Staff Report - Mitigation Fee Act Annual Report for the Year Ended June 30, 2022

Sacramento City Council
January 10, 2023

Document
Staff Report - Mitigation Fee Act Annual Report for the Year Ended June 30, 2022
Meeting
January 10, 2023
Body
Sacramento City Council
Pages
3
Original file
548 KB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

City of Sacramento
City Council - 5PM Report
915 I Street Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2022-02154 1/10/2023 Consent Item 14.

Mitigation Fee Act Annual Report for the Year Ended June 30, 2022 (Noticed 12/22/2022) File ID: 2022-02154
Location: Districts 1,3,4,5,6,7 and 8
Recommendation: Receive and file the Mitigation Fee Act Annual Report for the Year Ended June 30, 2022.

Contact: Eric Frederick, Senior Development Project Manager, (916) 808-5129, [email protected]; Sheri Smith, Special Districts Manager, (916) 808-7204, [email protected]; Department of Finance
Presenter: None.

Attachments:
1-Description/Analysis
2-Mitigation Fee Act Annual Report for the Year Ended June 30, 2022 Description/Analysis
Issue Detail: The Mitigation Fee Act (California Government Code section 66000 et. seq., hereafter the Act) and City Code section 18.56.150 mandate an annual report be prepared regarding development impact fees charged by the City and made available to the public. The Mitigation Fee Act Annual Report for the Year Ended June 30, 2022 (Attachment 2) fulfills the annual reporting requirements for the following development impact fee funds:
· 65th Street Fee Fund
· Central City Fee Fund
· Greenbriar Development Agreement Fee Fund
· Jacinto Creek Planning Area (JCPA) Fee Fund
· North Natomas Drainage Fee Fund
· North Natomas Public Facilities Fee Fund
· North Natomas Public Facilities Land Acquisition Fee (PFLAF) Fund

Page 1 of 3 ends

File ID: 2022-02154 1/10/2023 Consent Item 14.
· North Natomas Regional Park Land Acquisition Fee (RPLAF) Fund · North Natomas Transit Fee Fund
· Railyards Fee Fund
· River District Fee Fund
· Willowcreek Fee Fund
The report presents the following information as required by the Act and City Code:
· A brief description of the type of fee in the account or fund. · The amount of the fee.
· The beginning and ending balance of the account or fund. · The amount of the fees collected, and interest earned. · An identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the total percentage of the cost of the public improvement that was funded by the fees.
· An identification of an approximate date by which the construction of the public improvement will commence if the local agency determines that sufficient funds have been collected to complete financing on an incomplete public improvement. · A description of each interfund transfer or loan made from the account or fund, including the public improvement on which the transferred or loaned fees will be expended, and, in the case of an interfund loan, the date on which the loan will be repaid, and the rate of interest that the account or fund will receive on the loan.
· The amount of any refunds made once it has been determined that sufficient revenues have been collected to fund incomplete public improvements but an approximate date for commencement of construction has not been identified.
· The amount of any automatic annual adjustment, including the basis of the calculation.

Pursuant to the Act and the City Code, the report included as Attachment 2 was made available to the public on December 22, 2022.

Policy Considerations: Filing the required annual report with the Council will satisfy the requirements of the Act and City Code.

Economic Impacts: Not applicable.

Environmental Considerations:

California Environmental Quality Act (CEQA): Under CEQA Guidelines, this report contains administrative activities that do not constitute a project and is therefore exempt from CEQA

Page 2 of 3 ends

File ID: 2022-02154 1/10/2023 Consent Item 14.
review (14 Cal Code Reg. § 15378(b)(2)).

Sustainability: Not applicable.

Commission/Committee Action: None.

Rationale for Recommendation: The Act and City Code section 18.56.150 require an annual report be filed with Council for all the City’s impact fee funds. The attached report will satisfy the filing requirements for the impact fee funds included therein.

Financial Considerations: There are no financial impacts to any City funds.

Local Business Enterprise (LBE): Not applicable.

Page 3 of 3 ends

Mitigation Fee Act Annual Report
For the Year Ended June 30, 2022

Made Available to the Public on December 22, 2022

Received and Filed by the Sacramento City Council at its Meeting on January 10, 2023

City of Sacramento
Mitigation Fee Act Annual Report
For the Year Ended June 30, 2022

TABLE OF CONTENTS
Section  Page

1.  INTRODUCTION ................................................................................................................................. 1

2.  BRIEF DESCRIPTION OF FEES ............................................................................................................. 2

3.  FEE AMOUNTS ................................................................................................................................... 6

4.  FUND BALANCES ................................................................................................................................ 7

5.  FEES COLLECTED AND INTEREST EARNED ......................................................................................... 7

6.  IDENTIFICATION OF PUBLIC IMPROVEMENTS ON WHICH FEES WERE EXPENDED ........................... 7

7.  APPROXIMATE DATE OF COMMENCEMENT OF CONSTRUCTION ..................................................... 7

8.  INTERFUND TRANSFERS OR LOANS ................................................................................................... 7

9.  REFUNDS MADE ................................................................................................................................. 7

10.  AUTOMATIC ADJUSTMENTS .............................................................................................................. 7

EXHIBITS

A‐1.  FY2021/22 65th Street Fees
A‐2.  FY2021/22 Central City Fees
A‐3.  FY2021/22 Greenbriar DA Fees
A‐4.  FY2021/22 Jacinto Creek Planning Area (JCPA) Fees A‐5.  FY2021/22 North Natomas Fees
A‐6.  FY2021/22 Railyards Fees
A‐7.  FY2021/22 River District Impact Fees
A‐8.  FY2021/22 Willowcreek Fees
B.  Annual Financial Report by Funds for the Fiscal Year Ended June 30, 2022 C.  Identification of Public Improvements on which Fees were Expended

City of Sacramento FY2021/22 Mitigation Fee Act Annual Report  Page 1

1. INTRODUCTION
The Mitigation Fee Act (California Government Code 66000 et. seq., hereafter the “Act”), more commonly known as Assembly Bill 1600, was enacted by the State of California in 1987. Section 66006(b) of the Act requires local agencies to report, every year and every fifth year, certain financial information regarding their development impact fees. The requirement for an annual report also applies to fees for public facilities collected under development agreements entered into on or after January 1, 2004 (§65865(e)). The local agency must make this information available for review by the public and must present it at the next regularly scheduled public meeting not less than 15 days from when the information is made available to the public.

This Fiscal Year (FY) 2021/22 annual report presents the information required by the Act for certain development impact fee funds established by the City of Sacramento, identified as follows:

a. 65th Street Fee Fund
b. Central City Fee Fund
c. Greenbriar DA Fee Fund
d. Jacinto Creek Planning Area (JCPA) Fee Fund
e. North Natomas Drainage Fee Fund
f. North Natomas Public Facilities Fee Fund
g. North Natomas Public Facilities Land Acquisition Fee (PFLAF) Fund h. North Natomas Regional Park Land Acquisition Fee (RPLAF) Fund i. North Natomas Transit Fee Fund
j. Railyards Fee Fund
k. River District Fee Fund
l. Willowcreek Fee Fund

For each fee deposited into these funds, the report is organized as follows:

Section 2:  A brief description of the type of fee in the account or fund.

Section 3:  The amount of the fee.

Section 4:  The beginning and ending balance of the account or fund.

Section 5:  The amount of the fees collected and interest earned.

Section 6:  An identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement, including the total percentage of the cost of the public improvement that was funded by the fees.

Section 7:  An identification of an approximate date by which the construction of the public improvement will commence if the local agency determines that sufficient funds have been collected to complete financing on an incomplete public improvement.

City of Sacramento FY2021/22 Mitigation Fee Act Annual Report  Page 2

Section 8:  A description of each interfund transfer or loan made from the account or fund, including the public improvement on which the transferred or loaned fees will be expended, and, in the case of an interfund loan, the date on which the loan will be repaid, and the rate of interest that the account or fund will receive on the loan.

Section 9:  The amount of any refunds made once it has been determined that sufficient revenues have been collected to fund all projects.

Section 10:  The amount of any automatic adjustment made under City Code section

18.56.120, including the basis of the calculation.

2. BRIEF DESCRIPTION OF FEES
Below is a brief description of the types of fees in the accounts or funds included in this report.

A portion of each fee, as described in their respective finance plans, is used to pay for administrative costs associated with each fee and planning costs associated with public facilities paid for with fee revenue.
a. 65th Street Fee: This fee is comprised of the following components to pay for specific facilities serving new development in the 65th Street area:
i. Transportation Component:  This fee component is used to fund transportation improvements to promote a variety of travel modes and improve connectivity, including on‐site roadway and intersection improvements, tunnels, bike paths, street modifications, signals, sidewalks, ITS improvements, and landscaping. ii. Water Component:  This fee component is used to fund the upsizing or replacement of existing water mains in order to serve new 65th Street Area development.
iii. Storm Drainage Component: This fee component is used to fund the upgrades to drainage facilities needed to accommodate new growth in the 65th Street Area.

The funded improvements are designed to improve water quality, limit stormwater runoff, improve efficiency of the system, and reduce/prevent flooding in the 65th Street Area.
iv. Sewer Component: This fee component is used to fund improvements to the existing sanitary sewer system needed to convey sewage from planned new development in the 65th Street Area into the citywide sewer system.

b. Central City Fee: This fee is comprised of the following components to fund infrastructure and public facilities needed to accommodate new development within the Central City Specific Plan Area:
i. Transportation Component:  This component of the fee will fund transportation infrastructure and facilities to improve the multi‐modal transportation system by adding pedestrian, bicycle, transit and other improvements to efficiently support increased densities and a mix of uses in the plan area.

City of Sacramento FY2021/22 Mitigation Fee Act Annual Report  Page 3

ii. Public Facilities Component:  This component of the fee will fund public safety facilities (Police and Fire) needed to support anticipated levels of new development.
iii. Water Component:  This component of the fee will fund water Backbone Infrastructure improvements to accommodate new development in the Central City Specific Plan Area.
iv. Sewer Component: This component of the fee will fund improvements to the existing combined sewer system needed to convey both sanitary sewage and stormwater from planned new development in the Central City Specific Plan Area into the combined sewer system and maintain system reliability.

c. Greenbriar DA Fee:  This fee is collected under development agreement dated May 30, 2017, which is designated as City Agreement No. 2017‐0850. This fee includes a Transit Fee and Public Facility Fee (the “GB Fees”). The Transit Fee shall contribute to transit facilities and programs in a manner determined at the discretion of the City. The Greenbriar Public Facility Fee is comprised of three components: the Regional Park Fee, the Fire Facilities Fee, and the Community Center Fee. The GB Fees and its components will be used to contribute to various regional and city‐wide funds. A brief description of each Public Facility Fee components is provided below:
i. Regional Park Component: This fee component shall contribute toward land acquisition and park development costs for a regional park in North Natomas in a manner determined at the discretion of the City.
ii. Fire Facilities Component: This fee component shall contribute toward fire facilities in a manner determined at the discretion of the City. iii. Community Center Component: This fee component shall contribute toward construction of a North Natomas regional community center in a manner determined at the discretion of the City.

d. JCPA Fee:  This fee is comprised of Drainage, Channel, and Facilities components; a brief description of each is provided below:
i. Drainage Component: This fee component is used to pay for pipelines and detention basins associated with new development in the JCPA based on drainage shed.
ii. Channel Component: This fee component is used to pay for a drainage channel associated with new development in the JCPA based on drainage shed. iii. Facilities Component: This fee component is used to pay for water and roadway facilities, including water pipes, traffic signals, and associated appurtenances related to new development in the JCPA.

e. North Natomas Drainage Fee:  This fee is used to pay for the design and construction of new storm drainage detention‐related facilities in each drainage basin that does not City of Sacramento FY2021/22 Mitigation Fee Act Annual Report  Page 4

have an established funding mechanism of its own and serves new development in the North Natomas community.

f. North Natomas Public Facilities Fee:  This fee is used to pay for the following facilities that serve new development in the North Natomas community:
i. Roadway and Freeway Facilities: Expansion of existing construction of new roadway and freeway facilities as described in the Circulation Element of the North Natomas Community Plan and supporting reports prepared by Kittelson & Associates.
ii. Freeway and Roadway Landscaping: Landscaping improvements for freeway corridors and linear roadways.
iii. Fire Station: Design, construct, and equip two fire stations in North Natomas. iv. Library: Design, construct, and provide materials for one library in North Natomas. v. Police Substation and Equipment: Design, construct, and equip the North Natomas share of one 24,000 square foot police station.
vi. Community Center: Fund a portion of the cost of a community center (one of up to four community centers expected at buildout) in the town center, designed for both residential and business use.
vii. Bikeways and Shuttles: Construct 128,400 linear feet (approximately 24 miles) of bikeway and purchase shuttle buses.

g. North Natomas PFLAF:  This fee is used to pay for the acquisition of public lands, including land used for open space, drainage systems, roadways, interchanges, transit facilities, parks, civic facilities, schools, and buffers to other land uses

h. North Natomas RPLAF:  This fee is used to pay for the acquisition of regional park land in North Natomas.

i. North Natomas Transit Fee:  This fee is used to pay for construction of Light Rail Transit stations that serve new development in the North Natomas community.

j. Railyards Impact Fee:  This fee is comprised of the following components to partially fund construction of backbone infrastructure and public facilities improvements necessary to accommodate new residential and commercial uses generated by project development:
i. On‐Site Infrastructure Component:  This component of the fee is used to pay for the following facilities that serve new development within the Railyards area:

1. Roadways:  Construction of improvements to the transportation system to create an on‐site transportation system consisting of on‐site roadway and intersection facilities accommodating new bicyclists, pedestrians, and automobiles.

City of Sacramento FY2021/22 Mitigation Fee Act Annual Report  Page 5

2. Storm Drainage:  Construction of improvements to the storm drainage system consisting of new storm drainage facilities needed to collect, contain, and discharge to the public drainage system stormwater generated in the Railyards, including construction of a drainage pump station, berms, floodgates, and underground drainage lines.

3. Sanitary Sewer:  Construction of the portion of the trunk sewer facilities needed to convey sanitary sewage generated by projects in the Railyards into the City sewer system, including the portion of trunk sewer facilities needed to convey Railyards sewage to the public sewer system.

4. Public Transit:  Construction of public transit system facilities, including construction of the Railyard’s share of a light rail station located in the area and other transit facilities providing access for the Railyards residents, employees, and patrons to and from the Sacramento Valley Station.

5. Parks and Open Space Facilities:  Construction of portions of Vista Park, South Park Paseo, Riverfront Park, connections to the Sacramento River and Vista Park, as well as open space in the Railyards area.

ii. I‐5/Richards Interchange Component:  The purpose of the I‐5/Richards Interchange component of the fee is to fund freeway interchange facilities needed to improve freeway access to and from the Railyards area for Railyards residents, employees, and patrons.
iii. Community Facilities Component:  This fee component is used to pay for the following facilities that serve new development within the Railyards area:

1. Community Center/Library Facilities:  To fund a portion of the construction of facilities housing community center/library facilities that will be used by new Railyards residents, employees and patrons.

2. Public Safety Facilities:  To fund a portion of the construction of new police and fire facilities serving the Railyards area.

k. River District Impact Fee:  This fee is used to fund the cost of backbone infrastructure and public facilities that are needed in the River District to accommodate planned development as set forth in the River District Specific Plan, but are not funded by existing fee programs or other sources of revenues. Fee funded improvements include transportation, storm drainage, water, transportation and utility contingency, open space facilities, light rail station facilities, library facilities, and public safety facilities.

l. Willowcreek Fee:  This fee is used to pay for the following facilities that serve new development in the Willowcreek development area:
i. Transportation: Construction of new transportation improvements which will serve new development in Willowcreek, including roadways, earthwork, traffic City of Sacramento FY2021/22 Mitigation Fee Act Annual Report  Page 6

handling, two emergency accesses, and new frontage improvements including curb, gutter, and sidewalk abutting Interstate 80.
ii. Joint Trench and Utility User Tax: Joint trench utilities and PG&E utility user taxes which will serve new development in Willowcreek.
iii. Sanitary Sewer Distribution: Construction of new sanitary sewer system extensions which will serve new development in Willowcreek.
iv. Water Improvements: Construction of new water distribution mains which will serve new development in Willowcreek.
v. Drainage Improvements: Construction of new storm drainage pipes which will serve new development in Willowcreek.

3. FEE AMOUNTS
The following details the amount of each fee for the year ended June 30, 2022, unless otherwise indicated.

a. 65th Street Fees:

See Exhibit A‐1. The 65th Street Fee was subject to an Economic Incentive Program. This Economic Incentive Program reduced the 65th Street Fee over a four‐year period that ended October 1, 2021. While it was in place, revised Economic Incentive Program fees for the program took effect on October 1 of each year. Therefore, for this FY2021/22 report, fees as of July 1, 2021 and October 1, 2021 are provided in Exhibit A‐1.

b. Central City Fees:

See Exhibit A‐2. The Central City Fee is subject to a phased implementation of the full fee (Year 1 – 25%; Year 2 – 50%; Year 3 – 75%; and Year 4+ ‐ 100%). Prior to proceeding each year with the next step of the phased implementation, City staff is required to request the City Council’s authorization.

c. Greenbriar DA Fees:

See Exhibit A‐3

d. JCPA Fees:

See Exhibit A‐4.

e. North Natomas Fees:

See Exhibit A‐5.

f. Railyards Impact Fees:

See Exhibit A‐6.

City of Sacramento FY2021/22 Mitigation Fee Act Annual Report  Page 7

g. River District Fees:

See Exhibit A‐7.

h. Willowcreek Fees:

This fee is assigned to undeveloped parcels of land. Exhibit A‐8 provides a list of remaining parcels and their assigned Willowcreek Fee.

4. FUND BALANCES
The beginning and ending fund balances for each fund or account for the year ended June 30, 2022, are provided in Exhibit B to this report.

5. FEES COLLECTED AND INTEREST EARNED
The fees collected and interest earned for each fund or account for the year ended June 30, 2022, are provided in Exhibit B to this report.

6. IDENTIFICATION OF PUBLIC IMPROVEMENTS ON WHICH FEES WERE EXPENDED For each fee district, an identification of each public improvement on which fees were expended and the amount of the expenditures on each improvement during the year ended June 30, 2022, including the total percentage of the cost of the public improvement that was funded by the fees, is provided in Exhibit C to this report.

7. APPROXIMATE DATE OF COMMENCEMENT OF CONSTRUCTION
At this time, no date for the commencement of construction of facilities is available as the City of Sacramento determines if sufficient funds exist to finance the public improvements based on the specific public facilities financing plans and nexus studies that establish the fees. Therefore, reference is made to each specific plan regarding the funds needed to complete individual public improvements.

8. INTERFUND TRANSFERS OR LOANS
Information regarding interfund transfers or loans for the year ended June 30, 2022, is provided in Exhibit B to this report.

9. REFUNDS MADE
For the year ended June 30, 2022, no refunds have been made from surplus fees in any of the districts included in this report.

10. AUTOMATIC ADJUSTMENTS
All fees included in this report, including any fees that are part of an economic incentive program, are subject to an automatic adjustment to account for inflation. With the exception of City of Sacramento FY2021/22 Mitigation Fee Act Annual Report  Page 8

the fees outlined below, all fees in‐place on July 1, 2021, were automatically increased on that date by 2.55%, which is the percentage increase in the Engineering News Record San Francisco Construction Cost Index from March 2020 to March 2021.

Below is a list of fees that were automatically adjusted on July 1, 2021, using a different basis than that described above:

a. North Natomas Fees:  Automatic adjustment amounts for each fee category are shown in Exhibit A‐5.

b. Central City Fees: Automatic adjustment amounts for each fee category are shown in Exhibit A‐2.

Exhibit A‐1
FY2021/22 65th Street Fees

Basis Transportation Fee Water Fee Drainage Fee Sewer Fee Administration Fee Single Family per unit 1,342.39 2,102.81 3,205.37 3,300.84 298.94 Multifamily per unit 772.92 1,551.53 1,802.73 2,435.85 196.64 Office per sq. ft. 1.99 1.24 2.23 1.94 0.23 Retail per sq. ft. 2.02 0.68 2.46 1.08 0.19 Industrial per sq. ft. 1.38 0.63 2.10 0.98 0.15 Hotel per room 555.82 611.52 3,024.64 1,281.01 163.68 Basis Transportation Fee Water Fee Drainage Fee Sewer Fee Administration Fee Single Family per unit 2,450.63 2,101.67 3,204.23 3,298.57 331.90 Multifamily per unit 1,410.59 1,576.54 1,831.15 2,474.50 218.24 Office per sq. ft. 3.64 1.05 1.89 1.65 0.25 Retail per sq. ft. 3.69 0.52 1.89 0.83 0.20 Industrial per sq. ft. 2.49 0.52 1.78 0.83 0.17 Hotel per room 1,015.03 630.84 3,116.71 1,319.66 183.00 65th Street Area Fees
as of July 1, 2021
65th Street Area Fees
as of October 1, 2021

Exhibit A‐2
FY2021/22 Central City Fees

Basis Base Fee
Economic Incentive
(50%)
RES <750 SF Residential <750 SF per unit SF 4.37 2.19 RES >750 SF Residential >750 SF per unit 3,256.21 1,628.11 RETAIL Retail per sq. ft. 4.16 2.08 OFF Office per sq. ft. 5.58 2.79 IND Light Industrial per sq. ft. 2.71 1.36 HOTL Hotel per room 1,482.68 741.34 Basis Base Fee
Economic Incentive
(75%)
RES <750 SF Residential <750 SF per unit SF 3.96 2.97 RES >750 SF Residential >750 SF per unit 2,968.00 2,226.00 RETAIL Retail per sq. ft. 3.77 2.83 OFF Office per sq. ft. 5.09 3.83 IND Light Industrial per sq. ft. 2.46 1.86 HOTL Hotel per room 1,348.00 1,011.00 as of January 1, 2022
Year 3
Land Use
Land Use
Central City Impact Fee
as of July 1, 2021
Year 2 + Annual Adjustments
Central City Impact Fee

Exhibit A‐3
FY2021/22 Greenbriar DA Fees

Final

BY LAND USE
dated 06/04/2021
Fee Type Land Use Type Density
Pay Class
Code As Of 07/01/20 As of 07/01/2021 $%
Adjustment
Basis
Residential:

Public Facilities Fees
Regional Park Low Density Residential > 5,500 Sq Ft 433 2,343 $ 2,402$ 60$ 2.549% ENR CCI Fire Low Density Residential > 5,500 Sq Ft 434 585 $ 600$ 15$ 2.549% ENR CCI Community Center Low Density Residential > 5,500 Sq Ft 435 755 $ 774$ 19$ 2.549% ENR CCI Transit Low Density Residential > 5,500 Sq Ft 436 834 $ 855$ 21$ 2.549% ENR CCI 4,517$ 4,632 $ 115 $ 2.549% Public Facilities Fees
Regional Park Medium Density Residential ≤ 5,500 Sq Ft 433 1,491 $ 1,529$ 38$ 2.549% ENR CCI Fire Medium Density Residential ≤ 5,500 Sq Ft 434 420 $ 431$ 11$ 2.549% ENR CCI Community Center Medium Density Residential ≤ 5,500 Sq Ft 435 564 $ 578$ 14$ 2.549% ENR CCI Transit Medium Density Residential ≤ 5,500 Sq Ft 436 694 $ 712$ 18$ 2.549% ENR CCI 3,169$ 3,250 $ 81 $ 2.549% Public Facilities Fees
Regional Park High Density Residential - Townhome ≤ 18 Units/Acre 433 1,101 $ 1,129$ 28$ 2.549% ENR CCI Fire High Density Residential - Townhome ≤ 18 Units/Acre 434 365 $ 375$ 9$ 2.549% ENR CCI Community Center High Density Residential - Townhome ≤ 18 Units/Acre 435 510 $ 523$ 13$ 2.549% ENR CCI Transit High Density Residential - Townhome ≤ 18 Units/Acre 436 620 $ 636$ 16$ 2.549% ENR CCI 2,597$ 2,663 $ 66 $ 2.549% Public Facilities Fees
Regional Park High Density Residential - Age Restricted 433 701 $ 719$ 18$ 2.549% ENR CCI Fire High Density Residential - Age Restricted 434 292 $ 300$ 7$ 2.549% ENR CCI Community Center High Density Residential - Age Restricted 435 296 $ 303$ 8$ 2.549% ENR CCI Transit High Density Residential - Age Restricted 436 269 $ 276$ 7$ 2.549% ENR CCI 1,558$ 1,598 $ 40 $ 2.549% Public Facilities Fees
Regional Park High Density Residential - Market > 18 Units/Acre 433 711 $ 729$ 18$ 2.549% ENR CCI Fire High Density Residential - Market > 18 Units/Acre 434 310 $ 318$ 8$ 2.549% ENR CCI Community Center High Density Residential - Market > 18 Units/Acre 435 456 $ 467$ 12$ 2.549% ENR CCI Transit High Density Residential - Market > 18 Units/Acre 436 546 $ 560$ 14$ 2.549% ENR CCI 2,023$ 2,074 $ 52 $ 2.549% City of Sacramento
Greenbriar Fee Schedule
Fees Going Forward
Change 07/01/20 - 07/01/21
1 of 2
Final

BY LAND USE
dated 06/04/2021
Fee Type Land Use Type Density
Pay Class
Code As Of 07/01/20 As of 07/01/2021 $%
Adjustment
Basis
Greenbriar Fee Schedule
Fees Going Forward
Change 07/01/20 - 07/01/21
Non-Residential:

Per Net Acre
Public Facilities Fees
Regional Park Regional Commercial 433 15,787$ 16,189$ 402$ 2.549% ENR CCI Fire Regional Commercial 434 4,131 $ 4,237$ 105$ 2.549% ENR CCI Community Center Regional Commercial 435 8,882 $ 9,108$ 226$ 2.549% ENR CCI Transit Regional Commercial 436 26,069$ 26,733$ 664$ 2.549% ENR CCI 54,869$ 56,267 $ 1,398 $ 2.549% Public Facilities Fees
Regional Park Shopping Center 433 15,787$ 16,189$ 402$ 2.549% ENR CCI Fire Shopping Center 434 4,449 $ 4,563$ 113$ 2.549% ENR CCI Community Center Shopping Center 435 8,882 $ 9,108$ 226$ 2.549% ENR CCI Transit Shopping Center 436 44,315$ 45,444$ 1,129$ 2.549% ENR CCI 73,433$ 75,304 $ 1,871 $ 2.549% end of schedule
2 of 2

Exhibit A‐4
FY2021/22 JCPA Fees

Water Roadways
Developer
& City
Planning
City Admin
(4% of
fees)
Watershed 1
Low‐Density ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  ‐ $             ‐ $              ‐ $                 ‐ $               ‐ $               ‐ $                per unit Medium/Low Density 711 $               28$                 739$               ‐ $                  ‐ $                  ‐ $                  1,009$        244$              ‐ $                 50$                 1,304$           2,043$            per unit Medium Density 573 $               23$                 595$               ‐ $                  ‐ $                  ‐ $                  785$            198$              ‐ $                 39$                 1,023$           1,618$            per unit Office/Commercial ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  ‐ $             ‐ $              ‐ $                 ‐ $               ‐ $               ‐ $                per ac Watershed 2 (see note 1)
Low‐Density ‐ $                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  1,325$        258$              ‐ $                 63$                 1,646$           1,646$            per unit Medium/Low Density ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  1,009$        244$              ‐ $                 50$                 1,304$           1,304$            per unit Medium Density ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  785$            198$              ‐ $                 39$                 1,023$           1,023$            per unit Office/Commercial ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  8,505$        4,426$          ‐ $                 517$               13,448$         13,448$          per ac Watershed 3
Low‐Density 1,391 $            56$                 1,446$            1,136$              45$                   1,182$             1,325$        258$              ‐ $                 63$                 1,646$           4,274$            per unit Medium/Low Density 1,118 $            45$                 1,163$            913$                 37$                   950$                 1,009$        244$              ‐ $                 50$                 1,304$           3,416$            per unit Medium Density ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  ‐ $             ‐ $              ‐ $                 ‐ $               ‐ $               ‐ $                per unit Office/Commercial 14,254 $          570$               14,824$          11,642$            466$                 12,108$           8,505$        4,426$          ‐ $                 517$               13,448$         40,379$          per ac Watershed 4
Low‐Density ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  ‐ $             ‐ $              ‐ $                 ‐ $               ‐ $               ‐ $                per unit Medium/Low Density ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  ‐ $             ‐ $              ‐ $                 ‐ $               ‐ $               ‐ $                per unit Medium Density 1,192 $            48$                 1,239$            ‐ $                  ‐ $                  ‐ $                  785$            198$              ‐ $                 39$                 1,023$           2,262$            per unit Office/Commercial ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  ‐ $             ‐ $              ‐ $                 ‐ $               ‐ $               ‐ $                per ac Watershed 5
Low‐Density ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  ‐ $             ‐ $              ‐ $                 ‐ $               ‐ $               ‐ $                per unit Medium/Low Density ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  ‐ $             ‐ $              ‐ $                 ‐ $               ‐ $               ‐ $                per unit Medium Density ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  ‐ $             ‐ $              ‐ $                 ‐ $               ‐ $               ‐ $                per unit Office/Commercial 25,337 $          1,013$            26,351$          11,642$            466$                 12,108$           8,505$        4,426$          ‐ $                 517$               13,448$         51,906$          per ac Watershed 6
Low‐Density ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  ‐ $             ‐ $              ‐ $                 ‐ $               ‐ $               ‐ $                per unit Medium/Low Density ‐$                ‐ $                ‐ $                ‐ $                  ‐ $                  ‐ $                  ‐ $             ‐ $              ‐ $                 ‐ $               ‐ $               ‐ $                per unit Medium Density 2,168 $            87$                 2,255$            736$                 29$                   765$                 785$            198$              ‐ $                 39$                 1,023$           4,043$            per unit Office/Commercial 34,335 $          1,373$            35,708$          11,642$            466$                 12,108$           8,505$        4,426$          ‐ $                 517$               13,448$         61,264$          per ac Note 1:   A portion of the parcels in Watershed 2 have already funded drainage improvements and will not be subject to the drainage fee.

Note 2:   The Calistoga project has been removed from the Fee program as they are locking into 2016 fees subject to ENR Escalation.

Note 3:   Built Out
Jacinto Creek Impact Fee as of July 1, 2021
Drainage 4% Admin Total
Drainage Channel 4% Admin Total
Channel
PFF Fee Components
Total PFF Total Fees

Exhibit A‐5
FY2021/22 North Natomas Fees

Final

BY LAND USE
dated 06/18/2021
Fee Type Land Use
Pay Class
Code As Of 07/01/20 As Of 07/01/21 $ % Adjustment Basis Residential:

Per Unit Per Unit
Public Facilities Fees <3250 270 6,608$ 6,322 $ (286) $ -4.33% Developer Agreement Transit Fees <3250 271 492$ 505 $ 13 $ 2.64% ENR CCI Land Acquisition <3250 272 1,752$ 2,375 $ 623 $ 35.56% PLAV Regional Park Fees <3250 273 1,509$ 1,566 $ 57 $ 3.78% CPI 10,361$ 10,768 $ 407 $ 3.93% Public Facilities Fees >5000 270 9,188$ 8,878 $ (310) $ -3.37% Developer Agreement Transit Fees >5000 271 591$ 606 $ 15 $ 2.54% ENR CCI Land Acquisition >5000 272 2,713$ 3,677 $ 964 $ 35.53% PLAV Regional Park Fees >5000 273 2,370$ 2,460 $ 90 $ 3.80% CPI 14,862$ 15,621 $ 759 $ 5.11% Public Facilities Fees 3250-5000 270 7,898$ 7,600 $ (298) $ -3.77% Developer Agreement Transit Fees 3250-5000 271 542$ 555 $ 13 $ 2.40% ENR CCI Land Acquisition 3250-5000 272 2,233$ 3,026 $ 793 $ 35.51% PLAV Regional Park Fees 3250-5000 273 1,939$ 2,013 $ 74 $ 3.82% CPI 12,612$ 13,194 $ 582 $ 4.61% Public Facilities Fees Age-Restricted SF 270 6,714$ 6,414 $ (300) $ -4.47% Developer Agreement Transit Fees Age-Restricted SF 271 387$ 397 $ 10 $ 2.58% ENR CCI Land Acquisition Age-Restricted SF 272 3,224$ 4,370 $ 1,146 $ 35.55% PLAV Regional Park Fees Age-Restricted SF 273 2,831$ 2,939 $ 108 $ 3.81% CPI 13,156$ 14,120 $ 964 $ 7.33% City of Sacramento
North Natomas Development Impact Fees Schedule
Effective July 1, 2021
Change 07/01/20 - 07/01/21
1 of 6
Final

BY LAND USE
dated 06/18/2021
Fee Type Land Use
Pay Class
Code As Of 07/01/20 As Of 07/01/21 $ % Adjustment Basis North Natomas Development Impact Fees Schedule
Effective July 1, 2021
Change 07/01/20 - 07/01/21
Multi-Family ( >2 attached units ):

Per Unit Per Unit
Public Facilities Fees >18 units/acre 270 4,871$ 4,487 $ (384) $ -7.88% Developer Agreement Transit Fees >18 units/acre 271 387$ 397 $ 10 $ 2.58% ENR CCI Land Acquisition Fees >18 units/acre 272 802$ 1,087$ 285 $ 35.54% PLAV Regional Park Fees >18 units/acre 273 719$ 746 $ 27 $ 3.76% CPI 6,779$ 6,717 $ (62) $ -0.91% Public Facilities Fees 12-18 units/acre 270 5,739$ 5,405 $ (334) $ -5.82% Developer Agreement Transit Fees 12-18 units/acre 271 440$ 451 $ 11 $ 2.50% ENR CCI Land Acquisition Fees 12-18 units/acre 272 1,277$ 1,731 $ 454 $ 35.55% PLAV Regional Park Fees 12-18 units/acre 273 1,114$ 1,156 $ 42 $ 3.77% CPI 8,570$ 8,743 $ 173 $ 2.02% Public Facilities Fees 8-12 units/acre 270 6,608$ 6,322 $ (286) $ -4.33% Developer Agreement Transit Fees 8-12 units/acre 271 492$ 505 $ 13 $ 2.64% ENR CCI Land Acquisition Fees 8-12 units/acre 272 1,752$ 2,375 $ 623 $ 35.56% PLAV Regional Park Fees 8-12 units/acre 273 1,509$ 1,566 $ 57 $ 3.78% CPI 10,361$ 10,768 $ 407 $ 3.93% Public Facilities Fees Age-Restricted Apts 270 3,225$ 3,051 $ (174) $ -5.40% Developer Agreement Transit Fees Age-Restricted Apts 271 190$ 195 $ 5 $ 2.63% ENR CCI Land Acquisition Fees Age-Restricted Apts 272 805$ 1,091$ 286 $ 35.53% PLAV Regional Park Fees Age-Restricted Apts 273 708$ 735 $ 27 $ 3.81% CPI 4,928$ 5,072 $ 144 $ 2.92% Public Facilities Fees Age-Restricted Congr Care 270 1,149$ 1,340 $ 191 $ 16.62% Developer Agreement Transit Fees Age-Restricted Congr Care 271 105$ 108 $ 3 $ 2.86% ENR CCI Land Acquisition Fees Age-Restricted Congr Care 272 425$ 576 $ 151 $ 35.53% PLAV 2 of 6
Final

BY LAND USE
dated 06/18/2021
Fee Type Land Use
Pay Class
Code As Of 07/01/20 As Of 07/01/21 $ % Adjustment Basis North Natomas Development Impact Fees Schedule
Effective July 1, 2021
Change 07/01/20 - 07/01/21
Regional Park Fees Age-Restricted Congr Care 273 372$ 386 $ 14 $ 3.76% CPI 2,051$ 2,410 $ 359 $ 17.50% Non-Residential:

Per Net Acre Per Net Acre
Public Facilities Fees Community Commercial 270 143,677$ 148,156 $ 4,479 $ 3.12% Developer Agreement Transit Fees Community Commercial 271 20,937$ 21,470 $ 533 $ 2.55% ENR CCI Land Acquisition Fees Community Commercial 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Community Commercial 273 15,971$ 16,579 $ 608 $ 3.81% CPI 198,775$ 210,859 $ 12,084 $ 6.08% Public Facilities Fees Convalescent Care/Nursing 270 45,596$ 53,028 $ 7,432 $ 16.30% Developer Agreement Transit Fees Convalescent Care/Nursing 271 4,287$ 4,396 $ 109 $ 2.54% ENR CCI Land Acquisition Fees Convalescent Care/Nursing 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Convalescent Care/Nursing 273 15,971$ 16,579 $ 608 $ 3.81% CPI 84,044$ 98,657 $ 14,613 $ 17.39% Public Facilities Fees Convenience Commercial 270 245,381$ 256,840 $ 11,459 $ 4.67% Developer Agreement Transit Fees Convenience Commercial 271 40,639$ 41,675 $ 1,036 $ 2.55% ENR CCI Land Acquisition Fees Convenience Commercial 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Convenience Commercial 273 15,971$ 16,579 $ 608 $ 3.81% CPI 320,181$ 339,748 $ 19,567 $ 6.11% Public Facilities Fees EC Commercial 270 143,677$ 148,156 $ 4,479 $ 3.12% Developer Agreement Transit Fees EC Commercial 271 20,937$ 21,470 $ 533 $ 2.55% ENR CCI Land Acquisition Fees EC Commercial 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees EC Commercial 273 15,971$ 16,579 $ 608 $ 3.81% CPI 198,775$ 210,859 $ 12,084 $ 6.08% 3 of 6
Final

BY LAND USE
dated 06/18/2021
Fee Type Land Use
Pay Class
Code As Of 07/01/20 As Of 07/01/21 $ % Adjustment Basis North Natomas Development Impact Fees Schedule
Effective July 1, 2021
Change 07/01/20 - 07/01/21
Public Facilities Fees Highway Commercial 270 145,986$ 150,438 $ 4,452 $ 3.05% Developer Agreement Transit Fees Highway Commercial 271 21,550$ 22,099 $ 549 $ 2.55% ENR CCI Land Acquisition Fees Highway Commercial 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Highway Commercial 273 15,971$ 16,579 $ 608 $ 3.81% CPI 201,697$ 213,770 $ 12,073 $ 5.99% Public Facilities Fees Light Industrial w/ <20% Office 270 42,916$ 42,414 $ (502) $ -1.17% Developer Agreement Transit Fees Light Industrial w/ <20% Office 271 3,694$ 3,789 $ 95 $ 2.57% ENR CCI Land Acquisition Fees Light Industrial w/ <20% Office 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Light Industrial w/ <20% Office 273 15,971$ 16,579 $ 608 $ 3.81% CPI 80,771$ 87,436 $ 6,665 $ 8.25% Public Facilities Fees Light Industrial w/ 20%-50% Office 270 53,304$ 52,946 $ (358) $ -0.67% Developer Agreement Transit Fees Light Industrial w/ 20%-50% Office 271 4,988$ 5,115 $ 127 $ 2.55% ENR CCI Land Acquisition Fees Light Industrial w/ 20%-50% Office 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Light Industrial w/ 20%-50% Office 273 15,971$ 16,579 $ 608 $ 3.81% CPI 92,453$ 99,294 $ 6,841 $ 7.40% Public Facilities Fees Office EC 30 270 77,542$ 77,521 $ (21) $ -0.03% Developer Agreement Transit Fees Office EC 30 271 8,005$ 8,209 $ 204 $ 2.55% ENR CCI Land Acquisition Fees Office EC 30 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Office EC 30 273 15,971$ 16,579 $ 608 $ 3.81% CPI 119,708$ 126,963 $ 7,255 $ 6.06% Public Facilities Fees Office EC 40 270 98,929$ 97,425 $ (1,504) $ -1.52% Developer Agreement Transit Fees Office EC 40 271 11,083$ 11,366 $ 283 $ 2.55% ENR CCI Land Acquisition Fees Office EC 40 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Office EC 40 273 15,971$ 16,579 $ 608 $ 3.81% CPI 4 of 6
Final

BY LAND USE
dated 06/18/2021
Fee Type Land Use
Pay Class
Code As Of 07/01/20 As Of 07/01/21 $ % Adjustment Basis North Natomas Development Impact Fees Schedule
Effective July 1, 2021
Change 07/01/20 - 07/01/21
144,173$ 150,024 $ 5,851 $ 4.06% Public Facilities Fees Office EC 65 270 149,241$ 144,160 $ (5,081) $ -3.40% Developer Agreement Transit Fees Office EC 65 271 17,855$ 18,311 $ 456 $ 2.55% ENR CCI Land Acquisition Fees Office EC 65 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Office EC 65 273 15,971$ 16,579 $ 608 $ 3.81% CPI 201,257$ 203,704 $ 2,447 $ 1.22% Public Facilities Fees Office EC 80 270 176,926$ 169,399 $ (7,527) $ -4.25% Developer Agreement Transit Fees Office EC 80 271 21,550$ 22,099 $ 549 $ 2.55% ENR CCI Land Acquisition Fees Office EC 80 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Office EC 80 273 15,971$ 16,579 $ 608 $ 3.81% CPI 232,637$ 232,731 $ 94 $ 0.04% Public Facilities Fees Office/Hospital EC 50 270 116,393$ 112,978 $ (3,415) $ -2.93% Developer Agreement Transit Fees Office/Hospital EC 50 271 13,545$ 13,890 $ 345 $ 2.55% ENR CCI Land Acquisition Fees Office/Hospital EC 50 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Office/Hospital EC 50 273 15,971$ 16,579 $ 608 $ 3.81% CPI 164,099$ 168,101 $ 4,002 $ 2.44% Public Facilities Fees Regional Commercial 270 130,716$ 134,252 $ 3,536 $ 2.71% Developer Agreement Transit Fees Regional Commercial 271 18,471$ 18,942 $ 471 $ 2.55% ENR CCI Land Acquisition Fees Regional Commercial 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Regional Commercial 273 15,971$ 16,579 $ 608 $ 3.81% CPI 183,348$ 194,427 $ 11,079 $ 6.04% Public Facilities Fees Transit Commercial 270 198,452$ 206,849 $ 8,397 $ 4.23% Developer Agreement Transit Fees Transit Commercial 271 31,401$ 32,201 $ 800 $ 2.55% ENR CCI Land Acquisition Fees Transit Commercial 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV 5 of 6
Final

BY LAND USE
dated 06/18/2021
Fee Type Land Use
Pay Class
Code As Of 07/01/20 As Of 07/01/21 $ % Adjustment Basis North Natomas Development Impact Fees Schedule
Effective July 1, 2021
Change 07/01/20 - 07/01/21
Regional Park Fees Transit Commercial 273 15,971$ 16,579 $ 608 $ 3.81% CPI 264,014$ 280,283 $ 16,269 $ 6.16% Public Facilities Fees Village Commercial 270 197,707$ 205,895 $ 8,188 $ 4.14% Developer Agreement Transit Fees Village Commercial 271 31,401$ 32,201 $ 800 $ 2.55% ENR CCI Land Acquisition Fees Village Commercial 272 18,190$ 24,654 $ 6,464 $ 35.54% PLAV Regional Park Fees Village Commercial 273 15,971$ 16,579 $ 608 $ 3.81% CPI 263,269$ 279,329 $ 16,060 $ 6.10% Stadium:

Per Net Acre Per Net Acre
Public Facilities Fees Stadium 270 130,893$ 142,177 $ 11,284 $ 8.62% Developer Agreement Transit Fees Stadium 271 20,773$ 21,302 $ 529 $ 2.55% ENR CCI Land Acquisition Fees Stadium 272 11,117$ 15,068 $ 3,951 $ 35.54% PLAV Regional Park Fee Stadium 273 15,971$ 16,579 $ 608 $ 3.81% CPI 178,754$ 195,126 $ 16,372 $ 9.16% end of schedule
6 of 6

Exhibit A‐6
FY2021/22 Railyards Fees

Basis Total Fee
RES <450 SF Residential <450 SF per unit 4,673.00
RES 450-750 SF Residential 450-750 SF per unit 6,112.00 RES >750 SF Residential >750 SF per unit 7,190.00
RETAIL Retail per sq. ft. 14.51
OFF Office per sq. ft. 11.78
FLEX Flexible Mixed-Use Office per sq. ft. 12.00
COURTHOUSE Courthouse per sq. ft. 9.62
KAISER Kaiser Facilities per sq. ft. 22.16
HOTEL Hotel per room 5,323.00
MLS MLS Stadium - 8,269,578.00
Basis Total Fee
RES <450 SF Residential <450 SF per unit 2,447.00
RES 450-750 SF Residential 450-750 SF per unit 3,200.00 RES >750 SF Residential >750 SF per unit 3,765.00
RETAIL Retail per sq. ft. 2.75
OFF Office per sq. ft. 3.08
FLEX Flexible Mixed-Use Office per sq. ft. 3.07
COURTHOUSE Courthouse per sq. ft. -
KAISER Kaiser Facilities per sq. ft. 4.14
HOTEL Hotel per room 1,079.00
MLS MLS Stadium - 3,046,035.00
Land Use
Land Use
Railyards Impact Fee
as of June 21, 2022
Railyards Impact Fee
as of July 1, 2021

Exhibit A‐7
FY2021/22 River District Impact Fees

Basis Base  Fee Economic  Incentive*
RES Residential per  unit 7,247.21                       3,623.61 COMM/RET Commercial/Retail per  sq. ft. 16.14                             8.07 OFF Office per  sq. ft. 12.73                             6.37 IND Light  Industrial per  sq. ft. 8.48                               4.24 HOTL Hotel   per room 4,016.88                       2,008.44 *Economic Incentive Limitations:
‐Overall maximum of 1,000 residential dwelling units are eligible for the incentive program.

No more than 200 dwelling units are eligible for any single development project. ‐Overall maximum of 500,000 SF of office development is eligible for the incentive program.

No more than 200,000 SF is eligible for any single office development. ‐Overall maximum of 100,000 SF of retail development is eligible for the incentive program.

No more than 25,000 SF is eligible for any single retail development. as of July 1, 2021
River District Impact Fee
Land Use

Exhibit A‐8
FY2021/22 Willowcreek Fees

Assessor's
Parcel Number Fee per Parcel
225-0220-123-0000 $124,759
274-0030-083-0000 $574,217
274-0030-084-0000 $290,028
* Excludes undevelopable parcels and parcels owned by a public agency.

Willowcreek Fees
as of July 1, 2021*

Exhibit B
Annual Financial Report by Funds
For the Fiscal Year Ended June 30, 2022

City of Sacramento
Development Impact Fees
Annual Financial Report By Funds for the Fiscal Year Ending June 30, 2022 Impact Fee  Interest  Total  Ending
Fund Description Fund Beginning Balance1 Revenue1 Income1 Transfer In/(Out)1 Available1 Expenditures1 Balance1 Willowcreek Fee District Fund 3008 2,687,56 6                        98,559                              19,239                              2,805,364                        98,189                              2,707,175 Jacinto Creek Planning Area 3203 2,098,585                         350                                   15,467                              2,114,401                        8,194                                2,106,207 NNFP Drainage Fee Fund 3205 32,851                               803,950                           1,685                                838,486                           756,291                           82,195 NNFP Public Facilities Fee Fnd 3206 17,619,771                       1,373,084                        2      134,490                           19,127,345                      840,945                           5      18,286,401 NNFP Transit Fee Fund 3207 11,741,482                       427,464                           88,611                              ‐                                         3      12,257,557                      9,583                                12,247,974 NNFP Pub Land Acquisition Fee 3208 3,873,802                         678,842                           16,632                              4,569,276                        4,052,710                        516,566 NNFP Reg Park Land Acquisition 3209 1,351,040                         576,306                           9,555                                ‐                                         4      1,936,901                        849,146                           5      1,087,755 Downtown Impact Fee Fund 3210 1,214,07 6                        1,008,251                        11,869                              2,234,195                        135,242                           2,098,953 Railyards Impact Fee Fund 3211 2,452,078                         1,938                                18,105                              2,472,122                        27,745                              2,444,376 River District Impact Fee Fund (Formerly Richard Blvd.) 3212 831,797                            1,375,452                        10,062                              2,217,311                        8,631                                2,208,680 65th Street Impact Fee Fund 3214 1,082,532                         32,565                              5,638                                1,120,736                        943,388                           177,347 Greenbriar DA Fee Fund6 3216 1,956,600                        1,286,691                        16,335                              3,259,625                        497,645                           2,761,980 ‐                                        ‐                                       ‐                                        ‐ 46,942,179                      7,663,452                        347,688                           ‐                                        54,953,319                      8,227,709                        46,725,609 1Prepared using the cash basis of accounting. Revenues and expenditures are reported in the accounting period in which they are received or disbursed, respectively. 2Impact Fee Revenue is net of $357k refund.
3No cash is available in the Greenbriar DA Fee Fund to pay inter‐fund loan from Transit Fee Fund in FY22.  The inter‐fund loan of $2.6 million from NNFP Transit Fee Fund to Greenbriar DA Fee Fund was authorized in FY20 for the North Natomas Community Center and Aquatic Complex Project; earning interest at the Pool A rate; and will be repaid when the City Manager determines that cash for that purpose is available in the Greenbriar DA Fee program or when repayment is required for the allowable purposes on the Green Line, whichever occurs first. 4No cash is available in the NN Regional Park Land Acquisition Fee Fund to pay inter‐fund loans from Transit Fee Fund in FY22. The inter‐fund loans were obtained to pay debt service on the Park Bonds and call a portion of the principal of the Park Bonds; earning interest at the Pool A rate; and will be repaid when the City Manager determines that cash for that purpose is available in the NN Reg Park Land Acquisition Fee program or when repayment is required for the allowable purposes on the Green Line, whichever occurs firts. 5Cash in the NNFP Reg Park Land Acquisition Fee and NNFP Public Facilities Fee programs are used to pay the 2006 Capital Improvement Revenue Bonds, Series E principal and interest. Due December 1, 2033, bearing interest rates of 5.25%. 6The requirement for an annual report also applies to fees for public facilities collected under development agreements entered into on or after January 1, 2004 (§65865(e)).

Exhibit C
Identification of Public Improvements on
which Fees were Expended
For the Fiscal Year Ended June 30, 2022

20/21 %  Funded
Fund Description Fund Expenditure  Description Expenditure s with Dev Fee Willowcreek Fee District Fund 3008 Administrative  Services 17,427 $                           100% Willowcreek Fee District Fund 3008 Developer  Reimbursements 80,762                              100% Willowcreek Fee District Fund Total 98,189
Jacinto Creek Planning Area 3203 Administrative  Services 8,194                                100% Jacinto Creek Planning Area Total 8,194
NNFP Drainage Fee Fund 3205 Administrative  Services 8,940                                100% NNFP Drainage Fee Fund 3205 Developer  Reimbursements 747,351                            100% NNFP Drainage Fee Fund Total 756,291
NNFP Public Facilities Fee Fnd 3206 Administrative  Services 154,991                            100% NNFP Public Facilities Fee Fnd 3206 North  Natomas Community/Aquatic Center 98,507                              100% NNFP Public Facilities Fee Fnd 3206 North  Natomas Freeway Monitoring 6,164                                100% NNFP Public Facilities Fee Fnd 3206 2006  Series E CIRBS 581,283                            1   100% NNFP Public Facilities Fee Fnd Total 840,945
NNFP Transit Fee Fund 3207 Administrative  Services 9,583                                100% NNFP Transit Fee Fund Total 9,583
NNFP Pub Land Acquisition Fee 3208 Administrative  Services 80,187                              100% NNFP Pub Land Acquisition Fee 3208 Developer  Reimbursements 3,972,523                        100% NNFP Pub Land Acquisition Fee Total 4,052,710
NNFP Reg Park Land Acquisition 3209 Administrative  Services 12,135                              100% NNFP Reg Park Land Acquisition 3209 2006  Series E CIRBS 837,011                            1   100% NNFP Reg Park Land Acquisition Total 849,146
Downtown Impact Fee Fund 3210 Administrative  Services 25,865                              100% Downtown Impact Fee Fund 3210 Downtown  Mobility Project 109,377                            100% Downtown Impact Fee Fund Total 135,242
Railyards Impact Fee Fund 3211 Administrative  Services 27,745                              100% Railyards Impact Fee Fund Total 27,745
River District Impact Fee Fund (Formerly Richard Blvd.) 3212 Administrative  Services 8,631                                100% River District Impact Fee Fund (Formerly Richard Blvd.) Total 8,631 65th Street Impact Fee Fund 3214 Administrative  Services 160                                    100% 65th Street Impact Fee Fund 3214 Developer  Reimbursements 943,228                            100% 65th Street Impact Fee Fund Total 943,388
Greenbriar DA Fee Fund 3216 Administrative  Services 13,252                              100% Greenbriar DA Fee Fund 3216 North  Natomas Community/Aquatic Center 484,393                            100% Greenbriar DA Fee Fund Total 497,645
Grand Total 8,227,709$
1Cash in the NNFP Reg Park Land Acquisition Fee and NNFP Public Facilities Fee programs are used to pay the 2006 Capital Improvement Revenue Bonds, Series E principal and interest. Due December 1, 2033, bearing interest rates of 5.25%.

City of Sacramento
Fiscal Year 2022
Expenditures
AB1600 Report