Jurisdiction Roseville ANNUAL ELEMENT PROGRESS REPORT
Reporting
Year 2025
(Jan. 1 - Dec.
31) Housing Element Implementation Cells in grey contain auto-calculation f ormulas Planning
Period 6th Cycle 05/15/2021 - 05/15/2029
Note: "+" indicates an optional field
6350 Baseline Rd
Unit 174
Units 174/175 -
Estia - Duplex - 1-
bedroom ea., 1-
story - 1418 SF
BD25-5039 2 to 4O
0 2 10/2/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 176
Units 176/177 -
Estia - Duplex - 1-
bedroom ea., 1-
story - 1418 SF
BD25-5040 2 to 4O
0 2 10/2/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 178
Units 178/179 -
Estia - Duplex - 1-
bedroom ea., 1-
story - 1418 SF
BD25-5041 2 to 4O
0 2 10/2/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 180
Units 180/181 -
Estia - Duplex - 1-
bedroom ea., 1-
story - 1418 SF
BD25-5042 2 to 4O
0 2 10/2/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 182
Units 182/183 -
Estia - Duplex - 1-
bedroom ea., 1-
story - 1418 SF
BD25-5043 2 to 4O
0 2 10/2/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 184
Units 184/185 -
Estia - Duplex - 1-
bedroom ea., 1-
story - 1418 SF
BD25-5044 2 to 4O
0 2 10/2/202520 NONE NoN Application stated moderate
lev el
499-010-014-000
6350 Baseline Rd
Unit 186
Units 186/187 -
Estia - Duplex - 1-
bedroom ea., 1-
story - 1418 SF
BD25-0430 2 to 4O
0 2 2/4/202520 NONE NoN Application stated moderate
lev el
499-010-014-000
6350 Baseline Rd
Unit 21 - 41
Units 21/22 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD24-7074 2 to 4O
0 2 2/4/202520 NONE NoN Application stated moderate
lev el
499-010-014-000
6350 Baseline Rd
Unit 23
Units 23/24 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD24-7073 2 to 4O
0 2 2/4/202520 NONE NoN Application stated moderate
lev el
499-010-014-000
6350 Baseline Rd
Unit 25
Units 25/26 - Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD24-7075 2 to 4O
0 2 8/18/202520 NONE NoN Application stated moderate
lev el
499-010-014-000
6350 Baseline Rd
Unit 27
Units 27/28 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD24-7072 2 to 4O
0 2 8/18/202520 NONE NoN Application stated moderate
lev el
499-010-014-000
6350 Baseline Rd
Unit 29
Units 29/30 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD24-7071 2 to 4O
0 2 8/18/202520 NONE NoN Application stated moderate
lev el
499-010-014-000
6350 Baseline Rd
Unit 31
Units 31/32 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD24-7070 2 to 4O
0 2 8/18/202520 NONE NoN Application stated moderate
lev el
499-010-014-000
6350 Baseline Rd
Unit 33
Units 33/34 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD24-7069 2 to 4O
0 2 8/18/202520 NONE NoN Application stated moderate
lev el
499-010-014-000
6350 Baseline Rd
Unit 35
Units 35/36 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD24-7068 2 to 4O
0 2 8/18/202520 NONE NoN Application stated moderate
lev el
499-010-014-000
6350 Baseline Rd
Unit 37
Units 37/38 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD24-7067 2 to 4O
0 2 8/18/202520 NONE NoN Application stated moderate
lev el
499-010-014-000
6350 Baseline Rd
Unit 39
Units 39/40 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD24-7066 2 to 4O
0 2 8/18/202520 NONE NoN Application stated moderate
lev el
499-010-014-000
6350 Baseline Rd
Unit 41
Units 41/42 - Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD24-7076 2 to 4O
0 2 8/18/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 47
Units 47/48- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4802 2 to 4O
0 2 9/10/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 49
Units 49/50- Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD25-4805 2 to 4O
0 2 9/10/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 51
Units 51/52- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4801 2 to 4O
0 2 9/10/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 53
Units 53/54- Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD25-4804 2 to 4O
0 2 9/10/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 55
Units 55/56- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4800 2 to 4O
0 2 9/10/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 57
Units 57/58- Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD25-4803 2 to 4O
0 2 9/10/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 59
Units 59/60 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD25-4851 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 61
Units 61/62- Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD25-4852 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 63
Units 63/64 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD25-4853 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 65
Units 65/66 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD25-4854 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 67
Units 67/68 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD25-4855 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 69
Units 69/70 - Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD25-4856 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 71
Units 71/72- Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD25-4857 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 73
Units 73/74- Estia -
Duplex - 2-
bedrooms ea., 1-
story - 2166 SF
BD25-4858 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 75
Units 75/76- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4859 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 77
Units 77/78- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4860 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 79
Units 79/80- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4861 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 81
Units 81/82- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4862 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 83
Units 83/84- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4863 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 85
Units 85/86- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4864 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 87
Units 87/88- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4865 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 89
Units 89/90- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4866 2 to 4O
0 2 9/17/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 91
Unit 91 - Estia -
SFD - 2-bedroom, 1-
story - 1083 SF
BD25-4807 SFDO
0 1 9/10/202510 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 92
Units 92/93- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4799 2 to 4O
0 2 9/10/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 94
Unit 94- Estia - SFD
- 2-bedroom, 1-
story - 1083 SF
BD25-4806 SFDO
0 1 9/10/202510 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 95
Units 95/96- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4798 2 to 4O
0 2 9/10/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 97
Units 97/98- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4797 2 to 4O
0 2 9/10/202520 NONE NoN Application stated moderate
lev el
6350 Baseline Rd
Unit 99
Units 99/100- Estia -
Duplex - 1-bedroom
ea., 1-story - 1418
SF
BD25-4796 2 to 4O
0 2 9/10/202520 NONE NoN Application stated moderate
lev el
496-740-025-000 640 Imperial Ct
Lot 355 Ar32
Amoruso Ranch
Ph1 PV
BD25-2721 SFDO
0 1 6/20/202510 NONE NoN
496-740-026-000 641 Imperial Ct
Lot 356 Ph1
Amoruso Ranch
Ph1 PV
BD25-3115 SFDO
0 1 6/27/202510 NONE NoN
496-790-036-000 641 Silv er Canoe
Ct Lot 97 Ar-117A
Amoruso Ranch AR117A PV
BD25-2014 SFDO
0 1 6/13/202511 11/25/20251 NONE NoN
496-790-037-000 649 Silv er Canoe
Ct Lot 98 Ar-117A
Amoruso Ranch AR117A PV
BD25-2015 SFDO
0 1 6/13/202511 12/3/20251 NONE NoN
358-070-022-000 6597 Laurel Crest
Ci Unit A
Unit A - (N) DET
ADU - 319SF
BD25-5277 ADUR
0 1 11/19/202510 NONE NoN Af f ordable by design
363-240-039-000 697 Tamarindo
Wy Unit A
Conv erting existing
garage into a ADU,
adding new kitchen,
bathroom and liv ing
area
BD21-1672 ADUR
0 01 7/10/20251 NONE NoN Af f ordable by design
496-780-023-000 700 Buf f alo Ct Lot
88 Ar46
Amoruso Ranch AR46 PV
BD25-0033 SFDO
0 1 3/5/202511 11/5/20251 NONE NoN
496-820-024-000 700 Chipmunk Ct
Lot 24 P4V8
L-24 SFD 2470/438
PV
BD25-3924 SFDO
0 1 10/8/202510 NONE NoN
496-740-007-000 700 Fountain Ct
Lot 337 Ar
Amoruso Ranch
Ph1 PV
BD25-2020 SFDO
0 1 6/5/202511 10/8/20251 NONE NoN
498-290-001-000 700 White Sands
Pl Lot 1 Df -20
Sierra Vista DF-20
PV
BD24-6621 SFDO
0 01 6/6/20251 NONE NoN Application stated moderate
lev el
498-390-048-000 7000 Carbone Dr
Lot 48 Cg 1
Sierra Vista Torrente
Ph 2 PV
BD24-5133 SFDO
0 01 3/27/20251 NONE NoN Application stated moderate
lev el
496-840-041-000
7000 Lone
Sy camore St Lot
41 C20
Creekv iew C20 PV BD24-5809 SFDO
0 01 3/14/20251 NONE NoN Application stated moderate
lev el
499-180-073-000 7000 Ny strom Wy
Lot 141 Kt20A
Sierra Vista KT-20A
PV
BD24-5508 SFDO
0 01 6/27/20251 NONE NoN Application stated moderate
lev el
498-420-057-000 7000 Star Rise
Wy Lot 57 Fd2
Sierra Vista Parcel
FD-2 PV
BD24-5371 SFDO
0 01 3/19/20251 NONE NoN
492-490-094-000 7001 El Cerrito
Wy Lot 92 F6-A1
WR Fiddy ment F6A1 PV
BD24-3930 SFDO
0 01 1/21/20251 NONE NoN
496-840-040-000
7001 Lone
Sy camore St Lot
40 C20
Creekv iew C20 PV BD24-5808 SFDO
0 01 3/14/20251 NONE NoN Application stated moderate
lev el
499-180-090-000 7001 Ny strom Wy
Lot 158 Kt20A
Sierra Vista KT-20A
PV
BD24-5511 SFDO
0 01 7/7/20251 NONE NoN Application stated moderate
lev el
498-360-100-000 7001 Star Mist Wy
Lot 100 Fd9
Pulte - SV Solaire
Ph6 Vil9
BD24-4520 SFDO
0 01 3/10/20251 NONE NoN
498-420-056-000 7001 Star Rise
Wy Lot 56 Fd2
Sierra Vista Parcel
FD-2 PV
BD24-5370 SFDO
0 01 3/24/20251 NONE NoN
496-730-033-000 7001 Vail Ranch
Rd Lot 245 Ar26
Amoruso Ranch
Ph1 PV
BD25-0857 SFDO
0 1 3/5/202511 9/18/20251 NONE NoN
498-390-049-000 7008 Carbone Dr
Lot 49 Cg 1
Sierra Vista Torrente
Ph 2 PV
BD24-5134 SFDO
0 01 3/21/20251 NONE NoN Application stated moderate
lev el
496-840-042-000
7008 Lone
Sy camore St Lot
42 C20
Creekv iew C20 PV BD24-5810 SFDO
0 01 3/11/20251 NONE NoN Application stated moderate
lev el
499-180-074-000 7008 Ny strom Wy
Lot 142 Kt20A
Sierra Vista KT-20A
PV
BD24-5509 SFDO
0 01 7/3/20251 NONE NoN Application stated moderate
lev el
498-420-058-000 7008 Star Rise
Wy Lot 58 Fd-2
Sierra Vista Parcel
FD-2 PV
BD24-6105 SFDO
0 01 4/3/20251 NONE NoN
492-490-093-000 7009 El Cerrito
Wy
WR Fiddy ment F6A1 PV
BD24-3929 SFDO
0 01 1/17/20251 NONE NoN
496-840-039-000
7009 Lone
Sy camore St Lot
39 C20
Creekv iew C20 PV BD24-5807 SFDO
0 01 3/18/20251 NONE NoN Application stated moderate
lev el
499-180-089-000 7009 Ny strom Wy
Lot 157 Kt20A
Sierra Vista KT-20A
PV
BD24-5510 SFDO
0 01 7/11/20251 NONE NoN Application stated moderate
lev el
498-360-101-000 7009 Star Mist Wy
Lot 101 Fd9
Pulte - SV Solaire
Ph6 Vil9
BD24-4521 SFDO
0 01 3/10/20251 NONE NoN
498-420-055-000 7009 Star Rise
Wy Lot 55 Fd-2
Sierra Vista Parcel
FD-2 PV
BD24-6104 SFDO
0 01 4/21/20251 NONE NoN
496-730-032-000 7009 Vail Ranch
Rd Lot 244 Ar26
Amoruso Ranch
Ph1 PV
BD25-0856 SFDO
0 1 3/5/202511 9/24/20251 NONE NoN
496-820-012-000 701 Chipmunk Ct
Lot 12 Ph4V8
L-12 SFD
2724/471PV
BD25-4625 SFDO
0 1 10/23/202510 NONE NoN
015-920-033-000 701 Southern Hills
Ct 53 Sv cc
Inf ill Sierra View
Country Club PV
BD25-5829 SFDO
0 1 12/18/202510 NONE NoN
498-390-050-000 7016 Carbone Dr
Lot 50 Ph2
Sierra Vista Torrente
Ph 2 PV
BD24-6747 SFDO
0 01 6/18/20251 NONE NoN Application stated moderate
lev el
496-840-043-000
7016 Lone
Sy camore St Lot
43 C20
Creekv iew C20 PV BD24-5811 SFDO
0 01 3/11/20251 NONE NoN Application stated moderate
lev el
499-180-075-000 7016 Ny strom Wy
Lot 143 Kt-20
Sierra Vista KT-20A
PV
BD24-5842 SFDO
0 01 7/15/20251 NONE NoN Application stated moderate
lev el
498-420-059-000 7016 Star Rise
Wy Lot 59 Fd-2
Sierra Vista Parcel
FD-2 PV
BD24-6106 SFDO
0 01 4/17/20251 NONE NoN
496-730-034-000 7016 Vail Ranch
Rd Lot 246 Ar-26
Amoruso Ranch
Ph1 PV
BD25-1633 SFDO
0 1 4/18/202511 10/8/20251 NONE NoN
498-390-046-000 7017 Carbone Dr
Lot 46 Ph2
Sierra Vista Torrente
Ph 2 PV
BD24-6746 SFDO
0 01 5/30/20251 NONE NoN Application stated moderate
lev el
492-490-092-000 7017 El Cerrito
Wy Lot 90 F6-A1
WR Fiddy ment F6A1 PV
BD24-3928 SFDO
0 01 1/22/20251 NONE NoN
496-840-038-000
7017 Lone
Sy camore St Lot
38 C20
Creekv iew C20 PV BD24-5806 SFDO
0 01 3/24/20251 NONE NoN Application stated moderate
lev el
499-180-088-000 7017 Ny strom Wy
Lot 156 Kt-20
Sierra Vista KT-20A
PV
BD24-5845 SFDO
0 01 7/22/20251 NONE NoN Application stated moderate
lev el
498-360-102-000 7017 Star Mist Wy
Lot 102Ph6Vil9
Pulte - SV Solaire
Ph6 Vil9 - PV w/ESS
BD25-1130 SFDO
0 1 3/25/202511 9/19/20251 NONE NoN
498-420-054-000 7017 Star Rise
Wy Lot 54 Fd-2
Sierra Vista Parcel
FD-2 PV
BD24-6103 SFDO
0 01 4/15/20251 NONE NoN
496-730-031-000 7017 Vail Ranch
Rd Lot 243 Ar22
Amoruso Ranch
Ph1 PV
BD25-0951 SFDO
0 1 3/14/202511 9/25/20251 NONE NoN
498-390-051-000 7024 Carbone Dr
Lot 51 Ph2
Sierra Vista Torrente
Ph 2 PV
BD24-6748 SFDO
0 01 6/17/20251 NONE NoN Application stated moderate
lev el
496-840-044-000
7024 Lone
Sy camore St Lot
44 C20
Creekv iew C20 PV BD24-5812 SFDO
0 01 4/2/20251 NONE NoN Application stated moderate
lev el
499-180-076-000 7024 Ny strom Wy
Lot 144 Kt-20
Sierra Vista KT-20A
PV
BD24-5843 SFDO
0 01 7/22/20251 NONE NoN Application stated moderate
lev el
498-420-060-000 7024 Star Rise
Wy Lot 60 Fd2
Sierra Vista Parcel
FD-2 PV
BD24-6598 SFDO
0 01 5/8/20251 NONE NoN
496-730-035-000 7024 Vail Ranch
Rd Lot 247 Ar-26
Amoruso Ranch
Ph1 PV
BD25-1634 SFDO
0 1 4/18/202511 10/15/20251 NONE NoN
498-390-045-000 7025 Carbone Dr
Lot 45 Ph2
Sierra Vista Torrente
Ph 2 PV
BD24-6745 SFDO
0 01 6/12/20251 NONE NoN Application stated moderate
lev el
492-490-091-000 7025 El Cerrito
Wy Lot 89 F6-A1
WR Fiddy ment F6A1 PV
BD24-3927 SFDO
0 01 1/15/20251 NONE NoN
496-840-037-000
7025 Lone
Sy camore St Lot
37 C20
Creekv iew C20 PV BD24-5805 SFDO
0 01 3/26/20251 NONE NoN Application stated moderate
lev el
499-180-087-000 7025 Ny strom Wy
Lot 155 Kt-20
Sierra Vista KT-20A
PV
BD24-5844 SFDO
0 01 7/24/20251 NONE NoN Application stated moderate
lev el
498-360-103-000 7025 Star Mist Wy
Lot 103 Ph6
Pulte - SV Solaire
Ph6 Vil9 - PV w/ESS
BD25-1608 SFDO
0 1 5/6/202511 10/8/20251 NONE NoN
498-420-053-000 7025 Star Rise
Wy Lot 53 Fd2
Sierra Vista Parcel
FD-2 PV
BD24-6597 SFDO
0 01 6/16/20251 NONE NoN
496-730-030-000 7025 Vail Ranch
Rd Lot 242 Ar-26
Amoruso Ranch
Ph1 PV
BD25-1632 SFDO
0 1 4/18/202511 9/30/20251 NONE NoN
498-390-052-000 7032 Carbone Dr
Lot 52 Tor Ph2
Sierra Vista Torrente
Ph 2 PV
BD25-1039 SFDO
0 1 3/18/202511 9/22/20251 NONE NoN Application stated moderate lev el
496-840-045-000
7032 Lone
Sy camore St Lot
45 C20
Creekv iew C20 PV BD24-5813 SFDO
0 01 4/3/20251 NONE NoN Application stated moderate
lev el
499-180-077-000 7032 Ny strom Wy
Lot 145 Kt-20A
Sierra Vista KT-20A
PV
BD24-5880 SFDO
0 01 7/30/20251 NONE NoN Application stated moderate
lev el
498-420-061-000 7032 Star Rise
Wy Lot 61 Fd2
Sierra Vista Parcel
FD-2 PV
BD24-6599 SFDO
0 01 5/29/20251 NONE NoN
496-730-036-000 7032 Vail Ranch
Rd Lot 248 Ar-26
Amoruso Ranch
Ph1 PV
BD25-1635 SFDO
0 1 4/18/202511 10/21/20251 NONE NoN
498-390-044-000 7033 Carbone Dr
Lot 44 Cg-1
Sierra Vista Torrente
Ph 2 PV
BD25-0213 SFDO
0 1 2/12/202511 7/28/20251 NONE NoN Application stated moderate lev el
492-490-090-000 7033 El Cerrito
Wy Lot 88 F6-A1
WR Fiddy ment F6A1 PV
BD24-3926 SFDO
0 01 1/9/20251 NONE NoN

Page 291 of 981 ends

Jurisdiction Roseville ANNUAL ELEMENT PROGRESS REPORT
Reporting
Year 2025
(Jan. 1 - Dec.
31) Housing Element Implementation Cells in grey contain auto-calculation f ormulas Planning
Period 6th Cycle 05/15/2021 - 05/15/2029
Note: "+" indicates an optional field
496-840-036-000
7033 Lone
Sy camore St Lot
36 C20
Creekv iew C20 PV BD24-5804 SFDO
0 01 3/27/20251 NONE NoN Application stated moderate
lev el
499-180-086-000 7033 Ny strom Wy
Lot 154 Kt-20A
Sierra Vista KT-20A
PV
BD24-5884 SFDO
0 01 8/6/20251 NONE NoN Application stated moderate
lev el
498-360-104-000 7033 Star Mist Wy
Lot 104 Fd-9
Pulte - SV Solaire
Ph6 Vil9 - PV w/ESS
BD25-2698 SFDO
0 1 6/13/202511 12/9/20251 NONE NoN
498-420-052-000 7033 Star Rise
Wy Lot 52 Fd2
Sierra Vista Parcel
FD-2 PV
BD24-6596 SFDO
0 01 6/4/20251 NONE NoN
496-730-029-000 7033 Vail Ranch
Rd Lot 241 Ar-26
Amoruso Ranch
Ph1 PV
BD25-1631 SFDO
0 1 4/18/202511 11/4/20251 NONE NoN
498-390-053-000 7040 Carbone Dr
Lot 53 Ph2
Sierra Vista Torrente
Ph 2 PV
BD25-1457 SFDO
0 1 4/17/202511 10/14/20251 NONE NoN Application stated moderate lev el
496-840-046-000
7040 Lone
Sy camore St Lot
46 C20
Creekv iew C20 PV BD24-5814 SFDO
0 01 4/7/20251 NONE NoN Application stated moderate
lev el
499-180-078-000 7040 Ny strom Wy
Lot 146 Kt-20A
Sierra Vista KT-20A
PV
BD24-5882 SFDO
0 01 8/5/20251 NONE NoN Application stated moderate
lev el
498-420-062-000 7040 Star Rise
Wy Lot 62 Fd2
Sierra Vista Parcel
FD-2 PV
BD24-6611 SFDO
0 01 6/6/20251 NONE NoN
496-730-037-000 7040 Vail Ranch
Rd Lot 249 Ar
Amoruso Ranch
Ph1 PV
BD25-1829 SFDO
0 1 6/13/202511 11/25/20251 NONE NoN
498-390-043-000 7041 Carbone Dr
Lot 43 Tor Ph2
Sierra Vista Torrente
Ph 2 PV
BD25-1038 SFDO
0 1 3/18/202511 9/3/20251 NONE NoN Application stated moderate lev el
492-490-089-000 7041 El Cerrito
Wy Lot 87 F6-A1
WR Fiddy ment F6A1 PV
BD24-3925 SFDO
0 01 1/2/20251 NONE NoN
496-840-035-000
7041 Lone
Sy camore St Lot
35 C20
Creekv iew C20 PV BD24-5803 SFDO
0 01 3/27/20251 NONE NoN Application stated moderate
lev el
499-180-085-000 7041 Ny strom Wy
Lot 153 Kt-20A
Sierra Vista KT-20A
PV
BD24-5883 SFDO
0 01 8/8/20251 NONE NoN Application stated moderate
lev el
498-360-105-000 7041 Star Mist Wy
Lot 105 Ph6
Pulte - SV Solaire
Ph6 Vil9 - PV w/ESS
BD25-1609 SFDO
0 1 5/6/202511 10/9/20251 NONE NoN
498-420-051-000 7041 Star Rise
Wy Lot 51 Fd2
Sierra Vista Parcel
FD-2 PV
BD24-6613 SFDO
0 01 6/24/20251 NONE NoN
496-730-028-000 7041 Vail Ranch
Rd Lot 240 Ar-26
Amoruso Ranch
Ph1 PV
BD25-1630 SFDO
0 1 4/18/202511 11/4/20251 NONE NoN
498-390-054-000 7048 Carbone Dr
Lot 54 Ph2
Sierra Vista Torrente
Ph 2 PV
BD25-1458 SFDO
0 1 4/17/202511 10/9/20251 NONE NoN Application stated moderate lev el
496-840-047-000
7048 Lone
Sy camore St Lot
47 C20
Creekv iew C20 PV BD24-6366 SFDO
0 01 4/23/20251 NONE NoN Application stated moderate
lev el
499-180-079-000 7048 Ny strom Wy
Lot 147 Kt-20A
Sierra Vista KT-20A
PV
BD24-6359 SFDO
0 1 1/29/202511 8/12/20251 NONE NoN Application stated moderate lev el
498-420-063-000 7048 Star Rise
Wy Lot 63 Fd2
Sierra Vista Parcel
FD-2 PV
BD24-6612 SFDO
0 01 6/25/20251 NONE NoN
496-730-038-000 7048 Vail Ranch
Rd Lot 250 Ar
Amoruso Ranch
Ph1 PV
BD25-1830 SFDO
0 1 6/13/202510 NONE NoN
498-390-042-000 7049 Carbone Dr
Lot 42 Tor Ph2
Sierra Vista Torrente
Ph 2 PV
BD25-1037 SFDO
0 1 3/18/202511 9/9/20251 NONE NoN Application stated moderate lev el
492-490-088-000 7049 El Cerrito
Wy Lot 86 F6-A1
WR Fiddy ment F6A1 PV
BD24-3920 SFDO
0 01 1/6/20251 NONE NoN
499-180-084-000 7049 Ny strom Wy
Lot 152 Kt-20A
Sierra Vista KT-20A
PV
BD24-6362 SFDO
0 1 1/29/202511 8/25/20251 NONE NoN Application stated moderate lev el
498-360-106-000 7049 Star Mist Wy
Lot 106 Fd-9
Pulte - SV Solaire
Ph6 Vil9 - PV w/ESS
BD25-2699 SFDO
0 1 6/13/202511 12/9/20251 NONE NoN
498-420-050-000 7049 Star Rise
Wy Lot 50 Fd2
Sierra Vista Parcel
FD-2 PV
BD24-6614 SFDO
0 01 6/24/20251 NONE NoN
496-730-027-000 7049 Vail Ranch
Rd Lot 239 Ar-26
Amoruso Ranch
Ph1 PV
BD25-1629 SFDO
0 1 4/18/202511 11/4/20251 NONE NoN
498-390-055-000 7056 Carbone Dr
Lot 55 Trnt2
Sierra Vista Torrente
Ph 2 PV
BD25-1935 SFDO
0 1 5/14/202511 11/4/20251 NONE NoN Application stated moderate lev el
496-840-048-000
7056 Lone
Sy camore St Lot
48 C20
Creekv iew C20 PV BD24-6367 SFDO
0 01 4/23/20251 NONE NoN Application stated moderate
lev el
499-180-080-000 7056 Ny strom Wy
Lot 148 Kt-20A
Sierra Vista KT-20A
PV
BD24-6360 SFDO
0 1 1/29/202511 8/19/20251 NONE NoN Application stated moderate lev el
498-420-064-000 7056 Star Rise
Wy Lot 64 Fd-2
Sierra Vista Parcel
FD-2 PV
BD24-7115 SFDO
0 1 1/17/202511 7/8/20251 NONE NoN
496-730-039-000 7056 Vail Ranch
Rd Lot 251 Ar
Amoruso Ranch
Ph1 PV
BD25-1831 SFDO
0 1 6/13/202510 NONE NoN
498-390-041-000 7057 Carbone Dr
Lot 41 Trnt2
Sierra Vista Torrente
Ph 2 PV
BD25-1456 SFDO
0 1 4/17/202511 10/2/20251 NONE NoN Application stated moderate lev el
499-180-083-000 7057 Ny strom Wy
Lot 151 Kt-20A
Sierra Vista KT-20A
PV
BD24-6361 SFDO
0 1 1/29/202511 8/25/20251 NONE NoN Application stated moderate lev el
498-360-107-000 7057 Star Mist Wy
Lot 107 Fd-9
Pulte - SV Solaire
Ph6 Vil9 - PV w/ESS
BD25-2700 SFDO
0 1 6/13/202511 12/10/20251 NONE NoN
498-420-049-000 7057 Star Rise
Wy Lot 49 Fd-2
Sierra Vista Parcel
FD-2 PV
BD24-7113 SFDO
0 1 1/17/202511 7/28/20251 NONE NoN
496-730-026-000 7057 Vail Ranch
Rd Lot 238 Ar-26
Amoruso Ranch
Ph1 PV
BD25-1628 SFDO
0 1 4/18/202511 11/21/20251 NONE NoN
498-390-056-000 7064 Carbone Dr
Lot 56 Trnt2
Sierra Vista Torrente
Ph 2 PV
BD25-1936 SFDO
0 1 5/14/202511 11/17/20251 NONE NoN Application stated moderate lev el
496-840-049-000
7064 Lone
Sy camore St Lot
49 C20
Creekv iew C20 PV BD24-6368 SFDO
0 01 4/23/20251 NONE NoN Application stated moderate
lev el
499-180-081-000 7064 Ny strom Wy
Lot 149 Kt20A
Sierra Vista KT-20A
PV
BD24-6512 SFDO
0 1 2/7/202511 9/5/20251 NONE NoN Application stated moderate lev el
498-420-065-000 7064 Star Rise
Wy Lot 65 Fd-2
Sierra Vista Parcel
FD-2 PV
BD24-7114 SFDO
0 1 1/17/202511 7/18/20251 NONE NoN
496-730-040-000 7064 Vail Ranch
Rd Lot 252 Ar
Amoruso Ranch
Ph1 PV
BD25-1832 SFDO
0 1 6/13/202510 NONE NoN
498-390-040-000 7065 Carbone Dr
Lot 40 Trnt2
Sierra Vista Torrente
Ph 2 PV
BD25-1934 SFDO
0 1 5/14/202511 10/24/20251 NONE NoN Application stated moderate lev el
499-180-082-000 7065 Ny strom Wy
Lot 150 Kt20A
Sierra Vista KT-20A
PV
BD24-6513 SFDO
0 1 2/7/202511 9/10/20251 NONE NoN Application stated moderate lev el
498-420-048-000 7065 Star Rise
Wy Lot 48 Fd-2
Sierra Vista Parcel
FD-2 PV
BD24-7112 SFDO
0 1 1/17/202511 7/25/20251 NONE NoN
496-730-025-000 7065 Vail Ranch
Rd Lot 237 Ar-26
Amoruso Ranch
Ph1 PV
BD25-1627 SFDO
0 1 4/18/202511 11/20/20251 NONE NoN
498-390-057-000 7072 Carbone Dr
Lot 57 Trnt2
Sierra Vista Torrente
Ph 2 PV
BD25-1937 SFDO
0 1 5/14/202511 11/6/20251 NONE NoN Application stated moderate lev el
496-840-050-000
7072 Lone
Sy camore St Lot
50 C20
Creekv iew C20 PV BD24-6369 SFDO
0 01 4/29/20251 NONE NoN Application stated moderate
lev el
498-420-066-000 7072 Star Rise
Wy Lot 66 Fd-2
Sierra Vista Parcel
FD-2 PV
BD24-7110 SFDO
0 1 1/28/202510 NONE NoN
498-390-039-000 7073 Carbone Dr
Lot 39 Trnt2
Sierra Vista Torrente
Ph 2 PV
BD25-1933 SFDO
0 1 5/14/202511 10/24/20251 NONE NoN Application stated moderate lev el
498-420-047-000 7073 Star Rise
Wy Lot 47 Fd-2
Sierra Vista Parcel
FD-2 PV
BD24-7109 SFDO
0 1 1/28/202510 NONE NoN
496-780-024-000 708 Buf f alo Ct Lot
89 Ar46
Amoruso Ranch AR46 PV
BD25-0034 SFDO
0 1 3/5/202511 11/3/20251 NONE NoN
496-820-023-000 708 Chipmunk Ct
Lot 23 P4V8
L-23 SFD 2724/471
PV
BD25-3923 SFDO
0 1 10/8/202510 NONE NoN
496-740-008-000 708 Fountain Ct
Lot 338 Ar
Amoruso Ranch
Ph1 PV
BD25-2021 SFDO
0 1 6/5/202511 10/27/20251 NONE NoN
498-290-002-000 708 White Sands
Pl Lot 2 Df -20
Sierra Vista DF-20
PV
BD24-6622 SFDO
0 01 6/9/20251 NONE NoN Application stated moderate
lev el
498-420-067-000 7080 Star Rise
Wy Lot 67 Fd-2
Sierra Vista Parcel
FD-2 PV
BD24-7111 SFDO
0 1 1/28/202510 NONE NoN
496-730-009-000 7080 Vail Ranch
Rd Lot 155 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4126 SFDO
0 01 6/3/20251 NONE NoN
498-420-046-000 7081 Star Rise
Wy Lot 46 Fd-2
Sierra Vista Parcel
FD-2 PV
BD24-7108 SFDO
0 1 1/28/202510 NONE NoN
496-730-024-000 7081 Vail Ranch
Rd Lot 170 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4132 SFDO
0 01 5/20/20251 NONE NoN
496-730-010-000 7088 Vail Ranch
Rd Lot 156 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4127 SFDO
0 01 6/9/20251 NONE NoN
496-730-023-000 7089 Vail Ranch
Rd Lot 169 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4131 SFDO
0 01 5/20/20251 NONE NoN
496-820-013-000 709 Chipmunk Ct
Lot 13 P4V8
L-13 SFD 2470/438
PV
BD25-3921 SFDO
0 1 10/8/202510 NONE NoN
496-740-017-000 709 Fountain Ct
Lot 347 Ar32
Amoruso Ranch
Ph1 PV
BD25-2713 SFDO
0 1 6/20/202510 NONE NoN
015-920-032-000 709 Southern Hills
Ct 52 Sv cc
Inf ill Sierra View
Country Club PV
BD25-5828 SFDO
0 1 12/18/202510 NONE NoN
498-290-103-000 709 White Sands
Pl Lot 103 Df 20
Sierra Vista DF-20
PV
BD23-2465 SFDO
0 01 11/3/20251 NONE NoN Application stated moderate
lev el
496-730-011-000 7096 Vail Ranch
Rd Lot 157 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4128 SFDO
0 01 6/11/20251 NONE NoN
492-490-082-000 7097 El Cerrito
Wy Lot 80 F-6A1
WR Fiddy ment F6A1 PV
BD24-5078 SFDO
0 01 3/19/20251 NONE NoN
496-730-022-000 7097 Vail Ranch
Rd Lot 168 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4130 SFDO
0 01 5/28/20251 NONE NoN
496-730-012-000 7104 Vail Ranch
Rd Lot 158 Ar22
Amoruso Ranch
Ph1 PV
BD25-0305 SFDO
0 1 2/7/202511 6/13/20251 NONE NoN
492-490-081-000 7105 El Cerrito
Wy Lot 79 F-6A1
WR Fiddy ment F6A1 PV
BD24-5077 SFDO
0 01 3/5/20251 NONE NoN
496-730-021-000 7105 Vail Ranch
Rd Lot 167 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4129 SFDO
0 01 5/29/20251 NONE NoN
011-182-004-000 711 Alta Vista Av
Unit A
(N) DET ADU - w/
PV on ADU - 627sf
BD24-5581 ADUR
0 1 1/22/202510 NONE NoN Af f ordable by design
496-730-013-000 7112 Vail Ranch
Rd Lot 159 Ar22
Amoruso Ranch
Ph1 PV
BD25-0306 SFDO
0 1 2/7/202511 7/18/20251 NONE NoN
492-490-080-000 7113 El Cerrito
Wy Lot 78 F-6A1
WR Fiddy ment F6A1 PV
BD24-5076 SFDO
0 01 3/3/20251 NONE NoN
496-730-020-000 7113 Vail Ranch
Rd Lot 166 Ar22
Amoruso Ranch
Ph1 PV
BD25-0946 SFDO
0 1 3/12/202511 7/7/20251 NONE NoN
496-730-014-000 7120 Vail Ranch
Rd Lot 160 Ar22
Amoruso Ranch
Ph1 PV
BD25-0944 SFDO
0 1 3/14/202511 7/18/20251 NONE NoN
492-490-079-000 7121 El Cerrito
Wy Lot 77 F-6A1
WR Fiddy ment F6A1 PV
BD24-5075 SFDO
0 01 2/28/20251 NONE NoN
496-730-019-000 7121 Vail Ranch
Rd Lot 165 Ar22
Amoruso Ranch
Ph1 PV
BD25-0310 SFDO
0 1 2/7/202511 7/9/20251 NONE NoN
492-490-061-000 7128 El Cerrito
Wy Lot 59 F-6A1
WR Fiddy ment F6A1 PV
BD24-5069 SFDO
0 01 2/7/20251 NONE NoN
496-730-015-000 7128 Vail Ranch
Rd Lot 161 Ar22
Amoruso Ranch
Ph1 PV
BD25-0307 SFDO
0 1 2/7/202511 7/18/20251 NONE NoN
492-490-078-000 7129 El Cerrito
Wy Lot 76 F-6A1
WR Fiddy ment F6A1 PV
BD24-5074 SFDO
0 01 2/27/20251 NONE NoN
496-730-018-000 7129 Vail Ranch
Rd Lot 164 Ar22
Amoruso Ranch
Ph1 PV
BD25-0309 SFDO
0 1 2/7/202511 7/10/20251 NONE NoN
492-490-062-000 7136 El Cerrito
Wy Lot 60 F-6A1
WR Fiddy ment F6A1 PV
BD24-5070 SFDO
0 01 2/10/20251 NONE NoN
496-730-016-000 7136 Vail Ranch
Rd Lot 162 Ar22
Amoruso Ranch
Ph1 PV
BD25-0308 SFDO
0 1 2/7/202511 7/18/20251 NONE NoN
492-490-077-000 7137 El Cerrito
Wy Lot 75 F-6A1
WR Fiddy ment F6A1 PV
BD24-5073 SFDO
0 01 2/21/20251 NONE NoN
496-730-017-000 7137 Vail Ranch
Rd Lot 163 Ar22
Amoruso Ranch
Ph1 PV
BD25-0945 SFDO
0 1 3/12/202511 7/11/20251 NONE NoN
492-490-063-000 7144 El Cerrito
Wy Lot 61 F-6A1
WR Fiddy ment F6A1 PV
BD24-5071 SFDO
0 01 2/14/20251 NONE NoN
492-490-076-000 7145 El Cerrito
Wy Lot 74 F-6A1
WR Fiddy ment F6A1 PV
BD24-5072 SFDO
0 01 2/18/20251 NONE NoN
492-490-064-000 7152 El Cerrito
Wy Lot 62 F-6A1
WR Fiddy ment F6A1 PV
BD24-6374 SFDO
0 01 5/6/20251 NONE NoN
492-490-075-000 7153 El Cerrito
Wy Lot 73 F6A1
WR Fiddy ment F6A1 PV
BD24-6449 SFDO
0 01 6/11/20251 NONE NoN
498-310-070-000
7153 Great
Copper St Lot 70
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-4364 SFDO
0 1 9/29/202510 NONE NoN Application stated moderate
lev el
496-780-025-000 716 Buf f alo Ct Lot
90 Ar46
Amoruso Ranch AR46 PV
BD25-0035 SFDO
0 1 3/5/202511 11/4/20251 NONE NoN
496-820-022-000 716 Chipmunk Ct
Lot 22 P4V8
L-22 SFD 1564/423 BD25-3922 SFDO
0 1 10/8/202510 NONE NoN
496-740-009-000 716 Fountain Ct
Lot 339 Ar
Amoruso Ranch
Ph1 PV
BD25-2022 SFDO
0 1 6/5/202511 12/11/20251 NONE NoN
498-290-003-000 716 White Sands
Pl Lot 3 Df -20
Sierra Vista DF-20
PV
BD24-6623 SFDO
0 01 6/5/20251 NONE NoN Application stated moderate
lev el
492-490-065-000 7160 El Cerrito
Wy Lot 63 F-6A1
WR Fiddy ment F6A1 PV
BD24-6375 SFDO
0 01 5/6/20251 NONE NoN
492-490-074-000 7161 El Cerrito
Wy Lot 72 F6A1
WR Fiddy ment F6A1 PV
BD24-6448 SFDO
0 01 6/4/20251 NONE NoN
498-310-071-000
7161 Great
Copper St Lot 71
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-2919 SFDO
0 1 7/3/202511 12/11/20251 NONE NoN Application stated moderate lev el
492-490-066-000 7168 El Cerrito
Wy Lot 64 F-6A1
WR Fiddy ment F6A1 PV
BD24-6376 SFDO
0 01 5/15/20251 NONE NoN
498-310-085-000
7168 Great
Copper St Lot 85
Fd-24
Sierra Vista FD-24
Ph 1 PV
BD25-4366 SFDO
0 1 9/29/202510 NONE NoN Application stated moderate
lev el
492-490-073-000 7169 El Cerrito
Wy Lot 71 F6A1
WR Fiddy ment F6A1 PV
BD24-6447 SFDO
0 01 6/11/20251 NONE NoN
498-310-072-000
7169 Great
Copper St Lot 72
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-2920 SFDO
0 1 7/3/202511 12/9/20251 NONE NoN Application stated moderate lev el
496-820-014-000 717 Chipmunk Ct
Lot 14 C-8
L- 14 SFD 2470/438
PV
BD25-1536 SFDO
0 1 6/30/202510 NONE NoN
496-740-016-000 717 Fountain Ct
Lot 346 Ar32
Amoruso Ranch
Ph1 PV
BD25-2712 SFDO
0 1 6/20/202510 NONE NoN
015-920-031-000 717 Southern Hills
Ct 51 Sv cc
Inf ill Sierra View
Country Club PV
BD25-5827 SFDO
0 1 12/18/202510 NONE NoN
492-490-067-000 7176 El Cerrito
Wy Lot 65 F-6A1
WR Fiddy ment F6A1 PV
BD24-6377 SFDO
0 01 5/21/20251 NONE NoN
498-310-084-000
7176 Great
Copper St Lot 84
Fd-24
Sierra Vista FD-24
Ph 1 PV
BD25-4365 SFDO
0 1 9/29/202510 NONE NoN Application stated moderate
lev el
492-490-072-000 7177 El Cerrito
Wy Lot 70 F6A1
WR Fiddy ment F6A1 PV
BD24-6446 SFDO
0 01 6/4/20251 NONE NoN
498-310-073-000
7177 Great
Copper St Lot 73
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-1906 SFDO
0 1 5/15/202511 11/12/20251 NONE NoN Application stated moderate lev el
492-490-068-000 7184 El Cerrito
Wy Lot 66 F-6A1
WR Fiddy ment F6A1 PV
BD24-6378 SFDO
0 01 5/21/20251 NONE NoN
498-310-083-000
7184 Great
Copper St Lot 83
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-3529 SFDO
0 1 8/21/202510 NONE NoN Application stated moderate
lev el
492-490-071-000 7185 El Cerrito
Wy Lot 69 F6A1
WR Fiddy ment F6A1 PV
BD24-6445 SFDO
0 01 5/6/20251 NONE NoN
498-310-074-000
7185 Great
Copper St Lot 74
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-1907 SFDO
0 1 5/15/202511 11/5/20251 NONE NoN Application stated moderate lev el
492-490-069-000 7192 El Cerrito
Wy Lot 67 F-6A1
WR Fiddy ment F6A1 PV
BD24-6379 SFDO
0 01 5/20/20251 NONE NoN
498-310-082-000
7192 Great
Copper St Lot 82
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-3528 SFDO
0 1 8/21/202511 12/23/20251 NONE NoN Application stated moderate lev el
492-490-070-000 7193 El Cerrito
Wy Lot 68 F6A1
WR Fiddy ment F6A1 PV
BD24-3202 SFDO
0 01 2/13/20251 NONE NoN
498-310-075-000
7193 Great
Copper St Lot 75
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-1908 SFDO
0 1 5/15/202511 11/12/20251 NONE NoN Application stated moderate lev el
498-310-081-000
7200 Great
Copper St Lot 81
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-3527 SFDO
0 1 8/21/202510 NONE NoN Application stated moderate
lev el
498-310-076-000
7201 Great
Copper St Lot 76
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-1909 SFDO
0 1 5/15/202511 11/4/20251 NONE NoN Application stated moderate lev el
498-310-080-000
7208 Great
Copper St Lot 80
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-2922 SFDO
0 1 7/3/202511 12/8/20251 NONE NoN Application stated moderate lev el
498-310-077-000
7209 Great
Copper St Lot 77
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-0935 SFDO
0 1 3/19/202511 10/9/20251 NONE NoN Application stated moderate lev el
498-310-079-000
7216 Great
Copper St Lot 79
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-2921 SFDO
0 1 7/3/202511 12/4/20251 NONE NoN Application stated moderate lev el
498-310-078-000
7232 Great
Copper St Lot 78
Fd24
Sierra Vista FD-24
Ph 1 PV
BD25-0936 SFDO
0 1 3/19/202511 8/4/20251 NONE NoN Application stated moderate lev el
498-320-013-000
7233 Great
Copper St Lot 13
Fd24Ph2
Sierra Vista FD-24
Ph 2 PV
BD25-0691 SFDO
0 1 3/21/202511 10/10/20251 NONE NoN Application stated moderate lev el
496-780-026-000 724 Buf f alo Ct Lot
91 Ar46
Amoruso Ranch AR46 PV
BD25-0036 SFDO
0 1 3/5/202511 11/6/20251 NONE NoN
496-820-021-000 724 Chipmunk Ct
Lot 21Ph4Vil8
L-21 SFD 1564/423
PV
BD25-0490 SFDO
0 1 3/12/202511 9/15/20251 NONE NoN
496-740-010-000 724 Fountain Ct
Lot 340 Ar
Amoruso Ranch
Ph1 PV
BD25-2023 SFDO
0 1 6/5/202511 11/5/20251 NONE NoN
498-320-012-000
7240 Great
Copper St Lot 12
Ph2
Sierra Vista FD-24
Ph 2 PV
BD25-0813 SFDO
0 1 3/19/202511 8/4/20251 NONE NoN Application stated moderate lev el
498-320-014-000
7241 Great
Copper St Lot 14
Fd24Ph2
Sierra Vista FD-24
Ph 2 PV
BD25-0692 SFDO
0 1 3/21/202511 10/7/20251 NONE NoN Application stated moderate lev el
498-320-011-000
7248 Great
Copper St Lot 11
Ph2
Sierra Vista FD-24
Ph 2 PV
BD25-0812 SFDO
0 1 3/19/202511 7/30/20251 NONE NoN Application stated moderate lev el
498-320-015-000
7249 Great
Copper St Lot 15
Fd24Ph2
Sierra Vista FD-24
Ph 2 PV
BD25-0693 SFDO
0 1 3/21/202511 10/9/20251 NONE NoN Application stated moderate lev el
496-820-015-000 725 Chipmunk Ct
Lot 15 C-8
L-15 SFD 1567/423
PV
BD25-1537 SFDO
0 1 6/30/202510 NONE NoN
496-740-015-000 725 Fountain Ct
Lot 345 Ar
Amoruso Ranch
Ph1 PV
BD25-2028 SFDO
0 1 6/5/202511 11/21/20251 NONE NoN
015-920-030-000 725 Southern Hills
Ct 50 Sv cc
Inf ill Sierra View
Country Club PV
BD25-5826 SFDO
0 1 12/18/202510 NONE NoN
498-320-010-000
7256 Great
Copper St Lot 10
Ph2
Sierra Vista FD-24
Ph 2 PV
BD25-0811 SFDO
0 1 3/19/202511 7/24/20251 NONE NoN Application stated moderate lev el
498-320-016-000
7257 Great
Copper St Lot 16
Fd24
Sierra Vista FD-24
Ph 2 PV
BD24-5358 SFDO
0 1 1/15/202511 6/13/20251 NONE NoN Application stated moderate lev el
498-320-009-000
7264 Great
Copper St Lot 9
Fd24
Sierra Vista FD-24
Ph 2 PV
BD24-5357 SFDO
0 1 1/15/202511 6/12/20251 NONE NoN Application stated moderate lev el
498-320-017-000
7265 Great
Copper St Lot 17
Fd24
Sierra Vista FD-24
Ph 2 PV
BD24-5359 SFDO
0 1 1/15/202511 6/13/20251 NONE NoN Application stated moderate lev el
498-320-008-000
7272 Great
Copper St Lot 8
Fd24
Sierra Vista FD-24
Ph 2 PV
BD24-5356 SFDO
0 1 1/15/202511 6/10/20251 NONE NoN Application stated moderate lev el
498-320-018-000
7273 Great
Copper St Lot 18
Fd24Ph2
Sierra Vista FD-24
Ph 2 PV
BD24-3786 SFDO
0 01 1/2/20251 NONE NoN Application stated moderate
lev el
498-320-007-000
7280 Great
Copper St Lot 7
Fd24Ph2
Sierra Vista FD-24
Ph 2 PV
BD24-3789 SFDO
0 01 1/13/20251 NONE NoN Application stated moderate
lev el
498-320-019-000
7281 Great
Copper St Lot 19
Fd24Ph2
Sierra Vista FD-24
Ph 2 PV
BD24-3787 SFDO
0 01 1/10/20251 NONE NoN Application stated moderate
lev el

Page 292 of 981 ends

Jurisdiction Roseville ANNUAL ELEMENT PROGRESS REPORT
Reporting
Year 2025
(Jan. 1 - Dec.
31) Housing Element Implementation Cells in grey contain auto-calculation f ormulas Planning
Period 6th Cycle 05/15/2021 - 05/15/2029
Note: "+" indicates an optional field
498-320-006-000
7288 Great
Copper St Lot 6
Fd24Ph2
Sierra Vista FD-24
Ph 2 PV
BD24-3788 SFDO
0 01 1/22/20251 NONE NoN Application stated moderate
lev el
496-820-020-000 732 Chipmunk Ct
Lot 20 Ph4Vil8
L-20 SFD 2104/462
PV
BD25-0491 SFDO
0 1 3/12/202511 9/23/20251 NONE NoN
496-740-011-000 732 Fountain Ct
Lot 341 Ar
Amoruso Ranch
Ph1 PV
BD25-2024 SFDO
0 1 6/5/202511 11/4/20251 NONE NoN
496-820-016-000 733 Chipmunk Ct
Lot 16 C-8
L-16 SFD 2724/471
PV
BD25-1538 SFDO
0 1 6/30/202510 NONE NoN
496-740-014-000 733 Fountain Ct
Lot 344 Ar
Amoruso Ranch
Ph1 PV
BD25-2027 SFDO
0 1 6/5/202511 11/17/20251 NONE NoN
015-920-029-000 733 Southern Hills
Ct 49 Sv cc
Inf ill Sierra View
Country Club PV
BD25-5825 SFDO
0 1 12/18/202510 NONE NoN
496-820-019-000 740 Chipmunk Ct
Lot 19Ph4Vil8
L-19 SFD 2724/471
PV
BD25-0492 SFDO
0 1 3/12/202511 9/19/20251 NONE NoN
496-740-012-000 740 Fountain Ct
Lot 342 Ar
Amoruso Ranch
Ph1 PV
BD25-2025 SFDO
0 1 6/5/202511 11/4/20251 NONE NoN
496-820-017-000 741 Chipmunk Ct
Lot 17 C-8
L-17 SFD 2104/462
PV
BD25-1539 SFDO
0 1 6/30/202510 NONE NoN
496-740-013-000 741 Fountain Ct
Lot 343 Ar
Amoruso Ranch
Ph1 PV
BD25-2026 SFDO
0 1 6/5/202511 11/18/20251 NONE NoN
496-630-008-000 7465 Moon Dream
Wy Lot 8 Wb41
Sierra Vista WB-41
PV
BD24-5528 SFDO
0 01 3/31/20251 NONE NoN Application stated moderate
lev el
496-630-060-000 7472 Moon Dream
Wy Lot 60 Wb41
Sierra Vista WB-41
PV
BD24-5529 SFDO
0 01 3/24/20251 NONE NoN Application stated moderate
lev el
496-630-007-000 7473 Moon Dream
Wy Lot 7 Wb41
Sierra Vista WB-41
PV
BD24-5527 SFDO
0 01 4/2/20251 NONE NoN Application stated moderate
lev el
496-820-018-000 748 Chipmunk Ct
Lot 18Ph4Vil8
L-18 SFD 2470/438
PV
BD25-0493 SFDO
0 1 3/12/202511 9/24/20251 NONE NoN
496-630-061-000 7480 Moon Dream
Wy Lot 61 Wb41
Sierra Vista WB-41
PV
BD24-5530 SFDO
0 01 3/25/20251 NONE NoN Application stated moderate
lev el
496-630-006-000 7481 Moon Dream
Wy Lot 6 Wb-41
Sierra Vista WB-41
PV
BD24-6630 SFDO
0 01 6/17/20251 NONE NoN Application stated moderate
lev el
496-630-062-000 7488 Moon Dream
Wy Lot 62 Wb-41
Sierra Vista WB-41
PV
BD24-6502 SFDO
0 01 5/1/20251 NONE NoN Application stated moderate
lev el
496-630-005-000 7489 Moon Dream
Wy Lot 5 Wb41
Sierra Vista WB-41
PV
BD22-7244 SFDO
0 01 9/3/20251 NONE NoN Application stated moderate
lev el
496-630-063-000 7496 Moon Dream
Wy Lot 63 Wb-41
Sierra Vista WB-41
PV
BD24-6503 SFDO
0 01 5/7/20251 NONE NoN Application stated moderate
lev el
496-630-004-000 7497 Moon Dream
Wy Lot 4 Wb41
Sierra Vista WB-41
PV
BD22-7245 SFDO
0 01 8/18/20251 NONE NoN Application stated moderate
lev el
496-630-003-000 7505 Moon Dream
Wy Lot 3 Wb41
Sierra Vista WB-41
PV
BD22-7246 SFDO
0 01 5/20/20251 NONE NoN Application stated moderate
lev el
496-630-002-000 7513 Moon Dream
Wy Lot 2 Wb-41
Sierra Vista WB-41
PV
BD24-6631 SFDO
0 01 6/13/20251 NONE NoN Application stated moderate
lev el
496-630-001-000 7521 Moon Dream
Wy Lot 1 Wb-41
Sierra Vista WB-41
PV
BD24-6632 SFDO
0 01 6/27/20251 NONE NoN Application stated moderate
lev el
498-280-031-000 800 Cany onland
Ct Lot 89 Df 1&2
Sierra Vista DF-1 &
DF-2 PV
BD25-3336 SFDO
0 1 7/16/202510 NONE NoN
496-760-020-000 800 Clif f Ct Lot
418 Ar
Amoruso Ranch
Ph1 PV
BD24-3272 SFDO
0 01 4/29/20251 NONE NoN
496-780-012-000 800 Rosette Ct
Bldg 77 Ar15
Amoruso Ranch AR15 PV
BD24-6457 SFDO
0 1 2/4/202511 8/22/20251 NONE NoN
496-840-001-000
8000
Whippersnapper
Wy Lot 1 C20
Creekv iew C20 PV BD25-3083 SFDO
0 1 6/27/202510 NONE NoN Application stated moderate
lev el
498-420-078-000 8001 Moongate
Wy Lot 78 Fd2
Sierra Vista Parcel
FD-2 PV
BD24-3573 SFDO
0 01 1/3/20251 NONE NoN
496-670-063-000 8001 Roundhouse
Lp Lot 63 C5
Creekv iew C5 PV BD24-1993 SFDO
0 01 1/14/20251 NONE NoN
496-840-077-000
8001
Whippersnapper
Wy Lot 77 C20
Creekv iew C20 PV BD25-3087 SFDO
0 1 6/27/202510 NONE NoN Application stated moderate
lev el
496-840-002-000
8008
Whippersnapper
Wy Lot 2 C20
Creekv iew C20 PV BD25-3084 SFDO
0 1 6/27/202510 NONE NoN Application stated moderate
lev el
496-670-064-000 8009 Roundhouse
Lp Lot 64 C5
Creekv iew C5 PV BD24-1994 SFDO
0 01 1/21/20251 NONE NoN
496-730-045-000
8009 Trapper
Ranch Rd Lot 257
Ar
Amoruso Ranch
Ph1 PV
BD25-3210 SFDO
0 1 12/18/202510 NONE NoN
496-840-076-000
8009
Whippersnapper
Wy Lot 76 C20
Creekv iew C20 PV BD25-3086 SFDO
0 1 6/27/202510 NONE NoN Application stated moderate
lev el
496-740-087-000 801 Clif f Ct Lot
425 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4342 SFDO
0 01 6/2/20251 NONE NoN
496-780-022-000 801 Rosette Ct
Lot 87 Ar-15
Amoruso Ranch AR15 PV
BD24-6852 SFDO
0 1 2/25/202511 9/23/20251 NONE NoN
498-360-074-000 801 Sun Pillar Ct
Lot 74 Fd-9
Pulte - SV Solaire
Ph6 Vil9 PV
BD25-5633 SFDO
0 1 12/2/202510 NONE NoN
496-840-003-000
8016
Whippersnapper
Wy Lot 3 C20
Creekv iew C20 PV BD25-3085 SFDO
0 1 6/27/202510 NONE NoN Application stated moderate
lev el
496-670-065-000 8017 Roundhouse
Lp Lot 65 C5
Creekv iew C5 PV BD24-1995 SFDO
0 01 1/29/20251 NONE NoN
496-730-044-000
8017 Trapper
Ranch Rd Lot 256
Ar
Amoruso Ranch
Ph1 PV
BD25-3209 SFDO
0 1 12/18/202510 NONE NoN
496-840-075-000
8017
Whippersnapper
Wy Lot 75 C20
Creekv iew C20 PV BD25-2582 SFDO
0 1 6/13/202510 NONE NoN Application stated moderate
lev el
496-840-004-000
8024
Whippersnapper
Wy Lot 4 C20
Creekv iew C20 PV BD25-2573 SFDO
0 1 6/13/202510 NONE NoN Application stated moderate
lev el
496-670-066-000 8025 Roundhouse
Lp Lot 66 C5
Creekv iew C5 PV BD24-1996 SFDO
0 01 1/31/20251 NONE NoN
496-730-043-000
8025 Trapper
Ranch Rd Lot 255
Ar
Amoruso Ranch
Ph1 PV
BD25-3208 SFDO
0 1 12/18/202510 NONE NoN
496-840-074-000
8025
Whippersnapper
Wy Lot 74 C20
Creekv iew C20 PV BD25-2581 SFDO
0 1 6/13/202510 NONE NoN Application stated moderate
lev el
496-840-005-000
8032
Whippersnapper
Wy Lot 5 C20
Creekv iew C20 PV BD25-2574 SFDO
0 1 6/13/202510 NONE NoN Application stated moderate
lev el
496-670-067-000 8033 Roundhouse
Lp Lot 67 C5
Creekv iew C5 PV BD24-2671 SFDO
0 01 2/19/20251 NONE NoN
496-730-042-000
8033 Trapper
Ranch Rd Lot 254
Ar
Amoruso Ranch
Ph1 PV
BD25-3207 SFDO
0 1 12/18/202510 NONE NoN
496-840-073-000
8033
Whippersnapper
Wy Lot 73 C20
Creekv iew C20 PV BD25-2580 SFDO
0 1 6/13/202510 NONE NoN Application stated moderate
lev el
496-840-006-000
8040
Whippersnapper
Wy Lot 6 C20
Creekv iew C20 PV BD25-2575 SFDO
0 1 6/13/202510 NONE NoN Application stated moderate
lev el
499-030-028-000 8041 Bossa Nov a
Wy
New Detached ADU
- 749 sf with PV
included
BD24-1540 ADUR
0 01 12/19/20251 NONE NoN Af f ordable by design
496-670-068-000 8041 Roundhouse
Lp Lot 68 C5
Creekv iew C5 PV BD24-2672 SFDO
0 01 2/21/20251 NONE NoN
496-730-041-000
8041 Trapper
Ranch Rd Lot 253
Ar
Amoruso Ranch
Ph1 PV
BD25-3206 SFDO
0 1 12/18/202510 NONE NoN
496-840-072-000
8041
Whippersnapper
Wy Lot 72 C20
Creekv iew C20 PV BD25-2579 SFDO
0 1 6/13/202510 NONE NoN Application stated moderate
lev el
496-840-007-000
8048
Whippersnapper
Wy Lot 7 C20
Creekv iew C20 PV BD25-2576 SFDO
0 1 6/13/202510 NONE NoN Application stated moderate
lev el
496-670-069-000 8049 Roundhouse
Lp Lot 69 C5
Creekv iew C5 PV BD24-2673 SFDO
0 01 2/21/20251 NONE NoN
496-840-071-000
8049
Whippersnapper
Wy Lot 71 C20
Creekv iew C20 PV BD25-1696 SFDO
0 1 4/17/202510 NONE NoN Application stated moderate
lev el
496-840-008-000
8056
Whippersnapper
Wy Lot 8 C20
Creekv iew C20 PV BD25-2577 SFDO
0 1 6/13/202510 NONE NoN Application stated moderate
lev el
496-670-070-000 8057 Roundhouse
Lp Lot 70 C5
Creekv iew C5 PV BD24-2674 SFDO
0 01 3/4/20251 NONE NoN
496-730-008-000
8057 Trapper
Ranch Rd Lot 154
Ar22
Amoruso Ranch
Ph1 PV
BD25-0943 SFDO
0 1 3/14/202511 8/14/20251 NONE NoN
496-840-070-000
8057
Whippersnapper
Wy Lot 70 C20
Creekv iew C20 PV BD25-1695 SFDO
0 1 4/17/202510 NONE NoN Application stated moderate
lev el
014-421-004-000 806 Elisa Wy Unit A
Conv ert (E) garage
into JADU - 496 SF
BD25-2160 ADUR
0 1 8/26/202510 NONE NoN Af f ordable by design
496-840-009-000
8064
Whippersnapper
Wy Lot 9 C20
Creekv iew C20 PV BD25-2578 SFDO
0 1 6/13/202510 NONE NoN Application stated moderate
lev el
496-670-071-000 8065 Roundhouse
Lp Lot 71 C5
Creekv iew C5 PV BD24-3398 SFDO
0 01 5/8/20251 NONE NoN
496-730-007-000
8065 Trapper
Ranch Rd Lot 153
Ar22
Amoruso Ranch
Ph1 PV
BD25-0476 SFDO
0 1 2/26/202511 8/15/20251 NONE NoN
496-840-069-000
8065
Whippersnapper
Wy Lot 69 C20
Creekv iew C20 PV BD25-1694 SFDO
0 1 4/17/202511 11/4/20251 NONE NoN Application stated moderate lev el
496-840-010-000
8072
Whippersnapper
Wy Lot 10 C20
Creekv iew C20 PV BD25-1687 SFDO
0 1 4/17/202511 10/28/20251 NONE NoN Application stated moderate lev el
496-670-072-000 8073 Roundhouse
Lp Lot 72 C5
Creekv iew C5 PV BD24-3399 SFDO
0 01 5/12/20251 NONE NoN
496-730-006-000
8073 Trapper
Ranch Rd Lot 152
Ar22
Amoruso Ranch
Ph1 PV
BD25-0475 SFDO
0 1 2/26/202511 8/12/20251 NONE NoN
496-840-068-000
8073
Whippersnapper
Wy Lot 68 C20
Creekv iew C20 PV BD25-1693 SFDO
0 1 4/17/202511 10/29/20251 NONE NoN Application stated moderate lev el
498-280-030-000 808 Cany onland
Ct Lot 88 Df 1&2
Sierra Vista DF-1 &
DF-2 PV
BD25-3335 SFDO
0 1 7/16/202510 NONE NoN
496-760-021-000 808 Clif f Ct Lot
419 Ar
Amoruso Ranch
Ph1 PV
BD24-3273 SFDO
0 01 4/30/20251 NONE NoN
496-780-013-000 808 Rosette Ct
Lot 78 Ar15
Amoruso Ranch AR15 PV
BD24-6458 SFDO
0 1 2/4/202511 9/23/20251 NONE NoN
496-840-011-000
8080
Whippersnapper
Wy Lot 11 C20
Creekv iew C20 PV BD25-1688 SFDO
0 1 4/17/202511 10/27/20251 NONE NoN Application stated moderate lev el
496-670-073-000 8081 Roundhouse
Lp Lot 73 C5
Creekv iew C5 PV BD24-3400 SFDO
0 01 5/15/20251 NONE NoN
496-730-005-000
8081 Trapper
Ranch Rd Lot 151
Ar22
Amoruso Ranch
Ph1 PV
BD25-0474 SFDO
0 1 2/26/202511 8/11/20251 NONE NoN
496-840-012-000
8088
Whippersnapper
Wy Lot 12 C20
Creekv iew C20 PV BD25-1689 SFDO
0 1 4/17/202511 10/7/20251 NONE NoN Application stated moderate lev el
496-670-074-000 8089 Roundhouse
Lp Lot 74 C5
Creekv iew C5 PV BD24-3401 SFDO
0 01 5/16/20251 NONE NoN
496-730-004-000
8089 Trapper
Ranch Rd Lot 150
Ar22
Amoruso Ranch
Ph1 PV
BD25-0473 SFDO
0 1 2/26/202511 8/8/20251 NONE NoN
496-740-086-000 809 Clif f Ct Lot
424 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4341 SFDO
0 01 6/2/20251 NONE NoN
496-780-021-000 809 Rosette Ct
Lot 86 Ar-15
Amoruso Ranch AR15 PV
BD24-6851 SFDO
0 1 2/25/202511 10/16/20251 NONE NoN
498-360-075-000 809 Sun Pillar Ct
Lot 75 Fd-9
Pulte - SV Solaire
Ph6 Vil9 PV
BD25-5634 SFDO
0 1 12/2/202510 NONE NoN
496-840-013-000
8096
Whippersnapper
Wy Lot 13 C20
Creekv iew C20 PV BD25-1690 SFDO
0 1 4/17/202511 10/2/20251 NONE NoN Application stated moderate lev el
496-730-003-000
8097 Trapper
Ranch Rd Lot 149
Ar22
Amoruso Ranch
Ph1 PV
BD25-0472 SFDO
0 1 2/26/202511 7/30/20251 NONE NoN
496-840-014-000
8104
Whippersnapper
Wy Lot 14 C20
Creekv iew C20 PV BD25-1691 SFDO
0 1 4/17/202511 10/1/20251 NONE NoN Application stated moderate lev el
496-730-002-000
8105 Trapper
Ranch Rd Lot 148
Ar22
Amoruso Ranch
Ph1 PV
BD25-0942 SFDO
0 1 3/14/202511 7/29/20251 NONE NoN
492-450-015-000
8112 Challis Ci
Unit A
Conv ert portion of
Existing Attached
Garage to New
JADU (349 SF)
BD23-1098 ADUR
0 01 6/12/20251 NONE NoN Af f ordable by design
496-840-015-000
8112
Whippersnapper
Wy Lot 15 C20
Creekv iew C20 PV BD25-1692 SFDO
0 1 4/17/202511 10/1/20251 NONE NoN Application stated moderate lev el
496-730-001-000
8113 Trapper
Ranch Rd Lot 147
Ar22
Amoruso Ranch
Ph1 PV
BD25-0304 SFDO
0 1 2/7/202511 7/28/20251 NONE NoN
496-840-016-000
8120
Whippersnapper
Wy Lot 16 C20
Creekv iew C20 PV BD25-1499 SFDO
0 1 4/17/202511 9/24/20251 NONE NoN Application stated moderate lev el
496-840-017-000
8128
Whippersnapper
Wy Lot 17 C20
Creekv iew C20 PV BD25-1500 SFDO
0 1 4/17/202511 9/22/20251 NONE NoN Application stated moderate lev el
496-710-024-000
8129 Trapper
Ranch Rd Lot 138
Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-2842 SFDO
0 01 3/20/20251 NONE NoN
496-840-018-000
8136
Whippersnapper
Wy Lot 18 C20
Creekv iew C20 PV BD25-1501 SFDO
0 1 4/17/202511 9/18/20251 NONE NoN Application stated moderate lev el
496-710-025-000
8137 Trapper
Ranch Rd Lot 139
Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-2843 SFDO
0 01 2/11/20251 NONE NoN
496-840-067-000
8137
Whippersnapper
Wy Lot 67 C20
Creekv iew C20 PV BD25-1508 SFDO
0 1 4/17/202511 9/3/20251 NONE NoN Application stated moderate lev el
496-840-019-000
8144
Whippersnapper
Wy Lot 19 C20
Creekv iew C20 PV BD25-1502 SFDO
0 1 4/17/202511 9/12/20251 NONE NoN Application stated moderate lev el
496-710-026-000
8145 Trapper
Ranch Rd Lot 140
Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-2844 SFDO
0 01 2/26/20251 NONE NoN
496-840-066-000
8145
Whippersnapper
Wy Lot 66 C20
Creekv iew C20 PV BD25-1507 SFDO
0 1 4/17/202511 9/2/20251 NONE NoN Application stated moderate lev el
496-840-020-000
8152
Whippersnapper
Wy Lot 20 C20
Creekv iew C20 PV BD25-1503 SFDO
0 1 4/17/202511 9/12/20251 NONE NoN Application stated moderate lev el
496-710-027-000
8153 Trapper
Ranch Rd Lot 141
Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-2845 SFDO
0 01 1/27/20251 NONE NoN
496-840-065-000
8153
Whippersnapper
Wy Lot 65 C20
Creekv iew C20 PV BD25-1506 SFDO
0 1 4/17/202511 8/28/20251 NONE NoN Application stated moderate lev el
496-820-009-000 816 Canoe Ct Lot
9 Ph4V8
CV PH4 Vil 8 PV BD25-5505 SFDO
0 1 11/14/202510 NONE NoN
498-280-029-000 816 Cany onland
Ct Lot 87 Df 1&2
Sierra Vista DF-1 &
DF-2 PV
BD25-3334 SFDO
0 1 7/16/202510 NONE NoN
496-760-022-000 816 Clif f Ct Lot
420 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4337 SFDO
0 01 5/1/20251 NONE NoN
496-780-014-000 816 Rosette Ct
Lot 79 Ar15
Amoruso Ranch AR15 PV
BD24-6459 SFDO
0 1 2/4/202511 9/23/20251 NONE NoN
496-840-021-000
8160
Whippersnapper
Wy Lot 21 C20
Creekv iew C20 PV BD25-1504 SFDO
0 1 4/17/202511 9/10/20251 NONE NoN Application stated moderate lev el
496-710-028-000
8161 Trapper
Ranch Rd Lot 142
Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-2846 SFDO
0 01 1/27/20251 NONE NoN
496-840-064-000
8161
Whippersnapper
Wy 64 C20
Creekv iew C20 PV BD25-0795 SFDO
0 1 3/7/202511 8/14/20251 NONE NoN Application stated moderate lev el
496-840-022-000
8168
Whippersnapper
Wy Lot 22 C20
Creekv iew C20 PV BD25-1505 SFDO
0 1 4/17/202511 9/4/20251 NONE NoN Application stated moderate lev el
496-840-063-000
8169
Whippersnapper
Wy Lot 63 C20
Creekv iew C20 PV BD25-0794 SFDO
0 1 3/7/202511 8/13/20251 NONE NoN Application stated moderate lev el
496-820-003-000 817 Canoe Ct Lot
3 Ph4V8
L-3 SFD 2724/471
PV
BD25-4622 SFDO
0 1 10/23/202510 NONE NoN
496-740-085-000 817 Clif f Ct Lot
423 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4340 SFDO
0 01 5/15/20251 NONE NoN
496-780-020-000 817 Rosette Ct
Lot 85 Ar-15
Amoruso Ranch AR15 PV
BD24-6850 SFDO
0 1 2/25/202511 10/6/20251 NONE NoN
496-840-023-000
8176
Whippersnapper
Wy Lot 23 C20
Creekv iew C20 PV BD25-0786 SFDO
0 1 3/7/202511 8/7/20251 NONE NoN Application stated moderate lev el
496-840-062-000
8177
Whippersnapper
Wy Lot 62 C20
Creekv iew C20 PV BD25-0793 SFDO
0 1 3/7/202511 8/7/20251 NONE NoN Application stated moderate lev el
496-840-024-000
8184
Whippersnapper
Wy Lot 24 C20
Creekv iew C20 PV BD25-0787 SFDO
0 1 3/7/202511 7/28/20251 NONE NoN Application stated moderate lev el
496-840-025-000
8192
Whippersnapper
Wy Lot 25 C20
Creekv iew C20 PV BD25-0788 SFDO
0 1 3/7/202511 7/29/20251 NONE NoN Application stated moderate lev el
496-840-026-000
8200
Whippersnapper
Wy Lot 26 C20
Creekv iew C20 PV BD25-0789 SFDO
0 1 3/7/202511 7/22/20251 NONE NoN Application stated moderate lev el
496-840-027-000
8208
Whippersnapper
Wy Lot 27 C20
Creekv iew C20 PV BD25-0790 SFDO
0 1 3/7/202511 7/21/20251 NONE NoN Application stated moderate lev el
496-840-028-000
8216
Whippersnapper
Wy Lot 28 C20
Creekv iew C20 PV BD25-0791 SFDO
0 1 3/7/202511 7/16/20251 NONE NoN Application stated moderate lev el
496-840-029-000
8224
Whippersnapper
Wy Lot 29 C20
Creekv iew C20 PV BD25-0792 SFDO
0 1 3/7/202511 7/8/20251 NONE NoN Application stated moderate lev el
496-840-030-000
8232
Whippersnapper
Wy Lot 30 C20
Creekv iew C20 PV BD25-0313 SFDO
0 1 2/7/202511 7/2/20251 NONE NoN Application stated moderate lev el
496-840-061-000
8233
Whippersnapper
Wy Lot 61 C20
Creekv iew C20 PV BD25-0322 SFDO
0 1 2/7/202511 6/25/20251 NONE NoN Application stated moderate lev el
496-820-008-000 824 Canoe Ct Lot
8 Ph4V8
CV PH4 Vil 8 PV BD25-5504 SFDO
0 1 11/14/202510 NONE NoN
498-280-028-000 824 Cany onland
Ct Lot 86
Sierra Vista DF-1 &
DF-2 PV
BD25-1583 SFDO
0 1 4/16/202510 NONE NoN
496-740-083-000 824 Clif f Ct Lot
421 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4338 SFDO
0 01 5/13/20251 NONE NoN
496-780-015-000 824 Rosette Ct
Lot 80 Ar15
Amoruso Ranch AR15 PV
BD24-6460 SFDO
0 1 2/4/202511 8/22/20251 NONE NoN

Page 293 of 981 ends

Jurisdiction Roseville ANNUAL ELEMENT PROGRESS REPORT
Reporting
Year 2025
(Jan. 1 - Dec.
31) Housing Element Implementation Cells in grey contain auto-calculation f ormulas Planning
Period 6th Cycle 05/15/2021 - 05/15/2029
Note: "+" indicates an optional field
496-840-031-000
8240
Whippersnapper
Wy Lot 31 C20
Creekv iew C20 PV BD25-0314 SFDO
0 1 2/7/202511 7/2/20251 NONE NoN Application stated moderate lev el
496-840-060-000
8241
Whippersnapper
Wy Lot 60 C20
Creekv iew C20 PV BD25-0321 SFDO
0 1 2/7/202511 6/19/20251 NONE NoN Application stated moderate lev el
496-840-059-000
8249
Whippersnapper
Wy Lot 59 C20
Creekv iew C20 PV BD25-0320 SFDO
0 1 2/7/202511 6/19/20251 NONE NoN Application stated moderate lev el
496-820-004-000 825 Canoe Ct Lot
4 Ph4V8
L-4 SFD 2470/438
PV
BD25-4623 SFDO
0 1 10/23/202510 NONE NoN
496-740-084-000 825 Clif f Ct Lot
422 Ar Ph1
Amoruso Ranch
Ph1 PV
BD24-4339 SFDO
0 01 5/13/20251 NONE NoN
496-840-058-000
8257
Whippersnapper
Wy Lot 58 C20
Creekv iew C20 PV BD25-0319 SFDO
0 1 2/7/202511 6/13/20251 NONE NoN Application stated moderate lev el
496-840-057-000
8265
Whippersnapper
Wy Lot 57 C20
Creekv iew C20 PV BD25-0318 SFDO
0 1 2/7/202511 6/11/20251 NONE NoN Application stated moderate lev el
496-840-056-000
8273
Whippersnapper
Wy Lot 56 C20
Creekv iew C20 PV BD25-0317 SFDO
0 1 2/7/202511 6/10/20251 NONE NoN Application stated moderate lev el
496-840-055-000
8281
Whippersnapper
Wy Lot 55 C20
Creekv iew C20 PV BD25-0316 SFDO
0 1 2/7/202511 6/3/20251 NONE NoN Application stated moderate lev el
496-840-054-000
8289
Whippersnapper
Wy Lot 54 C20
Creekv iew C20 PV BD25-0315 SFDO
0 1 2/7/202511 6/5/20251 NONE NoN Application stated moderate lev el
496-840-032-000
8296
Whippersnapper
Wy Lot 32 C20
Creekv iew C20 PV BD24-6363 SFDO
0 01 5/21/20251 NONE NoN Application stated moderate
lev el
496-840-053-000
8297
Whippersnapper
Wy Lot 53 C20
Creekv iew C20 PV BD24-6372 SFDO
0 01 5/30/20251 NONE NoN Application stated moderate
lev el
496-840-033-000
8304
Whippersnapper
Wy Lot 33 C20
Creekv iew C20 PV BD24-6364 SFDO
0 01 5/21/20251 NONE NoN Application stated moderate
lev el
496-840-052-000
8305
Whippersnapper
Wy Lot 52 C20
Creekv iew C20 PV BD24-6371 SFDO
0 01 5/1/20251 NONE NoN Application stated moderate
lev el
496-840-034-000
8312
Whippersnapper
Wy Lot 34 C20
Creekv iew C20 PV BD24-6365 SFDO
0 01 5/21/20251 NONE NoN Application stated moderate
lev el
496-840-051-000
8313
Whippersnapper
Wy Lot 51 C20
Creekv iew C20 PV BD24-6370 SFDO
0 01 5/6/20251 NONE NoN Application stated moderate
lev el
496-820-007-000 832 Canoe Ct Lot
7 Ph4V8
CV PH4 Vil 8 PV BD25-5503 SFDO
0 1 11/14/202510 NONE NoN
498-280-027-000 832 Cany onland
Ct Lot 85
Sierra Vista DF-1 &
DF-2 PV
BD25-1582 SFDO
0 1 4/16/202511 9/26/20251 NONE NoN
496-780-016-000 832 Rosette Ct
Lot 81 Ar15
Amoruso Ranch AR15 PV
BD24-6461 SFDO
0 1 2/4/202511 9/23/20251 NONE NoN
496-820-005-000 833 Canoe Ct Lot
5 Ph4V8
L-5 SFD 2724/471
PV
BD25-4624 SFDO
0 1 10/23/202510 NONE NoN
496-780-019-000 833 Rosette Ct
Lot 84 Ar-15
Amoruso Ranch AR15 PV
BD24-6849 SFDO
0 1 2/25/202511 10/2/20251 NONE NoN
496-820-006-000 840 Canoe Ct Lot
6 Ph4V8
CV Ph4 Vil 8 BD25-5502 SFDO
0 1 11/14/202510 NONE NoN
496-780-017-000 840 Rosette Ct
Lot 82 Ar15
Amoruso Ranch AR15 PV
BD24-6462 SFDO
0 1 2/4/202511 8/22/20251 NONE NoN
496-780-018-000 841 Rosette Ct
Lot 83 Ar-15
Amoruso Ranch AR15 PV
BD24-6848 SFDO
0 1 2/25/202511 9/16/20251 NONE NoN
498-280-041-000 900 Acadia Ct Sierra Vista DF-1 &
DF-2 PV
BD25-1587 SFDO
0 1 4/16/202510 NONE NoN
492-490-016-000 900 Brea Ct Lot
14 F6-A1
WR Fiddy ment F6A1 PV
BD24-4833 SFDO
0 01 3/18/20251 NONE NoN
496-780-035-000 900 Brock Ct Lot
156 Ar-15
Amoruso Ranch AR15 PV
BD24-6862 SFDO
0 1 2/7/202511 9/17/20251 NONE NoN
496-710-016-000 9000 Black Opal
Ci Lot 130 Ar6
Amoruso Ranch AR6 PV
BD24-5731 SFDO
0 1 1/2/202511 6/26/20251 NONE NoN
496-710-001-000 9001 Black Opal
Ci Lot 115 Ar6
Amoruso Ranch AR6 PV
BD24-5728 SFDO
0 1 1/2/202511 6/20/20251 NONE NoN
496-710-015-000 9008 Black Opal
Ci Lot 129 Ar6
Amoruso Ranch AR6 PV
BD24-5730 SFDO
0 1 1/2/202511 6/26/20251 NONE NoN
496-710-002-000 9009 Black Opal
Ci Lot 116 Ar6
Amoruso Ranch AR6 PV
BD24-5729 SFDO
0 1 1/2/202511 6/27/20251 NONE NoN
499-070-064-000 9009 Himalay a
Wy Lot 64 Kt21A1
Sierra Vista KT 21A1 PV
BD24-3406 SFDO
0 01 2/24/20251 NONE NoN Application stated moderate
lev el
498-280-032-000 901 Acadia Ct Lot
90 Df 1&Df 2
Sierra Vista DF-1 &
DF-2 PV
BD25-1584 SFDO
0 1 4/16/202510 NONE NoN
496-780-027-000 901 Brock Ct Lot
148 Ar15
Amoruso Ranch AR15 PV
BD25-0028 SFDO
0 1 2/14/202511 11/3/20251 NONE NoN
015-080-070-000 901 Porter Dr Lot
10 Pcl 13
Inf ill PCL 13 1028
Main Street PV
BD24-5893 SFDO
0 01 8/22/20251 NONE NoN
492-490-005-000 9016 Brea Wy Lot
3 F6A1
WR Fiddy ment F6A1 PV
BD24-0407 SFDO
0 01 2/18/20251 NONE NoN
496-710-003-000 9017 Black Opal
Ci Lot 117 Ar6
Amoruso Ranch AR6 PV
BD24-5009 SFDO
0 01 4/2/20251 NONE NoN
499-070-065-000 9017 Himalay a
Wy Lot 65 Kt21A1
Sierra Vista KT 21A1 PV
BD21-3934 SFDO
0 01 5/28/20251 NONE NoN Application stated moderate
lev el
496-710-004-000 9025 Black Opal
Ci Lot 118 Ar6
Amoruso Ranch AR6 PV
BD24-5010 SFDO
0 01 4/9/20251 NONE NoN
499-070-066-000 9025 Himalay a
Wy Lot 66 Kt21A1
Sierra Vista KT 21A1 PV
BD21-3935 SFDO
0 01 5/28/20251 NONE NoN Application stated moderate
lev el
015-080-069-000 903 Porter Dr Lot
9 Pcl 13
Inf ill PCL 13 1028
Main Street PV
BD24-5892 SFDO
0 01 12/8/20251 NONE NoN
496-710-005-000 9033 Black Opal
Ci Lot 119 Ar6
Amoruso Ranch AR6 PV
BD24-5011 SFDO
0 01 4/18/20251 NONE NoN
499-070-067-000 9033 Himalay a
Wy Lot 67 Kt21A1
Sierra Vista KT 21A1 PV
BD21-3936 SFDO
0 01 5/28/20251 NONE NoN Application stated moderate
lev el
496-710-006-000 9041 Black Opal
Ci Lot 120 Ar6
Amoruso Ranch AR6 PV
BD24-5012 SFDO
0 01 4/11/20251 NONE NoN
492-490-009-000 9048 Brea Wy Lot
7 F6A1
WR Fiddy ment F6A1 PV
BD25-0546 SFDO
0 1 2/19/202510 NONE NoN
496-710-007-000 9049 Black Opal
Ci Lot 121 Ar6
Amoruso Ranch AR6 PV
BD24-4995 SFDO
0 01 4/11/20251 NONE NoN
492-490-027-000 9049 Brea Wy Lot
25 F6-A1
WR Fiddy ment F6A1 PV
BD24-6685 SFDO
0 01 8/20/20251 NONE NoN
499-070-069-000 9049 Himalay a
Wy Lot 69 Kt21A1
Sierra Vista KT 21A1 PV
BD24-3407 SFDO
0 1 11/24/202510 NONE NoN Application stated moderate
lev el
015-080-068-000 905 Porter Dr Lot
8 Pcl 13
Inf ill PCL 13 1028
Main Street PV
BD24-5891 SFDO
0 01 8/15/20251 NONE NoN
496-710-014-000 9056 Black Opal
Ci Lot 128 Ar6
Amoruso Ranch AR6 PV
BD24-4998 SFDO
0 01 3/28/20251 NONE NoN
492-490-010-000 9056 Brea Wy Lot
8 F6A1
WR Fiddy ment F6A1 PV
BD25-0547 SFDO
0 1 2/19/202511 9/8/20251 NONE NoN
496-710-008-000 9057 Black Opal
Ci Lot 122 Ar6
Amoruso Ranch AR6 PV
BD24-4996 SFDO
0 01 3/27/20251 NONE NoN
492-490-026-000 9057 Brea Wy Lot
24 F6-A1
WR Fiddy ment F6A1 PV
BD24-6684 SFDO
0 01 7/31/20251 NONE NoN
496-710-013-000 9064 Black Opal
Ci Lot 127 Ar6
Amoruso Ranch AR6 PV
BD24-4997 SFDO
0 01 4/17/20251 NONE NoN
496-710-009-000 9065 Black Opal
Ci Lot 123 Ar-6
Amoruso Ranch AR6 PV
BD24-3998 SFDO
0 01 3/24/20251 NONE NoN
015-080-067-000 907 Porter Dr Lot
7 Pcl 13
Inf ill PCL 13 1028
Main Street PV
BD24-5890 SFDO
0 01 9/24/20251 NONE NoN
496-710-012-000 9072 Black Opal
Ci Lot 126 Ar-6
Amoruso Ranch AR6 PV
BD24-4001 SFDO
0 01 3/11/20251 NONE NoN
496-710-010-000 9073 Black Opal
Ci Lot 124 Ar-6
Amoruso Ranch AR6 PV
BD24-3999 SFDO
0 01 3/24/20251 NONE NoN
498-280-040-000 908 Acadia Ct Lot
98 Df 1&Df 2
Sierra Vista DF-1 &
DF-2 PV
BD25-1586 SFDO
0 1 4/16/202511 11/5/20251 NONE NoN
492-490-017-000 908 Brea Ct Lot
15 F6A1
WR Fiddy ment F6A1 PV
BD24-3198 SFDO
0 01 3/18/20251 NONE NoN
496-780-034-000 908 Brock Ct Lot
155 Ar-15
Amoruso Ranch AR15 PV
BD24-6861 SFDO
0 1 2/7/202511 9/25/20251 NONE NoN
496-710-011-000 9081 Black Opal
Ci Lot 125 Ar-6
Amoruso Ranch AR6 PV
BD24-4000 SFDO
0 01 5/1/20251 NONE NoN
492-490-011-000 9088 Brea Wy Lot
9 F6-A1
WR Fiddy ment F6A1 PV
BD24-6681 SFDO
0 01 7/10/20251 NONE NoN
496-790-038-000 9089 Black Opal
Ci Lot 99 Ar117A
Amoruso Ranch AR117A PV
BD25-5968 SFDO
0 1 12/24/202510 NONE NoN
492-490-025-000 9089 Brea Wy Lot
23 F6-A1
WR Fiddy ment F6A1 PV
BD24-6683 SFDO
0 01 7/10/20251 NONE NoN
498-280-033-000 909 Acadia Ct Lot
91 Df 1&Df 2
Sierra Vista DF-1 &
DF-2 PV
BD25-1585 SFDO
0 1 4/16/202511 10/17/20251 NONE NoN
492-490-022-000 909 Brea Ct Lot
20 F6A1
WR Fiddy ment F6A1 PV
BD24-3201 SFDO
0 01 1/28/20251 NONE NoN
496-780-028-000 909 Brock Ct Lot
149 Ar15
Amoruso Ranch AR15 PV
BD25-0029 SFDO
0 1 2/14/202511 11/6/20251 NONE NoN
015-080-066-000 909 Porter Dr Lot
6 Pcl 13
Inf ill PCL 13 1028
Main Street PV
BD24-5889 SFDO
0 01 12/4/20251 NONE NoN
492-490-012-000 9096 Brea Wy Lot
10 F6-A1
WR Fiddy ment F6A1 PV
BD24-6682 SFDO
0 01 8/19/20251 NONE NoN
496-790-039-000 9097 Black Opal
Ci Lot 100Ar-117A
Amoruso Ranch AR117A PV
BD25-5969 SFDO
0 1 12/24/202510 NONE NoN
492-490-024-000 9097 Brea Wy Lot
22 F6-A1
WR Fiddy ment F6A1 PV
BD24-4835 SFDO
0 01 4/16/20251 NONE NoN
499-070-074-000 9097 Himalay a
Wy Lot 74 Kt21A2
Sierra Vista KT 21A2 PV
BD25-1593 SFDO
0 1 6/20/202511 12/15/20251 NONE NoN Application stated moderate lev el
492-490-013-000 9104 Brea Wy Lot
11 F6-A1
WR Fiddy ment F6A1 PV
BD24-4830 SFDO
0 01 2/21/20251 NONE NoN
496-790-040-000 9105 Black Opal
Ci Lot 101Ar-117A
Amoruso Ranch AR117A PV
BD25-5970 SFDO
0 1 12/24/202510 NONE NoN
492-490-023-000 9105 Brea Wy Lot
21 F6-A1
WR Fiddy ment F6A1 PV
BD24-4834 SFDO
0 01 4/2/20251 NONE NoN
015-080-065-000 911 Porter Dr Lot
5 Pcl13
Inf ill PCL 13 1028
Main Street PV
BD24-5644 SFDO
0 01 9/10/20251 NONE NoN
496-710-032-000 9112 Black Opal
Ci Lot 146 Ar6
Amoruso Ranch AR6 PV
BD24-4003 SFDO
0 01 3/12/20251 NONE NoN
492-490-014-000 9112 Brea Wy Lot
12 F6-A1
WR Fiddy ment F6A1 PV
BD24-4831 SFDO
0 01 2/19/20251 NONE NoN
496-790-041-000 9113 Black Opal
Ci Lot 102Ar-117A
Amoruso Ranch AR117A PV
BD25-5971 SFDO
0 1 12/24/202510 NONE NoN
496-710-031-000 9120 Black Opal
Ci Lot 145 Ar-6
Amoruso Ranch AR6 PV
BD24-4002 SFDO
0 01 3/12/20251 NONE NoN
492-490-015-000 9120 Brea Wy Lot
13 F6-A1
WR Fiddy ment F6A1 PV
BD24-4832 SFDO
0 01 4/2/20251 NONE NoN
496-790-042-000 9121 Black Opal
Ci Lot 103Ar-117A
Amoruso Ranch AR117A PV
BD25-2016 SFDO
0 1 6/13/202511 12/5/20251 NONE NoN
496-790-043-000 9129 Black Opal
Ci Lot 104Ar-117A
Amoruso Ranch AR117A PV
BD25-2017 SFDO
0 1 6/13/202511 12/2/20251 NONE NoN
015-080-064-000 913 Porter Dr Lot
4 Pcl13
Inf ill PCL 13 1028
Main Street PV
BD24-5643 SFDO
0 01 6/6/20251 NONE NoN
015-080-063-000 915 Porter Dr Lot
3 Pcl13
Inf ill PCL 13 1028
Main Street PV
BD24-5642 SFDO
0 01 6/24/20251 NONE NoN
498-280-039-000 916 Acadia Ct Lot
97 Df 1&2
Sierra Vista DF-1 &
DF-2 PV
BD25-0514 SFDO
0 1 2/11/202510 NONE NoN
492-490-018-000 916 Brea Ct Lot
16 F6A1
WR Fiddy ment F6A1 PV
BD24-3199 SFDO
0 01 1/27/20251 NONE NoN
496-780-033-000 916 Brock Ct Lot
154 Ar-15
Amoruso Ranch AR15 PV
BD24-6860 SFDO
0 1 2/7/202511 9/26/20251 NONE NoN
498-280-034-000 917 Acadia Ct Lot
92 Df 1&2
Sierra Vista DF-1 &
DF-2 PV
BD25-0509 SFDO
0 1 2/11/202511 11/7/20251 NONE NoN
492-490-021-000 917 Brea Ct Lot
19 F6A1
WR Fiddy ment F6A1 PV
BD24-3200 SFDO
0 01 2/4/20251 NONE NoN
496-780-029-000 917 Brock Ct Lot
150 Ar15
Amoruso Ranch AR15 PV
BD25-0030 SFDO
0 1 2/14/202511 11/10/20251 NONE NoN
015-080-062-000 917 Porter Dr Lot
2 Pcl13
Inf ill PCL 13 1028
Main Street PV
BD24-5641 SFDO
0 01 6/12/20251 NONE NoN
015-080-061-000 919 Porter Dr Lot
1 Pcl 13
Inf ill PCL 13 1028
Main Street PV
BD24-5640 SFDO
0 01 5/29/20251 NONE NoN
498-280-038-000 924 Acadia Ct Lot
96 Df 1&2
Sierra Vista DF-1 &
DF-2 PV
BD25-0513 SFDO
0 1 2/11/202511 11/10/20251 NONE NoN
492-490-019-000 924 Brea Ct Lot
17 F6A1
WR Fiddy ment F6A1 PV
BD24-3173 SFDO
0 01 1/6/20251 NONE NoN
498-280-035-000 925 Acadia Ct Lot
93 Df 1&2
Sierra Vista DF-1 &
DF-2 PV
BD25-0510 SFDO
0 1 2/11/202510 NONE NoN
492-490-020-000 925 Brea Ct Lot
18 F6A1
WR Fiddy ment F6A1 PV
BD24-3174 SFDO
0 01 1/14/20251 NONE NoN
496-780-030-000 925 Brock Ct Lot
151 Ar15
Amoruso Ranch AR15 PV
BD25-0031 SFDO
0 1 2/14/202511 11/4/20251 NONE NoN
498-280-037-000 932 Acadia Ct Lot
95 Df 1&2
Sierra Vista DF-1 &
DF-2 PV
BD25-0512 SFDO
0 1 2/11/202511 8/15/20251 NONE NoN
496-780-032-000 932 Brock Ct Lot
153 Ar-15
Amoruso Ranch AR15 PV
BD24-6859 SFDO
0 1 2/7/202511 9/18/20251 NONE NoN
498-280-036-000 933 Acadia Ct Lot
94 Df 1&2
Sierra Vista DF-1 &
DF-2 PV
BD25-0511 SFDO
0 1 2/11/202511 8/7/20251 NONE NoN
496-780-031-000 933 Brock Ct Lot
152 Ar15
Amoruso Ranch AR15 PV
BD25-0032 SFDO
0 1 2/14/202511 11/10/20251 NONE NoN
471-200-013-000 1122 Salmon Dr
Salmon Dr -
Permanent
supportiv e housing
BD24-30835R
0 6 5/7/202566 12/23/20256 NONE NoY CDBG Other 551 Destroy edO 014-062-018-000 412 Sixth Street INFILL PCL 108 -
Rail Town Village
PL24-1103 SFDR 12 7/29/2025 1200 NONE NoY
011-092-010-000 300 Elef a Street
DTSP PCL DT-1 -
300 Elef a MultiFamily
PL25-0205 5+R6 12/11/2025
6 00 NONE NoY
477-490-023-000
1501 Westbrook
Boulev ard
SVSP PCL FD-21 -
Centera & Windham

II DRRS
Modif ication
PL25-0533 SFDO 187 11/20/2025
187
00 NONE NoN
496-100-103-000 1961 Westbook
Boulev ard
SVSP PCL WB-42B -
Orion at Solaire
DRRS Mod
PL25-0597 SFDO 53 12/9/2025
53 00 NONE NoN
496-100-102-000 2931 Pleasant
Grov e Boulev ard
SVSP PCL WB42-B -
Orion at Solaire
PL25-0357 SFDO 53 9/23/2025 53
00 NONE NoN
017-390-011-000 1098 Woodcreek
Oaks Boulev ard
NWRSP PCL 89 -
Heritage Park
Apartments ODS
PL25-0264 5+R8 7/17/2025
8 00 NONE NoY DB 50.0%
1 Dev elopment
Standards
Modif ication
No
017-470-049-000
5331 Green
Feather Way
ARSP PCL AR-8,
AR-9, AR-10, AR16, AR-17, AR-18,
& AR-23 - Amoruso
Ranch Phase 1
Subphase B1
PL25-0263 SFDO 312 10/2/2025
312
00 NONE NoN
011-114-010-000 808 Main Street INFILL PCL 18 -
SB684 Lot Split
PL25-0493 SFDO2 11/4/2025
2 00 NONE NoY
470-170-076-000 1104 Nottingham
Court
INFILL PCL 51 -
Kaur Ministerial TwoLot Map
PL25-0032 SFDO1 6/24/2025
1 00 SB 9 (2021) -
Residential Lot Split
NoY
013-025-020-000 406 East Street
INFILL PCL 35 -
406 East St Two-Lot
Ministerial Map
PL25-0037 SFDO2 10/1/2025
2 00 SB 9 (2021) -
Residential Lot Split
NoY
0 00
0 00
0 00
0 0
0 0
00 0
00 0
00 0
00 0
0 0
0 0
0 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
00 0
0 0
0 00
0 00
0 00
0 00
0 00
0 0
0 0
00 0
00 0
00 0
00 0
00 0
00 0
0 0
0 00
0 00
0 00
0 00
0 0
0 0
00 0
00 0
00 0
00 0
00 0
0 0
0 00
0 0
0 0
00 0
00 0
00

Page 294 of 981 ends

Jurisdiction Roseville ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2025 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 05/15/2021 - 05/15/2029
1 Projection
Period 3 4
RHNA Allocation
by Income Level
Projection
Period -
06/30/2021-
05/14/2021
2021 2022 2023 2024 2025 2026 2027 2028 2029
Total Units
to Date (all
years)
Total Remaining
RHNA by
Income Level
Deed Restricted - - - - - - - - - -
Non-Deed Restricted - - - - - - - - - -
Deed Restricted - - - 51 61 14 - - - -
Non-Deed Restricted - - - - - - - - - -
Deed Restricted - - 2 129 158 103 - - - -
Non-Deed Restricted - - - - - - - - - -
Deed Restricted - - 83 259 253 290 - - - -
Non-Deed Restricted - 10 26 23 20 - - - - -
Deed Restricted - 5 3 39 48 - - - - -
Non-Deed Restricted - 465 670 469 416 404 - - - -
Above Moderate 4,142 - 641 1,053 940 577 572 - - - - 3,783 359 12,066
- 1,121 1,837 1,910 1,533 1,383 - - - - 7,784 5,055
Income Level
Very Low
126 -
This table is auto-populated once you enter your jurisdiction name and current year data. Past year information comes from previous APRs.

Please contact HCD if your data is different than the material supplied here 2 Table B
Regional Housing Needs Allocation Progress
Permitted Units Issued by Affordability
3,337
2,519 Moderate
3,855
2,323
1,746
964
518
Please note: The APR form can only display data for one planning period. To view progress for a different planning period, you may login to HCD's online APR system, or contact HCD staff at [email protected].

Acutely Low - -
*For years prior to 2025, data on deed-restricted vs. non-deed restricted Extremely Low-Income units is approximated from whether the projects reported any deed-restricted Very Low-Income Units. If you wish to edit this historical data for accuracy or have any questions about the data, you may login to HCD's online APR system, or contact HCD staff at [email protected].

Total Units
*For jurisdictions that received RHNA determinations for the current cycle prior to the passage of AB 3093 (September 19, 2024):
- You were not allocated Acutely Low-Income and Extremely Low-Income RHNA targets, therefore the allocations in Field 1 are listed as "0" - If you wish to set your own targets in these income categories for informational purposes, contact HCD staff at [email protected]. - All Acutely Low-Income and Extremely Low-Income units reported during the cycle are counted towards Very-Low Income RHNA progress -
Total RHNA
-
1,359 Low
*For years prior to 2025, Acutely Low-Income units are reported within the Extremely Low-Income category Please Note: Table B does not currently contain data from Table F or Table F2 for prior years. You may login to the APR system to see Table B that contains this data.

Extremely Low -

Page 295 of 981 ends

Jurisdiction Roseville ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2025
(Jan. 1 - Dec.
31) Housing Element Implementation
Planning Period 6th Cycle 05/15/2021 - 05/15/2029
Date of
Rezone Rezone Type
2 4 5 6 7 9 10 11
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Date of
Rezone
Very LowIncome Low-Income ModerateIncome
Above
ModerateIncome
Rezone Type Parcel Size
(Acres)
General Plan
Designation Zoning
Minimum
Density
Allowed
Maximum
Density
Allowed
Realistic
Capacity Vacant/Nonvacant Description of Existing Uses
Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
Summary Row: Start Data Entry Below
3 8
Project Identifier RHNA Shortfall by Household Income Category Sites Description 1 Sites Identified or Rezoned to Accommodate Shortfall Housing Need and No Net-Loss Law Table C

Page 296 of 981 ends

Jurisdiction Roseville
Reporting Year 2025 (Jan. 1 - Dec. 31)
1 2 3 4 5 6 7 8 9
Name of Program Objective
Projected Completion
Date in Housing
Element
Applicable Cycle Status of Program
Implementation
Program
Implementation
Details
Quantified Outcomes:

Category
Quantified Outcomes:

Count Supporting Documents
Federal and State Programs
- HCV (Federal)
Minimum of 65 Housing Choice Vouchers
per year, 49 of them to extremely low
income households
6/30/2029 6th Cycle Continuous
RHA issued a total of 41
HCV's of which 30 were
VASH. RHA issued and
housed 7 PBVs. RHA was
placed in shortfall prevention
protocol per HUD, and
ceased issuing regykar
vouchers in February 2025.

Households 41 www.roseville.ca.us/rha
Federal and State Programs
- Housing Rehabilitation
Program
Assist 6 low income homeowners per year 6/30/2029 6th Cycle Continuous The Owner-Occupied
Housing Rehabilitation
program assisted 7 lowincome homeowners.

Units 7 none
Density Bonus Program To increase the City's supply of affordable housing 6/30/2029 6th Cycle Continuous
Three projects used the
density bonus ordinance
during the reportting year, for
a total of 26 additional units.

Units 26 none
Accessory Dwelling Units
Ordinance
Issue building permits for a minimum of 10
units annually (five times the average rate
between 2013 and 2017) for a total of 80
units
6/30/2029 6th Cycle Continuous
A total of 39 building permits
for ADUs were issued during
the reporting year.

Units 39 none
Condominium Conversion
Ordinance
To support the conversion of rental units to
condominiums 6/30/2029 6th Cycle Continuous
The City processed no
residential condominium
conversions during the
reporting period.

Units None
Streamline Project
Processing
Complete 100% of applications within the
City's adopted schedules 6/30/2029 6th Cycle Continuous Planning, Engineering, and
Building have completed
94% of tasks by their due
dates. For the 6% where
due dates were not met,
tasks were typically late by a
few days.

Other None

ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Describe progress of all programs including local efforts to remove governmental constraints to the maintenance, improvement, and development of housing as identified in the housing element.

Table D
Program Implementation Status pursuant to GC Section 65583

Page 297 of 981 ends

Specific Plan Areas (SPA)
Ensure affordable units are integrated
throughout the SPA and provide 10% of
total SPA units as affordable units,
consistent with Land Use Element Policy
LU5.5.
6/30/2029 6th Cycle Continuous
No new Specific Plans were
approved because no new
land was annexed. As
described in the Housing
Element, the City's existing
Specific Plans are consistent
with this program.

Units https://www.roseville.ca.us/cms/One.aspx?po
rtalId=7964922&pageId=8774576
Public/Private Partnerships
Ensure affordable units are integrated
throughout the SPA and provide 10% of
total SPA units as affordable units,
consistent with Land Use Element Policy
LU5.5.
6/30/2029 6th Cycle Continuous
As described in the Housing
Element, the City's existing
Specific Plans are consistent
with this program.

Units https://www.roseville.ca.us/cms/One.aspx?po
rtalId=7964922&pageId=8774576
Affordable Housing
Agreements
Provide 10% of total SPA units as
affordable units, consistent with Land Use
Element Policy LU5.5.
6/30/2029 6th Cycle Continuous
100% of Affordable Housing
Agreements were reviewed
in 2025 and were found to
be consistent with this
program.

Units 32 None
In-Lieu Fees
Provide 10% of total SPA units as
affordable units, consistent with Land Use
Element Policy LU5.5.
6/30/2029 6th Cycle Continuous
The City continues to
maintain consistency with
the 10% affordability
requirement through
implementation of the
Specific Plans program.

Units None
Non-Residential
Construction Fee
Provide additional funding sources for
affordable housing 2021 6th Cycle Completed
Consistent with the program
direction to review
establishment of a fee by
2021, the City completed a
commercial linkage fee
nexus study, and released
the study, discussion
materials, and a draft
ordinance for public review
in November 2021.

Units
https://www.roseville.ca.us/government/depar
tments/development_services/planning/housi
ng_element/updates
Preservation of Affordable
Housing
To ensure affordable units remain
affordable for as long as possible 6/30/2029 6th Cycle Continuous No affordable units were at
risk during the 2024 review
period.

Units None
Housing Successor Agency
Gap financing for future developments and
Homeless Prevention and Rapid
Rehousing Program
6/30/2029
6th Cycle
Continuous
The City used $250,000 in
Low/Mod funds to
supplement the Homeless
Prevention and Rapid
Rehousing Program in
Program Year 2025
Households None
Residential Capacity
Monitoring (No Net Loss)
Evaluate 100% of residential applications
for RHNA consistency 6/30/2029 6th Cycle Continuous
100% of projects were
reviewed for consistency
with the City's RHNA targets.

Also see the program below,
Rezone Program for
Adequate Sites.

Units None
Rezone Program for
Adequate Sites
Achieve a minimum lower income capacity
of 6,178 units by 2024 2024 6th Cycle Completed
The City effectuated the
Rezone Program and
received confirmation of
successful completion from
HCD on June 27, 2025.

Units 2,403
none, consolidated documentation was
submitted to HCD as part of confirmation
process.

Page 298 of 981 ends

Affordable Housing
Streamlining
To streamline the approval of affordable
housing projects by providing a ministerial
approval process, thereby shortening
timeframes by an average of three to five
months and fees by $8,000 or more
6/30/2029 6th Cycle Completed
The City approved one
affordable housing project
using this process during the
reporting period, for a total of
190 affordable units.

Units 190
https://www.roseville.ca.us/government/depar
tments/development_services/planning/object
ive_design_standards
Prioritize Affordable Housing
To faciliate and incentivize the construction
of affordable housing. The goal is for 100%
of affordable housing projects to leverage
this program
6/30/2029 6th Cycle Completed
The City approved one
affordable housing project
using this process during the
reporting period, for a total of
190 affordable units.

Units 190
https://www.roseville.ca.us/government/depar
tments/development_services/planning/object
ive_design_standards and
https://www.roseville.ca.us/cms/One.aspx?po
rtalId=7964922&pageId=8740482
Housing Replacement
Program
To ensure conservation and replacement
of affordable units 6/30/2029 6th Cycle Continuous
No affordable units needed
replacement during the 2025
review period.

Units None
Accessory Dwelling Unit
Outreach Program
Ensure 100% of multifamily property
owners who contact the City receive
information on accessory dwelling units
2022 6th Cycle Continuous
The City created and
maintains informational
handouts for ADUs in both
the single-family and
multifamily context.

Units2
https://cdnsm5-
hosted.civiclive.com/UserFiles/Servers/Server
_7964838/File/Government/Departments/Dev
elopment%20Services/Planning/AFH/Handou
ts/Accessory%20Dwelling%20Units%20-
%20Single%20Family.pdf
Federal and State Programs
- Section 8 HCV (Federal)
Effectively implement federal and state
programs and leverage funding
opportunities, increase the number of
participating properties in high resource
areas of the City, and obtain funding for
affordable housing projects serving special
needs populations
6/30/2029 6th Cycle Continuous
RHA has utilized 100% of
the Foster Youth Initiative
vouchers to support foster
youth transitioning out of
foster care and are
homeless or at risk of
homelessness. RHA also
applied for 20 additional
VASH vouchers for
homeless veterans. An
additional 21 Project Based
Vouchers were leased in
2025 to estremely lowincome households.

Households none
Federal and State Programs
- Section 202 (Federal)
Effectively implement federal and state
programs and leverage funding
opportunities, increase the number of
participating properties in high resource
areas of the City, and obtain funding for
affordable housing projects serving special
needs populations
6/30/2029 6th Cycle Continuous
There were no applications
by housing developers to
use Section 202 funding in
2024
Units None
Federal and State Programs
- CDBG (Federal)
Effectively implement federal and state
programs and leverage funding
opportunities, increase the number of
participating properties in high resource
areas of the City, and obtain funding for
affordable housing projects serving special
needs populations
6/30/2029 6th Cycle Continuous
CDBG funds in the amount
of $571,80 were loaned to
an affordable project for
acquistiion of land which
assisted in the project being
fuly funded.

Units 192 None

Page 299 of 981 ends

Housing Rehabilitation
Program - Home (State) and
CDBG (Federal)
Effectively implement federal and state
programs and leverage funding
opportunities, increase the number of
participating properties in high resource
areas of the City, and obtain funding for
affordable housing projects serving special
needs populations
6/30/2029 6th Cycle Continuous
The Housing Rehabilitation
program supported seven
households in Roseville, with
a total investment of
$539,462.98 allocated in
CDBG, HOME and
CalHome for the
rehabilitation of these
homes. Of this amount,
$47,815.98 was provided
through CD
Units 7 None
Public Service Funds
Effectively implement federal and state
programs and leverage funding
opportunities, increase the number of
participating properties in high resource
areas of the City, and obtain funding for
affordable housing projects serving special
needs populations
6/30/2029 6th Cycle Continuous
Public Service programs
included transitional housing
and case management for
persons with mental illness;
mental health services;
veterans services; food and
meal delivery; grocery
distribution; and services for
victims of domestic violence.

During the reporting year,
these programs assisted
1,220 individuals, including
273 persons with disabilities,
398 elderly individuals, 186
persons experiencing
homelessness, and 147
female heads of household.

In addition, the food locker
grocery distribution program
served an average of 452
households per week.

Persons 1220 none
Homeless Prevention and
Rapid Rehousing Program
Fund non-profits to implement homeless
prevention and rapid rehousing programs
such as rent, utilities, and deposit
payments, homeless hotel vouchers and
ready-to-rent programs
6/30/2029 6th Cycle Continuous A.S.K. (AMI Housing, Saint V Persons 924 n/a Roseville Community Grants
Funds
Provide funding to public agencies and nonprofits for programs that benefit and support the Roseville community
6/30/2029
6th Cycle
Continuous
The Grants Advisory
Commission awarded
$288,010 to 17 non-profit
organizations for use
between July 2025 and June
2026
Households 17 https://www.roseville.ca.us/cms/One.aspx?po rtalId=7964922&pageId=8651252

Page 300 of 981 ends

Address Significant
Disparities and Increase
Opportunities
To ensure that direct and indirect
government activities and influence is
equitable and supports access to housing
opportunists for all groups. Metrics for
success include 700 low, very low, and
extremely low income households assisted
with rental assistance; 15 owner-occupied
rehab projects (based on current funding
levels)within a disadvantaged community
area or at risk of displacement; at least 1
permanent supportive housing project
explored annually.
6/30/2029 6th Cycle Continuous
The Housing Authority
housed over 845 low, very
lowe- and extremely lowincome households during
the year. Seven Owneroccupied rehab (OOR)
projects were completed;
four within a senior
manufactured home
community and three within
disadvantaged, lowerincome areas, all seniors
who are living on a fixed
income. Additionally, the City
of Roseville is finalizing the
use $1,500,000 in HOME PI
monies to loan to Sunrose
Apartments, a permanent
supportive housing project
that is house people coming
directly from homelessness.

Units 900 none
Homeless Outreach Contact 50 high-risk community members per month 6/30/2029 6th Cycle Continuous
Social Services Unit made
739 contacts related to
mental health,
homelessness and other
community needs using
services alone. Services
include transportation, crisis
counseling, legal support, or
other needs such as hotel
accommodation, connect
cards, id vouchers, etc.

Persons 739
https://www.roseville.ca.us/news/what_s_hap
pening_in_roseville/police_community_relatio
ns
Family Mobile Team A minimum of 350 interactions annually 6/30/2029 6th Cycle Continuous 385 interactions by Placer County joint team. Persons 385 N/A
Family Reunification
Program
Reunification of at least 20 individuals
experiencing homelessness 6/30/2029 6th Cycle Continuous Social Services Unit
provided reunification for 20
homeless individuals
Persons 20 N/A
Regional Housing Programs Participate in regional approaches to affordable housing 6/30/2029
6th Cycle
Continuous
The City holds a board
member seat and co-chairs
the CA 515 Continuum of
Care, and participates in
quarterly Placer County
sponsored regional
conversations including how
jurisdictions can grow
affordable housing in the
region, affordability
requirements, valuable in
lieu fees, information
sharing, etc.

Meetings
chromeextension://efaidnbmnnnibpcajpcglclefindmkaj
/https://cloud-1de12d.bcdn.net/customfile/fefd7d7f41531d2aefc3981 92408431dd2dab3b1a6365dc2de1a21363b4
b1646/Placer-2-Page-Summary-2025.pdf

Page 301 of 981 ends

Fair Housing and Housing
Discrimination Legal
Services
To ensure residents are informed of their
housing rights and are provided with
support on fair housing issues, and that
City actions do not create barriers to fair
housing or impact choice. Annually, 50
responses to inquiries; at least 1 Fair
Housing Workshop; Adequate annual
funding, $12,000 for 2022, future years
amount responsive to resources/needs.
6/30/2029 6th Cycle Continuous
The City contracts with
Project Sentinel, a Fair
Housing agency, to provide
services for Roseville
residents. Outreach activities
in 2025 included a workshop
on Source of Income and
Fair Housing Rights, as well
as a session covering
reasonable
accommodations, Limited
English Proficiency (LEP)
discrimination, Familial
Status, and other state and
federal protections. A total of
1,002 mailers were
distributed, providing general
information about services
and contact information to
local organizations,
community centers, partner
agencies, and low-income
residential neighborhoods.

Staff also conducted inperson outreach by tabling
twice at the Maidu
Community Center in
Roseville and remained
available to respond directly
to Fair Housing inquiries and
questions from community
members. Twenty-two
households (53 individuals)
Households 1002 none
Support for Housing for
Persons with Developmental
Disabilities
To ensure residents are informed of
housing options for persons with
developmental disabilities
6/30/2029 6th Cycle Continuous
The Housing Division met
twice in 2025 with Alta
Regional and Future for our
Kids to discuss collaborating
on future affordable housing
projects for persons with
developmental disabilities.

Alta's website has a landing
page for housing options for
people with disabilities and a
section advertising
partnership opportunities
with affordable housing
developers. Mercy Housing
received a grant for $1M to
set-aside units at their new
property for people with
disabilities.

Meetings None

Page 302 of 981 ends

Allow Shared Housing Under
Housing Choice Voucher for
Persons with Disabilities
To provide rental assistance for residents
with disabilities 6/30/2029 6th Cycle Continuous
RHA reviews all reasonable
accommodation requests for
shared housing when
received. RHA had no
requests for shared houing
in 2025 and currently has 7
participants in a shared
housing living situation.

Households7 None
Process and Fee Structure
Review Review process and fee structure 6/30/2029 6th Cycle Completed The City adopted an
updated fee structure,
effective July 1, 2025.

Other https://www.roseville.ca.us/cms/One.aspx?po
rtalId=7964922&pageId=8740472
Review of Subdivision
Improvement Standards and
Zoning Ordinances
Complete review of the Subdivision
Improvement Standards and Zoning
Ordinance once per year
6/30/2029 6th Cycle Continuous
The city approved an annual
maintenance update of the
Zoning Ordinance in June
2025.

Other https://rosevilleca.portal.civicclerk.com/event/
2579/files/agenda/3067
Public Education Program
100% of staff reports or other City materials
for affordable housing projects will include
information about the necessity of
affordable housing and City newsletters will
contain such materials as a minimum of
twice annually. A FlashVote survey or other
survey will be distributed annually to
elevate the community's perceptions of
affordable housing
6/30/2029 6th Cycle Continuous
The City published multiple
articles in 2025. These
included a July 2025
Roseville Housing Authority
newsletter and
articles/announcements
about developing the City's
annual housing action plan
in December 2025.

Other
https://www.roseville.ca.us/news/what_s_hap
pening_in_roseville/annual_point-in-
_time_count_results_released
https://www.roseville.ca.us/news/what_s_hap
pening_in_roseville/help_shape_the_annual_
action_plan
Public Participation
Provide multiple means and opportunities
for public participation as part of Planning
entitlement projects
6/30/2029 6th Cycle Continuous
The City continued to
implement all aspects of
public participation listed in
this program.

Meetings1 None
Special Needs Housing
Laws
City ensures compliance with AB 2162 and
AB 101 and other legislation
Within two years of adoption
of the Housing Element 6th Cycle Continuous
The City's Zoning Ordinance
states that supportive
housing is a residential use
and allows supportive
housing in all zones where
single-family, two-family, or
multi-family housing is
permitted. Low barrier
navigation centers were also
added to the Zoning
Ordinance as a permitted
use, consistent with AB 101.

Other
https://www.roseville.ca.us/government/depar
tments/development_services/planning/zonin
g_information
Roseville Electric Program Meet the City's Renewable Portfolio Standards requirements 6/30/2029 7th Cycle Continuous
Roseville Electric is meeting
the City and State's
Renewable Portforlio
Standard requirements
Other https://www.roseville.ca.us/cms/One.aspx?po
rtalId=7964922&pageId=9074865
New Construction Efficiency
Measures
Review 100% of building permits for
consistency with Title 24 requirements 6/30/2029 6th Cycle Continuous 100% of building permits
were reviewed electronically
for consistency with Title 24
as required by the Building
Code.

Other none

Page 303 of 981 ends

Jurisdiction Roseville ANNUAL ELEMENT PROGRESS REPORT
Reporting
Period 2025
(Jan. 1 - Dec.
31) Housing Element Implementation
Planning 6th Cycle 05/15/2021 - 05/15/2029
Description of
Commercial
Development Bonus
Commercial Development Bonus
Date Approved
3 4
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Very Low
Income
Low
Income
Moderate
Income
Above Moderate
Income
Description of
Commercial
Development Bonus
Commercial Development Bonus
Date Approved
Summary Row: Start Data Entry Below
Units Constructed as Part of Agreement
Commercial Development Bonus Approved pursuant to GC Section 65915.7 Table E
Note: "+" indicates an optional field
Project Identifier
1 2
Cells in grey contain auto-calculation
formulas
(CCR Title 25 §6202)
Annual Progress Report January 2020

Page 304 of 981 ends

Jurisdiction Roseville ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Period 2025
(Jan. 1 - Dec.
31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 05/15/2021 - 05/15/2029
The description should adequately document how each unit complies with subsection (c) of Government Code Section 65583.1+.

For detailed reporting requirements, see the chcklist here:

Extremely LowIncome+ Very Low- Income+ Low-Income+ TOTAL UNITS+ Extremely Low- Income+ Very Low- Income+ Low-Income+ TOTAL UNITS+ https://www.hcd.ca.gov/community- development/docs/adequate-sites-checklist.pdf Rehabilitation ActivityPreservation of Units At-RiskAcquisition of UnitsMobilehome Park PreservationTotal Units by Income Table F
Please note this table is optional: The jurisdiction can use this table to report units that have been substantially rehabilitated, converted from non-affordable to affordable by acquisition, and preserved, including mobilehome park preservation, consistent with the standards set forth in Government Code section 65583.1, subdivision (c). Please note, motel, hotel, hostel rooms or other structures that are converted from non-residential to residential units pursuant to Government Code section 65583.1(c)(1)(D) are considered net-new housing units and must be reported in Table A2 and not reported in Table F.

Activity Type
Units that Do Not Count Towards RHNA+
Listed for Informational Purposes Only
Units that Count Towards RHNA +
Note - Because the statutory requirements severely limit what can be counted, please contact HCD at [email protected] and we will unlock the form which enable you to populate these fields.

Units Rehabilitated, Preserved and Acquired for Alternative Adequate Sites pursuant to Government Code section 65583.1(c) Annual Progress Report January 2020

Page 305 of 981 ends

Jurisdiction Roseville ANNUAL ELEMENT PROGRESS REPORT
Note: "+" indicates an optional field
Reporting Period 2025 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulasPlanning Period 6th Cycle 05/15/2021 - 05/15/2029 Notes
23 6
Prior APN+ Current APN Street Address Project Name+
Local
Jurisdiction
Tracking ID
Unit
Category
(2 to 4,5+)
Tenure
R=Renter
Very LowIncome Deed
Restricted
Very LowIncome
Non Deed
Restricted
Low- Income Deed
Restricted
Low- Income
Non Deed
Restricted
ModerateIncome Deed
Restricted
ModerateIncome Non
Deed
Restricted
Above
ModerateIncome
Total Moderate Income
Units Converted from
Above Moderate
Date
Converted Notes
Summary Row: Start Data Entry Below 00 0 0 0 0 0 0
Table F2
Above Moderate Income Units Converted to Moderate Income Pursuant to Government Code section 65400.2 For up to 25 percent of a jurisdiction’s moderate-income regional housing need allocation, the planning agency may include the number of units in an existing multifamily building that were converted to deed-restricted rental housing for moderate-income households by the imposition of affordability covenants and restrictions for the unit. Before adding information to this table, please ensure housing developments meet the requirements described in Government Code 65400.2(b). 5 Project Identifier Unit Types
1 4
Affordability by Household Incomes After Conversion Units credited toward Moderate Income RHNA

Page 306 of 981 ends

Jurisdiction Roseville
Reporting Period 2025
(Jan. 1 - Dec.
31)
Period 6th Cycle 05/15/2021 - 05/15/2029 ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation
23 4
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Realistic
Capacity
Identified in
the Housing
Element
Entity to whom the site
transferred Intended Use for Site
1 Summary Row: Start Data Entry Below
Note: "+" indicates an optional fieldCells in grey contain auto-calculation formulas Table G
Locally Owned Lands Included in the Housing Element Sites Inventory that have been sold, leased, or otherwise disposed of Project Identifier
element sites inventory contains a site which is or was owned by the reporting jurisdiction, and has been sold, leased, or otherwise disposed of during the reporting year.

Page 307 of 981 ends

Jurisdiction Roseville Note: "+" indicates an optional field Reporting
Period 2025
(Jan. 1 - Dec.
31)
Cells in grey contain auto-calculation
formulas
Designation Size Notes
1 2 34 5 6 7
APN Street Address/Intersection Existing Use Number of
Units
Surplus
Designation
Parcel Size (in
acres) Notes
015-100-058-000 503 Berry Street Vacant 0 Surplus Land 1.23 014-440-090-000 251 Sunrise Avenue Vacant 0 Surplus Land 0.38 013-290-005-000 505 Royer Street Vacant 0 Surplus Land 0.38 013-290-006-000 300 Taylor Street Vacant 0 Surplus Land 0.78 013-290-002-000 401 Oak Street Vacant 0 Surplus Land 1.39 013-290-001-000 403 Oak Street Public Facilities 0 Surplus Land 0.48 017-101-008-000 6382 Phillip Road Vacant 0 Surplus Land 237.26 NOTE: This table must contain an inventory
of ALL surplus/excess lands the reporting
jurisdiction owns
Summary Row: Start Data Entry Below
Parcel Identifier

ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Table H
Locally Owned Surplus Sites

Page 308 of 981 ends

Jurisdiction Roseville ANNUAL ELEMENT PROGRESS REPORT
Reporting Period 2025
(Jan. 1 - Dec.
31) Housing Element Implementation
Planning Period 6th Cycle 05/15/2021 - 05/15/2029
Project Type Date
Units
(Beds/Student
Capacity) Granted
Notes
23 56
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Unit Category
(SH - Student Housing) Date
Very LowIncome Deed
Restricted
Very LowIncome Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
ModerateIncome Deed
Restricted
ModerateIncome Non
Deed
Restricted
Above
ModerateIncome
Total Additional
Beds Created Due
to Density Bonus
Notes
Summary Row: Start Data Entry Below
Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
Table J
Student housing development for lower income students for which was granted a density bonus pursuant to subparagraph (F) of paragraph (1) of subdivision (b) of Section 65915 Project Identifier Units (Beds/Student Capacity) Approved 1 4
NOTE: STUDENT HOUSING WITH DENSITY BONUS
ONLY. This table only needs to be completed if there
were student housing projects WITH a density bonus
approved pursuant to Government Code65915(b)(1)(F)
Annual Progress Report January 2020

Page 309 of 981 ends

Jurisdiction Roseville ANNUAL ELEMENT PROGRESS REPORT
Reporting Period 2025 (Jan. 1 - Dec. 31)
Planning Period 6th Cycle 05/15/2021 - 05/15/2029
No
Does the Jurisdiction have a local tenant preference
policy?
If the jurisdiction has a local tenant preference policy, provide a link to the jurisdiction's webpage containing authorizing local ordinance and supporting materials.

Notes
Table K
Tenant Preference Policy
Local governments are required to inform HCD about any local tenant preference ordinance the local government maintains when the jurisdiction submits their annual progress report on housing approvals and production, per Government Code 7061 (SB 649, 2022, Cortese). Effective January 1, 2023, local governments adopting a tenant preference are required to create a webpage on their internet website containing authorizing local ordinance and supporting materials, no more than 90 days after the ordinance becomes operational.

Page 310 of 981 ends

Jurisdiction Roseville Note: "+" indicates an optional field Reporting
Period 2025
(Jan. 1 - Dec.
31)
Cells in grey contain auto-calculation
formulas
Size Notes
34 APN Street Address/Intersection Date of
Designation
Designation
Level
Historic Site
Period
Areas of
Significance
Parcel Size (in
acres) Notes
Summary Row:

Historical Resources
Parcel Identifier
1 Designation
2 NOTE: This table needs to be completed with any sites within your jurisdiction that were newly added to a National, State, or Local register of historic places within the reporting year. If none, leave blank.

ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Table L

Page 311 of 981 ends

Jurisdiction Roseville
Reporting Year 2025 (Jan. 1 - Dec. 31)
Total Award Amount Total award amount is auto-populated based on amounts entered in rows 15-26.

Task $ Amount Awarded $ Cumulative Reimbursement Requested Other Funding Notes Prepare Draft Housing Element $40,000.00 $40,000.00 REAP Public Outreach $4,000.00 $4,000.00 Local General Fund
Revise Draft Housing Element $5,000.00 $5,000.00 Local General Fund Prepare Draft Environmental
Document $30,000.00 $29,527.99 Local General Fund
Prepare Supporting Technical
Studies $110,000.00 $109,187.18 Local General Fund
Public Outreach $2,000.00 $2,000.00 Local General Fund
Planning Commission Hearings $2,000.00 $2,000.00 Local General Fund City Council Hearings $2,000.00 $2,000.00 REAP
Prepare Implementing Programs $80,000.00 $79,041.11 REAP Prepare Housing-Related
Ordinances and Progras and
Prepare Supporting Studies & Env
Docs
$94,000.00 $93,603.63 REAP
Public Outreach, Final Docs, &
Hearings $3,200.00 $3,104.43 Local General Fund
Unclaimed Funds $127,800.00 $0.00 None
Summary of entitlements, building permits, and certificates of occupancy (auto-populated from Table A2) Current Year
Deed Restricted 0Non-Deed Restricted 0Deed Restricted 20Non-Deed Restricted 0Deed Restricted 83Non-Deed Restricted 0Deed Restricted 97Non-Deed Restricted 0Deed Restricted 0Non-Deed Restricted 26 622848
Current Year
Deed Restricted 0Non-Deed Restricted 0Deed Restricted 14Non-Deed Restricted 0Deed Restricted 103Non-Deed Restricted 0Deed Restricted 290Non-Deed Restricted 0Deed Restricted 0Non-Deed Restricted 404 572
1383
Current Year
Deed Restricted 0Non-Deed Restricted 0Deed Restricted 70Non-Deed Restricted 0Deed Restricted 239Non-Deed Restricted 19Deed Restricted 373Non-Deed Restricted 72Deed Restricted 69Non-Deed Restricted 444 773
2059
Moderate
Above Moderate
Total Units
Completed Entitlement Issued by Affordability Summary
Income Level
Very Low
Low
Moderate
Above Moderate
Total Units
Building Permits Issued by Affordability Summary
Income Level
Very Low
Low
Acutely Low
Extremely Low
Total Units
Certificate of Occupancy Issued by Affordability Summary Income Level
Very Low
Low
Moderate
Above Moderate
CompletedCompletedCompletedCompletedCompletedCompleted
Acutely Low
Extremely Low
Acutely Low
Extremely Low

ANNUAL ELEMENT PROGRESS REPORT
Local Early Action Planning (LEAP) Reporting
(CCR Title 25 §6202)
CompletedCompleted
Please update the status of the proposed uses listed in the entity’s application for funding and the corresponding impact on housing within the region or jurisdiction, as applicable, categorized based on the eligible uses specified in Section 50515.02 or 50515.03, as applicable. $ 500,000.00
Task Status
CompletedCompletedCompletedCompleted

Page 312 of 981 ends

Report of Required Information per Health and Safety Code 34176.1 (f) City of Roseville Housing Successor
Fiscal Year 2024-25
Page | 1

1. Any amounts deposited into the Fund, with segregation of amounts deposited from payments pursuant to a Recognized Obligation Payment Schedule ("ROPS") from other sources.

Amount Source Purpose
$32,274 Interest on Investments Earned Fund Balance-Reserved $7,059 Interest on Notes/Loans Fund Balance-Reserved
$41,319 Monitoring Fees Fund Balance-Reserved
$737,249 20% Deposit from City Loan Payoff Fund Balance-Reserved $214,167 Loan Payoffs-Program Income Fund Balance-Reserved $0.00 Other Income Fund Balance-Reserved
$1,032,069 Total Deposits

2. The balance in the Fund at the fiscal year end, with segregation of amounts held to meet obligations on a ROPS from other amounts.

Amount Description
$2,370,814 Ending Cash
$8,535 Interest Receivable
$2,379,350 Fund Balance 6/30/25

3. A description of expenditures from the Fund by category for:
a. Monitoring and preserving the long-term affordability of units subject to affordability restrictions or covenants entered by the redevelopment agency or the housing successor and administering permitted affordable housing activities. The amount that can be spent on monitoring and administration is capped at 2% of the value of the assets in the Fund or $200,000 whichever is greater.
b. Homeless prevention and rapid rehousing services. This amount is limited to $250,000 annually.
c. Development of housing affordable to households at or below 80% of area median income ("AMI").

Amount Description
$145,393 a. Staff charges for Monitoring
$15,953 a. Professional Services
$22,850 a. Misc Office Charges
$250,000 b. Homeless Prevention
$0.00 c. Development of housing
$434,196 Total Expenditures

Page 313 of 981 ends

Report of Required Information per Health and Safety Code 34176.1 (f) City of Roseville Housing Successor
Fiscal Year 2024-25
Page | 2

4. The statutory value of real property owned by the housing successor, the value of loans and grants receivable, and the sum of these two amounts. "Statutory value of real property" means the value of properties formerly held by the former redevelopment agency as listed on the housing asset transfer form approved by the Department of Finance ("DOF") and the purchase price of properties purchased by the housing successor.

Amount Description
$875,000 MSP Land - Note Receivable
$5,760,000 Mercy Housing - Deferred Receivables
$500,000
Hampstead Prospera at Fiddyment
Workforce – Deferred Receivables
$3,779,704 FTHB/commercial Deferred Receivables
$761,715 Residential
$11,676,419 Total Value of Land & A/R

5. A description of any inter-jurisdictional transfers of monies from the Fund in the previous fiscal year as well as any transfer from prior fiscal years if the funds are still unencumbered and a description of and status update on any project for which transferred funds have been or will be expended if that project has not yet been placed in service.

None

6. A description of any project for which the housing successor receives or holds real property tax revenue pursuant to the ROPS and the status of that project.

None

7. For interests in real property acquired by the former redevelopment agency prior to February 1, 2012, a status update on compliance with the development of the property within five (5) years after the DOF approved the property as a housing asset, which would typically be the date of approval of the housing asset transfer list. For interests in real property acquired on or after February 1, 2012, a status update on the project.

The Housing Successor provided gap financing to the projects listed below. The properties are privately owned and the Housing Successor holds no title:

Mercy Housing secured a loan from the Housing Successor for $5,760,000 for the development of a 58- unit mixed-use affordable housing development at 623 Vernon Street, Roseville. The loan was approved by the City Council, acting as the Housing Successor, on November 16, 2016. The project was completed in November 2018.

In 2016, the Housing Successor committed $600,000 of funding from the low/moderate affordable housing funds towards the Junction Crossing affordable rental housing development at 120 Pacific Street.

The deferred low interest loan was approved by the City Council, acting as the Housing Successor, on October 20, 2021. This project includes 80 affordable units available for low- and very low-income households and was completed in February 2024.

Page 314 of 981 ends

Report of Required Information per Health and Safety Code 34176.1 (f) City of Roseville Housing Successor
Fiscal Year 2024-25
Page | 3
The Housing Successor loaned $500,000 in gap funding to Hampstead Company’s Prospera at Fiddyment - Workforce Housing project for the development of a 104-unit mixed-income affordable housing development. The project is located at 2801 North Hayden Parkway in West Roseville and the loan was approved by the City Council, acting as the Housing Successor, on April 3, 2024. The project was completed in October 2024.

8. A description of any outstanding replacement housing and housing production obligations that transferred to the housing successor on February 1, 2012, the housing successor's progress in meeting those obligations, and the housing successor's plans to meet the unmet obligations.

The Agency will continue to use loan portfolio payoffs and 20% set-aside deposits from City loan payments to provide additional assistance for affordable housing developments. The value of the 20% loan receivable from the Successor Agency on June 30, 2025, is $1,497,692.20 providing the California Department of Finance approves the payment of the City loans by the Successor Agency.

9. Reporting on income targeting requirements does not need to be included until December 31, 2019 for the period from January 1, 2014 through the end of the fiscal year covered by the report (June 30, 2019 for most housing successors), and every five years thereafter. However, it may be useful for housing successors to track this information on an annual basis to ensure the requirement is met every five years. The required income targeting expenditures are that, over a five year period, the funds remaining after expenditures for monitoring and administration and rapid rehousing services, if any, must be expended for the development of housing affordable to and occupied by households earning 80% or less of the AMI, with at least 30% of the funds expended on the development of housing affordable to and occupied by households earning 30% or less of the AMI and not more than 20% of the funds expended on the development of housing affordable to and occupied by households earning between 60% and 80% of the AMI.

Current reporting period is FY 2024–25 - FY 2028–29 (due Dec 31, 2029) The Housing Successor did not expend any funds on housing activities during FY 2024–25.

10. The percentage of units of deed-restricted rental housing restricted to seniors and assisted individually or jointly by the housing successor, its former redevelopment agency, and its host jurisdiction within the previous 10 years in relation to the total number of units of deedrestricted rental housing assisted individually or jointly by the housing successor, its former redevelopment agency, and its host jurisdiction within the same time period. If the percentage of assisted senior rental housing is more than 50 percent of the total of all assisted rental housing, no additional senior rental housing can be assisted until the percentage falls to 50 percent or less.

Units Assisted from 7/1/2015 - 6/30/2025:
# of Units Description
0 Senior Restricted Rental Housing Units
891 Non-Senior Restricted Rental Housing Units
891 Total Units
0% % of Senior Restricted Rental Housing Units

Page 315 of 981 ends

Report of Required Information per Health and Safety Code 34176.1 (f) City of Roseville Housing Successor
Fiscal Year 2024-25
Page | 4

11. The amount of any excess surplus, the amount of time that the successor agency has had the excess surplus, and the housing successor's plan for eliminating the excess surplus. The definition of excess surplus has been modified so that an "excess surplus" exists to the extent a housing successor holds unencumbered funds in its Fund in an amount that exceeds the greater of $1,000,000 or the total amount of deposits into the Fund for the preceding four fiscal years. The housing successor is required to spend the excess surplus amount or transfer that amount to another jurisdiction as provided in Health and Safety Code Section 34176.1(c)(2) within three fiscal years. If not, the excess surplus amount must be transferred to HCD to use pursuant to the Multifamily Housing Program or the Joe Serna, Jr. Farmworker Housing Grant Program.

Fiscal Year Amount Deposited
FY2023-24 $450,374
FY2022-23 $500,424
FY2021-22 $1,301,704
FY2020-21 $603,561
TOTAL $2,8256,063
Fund Balance – 6/30/25 $2,379,350
Amount of Fund Balance does not exceed the
sum of the deposits in the prior four years. $0

12. Inventory of Home Ownership Units: This section provides an inventory of homeownership units assisted by the former Agency or FVHA as Housing Successor that are subject to covenants or restrictions or to an adopted program that protects the former Agency’s investment of moneys from the Low and Moderate Income Fund per Section 33334.3 (f).

Loan Date Loan Due in yrs Address Amount
12/2/2008 28 121 Hickory Street 77,300.00
2/18/2009 29 109 Hickory Street 100,000.00
6/30/2009 29 153 Hickory Street 98,637.00
11/4/2009 29 145 Hickory Street 100,000.00
11/24/2009 29 125 Hickory Street 85,778.00
11/25/2009 29 141 Hickory Street 100,000.00
11/25/2009 29 113 Hickory Street 100,000.00
3/11/2010 29 149 Hickory Street 100,000.00
4/14/2010 15 1232 Impressionist Loop $80,000
7/1/2010 15 1419 Wabash Way $28,650
TOTAL $870,365.00

Page 316 of 981 ends

City Council
Communication
Meeting Date: 3/18/2026
Item #: VI.7
File #: 0103-03-02
Item ID: 2026-180
Title: HOUSING AUTHORITY/CITY COUNCIL - Quarterly Status Update 4th Quarter 2025 Contact: Suzi Cook-Turner, Trisha Isom 916-774-5414, 916-746-1239 smcook[email protected], [email protected]

SUMMARY
Staff recommends City Council, acting as the Roseville Housing Authority Board, receive a quarterly status report on the Housing Authority’s Housing Choice Voucher Program. This report is for informational purposes only and has no impact on the City's General Fund.

RECOMMENDATION
The City Council, acting as the Roseville Housing Authority Board, is not required to take any action on this item. This quarterly report is for informational purposes only.

BACKGROUND
Pursuant to the bylaws of the Roseville Housing Authority (RHA), the City Council, acting as the governing board for the Housing Authority, holds its quarterly meetings the first Wednesday of March, June, September, and December, or as soon as possible thereafter. Staff has prepared the following status report regarding lease-up activity for the Housing Choice Voucher (HCV) Program.

The HCV Program provides income-qualified households in Roseville and Rocklin with rental assistance using funding from the U.S. Department of Housing and Urban Development (HUD). This assistance is utilized at rental units that meet program specific housing standards, are owned by a willing property owner, and are within Roseville or Rocklin city limits. This rental assistance ensures that the household can afford to live in safe and decent housing.

During the fourth quarter of 2025, RHA provided rental assistance to a total of 801 households. This included 641 vouchers in Roseville, 152 in Rocklin, and 8 in other jurisdictions. RHA remains committed to increasing affordable housing opportunities in the Roseville/Rocklin area. Highlights for the fourth quarter of 2025 include:
• Project-Based Vouchers (PBV): RHA is actively working with property management teams to fill PBV units as they become available. The agency’s commitment for 2026 is to lease up a total of 11 new PBV units, expanding housing opportunities for eligible families. Staff conduct regular check-ins with property managers across participating developments to ensure open lines of communication and provide ongoing support. This collaborative approach reflects the City of Roseville’s commitment to delivering outstanding customer service and fostering strong partnerships with housing providers.
• Emergency Housing Vouchers (EHV): After being notified that EHV funding would end in 2026, earlier than anticipated, RHA amended its Administrative Plan to establish a preference for EHV participants. This allows EHV households to receive priority placement on waiting lists without

Page 317 of 981 ends

opening the lists to the public. RHA obtained the necessary waivers from HUD prior to implementation and ensured the revisions align with HUD guidance and applicable requirements of the Housing Opportunity Through Modernization Act (HOTMA). These actions demonstrate RHA’s proactive efforts to maintain housing stability for affected families. • HUD-Veteran Affairs Supportive Housing (HUD-VASH): RHA continues to demonstrate strong performance in the HUD-VASH program, maintaining a 98% lease-up rate out of 100 allocated vouchers. This achievement reflects the agency’s commitment to meeting the housing needs of veterans in our community. Staff work closely with Veteran Affairs partners to ensure expedited processing of program eligibility and initial move-in inspections, reducing barriers and accelerating access to stable housing. These collaborative efforts underscore RHA’s dedication to providing timely, supportive services for veterans and reinforcing the City of Roseville’s mission to deliver outstanding customer service.
• Challenges: Fourth-quarter planning and operations were significantly impacted by the prolonged federal budget shutdown. Limited HUD staffing and restricted communication delayed guidance, shortfall meetings, and clarity regarding Transportation and Housing and Urban Development funding. At the same time, agencies were addressing participant hardships, including increasing rent arrears, without clear federal direction. These delays complicated transitions from shortfall assistance to regular voucher programs and increased administrative burden.

Roseville Housing Authority is authorized to provide rental assistance to 845 households through the Housing Choice Voucher (HCV) program. This allocation includes several specialized voucher types designed to meet the needs of vulnerable populations:
• 37 Emergency Housing Vouchers (EHV): For individuals and families experiencing homelessness or at risk of homelessness.
• 75 Non-Elderly Disabled (NED) Vouchers: For households with a head of household or partner who is non-elderly and disabled.
• 43 Mainstream Vouchers: For non-elderly households with a disabled head of household or partner who are transitioning out of institutional or segregated settings, currently homeless, or at risk of homelessness.
• 100 HUD-VASH Vouchers: For veteran households referred by the Department of Veterans Affairs (VA), aiding with housing search, paperwork, and long-term housing stability. • 20 Foster Youth to Independence (FYI) Vouchers: For former foster youth ages 18–24 who are homeless or at risk of homelessness as they transition out of foster care. • Project-Based Vouchers (PBV): A rental unit that receives housing subsidy assistance through a contract between RHA and the property owner. Unlike tenant-based vouchers, which move with the family, PBV assistance is tied to the specific unit. Families who lease these units pay a portion of rent based on income, and RHA pays the remainder directly to the property owner in the form of a Housing Assistance Payment (HAP).

HUD requires housing authorities to maintain at least a 95% lease-up rate or utilize 95% of annual budget authority to remain in compliance. Agencies achieving 98% or higher in either category may be designated as high performing. RHA continues to meet HUD’s high-performance standards, with 100% expenditure of its annual budget allocation in 2025. The attached table provides a monthly summary of RHA’s voucher

Page 318 of 981 ends

programs for the fourth quarter of 2025 and the annual lease up numbers. This snapshot highlights strong lease-up in EHV and NED, near-full utilization in HUD-VASH, and targeted efforts to increase FYI utilization.

Through effective management of specialized voucher programs, strong partnerships with developers, and expanded landlord participation, RHA continues to deliver high-quality housing assistance and remains a high-performing housing authority. These efforts directly support the City of Roseville and the Roseville Housing Authority’s goals of expanding affordable housing and addressing homelessness in the Roseville/Rocklin region.

FISCAL IMPACT
This Housing Authority Quarterly Status Report does not create any additional cost to the City’s General Fund.

ENVIRONMENTAL REVIEW
The California Environmental Quality Act (CEQA) does not apply to activities that will not result in a direct or reasonably foreseeable indirect physical change in the environment or is otherwise not considered a project as defined by CEQA Statute §21065 and CEQA State Guidelines §15060(c)(3) and §15378. The Roseville Housing Authority Quarterly Report meets the above criteria and is not subject to CEQA. No additional environmental review is required.

CITY COUNCIL STRATEGIC PLAN/OVERARCHING GOALS

1. Ensure a safe and healthy community

3. Enhance economic vitality
Respectfully Submitted,
Suzi Cook-Turner, Housing Supervisor
Trisha Isom, Housing Manager
Melissa Anguiano, Economic Development Director
ATTACHMENTS:

1. Lease Up Rates CY 2025
REVIEWERS:

Suzi Cook-Turner, Economic Development Department - Housing Created/Initiated - 2/25/2026 Trisha Isom, Economic Development Department - Housing Approved - 2/26/2026 Melissa Anguiano, Economic Development Department Approved - 2/27/2026 Kelly Aye, City Attorney Department Approved - 3/2/2026 Katrina Six, City Clerk Department Approved - 3/3/2026
Ryan DeVore, City Manager Department - Assistant City Manager Approved - 3/3/2026 Dennis Kauffman, City Manager Department - Assistant City Manager Approved - 3/4/2026 Michelle Sheidenberger, City Attorney Department Approved - 3/5/2026 Dominick Casey, City Clerk Department Approved - 3/9/2026 Katrina Six, City Clerk Department Final Approval - 3/9/2026

Page 319 of 981 ends
Page 320 of 981 ends

Roseville Housing Authority Voucher Lease-up CY 2025
Actual Leaseup of FYI 22-HUD FYI (20) Actual Lease- up of Mainstream 12-HUD Mainstream (43)
Jan-25 575 570 75 75 60 100 1 20 42 43 39 39
Feb-25 575 570 75 75 69 100 1 20 39 43 39 39Mar-25 572 570 75 75 68 100 1 20 36 43 39 39 Apr-25 573 570 75 75 68 100 3 20 38 43 38 38
May-25 580 570 75 75 73 100 3 20 37 43 37 37
Jun-25 575 570 75 75 75 100 4 20 37 43 37 37
Jul-25 564 570 75 75 90 100 6 20 37 43 36 36
Aug-25 541 570 75 75 98 100 7 20 37 43 37 37Sep-25 540 570 75 75 99 100 8 20 37 43 37 37 Oct-25 540 570 75 75 100 100 7 20 38 43 37 37
Nov-25 537 570 75 75 100 100 8 20 36 43 37 37Dec-25 540 570 75 75 98 100 10 20 37 43 37 37 YTD Total 6712 6840 900 900 998 1200 59 240 451 516 450 450 YED % Leased 100.0%
2025 Actual Lease-up of Regular 10-HUD Regular (570) Actual Lease-up of Non- Elderly 5-HUD Non- Elderly Disabled (75)

98.1% 100.0% 83.2% 24.6% 87.4%
Actual
Lease-up
of VASH
11-HUD
VASH (100)
Actual
Lease-up
of EHV
21-HUD
Emergency
Housing
Vouchers

Page 321 of 981 ends

City Council
Communication
Meeting Date: 3/18/2026
Item #: VI.8
File #: 0704
Item ID: 2026-163
Title: FD-50 Park Project - Approve Plans and Specifications and Authorize Staff to Call for Bids Contact: Josh Cervantes 916-746-1233 [email protected]

SUMMARY
Staff recommends approval of plans and specifications for the FD-50 Park Project and authorize staff to call for bids. The project scope includes a playground, shaded picnic area, paved walking paths, multi-use grass turf area, plantings and irrigation. The project is estimated to cost $580,000 for the base bid, and will be funded by the Sierra Vista Neighborhood Park Fund.

RECOMMENDATION
Staff recommends that the City Council approve the plans and specifications for the FD-50 Park Project and authorize staff to call for bids.

BACKGROUND
FD-50 Park is a 1.70-acre neighborhood park located at Starfield Drive and Nova Place in Sierra Vista.

The master plan for this park was approved by the City Council on May 21, 2025.

Amenities planned for the park include installation of a playground, shaded picnic area, paved walking paths, multi-use grass turf area, plantings and irrigation. Additive alternates have been identified for budget purposes to allow for “menu style” bidding, and include an alternative playground layout option, additional turf and irrigation, sod in lieu of seeded turf, and a concrete half basketball court instead of plantings and irrigation. The purpose of including an alternative play structure option is to allow for a unique park identity based on the final park name, which is yet to be determined.

Bids are scheduled to be opened in April 2026. Staff plans to return to Council in May to seek approval to award the project.

The architect’s estimate for construction for the base bid is $580,000.

FISCAL IMPACT
Funding for construction of this park was included in the D-50 Neighborhood Park project budget in the Neighborhood Park - Sierra Vista Fund. Maintenance costs will be approximately $16,000/acre/year and will be funded by the Sierra Vista Community Facilities District No. 2 (Public Services) Fund. There will be no General Fund impact.

ENVIRONMENTAL REVIEW
Development of the FD-50 Neighborhood Park master plan was previously evaluated in the Sierra Vista Specific Plan EIR (certified May 5, 2010, SCH No. 2008032115) and identified in the associated Sierra Vista Specific Plan. Construction of FD-50 Neighborhood Park Master Plan is found to be within the scope of the project covered by Sierra Vista Specific Plan EIR. As discussed in the Specific Plan EIR, the EIR

Page 322 of 981 ends

provides environmental analysis of community infrastructure and facilities, including parks, pedestrian bridges and bike trails, the extent possible. Because this project is consistent with the Sierra Vista Specific Plan EIR and Specific Plan, no new effects would be expected to occur and all applicable mitigation measures from the Sierra Vista Specific Plan EIR will be implemented during the design and construction of FD-50 Neighborhood Park Master Plan. Because the proposed project meets requirements identifies in Section 15183 of the State CEQA Guidelines, no additional CEQA review is required.

CITY COUNCIL STRATEGIC PLAN/OVERARCHING GOALS

1. Ensure a safe and healthy community

4. Invest in well-planned infrastructure and growth

5. Support community engagement and advocacy

6. Deliver exceptional City services
Respectfully Submitted,
Josh Cervantes, Park Development Project Manager
Jill Geller, Parks Recreation and Libraries Director
ATTACHMENTS:

1. FD-50 - Vicinity Map

2. Project Manual

3. Plan Set
REVIEWERS:

Josh Cervantes, Parks, Recreation, and Libraries Department - Park Development
Created/Initiated -
2/23/2026
Tara Gee, Parks, Recreation, and Libraries Department - Park Development Approved - 2/23/2026 Jill Geller, Parks, Recreation, and Libraries - All Approved - 2/27/2026 Kelly Aye, City Attorney Department Approved - 3/2/2026 Katrina Six, City Clerk Department Approved - 3/2/2026
Ryan DeVore, City Manager Department - Assistant City Manager Approved - 3/3/2026 Dennis Kauffman, City Manager Department - Assistant City Manager Approved - 3/4/2026 Michelle Sheidenberger, City Attorney Department Approved - 3/5/2026 Dominick Casey, City Manager Department - City Manager Approved - 3/9/2026 Katrina Six, City Clerk Department Final Approval - 3/9/2026

Page 323 of 981 ends

r
y
Silver Spruce Dr
Splendor Ln
Moonraker Ln
Silver Spruce Dr Silver Spruce Dr
Super Moon Way
Volans
Vela
Star Shower Dr
Silver Spruce Dr
Musca
Pavo
Tucana
Skyward Way
Earl Rush Dr
Skyward Way
Splendor Ln
Moonraker Ln
Nova
Supernova Supernova
Earl Rush Dr
Auriga
Constellation
Moonraker Ln
New Moon Dr
Moonraker Ln
New Moon Dr
Starfield Dr
Milky Way Cir
Titan Ln Nova
Constellation
Starfield Dr
Mercury Ln
Wandering Star Dr
Supernova
Starfield Dr
Earl Rush Dr
Milky Way Cir Constellation
Stark St
Moonraker Ln
Moonraker Ct
Moonraker Ln
Westbrook Blvd Westbrook Blv
M
d
ilky Way Cir
Titan Ln
Westbrook Blvd
Milky Way Cir
Mercury Ln
Wandering Star Dr
Earl Rush Dr
Earl Rush Dr
Westbrook Blvd
Westbrook Blvd
Milky Way Cir
Westbrook Blvd
Westbrook Blvd
Westbrook Blvd
Westbrook Blvd
Nova Pl
Supernova Ln
FD-50
Park
FD-50 Park
Vicinity Map

Page 324 of 981 ends

Project Manual for the
FD-50 Park Project
March 2026
The latest edition of the City of Roseville Parks Construction Standards are incorporated by reference as a part of this Project Manual. The Parks Construction Standards can be purchased at the address listed below.

Parks, Recreation & Libraries
316 Vernon Street, Suite 400
Roseville, California 95678
www.roseville.ca.us

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 325 of 981 ends

(916) 774-5505 • (916) 773-5595 Fax • (916) 774-5220 TDD • [email protected] • www.roseville.ca.us/parks Notice to Bidders
DATE: March 19, 2026
TO: Prospective Bidders
FROM: Joshua Cervantes, Park Development Project Manager RE: FD-50 Park Project
Project Description: The City of Roseville is now accepting bid proposals for the FD-50 Park Project from pre-qualified Prime Contractors. The scope of work for the base bid includes, but is not limited to, grading and utilities, furnishing and installation of a playground option A, Shade Structure with a seated picnic area, walking paths, turf area, planting and irrigation. Additive alternates includes a furnishing and installation of playground option B in lieu of option A, a half basketball court, additional turf and irrigation, sod in lieu of seeded turf, and a concrete half basketball court instead of planting and irrigation.

Prime Contractors: At this time, this project is only available for bidding by Prime Contractors listed on the City of Roseville Parks, Recreation and Libraries 2026 Pre-Qualified Contractor List. Please see attached Pre-Qualified Prime Contractors memo for more information.

Subcontractors: The City reserves the right to conduct a post-bid qualifications review of any subcontractors if deemed necessary.

Contract Documents: A Project Manual, including all Contract Documents and the Proposal forms for bidding this project, may be obtained online from the City of Roseville’s website at www.roseville.ca.us/business/procurement_services/bids_rfps. Potential bidders are advised to obtain all documents and specifications related to this project directly from the City of Roseville / Public Purchase.

The City of Roseville does not guarantee the accuracy of any forms, plans, or project manuals obtained through outside sources other than the City of Roseville. Furthermore, the City does not guarantee the distribution of any addendums or the accuracy of their content if obtained from a third party.

Engineer’s Estimate: The engineer's estimate for construction of the base bid items is $580,000.

Questions: The deadline for submission of questions and clarifications regarding the Contract Documents is Monday, March 30, 2026 at 5:00 p.m. In order to meet the required timeline to issue addenda, questions will not be accepted after this date. Only Addenda issued by the City are binding. All questions shall be directed to the attention of Joshua Cervantes either via e-mail at [email protected], or Public Purchase at https://roseville.ca.us/rfp.

Pre-Bid Conference: There is NO pre-bid conference for this project.

Bid Deadline: Proposals will be received at the Office of the City Clerk, 311 Vernon Street, Roseville, California, until 3:00 p.m. on Monday, April 6, 2026. The proposals will be publicly opened and read by the City Clerk or designee of the City of Roseville in the City Clerk’s Office at 3:05 p.m. on that same day.

The July 2025 edition of the City of Roseville Parks Construction Standards will be applicable to this project.

The successful bidder will be required to use the standards contained in the book for the construction of this project.

Parks, Recreation & Libraries
Park Development
316 Vernon Street, Suite 400
Roseville, California 95678

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 326 of 981 ends

Parks, Recreation & Libraries
Park Development
316 Vernon Street, Suite 400
Roseville CA 95678
To the successful bidder:

In order to move forward with the award of this project, the City of Roseville requests that you submit the following documents:

1. Please return two, original signed agreements OR a PDF of original signatures if unable to get originals. Corporations require two corporate signatures –OR- one corporate signature and a corporate seal. For a listing of accepted signatures, please see below *. * In accordance with Section 313 of the California Corporations Code, any document executed by a corporation requires the signature from at least one person from EACH of the following two groups:

GROUP ONE GROUP TWO
Chairman of the Board Secretary
President Assistant Secretary
Vice President Chief Financial Officer
Assistant Treasurer
If an officer holds a title in each of the above groups (dual title), that officer may sign for each of the two groups by two separate signatures with the appropriate title listed with his or her signature.

There are also two exceptions whereby we would accept only one signature:
- One corporate signature AND a corporate seal
-OR-
- They are able to provide a current resolution from their Board of Directors, stating that a particular person has the sole authority to bind the corporation.

2. Public Works Faithful Performance Bond – fully executed and notarized.

3. Public Works Labor and Materials Payment Bond – fully executed and notarized.

4. Insurance - fully executed and notarized.

We request that all documents be received by April 13, 2026.

The Parks, Recreation & Libraries Department requires submittal of all of the above executed documents prior to City Council bid award.
916.774.5505 phone
916.774.5251 fax
www.roseville.ca.us

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 327 of 981 ends

[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

TABLE OF CONTENTS
Pagination Notation
Notice to Contractors NTC
Instructions to Bidders INT
Proposal PROP
Insurance Broker Information Packet INS
General Conditions for Buildings and Grounds GC
Supplemental Conditions SC
Specifications SPEC
Drawings DRAW
Assembly Bill No. 626 AB 626

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 328 of 981 ends

NTC - 1
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

CITY OF ROSEVILLE
DEPARTMENT OF _________________
Name of Project:______________________________________________

NOTICE TO CONTRACTORS
NOTICE IS HEREBY GIVEN THAT sealed Proposals will be received at the Office of the City Clerk, 311 Vernon Street, Roseville, California, until ___________________________ at 3:00 p.m. Late Proposals will be rejected. No exceptions.

The Proposals will be publicly opened and read by the City Clerk or designee of the City of Roseville at 3:05 p.m. on _____________________, 20__ at the Office of the City Clerk located at 311 Vernon Street, Roseville California for the following project:
_____________________________________________________________________________.

A pre-bid meeting will be held at ____________________________________________ ______________________________________________.

A Project Manual, including all Contract Documents and the Proposal forms for bidding this project, may be obtained on-line from the City of Roseville’s website at https://www.roseville.ca.us/business/procurement_services/bids_rfps. All communications relative to this project shall be conducted through Public Purchase.

Bids shall be submitted on the City’s Proposal Forms included in the Project Manual, plainly endorsed with the Bidder’s name together with signed acknowledgement of any and all addenda. Proposal Forms shall be securely sealed in a suitable envelope marked with the name and address of the Bidder, and marked in capital letters on the front and back of the envelope as

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 329 of 981 ends

NTC - 2
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] follows:
[NAME OF PROJECT]
(Name of Bidder)
(Address of Bidder)
Whether mailed or personally delivered, all bids shall be addressed to the City of Roseville, Office of the City Clerk, 311 Vernon Street, Roseville, California, 95678.

Each bid must be accompanied by a Bid Guaranty in the form of a Certificate of Deposit, Certified or Cashier’s Check, Bidder’s Bond or Irrevocable Standby Letter of Credit in an amount equal to at least ten percent (10%) of the Bidder’s Grand Total Price. The Bid Guaranty will be retained by the City and applied to any and all damages sustained by the City in the event that the successful Bidder fails or refuses to enter into the Contract awarded to it and to furnish all required bonds and Certificates of Insurance. The City intends to award the Contract to the lowest responsible Bidder based on the Grand Total Bid Price for all components of the Project.

To the extent allowed by law, the City reserves the right to reject any and all bids and/or to waive any irregularities or informalities in any bid or in the bidding procedure. The City specifically reserves the right to not award the Contract after the opening of bids.

Any bid may be withdrawn at any time prior to the time fixed in the public notice for the deadline submission of bids only by written request for the withdrawal of the bid filed with the City Clerk. The request shall be executed by the Bidder or his or her duly authorized representative. The withdrawal of a bid does not prejudice the right of the Bidder to file a new bid by the submission deadline. Whether or not bids are opened exactly at the time fixed in the public notice for opening bids, a bid will not be received after the deadline submission of bids

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 330 of 981 ends

NTC - 3
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] nor may any bid be withdrawn after the time fixed in the public notice for deadline for submission of bids. Immediately following the deadline for submission of bids all bids shall become the property of the City of Roseville and the City is under no obligation to return bids.

Bids will be examined and reported to the City Council within sixty (60) business days after the bid opening. Except as permitted by applicable law, no Bidder may withdraw its bid for a period of sixty (60) business days after the date of bid opening. Each Bidder will be notified of any award of the Contract by the City.

The City will affirmatively ensure non-discrimination on the basis of one or more of the following: race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, age, sexual orientation, or military and veteran status in the award and administration of contracts that it awards.

Pursuant to Public Contract Code Section 22300, the successful Bidder may submit certain securities in lieu of the City withholding retention of payments during the Project.

The City has determined that the Contractor shall possess a valid Class ___, _______________________ Contractor's license at the time that the bid is submitted, as well as any other license classification as may be required by the laws of the California for the performance of the work specified in the Contract Documents. Said license shall be maintained during the Contract period. Failure to possess the specified license shall render the bid nonresponsive and will act as a bar to the award of the Contract to any Bidder not possessing such a license at the time of bid submittal. The Contractor shall provide certification of the license, its number and the expiration date on the proposal form.

The work is to be done in Placer County. Pursuant to California Labor Code Section 1773, the City has ascertained the General Prevailing Rate of Wages in the County in which the

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 331 of 981 ends

NTC - 4
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] work is to be done to be as determined by the Director of Industrial Relations of the State of California. The Contractor is hereby made aware that information regarding prevailing wage rates may be obtained from the State Department of Industrial Relations and/or the following website address: http://www.dir.ca.gov/dlsr/DPreWageDetermination.htm. The Contractor is required to post a copy of the applicable wage rates at the job site. Attention is directed to Section 5 “Legal Relations and Responsibility” of the General Conditions.

Pursuant to Labor Code Section 1771.1(b), notice is hereby given that a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in Labor Code Sections 1720, et seq., unless currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5 or exempt from registration requirements pursuant to Labor Code Section 1725.5(f). It is not a violation of Labor Code Section 1771.1 for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform work pursuant to Labor Code Section 1725.5 at the time the contract is awarded or is exempt from registration requirements pursuant to Labor Code Section 1725.5(f). The Contractor is hereby notified that this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

Vehicles with a GVWR greater than 8,500 lbs. and light – duty package delivery vehicles operated in California may be subject to the California Air Resources Board Advanced Clean Fleets regulations. Such vehicles may therefore be subject to requirements to reduce emissions and air pollutants. For more information, please visit the CARB Advanced Clean Fleets

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 332 of 981 ends

NTC - 5
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] webpage at https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets. In addition, certain off-road diesel vehicles may be subject to the CARB In-Use Off-Road Diesel-Fueled Fleets Regulation. For more information, please visit the CARB In-Use Off-Road Diesel-Fueled Fleets Regulation webpage at https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueledfleets-regulation.

All questions prior to the deadline for bid submissions shall be directed to the attention of ______________________________ via ________________________________ _______________________________. The deadline for submissions of questions and clarifications regarding the Contract Documents is _______ calendar days before the deadline for bid submissions. Only Addenda issued by the City are binding. ___________________________________
City Clerk, City of Roseville
Dated: _____________________________
Published: __________________________

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 333 of 981 ends

INT - 1
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

INSTRUCTIONS TO BIDDERS
SECTION 1. GENERAL
1-1.01 GENERAL. These Instructions to Bidders form a part of the Contract Documents. Capitalized terms are defined in the General Conditions Section 1. 1-1.02 EXAMINATION OF PLANS, CONTRACT DOCUMENTS AND
SITE OF THE WORK. The Bidder shall examine carefully the site of the Work and all the Contract Documents, including these Instructions to Bidders, and shall inform itself of the conditions relating to the execution of the Work. Failure to do so will not relieve the successful Bidder of its obligation to enter into an Agreement and complete the Work in strict accordance with the Contract Documents. Conditions relating to the execution of the Work include the requirements of federal, state, and local laws, statutes and ordinances relative to the execution of Work, including, but not limited to, applicable regulations concerning prevailing wage rates, non-discrimination in the employment of labor, protection of the public, employee health and safety, and environmental protection.

The submission of a bid shall be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and scope of Work to be performed, the quantities of materials to be furnished, and as to the requirements of all the Contract Documents.
1-1.03 EXISTING INFORMATION. Where the Department has made investigations of site conditions, including subsurface conditions in areas where Work is to be performed under the Contract, such investigations are made only for the purpose of study and design. City does not represent that such conditions as found in these investigations or inferences or conclusions drawn as a result of these investigations will represent actual site

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 334 of 981 ends

INT - 2
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] conditions and hereby disclaims any liability as a result of Contractor’s or Bidder’s reliance on such investigations. City will presume that all Bidders have conducted their own site investigations, including investigations of subsurface conditions. Where such investigations have been made, Bidders or Contractors may, upon written request, inspect the records of the Department as to such investigations subject to the conditions set forth in these Instructions to Bidders. Such inspection of records may be made only at the location noted above. The records of such investigations are not a part of the Contract Documents and are shown solely for the convenience of the Bidder or Contractor. The City assumes no responsibility whatsoever with respect to the sufficiency or accuracy of the investigations made, the records thereof, or of the interpretations set forth therein or made by the City in its use thereof. The City makes no warranty or guarantee, either express or implied, that the conditions indicated by such investigations or records are representative of those existing throughout such areas, or any part thereof, or that unforeseen developments may not occur, or that materials other than, or in proportions different from those indicated, may not be encountered.

No information derived from such inspection of records of investigations or compilation thereof made by the City, the Department or from the Engineer, or his or her assistants, will in any way relieve the Bidder or Contractor from properly examining the site and making such additional investigations as it may elect, or from properly fulfilling the terms of the Contract.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 335 of 981 ends

INT - 3
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 2: BID REQUIREMENTS
2-1.01 PROPOSAL FORMS. The Department will furnish to each Bidder standard Proposal Forms, which, when filled out and executed may be submitted as the bid.

Proposals shall include all pages in the Project Manual with page numbers marked “PROP” plus the Addendum acknowledgment form (front sheet) from all Addenda received by the Bidder.

Proposals shall be removed from the Project Manual. The full Project Manual shall not be submitted with the proposal. Bids not presented on forms so furnished will be disregarded.

The Proposal and one (1) copy thereof shall be submitted as directed in the “Notice to Contractors” under sealed cover plainly marked as a Proposal, and identifying the project to which the Proposal relates and the date of the bid opening therefor. Proposals which are not properly marked may be disregarded.

All blank spaces in the Proposal must be completed, as required, in ink. All price information shall be shown, clearly legible, in figures where required.

The Bidder shall sign the Proposal in the blank space provided therefor. If the Bidder is the sole owner, the Proposal shall be signed by the owner. If the Bidder is a corporation, the legal name of the corporation and its State of incorporation shall be set forth and the Proposal shall be signed by at least two officers authorized to sign contracts on behalf of the corporation.

If the Bidder is a partnership, the true name of the firm shall be set forth, the names and addresses of all partners shall be given and the Proposal shall be signed by a partner in the firm authorized to sign contracts on behalf of the partnership. If the Bidder is a joint venture, the Proposal shall be signed on behalf of each participating company by officers or other individuals who have the full and proper authorization to do so. If the Proposal is signed by an agent of the Bidder other than an officer of a corporation or a member of a partnership, a notarized Power of

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 336 of 981 ends

INT - 4
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] Attorney must be on file with the City prior to opening of bids or must be submitted with the Proposal. If requested by the City, the Bidder shall promptly submit evidence satisfactory to the City of the authority of the person signing the Proposal. 2-1.02 SUBMISSION OF BIDS. Bids must be submitted at the prescribed time and location specified in the Notice to Contractors. Any submission received after the prescribed time shall be rejected, regardless of whether or not bids are opened exactly at the prescribed time.

Any unauthorized conditions or qualifications entered on, or changes made to, the Proposal may render it invalid and may cause its rejection.

No telegraphic, telephonic, or facsimile or other electronically transmitted bids will be considered.
2-1.03 REQUIRED LISTING OF PROPOSED SUBCONTRACTORS. Each Proposal shall list the name, address and Contractor license number of each Subcontractor to whom the Bidder proposes to subcontract portions of the Work in an amount in excess of onehalf of one percent (0.5%) of its total bid, in accordance with Section 4100 to 4114, inclusive, of the Public Contract Code for the State of California. The Bidder shall list the Subcontractor’s license number and the portion of the Work that will be done by each Subcontractor. If the Bidder fails to specify a Subcontractor for any portion of the Work, the Bidder agrees to perform that portion of the Work itself, and represents that it is qualified to perform that portion of the Work itself. The Bidder's attention is invited to other provisions of the Public Contract Code related to the imposition of penalties for a failure to observe its provisions by using unauthorized Subcontractors or by making unauthorized substitutions. 2-1.04 CONTRACTOR’S LICENSING LAWS. Attention is directed to the

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 337 of 981 ends

INT - 5
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] provisions of Business and Professions Code Chapter 9 of Division 3 concerning the licensing of Contractors.

All Bidders at the time of bid submittal shall be licensed as Contractors in accordance with the laws of this State. Any Bidder or Contractor not so licensed is subject to the penalties imposed by such laws. The form of Contractor's license required is stated in the Notice to Contractors, provided that the City makes no representation as to whether the State may require other or additional licenses. It is the Bidder's and Contractor's responsibility to obtain the correct Contractor's licenses. Bidders shall be skilled and regularly engaged in the general class or type of Work called for under this Contract.

All Bidders and Contractors, including Subcontractors, shall have a current City business license before undertaking any Work.
2-1.05 NONCOLLUSION DECLARATION. By submitting a bid, the Bidder represents and warrants that such bid is genuine and not a sham or collusive or made in the interest or on the behalf of any person therein named, and that the Bidder has not, directly or indirectly, included or solicited any other Bidder to put in a sham bid, or any other person, firm, or corporation to refrain from bidding, and that the Bidder has not in any manner sought collusion to secure the Bidder an advantage over any other Bidder.

Bidders shall submit a properly completed and executed “Noncollusion Declaration” in the form required by Public Contract Code Section 7106 and provided with the Proposal (PROP11). 2-1.06 DISQUALIFICATION, REMOVAL OR OTHER PREVENTION OF BIDDING. A bid may be rejected on the basis of a Bidder, any officer of such Bidder, or any employee of such Bidder who has a proprietary interest in such Bidder, having been disqualified,

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 338 of 981 ends

INT - 6
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] removed, or otherwise prevented from bidding on, or completing a federal, state, or local project because of a violation of law or a safety regulation.
2-1.07 PROPOSAL GUARANTY. All bids shall be accompanied by one of the following forms of Bidder's security: Cash, a cashier's check, a certified check, or a Bidder's bond executed by an admitted California surety insurer, made payable to the City of Roseville, or any other form of security deemed acceptable by the City Attorney. The security shall be in an amount equal to at least ten percent (10%) of the amount bid. A bid will not be considered unless one of the form of Bidder's security is enclosed with it.

A Bidder's bond shall conform to the City's bond form in the Proposal and shall be properly filled out and executed.
2-1.08 SCHEDULE OF BID PRICES. Bidders are directed to submit unit and lump sum prices for all Work set forth in the Contract Documents on the Proposal Form entitled “Schedule of Bid Prices.”
Unit prices and lump sum prices, as indicated, must be entered in the appropriate spaces provided in the Schedule of Bid Prices. If applicable, unit prices shall be multiplied by the quantities shown, and the total shall be inserted in the Amount column. In the event of any error or discrepancy between the unit price and the calculated amount, the unit prices shall govern.

The City may correct any mathematical errors apparent on the face of the bid.

The amounts shown in the Amount column must be added together in arriving at the Grand Total Bid Price.

Amounts for Allowance bid items must be entered in the exact amount in the Amount column.

The prices included within the Schedule of Bid Prices shall include all costs for labor,

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 339 of 981 ends

INT - 7
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] materials, tools, equipment, services, Subcontractors, suppliers, taxes, insurance, shipment, delivery, overhead, profit, and all other costs necessary to perform the Work in accordance with the Contract Documents.

The Grand Total Bid Price shall be indicated in the Summary table form included with the Schedule of Bid Prices. The Grand Total Bid Price shall be the sum of the amounts bid for each of the designated portions of the Work, as more specifically described on the Schedule of Bid Prices form itself.

Full compensation for complying with the Contract Documents, including requirements of the Standard Specifications, the General Conditions, Supplemental Conditions, and all warranties, shall be considered included in the bid items and no additional compensation shall be allowed therefor.

Full compensation for completion of all work as shown on the plans, as specified in the Specifications, and as directed by the City, shall be considered included in the bid items and no additional compensation shall be allowed.

Bidders are strongly discouraged from submitting unbalanced bids. As used herein, the term “unbalanced bid” is defined as any bid that does not include a reasonable proportionate allocation of indirect costs and profit of each bid item indicated in the Schedule of Bid Prices.

The City reserves the right to reject any unbalanced bid if the City determines that there is a reasonable doubt that an acceptance of the bid will not result in the lowest ultimate cost to the City with regard to the work or a disproportionate distribution of contract funds.

The City reserves the right to delete any bid item in its entirety and/or significantly reduce the quantity of Work under a bid item. The City makes no representation that any Work under a bid item will be performed during the course of the Project or that the Work will be

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 340 of 981 ends

INT - 8
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] performed at the quantities included in the Schedule of Bid Prices. As provided in the General Conditions, for any deleted Work, Contractor shall not be entitled to payment of the indirect costs and profit included for said bid item. All bid items shall be considered distinct and severable from the remaining bid items, and each Bidder acts at its peril if its bid is unbalanced.

The City shall compare bids on the basis of the Grand Total Bid Price, which includes the base bid and any alternates designated on the Schedule of Bid Prices. Alternates may or may not be awarded, or may be awarded in any combination, at the City’s discretion. 2-1.09 WITHDRAWAL OF PROPOSALS. Any bid may be withdrawn at any time prior to the time fixed in the Notice to Contractors for the opening of bids, provided that a request in writing, executed by the Bidder or its duly authorized representative, for the withdrawal of such bid is filed with the City Clerk. Facsimile and electronic mail requests are not acceptable. The withdrawal of a bid shall not prejudice the right of a Bidder to file a new bid. The withdrawal of any bid after the time fixed in the Notice to Contractors for the opening of bids will not be permitted.
2-1.10 ADDENDUM. Proposals shall include all costs and account for all Addenda issued prior to opening of bids. The Bidder is responsible for verifying that all issued Addenda have been received. An Addendum acknowledgment form for each Addendum shall be included as part of the Proposal submittal.
2-1.11 PUBLIC OPENING OF PROPOSALS. Proposals will be publicly opened and read at the time and place indicated in the Notice to Contractors. Bidders or their authorized agents are invited to be present.
2-1.12 TRENCHING AND EXCAVATION WORK. In accordance with the provisions of California Labor Code Section 6707, if the Work involves construction of a

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 341 of 981 ends

INT - 9
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] pipeline, sewer, sewage disposal system, boring or jacking pits, or similar trenches or open excavations, which are five feet (5') or deeper, each bid submitted shall contain, as a bid item, adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life or limb, which shall conform to all applicable safety orders.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 342 of 981 ends

INT - 10
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 3: EVALUATION OF BIDS
3-1.01 BID EVALUATION PROCESS. Bids will be evaluated to determine the apparent low Bidder. The apparent low Bidder will be determined on the basis of the Grand Total Bid Price, as shown in the Schedule of Bid Prices. If additive or deductive alternates are used in the Schedule of Bid Prices, the apparent low Bidder will be the Bidder with the lowest total of the bid prices for base contract items plus the alternates designated by the City as those that will be used for determining the lowest bid price. However, the City reserves the right to (1) not award any alternates or (2) award any combination of alternates.

In case of discrepancy between the total of the base contract items and any specified alternates and the stated Grand Total Bid Price, the total of the base contract items plus specified alternates shall prevail. Any mathematical errors that appear on the face of the bid will be corrected by the City and the City will use the mathematically corrected addition. For example, if the mathematical total of Bidder’s base contract items plus specified alternates equals $1,000,000, but the Bidder has written $1,250,000 as the Grand Total Bid Price, the City will consider $1,000,000 to be the Bidder’s Grand Total Bid Price for purposes of comparison to other Bidders and actual bid award. The City reserves its rights to reject or accept bids based on discrepancies between the stated Grand Total Bid Price and the actual mathematical total of the base contract bid items, plus specified alternates.
3-1.02 REJECTION OF IRREGULAR PROPOSALS. Proposals may be rejected in the City's sole discretion if they show any alterations of form, additions not called for, conditional bids, incomplete bids, erasures, or irregularities of any kind. However, the City reserves the right to waive any minor irregularities and informalities in any bid or in the bid procedure for any reason.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 343 of 981 ends

INT - 11
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] 3-1.03 COMPETITIVE BIDDING. If more than one proposal is offered by any individual, firm, partnership, corporation, association, or any combination thereof, under the same or different names, all such proposals may be rejected. A party who has quoted prices on materials or Work to a Bidder is not thereby disqualified from quoting prices to other Bidders, or from submitting a bid directly for the materials or Work.

All Bidders are put on notice that any collusive agreement to control or affect the awarding of this Contract is in violation of the competitive bidding requirements of the City Charter, State Contract Act and the Business and Professions Code and may render void any Contract let under such circumstances.
3-1.04 RELIEF OF BIDDERS. If the Bidder claims a mistake was made in its bid, the Bidder shall give the Department written notice within five (5) Days after the opening of the bids of the alleged mistake, specifying in the notice in detail how the mistake occurred. No relief from a claimed mistaken bid shall be granted unless such mistake clearly appears on the face of the bid submitted to the City. Claimed mistakes on backup worksheets, spreadsheets, computerized bidding programs, or any other similar calculative bidding mistake which is not apparent on the face of the bid shall not under any circumstance be considered as a basis for relief. The burden of proving the occurrence of a mistake entitling a Bidder to relief from its bid rests entirely on the Bidder. Relief from bids shall be in the City's sole discretion.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 344 of 981 ends

INT - 12
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 4: AWARD AND EXECUTION OF CONTRACT
4-1.01 AWARD OF CONTRACT. The City reserves the right to reject any and all proposals and to award (or not award) any combination of bid items at its option. Any such award will be to the lowest responsible Bidder whose proposal complies with the requirements prescribed for the bid items awarded. Such award, if made, will be made within sixty (60) business days after the opening of the proposals. If the lowest responsible Bidder refuses or fails to execute the Contract, or provide an acceptable Performance Bond, Payment Bond, and insurance certificate(s), the City may award the Contract to the second lowest responsible Bidder. Such award, if made, will be made within eighty-two (82) business days after the opening of proposals. If the second lowest responsible Bidder refuses or fails to execute the Contract, or provide an acceptable Performance Bond, Payment Bond, and insurance certificate(s), the City may award the Contract to the third lowest responsible Bidder. Such award, if made, will be made within one hundred four (104) business days after the opening of the proposals. The above time periods within which the award of Contract may be made are subject to extension for such further period as may be agreed upon in writing between the City and the Bidder concerned.
4-1.02 RETURN OF BIDDER’S SECURITIES. Within ten (10) Days after the award of the Contract, the City Clerk will return all Bidders' securities, other than Bidders' bonds, accompanying the proposals that are not to be further considered in making the award.

Retained Bidders' securities will be held until the Contract has been fully executed, after which all Bidders' securities, except Bidders' bonds and any Bidders' securities that have been forfeited, will be returned.
4-1.03 CONTRACT BONDS. The successful Bidder shall furnish two (2)

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 345 of 981 ends

INT - 13
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] bonds in the form contained in the section entitled Insurance Broker Information Packet and Bonds. One (1) bond shall secure the payment of the claims of laborers, mechanics or materialmen employed on the Work under the Contract, and the other bond shall guarantee the faithful performance of the Contract.

Each of the two (2) bonds shall be in a sum equal to one hundred percent (100%) of the Contract Price. If the Contract Price increases by the issuance of Change Orders, the penal amounts of the bonds required shall increase accordingly. Sureties on each of said bonds shall be satisfactory to the City.

All alterations, extensions of time, extra and additional Work, and other changes authorized by the Standard Specifications, the General Conditions, the Supplemental Conditions or any part of the Contract may be made without securing the consent of the surety or sureties on the Contract bonds.

Furthermore, the successful Bidder shall furnish a certificate from the County Clerk as required by California Civil Code of Procedure Section 995.660(a)(3). 4-1.04 INSURANCE. At the time of the execution of the Contract, the Contractor shall, at its own expense, procure, and at all times during the prosecution of the Work maintain in full force and effect Worker's Compensation Insurance, and Liability Insurance as specified in the General Conditions. The Contractor shall provide a Certificate of Insurance in the form contained in the section entitled Insurance Broker Information Packet. 4-1.05 EXECUTION OF CONTRACT. The Contract shall be signed by the successful Bidder and returned, together with all the required Contract bonds and insurance certificates, within fifteen (15) Days after the Contract has been awarded, or as otherwise directed, in writing, by the City.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 346 of 981 ends

INT - 14
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] If the Bidder is an individual, the Contract shall be executed personally by the Bidder. If the Bidder is a partnership, it is desirable that the Contract be executed by all of the partners, but it may be executed by one of them. If the Bidder is a corporation, it must be executed by two officers of the corporation consisting of (1) the chairman of the board, president or vice president; and (2) the secretary, assistant secretary, chief financial officer, treasurer or assistant treasurer, or by a person authorized by the corporation to execute written contracts on its behalf, and the corporate seal affixed thereto. In the alternative, a person other than an officer may sign the Contract, provided evidence satisfactory to the City is provided indicating the individual’s authority to bind the corporation. If the corporate seal is not affixed to the Contract, or if it is executed by a person other than officers, or only by one officer, there must be attached to the Contract a certified copy of a resolution of the corporation authorizing such officer or person to execute written contracts for and on behalf of the corporation. If the Bidder is a joint venture, the Contract must be executed on behalf of each participating firm by officers or other individuals who have the full and proper authorization to do so. 4-1.06 FAILURE TO EXECUTE CONTRACT. Failure of the lowest responsible Bidder, the second lowest responsible Bidder, or the third lowest responsible Bidder to execute the Contract and file acceptable bonds and insurance as provided within fifteen (15) Days after the Contract has been awarded, or as otherwise directed, in writing, by the City, shall be just cause for annulment of the award and forfeiture of the Bidder's security. The successful Bidder may file with the City Clerk a written notice, signed by the Bidder or Bidder's authorized representative, specifying that the Bidder will refuse to execute the Contract if presented to Bidder. The filing of such notice shall have the same force and effect as the failure of the Bidder to execute the Contract and furnish acceptable bonds within the time prescribed.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 347 of 981 ends

INT - 15
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 5: BID PROTEST PROCEDURES
5-1.01 POLICY/PROCEDURES. It is the policy of the City to consider fully and adjudicate promptly protests filed by prospective Bidders relating to the City’s bidding procedure or award of the Contract. Protests shall be filed and processed in accordance with Section 4.12.150 of the Roseville Municipal Code. A Bidder’s failure to follow the bid protest procedures may result in rejection of the protest by the City.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 348 of 981 ends

PROP - 1
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] PROPOSAL TO THE DEPARTMENT OF ________________________
Project:_______________________________________
Name of Bidder _________________________________ Business Phone ________________ Business Address _______________________________________________________________ Place of Business _______________________________________________________________ Contractor’s License No. ______________________________________ License Expiration Date_______________________________________ License Classification Type __________________________________________ DIR Registration No. _________________________________________ Type of business organization:
*If a Corporation, incorporated under the laws of the State of:

City of Roseville Business License No.

The undersigned Bidder herewith submits this Proposal and binds itself on award by the City of Roseville under this bid to execute a Contract in accordance with its bid and the Contract Documents.

The Notice to Contractors, Instructions to Bidders, Form of Agreement, Specifications, General Conditions, Supplemental Conditions, Contract Drawings, and Addenda, if any, are made part of this bid and all provisions thereof are hereby accepted, and all representations and warranties are required thereby are hereby affirmed.

The work to be done is described in the Bidding Documents entitled _______________ ____________________________________________________, City of Roseville, California.

This offer shall be irrevocable for a period of sixty (60) Days after the date on which bids are opened.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 349 of 981 ends

PROP - 2
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] The undersigned Bidder understands that any clarification made to the above or any new and different conditions or information submitted on or with its Proposal, other than that requested, may render the bid non-responsive.

The undersigned, as Bidder, declares that the only persons or parties interested in this Proposal as principals are those named herein; that this Proposal is made without collusion with any other person, firm, or corporation; that the Bidder has carefully examined the location of the proposed Work, the attached Form of Agreement, and the plans, Specifications, and other Contract Documents; and agrees if this Proposal is accepted, that it will contract with the City of Roseville, in the form of a copy of the Agreement contained in the Project Manual, to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the Contract Documents, in the manner and time therein prescribed, and according to the requirements of the Director, as therein set forth, and that the Bidder will take in full payment therefore prices indicated in the Schedule of Bid Items, including all work modified by addendum numbers ________________. (IF NONE, STATE NONE).

Bids are required for all Bid Items. The amount of the Bid for comparison purposes will be the total of all items awarded.

The Bidder shall set forth for each item of work, in clearly legible figures, an item (“unit”) price and a total for the item in the respective spaces provided for this purpose in the Schedule of Bid Items.

The prices included within the Schedule of Bid Items include all costs for labor, materials, tools, equipment, services, Subcontractors, suppliers, taxes, insurance, shipment, delivery, overhead, profit, and for all other costs necessary to perform the Work in accordance

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 350 of 981 ends

PROP - 3
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] with the Contract Documents.

Accompanying this Proposal is _______________________________________________. (Notice: Insert the words “Cash $_________,” “Cashier's Check,” “Certified Check,” or “Bidder's Bond,” as the case may be, in an amount equal to at least ten percent (10%) of the total of the Bid.)
The names of all persons interested in the foregoing Proposal as Principals, are as follows: ______________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ If SOLE OWNER, execute here:

I sign as sole owner of the business named above:
_____________________________________________________________________________ If PARTNERSHIP, one or more partners sign here:

The undersigned certify that we are partners in the business named above and that we sign this bid with the full authority to do so:
____________________________________________________________________________ ____________________________________________________________________________ If CORPORATION, execute here:

Corporate Name: _______________________________________

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 351 of 981 ends

PROP - 4
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] Incorporated under the laws of the State of ____________________________________ The undersigned certify that they sign this bid with the full and proper authorization so to do:

By
Signature of Authorized Official*
Title
Typewritten or Printed Name
By
Signature of Authorized Official*
Title
Typewritten or Printed Name
If JOINT VENTURE, execute here:

Joint Venture name composed of:

The undersigned certify that they sign this bid with the full and proper authorization so to do:

Signature of Authorized Official*
Title
Typewritten or Printed Name
Signature of Authorized Official*
Title
Typewritten or Printed Name
*If Bidder is a partnership or Joint Venture, give the full names of all partners and/or Joint Ventures in the space provided (use additional sheet if required). If Bidder is a corporation, two signatures are required as follows: (1) the Chairman, President, or Vice-President and (2) the Secretary, Assistant Secretary, Chief Financial Officer, Treasurer, or Assistant Treasurer. In the alternative, this Agreement may be executed by a single officer or a person other than an officer provided that evidence satisfactory to City is provided demonstrating that such individual is authorized to bind the corporation (example, a copy of a certified resolution from the corporation’s board or a copy of the corporation’s bylaws).

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 352 of 981 ends

PROP - 5
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] [LIST OF SUBCONTRACTORS FOLLOWS ON NEXT PAGE.]

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 353 of 981 ends

PROP - 6
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

LIST OF SUBCONTRACTORS
Contractor’s Name: _________________________________
The Bidder is required to furnish the following information in accordance with the provisions of Section 4100 and 4114, inclusive, of the Public Contract Code of the State of California. This list and information shall include all Subcontractors that perform work, provide labor or render services to the Bidder in connection with the Project in an amount in excess of one-half of one percent (0.5%) of the total amount of the Bidder Grand Total Price.

PORTION/

TYPE OF
WORK
% OF

CONTRACT
SUBCONTRACTOR’S
NAME

CONTRACTOR
LICENSE NO. DIR REG NO. BUSINESS ADDRESS (CITY, STATE)

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 354 of 981 ends

PROP - 7
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

SECURITY FOR COMPENSATION CERTIFICATE
(Required by California Labor Code Section 1861)
TO: City Council
City of Roseville
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract. _________________________________
_________________________________
(Signature of Bidder)
_________________________________
_________________________________
Business Address
_________________________________
Telephone

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 355 of 981 ends

PROP - 8
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] BIDDER’S BOND
City Council of the City of Roseville
KNOW ALL MEN BY THESE PRESENTS:

That we ________________________________________________________________ ___________________________________________________________, as PRINCIPAL, and ______________________________________________________________________________ a, __________________________________________ and duly authorized to transact business under the laws of the State of California, as SURETY, are held and firmly bound unto the City of Roseville in the penal sum of _______________________________________________ dollars ($________________), being at least TEN PERCENT (10%) OF THE TOTAL AMOUNT OF THE BID of the Principal above named, submitted by said Principal to the City of Roseville, acting by and through the Public Works Director, for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, to the Director of the Department to which said Bid was submitted, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH,
That whereas the Principal has submitted the above-mentioned Bid to the City Council of the City of Roseville, as aforesaid, for certain construction specifically described as follows, for which Bids are to be opened at the Office of the City Clerk located at 311 Vernon Street, Roseville, California, on ____________________________, 20__ FOR (Copy here the exact title of work as it appears on the Proposal.)

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 356 of 981 ends

PROP - 9
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] NOW, THEREFORE, IF THE AFORESAID PRINCIPAL is awarded the Contract and, within the time and manner required under the Contract Documents, after the prescribed forms are presented for signature, enters into a written Contract, in the prescribed form, in accordance with the Bid, and files all insurance and two (2) Bonds with the Department, one (1) to guarantee Faithful Performance and the other to guarantee Payment for Labor and Materials, as required by law, then this obligation shall be null and void; otherwise, it shall be and remain in full force and effect.

IN WITNESS WHEREOF, we have hereunto set our hands and seals on this _____ day of _____________________, 20___.
______________________________(Seal)
______________________________(Seal)
______________________________(Seal)
Principal
______________________________(Seal)
______________________________(Seal)
______________________________(Seal)
Surety
__________________________________
__________________________________
Business Address
NOTE: To be considered complete, both the Principal and the Surety must sign this Bidder’s Bond. In addition, signatures of those executing for the Surety must be properly acknowledged.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 357 of 981 ends

PROP - 10
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] Project ____________________________
Contractor _________________________

SCHEDULE OF BID ITEMS

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 358 of 981 ends

PROP – 10A

SCHEDULE OF BID ITEMS
FD-50 Park Project
The bidder, in compliance with the published Notice to Contractors, having examined the Plans and Specifications, any and all addenda, any related documents, and all of the sites of the proposed work, and being familiar with all the conditions surrounding the construction of the proposed project, including the availability of material, hereby proposes to furnish all labor, materials, and supplies, and to construct the project in accordance with the Contract Documents, within the time period set forth therein, and at the prices stated. This is a lump sum bid project. These prices are to include all labor, materials, supplies, and all other expenditures incidental to complete compliance to the Contract Documents.

The work to be included in the Contract shall be determined by the City prior to award of Contract. The amount of the bid for comparison and award purposes shall be the total amount set forth in the “Grand Total Bid Price”. The City reserves the right to award none, all or selected add alternates as the budget permits.

BASE BID:

Base bid includes all work as shown on the plans, project manual, and addenda to construct The FD-50 Park Project.

Numerical Base Bid: $
Written Base Bid: dollars and ______
ADD ALTERNATES:

Add Alternate #1 Sodded Turf in lieu of Seed.

Numerical Additive Alternative #1 Bid: $
Written Additive Alternative #1 Bid: dollars and ______ Add Alternate #2 Seeded Turf and Irrigation in lieu of bark mulch/planting.

Numerical Additive Alternative #1 Bid: $
Written Additive Alternative #1 Bid: dollars and ______ Add Alternate #3 Sodded Turf in lieu of Add Alt #2 Seeded Turf (contingent on award of Add Alt-2).

Numerical Additive Alternative #3 Bid: $
Written Additive Alternative #3 Bid: dollars and ______ Continued on following page--

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 359 of 981 ends

PROP – 10B
Add Alternate #4 Concrete Half Basketball Court in lieu of planting and Irrigation.

Numerical Additive Alternative #4 Bid: $
Written Additive Alternative #4 Bid: dollars and ______ Add Alternate #5 Furnish and Installation of Playground Design Option B in lieu of Playground Option A.

Numerical Additive Alternative #5 Bid: $
Written Additive Alternative #5 Bid: dollars and ______ GRAND TOTAL BID PRICE:

Lump sum Base Bid plus Add Alternates #1, #2, #3, #4, #5 Numerical Grand Total Bid Price: $
Written Grand Total Bid Price: dollars and ______
The additions/deletions sheets (PROP – 13C through PROP – 13E) shall be completed in their entirety.

The additions/deletions sheets will not be considered for bid award but may be used for contract change orders.

Contractor Name (print or type):

Signature (by authorized representative):

Date: License No.: Class:

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 360 of 981 ends

For Additions and Deletions Only
Contractor shall provide itemized costs as shown below for use during construction for additions or deletions only. Unit costs to be listed are based on the project plans, specifications, Parks Construction Standards and the Design & Construction Standards, unless otherwise noted. Items listed are not necessarily shown on the plans or identified in the Technical Specifications.

Item Description Unit Unit Cost
1 EC-2 Preservation of Existing Vegetation sf
2 EC-3 Hydraulic Mulch sf
3 EC-4 Hydroseeding sf
4 EC-6 Straw Mulch sf
5 EC-7 Geotextiles and Mats sf
6 EC-8 Wood Mulching sf
7 EC-10 Velocity dissipation device ea
8 EC-11 Slope Drains ea
9 EC-14 Compost Blanket sf
10 EC-16 Non-Vegetative Stabilization sf
11 SE-1 Silt Fence lf
12 SE-5 Fiber Rolls lf
13 SE-6 Gravel Bag Berm ea
14 SE-7 Street Sweeping and Vacuuming ea
15 SE-8 Sandbag Barrier lf
16 SE-9 Straw Bale Barrier lf
17 SE-10 Storm Drain Inlet Protection ea
18 TC-1 Stabilized construction entrance/exit ea
19 TC-3 Entrance/outlet tire wash ea
20 Clearing and Grubbing sf
21 Site Security Fencing lf
22 Rough Grading (Earthwork) cy
FD-50 PARK PROJECT
Items 1 through 19 are to be consistent with requirements detailed in California Stormwater Quality Association Stormwater Best Management Practice Handbook, latest edition.

PROP - 13

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 361 of 981 ends

For Additions and Deletions Only (continued)
Item Description Unit Unit Cost
23 Finish grading (earthwork) sf
24 1" Schedule 80 PVC Pipe lf
25 12" Storm drain, PVC, SDR-35 lf
26 6" Storm drain, PVC, SDR-35 lf
27 4" Storm drain, PVC, SDR-35 lf
28 4" Sanitary Sewer, SDR-35 lf
29 1" Domestic Water Service, meter, backflow ls
30 2" Recycled Water Service, Meter ea
31 Sanitary Sewer Cleanout ea
32 12"x12" Storm Drain Catch Basin ea
33 24"x24" Storm Drain Drop Inlet ea
34 Storm Drain Connection to Existing SD Stub ea
35 Electrical POC ls
36 Concrete Paving - ROW (per DS Standard) sf
37 Concrete Paving (per Parks detail PK-31) sf
38 Redwood Header Board lf
39 Concrete Mow Curb (6")
40 Concrete Mow Curb (12") lf
41 Stabilized Decomposed Granite Paving sf
42 Drinking Fountain with Bottle Filler ea
43 Picnic Table ea
44 Picnic Table, Accessible ea
45 Park Bench with Back ea
46 Basketball Hoop, standard, backboard, Assembly ea
47 Park Identification Sign ea
48 16' Pole Light LED ea
49 Trash Receptacle ea
50 Play Area Curb (PK-36) lf
FD-50 PARK PROJECT
PROP - 13

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 362 of 981 ends

Item Description Unit Unit Cost
51 Play Equipment (small) ls
52 Engineered Wood Fiber (12" depth) cy
53 Drain rock (3" depth) cy
54 Play Area Access Ramp ea
55 Playground Rules Sign ea
56 Irrigation Booster Pump ls
57 Irrigation Controller with Enclosure ea
58 2" Recycled Water Filter (Amiad) ls
59 Flow meter and Master Valve ls
60 Irrigation Mainline 3" lf
61 Irrigation Control Wire (#12,#14 AWG-UF) lf
62 6" Sleeve (Sch 40) lf
63 Irrigation Lateral Lines PVC lf
64 Irrigation Remote Control Valve 2" ea
65 Irrigation Remote Control Valve 1.5" ea
66 Irrigation Remote Control Valve 1" ea
67 Quick Coupling Valve 1" ea
68 R-VAN Rotary Assembly incl. Swing Joint ea
69 Tree Bubbler ea
70 Soil Amendments sf
71 Hydroseeded Turf sf
72 Sodded Turf sf
73 Install Trees (15 Gal.) ea
74 Install Trees (24" Box) ea
75 Install Shrubs (5 Gallon) ea
76 Install Shrubs/Grasses (1 Gallon) ea
77 Install Groundcover Roses (2 Gallon) ea
78 Bark Mulch (3") cy
79 Landscape Maintenance (per 30 Day) ea
For Additions and Deletions Only (continued)
FD-50 PARK PROJECT
PROP - 13

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 363 of 981 ends

PROP - 11
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

NONCOLLUSION DECLARATION TO BE EXECUTED BY

BIDDER AND SUBMITTED WITH BID
The undersigned declares:

I am the _________________ of ______________________, the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding. The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other Bidder. All statements contained in the bid are true. The Bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on _____________________ [date], at _____________________________ [city], ________________ [state]. ____________________________________
(Signature of Declarant)

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 364 of 981 ends

PROP - 12
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

DISQUALIFICATION QUESTIONNAIRE
The Bidder shall complete, under the penalty of perjury, the following questionnaire:

Has the Bidder, any officer of the Bidder, or any employee of the Bidder who has proprietary interest in the Bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation?
Yes______ No______
If the answer is yes, explain the circumstances in the following space.

NAME OF BIDDER: _________________________________________ SIGNATURE OF BIDDER: ____________________________________ TITLE OF BIDDER: _________________________________________ DATE: _____________________________________________________

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 365 of 981 ends

PROP - 13
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

ACKNOWLEDGEMENT OF INSURANCE AND BOND REQUIREMENTS
Included in the Bid Price is full compensation for the requirements set forth in the INSURANCE BROKER INFORMATION PACKET of the Project Manual.

NAME OF BIDDER: _________________________________________ SIGNATURE OF BIDDER: ____________________________________ TITLE OF BIDDER: _________________________________________ DATE: _____________________________________________________

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 366 of 981 ends

PROP - 14
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

DISCLAIMER OF WARRANTIES AND ACCURACY OF DATA
Although soil and site investigation reports have been obtained from sources believed to be reliable, no warranty expressed or implied is made regarding accuracy, adequacy, completeness, legality, reliability or usefulness of any information contained therein. These reports are subject to change at any time, may be incomplete, and/or may contain errors. This information is provided for informational purposes only. The City of Roseville provides this information on an “as is” basis. Warranties of any kind, express or implied, or statutory, including but not limited to the implied warranties of merchantability, and fitness for a particular purpose ARE DISCLAIMED to any party viewing these documents or to any third party.

The City of Roseville does not accept and expressly disclaims liability to any party viewing such information, or to any third party whatsoever, for any loss, damage, or injury (including incidental or consequential damages) whether such loss, damage, or injury is the result of negligence, willful or intentional misconduct, or any other cause.

I have read and acknowledged the above disclaimer and agree to hold harmless the City of Roseville on any theory of liability for any loss, damage or injury whether in contract, strict liability or tort arising in any way out of the use or contents of the released information or documents described above or the performance of the work called for herein.

Print Name Signature

Name of Business/Company/Corporation Date

Address Phone

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 367 of 981 ends

PROP - 15
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

END OF PROPOSAL

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 368 of 981 ends

1 [B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

A G R E E M E N T
THIS AGREEMENT, is made and entered into this _____ day of __________________, 20_____, by and between the City of Roseville, a municipal corporation, (“CITY”), and ______________________________________________, a ____________________________, (“CONTRACTOR”); and
W I T N E S E T H:

WHEREAS, the City Council of the CITY, at a meeting held on the ____day of __________________, 20_____, approved plans and specifications for the ______________________________________________________________________________ and directed the City Clerk to advertise for sealed proposals for doing said work and providing that bids be submitted on the _____ day of ________________, 20_____; and WHEREAS, the City Clerk, thereafter duly and regularly caused a notice to be published in the manner and for the time prescribed by law; and
WHEREAS, CONTRACTOR, pursuant to the provisions of said notice duly filed a bid with the City Clerk, a true copy of which bid is now on file in the office of the City Clerk, and is hereby referred to and by this reference made a part hereof as fully as if set forth at length herein; and
WHEREAS, all bids received pursuant to said notice were opened and examined and publicly declared at the time specified in said advertisement for bids and at a meeting of the City Council held on the _____ day of ___________________, 20_____, the Council found and

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 369 of 981 ends

2 [B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] declared the bid of CONTRACTOR to be the lowest responsible bid and thereupon awarded a contract to CONTRACTOR to do the work referred to in the aforementioned specifications.

NOW, THEREFORE, the parties agree as follows:

1. THE WORK. CONTRACTOR agrees:
a. To do the work and furnish all the labor, materials, tools, supplies, equipment, superintendence, insurance, and bonds required for the _______________________ ______________________________________________________________________________ in accordance with the Contract Documents (the Work).
b. To do and perform the Work contemplated hereby in a good and workmanlike manner under the direction of and to the satisfaction of the Director of Public Works of the City of Roseville.

2. PAYMENT. CITY shall pay CONTRACTOR __________________________ _________________________________________ dollars ($________________) for the Work to be done under this Agreement in accordance with the Contract Documents.

3. CONTRACT DOCUMENTS. The complete Agreement between the parties hereto consists of the following documents:
a. The advertisement for bids (including the notice to bidders, instructions to bidders and proposals);
b. The accepted bid;
c. Plans and specifications (including general conditions, supplemental conditions, special provisions and construction details); d. Bonds and insurance required by the specifications; and

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 370 of 981 ends

3 [B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] e. This contract.

All documents specified above are intended to operate so that any work called for in any one and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said documents.

4. LIQUIDATED DAMAGES. In the event CONTRACTOR does not complete the Work within the time specified, CONTRACTOR agrees that CITY will suffer damages.

Inasmuch as the actual damages which would result from such breach by CONTRACTOR under this Agreement are uncertain, and would be impractical or extremely difficult to fix, CONTRACTOR agrees that it shall pay, or CITY shall deduct from CONTRACTOR’s fee, the amount of $________ per day as liquidated damages, in the event of such delay.

5. TIME OF COMPLETION. Time is of the essence of this Agreement.

CONTRACTOR shall complete all Work under the Contract Documents within _____ Days of the date of this Contract. CONTRACTOR shall begin work by the date specified in the “Notice to Proceed” letter and shall diligently prosecute all of the Work under this Contract in all parts and requirements as defined in the Contract Documents.

6. SERVICE OF NOTICE. Any notice required or permitted to be given under this Agreement shall be deemed given when (a) personally delivered to the recipient identified below; (b) mailed by registered or certified mail, return receipt requested, postage pre-paid, to the address specified below; or (c) sent by facsimile, with confirmation of receipt, to the facsimile number identified below.

CITY OF ROSEVILLE CONTRACTOR
______________________________ ______________________________ ______________________________ ______________________________ ______________________________ ______________________________ ______________________________ ______________________________

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 371 of 981 ends

4 [B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] CITY may also act through either its architect or construction manager if CITY expressly gives notice to CONTRACTOR, in writing, that CITY’s designee has authority to act for CITY in a specific capacity.

7. DISPUTES. Disputes arising from this Agreement will be determined in accordance with the Contract Documents and Public Contract Code Sections 10240-10240.13.

8. GOVERNING LAW. This Agreement shall be governed by and construed in accordance with the laws of the State of California.

9. INDEPENDENT CONTRACTOR. CONTRACTOR shall act as an independent contractor, and covenants and agrees that it will conduct itself consistent with such status, that it will neither hold itself out as, nor claim to be, an officer or employee of CITY by reason of this Agreement.

10. SUCCESSORS IN INTEREST. This Agreement shall be binding upon the heirs, successors, executors, administrators and assigns of the respective parties hereto.

11. MODIFICATION. This Agreement and each provision contained herein may be waived, amended, supplemented or eliminated only by mutual written agreement of the parties.

12. SEVERABILITY. If any of the provisions contained in this Agreement are for any reason held invalid or unenforceable, such holding shall not affect the remaining provisions or the validity and enforceability of the Agreement as a whole.

13. INTEGRATED AGREEMENT. This is an integrated agreement and contains all of the terms, considerations, understanding and promises of the parties. It shall be read as a whole.

14. CONTRACTORS LICENSE LAW. CONTRACTORS ARE REQUIRED BY LAW TO BE LICENSED AND REGULATED BY THE CONTRACTORS’ STATE LICENSE

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 372 of 981 ends

5 [B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

BOARD WHICH HAS JURISDICTION TO INVESTIGATE COMPLAINTS AGAINST

CONTRACTORS IF A COMPLAINT REGARDING A PATENT ACT OR OMISSION IS FILED WITHIN FOUR (4) YEARS OF THE DATE OF THE ALLEGED VIOLATION. A

COMPLAINT REGARDING A LATENT ACT OR OMISISON PERTAINING TO STRUCUTRAL DEFECTS MUST BE FILED WITHIN TEN (10) YEARS OF THE DATE OF THE ALLEGED VIOLATION. ANY QUESTIONS CONCERNING A CONTRACTOR MAY BE REFERRED TO THE REGISTRAR, CONTRACTORS’ STATE LICENSE BOARD, P.O.

BOX 26000, SACRAMENTO, CALIFORNIA 95826.

IN WITNESS WHEREOF, the City of Roseville, a municipal corporation, has authorized the execution of this Agreement in duplicate by its City Manager and attestation by its City Clerk under authority of Resolution No. _____, adopted by the Council of the City of Roseville on the ____day of _________________, 20_____, and CONTRACTOR has caused this Agreement to be duly executed.

CITY OF ROSEVILLE, a ___________________________, a
municipal corporation _____________________________
BY:______________________________ BY: __________________________ DOMINICK CASEY its: __________________________
City Manager
and
ATTEST:

BY: __________________________
its: __________________________
BY:______________________________

CARMEN AVALOS
City Clerk

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 373 of 981 ends

6 [B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] APPROVED AS TO FORM:

BY: ______________________________

MICHELLE SHEIDENBERGER
City Attorney
APPROVED AS TO SUBSTANCE:

BY: ______________________________

Print Name:________________________
Title:______________________________

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 374 of 981 ends

[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

INSURANCE BROKER INFORMATION PACKET
Project:_______________________________________
NOTICE TO CONTRACTOR:

For your convenience, this package contains the Requirements for Insurance and Bonds for this project, including the necessary City forms. You are required to return these forms in addition to the executed Contract within fifteen (15) calendar days after the award of the Bid, unless otherwise directed by City in writing. (See the Instructions to Bidders.) Please insert the dollar amount of your accepted Bid into the blank on page INS-1 and present this entire package to your insurance broker if you are awarded the Bid.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 375 of 981 ends

[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

TABLE OF CONTENTS
Page
Notice to Insurance Broker INS 1
Insurance Requirements INS 2
Public Works Faithful Performance Bond INS 10
Public Works Payment Bond INS 13

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 376 of 981 ends

INS - 1
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

NOTICE TO INSURANCE BROKER
Your client has been awarded a bid by the City Council of the City of Roseville to perform a public works project known as ___________________________________________.

The Contract Conditions for that project require your client (“the Contractor”) to return certain evidence of insurance and bonds to the City Attorney of the City within fifteen (15) days after the Bid award, unless otherwise directed by the City in writing, or else the Bid award may be terminated and awarded to another company.

This package contains the information you will need as an insurance broker to provide the appropriate insurance and bonds to the City. The insurance coverages the Contractor needs are specified in the section entitled “Insurance Requirements.” Please note that, in addition to the insurance certificate itself, copies of several endorsements must be actually furnished.

Please refer to the Supplemental Conditions for modifications of the General Conditions, if any, and the requirements of this insurance packet.

Please use the standard City of Roseville Bond Forms provided in this package.

The Bonds required must each be in the penal amount of: $______________________.

Bonds must be sent to the following staff person:
________________________________
________________________________
________________________________
Insurance documents must be provided using one of the following methods:
a. By email to [email protected]
b. By fax to (770) 335-5727
After using one of these methods, please DO NOT also send the insurance certificate(s) by mail.
c. Or mail the documents to
City of Roseville
Insurance Compliance
P.O. Box 100085-R1
Duluth, GA 30096

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 377 of 981 ends

INS - 2
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] When forwarding the documents, please refer to the project name so that the documents can be matched with the Contract for which they are submitted.

Thank you.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 378 of 981 ends

INS - 3
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

INSURANCE REQUIREMENTS
The following sections are quoted from the General Conditions:
5-1.23 INSURANCE COVERAGE.

A. Evidence of Maintenance Required. The Contractor shall, at its expense, procure and at all times maintain in full force and effect at a minimum the insurance required by this section on all of its operations; and the Contractor shall not allow any Subcontractor to commence work until similar insurance required of the Subcontractor has been obtained and filed. An original Certificate of Insurance, and copies of all required endorsements, all in a form approved by the Risk Manager, evidencing all required coverage or policies shall be filed after the award of the bid and prior to approval of the Contract by the City Council. Contractor shall provide ten (10) days prior written notice to the City of any reduction of coverage limits or cancellation of the coverage or policies shall be given to the City of Roseville as Certificate holder.

B. Qualifying Insurers. With the exception of the State Compensation Insurance Fund, all required insurance policies shall be issued by companies acceptable to the City and licensed to do business in the State of California and who hold a current policy holders alphabetic and financial size category rating of not less than AVII according to the most recent issue of Best's Insurance Reports.

C. Insurance Required.

1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations with limits of no less than Two Million Dollars ($2,000,000) per occurrence for bodily injury, personal injury and property damage for projects under One Million Dollars ($1,000,000) and

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 379 of 981 ends

INS - 4
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] limits of no less than Five Million Dollars ($5,000,000) per occurrence for bodily injury, personal injury and property damage for projects over One Million Dollars ($1,000,000). If a general aggregate limit applies, either the aggregate limit shall apply separately to this project or the general aggregate limit shall be twice the required occurrence limit.

The Commercial General Liability insurance shall include the following, copies of which shall be provided:
a. Inclusion of the City of Roseville, and its officers, agents, employees, and volunteers, as additional insureds (except for workers’ compensation) as respects services or operations under the Contract. The additional insured endorsement for the general liability policy shall be at least as broad as the ISO CG 2010 10 01 combined with ISO CGL Endorsement CG 2037 10 01. Any other endorsement must be approved in writing by the City.

Endorsements must include coverage for on-going and completed operations, which coverage shall be maintained for four (4) years following completion of the Project. Endorsements shall cover the City of Roseville, its officers, agents, employees, and volunteers. b. The insurance shall provide coverage for claims by one insured against another insured and the policies shall not contain any cross-suits exclusions, crossliability exclusions, or insured versus insured exclusions. The policies shall not contain any classification exclusions purporting to deny coverage for any work to be performed by Contractor or any of its Subcontractors.
c. Stipulation that the insurance is primary and noncontributory, as evidenced by a separate endorsement (CG 20 01 04 13 or an equivalent) or section of the policy, and that neither the City nor its insurers will be called upon to contribute to a loss. d. Such insurance shall specifically cover the contractual liability of

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 380 of 981 ends

INS - 5
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] the Contractor.
e. Any available insurance proceeds in excess of the specified minimum insurance coverage requirements and limits shall be available to the additional insureds. Furthermore, the requirements for coverage and limits shall be: (1) the minimum coverage and limits specified in this Agreement; or (2) the full coverage and maximum limits of any insurance proceeds available to the named insureds, whichever is greater. f. Waiver of subrogation endorsement.
g. The Contractor shall furnish a certificate for the period covered.

2. Automobile Liability: Insurance Services Office Form Number CA 0001 covering Code 1 (any auto), or if Contractor has no owned autos, Code 8 (hired) and Code 9 (non-owned), with limits of no less than One Million Dollars ($1,000,000) per accident for bodily injury and property damage.

3. Workers' Compensation: In accordance with the provisions of the California Labor Code, Contractor is required to be insured against liability for Workers' Compensation or to undertake self-insurance. Statutory Workers' Compensation and Employers' Liability of at least One Million Dollars ($1,000,000) shall cover all Contractors staff while performing any work incidental to the performance or this Agreement.

4. Professional Liability: Professional Liability (Errors and Omission) Insurance appropriate to Contractor’s profession, with a limit of liability not less than One Million Dollars ($1,000,000) per occurrence or claim and Two Million Dollars ($2,000,000) aggregate to cover all design and engineering services rendered by Contractor pursuant to the Agreement. Coverage must commence from the first day that Contractor or any of its Subcontractors provided any design or engineering services in connection with the Project.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 381 of 981 ends

INS - 6
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

5. Builder’s Risk/Course of Construction Insurance Is ____ OR Is Not ____ Required by Risk Management: The Contractor shall be responsible for all loss, damage or destruction whatsoever to the work called for by this Contract until the approval of a Notice of Completion or acceptance of the Work if no Notice of Completion is to be recorded.

The Contractor shall secure “All Risk” type of builder's Risk Insurance of the type covering one hundred percent (100%) of the value of the work performed under this Contract (the value is presumed to be the Contract amount unless otherwise stated in Supplemental Conditions) and all materials, equipment, or other items to be incorporated therein while the same are located at the construction site, a bonded warehouse, or its place of manufacture. At any time, the policy shall cover the value of the work completed. The policy shall cover hazards including the losses due to fire, explosion, hail, rain, lightning, flood (separate insurance as needed), vandalism, malicious mischief, wind, collapse, aircraft, and smoke.

The policies providing such insurance shall name the City as a loss payee as its respective interests may appear, and certified copies of such policies shall be filed with the City. The maximum deductible allowable under the Builder's All Risk policy shall be five percent (5%) of the Contract amount.

Builder's Risk Insurance is not required for coverage of losses in excess of five percent (5%) of the Contract amount for damages resulting from earthquake in excess of a magnitude of

3.5 on the Richter scale, or tidal waves. Coverage in the amount of five percent (5%) of the Contract amount for such losses is required.

6. Pollution Coverage: Contractor shall procure pollution liability coverage or other insurance covering claims for bodily injury or property damage arising out of the abatement, removal, storage, transportation, or other exposure to hazardous materials or

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 382 of 981 ends

INS - 7
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] pollutants, in limits not less than Two Million Dollars ($2,000,000). Contractor shall add the City and all parties required to be indemnified by Contractor as additional insured on all pollution liability policies.

7. Higher Coverage Limits: If Contractor maintains higher coverage limits than the amounts shown above, then the City requires and shall be entitled to coverage for the higher coverage limits maintained by Contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

8. Claims Made Coverage: Liability insurance coverage may not be written on a “claims made” or modified occurrence basis. The Certificate of Insurance must clearly provide that the coverage is on an “occurrence” basis.
5-1.24 OTHER INSURANCE PROVISIONS.

A. The requirements of the Standard Specifications as to types and limits of insurance coverage to be maintained by the Contractor, and any approval of insurance by the City, are not intended to, and shall not in any manner limit or qualify the liabilities and obligations otherwise assumed by the Contractor pursuant to the Contract, including, but not limited to, the provisions concerning indemnification, nor preclude the City from taking any other action available to it under any other provision of the Contract or law.

B. The City acknowledges that some insurance requirements contained in these Standard Specifications may be fulfilled by self-insurance on the part of the Contractor.

However, this shall not in any way limit liabilities assumed by Contractor under the Contract.

Any self-insurance must be approved in writing by the City, in its sole discretion and shall not reduce the limits of liability. Any deductibles or self-insured retentions (“SIR”) must be declared on the certificate of insurance and approved by City in writing. Policies containing any

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 383 of 981 ends

INS - 8
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SIR provision shall provide or be endorsed to provide that the SIR may be satisfied by either the named insured or City. City reserves the right to obtain a full certified copy of any insurance policy and endorsements. The failure to exercise this right shall not constitute a waiver of such right.

C. The Contractor agrees to include in its contracts with all subcontractors the same requirements and provisions of this Contract, including the indemnity and insurance requirements, to the extent they apply to the scope of the subcontractor’s work. Furthermore, the Contractor shall require its subcontractors to agree to be bound to the Contractor and the City in the same manner and to the same extent as the Contractor is bound to the City under this Contract. Additionally, the Contractor shall obligate its subcontractors to comply with these same provisions with respect to any tertiary subcontractor, regardless of tier. A copy of the City’s indemnity and insurance provisions will be furnished to the subcontractor or tertiary subcontractor upon request. Alternatively, the Contractor may insure subcontractor(s) under its own policy.

D. The City, its officers, agents, employees, and volunteers are to be covered as insureds with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the Contractor; and with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts or equipment furnished in connection with such work or operations. Coverage shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where an agreement to indemnify the additional insured would be invalid under California Insurance Code Section 11580.04.

E. The limits of insurance required in this Contract may be satisfied by a combination of primary and excess insurance. Any excess insurance shall contain or be

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 384 of 981 ends

INS - 9
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] endorsed to contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of the City (if agreed to in a written contract) before the City’s own insurance shall be called upon to protect it as a named insured.

F. The insurance procured by Contractor shall be subject to the approval of the City, but any acceptance of insurance certificates by the City shall in no way limit or relieve Contractor of its duties and responsibilities under the Agreement.

G. Contractor shall be responsible for all premiums, deductibles, and selfinsured retention applicable to the insurance it is required to procure under the Contract. All deductibles or self-insured retentions over five hundred thousand dollars ($500,000) must be approved by the City, in writing. Contractor shall be responsible for all deductibles, self-insured retention payments, and/or increased premiums incurred if the City’s policies of insurance are forced to cover damages or respond to claims for which Contractor or its Subcontractors were obligated to provide insurance under the Contract.

H. Failure of the City to enforce in a timely manner any of the requirements of these insurance provisions shall not act as a waiver to enforcement of any of these provisions at a later date.

I. Contractor’s indemnity obligations shall not be limited by these insurance provisions and shall survive the expiration of the Contract and the insurance provisions of the Contract shall likewise not be limited by the indemnity provisions of the Contract.

J. THE CITY RESERVES THE RIGHT TO WITHHOLD ANY

PROGRESS PAYMENTS TO THE CONTRACTOR IN THE EVENT OF
FOR
NONCOMPLIANCE WITH ANY INSURANCE REQUIREMENTS.

COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 385 of 981 ends

[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

PUBLIC WORKS

FAITHFUL PERFORMANCE BOND
(Project: ______________________________________________) WHEREAS, the City of Roseville (“CITY”) has awarded a bid and contract to ___________________________________________________________________ as contractor (“PRINCIPAL”) for the public work described as __________________ _________________________________________________ (the “WORK”). The contract (“AGREEMENT”), for the public work described above, and all of its terms and conditions are incorporated by reference and made a part hereof; and WHEREAS, the PRINCIPAL is required to furnish a bond in connection with the AGREEMENT guaranteeing its faithful performance; and
NOW, THEREFORE, we the undersigned PRINCIPAL and _________________ ____________________________, a _______________________________, admitted and duly authorized to transact business under the laws of the State of California, as SURETY (“SURETY”), are held and firmly bound unto the CITY or its successors and assigns in the sum of ____________________________________________________ dollars ($___________________) (which amount is not less than 100% of the AGREEMENT price) to be paid to the CITY or its successors and assigns; and for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors or assigns jointly and severally, firmly by these presents.

The condition of this obligation is such that if the PRINCIPAL, or its heirs, executors, administrators, successors or assigns, shall abide by, and in all respects promptly and faithfully perform the covenants, conditions and provisions in said AGREEMENT and any alteration thereof made as therein provided, notice of which alterations to Surety being hereby waived, on its part to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless CITY, its officers, agents, employees, volunteers as therein stipulated, then this obligation shall be null and void; otherwise, this obligation shall be and remain in full force and effect.

As condition precedent to the satisfactory completion of the contract, the obligation of the PRINCIPAL and SURETY under this Bond shall remain in effect for a period of one (1) year after the completion and acceptance of the WORK. During that time, if the PRINCIPAL, its heirs, executors, administrators, successors or assigns fails to make full, complete and satisfactory repair and replacement or totally protect the CITY from any loss or damage made evident during that year which results from or is caused by either defective materials or faulty workmanship in the prosecution of the WORK, then the obligation shall remain in full force and effect. However, anything in Bond No. __________
Premium $_________

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 386 of 981 ends

[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] this paragraph to the contrary notwithstanding, the obligation of the SURETY shall continue so long as any obligation of the PRINCIPAL remains.

No prepayment or delay in payments, and no change, extension, addition or alteration of any provision of the AGREEMENT or in the specifications agreed to between the PRINCIPAL and the CITY, or any forbearance on the part of the CITY shall operate to relieve the SURETY. The SURETY hereby waives the provisions of Section 2819 of the California Civil Code. The SURETY waives all rights of subrogation against the CITY or any person employed by the CITY. If the contract price increases by the issuance of change orders, the amount specified in this bond shall increase by the same amount.

Whenever PRINCIPAL shall be and declared by CITY to be in default under the AGREEMENT, SURETY shall promptly remedy the default, or shall promptly do one of the follow at CITY’s election:

1. Undertake through its agents or independent contractors, reasonably acceptable to CITY, to complete the AGREEMENT in accordance with its terms and conditions and to pay and perform all obligations of PRINCIPAL under the AGREEMENT, including without limitation, all obligations with respect to warranties, guarantees, and the payment of liquidated damages.

2. Reimburse CITY for all costs CITY incurs in completing the AGREEMENT, and in correcting, repairing or replacing defects in materials or workmanship and/or materials and workmanship which do not conform to the specifications in the AGREEMENT.

SURETY’s obligations hereunder are independent of the obligations of any other surety for the performance of the AGREEMENT, and suit may be brought against SURETY and such other sureties, jointly and severally, or against any one or more of them, or against less than all of them without impairing CITY’s rights against the others.

No right of action shall accrue on this bond to or for the use of any person or corporation other than CITY or its successors or assigns.

As part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees, including reasonable attorneys' fees, incurred by CITY in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

FOR
[SIGNATURES NEXT PAGE]

COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 387 of 981 ends

[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] IN WITNESS WHEREOF, this instrument has been duly executed by the PRINCIPAL and SURETY above-named, on the ____ day of __________________, 20___.

PRINCIPAL: SURETY:

BY:____________________________ BY:__________________________ PRINT NAME: ________________________ PRINT NAME: ______________________ PRINT TITLE: ________________________ PRINT TITLE:_______________________ AND MAILING ADDRESS:

BY: ___________________________ _____________________________ PRINT NAME: ________________________ ___________________________________ PRINT TITLE:_________________________ ___________________________________ (Notarization by Surety and copy of
Power of Attorney required.)
APPROVED AS TO FORM:

BY: ________
City Attorney

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 388 of 981 ends

[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

PUBLIC WORKS

LABOR AND MATERIALS PAYMENT BOND
(Project: ______________________________________________)

WHEREAS, the City of Roseville (“CITY”), has awarded a bid and contract to ______________________________________________________________________ as contractor (“PRINCIPAL”), for the public work described as ____________________ ________________________________________________ (the “WORK”). The contract (“AGREEMENT”), for the public work described above, and all of its terms and conditions are incorporated by reference and made a part hereof; and WHEREAS, the PRINCIPAL is required to furnish a bond in connection with the AGREEMENT guaranteeing payment of persons who provide labor and material; and NOW, THEREFORE, we the undersigned PRINCIPAL and _________________ ____________________________, a _______________________________, admitted and duly authorized to transact business under the laws of the State of California, as SURETY (“SURETY”), are held and firmly bound unto the CITY or its successors and assigns in the sum of ____________________________________________________ dollars ($___________________) (which amount is not less than 100% of the AGREEMENT price) to be paid to the CITY or its successors and assigns; and for which payment, well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors or assigns jointly and severally, firmly by these presents.

The condition of the obligation is such that if the PRINCIPAL, its subcontractors, heirs, executors, administrators, successors or assigns fails to pay any of the persons named in Section 8004 or 9100 of the Civil Code of the State of California, or the amounts due under the Unemployment Insurance Code of the State of California, or any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees of the PRINCIPAL and its subcontractors pursuant to Section 13020 of the Unemployment Insurance Code, with respect to work or labor performed by any such claimant, that the SURETY will pay for the same, in an amount not exceeding the sum specified in this bond, and also, in case suit is brought upon the bond, shall pay reasonable attorneys’ fees, to be fixed by the Court.

This bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file a Stop Payment Notice pursuant to the provisions of Section 9350 et seq. of the Civil Code of the State of California, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Bond No. __________
Premium $_________

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 389 of 981 ends

[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] No prepayment or delay in payments, and no change, extension, addition or alteration of any provision of the AGREEMENT or in the specifications agreed to between the PRINCIPAL and the CITY, or any forbearance on the part of the CITY shall operate to relieve the SURETY. The SURETY hereby waives the provisions of Section 2819 of the California Civil Code. The SURETY waives all rights of subrogation against the CITY or any person employed by the CITY. If the contract price increases by the issuance of change orders, the amount specified in this bond shall increase by the same amount.

As part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees, including reasonable attorneys' fees, incurred by CITY in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

IN WITNESS WHEREOF, this instrument has been duly executed by the PRINCIPAL and SURETY above-named, on the _____ day of __________________, 20__.

PRINCIPAL: SURETY:

BY:____________________________ BY:__________________________ PRINT NAME: ________________________ PRINT NAME: ______________________ PRINT TITLE: ________________________ PRINT TITLE:_______________________ AND MAILING ADDRESS:

BY: ___________________________ _____________________________ PRINT NAME: ________________________ ___________________________________ PRINT TITLE:_________________________ ___________________________________ (Notarization by Surety and copy of
Power of Attorney required.)
APPROVED AS TO FORM:

BY: ________
City Attorney

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 390 of 981 ends

GC
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

CITY OF ROSEVILLE

GENERAL CONDITIONS
FOR

BUILDINGS AND GROUNDS

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 391 of 981 ends

GC – i
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024]

CITY OF ROSEVILLE

GENERAL CONDITIONS
FOR

BUILDINGS AND GROUNDS
SECTION 1: DEFINITIONS AND TERMS .................................................................... GC-1:1 1-1.01 GENERAL ...................................................................................................... GC-1:1 1-1.02 ACCEPTANCE .............................................................................................. GC-1:1 1-1.03 ADDENDUM .................................................................................................. GC-1:1 1-1.04 AS-BUILT DOCUMENTS, AS-BUILT DRAWINGS AND RECORD DOCUMENTS ................................................................................................ GC-1:1 1-1.05 ASSESSMENT ............................................................................................... GC-1:1 1-1.06 BENEFICIAL OCCUPANCY ...................................................................... GC-1:2 1-1.07 BID GUARANTY ........................................................................................... GC-1:2 1-1.08 BIDDER .......................................................................................................... GC-1:2 1-1.09 BIDDING DOCUMENTS ............................................................................. GC-1:2 1-1.10 CHANGE ORDER ......................................................................................... GC-1:2 1-1.11 CITY ................................................................................................................ GC-1:2 1-1.12 CITY ATTORNEY ........................................................................................ GC-1:2 1-1.13 CITY CLERK ................................................................................................. GC-1:2 1-1.14 CLAIM ............................................................................................................ GC-1:2 1-1.15 CONSTRUCTION SCHEDULE .................................................................. GC-1:3 1-1.16 CONTRACT OR AGREEMENT ................................................................. GC-1:3 1-1.17 CONTRACT CONDITIONS ........................................................................ GC-1:3 1-1.18 CONTRACT DOCUMENTS ........................................................................ GC-1:3 1-1.19 CONTRACT DRAWINGS ............................................................................ GC-1:3 1-1.20 CONTRACT PRICE ...................................................................................... GC-1:4 1-1.21 CONTRACT TIME ....................................................................................... GC-1:4 1-1.22 CONTRACTOR ............................................................................................. GC-1:4 1-1.23 DAY OR DAYS ............................................................................................... GC-1:4 1-1.24 DEPARTMENT ............................................................................................. GC-1:4 1-1.25 DIRECT COSTS ............................................................................................ GC-1:4 1-1-26 DIRECTOR. ................................................................................................... GC-1:6 1-1.27 EMERGENCY. .............................................................................................. GC-1:6 1-1.28 ENGINEER OR ARCHITECT ..................................................................... GC-1:7 1-1.29 FINAL COMPLETION ................................................................................. GC-1:7 1-1.30 FORCE ACCOUNT ....................................................................................... GC-1:7 1-1.31 GENERAL NOTES ........................................................................................ GC-1:7 1-1.32 INSTALLATION,INSTALL ........................................................................ GC-1:7 1-1.33 LABORATORY ............................................................................................. GC-1:7 1-1.34 LEGAL HOLIDAYS ...................................................................................... GC-1:7 1-1.35 LIQUIDATED DAMAGES ........................................................................... GC-1:7 1-1.36 NOTICE OF COMPLETION ....................................................................... GC-1:8 1-1.37 NOTICE TO PROCEED ............................................................................... GC-1:8 1-1.38 NOTICE OF TERMINATION ..................................................................... GC-1:8

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 392 of 981 ends

GC – ii
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] 1-1.39 OVERHEAD ................................................................................................... GC-1:8 1-1.40 PREMISES ..................................................................................................... GC-1:9 1-1.41 PROFESSIONAL ENGINEER .................................................................... GC-1:9 1-1.42 PROJECT MANUAL .................................................................................... GC-1:9 1-1.43 PROPOSAL FORMS ..................................................................................... GC-1:9 1-1.44 REQUEST FOR INFORMATION (RFI). ................................................... GC-1:9 1-1.45 SAFETY .......................................................................................................... GC-1:9 1-1.46 SCHEDULE OF VALUES. ........................................................................... GC-1:9 1-1.47 SHOP DRAWINGS ...................................................................................... GC-1:10 1-1.48 SPECIFICATIONS ...................................................................................... GC-1:10 1-1.49 SUBCONTRACTOR ................................................................................... GC-1:10 1-1.50 SUBMITTALS ............................................................................................. GC-1:10 1-1.51 SUPPLEMENTAL CONDITIONS ............................................................ GC-1:10 1-1.52 SUPPLIER .................................................................................................... GC-1:10 1-1.53 WORK ........................................................................................................... GC-1:11 1-1.54 WORK SITE ................................................................................................. GC-1:11 1-1.55 WORKING DRAWINGS ............................................................................ GC-1:11 SECTION 2: CONTROL AND SCOPE OF THE WORK ............................................. GC-2:1 2-1.01 AUTHORITY OF DIRECTOR .................................................................... GC-2:1 2-1.02 INTENT OF CONTRACT DOCUMENTS .................................................. GC-2:1 2-1.03 EXAMINATION AND VERIFICATION OF CONTRACT
DOCUMENTS ................................................................................................ GC-2:2 2-1.04 CONTRACT DRAWINGS ............................................................................ GC-2:3 2-1.05 COORDINATION AND INTERPRETATION OF CONTRACT
DOCUMENTS ................................................................................................ GC-2:3 2-1.06 INDEPENDENT CONTRACTOR STATUS ............................................... GC-2:5 2-1.07 ORDER OF WORK ....................................................................................... GC-2:5 2-1.08 SUBMITTALS ............................................................................................... GC-2:5 2-1.08A SHOP DRAWINGS.................................................................................. GC-2:6 2-1.08B DESCRIPTIVE DATA ............................................................................ GC-2:7 2-1.08C SAMPLES ................................................................................................ GC-2:7 2-1.08D MANUALS, INSTRUCTIONS AND AFFIDAVIT ................................ GC-2:7 2-1.08E ALTERNATIVES................................................................................... GC-2:10 2-1.09 DISPOSAL OF MATERIAL OUTSIDE THE WORK SITE ................... GC-2:12 2-1.10 ACCESS TO THE WORK .......................................................................... GC-2:12 2-1.11 TEMPORARY UTILITIES ........................................................................ GC-2:12 2-1.12 UTILITY FACILITIES ............................................................................... GC-2:13 2-1.13 PRESERVATION AND CLEANING ........................................................ GC-2:14 2-1.14 LIMITATIONS ON WORK SITE AND PREMISES ............................... GC-2:14 2-1.15 DUST CONTROL ........................................................................................ GC-2:15 2-1.16 SANITATION .............................................................................................. GC-2:15 2-1.17 NIGHT WORK AND NORMAL WORKING HOURS............................ GC-2:15 2-1.18 LINES AND GRADES ................................................................................. GC-2:16 2-1.19 ARCHEOLOGICAL DISCOVERIES ....................................................... GC-2:17 2-1.20 PRESERVATION OF MONUMENTS ...................................................... GC-2:17 2-1.21 CONFORMITY WITH CONTRACT DOCUMENTS ............................. GC-2:18

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 393 of 981 ends

GC – iii
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] 2-1.22 FINAL CLEANUP ....................................................................................... GC-2:18 2-1.23 AS-BUILT DOCUMENTS AND DRAWINGS ......................................... GC-2:18 2-1.24 SUPERINTENDENCE ................................................................................ GC-2:19 2-1.25 CHARACTER OF WORKER .................................................................... GC-2:20 2-1.26 INSPECTION ............................................................................................... GC-2:20 2-1.27 REMOVAL OF REJECTED AND UNAUTHORIZED WORK ............. GC-2:21 SECTION 3: CHANGES IN THE WORK ...................................................................... GC-3:1 3-1.01 CHANGES ...................................................................................................... GC-3:1 3-1.02 PROPOSED CHANGE ORDERS ................................................................ GC-3:2 3-1.03 EMERGENCY AND INDETERMINATE TYPE CHANGE ORDERS ... GC-3:3 3-1.04 EXECUTED CHANGE ORDER .................................................................. GC-3:3 3-1.05 CONTRACT PRICE ADJUSTMENT ......................................................... GC-3:3 3-1.06 FORCE ACCOUNT PAYMENT .................................................................. GC-3:5 3-1.06A LABOR ..................................................................................................... GC-3:6 3-1.06B MATERIALS ............................................................................................ GC-3:6 3-1.06C EQUIPMENT........................................................................................... GC-3:7 3-1.06D MARKUPS ............................................................................................... GC-3:8 3-1.06E RECORDS ................................................................................................ GC-3:9 3-1.07 COST REDUCTION PROPOSALS ........................................................... GC-3:11 SECTION 4: CONTROL OF MATERIALS ................................................................... GC-4:1 4-1.01 MATERIALS ................................................................................................. GC-4:1 4-1.02 PRODUCT AND REFERENCE STANDARDS .......................................... GC-4:2 4-1.03 SAMPLING AND TESTING OF MATERIALS ......................................... GC-4:2 4-1.04 CERTIFICATES OF COMPLIANCE ......................................................... GC-4:7 SECTION 5: LEGAL RELATIONS AND RESPONSIBILITY .................................... GC-5:1 5-1.01 LAWS TO BE OBSERVED .......................................................................... GC-5:1 5-1.02 HOURS OF LABOR ...................................................................................... GC-5:1 5-1.03 NONDISCRIMINATION ............................................................................. GC-5:2 5-1.04 PREVAILING WAGE ................................................................................... GC-5:3 5-1.05 REGISTRATION REQUIRED AS QUALIFICATION TO BID .............. GC-5:6 5-1.06 PAYROLL RECORDS .................................................................................. GC-5:7 5-1.07 SAFETY REQUIREMENTS ...................................................................... GC-5:10 5-1.08 SUBSURFACE EXCAVATIONS, NOTIFICATION ............................... GC-5:15 5-1.09 PUBLIC SAFETY ........................................................................................ GC-5:15 5-1.10 EMERGENCIES .......................................................................................... GC-5:17 5-1.11 APPRENTICES ........................................................................................... GC-5:18 5-1.12 FAIR LABOR STANDARDS ACT ............................................................ GC-5:18 5-1.13 WORKERS' COMPENSATION ................................................................ GC-5:19 5-1.14 AIR POLLUTION CONTROL AND ASBESTOS .................................... GC-5:19 5-1.15 USE OF PESTICIDES ................................................................................. GC-5:20 5-1.16 SOUND AND LIGHT CONTROL REQUIREMENTS ............................ GC-5:20 5-1.17 WEIGHT LIMITATIONS .......................................................................... GC-5:21 5-1.18 ENVIRONMENTAL CLEARANCES; MITIGATION MONITORING
PROGRAMS; AND REGULATORY AGENCY PERMIT

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 394 of 981 ends

GC – iv
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] REQUIREMENTS ....................................................................................... GC-5:21 5-1.19 PERMITS AND LICENSES ....................................................................... GC-5:21 5-1.20 WATER POLLUTION ................................................................................ GC-5:22 5-1.21 PROTECTION AND USE OF PROPERTY .............................................. GC-5:23 5-1.22 RESPONSIBILITY FOR DAMAGE AND INDEMNIFICATION ......... GC-5:24 5-1.23 INSURANCE COVERAGE ........................................................................ GC-5:26 5-1.24 OTHER INSURANCE PROVISIONS ....................................................... GC-5:31 5-1.25 THIRD PARTY BENEFICIARY ............................................................... GC-5:33 5-1.26 COORDINATION AND ACCESS ............................................................. GC-5:33 5-1.27 OCCUPANCY BY THE DEPARTMENT PRIOR TO ACCEPTANCE .. GC-5:34 5-1.28 RIGHT TO OPERATE UNSATISFACTORY FACILITIES AND
EQUIPMENT ............................................................................................... GC-5:35 5-1.29 CONTRACTOR'S RESPONSIBILITY FOR THE WORK .................... GC-5:36 5-1.30 RESPONSIBILITY FOR UTILITIES ....................................................... GC-5:37 5-1.31 PROPERTY RIGHTS IN MATERIALS ................................................... GC-5:39 5-1.32 COURT ORDERED DELAY ...................................................................... GC-5:39 5-1.33 NO PERSONAL LIABILITY ..................................................................... GC-5:39 5-1.34 RIGHTS IN LAND AND IMPROVEMENTS ........................................... GC-5:40 5-1.35 ANTITRUST CLAIMS ................................................................................ GC-5:40 5-1.36 RIGHTS TO DRAWINGS, TECHNICAL DATA PATENTS ................. GC-5:40 5-1.37 PAYMENT OF TAXES ............................................................................... GC-5:41 5-1.38 GRATUITIES AND CONFLICT OF INTEREST .................................... GC-5:42 5-1.39 COOPERATION.......................................................................................... GC-5:43 5-1.40 DIGGING TRENCHES OR OTHER EXCAVATIONS .......................... GC-5:43 5-1.41 CONTRACTOR REGISTRATION ........................................................... GC-5:44 5-1.42 CITY OF ROSEVILLE ENCROACHMENT PERMITS AND
RIGHTS-OF-WAY ...................................................................................... GC-5:45 SECTION 6: PROSECUTION AND PROGRESS .......................................................... GC-6:1 6-1.01 SUBLETTING AND SUBCONTRACTING ............................................... GC-6:1 6-1.02 ASSIGNMENT ............................................................................................... GC-6:2 6-1.03 BEGINNING OF WORK .............................................................................. GC-6:2 6-1.04 PROGRESS SCHEDULE. ............................................................................ GC-6:3 6-1.05 SCHEDULE OF VALUES ............................................................................ GC-6:9 6-1.06 CITY’S RIGHT TO STOP WORK .............................................................. GC-6:9 6-1.07 TIME OF COMPLETION .......................................................................... GC-6:11 6-1.08 LIQUIDATED DAMAGES ......................................................................... GC-6:12 6-1.09 DELAYS AND EXTENSIONS TO THE WORK ...................................... GC-6:13 6-1.10 TERMINATION .......................................................................................... GC-6:18 6-1.10A TERMINATION OF AGREEMENT – CONVENIENCE OF CITY..GC-6:18 6-1.10B TERMINATION OF AGREEMENT - FOR CAUSE .......................... GC-6:21 SECTION 7: ACCEPTANCE AND PAYMENT ............................................................ GC-7:1 7-1.01 ACCEPTANCE .............................................................................................. GC-7:1 7-1.02 SCOPE OF PAYMENT ................................................................................. GC-7:2 7-1.03 NOTICE OF POTENTIAL CLAIM ............................................................ GC-7:2 7-1.04 CLAIMS ......................................................................................................... GC-7:5

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 395 of 981 ends

GC – v
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] 7-1.05 DISPUTE RESOLUTION PROCEDURE ................................................... GC-7:6 7-1.06 STOP PAYMENT NOTICES ....................................................................... GC-7:7 7-1.07 PROGRESS PAYMENTS ............................................................................. GC-7:7 7-1.08 PAYMENT FOR MATERIALS AND EQUIPMENT ON HAND ............. GC-7:9 7-1.09 RETENTION ON PROGRESS PAYMENTS ........................................... GC-7:11 7-1.10 FINAL PAYMENT ..................................................................................... GC-7:12 7-1.11 CLERICAL ERRORS ................................................................................. GC-7:14 7-1.12 WARRANTY ................................................................................................ GC-7:14 7-1.13 WARRANTY OF TITLE ............................................................................ GC-7:16

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 396 of 981 ends

GC – 1:1
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 1

DEFINITIONS AND TERMS
1-1.01 GENERAL. When the following abbreviations and terms or pronouns in place of them appear in the Contract Documents, the intent and meaning shall be interpreted as provided in this Section 1.
1-1.02 ACCEPTANCE. Formal Acceptance by resolution by the Roseville City Council of the Contract when completed in all respects in accordance with the Contract Documents and any modifications previously approved.
1-1.03 ADDENDUM. Written interpretation or revision to any of the Contract Documents issued by the City before the bid opening.
1-1.04 AS-BUILT DOCUMENTS, AS-BUILT DRAWINGS AND RECORD DOCUMENTS. As-Built Documents, As-Built Drawings and Record Documents are all contract documents modified to reflect changes during the construction phase. Specifically, AsBuilt Documents/Drawings are a revised set of drawings submitted by the Contractor upon Final Completion of a project. They reflect changes made in the Specifications and Working Drawings during the construction process, and show the exact dimensions, geometry, and location of all elements of the work completed under the Contract. Record Documents, on the other hand, are compiled by the Engineer or Architect based on the As-Built Documents/Drawings submitted by the Contractor. They reflect the Engineer or Architect’s concurring review of what changes were denoted, why they were made and where they occurred and create a record set of drawings.
1-1.05 ASSESSMENT. A cost imposed on the Contractor for non-compliance

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 397 of 981 ends

GC – 1:2
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] with certain contractual requirements.
1-1.06 BENEFICIAL OCCUPANCY. The taking possession of a portion of the Work by the City for its use and/or occupancy on other than a temporary or emergency basis. 1-1.07 BID GUARANTY. The cashier’s, certified check, irrevocable standby letter of credit, deposit of securities, or Bidder’s Bond, accompanying the bid submitted by the Bidder, as a guaranty that the Bidder will enter into an agreement with the City for the performance of the Work, if the Agreement is awarded to Bidder, and the Bidder will submit the required Contract Bonds and Certificate of Insurance. Also referred to as the Bidder’s Security. 1-1.08 BIDDER. Individual, firm, partnership, limited liability company, corporation, joint venture, or any combination thereof, submitting a Proposal for the Work, acting directly, or through a duly authorized representative. 1-1.09 BIDDING DOCUMENTS. Includes the Notice to Bidders, Bidding Requirements, Contract Conditions, Drawings, and Addenda. 1-1.10 CHANGE ORDER. Any written order to the Contractor directing an addition, deletion, or modification of the Work, or an adjustment in the Contract Price or Contract Time provided in the Contract Documents and issued after the Agreement has been signed.
1-1.11 CITY. The City of Roseville.
1-1.12 CITY ATTORNEY. The City Attorney of the City.
1-1.13 CITY CLERK. The City Clerk of the City.
1-1.14 CLAIM. A separate demand by Contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following: (a) a time extension, including, without limitation, for relief for damages or penalties for delay assessed by

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 398 of 981 ends

GC – 1:3
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] the City; (b) payment by the City of money or damages arising from work done by, or on behalf of, Contractor pursuant to the Contract Documents and payment for which is not otherwise expressly provided or to which Contractor is not otherwise entitled; and (c) payment of an amount that is disputed by the City.
1-1.15 CONSTRUCTION SCHEDULE. A list or graphic display of construction activities required for completing the Work, in a format required by the Contract Documents. The duration, start and finish date, and sequence of significant activities, critical path, float and milestones must be indicated in the Construction Schedule. 1-1.16 CONTRACT OR AGREEMENT. The written agreement relating to the Work to be performed, the labor, materials, and equipment to be furnished, and the payment to be made therefor. The Agreement/Contract is part of and incorporates all of the Contract Documents.
1-1.17 CONTRACT CONDITIONS. Includes the General Conditions, Supplemental Conditions, and Specifications.
1-1.18 CONTRACT DOCUMENTS. Includes those documents that form the basis of the Contract, including but not limited to, Bidding Documents, the Bid or Proposal, Contract Bonds, the Contract, all required insurance certificates or endorsements, all bonds, all required certifications or statements, Change Orders, any Contract Amendment, any City Standard which is incorporated by reference and these City of Roseville General Conditions for Buildings and Grounds.
1-1.19 CONTRACT DRAWINGS. The official drawings including plans, elevations, sections, detail drawings, diagrams, plated, General Notes, information and schedules thereon, or exact reproductions thereof, showing the location, character, dimension, and details

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 399 of 981 ends

GC – 1:4
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] of the Work. The Contract Drawings include any drawings or plates bound within the Supplemental Conditions.
1-1.20 CONTRACT PRICE. The total compensation to be paid to the Contractor in accordance with the terms of the Agreement. 1-1.21 CONTRACT TIME. The number of Days, or portion thereof, allowed for completion of the Work, including all authorized time extensions. The effective date for commencement of the Work specified in the Notice to Proceed shall define the beginning of the Contract Time.
1-1.22 CONTRACTOR. Individual, firm, partnership, limited liability company, corporation, joint venture, or any combination thereof, who has entered into the Agreement with City.
1-1.23 DAY OR DAYS. Unless otherwise designated, Day or Days as used in the Contract Documents will be understood to mean calendar Day or Days. 1-1.24 DEPARTMENT. The Department for Contract Administration, as identified in the Supplemental Conditions.
1-1.25 DIRECT COSTS. Those cost items (including labor, materials, equipment and any subcontractor’s work) that are used in the actual performance of, and are specifically and uniquely attributable to the Work or changed Work. Direct Costs do not include Overhead. Direct Costs only include the following:

A. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include salaries and

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 400 of 981 ends

GC – 1:5
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] wages plus the cost of fringe benefits which shall include social security contributions, unemployment, excise and payroll taxes, workers' compensation, health and retirement benefits, sick leave, vacation and holiday pay applicable thereto. Such employees may include superintendents and foremen at the site. The expenses of performing work after regular working hours, on Saturday, Sunday or legal holidays shall be included in the above only to the extent authorized by City in writing.

B. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and suppliers' field services required in connection therewith. All trade discounts, rebates and refunds and all returns from sale of surplus materials and equipment shall accrue to City, and Contractor shall make provisions so that they may be obtained.

C. Payments made by Contractor to the subcontractors for work performed by subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to Contractor and shall deliver such bids to City who will then determine which bids will be accepted. If a subcontract provides that the subcontractor is to be paid on the basis of cost of the work plus a fee, the subcontractor's cost of the work shall be determined in the same manner as Contractor's cost of the work. All subcontracts shall be subject to the other provisions of the Contract Documents insofar as applicable.

D. Costs of special consultants (including engineers, architects, testing laboratories, surveyors, and accountants) employed for services specifically, and only, related to the Work.

E. Supplemental costs including the following:

1. The proportion of necessary transportation, travel and subsistence

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 401 of 981 ends

GC – 1:6
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] expenses of Contractor's employees incurred in discharge of duties connected with the Work.

2. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office and temporary facilities at the site and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value of such items used but not consumed which remain the property of Contractor.

3. Rentals of all construction equipment and machinery and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, installation, dismantling and removal thereof, all in accordance with terms of said rental agreements. The rental of any such equipment, machinery or parts shall cease when the use thereof is no longer necessary for the Work.

4. Sales, consumer, use or similar taxes related to the Work, and for which Contractor is liable, imposed by laws and regulations.

5. The cost of utilities (including the meter and all associated installation costs), fuel and sanitary facilities at the site.

6. Cost of premiums for additional bonds and insurance required because of changes in the Work.
1-1-26 DIRECTOR. Director of the Department for Contract Administration or his or her designee.
1-1.27 EMERGENCY. Any sudden generally unforeseen occurrence (such as a fire, flood, storm, earthquake, civil disorder, or other natural and/or man-made disaster) that has the potential to adversely affect the safety of life, the Work, and/or adjacent property; to interrupt contracts essential to the performance of the Work; and/or to cause catastrophic failure of City

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 402 of 981 ends

GC – 1:7
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] equipment and/or facilities.
1-1.28 ENGINEER OR ARCHITECT. Professional Engineer or Architect designated for a particular project responsible for signing and sealing the permit drawings, interpretation of the drawings where ambiguities exist, review of requests for information, design Change requests and Shop Drawings, resolution of errors and omissions, and finalization of Record Documents.
1-1.29 FINAL COMPLETION. When the project has been completed according to the terms and conditions set forth in the Contract Documents. Final Completion is not the same as Acceptance.
1-1.30 FORCE ACCOUNT. Payment by force account shall mean payment on the basis of the Contractor’s time and materials.
1-1.31 GENERAL NOTES. The written instructions, provisions, conditions or other requirements appearing on the Contract Drawings and so identified thereon, which pertain to the performance of the Work.
1-1.32 INSTALLATION, INSTALL. Completely assembling, erecting, and/or connecting materials, parts, components, supplies, and related equipment specified or required for the completion of the Work.
1-1.33 LABORATORY. Established professional laboratories authorized by the City to test materials and Work involved in the Contract. 1-1.34 LEGAL HOLIDAYS. Those days designated as Federal holidays or declared by the City, or otherwise specified in the Contract Documents. 1-1.35 LIQUIDATED DAMAGES. The amount prescribed in the Contract Documents to be paid to the City or to be deducted from any payments due or to become due the

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 403 of 981 ends

GC – 1:8
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] Contractor for each day's delay in completing the whole or any specified portion of the Work beyond the time allowed in the Supplemental Conditions. 1-1.36 NOTICE OF COMPLETION. A legal notice filed by the City with the Placer County Recorder’s Office stating that construction has been completed and accepted by the City.
1-1.37 NOTICE TO PROCEED. A written notice given by the City to the Contractor fixing the date on which the Contract Time will commence to run. 1-1.38 NOTICE OF TERMINATION. Written notice from the City to the Contractor and/or its Surety terminating the Agreement, or a portion thereof, either for convenience of the City or for default due to the Contractor’s failure to perform its contractual obligations.
1-1.39 OVERHEAD. Business or administrative expenses (including but not limited to office expenses, administrative staff, rent, insurance, utilities) not chargeable to a particular part of the Work. The term “Overhead” shall include all of the following:

A. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor whether at the Work Site or in Contractor's principal or a branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications, all of which are to be considered administrative costs covered by the Contractor's fee.

B. Expenses of Contractor's principal and branch offices other than Contractor's office at the site.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 404 of 981 ends

GC – 1:9
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] C. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments.

D. Cost of premiums for all bonds and for all insurance whether or not Contractor is required by the Contract Documents to purchase and maintain the same, except as provided in section 1-1.25.

E. Other overhead or general expense costs of any kind. 1-1.40 PREMISES. Shall mean the area within construction easements, easements, rights of entry and City owned property which surrounds the Work Site, limited by the property lines thereof. In some cases Premises may coincide with the Work Site. 1-1.41 PROFESSIONAL ENGINEER. An engineer licensed by the Board of Registration for Professional Engineers, State of California. 1-1.42 PROJECT MANUAL. A book containing all Contract Documents. 1-1.43 PROPOSAL FORMS. The approved forms upon which the City requires that each Bidder submit its bid with regard to the Agreement. 1-1.44 REQUEST FOR INFORMATION (RFI). A document issued by the Contractor requesting information concerning the Contract Documents. 1-1.45 SAFETY. Includes the practice of identifying potential hazards, assessing their risk, taking corrective action where possible, including and providing control measures such as engineering design, written procedures, and the personal protective equipment for workers in order to eliminate or reduce the risk for exposure in the workplace. 1-1.46 SCHEDULE OF VALUES. The breakdown of the Contract Price that will serve as the basis for Contractor’s Applications of Payment. Any lump sum bid item

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 405 of 981 ends

GC – 1:10
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] included within the Contract Price will be apportioned among values relating to specific components of the Work covered by said lump sum.
1-1.47 SHOP DRAWINGS. Drawings, plans, diagrams, schedules, and other data specifically prepared and submitted to the City by the Contractor, showing in detail: (a) the proposed fabrication and assembly of a special component of the Work; and (b) the Installation (form, fit and attachment details) of a special component of the Work. Shop Drawings shall be deemed to include Working Drawings, Product Data, literature, and applicable performance and test data.
1-1.48 SPECIFICATIONS. The technical Specifications for the Work prepared by the Director or an Engineer or Architect describing in detail the nature of the Work, its components, any performance standards, and how the Work is to be constructed. 1-1.49 SUBCONTRACTOR. Any individual, firm, partnership, limited liability company, corporation, joint venture, or combination thereof, other than employees of the Contractor, engaged by the Contractor to furnish services, labor, equipment and materials for a portion of the Work.
1-1.50 SUBMITTALS. Those documents required to be submitted by the Contractor for review by the City in accordance with the Contract Documents. 1-1.51 SUPPLEMENTAL CONDITIONS. The Supplemental Conditions are specific clauses modifying or supplementing these General Conditions. 1-1.52 SUPPLIER. Any individual, firm, partnership, limited liability company, corporation, joint venture, or combination thereof, other than employees of the Contractor, that supplies a tangible product as a portion of the Work, with services usually limited to delivery and/or required testing, and with manufacturing, fabrication, or production facilities located off

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 406 of 981 ends

GC – 1:11
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] the Work Site.
1-1.53 WORK. The furnishing of all labor, and the furnishing and Installing of all materials, articles, supplies and equipment as specified, designated, or required by the Contract Documents.
1-1.54 WORK SITE. All or portion of the Premises that the Work is limited to as shown on the Contract Drawings or designated by the Director. Public streets are not included unless Work is being done within the street right-of-way. 1-1.55 WORKING DRAWINGS. Original drawings prepared by the Contractor and/or its Subcontractors or Suppliers, of any tier, illustrating Work required for construction that will not become an integral part of the completed Work. This includes, but is not limited to, drawings for temporary structures such as decking, bulkheads, excavation supports, utility support, groundwater control, forming, falsework, access roads, staging areas, staging plans, and diversion plans. A Working Drawing is one type of a Shop Drawing.

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 407 of 981 ends

GC – 2:1
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] SECTION 2

CONTROL AND SCOPE OF THE WORK
2-1.01 AUTHORITY OF DIRECTOR. The Contract shall be performed in a manner satisfactory to the Director who shall decide all questions which may arise as to the quality or acceptability of materials furnished and Work performed and as to the manner of performance and rate of progress of the Work; all questions which may arise as to the interpretation of the Contract Documents; all questions as to the acceptable fulfillment of the Contract on the part of the Contractor; and all questions as to compensation. The Director shall have authority to enforce and make effective such decisions and orders in the event the Contractor fails to promptly carry out the same.
2-1.02 INTENT OF CONTRACT DOCUMENTS. The Contract Documents are complementary, and what is called for by one shall be as binding as if called for by all. The intent of the Contract Documents is to describe the details for the construction and completion of the Work. Where the Contract Documents describe portions of the Work in general terms, but not in complete detail, it is understood that only the best general practice shall be followed and that only materials and workmanship of the best quality are to be used. Any Work, materials, or equipment that are customarily provided, or that are reasonably inferable from the Contract Documents as being required to produce the intended result, shall be supplied, whether or not specifically called for. When words, which have a well-known technical or trade meaning are used to describe work, materials, or equipment, such words shall be interpreted in accordance with that meaning. Unless otherwise specified, the Contractor shall furnish all labor, materials, tools, equipment, and incidentals, and do all the Work involved in executing the Contract in a

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 408 of 981 ends

GC – 2:2
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] satisfactory and workmanlike manner.

Reference to standard specifications, manuals or codes of any technical society, organization or association, or to the laws or regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code, laws, or regulations in effect on the first published date of the Notice to Contractors, except as may be otherwise specifically stated. However, no provision of any referenced standard specification, manual or code (whether or not specifically incorporated by reference in the Contract Documents) shall be effective to change the duties and responsibilities of City or Contractor, or any of their consultants, agents, or employees from those set forth in the Contract Documents, nor shall it be effective to assign to City, or City’s designated representative, any duty or authority to supervise or direct the furnishing or performance of the Work or any duty or authority to undertake responsibility contrary to other provisions of the Contract Documents.

The Contract Documents are divided into parts, divisions, sections and articles for convenience, organization and reference. Generally, there has been no attempt to divide the Specifications sections into work performed by the various building trades, work by separate Subcontractors, or work required for separate facilities in the project. 2-1.03 EXAMINATION AND VERIFICATION OF CONTRACT
DOCUMENTS. The Contractor shall thoroughly examine and become familiar with all of the various parts of the Contract Documents and shall determine the nature and location of the Work, the general and local conditions (including applicable laws) and all other matters which can in any way affect the cost, progress or performance of the Work under this Agreement. Failure to make an examination necessary for this determination shall not release the Contractor from the obligations of the Agreement. No oral agreement or conversation with any officer, or employee

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 409 of 981 ends

GC – 2:3
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] of the City, or with the City’s designated representative either before or after the execution of the Agreement, shall affect or modify any of the terms or obligations contained in the Contract Documents.
2-1.04 CONTRACT DRAWINGS. The Contract Drawings consist of general drawings and show such plans, elevations, sections, details and schedules as are necessary to give a graphic and pictorial description of the contemplated construction. All authorized alterations affecting the requirements and information given on the Contract Drawings shall be in writing.
2-1.05 COORDINATION AND INTERPRETATION OF CONTRACT
DOCUMENTS. All Contract Documents are essential parts of the Contract, and a requirement occurring in one is as binding as though occurring in all. They are intended to be complementary, and to describe and provide for a complete Work.

In the event of inconsistencies between requirements contained in different components of the Contract Documents, the precedence of the Contract Documents shall be as follows to resolve conflicts:

1. Change Orders

2. The Contract (including Addenda)

3. The Supplemental Conditions

4. Specifications

5. Contract Drawings

6. The General Conditions
Should it appear that the Work to be done or any of the matters relative thereto are not sufficiently detailed or explained in the Contract Documents, the Contractor shall submit a

FOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 410 of 981 ends

GC – 2:4
[B:\City Attorney\agreement\form agreements\Project Manuals\buildings & grounds.docx; 1/4/2024] Request for Information (“RFI”) to the Director for such further explanations as may be necessary and shall conform to the written explanation given as if part of the Contract Documents. The decisions of the Director shall be final.

Contractor shall anticipate that it will be necessary to prepare and submit RFIs regarding the Contract Documents. The City will respond to each RFI by no later than fourteen (14) Days after receipt of the RFI, unless the RFI is of significant complexity. Furthermore, in the event that there are numerous RFIs pending, Contractor shall cooperate with the City in establishing a priority for responding to the RFIs, and potentially some RFIs may be responded to beyond the fourteen (14) Day period.

Each RFI prepared by Contractor shall be full and complete. Contractor shall prepare RFIs so as to not cause any delay to the progress of the Work and to not cause any impact to Contractor’s labor productivity in the field. Contractor shall not assert any Claims for delay or interference against the City if Contractor fails to timely submit any RFI to the City, after consideration of the response period allowed for by the City.

The response to an RFI shall not, by itself, constitute a writing that authorizes Contractor to perform any Work that causes an adjustment to either the Contract Price or the Contract Time.

If Contractor believes that any response to any RFI should constitute a compensable change, Contractor shall provide a Notice of Potential Claim as provided in Section 7-1.03, below.

Contractor’s failure to provide the required written notice shall constitute a waiver of the Contractor’s right to seek a compensable change based on the RFI response.

The Contractor shall examine all Contract Documents; shall verify all figures in the Contract Documents before laying out the Work; shall promptly notify the City of all errors, inconsistencies, and/or omissions that it discovers; and, in instances where such nonFOR COUNCIL APPROVAL ONLY - NOT FOR CONSTRUCTION

Page 411 of 981 ends