Cities Index.
Staff Report - Execution of Superseding Freeway Agreements with the State of California Department of Transportation (Caltrans) and to Request a New Public Road Connection in State Access Control to State Route 99 & Highway 50 for the Broadway Complete Street Project

Sacramento City Council
September 20, 2022

Document
Staff Report - Execution of Superseding Freeway Agreements with the State of California Department of Transportation (Caltrans) and to Request a New Public Road Connection in State Access Control to State Route 99 & Highway 50 for the Broadway Complete Street Project
Meeting
September 20, 2022
Body
Sacramento City Council
Original file
4.2 MB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

City of Sacramento
City Council Report
915 I Street, 1st Floor
Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2022-01557 9/20/2022 Consent Item 6.

Execution of Superseding Freeway Agreements with the State of California Department of Transportation (Caltrans) and to Request a New Public Road Connection in State Access Control to State Route 99 & Highway 50 for the Broadway Complete Street Project (T15175300)
File ID: 2022-01557
Location: 29
th Street, between Broadway and X Street; Districts 4, 5, and 7 Recommendation: Adopt a Resolution: 1) approving the proposed revisions to the existing Freeway Agreements as depicted in Exhibit A (Attachment 3); 2) authorizing the City Manager or the City Manager’s designee to execute a superseding Freeway Agreement for State Route 99/Interstate 80 with Caltrans; and 3) authorizing the City Manager or the City Manager’s designee to execute a superseding Freeway Agreement for Interstate 80/US Highway 50 with Caltrans.

Contact: Philip Vulliet, Senior Engineer, (916) 808-5092, [email protected]; Jesse Gothan, Supervising Engineer, (916) 808-6897, [email protected]; Ofelia Avalos, Engineering Services Manager, (916) 808-5054, [email protected]; Department of Public Works
Presenter: None
Attachments:
1-Description/Analysis
2-Resolution
3-Exhibit A - Modification of Freeway Agreements - 29
th Street Extension
Description/Analysis
Issue Detail: In August 2016, the City Council accepted the Broadway Complete Streets Plan as the City’s guide for the reconfiguration of the Broadway corridor between Interstate 5 and State Route

99. On February 14, 2017, the City Council approved the establishment of the Broadway Complete Street Capital Improvement Project.

City of Sacramento Page 1 of 4
File ID: 2022-01557 9/20/2022 Consent Item 6.

When fully implemented, the Broadway Complete Street Project (T15175300) will transform Broadway from 3rd Street to Franklin Boulevard into a complete street that provides an active pedestrian, bicycle, and transit friendly environment. The accepted plan and proposed project will reduce the vehicle travel lanes from four lanes to two lanes with a center turn lane, add buffered bike lanes, accommodate parking, and improve pedestrian crossings. To accommodate vehicular traffic circulation with the lane reduction on Broadway, the project will reestablish one block of 29th Street, between X Street and Broadway, which will connect at the intersection with the southbound SR-99 onramp. This is the location of the former 29th Street, which was removed with the construction of Highway 50/80 and the freeway-to-freeway interchange between Highway 50 and SR-99, under Freeway Agreements between the California Highway Commission and City dated July 15, 1965 (City Agreement 1395) and July 30, 1965. The location will remain under State access control, and the City will maintain the reconstructed 29th Street roadway segment, consistent with maintenance of local road crossings under the State highway.

To proceed with the construction of 29th Street between X Street and Broadway, Caltrans requires that the City execute Superseding Freeway Agreements. Because this project is located at the Highway 50/SR-99 interchange the City is required to execute superseding freeway agreements for both SR-99 and Highway 50 which will replace the existing 1965 Freeway Agreements and will identify 29th Street as a proposed local road crossing. Per Caltrans processes, prior to completing the Superseding Freeway Agreements the City must provide Caltrans and the California Transportation Commission with a Resolution (Attachment 2) approving the proposed revision to the freeway agreements and authorizing the City Manager or the City Manager’s designee to execute the Superseding Freeway Agreements in the future.

Policy Considerations: The actions requested herein are necessary for the construction of the Broadway Complete Street project, which is consistent with the City’s goals of improving and expanding public safety, and enhancing livability, as identified in the General Plan:

M1.2.1 - Multimodal Choices. The City shall develop an integrated, multimodal transportation system that improves the attractiveness of walking, bicycling, and riding transit over time to increase travel choices and aid in achieving a more balanced transportation system and reducing air pollution and greenhouse gas emissions.

These improvements will accommodate cyclists of varying experience levels and abilities and increase overall ridership.

The project is consistent with goals established in the Central City Specific Plan for the Broadway District:

LU.7.10 - Broadway Complete Streets Plan. Implement the Broadway Complete Streets Plan which introduces traffic calming, reduced roadway and intersection widths, reduced left turn lanes, consistent curb treatments, street lighting, and additional on-street parking.

The Central City Specific Plan included the 29th Street extension in its Mobility Element, identifying it City of Sacramento Page 2 of 4
File ID: 2022-01557 9/20/2022 Consent Item 6.
as a “New One-Way Roadway Connection” in the Preferred Roadway Network.

Economic Impacts: None
Environmental Considerations:

California Environmental Quality Act (CEQA): On October 15, 2019, the City Council approved an addendum to the Central City Specific Plan Environmental Impact Report (CCSP EIR) to include the improvement proposed with the Broadway Complete Streets Project.

The CCSP EIR evaluated the potential impacts for the improvements identified in the Broadway Complete Street project, including the lane reduction, bike and pedestrian facilities, streetscape improvements, lighting improvements, and 29th Street extension between Broadway and X Street. Supplemental traffic analysis was performed to evaluate intersection and corridor operations, and operations along adjacent streets. The supplemental analysis identified no significant impacts that were not previously identified and evaluated in the CCSP EIR.

National Environmental Policy Act (NEPA): This project is federally funded. In compliance with the NEPA, Caltrans determined on March 3, 2020, that the project is a Categorical Exclusion under 23 CFR 771.112(c)(3), and is categorically excluded from needing to prepare an environmental assessment (EA) or environmental impact statement (EIS).

No further environmental review is required for subsequent actions of the previously approved project.

Sustainability: The Broadway Complete Street project is consistent with City Council’s sustainability priorities. The transportation sector accounts for 48% of community-wide greenhouse gas emissions. The City’s Climate Action Plan includes several implementation measures to reduce vehicle trips and increase use of transit and active modes. The project under development would implement the Climate Action Plan by providing enhanced pedestrian and bicycle connections. Improvements would also support one of Sacramento Regional Transit’s busiest bus routes, further supporting vehicle trip reductions.

Commission/Committee Action: None
Rationale for Recommendation: The Broadway Complete Street project requires the construction of a new roadway segment within State access control, to accommodate changes in vehicular circulation needed for the proposed lane reduction and bicycle enhancements. Construction of the new roadway segment in State access control requires a new Freeway Agreement to supersede the existing Freeway Agreement, and a request to install a new public road connection to SR-99. Council action is required to execute a Freeway Agreement with the State of California, and to request a new City of Sacramento Page 3 of 4
File ID: 2022-01557 9/20/2022 Consent Item 6.
public road connection to state highways.

Financial Considerations The estimated total cost to complete preliminary engineering for the Broadway Complete Streets Project is $2.3 million. There is sufficient funding within the project to complete processing of the recommended action and complete final design. Staff will return for City Council approval of budgetary actions associated with programmed federal grant funds for this project at construction award.

Local Business Enterprise (LBE): Not applicable
City of Sacramento Page 4 of 4

Version Dated 10/16/19

RESOLUTION NO. 2022-XXXX

Adopted by the Sacramento City Council

September 20, 2022

Execution of Superseding Freeway Agreements with the State of California Department of Transportation (Caltrans) and to Request a New Public Road Connection in State Access Control to State Route 99 & Highway 50 for the Broadway Complete Streets Project (T15175300)

BACKGROUND

A. The State of California Department of Transportation (“CALTRANS”) and the City of Sacramento (“CITY”) entered into a Freeway Agreement dated July 15, 1965 (City Agreement 1395) , related to that portion of Interstate 80 / US Highway 50 from the Sacramento River to 34th Street;

B. CALTRANS and the CITY entered into a Freeway Agreement dated July 30, 1965, related to that portion of State Route 99 / Interstate 80 from 5th Street to A Street;

C. The CITY is currently working on a Complete Streets project and proposes to reestablish a previously closed public road (29th Street) within the US 50 / SR 99 interchange between X Street and Broadway;

D. The work will include the reestablishment of 29th Street. 29th Street will include 2 vehicular lanes, bike lanes, sidewalks, and a new traffic signal at the southbound SR 99 on -ramp intersection;

E. The proposed improvements are needed to move regional traffic volumes away from Broadway to the adjacent parallel street, X Street, improve access to State Route 99, and improve comfort for nonmotorized users along the Broadway corridor; and

F. The revisions to the existing freeway interchange described above and thos e shown on Exhibit “A,” which is attached hereto and incorporated herein by this reference, require

Version Dated 10/16/19

minor revisions to the current Freeway Agreements.

BASED ON THE FACTS SET FORTH IN THE BACKGROUND, THE CITY COUNCIL RESOLVES AS FOLLOWS:

Section 1. The proposed revisions to the Freeway Agreement dated July 15, 1965, for Interstate 80 / US Highway 50, and the Freeway Agreement dated July 30, 1965 , for State Route 99 / Interstate 80 as described hereinabove and depicted within the attached Exhibit “A,” are approved.

Section 2. The City Manager or designee is authorized to execute a Freeway Agreement superseding the 1965 State Route 99 / Interstate 80 agreement which incorporates the revisions provided in Exhibit A at some future date.

Section 3. The City Manager or designee is authorized to execute a Freeway Agreement superseding the 1965 Interstate 80 / US Highway 50 agreement which incorporates the revisions provided in Exhibit A at some future date.

Adopted by the City of Sacramento City Council on September 20, 2022, by the following vote:

Ayes:

Noes: None

Abstain: None

Absent: None

Attest:
_____________________________________
Mindy Cuppy, City Clerk

Version Dated 10/16/19

The presence of an electronic signature certifies that the foregoing is a true and correct copy as approved by the Sacramento City Council.

RIGHT OF WAY DISCLAIMERRIGHT OF WAY DISCLAIMER
Graphic Scale