City of Sacramento
City Council - 5PM Report
915 I Street Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2022-01805 11/1/2022 Consent Item 8.
Change Order: Florin Pump Station Improvements
File ID: 2022-01805
Location: District 6
Recommendation: Pass a Motion: 1) authorizing the City Manager or the City Manager’s designee to execute Change Order No. 6 to City Agreement No. 2021-0694 with TNT Industrial Contractors, Inc., for an amount not-to-exceed $32,557.06, bringing the agreement’s total not-to-exceed amount to $1,789,359.47; 2) resetting the City Manager’s authority to issue Change Orders for the Agreement.
Contact: Steven Swain, Project Manager, (916) 808-4059, [email protected]; Michelle Carrey, Supervising Engineer, (916) 808-1438, [email protected]; Sherill Huun, Engineering & Water Resources Division Manager, (916) 808-1455, [email protected]; Department of Utilities
Presenter: None
Attachments:
1-Description/Analysis
2-Change Order
Description/Analysis
Issue Detail: Staff recommends Council approve Change Order No. 6 with TNT Industrial Contractors, Inc. for the City Agreement No. 2021-0694, for resurfacing a flange on the pump station effluent piping, as well as performing additional testing and balancing of the HVAC system.
Policy Considerations: This Change Order exceeds the City Manager’s approval authority and requires Council approval.
Economic Impacts: This Change Order is expected to create 0.13 total jobs (0.07 direct jobs and
0.06 jobs through indirect and induced activities) and create $20,101.87 in total economic output ($12,670.36 of direct output and another $7,431.51 of output through indirect and induced activities).
File ID: 2022-01805 11/1/2022 Consent Item 8.
The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER). CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical $1 million of spending in various construction categories within the City of Sacramento in an average one-year period. Actual impacts could differ significantly from the estimates and neither the City of Sacramento nor CSER shall be held responsible for consequences resulting from such differences.
Environmental Considerations:
California Environmental Quality Act (CEQA): The subject projects were reviewed and determined to be categorically exempt from the California Environmental Quality Act (CEQA).
The projects include operation, repair, maintenance, and minor alteration of existing public facilities and mechanical equipment (CEQA Guidelines Section 15301).
Sustainability: The proposed project is consistent with the 2035 General Plan <https://www.cityofsacramento.org/Community-Development/Resources/Online-Library/2035-- as it improves infrastructure reliability at the Florin Pump Station, which will enhance the ability to maintain pressure throughout the entire water system.
Commission/Committee Action: Not applicable.
Rationale for Recommendation: Upon disassembly, an existing 54-inch flange on the effluent piping of the pump station was found to be out of plane, preventing the proper reassembly of the piping and the ability of the pump station to provide water to the distribution system. This pump station is critical to the operation of the City water distribution system. In order to bring the pump station back into service, it was necessary to resurface the flange.
Financial Considerations: The original contract not-to-exceed amount was $1,490,026. The net change by previous change orders in the amount of $266,776.41, increased the contract not-to- exceed amount to $1,756,802.41. Proposed Change Order No. 6 in the amount of $32,557.06 would increase the contract not-to-exceed amount to $1,789,359.47. There are sufficient funds in the Florin Res Back Up Engine (Z14130100, 6005) to execute this Change Order.
There are no General Funds allocated or planned for this project.
Local Business Enterprise (LBE): TNT Industrial Contractors, Inc. is an LBE.
Background: During construction of the project, the pump station was shut down in order to disassemble a section of 54-inch effluent piping and install a new flow meter. During installation and assembly, it was found that an existing 54-inch flange was out of plane, causing the pipe to leak. To properly assemble the pipe and install the new flow meter, the City directed the Contractor to
File ID: 2022-01805 11/1/2022 Consent Item 8.
resurface the existing flange.
Additionally, as a part of the project, the Contractor furnished and installed new HVAC equipment, including ducting, fans, and air conditioning units, to improve ventilation within the pump station.
During testing and balancing of this new equipment, it was discovered that some of the existing HVAC fans were not operational, preventing the balancing of the new equipment. Once these fans were returned to service, additional testing and balancing was performed by the Contractor.
/0/1/2/3/4/5/0/3/i255
/4/1/7/3/8/2/9/i255/10/11/12/12/3/i255
/13/14/15/16/17/18/19/16/i255/13/14/21/22/17/23/24/14/25/16/26/15/27/i255/28/14/17/29/30/i255/31/25/32/16/i255/33/19/19/14/29/34/18/15/35/i255/33/36/36/i255/13/14/15/16/17/18/19/16/32/37/i255/38/14/39/22/21/22/17/40/i255/26/16/i255/26/32/i255/41/42/43/i255/34/18/17/16/i255/14/44/i255/16/38/22/i255/19/14/15/16/17/18/19/16/45/i255 /9/46/47/46/48/49/50/i255/8/47/51/52/48/53/49/54/55/52/47/i255/56/4/46/57/58/55/48/46/59/60/i255 /61/62/63/64/63/65/66/67/i255/69/70/65/71/62/66/72/71/i255/73/i255/74/75/76/77/77/67/78/79/78/65/71/75/i255/70/65/67/80/81/82/i255/83/83/83/83/83/83/83/83/i255/i255/i255/84/76/77/77/67/78/79/78/65/71/85/86/87/87/78/65/87/76/79/i255/73/82/i255/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /86/75/75/78/75/75/70/62/88/75/i255/89/66/62/72/78/67/i255/90/76/79/91/78/62/74/75/81/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83 /69/70/65/71/62/66/72/71/i255/92/93/93/78/72/71/63/94/78/i255/95/66/71/78/82/i255/83/83/83/83/83/83/83/83/83/i255/i255/i255/i255/69 /70/65/71/62/66/72/71/i255/92/96/77/63/62/66/71/63/70/65/i255/95/66/71/78/i255/74/63/93/i255/66/77/77/67/63/72/66/91/67/78/81/82/i255/83/83/83/83/83/83/83/83/83/i255 /97/i255/86/79/70/76/65/71/i255/74/90/70/71/i255/71/70/i255/92/96/72/78/78/87/81/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255/86/87/98/76/75/71/78/87/i255/97/i255/86/79/70/76/65/71/i255/74/99/85/100/81/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /61/71/101/78/62/i255/89/66/62/71/80/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /89/62/70/98/78/72/71/i255/102/63/71/67/78/82/i255/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /89/62/70/98/78/72/71/i255/73/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255/103/63/87/85/104/105/106/85/104/105/89/i255/73/82/i255/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /69/63/71/80/i255/69/70/76/65/72/63/67/i255/86/77/77/62/70/94/66/67/82/i255/63 /93/i255/107/92/84/108/i255/69/70/76/65/72/63/67/i255/105/63/67/78/i255/109/95/73/82/i255/83/83/83/83/83/83/83/83/83/83/i255 /0/52/47/54/48/49/111/54/i255/112/48/52/111/46/113/113/55/47/114/i255/0/52/47/54/49/111/54/113/i255 /95/78/77/66/62/71/79/78/65/71/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /69/70/65/71/62/66/72/71/i255/69/70/70/62/87/63/65/66/71/70/62/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /89/62/70/98/78/72/71/i255/115/66/65/66/64/78/62/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83 /116/117/118/119/120/121/i255/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/83/83/83/83/83/83/i255 /124/46/125/49/48/54/53/46/47/54/i255/4/46/126/55/46/127/i255/49/47/59/i255/4/52/58/54/55/47/114/i255 /74/84/63/64/65/66/71/76/62/78/81/i255 /74/95/66/71/78/81/i255 /74/84/63/64/65/66/71/76/62/78/81/i255 /74/95/66/71/78/81/i255 /74/84/63/64/65/66/71/76/62/78/81/i255 /74/95/66/71/78/81/i255 /128/129/130/131/132/133/134/135/132/136/129/130/i255/138/139/140/132/141/i255 /143/144/145/146/147/148/149/150/151/147/141/i255/i255
/152/149/148/149/150/149/151/153/i255/154/155/153/155/156/146/147/141/i255/i255 /157/158/159/146/147/141/i255
/74/84/63/64/65/66/71/76/62/78/81/i255 /74/95/66/71/78/81/i255 /10/125/46/111/55/49/50/i255/8/47/113/54/48/58/111/54/55/52/47/160/0/52/53/53/46/47/54/113/i255/56/55/161/46/161/i255/48/46/111/52/48/59/55/47/114/i255/48/46/57/58/46/113/54/46/59/162/i255/52/54/163/46/48/i255/49/114/46/47/111/164/i255/113/55/114/47/49/54/58/48/46/113/i255/48/46/57/58/55/48/46/59/162/i255/46/54/111/161/60/i255 /83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/28/42/24/i255/13/36/167/24/168/i255/169/i255/170/43/i255/171/167/172/33/24/43/31/167/41/43/173/i255/42/41/36/174/i255/175/i255/171/42/i255/41/42/43/i255/176/24/170/43/167/i255/177/167/36/42/176 /i255/43/178/170/173/i255/36/170/41/167/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/i255 /179/179/i255/181/182/183/184/i255/185/186/187/185/188/184/189/190/191/192/i255 /194/195/196/197/198/199/200/201/202/i255/194/195/204/205/195/206/207/195/199 /208/207/209/195/198/i255/210/211/198/207/212/i255/213/200/202/201/211/207/205/198/195/i255/194/195/204/205/200/198/195/199 /214/215/214/i255/217/218/219/220/221/222/223/224/225/226/i255/227/228/218/222/223/225/229/222/228/223/221/230/i255/217/218/229/231 /232/233/234/233/235/236/233/236/236
/237/238/223/239/228/223/240/225/218/229/238/i255/237/238/223/224/228/219/230/i255/225/219/219/i255/235/236/i255/229/225/226/238/218/219/225/223/i255/219/225/241/221 /236/242
/243/222/224/226/224/222/224/238/221
/236/242/244/233/245/244/246/236/246/233
/247/222/238/248/238/218/i255/247/249/225/224/218
/250/246/233/233/234/233/235/246/233/236/233/233
/251/252/223/225/248/238/221/253/229/224/222/241/228/239/221/225/229/223/225/240/238/218/222/228/231/228/223/254 /255/235/246/230/245/245/0/231/236/242
/1/226/228/223/224/218/i255/2/220/240/237/i255/247/222/225/222/224/228/218/i255/217/240/237/223/228/248/238/240/238/218/222/221 /246/236/246/246/3/236/233/4/236/245/215/5
/251/238/218/238/238/i255/252/223/225/248/238/221
/246/236/246/233/3/236/242/6/234
/255/233/230/0/4/6/230/235/245/6/231/234/0
/7/7
/8/9/10/i255/12/13/i255/14/15/14/14
/16/17/18/i255/20/20/21/i255/22/23/22/22
/24/25/26/27/28/29/29/i255/31/32/32/33/i255/34/35/36/37/i255/38/38/39/i255/40/41/40/40/i255/38/42/43/41/41/i255/44/45/46/47 /35/36/37/i255/38/38/39/i255/40/41/40/40 /0/1/2/3/i255/5/6/i255/7/8/0/9/8/10/11/12/2/5/i255
/i255 /0/13/8/12/14/11/i255/5/9/15/11/9/i255
/i255
/0/17/18/19/20/21/22/19/i255/23/i255/24/i255/15/21/19/25/26/i255/27/28/27/29/30/28/31/32/33/i255/i255/28/31/34/29/35/34/27/28/27/29/i255/i255/36/37/38/39/25/19/i255/23/26/i255/33/40/27/29/29/30/35/28/28/28/28/30/31/28/28/35/30/35/29/28/28/28/28/28/28/30/41/29/33/29/42/28/29/28/28/30/33/28/29/i255 /i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255 /i255/i255/i255/i255/i255/i255/i255 /43/37/20/22/44/21/45/25/i255/5/20/38/25/20/i255/23/26/i255/28/28/28/28/28/31/29/46/42/32/i255/i255 /i255 /0/44/21/18/39/25/i255/5/20/38/25/20/i255/12/17/26/i255/31/i255/i255/i255/i255/i255/i255/i255/i255 /i255
/47/48/49/50/48/51/52/53/54/55/56/i255/57/48/58/59/60/55/50/53/59/48/i255/i255/i255/i255/i255/i255/i255 /i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255 /47/52/61/54/52/51/62/52/50/i255/29/33/56/i255/27/28/27/27/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255 /i255
/63/64/65/i255/i255/i255/i255/i255/i255/63/66/63/i255/67/53/68/69/70/54/50/59/48/58/i255/57/55/53/54/50/48/49/54/55/50/70/56/i255/67/53/49/71/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/56/i255/57/55/53/54/50/48/49/54/55/50/i255 /i255
/0/5/12/2/9/8/0/2/i255/6/5/9/26/i255/6/72/17/20/73/18/i255/43/37/74/75/i255/7/19/21/19/73/17/18/i255/1/74/75/20/17/76/25/74/25/18/19/45/i255/77/36/78/79/79/80/79/81/78/79/82/79/79/83/i255/i255 /i255
/84/61/55/53/i255/51/69/54/69/48/58/i255/48/49/49/52/61/54/48/53/49/52/i255/55/60/i255/54/85/59/70/i255/68/55/49/69/51/52/53/54/i255/62/86/i255/54/85/52/i255/57/59/54/86/i255/55/60/i255/47/48/49/50/48/51/52/53/54/55/56/i255/85/52/50/52/59/53/48/60/54/52/50/i255/50/52/60/52/50/50/52/68/i255/54/55/i255/48/70/i255/87/57/67/63/88/87/56/i255/48/53/68/i255/86/55/69/50/i255/60/59/50/51/56/i255/85/52/50/52/59/53/48/60/54/52/50/i255 /50/52/60/52/50/50/52/68/i255/54/55/i255/48/70/i255/87/57/64/66/63/89/90/57/63/64/89/87/56/i255/59/53/i255/48/49/49/55/50/68/48/53/49/52/i255/91/59/54/85/i255/54/85/52/i255/54/52/50/51/70/i255/48/53/68/i255/49/55/53/68/59/54/59/55/53/70/i255/55/60/i255/54/85/52/i255/55/50/59/92/59/53/48/58/i255/49/55/53/54/50/48/49/54/i255/68/55/49/69/51/52/53/54/70/56/i255/86/55/69/i255/48/50/52/i255/85/52/50/52/62/86/i255/68/59/50/52/49/54/52/68/i255 /54/55/i255/51/48/93/52/i255/54/85/52/i255/60/55/58/58/55/91/59/53/92/i255/49/85/48/53/92/52/i255/55/50/i255/49/85/48/53/92/52/70/i255/60/55/50/i255/54/85/52/i255/49/55/53/70/59/68/52/50/48/54/59/55/53/i255/70/52/54/i255/60/55/50/54/85/i255/62/52/58/55/91/65/i255 /i255
/15/25/45/22/20/73/75/19/73/17/18/26/i255/94/7/25/25/i255/11/95/44/73/96/73/19/i255/8/97/i255/21/19/19/21/22/44/25/38/i255/21/18/38/i255/73/18/22/17/20/75/17/20/21/19/25/38/i255/44/25/20/25/73/18/98/i255 /i255
/i255/i255 /i255/i255/i255/i255/i255
/i255 /i255/i255/63/85/52/i255/55/50/59/92/59/53/48/58/i255/49/55/53/54/50/48/49/54/i255/70/69/51/i255/91/48/70/65/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/99/i255/29/56/33/32/28/56/28/27/31/71/28/28/i255 /i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/66/52/54/i255/49/85/48/53/92/52/i255/62/86/i255/61/50/52/100/59/55/69/70/i255/49/85/48/53/92/52/i255/55/50/68/52/50/70/65/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/99/i255/i255/i255/i255/27/31/31/56/40/40/31/71/33/29/i255 /i255 /63/85/52/i255/49/55/53/54/50/48/49/54/i255/70/69/51/i255/61/50/59/55/50/i255/54/55/i255/54/85/59/70/i255/49/85/48/53/92/52/i255/55/50/68/52/50/i255/91/48/70/65/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/99/i255/29/56/40/35/31/56/46/28/27/71/33/29/i255 /i255 /63/85/52/i255/49/55/53/54/50/48/49/54/i255/70/69/51/i255/91/59/58/58/i255/62/52/i255/101/102/103/104/105/106/107/105/108/i255/62/86/i255/54/85/59/70/i255/57/71/64/71/65/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/99/i255/i255/i255/i255/i255/i255/i255/42/27/56/35/35/40/71/28/31/i255 /i255 /66/52/91/i255/49/55/53/54/50/48/49/54/i255/70/69/51/i255/59/53/49/58/69/68/59/53/92/i255/48/58/58/i255/57/85/48/53/92/52/i255/64/50/68/52/50/70/65/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/99/i255/i255/29/56/40/46/32/56/42/35/32/71/33/40/i255 /i255
/57/64/66/63/89/90/57/63/64/89/i255/48/92/50/52/52/70/i255/54/85/48/54/i255/54/85/52/i255/48/51/55/69/53/54/i255/55/60/i255/59/53/49/50/52/48/70/52/i255/55/50/i255/68/52/49/50/52/48/70/52/i255/59/53/i255/54/85/52/i255/49/55/53/54/50/48/49/54/i255/70/69/51/i255/70/61/52/49/59/60/59/52/68/i255/59/53/i255/54/85/59/70/i255/49/85/48/53/92/52/i255/55/50/68/52/50/i255/70/85/48/58/58/i255/49/55/53/70/54/59/54/69/54/52/i255/60/69/58/58/i255 /49/55/51/61/52/53/70/48/54/59/55/53/i255/60/55/50/i255/54/85/52/i255/91/55/50/93/i255/50/52/109/69/59/50/52/68/i255/62/86/i255/54/85/59/70/i255/49/85/48/53/92/52/i255/55/50/68/52/50/56/i255/59/53/49/58/69/68/59/53/92/i255/62/69/54/i255/53/55/54/i255/58/59/51/59/54/52/68/i255/54/55/i255/48/58/58/i255/49/55/51/61/52/53/70/48/54/59/55/53/i255/60/55/50/i255/54/85/52/i255/48/68/68/59/54/59/55/53/48/58/i255/48/53/68/34/55/50/i255/50/52/100/59/70/52/68/i255 /91/55/50/93/i255/70/61/52/49/59/60/59/52/68/i255/85/52/50/52/59/53/56/i255/48/53/68/i255/70/85/48/58/58/i255/60/69/58/58/86/i255/49/55/51/61/52/53/70/48/54/52/i255/57/64/66/63/89/90/57/63/64/89/i255/60/55/50/i255/48/53/86/i255/48/53/68/i255/48/58/58/i255/68/59/50/52/49/54/i255/48/53/68/i255/59/53/68/59/50/52/49/54/i255/49/55/70/54/70/i255/54/85/48/54/i255/51/48/86/i255/62/52/i255/59/53/49/69/50/50/52/68/i255/62/86/i255 /57/64/66/63/89/90/57/63/64/89/i255/59/53/i255/49/55/53/53/52/49/54/59/55/53/i255/91/59/54/85/i255/70/69/49/85/i255/48/68/68/59/54/59/55/53/48/58/i255/48/53/68/34/55/50/i255/50/52/100/59/70/52/68/i255/91/55/50/93/56/i255/59/53/49/58/69/68/59/53/92/i255/48/53/86/i255/49/85/48/53/92/52/70/56/i255/68/59/70/50/69/61/54/59/55/53/70/i255/55/50/i255/68/52/58/48/86/70/i255/59/53/i255/91/55/50/93/i255/70/49/85/52/68/69/58/52/70/i255 /55/50/i255/59/53/i255/54/85/52/i255/61/52/50/60/55/50/51/48/53/49/52/i255/55/60/i255/55/54/85/52/50/i255/91/55/50/93/i255/62/86/i255/57/64/66/63/89/90/57/63/64/89/71/i255/i255/63/85/52/i255/54/59/51/52/i255/60/55/50/i255/61/52/50/60/55/50/51/48/53/49/52/i255/55/60/i255/54/85/52/i255/57/55/53/54/50/48/49/54/i255/91/59/58/58/i255/73/18/22/20/25/21/45/25/i255/96/110/i255/81/82/i255/22/21/72/25/18/38/21/20/i255/38/21/110/45/i255 /62/86/i255/50/52/48/70/55/53/i255/55/60/i255/54/85/52/i255/91/55/50/93/i255/50/52/109/69/59/50/52/68/i255/62/86/i255/54/85/59/70/i255/57/85/48/53/92/52/i255/64/50/68/52/50/71/i255/i255/i255/111/112/49/52/61/54/i255/48/70/i255/85/52/50/52/59/53/i255/48/62/55/100/52/i255/52/112/61/50/52/70/70/58/86/i255/61/50/55/100/59/68/52/68/56/i255/57/64/66/63/89/90/57/63/64/89/i255/60/69/50/54/85/52/50/i255/48/92/50/52/52/70/i255/54/85/48/54/i255 /54/85/52/i255/61/52/50/60/55/50/51/48/53/49/52/i255/55/60/i255/54/85/52/i255/91/55/50/93/i255/70/61/52/49/59/60/59/52/68/i255/59/53/i255/54/85/59/70/i255/57/85/48/53/92/52/i255/64/50/68/52/50/i255/55/50/i255/54/85/52/i255/50/52/70/49/85/52/68/69/58/59/53/92/i255/55/60/i255/55/54/85/52/50/i255/61/50/55/113/52/49/54/i255/91/55/50/93/i255/51/48/68/52/i255/53/52/49/52/70/70/48/50/86/i255/62/86/i255/54/85/59/70/i255/57/85/48/53/92/52/i255 /64/50/68/52/50/56/i255/70/85/48/58/58/i255/53/55/54/i255/49/55/53/70/54/59/54/69/54/52/i255/48/i255/68/52/58/48/86/i255/91/85/59/49/85/i255/91/59/58/58/i255/52/112/54/52/53/68/i255/54/85/52/i255/54/59/51/52/i255/58/59/51/59/54/i255/60/55/50/i255/49/55/51/61/58/52/54/59/55/53/i255/55/60/i255/54/85/52/i255/91/55/50/93/i255/48/70/i255/70/48/59/68/i255/54/52/50/51/i255/59/70/i255/69/70/52/68/i255/59/53/i255/54/85/52/i255/57/55/53/54/50/48/49/54/i255 /62/52/54/91/52/52/53/i255/57/67/63/88/i255/48/53/68/i255/57/64/66/63/89/90/57/63/64/89/i255/60/55/50/i255/54/85/52/i255/61/50/55/113/52/49/54/71/i255 /i255
/i255
/8/75/75/20/17/76/21/72/i255/9/25/22/17/74/74/25/18/38/25/38/i255/36/110/26/i255 /i255/i255/i255/i255/i255 /i255/8/75/75/20/17/76/25/38/i255/21/45/i255/19/17/i255/6/17/20/74/i255/36/110/26/i255 /i255
/i255
/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/i255 /116/50/55/113/52/49/54/i255/117/48/53/48/92/52/50/i255/118/i255/47/54/52/100/52/53/i255/47/91/48/59/53/i255/i255 /i255/i255/i255/i255/i255/i255/119/48/54/52/i255/i255 /i255/117/59/49/85/48/52/58/i255/120/55/70/70/i255/118/i255/47/52/53/59/55/50/i255/119/52/61/69/54/86/i255/57/59/54/86/i255/90/54/54/55/50/53/52/86/i255 /i255
/i255
/8/75/75/20/17/76/25/38/i255/36/110/26/i255 /i255/i255/i255/i255/i255/i255/i255 /i255/8/75/75/20/17/76/25/38/i255/36/110/65/i255 /i255
/i255
/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255 /115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/115/i255 /57/55/53/54/50/48/49/54/55/50/i255/118/i255/63/66/63/i255/67/53/68/69/70/54/50/59/48/58/i255/57/55/53/54/50/48/49/54/55/50/70/71/56/i255/67/53/49/71/i255/i255 /119/48/54/52/i255/i255 /i255/121/52/49/54/55/50/i255/122/48/50/50/55/53/i255/i255/118/i255/90/70/70/59/70/54/48/53/54/i255/57/59/54/86/i255/117/48/53/48/92/52/50/i255 /i255
/i255
/i255/i255
/i255/i255/i255/i255/i255/i255/i255 /i255/8/19/19/25/45/19/25/38/i255/36/110/26/i255 /i255/i255/i255/i255 /i255/i255/i255 /i255
/i255
/i255/i255 /i255/i255/i255/i255/i255/i255/i255 /i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255 /i255 /i255/i255/i255/i255/i255/i255/i255/i255/117 /59 /53/68/86/i255/57/69/61/61/86/i255/30/i255/57/59/54/86/i255/57/58/52/50/93/i255 /i255/i255/i255/i255 /i255 /i255 /i255
/123/124/125/i255/127/128/i255/129/130/129/129
/131/132/133/i255/135/136/i255/137/138/137/137
/0/1/2/3/4/3/5/i255/7/8/i255/9/10/11/12/i255/13/i255/14/15/i255/16/i255 /i255
/i255
/17/18/19/20/i255/22/23/i255/24/25/17/26/25/27/28/29/19/22/i255 /17/30/25/29/31/28/i255/22/26/32/28/26/i255
/28/33/30/18/34/18/19/i255/25/i255
/i255
/17/35/36/37/38/39/40/37/i255/41/i255/42/i255/32/39/37/43/44/i255/45/46/45/13/47/46/48/49/50/i255/46/48/51/13/52/51/45/46/45/13/i255/i255/i255/34/53/54/55/43/37/i255/41/44/i255/50/56/45/13/13/47/52/46/46/46/46/47/48/46/46/52/47/52/13/46/46/46/46/46/46/47/57/13/50/13/16/46/13/46/46/47/50/46/13/i255 /i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255 /i255/i255/i255/i255/i255/i255/i255
/58/53/38/40/59/39/60/43/i255/22/38/54/43/38/i255/41/44/i255/46/46/46/46/46/48/13/61/16/49/i255/i255 /i255 /17/59/39/36/55/43/i255/22/38/54/43/38/i255/29/35/44/i255/48/i255/i255/i255/i255/i255/i255/i255 /i255/i255
/13/63/i255/58/17/22/41/65/66/i255/67/i255/68/69/70/71/36/40/59/i255/23/72/39/36/55/43/i255/26/43/60/53/38/73/39/40/71/36/55/44/i255/74/75/i255/76/10/77/78/2/i255/45/16/77/79/8/i255/45/46/45/45/8/i255/79/80/77/3/75/11/i255/3/75/81/5/10/82/82/10/5/3/14/75/i255/14/15/i255/5/2/12/i255/75/12/83/i255/3/75/5/12/77/75/10/82/i255/15/82/14/83/i255/84/12/5/12/77/i255 /10/75/79/i255/85/3/85/3/75/11/8/i255/3/5/i255/83/10/81/i255/79/3/81/78/14/86/12/77/12/79/i255/5/2/10/5/i255/5/2/12/i255/12/1/3/81/5/3/75/11/i255/52/50/47/3/75/78/2/i255/15/82/10/75/11/12/i255/5/2/10/5/i255/83/10/81/i255/5/14/i255/4/12/i255/80/5/3/82/3/87/12/79/i255/15/14/77/i255/78/14/75/75/12/78/5/3/75/11/i255/5/2/12/i255/75/12/83/i255/85/3/85/3/75/11/i255 /83/10/81/i255/14/80/5/i255/14/15/i255/85/82/10/75/12/8/i255/85/77/12/86/12/75/5/3/75/11/i255/5/2/12/i255/88/14/75/5/77/10/78/5/14/77/i255/15/77/14/84/i255/15/3/75/3/81/2/3/75/11/i255/5/2/12/i255/3/75/81/5/10/82/82/10/5/3/14/75/89/i255/7/5/i255/5/2/12/i255/79/3/77/12/78/5/3/14/75/i255/14/15/i255/5/2/12/i255/88/3/5/90/8/i255/5/2/12/i255 /88/14/75/5/77/10/78/5/14/77/i255/77/12/81/80/77/15/10/78/12/79/i255/5/2/12/i255/15/82/10/75/11/12/i255/14/75/i255/91/7/85/77/3/82/i255/45/56/5/2/8/i255/45/46/45/45/63/89/i255/i255/88/14/84/85/12/75/81/10/5/3/14/75/i255/14/15/i255/92/16/13/8/45/48/45/89/46/48/i255/2/10/81/i255/4/12/12/75/i255/79/12/5/12/77/84/3/75/12/79/i255/80/81/3/75/11/i255/10/i255 /5/3/84/12/i255/10/75/79/i255/84/10/5/12/77/3/10/82/81/i255/10/75/10/82/90/81/3/81/i255/10/75/79/i255/78/14/75/81/5/3/5/80/5/12/81/i255/15/80/82/82/i255/78/14/84/85/12/75/81/10/5/3/14/75/i255/15/14/77/i255/5/2/12/i255/83/14/77/93/8/i255/3/75/78/82/80/79/3/75/11/i255/10/82/82/i255/84/10/77/93/47/80/85/81/8/i255/85/77/14/15/3/5/81/8/i255 /81/80/77/78/2/10/77/11/12/81/8/i255/5/10/1/12/81/8/i255/10/75/79/i255/14/86/12/77/2/12/10/79/i255/78/14/81/5/81/89/i255 /i255
/94/2/3/81/i255/78/2/10/75/11/12/i255/83/3/82/82/i255/10/79/79/i255/87/12/77/14/i255/91/46/63/i255/78/10/82/12/75/79/10/77/i255/79/10/90/81/i255/5/14/i255/5/2/12/i255/88/14/75/5/77/10/78/5/i255/94/3/84/12/89/i255 /i255
/91/95/10/5/10/4/10/81/12/i255/88/14/79/12/96/i255/95/12/81/3/11/75/i255/97/81/81/80/12/63/i255/i255/i255/i255/i255/i255/i255/94 /14/5/10/82/i255/94/2/3/81/i255/97/5/12/84/96/i255/92/i255/16/13/8/45/48/45/89/46/48/i255 /i255
/45/63/i255/58/17/22/41/65/98/i255/67/i255/25/54/54/71/37/71/35/36/39/72/i255/34/39/72/39/36/40/43/i255/39/36/54/i255/19/43/60/37/71/36/55/i255/35/73/i255/23/39/36/i255/23/17/70/65/44/i255/7/5/i255/5/2/12/i255/77/12/99/80/12/81/5/i255/14/15/i255/5/2/12/i255/88/3/5/90/8/i255/5/2/12/i255/78/14/75/5/77/10/78/5/14/77/i255/85/12/77/15/14/77/84/12/79/i255 /10/75/i255/10/79/79/3/5/3/14/75/10/82/i255/5/12/81/5/i255/10/75/79/i255/4/10/82/10/75/78/12/i255/14/15/i255/81/85/82/3/5/i255/10/3/77/i255/81/90/81/5/12/84/i255/15/10/75/i255/14/75/i255/10/i255/82/80/84/85/i255/81/80/84/i255/4/10/81/3/81/i255/15/14/77/i255/10/i255/5/14/5/10/82/i255/85/77/3/78/12/i255/14/15/i255/92/13/8/45/49/52/89/46/46/89/i255/94/2/3/81/i255/5/12/81/5/i255 /83/10/81/i255/85/12/77/15/14/77/84/12/79/i255/14/75/i255/7/80/11/80/81/5/i255/45/48/5/2/8/i255/45/46/45/45/i255/10/75/79/i255/83/10/81/i255/83/3/5/75/12/81/81/12/79/i255/4/90/i255/10/i255/88/3/5/90/i255/77/12/85/77/12/81/12/75/5/10/5/3/86/12/89/i255/94/2/3/81/i255/78/2/10/75/11/12/i255/14/77/79/12/77/i255/78/14/75/81/5/3/5/80/5/12/81/i255 /15/80/82/82/i255/78/14/84/85/12/75/81/10/5/3/14/75/i255/15/14/77/i255/5/2/12/i255/83/14/77/93/8/i255/3/75/78/82/80/79/3/75/11/i255/10/82/82/i255/84/10/77/93/47/80/85/81/8/i255/85/77/14/15/3/5/81/8/i255/81/80/77/78/2/10/77/11/12/81/8/i255/5/10/1/12/81/8/i255/10/75/79/i255/14/86/12/77/2/12/10/79/i255/78/14/81/5/81/89/i255 /i255
/94/2/3/81/i255/78/2/10/75/11/12/i255/83/3/82/82/i255/10/79/79/i255/5/2/3/77/5/90/i255/91/16/46/63/i255/78/10/82/12/75/79/10/77/i255/79/10/90/81/i255/5/14/i255/5/2/12/i255/88/14/75/5/77/10/78/5/i255/94/3/84/12/89/i255 /i255
/91/95/10/5/10/4/10/81/12/i255/88/14/79/12/96/i255/88/80/81/5/14/84/12/77/i255/100/12/99/80/12/81/5/63/i255/i255 /i255/i255 /i255/i255/i255/94 /14/5/10/82/i255/94/2/3/81/i255/97/5/12/84/96/i255/92/i255/13/8/45/49/52/89/46/46/i255 /i255
/i255
/i255
/i255
/i255
/i255/i255/i255 /i255/i255/i255/i255/i255/i255/i255 /i255/i255/i255/i255/i255/i255/101/102/103/104/105/i255/101/106/107/108/i255/109/106/104/110/111/112/i255/113/114/115/112/114/116/i255/i255/117/i255/118/119/120/121/121/122/123/124/125/i255