Staff Report - Approval of the 2022 Speed Lump Project (S15184100)

Sacramento City Council
August 23, 2022

Document
Staff Report - Approval of the 2022 Speed Lump Project (S15184100)
Meeting
August 23, 2022
Body
Sacramento City Council
Original file
1.7 MB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

City of Sacramento
City Council Report
915 I Street, 1st Floor
Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2022-01491 8/23/2022 Consent Item 05.

Approval of the 2022 Speed Lump Project (S15184100)
File ID: 2022-01491
Location: Citywide
Recommendation: Pass a Motion approving the 2022 Speed Lump Project.

Contact: LoAnna Hernandez, Senior Engineering Technician, (916) 808-2005, [email protected]; Megan Carter, Supervising Engineer, (916) 808-2522, [email protected], David Edrosolan, City Traffic Engineer, (916) 808-5974, [email protected]; Department of Public Works Presenter: None.

Attachments:
1-Description/Analysis
2-2022 Speed Lump Project Residential Locations
3-2022 Speed Lump Project School - Park Locations
4-2022 Speed Lump Project Locations Map
Description/Analysis
Issue Detail: The Speed Lump Project consists of the construction of asphalt speed lumps, sign installation, and striping to reduce vehicle speeds in residential neighborhoods. The streets are selected through traffic investigations and a voting process where residents are balloted for approval of speed lump installation.

Policy Considerations: The 2022 Speed Lump Project serves to enhance the quality of life within existing neighborhoods, using neighborhood traffic management techniques, as part of the Vision Zero Safety Program; while recognizing the City’s desire to provide a grid system that creates a high level of connectivity, consistent with General Plan Goal M 4.3.

Economic Impacts: None.

City of Sacramento Page 1 of 2
File ID: 2022-01491 8/23/2022 Consent Item 05.

Environmental Considerations: California Environmental Quality Act (CEQA): The Community Development Department, Environmental Planning Services Division, has reviewed the 2022 Speed Lump Project and has determined that the project is exempt from the provisions of the California Environmental Quality Act (CEQA) under Class 1, Section 15301. Projects exempted under Class 1, Section 15301(c), consist of the operation, repair, or minor alteration of existing highways, streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities involving negligible or no expansion of use. There would be no significant effect on the environment.

Sustainability: None.

Commission/Committee Action: None.

Rationale for Recommendation: The 2022 Speed Lump Project addresses speed reduction on residential streets which is encompassed in the City’s commitment to Vision Zero/Traffic Safety. One of the biggest factors in traffic related fatalities and serious injuries is speeding.

Speed lumps are one of the most cost-effective methods available to decrease vehicle speeds.

All locations included in the project were recently approved by a vote of residents and met the minimum 25 percent return rate and the two-thirds majority vote in favor of speed lump installation. The annual Speed Lump Project typically identifies at least one location per City Council District per year. Public Works increased the budgeted funding for the Speed Lump Project for FY22/23 to construct many more locations and address citywide speeding concerns.

Staff mailed ballots to residents and property owners along 40 street segments, including 11 locations adjacent to parks or schools. As a result of the resident voting process, the 2022 Speed Lump Project proposes to install speed lumps on 30 street segments, including 8 locations adjacent to parks or schools. Construction will be performed by City crews and is expected to begin in October 2022, if all materials can be readily obtained.

Financial Considerations: The estimated cost to complete the 2022 Speed Lump Project is $400,000 which includes asphalt speed lump construction, sign installation and striping by City crews. There is sufficient funding in the Vision Zero Safety Program (S15184100) to cover the estimated speed lump construction and signing and striping costs and complete the remaining program requirements. There are no General Funds planned or allocated for this project.

Local Business Enterprise (LBE): Not applicable.

City of Sacramento Page 2 of 2
Attachment 2
2022 Speed Lump Project
Residential Locations
Location
Council District (New District)
Between These Streets Lumps
1 (1) – Juneberry Road Del Paso Boulevard & North Breezy Meadow Drive
3 1 (1) – Golden Elm Street Red Alder Avenue & Golden Willow Avenue 2 1 (1) – Kalamer Way Macon Drive & Southern Curve 2
1 (3) – Prosper Road East Commerce Way & Beechcraft Way 3 2 (2) – South Avenue Mahogany Street & Astoria Street 5 2 (2) – Taylor Street Kesner Avenue & Ford Road 5
3 (3) – Azevedo Drive Osuna Way & Pebblewood Drive 5
3 (3) – Soda Way Mammoth Way & San Juan Road 3
3 (4) – 41st Street D Street & H Street 5
3 (4) – 54th Street J Street & M Street 3
4 (4) – N/A
5 (5) – Hogan Drive 54th Avenue & 57th Avenue 3
5 (5) – 33rd Street 9th Avenue & 12th Avenue 3
5 (5) – 57th Avenue 21st Street & Hogan Drive 3
5 (5) – Miller Way 39th Street & Stockton Boulevard 2
5 (7) – South Land Park Drive 43rd Avenue & 13th Street 4 5 (7) – South Land Park Drive 13th Street (N) & 14th Street 4 6 (6) – Wissemann Drive Merribrook Drive & Everglade Drive 4 6 (6) – McMahon Drive 63rd Street & 65th Street Expressway 2 6 (6) – Lake Forest Drive Notre Dame Drive & Occidental Drive 2 6 (6) – Lake Forest Drive End & Chestnut Hill Drive 3
7 (7) – South Land Park Drive Rio Mondego Drive & Greenhaven Drive 3 7 (8) – Hanford Way Grandstaff Drive & Bamford Drive 3
8 (8) – N/A
Total Speed Lumps 72
Attachment 3

2022 Speed Lump Project
School/ Park Locations

Location
Council District (New District)
Between These Streets Lumps
1 (1) – Northborough Drive West Elkhorn Boulevard & Rose Arbor Drive 3 1 (1) – Bonfair Ave Tynebourne Street & Duckhorn Drive 3 1 (3) – Endeavor Way Gloster Way & Innovator Drive 3
2 (2) – N/A
3 (3) – N/A
4 (4) – N/A
5 (5) – 5th Avenue 34th Street & 36th Street 2
5 (5) – 5th Avenue Franklin Boulevard & 34th Street 1
5 (5) – Y Street Broadway & 33rd Street 2
5 (5) – 33rd Street Y Street & Broadway 1
8 (8) – Whitehouse Road Masters Street & Sheldon Road 4

Total Speed Lumps 19

1 1
2 3
5 5 6
7 8

FLORIN RD
J ST
H ST

SOUTH WATT AV

EL CAMINO AV

FRANKLIN BL

FRUITRIDGE RD

GARDEN HY

ARDEN WY

FOLSOM BL

HOWE AV

FREEPORT B

POWER INN RD
14TH AV
P ST

BROADWAY

DEL PASO BL

RIO LINDA BL

AUBURN BL

RIVERSIDE BL

BELL AV

FULTON AV
E ST

CENTER PK

SAN JUAN RD

LAND PARK DR

GERBER RD

MARCONI AV
W ST
47TH AV

TRUXEL RD

ELDER CREEK RD

NORTHGATE BL

DRY CREEK RD

GRAND AV

MACK RD
7TH ST
RO
D

EL CENTRO RD

POCKET RD

KIEFER BL
21ST ST

NORWOOD AV

LA RIVIERA DR

ARENA BL

RALEY BL

SHELDON RD
K ST
12TH AV

ELSIE AV

SORENTO RD
3RD ST
16TH ST

JACINTO AV

NATOMAS BL
35TH AV

BRUCEVILLE RD
T ST

MAIN AV
CST
24TH ST

ALHAMBRA BL
ELV
ASAV

JACKSON RD
34TH ST

CALVINE RD
29TH ST
F ST

ARCADE BL

EXPOSITION BL

RICHARDS BL
S ST
65TH ST
2ND BP

NORTH MARKET BL

STOCKTON BL

AZEVEDO DR

CARLSON
DR

ETHAN WY
56TH ST
HAR

VARD ST

WINDING WY

CALVINE RD
14TH AV

WEST RIVER DR
S ST
12TH AV
47TH AV
12TH AVT ST
24TH ST

ELVAS AV
24TH ST

DEL PASO BL
21ST ST
F ST
K
2022 Speed Lump Locations
Attachment 4

BELL AV
EVILL

← All documents from this meeting