Staff Report - 2022 Combined Sewer System Pipe Removal and Replacement

Sacramento City Council
September 20, 2022

Document
Staff Report - 2022 Combined Sewer System Pipe Removal and Replacement
Meeting
September 20, 2022
Body
Sacramento City Council
Pages
4
Original file
75.1 MB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

City of Sacramento
City Council Report
915 I Street, 1st Floor
Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2022-01539 9/20/2022 Consent Item 14.
2022 Combined Sewer System Pipe Removal and Replacement [Two-Thirds Vote Required] File ID: 2022-01539
Location: District 4, 5, and 7
Recommendation: Pass a Motion: 1) by two-thirds vote waiving the requirement for 10-day posting of agreements over $1 million under City Code section 4.04.020(C) and Council Rules of Procedure Chapter 7, Section E.2.d; 2) approving the contract plans and specifications for the CY2022 CSS Rehabilitation Project (X14170100); 3) awarding the contract to Sub Terra Construction, Inc. for an amount not-to-exceed $1,347,569; and 4) authorizing the City Manager or City Manager’s designee to execute the construction contract with Sub Terra Construction, Inc.

Contact: Tim Moresco, Project Manager, (916) 808-1432, [email protected]; Brett Grant, Supervising Engineer, (916) 808-1413, [email protected]; Sherill Huun, Engineering & Water Resources Division Manager, (916) 808-1455, [email protected]; Department of Utilities
Presenter: None
Attachments:
1-Description/Analysis
2-Agreement
Description/Analysis
Issue Detail: Staff recommends Council award a construction contract to Subterra Construction Inc., to remove and replace roughly 3,000 linear feet of combined sewer pipeline, remove and replace manholes, drains, and sewer services at the following locations:
1) 24th Street (3rd avenue to Castro Way)
2) I Street (30th St to Alhambra Blvd)
3) I Street (33rd St to 35th St)
4) M Street/Folsom Blvd Alley
th
City of Sacramento Page 1 of 3
File ID: 2022-01539 9/20/2022 Consent Item 14.
5) Portola Way (26th St to Franklin Blvd)
6) 25th Street (Castro Way to Marshall Way)
These locations are all in need of repairs due to their age, deteriorated condition and poor structural integrity, lack of capacity, and increased maintenance schedules. Also, this project, which will include the upsizing of the pipe segments, will help achieve the goals of the City outlined in the Combined Sewer System Long Term Control Plan to eliminate outflows during a 10-year storm.

Policy Considerations: City Council approval is required to award construction contracts of $250,000 or more. The action requested conforms with City Code Chapter 3.60, Articles I and III, which provide for award of competitively bid contracts to the lowest responsible bidder.

Rehabilitation of aging and deteriorated sewer pipes is consistent with the criteria and goals set forth in the Department of Utilities’ Capital Improvement Programming Guide (such as rehabilitate, replace, and expand critical infrastructure to ensure reliability and safety of the City’s sewer system).

The Sacramento City Code Section 4.04.020 and Council Rules of Procedure (Chapter 7, Section E.2.d) mandate that, unless waived by a 2/3 vote of the City Council, all labor agreements and all agreements greater than $1,000,000 shall be made available to the public at least ten (10) days prior to council action.

Economic Impacts: This new infrastructure is expected to create 5.39 total jobs (3.10 direct jobs and 2.29 jobs through indirect and induced activities) and create $832,036.27 in total economic output ($524,438.82 of direct output and another $307,597.45 of output through indirect and induced activities).

The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER). CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical $1 million of spending in various construction categories within the City of Sacramento in an average one-year period. Actual impacts could differ significantly from the estimates and neither the City of Sacramento nor CSER shall be held responsible for consequences resulting from such differences.

Environmental Considerations:

California Environmental Quality Act (CEQA): The subject projects were reviewed and determined to be categorically exempt from the California Environmental Quality Act (CEQA).

The projects include replacing existing combined sewer mains (utility systems) involving negligible expansion of capacity (CEQA Guidelines Section 15302 (c)).

Sustainability: The proposed project is consistent with the 2035 General Plan Policy U 3.1.3 as it will rehabilitate and improve the existing combined sewer system (CSS) to decrease City of Sacramento Page 2 of 3
File ID: 2022-01539 9/20/2022 Consent Item 14.
flooding, CSS outflows and combined system overflows.

Commission/Committee Action: Not applicable.

Rationale for Recommendation: The project was advertised, and three bids were received and opened on August 3, 2022. Subterra Construction, Inc. was the lowest responsive bidder.

Contractor Amount
SubTerra Construction, Inc. $1,347,569.00
Lund Construction Co. $2,318,014.50
McGuire and Hester $2,543,975.00
The Engineer’s construction cost estimate was $1,606,345.

Financial Considerations: Sufficient funds exist in the Combined Collection System Rehabilitation and Replace Project (X14170100, Funds 6006 and 6321) to award a contract to Subterra Construction, Inc. for an amount not-to-exceed $1,347,569.

There are no General Funds allocated or planned for this project.

Local Business Enterprise (LBE): Subterra Construction Inc. is not an LBE but has partnered with Granite Construction Supply and GR Trucking, LLC for this project to exceed the minimum LBE participation requirement. Granite Construction Supply will provide trench backfill and street restoration material and GR Trucking will provide the Trucking services.

City of Sacramento Page 3 of 3
Addendum 1
_______________________________________________________________________________________________________

ENGINEERING SERVICES DIVISION

CONTRACT SPECIFICATIONS
FOR
CY-2022 CSS PIPE R&R
PN: X14170111
B23141321001
Engineer’s Estimate: $1,606,345
Separate Plans
Tim Moresco Bid to be received before 2:00 PM
Senior Engineer August 3, 2022
(916) 808-1432 New City Hall, Office of the City Clerk
915 I Street, 5th Floor, Mayor’s Reception Desk
Sacramento, CA 95814

LBE PROGRAM PARTICIPATION
For information on meeting the City of Sacramento’s Local Business Enterprise (LBE) project goals, please contact Procurement Services at (916) 808-6240, or visit the City of Sacramento’s small business web site at:
http://portal.cityofsacramento.org/Finance/Procurement/Bid-Information#bidding-options ________________________________________________________________________________________

_______________________________________________________________________________________________________

ENGINEERING SERVICES DIVISION

CONTRACT SPECIFICATIONS
FOR
CY-2022 CSS 3,3(R&R
PN: X14170111
B23141321001
Engineer’s Estimate: $1,506,345
Separate Plans
James Yorita Bid to be received before 2:00 PM
Associate Engineer August 3, 2022
(916) 808-1911 New City Hall, Office of the City Clerk
915 I Street, 5th Floor, Mayor’s Reception Desk
Sacramento, CA 95814

LBE PROGRAM PARTICIPATION
For information on meeting the City of Sacramento’s Local Business Enterprise (LBE) project goals, please contact Procurement Services at (916) 808-6240, or visit the City of Sacramento’s small business web site at:
http://portal.cityofsacramento.org/Finance/Procurement/Bid-Information#bidding-options ________________________________________________________________________________________

ENGINEERING & WATER RESOURCES 1395 35th AVENUE

DIVISION SACRAMENTO, CA
95822-2911

PH 916-808-1400
FAX 916-808-1497
CY-2022 CSS R&R
(PN: X14170111)
ADDENDUM #01
July 28, 2022
To All Potential Bidders:

Attached hereto are addenda items, which shall be incorporated into the Plans and Specifications for the above noted project. These changes shall be considered as part of the original documents, as if they were originally provided therein, and as such shall be used as contractual documents. All other terms, conditions, and specifications of the bid remain unchanged. Bidders must acknowledge receipt of this addendum prior to the hour and date specified for bids to be received by one of the following methods:
(a) By acknowledging receipt on the sealed proposal in the space provided. (b) By separate letter that includes a reference to the Project Name and the Addendum Number.

Failure to acknowledge receipt of this addendum in one of the above methods and cause acknowledgment to be received prior to the hour and date specified for receipt of proposals may result in rejection of your proposal. If by virtue of this addendum you decide to change a proposal already submitted, such change may be made by letter, provided such letter makes reference to the Project Name and this Addendum, and is received prior to the hour and date specified for receipt of proposals.

For any questions related to this addendum, contact the Project Manager, Tim Moresco at (916) 808- 1432.

Sincerely,

James Yorita, Associate Engineer
Addendum
Enclosure
cc: Distribution List
Planholders
26 Allow 100,000.00 Groundwater Dewatering $ 1 100,000.00 $ Item No. Description Units Unit Cost Est. Quantity Est.Total ADDENDUM NO. 01 DATE: July 28, 2022
CY-2022 CSS R&R
(PN: X14170111)

1. BID SCHEDULE
Added Bid Item No. 26 – Dewatering Allowance (ALLOW) of $100,000, as shown below:

2. ENGINEERS ESTIMATE
The Engineer’s Estimate is updated from $1,506,345.00 to $1,606,345.00.

3. SPECIAL PROVISIONS
The following items shall be added to the Special Provisions (Modifications are in gray, Deletions are denoted with the strikethrough):

Item No. 4 8-inch Combined Sewer Pipe to Burst

Where shown on the Plans and as directed by the Engineer, the existing 8-inch VCP combined sewer pipe shall be replaced with an 8-inch HDPE SDR 32.5 sewer pipe using static pipe bursting methods unless other approved by the Engineer. Sewer pipe connections to manholes shall be included in this bid item.

Payment shall be at the unit price bid per lineal foot (LF) of pipe replaced and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in replacing the existing pipe shown on the Plans using an approved pipe bursting method, as specified in these Special Provisions and as directed by the Engineer, including manhole preparation, launching pit excavation, excavation, sewer service/DI reinstatement by electrofusion saddles, temporary fence removal, removal of Fernco™ couplings, and any required surface restoration.

Pre- and post-construction CCTV inspections; excavation for launching pits; excavation, reinstatement, and backfill for sewer service/DI lead connections shall not be paid for under this bid item but shall be paid for under separate bid items.

Item No. 7 6” Asphalt Concrete Pave
This Item shall include all permanent paving and speed lumps associated with contract bid items for combined sewer pipe to place and shall be defined as permanent pavement placement.

Payment shall be at the unit price bid per TON for Hot Mix Asphalt (3/4”, Type A) and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in placing Hot Mix Asphalt (3/4”, Type A) including but not limited to placing, planing, cores, testing, 1 job mix formula fog seal, leveling and compacting material for HMA placement, as specified in the State Standard Specifications, the Plans, the CSSS, and as directed by the Engineer Item No. 26 Groundwater Dewatering
Groundwater dewatering shall be performed in accordance with Section 16-1 and Section 26-2 of the Standard Specifications and Section 3.08 of these Special Provisions. Work under this item shall include all permitting, pumping, electrical connection and power costs required to dewater areas to effectuate a safe construction site and provide an acceptable work surface for the placement and curing of structural concrete, piping and equipment, respectively. Work shall also include the treatment and disposal of any and all water removed as part of the process.

Groundwater dewatering will be considered an allowance item. Actual payments shall be based on actual quantities installed, in-place, as measured and/or verified by the Engineer.

Contractor shall plan to work collaboratively with the Engineer to control allowance costs and avoid impacts to the Progress Schedule. Contractor shall maintain accurate cost records which depict the total cost incurred for dewatering. Contractor shall monitor the dewatering item total costs to date and immediately report to the Engineer should the total cost to date reach 80% of the total allowance amount of any allowance item amount shown in above table. Should the total cost of any allowance item reach 80% of the total allowance amount budgeted, the Contractor shall quantify and forecast the cost to complete the remaining known allowance item tasks and submit this forecasted quantity and completion cost to the Engineer.

Payment shall be done so through an allowance (ALLOW) amount of up to $100,000.

The amount of money allocated to cover the actual costs of furnishing all labor, materials, tools, and equipment and performing all work necessary to complete this bid item. The Contractor shall not exceed the allowance amounts set forth in this contract without written approval of the City. Should the Contractor exceed the allowance amounts without the written approval of the City, the Contractor will be responsible for all costs greater than the allowance amounts shown in above table. The City understands and agrees that the final billing for Dewatering may be more or less than the figure specified in this Contract, and that any adjustments will be made through contract change order.

Attachments:

A. Updated Bid Schedule

REQUIRED DOCUMENT IN SEALED BID PROPOSAL
Contractor's Name:
(Please print)
Addendum 1

CITY OF SACRAMENTO

SEALED PROPOSAL
(MUST BE SIGNED BY BIDDER)
The Sealed Proposal will be received not later than August 3, 2022, at the Office of the City Clerk, New City Hall, at 915 I Street, 5th Floor, Mayor’s Reception Desk, up to the hour of 2:00 p.m. on August 3, 2022, and opened at and read after 2:30 p.m. on August 3, 2022, or as soon thereafter as business allows, for construction of:

TO THE HONORABLE CITY COUNCIL:

The undersigned hereby proposes and agrees to furnish any and all required labor, material, transportation, and services for
CY-2022 CSS R&R
(PN: X14170111) (B23141321001)
in the City and County of Sacramento, California.

TOTAL BID: ($ ).

The work herein described is to be performed in strict conformity with the Plans, City of Sacramento Standard Specifications (Resolution No. 89-216) and these Special Provisions, all as on file in the Office of the City Clerk, at the following unit prices.

Item
No.

Description Estimated
Quantity
Unit Unit Price Total
1 Mobilization 1 LS $__________ $______________
2 Traffic Control 1 LS $__________ $______________
3 Preconstruction Photographs 7 EA $__________ $______________ 4 8-inch Combined Sewer Pipe to Burst 160 LF $__________ $______________ 5 10-inch Combined Sewer Pipe to Place 2,083 LF $__________ $______________ 6 24-inch Combined Sewer Pipe to Place 678 LF $__________ $______________ 7 6" Asphalt Concrete Pave 267 TON $__________ $______________ 8 6" Concrete Alley/Driveway 1,716 SF $__________ $______________ 9 Abandon Existing Combined Sewer Main 1 LS $__________ $______________ 10 Manhole to Abandon 3 EA $__________ $______________
11 Manhole Base, to Reconstruct 3 EA $__________ $______________ 12 Manhole to Remove, Manhole No. 3 to
Construct
9 EA $__________ $______________
13 Manhole No. 3 to Construct 2 EA $__________ $______________ 14 Manhole No. 3A to Construct 1 EA $__________ $______________

REQUIRED DOCUMENT IN SEALED BID PROPOSAL
Item
No.

Description Estimated
Quantity
Unit Unit Price Total
15 Manhole with Junction Box 1 EA $__________ $______________ 16 Manhole to Remove, Manhole No. 4 to
Construct
2 EA $__________ $______________
17 Outside Drop Connection 2 EA $__________ $______________ 18 Sewer Service to Place/Replace/Reinstate 46 EA $__________ $______________ 19 Point Repairs 9 LF $__________ $______________
20 Drain Inlet No. 22 to Construct 5 EA $__________ $______________ 21 Drain Lead to Remove, 8-inch Drain Inlet Lead
to Install
130 LF $__________ $______________
22 Utility Potholing 1 LS $__________ $______________
23 CCTV Inspection 3,081 LF $__________ $______________ 24 Unmarked Utility Crossings 32 EA $__________ $______________ 25 Unsuitable Material, Removal, and Replacement 113 CY $__________ $______________ 26 Groundwater Dewatering 1 $OORZ $__________ $______________ TOTAL BID: $__________________
Addendum 1
Addendum 1
_______________________________________________________________________________________________________

ENGINEERING SERVICES DIVISION

CONTRACT SPECIFICATIONS
FOR
CY-2022 CSS PIPE R&R
PN: X14170111
B23141321001
Engineer’s Estimate: $1,606,345
Separate Plans
Tim Moresco Bid to be received before 2:00 PM
Senior Engineer August 3, 2022
(916) 808-1432 New City Hall, Office of the City Clerk
915 I Street, 5th Floor, Mayor’s Reception Desk
Sacramento, CA 95814

LBE PROGRAM PARTICIPATION
For information on meeting the City of Sacramento’s Local Business Enterprise (LBE) project goals, please contact Procurement Services at (916) 808-6240, or visit the City of Sacramento’s small business web site at:
http://portal.cityofsacramento.org/Finance/Procurement/Bid-Information#bidding-options ________________________________________________________________________________________

CY-2022 CSS3,3( R&R

TABLE OF CONTENTS

INVITATION TO BID

LBE INFORMATION

NOTICE TO CONTRACTORS

BAN THE BOX

DEPARTMENT OF INDUSTRIAL RELATIONS NEWSLINE

PROPOSAL FORMS (TO BE SUBMITTED BY ALL BIDDERS AS THE BID PAGE) Sealed Proposal
Bid Proposal Guarantee
Subcontractor and LBE Participation Verification
Drug-Free Workplace Policy and Affidavit
Minimum Qualifications Questionnaire
Requirements of the Non-Discrimination in Employee Benefits Code Construction and Demolition (C&D) Debris Recycling Requirements LBE Requirements (City Contracts no Federal Funds Used) CONTRACT FORMS (Only for successful Bidder)
Worker’s Compensation Insurance Certification
Agreement
Bonds
x Performance Bond
x Payment Bond
CWTA Requirements
C & D Waste Management Plan
C &D Debris Haulers & Facilities
C & D Debris Waste Log
Novel Coronavirus (COVID-19) Safety Requirements
ARTICLE 1 ʊCosts of Novel Coronavirus (COVID-19) Safety Requirements

CALIFORNIA LABOR CODE RELATING TO APPRENTICES
http://www.dir.ca.gov/dlse/dlsePublicWorks.html

TAX FORMS (REQUIRED UPON AWARD)
W-9 ........................ https://www.irs.gov/pub/irs-pdf/fw9.pdf CA Form 590 https://www.ftb.ca.gov/forms/2022/2022-590.pdf CA Form 587 ......... https://www.ftb.ca.gov/forms/2022/2022-587.pdf

SPECIAL PROVISIONS

LBE INFORMATION
The City of Sacramento’s Local Business Development program establishes an annual local business enterprise (LBE) participation goal for City contracts, and authorizes City departments to require minimum LBE participation levels in individual contracts. Under City Code section

3.60.270, all bidding contractors must meet or exceed the minimum LBE participation requirement specified in the contract’s bid specifications to qualify as a responsive bidder.

For information on meeting the City of Sacramento’s Local Business Enterprise (LBE) project goals, please contact Procurement Services at (916) 808-6240, or visit the City of Sacramento’s small business web site at: http://portal.cityofsacramento.org/Finance/Procurement/BidInformation#bidding-options

NOTICE TO CONTRACTORS

CITY OF SACRAMENTO
Sealed Proposals will be received by the City Clerk of the City of Sacramento at the Office of the City Clerk, New City Hall, located at 915 I Street, 5th Floor, Mayor’s Reception Desk, up to the hour of 2:00 p.m. on August 3, 2022 and opened at and read after 2:30 p.m. on August 3, 2022, or as soon thereafter as business allows, for construction of:

CY-2022 CSS3,3( R&R
(PN: X14170111) (B23141321001)
as set forth in the Contract Documents.

Proposals received and work performed thereunder shall comply with the requirements of Chapter 3.60 of the Sacramento City Code. Each Bid Proposal shall be accompanied by bid security of at least 10% of the sum the Bid Proposal. The City reserves the right to reject proposals or to waive any error or omission in any Bid Proposal received. Signed proposals shall be submitted on the printed forms contained herein and enclosed in an envelope marked:

SEALED PROPOSAL FOR
CY-2022 CSS 3,3(R&R
(PN: X14170111) (B23141321001)
You can view and download the plans and Contract Documents from:

PLANET BIDS
http://www.planetbids.com/portal/portal.cfm?CompanyID=15300# The contractor and all subcontractors shall comply with the rates of wages currently established by the Director of Industrial Relations under provisions of Sections 1773 of the Labor Code of the State of California, a copy of which is on file in the office of the City Clerk and available to any interested party on request. In accordance with Sacramento City Code Section 3.60.180 and Section 1771.5 of the California Labor Code, the payment of the general prevailing rate of per diem wages or the general prevailing rate of per diem wages for holiday and overtime is not required for any construction project of $25,000 or less, or an alteration, demolition, repair, and maintenance project of $15,000 or less. The City of Sacramento has an approved Labor Compliance Program. The City uses an electronic system for the submission of Labor Compliance Reports, which became effective May 1, 2007. The contractor and every lower-tier subcontractor shall submit certified payrolls and labor compliance documentation electronically at the discretion of and in the manner specified by the City of Sacramento.

Electronic submittal is via a web-based system, accessed on the World Wide Web by a web browser. Each contractor and subcontractor is given a Log On identification and password to access the City of Sacramento’s reporting system.

Use of the system may entail additional data entry of weekly payroll information including employee identification, labor classification, total hours worked and hours worked on this project, wage and benefit rates paid, etc. The contractor’s payroll and accounting software might be capable of generating a ‘comma delimited file’ that will interface with the software.

Department of Industrial Relations Registration and Reporting Requirements (SB 854) Labor Code Section 1725.5 (enacted by SB 854) requires all contractors bidding on this contract, all subcontractors listed in a bid for this contract, and any contractor or subcontractor performing any work under this contract, to be currently registered with the California Department of Industrial Relations (DIR), as specified in Labor Code Section 1725.5. Labor Code Section 1771.1 (enacted by SB 854) provides that a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal (subject to the requirements of Section 4104 of the Public Contract Code), or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5. Every bidding contractor shall list the contractor’s current DIR registration number, and the current DIR registration number of all listed subcontractors, on the Subcontractor and Local Business Enterprise (LBE) Participation Verification Form included in the contractor’s bid.

Pursuant to Labor Code Section 1771.1(b): (1) any bid received from a contractor that is not currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5 shall be rejected as non-responsive; and (2) any bid listing one or more subcontractors on the bidder’s Subcontractor and Local Business Enterprise (LBE) Participation Verification Form that are not currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5, shall be rejected as nonresponsive, unless the listing was an inadvertent error and any of the conditions specified in Labor Code Section 1771.1(c) apply.

This contract also is subject to compliance monitoring and enforcement by the DIR. For all contracts awarded on or after April 1, 2015, California Labor Code Section 1771.4 (enacted by SB 854) requires the contractor and all subcontractors to furnish electronic payroll records directly to the Labor Commissioner (in addition to City staff via the City’s electronic system).

A Fact Sheet summarizing the provisions of SB 854 is attached. This is provided solely for informational purposes, and does not in any way affect the contractor’s and subcontractors’ obligation to comply in all respects with the provisions of SB 854, including the provisions referenced above, as well as all other applicable laws and regulations.

The contractor shall disseminate these provisions to every lower-tier subcontractor and vendor required to provide labor compliance documentation.

All questions regarding the City’s Labor Compliance Program should be directed to the Department’s contracts staff or the Labor Compliance Officer at (916) 808-4011.

Pursuant to Sacramento City Code Section 3.60.190, all contractors and subcontractors shall comply with Section 1777.5 et seq., of the California Labor Code governing the employment of apprentices. Pursuant to Sacramento City Code Section 3.60.250 and Public Contract Code Section 22300, any contract awarded pursuant to this invitation to bid shall contain a provision permitting the substitution of securities for monies withheld to ensure performance under the contract, in accordance with the requirements and form specified by the City.

Bid protests must be filled and maintained in accordance with the provisions of Sections 3.60.460 through

3.60.560 of the Sacramento City Code. Bid protests that do not comply with Sections 3.60.460 through

3.60.560 of the Sacramento City Code shall be invalid and shall not be considered. A bid protest fee of $750.00 is required at the time of filing. The term "bid protest" includes any bid protest that (1) claims that one or more bidders on this contract should be disqualified or rejected for any reason, (2) contests a City staff recommendation to award this contract to a particular bidder, or (3) contests a City staff recommendation to disqualify or reject one or more bidders on this contract. A copy of Sections 3.60.460 through 3.60.560 of the Sacramento City Code may be obtained from the Project Manager, or from the City Clerk, located at 915 I Street, 5th Floor, Sacramento, CA 95814.

The Project Manager’s contact information is:

James Yorita, Department of Utilities, Engineering & Water Resource Division 1395 35th Avenue, Sacramento, CA 95822
Phone: (916) 808-1911 / Fax: (916) 808-1497/Email [email protected]

BAN-THE-BOX REQUIREMENTS

INTRODUCTION
On September 6, 2016, the City of Sacramento enacted an ordinance regarding criminal conviction information in the employment application process (the “Ban-the-Box Ordinance”), which added Chapter 3.62 to the Sacramento City Code and amended Section 2.40.050 of the Sacramento City Code. The Ban-the-Box Ordinance prohibits “covered employers” from asking an applicant for employment to disclose, orally or in writing, information concerning the criminal conviction history of the applicant, including any inquiry about criminal conviction history on any employment application, until the employer has determined the applicant meets the minimum employment qualifications stated in any notice issued for the position.

APPLICATION
“City Contract”
The Ban-the-Box Ordinance applies to all “city contracts.” The term “city contract” means a contract awarded after January 1, 2017 to a “covered employer” for services or a public project in return for compensation of $250,000 or more. The term “city contract” includes contracts for services or public projects that were awarded for an amount less than $250,000 but were amended to increase the total compensation to $250,000 or more.

The Ban-the-Box Ordinance also applies when the aggregate value of all contracts for services or public projects the City has awarded to the same “covered employer” within the previous 12 months is $250,000 or more.

The Ban-the-Box Ordinance does not apply to: (1) contracts awarded by the City Manager in response to an emergency; and (2) contracts for the purchase or lease of equipment, supplies, or other personal property, even if they include incidental services such as delivery, installation, or maintenance. “Covered Employer”
The Ban-the-Box Ordinance only applies to “covered employers.” The term “covered employer” means a person who is a party to a “city contract” and has at least 20 employees working either full or part time. The number of employees that a contractor has is determined by adding the contractor’s employees and the employees of any “related person.” A person is a “related person” when any of the following circumstances exists:
(1) The person and the person that is a party to a “city contract” are both corporations and:

(a) Share a majority of members of their governing boards; or (b) Have two or more officers in common; or
(c) Are controlled by the same majority shareholder or shareholders (control means more than 50% of the corporation’s voting power); or
(d) Are in a parent-subsidiary relationship (such a relationship exists when one corporation directly or indirectly owns shares possessing more than 50% of another corporation’s voting power). (2) The person otherwise controls and directs, or is controlled and directed by, the person that is a party to a city contract, as determined by the City Manager, or City Manager designee.

The term “covered employer” includes a subcontractor providing services under a “city contract” if the subcontractor has at least 20 employees, whether full- or part-time, or the amount of the subcontract is at least 25% of the amount of the “city contract.”
The term “covered employer” does not include any unit of federal, state or local government.

Exceptions
The Ban-the-Box Ordinance provisions do not apply to: (1) a position for which a “covered employer” is otherwise required by law to conduct a criminal conviction history background check; or (2) a position that will not involve work pursuant to a “city contract.” Additionally, the BanͲtheͲBox Ordinance does not prevent a “covered employer” from conducting a criminal conviction history background check in subsequent stages of the application process after initially determining whether the applicant meetsthe minimum employment qualifications.

COMPLIANCE
It is the contractor’s responsibility to determine whether the aggregate value of $250,000 or more has been met, and to notify the City in writing whenever this is the case. It is also the contractor’s responsibility to ensure that all of its subcontractors who are covered by the Ban-the-Box Ordinance comply with the provisions of the Ban-the-Box Ordinance by including these requirements in all subcontracts covered by the Ban-the-Box Ordinance.

VIOLATIONS AND MONITORING
The Ban-the-Box Ordinance provides that any violation of the Ban-the-Box Ordinance by a “covered employer” constitutes a material breach of the contract, and authorizes the City to terminate the contract. The City may also enforce the Ban-the-Box Ordinance by investigating any alleged violation (but any failure of the City to investigate does not create a right of action against the City). The City may further require “covered employers” to verify compliance.

ADDITIONAL INFORMATION
For a complete description of the Ban-the-Box Ordinance provisions related to City contracts, refer to the Banthe-Box Ordinance, codified at Sacramento City Code Chapter 3.62. The Sacramento City Code is available on the internet at www.cityofsacramento.org.

For more information on the City’s Ban-the-Box Ordinance, contact Procurement Services at 916-808-6240 or email [email protected].

THE FOLLOWING DOCUMENTS

ARE TO BE COMPLETED AND

SUBMITTED WITH THE BID PACKAGE

FOLLOWING FORMS TO BE FILLED OUT AND SIGNED
ONLY

IF AWARDED CONTRACT

Form approved by City Attorney 1Ͳ11Ͳ17 2

3. AGREEMENT CONTROLS
In the event of a conflict between any of the terms and conditions set forth in this Agreement and the terms and conditionsset forth in other Contract Documents, the terms and conditions set forth in this Agreementshall prevail, except that the provisions of any duly authorized change ordershall prevail over any conflicting provisions of this Agreement.

4. SCOPE OF CONTRACT
Contractor agrees to furnish all tools, equipment, apparatus, facilities, labor, material and transportation necessary to perform and complete in a good and workmanlike manner to the satisfaction of City, all the Work called for in the Contract Documents entitled:

CYͲ2022 CSS R&R (PN:X14170111)
Including the Work called for in the following alternative bid items described in the Proposal Form:
__________________________________________________________________________ Contractor agrees to perform such Work in the manner designated in and in strict conformity with the Contract Documents.


5. CONTRACT AMOUNT AND PAYMENTS
City agrees to pay and Contractor agrees to accept, as complete payment for the above Work, in accordance with the schedule and procedures set forth in the Contract Documents and subject to deductions, withholdings and additions as specified in the Contract Documents, a total sum that shall not exceed the total bid amount set forth in Contractor’s Proposal Form.In addition, subject to deductions, withholdings and additions as specified in the Contract Documents, payment for individual items of the Work shall be computed as follows: A. For items of the Work for which a lump sum price isspecified in Contractor’s Proposal Form, Contractor shall be paid the lump sum price(s) specified in Contractor’s Proposal Form; and B. For items of the Work for which a unit price is specified in Contractor’s Proposal Form, Contractor shall be paid the sum computed at such unit price, or computed at a different price if such different price is determined by City in accordance with the Standard Specifications, based on the actual amount of each such item performed and/or furnished and incorporated in the Work; provided that in no event shall the total sum for a unit price item exceed the total bid amount set forth for such item in the Contractor’s Proposal Form, unless authorized by Change Order.

6. PROGRESS PAYMENTS
Subject to the terms and conditions of the Contract, City shall cause payments to be made upon demand of Contractor as follows:

A. On or about the first of the month, the Engineershall present to the Contractor a statement showing the amount of labor and materialsincorporated in the Work through the twentieth (20) calendar day of the preceding month.After both Contractor and Engineer approve the Form approved by City Attorney 1Ͳ11Ͳ17 3
statement in writing, and the City’s labor compliance officer provides written approval, the City shall issue a certificate for ninetyͲfive (95) percent of the amount it shall find to be due, subject to any deductions or withholdings authorized or required under the Contract or any applicable Laws or Regulations.
B. No inaccuracy or error in said monthly estimates shall operate to release Contractor from damages arising from such Work or from enforcement of each and every provision of the Contract Documents, and City shall have the right subsequently to correct any error made in any estimate for payment.

C. Contractor shall not be paid for any defective or improper Work.

D. The remaining five (5) percent of the value of the Work performed under the Contract, if unencumbered and subject to any deductions or withholdings authorized or required under the Contract or any applicable Laws or Regulations, shall be released not later than sixty (60) days after completion and final acceptance of the Work by City.

Acceptance by Contractor of the final payment shall constitute a waiver of all claims against the City arising under the Contract Documents, except for disputed claims in stated amounts that the Contractor specifically reserves in writing, but only to the extent that the Contractor has complied with all procedures and requirements applicable to the presentation and processing of such claim(s) under the Contract Documents. Contractor shall be entitled to substitute securities for retention or to direct that payments of retention be made into escrow, as provided in Public Contract Code Section 22300, upon execution of the City’s Escrow Agreement for Security Deposits in Lieu of Retention.

E. The parties agree that, for purposes of the timely progress payment requirementsspecified in Public Contract Code Section 20104.50, the date that the City receives a statement jointly approved by the Contractor and the Engineer as provided above shall be deemed to constitute the date that City receives an undisputed and properly submitted payment request from the Contractor.Progress payments not made within 30 days after this date may be subject to payment of interest as provided in Public Contract Code Section 20104.50.

F. This Contract is subject to compliance monitoring and enforcement by the California Department of Industrial Relations, as specified in California Labor Code section 1771.4.

7. RETENTION OF SUMS CHARGED AGAINST CONTRACTOR
When, under the provisions of this Contract or any applicable Laws or Regulations, City is authorized or required to withhold, deduct or charge any sum of money against Contractor, City may deduct and retain the amount ofsuch charge from the amount of the nextsucceeding progress estimate(s), or from any other moneys due or that may become due Contractor from City.If, on completion or termination of the Contract, sums due Contractor are insufficient to pay City's charges, City shall have the right to recover the balance from Contractor or its Sureties.

8. COMMENCEMENT AND PROSECUTION OF WORK
Contractor shall commence the Work not later than fifteen (15) working days after the date of the written Notice to Proceed from City to Contractor and shall diligently prosecute the Work to final Form approved by City Attorney 1Ͳ11Ͳ17 4
completion.The phase “commence the Work” means to engage in a continuous program onͲsite including, but not limited to, site clearance, grading, dredging, land filling and the fabrications, erection, or installation of the Work.The Notice to Proceed shall be issued within fifteen (15) calendar days following execution of the Agreement by the City and the filing by Contractor of the required Bonds and proof of insurance, provided that the Engineer may delay issuance of the Notice to Proceed if the Engineer determines in the Engineer’s sole discretion that conditions on the site of the Work are unsuitable for commencement of the Work.After the Notice to Proceed is issued, the continuous prosecution of Work by Contractor shall be subject only to Excusable Delays as defined in this Agreement.

9. TIME OF COMPLETION
The entire Work shall be brought to completion in the manner provided for in the Contract Documents on or before __165 (one hundred sixty five)____working days from the date of the Notice to Proceed (hereinafter called the “Completion Date”) unless extensions of time are granted in accordance with the Contract Documents.

Failure to complete the entire Work by the Completion Date and in the manner provided for in the Contract Documentsshallsubject Contractor to liquidated damages as provided in this Agreement. Time is and shall be of the essence in the performance of the Contract and the Work.

10. PAYMENTS DO NOT IMPLY ACCEPTANCE OF WORK
The payment of any progress payment, or the acceptance thereof by Contractor, shall not constitute acceptance of the Work or any portion thereof and shall in no way reduce the liability of Contractor to replace unsatisfactory work or material, whether or not the unsatisfactory character of such work or material was apparent or detected at the time such payment was made.

11. ACCEPTANCE NOT RELEASE
Contractor shall correct immediately any defective or imperfect work or materials that may be discovered before final acceptance of the entire Work, whether or not such defect or imperfection was previously noticed or identified by the City.The inspection of the Work, or any part thereof, shall not relieve Contractor of any of its obligations to perform satisfactory work as herein specified.

Failure or neglect on the part of City or any of its officers, employees or authorized agents to discover, identify, condemn or reject defective or imperfect work or materials shall not be construed to imply an acceptance of such work or materials, if such defect or imperfection becomes evident at any time prior to final acceptance of the entire Work, nor shall such failure or neglect be construed as barring City from enforcing Contractor’s warranty(ies) or otherwise recovering damages or such a sum of money as may be required to repair or rebuild the defective or imperfect work or materials whenever City may discover the same, subject only to any statutes of limitation that may apply to any such claim.

12. CITY'S RIGHT TO TAKE POSSESSION OF THE WORK IN WHOLE OR IN PART The City shall have the right at any time to enter upon the Work and perform work not covered by this Contract, or to occupy and use a portion of the Work, prior to the date of the final acceptance Form approved by City Attorney 1Ͳ11Ͳ17 5
of the Work as a whole, without in any way relieving Contractor of any obligations under this Contract.

13. NO WAIVER OF REMEDIES
Neither the inspection by City, its officers, employees or agents, nor any certificate or other approval for the payment of money, nor any payment for, nor acceptance of the whole or any part of the Work by City, nor any extensions of time, nor any position taken by City, its officers, employees or its agents shall operate as a waiver of any provision of the Contract Documentsnor of any power herein reserved to City or any right to damages herein provided, nor shall any waiver of any breach of this Agreement be held to be a waiver of any other or subsequent breach.All remedies provided in the Contract Documents shall be taken and construed as cumulative; in addition to each and every other remedy herein provided, the City shall have any and all equitable and legal remedies that it would in any case have.

14. WARRANTY
Except as otherwise expressly provided in the Contract Documents, and excepting only items of routine maintenance, ordinary wear and tear and unusual abuse or neglect by City, Contractor warrants and guarantees all Work executed and all supplies, materials and devices of whatsoever nature incorporated in or attached to the Work, or otherwise provided as a part of the Work pursuant to the Contract, to be absolutely free of all defects of workmanship and materials for a period of one year after final acceptance of the entire Work by the City.Contractor shall repair or replace all work or material, together with any other work or material that may be displaced or damaged in so doing, that may prove defective in workmanship or material within this one year warranty period without expense or charge of any nature whatsoever to City. In the event that Contractor shall fail to comply with the conditions of the foregoing warranty within ten (10) days after being notified of the defect in writing, City shall have the right, but shall not be obligated, to repair, or obtain the repair of, the defect and Contractor shall pay to City on demand all costs and expense of such repair.Notwithstanding anything herein to the contrary, in the event that any defect in workmanship or material covered by the foregoing warranty results in a condition that constitutes an immediate hazard to public health or safety, or any property interest, or any person, City shall have the right to immediately repair, or cause to be repaired, such defect, and Contractor shall pay to City on demand all costs and expense of such repair.The foregoing statement relating to hazards to health, safety or property shall be deemed to include both temporary and permanent repairs that may be required as determined in the sole discretion and judgment of City.

In addition to the above, the Contractor shall make a written assignment of all manufacturer’s and other product warranties to the City, prior to completion and final acceptance of the Work by City.

The Contractor’s Performance Bond shall secure the performance of the Contractor’s obligations under this Section 14, and the Contractor and its Surety shall be jointly and severally liable for these obligations.

15. LIQUIDATED DAMAGES IF WORK NOT COMPLETED ON TIME
Form approved by City Attorney 1Ͳ11Ͳ17 6
A. The actual fact of the occurrence of damages and the actual amount of the damages that City would suffer if the entire Work, and/or any specified portion thereof, were not completed within the time(s)specified herein are dependent upon many circumstances and conditionsthat could prevail in various combinations, and for thisreason, it isimpracticable and extremely difficult to fix the actual damages.Damages that City would suffer in the event of such delay include: loss of the use of the project; expenses of prolonged assignment to the project of an architectural and/or engineering staff; prolonged costs of administration, inspection, and supervision; increased operational expenses and/or impaired operation of other facilities dependent upon completion of the project; and the loss and inconvenience suffered by the public within the City of Sacramento by reason of the delay in the completion of the project or portion thereof. Accordingly, the parties agree, and by execution of this Agreement, Contractor acknowledges that it understands and agrees, that the amount(s) set forth herein as liquidated damages reflect the parties’ best efforts at the time of entering into the Contract to estimate the damages that may be incurred by City and the public due to the Contractor’s delay in completion of the Work and/or any specified portion thereof, andshall be presumed to be the amount of damages sustained by the failure of Contractor to complete the entire Work and/or any specified portion thereof within the time(s) specified herein. B. Contractor shall pay liquidated damages to City for failure to complete the entire Work by the Completion Date (as extended in accordance with the Contract Documents, if applicable) in the amount of __One Thousand Five Hundred Dollars ($1,500.00)____ for each calendar day after the Completion Date (as extended in accordance with the Contract Documents, if applicable), continuing to the time at which the entire Work is completed. Such amount is the actual cash value agreed upon by the City and Contractor as the loss to City and the public resulting from Contractor's default. The parties agree, and by execution of this Agreement, Contractor acknowledges that it understands and agrees, that the foregoing provisions provide for the imposition of liquidated damages from the Completion Date (as extended in accordance with the Contract Documents, if applicable) until the date of completion of the entire Work as determined by the Engineer in accordance with Section 8Ͳ4 of the Standard Specifications, whether or not the Work or any portion thereof is claimed or determined to be substantially complete prior to such date of completion.
C. In the event Contractor shall become liable for liquidated damages, City, in addition to all other remedies provided by law, shall have the right to withhold any and all payments that otherwise would be or become due Contractor until the liability of Contractor under this section is finally determined.City shall have the right to use and apply such payments, in whole or in part, to reimburse City for all liquidated damages due or to become due to City. Any remaining balance of such payments shall be paid to Contractor only after discharge in full of all liability incurred by Contractor under thissection or otherwise under any provision of the Contract Documents or any applicable Law or Regulation.If the sum so retained by City is not sufficient to discharge all such liabilities of Contractor, Contractor shall continue to remain liable to City until all such liabilities are satisfied in full.No failure by City to withhold any payment as specified above shall in any manner be construed to constitute a release of any such liabilities nor a waiver of the City’s right to withhold payment for such liabilities.
Form approved by City Attorney 1Ͳ11Ͳ17 7

16. INDEMNITY AND HOLD HARMLESS
A. Contractor shall defend, hold harmless and indemnify the City, its officers, employees, and agents, and each and every one of them, from and against any and all actions, damages, costs, liabilities, claims, demands, losses, judgments, penalties, costs and expenses of every type and description, whether arising on or off the site of the Work, including, but not limited to, any fees and/or costs reasonably incurred by City’s staff attorneys or outside attorneys and any fees and expenses incurred in enforcing this provision (hereafter collectively referred to as “Liabilities”), including but not limited to Liabilities arising from personal injury or death, damage to personal, real or intellectual property or the environment, contractual or other economic damages, or regulatory penalties, arising out of or in any way connected with performance of or failure to perform the Work by the Contractor, any subcontractor or agent, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, whether or not (i) such Liabilities are caused in part by a party indemnified hereunder, or (ii) such Liabilities are litigated, settled or reduced to judgment; provided that the foregoing indemnity does not apply to liability for damages for death or bodily injury to persons, injury to property, or other loss, damage or expense to the extent arising from (i) the sole negligence or willful misconduct of, or defects in design furnished by, City, its agents, servants, or independent contractors who are directly responsible to City, or (ii) the active negligence of City.

B. The existence or acceptance by City of any of the insurance policies or coverages described in this Agreement shall not affect or limit any of City’s rights under this Section 16, nor shall the limits of such insurance limit the liability of Contractor hereunder.The provisions of this Section 16 shall survive any expiration or termination of the Contract.

17. CONTRACTOR SHALL ASSUME RISKS
Until the completion and final acceptance by City of all Work under this Contract, the Work shall be under Contractor's responsible care and charge, and Contractor, at no cost to City, shall rebuild, repair, restore and make good all injuries, damages, reͲerections, and repairs occasioned or rendered necessary by accidental causes of any nature, to all or any portions of the Work.

18. GENERAL LIABILITY OF CONTRACTOR
Except as otherwise herein expressly stipulated, Contractor shall perform all the Work and furnish all the labor, materials, tools, equipment, apparatus, facilities, transportation, power and light, and appliances, necessary or proper for performing and completing the Work herein required in the manner and within the time herein specified. The mention of any specific duty or liability of Contractor shall not be construed as a limitation or restriction of any general liability or duty of Contractor, and any reference to any specific duty or liability shall be construed to be solely for the purpose of explanation.

19. INSURANCE 
During the entire term of the Contract, Contractor shall maintain the insurance coverage described in this Section 19.
Form approved by City Attorney 1Ͳ11Ͳ17 8
Full compensation for all premiums that Contractor is required to pay for the insurance coverage described herein shall be included in the compensation specified for the Work performed by Contractor under this Contract.No additional compensation will be provided for Contractor’s insurance premiums.Any available insurance proceeds in excess of the specified minimum limits and coverages shall be available to the City.

It is understood and agreed by the Contractor that its liability to the City shall not in any way be limited to or affected by the amount of insurance coverage required or carried by the Contractor in connection with this Contract.

A. Minimum Scope & Limits of Insurance Coverage
(1) Commercial General Liability Insurance providing coverage at least as broad as ISO CGL Form 00 01 on an occurrence basis for bodily injury, including death, of one or more persons, property damage, and personal injury, arising out of activities performed by or on behalf of Contractor and its subcontractors, products and completed operations of Contractor and its subcontractors, and premises owned, leased, or used by Contractor and its subcontractors, with limits of not less than one million dollars ($1,000,000) per occurrence. The policy shall provide contractual liability and products and completed operations coverage for the term of the policy.
(2) Automobile Liability Insurance providing coverage at least as broad as ISO Form CA 00 01 for bodily injury, including death, of one or more persons, property damage, and personal injury, with limits of not less than one million dollars ($1,000,000) per accident.The policy shall provide coverage for owned, nonͲ owned, and/or hired autos as appropriate to the operations of the Contractor. No automobile liability insurance shall be required if Contractor completes the following certification:
“I certify that a motor vehicle will not be used in the performance of any work or services under this agreement.” ________ (Contractor initials) (3) Excess Insurance: The minimum limits of insurance required above may be satisfied by a combination of primary and umbrella or excess insurance coverage; provided that any umbrella or excess insurance shall contain, or be endorsed to contain, a provision that it shall apply on a primary basis for the benefit of the CITY, and any insurance or selfͲinsurance maintained by CITY, its officials, employees, or volunteers shall be in excess of such umbrella or excess coverage and shall not contribute with it.
(4) Workers’ Compensation Insurance with statutory limits, and Employers’ Liability Insurance with limits of not less than one million dollars ($1,000,000). The Form approved by City Attorney 1Ͳ11Ͳ17 9
Workers’ Compensation policy shall include a waiver of subrogation in favor of the City.
No Workers’ Compensation insurance shall be required if Contractor completes the following certification:
“I certify that my business has no employees, and that I do not employ anyone. I am exempt from the legal requirements to provide Workers' Compensation insurance.”_________ (Contractor initials) B. Additional Insured Coverage
(1) Commercial General Liability Insurance: The City, its officials, employees, and volunteers shall be covered by policy terms or endorsement as additional insureds as respects general liability arising out of: activities performed by or on behalf of Contractor and itssubcontractors; products and completed operations of Contractor and its subcontractors; and premises owned, leased, or used by Contractor and its subcontractors.
(2) Automobile Liability Insurance:The City, its officials, employees, and volunteers shall be covered by policy terms or endorsement as additional insureds as respects auto liability.
C. Other Insurance Provisions
The policies are to contain, or be endorsed to contain, the following provisions:

(1) Contractor’s insurance coverage, including excess insurance, shall be primary insurance as respects City, its officials, employees, and volunteers. Any insurance or selfͲinsurance maintained by City, its officials, employees, or volunteers shall be in excess of Contractor’s insurance and shall not contribute with it.
(2) Any failure to comply with reporting provisions of the policies shall not affect coverage provided to City, its officials, employees, or volunteers. (3) Coverage shall state that Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
(4) City will be provided with thirty (30) days written notice of cancellation or material change in the policy language or terms.
D. Acceptability of Insurance
Insurance shall be placed with insurers with a Bests’ rating of not less than A:VI.SelfͲ insured retentions, policy terms or other variations that do not comply with the requirements of this Section 3 must be declared to and approved by the City in writing Form approved by City Attorney 1Ͳ11Ͳ17 10
prior to execution of this Contract.

E. Verification of Coverage
(1) Contractor shall furnish City with certificates and required endorsements evidencing the insurance required.Copies of policies shall be delivered to the City on demand. Certificates of insurance shall be signed by an authorized representative of the insurance carrier.
(2) For all insurance policy renewals during the term of this Contract, Contractor shall send insurance certificates reflecting the policy renewals directly to: City of Sacramento
c/o EXIGIS LLC
P.O. Box 947
Murrieta, CA 92564
Insurance certificates also may be faxed to (888) 355Ͳ3599, or eͲmailed to: certificatesͲ[email protected]
(3) The City may withdraw its offer of contract or cancel this Contract if the certificates of insurance and endorsements required have not been provided prior to execution of this Contract. The City may withhold payments to Contractor or cancel the Contract if the insurance is canceled or Contractor otherwise ceases to be insured as required herein.

F. Subcontractors
Contractor shall require and verify that all subcontractors maintain insurance coverage that meets the minimum scope and limits of insurance coverage specified in subsection A, above.


20. FAILURE TO MAINTAIN BONDS OR INSURANCE
If, at any time during the performance of this Contract, Contractor fails to maintain any item of the bonds and/or insurance required under the Contract in full force and effect, Contractor shall immediately suspend all work under the Contract and notify City in writing of such failure.After such notice is provided, or if City discovers such failure and notifies Contractor, the City thereafter may withhold all Contract payments due or that become due until notice is received by City that such bonds and/or insurance have been restored in full force and effect and that the premiums therefor have been paid for a period satisfactory to the Division of Risk Management.Contractor shall not resume work until notified by City to do so, and the City shall have no responsibility or liability for any costs incurred by Contractor as a result of such suspension of Work. In addition to the foregoing, any failure to maintain any item of the required bonds and/or insurance at any time during the performance of this Contract will be sufficient cause for termination of the Contract by City.
Form approved by City Attorney 1Ͳ11Ͳ17 11
The Contractor shall be solely responsible for, and shall defend, indemnify and hold harmless the City, its officers, employees and agents against and from, any and all damages, claims, losses, actions, costs or other expenses of any kind incurred by any party as a direct or indirect result of any suspension of Work or termination of the Contract under the provisions of this Section.

21. EXCUSABLE DELAYS
For the purpose of these Contract Documents, the term "Excusable Delay" shall mean, and is limited to, delay caused directly by: acts of God; acts of a public enemy; fires; inclement weather as determined by the Engineer; riots; insurrections; epidemics; quarantine restrictions; strikes; lockouts; sitdowns; acts of a governmental agency; priorities or privileges established for the manufacture, assemble, or allotment of materials necessary in the Work by order, decree or otherwise of the United States or by any department, bureau, commission, committee, agent, or administrator of any legally constituted public authority; changes in the Work ordered by City insofar as they necessarily require additional time in which to complete the Work; the prevention of Contractor from commencing or prosecuting the Work because of the acts of others, excepting Contractor's subcontractors or suppliers; or the prevention of Contractor from commencing or prosecuting the Work because of a Citywide failure of public utility service.

The term "Excusable Delay" shall specifically not include: (i) any delay that could have been avoided by the exercise of care, prudence, foresight and diligence on the part of Contractor;(ii) any delay in the prosecution of any part of the Work that does not constitute a Controlling Operation, whether or notsuch delay is unavoidable;(iii) any reasonable delay resulting from time required by City for review of any Contractor submittals and for the making of surveys, measurements and inspection;and, (iv) any delay arising from an interruption in the prosecution of the Work on account of reasonable interference by other Contractors employed by City that does not necessarily prevent the completion of the entire Work within the time specified. Excusable Delays, if any, shall operate only to extend the Completion Date (not in excess of the period of such delay as determined by City) and shall not under any circumstances increase the amount City is required to pay Contractor except as otherwise provided in these Contract Documents.

22. CONTRACTOR TO SERVE NOTICE OF DELAYS
Whenever Contractor foresees any delay in the prosecution of the Work, and in any event as soon as possible (not to exceed a period of ten (10) calendar days) after the initial occurrence of any delay that Contractor regards as or may later claim to be an Excusable Delay, the Contractor shall notify the Engineer in writing of such delay and its cause, in order that the Engineer: (i) may take immediate steps to prevent if possible the occurrence or continuance of the delay; or (ii) if this cannot be done, may determine whether the delay is to be considered excusable, how long it continues, and to what extent the prosecution and completion of the Work are delayed thereby. Said written notice shall constitute an application for an extension of time only if the notice requestssuch an extension and setsforth the Contractor's estimate of the additional time required together with a full description of the cause of the delay relied upon.

After the completion of any part or whole of the Work, the Engineer, in estimating the amount due Contractor, will assume that any and all delays that may have occurred in its prosecution and completion were not Excusable Delays, except for such delays for which the Contractor has provided timely written notice asrequired herein, and that the Engineer hasfound to be excusable. Form approved by City Attorney 1Ͳ11Ͳ17 12
Contractor shall not be entitled to claim Excusable Delay for any delay for which the Contractor failed to provide such timely written notice.

23. EXTENSION OF TIME
If the Contractor complies with Section 22, above, and the Engineer finds a delay claimed by the Contractor to be an Excusable Delay, the Contractor shall be allowed an extension of time to complete the Work that is proportional to the period of Excusable Delay determined by the Engineer, subject to the approval by City of a change order granting such time extension. During a duly authorized extension for an Excusable Delay, City shall not charge liquidated damages against the Contractor for such delay.
If the City extends the time to complete the Work as provided herein, such extension shall in no way release any warranty or guarantee given by Contractor pursuant to the provisions of the Contract Documents, nor shall such extension of time relieve or release the sureties of the Bonds provided pursuant to the Contract Documents.By executing such Bonds, the Sureties shall be deemed to have expressly agreed to any such extension of time.The granting of any extension of time as provided herein shall in no way operate as a waiver on the part of City of its rights under this Contract, excepting only extension of the Completion Date for such period of Excusable Delay as may be determined by the Engineer and approved by a duly authorized change order.

24. NO PAYMENT FOR DELAYS
No damages or compensation of any kind shall be paid to Contractor or any subcontractor because of delaysin the progress of the Work whether or notsuch delays qualify for extension of time under this Agreement; except that this provision shall not preclude the recovery of damages for a delay caused by the City that is unreasonable under the circumstances and that is not within the contemplation of the parties, provided that the Contractor timely submits allsuch written notice(s) and fully complies with such other procedures as may be specified in the Contract Documents or any Laws or Regulations for Contractor to claim damages for such delay.

25. CHANGES IN THE WORK
Changes in the Work authorized or directed in accordance with the Contract Documents and extensions of time of completion made necessary by reason thereof shall not in any way release any warranty or guarantee given by Contractor pursuant to the provisions of the Contract Documents, nor shall such changes in the Work relieve or release the Sureties on Bonds provided pursuant to the Contract Documents.By executing such Bonds, the Sureties shall be deemed to have expressly agreed to any such change in Work and to any extension of time made by reason thereof.

26. TERMINATION AFTER COMPLETION DATE
In addition to any other rights City may have, if any services or work required under the Contract (including but not limited to punch list items) are not completed as of the Completion Date (as adjusted by any extensions of time for Excusable Delays granted pursuant to the Contract Documents), City may terminate the Contract at any time after the Completion Date ( as adjusted by any extensions of time for Excusable Delays granted pursuant to the Contract Documents), by providing a written notice to Contractor specifying the date of termination. Such notice also may specify conditions or requirementsthat Contractor must meet to avoid termination of the Contract Form approved by City Attorney 1Ͳ11Ͳ17 13
on such date. If Contractor fails to fulfill all such conditions and requirements by such termination date, or, if no such conditions or requirements are specified, Contractor shall cease rendering services and performing work on such termination date, and shall not be entitled to receive any compensation for services rendered or work performed after such termination date.In the event of such termination, Contractor shall remain liable to City for liquidated damages incurred for any period of time prior to the termination date.
In addition to any other charges, withholdings or deductions authorized under the Contract or any Laws or Regulations, if City terminatesthe Contract pursuant to thissection, City may withhold and deduct from any payment and/or retention funds otherwise due Contractor any sum necessary to pay the City's cost of completing or correcting, or contracting for the completion or correction of, any services or work under the Contract that are not completed to the satisfaction of the City or that otherwise are deficient or require correction as of such termination date, including but not limited to incomplete punch list items.Such costs shall include all of the City’s direct and indirect costs incurred to complete or correct such services or work, including the City’s administrative and overhead costs.If the amount of payment(s) and/or retention funds otherwise due the Contractor are insufficient to pay such costs, City shall have the right to recover the balance of such costsfrom the Contractor and/or its Surety(ies).

27. TERMINATION FOR CONVENIENCE

Upon written notice to the Contractor, the City may at any time, without cause and without prejudice to any other right or remedy of the City, elect to terminate the Contract for the convenience of City.In such case, the Contractor shall be paid (without duplication of any items, and after deduction and/or withholding of any amounts authorized to be deducted or withheld by the Contract Documents or any Laws or Regulations):

A. For Work executed in accordance with the Contract Documents prior to the effective date of termination and determined to be acceptable by the Engineer, including fair and reasonable sums for overhead and profit on such Work;
B. For reasonable claims, costs, losses, and damages incurred in settlement of terminated contracts with subcontractors, suppliers, and others; and C. For reasonable expenses directly attributable to termination.

Contractor shall not be paid for any loss of anticipated profits or revenue for any Work not performed prior to termination, nor for any economic loss arising out of or resulting from such termination, except for the payments listed in this section.Contractor’s warranty under Section 14 of this Agreementshall apply, and Contractor shall remain responsible for all obligations related to such warranty, with respect to all portions of the Work performed prior to the effective date of the termination for convenience pursuant to this section.The City shall be entitled to have any or all remaining Work performed by other contractors or by any other means at any time after the effective date of a termination for convenience pursuant to this section.

28. TERMINATION FOR BREACH OF CONTRACT
If Contractor abandons the Work under this Contract, or if the Contract or any portion of the Contract is sublet or assigned without the consent of the City, or if the Engineer determines in the Form approved by City Attorney 1Ͳ11Ͳ17 14
Engineer’s sole discretion that the conditions of the Contract in respect to the rate of progress of the Work are not being fulfilled or any part thereof is unnecessarily delayed, or if Contractor violates or breaches, or failsto execute in good faith, any of the terms or conditions of the Contract, or if Contractor refuses or fails to supply enough properly skilled labor or materials or refuses or fails to make prompt payment to subcontractors for material or labor, or if Contractor disregards any Laws or Regulations or proper instruction or orders of the Engineer, then, notwithstanding any provision to the contrary herein, the City may give Contractor and itsSureties written notification to immediately correct the situation or the Contract shall be terminated.

In the event that such notice is given, and, in the event such situation is not corrected, or arrangements for correction satisfactory to the City are not made, within ten (10) calendar days from the date of such notice or within such other period of time as may be specified by the City in the notice, the Contract shall upon the expiration of said period cease and terminate.In the event of any such termination, City may take over the Work and prosecute the Work to completion, or otherwise, and the Contractor and its Sureties shall be liable to City for any cost occasioned City thereby, as hereinafter set forth.

In the event City completes the Work, or causes the Work to be completed, no payment of any kind shall be made to Contractor until the Work is complete.The cost of completing the Work, including but not limited to, extra costs of project administration and management incurred by City, both direct or indirect, shall be deducted from any sum then due, or that becomes due, to Contractor from City.If sums due to Contractor from City are less than the cost of completing the Work, Contractor and its Sureties shall pay City a sum equal to this difference on demand.In the event City completes the Work, and there is a sum remaining due to Contractor after City deducts the costs of completing the Work, then City shall pay such sum to Contractor.The Contractor and Contractor’s Sureties shall be jointly and severally liable for all obligations imposed on Contractor hereunder.

No act by City before the Work is finally accepted, including, but not limited to, exercise of other rights under the Contract, actions at law or in equity, extensions of time, payments, assessments of liquidated damages, occupation or acceptance of any part of the Work, waiver of any prior breach of the Contract or failure to take action pursuant to this section upon the happening of any prior default or breach of Contractor, shall be construed to be a waiver or estoppel of the City’s right to act pursuant to this Section upon any subsequent event, occurrence or failure by Contractor to fulfill the terms and conditions of the Contract.The rights of City to terminate the Contract pursuant to this Section and pursuant to Sections 26 and 27 are cumulative and are in addition to all other rights of City pursuant to the Contract and at law or in equity.

29. CONTRACTOR BANKRUPT
If Contractor should commence any bankruptcy proceeding, or if Contractor is adjudged a bankrupt, or if Contractor makes any assignment for the benefit of creditors, or if a receiver is appointed on account of Contractor'sinsolvency, then the City may, without prejudice to any other right or remedy, terminate the Contract and complete the work by giving notice as provided in Section 28 above.

30. SURETIES’ OBLIGATIONS UPON TERMINATION
If the City terminates the Contract pursuant to Section 28 or Section 29 above:

Form approved by City Attorney 1Ͳ11Ͳ17 15
A. The Surety under Contractor’s performance bond shall be fully responsible for all of the Contractor’sremaining obligations of performance under the Contract asif the Surety were a party to the Contract, including without limitation Contractor’s obligations, as provided in the Contract Documents, to complete and provide a oneͲyear warranty of the entire Work, pay liquidated damages and indemnify, defend and hold harmless City, up to the full amount of the performance bond.

B. The Surety under Contractor’s payment bond shall be fully responsible for the performance of all of the Contractor’s remaining payment obligations for work, services, equipment or materials performed or provided in connection with the Work or any portion thereof, up to the full amount of the payment bond.

31. ACCOUNTING RECORDS OF CONTRACTOR
During performance of the Contract and for a period of three (3) years after completing the entire Work, Contractor shall maintain all accounting and financial records related to the Contract and performance of the Work in accordance with generally accepted accounting practices, and shall keep and make such records available for inspection and audit by representatives of the City upon reasonable written notice.

32. USE TAX REQUIREMENTS
During the performance of this Agreement, CONTRACTOR, for itself, its assignees and successors in interest, agrees as follows:

A. Use Tax Direct Payment Permit: For all leases and purchases of materials, equipment, supplies, or other tangible personal property used to perform the Agreement and shipped from outside California, the Contractor and any subcontractors leasing or purchasing such materials, equipment, supplies or other tangible personal property shall obtain a Use Tax Direct Payment Permit from the California State Board of Equalization (“SBE”) in accordance with the applicable SBE criteria and requirements. B. Sellers Permit:For any construction contract and any construction subcontract in the amount of $5,000,000 or more, Contractor and the subcontractor(s) shall obtain sellers permits from the SBE and shall register the jobsite as the place of business for the purpose of allocating local sales and use tax to the City. Contractor and its subcontractors shall remit the selfͲaccrued use tax to the SBE, and shall provide a copy of each remittance to the City.
C. The above provisions shall apply in all instances unless prohibited by the funding source for the Agreement.

33. NONͲDISCRIMINATION IN EMPLOYEE BENEFITS
This Agreement may be subject to the requirements of Sacramento City Code Chapter 3.54, NonͲDiscrimination in Employee Benefits by City Contractors.The Contract Documentsinclude a summary of the requirements of Sacramento City Code Chapter 3.54, entitled “Requirements of the NonͲDiscrimination in Employee Benefits Code.” By signing this Agreement, Contractor Form approved by City Attorney 1Ͳ11Ͳ17 16
acknowledges and represents that Contractor has read and understands these requirements and agrees to fully comply with all applicable requirements of Sacramento City Code Chapter

3.54. If requested by City, Contractor agrees to promptly provide such documents and information as may be required by City to verify Contractor’s compliance.Any violation by Contractor of Sacramento City Code Chapter 3.54 constitutes a material breach of this Agreement, for which the City may terminate the Agreement and pursue all available legal and equitable remedies.

34. CONSIDERING CRIMINAL CONVICTION INFORMATION IN THE EMPLOYMENT APPLICATION PROCESS
This Agreement may be subject to the requirements of Sacramento City Code Chapter 3.62, Procedures for Considering Criminal Conviction Information in the Employment Application Process.The Contract Documents include a summary of the requirements of Sacramento City Code Chapter 3.62, entitled “BanͲTheͲBox Requirements.” By signing this Agreement, Contractor acknowledges and represents that Contractor has read and understands these requirements and agrees to fully comply with all applicable requirements of Sacramento City Code Chapter 3.62. If requested by City, Contractor agrees to promptly provide such documents and information as may be required by City to verify Contractor’s compliance.Any violation by Contractor of Sacramento City Code Chapter 3.62 constitutes a material breach of this Agreement, for which the City may terminate the Agreement and pursue all available legal and equitable remedies.Contractor agrees to require its subcontractors to fully comply with all applicable requirements of Sacramento City Code Chapter 3.62, and include these requirements in all subcontracts covered by Sacramento City Code Chapter 3.62. 

3 Construction and Demolition (C&D) Debris Recycling Requirements As a condition of receiving this Contract, Contractor agrees to fully comply with the requirements specified herein for all demolition projects, as well as projects with a valuation of $250,000 or more:

1. Definitions. For purposes of this section, the following terms, words and phrases shall have the following meanings:
“Certified C&D sorting facility” means a facility that receives C&D debris and/or processes C&D debris into its component material types for reuse, recycling, and disposal of residuals and possesses a valid certificate as a C&D sorting facility from the Sacramento Regional County Solid Waste Authority. “Construction and demolition debris” or “C&D debris” means used or commonly discarded materials resulting from construction, repair, remodel or demolition operations on any pavement, house, building, or other structure, or from landscaping that are not hazardous as defined in California Health and Safety Code section 25100 et seq. Such materials include, but are not limited to, concrete, asphalt, wood, metal, brick, dirt, sand, rock, gravel, plaster, glass, gypsum wallboard, cardboard and other associated packaging, roofing material, ceramic tile, carpeting, masonry, plastic pipe, trees, and other vegetative matter resulting from land clearing and landscaping. “Divert” or “diversion” means to use materials for any purpose other than disposal in a landfill or transformation facility. Methods to divert materials include on-site reuse of the materials, delivery of materials from the project site to a certified C&D sorting facility or a recycling facility, or other methods as approved in regulations promulgated by the City Department of Utilities.

“Franchised waste hauler” means a person who possesses a valid commercial solid waste collection franchise issued by the Sacramento Regional County Solid Waste Authority. “Mixed C&D debris” means loads that include commingled recyclable and non-recyclable C&D debris generated at a project site.
“Recyclable C&D debris” means C&D debris required to be diverted from landfills as specified in the Waste Management Plan and returned to the economic mainstream in the form of raw material for new, reused or reconstituted products that meet the quality standards necessary to be used in the marketplace. “Recycling facility” means a facility or operation that receives, processes, and transfers source-separated recyclable materials.
“Source-separated C&D debris” means recyclable C&D debris that is separately sorted and containerized at the site of generation by individual material type and segregated from mixed C&D debris prior to collection and transporting. “Waste log” means a record detailing the management of C&D debris generated by the covered project, including the date and weight/volume of material by type that was salvaged, reused, recycled or disposed.

2. Waste Management Plan. A completed WMP (see Attachment 1) must be submitted to and approved by the City prior to commencing any work on the project. The WMP must specify the types of C&D debris that will be generated from the project; the manner in which C&D debris will be managed and/or stored on the project site; the manner in which recyclable C&D debris generated from the project will be recycled or reuse; the person who will haul, collect or transport the recyclable C&D debris from the project site; and the certified C&D sorting facility or recycling facility where recyclable C&D debris will be delivered. The WMP must be approved by the City prior to commencing any work on the project.

3. Contractor shall be solely responsible for diverting the recyclable C&D materials specified on the WMP. Mixed C&D debris shall be delivered to a SWA-certified C&D sorting facility only. Only the permit holder, the person who generates the waste, a franchised waste hauler, or the City of Sacramento can transport or haul mixed C&D debris. Source-separated C&D debris may be delivered by any person to any recycling facility that accepts such materials. (See Attachment 2 for list of C&D Debris Haulers and Facilities).

4 4. During the course of the project, Contractor shall maintain a waste log (see Attachment 3), and keep all weight tickets or weight receipts, for all C&D debris hauled away from the project. At a minimum, the waste log shall specify the C&D debris generated by the project; the manner in which C&D debris was recycled or re-used; and the facility where the C&D debris was delivered.

5. Within 30 days after submitting the project completion report, Contractor shall submit to the City a completed waste log, along with copies of supporting weight tickets. Contractor shall maintain and keep accurate and complete records of al bills, weight receipts or weight tickets that were issued for the collection, transport or disposal of C&D debris for a period of one-year after submittal of the waste log. The records shall be made available for inspection, examination and audit by the City during the one-year retention period to validate the information provided in the WMP and in the waste log. If the City determines noncompliance by the Contractor after an audit has been conducted, Contractor shall reimburse the City for all costs incurred in performing the audit.

6. Failure by Contractor to comply with any provisions specified herein will subject Contractor to possible suspension and/or termination of this Contract for cause; repayment of any or all of the Contract amount disbursed by the City; imposition of a penalty, payable to the City ($50-$250 for first offense, $251-$500 for second offense, and $501-$1500 for subsequent offenses); and/or submission of a performance security deposit fee when submitting a permit application to the City for a project within one year of imposition of the penalty.

For questions or to obtain more information about the Recycling Requirements for C&D debris, contact the City of Sacramento, Solid Waste Services Division, 2812 Meadowview Road, Building 1, Sacramento, CA 95832, or telephone (916) 808-4833, or email C&[email protected]

Recycling & Solid Waste | 2812 Meadowview Road, Building 1 | Sacramento, CA 95832 | 916-808-0965 | www.sacrecycle.org UDefinitionsU
Please read and understand these terms. Call Recycling & Solid Waste (RSW) at (916) 808-0965 if these terms are not clear to you. More information is also available online at 32TUhttp://www.cityofsacramento.org/public-works/RSW/CollectionServices/Recycling/Construction-and-DemolitionU32T.

1. Self-haul or self-hauling: This is when the permit holder, general contractor, or a subcontractor who is doing work on the project hauls their own waste materials for recycling or disposal. Note that a jobsite cleanup crew is not doing other work on the project and is not self-hauling. Jobsite cleanup crews must be franchised in order to haul mixed C&D debris away.

2. Franchised hauler: See a list provided at 32Thttps://swa.saccounty.net/Pages/Franchisee-Listing.aspx 32T. These companies are the only companies in Sacramento who can legally collect and haul mixed C&D debris.

3. Source separation: This is achieving compliance with the recycling requirement by keeping wood, metal, cardboard, or other recyclables in separate containers. Source-separated material may be hauled by anyone.

4. Mixed C&D debris: This is achieving compliance with the recycling requirement by putting all recyclable debris into one container. Mixed material must be sent to a certified mixed C&D sorting facility to have the recyclable material extracted and recovered. Mixed material also must be either self-hauled, or hauled by a franchised hauler. If your job site is crowded, this option saves the most space.

5. Certified Mixed C&D Sorting Facility: See list at 32Thttps://swa.saccounty.net/Pages/CDDebrisSortingFacilities.aspx 32T .

These facilities have been certified by the Sacramento Regional Solid Waste Authority to extract recyclable materials from mixed C&D debris. If you achieve compliance by mixed recovery, your debris must go to a certified mixed sorting facility.

Terms and Conditions
x Your approved Waste Management Plan and Waste Log must be kept on the job site in the permit folder for the duration of the project.
x City of Sacramento staff may enter the jobsite to inspect waste collection areas. x Only SWA-Certified Mixed C&D Sorting Facilities may be used to recycle these materials if mixed with other materials. x Only SWA-Franchised Haulers or self-haulers (as defined above) may collect and transport trash or mixed C&D material from the jobsite.
x Construction and Demolition Debris may not be burned or dumped illegally. x Your Waste Log must be completed and submitted within 30 days of your permit being finaled or expired. All waste hauling and disposal or recycling activity must be entered on the Waste Log, including information from any subcontractors who self-hauled their own debris off-site. Enter your Permit Number on your Waste Log now! x You must keep all receipts or weight-tickets from your project for a period of one year from the submittal of your waste log.

Failure to comply with these terms and conditions may result in a fine and a security deposit on future projects.

Construction & Demolition
Waste Management Plan
C&D Debris Waste Management Plan
City of Sacramento Solid Waste Services
Phone: (916) 808-0965 / Fax: (916) 808-4999
C&[email protected]
6 Certified Mixed C&D Facilities
Allied Waste / Elder Creek Transfer and Recovery (916) 387-8425 Florin-Perkins Public Disposal (916) 443-5120
L&D Landfill (916) 737-8640
Waste Management / K&M Recycle America (916) 452-0142
Franchised Haulers
ACES Waste Services, Inc. (866) 488-8837 Elk Grove Waste Management, LLC (916) 689-4052 Allied Waste Services (916) 631-0600 Mini Drops, Inc. (916) 686-8785 All Waste Systems, Inc. (916) 456-1555 Norcal Waste Services of Sacramento (916) 381-5300 Atlas Disposal Industries, LLC (916) 455-2800 North West Recyclers (916) 686-8575 California Waste Recovery Systems (916) 441-1985 Waste Management of Sacramento (916) 387-1400 Central Valley Waste Services, Inc. (209) 369-8274 Waste Removal & Recycling (916) 453-1400 City of Sacramento Solid Waste (916) 808-4839 Western Strategic Materials, Inc. (916) 388-1076 Recyclers* Recovery Stations & Landfills
Bell Marine (916) 442-9089 Elder Creek Recovery & Transfer Station
(916) 387-8425
C & C Paper Recycling (916) 920-2673
EBI Aggregates (916) 372-7580 Kiefer Landfill (916) 875-5555 International Paper (916) 371-4634 L & D Landfill (916) 383-9420 Modern Waste Solutions (916) 447-6800 North Area Recovery Station (916) 875-5555 PRIDE Industries, Inc. (916) 640-1300 Sacramento Recycling & Transfer Station
(916) 379-0500
Recycling Industries, Inc. (916) 452-3961
Sacramento Local Conservation Corps (916) 386-8394 Waste Management Recycle America (916) 452-0142 Smurfit-Stone Container Corporation (916) 381-3340
Southside Art Center (916) 387-8080
Spencer Building Maintenance, Inc. (916) 922-1900
More updated information can be found online at:
http://www.cityofsacramento.org/utilities/
* Please note that any facility may receive source-separated recyclable materials as long as it is authorized to do so by the State of California. This is not meant to be a complete list.

C&D Debris
Haulers & Facilities
C&D Debris Waste Management Plan
City of Sacramento Solid Waste Services
2812 Meadowview Road, Building 1
Sacramento, CA 95832
Phone: (916) 808-4833 / Fax: (916) 808-4999
C&[email protected]
1 Building Permit
Please put all known permit numbers related to this project.

This waste log must be submitted to Solid Waste within 30 days of the building permit being finaled (or expired). This waste log, and the supporting weight tickets, must also be kept on file for one year after project completion.

Date Hauler Material Destination Weight*

Hauler: Indicate the Franchisee, Self-Hauler, City of Sacramento, or other hauler who removed the material offsite.

Material: Indicate appropriate category: Scrap Metal, Inert Materials, Cardboard, Wooden Pallets, or Clean Wood Waste.

Destination: Indicate the facility that received the material for disposal or recycling * Weight: Indicate the weight. If weight is not known, put volume. Example: “3.2 tons” – or – “10 yards” Office Use Only: Received by: _____________________________________ On date: _________________ Ƒ Logged Ƒ Approved Ƒ Scanned Ƒ Filed Total Diversion: __________% Construction & Demolition
Waste Log
C&D Debris Waste Management Plan
City of Sacramento Recycling and Solid Waste
2812 Meadowview Road, Building 1
Sacramento, CA 95832
Phone: (916) 808-0965 / Fax: (916) 808-4999
C&[email protected]
NOVEL CORONAVIRUS (COVID-19) SAFETY REQUIREMENTS
PART 1ͲGENERAL

1.01  SUMMARY
Section Includes: COVIDͲ19 safety requirements to address the COVIDͲ19 epidemic, including without limitation any requirements imposed by federal, state, and local guidelines and orders or those necessary for performance of work safely.
These COVIDͲ19 safety requirements are not all encompassing and may need to be modified by the Contractor for individual construction tasks and updated asthe COVIDͲ19 epidemic evolves. The Contractor and all its subͲtier level subcontractors and suppliers shall account in their Bid and subͲbids for all cost impacts whether affecting labor (including, but not limited to obtaining qualified workers, quantity of workers, as well as their productivity), deliveries, supervision, testing and/or procurement of materials and/or equipment and time caused by any COVIDͲ19 safety requirements, including without limitation those found in all public health and governmental directives in place at the time Bids are received by the City for this Project.

A. Related Sections:

1. Section 00200 – Instructions to Bidders

1. Section 00700 – General Conditions

2. Section 01145 – Use of Site

3. Section 01160 – Site Safety Requirements

4. Section 01330 – Submittal Procedures

1.02 COVIDͲ19 EXPOSURE PREVENTION, PREPAREDNESS, AND RESPONSE PLAN A. Contractor’s Responsibility

1. The Contractor shall prepare a COVIDͲ19 Exposure Prevention, Preparedness and Response Plan (a “COVIDͲ19 Plan”) specific to this Project that describes how to prevent worker exposure to coronavirus; protective measures to be taken on the jobsite; personal protective equipment and work practice controls to be used; cleaning and disinfecting procedures; and procedures to follow if a worker shows symptoms of COVIDͲ19 illness or tests positive for COVIDͲ19.In addition to any governmental or other guidance available at the time of Bid submission, the Contractor should review OSHA COVIDͲ19 Workplace Safety Guidance documentation, such as: https://www.osha.gov/Publications/OSHA3990.pdf, as a resource in preparation of its COVIDͲ19 Plan.Other reliable and current sources of COVIDͲ19 information can be found from:

The California Department of Public Health (CDPH, State), including without limitation, guidance such as:
https://www.cdph.ca.gov/Programs/CID/DCDC/Pages/Immunization/nCOV2019.aspx The federal Centers for Disease Control and Prevention (CDC, National), including without limitation, guidance such as:
http://www.cdc.gov/coronavirus/novelͲcoronavirusͲ2019.html The Sacramento County Public Health Department, including without limitation, guidance found here: https://www.saccounty.net/COVIDͲ19/Pages/default.aspx

1. The Contractor’s COVIDͲ19 Plan shall at a minimum address the following COVIDͲ19 safety guidelines:
a. COVIDͲ19 Employee and Visitor training and checkͲlist before entering worksite. a. Employee distancing and strategies to maximize distancing when possible. b. Limitations on gathering size.
c. Personal Protective Equipment (PPE) requirements.
d. Identification of “choke points” and “high risk areas” such as hallways, hoists and elevators, break areas and vehicles.
e. Staggering trades and modification of work schedules to reduce worker density to maximize distancing opportunities.
f. COVIDͲ19 employee good personal hygiene measures.
g. Disinfection and cleaning requirements.
h. Personal prevention actions requirements for all employees. i. Toolbox and Tailgate COVIDͲ19 employee training.
j. Recognition of COVIDͲ19 Symptoms.
k. Procedures for COVIDͲ19 exposure and notification to others who were at the Site.
l. Daily screening protocols for arriving workers and visitors to ensure potentially infected workers and visitors do not enter the Site.
m. Maintenance of daily attendance logs of all workers and visitors who enter the Site.

2. Also, as part of this Plan, the Contractor shall draft and implement a COVIDͲ19 Code of Safe Practices that is posted in areas visible to all employees and visitors.

3. The Contractor shall be prepared at each Progress and Coordination Meeting, if requested by the Construction Manager, to provide information relevant to the application, enforcement, and implementation of the Code of COVIDͲ19 Safe Practices.

4. All Contractor managers and supervisors(from forepersonsto project managers) must be familiar with the COVIDͲ19 Plan and be ready to answer questions from employees, subcontractors, suppliers and visitors. Managers and supervisors must set a good example by following the COVIDͲ19 Plan at all times.This involves practicing good personal hygiene and jobsite safety practices to prevent the spread of the virus. Managers and supervisors must encourage this same behavior from all employees, subcontractors, suppliers and visitors.

5. The Contractor shall immediately notify the Construction Manager if any person under the Contractor’s control on this Project has tested positive for COVIDͲ19.

1.03 SUBMITTALS
A. The following information shall be provided in accordance with Section 01330, Submittal Procedures, after the Award of Contract and before any work begins at the Site:

1. COVIDͲ19 Exposure Prevention, Preparedness and Response Plan.

2. COVIDͲ19 Code of Safe Practices.

B. To the extent that there are material amendments or modifications made to any of the above plans or practices during the performance of the Work, the Contractorshall provide to the City as soon as practicable the amendments and shall post an amendments to the Code of Safe Practices to all employees and visitors who enter the Site.

PART 2ͲPRODUCTS (NOT USED)
PART 3ͲEXECUTION (NOT USED)
**END OF SECTION**

ARTICLE 1 ʊ COSTS OF NOVEL CORONAVIRUS (COVID-19) SAFETY REQUIREMENTS

1.01 Given the coronavirus (COVID-19) epidemic, each Bidder must understand that the means and methods of construction, and the ways of doing business, have been materially impacted and changed (at least for the foreseeable future). These impacts and changes relate to social distancing, ability to perform at the pace previously performed, personal interaction of workers, implementation of increased safety measures, and a myriad of other impacts to construction operations. Heightened measures to protect persons from illness and the adoption and implementation of many new and more intensive practices will make the performance of construction work different and more challenging.

1.02 It is the intent of the City, by including the previous paragraph, Novel Coronavirus (COVID-19) Safety Requirements, to alert all Bidders for all aspects of this Project, that they are to include in their Bids all known and reasonably estimated COVID-19 costs and impacts to the ability to obtain goods and materials required, as well as labor to perform the Work. Further, all costs for all of these and other aspects of the project, including supervision, temporary facilities, incidentals, testing, QA/QC, etc. (this listing is intended to be illustrative and not comprehensive) shall be evaluated by each Bidder so its Bid submitted to the City includes all such potential costs in recognition of the foregoing and subsequent notices in this and other sections of the Contract Documents.

1.03 Each Bidder is to critically appraise and evaluate the reasonably anticipated costs and time impacts, if any, which may need to be accounted for in light of the COVID–19 pandemic and all governmental directives and requirements, and commercial impacts, arising therefrom.

1.04 It is the responsibility of each Bidder to alert all Sub-Bidders (potential subcontractors and suppliers of every tier and trade) to also factor in the above-referenced COVID-19 cost and time impacts, if any, into their sub-bids to Bidders for all aspects of the Project.

1.05 By submitting a Bid for this Project, each Bidder represents to the City that it included in its Total Bid Price all cost impacts, whether affecting labor (including, but not limited to obtaining qualified workers, quantity of workers, as well as their productivity); deliveries; supervision; testing; procurement of materials or equipment; and time caused by COVID-19 safety requirements found in all public health and governmental directives in place at the time Bids are received by the City for this Project. Furthermore, each Bidder recognizes it will not be entitled to a change order granting a COVID-19 related time extension or for any COVID-19 related increased costs, which arise from Novel Coronavirus (COVID-19) Safety Requirements or from any public health or governmental directives in place at the time Bids are received by the City for this Project.

CALIFORNIA LABOR CODE RELATING TO APPRENTICES

ON PUBLIC WORKS PROJECTS
See following links: www.dir.ca.gov and/or www.leginfo.ca.gov http://www.dir.ca.gov/dlse/dlsePublicWorks.html

ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?

INSR ADDL SUBR

LTR INSD WVD

PRODUCER CONTACT
NAME:

PHONE FAX (A/C, No, Ext): (A/C, No):

E-MAIL
ADDRESS:

INSURER A :

INSURED INSURER B :

INSURER C :

INSURER D :

INSURER E :

INSURER F :

POLICY NUMBER POLICY EFF POLICY EXP TYPE OF INSURANCE (MM/DD/YYYY) (MM/DD/YYYY) LIMITS

AUTOMOBILE LIABILITY

UMBRELLA LIAB

EXCESS LIAB

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $
DAMAGE TO RENTED CLAIMS-MADE OCCUR PREMISES (Ea occurrence) $ MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $

PRO- POLICY LOC JECT PRODUCTS - COMP/OP AGG
OTHER: $

COMBINED SINGLE LIMIT
(Ea accident) $
ANY AUTO BODILY INJURY (Per person) $

OWNED SCHEDULED
AUTOS ONLY AUTOS BODILY INJURY (Per accident) $

HIRED NON-OWNED PROPERTY DAMAGE
AUTOS ONLY AUTOS ONLY (Per accident) $
$

OCCUR EACH OCCURRENCE
CLAIMS-MADE AGGREGATE $
DED RETENTION $
PER OTHSTATUTE ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE $
If yes, describe under
DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT INSURER(S) AFFORDING COVERAGE NAIC #

COMMERCIAL GENERAL LIABILITY
Y / N
N / A (Mandatory in NH)

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

CERTIFICATE HOLDER CANCELLATION
ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
The ACORD name and logo are registered marks of ACORD
8/18/2022
25682
SubTerra Construction, Inc.
1350 Van Dyke Ave., #101
San Francisco, CA 94124
25674
10172
A 1,000,000
XX 4T22-CO-8S782366-TCT-21 11/15/2021 11/15/2022 50,000 5,000
1,000,000
2,000,000
2,000,000
A 1,000,000
XX BA-8S781228-21-2S-G 11/15/2021 11/15/2022
B 5,000,000
CUP-8S783511-21-2S 11/15/2021 11/15/2022 5,000,000
C
X 9259474-2022 8/21/2022 8/21/2023 1,000,000
1,000,000
1,000,000
D Pollution G28223195002 3/2/2022 Each Occurrence
D Pollution G28223195002 3/2/2022 3/2/2023 Aggregate 2,000,000 RE: CY-2022 CSS PIPE R&R. Per written contract with the Named Insured. The City, its officials, employees, and volunteers are an additonal insured, as respects general liability, per from CG D2 46 04 19 attached. General Liability primary and non-contributory per form CG T1 00 02 19 attached. General Liability waiver of subrogation per form CG D3 16 02 19 attached. Auto liability additional insured and waiver of subrogation per form CA T3 53 02 15 attached. Workers Compensation waiver of subrogation per form 10217 (REV.4-2018) attached. 30 day notice of cancellation except 10 day notice of cancellation for non payment of premium. CIR Form attached.

City of Sacramento
c/o EXIGIS LLC
P.O. Box 947
Murrieta, CA 92564
SUBTCON-01 SHUDSON
Panorama Risk & Insurance Solutions, LLC
16030 Ventura Blvd Ste 260
Encino, CA 91436
The Travelers Indemnity Company Of Connecticut
Travelers Property Casualty Company Of America
State Compensation Insurance Fund
Westchester Surplus Lines Insurance Company
3/2/2023
X
X
X
X
X
X
1,000,000
6KDQHO+XGVRQ
VKXGVRQ#SDQRUDPDFRP

FORM NUMBER:

EFFECTIVE DATE:

The ACORD name and logo are registered marks of ACORD

ADDITIONAL REMARKS

ADDITIONAL REMARKS SCHEDULE
FORM TITLE:

Page of

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01)
AGENCY CUSTOMER ID:

LOC #:

AGENCY NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
© 2008 ACORD CORPORATION. All rights reserved.

Panorama Risk & Insurance Solutions, LLC
SUBTCON-01
SEE PAGE 1
1 SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
1 SEE P 1
SubTerra Construction, Inc.
1350 Van Dyke Ave., #101
San Francisco, CA 94124
SEE PAGE 1

SHUDSON
1 Contractual Insurance Requirements - CIR Form
The attached Certificate of Insurance is provided as part of our service to our client, the Insured. If special endorsements have been provided, they also are indicated attached. You may find that these documents do not comply with all the terms and conditions of the underlying contract between the Certificate Holder and the Insured due to the insurance company’s insuring conditions, limitations, exclusions and other terms. If you have any questions, please contact the undersigned.

Panorama Risk & Insurance Solutions LLC.
52 S. 1st St., Suite 310
San Jose, CA 95113 CA License #6001592
RE: 6XE7HUUD&RQVWUXFWLRQ,QF
Pol7&267&7

Insured: 4VC5FSSB$POTUSVDUJPO
*OD
Policy No: 5$045$5
*OTVSFE4VC5FSSB$POTUSVDUJPO*OD
1PMJDZ/P5$045$5

COMMERCIAL AUTO
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

BUSINESS AUTO EXTENSION ENDORSEMENT
This endorsement modifies insurance provided under the following:

BUSINESS AUTO COVERAGE FORM
GENERAL DESCRIPTION OF COVERAGE – This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to the Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general coverage description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this endorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered.

H. HIRED AUTO PHYSICAL DAMAGE – LOSS OF
USE – INCREASED LIMIT
A. BROAD FORM NAMED INSURED
B. BLANKET ADDITIONAL INSURED
I. PHYSICAL DAMAGE – TRANSPORTATION
EXPENSES – INCREASED LIMIT C. EMPLOYEE HIRED AUTO
D. EMPLOYEES AS INSURED J. PERSONAL PROPERTY
E. SUPPLEMENTARY PAYMENTS – INCREASED
LIMITS
K. AIRBAGS
L. NOTICE AND KNOWLEDGE OF ACCIDENT OR
F. HIRED AUTO – LIMITED WORLDWIDE COV- LOSS
ERAGE – INDEMNITY BASIS M. BLANKET WAIVER OF SUBROGATION G. WAIVER OF DEDUCTIBLE – GLASS N. UNINTENTIONAL ERRORS OR OMISSIONS

PROVISIONS
A. BROAD FORM NAMED INSURED this insurance applies and only to the extent that person or organization qualifies as an "insured"
under the Who Is An Insured provision contained
in Section II.

The following is added to Paragraph A.1., Who Is
An Insured, of SECTION II – COVERED AUTOS
LIABILITY COVERAGE:

C. EMPLOYEE HIRED AUTO Any organization you newly acquire or form during the policy period over which you maintain 50% or more ownership interest and that is not
separately insured for Business Auto Coverage.

Coverage under this provision is afforded only until the 180th day after you acquire or form the organization or the end of the policy period, whichever is earlier.

1. The following is added to Paragraph A.1.,
Who Is An Insured, of SECTION II – COVERED AUTOS LIABILITY COVERAGE:

An "employee" of yours is an "insured" while
operating an "auto" hired or rented under a
contract or agreement in an "employee's"
name, with your permission, while performing
duties related to the conduct of your busi- B. BLANKET ADDITIONAL INSURED ness.

The following is added to Paragraph c. in A.1.,
Who Is An Insured, of SECTION II – COVERED
AUTOS LIABILITY COVERAGE:

2. The following replaces Paragraph b. in B.5.,
Other Insurance, of SECTION IV – BUSINESS AUTO CONDITIONS:
b. For Hired Auto Physical Damage Coverage, the following are deemed to be covered "autos" you own:

Any person or organization who is required under
a written contract or agreement between you and
that person or organization, that is signed and
executed by you before the "bodily injury" or
"property damage" occurs and that is in effect
during the policy period, to be named as an additional insured is an "insured" for Covered Autos Liability Coverage, but only for damages to which
(1) Any covered "auto" you lease, hire,
rent or borrow; and
(2) Any covered "auto" hired or rented by
your "employee" under a contract in
an "employee's" name, with your
CA T3 53 02 15 ú 2015 The Travelers Indemnity Company. All rights reserved. Page 1 of 4 Includes copyrighted material of Insurance Services Office, Inc. with its permission. 1PMJDZ/VNCFS#"44(
4VC5FSSB$POTUSVDUJPO
*OD

COMMERCIAL AUTO
permission, while performing duties
related to the conduct of your business.
(a) With respect to any claim made or "suit"
brought outside the United States of
America, the territories and possessions
of the United States of America, Puerto
Rico and Canada: However, any "auto" that is leased, hired, rented or borrowed with a driver is not a
covered "auto". (i) You must arrange to defend the "insured" against, and investigate or settle any such claim or "suit" and keep us advised of all proceedings and actions.

D. EMPLOYEES AS INSURED
The following is added to Paragraph A.1., Who Is
An Insured, of SECTION II – COVERED AUTOS
LIABILITY COVERAGE:
(ii) Neither you nor any other involved
"insured" will make any settlement
without our consent.

Any "employee" of yours is an "insured" while using a covered "auto" you don't own, hire or borrow in your business or your personal affairs. (iii) We may, at our discretion, participate in defending the "insured" against, or
in the settlement of, any claim or
"suit".

E. SUPPLEMENTARY PAYMENTS – INCREASED
LIMITS

1. The following replaces Paragraph A.2.a.(2),
of SECTION II – COVERED AUTOS LIABILITY COVERAGE:
(iv) We will reimburse the "insured" for
sums that the "insured" legally must
pay as damages because of "bodily
injury" or "property damage" to which
this insurance applies, that the "insured" pays with our consent, but only up to the limit described in Paragraph C., Limits Of Insurance, of SECTION II – COVERED AUTOS
LIABILITY COVERAGE.
(2) Up to $3,000 for cost of bail bonds (including bonds for related traffic law violations) required because of an "accident" we cover. We do not have to furnish
these bonds.

2. The following replaces Paragraph A.2.a.(4),
of SECTION II – COVERED AUTOS LIABILITY COVERAGE:
(v) We will reimburse the "insured" for
the reasonable expenses incurred
with our consent for your investigation of such claims and your defense of the "insured" against any such
"suit", but only up to and included
within the limit described in Paragraph C., Limits Of Insurance, of SECTION II – COVERED AUTOS
LIABILITY COVERAGE, and not in
addition to such limit. Our duty to
make such payments ends when we
have used up the applicable limit of
insurance in payments for damages,
settlements or defense expenses.
(4) All reasonable expenses incurred by the
"insured" at our request, including actual
loss of earnings up to $500 a day because of time off from work.

F. HIRED AUTO – LIMITED WORLDWIDE COVERAGE – INDEMNITY BASIS The following replaces Subparagraph (5) in Paragraph B.7., Policy Period, Coverage Territory, of SECTION IV – BUSINESS AUTO CONDITIONS:
(5) Anywhere in the world, except any country or
jurisdiction while any trade sanction, embargo, or similar regulation imposed by the United States of America applies to and prohibits the transaction of business with or within such country or jurisdiction, for Covered Autos Liability Coverage for any covered "auto" that you lease, hire, rent or borrow
without a driver for a period of 30 days or less
and that is not an "auto" you lease, hire, rent
or borrow from any of your "employees",
partners (if you are a partnership), members
(if you are a limited liability company) or
members of their households.
(b) This insurance is excess over any valid
and collectible other insurance available
to the "insured" whether primary, excess,
contingent or on any other basis.
(c) This insurance is not a substitute for required or compulsory insurance in any country outside the United States, its territories and possessions, Puerto Rico and Canada.

Page 2 of 4 ends

Includes copyrighted material of Insurance Services Office, Inc. with its permission.

COMMERCIAL AUTO
You agree to maintain all required or (2) In or on your covered "auto". compulsory insurance in any such country up to the minimum limits required by local law. Your failure to comply with
compulsory insurance requirements will
not invalidate the coverage afforded by
this policy, but we will only be liable to the
same extent we would have been liable
had you complied with the compulsory insurance requirements.

This coverage applies only in the event of a total
theft of your covered "auto".

No deductibles apply to this Personal Property
coverage.

K. AIRBAGS
The following is added to Paragraph B.3., Exclusions, of SECTION III – PHYSICAL DAMAGE COVERAGE:

Exclusion 3.a. does not apply to "loss" to one or
more airbags in a covered "auto" you own that inflate due to a cause other than a cause of "loss" set forth in Paragraphs A.1.b. and A.1.c., but
only:
(d) It is understood that we are not an admitted or authorized insurer outside the United States of America, its territories
and possessions, Puerto Rico and Canada. We assume no responsibility for the furnishing of certificates of insurance, or
for compliance in any way with the laws
of other countries relating to insurance.
a. If that "auto" is a covered "auto" for Comprehensive Coverage under this policy; b. The airbags are not covered under any warG. WAIVER OF DEDUCTIBLE – GLASS ranty; and The following is added to Paragraph D., Deducti- c. The airbags were not intentionally inflated. ble, of SECTION III – PHYSICAL DAMAGE
COVERAGE:

We will pay up to a maximum of $1,000 for any
one "loss".

No deductible for a covered "auto" will apply to
glass damage if the glass is repaired rather than
replaced.

L. NOTICE AND KNOWLEDGE OF ACCIDENT OR
LOSS
The following is added to Paragraph A.2.a., of
H. HIRED AUTO PHYSICAL DAMAGE – LOSS OF SECTION IV – BUSINESS AUTO CONDITIONS:

USE – INCREASED LIMIT Your duty to give us or our authorized representative prompt notice of the "accident" or "loss" applies only when the "accident" or "loss" is known to:

The following replaces the last sentence of Paragraph A.4.b., Loss Of Use Expenses, of SECTION III – PHYSICAL DAMAGE COVERAGE:

However, the most we will pay for any expenses (a) You (if you are an individual); for loss of use is $65 per day, to a maximum of
$750 for any one "accident".
(b) A partner (if you are a partnership);
(c) A member (if you are a limited liability comI. PHYSICAL DAMAGE – TRANSPORTATION pany); EXPENSES – INCREASED LIMIT (d) An executive officer, director or insurance manager (if you are a corporation or other organization); or The following replaces the first sentence in Paragraph A.4.a., Transportation Expenses, of SECTION III – PHYSICAL DAMAGE COVERAGE:
(e) Any "employee" authorized by you to give notice of the "accident" or "loss".

We will pay up to $50 per day to a maximum of
$1,500 for temporary transportation expense incurred by you because of the total theft of a covered "auto" of the private passenger type.

M. BLANKET WAIVER OF SUBROGATION
The following replaces Paragraph A.5., Transfer
Of Rights Of Recovery Against Others To Us,
of SECTION IV – BUSINESS AUTO CONDIJ. PERSONAL PROPERTY TIONS:

5. Transfer Of Rights Of Recovery Against
Others To Us
The following is added to Paragraph A.4., Coverage Extensions, of SECTION III – PHYSICAL DAMAGE COVERAGE: We waive any right of recovery we may have against any person or organization to the extent required of you by a written contract signed and executed prior to any "accident"
or "loss", provided that the "accident" or "loss"
arises out of operations contemplated by
Personal Property
We will pay up to $400 for "loss" to wearing apparel and other personal property which is:
(1) Owned by an "insured"; and
CA T3 53 02 15 ú 2015 The Travelers Indemnity Company. All rights reserved. Page 3 of 4 Includes copyrighted material of Insurance Services Office, Inc. with its permission.

COMMERCIAL AUTO
such contract. The waiver applies only to the
person or organization designated in such
contract.

The unintentional omission of, or unintentional
error in, any information given by you shall not
prejudice your rights under this insurance. However this provision does not affect our right to collect additional premium or exercise our right of cancellation or non-renewal.

N. UNINTENTIONAL ERRORS OR OMISSIONS
The following is added to Paragraph B.2., Concealment, Misrepresentation, Or Fraud, of SECTION IV – BUSINESS AUTO CONDITIONS:

Page 4 of 4 ends

Includes copyrighted material of Insurance Services Office, Inc. with its permission. 


 





 



(
&,
, "$

#

,
#, 
"",

" 

"
" 

" #&,
$$"#, , 
#, ,,
,
"




"

"
"
" " " 

"


" " " 
"

" 



" 
"


" 

" 
"
, *

,
$$"#, , 
#, ,
,
"$# , 

"#$#

, 
,
 , %, +, ',
", !"
, 
,
,
&, ", 
,  , , 

#, !, * , , *
,


, , , !*,
#

,
*, , 
*, &, $,
 ,


, !,  ,  , 
, 
, ,
+ , 
, , 
,


!
,
, 

 , 
, *, , 
,
)
 ,  , *!,


, $, !

, , (
,


,  , 
!
, *!,
, 
, , 

 , , !,

, 

 , 
!, , ,


 , ,

,
, , 
,  , 
*, 
!,



!
,

, , + ,
*, 
, , + ,
, ', 
, 
, !

,
, 

,
*, (
,



, , !
, ,
%#,

,

 ,


, %#, ,
!
 ,





),

,





, ,
,
" " "



" "

" 

" "
!" 
" 

" "


"
!" " 
" 
"

" 


" " " " " 
!"

" " " 


" 

" "



" " " 
!" "

"


" "
!" 
" 

" " " 
" 
"

" 


" "
" " "



"





" 
" 

" " " 

"

$$"#, , 




  





,

  
  
   


SPECIAL PROVISIONS
i

CITY OF SACRAMENTO SPECIAL PROVISIONS FOR
CY-2022 CSS PIPE R&R PROJECT
PROJECT NUMBER: X14170111
25th Street/Castro Way, Portola Way, 37th Street Alley, Rice Alley (17th to 18th), I Street (30th to Alhambra Blvd), I Street (33rd to 35th), 24th Street

TABLE OF CONTENTS
SECTION 1 – GENERAL CONSTRUCTION REQUIREMENTS .................................................. 2

1.01 Location, Scope of Work ................................................................................................ 2

1.02 Specifications .................................................................................................................. 2

1.03 Time of Award ................................................................................................................. 2

1.04 Providing Bonds and Surety .......................................................................................... 3

1.05 Interpretation of Contract Documents .......................................................................... 3

1.06 Proof of Compliance with Contract ............................................................................... 3

1.07 Order of Work .................................................................................................................. 3

1.08 Shop Drawings & Submittals ......................................................................................... 4

1.09 Project Sign ..................................................................................................................... 5

1.10 Manufacturer’s Instructions ........................................................................................... 5

1.11 Project Scheduling .......................................................................................................... 5

1.12 Record Drawings ............................................................................................................. 6

1.13 Materials and Equipment ................................................................................................ 6

1.14 Control of Materials Testing ........................................................................................... 6

1.15 Quality Control ................................................................................................................ 7

1.15 Contractor’s Safety Program ....................................................................................... 10

1.16 Novel Coronavirus (Covid-19) Safety Requirements ................................................. 10

1.17 Inspection ...................................................................................................................... 12

1.18 Cooperation with City and Other Contractors ............................................................ 12

1.19 Public Outreach ............................................................................................................. 13

1.19 Permits ........................................................................................................................... 13

1.20 Permanent Survey Monuments ................................................................................... 13

1.21 Administrative Penalty Ordinance ............................................................................... 13

1.22 Water Quality Control ................................................................................................... 14

1.23 Project Closeout ............................................................................................................ 14

1.24 Payment ......................................................................................................................... 15 SECTION 2– PUBLIC CONVENIENCE & PROTECTION OF EXISTING CONDITIONS .......... 16

2.01 Public Right-of-Way and Easements ........................................................................... 16

2.02 Existing Facilities .......................................................................................................... 16

2.03 Coordination of Work ................................................................................................... 16

2.04 Maintaining Water, Sewer & Drainage Flows .............................................................. 16

2.05 Temporary Diversion of Sewer and Drainage Flows ................................................. 17

2.06 Work Performed by City Crews ................................................................................... 17

2.07 Existing Site Conditions ............................................................................................... 18

2.08 Handling and Removal of Hazardous or Contaminated Materials ............................ 18

2.09 Health and Safety .......................................................................................................... 19

2.10 Public Notification of Work .......................................................................................... 19

2.11 Maintenance of Traffic, Public Safety and Convenience ........................................... 19

2.12 Removal of Street Parking ........................................................................................... 22 ii

2.13 Payment ......................................................................................................................... 22 SECTION 3 – GENERAL SEWER CONSTRUCTION REQUIREMENTS ................................. 23

3.01 Utility Potholing ............................................................................................................. 23

3.02 Sheeting, Shoring, and Bracing ................................................................................... 23

3.03 Trench Excavation and Backfill ................................................................................... 28

3.04 Pipe Burst 8” Combined Sewer Pipe ........................................................................... 29

3.05 Unsuitable Material ....................................................................................................... 31

3.06 Pavement Cutting and Surface Restoration ............................................................... 31

3.07 Temporary Paving ......................................................................................................... 32

3.08 Dewatering ..................................................................................................................... 32

3.09 Combined Sewer Pipe .................................................................................................. 36

3.10 Sewer Service Connections ......................................................................................... 37

3.11 Abandonment of Existing Pipeline .............................................................................. 38

3.12 Closed Circuit Television Inspection of Pipes ........................................................... 38

3.13 Manhole Construction .................................................................................................. 39

3.14 Tree Preservation Requirements ................................................................................. 40

3.15 Archaeological Resources Discovery ......................................................................... 40

3.16 Payment ......................................................................................................................... 41 SECTION 4 – ITEMS OF THE PROPOSAL ............................................................................... 42 Item No. 1 Mobilization ......................................................................................................... 42 Item No. 2 Traffic Control ..................................................................................................... 42 Item No. 3 Preconstruction Photographs ........................................................................... 42 Item No. 4 8-inch Combined Sewer Pipe to Burst .............................................................. 42 Item No. 5 10-inch Combined Sewer Pipe to Place ............................................................ 43 Item No. 6 24-inch Combined Sewer Pipe to Place ............................................................ 43 Item No. 7 6” Asphalt Concrete Pave .................................................................................. 43 Item No. 8 6” Concrete Alley/Driveway ............................................................................... 44 Item No. 9 Abandon Existing Combined Sewer Main ........................................................ 44 Item No. 10 Manhole to Abandon .......................................................................................... 44 Item No. 11 Manhole Base, to Reconstruct .......................................................................... 45 Item No. 12 Manhole to Remove, Manhole No. 3 to Construct ........................................... 46 Item No. 13 Manhole No. 3 to Construct ............................................................................... 47 Item No. 14 Manhole No. 3A to Construct ............................................................................. 47 Item No. 15 Manhole with Junction Box ............................................................................... 47 Item No. 16 Manhole to Remove, Manhole No. 4 to Construct ........................................... 47 Item No. 17 Outside Drop Connection .................................................................................. 48 Item No. 18 Sewer Service to Place/Replace/Reinstate ....................................................... 48 Item No. 19 Point Repairs ....................................................................................................... 49 Item No. 20 Drain Inlet No. 22 to Construct .......................................................................... 50 Item No. 21 Drain Lead to Remove, 8-inch Drain Inlet Lead to Install ................................ 51 Item No. 22 Utility Potholing .................................................................................................. 52 Item No. 23 CCTV Inspection ................................................................................................. 52 Item No. 24 Unmarked Utility Crossings ............................................................................... 52 Item No. 25 Unsuitable Material, Removal, and Replacement ............................................ 53 APPENDIX A - Notification Letter ............................................................................................ 54 APPENDIX B - 37th Street Alley CCTV Image .......................................................................... 56 2 CITY OF SACRAMENTO SPECIAL PROVISIONS FOR
CY-2022 CSS PIPE R&R PROJECT
PROJECT NUMBER: X14170111
25th Street/Castro Way, Portola Way, 37th Street Alley, Rice Alley (17th to 18th), I Street (30th to Alhambra Blvd), I Street (33rd to 35th), 24th Street SECTION 1 – GENERAL CONSTRUCTION REQUIREMENTS

1.01 Location, Scope of Work
These Special Provisions cover in general, the reconstruction of combined sanitary sewer facilities within the following locations:
1) Castro Way from 25th Street to 25th Street and Marshall Way 2) Portola Way between 26th Street and Franklin Blvd
3) 37th Street Alley between 37th Street and 38th Street 4) Rice Alley between 17th Street and 18th Street
5) I Street between 30th Street to Alhambra Blvd
6) I Street between 33rd Street to 35th Street
7) 24th Street between Castro Way and 3rd Ave
The work to be performed consists of replacing nearly 2,736 LF combined sewer pipeline by excavating and replacing 160 LF combined sewer pipeline using pipe bursting techniques, manholes, manhole outside drops, abandoning manholes, drains, sewer services, concrete flatwork, and associated work. The Contractor shall provide all labor, materials, tools and equipment, and shall perform all work necessary to complete the subject project in place and make all required connections to the existing combined sewer system as shown on the Plans and as specified herein.

1.02 Specifications
The work to be performed under this contract shall be done in accordance with the Special Provisions contained herein. In these Special Provisions, reference is made to the Standard Specifications of the City of Sacramento (CSSS), most current, and all addenda, referred to herein as "Standard Specifications". The general requirements of this contract shall be governed by these Special Provisions first, followed by Sections 1 through 8 of the Standard Specifications. Other standards or specifications specified in these Special Provisions govern only the applicable technical specifications.

1.03 Time of Award
Time of Award for this contract shall be made within Sixty (60) calendar days after opening of the proposals to the lowest responsible bidder, per Section 3-2 of the Standard Specifications.
3 1.04 Providing Bonds and Surety
The Contractor shall provide signed agreement and surety bonds within ten (10) calendar days after receipt of notice to award by the City and prior to award by the City Council.

The contractor shall be reimbursed for all surety bond costs should the City Council not award a contract.

1.05 Interpretation of Contract Documents
Questions from bidders concerning the interpretation of any portion of the contract documents should be submitted in writing by E-mail (with E-mail delivery receipt request) to the City’s Representative at the following address:
http://www.planetbids.com/portal/portal.cfm?CompanyID=15300 Subject: Contractor Name and questions.

Interpretation, where necessary, will be made by the City in the form of an addendum to the contract documents and, when issued, will be sent as promptly as is practicable to all parties to whom the bid documents have been issued. All such addenda shall become part of the contract.

It shall also be the bidder's responsibility to call to the attention of the Engineer any missing pages or drawings in the contract documents including the addenda. These items shall be brought to the attention of the Engineer at least 7 calendar days prior to the bid opening date.

1.06 Proof of Compliance with Contract
In order that the Engineer may determine whether the Contractor has complied with the requirements of the contract documents not readily determinable through inspection and tests of plant, equipment, work, or materials, the Contractor shall at any time when requested, at the Contractor's expense, submit to the Engineer properly authenticated documents or other satisfactory proofs as to his compliance with such requirements.

1.07 Order of Work
Contractor will be allowed to work on a maximum of 3 different project locations at any given time. For the order of work only, work will be considered complete once the final AC pavement/concrete has been completed. Unless otherwise approved by the Engineer, Contractor shall complete the following 3 locations first:

1. 37th Street Alley

2. Rice Alley

3. 25th Street/Castro Way
4 Contractor may submit a proposed modification of the specified order of work that will be more satisfactory for the work’s operation. Contractor shall submit a revised progress schedule if modifications are made to the sequencing of the work.

1.08 Shop Drawings & Submittals
In accordance with Section 5-7 of the Standard Specifications, Contractor shall prepare and submit for review 5 copies of the following shop drawings and submittals:

1. Construction schedule

2. Pipe Bursting Construction Details
a) Detailed construction procedures and layout plans to include pipe bursting method; sequence of construction; insertion pit(s) size and locations; method to reconnect and restore sewer services; joining plan; equipment storage area; surface heave/settlement plan, etc.
b) Contractor qualifications: The Contractor shall submit a statement of qualifications, in conformance with the submittal requirements included herein, that demonstrates that the Contractor’s on-site foreman has a minimum three years of pipe bursting experience and has successfully completed at least five similar projects. Submittal shall include length, host pipe size, replacement pipe size and contact information that will allow confirmation of qualification statement.
c) Certifications: The Contractor shall submit certifications of training by the pipe bursting systems manufacturer stating that their operators have been fully trained in the use of the pipe bursting equipment. Certifications of training from the pipe fusion manufacturers shall also be submitted stating that the operators have been fully trained in the use of the fusion equipment.

3. Winterization/Wet weather plan (See Section 2.04)

4. Order of Work

5. Record drawings (monthly upon completion of work)

6. Concrete mix design (manholes and paving)

7. Hot Mix Asphalt (HMA) mix design and quality control plan (manholes and paving)

8. Quality Control Plan for the Project (manholes, pipe, asphalt, pipe bedding, concrete, aggregate base, and etc.)

9. Traffic control plan (City)

10. Water quality control plan

11. Proposed pipe material and fittings

12. Manhole rehabilitation

13. Pipe bedding, aggregate base, controlled density fill

14. Clean out assembly

15. Temporary diversion of flows (if necessary)

16. Dewatering plan (if necessary)

17. Public notification plan

18. Sheeting and Shoring Plan
5 19. Preconstruction Videos

20. CCTV inspection Videos

21. Trench Plates (including calculations for size and thickness)

22. Qualifications for welder responsible for constructing shoring system

23. Pavement Restoration Construction Plan

24. Health and Safety Plan
Contractor is advised that at the Engineer’s discretion, the above list may be expanded to include additional items to which Section 5-7 of the Standard Specifications will apply.

Contractor shall keep one copy of the approved Traffic Control Plan and the Water Quality Control Plan at the construction site at all times.

1.09 Project Sign
Prior to beginning any onsite work, the contractor shall install a total of 2 project signs.

The signs shall be supplied by the City and are approximately 30-inches by 54-inches.

Location and height of sign installation shall be as directed by the Engineer. Due to the nature of the operation, the Contractor, shall, at a minimum, install these signs on a type III barricade, above surrounding grade. If acceptable to the Engineer an existing signpost may be used. Each sign and post installed by the Contractor shall be removed at the end of the project and the sign returned to the City.

1.10 Manufacturer’s Instructions
Contractor shall comply with manufacturer's installation instructions and procedures in accordance with Section 5-16 of the City Standard Specifications.

1.11 Project Scheduling
The Contractor shall submit a detailed Critical Path Schedule (CPM) showing all items of work at least ten (10) days prior to initiating onsite construction. The schedule shall include the proposed sequencing of construction activities. The schedule shall be submitted, reviewed, and updated in accordance with Section 7-2 of the Standard Specifications. No progress payments will be made for work completed prior to acceptance of the schedule. The Contractor shall submit a revised progress schedule within 5 working days of the Engineers written request.

Contractor shall plan to attend regular weekly construction coordination meetings throughout the duration of the construction work and shall anticipate 1 to 1-1/2 hours each meeting. Weekend and night work where approved by City will be performed in accordance with Section 7-4 of the Standard Specifications and shall comply with the noise ordinance in Chapter 8.68 of the Sacramento City Code.

When change orders are initiated, delays are experienced, or the Contractor desires to revise the schedule logic, the Contractor shall submit to the Construction Manager a written Time Impact Analysis (TIA) illustrating the influence of each change, delay, or Contractor request on the current contract schedule completion date. Each TIA shall 6 demonstrate how the Contractor proposes to incorporate the change order, delay, or Contractor request into the Schedule. The analysis shall demonstrate the time impact based on the date of occurrence of the change, delay or revision; the status of construction at that point in time; and the impact of all affected activities. The event times used in the analysis shall be those included in the latest updated copy of the CPM Schedule or as adjusted by mutual agreement between the Engineer and Contractor.

The TIA must:

1. Illustrate the impacts of each change or delay on the current scheduled completion date or internal milestone.

2. Use the accepted schedule that has a data date closest to and before the event. If the Engineer determines that the accepted schedule used does not appropriately represent the conditions before the event, the accepted schedule must be updated to the day before the event being analyzed.

3. Include an impact schedule developed from incorporating the event into the accepted schedule by adding or deleting activities or by changing durations or logic of existing activities. If the impact schedule shows that incorporating the event modifies the critical path and scheduled completion date of the accepted schedule, the difference between scheduled completion dates of the 2 schedules must be equal to the adjustment of Contract time.

1.12 Record Drawings
The Contractor shall maintain a neat and accurate marked set of record drawings showing the final locations and layout of piping and conduit; structures; and other facilities.

Drawings shall be kept current weekly, with all work instructions and change orders, and construction adjustments. Installed cleanouts shall be dimensioned to the nearest property line or be assigned stations to the nearest foot. Drawings shall be subject to the inspection of the Engineer at all times and progress payments, or portions thereof, may be withheld if drawings are not accurate and current. Pipe material shall be added to drawing, if not denoted on contract drawings. Prior to acceptance of the work, the Contractor shall deliver to the Engineer one (1) set of neatly marked record drawings accurately showing the information required above.

Record drawings shall be submitted and approved by the Engineer in accordance with "Shop Drawings and Submittals" of these Special Provisions.

1.13 Materials and Equipment
The Contractor is responsible for the care and protection of all materials and equipment until the completion and final acceptance of the work, in accordance with Section 5-15, 5-16, 5-17, 5-18, 5-21, and 5-22 of the Standard Specifications and these Special Provisions. PVC pipe manufactured by JM Pipe or PW Eagle Pipe will not be allowed.

1.14 Control of Materials Testing
Comply with the provisions of Section – 1.14 Quality Control.

Contractor’s attention is directed to CSSS Sections 5-22 thru 5-24. City will retain an 7 independent testing firm to perform initial soil/aggregate/asphalt compaction tests; castin-place concrete slump and strength tests; grout strength tests; and any other additional test required by the City. Contractor shall perform all other required testing and submit written test results to the Engineer.

In addition to the requirements of Section 5 of the CSSS and Section 6-3.01 of the State Standard Specifications the contractor shall follow material testing for this project will be provided by the Contractor as set forth in Section 6 of the State Standard Specifications and the most current City of Sacramento Quality Assurance Program. The Contractor shall perform all testing to verify compliance with the City and State Specifications of any and all materials furnished by the Contractor. The Contractor shall submit and receive the Engineer’s approval of all compliance test results prior to incorporating materials into the
project.

Engineer shall be given two (2) working days-notice prior to each test performed by Contractor.

Any system material or workmanship found defective on the basis of acceptance tests shall be reported to the Engineer. Contractor shall replace the defective material or equipment and have testing repeated without additional cost to the City, until test results are satisfactory to the Engineer. The City will only pay for initial testing services for concrete strength and slump, soil compaction, and grout strength.

When initial tests indicate non-compliance with the Contract Documents, the costs of any additional tests required for determining compliance will be deducted by the City from the Contract Sum due the Contractor.

1.15 Quality Control
A. Definition
Specific quality control requirements for the Work are indicated throughout the Contract Documents. The requirements of this Section are primarily related to performance of the Work beyond furnishing of manufactured products. The term "Quality Control" includes inspection, sampling and testing, and associated requirements.

1. Quality Control: All those planned and specified actions or operations necessary to produce a product or service that will meet requirements for quality as specified. Quality Control is the responsibility of the Contractor. The Contractor will monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.

2. Quality Assurance: Those planned and systematic operations conducted to ensure that the operations and/or products incorporated into the project meet the project specifications. Quality Assurance encompasses oversight of the Contractor’s Quality Control; verifying the results of Contractor testing; review 8 of sampler, tester and laboratory qualifications; independent assurance sampling and testing, and inspection for conformance with the plans and specifications. Quality Assurance is the responsibility of the Contractor and Engineer.

B. Quality Control Program:

1. Contractor shall develop a detailed written Quality Control (QC) Program for all Work required in the Contract Documents. The Contractor must submit for the Engineer’s acceptance the Contractor’s Quality Control Program (QC Program) for the entire Project before beginning any of the Work other than mobilization tasks to install temporary facilities. Except for mobilization, no other work will begin until the Engineer has accepted the Contractor’s overall QC Program for the project. This QC Program must meet the objectives and requirements as defined herein. The QC Program must be specific to this Project and the Contract Documents.

2. In addition, the Contractor must submit for the Engineer’s acceptance the Contractor’s individual QC Plans before starting each area or section of the Work and/or new specialty trade to complete any portion of the Work. Work will be permitted to start only after the Engineer reviews and accepts Contractor's individual QC Plan. The individual QC Plans must identify all QC personnel, procedures, inspections, laboratories, Testing equipment calibrations and certifications, tests, inspection/test hold points, instructions, sampling and testing records organized by date and type of material, reports, records, schedules, etc. specific for each area or division of the Work and/or new specialty trade to complete any portion of the Work.

3. Contractor shall appoint a Quality Control Officer who will have the responsibility for the oversight, implementation, and monitoring of the QC Program on this one project. Contractor shall maintain a log of required testing indicating the tests or sampling and test method required, location, frequency and responsibility.

4. Contractor shall provide written procedures defining methods of construction, control measures, and the performance of inspections and testing for the different types of Work.

5. Procedures shall detail “Hold Points,” where Work shall not proceed until the required Quality Control functions are performed and documentation shows the Work meets the requirements of the Contract.

6. Procedures shall detail problem resolution steps and corrective actions in the event the Work does not meet the Contract Specifications.

7. Procedures shall be provided for all major activities of Work.

8. Contractor shall maintain evidence of activities affecting quality, including operating logs, records of inspections and tests, audit reports, material 9 analyses, personnel qualification and certification records, procedures, and document review records.

9. Quality records shall be maintained in a manner that provides for timely retrieval, and traceability. Quality records shall be protected from deterioration, damage, or destruction.

10. Within 24 hours, notify the Engineer of any noncompliance identified by your QC program. The Contractor shall provide the City access to all QC records.

11. Submit QC test data and QC test results within 2 business days of test completion.

C. Sampling and Testing

1. Unless otherwise indicated, all products, materials, and equipment shall be subject to inspection by the Engineer at the place of manufacture as specified in the CSSS.

2. The City or an independent firm retained by the City will perform inspections, testing, and other services as required by the Engineer. a. The Contractor shall cooperate with the Engineer or independent firm and furnish samples of materials, design mix, equipment, tools, storage, and assistance as requested.
b. The Contractor shall notify Engineer three (3) working days prior to the expected time for operations requiring inspection and laboratory testing services.
c. Retesting required because of non-conformance to requirements shall be performed by the same independent firm on instructions by the Engineer. The Contractor shall be responsible for all costs including administrative, material testing, design and, engineering activities directly related to such retesting.

D. Installation

1. Inspection: The Contractor shall inspect materials or equipment upon the arrival on the job site and immediately prior to installation and reject damaged and defective items.

2. Measurements: The Contractor shall verify measurements and dimensions of the Work, as an integral step of starting each installation.

3. Manufacturer's Instructions: Where installations include manufactured products, the Contractor shall comply with manufacturer's applicable instructions and recommendations for installation, to whatever extent these are more explicit or more stringent than applicable requirements indicated in 10 Contract Documents.
a. When manufacturers' instructions conflict with Contract Documents, request clarification from Engineer before proceeding.

1.15 Contractor’s Safety Program
Contractor shall provide a written IIP Program conforming to Cal-OSHA requirements.

IIP Program shall be customized to prevent workplace injuries and illnesses specific to the work on this contract. Written copy of the IIP Program shall be maintained at the job site. As a minimum the IIP Program shall contain the following elements; responsibility, compliance, communication, hazard assessment, accident/exposure investigation, hazard correction, training & instruction, and recordkeeping. Refer to “Cal/OSHA Pocket Guide for the Construction Industry” dated June 2015 and website:
http://www.dir.ca.gov/dosh/puborder.asp for further information.

1.16 Novel Coronavirus (Covid-19) Safety Requirements

1. GENERAL
a. Section Includes: COVID-19 safety requirements to address the COVID-19 epidemic, including without limitation any requirements imposed by federal, state, and local guidelines and orders or those necessary for performance of work safely.
b. These COVID-19 safety requirements are not all encompassing and may need to be modified by the Contractor for individual construction tasks and updated as the COVID-19 epidemic evolves.
c. The Contractor and all its sub-tier level subcontractors and suppliers shall account in their Bid and sub-bids for all cost impacts whether affecting labor (including, but not limited to obtaining qualified workers, quantity of workers, as well as their productivity), deliveries, supervision, testing and/or procurement of materials and/or equipment and time caused by any COVID-19 safety requirements, including without limitation those found in this Section and also all public health and governmental directives in place at the time Bids are received by the City for this Project.

2. COVID-19 EXPOSURE PREVENTION, PREPAREDNESS, AND RESPONSE PLAN
Contractor’s Responsibility
a. The Contractor shall prepare a COVID-19 Exposure Prevention, Preparedness and Response Plan (a “COVID-19 Plan”) specific to this Project that describes how to prevent worker exposure to coronavirus; protective measures to be taken on the jobsite; personal protective equipment and work practice controls to be 11 used; cleaning and disinfecting procedures; and procedures to follow if a worker shows symptoms of COVID-19 illness or tests positive for COVID-19. In addition to any governmental or other guidance available at the time of Bid submission, the Contractor should review OSHA COVID-19 Workplace Safety Guidance
documentation, such as:
https://www.osha.gov/Publications/OSHA3990.pdf, as a resource in preparation of its COVID-19 Plan. Other reliable and current sources of COVID-19 information can be found from:

The California Department of Public Health (CDPH, State), including without limitation, guidance such as::
https://www.cdph.ca.gov/Programs/CID/DCDC/Pages/Immunization /nCOV2019.aspx
The federal Centers for Disease Control and Prevention (CDC, National), including without limitation, guidance such as:
http://www.cdc.gov/coronavirus/novel-coronavirus-2019.html The Sacramento County Public Health Department, including without limitation, guidance found here:
https://www.saccounty.net/COVID-19/Pages/default.aspx
b. The Contractor’s COVID-19 Plan shall at a minimum address the following COVID-19 safety guidelines:

1. COVID-19 Employee and Visitor training and check-list before entering worksite.

2. Employee distancing and strategies to maximize distancing when possible.

3. Limitations on gathering size.

4. Personal Protective Equipment (PPE) requirements.

5. Identification of “choke points” and “high risk areas” such as hallways, hoists and elevators, break areas and vehicles.

6. Staggering trades and modification of work schedules to reduce worker density to maximize distancing opportunities.

7. COVID-19 employee good personal hygiene measures.

8. Disinfection and cleaning requirements.

9. Personal prevention actions requirements for all employees.

10. Toolbox and Tailgate COVID-19 employee training.

11. Recognition of COVID-19 Symptoms.

12. Procedures for COVID-19 exposure and notification to others who were at the Site.

13. Daily screening protocols for arriving workers and visitors to ensure potentially infected workers and visitors do not enter the Site.

14. Maintenance of daily attendance logs of all workers and visitors who enter the Site.
c. Also, as part of this Plan, the Contractor shall draft and implement a 12 COVID-19 Code of Safe Practices that is posted in areas visible to all employees and visitors.
d. The Contractor shall be prepared at each Progress and Coordination Meeting, if requested by the Construction Manager, to provide information relevant to the application, enforcement, and implementation of the Code of COVID-19 Safe Practices.
e. All Contractor managers and supervisors (from forepersons to project managers) must be familiar with the COVID-19 Plan and be ready to answer questions from employees, subcontractors, suppliers and visitors. Managers and supervisors must set a good example by following the COVID-19 Plan at all times. This involves practicing good personal hygiene and jobsite safety practices to prevent the spread of the virus. Managers and supervisors must encourage this same behavior from all employees, subcontractors, suppliers and visitors. f. The Contractor shall immediately notify the Construction Manager if any person under the Contractor’s control on this Project has tested positive for COVID-19.
g. The Contractor is responsible to provide to the Engineer its COVID-19 Plan. This plan is due to the Engineer at the preconstruction meeting.

No work shall be permitted until this plan is accepted by the Engineer.

1.17 Inspection
In addition to Section 5-20 Inspection of the City Standard Specifications, the following shall apply:

All work is subject to inspection and approval by the Engineer. The Contractor shall notify the Engineer, along with all affected utility companies, two (2) working days in advance of the start of work to coordinate and schedule inspection staff.

The City will provide inspection cost Monday - Friday (7:00 AM to 5:00 PM) basis only excluding designated City, State, or Federal holidays. If night work (7:00 PM to 5:00 AM) is required, the City will also provide inspection costs for Night work starting Sunday night through Friday morning. The Contractor shall reimburse the City in the amount of $175.00 per hour for the actual cost of all inspection cost for work requested outside of the contract working hours, Saturday and Sunday work, or inspection performed during designated City, State, or Federal holidays. Designated City holidays are listed in the City of Sacramento Standard Specifications.

1.18 Cooperation with City and Other Contractors
The Contractor shall cooperate with other forces constructing, relocating, and/or modifying facilities within the project limits. The Contractor shall coordinate their work with that of others, including private developers and utility companies, to prevent delays.

The Contractor shall provide to the City written confirmation of any utility relocations 13 identified in the plans prior to proceeding with work in that area.

It is understood and agreed that the Contractor has considered this in the bid all of the permanent and temporary utility appurtenances in their present and/or relocated positions, as shown on the plans, or as described in the specifications, and that no additional compensation will be allowed for any delays, inconvenience, or damages sustained due to any interference from said appurtenances or the operation of moving them. In addition, the Contractor shall not be allowed any additional compensation for delays of inconvenience sustained by the Contractor due to the City not having Citysupplied equipment ready for pick-up. In such a case, the City may increase the number of working days for the contract.

In addition to Section 6-17, “Contractor’s Legal Address,” of the CSSS, five (5) days prior to beginning work, the Contractor shall provide to the Engineer, in writing, the name and telephone number of a representative who is directly involved with this project, and under the supervision of the Contractor. The Contractor’s representative may be contacted by City staff during non-working hours including nights, weekends and holidays in the case of any public inconvenience and/or emergency relating to the Contractor’s operations. The contact representative shall not be replaced by another company employee for the duration of the project without a written explanation from the Contractor which has been approved by the Engineer. Should a new representative be used, he/she shall be knowledgeable of the project, the events, and/or revisions that may be occurring.

1.19 Public Outreach
Successful completion of the project will require a significant amount of public outreach to mitigate the potential negative impacts associated with working in a major urban transportation corridor. The Contractor shall complete all tasks as requested by the City to distribute information and provide a representative to participate in public or closed meetings associated with the City’s effort to inform stakeholder’s regarding the current or future activities associated with execution of the project.

1.19 Permits
The Contractor shall obtain a permit from the division of occupational safety and health prior to any trenching excavation five feet or more in depth. A copy of this permit shall be available at the construction site at all times.

1.20 Permanent Survey Monuments
The Contractor is responsible for verifying that arrangements have been made for preserving and/or perpetuating all permanent survey monuments affected by the work, in accordance with Section 5-6 of the Standard Specifications.

1.21 Administrative Penalty Ordinance
14 The Contractor shall become familiar with Chapter 12.20 of the City Code which contains minimum requirements and restrictions relating to construction activities within the City right of way and establishes administrative penalties for non-compliance of these requirements. The Contractor may be assessed the administrative penalty for each violation of any provision addressed by the ordinance, unless modified herein, and amounts can be deducted from the Contract. The ordinance includes the following general categories:
x Working hours for the City’s “Primary Streets”
x Traffic control plan requirements
x Access to private property
x Maintenance of construction areas
x Maintenance of traffic, public safety and convenience x Repair of traffic control systems
x Care of existing known facilities
x Protection of existing improvements
x Public notification
x Noise levels
Copies of the ordinance are available from the City Clerk’s Office, 915 I Street, Sacramento, CA. 95814, and at www.cityofsacramento.org.

1.22 Water Quality Control
The Contractor shall be responsible for the requirements consisting of regulations contained in the National Pollution Discharge Elimination System (NPDES) Stormwater Permit, issued to the City and in accordance with Section 16 of the Standard Specifications.

The Contractor shall prepare and submit an erosion, sediment and pollution control plan (ESC Plan) to the Engineer for review. The ESC Plan shall be submitted a minimum of 48 hours prior to start of the work. The Contractor shall not begin work until an accepted ESC Plan is on file with the Engineer.

The City reserves the right to take corrective action and withhold the City’s costs for corrective action from progress payments or final payment in accordance with Section 7, “Retention of Sums Charged against the Contractor”, of the Agreement, contained herein.

Any fines, including third-party claims, levied against the City as a result of the Contractor’s non-compliance are the Contractor’s sole responsibility and will be withheld from progress payments or final payment in accordance with Section 7, of the Agreement.

1.23 Project Closeout
When the project is completed in accordance with the Plans and Specifications, the Contractor shall notify the Engineer of the completion of the project at which time the City will prepare a list of deficient work items, or punch list, and after all punch list items have been completed to the satisfaction of the Engineer, and as-built drawings are completed and submitted, a completion report will be prepared, as detailed and in accordance with 15 Section 8-4 of the Standard Specifications.

1.24 Payment
Full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in performing and complying with these General Requirement items shall be considered as included in the prices paid for in the various contract bid items the Contractor deems appropriate, and no additional compensation will be allowed. **END OF SECTION**

16 SECTION 2– PUBLIC CONVENIENCE & PROTECTION OF EXISTING CONDITIONS

2.01 Public Right-of-Way and Easements
All water, sewer & drainage pipe and appurtenances constructed as part of this project are to be placed within public street rights-of-way and easements. The Contractor shall confine his or her operations within the limits of existing street right-of-way or easements as much as practicable.

In the event the Contract requirements necessitate the Contractor to encroach onto adjoining private property the Contractor shall make all necessary arrangements with the owner of the property for such encroachment. A copy of any written agreements entered into between the Contractor and the property owner concerning encroachment onto private property shall be provided to the Engineer prior to beginning any work on the property described in the agreement.

2.02 Existing Facilities
Protection and maintenance of existing utilities shall meet the applicable requirements of Sections 13 of the Standard Specifications and these Special Provisions.

The location, alignment, and depth of existing underground utilities as shown on the Plans are taken from public records and no responsibility is assumed for the accuracy thereof.

For the most part, underground utility services are not shown on the Plans. Attention is directed to the provisions in Section 6-19 of the Standard Specifications.

The Contractor will ensure that utility services to customers in the project are maintained.

The Contractor is expected to "pothole" existing underground utilities a minimum of ten (10) working days in advance at any location where an existing utility may be in conflict with the proposed work. Potholing shall be performed in accordance with Section 3.01 of these Special Provisions.

The cost of relocating existing overhead and/or underground utilities, not specified on the Plans to be relocated, but are relocated or cut and reconnected at the Contractor’s choice, shall be borne by the Contractor.

2.03 Coordination of Work
The Contractor shall cooperate and coordinate regularly with the residents and business owners along the alley ways and streets throughout the duration of construction and shall minimize impacts to the residents and business owners.

2.04 Maintaining Water, Sewer & Drainage Flows
The Contractor shall be responsible maintaining water, sewer, and drainage flows including emergency repairs and temporary bypasses in accordance with Section 13-2 of the City Standard Specifications and these Special Provisions. 17 The Contractor shall be responsible for maintaining existing sewer flows until new sewer improvements are complete and functioning. The cut sewer services shall be replaced or repaired by 5:00 PM of the same day and shall be constructed per Standard Drawing S-260 & S-265.

The Contractor shall be responsible for maintaining existing drainage flow until the final completion of the project. This includes removal of ponded water from any temporary low points created during construction.

The Contractor shall be responsible for maintaining existing drainage flow until the final completion of the project. The Contractor shall submit winterization plans prior to beginning construction. Winterizations plans shall be executed for the project if construction is not substantially complete prior to October 31 or if wet weather of three consecutive days is predicted, whichever comes first. The Contractor may restart construction work if dry weather is predicted for a minimum of three days, and work is approved by the Engineer.

No additional compensation will be paid to the Contractor for maintenance of existing facilities; the cost of this work shall be included in the various contract items of work.

2.05 Temporary Diversion of Sewer and Drainage Flows
Should it become necessary for the Contractor to temporarily divert, bypass, or impound flows carried by existing sewer or drainage systems through or around the construction operations within the limits of this project, the Contractor shall prepare a plan of such diversion, bypass, or impoundment and submit the plan to the Engineer for approval.

The plan shall be sufficiently detailed to illustrate the concept proposed. The plan shall also provide information on the quantity of flow to be conveyed by the diversion or bypass system or the volume to be impounded. The plan shall indicate the number, size and configuration of any channel, and the size and configuration of any impoundment basin to be used.

The plan for temporary diversion or bypassing of existing sewer or drainage flows shall be submitted to the Engineer a minimum of ten (10) working days prior to the start of work on any temporary system. The Contractor shall not begin work on temporary diversion, bypass, or impoundment system until an approved plan is on file with the Engineer.

No additional compensation will be paid to the Contractor for temporary diversion, bypassing, or impoundment of existing sewer or drainage flows. The cost of such work shall be included in the various contract items of work.

2.06 Work Performed by City Crews
The Contractor is advised that the City retains the option of performing with City crews all or a portion of any work involved in relocating, repairing, or otherwise restoring existing sewer, water, and drainage systems and services to developed properties within the limits of the project that may be in conflict with the proposed project improvements. Any such 18 work performed by City forces will be at the discretion and convenience of the City. All work performed and materials provided by the City will be paid for by the Contractor or removed from this contract at no additional cost to the City.

2.07 Existing Site Conditions
Bidders are directed to Section 2-4 of the Standard Specifications which require Bidders to examine the project site.

2.08 Handling and Removal of Hazardous or Contaminated Materials In the event hazardous or contaminated materials are encountered at the site for which separate handling or removal provisions have not been made in these Special Provisions, the Contractor shall stop work on that item, contact the Engineer and schedule his operations to work elsewhere on the site, if possible. The City will be responsible for handling and removal of hazardous material or may request that the Contractor be made available, through contract change order, to provide additional services as needed for the completion of the work. Additional services may consist of retaining a subcontractor who possesses a California license for hazardous substance removal and remedial actions.

Hazardous or contaminated materials may only be removed and disposed of from the project site in accordance with the following provisions:

1. All work is to be completed in accordance with the following regulations and requirements:
a. Chapter 6.5, Division 20, California Health and Safety Code. b. California Administration Code, Title 22, relating to Handling, Storage, and Treatment of Hazardous Materials.
c. City of Sacramento Building Code and the Uniform Building Code, 1994 edition.

2. Coordination shall be made with the County of Sacramento Environmental Management Department, Hazardous Materials Division, and the necessary applications shall be filed.

3. All hazardous materials shall be disposed of at an approved disposal site and shall only be hauled by a current California registered hazardous waste hauler using correct manifesting procedures and vehicles displaying a current Certificate of Compliance. The Contractor shall identify by name and address the site where toxic substances shall be disposed of. No payment for removal and disposal services shall be made without a valid certificate from the approved disposal site that the material was delivered.

None of the aforementioned provisions shall be construed to relieve the Contractor from the Contractor’s responsibility for the health and safety of all persons (including employees) and from the protection of property during the performance of the work. This requirement shall be applied continuously and not be limited to normal working hours. 19 2.09 Health and Safety
The Contractor is warned that existing sewers and appurtenances have been exposed to sewage and industrial wastes. These facilities shall therefore be considered contaminated with disease-causing organisms. Personnel in contact with contaminated facilities, debris, wastewater, or similar items shall be advised by the Contractor of the necessary precautions that must be taken to avoid becoming diseased. It is the Contractor's responsibility to urge his personnel to observe a strict regime of proper hygienic precautions, including any inoculations recommended by the local public health officer.

Because of the danger of solvents, gasoline, and other hazardous material in the existing sewers, these areas shall be considered hazardous to open flame, sparks, or unventilated occupancy. The Contractor shall be aware of these dangers and shall take the necessary measures to assure his personnel observe proper safety precautions when working in these areas.

The Contractor shall not allow any wastewater to discharge from sewage collection systems onto adjacent lands or waters. In case of accidental discharge, the Contractor shall be responsible for containment, immediate cleanup and disposal at his own expense to the full satisfaction of the Engineer. Where containment is not possible, adequate disinfection shall be provided by the Contractor at his expense as directed by the Engineer or agency with jurisdiction. If, in the opinion of the Engineer, the Contractor fails to adequately follow the above guidelines, he will make arrangements to have the work done by others, and have the cost charged to the Contractor.

2.10 Public Notification of Work
The Contractor shall notify property owners and/or tenants adjacent to the project limits in writing ten (10) working days in advance of beginning work. The notice shall be approved by the Engineer and shall describe the work to be performed, the anticipated duration of construction and the name and telephone number of the Contractor’s representative that can be reached 24 hours a day, seven (7) days a week. See sample notification letters in Appendix B.

2.11 Maintenance of Traffic, Public Safety and Convenience The Contractor's attention is directed to Sections 6-6 through 6-11, 7-4 and 16-3 of the Standard Specifications.

Spillage resulting from hauling operations along or across any public traveled way shall be removed immediately by the Contractor at his expense. Water or dust palliative shall be applied if ordered by the Engineer for the alleviation or prevention of dust nuisance.

All persons performing work shall repair or replace, to previous condition or better, all existing traffic control system markers or devices that are damaged or destroyed during work within three (3) calendar days of the completion of work in the immediate area unless 20 written direction extending the time period or relieving the persons performing work of this obligation is provided by the Engineer.

The Contractor will ensure that utility services to customers in the project are maintained.

Contractor shall not interfere with or impair any railroad operations in accordance with Section 6-6 of the City Standard Specifications.

The Contractor shall be required to establish traffic scheduling and control measures acceptable to the Engineer prior to starting any work. The Contractor shall submit to the Engineer for review and approval a plan showing proposed traffic control measures and/or detours for vehicles and pedestrians affected by the construction work. This plan shall be submitted a minimum of ten (10) working days prior to the scheduled commencement of any work by the Contractor. The Contractor will not be allowed to begin work until an approved plan is on file with the Engineer. In addition, the approved plan shall be kept on hand at the project site at all times while construction is in progress. All advance warning and traffic delineation shall conform to the provisions of Section 6-10 of the Standard Specifications.

The Contractor’s traffic control plan shall include location of proposed work area, locations of areas where the public right of way will be closed or obstructed, any proposed phases of traffic control and time period of when traffic control will be in effect. The traffic control plan shall also include name and business address of Contractor and a statement that the Contractor will comply with City’s noise ordinance.

The Contractor shall be solely and completely responsible for furnishing, installing, and maintaining all warning signs and devices necessary to safeguard the general public and the work, and to provide for the safe and proper routing of all vehicular and pedestrian traffic during the performance of the work. The requirement shall apply continuously and shall not be limited to normal working hours.

The Contractor shall perform the following requirements included in the City ordinance Chapter 12.20, with this contract:

1. The Contractor shall not cause public rights-of-way, public property or public easement to be covered with construction related trash, debris, garbage, waste material or soil. Areas affected by the construction, must be cleaned to the satisfaction of the Engineer prior to re-opening to the public.

2. Trench plates shall not be utilized for more than three (3) calendar days in one location and temporary surfacing shall not be utilized for more than five (5) calendar days in one location without prior written approval of the Engineer.

3. The Contractor shall provide access to all existing driveways at all times except when excavation is in progress, when forms are in place, when concrete or asphalt is being placed or unless other arrangements are made with the property owner. The Contractor shall take precautions so as not to entrap vehicles on 21 private property during the progress of the work. Driveways may be closed only during normal working hours and only after giving property owners a minimum of twenty-four (24) hours’ notice in advance of the closure. Access for emergency vehicles shall be available on all streets within the construction area at all times.

4. Rear access to buildings and existing parking areas behind buildings shall be maintained. If arrangements have been made with property owners, the Contractor may close such access for a limited time. Contractor shall give property owners forty-eight (48) hours’ notice in advance of the closure.

5. Provide for pedestrian traffic at all times except where closures are approved in advance by the Engineer.

6. At least one (1) lane of traffic shall be maintained at all times in the street. All work within public streets and/or roadway right-of-way shall be done in an expeditious manner so as to cause as little inconvenience to the traveling public as possible. Skid - resistant steel plates or other approved methods shall be used to cover all open excavations in the roadway during non-working hours for the entire project.

7. City working hours are defined to be between 7:00 am and 6:00 pm, Monday through Friday, excluding legal holidays unless otherwise defined in these Special Provisions.

8. For work done before 7:00 A.M. or after 6:00 P.M., or during all daylight hours between 6:00 P.M. Friday to 7:00 A.M. Monday, the street or alley may be closed provided proper detours are provided and only if arrangements have been made with the property owners in advance and approved by the Engineer. A minimum of five (5) working days’ notice shall be given to property owners in advance of closure.

9. At night and at other times when work is not in progress, the entire roadway and alley shall be open to the public for pedestrian and vehicular traffic.

All signs and street marking damage caused by or related to the construction of this project shall be replaced in kind by the Contractor. In the case of partial damage to lane stripes and traffic lettering the whole stripe or marking in its entirety shall be replaced.

Temporary markings and striping shall be installed within 72 hours (three working days) of damage.

Prior to commencing work and/or closing the street or alley, Contractor shall contact the following City Divisions and agencies:

1. Police Communication Center one (1) working day prior to closure by calling 277- 1750, or fax at 277-1772.

2. Fire Department Communications Center one (1) working day prior to closure by 22 calling 228-3035 or fax at 228-3082.

3. City Traffic Engineering Services five (5) working days prior to closure by calling 808-5307.

4. City Solid Waste Division five (5) working days prior to closure by calling 808- 4952 or fax at 808-4999. The Contractor shall also coordinate with the property owners all relocations of trash receptacles necessary to maintain garbage collection.

4. Street Parking five (5) working days prior to closure by calling 808-5579 or fax at 808-7501.

5. Regional Transit five (5) working days prior to closure by calling Lynn Cain at 321-5375 or fax at 557-4541.

At a minimum, the information faxed shall include:
x Project name and number
x Contractor’s name and a 24-hour phone number
x City of Sacramento’s project manager’s name
x City Inspector Name and phone number
x Limits of street closure, with street names
x Duration of street closure
The Contractor shall cooperate with and notify the above listed of proposed construction operations and traffic control operations a minimum of five working days before work is to begin in each work area. If changes are made to the traffic control plan, Contractor shall re-notify at least two working days before work is to begin. In addition, the Contractor shall make available a 24-hour telephone number in case of emergencies and/or problems.

2.12 Removal of Street Parking
In locations where the Contractor's operations require removal of on-street parking, such removal shall be in accordance with Section 6-18 of the Standard Specifications. Failure to comply with this section will prevent the City from towing vehicles parked in the proposed work area.

2.13 Payment
Full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in performing and complying with these General Requirement items shall be considered as included in the prices paid for in the various contract bid items the Contractor deems appropriate, and no additional compensation will be allowed. **END OF SECTION**
23 SECTION 3 – GENERAL SEWER CONSTRUCTION REQUIREMENTS

3.01 Utility Potholing
A. Prior to construction, the Contractor shall contact Underground Service Alert (U.S.A.) to field locate and mark at the surface, existing utilities and utilities structures within the project area. Three (3) weeks prior to excavation for pipeline installation, the Contractor shall pothole and survey all utilities along the proposed pipeline alignment. Level 3 Communications shall be provided 72- hours’ notice prior to potholing their facilities to schedule field personnel to be onsite to observe and advise during potholing operations. Existing potholed utility information shown on the Plans provide accurate information of the potholed utility at that specific pothole location only. The City makes no guarantee that the potholed underground utility remains at the same alignment and depth away from the pothole location.

B. A representative from the City shall be onsite during the pothole operations. The Contractor shall submit pothole and survey information to the Engineer a minimum of 10 days prior to beginning construction.

C. The following information shall be collected for each pothole: 1) brief description of location, stationing, and alignment (e.g. parallel or perpendicular to pipeline) 2) asphalt thickness, 3) size and type of utility, and 4) depth of utility infrastructure measured from finished grade to the top of utility. Where duct banks or concrete encased utilities are encountered, the top and bottom depths from finished grade shall be collected and included with the above information.

D. Surface restoration within the proposed trench width shall be temporary paving per these Special Provisions and City Standard Specifications. If pothole excavation falls outside of proposed pipeline trench width, permanent paving shall be performed per the Pavement Cutting and Surface Restoration section of these Special Provisions.

3.02 Sheeting, Shoring, and Bracing
A. Shoring refers to providing all components of the excavation support system, including, but not limited to, bracing, steel soldier piles or sheet piles, struts, walls, or any other support including internal bracing, where applicable.

Contractor shall use other methods of support only when approved by the Engineer. Shoring shall be designed, provided, maintained, and where applicable, removed by the Contractor, in accordance with these Special Provisions and the Construction Documents.

B. As required by Section 6705 of the California Labor Code and in addition thereto, whenever work under the contract involves the excavation of any trench or trenches 5 feet or more in depth, including temporary construction pits and 24 manhole excavations, the Contractor shall submit to the Engineer a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plans vary from the shoring system standards established by the Construction Safety Orders of the Division of Industrial Safety, in Title 8, Subchapter 4, Article 6, California Code of Regulations, the plans shall be prepared and signed by a registered civil or structural engineer employed by the Contractor. Shoring system plans for excavations in excess of 5 feet or more in depth, shall be prepared and signed by a civil or structural engineer, registered in California and employed by the Contractor. All costs therefore shall be included in the bid price named in the contract for completion of the work as set forth in the contract documents. Nothing in this section shall be deemed to allow the use of a shoring, sloping or other protective system less effective than that required by the Construction Safety Orders. Nothing in this section shall be construed to impose tort liability on the City, Engineer, Design Consultant, or any of their officers, agents, representatives, or employees.

C. The sheeting, shoring, and bracing system shall be designed to assure worker safety and optimal conditions for pipe installation, and to minimize damage to adjacent pavement, structures, fences, walls, pipelines, and utilities. Horizontal strutting below the barrel of a pipe and the use of pipe as support are not acceptable.

D. The sheeting, shoring, and bracing system shall be designed and constructed to meet all the following minimum requirements:

1. Protect personnel that enter excavations.

2. Comply with all governing regulations pertaining to excavation safety (e.g., the most current edition of Cal/OSHA Construction Safety Orders, Article 6).

3. Be compatible with the surface and subsurface soil and groundwater conditions encountered in project borings, reference borings, reference CPTs and/or mapped along the project alignment, and resist lateral earth pressures, and hydrostatic pressures in and where applicable.

4. Protect adjacent existing utilities, pipelines, pavements, structures, fences, and walls.

5. Excavation and installation of shoring shall occur in a manner and sequence that does not damage existing utilities, pipelines, pavements, structures, fences, and walls including through settlement, heave, or vibrations.

6. Prevent raveling, running, flowing, caving, sloughing, or lateral movement of excavation walls and associated loss of adjacent ground and adjacent ground surface settlement, even when subjected to construction vibrations. 25 7. Allow for removal or abandonment of shoring in a manner and sequence that:
1) is in step with the backfilling sequence (i.e., shoring should not be removed ahead of backfilling); 2) does not cause disturbance (i.e., loosing) of pipe bedding and pipe embedment material; and 3) does not damage existing pipelines or structures, pavements, utilities, fences, and walls including through settlement, heave, or vibrations (contractor to address removal/abandonment concerns specific to the type
of shoring proposed in the shoring submittal). Any void space created by shoring removal should be completely filled with CLSM or approved equivalent.

8. Resist lateral earth pressures including those from hydrostatic pressures and lateral loads from vehicular, construction equipment (and spoils, and nearby existing structures, even when subject to construction vibrations.

9. Provide stable excavation walls and bottom (e.g., prevent bottom heave and/or piping/boiling).

E. The Contractor shall design and construct the shoring system in accordance with all applicable codes, and in accordance with the specific requirements described herein. The Contractor shall at all times furnish, install, and maintain sufficient shoring and bracing in trenches and pits to ensure safety of the workmen and to protect and facilitate the work.

F. The Contractor shall:

1. Design each member or support element to support the maximum loads that can occur during construction with appropriate safety factors. A temporary shoring system shall be designed to provide a minimum factor of safety of 2.0 against sliding and 1.5 against bottom heave.

2. Design the support system to prevent raveling, running, and flowing of excavation walls and associated loss of adjacent ground and adjacent ground surface settlement or existing trench material at utility crossings.

3. Design the support system to retain non-cohesive granular soils subject to raveling, flowing, and/or running upon vibration from construction equipment including compaction of backfill.

4. Design excavation support systems in accordance with all CAL/OSHA, and OSHA, requirements.

5. Design the support system to support the loads for the full vertical depth of the trench included up to 2 feet of over excavation.
26 6. Obtain all appropriate permits and obtain all necessary written approvals of the proposed shoring system/designs from CAL-OSHA prior to submitting to the Engineer for review and approval.

G. Contractor shall take into account all surcharge loadings. Surcharge loadings can be due to such things as material or soil stockpiles, sloping ground adjacent to shoring, and adjacent building foundations, Contractor shall assure that his assumed conditions and loadings are not exceeded in the field during construction. The Contractor shall design shoring to withstand any construction loading. The design of shoring shall conform to accepted engineering practice in this field. The Owner’s approval of the Contractor’s plans and methods of' construction does not relieve the Contractor of his responsibility for the adequacy of this support.

H. The Contractor shall be solely responsible for, and bear the sole burden of cost for, any and all damages resulting from improper shoring or failure to shore. The safety of workmen, the protection of adjacent structures, property and utilities, and the installation of adequate supports for all excavations shall be the sole responsibility of the Contractor.

I. The design, planning, installation, (and removal, if required) of all shoring shall be accomplished in such a manner as to maintain stability of the required excavation and to prevent movement of soil and rock that may cause damage to adjacent shoring systems, structures and utilities, damage or delay the work, or endanger life and health.

J. Contractor shall submit plans for shoring to the Engineer for review at least 30 days prior to commencement of work. No excavations shall be started until the Engineer has received the Contractor's shoring design. The shoring and bracing system plans shall allow the Engineer to review the overall completeness and effectiveness of the proposed system. Receipt of the shoring and bracing plans by the Engineer in no way relieves the Contractor of complete responsibility for providing effective and safe shoring and bracing of the construction area and/or pipeline under construction. Shoring and bracing submittals shall demonstrate coordination with the dewatering method and submittal.

K. Sheeting and shoring plan submittal shall include the following:

1. Design assumptions, analyses, calculations, and information on Contractor's proposed method of installation (and removal, if required) of all shoring. The design and calculations shall be performed by, sealed and signed by a professional civil or structural engineer registered in the State of California and experienced in the design of earth retaining structures.

2. The maximum design load to be carried by the various members of the support system.
27 3. Detailed excavation support drawings, showing all pertinent dimensions, spacings, and relationships among the components of the shoring, as well as construction sequence and scheduling.

4. The method of bracing.

5. The full excavation depth and depth(s) below the main excavation to which the support system will be installed.

6. Detailed sequence of construction and bracing removal.

7. Detailed drawings and descriptions of the method to be used by the Contractor to monitor shoring and adjacent ground/structure movements.

8. Demonstrate coordination with interior (sump pumps) and exterior (dewatering wells) dewatering methods and dewatering submittal.

9. Calculations demonstrating that shoring has been designed for hydrostatic pressures if external dewatering wells are not planned to fully draw down the groundwater level behind the shoring to below the excavation bottom.

L. Contractor shall submit proof of experience and qualifications required as follows; work shall be performed by an individual or firm of established reputation (or, if newly organized, whose personnel have previously established a reputation in the same field) for at least 5 years, which is regularly engaged in, and which maintains a regular force of workmen skilled in design, installation and maintenance of shoring.

M. All welding shall be done by skilled welders, welding operators, and tackers who have had adequate experience in the type of materials to be used. Welders shall be qualified under the provisions of ANSI/AWS D1.1 by an independent local approved testing agency not more than six months prior to commencing work; unless having been continuously employed in similar welding jobs since last certification. Machines and electrodes similar to those used in the work shall be used in qualification tests. The Contractor shall furnish all material and bear the expense of qualifying welders.

N. Prior to installation of sheeting/shoring system, Contractor shall perform the following:

1. Verify Surface Conditions and utility locations. Protect utilities and improvements, as called for in the Contract Documents, or required by the Utility Company(s).

2. Verify field measurements indicated on Drawings.

3. Verify layout of work before beginning installation. 28 4. Examine the available boring data before beginning design and installation of the shoring system.

O. Contractor shall protect, or repair utilities damaged by operations and shall protect adjacent structures and property from damage and disfiguration.

Contractor shall also provide any necessary groundwater control and/or drainage in accordance with these Special Provisions and the City Standards and Specifications.

P. The methods of constructing the temporary shoring are at the option of the Contractor and subject to review and approval by the Engineer. Excavations shall be made to the lines, grade, and dimensions shown on the Contractor's Shop Drawings. If the excavation is found to be deviating from the true lines and grade, the Contractor shall immediately make the necessary changes in operation to bring the operation back to the correct position. Any excess deviation beyond that specified herein shall be remedied by the Contractor at their own expense.

Q. All materials encountered shall be regarded as unclassified and shall be excavated, regardless of the nature thereof, and all excavated material must be removed and disposed of. Excavation shall be done in such manner as to provide adequate support at all times to adjacent conduits, structures, or roads and so as to offer no hazard to train, truck or automobile operations. Bracing and shoring shall be substantial and safe, and all work shall be done in full conformity and subject to the inspection of all affected parties. If, and when, required and to the degree necessary, the Contractor shall provide additional support as may be necessary at no additional cost.

R. Every precaution shall be taken to prevent the entry of water, mud and foreign matter into the excavation at all times. It is the intention of these Special Provisions that all construction work described herein shall be carried out under dry conditions. The Contractor shall promptly and continuously control water inflow and dispose of all water from any source that may accumulate in the excavation. This shall include all necessary pumping, bailing, draining and sedimentation prior to discharge.

S. Any and all excess excavation or over-excavation performed by the Contractor for any purpose or reason, except as may be ordered in writing by the Engineer, shall be at the expense of the Contractor. Any damage done to the work by the Contractor’s operations shall be repaired by and at the expense of the Contractor and in a manner approved by the Engineer. Excavate only as much as can safely stand unsupported prior to installing shoring, but in no case more than 4 feet shall be left unsupported at any time. Install lagging immediately after excavation.

3.03 Trench Excavation and Backfill
29 Trench excavation and backfill in all streets shall meet the applicable requirements of Sections 10, 14 and 26 of the Standard Specifications, the Plans, and these Special Provisions. If specified in these Special Provisions, pipe shall be backfilled using Controlled Density Fill (CDF), in accordance with Section 10-16 of the Standard Specifications, and as directed by the Engineer. Slurry cement backfill will not be allowed.

When the Engineer approves shallow placement of drain inlet leads requiring protective measures, all work associated with protective measures shall be considered as extra and paid per Section 8 of the Standard Specifications.

3.04 Pipe Burst 8” Combined Sewer Pipe
Where shown on the Plans and as directed by the Engineer, the existing 8-inch VCP combined sewer pipes shall be replaced with an 8-inch HDPE SDR 32.5 sewer pipe using static pipe bursting methods unless other approved by the Engineer. Sewer pipe connections to manholes shall be included in this bid item.

A. General
Transport, handle, and store pipe and fittings as recommended by the manufacturer.

If new pipe and fittings become damaged before or during installation, it shall be repaired as recommended by the manufacturer or replaced as required by the Engineer at the Contractor’s expense before proceeding further.

Launching or insertion pits shall only be allowed at locations shown on the plans, unless otherwise approved by the Engineer. Provide silencers or other devices on the equipment used to perform the work in order to reduce machine noise. The contractor shall install all pulleys, rollers, bumpers, alignment control devices and other equipment required to protect manholes, and to protect the pipe from damage during installation. Lubrication may be used as recommended by the manufacturer.

Under no circumstances will the pipe be stressed beyond its yield stress.

Manholes proposed to burst through shall be prepared to allow the bursting equipment to pass through without resistance. Manhole preparation work shall be paid as part of this bid item. After the bursting operation, the manhole shall be restored to existing or better condition.

Pipe laydown areas shall be coordinated with the affected residents and identified on the traffic control plans. Any necessary street closure shall be notified per the Maintenance of Traffic, Public Safety and Convenience of this specification.

Contractor shall perform surface monitoring to document any heave or settlement deformations caused by the pipe bursting operation. The monitoring plan shall include at least three monitoring locations along the alignment. Locations shall be surveyed before and after pipe bursting to document any heave or settlement. At 30 least one survey point shall be located over the crown of the pipe and the other two, a measured distance to the side. In addition, existing structures located within three (3) horizontal feet of the pipe shall be monitored before and after pipe bursting.

B. High Density Polyethylene Plastic Pipe
Polyethylene plastic pipe shall be solid wall high density polyethylene pipe and meet the applicable requirements of ASTM F714 Polyethylene (PE) Plastic Pipe SDR 32.5 based on outside diameter. The body of the pipe shall be manufactured from high density molecular weight polyethylene resin which conforms to ASTM D1248 and shall have traditional designation PE 4710 and a cell classification of 445574C as described in ASTM D3350 and the inner wall shall be light gray in color and have a minimum cell classification of 345444E under ASTM D3350. A higher cell classification limit, per ASTM D3350, will also be accepted by the Engineer at no extra cost to the City.

Pipe shall contain no recycled compound except that generated in the manufacturer’s own plant from resin of the same specification from the same raw material pipe. Pipe shall be homogeneous throughout and free of visible cracks, bubbles, holes, foreign inclusions or other deleterious faults. Pipe shall be uniform in color, opacity, density, and other physical properties and produced to the dimensions and tolerances specified in ASTM F714.

The polyethylene pipe manufacturer shall provide certification that stress regression testing has been performed on the specific product in accordance with ASTM D2837, with a minimum hydrostatic design basis (HDB) of 1,600 psi. The said certification shall include a stress life curve per ASTM D2837.

Polyethylene pipe shall be assembled and joined at the site using the thermal buttfusion method to provide a leak proof joint. Threaded or solvent-cement joints and connections are not permitted. All equipment and procedures used shall be used in strict compliance with the manufacturer’s recommendations. Fusing shall be accomplished by personnel certified as fusion technicians by a manufacturer of polyethylene pipe and/or fusing equipment.

Butt-fused joints shall be properly aligned and shall have uniform roll-back beads resulting from the use of proper temperature and pressure. The fused joint shall be water-tight and shall have tensile strength equal to that of the pipe. Internal roll-back beads shall be properly removed. All joints shall be subject to acceptance by the Engineer. All defective joints shall be cut out and replaced at no cost to the City. Any section of the pipe with gash, blister, abrasion, nick, scar, or other deleterious fault greater in depth than ten percent (10%) of the wall thickness shall not be used and must be removed from the site. Terminal sections of pipe that are jointed within the insertion pit shall be connected with a full circle pipe repair clamp. The butt gap between pipe ends shall not exceed one-quarter (1/4) inch. 31 The installed pipe shall be allowed the manufactures recommended amount of time, but not less than four (4) hours to cool and relax prior to any reconnection of sewer service, sealing of the manhole annulus, or backfilling of the launching pit. Sufficient excess length of new pipe, but not less than four (4) inches, shall be allowed to protrude into the manhole to provide for this occurrence.

C. Existing 8-inch main
The Contractor should be aware that existing 8-inch combined sewer main has offset fractures at the locations shown on the plans and as shown in Exhibit B. It shall be the responsibility of the contractor to use the proper head for the pipe bursting process.

3.05 Unsuitable Material
During excavation whenever the bottom of the trench is exposed and if unsuitable material is encountered, the Contractor shall notify the Engineer for concurrence that the material is unsuitable. If the Engineer does not approve that the material is unsuitable, prior to any additional excavation and backfill at this location, the Contractor will be responsible for the cost of excavation and backfill.

The foundation shall be treated in accordance with Section 26 of the Standard Specifications. Unsuitable material is generally defined as material the Engineer determines to be:

1. Of such unstable nature as to be incapable of being compacted to specified density using ordinary methods at or near optimum moisture content: or

2. Too wet to be properly compacted and circumstances prevent processing or in place drying prior to incorporation into the work.

3. Containing visible or excessive deleterious material.

4. Otherwise unsuitable for planned use.

Trench backfill shall consist of Class 2 Aggregate Base (AB) or job excavated, native soil meeting the requirements of Section 26-5 of the Standard Specifications. The use of the job excavated, native soil shall be at the Contractors risk. No additional compensation will be paid to the Contractor for hauling, stockpiling, drying, wetting or any processing of the native soil or AB required to achieve the minimum stability and relative compaction criteria.

Excavated unsuitable material shall be the property of the Contractor and shall be disposed of away from the project site. For offsite disposal, the Contractor shall have written permission from the owner upon whose property the disposal is to be made before any material is deposited thereon.

3.06 Pavement Cutting and Surface Restoration
32 Pavement cutting and surface restoration shall conform to the applicable provisions of Section 26-11 of the Standard Specifications, the Plans, and these Special Provisions.

The Contractor shall restore surfaces in kind (using the same surface material as existing) unless otherwise noted on the Plans or within these Special Provisions. Payment for restoring the surface in kind within any excavation shall be included in the associated item of work unless otherwise stated in these Special Provisions.

If trench crosses sidewalk, curb, and gutter, Contractor shall replace entire sidewalk panel to nearest control or expansion joint on both sides of trench wall. Extent of curb and gutter replacement shall coincide with sidewalk panel being replaced. Pavement cutting shall be perpendicular and parallel to the centerline of the road when practicable.

3.07 Temporary Paving
Temporary paving shall be in accordance with Section 14-4 of the Standard Specifications.

3.08 Dewatering
A. Contractor shall be responsible for controlling groundwater encountered during construction per Sections 26-2 and 16-1 of the Standard Specifications, and these Special Provisions.

B. Groundwater shall be collected in temporary storage tanks for settling, filtration, and testing prior to discharge. The Contractor shall develop an excavation dewatering plan as specified herein and submit it to the City for review and approval.

C. The Contractor shall assume sole responsibility for:

1. Planning, design, installation and operation of temporary groundwater dewatering systems and temporary surface water control systems. Water control systems designed and installed by the Contractor shall adequately protect existing property, foundations and permanent structures.

2. Loss or damage resulting from partial or complete failure of operation of dewatering systems.

3. Repairing damage to adjacent properties, buildings, structures, utilities and other work due to installation, settlement or resultant damage caused by the groundwater control operations.

4. Determining means and methods for disposing of water removed by dewatering systems. The Contractor shall abide by all discharge requirements as determined by Sacramento County Regional Sanitation District and/or the Regional Water Quality Control Board. If permit requirements specify water quality requirements that must be met before 33 water can be disposed, provide the necessary treatment facilities to achieve the specified water quality limits. Contractor shall not dewater to sewer or storm drain system without an approved permit. The Contractor shall provide the necessary conveyance facilities to meet the required discharge volume within the permit requirements.

5. Modifying groundwater control systems or operations if they cause or threaten to cause damage to new construction, existing site improvements, adjacent property, or adjacent water wells, or affect potentially contaminated areas.

D. Groundwater control systems may include single-stage or multiple-stage well point systems, sump pumps within excavations, shallow or deep wells, or combinations of these types of dewatering systems. Locate groundwater control and drainage systems so as not to interfere with utilities, construction operations, vehicular traffic, pedestrian traffic, adjacent properties, or adjacent water wells.

Modify dewatering procedures which cause, or threaten to cause, damage to new or existing facilities, so as to prevent further damage. Install settlement gauges, as necessary, to monitor settlement of critical structures or facilities adjacent to areas of dewatering. Control the rate of dewatering to avoid all objectionable settlement and subsidence. Remove or abandon dewatering system when it is no longer needed in accordance with regulatory stipulations indicated in this Section.

E. If dewatering is required, Contractor shall design dewatering systems of sufficient scope, size, and capacity to accomplish the following results:

1. Control the flow of surface water into trench and structure excavations by grading, dikes, or other means.

2. Unless otherwise approved by the Engineer, lower groundwater levels a minimum of 24-inches below trench excavation and minimize infiltration of groundwater into trench and structure excavations.

3. Lower and maintain groundwater to a level of at least 24-inches below the lowest point of structure excavations.

4. Lower groundwater levels further when necessary to obtain the specified degree of compaction. Develop substantially dry and stable subgrade for subsequent earthwork compaction and construction operations.

5. Prevent the loss of fines, seepage, boils, quick conditions, or softening of the foundation soils. Maintain stability of sides and bottoms of excavations.

F. Contractor shall maintain dewatering operations to control and minimize erosion, to create stable sides and bottoms of excavations, to stabilize constructed slopes and to prevent settlement and damage to structures and utilities. Dewatering systems utilized shall collect and dispose of removed water. Water removed by dewatering systems cannot be discharged into the storm water collection system 34 which consists of pipes, catch basins, manholes and roadside drainage ditches, and channels. Contractor shall comply with requirements of agencies having jurisdiction and with all laws and regulations for development, drilling, and abandonment of wells used in dewatering systems.

G. A minimum of three (3) weeks prior to beginning work requiring dewatering operations, the Contractor shall submit a groundwater control plan that will:

1. Illustrate the arrangement, locations and details of the dewatering system, including wells and well points; dewatering pumps and piezometers; locations of headers, treatment systems and discharge lines; standby equipment and power supply; silt removal, pollution control and treatment facilities; and the means of conveyance, discharge and disposal of water.

2. Include a narrative report outlining the dewatering procedures and controls.

3. Include completed applications from all applicable regulatory agencies with authority to oversee the discharges to the CSSS or separated drainage system. Permits shall be approved before discharge is allowed.

H. After approval of the Contractor’s groundwater control plan submittal and within two weeks of starting excavation activities, the Contractor shall install and run the dewatering system to achieve the required draw down level below the bottom of the excavation. Contractor shall verify the groundwater depth prior to starting excavation and provide confirmation to the Engineer that the groundwater level is at the level required below the bottom of excavation. Upon verification of the groundwater to the specified limits, the excavation work may proceed as directed by the Engineer. The Contractor shall provide additional measures for draw down of groundwater if the required level is not met within the two (2) week dewatering draw down period. Dewatering systems shall maintain the required groundwater levels throughout the prosecution of the Work until the time that final backfill has been placed to a point higher than the static groundwater level.

I. Contractor shall maintain sufficient standby equipment, staff, and materials available at the site to ensure continuous operation, where required.

J. Perform dewatering in accordance with approved Shop Drawings. Keep the Engineer advised of any changes made to accommodate field conditions and, on completion of the dewatering system installation, revise and resubmit Shop Drawings as necessary to indicate the installed configuration.

K. Organize dewatering operations to lower the groundwater level in excavations as required for prosecution of the Work, and to provide a stable, dry subgrade for the prosecution of construction operations. Maintain water level at lower elevations so that no danger to structures can occur because of buildup of excessive hydrostatic pressure, and provide for maintaining the water level below 35 the subgrade, unless otherwise permitted by the Engineer. Maintain groundwater level a minimum of five feet below the prevailing level of backfill being placed.

L. Dispose of water in such a manner as to cause no injury or nuisance to public or private property, or be a menace to the public health. Dispose of the water in accordance with applicable regulatory agency requirements.

M. If dewatering of open-cut pipe trenches is required, do not drain trench water through the pipeline under construction.

N. Maintain continuous dewatering operations so that the excavated areas are kept free from water during construction, while concrete is setting and achieves full strength, and until backfill has been placed to a sufficient height to anchor the work against possible flotation.

O. Prevent disposal of sediment to adjacent lands or waterways by employing necessary methods, including settling basins. Locate settling basins away from watercourses to prevent silt-bearing water from reaching the watercourse.

P. Intercept surface water and divert it away from excavations through use of dikes, ditches, curb walls, pipes, sumps or other means. This requirement extends to temporary works required to protect adjoining properties from surface drainage caused by construction operations.

Q. Implement the appropriate level of surface water control to protect water quality throughout the construction period.

R. Provide labor, material, equipment, techniques and methods to lower, control and handle groundwater in a manner compatible with construction methods and site conditions. Monitor effectiveness of the installed system and its effect on adjacent property. Intercept water flowing into excavations and divert it to sumps or ditches to allow pumping of collected water out of the excavation. Provide settling basins, geotextile containment devices or other sediment removal and water treatment devices for water quality control and compliance with regulatory and permit requirements. Install geotextile containment devices in accordance with the manufacturer’s instructions and requirements. Operate and maintain groundwater control systems in accordance with the Groundwater Control Plan.

Notify Construction Manager in writing of any changes made to accommodate field conditions and changes to the Work. Provide for continuous system operation, including nights, weekends, and holidays. When deemed appropriate, provide backup power source for electrical service. Monitor operations to verify that the system lowers groundwater levels at a rate required to maintain a dry excavation resulting in a stable subgrade for prosecution of subsequent operations. Remove all groundwater control systems upon completion of construction or when dewatering and control of surface or groundwater is no 36 longer required. Remove and grout piezometers when groundwater control operations are complete.

3.09 Combined Sewer Pipe
A. Where shown on the Plans, combined sewer pipe and fittings shall be provided and placed in accordance with the Plans, manufacturers recommendations, and as directed by the Engineer, and shall conform to Sections 10 and 26 of the Standard Specifications. Information regarding pipe material and pipe installation shall be submitted for approval in accordance with these Special Provisions.

B. Only one type of pipe shall be used between manholes. Prior to the start of work, the Contractor shall submit a plan showing types of pipe and locations to the Engineer. Any deviation in the plan thereafter shall not be allowed unless approved in advance by the Engineer.

C. Combined sewer pipe connections to manholes shall be included in this item unless otherwise indicated in these Special Provisions. In addition, Contractor shall connect existing ABS sewer services to new sewer pipe in accordance with these Special Provisions and include this work in the cost of this item.

D. The Contractor shall install a flexible joint (bell and spigot or flexible coupling) a horizontal distance of 18 inches to 24 inches from the wall of the manhole .

E. Existing pipe shall be removed at such places as shown on the Plans or as designated by the Engineer in accordance with Section 13 of the Standard Specifications and these Special Provisions. All removed pipes or portions thereof shall be disposed of by the Contractor. Payment for removal and disposal of existing pipe shall be included in these items.

F. Unless otherwise approved, all pipes shall have bell and spigot joints with elastomeric gaskets providing a watertight seal. Tests for leakage will be required per Section 26-10 of the Standard Specifications.

G. For all flexible pipe and fittings, the minimum pipe stiffness at 5% deflection shall be 46 PSI according to ASTM test D2412. Flexible pipe joints shall be in accordance with ASTM D3212. All flexible conduits shall be tested with a mandrel 5% smaller than the average inside diameter of the pipe placed no sooner than 96 hours after placement of the backfill. Mandrel tests may be performed by the City after a six (6) month period of time at which time a maximum deflection of 7-1/2% from the base I.D. will be allowed. The mandrel used shall be the PHOS PVC Sewer Pipe Deflection Gauge or other deflection gauge approved by the Engineer.

After mandrel testing and in order to ensure proper placement, all sewer pipes 37 placed shall be CCTV inspected by the Contractor utilizing a robotic CCTV camera device as specified elsewhere in these Special Provisions.

H. Where shown on the Plans, combined sewer pipe shall conform to Section 10-19 of the Standard Specifications.

I. Surface restoration shall be in accordance with the section of the General Requirements entitled “Pavement Cutting and Surface Restoration” and shall be paid for under this item of the contract. Pavement cutting shall be perpendicular and parallel to the centerline of the road.

3.10 Sewer Service Connections
Four- and six-inch lateral sewer services shall be replaced as indicated on the Plans and shall be constructed to the requirements of Sections 10, 26, and 38 of the Standard Specifications. All substandard sewer services shall be replaced in accordance with the same requirements. Unless otherwise directed, substandard sewer services are existing live services that are not solid wall HDPE or ABS pipe. The new sewer service shall match existing in size. All sewer services shall be acrylonitrile-butadiene-styrene (ABS) and constructed as shown on the ABS Sewer Service Detail S-260 in the City’s Standard Details. Cleanouts shall be placed as shown on the Typical Sewer Service Cleanout Locations Detail S-265 in the City’s Standard Details. Services shall be connected to sewer mains using tees or insert-a-tees when the sewer main is 8-inches in diameter or greater. Under no circumstances shall grouted connections be acceptable.

The number and location of lateral sewer services shown on the Plans are based on CCTV inspection. The inspection identified openings in the sewer main that may or may not consist of live sewer services. Only live services shall be replaced. The Engineer shall differentiate between the active and abandoned service connections after they are exposed by the Contractor. All abandoned service connections shall be plugged and sealed as covered elsewhere in these Special Provisions.

New services shall be installed perpendicular to the main. The layout of services shown on the Plans is diagrammatic only. Final layout of new services and cleanouts will be determined by the Engineer as follows: After exposure of service connection at main by Contractor, Engineer will trace layout of existing service line and proposed location of cleanout. The Contractor will coordinate this work with the Engineer a minimum of two (2) working days in advance of placing new services.

The operations of the Contractor shall not result in any interruption of sewer service to any building being served by the sewer main. The replacement of the sewer service shall be accomplished within the same day that work is started. The Contractor shall provide, at no extra cost to the City, whatever equipment, materials, labor and services are necessary to ensure that the sewer service is maintained consistent with this requirement including, if necessary, the installation of temporary lines, temporary pumping equipment, 38 and night-time or other overtime work as may be required.

When connecting a service to an existing manhole, the service shall be installed above the base of the manhole such that no alteration of the manhole base is required, unless otherwise approved by the Engineer. If the service enters a manhole near the invert of the MH flow channel, the service shall be channelized in the MH bench with vitrified clay pipe, shaped to provide a smooth transition into the main flow channel. If the service enters a manhole more than 1.5 feet above the spring-line of the pipe forming the manhole channel, an inside drop connection shall be constructed from the incoming service to one (1) foot above the spring-line of the pipe forming the channel at no additional cost to the City.

3.11 Abandonment of Existing Pipeline
Pipelines shall be abandoned by plugging each end per Section 13-3 of the Standard Specifications and completely filling the abandoned section with CDF, Ready Mixed Flowable Fill (RFF) per Section 10-16 of the Standard Specifications.

Prior to abandonment, Contractor shall determine if any live sewer services are connected to the main to be abandoned. Contractor shall provide CCTV data or other documentation confirming the presence or absence of live service connections. Prior to abandoning the main, Contractor shall reconnect live services to the new main as shown on the Plans.

3.12 Closed Circuit Television Inspection of Pipes
Prior to performing pipe bursting operations, Closed circuit in-line television (CCTV) inspection of the existing pipes shall be performed by the Contractor. The purpose of performing a pre-construction inspection is to verify that pipe conditions are suitable for pipe bursting and to verify the location and number of services connected to the existing pipe.

All newly constructed pipes shall be inspected by the Contractor utilizing a remote closed circuit in-line television (CCTV) camera. The CCTV inspections shall be conducted after all utilities have been installed and backfill compaction has been completed, but prior to final paving.

Contractor shall also clean pipe as necessary to remove standing water and to remove solids, debris, grease or grit from the entire circumference of the pipe between manholes or access points within the project limits.

The Contractor shall notify the Engineer two (2) working days in advance of the anticipated date of the CCTV inspection so that the Engineer may observe the flow control, cleaning and CCTV inspection operations. It shall be the Contractor's responsibility to coordinate the CCTV inspection with the Engineer. 39 Perform all CCTV inspection in accordance with NASSCO’s Pipeline Assessment Certification Program (PACP). CCTV inspections shall be conducted entirely in digital format and shall be recorded in MPG or AVI format written to USB thumb drive and shall be compatible with the Granite XP software (version 7 or City’s current version). All CCTV inspection reports shall be within +/- 2 (two) feet of the measured linear footage along the existing pipe centerline from the center of manhole to the center of manhole or access point.

The documentation of the work shall consist of a USB thumb drive, PACP CCTV Reports, and the unmodified PACP database. The database shall contain PACP scoring for each inspection observation or defect. The documentation shall note important features encountered during the inspection. The speed of travel shall be slow enough to detect reverse slope or low spots in pipe grades and to inspect and identify each pipe joint, service connection, etc., but should not, at any time, be faster than 30 feet per minute. The CCTV camera shall be centered in the pipe to provide accurate distance measurements to provide exact locations of important features in the pipe and these footage measurements shall be displayed and documented on the video. The completed USB thumb drive shall become the property of the City.

Every section of the pipe (manhole to manhole or access point) shall be identified on the video display and shall include the following: project name, street name, City manhole numbers, inspector’s name, pipe diameter and length, and date of inspection. In addition to inspecting the pipe, all manholes shall be panned with the CCTV camera.

Work not following these Special Provisions may be rejected for payment and the Contractor may be required to re-do the work

3.13 Manhole Construction
Manholes shall be constructed as shown on the Plans or as directed by the Engineer in conformance with Section 25 and Section 38 of the Standard Specifications, with the exception that all manholes on this project shall be tested and shall meet the requirements of ASTM C1244 prior to acceptance. Testing shall be performed prior to backfill.

Manhole bench shall slope upwards from the spring-line of the pipe to the projected level of the crown of the pipe at the manhole wall or twelve (12) inches above the spring-line, whichever is less. All holes, cracks, and seams shall be grouted flush using non-shrink grout with the manhole interior. Non-shrink grout shall be “Metallic Grouting Compound” by Burke, “Embecco” by Master Builders, “Ferrolith-G” by SonnebornDesoto, or approved equal. All internal surfaces shall have a smooth finish.

External joint of each barrel section and of the barrel/cone connection shall be sealed with an external rubber sealing sleeve as manufactured by Infi-Shield Inc. or equal. The 40 seal shall be made of neoprene and EPDM rubber and have a minimum thickness of 60 mils. Material shall conform to specifications of ASTM C923, ASTM C443, and ASTM F477. Rubber seal shall be attached to manhole using non hardening butyl rubber mastic applied to the top and bottom of sleeve in accordance with manufacturer’s instructions. Seal shall overlap joint a minimum of 3-inches and shall be continuous around the perimeter of the barrel section and overlapped 6-inches minimum.

3.14 Tree Preservation Requirements
If necessary, the trees within the project area shall be protected by the following means:

1. The contractor shall hire an International Society of Arboriculture (ISA) certified arborist to do any required pruning for equipment clearance. The contractor shall hire an ISA certified arborist for a root inspection(s) for trenching activities within the dripline(s) of the trees.

2. If during excavation for the project, tree roots greater than two inches in diameter are encountered, work shall stop immediately until the project arborist can perform an on-site inspection. All roots shall be cut clean and the tree affected may require supplemental irrigation/fertilization and pruning as a result of the root cutting. The project sponsor will be responsible for any costs incurred. Depending upon the number of roots encountered and the time of year, wet burlap may be required along the sides of the trench.

3. The contractor shall be held liable for any damage to existing trees, i.e. trunk wounds, broken limbs, pouring of any deleterious materials, or concrete washout under the dripline of the trees. Damages will be assessed using the A Guide to Plant Appraisal eighth edition, published by the International Society of Arboriculture. An appraisal report shall be submitted for review by the City Arborist.

4. Tree protection methods noted above shall be identified on all construction plans for the project.

3.15 Archaeological Resources Discovery
Discovery of cultural resources. In the event that any prehistoric subsurface archaeological features or deposits, including locally darkened soil ("midden"), that could conceal cultural deposits, animal bone, obsidian and/or mortars are discovered during construction-related earth-moving activities, all work within 150 feet of the resources shall be halted, and the Contractor and City shall consult with a qualified archaeologist who are certified by the Society of Professional Archeologists (SOPA) and/or meet the federal standards as stated in the Code of Federal Regulations (36 CFR 61) to assess the significance of the find. Archaeological test excavations shall be conducted by a qualified 41 archaeologist to aid in determining the nature and integrity of the find. If the find is determined to be significant by the qualified archaeologist, representatives of the City and the qualified archaeologist shall coordinate to determine the appropriate course of action.

All significant cultural materials recovered shall be subject to scientific analysis and professional museum curation. In addition, a report shall be prepared by the qualified archaeologist according to current professional standards. Work shall be re-started only upon a notice to proceed from the City’s Project Manager.

Discovery of Native American site. If a Native American site is discovered during project construction, the Contractor shall give immediate notice to the City’s Project Manager, and the evaluation process shall include consultation with the appropriate Native American representatives. If Native American archaeological, ethnographic, or spiritual resources are involved, all identification and treatment shall be conducted by qualified archaeologists, who are certified by the Society of Professional Archeologists (SOPA) and/or meet the federal standards as stated in the Code of Federal Regulations (36 CFR 61), and Native American representatives, who are approved by the local Native American community as scholars of the cultural traditions.

In the event that no such Native American is available, persons who represent tribal governments and/or organizations in the locale in which resources could be affected shall be consulted. If historic archeological sites are involved, all identified treatment is to be carried out by qualified historical archaeologists.

Discovery of human remains. If a human bone or bone of unknown origin is found during construction, the Contractor shall give immediate notice to the City’s Project Manager, all work shall stop in the vicinity of the find, and the County Coroner shall be contacted immediately. If the remains are determined to be Native American, the Coroner shall notify the Native American Heritage Commission, who shall notify the person most likely believed to be a descendant. The most likely descendant shall work with the City’s Project Manager and Contractor to develop a program for re-internment of the human remains and any associated artifacts. No additional work is to take place within the immediate vicinity of the find until the identified appropriate actions have taken place.

3.16 Payment
Full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in performing and complying with these General Requirement items shall be considered as included in the prices paid for in the various contract bid items the Contractor deems appropriate, and no additional compensation will be allowed. **END OF SECTION**
42 SECTION 4 – ITEMS OF THE PROPOSAL
Item No. 1 Mobilization
Mobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the bonding, movement of personnel, equipment, supplies, and incidentals to the project site; and for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items.

Compensation for mobilization in excess of ten (10) percent of the total amount of all other bid items shall be paid with the progress payment when all other work items are 100 percent complete.

Payment for mobilization shall be on a contract lump sum (LS) basis and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for performing all work necessary to complete this item.

Item No. 2 Traffic Control
All traffic control work shall be performed in accordance with Sections 2.11 and 2.12 of these Special Provisions.

Payment for traffic control and device maintenance shall be at the contract lump sum (LS) price for traffic control and shall include full compensation for conforming to all requirements of City of Sacramento Ordinance No. 2002-004, Section 7, “Prosecution and Progress” of the Standard Specifications, these Special Provisions, and for the work as shown on the plans and as directed by the Engineer. These activities include but are not limited to preparation of traffic control plans, furnishing, installing, and removing traffic control devices, including signs, Portable Changeable Message Signs (CMS), covers, lights, flares, cones, barricades, water-filled barrier, temporary striping channelizing devices flagmen, and other items necessary for the safety, sole convenience, and direction of public traffic through and around the work area.

Item No. 3 Preconstruction Photographs
This item shall conform to Section 11 of the Standard Specifications.

Payment for preconstruction photographs shall be at the contract lump sum (LS) basis and shall include full compensation for furnishing all labor, materials, tools and equipment, and for performing all work necessary to complete this item in place.

Item No. 4 8-inch Combined Sewer Pipe to Burst
Where shown on the Plans and as directed by the Engineer, the existing 8-inch VCP combined sewer pipe shall be replaced with an 8-inch HDPE SDR 32.5 sewer pipe using 43 static pipe bursting methods unless other approved by the Engineer. Sewer pipe connections to manholes shall be included in this bid item.

Payment shall be at the unit price bid per lineal foot (LF) of pipe replaced and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work involved in replacing the existing pipe shown on the Plans using an approved pipe bursting method, as specified in these Special Provisions and as directed by the Engineer, including manhole preparation, launching pit excavation, temporary fence removal, removal of Fernco™ couplings, and any required surface restoration.

Pre- and post-construction CCTV inspections; excavation for launching pits; excavation, reinstatement, and backfill for sewer service/DI lead connections shall not be paid for under this bid item but shall be paid for under separate bid items.

Item No. 5 10-inch Combined Sewer Pipe to Place
Item No. 6 24-inch Combined Sewer Pipe to Place
Where shown on the Plans, PVC sewer pipe and fittings shall be provided and placed in accordance with the Plans, manufacturers recommendations, and as directed by the Engineer, and shall conform to Sections 10 and 26 of the Standard Specifications.

Information regarding pipe material and pipe installation shall be submitted for approval in accordance with these Special Provisions.

Payment shall be at the unit price bid per lineal foot (LF) of proposed combined sewer main installed and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and for doing all work necessary to complete this item in place including pavement cutting and removal, trenching, furnishing and placing pipe, backfilling, removing or abandoning existing pipe, reconnecting/reinstating existing sewer services, connecting sewer pipe to manholes, and testing.

Item No. 7 6” Asphalt Concrete Pave
This Item shall include all permanent paving associated with contract bid items for combined sewer pipe to place and shall be defined as permanent pavement placement.

Payment shall be at the unit price bid per TON for Hot Mix Asphalt (3/4”, Type A) and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in placing Hot Mix Asphalt (3/4”, Type A) including but not limited to placing, planing, cores, testing, 1 job mix formula fog seal, leveling and compacting material for HMA placement, as specified in the State Standard Specifications, the Plans, the CSSS, and as directed by the Engineer 44 Item No. 8 6” Concrete Alley/Driveway
Concrete removal, placement and restoration for the removal and replacement of pipe shall be completed as shown on the plans and per the Standard Specifications, section

10. This item shall include 37th Street Alley and the Rice Alley. This item shall include the cost to protect existing concrete that will not be removed as part of the project. The Concrete shall be Class “B” Concrete per section 10-5 of the Standard Specifications.

Dowel reinforcement shall be installed per section 24-11 of the Standard Specifications.

Payment shall be at the unit bid price per square foot (SF) and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work necessary to complete this item in place.

Item No. 9 Abandon Existing Combined Sewer Main
This item shall consist of abandoning the existing combined sewer main where shown in the plans per the Standard Specifications and the following minimum requirements:

1. Pipe ends shall be plugged with a minimum of 2-longitudinal-feet of concrete,

2. Pipes larger than 8-inches in diameter shall be filled with controlled density fill (CDF). A plan for filling pipes shall be submitted for approval. The plan shall provide details regarding the proposed method, sequencing, and materials to be used during the filling operations,
Payment shall be on a lump sum (LS) basis and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for performing all work necessary to complete this item.

Item No. 10 Manhole to Abandon
Where shown on the Plans, existing manholes shall be abandoned per the Standard Specifications and the following minimum requirements:

1. Manholes shall be abandoned by removing the Grade Rings, crushing the top 12” of Cone or removing, crushing the concrete base to allow free movement of groundwater, and backfilling with compacted Class 2 aggregate base to within 8-inches of finished grade. 8-Inches of topsoil shall be placed above Class 2 aggregate base to finished grade.

2. The removed manhole Head and Cover shall be delivered to City of Sacramento Corporation Yard, Division of Field Services, 5730 24th Street, Attention: Kevin Guerra, Wastewater Superintendent (916) 808-4022.

3. Pavement cutting shall be perpendicular and parallel to the centerline of the road. Surface restoration shall be in accordance with the General Requirements, “Pavement Cutting and Surface Restoration,” herein. 45 Payment shall be at the unit price bid per each and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals for doing all work involved in abandoning the Manhole as shown on the Plans, as specified in these Special Provisions and as directed by the Engineer.

Item No. 11 Manhole Base, to Reconstruct
Where shown on the Plans, manhole base shall be reconstructed. In general, manholes requiring base reconstruction have undersized flowlines requiring modification. This item includes all work associated with reconstructing manhole bases, including inspection, cleaning, repairs, modification, and reconstructing the base in conformance with City Standards and these Special Provisions.

Materials
Non-Shrink Grout - Base material shall be non-shrink grout, A Non-shrink Multipurpose Grout Cement All@, by Rapid Set, or equal. Non-shrink grout shall conform to ASTM C1107 and ASTM C928. Minimum compressive strength per ASTM C109 shall be 7400 psi at 28 days.

Additive - Bonding emulsion additive shall be mixed into non-shrink grout and shall be SB Bonding Emulsion by Koester American Corp. or equal.

Flowline - Flowline material shall be vitrified clay in conformance with City Standards and these Special Provisions. New flowline shall match inlet and outlet pipe elevations and shall extend to inside face of manhole. If inlet and outlet pipes are of different sizes, new flowline pipe size shall match larger pipe size.

Application
Preparation - Remove all unsound concrete keeping edges and corners square. Adjacent concrete should be free of oil, grease, laitance, and debris. Surface shall be water blasted. Dampen surface prior to placement of non-shrink grout.

Workmanship - Existing flowline shall be saw cut and chipped to remove a minimum of two-inches (2") below and outside existing flowline pipe. New flowline pipe shall be set into freshly mixed non-shrink grout.

Non-shrink grout and bonding emulsion additive shall be mixed and placed in accordance with manufacturer=s instructions. Mix with clean potable water only. Use the minimum possible trowel strokes and minimum pressure when trowelling. Do not re-finish already trowelled surfaces. Wet cure for a minimum of 48 hours.

Manhole bench shall slope upwards from the springline of the pipe to the projected level of the crown of the pipe at the manhole wall or 12 inches above the springline, whichever 46 is less. All holes, cracks, and seams shall be grouted flush with the manhole interior. All internal surfaces shall have a smooth finish.

Payment shall be at the unit price bid per each manhole base reconstructed and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals for doing all work involved in manhole base, to reconstruct as shown on the Plans, as specified in these Special Provisions and as directed by the Engineer.

Item No. 12 Manhole to Remove, Manhole No. 3 to Construct Existing manholes and catch basin manholes shall be removed and a Manhole No. 3 shall be constructed where shown on the plans or directed by the Engineer in conformance with Section 25 and Section 38 of the Standard Specifications, Detail S-70, and section

3.13 of these Special Provisions.

The existing manhole shall be disposed of away from the site of the project. Excavation shall conform to Section 14-2, Structure Excavation of the Standard Specifications. The existing frame and cover shall be cleaned of all foreign material and delivered to the City of Sacramento Corporation Yard, Division of Field Services, 5730 24th Street, Attention:

Kevin Guerra, Wastewater Superintendent (916) 808-4022.

Flowline material for main pipe and intersecting mains shall be vitrified clay except: if manhole base is precast concrete; or if manhole base is placed over main which is “laid through”, in which case flowline material shall be same as main. Clay liner may be omitted for manholes with mains of 36- inch diameter and larger. Flow line material shall conform to the Standard Specifications and these Special Provisions. New flowline shall match inlet and outlet pipe elevations and shall extend to inside face of manhole. If inlet and outlet pipes are of different sizes, new flowline pipe size shall match larger pipe size.

Manhole bench shall slope upwards from the spring-line of the pipe to the projected level of the crown of the pipe at the manhole wall or twelve (12) inches above the spring-line, whichever is less. All holes, cracks, and seams shall be grouted flush using nonshrink grout with the manhole interior. Non-shrink grout shall be “Metallic Grouting Compound” by Burke, “Embeco” by Master Builders, “Ferrolith-G” by Sonneborn-Desoto, or approved equal. All internal surfaces shall have a smooth finish.

Surface restoration shall be in accordance with the Section 3.05 of these Special Provisions, entitled “Pavement Cutting and Surface Restoration” and shall be paid for under this item of the contract.

Pavement cutting shall be perpendicular and parallel to the centerline of the road.

Payment shall be at the unit price bid per each (EA) manhole removed and new manhole constructed and shall include full compensation for furnishing all labor, materials, tools and equipment and for performing all work necessary to complete this item in place. 47 Item No. 13 Manhole No. 3 to Construct
Where shown in the project plans, No. 3 Manhole shall be installed per City Standard Detail S-70 and Section 3.13 of these Special Provisions.

Payment shall be at the unit price bid per each (EA) new manhole No. 3 constructed and shall include full compensation for furnishing all labor, materials, tools and equipment and for performing all work necessary to complete this item in place.

Item No. 14 Manhole No. 3A to Construct
Where shown in the project plans, No. 3A Manhole shall be installed per City Standard Detail S-80 and Section 3.13 of these Special Provisions.

Payment shall be at the unit price bid per each (EA) new manhole No. 3A constructed and shall include full compensation for furnishing all labor, materials, tools and equipment and for performing all work necessary to complete this item in place.

Item No. 15 Manhole with Junction Box
Where shown in the project plans, Manhole with Junction Box shall be installed per City Standard Detail S-310 and Section 3.13 of these Special Provisions. Contractor shall pothole combined sewer main to verify alignment and depth prior to ordering junction box.

Payment shall be at the unit price bid per each (EA) new manhole with junction box constructed and shall include full compensation for furnishing all labor, materials, tools and equipment and for performing all work necessary to complete this item in place.

Item No. 16 Manhole to Remove, Manhole No. 4 to Construct Where shown in the project plans, No. 4 Manhole shall be installed per City Standard Detail S-110 and Section 3.13 of these Special Provisions.

The existing manhole shall be disposed of away from the site of the project. Excavation shall conform to Section 14-2, Structure Excavation of the Standard Specifications. The existing frame and cover shall be cleaned of all foreign material and delivered to the City of Sacramento Corporation Yard, Division of Field Services, 5730 24th Street, Attention:

Kevin Guerra, Wastewater Superintendent (916) 808-4022.

Flowline material for main pipe and intersecting mains shall be vitrified clay except: if manhole base is precast concrete; or if manhole base is placed over main which is “laid through”, in which case flowline material shall be same as main. Clay liner may be omitted for manholes with mains of 36- inch diameter and larger. Flow line material shall conform 48 to the Standard Specifications and these Special Provisions. New flowline shall match inlet and outlet pipe elevations and shall extend to inside face of manhole. If inlet and outlet pipes are of different sizes, new flowline pipe size shall match larger pipe size.

Manhole bench shall slope upwards from the spring-line of the pipe to the projected level of the crown of the pipe at the manhole wall or twelve (12) inches above the spring-line, whichever is less. All holes, cracks, and seams shall be grouted flush using nonshrink grout with the manhole interior. Non-shrink grout shall be “Metallic Grouting Compound” by Burke, “Embeco” by Master Builders, “Ferrolith-G” by Sonneborn-Desoto, or approved equal. All internal surfaces shall have a smooth finish.

Surface restoration shall be in accordance with the Section 3.05 of these Special Provisions, entitled “Pavement Cutting and Surface Restoration” and shall be paid for under this item of the contract.

Pavement cutting shall be perpendicular and parallel to the centerline of the road.

Payment shall be at the unit price bid per each (EA) manhole removed and new manhole constructed and shall include full compensation for furnishing all labor, materials, tools and equipment and for performing all work necessary to complete this item in place Item No. 17 Outside Drop Connection
Where shown in the project plans, outside drop connection shall be installed per City Standard Detail S-130 and Section 3.13 of these Special Provisions.

Payment shall be at the unit price bid per each (EA) new outside drop constructed and shall include full compensation for furnishing all labor, materials, tools and equipment and for performing all work necessary to complete this item in place.

Item No. 18 Sewer Service to Place/Replace/Reinstate
Where shown on the plans, four and six-inch lateral sewer services shall be placed/replaced and shall be constructed to the requirements of Section 10, 26, and 38 of the Standard Specifications and section 3.09 of these Special Provisions. All substandard sewer services shall be replaced in accordance with the same requirements. Unless otherwise directed, substandard sewer services are existing live services that are not solid wall HDPE or ABS pipe.

Cleanouts shall be constructed with ABS pipe and fittings per City Standard Details S260 and S-265 unless otherwise noted. Cleanout wye shall be “long sweep” design unless otherwise noted. Unless otherwise directed by the Engineer, reconnection of existing services shall be made after pipe insertion and relaxation. The reconnection shall be made using Inserta Tee taps, electrofusion saddles, conventional fusion saddles or an approved equal. Inserta Tees, electrofusion PE saddles, and conventional fusion PE 49 saddles shall be installed per manufacturer’s recommended procedures and instructions.

When pipe bursting, the Contractor shall locate and expose all sewer services prior to pipe bursting. In addition, the Contractor shall install the new cleanout and sewer service pipe. Upon completion of the pipe bursting, the Contractor shall expedite reconnection of services to reduce customer inconvenience. All sewer disconnected sewer services shall be reconnected before the end of the working day.

The quantity of sewer services to be replaced shown on the Proposal is for bidding purposes only. The unit price indicated for existing sewer services to be replaced will not be adjusted because the actual number of required sewer services varies from the quantity shown on the Plans and in the Proposal. Existing services reconnected at the main shall be paid for at the as part of the linear footage of the main line combined sewer pipe.

Sewer Services to be reconnected/reinstated at the main shall be paid for in the linear footage price for the bid item for pipe to replace.

Surface restoration shall be in accordance with the section of the General Requirements entitled “Pavement Cutting and Surface Restoration” and shall be paid for under this item of the contract.

Payment shall be at the unit price bid for each (EA) sewer service removed and placed and shall include full compensation for furnishing all labor, materials, tools and equipment and for performing all work necessary to complete this item in place.” Item No. 19 Point Repairs
This item shall include all work required to perform point repairs. The work shall include verifying the location of the point repair through internal television inspection of the pipe and mark the location on the surface using a remote locating device, locating all affected utilities, excavation, dewatering, pipe repairs or replacement, backfilling, surface restoration, and, where required, temporary flow diversion or bypass, sewer dewatering, and traffic control.

It shall be the responsibility of the Contractor to clear the line of obstructions such as solids, offset joints, or collapsed pipe that will prevent proper insertion. If inspection reveals obstructions that the Engineer agrees cannot be removed by conventional pipe cleaning equipment or with the cutting tools such as a hydro jet cutting tool or a robotic grinding cutter head specifically designed for this purpose, then the Contractor shall locate the point repair at the surface with a remote locating device and make a point repair excavation to uncover and remove or repair the obstruction. Prior to the commencement of the work, the point repair excavation shall be approved in writing by the Engineer and the final length shall be as directed by the Engineer in the field. 50 Before any point repair excavation is initiated, the Contractor shall give the Engineer 5 working days notice. Replacement pipe diameter and materials shall match existing (pipe material may be PVC SDR-35 upon approval by the Engineer). The Contractor shall provide a flexible rubber repair coupling with Type 316 stainless steel bands at each end of the replaced section in order to connect it with the existing sanitary sewer. The replaced section of pipe shall provide a smooth transition from the existing pipe to the new pipe.

The length of point repairs listed in the Bid Proposal is approximate only. The unit price indicated for point repairs will not be adjusted because the length of point repairs actually required varies from the quantity in the Bid Proposal.

Payment for point repairs shall be at the unit price bid per lineal feet of pipe replaced.

The minimum length for a point repair shall be 3 feet. Payment shall include full compensation for all materials, labor, equipment, and supplies necessary to complete this item in place.

Item No. 20 Drain Inlet No. 22 to Construct
Gutter Drain No. 22 shall be placed at locations shown on the Plans or as directed by the Engineer and shall conform to the requirements of Section 10, 30 and 38 of the Standard Specifications, unless otherwise noted. Included in this item is all work associated with removing the existing gutter drain. The existing grates shall be cleaned of all foreign material and delivered to the City of Sacramento Corporation Yard, Division of Field Services, 5730 24th Street, Attention: Kevin Guerra, Sewer Superintendent (916) 808- 4022.

Gutter drains shall be connected to PVC pipe leads using Fernco couplings (or approved equal).

For installation in streets, curb and gutter reconstruction shall match existing geometry and, at the Engineers discretion, extend up to five (5) feet in length on either side of the inlet. The cost of curb and gutter reconstruction shall be included in the unit price for this item. For installation in alleys, the eight (8) inch PVC pipe leads, connection to the new main or manhole, and removal of the existing lead is included in the cost of this item.

Surface restoration shall be in accordance with the section of the General Requirements entitled “Pavement Cutting and Surface Restoration” and shall be paid for under this item of the contract.

Payment shall be at the unit price bid per each Gutter Drain No. 22 placed and shall include full compensation for furnishing all labor, materials, tools and equipment and for performing all work necessary to complete this item in place 51 Item No. 21 Drain Lead to Remove, 8-inch Drain Inlet Lead to Install Where shown on the Plans, 8-inch diameter drain inlet leads shall be polyvinyl chloride (PVC). Drain lead connections to manholes shall be included in this item unless otherwise indicated in these Special Provisions.

Drain inlet lead and fittings shall be constructed to the details on the Plans and shall conform to Sections 10, 14, and 26 of the Standard Specifications and these Special provisions. PVC pipe and fittings shall conform to ASTM D3034 and shall be STORM DRAINAGER 35 with elastomeric gasket joints providing a watertight seal per ASTM D3212. Minimum pipe stiffness at 5% deflection shall be 46 PSI according to ASTM test D2412. Pipe shall be subject to deflection tests as specified elsewhere in these Special Provisions.

C-900 PVC for pipe and fittings shall be utilized for any pipe that has less than eighteen (18) inches of cover between the top of the installed pipe and the finish grade. If the depth of cover is less than twelve (12) inches, the Contractor shall encase pipe with controlled density fill as specified elsewhere in these Special Provisions and the CSSS. When the Engineer approves shallow placement of drain inlet leads requiring protective measures proposed by Contractor, all work associated with protective measures shall be considered as extra and paid per Section 8 of the Standard Specifications.

When connecting to a manhole:

A. The Contractor shall install a flexible joint (bell and spigot or flexible coupling) a horizontal distance of 18 inches to 24 inches from the wall of the manhole.

B. All connections to the manholes not cast as part of the base shall be made by use of a coring machine and a NPC "Kor-N-Seal Cavity O-Ring" or approved equal flexible watertight coupling. The incoming pipe shall be cut, and the space between the inserted pipe and the seal shall be grouted smooth.

It shall be the Contractor's responsibility to determine the final vertical alignment by means of locating potential conflicts prior to construction of the drain inlet, lead, or coring of the manhole. No deflections will be allowed in the lead unless otherwise approved by the Engineer. Guidelines for final profile of drain lead are as follows: The distance from the grate elevation to the top of the drain inlet base shall be between 4'-8" and 5' unless otherwise shown on the Plans or directed by the Engineer. The drain lead shall have a minimum slope of 0.01 ft/ft unless otherwise approved by the Engineer.

Lead traps may be moved away from the drain inlet, if approved by the Engineer, to avoid conflicts with crossing utilities. Unless otherwise stated herein, no additional compensation shall be paid to the Contractor for potholing or altering drain inlet or lead elevations.

Payment shall be at the unit price bid per lineal foot (LF) of 8-inch drain lead placed and 52 shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals for performing all work necessary to complete this item in place including pavement/surface Improvements cutting and removal, trenching, furnishing and placing pipe, backfilling, flow control, removal, dewatering, testing, temporary pavement and maintenance, and permanent paving or other surface restoration as specified in the Plans, these Special Provisions, the CSSS, and as directed by the Engineer.

Item No. 22 Utility Potholing
Prior to construction, Contractor to perform utility potholing per section 3.01 of these special provisions.

Payment shall be at the contract lump sum (LS) price basis for all utility potholes and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for performing all work necessary to complete this item in place including pavement cutting and removal, excavation, backfilling, and repaving or other surface restoration as specified in the Plans and as directed by the Engineer.

Item No. 23 CCTV Inspection
All newly constructed combined sewer pipes shall be inspected by the Contractor utilizing a remote closed circuit in-line television (CCTV) camera in accordance with Section 3.12 of these Special Provisions.

Payment shall be at the unit price bid per lineal foot (LF) of proposed combined sewer pipe inspected and shall include full compensation for furnishing all labor, materials, tools and equipment and for performing all work necessary to complete this item in place.

Item No. 24 Unmarked Utility Crossings
All utilities, abandoned or live, not shown on the plans that cross the excavation for but do not physically conflict with the installation of the subgrade items of the Bid Proposal shall be paid for under this item. A crossing shall be defined as any pipe, cable, conduit, or duct structure that in the opinion of the Engineer crosses the excavation within 60 degrees of a line perpendicular to the excavation. If more than one utility crosses within a 15-inch long section of the trench, then all the utilities in that cross section will be paid as one. Crossings that are more than 60 degrees from perpendicular, run parallel in the excavation or physically conflict with the installation shall be paid for on a time and material basis in accordance with section 8 of the Standard Specifications.

Payment shall be at the unit price bid per each (EA) unmarked utility crossing and shall include full compensation for furnishing all labor, materials, tools and equipment and for performing all work necessary to complete this item in place. 53 Item No. 25 Unsuitable Material, Removal, and Replacement Whenever the bottom of the trench is, in the opinion of the Engineer, unsuitable as a foundation for pipe bedding, the foundation shall be treated in accordance with Section 26-5-4 of the Standard Specifications. Unsuitable material is generally defined as material the Engineer determines to be:

Of such unstable nature as to be incapable of being compacted to specified density using ordinary methods at or near optimum moisture content; or

1. Too wet to be properly compacted and circumstances prevent processing or inplace drying prior to incorporation into the work; or

2. Containing visible or excessive deleterious material; or

3. Otherwise unsuitable for planned use.

Trench backfill shall consist of Class 2 Aggregate Base (AB) or job excavated, native soil meeting the requirements of Section 26-5 of the Standard Specifications. The use of the job excavated, native soil shall be at the Contractors risk. No additional compensation will be paid to the Contractor for hauling, stockpiling, drying, wetting or any processing of the native soil or AB required in order to achieve the minimum stability and relative compaction criteria.

Excavated unsuitable material shall be the property of the Contractor and shall be disposed of away from the project site. For offsite disposal, the Contractor shall have written permission from the owner upon whose property the disposal is to be made before any material is deposited thereon.

The quantity shown in the Proposal for this item shall be considered approximate. No guarantee is made or implied that the quantity will not be reduced, increased, or deleted as may be required by the Engineer. This item has been included in the proposal in anticipation of encountering unsuitable material during pipe backfill or subgrade preparation. If no unsuitable material is excavated, then this item will be deleted.

Payment shall be at the unit bid price per cubic yard (CY) of Unsuitable Material removed and replaced with clean crushed rock and shall be based upon the weight of the material placed less the weight of moisture content. This price shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all work involved in removing and disposing of unsuitable material and backfilling with aggregate base, as shown on the plans, these special provisions, and as directed by the Engineer.
**END OF SECTION**

54 APPENDIX A

1. Constructing Sewer Main Notification Letter – 2 working days’ notice 55 Constructing Sewer Main [Distribute 2 working days prior to beginning work] (CONTRACTOR LETTER HEAD)
Dear Resident,
The City of Sacramento, Department of Utilities, awarded a construction contract to (Contractor) to replace the combined sewer/drainage pipeline add location here.

During the course of construction, a portion of the alley will be closed to through traffic. In addition, if your garage, driveway, or parking area is accessed from the alley, access may be temporarily restricted during the brief period that construction takes place in front of your driveway. At the end of each work day, the entire alley will be re-opened. Our work hours are typically between 7 AM to 6 PM. In an effort to minimize driveway access delays, you may consider moving your vehicle before 7:00 a.m. when the construction crews begin work.

General public and construction crew safety is of primary concern to us and we encourage you to observe the construction signs. We realize this construction project may be a temporary inconvenience and we will strive to minimize the impacts to the residents.

If you have any questions or problems, please contact any one of the project representatives listed below:

Contractor Superintendent: Name: Phone Number
City Inspector: Name: Phone Number
City Inspection Supervisor: Name: Phone Number
City Project Manager: Name: Phone Number
Pipeline work is scheduled to begin in your neighborhood on ___________________.

Once the pipelines are constructed, we will restore the surface of the alley. The anticipated project completion date is ___________________.

Thank you for your cooperation on this very important project.

Sincerely,
Contractor Representative
56 APPENDIX B

1. 37th Street Alley, CCTV Image of Existing 8” VCP
57 AJ ME S C . YOR I TA
AJ ME S C . YOR I TA
AJ ME S C . YOR I TA
AJ ME S C . YOR I TA
AJ ME S C . YOR I TA
AJ ME S C . YOR I TA
AJ ME S C . YOR I TA
AJ ME S C . YOR I TA
AJ ME S C . YOR I TA
AJ ME S C . YOR I TA
AJ ME S C . YOR I TA
AJ ME S C . YOR I TA
AJ ME S C . YOR I TA