SPECIFIC PLAN - DEVELOPMENT STANDARDS*
CANYON SPRINGS BUSINESS PARK
(Originally adopted on January 17, 1984 by Resolution No. 15249) Prepared by:
T&S Development, Inc. (in association with Consultants) 5225 Canyon Crest Drive Building 100, Suite 150
Riverside, California 92507
* This handout constitutes Section l of the original "Springs" Specific Plan. Other Sections of the document may be viewed at the Riverside Planning Department AUGUST 2017
REVISED OCTOBER 2025
Printed on 30% post-consumer recycled material.
Canyon Springs Business Park
Specific Plan
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 TOC-1
TABLE OF CONTENTS
Section Page No.
EXECUTIVE SUMMARY .................................................................................................... ES-1 SECTION 1 INTRODUCTION AND BACKGROUND........................................................ 1-1
1.1 Project Description...............................................................................................1-1
1.1.1 Type and Scale of Project ........................................................................1-1
1.1.1.1 Planning Area 1: Regional Shopping Center.........................1-6
1.1.1.2 Planning Area 2: Support Commercial..................................1-7
1.1.1.3 Planning Area 3: Mixed Use Retail/Office............................1-8
1.1.1.4 Planning Area 4: Mixed Use Retail/Office..........................1-10
1.1.1.5 Planning Area 5: Support Commercial................................1-12
1.1.1.6 Planning Area 6: Highway/Community Retail....................1-13
1.1.1.7 Planning Area 7....................................................................1-14
1.1.1.8 Planning Area 8: Corporate Office ......................................1-14
1.1.1.9 Planning Area 9: Professional Office ..................................1-16
1.1.1.10 Planning Area 10: Medical Campus....................................1-17
1.1.2 Type of Ownership ................................................................................1-19
1.1.3 Supporting Documents/Cases................................................................1-19
1.2 Project Setting....................................................................................................1-20
1.2.1 General and Specific Location...............................................................1-20
1.2.2 Community Setting Characteristics .......................................................1-20
1.2.3 Area Development Trends.....................................................................1-21
1.2.4 Expected Timeframe for Development..................................................1-21
EXHIBITS
1 General Plan Land Use ..................................................................................................ES-3 2 Zoning............................................................................................................................ES-5 TABLE
1 Summary of Planning Areas..........................................................................................ES-2 Canyon Springs Business Park
Specific Plan
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 TOC-2
INTENTIONALLY LEFT BLANK
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 ES-1
EXECUTIVE SUMMARY
The CANYON SPRINGS project is located at the far easterly corporate limits of the City of Riverside. The general plan has designated the project site for Commercial uses, and represents a logical infill of development into an area where urban services and utilities are either now available, or can be provided.
CANYON SPRINGS is a regionally oriented mixed use development that combines commercial, office, entertainment, and recreational uses within a total gross area of approximately 222 acres.
Planning Areas 1, 2, 3, 4, 5, and 6 comprise approximately 188 acres and consist of the Commercial Retail zoned portions of the project. Planning Area 7 has been removed and is now part of the Canyon Springs Healthcare Campus Specific Plan. Planning Areas 8, 9, and 10 comprise approximately 34 acres and consist of the Office zoned portions of the project. A three-acre parcel in Planning Area 10 is a flood detention basin and zoned Public Facilities.
CANYON SPRINGS will enjoy the benefits of a master planned development. The infrastructure and other public facilities have been sufficiently sized to meet the needs of the entire community at full build-out. In addition, specific planning and design elements such as land use compatibility, site design, architecture, and landscaping will be consistently applied to assure a varied yet homogeneous project.
The project can be constructed without damage to the environment beyond that caused by the incremental increase in human activity. The project site is not in a natural biological state, with no identified archaeological or historical resources.
CANYON SPRINGS will fulfill a demonstrated need in this area for additional job and business opportunities that provide for a balance from the predominately residential land use pattern in Moreno Valley to the east. The project has been designed to meet identified market demands. In addition, the Fiscal Impact Analysis for the project indicates that the proposed mix of land uses will result in an annual surplus of $6 million dollars to the City of Riverside upon full build-out.
The following exhibits and table outline the General Plan and Zoning for each of the Site Planning Areas for CANYON SPRINGS and the total acreage for each Planning Area.
This amendment to the CANYON SPRINGS Business Park Specific Plan (CSBP) is for the purpose of rescinding all or portions of the Planning Areas that will become the Canyon Springs Healthcare Campus (CSHC) Specific Plan, pending adoption. Planning Area 7 has been rescinded in its entirety and the boundaries of Planning Areas 8, 9 and 10 have been modified to remove the portions that encompass the CSHC Specific Plan area. The exhibits herein have been revised to reflect the new Planning Area boundaries, as well as the updated General Plan and Zoning
EXECUTIVE SUMMARY
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 ES-2
designations that have changed since the last amendment. Section 1 of the CSBP Specific Plan is amended to update each Planning Area with revised acreages and/or current zoning designations.
All other Sections of the CSBP Specific Plan remain unchanged as they establish the setting and constraints, policy framework and development plan and program that direct growth in CANYON SPRINGS. The result is two specific plans that are independently implemented to avoid conflict between policies, standards, and regulations of both specific plans. Therefore, there will be no inconsistencies between the CSHC Specific Plan and the CSBP Specific Plan.
Table 1
Summary of Planning Areas
Planning Area Acreage Zone
1 54.01 Commercial Retail
2 15.72 Commercial Retail
3 27.17 Commercial Retail
4 22.01 Commercial Retail
5 28.35 Commercial Retail
6 40.31 Commercial Retail
8 19.50 15.60 Office
9 6.93 10.83 Office
10 7.93 Office
TOTAL 221.93
LA Fitness
Party City
Canyon Park Drive
Day Street
Gateway Drive
Corporate Center Place
Valley
Springs
Parkway
Canyon Springs Parkway
Eucalyptus Avenue
CSHCSP
CSHCSP
CSHCSP
Planning
Area 1
Planning
Area 6
Planning
Area 5
Planning
Area 2
Planning
Area 3
Planning
Area 4
Planning
Area 8
Planning
Area 9
Planning
Area 10
Planning
Area 10
Exhibit 1: General Plan Land Use
Canyon Springs Business Park Specific Plan
SOURCE: Bing 2025, 2017; County of Riverside, 2017
Date: 10/16/2025 - Last saved by: cbattle - Path: Z:\Projects\j1861001\MAPDOC\CSBP SP\CSBP SP.aprx 0 250 500
n
Feet
NewProjectBoundary
Canyon Springs Business Park Specific Plan
Planning Areas
General Plan Land Use Description
Business/Office Park
Commercial
Project Site
Canyon Springs Healthcare Campus Specific Plan
(CSHCSP)
EXECUTIVE SUMMARY
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 ES-4
INTENTIONALLY LEFT BLANK
Canyon Park Drive
Day Street
Gateway Drive
Corporate Center Place
Valley
Springs
Parkway
Eucalyptus Avenue
Canyon Springs Parkway
CSHCSP
CSHCSP
CSHCSP
Planning
Area 1
Planning
Area 6
Planning
Area 5
Planning
Area 2
Planning
Area 3
Planning
Area 4
Planning
Area 8
Planning
Area 9
Planning
Area 10
Planning
Area 10
Exhibit 2: Zoning
Canyon Springs Business Park Specific Plan
SOURCE: Bing 2025, 2017; County of Riverside, 2017
Date: 10/16/2025 - Last saved by: cbattle - Path: Z:\Projects\j1861001\MAPDOC\CSBP SP\CSBP SP.aprx 0 250 500
n
Feet
Canyon Springs Business Park Specific Plan
Planning Areas
Zoning Description
Business and Manufacturing Park Zone
Commercial Retail Zone
Office Zone
Public Facilities Zone
Canyon Springs Healthcare Campus Specific Plan
(CSHCSP)
EXECUTIVE SUMMARY
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 ES-6
INTENTIONALLY LEFT BLANK
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-1
SECTION 1
INTRODUCTION AND BACKGROUND
1.1 PROJECT DESCRIPTION
1.1.1 Type and Scale of Project
The purpose of this Specific Plan is to create a commerce center of retail commercial, office, and recreational uses together with appropriate public, quasi-public and private services and facilities necessary to accommodate the shopping, employment, service, and recreational needs of the clientele of the project. The Plan proposes the creation of ten planning areas, as more fully described in subsequent discussions. Each planning area provides a focus of development which differs from one another in use and intensity, however, integrated with one another in image and quality. A plan of architectural design and thematic landscape along with pedestrian, bicycle, and vehicular circulation systems, will serve to unify the planning areas and aid in promoting a "sense of place".
The Plan proposes to accommodate the most intensive use, the Regional Shopping Center within the northwest quadrant of the site, buffered from surrounding properties by the roadbeds of adjacent freeways Interstate 215 and State Route 60, as well as the remaining planning areas of CANYON SPRINGS. From this use, the planning areas form rings of development in complementary uses from support commercial to offices; a well-defined planning use hierarchy.
Traveler and community oriented retail uses are concentrated at the interchange nodes of the adjacent freeways at Day Street and Eucalyptus Avenue respectfully. The location of these uses accommodates the needs of the travelers and those seeking community-oriented retail goods and services, without requiring more lengthy vehicular trips either through the adjacent Edgemont Community, or within CANYON SPRINGS itself.
There are no well-defined natural drainage areas, hillsides, existing water feature, rock outcroppings, tree stands, or historical or archeological features which might influence development patterns on the project site. The Plan proposes the full conversion of the site to urban uses, however, approximately 15 percent of the project site will be reserved for landscaping in the form of setbacks along roadway corridors, disbursement within paved parking areas and to complement structures within the project. Landscaping, while not effective in reducing noise, will be used to "mask" vehicular and mechanical noises through the rustling of leaves. The sound of moving water will serve a similar function in the water features to be used extensively within CANYON SPRINGS. Additionally, a flood control retention basin has been designed and constructed on the north side of Eucalyptus Avenue at the south end of the project. Flood control basin land and construction cost will be deducted from storm water improvements assessments cost attributable to the project at the time of building permit issuance.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-2
Examples of ongoing methods of reinforcing the sense of place include the institution and enforcement of strict architectural, landscape and signage criteria and standards, the use of the project name "CANYON SPRINGS", establishment of consistent logo, color and graphics, and the creation of community programs and facilities.
The various planning areas and the related circulation network have been established on the basis of the particular needs of each use area. For example, the Regional Shopping Center is located on the most visually prominent site in the project and the internal circulation system directs traffic from the freeway interchange nodes directly to the Center with the least impact on the surrounding community. Conversely, the professional office area does not require freeway visibility, but needs major street access to the transportation network which can be provided primarily by Day Street.
An additional benefit to the office uses anticipated are the compatibility features which are designed into the plan to buffer the Edgemont Community to the south. They include the limiting of building height and provision of setbacks, walls, and landscaping to provide visual screening performance. Additionally, strict standards will eliminate glare, noise, odor, smoke, dust, vibration, and such environment disturbances which preclude such uses in proximity to an elementary school dwelling.
Conditions, Covenants, and Restrictions have been recorded over the entire project to assure the quality of development envisioned by The Plan and the continued quality maintenance of CANYON SPRINGS. The C.C. & R.'s provide for a maintenance and management plan for the entire specific plan area. The maintenance and management plan identifies the method by which ongoing responsibility for maintenance and management of private roads, parking, open space areas, signing, landscaping, irrigation, lake areas, common areas, and other responsibilities will be provided. The maintenance and management responsibilities will be met through the formation of a master commercial property owners association combined with subordinate associations.
While each of the nine Planning Areas are individually named and described, it is intended that these Planning Areas are a part of the overall CANYON SPRINGS Project. As the project responds to the demands of the market place, there will be a need for density tradeoffs between planning areas.
All streets have been built to public street standards at capacities to serve CANYON SPRINGS at each stage of development including full buildout. The following street improvements have and will be implemented during the development of CANYON SPRINGS. The following road improvement standards will apply to the new streets providing access to this project (refer to the Exhibit 3 to identify street segments):
• Special Standard (110-foot-wide, 6 lane arterial highway) Canyon Springs Parkway and Valley Springs Parkway.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-3
• Standard No. 101 (100-foot-wide major highway) Corporate Centre Place, Canyon Park Drive, and Gateway Drive.
• Day Street will be upgraded from a secondary highway to a 110-foot-wide arterial highway between the northern most access to the project site and Eucalyptus Avenue. From the northern most access to Highway 60, Day Street has been improved to 110-foot-wide, 10 lane to 6 lane arterial standards. The improvement of Day Street will be coordinated with the west side curb and gutter and match-up paving requirements previously attributed to the adjacent Towngate Project.
• Eucalyptus Avenue will be upgraded to a 110 foot arterial between Day Street and Valley Springs Parkway. The portion of Eucalyptus Avenue west of Valley Springs Parkway will be improved to 134-foot-wide, six lane arterial standards with the development by Cal Trans of the full interchange to be located at Eucalyptus and I-215. • The following intersections shall be signalized:
o I-215 at Eucalyptus Avenue (both legs of the interchange depending upon design). o Highway 60 at Day Street (Both Legs). •
o Canyon Springs Parkway at Day Street
o Campus Parkway at Day Street
o Eucalyptus Avenue at Day Street •
o Eucalyptus Avenue at Valley Springs Parkway
The cost of signalization will be deducted from the Traffic Signal Assessment costs attributable to the project at the time of building permit issuance.
Architectural quality will be emphasized throughout CANYON SPRINGS. Quality building materials will be required such as brick, masonry, concrete, glass, tile, wood and the like; metal buildings will not be permitted. C.C. & R.'s have been established within the management framework of CANYON SPRINGS. Approval by the Declarant of Architectural Plans shall be based, among other things, upon adequacy of site dimensions; adequacy of structural design; conformity and harmony of external design with neighboring structures; effect of locations and use of the proposed Improvements upon the Improvements on neighboring Sites and the operations and uses conducted on such Sites; relation of topography, grade and finished ground elevation of the Site being improved to that of neighboring Sites; proper facing of main elevation with respect to nearby streets; and conformity of the Architectural Plans to the purpose of general plan and intent of the provision of the Declaration.
No one style will be mandated for CANYON SPRINGS. The overall theme of the project will be one of timeless contemporary structures of substance and quality. The majority of the structures SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-4
will feature prominent roof lines and eaves, subtle use of texture and pattern and color. Windows will be oriented where possible or appropriate for cooling and aesthetic interest. Mechanical equipment and utility meters will be either enclosed or visually and acoustically screened.
Some structures will be featured as accents within the urbane design framework of CANYON SPRINGS. These buildings may feature more traditional building styles, materials, and colors and will be represented by free-standing independent uses, such as restaurants. These elements are intended to provide spice within the architectural recipe and will be carefully and thoughtfully integrated in CANYON SPRINGS.
CANYON SPRINGS landscape design will consist of formally landscaped areas planted with materials chosen for their resistance to drought and for ease of maintenance, as well as their appearance for their chosen location. The following page is a typical representation of plant material for CANYON SPRINGS.
Landscape will be used as a visual and physical amenity. Minimum 10-foot-deep landscaped setbacks will be provided between all public street rights-of-way and adjacent development.
Mounded areas of turf or massing of shrubs will be provided in setback areas adjacent to parking areas in order to provide a visual barrier; softening the view.
In plaza areas, textured paving will be interspersed with tree groupings, shrubs, ground covers and turf. Quality details including decorative street furniture, boulders, bollards, lighting, pavement in various textures, and water features will be integrated throughout CANYON SPRINGS. The landscaping plans will emphasize an attractive visual quality, as well as provide shade, color, aroma, texture, accent and softening of the view of structures.
All parking areas in CANYON SPRINGS will include a minimum of five (5) percent in landscaped areas. The majority of plant material in parking areas will consist of trees to reduce glare, provide shade and visually soften the appearance of the parking area.
A palette of plant material will be recommended by experienced landscape architects in keeping with the requirements of CANYON SPRINGS. Consistent landscape treatments and use of a defined palette of material will provide visual harmony in CANYON SPRINGS. Within the basic landscape framework, some variety will be permitted in landscape design between the various Planning Areas to add character and identity.
The landscaped areas will be irrigated by automatically controlled systems. Emphasis will be placed on water conservation measures such as drip emitters, and underground emitters where feasible.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-5
Typical Landscape Material
Hedges, screens, backgrounds and barriers:
Deciduous
• Elaeagnus Angustifolia
• Fouquieria Splendens
• Liquidambar Styraciflua
• Maclura Pomifera
• Viburnum Opulus
Groundcovers
• Abelia Grandiflora "Prostrata”
• Baccharis Pilularis
• Carissa Grandiflora
• Hebe Menziesii
• Hedera
• Juniperus
• Mahonia Repens
• Mazus Reptans
• Osteospermum
• Phyla Nodiflora
• Sagina Subulata
• Turf
• Zoysia Tenuifolia
Trees
• Cedrus Deodora
• Eucalyptus
• Fraxinus Modesto
• Jacaranda Mimosifolia
• Lagerstroemia lndica
• Liriodendron Tulipifera
• Pinus
• Platanus Acerfolia
• Platanus Racemosa
• Podocarpus
• Populus
Evergreen
• Abelia Grandiflora
• Callistemon Salignus
• Ceratonia Siliqua
• Cocculus Laurifolius
• Dodonaea Viscosa
• Eucalyptus
• Eugenia Uniflora
• Hebe Buxifotia
• ltea
• Juniperus
• Lagunaria Patersonii
• Lysiloma Thomberi
• Mahonia Aquifolium
• Nandina Domestica
• Nerium Oleander
• Photinia
• Pittosporum Tobira
• Pittosporum Undulaturn
• Raphiolepsis
• Sequoia Sempervirens
• Taxus
• Tecomaria Capensis
• Viburnum Suspensum
• Xylosma Congestum
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-6
1.1.1.1 Planning Area 1: Regional Shopping Center
The major commercial element of Canyon Crossings at Canyon Springs consists of a Regional Shopping Center. The Regional Shopping Center consists of a 54.01 acre site for an open center containing leased shops and anchored by several major stores and restaurants.
The buildings are orientated in an “L” shape along the two highways. This has been planned for four major reasons: topography, vista, site constraints and identity. Topographically, the site is relatively flat sloping gently from north to south. The major site constraints consist of underground lines of the California Aqueduct and the Metropolitan Water Districts, both of which bisect the project site. While each of the pipelines have restrictions against structures; parking, landscaping, and streets may cross over them. Therefore, Canyon Crossings is planned to avoid these pipelines.
The landscape design in Planning Area 1 will emphasize three points:
1. The softening of the view into the site from surrounding roadways through the use of low mounds, shrub masses, including use of shrubs and columnar-shaped trees;
2. The shading of the parking area through the use of canopy-shaped trees;
3. The landscape will soften and enhance the building structure with the use of accent groundcovers, shrubs and trees, along with hardscape elements. Water features near the mall would be formalized to complement the urban nature of the structure and landscape pattern.
Uses Permitted
The uses anticipated within Canyon Crossings will comply with the Uses Permitted section of the Commercial Retail Zone as of the date of this Specific Plan Amendment.
Summary of Development Standards – Planning Area I
Setbacks: Building setbacks will be per the standards of the Commercial Retail Zone.
Landscape: Landscape shall be per the standards of the Commercial Retail Zone.
Parking Standards: Parking standards shall be per the standards of Table 19.580.060 “Required Spaces”.
The parking spaces may be shared parking between the different retail uses with arrangement to satisfy the total parking space requirements for the project. This will be accomplished through the provision of SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-7
reciprocal ingress, egress and parking agreements between all contiguous parcels by the Parcel Map.
Special
Requirements:
The following items shall be screened from view:
• Trash Storage
• Mechanical Equipment
• Utility Meters
• Loading Areas
1.1.1.2 Planning Area 2: Support Commercial
The Regional Oriented Retail support commercial uses will be contained in a 15.72 acre site. Uses within Planning Area 2 will be developed as freestanding uses such as restaurants, financial institutions, a theater complex, and furniture showrooms, as well as multiple-tenant retail uses as a support element to the Regional Shopping Center. These uses could include a wide range of primarily one-story buildings containing gift shops, boutiques, appliance and specialty retail and service establishments.
Occasional two-story structures may be included, as well as service facilities such as an automobile service station. Additionally, multiple story office and hotel uses may be included.
The full development of the Regional Oriented Retail support commercial uses will be constructed incrementally throughout the three phases of development of CANYON SPRINGS.
The architectural design of the support commercial uses will primarily feature masonry construction, stucco facades, and wood and tile trim. Heavy overhangs will serve to provide shaded walkways and to shade store-front showroom windows.
The landscape design in Planning Area 2 will emphasize three points:
1. The softening of the view into the site from surrounding roadways through the use of low mounds and shrub masses, and columnar-shaped trees;
2. Shading of the parking areas through the use of canopy-shaped trees;
3. The landscape will soften and enhance the building structures with the use of accent ground covers, shrubs, and trees, along with hardscape elements.
The intent of the landscape design of Planning Area 2 is to reflect and complement the landscape design of Planning Area 1.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-8
Uses Permitted
The uses anticipated within the Regional Oriented Retail support commercial will comply with the Uses Permitted in the Commercial Retail Zone.
SUMMARY OF DEVELOPMENT STANDARDS - Planning Area 2
Setbacks: Building setbacks will be a minimum of 25 feet from Canyon Springs Parkway and a minimum of 20 feet from Campus Parkway and Corporate Centre Place.
Landscape setbacks will be a minimum of 20 feet from Canyon Springs Parkway and a minimum of 10 feet from Campus Parkway and Corporate Centre Place.
Landscape: Landscape shall be provided per the standards of the Riverside Municipal Code.
Building Heights: Building heights will be per the standards of the Commercial Retail zone.
Parking Standards: Parking shall be provided at a ratio of 1 parking stall per 250 square feet of gross leasable area.
A maximum 30 percent of all parking stalls will be designed as compact car stalls.
Special
Requirements:
The following items shall be screened from view:
• Trash Storage
• Mechanical Equipment
• Utility Meters
• Loading Areas
1.1.1.3 Planning Area 3: Mixed Use Retail/Office
Planning Area 3 contains 27.17 acres, including approximately 21 acres to the east consisting of Highway Commercial uses such as restaurants, shops, hotels, and uses catering to the traveler. The structures will be mostly freestanding one (1) story structures; however, some taller structures will SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-9
be planned such as a motor inn. The remaining area to the west includes multiple-story hotel and office buildings as well as support recreational, retail and restaurant facilities.
Construction in Planning Area 3 will occur during all three phases of development of CANYON SPRINGS.
The architectural design of the Highway Commercial/Hotel uses will focus on the Hotel, the largest and tallest structure anticipated for Planning Area 3. The Hotel will feature masonry, concrete, and glass as the major exterior expressed building materials. These materials will be repeated in the smaller freestanding restaurant, automobile service station and shop structures. Heavy overhangs will serve to provide shaded walkways and to shade store-front showroom windows.
The landscape design in Planning Area 3 will emphasize three points:
1. The softening of the view into the site from surrounding roadways through the use of low mounds and shrub masses, and columnar-shaped trees. This design applies to the view from State Route 60 as well.
2. Shading of the parking area through the use of canopy-shaped trees.
3. The landscape will soften and enhance the building structures with the use of accent ground covers, shrubs, and trees, along with hardscape elements including rock-salt finish concrete, bomanite, and river rock. Outdoor recreation facilities associated with the Hotel such as the swimming pool will be screened by dense shrub massing.
The intent of the landscape design in Planning Area 3 is to coordinate the appearance between the east and west areas as well as provide a continuity of design with the larger commercial planning areas 1, 2 and 4 adjacent to the west and south.
Uses Permitted
The uses anticipated within the Highway Commercial/Hotel area will comply with the Uses Permitted in the Commercial Retail Zone. .
SUMMARY OF DEVELOPMENT STANDARDS - Planning Area 3
Setbacks: Building setbacks will be a minimum of 23 feet from Day Street and 25 feet from Canyon Springs Parkway.
Building setbacks will be a minimum of 20 feet from adjacent freeway rights-of-way.
Landscape setbacks will be a minimum of 23 feet from Day Street, 20 feet from Canyon Springs Parkway and 15 feet from the adjacent freeway.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-10
Landscape: Landscape shall be provided per the standards of the Riverside Municipal Code.
Building Heights: Building heights shall be per the standards of the Commercial Retail Zone except that the major hotel may be permitted to a maximum of 11 stories.
Parking Standards: Office and retail parking in Planning Area 3 shall be provided to a ratio of 1 parking stall per 250 square feet of gross leasable area regulations standards with the exception of the hotel and motel which will provide 1 parking stall per two rooms and restaurant which shall provide 1 parking stall per 100 square feet of gross leasable area.
A maximum 30 percent of all parking stalls will be designed as compact car stalls.
Special
Requirements:
The following items shall be screened from view:
• Trash Storage
• Mechanical Equipment
• Utility Meters
• Loading Areas
1.1.1.4 Planning Area 4: Mixed Use Retail/Office
Planning Area 4 contains 22 acres. The Retail Commercial area will consist of major commercial tenants and freestanding and in line shops primarily of one to two stories. Construction within this planning area will be implemented incrementally throughout the three phases of development of CANYON SPRINGS, with an emphasis in the first and second phases. This planning area is intended to provide an environment oriented to retail commercial uses with ancillary and support uses such as restaurants, barber and beauty shops, health clubs, interior decorators showrooms, mimeographing and blueprint services and pharmacies.
The architectural design of the Retail Commercial area will depend heavily upon wood elements as well as masonry and stucco facades. Eclectic roof elements including overhangs, arches, and arcades will be emphasized. Masonry elements and river rock would serve as accent materials on the structures.
The landscape design in Planning Area 4 will emphasize four points:
1. The softening of the view into the site from surrounding roadways through the use of low mounds and shrub masses, and columnar-shaped trees;
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-11
2. Shading of the parking area through the use of canopy-shaped trees;
3. The landscape will soften and enhance the building structures with the use of accent ground covers, shrubs, and trees;
4. The landscape design will provide vistas from inside the structures and outdoor areas for human use, including pedestrian ways and plazas. Hardscape elements including rock-salt finish concrete, bomanite, and river rock will be incorporated. A major urban fountain feature will accent the project at Day Street and Canyon Springs Parkway.
Uses Permitted
The uses anticipated within the Retail Commercial area will comply with the Uses Permitted section of the Commercial Retail Zone.
SUMMARY OF DEVELOPMENT STANDARDS - Planning Area 4
Setbacks: Building setbacks will be a minimum of 23 feet from Day Street, 25 feet from Canyon Springs Parkway and a minimum of 20 feet from Campus Parkway and Corporate Centre Place.
Landscape setbacks will be a minimum of 23 feet from Day Street and 20 feet from Canyon Springs Parkway and 10 feet from Campus Parkway and Corporate Centre Place.
Landscape: Landscape shall be provided per the standards of the Commercial Retail Zone.
Building Heights: Building heights shall be provided per the standards of the Riverside Municipal Code.
Parking Standards: Parking shall be provided to a ratio of 1 parking stall per 250 square feet of gross leasable area.
A maximum 30 percent of all parking stalls will be designed as compact car stalls.
Special
Requirements
The following items shall be screened from view:
• Trash Storage
• Mechanical Equipment
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-12
• Utility Meters
• Loading Areas
1.1.1.5 Planning Area 5: Support Commercial
Planning Area 5 contains 28.35 acres. Planning Area 5 provides support uses, (including indoor retail, additional offices, and services uses), and serves as a transition from the predominantly single story, free-standing retail uses on neighboring parcels to the south.
Uses Permitted
Commercial Retail and Office uses as listed in Table 19.150.020(A) of the Riverside Municipal Code, excluding drive-in restaurants.
SUMMARY OF DEVELOPMENT STANDARDS - Planning Area 5
Minimum Lot Size: One acre
Setbacks: Building setbacks will be a minimum of 25 feet from Valley Springs Parkway and a minimum of 20 feet from Campus Parkway and Corporate Centre Place.
Landscape setbacks will be a minimum of 20 feet from Valley Springs Parkway and a minimum of 10 feet from Campus Parkway and Corporate Centre Place.
Landscape: Landscape shall be provided per the standards of the Riverside Municipal Code.
Building Heights: Building heights shall be provided per the standards of the Commercial Retail Zone.
Parking Standards: Parking shall be provided in compliance with Table 19.580.060 “Required Spaces” of the Riverside Municipal Code. Shared parking shall be permitted per an approved plan and associated reciprocal easement agreement.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-13
1.1.1.6 Planning Area 6: Highway/Community Retail
The Highway/Community Oriented Retail uses will be contained in a 40.31 acre site. Uses within Planning Area 6 will be developed as one-story freestanding uses such as restaurants, financial institutions, showrooms, catalogue, Jr. department and discount stores, as well as multiple-tenant retail uses. Occasional two-story structures may be included, as well as service facilities such as an automobile service station. Additionally, multiple story office and hotel/motel uses are planned.
The full development of the Highway/Community Oriented Retail uses will be constructed incrementally throughout the three phases of development of CANYON SPRINGS. The majority of construction, however, will be in earlier phases.
The architectural design of the Highway/Community Oriented Retail uses will primarily feature masonry construction, stucco facades, and wood and tile trim. Covered walkways and other architectural features will be articulated on multiple-tenant structures.
The landscape design in Planning Area 6 will emphasize three points:
1. The softening of the view into the site from surrounding roadways through the use of low mounds and shrub masses and columnar-shaped trees. This design applies to the view from adjacent Interstate 215 as well;
2. Shading of parking areas through the use of canopy-shaped trees;
3. The landscape will soften and enhance the building structures with the use of accent ground covers, shrubs, and trees along with hardscape elements.
Uses Permitted
The uses anticipated in the Highway/Community Oriented Retail planning area will comply with the Uses Permitted section of the Commercial Retail Zone.
SUMMARY OF DEVELOPMENT STANDARDS - Planning Area 6
Setbacks: Building setbacks will be a minimum of 25 feet from Valley Springs Parkway.
Building setbacks will be a minimum of 20 feet from Interstate 215.
Building setbacks will be a minimum of 20 feet from Eucalyptus Avenue.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-14
Landscape setbacks will be a minimum of 20 feet from Valley Springs Parkway, a minimum of 15 feet from Interstate 215, and a minimum of 10 feet from Eucalyptus Avenue.
Landscape: Landscape shall be provided per the standards of the Riverside Municipal Code.
Building Heights: Building heights will be per the standards of the Commercial Retail zone.
Parking Standards: Parking shall be provided at a ratio of 1 parking stall per 250 square feet of gross leasable area.
A maximum 30 percent of all parking stalls will be designed as compact car stalls.
Special
Requirements:
The following items shall be screened from view:
• Trash Storage
• Mechanical Equipment
• Utility Meters
• Loading Areas
1.1.1.7 Planning Area 7
Planning Area 7 has been rescinded from the Canyon Springs Business Park Specific Plan and is now part of the Canyon Springs Healthcare Campus (CSHC) Specific Plan Area. Refer to the CSHC Specific Plan for permitted uses and development standards pertaining to this area.
1.1.1.8 Planning Area 8: Corporate Office
Corporate Office/Health Club uses will be in an area totaling 19.5 15.6 acres. Planning Area 8 will consist of freestanding, garden, and corporate offices. A health club/spa is planned in the southern area of Planning Area 8 and will include such uses as racquet ball courts, gymnasium, tennis and basketball courts, a swimming pool, jogging track related retail uses such as eating establishments, sports clothing, sporting goods and vitamin sales. Several support uses such as restaurants, barber and beauty shops, interior decorator showrooms, blueprinting and pharmacies may be included in the office areas. The tallest structures in CANYON SPRINGS will be concentrated in this Planning Area, away from residential uses and the Edgemont Community to the South.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-15
The architectural design of the Corporate Office uses will depend upon wood and stucco elements, and masonry, concrete, and glass. Sloping roof elements and overhangs will shade window areas on lower structures. Larger, taller structures will provide an architectural accent in the use of glass curtain wall structures. Masonry and stone elements may serve as accent materials on the larger structures. Major parking structures are anticipated to provide parking for the office buildings.
The landscape design in Planning Area 8 will emphasize four points:
1. The softening of the view into the site from surrounding roadways through the use of 1ow mounds, shrub masses and columnar-shaped trees;
2. Shading of the parking areas through the use of canopy-shaped trees;
3. the landscape will soften and enhance the structures with the use of accent ground covers, shrubs and trees;
4. The landscape design will provide vistas from inside the structures and outdoor areas for human use, including courtyards and plazas. Hardscape elements including rock-salt concrete, bomanite, and river rock will be incorporated with water features. In garden office areas, the water features will typically focus upon smaller scale streams and ponds, while more formalized fountains will be associated with larger structures. A small lake- feature, planned to serve storm water retention may be incorporated near the health club. Shrub and tree massing will screen and enclose outdoor activities associated with the health club.
Uses Permitted
The uses anticipated in the Corporate Office Planning Area will comply with the Uses Permitted Section of the Office Zone.
SUMMARY OF DEVELOPMENT STANDARDS – Planning Area 8
Setbacks: Building setbacks will be a minimum of 25 feet from Valley Springs Parkway and a minimum of 20 feet from Campus Parkway, Canyon Park Drive, Gateway Drive, and Corporate Centre Place.
Landscape setbacks will be a minimum of 20 feet from Valley Springs Parkway and Canyon Park Drive and a minimum of 10 feet from Campus Parkway, Gateway Drive, and Corporate Centre Place.
Landscape: Landscape shall be provided per the standards of the Riverside Municipal Code.
Building Heights: Maximum building heights shall be per the standards of the Office Zone.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-16
Parking Standards: Parking in Planning Area 8 shall be in compliance with Table 19.580.060 “Required Spaces” in the Riverside Municipal Code. A maximum 30 percent of all parking stalls will be designed as compact car stalls.
Special
Requirements:
The following items shall be screened from view:
• Trash Storage
• Mechanical Equipment
• Utility Meters
• Loading Areas
1.1.1.9 Planning Area 9: Professional Office
Planning Area 9 contains 6.93 10.83 acres. The Professional Office area will consist of freestanding and garden office complexes. Construction within this planning area will be implemented incrementally throughout the three phases of development of CANYON SPRINGS, with an emphasis in the first and second phases. This planning area is intended to provide a campus-like environment of offices primarily oriented to service and professional pursuits with ancillary and support uses such as restaurants, barber and beauty shops, interior decorators showrooms, mimeographing and blueprint services and pharmacies.
The architectural design of the Professional Office uses will depend heavily upon wood elements as well as masonry and stucco facades. Sloping roof elements and overhangs will shade window areas. Larger, taller structures will provide an architectural accent in the use of glass curtain wall structures. Masonry and stone elements may serve as accent materials on the larger structures.
Parking structures may be utilized.
The landscape design in Planning Area 9 will emphasize four points:
1. The softening of the view into the site from surrounding roadways through the use of low mounds, shrub masses, columnar-shaped trees, and canopy- shaped trees;
2. Shading of the surface parking areas through the use of canopy-shaped trees
3. The landscape will soften and enhance the structures with the use of accent ground covers, shrubs, and trees;
4. The landscape design will provide vistas from inside the structures and outdoor areas for human use, including atriums, courtyards, and plazas. Hardscape elements including rocksalt finish concrete, bomanite, and river rock will be incorporated.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-17
Uses Permitted
The uses anticipated within the Professional Office area will comply with the Uses Permitted Section of the Office Zone.
SUMMARY OF DEVELOPMENT STANDARDS - Planning Area 9
Setbacks: Building setbacks will be a minimum of 23 feet from Day Street and a minimum of 20 feet from Campus Parkway, Canyon Park Drive, and Gateway Drive.
Landscape setbacks will be a minimum of 23 feet from Day Street, a minimum of 20 feet from Canyon Park Drive and 10 feet from Campus Parkway and Gateway Drive.
Landscape: Landscape shall be provided per the standards of the Riverside Municipal Code.
Building Heights: Maximum building heights shall be per the standards of the Office Zone.
Parking Standards: Parking in Planning Area 9 shall be in compliance with Table 15.580.060 “Required Spaces” of the Riverside Municipal Code. A maximum 30 percent of all parking stalls will be designed as compact car stalls.
Special
Requirements:
The following items shall be screened from view:
• Trash Storage
• Mechanical Equipment
• Utility Meters
• Loading Areas
1.1.1.10 Planning Area 10: Medical Campus
Planning Area 10 contains 7.93 acres. The Medical Campus area will consist of freestanding and garden office complexes primarily of two (2) to four (4) stories in height. Construction within this planning area will be implemented incrementally throughout the three phases of development of CANYON SPRINGS, with an emphasis in the first and second phases. This planning area is intended to provide a campus-like environment of offices primarily oriented to service, medical and professional pursuits with ancillary and support uses such as restaurants, barber and beauty SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-18
shops, interior decorators showrooms, mimeographing and blueprint services and pharmacies.
Additionally, a 3 acres storm water detention basin is located in this planning area on the north side of Eucalyptus Avenue.
The architectural design of the Medical Campus uses will depend upon wood elements as well as masonry and stucco facades. Sloping roof elements and overhangs will shade window areas.
Larger and taller structures will provide an architectural accent in the use of glass curtain wall structures. Masonry elements would serve as accent materials on the larger structures.
The landscape design in Planning Area 10 will emphasize four points:
1. The softening of the view into the site from surrounding roadways through the use of low mounds and shrub masses, and columnar-shaped trees, and canopy-shaped trees;
2. Shading of the surface parking areas through the use of canopy-shaped trees;
3. The landscape will soften and enhance the structures with the use of accent ground covers, shrubs, and trees;
4. The landscape design will provide vistas from inside the structures and outdoor areas for human use, including atriums, courtyards, and plazas. Hardscape elements including rocksalt finish concrete, bomanite, and river rock will be incorporated.
Uses Permitted
The uses anticipated within the Medical Campus area will comply with the Uses Permitted Section of the Office Zone.
SUMMARY OF DEVELOPMENT STANDARDS - Planning Area 10
Setbacks: Building setbacks will be a minimum of 23 feet from Day and Eucalyptus Streets and a minimum of 20 feet from Gateway Drive.
Building setbacks will be a minimum of 50 feet from existing school uses.
Landscape: Landscape setbacks will be a minimum of 23 feet from Day and Eucalyptus Streets and a minimum of 10 feet from Gateway Drive.
Landscape setbacks will be 10 feet from existing school uses and will include one evergreen tree per 200 square feet of planter.
Additional landscape shall be provided per the standards of the Riverside Municipal Code as appropriate.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-19
Building Heights: Maximum building heights shall be per the standards of the Commercial and Office Zone except that maximum building heights within 200 feet of existing school use will be limited to two (2) stories above grade.
Parking Standards: Parking in Planning Area 10 shall be in compliance with Table 19.580.060 “Required Spaces” of the Riverside Municipal Code. A maximum 30 percent of all parking stalls will be designed as compact car stalls.
Special
Requirements:
The following items shall be screened from view:
• Trash Storage
• Mechanical Equipment
• Utility Meters
• Loading Areas
A six-foot high masonry wall shall be provided along property boundaries between Planning Area 10 and adjacent existing school uses. Special performance standards shall be established and enforced to minimize light and glare on adjacent school.
1.1.2 Type of Ownership
Ownership will vary with air and/or ground leases, condominium or user ownership as possibilities. Detailed covenant, conditions and restrictions have been filed on the property to establish architectural landscape and signing criteria, maintenance requirements and allow common ingress and egress, and parking agreements where necessary. The above-described elements will be integrated as the entire CANYON SPRINGS project is developed to provide a highly landscaped balanced use business community where one can shop, work, and recreate within an integrated development and campus-like environment.
1.1.3 Supporting Documents/Cases
In addition and complementary to this Specific Plan document, an annexation to the City of Riverside has been accomplished (Annexation No. 51), a General Plan, prezoning and subsequent zoning cases (R-56-867, R-23-878, and R-24-878), have been approved to implement the commercial element and office uses anticipated for the project. Zoning Case R-80-845 also established the WC zoning to the detention basin. Additionally, a Development Agreement (Case DA-1-845) has been approved to guide the development rights for the project.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-20
An Environmental Impact Report was filed concurrently with the application and approved by the City.
A Parcel Map (PM 19617) has been recorded to implement the project. Further land divisions will be necessary to implement specific development proposals.
1.2 PROJECT SETTING
1.2.1 General and Specific Location
The project site is located at the far easterly corporate limits of the City of Riverside at the southeast intersection of Interstate 215, which extends in a southeasterly direction to Mexico and northerly to Canada, and State Route 60, which extends in an east-west direction from Beaumont to Los Angeles. The Towngate Development is located to the east across Day Street. March Air Force Base, to the south of the Edgemont community, southerly of the project site, is a major military headquarters for flight training and military transport.
The project site is a portion of the Bums and Karr Tract per Map Book 15, page 97, and a portion of Tract Number Twelve per Map Book 10, pages 7 and 8, both records of Riverside County in Section 3 Township 3 South, Range 4 West, of the United States Geological Service Riverside East Topographic Quadrangle, San Bernardino Base and Meridian.
1.2.2 Community Setting Characteristics
A number of diverse uses comprise the community setting. To the north across State Route 60 there are a few scattered residences and business and the 42 acre Canyon Springs Plaza shopping center in the City of Moreno Valley. The rugged slopes of Box Springs Mountain Regional Park lie further to the north. The Towngate Project, located across Day Street is a commercial, office and residential development in the City of Moreno Valley. Further to the east lies the urbanizing Moreno Valley area presently characterized by single family and scattered multiple-family dwellings, and commercial uses located along major arterials. The Edgemont Elementary School and the established community of Edgemont are also located south of the project site. To the west, across Interstate 215, is the Sycamore Canyon Business Park which includes both developed and undeveloped industrial land. Additionally, a spur line of the Atchinson, Topeka and Santa Fe Railroad generally parallels the westerly side of Interstate 215. Further to the west is vacant land planned for development as the Sycamore Canyon Business Park Specific Plan and the Sycamore Canyon arroyo planned for preservation as a wilderness park. This arroyo is part of a system of arroyos generally heading in a northwesterly direction through the City of Riverside to the Santa Ana River.
Three non-contiguous areas of the CSBP Specific Plan area have been rescinded as part of this amendment and will be re-zoned as the Canyon Springs Healthcare Campus Specific Plan. These SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-21
areas are identified in Exhibit 1 (General Plan land use) and Exhibit 2 (Zoning) in the Executive Summary of this Specific Plan. The areas are currently vacant and rough-graded. The northwest
10.45 14.35-acre semi-rectangular shaped area will be a senior housing facility; the northeast 10.27
6.37-acre irregular-shaped area will be an independent living, assisted living, and skilled nursing facility; and the south 30.13-acre irregular-shaped area will be a hospital, medical office buildings (MOBs), and parking structure.
1.2.3 Area Development Trends
The subject property is adjacent to the City of Moreno Valley, an area experiencing rapid urbanization. Moreno Valley has experienced growth primarily in the residential sector, with the major emphasis on single-family homes which appear to be more competitively priced than housing in surrounding communities and counties. Office, commercial, and industrial development has occurred recently, but to a very much lesser degree than housing.
The trend toward development of this region is influenced by availability of freeway access, flat topography, availability of sewer, water, and other utilities and comparable lower land costs and the availability of large-acreage property. The steadily declining productivity and profitability of farming operations historically located in the Moreno Valley area have also influenced the trend toward land development.
1.2.4 Expected Timeframe for Development
The construction of CANYON SPRINGS will be conducted on a phases basis that will require approximately ten years to achieve complete buildout. Each of these planning areas will experience some degree of simultaneous development. The initial street and utility systems were completed in 1986. The initial development will be concentrated near Day Street, however, until improvements can be made to the intersection of-215 and Eucalyptus Avenue.
SECTION 1 – INTRODUCTION AND BACKGROUND
Canyon Springs Business Park Specific Plan
August 2017, Revised October 2025 1-22