔ሺftሻ൯൧ w୘ሺftሻ
This above equation can be simplified if the maximum ponding depth of 0.5’ is used.  The  equation  below  is  used  on  the  worksheet  to  find  the  minimum  area required for the Bioretention Facility:
d୉ሺftሻ ൌ ሺ0.3 ൈ dୗሺftሻ ൅ 0.4 x 1ሺftሻሻ െቆ 0.7 ሺftଶሻ
w୘ሺftሻ ቇ൅0 . 5ሺftሻ

Riverside County - Low Impact Development BMP Design Handbook rev. 2/2012

Page 9 ends

b. For  the  design  without  side  slopes  the  following  equation  shall  be  used  to determine the total effective depth:
d୉ሺftሻ ൌd ୔ሺftሻ ൅ ሾሺ0.3ሻ ൈd ୗሺftሻ ൅ ሺ0.4ሻ ൈ 1 ሺ f t ሻሿ

The  equation  below,  using  the  maximum  ponding  depth  of  0.5',  is  used  on  the worksheet to find the minimum area required for the Bioretention Facility:

d୉ሺftሻ ൌ0 . 5 ሺftሻ ൅ ሾሺ0.3ሻ ൈd ୗሺftሻ ൅ ሺ0.4ሻ ൈ 1 ሺ f t ሻሿ

7) Calculate the minimum surface area, AM, required for the Bioretention Facility. This does not include the curb surrounding the Bioretention Facility or side slopes.

A୑ሺftଶሻ ൌ V୆୑୔ሺftଷሻ
d୉ ሺftሻ

8) Enter the proposed surface area.   This area shall not be less than the minimum required surface area.

9) Verify  that  side  slopes  are  no  steeper  than  4:1  in  the  standard  design,  and  are  not required in the modified design.

10) Provide  the  diameter,  minimum  6  inches,  of  the  perforated  underdrain  used  in  the Bioretention  Facility.  See  Appendix  B  for  specific  information  regarding  perforated pipes.

11) Provide  the  slope  of  the  site  around  the  Bioretention  Facility,  if  used.  The  maximum slope is 3 percent for a standard design.

12) Provide the check dam spacing, if the site around the Bioretention Facility is sloped.

13) Describe the vegetation used within the Bioretention Facility.

Riverside County - Low Impact Development BMP Design Handbook rev. 2/2012

Page 10 ends

References Used to Develop this Fact Sheet
Anderson, Dale V. "Landscaped Filter Basin Soil Requirements." Riverside, May 2010.

California Department of Transportation. CalTrans Standard Plans. 15 September 2005. May 2010 <http://www.dot.ca.gov/hq/esc/oe/project_plans/HTM/stdplns‐met‐new99.htm>.

Camp Dresser and McKee Inc.; Larry Walker Associates. California Stormwater Best Management Practice Handbook for New Development and Redevelopment. California Stormwater Quality Association (CASQA), 2004.

Contra Costa Clean Water Program. Stormwater Quality Requirements for Development Applications. 3rd Edition. Contra Costa, 2006.

County of Los Angeles Public Works. Stormwater Best Management Practice Design and Maintenance Manual. Los Angeles, 2009.

Kim, Hunho, Eric A. Seagren and Allen P. Davis. "Engineered Bioretention for Removal of Nitrate from Stormwater Runoff." Water Environment Research 75.4 (2003): 355‐366.

LA Team Effort. LA Team Effort: FREE Planter Boxes for Businesses. 2 November 2009. May 2010 <http://lateameffort.blogspot.com/2009/11/free‐planter‐boxes‐for‐businesses‐est.html>.

Montgomery County Maryland Department of Permitting Services Water Resources Section.

Biofiltration (BF). Montgomery County, 2005.

Program, Ventura Countywide Stormwater Quality Management. Technical Guidance Manual for Stormwater Quality Control Measures. Ventura, 2002.

United States Environmental Protection Agency. Storm Water Technology Fact Sheet Bioretention. Washington D.C, 1999.

Urban Drainage and Flood Control District. Urban Storm Drainage Criteria Manual Volume 3 ‐ Best Management Practices. Vol. 3. Denver, 2008. 3 vols.

Urbonas, Ben R. Stormwater Sand Filter Sizing and Design: A Unit Operations Approach. Denver:

Urban Drainage and Flood Control District, 2002.

THIS PAGE INTENTIONALLY LEFT BLANK