Staff Report - Railyards Temporary Surface Parking Lots (P23-001) [Noticed 03/03/2023; Passed for Publication 03/07/2023; Published 03/08/2023]

Sacramento City Council
March 14, 2023

Document
Staff Report - Railyards Temporary Surface Parking Lots (P23-001) [Noticed 03/03/2023; Passed for Publication 03/07/2023; Published 03/08/2023]
Meeting
March 14, 2023
Body
Sacramento City Council
Pages
7
Original file
17.2 MB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

City of Sacramento
City Council - 5PM Report
915 I Street Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2023-00086 3/14/2023 Public Hearing Item 9.

Railyards Temporary Surface Parking Lots (P23-001) [Noticed 03/03/2023; Passed for Publication 03/07/2023; Published 03/08/2023]
File ID: 2023-00086
Location: Sacramento Railyards Lots 4a, 4b, 4c, 4d, partial 8b, 9a, 9b, 9c, 15a, 15b, 15c, 15d, and partial 21b; APN: 002-0010-075-0000 (Council District 4, Represented by Mayor Steinberg) Recommendation: Conduct a public hearing and upon conclusion, adopt: 1) a Resolution determining the project is within the scope of the previously certified Subsequent Environmental Impact Report and Mitigation Monitoring Plan for the Railyards Specific Plan Update, KP Medical Center, MLS Stadium, and Stormwater Outfall Project (Resolution 2016-0379) (P15-040) (SCH 2006032058); 2) an Ordinance approving Amendment 2 to the Amended and Restated Development Agreement for the Sacramento Railyards Project Development Agreement between the City of Sacramento and Downtown Railyard Venture, LLC (City Agreement 2008-0150-02); and 3) a Resolution adopting project entitlements including a Temporary Conditional Use Permit for stand- alone parking facilities on property referred to as Lots 4a, 4b, 4c, 4d, partial 8b, 9a, 9b, 9c, 15a, 15b, 15c, 15d, and partial 21b (collectively “site”) as described in the Tentative Subdivision Map for The Railyards (Record No. Z21-107) within the Central Business District (“C-3-SPD”) zone and the Railyards Special Planning District (“SPD”), and Site Plan and Design Review for stand-alone parking facilities with deviations to waive development standards including surface paving, tree shading, and onsite perimeter landscape planters.

Contact: Jose Quintanilla, Associate Planner, 916-808-5879, [email protected]; Karlo Felix, Senior Planner, 916-808-7183, [email protected], Community Development Department.

Presenter: Jose Quintanilla, Associate Planner, 916-808-5879, [email protected], Community Development Department.

Applicant: Josh Leachman, Downtown Railyard Venture, LLC, c/o Seven Post Investment, P.O. Box 263, San Francisco, CA 94104
Property Owner: Same as Applicant
Attachments:
01-Description/Analysis
02-Background

Page 1 of 7 ends

File ID: 2023-00086 3/14/2023 Public Hearing Item 9.
03-Resolution - CEQA
04-Exhibit A: Resolution 2016-0379
05-Ordinance - Development Agreement
06-Exhibit A: Amendment 2 to Development Agreement
07-Resolution - Entitlements
08-Exhibit A: Project Plans
09-Development Agreement - Exhibits P and Q (current)
10-Exhibit Q - Enlarged Format (proposed)
11-Community Comments
Description/Analysis
Issue Detail: The Railyards is an infill site being developed with residential, retail, commercial uses, medical center, sports complex, live entertainment facility, and includes the restoration and reuse of historic structures. The applicant is requesting temporary surface parking lots to support the approved sports facility and approved commercial uses around the Central Shops Plaza, until such time as the Railyards is developed with adequate structured parking facilities. The proposal requires the following entitlements:
1) Development Agreement Amendment to amend Exhibits P and Q; 2) Conditional Use Permit for stand-alone parking facilities; and 3) Site Plan and Design Review for stand-alone parking facilities with deviations to waive development standards including surface paving, tree shading, and onsite perimeter landscape planters.

Public/Neighborhood Outreach and Comments: As part of the application review process, the proposed project was routed to Old Sacramento Business Association (PBID), Downtown Sacramento Partnership (PBID), The River District (PBID), Preservation Sacramento, Alkali and Mansion Flats Historic Neighborhood Association.

Staff received comments from The River District (PBID) expressing no “qualms” with the proposed parking lots.

Staff posted the site with an early notice at time of planning application submittal. Staff also mailed public hearing notices to all property owners, residents, and neighborhood groups within 500 feet of the project site and posted the site 10 days prior to the public hearing. At the time of writing this report, staff has not received any additional comments, aside from those mentioned above, on the project in response to the noticing.

Policy Considerations:

Page 2 of 7 ends

File ID: 2023-00086 3/14/2023 Public Hearing Item 9.

General Plan
The General Plan designation for the project site is Central Business District (CBD). The 2035 General Plan recognizes the Central Business District as Sacramento’s most intensely developed area that includes a mixture of office, governmental, entertainment, and visitor-serving uses. The vision for the CBD is a vibrant downtown core that will continue to serve as the business, governmental, retail, and entertainment center for the city and the region.

A significant element in the future CBD includes a mix of new commercial and residential uses. The proposed project supports continued redevelopment of the Sacramento Railyards by allowing for temporary parking facilities that serve a variety of uses that are gradually being constructed.

In addition to the project’s consistency with the CBD designation, the project is consistent with the following General Plan goals and policies:

Goal LU 2.6 City Sustained and Renewed. Promote sustainable development and land use practices in both new development, reuse, and reinvestment that provide for the transformation of Sacramento into a sustainable urban city while preserving choices (e.g., where to live, work, and recreate) for future generations.

Policy LU 2.6.3 Revitalization Strategies. The City shall employ a range of strategies to promote revitalization of distressed, under-utilized, and/or transitioning areas, including:

Targeted public investments; Development incentives; Public-private partnerships; Revised development regulations and entitlement procedures; and Implementation of City-sponsored studies and master plans.

Goal LU 5.6 Central Business District. Promote the Central Business District (CBD) as the regional center of the greater Sacramento area for living, commerce, culture, and government.

Policy LU 5.6.1 Downtown Center Development. The City shall encourage development that expands the role of the CBD as the regional center for living, commerce, arts, culture, entertainment, and government.

Policy LU 5.6.6 Central City Development Projects. The City shall work with the Sacramento Housing and Redevelopment Agency (SHRA), the Capitol Area Development Authority (CADA), and private developers to ensure that development efforts in areas surrounding the CBD (e.g., Railyards, River District, Docks Area, R Street) respect and respond to the urban patterns-streets, blocks, building heights, massing-and character established in the CBD, and do not undermine the physical centrality, visual primacy, or land use composition of the CBD.

Policy LU 5.6.7 Cultural Facilities Central City. The City shall continue to support the existing cultural facilities in the Central City and encourage the development of additional facilities that promote the city as the regional and historic center for meeting and gathering.

Goal HCR 2.1 Identification and Preservation of Historic and Cultural Resources. Identify and preserve the city’s historic and cultural resources to enrich our sense of place and our understanding

Page 3 of 7 ends

File ID: 2023-00086 3/14/2023 Public Hearing Item 9.
preserve the city’s historic and cultural resources to enrich our sense of place and our understanding of the city’s prehistory and history.

Policy HCR 2.1.11 Compatibility with Historic Context. The City shall review proposed new development, alterations, and rehabilitation/remodels for compatibility with the surrounding historic context. The City shall pay special attention to the scale, massing, and relationship of proposed new development to surrounding historic resources.

Goal ED 3.1 Land, Sites, and Opportunity Areas. Retain, attract, expand, and develop businesses by providing readily available and suitable sites with appropriate zoning and access.

Policy ED 3.1.10 Civic Amenities. The City shall support and encourage the development of civic amenities, entertainment venues, and convention opportunities that increase visitation, spending and tourism in Sacramento.

Goal M 6.1 Managed Parking. Provide and manage parking such that it balances the citywide goals of economic development, livable neighborhoods, sustainability, and public safety with the compact multi-modal urban environment prescribed by the General Plan.

Policy M 6.1.1 Appropriate Parking. The City shall manage public parking and regulate the provision and management of private parking to support parking availability and auto access to neighborhoods across the city, with consideration for access to existing and funded transit service, mixed-use development, and shared parking opportunities.

Policy M 6.1.4 Reduction of Parking Areas. The City shall strive to reduce the amount of land devoted to parking through such measures as the elimination or reduction of minimum off -street parking requirements in selected areas or citywide, support for the development of shared public parking structures, the application of shared parking for mixed-use developments, and the implementation of transportation demand management plans to reduce parking needs.

General Plan - Central City Community Plan
The subject property is located within the Central City Community Plan Area of the General Plan. The General Plan identifies the Community Plan Area as the core of the city with an urban downtown that holds State government buildings, corporate offices and businesses, high-rise condominiums, historic neighborhoods, parks and recreational areas, nightlife, restaurant and shops, schools, and industrial and manufacturing complexes all within a treelined street grid. Overall, the project is consistent with the Community Plan Area and supports the following highlighted implementing policy.

Policy CCLU 1.2 Interrelated Land Uses. The City shall provide for organized development of the Central City whereby the many interrelated land use components of the area support and reinforce each other and the vitality of the community.

Page 4 of 7 ends

File ID: 2023-00086 3/14/2023 Public Hearing Item 9.

Railyards Specific Plan
The project site is located within the Railyards Specific Plan. The goals of the Specific Plan are to create and encourage development of an active, mixed-use environment that protects the historic integrity of the site and provides connectivity between districts utilizing a pedestrian-friendly environment. To facilitate the infill redevelopment of the Sacramento Railyards, a broad mixture of uses is allowed, coupled with flexible development standards, and an efficient approval process that provides certainty for the city, developers, and lenders.

Staff finds that the project is consistent with the following goals and policies of the Railyards Specific Plan:

Goal S-1: Maximize the use of sustainable development practices in the Plan Area.

Policy S-1.4: Create centralized parking facilities to support a “park once” strategy so that visitors arriving to the area by car will park once and walk within the area.

Goal CC-1: Create an intensive mixed-use transit oriented urban environment that will become an integral part of the Central City.

Policy CC-1.7: Encourage development of centralized parking facilities, to promote shared parking and to optimize the use and efficiency of parking facilities, which should be wrapped by other uses wherever feasible and otherwise screened from the view of pedestrians.

Policy CC-1.8: Encourage structured parking in lieu of surface parking and service facilities that do not detract from the neighborhood character of the area.

Economic Impacts: The proposed project will further development of the Railyards as this area is not fully developed nor is the infrastructure in place to support eventual build-out of the Railyards.

Environmental Consideration: On November 10, 2016, the City Council certified a Subsequent Environmental Impact Report (SEIR) and adopted Findings of Fact and a Statement of Overriding Considerations and a Mitigation Monitoring Plan (MMP) for the Railyards Specific Plan Update, KP Medical Center, MLS Stadium, & Stormwater Outfall Projects (P15-040) (Original Project) (Resolution No. 2016-0379).

The Project (Railyards Temporary Surface Parking Lots, P23-001) implements the elements of the Original Project as follows: Conditional Use Permit and Site Plan and Design Review to develop Railyards Lots 4a, 4b, 4c, 4d, partial 8b, 9a, 9b, 9c, 15a, 15b, 15c, 15d, and partial 21b with temporary stand-alone surface parking facilities support the approved sports complex (P15-040) and commercial and live entertainment facilities around the Central Shops Plaza (Z21-107).

The Project is consistent with the SEIR, and the analysis of impacts and mitigation in the SEIR is adequate for the Project. None of the circumstances set forth in CEQA Guidelines Section 15162 are present and the SEIR and MMP are adequate to identify potential effects and mitigation measures for the project. The previously certified SEIR, the previously adopted findings of fact and statement of

Page 5 of 7 ends

File ID: 2023-00086 3/14/2023 Public Hearing Item 9.
the project. The previously certified SEIR, the previously adopted findings of fact and statement of overriding consideration, and all oral and documentary evidence received during the hearing on the Project have been reviewed and comply with the requirements of CEQA.

The EIR may be found at:
<http://www.cityofsacramento.org/Community-Development/Planning/Environmental/Impact- Reports>
200-Year Flood Protection: State Law (SB 5) and Planning and Development Code chapter 17.810 require that the City must make specific findings prior to approving certain entitlements for projects within a flood hazard zone. The purpose is to ensure that new development will have protection from a 200-year flood event or will achieve that protection by 2025. The project site is within a flood hazard zone and is an area covered by SAFCA’s Improvements to the State Plan of Flood Control System, and specific findings related to the level of protection have been incorporated as part of this project.

Even though the project site is within a flood hazard zone, the local flood management agency, SAFCA, has made adequate progress on the construction of a flood protection system that will ensure protection from a 200-year flood event or will achieve that protection by 2025. This is based on the SAFCA Urban level of flood protection plan, adequate progress baseline report, and adequate progress toward an urban level of flood protection engineer’s report that were accepted by City Council Resolution No. 2016-0226 on June 21, 2016, and the SAFCA 2022 Adequate Progress Annual Report accepted by City Council Resolution No. 2022-0313 on October 11, 2022.

Sustainability: The project is designed for temporary use to facilitate transition into more permanent uses and includes non-permeable surfaces and temporary improvements such as chain-link fencing and portable lighting.

Commission/Committee Action: On February 9, 2023, the Planning and Design Commission unanimously recommended approval of the project to the City Council. As part of the Commission’s discussion, some individual commissioners expressed a desire to ensure that temporary parking is reduced or eliminated once permanent parking is constricted. The Development Agreement addresses the issue and provides that the “Temporary Baseline Parking Allotment” be reduced on a stall for stall basis as permanent parking comes online, which is consistent with the parties’ intent to eliminate all temporary parking lots, one by one, during the course of the development of the property. The parties intend that all stadium and music venue parking within the property, except for limited parking onsite, will eventually be in permanent parking structures. In addition, once the stadium and music venue come online, the agreement provides for annual parking reviews (during the first four years) to review whether parking needs are being adequately addressed. The City may adjust the Baseline Temporary Parking Allotment that is then in effect up or down.

Rationale for Recommendation: Staff recommends the City Council approve the project, based on the findings of fact and conditions of approval listed in the attachments. Staff supports the project because it is consistent with the CBD designation of the General Plan; consistent with the goals and policies of the General Plan and the Railyards Specific Plan; and it supports the continued redevelopment of the Sacramento Railyards. Further, this area is not fully developed nor is the infrastructure in place to support eventual build-out of the Railyards. The proposed amendments to

Page 6 of 7 ends

File ID: 2023-00086 3/14/2023 Public Hearing Item 9.
infrastructure in place to support eventual build-out of the Railyards. The proposed amendments to the development agreement reflects the changing needs of the development while also emphasizing the temporary nature of these parking lots until such a time when parking structures are constructed with subsequent development on the Railyards.

Financial Considerations: Not Applicable
Local Business Enterprise (LBE): No goods or services are being purchased under this report.

Page 7 of 7 ends

Background
Figure 1 – Zoning and Vicinity Map

Table 1: Site and Project Information
General Plan Designation: Central Business District (CBD) Community Plan: Central City
Specific Plan: Sacramento Railyards
Special Planning District: Railyards
Zoning: Central Business District (C-3-SPD)
Parking District: Urban
Design Review District: Railyards
Parcel Area: 112.9 acres
Site and Entitlement History
The Sacramento Railyards Specific Plan area (Figure 1) is approximately 244 acres, and includes property largely owned by Downtown Railyard Venture , Kaiser Foundation Hospitals, and City of Sacramento . The project site was originally the western terminus of the Transcontinental Railroad operated by Southern Pacific Railroad and Union Pacific Railroad.

The original Railyards project (P05-097) was approved by the City Council on December 11, 2007. The project involved the development of a maximum of 12,100 dwelling units,

1.4 million square feet of retail, 1,100 hotel rooms, 2.4 million square feet of office, 485,390 square feet of historic/cultural space, and 491,000 square feet of mixed -use development.

A Post Subdivision Modification for minor changes was approved by the Planning Director in 2012 (P10-040). The changes included revising sections of 5th and 7th Streets to show two-way traffic; changing the alignment of 5 th and 6th Streets; revising the tentative map to reflect the realignment and to accommodate a parking garage.

In 2016, the City Council approved amendments to the previous entitlement approvals to increase commercial/office uses; decrease the number of residential units; and, to allow for a Kaiser Permanente Medical Center and Major League Soccer (MLS) stadium (P15- 040).

In 2021, the Zoning Administrator and Preservation Director approved a Tentative Map Revision for the removal of exclusive recreation easements (EREs) on Lot 21 (a -c) and replacement of the EREs with the dedication of irrevocable offers of dedication (IODs) for a public access easement on Lots 10, and 21 (a -c); dedication of an IOD for a tunnel ramp and structure on Lot 22; and revisions to the prior conditions of approval associated with the revision (Z21-107). Additionally, Site Plan and Design Review to develop Lots 10, 19, 21 (a -c), and 22 with an outdoor plaza (Central Shops Plaza) and a new commercial building (The Pavillion), and the adaptive reuse of a vacant historic building (Paintshop) with a 4,500-seat live entertainment facility (“music venue”).

Need for Additional Entitlements
The previous Railyards project approved in 2016 (P15-040) included entitlement approval for 6,500 parking spaces for use by the Major League Soccer (MLS) sports complex (“stadium”). 4,000 of these spaces were to be located within the Railyards SPD and 2,500 would be in the River District. It was expected that development of the MLS Stadium would occur early in the buildout of the Railyards, well in advance of the anticipated structured parking facilities described in the development agreement which would be part of other new development on adjacent parcels . As a result, an interim solution for event parking was needed that resulted in approvals for temporary parking on Lots 4, 8, 33, 46, 47, 48, 49, 50, 51, 56, and 59.

Since 2016 , several temporary parking sites have had developments approved, specifically: Lot 12 (The Foundry), a portion of Lot 46 (The Wong Center), Lot 48 (The AJ). Construction is currently underway on The Wong Center and The AJ. Construction is soon anticipated on the music venue within the Paintshop and the Central Shops Plaza; however, structured parking facilities to support these uses have not yet been constructed and additional temporary parking is needed to support activities around the Central Shops Plaza.

Entitlement Review
The proposed project requests three entitlements : a Development Agreement Amendment, a Conditional Use Permit, and Site Plan and Design Review. Pursuant to SCC section 17.216.810.B, stand-alone surface parking facilities require a Conditional Use Permit reviewed at the director-level (Zoning Administrator). Pursuant to SCC section

17.808.120, new development with deviations from development standards require Site Plan and Design Review reviewed at the director -level (Design Director). Pursuant to SCC section 18.16.130, the Planning and Design Commission considers and makes a recommendation to the City Council on Development Agreement Amendments. Pursuant to SCC section 17.808.310, all permits associated with a single development project are reviewed and decided at the highest level required for the project. Therefore, this project requires approval by the City Council.

Development Agreement Amendment
The privately-owned property in the Railyards is subject to the Amended and Restated Development Agreement for the Sacramento Railyards Project between the City of Sacramento and Downtown Railyard Venture, LLC (City Agreement 2008-0150-02). This project proposes amending Exhibit P (Special Conditions) and Exhibit Q (MLS Stadium Parking Plan) of City Agreement 2008 -0150-02 between the City and DRV. Exhibit P (Special Conditions) establishes obligations and requirements that both the applicant and City must abide by. Exhibit Q (MLS Parking Plan) identifies the temporary surface parking lots authorized in 2016. Existing Exhibits P and Q are included as Attachment 9.

The proposed amendments are centered on three components: (a) Exhibit P, Section III, Conditions of Development; Special Findings Required; (b) Exhibit P, Section IV, Parking; and (c) Exhibit Q, MLS Stadium Parking Plan.

Exhibit P, Section III, Conditions of Development; Special Findings Required In addition to the other findings and conditions that may be applied to entitlement requests, this development agreement currently includes requirements for conditions of development and special findings that apply to all developments in the Railyards.

The approving body must either make the special findings or waive them in part or in whole.

The proposed amendments to the development agreement would delete the current text of Section III of Exhibit P in its entirety, which includes conditions of development and special findings required for development in the Railyards including consistency with the specific plan; implementation of the financing plan for the Railyard s; transfer of land for public facilities to the City or other agencies; compliance with other applicable portions of Exhibit P; and completion of appropriate environmental review.

Additionally, this section contains mechanisms for projects in the Railyard s to be approved if the findings above cannot be made and not waived.

Staff supports deleting the current text of Section III of Exhibit P because project approvals in the City are required to include findings related to consistency with development standards during the entitlement process (e.g., Site Plan and Design Review, Conditional Use Permits); all applicable plans (e.g., General Plan, Specific Plans, Finance Plans, etc.); the Railyards Financing Plan has been previously approved and all development i s bound to the requirements of the plan; and a conditions of approval have been imposed on prior approvals which require the transferring of land for utility purposes (i.e., Z21-107).

Additionally, all development projects are subject to environmental rev iew unless categorically or statutorily exempt from the requirements of the California Environmental Quality Act (CEQA) or has been previously analyzed as part of a prior Environmental Impact Report (EIR) or other environmental document. In other words, there are mechanisms in the City Code which duplicate the special findings and conditions in the Development Agreement.

Exhibit P, Section IV, Parking
The Parking section of the development agreement is proposed to be amended and renumber as Section III to add language incorporating the proposed music venue at the Paintshop Building (Z21-107) and binding the venue to the provisions for parking therein and allowing the venue access to the temporary lots as shown in Exhibit Q of the Development Agreement. Amendments to the Parking section include:

a. An increase of the baseline temporary parking allotment (“parking allotment”) from 4000 to 4128, an increase of 128 vehicle spaces;
b. Changes to the methodology utilized as part of the “Annual Parking Review” to determine the parking allotment so that the anticipated use for the venue (either the stadium or the music venue) in the following year is considered. Currently, the methodology for determining the baseline temporary parking allotment considers only adjustments to the baseline based on the highest use during the prior two seasons;
c. An increase from 30 to 90 days for the required notice to the landowner should the City identify that the parking allotment be adjusted;
d. Removal of language limiting the use of temporary parking to MLS events. This would allow event parking associated with the music venue and Central Shops Plaza to utilize the temporary facilities.
e. The addition of a provision allowing the City to review the total number of vehicle stalls allowed as part of the baseline temporary parking allotment has been added to the Parking section. The provision allows the City to adjust the number of spaces should a development proposal for the MLS stadium differ significantly from the MLS stadium previously approved in the Railyards (P15-040). f. Removal of a section enumerating the requirements for parking large vehicles at Lots 46 and 47 in connection with events at Golden 1 Center. This section listed a number of requirements for the lots including requirements for “all weather” gravel; the ability for the Department of Public Works to condition the project as appropriate; and a provision prohibiting commercial vehicles from parking at these lots after 4 years of the effective date of the Development Agreement or when the lots are first required to meet the parking requirements.

Exhibit Q, MLS Stadium Parking Plan
Changes to Exhibit Q are proposed to incorporate th e new lots to be utilized for temporary parking as well as to identify the uses allowed to use each lot. The lots shown on Exhibit Q reflect prior approvals for temporary lots as well as those proposed with this request. The lots are classified in accordan ce with the use allowed to utilize the lots: stadium only, daily use and music venue only, music venue only, and music venue plus stadium. The exhibit also identifies the approximate number of spaces allowable per lot.

Conditional Use Permit
Conditional Use Permits are required for land uses to review the location and conduct of certain land uses that may create impacts to the surrounding area. The proposed temporary parking lots are intended to be temporary gravel lots with pavement proposed

only where required for access into the site and where required for compliance with accessibility requirements for vehicle spaces. All other vehicle spaces on site are shown for planning purposes on the attached plans and striping will not be installed. Ve hicle parking will be managed for each use. Further operational requirements are and will be regulated through approved Event Transportation Management Plan s (ETMP) established for the music venue (draft ETMP reviewed under Z21-107).

SCC Title 17 does not recognize temporary parking lots as a use but does require a Conditional Use Permit for stand -alone surface parking. A “stand -alone” parking lot is a parking lot that is the sole use on a parcel. Generally, the City does not support stand - alone surface parking, particularly in the Central City, because of the opportunity cost of providing a higher intensity use that it envisioned in the General Plan. However, staff is supportive of the proposed surface parking lots s ince the Railyards Specific Plan and Design Guidelines encourage future development of the site with shared -use parking structures and there is an essential parking need given the anticipated timing for construction of the music venue within the Paintshop Building and the Central Shops Plaza.

Although the proposed lots have been designed and conditioned to mitigate potential impacts to the community, the project’s ability to create impacts is limited given the temporary nature and temporary quality of the facility. Furthermore, it is the desire of the City to promote the viability of the music venue and Central Shops Plaza which furthers adopted City goals related to high-quality design, sustainable building practices, and the ability to access the district by a wider population with varying physical abilities.

Staff has imposed a condition of approval that authorizes use of the parking lots through December 2029. The applicant asserts that will allow sufficient time to realize a fair return on their investm ent of this interim use . Authorizing deviations to parking facility development standards reduce the costs associated with the lots, further reducing the amount invested to further encourage the development of the lots with permanent uses and structured pa rking facilities to serve the district. Additionally, the Development Agreement limits the use of temporary parking approved in 2016 through 2030.

Site Plan and Design Review
The purpose and intent of the Site Plan and Design Review entitlement is to ensure the project proposal complies with the relevant development standards of the applicable zone, as well as the relevant design guidelines. SCC section 17.608.040 establishes development standards for parking facilities.

This analysis is focused solely on the three (3) additional lots proposed to be temporary lots at Lots 4, 8, 9, and 15 as identified on the approved Tentative Subdivision Map for the Railyards (Z21-107). Lots in the Railyards previously analyzed for use as temporary lots are not considered.

The temporary lots can be accessed from the adjacent rights-of-way via paved driveways.

Unlike the rest of the parking lots only the driveway and accessible vehicle spaces a re paved. The remainder of the lot is composed of gravel. The perimeter of the site is proposed to be fenced with chain link fencing. The interior of the site will be comprised of temporary lighting and signage.

Deviations are requested for the surface parking lots to waive the requirement for a paved surface, the minimum 50% tree shading, and the six-foot landscape planter with six inch raised concrete curbing around the perimeter of the site. Staff is supportive of these deviations to allow the surface pa rking lots to be minimally improved to clearly demonstrate the short-term nature of the lots. Staff has conditioned the project to require that final details not reviewed at the time of the final hearing, would require staff level review and approval. These final details include, but are not limited to, items such as ADA compliance, fencing, lighting, and signage. Signage and operational requirements associated with event parking will be governed by the applicable ETMP in effect at the time of the event.

Waiver of Development Standards
As part of the approval process for the Conditional Use Permit, the Zoning Administrator can waive the development standards stated in Sections 17.608.040 (Development standards for off -street parking facilities) and 17.612. 020 (Paving requirements). Given the temporary nature of the proposed lots, the project has been evaluated with the following standards waived:

SCC section 17.608.040.E. Surface, drainage, and stripping. Off-street parking facilities shall meet the surfaci ng and drainage requirements in section 17.612.020.

All vehicle parking spaces shall be marked on the parking area.

Drainage for the Railyards is handled by a detention basin serving the entirety of the development. As such no drainage facilities are proposed with these lots. Additionally, given the use of gravel for the parking lot, vehicle spaces will not be striped, with the exception of vehicle spaces as required for accessibility. Operations of the lots is outlined in the approved ETMP for the Railyards.

SCC section 17.608.040 .K. Tree shading. Off-street vehicle parking facilities shall comply with the shading and landscaping requirements in chapter 17.612.

Given the temporary nature of the lots and limited period of time (through 2029), it is not ideal to provide landscaping for the lots that would be removed with the development of each property.

SCC section 17.612.020. Paving Requirements. (A) Paving required. Paving is required for all storage and service areas, outdoor merchandise and equipment sales and rental areas, as well as off -street parking, driveways, maneuvering, and loading areas for vehicles, including gas stations and auto sales. Unpaved areas shall not be

used for storage, vehicle parking, driving, or maneuvering. Except for single -unit and duplex dwellings, unpaved areas adjacent to paved areas shall be made inaccessible by a barrier, such as concrete curbs, bollards, or fencing. Paved areas that do not comply with this code must be made inaccessible to vehicles by a barrier, such a s a concrete curb, bollards, or fencing. (B) Paving materials. Paving materials shall consist of decorative pavers, asphaltic concrete or Portland cement, concrete paving, or alternative treatments providing comparable strength and performance for vehicles intended to use the facility and approved by the planning director in consultation with the public works and fire departments. (C) Curbs, decorative bollards, or other barriers required. Except at approved driveways, every off -street parking facility; off -street loading or unloading area; and storage, sale, rental, or service area shall be improved with curbs or other barriers that prevent parked vehicles, equipment, or other objects from projecting into the public right-of-way and landscaped planters. The curb or other barrier shall be at least six inches in height and thickness, and shall be constructed of concrete or other suitable material.

The proposed temporary parking lots are intended to be temporary gravel lots with pavement proposed only where req uired for access into the site and where required for compliance with accessibility requirements for vehicle spaces. All other vehicle spaces on site are shown for planning purposes on the attached plans and striping will not be installed. Vehicle spaces adjacent to the right of way will be separated via a chain link fence with no landscaping area or curbs proposed. Drainage for the Railyards is handled by a detention basin serving the entirety of the development. As such no drainage facilities are proposed with these lots.

RESOLUTION NO. 2023-

Adopted by the Sacramento City Council
March 14, 2023

DETERMINING THAT AMENDMENT 2 TO THE AMENDED AND RESTATED DEVELOPMENT

AGREEMENT FOR THE SACRAMENTO RAILYARDS PROJECT DEVELOPMENT AGREEMENT AND

THE RAILYARDS TEMPORARY SURFACE PARKING PROJECT IS WITHIN THE SCOPE OF THE

PREVIOUSLY CERTIFIED SUBSEQUENT ENVIRONMENTAL IMPACT REPORT AND MITIGATION

MONITORING PLAN FOR THE RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, AND STORMWATER OUTFALL PROJECT (P23-001)

BACKGROUND
A. On February 9, 2023, the Planning and Design Commission conducted a public hearing, for which notice was given pursuant to Sacramento City Code chapter 17.812, received, and considered evidence concerning the Railyards Temporary Surfa ce Parking project (“Project”), and forwarded to the city Council a recommendation to approve the Project.

B. On March 14, 2023, the City Council conducted a public hearing, for which notice was given pursuant to Sacramento City Code chapter 17.812, received, and considered evidence concerning the Project.

BASED ON THE FACTS S ET FORTH IN THE BACK GROUND, THE CITY COU NCIL RESOLVES AS FOLLOWS:

Section 1. The City Council finds as follows:

A. On November 10, 2016, pursuant to the California Environmental Qu ality Act (Public Resources Code §21000 et seq. (“CEQA”), the CEQA Guidelines (14 California Code of Regulations §15000 et seq.), and the City of Sacramento environmental guidelines, the City Council certified a Subsequent Environmental Impact Report (“SEI R”) and adopted Findings of Fact and Statement of Overriding Considerations (Resolution No. 2016-0379) and approved the Railyards Specific Plan Update, KP Medical Center, MLS Stadium, & Stormwater Outfall Projects (P15-040) (“Original Project”).

B. The Project (Railyards Temporary Surface Parking Lots, P23 -001) implements the elements of the Original Project as follows: Conditional Use Permit and Site Plan and Design Review to develop Railyards Lots 4a, 4b, 4c, 4d, partial 8b, 9a, 9b, 9c, 15a, 15b, 15c, 15d, and partial 21b with temporary stand-alone surface parking facilities to support the approved sports complex (P15-040) and commercial and live entertainment facilities around the Central Shops Plaza (Z21-107).

C. Staff has determined that the Project is consistent with the SEIR, and the analysis of impacts and mitigation in the SEIR is adequate for the Project. None of the circumstances set forth in CEQA Guidelines Section 15162 are present and the SEIR and MMP are adequate to identify potential effects and mitigation measures for the project. The previously certified SEIR, the previously adopted findings of fact and statement of overriding consideration, and all oral and documentary evidence received during the hearing on the Project have been reviewed and comply with the requirements of CEQA.

Section 2. The City Council has reviewed and considered the information contained in the previously certified SEIR for the Original Project, and all oral and documentary evidence received during the hearing on the Project. The Planning and Design Commission has determined that the previously certified SEIR, CEQA findings of fact and statement of overriding considerations constitute an adequate, accurate, objective, and complete review of the proposed Project and fin ds that no additional environmental review is required based on the reasons set forth below:

A. No substantial changes are proposed by the Project that will require major revisions of the previously certified SEIR due to the involvement of new significant env ironmental effects or a substantial increase in the severity of previously identified significant effects.

B. No substantial changes have occurred with respect to the circumstances under which the Project will be undertaken which will require major revisions to the previously certified SEIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.

C. No new information of substantial importance has been found that show s any of the following:

1. The Project will have one or more significant effects not discussed in the previously certified SEIR

2. Significant effects previously examined will be substantially more severe than shown in the previously certified SEIR;

3. Mitigation measures previously found to be infeasible would in fact be feasible and would substantially reduce one or more significant effects of the Project; or

4. Mitigation measures which are considerably different from those analyzed in the previously certified SEIR would substantially reduce one or more significant effects on the environment.

Section 3. The mitigation monitoring plan for the Original Project remains in effect and applies to the Project. The mitigation monitoring plan meets the requirements of CEQA section 21081.6 and CEQA Guidelines Section 15091.

Section 4. Upon approval of the Project, the City Manager shall file or cause to be filed a Notice of Determination with the Sacramento County Clerk and, if the project requires a discretionary approval from any state agency, with the State Office of Planning and Research, pursuant to section 21152(a) of the Public Resources Code and section 15075 of the State EIR Guid elines adopted pursuant thereto.

Section 5. Pursuant to Guidelines section 15091(e), the documents and other materials that constitute the record of proceedings upon which the City Council has based its decision are located in and may be obtained from, th e Office of the City Clerk at 915 I Street, Sacramento, California. The City Clerk is the custodian of records for all matters before the City Council.

Section 6. Exhibit A is a part of this resolution.

EXHIBITS:

Exhibit A: Resolution 2016-0379 – Certifying the Subsequent Environmental Impact Report and Adopting the Mitigation Monitoring Plan, Findings of Fact, and Statement of Overriding Considerations for the Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium & Stormwater Outfall Projects (P15-040) RESOLUTION NO. 2016-0379
Adopted by the Sacramento City Council
November 10, 2016

CERTIFYING THE SUBSEQUENT ENVIRONMENTAL IMPACT REPORT AND

ADOPTING THE MITIGATION MONITORING PLAN, FINDINGS OF FACT, AND

STATEMENT OF OVERRIDING CONSIDERATIONS FOR THE SACRAMENTO

RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL PROJECTS (P15-040)

BACKGROUND
A. On October 24, 2016, the City Planning and Design Commission conducted a public hearing on the Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium, & Stormwater Outfall projects at which it reviewed and considered the Subsequent Environmental Impact Report for the projects and passed a motion to forward to the City Council a recommendation to approve the project.

B. On November 10, 2016, the City Council conducted a public hearing that was noticed in accordance with Sacramento City Code sections 17.812.010 and

17.812.030 at which it received and considered oral testimony and other evidence concerning the Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium, & Stormwater Outfall projects.

BASED ON THE FACTS SET FORTH IN THE BACKGROUND, THE CITY COUNCIL RESOLVES AS FOLLOWS:

Section 1. The City Council finds that the Subsequent Environmental Impact Report for the Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium, & Stormwater Outfall (herein SEIR), which consists of the Draft SEIR and the Final SEIR (Response to Comments) (collectively the “SEIR”) has been completed in accordance with the requirements of the California Environmental Quality Act (CEQA), the State CEQA Guidelines and the Sacramento Local Environmental Procedures.

Section 2. The City Council certifies that the SEIR was prepared, published, circulated and reviewed in accordance with the requirements of CEQA, the State CEQA Guidelines and the Sacramento Local Environmental Resolution 2016-0379 November 10, 2016 Pa
ge 1 of 134
Procedures, and constitutes an adequate, accurate, objective and complete Final Subsequent Environmental Impact Report in full compliance with the requirements of CEQA, the State CEQA Guidelines and the Sacramento Local Environmental Procedures.

Section 3. The City Council certifies that the SEIR has been presented to it, that the City Council has reviewed the SEIR and has considered the information contained in the SEIR prior to acting on the proposed project, and that the SEIR reflects the City Council’s independent judgment and analysis.

Section 4. Pursuant to CEQA Guidelines Sections 15091 and 15093, and in support of its approval of the projects, the City Council adopts the attached Findings of Fact and Statement of Overriding Considerations in support of approval of the project as set forth in the attached Exhibit A of this Resolution.

Section 5. Pursuant to CEQA Section 21081.6 and CEQA Guidelines Section 15091, and in support of its approval of the projects, the City Council adopts the Mitigation Monitoring Plan to require all reasonably feasible mitigation measures be implemented by means of the projects’ conditions, agreements, or other measures, as set forth in the Mitigation Monitoring Plan (MMP) as set forth in Exhibit B of this Resolution. In case of conflict between the MMP and the mitigation measures described in Exhibit A, the MMP shall control.

Section 6. The City Council directs that, upon adoption of approvals for the projects, the City Manager shall file a notice of determination with the County Clerk of Sacramento County and with the State Office of Planning and Research, pursuant to the provisions of CEQA Section 21152.

Section 7. Pursuant to CEQA Guidelines Section 15091(e), the documents and other materials that constitute the record of proceedings upon which the City Council has based its decision are located in and may be obtained from the Office of the City Clerk at 915 I Street, Sacramento, California. The City Clerk is the custodian of records for all matters before the City Council.

Resolution 2016-0379 November 10, 2016 Pa ge 2 of 134
Table of Contents:

Exhibit A - CEQA Findings of Fact and Statement of Overriding Considerations for the Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium, & Stormwater Outfall Projects
Exhibit B – Mitigation Monitoring Plan for the Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium, & Stormwater Outfall Projects Adopted by the City of Sacramento City Council on November 10, 2016, by the following vote:

Ayes: Members Ashby, Guerra, Hansen, Harris, Jennings, and Schenirer Noes: None
Abstain: None

Absent: Members Carr, Warren, and Mayor Johnson
Attest:

Shirley Concolino, City Clerk
Resolution 2016-0379 November 10, 2016 Pa ge 3 of 134
Shirley Concolino
Digitally signed by Shirley Concolino
DN: cn=Shirley Concolino, o=City of Sacramento, ou=City Clerk, [email protected], c=US
Date: 2016.12.16 13:03:33 -08'00'
Exhibit A
CEQA Findings of Fact and Statement of Overriding
Considerations for the Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium, & Stormwater Outfall Projects Description of the Projects
The Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium, & Stormwater Outfall projects involve the development of the approximately 244-acre Railyards Specific Plan Area (RSP Area). The proposed projects include the following key elements:
x The proposed Railyards Specific Plan Update (RSPU) would revise the 2007 Railyards Specific Plan to allow for an approximately 244-acre mixed-use urban development comprised of between 6,000 and 10,000 dwelling units, between 2,757,027 and 3,857,027 square feet (sf) of office space, 514,270 sf of retail space, 718,003 sf of hospital uses, 510,000 sf of medical office uses, 771,405 sf of flexible mixed use space, 1,100 hotel rooms, 485,390 sf of historic/cultural space, a 25,000-ticketed attendee capacity sports and entertainment stadium, and 30 acres of open space.

As proposed, the RSPU would provide for medium- and high-rise single use and mixed use residential, retail, office, medical, and hotel structures.

The project also would provide cultural/recreational facilities, including but not limited to the refurbished Central Shops buildings, as well as numerous public parks and walkways. The proposed RSPU would include a network of public streets with vehicular, bicycle, and pedestrian access, parking facilities, water, wastewater, and drainage infrastructure and facilities. The RSPU would also include approximately 32 acres around the Sacramento Valley Station designated for the development of the Sacramento Intermodal Transit Facility (SITF), which would provide multiple modes of public transit service including bus, rail, light rail, and passenger auto. The proposed projects would also include provisions to accommodate high speed rail platforms east of 7
th Street. The proposed
RSPU would result in substantial grading activities along with import of fill to result in a relatively flat topography that will gently slope from east to west. As part of the site grading, the northern embankment would be removed and graded to an elevation consistent with the elevation of North B Street.
x A proposed new regional medical center to be built and operated by Kaiser Permanente (KP Medical Center) to replace its existing Morse Avenue medical center, which requires replacement because of State seismic safety laws and regulations. The KP Medical Center would be constructed on an approximately 17.8-acre parcel to be designated H- SPD, located in the western portion of the RSP Area. The proposed KP Medical Center would be constructed in phases, and will ultimately include Resolution 2016-0379 November 10, 2016 Pa
ge 4 of 134
a 420-bed, 658,000 sf hospital, and adjacent and connected 210,000 sf Hospital Support Building, a total of 300,000 sf in two medical office buildings, a helistop to facilitate transfer of patients, a 60,000 sf Central Utility Plant, two 1,500-space parking structures, and associated vehicular circulation and 200 surface parking spaces;
x A proposed 25,000-ticketed attendee capacity outdoor sports and entertainment stadium that would become the home of a new Major League Soccer team (MLS). The proposed MLS stadium would be developed on a 14.7-acre site in the eastern end of the RSP Area. The proposed MLS Stadium will accommodate approximately 37 sports and entertainment events each year, ranging in attendance from a few thousand to 27,000 for infrequent very large events. It is anticipated that MLS soccer games would attract sold out crowds of approximately 25,000.

The MLS Stadium would be an enclosed rectangular stadium structure, with a concreate seating bowl and canopy roof surrounded by a façade made from tubular metal and translucent panels with a roofline approximately 90-feet in height. The stadium structure would be surrounded by approximately five acres of open plaza areas that would accommodate event attendees and entertainment activities, including occasional outdoor music events;
x In the event that market conditions or other factors result in the KP Medical Center and/or MLS Stadium projects not being completed, the proposed RSPU would allow for an alternate set of land uses within the blocks that constitute the KP Medical Center and MLS Stadium project sites. Under the Land Use Variant instead of the proposed KP Medical Center on Lots 2(a) through (g) a total of 921,002 sf of office, 92,100 sf of retail, 138,150 sf of flex space, and 250 residential units could be developed. Similarly, on Blocks 52-55, instead of the up to 25,000- capacity MLS Stadium, the Land Use Variant could accommodate construction of 750 residential units, 30,700 sf of retail, and 46,050 sf of flex space;
x A proposed stormwater outfall on the far western edge of the RSP area that would discharge stormwater and other runoff to the Sacramento River. The proposed stormwater outfall would include a pump station that would be located on a parcel located underneath the elevated Interstate 5 and would be connected to an outfall structure on the east bank of the Sacramento River. Stormwater and other runoff from a majority of the RSP Area would be directed to the pump station and outfall though a drainage system that would be constructed throughout the RSP Area.

Findings Required Under CEQA

1. Procedural Findings
The City Council of the City of Sacramento finds as follows:

Resolution 2016-0379 November 10, 2016 Pa
ge 5 of 134
The SEIR for the Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium, & Stormwater Outfall (SCH # 2006032058, City project #P15-040) was prepared, noticed, published, circulated, reviewed, and completed in full compliance with the California Environmental Quality Act (Public Resources Code Section 21000 et seq. (“CEQA”), the CEQA Guidelines (14 California Code of Regulations Section15000 et seq.), and the City of Sacramento environmental guidelines, as follows:
a. A Notice of Preparation of the Draft SEIR was filed with the Governor’sOffice of Planning and Research (OPR) and each responsible and trustee agency and was circulated for public comments from June 26, 2015, through July 30, 2015.
b. A public scoping meeting was held on July 22, 2015, at Sacramento City Hall, 915 I Street, Sacramento, California, 95814, to request the public’s input on the scope and content of the environmental information that should be addressed in the SEIR.
c. A Notice of Completion (NOC) and copies of the Draft SEIR were distributed to the OPR on June 10, 2016, and to those public agencies that have jurisdiction by law with respect to the projects, or which exercise authority over resources that may be affected by the projects, and to other interested parties and agencies as required by law. The comments of such persons and agencies were sought.
d. An official 45-day public review and comment period for the Draft SEIR was established by the OPR. The official OPR public comment period began on June 10, 2016, and ended on July 27, 2016.
e. A Notice of Availability (NOA) of the Draft EIR was mailed to all interested groups, organizations, and individuals who had previously requested notice in writing on June 10, 2016. The NOA stated that the City of Sacramento had completed the Draft SEIR and that copies were available at the City of Sacramento, Community Development Department, 300 Richards Boulevard, Third Floor, Sacramento, California, 95811, and on the City’s website. The letter also indicated that the official 45-day public review period for the Draft EIR would end on July 27, 2016.
f. A public notice was placed in the Sacramento Bulletin on June 10, 2016, which stated that the Draft SEIR was available for public review and comment.
g. A public notice was posted in the office of the Sacramento County Clerk on June 10, 2016.

Resolution 2016-0379 November 10, 2016 Pa
ge 6 of 134
h. A public notice was mailed to all property owners within the project area, property owners within 1,000 feet of the project area, and occupants of contiguous property to the project area on June 10, 2016. i. The NOA and Draft SEIR were published on the City’s website at http://portal.cityofsacramento.org/Community-
Development/Planning/Environmental/Impact-Reports.aspx. j. An informational workshop was held on June 15, 2016, at the Tsakopoulos Library Galleria, 828 I Street, Sacramento, California, 95814, to inform the public of key analyses and conclusions reached in the Draft SEIR. k. Following closure of the public comment period, all comments received on the Draft SEIR during the comment period, the City’swritten responses to the significant environmental points raised in those comments, and additional information added by the City were added to the Draft SEIR to produce the Final SEIR.
l. The Final SEIR was made available for public review and published on the City’s website at http://portal.cityofsacramento.org/Community- Development/Planning/Environmental/Impact-Reports.aspx on October 10, 2016. m. Notices were mailed on October 10, 2016, to all federal and state agencies that provided comments on the Draft SEIR. The notice sent to each agency included that agency’s comment letter and specific responses to its comment letter.
n. In certifying the Final SEIR with the SEIR Errata, the City Council finds that the Final SEIR with the SEIR Errata does not add significant new information to the Draft SEIR that would require recirculation of the SEIR under CEQA because the Final SEIR and SEIR Errata contain no information revealing (1) any new significant environmental impact that would result from the Project or from a new or revised mitigation measure proposed to be implemented, (2) any substantial increase in the severity of a previously identified environmental impact, (3) any feasible project alternative or mitigation measures considerably different from others previously analyzed that would clearly lessen the environmental impacts of the Project but that was rejected by the Project Applicant, or (4) that the Draft SEIR was so fundamentally and basically inadequate and conclusory in nature that meaningful public review and comment were precluded.

2. Record of Proceedings
The contents of the record of proceedings shall be as set forth in subdivision (e) of Public Resources Code Section 21167.6. In particular, the following information is incorporated by reference and made part of the record supporting these findings:

Resolution 2016-0379 November 10, 2016 Pa
ge 7 of 134
a. The Draft and Final SEIR and all documents relied upon or incorporated by reference therein;
b. The City of Sacramento 2035 General Plan adopted March 3, 2015, and all updates;
c. The Master Environmental Impact Report for the City of Sacramento 2035 General Plan certified on March 3, 2015, and all updates; d. Findings of Fact and Statement of Overriding Considerations for the Adoption of the Sacramento 2035 General Plan adopted March 3, 2015, and all updates;
e. Planning and Develop ment Code of the City of Sacramento, as amended as of the date of this Resolution;
f. Blueprint Preferred Scenario for 2050, Sacramento Area Council of Governments (SACOG), December, 2004;
g. The Sacramento Railyards Specific Plan, December 2007; h. The Railyards Specific Plan Environmental Impact Report (SCH No. 2006032058), November 2007;
i. The Railyards Specific Plan Update, November 2016;
j. The Railyards Specific Plan Design Guidelines, November 2016; k. Railyards Special Planning District, November 2016;
l. Railyards Tentative Subdivision Map, November 2016;
m. Railyards Development Agreement, November 2016;
n. The Mitigation Monitoring Plan for the Projects;
o. The Sacramento Area Council of Gov ernments’ (SACOG) Metropolitan Transportation Plan/Sustainability Communities Strategy (MTP/SCS), February 2016;
p. All records of decision, staff reports, memoranda, maps, exhibits, letters, synopses of meetings, and other documents approved, reviewed, relied upon, or prepared by any City commissions, boards, officials, consultants, or staff relating to the Projects; and
q. Any other materials required by Public Resources Code Section 21167.6, or other applicable law, to be included in the record of proceedings.

Resolution 2016-0379 November 10, 2016 Pa
ge 8 of 134

3. Findings
CEQA requires that the lead agency adopt mitigation measures or alternatives, where feasible, to substantially lessen or avoid significant environmental impacts that would otherwise occur. Mitigation measures or alternatives are not required, however, where such changes are infeasible or where the responsibility for the project lies with some other agency. (CEQA Guidelines, Section 15091, sub. (a), (b).)
Public Resources Code section 21061.1 defines “feasible” to mean “capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social and technological factors.” CEQA Guidelines section 15364 includes another factor: “legal” considerations. (See also Citizens of Goleta Valley v. Board of Supervisors (Goleta II) (1990) 52 Cal.3d 553, 565.)
The concept of “feasibility” also encompasses the question of whether a particular alternative or mitigation measure promotes the underlying goals and objectives of a project. (City of Del Mar v. City of San Diego (1982) 133 Cal.App.3d 410, 417 (City of Del Mar).) “[F]easibility” under CEQA encompasses ‘desirability’ to the extent that desirabilityis based on a reasonable balancing of the relevant economic, environmental, social, and technological factors.” (Ibid.; see also Sequoyah Hills Homeowners Assn. v. City of Oakland (1993) 23 Cal.App.4th 704, 715 (Sequoyah Hills); see also California Native Plant Society v. City of Santa Cruz (2009) 177 Cal.App.4th 957, 1001 [after weighing “‘economic, environmental, social, and technological factors’ ... ‘an agency may conclude that a mitigation measure or alternative is impracticable or undesirable from a policy standpoint and reject it as infeasible on that ground’”].) With respect to a project for which significant impacts are identified that are not avoided or substantially lessened, a public agency may nevertheless approve the project if the agency first adopts a statement of overriding considerations setting forth the specific reasons why the agency found that the project’s “benefits” rendered “acceptable” its “unavoidable adverse environmental effects.” (CEQA Guidelines, Sections 15093, 15043, sub. (b); see also Pub. Resources Code, Sections 21081, sub. (b).)
In seeking to effectuate the substantive policy of CEQA to substantially lessen or avoid significant environmental effects to the extent feasible, an agency, in adopting findings, need not necessarily address the feasibility of both mitigation measures and environmentally superior alternatives when contemplating approval of a proposed project with significant impacts. Where a significant impact can be mitigated to an “acceptable” level solely by the adoption of feasible mitigation measures, the agency, in drafting its findings, has no obligation to consider the feasibility of any environmentally superior alternative that could also Resolution 2016-0379 November 10, 2016 Pa
ge 9 of 134
substantially lessen or avoid that same impact — even if the alternative would render the impact less severe than would the proposed project as mitigated. (Laurel Hills Homeowners Association v. City Council (1978) 83 Cal.App.3d 515, 521; see also Kings County Farm Bureau v. City of Hanford (1990) 221 Cal.App.3d 692, 730-731; and Laurel Heights Improvement Association v.

Regents of the University of California (“Laurel Heights I”) (1988) 47 Cal.3d 376, 400-403.)
In these Findings, the City first addresses the extent to which each significant environmental effect can be substantially lessened or avoided through the adoption of feasible mitigation measures. Only after determining that, even with the adoption of all feasible mitigation measures, an effect is significant and unavoidable does the City address the extent to which alternatives described in the EIR are (i) environmentally superior with respect to that effect and (ii) “feasible” within the meaning of CEQA.

In the Statement of Overriding Considerations found at the end of these Findings, the City identifies the specific economic, social, and other considerations that, in its judgment, outweigh the significant environmental effects that the projects will cause.

The California Supreme Court has stated that “[t]he wisdom of approving ... any development project, a delicate task which requires a balancing of interests, is necessarily left to the sound discretion of the local officials and their constituents who are responsible for such decisions. The law as we interpret and apply it simply requires that those decisions be informed, and therefore balanced.” (Citizens of Goleta Valley v. Board of Supervisors (Goleta II) (1990) 52 Cal. 3d 553, 564 [276 Cal. Rptr. 410, 801 P.2d 1161].)
In support of its approval of the Projects, the City Council’sfindings are set forth below for each of the potentially significant environmental effects and alternatives of the Projects identified in the SEIR pursuant to Section 21080 of CEQA and Section 15091 of the CEQA Guidelines.

These findings do not attempt to describe the full analysis of each environmental impact contained in the Final SEIR. Instead, a full explanation of these environmental findings and conclusions can be found in the Final SEIR and these findings hereby incorporate by reference the discussion and analysis in the Final SEIR supporting the determination regarding the impacts of the Projects and mitigation measures designed to address those impacts. In making these findings, the City Council ratifies, adopts and incorporates in these findings the determinations and conclusions of the Final SEIR relating to environmental impacts and mitigation measures except to the extent any such determinations and conclusions are specifically and expressly modified by these findings.

As set forth below, the City Council adopts and incorporates all of the mitigation measures set forth in the Final SEIR and the attached MMP to substantially Resolution 2016-0379 November 10, 2016 Pa
ge 10 of 134
lessen or avoid the potentially significant and significant impacts of the Projects.

The City Council intends to adopt each of the mitigation measures proposed in the Final SEIR to reduce or eliminate significant impacts resulting from the Project. Accordingly, in the event a mitigation measure recommended in the Final SEIR has inadvertently been omitted in these findings or the MMP, such mitigation measure is hereby adopted and incorporated in the findings below by reference. In addition, in the event the language describing a mitigation measure set forth in these findings or the MMP fails to accurately reflect the mitigation measures in the Final SEIR due to a clerical error, the language of the policies and implementation measures, as set forth in the Final SEIR shall control. The impact numbers and mitigation measure numbers used in these findings reflect the information contained in the Final SEIR.

A. Impacts Found to be Less Than Significant and Thus Requiring No Mitigation.

Under CEQA, no mitigation measures are required for impacts that are less than significant. (Pub. Resources Code, Section 21002; CEQA Guidelines, Section 15126.4, subd. (a)(3), 15091.) Based on substantial evidence in the whole record of this proceeding, the City Council finds that implementation of the projects will not result in any significant impacts in the following areas and that these impact areas, therefore, do not require mitigation.

Aesthetics, Light and Glare

4.1-5: The proposed projects could contribute to substantial cumulative degradation of the existing visual character or quality in the vicinity. (p. 4.1- 90)

4.1-7: The proposed projects could contribute to cumulative increases in light. (p. 4.1-95)
Air Quality

4.2-1: The proposed projects could conflict with or obstruct implementation of an applicable air quality plan. (p. 4.2-33)

4.2-4: The proposed projects could increase CO concentrations. (p. 4.2-58)

4.2-5: Implementation of the proposed project could result in short-term and long-term exposure to Toxic Air Contaminants (TACs). (p. 4.2-61) Resolution 2016-0379 November 10, 2016 Pa
ge 11 of 134

4.2-6: Implementation of the proposed projects could create objectionable odors. (p. 4.2-66)

4.2-10: The proposed projects could contribute to cumulative increases in CO concentrations. (p. 4.2-76)

4.2-11: The proposed projects would contribute to cumulative increases in short- and long-term exposures to Toxic Air Contaminants. (p. 4.2-78)

4.2-12: The proposed projects could contribute to cumulative changes in wind levels in downtown Sacramento. (p. 4.2-78)
Biological Resources

4.3-1: Development of the proposed projects could result in the loss of potential foraging habitat for Swainson’s hawk.(p. 4.3-38)

4.3-5: Development of the proposed projects could result in removal of habitat for the western pond turtle. (p. 4.3-57)

4.3-10: Implementation of the proposed projects, in combination with other cumulative development, could/would contribute to the cumulative loss of foraging habitat for Swainson’s hawk.(p. 4.3-70)

4.3-14: Implementation of the proposed project, in combination with other cumulative development, could/would contribute to the cumulative loss of habitat for the western pond turtle. (p. 4.3-75)

4.3-18: Implementation of the proposed projects, in combination with other cumulative development, could/would contribute to the cumulative loss of locally protected trees. (p. 4.3-79)
Cultural Resources

4.4-4: The proposed projects could cause a substantial adverse change to the I Street Bridge. (p. 4.4-69)
Resolution 2016-0379 November 10, 2016 Pa ge 12 of 134

4.4-5: The proposed projects could cause a substantial adverse change in the significance of historic resources outside of the Central Shops, specifically the remnant portion of the Pioneer/Sperry Grain Mill, California State Landmark 780 the First Transcontinental Railroad, and the Sacramento River Levees. (p. 4.4-70)

4.4-6: The proposed projects could cause a substantial adverse change in the significance of the Alkali Flat West and North Historic Districts. (p. 4.4- 73)
Energy Demand and Conservation

4.5-1: The proposed project would increase demand for energy, specifically electricity and natural gas, the construction of which could cause significant environmental effects. (p. 4.5-11)

4.5-2: The proposed projects could result in the wasteful, inefficient, or unnecessary use of energy. (p. 4.5-17)

4.5-3: The proposed project would contribute to cumulative increases in demand for energy. (p. 4.5-23)
Geology, Soils, and Seismicity

4.6-1: The proposed projects could expose people and structures to seismic hazards, such as groundshaking and liquefaction. (p. 4.6-21)

4.6-3: The proposed projects could cause erosion or the loss of topsoil during construction or operation. (p. 4.6-27)

4.6-4: The proposed projects could expose people or structures to unstable soil conditions, including expansive soils and subsidence. (p. 4.6-29)

4.6-5: The proposed projects could contribute to cumulative increases in the number of people exposed to seismic and geologic risks. (p. 4.6-36)

4.6-6: The proposed projects could contribute to cumulative increases in erosion within the Sacramento watershed. (p. 4.6-37)
Resolution 2016-0379 November 10, 2016 Pa ge 13 of 134
Global Climate Change

4.7-1: Implementation of the proposed projects could conflict with the City of Sacramento’s Climate Action Plan.(p. 4.7-15)
Hazards and Hazardous Materials

4.8-2: Renovation of Central Shop buildings could expose people to asbestos-containing materials, lead-based paint and/or other hazardous materials. (p. 4.8-43)

4.8-5: Occupancy of the proposed projects could increase the use of hazardous substances during occupancy. (p. 4.8-58)

4.8-6: Development of the proposed projects would bring new occupants or visitors in proximity to hazardous substances transportation routes, such as I-5 and the UPRR rail lines. (p. 4.8-63)

4.8-10: The proposed projects could contribute to cumulative risk of exposure of people due to inadvertent or accidental releases of hazardous substances transported on local or regional roadways or rail lines. (p. 4.8- 75)
Hydrology and Water Quality

4.9-1: The proposed projects could degrade water quality during construction. (p. 4.9-22)

4.9-2: Operation of the proposed projects could generate new sources of polluted runoff. (p. 4.9-26)

4.9-3: The proposed projects could expose people or property to an increased risk of flood hazards. (p. 4.9-29)

4.9-4: The proposed projects could adversely affect groundwater supplies, groundwater quality and/or interfere with groundwater recharge. (p. 4.9-32) Resolution 2016-0379 November 10, 2016 Pa ge 14 of 134

4.9-5: The proposed projects would contribute to the cumulative degradation of water quality. (p. 4.9-34)

4.9-6: The proposed projects could contribute to cumulative increases in the risk of flooding. (p. 4.9-35)

4.9-7: The proposed projects could contribute to cumulative impact on groundwater supplies, quality, and recharge. (p. 4.9-36) Noise and Vibration

4.10-8: The proposed projects would contribute to cumulative increases in traffic and rail noise levels. (p. 4.10-72)
Public Services

4.11-1: The proposed projects would increase demand for police protection services within the City of Sacramento. (p. 4.11-7)

4.11-2: The proposed projects would contribute to cumulative increase in demand for police protection services within the Central City. (p. 4.11-11)

4.11-3: The proposed projects would increase the demand for fire protection services. (p. 4.11-20)

4.11-4: The proposed projects would contribute to cumulative increases in demand for fire protection services within the Central City. (p. 4.11-23)

4.11-5: The proposed projects would generate additional students in Sacramento City Unified School District and Twin Rivers Unified School District. (p. 4.11-35)

4.11-7: The proposed projects would contribute to the cumulative increases in student enrollment in the Sacramento City Unified School District and the Twin Rivers Unified School District. (p. 4.11-41)
Resolution 2016-0379 November 10, 2016 Pa
ge 15 of 134

4.11-10: The proposed projects could result in an increased demand for library services. (p. 4.11-64)

4.11-11: The proposed projects would contribute to the cumulative increase in demand for library services in the City of Sacramento. (p. 4.11-65) Transportation

4.12-4: The proposed projects could adversely affect public transit operations or fail to adequately provide access to transit. (p. 4.12-212)

4.12-5: The proposed projects could adversely affect existing or planned bicycle facilities or fail to provide for access by bicycle. (p. 4.12-214)

4.12-11: The proposed projects could adversely affect public transit operations or fail to adequately provide access to transit under cumulative conditions. (p. 4.12-227)

4.12-12: The proposed projects could adversely affect existing or planned bicycle facilities or fail to provide for access by bicycle under cumulative conditions. (p. 4.12-228)
Utilities

4.13-1: The proposed projects would increase demand for wastewater treatment. (p. 4.13-12)

4.13-2: The proposed projects would increase flows to the City’s combined sewer system. (p. 4.13-15)

4.13-3: The proposed projects would contribute to cumulative increases in flows within the CSS. (p. 4.13-18)

4.13-4: The proposed projects would contribute to cumulative increases in wastewater requiring treatment at the SRWWTP. (p. 4.13-19) Resolution 2016-0379 November 10, 2016 Pa ge 16 of 134

4.13-5: The proposed projects could increase demand for potable water. (p.

4.13-37)

4.13-6: The proposed projects could increase demand for treated water and water distribution systems. (p. 4.13-39)

4.13-8: The proposed projects would contribute to cumulative increases in demand for water conveyance. (p. 4.13-47)

4.13-9: The proposed projects would generate additional solid waste. (p.

4.13-57)

4.13-10: The proposed project would contribute to cumulative increases in solid waste. (p. 4.13-60)
B. Significant or Potentially Signif icant Impacts Mitigated to a Less Than Significant Level.

The following significant and potentially significant environmental impacts of the projects, including cumulative impacts, are being mitigated to a less-than- significant level and are set out below. Pursuant to Section 21081(a)(1) of CEQA and Section 15091(a)(1) of the CEQA Guidelines, as to each such impact, the City Council, based on the evidence in the record before it, finds that changes or alterations incorporated into the projects by means of conditions or otherwise, mitigate, avoid or substantially lessen to a level of insignificance these significant or potentially significant environmental impacts of the projects. The basis for the finding for each identified impact is set forth below.

Aesthetics, Light and Glare

4.1-1: The implementation of the RSPU, including the potential development of large-floor plate and high-rise buildings in the RSP Area east of I-5, could alter public views. (p. 4.1-59)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.1-1 (RSPU)
Within Lot 46, the maximum street-wall height for structures facing 7th Street shall be 35 feet in height.

Resolution 2016-0379 November 10, 2016 Pa ge 17 of 134
Finding: Implementation of Mitigation Measure 4.1-1 would ensure that the street-wall height of development on Lot 46 facing 7th Street between F Street and the UPRR tracks would be no greater than 35 feet, which would ensure an appropriate visual transition from the intensity of development in the RSP Area to the adjacent properties in the Alkali Flat neighborhood. Such a street-wall height would also protect against significant increases in after shading and reductions in sky access.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.1-2: The potential development of high-rise buildings adjacent to the riverfront could conflict with the character of the riverfront between Old Sacramento and the Jibboom Street Bridge. (p. 4.1-74)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.1-2 (RSPU)
For development within the allowable footprints on Lot 35, the following base height, bulk and massing requirements shall be added to the RSPU Design Guidelines and enforced through the SPD and the City’s Site Plan and Design Review permit process:
• On the southern development lot, any portion of a building within 80 feet of the required setback from the riverbank shall be no greater than 35 feet in height.

Finding: Implementation of Mitigation Measure 4.1-2 would ensure a building height step down toward the Sacramento River to create a development edge similar in scale to other built environment on the east bank of the River between Old Sacramento and the Jibboom Street Bridge.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.1-4: The proposed projects could create a new source of glare. (p. 4.1-85) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.1-4 (RSPU)
Highly reflective mirrored glass walls shall not be used as a primary building material (no more than 35 percent) for building facades adjacent Resolution 2016-0379 November 10, 2016 Pa ge 18 of 134
to major roadways. Instead, low emission (Low-E) glass shall be used in order to reduce the reflective qualities of the building, while maintaining energy efficiency.

Finding: Implementation of Mitigation Measure 4.1-4 would substantially lessen and avoid potential glare impacts by limiting the permitted construction materials of new buildings to non-reflective materials.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.1-6: The proposed projects could cause an introduction of building height and mass that conflicts with the character of the Sacramento River riverfront between Old Sacramento and Discovery Park. (p. 4.1-93) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.1-6 (RSPU)
Implement Mitigation Measure 4.1-2.

Finding: Implementation of Mitigation Measure 4.1-6 would ensure a building height step down toward the Sacramento River to create a development edge that would be similar in scale to other built environment on the east bank of the Sacramento River between Old Sacramento and the Jibboom Street Bridge.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.1-8: The proposed projects could contribute to cumulative sources of glare. (p. 4.1-97)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.1-8 (RSPU)
Implement Mitigation Measure 4.1-4.

Finding: Implementation of Mitigation Measure 4.1-8 would substantially lessen and avoid potential glare impacts of the proposed RSPU by limiting the permitted construction materials of new buildings to non-reflective materials.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

Resolution 2016-0379 November 10, 2016 Pa ge 19 of 134
Air Quality

4.2-2: Construction of the proposed projects could result in short-term emissions of NOx, PM10 and PM2.5. (p. 4.2-39)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.2-2(a) (RSPU, KPMC, MLS, SO)
City approval of any grading or improvement plans shall include the following SMAQMD Basic Construction Emission Control Practices:
• All exposed surfaces shall be watered two times daily. Exposed surfaces include, but are not limited to soil piles, graded areas, unpaved parking areas, staging areas, and access roads. • Cover or maintain at least two feet of free board space on haul trucks transporting soil, sand, or other loose material on the site.

Any haul trucks that would be traveling along freeways or major roadways shall be covered.
• Use wet power vacuum street sweepers to remove any visible trackout mud or dirt onto adjacent public roads at least once a day.

Use of dry power sweeping is prohibited.
• Limit vehicle speeds on unpaved roads to 15 miles per hour. • All roadways, driveways, sidewalks, parking lots shall be paved as soon as possible. In addition, building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. • Minimize idling time either by shutting equipment off when not in use or reducing the time of idling to 5 minutes (as required by the state airborne toxics control measure [Title 13, Section 2485 of the California Code of Regulations]). Provide clear signage that posts this requirement for workers at the entrances to the site. • Maintain all construction equipment in proper working condition according to manufacturer’s specifications. The equipment shall be checked by a certified mechanic and determine to be running in proper condition before it is operated.

4.2-2(b) (RSPU, KPMC, MLS, SO)
City approval of any grading or improvement plans shall include the following SMAQMD Enhanced Exhaust Control Practices, including:

Resolution 2016-0379 November 10, 2016 Pa
ge 20 of 134
• Provide a comprehensive inventory of all off-road construction equipment, equal to or greater than 50 horsepower, that will be used an aggregate of 40 or more hours during any portion of the Proposed Project to the City and the SMAQMD. The inventory shall include the horsepower rating, engine model year, and projected hours of use for each piece of equipment. The construction contractor shall provide the anticipated construction timeline including start date, and name and phone number of the project manager and on-site foreman. This information shall be submitted at least 4 business days prior to the use of subject heavy-duty off- road equipment. The inventory shall be updated and submitted monthly throughout the duration of the Proposed Project, except that an inventory shall not be required for any 30-day period in which no construction activity occurs.
• Provide a plan in conjunction with the equipment inventory, approved by the SMAQMD, demonstrating that the heavy-duty (50 horsepower or more) off-road vehicles to be used in the construction project, including owned, leased, and subcontractor vehicles, will achieve a project wide fleet-average 20% NOx reduction and 45% particulate reduction compared to the most recent CARB fleet average. Acceptable options for reducing emissions may include use of late model engines, low-emission diesel products, alternative fuels, engine retrofit technology, after- treatment products, and/or other options as they become available. • Emissions from all off-road diesel powered equipment used on the project site shall not exceed 40% opacity for more than three minutes in any one hour. Any equipment found to exceed 40 percent opacity (or Ringelmann 2.0) shall be repaired immediately, and the City and SMAQMD shall be notified within 48 hours of identification of non-compliant equipment. A visual survey of all in- operation equipment shall be made at least weekly, and a monthly summary of the visual survey results shall be submitted throughout the duration of the project, except that the monthly summary shall not be required for any 30-day period in which no construction activity occurs. The monthly summary shall include the quantity and type of vehicles surveyed as well as the dates of each survey. The SMAQMD and/or other officials may conduct periodic site inspections to determine compliance. Nothing in this measure shall supersede other SMAQMD or state rules or regulations.
• If at the time of granting of each building permit, the SMAQMD has adopted a regulation applicable to construction emissions, compliance with the regulation may completely or partially replace this mitigation. Consultation with the SMAQMD prior to construction will be necessary to make this determination.

Resolution 2016-0379 November 10, 2016 Pa
ge 21 of 134

4.2-2(c) (RSPU, KPMC, MLS, SO)
City approval of any grading or improvement plans shall include the following SMAQMD Fugitive Dust Control Practices:
• Water exposed soil with adequate frequency for continued moist soil.
• Suspend excavation, grading, and/or demolition activity when wind speeds exceed 20 mph.
• Install wind breaks (e.g., plant trees, solid fencing) on windward side(s) of construction areas.
• Plant vegetative ground cover (fast-germinating native grass seed) in disturbed areas as soon as possible. Water appropriately until vegetation is established.
• Install wheel washers for all exiting trucks, or wash off all trucks and equipment leaving the site.
• Treat site accesses to a distance of 100 feet from the paved road with a 6 to 12-inch layer of wood chips, mulch, or gravel to reduce generation of road dust and road dust carryout onto public roads. • Post a publicly visible sign with the telephone number and person to contact at the lead agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The phone number of the District shall also be visible to ensure compliance.

4.2-2(d) (RSPU)
The project applicants shall pay into the SMAQMD’s construction mitigation fund to offset construction-generated emissions of NOx that exceed SMAQMD’s daily emission threshold of 85 lbs/day. Fees shall be paid to SMAQMD based upon the previously agreed upon Railyards Specific Plan fee of $2,603 per acre developed.

Finding: With implementation of the above mitigation measures, fugitive dust would be controlled, exhaust emissions would be reduced on-site, and mitigation fees would be provided to SMAQMD for project NOx emissions that exceed the SMAQMD significance threshold. SMAQMD uses the fees to fund off-site projects and programs that would offset the project’s NOx emissions.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

Resolution 2016-0379 November 10, 2016 Pa ge 22 of 134

4.2-7: Implementation of the proposed projects could alter wind speed at ground level (pedestrian level). (p. 4.2-67)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.2-7 (RSPU, KPMC)
The following measures are recommended to assure that future buildings developed in the RSP Area do not cause hazardous wind conditions for pedestrians in areas of substantial public use:
1) New buildings with heights of more than 85-feet shall be evaluated by a qualified wind expert to determine the potential to cause a new wind hazard or aggravate an existing wind hazard for pedestrians in areas of substantial public use. Based on a review of wind conditions, other development in the vicinity, and the project design, the evaluator may have sufficient evidence to form a professional opinion about the potential for the project to cause a hazardous wind environment. If sufficient evidence is available to conclude that no wind hazards will be created, no further mitigation is required. If sufficient evidence to establish safe pedestrian conditions is not available, the City shall require wind-tunnel testing to provide the evidence that a wind hazard would not result in public areas.
2) If required wind tunnel testing iden tifies wind hazards, the qualified wind expert shall work with the City and/or project proponent to develop corrective measures such as building design changes, protective structures, or landscaping modifications to help reduce pedestrian-level wind speeds to acceptable levels. The City shall require implementation of such corrective measures as a condition of the building permit.

Finding: Implementation of Mitigation Measure 4.2-7 would substantially lessen and avoid potential wind impacts by establishing protocols that would require building design to be tested and revised, to minimize impacts of new buildings.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.2-8: The proposed projects could contribute to cumulative sources of glare. (p. 4.2-75)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

Resolution 2016-0379 November 10, 2016 Pa ge 23 of 134

4.2-8 (RSPU, KPMC, MLS, SO)
Implement Mitigation Measure 4.2-2.

Finding: With implementation of the above mitigation measure for the proposed project, exhaust emissions would be reduced onsite and mitigation fees would be provided to SMAQMD to offset project NOx emissions that exceed the SMAQMD significance threshold. SMAQMD uses these fees to fund off-site projects that would offset the project’s NOx emissions. Although cumulative NOX emissions in the SVAB would be significant due to existing violations in the region, with implementation of Mitigation Measure 4.2-2 the proposed projects’ contributions would be reduced to a level that would result in a less-than- considerable contribution to the significant cumulative impact.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

Biological Resources

4.3-3: The proposed projects could result in impacts to special-status fish species and degradation of designated critical habitat. (p. 4.3-46) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.3-3 (SO)
To avoid, minimize, or compensate for potential impacts to protected and sensitive riverine species and critical habitat, and prevent impacts to special-status fish species the following actions shall be undertaken by the project applicant:
1) Unless prior approval is granted by NMFS, USFWS, and/or CDFW, (as applicable) in-water work shall be restricted to the August 1 to October 31 period to avoid/minimize construction impacts to special-status fish species.
2) Project-related impacts to riverine (e.g., valley-foothill) riparian vegetation shall be minimized by replacing lost vegetation onsite at a minimum ratio of 1:1, along the Sacramento River, if feasible.

Mitigation and/or restoration plans for all habitats that require revegetation, habitat creation, restoration, and enhancement shall be approved by the regulatory agencies, as applicable, and shall include construction specifications; irrigation schedules; planting palettes (showing container stock/box plantings, cutting specifications, and seed mixes); monitoring, maintenance, and remediation schedules; Resolution 2016-0379 November 10, 2016 Pa
ge 24 of 134
and success criteria, assurances and contingency measures.

Revegetation specifications, species composition and density shall be developed by an experienced restor ation ecologist. The restoration sites shall be evaluated to ensure that required revegetation has been performed in areas where temporary construction has been completed.

A report documenting restoration efforts shall be submitted by the applicant to the City and applicable regulatory agencies. If necessary, remedial revegetation should occur during the same rainy season that the remedial recommendation is made. Restoration sites shall be monitored by qualified restoration ecologists for three to five years, or until success criteria are achieved. Restoration plans shall be included in the final construction documents. Grading and revegetation activities shall comply with applicable regulations and mitigation measures identified in this EIR pertaining to dust, air emissions, noise, water quality and other potential environmental effects. Alternatively, if approved by regulatory agencies, the applicant may purchase mitigation credits from approved mitigation banks. Final mitigation ratios and locations are to be established in consultation with the regulatory agencies prior to riverbed disturbing activities and detailed mitigation requirements will be identified in the final regulatory agency permits.
3) To the extent feasible, the project applicant shall plant riparian vegetation and install biotechnical features, such as brush piles, logs, and root wads, to replace habitat impacted by construction of the outfall structure. These structures shall compensate for potential impacts associated with increased predation around the new structure.

Specific measures shall include elements that contribute to nearshore cover in the immediate vicinity of the structure to increase the potential for juvenile fish while discouraging occupancy of the same structures by predaceous species. The precise amount and relative value of affected riparian and cover habitat would be determined during project- level analysis of proposed activities.
4) Mitigation of riverine habitat would occur through creation, restoration, enhancement, and/or preservation of this habitat type within an approved off-site location and/or mitigation bank at a ratio to be established in consultation with the regulatory agencies. Mitigation banking would involve using mitigation credits from mitigation banks approved by the regulatory agencies. Final mitigation ratios and locations are to be established in consultation with the regulatory agencies prior to riverbed disturbing activities and detailed mitigation requirements will be identified in the final regulatory agency permits. 5) The cofferdam sheetpiles at the outfall structure construction site shall be installed using a vibratory hammer where possible to minimize underwater sound pressure levels to the greatest extent feasible and Resolution 2016-0379 November 10, 2016 Pa
ge 25 of 134
associated effects to sensitive fish species. If impact pile driving is required, sound pressure levels shall be managed (through operational controls) to achieve single-strike sound levels less than 206 dB peak (dBpeak) and 183 dB sound exposure level (dBSEL) measured at a distance of 10 meters. Additionally, pile driving shall only be conducted during daytime hours (allowing for regular periods of no impact) and shall commence at low-energy levels and slowly build to impact force (allowing for fish to move away from the construction site).

The project applicant shall also consult with NMFS, USFWS, and CDFW (as part of obtaining permit approvals, e.g., FESA Section 7 and Fish and Game Code Section 1600) to determine necessary impact minimization actions, which may include surveying the outfall site to determine fish presence prior to installation. The project applicant shall implement any additional measures developed through the FESA Section 7 and Fish and Game Code Section 1600 permit processes, to ensure that impacts are avoided and/or minimized. 6) To reduce the potential for fish stranding or minimize the potential for harm during cofferdam dewatering activities, the project applicant or its contractor shall implement a fish rescue plan. Prior to the closure of the cofferdam in the Sacramento River, seining by a qualified fisheries biologist will be conducted within the cofferdam using a small-mesh seine to direct and move fish out of the cofferdam area. Upon completion of seining, the entrance to the cofferdam will be blocked with a net to prevent fish from entering the cofferdam isolation area before the cofferdam is completed. Once the cofferdam is completed and the area within the cofferdam is closed and isolated, additional seining will be conducted within the cofferdam to remove any remaining fish. Once most of the fish have been removed from the isolated area, portable pumps with intakes equipped with 1.75 mm mesh screen shall be used to dewater to a depth of 1.5-2 feet. A qualified biologist shall implement further fish rescue operations using electrofishing and dip nets. All fish that are captured will be placed in clean 5-gallon buckets and/or coolers filled with Sacramento River water, transported downstream of the construction area, and released back into suitable habitat in the Sacramento River with minimal handling. After all fish have been removed using multiple seine passes, electrofishing, and dip nets (as necessary), portable pumps with screens (see above) will be used for final dewatering. NMFS, USFWS, and CDFW shall be notified at least 48 hours prior to the fish rescue.

Finding: In addition to previously discussed restrictions and requirements such as compliance with the SWPPP and implementation of BMPs, implementation of Mitigation Measures 4.3-3(a) through 4.3-3(f) would restrict in- water work to periods when species are least likely to be present, replace (through restoration, preservation or credit purchase) permanently impacted Resolution 2016-0379 November 10, 2016 Pa ge 26 of 134
habitat, and minimize effects associated with pile driving and dewatering. This, in combination with compliance with the FESA, CWA Regulations, National Pollution Discharge Elimination System (NPDES) Regulations, CVRWQCB and City water quality standards and runoff standards would reduce this impact to less than significant.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.3-4: Development of the proposed projects could result in removal of habitat for the Valley Elderberry Longhorn Beetle. (p. 4.3-55) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.3-4 (RSPU)
(1) Prior to construction within the RSP Area, the site shall be surveyed for the presence of the valley elderberry longhorn beetle and its elderberry host plant by a qualified biologist in accordance with USFWS protocols. If elderberry plants with one or more stems measuring 1.0 inch or greater in diameter at ground level occur on or adjacent to the project site, or are otherwise located where they may be directly or indirectly affected by the proposed project, minimization and compensation measures, which include transplanting existing shrubs and planting replacement habitat (conservation plantings), are required (see below). Surveys are valid for a period of two years. Elderberry plants with no stems measuring1.0 inch or greater in diameter at ground level are unlikely to be habitat for the beetle because of their small size and/or immaturity. Therefore, no minimization measures are required for removal of elderberry plants with all stems measuring 1.0 inch or less in diameter at ground level.
(2) For shrubs with stems measuring 1.0 inch or greater, the City shall ensure that elderberry shrubs within 100 feet of proposed development be protected and/or compensated for in accordance with the “U.S. Fish and Wildlife Services’ (USFWS) Conservation Guidelines for the Valley Elderberry Longhorn Beetle and the Programmatic Formal
Consultation Permitting Projects with Relatively Small Effects on the Valley Elderberry Longhorn Beetle Within the Jurisdiction of the Sacramento Field Office.”
Finding: With the implementation of Mitigation Measure 4.3-4, elderberry shrubs would be identified and protected and any shrubs that require removal would be compensated for. As a result, the proposed RSPU, including Land Use Variant, would not cause a reduction in VELB habitat.

Resolution 2016-0379 November 10, 2016 Pa ge 27 of 134
With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.3-6: Development of the proposed projects could result in impacts to bat species. (p. 4.3-59)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.3-6 (RSPU, SO)
Minimize potential adverse effects to bat species.

Vegetation removal, including tree removal, shall be conducted between September 16 and January 31, to the extent feasible, to minimize the potential loss of bat maternity roosts.

The applicant shall conduct pre-construction surveys for roost sites prior to construction activities within 100 feet of the I-5, I Street Bridge, and riparian habitat along the Sacramento River during the bat pupping season (April 1 through July 31). This survey shall be conducted by a wildlife biologist qualified to identify bat species. If no bats are roosting, then no further mitigation is required.

If a bat maternity roost is identified, buffers around the roost site shall be determined by a qualified biologist and implemented to avoid destruction or abandonment of the roost resulting from tree removal or other project activities.

Finding: Implementation of Mitigation Measures 4.3-6 would require pre- construction surveys to identify any maternity roosting sites within 100 feet of project activities, and if found, observance of no-disturbance zones around those sites.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.3-7: Development of the proposed projects could result in net reduction of sensitive habitats including protected wetland habitat as defined in Section 404 of the Clean Water Act, riparian vegetation, and state jurisdictional waters/wetlands. (p. 4.3-62)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.3-7 (SO)
Resolution 2016-0379 November 10, 2016 Pa ge 28 of 134
If the applicant shall prepare a wetland and riparian mitigation plan that ensures no net loss of waters of the U.S. and riparian vegetation. The wetland and riparian mitigation plan shall be based on a wetland delineation verified by USACE. This measure may be implemented through the 404 permit and Streambed Alteration Agreement process. The plan shall include the following:
1) The project proponent shall compensate for the loss of wetland and riparian habitat through a combination of restoration/enhancement, and the purchase of mitigation credits at an approved mitigation bank. The ratio of compensation shall be determined in consultation with USACE and California Department of Fish and Wildlife (CDFW), as part of the 404 permit and Streambed Alteration Agreement process, but shall not be less than 1:1.
2) Prior to any construction activities on the site, a protective fence shall be erected around the boundaries of areas that would be disturbed by construction. This fence shall remain in place until all construction activity in the immediate area is completed. No activity shall be permitted within the protected areas except for those expressly permitted by USACE and/or CDFW.
3) Water quality in the Sacramento River shall be protected using erosion control techniques during construction including, but not necessarily limited to, preservation of existing vegetation, mulches (e.g., hydraulic, straw, wood), and geotextiles and mats, during construction.

Finding: Implementation of Mitigation Measure 4.3-7 would mitigate impacts to the Sacramento River and riparian habitat within the RSP Area, specifically, the proposed Stormwater Outfall site. This would occur through a combination of restoration/enhancement, and/or purchase of restoration credits. By ensuring that the proposed RSPU and Stormwater Outfall achieve no net loss of waters of the U.S. or riparian habitat, this impact would be reduced to a less-than-significant level.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.3-8: Development of the proposed projects could result in isolation or interruption of contiguous habitat which would interfere substantially with the movement of resident or migratory fish or wildlife species, migratory corridors, or impede the use of native wildlife nursery sites. (p. 4.3-65) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

Resolution 2016-0379 November 10, 2016 Pa ge 29 of 134

4.3-8 (RSPU, KPMC, SO)
The applicant shall reduce spillover lighting from the proposed project onto the Sacramento River by implementing the following:

The applicant shall place structural barriers to screen automobile headlights that are directed perpendicular to the river shall be screened along the western project edge. This may be accomplished through the placement of a 3-4 foot vegetated hedge or other structural methods that would not additionally hinder wildlife movement through riverine riparian vegetation.

Outdoor lighting within the RSP Area west of I-5 shall be of the minimum wattage required for the particular use and shall be directed to the specific location intended for illumination (e.g., roads, walkways, or recreation fields) to prevent stray light spillover onto sensitive riverine habitat.

All fixtures on elevated light standards within the RSP Area west of I-5, such as in parking lots or along roadways, shall be shielded to reduce direct exposure to the Sacramento River.

Finding: Implementation of Mitigation Measure 4.3-8 would provide mechanisms to reduce potential night lighting impacts by ensuring no lighting is directed towards the river, and light spillover is minimized in areas within portions of the RSP Area west of I-5, which would reduce impacts to movements of fish species to less than significant.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.3-9: Development of the proposed projects could conflict with local policies protecting trees. (p. 4.3-68)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.3-9 (RSPU, KPMC, MLS, SO)
All tree removal within the RSP Area shall comply with the current City of Sacramento tree protection ordinance. The applicant shall implement mitigation measures to protect retained trees, and replace for the loss of tree resources (tree protection and replacement measures shall be determined in consultation with the City).

Finding: Implementation of Mitigation Measure 4.3-9 would reduce this impact to a less-than-significant level through compliance with the City’s established requirements to avoid or mitigate for the loss of protected trees.

Resolution 2016-0379 November 10, 2016 Pa ge 30 of 134
With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.3-12: Implementation of the proposed projects, in combination with other cumulative development, could/would contribute to cumulative impacts to special-status fish species and degradation of designated critical habitat. (p. 4.3-74)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.3-12 (SO)
Implement Mitigation Measure 4.3-2(a) through 4.3-2(f).

Finding: Implementation of Mitigation Measure 4.3-12 would restrict in-water work to periods when species are least likely to be present, replace (through restoration, preservation or credit purchase) permanently impacted habitat, implement BMPs to prevent substantial increases in sedimentation and turbidity, and the release and exposure of contaminants, and minimize effects associated with pile driving and dewatering. This, in combination with compliance with the CESA and FESA, CWA regulations, NPDES regulations, CVRWQCB and City water quality standards and runoff standards would reduce the proposed RSPU’s contribution to the regional cumulative impact to a less-than-considerable level and this would be a less-than-significant impact.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.3-13: Implementation of the proposed project, in combination with other cumulative development, could/would contribute to the cumulative loss of habitat for the Valley Elderberry Longhorn Beetle. (p. 4.3-75) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.3-13 (RSPU)
Implement Mitigation Measure 4.3-4.

Finding: With the implementation of Mitigation Measure 4.3-13 and compliance with applicable federal, State, and local policies and regulations, elderberry shrubs would be identified and protected and any shrubs that require removal would be compensated for. As a result, the proposed RSPU, including Land Use Variant, would not cause a reduction in VELB habitat and the proposed Resolution 2016-0379 November 10, 2016 Pa ge 31 of 134
RSPU’s contribution to the regional cumulative impact on VELB and their habitat would be less than significant.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.3-15: Implementation of the proposed projects, in combination with other cumulative development, could/would contribute to the cumulative loss of habitat, or impacts to for bat species. (p. 4.3-76)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.3-15 (RSPU, SO)
Implement Mitigation Measure 4.3-6.

Finding: With the implementation of Mitigation Measure 4.3-15, pre- construction surveys would be required to identify any maternity roosting sites within 100 feet of project activities, and if found, observance of no-disturbance zones around those sites. In combination with CDFW riparian vegetation mitigation requirements, the proposed projects’ contribution to cumulative impact on bat species within Sacramento County would be reduced. Project-related disturbance to bat species would not result in a considerable contribution to the cumulative loss of bats within Sacramento County.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.3-16: Implementation of the proposed projects, in combination with other cumulative development, could/would contribute to the cumulative loss of sensitive habitats including protected wetland habitat as defined in Section 404 of the Clean Water Act, riparian vegetation, and state jurisdictional waters/wetlands. (p. 4.3-77)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.3-16 (SO)
Implement Mitigation Measure 4.3-7.

Finding: Implementation of Mitigation Measures 4.3-16 would mitigate impacts to the Sacramento River and riparian habitat within the proposed Stormwater Outfall site. This would occur through a combination of restoration/enhancement, and/or purchase of restoration credits to ensure no net Resolution 2016-0379 November 10, 2016 Pa ge 32 of 134
loss. By ensuring that the proposed RSPU and Stormwater Outfall achieves no net loss of waters of the U.S. or riparian habitat, the projects’ cumulativeimpact would be reduced to a less-than-significant level.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.3-17: Implementation of the proposed projects, in combination with other cumulative development, could/would contribute to the cumulative isolation or interruption of contiguous habitat which would interfere substantially with the movement of resident or migratory fish or wildlife species, migratory corridors, or impede the use of native wildlife nursery sites. (p. 4.3-78)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.3-17 (RSPU, SO)
Implement Mitigation Measure 4.3-8.

Finding: With the implementation of Mitigation Measure 4.3-8, light spillover would be minimized in areas within portions of the RSP Area west of I-5, and no lighting would be directed towards the river, which would reduce impacts to riverine habitat and associated movements of fish species. Therefore, project impacts resulting from lighting into the Sacramento River would not contribute considerably to the cumulative loss of migratory habitat within the Sacramento River and this impact would be less than significant.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

Cultural Resources

4.4-1: The proposed projects could cause a substantial adverse change in the significance of an archaeological resource, including human remains. (p. 4.4-54)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.4-1(a) (RSPU ASAs)
i. Prior to any ground-disturbing activity in Archaeologically Sensitive Areas (ASAs), a focused Archaeological Testing Plan (ATP) shall Resolution 2016-0379 November 10, 2016 Pa ge 33 of 134
be prepared and implemented to determine the presence/absence of archaeological resources and to assess their eligibility to the CRHR. The ATP shall be reviewed and approved by the
Preservation Director prior to implementation. An example outline of the ATP is included in Appendix E of this Draft SEIR. ii. If the testing program identifies CRHR-eligible archaeological resources, an Archaeological Mitigation Plan shall be prepared and implemented.
iii. Based upon the results of test ex cavations, it may be necessary to conduct archaeological monitoring in some areas. In these areas, an Archaeological Monitoring Plan shall be prepared and implemented to ensure appropriate identification and treatment of anticipated archaeological resources, if any are discovered during grading or construction activities. At a minimum, the Monitoring Plan shall include provisions to result in the cessation of activities upon discovery, evaluation of such resources for historic significance, and if the resource is significant, appropriate treatment based on recommendations of a qualified archaeologist.

Appropriate treatment shall include protection of the resource from further damage, and one of the following, as appropriate:
(1) preservation in place; (2) return of the resource to the most likely descendent (MLD) (if determined to be of Native American origin), (3) curation in an appropriate location or facility, and/or (4) recordation. The City Preservation Director shall approve the Archaeological Monitoring Plan prior to implementation. An example outline of an Archaeological Monitoring Plan is included in Appendix E of this Draft SEIR.
iv. Prior to construction activities, an archaeologist will lead an in-field tailgate training session for project construction crews on the kinds and types of resources that may be present, and give plans for actions of work stoppage to occur should archeological features be encountered.

4.4-1(b) (RSPU, footprint of the northern levee embankment only) Within the current footprint of the northern levee embankment, prior to ground-disturbing activities that are anticipated to extend below the level of North B Street (e.g., excavation below the base of the extant levee embankment), an Archaeological Monitoring Plan shall be prepared and implemented to ensure appropriate identification and treatment of anticipated archaeological resources, if any are discovered during grading or construction activities. In the event of inadvertent discovery of a potential archaeological resource or human remains, Mitigation Measure

4.4-1(c) will be implemented.

Resolution 2016-0379 November 10, 2016 Pa
ge 34 of 134

4.4-1(c) (RSPU, KPMC, MLS, SO)
In the event that unanticipated archaeological resources or human remains are encountered, compliance with federal and state regulations and guidelines regarding the treatment of cultural resources and human remains shall be required. The following details the procedures to be followed in the event that new cultural resource sites or human remains are discovered.
i. If a monitoring archaeologist or a member of the construction team believes that an archaeological resource has inadvertently been uncovered, all work adjacent to the discovery shall cease, and an SOI qualified archaeologist immediately notified. Appropriate steps shall be taken, as directed by the archaeologist, to protect the discovery site. The area of work stoppage will be adequate to provide for the security, protection, and integrity of the archaeological resources in accordance with Federal and State Law. At a minimum the area will be secured to a distance of 50 feet from the discovery. Vehicles, equipment, and unauthorized personnel shall not be permitted to traverse the discovery site. The archaeologist shall conduct a field investigation and assess the significance of the find. Impacts to cultural resources shall be lessened to a less-than-significant level through data recovery or other methods determined adequate by the archaeologist and consistent with the Secretary of the Interior's Standards for Archaeological Documentation. All identified cultural resources shall be recorded on the appropriate DPR 523 (A-L) form and filed with the North Central Information Center.
ii. If human remains are discovered at the project construction site during any phase of construction, all ground-disturbing activity within 50 feet of the resources shall be halted and the County Coroner shall be notified immediately, according to Section 5097.98 of the State Public Resources Code and Section 7050.5 of California’s Health and Safety Code. If the remains are determined by the County Coroner to be Native American, the Native American Heritage Commission (NAHC) shall be notified within 24 hours, and the guidelines of the NAHC shall be adhered to in the treatment and disposition of the remains. If the remains are determined to be Chinese, or any other ethnic group, the appropriate local organization affiliated with that group shall be contacted and all reasonable effort shall be made to identify the remains and determine and contact the most likely descendant. The approved mitigation shall be implemented before the resumption of ground- disturbing activities within 50 feet of where the remains were discovered.

Resolution 2016-0379 November 10, 2016 Pa
ge 35 of 134
If the remains are of Native American origin, the landowner or the landowner’s representative shall contact the Native American Heritage Commission to identify the Most Likely Descendant. That individual shall be asked to make a recommendation to the landowner for treating or disposing of, with appropriate dignity, the human remains and any associated grave goods as provided in Public Resources Code Section 5097.98.

If the Most Likely Descendant fails to make a recommendation or the landowner or his or her authorized representative rejects the recommendation of the descendant, and if mediation by the Native American Heritage Commission fails to provide measures
acceptable to the landowner, then the landowner or authorized representative shall rebury the Native American human remains and associated grave goods with appropriate dignity on the property in a location not subject to further subsurface disturbance.

4.4-1(d) (SO)
The title to all abandoned shipwrecks, archaeological sites, and historic or cultural resources on or in the tide and submerged lands of California is vested in the State and under the jurisdiction of the California State Lands Commission (CSLC) (PRC Section 6313[a]). In the case of an inadvertent discovery of a submerged shipwreck or related artifacts, all work must cease in the immediate vicinity of the find and the lead agency’s archaeological resource staff will be notified immediately in order to initiate consultation with the CSLC staff within two business days of such discovery.

PRC Section 6313 (c) states any submerged historic resource remaining in state waters for more than 50 years will be presumed to be archaeologically or historically significant. If the lead agency’s archaeologist, in consultation with the CSLC staff, determines that a historical resource may be present, the lead agency will retain the services of a qualified maritime archeological consultant. The maritime archeological consultant will recommend whether the discovery is an historical/archeological resource that retains sufficient integrity and is of potential historical or scientific significance. The maritime archeological consultant also will recommend as to what action, if any, is warranted.

Based on this information, and consultation with the CSLC, implementation of additional measures may be required.

Measures shall include preservation in situ of the historical resource, implementation of a data recovery program, or other such action that preserves the cultural value of the resource. The maritime archeological consultant will submit a Final Cultural Resources Technical Report to the lead agency, NCIC, and the CSLC staff. This report will include an Resolution 2016-0379 November 10, 2016 Pa
ge 36 of 134
evaluation of the historical significance, with a description of the archeological and historical research methods employed in any archeological data recovery program undertaken.

Finding: With the implementation of Mitigation Measure 4.4-1(a) through (d), this impact would be reduced to a less-than-significant level. Implementation of pre-construction testing and accidental discovery procedures during construction would lessen anticipated impacts to prehistoric and historic period resources, including Native American archaeological resources by ensuring that previously unidentified archaeological resources are protected.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.4-2: The proposed projects could cause a substantial adverse change to the Central Shops Historic District, or the Water Tower. (p. 4.4-61) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.4-2(a) (RSPU Central Shops District)
Consistent with Section 17.604 and other sections of Title 17 of the City’s Planning & Development Code, and in coordination and consultation with the Preservation Director and the Preservation Commission, and adopted by the City Council, a Historic District Plan that is specifically focused on the Historic District in the Central Shops shall be prepared. Any development within the Historic District shall comply with the standards and criteria identified in the plan. The Historic District Plan shall include, at a minimum, the following components:

1. Statement of the goals for review of development projects within the Historic District;

2. A representation of the historical development of land uses, existing land uses, and any adopted plans for future land uses;

3. A statement of findings, including the following:
a. The historical or pre-historical period to which the area is significant. b. The predominant periods or styles of the structures or features therein.
c. The significant features and characteristics of such periods or styles, as represented in the Historic District and incorporating the findings of the historic district designation completed by the City in Resolution 2016-0379 November 10, 2016 Pa
ge 37 of 134
2007, including, but not limited to, structure height, bulk, distinctive architectural details, materials, textures, archeological and landscape, hardscape and site features and fixtures.
d. A statement, consistent with Title 17, Sacramento Register of Historic and Cultural Resources, of this chapter, of the standards and criteria to be used in determining the appropriateness of any development project involving a landmark, contributing resource or noncontributing resource within the Historic District.

4.4-2(b) (RSPU Central Shops District)
A copy of the full Southern Pacific Company Sacramento Shops HAER document (HAER CA303) shall be completed, and filed with the City’s Preservation Office and Center for Sacramento History, including the historic narrative, architectural drawings, and photographs, and archive quality copies disseminated to the appropriate state, regional, and local repositories.

Finding: With the implementation of Mitigation Measures 4.4 2(a) and 4.4- 2(b) listed above, this impact would be reduced to a less-than-significant level by ensuring that the integrity of the Central Shops Historic District is protected. All proposed new work would comply with the Secretary of the Interior’s (SOI) Rehabilitation Standards. The 2007 EIR Mitigation Measures 6.3-2(a) and (b) included the Sacramento Register listing of the Central Shops as a Historic District which has been completed, concurrent with the adoption of the update to the 2007 Railyards Specific Plan. 2007 Mitigation Measure 6.3-2(b) and (c) required preparation of a Historic America Building Survey document and Historic District Plan for the Central Shops Historic District, as reiterated in Mitigation Measure 4.4-2. Implementation of the proposed Specific Plan policies and design guidelines, along with Mitigation Measure 4.4-2 would ensure that no new impacts to the Central Shops Historic District would occur as a result of the proposed RSPU.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.4-3: The proposed projects could cause a substantial adverse change to the Central Shops Historic District, or Water Tower, by new construction surrounding and affecting the contributing resources and the significant features and characteristics of the district. (p. 4.4-65) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.4-3 (RSPU Central Shops and Transition Zone)
Resolution 2016-0379 November 10, 2016 Pa ge 38 of 134
Any proposed new project within the Central Shops Historic District (including new construction on Lot 22) shall be designed in compliance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties, specifically the standards for rehabilitation and new construction within a historic district. Standards 9 and 10 for Rehabilitation state that:

9. New additions, exterior alterations, or related new construction will not destroy historic materials, features, and spatial relationships that characterize the property. The new work shall be differentiated from the old and shall be compatible with the historic materials, features, size, scale and proportion, and massing to protect the integrity of the property and its environment.

10. New additions and adjacent or related new construction shall be undertaken in such a manner that, if removed in the future, the essential form and integrity of the historic property and its environment would be unimpaired.

The RSPU Design Guidelines and policies shall be consistent with these standards. In addition to compliance with the above, with the proposed adopted Historic District plan, and with the Design Guidelines established as part of the proposed RSPU, the project developer shall ensure that any new project involving the design of a new building shall not have a significant impact on the Historic District’s contributing resources or its features and characteristics. The City of Sacramento Historic Preservation Director, or the Commission, as appropriate per Preservation Development Project Site Plan & Design Review requirements of Title 17 of the City Code, shall review any proposed project’s site plan and design to ensure its compatibility with the SOI Standards and the adopted Historic District plan.

Finding: With the implementation of Mitigation Measure 4.4 3, this impact would be reduced to a less-than-significant level. Compliance with the Secretary of the Interior’s Rehabilitation Standards, the proposed Historic District plan, and the proposed RSPU Design Guidelines and policies, in conjunction with the design and preservation site plan and design review requirements in Mitigation Measure 4.4-3, would reduce anticipated impacts to the Central Shops Historic District and Water Tower to a less-than-significant level through design standards and historic district plan and design guidelines guidance.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.4-7: Construction of the proposed projects could damage and/or destroy paleontological resources. (p. 4.4-75)
Resolution 2016-0379 November 10, 2016 Pa
ge 39 of 134
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.4-7 (RSPU, KPMC, MLS, SO)
If discovery is made of items of paleontological interest, the contractor shall immediately cease all work activities in the vicinity (within approximately 100 feet) of the discovery. After cessation of excavation the contractor shall immediately contact the City. The contractor shall not resume work until authorization is received from the City. Any inadvertent discovery of paleontological resources during construction shall be evaluated by a qualified paleontologist. If it is determined that the project could damage a unique paleontological resource (as defined pursuant to the CEQA Guidelines), mitigation shall be implemented in accordance with PRC Section 21083.2 and Section 15126.4 of the CEQA Guidelines. If avoidance is not feasible, the paleontologist shall develop a treatment plan in consultation with the City.

Finding: Mitigation Measure 4.4-7 would ensure that paleontological resources would be identified before they have been damaged or destroyed, and then properly evaluated and treated. The impact would therefore be less than significant with mitigation.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.4-9: The proposed projects could contribute to the cumulative loss or alteration of historic built resources, including the Central Shops Historic District (the Southern Pacific Railroad Shops), the Water Tower, the Sacramento Valley Station, or the Alkali Flat Historic Districts. (p. 4.4-78) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.4-9 (RSPU Central Shops and Transition Zone)
Implement Mitigation Measures 4.4-2 and 4.4-3.

Finding: With the implementation of Mitigation Measures 4.4-2 and 4.4 3 listed above, this impact would be reduced to a less-than-significant level.

Compliance with the SOI Standards, through undertaking HABS/HAER recordation, and filing it with the City’s Preservation Director and Center for Sacramento History, and adopting a Historic District Plan per Mitigation Measure

4.4-2(b), RSPU Design Guidelines and policies, and the City Preservation Site Plan & Design Review procedures per Title 17 of the City Code, would lessen the project’s contribution to cumulative impacts on historic built resources by protecting the integrity of the Central Shops Historic District, through review of Resolution 2016-0379 November 10, 2016 Pa
ge 40 of 134
proposed new projects within the district for compliance with the SOI Standards, the Historic District Plan and Design Guidelines.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.4-10: The proposed projects would contribute to cumulative losses of paleontological resources. (p. 4.4-79)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.4-10 (RSPU, KPMC, MLS, SO)
Implement Mitigation Measure 4.4-7.

Finding: With the implementation of Mitigation Measure 4.4-7, the projects’ contribution toward the loss of paleontological resources would be reduced to a less-than-significant level by requiring implementation of accidental discovery procedures during construction.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

Geology, Soils and Seismicity

4.6-2: The proposed projects could result in damage to the historic Central Shops. (p. 4.6-24)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.6-2 (RSPU)
a) To the extent feasible, the historic buildings shall be stabilized and reinforced prior to trenching or other construction activities within 50 feet of the buildings.
b) A pre-excavation settlement-damage survey shall be prepared that shall include, at a minimum, visual inspection of existing vulnerable structures for cracks and other settlement defects, and establishment of horizontal and vertical control points on the buildings. A monitoring program of surveying horizontal and vertical control points on structures and shoring shall be followed to determine the effects of dewatering, excavation, and construction Resolution 2016-0379 November 10, 2016 Pa
ge 41 of 134
on the particular building site. If it is determined by the engineer that the existing buildings could be subject to damage, work shall cease until appropriate remedies to prevent damage are identified. c) If necessary and with approval by the City Chief Building Official, the construction contractor shall install temporary shoring or stabilization to help avoid permanent impacts. Stabilization may involve structural reinforcement or corrections for deterioration that would minimize or avoid potential structural failures or avoid accelerating damage to the historic structure. Stabilization shall be conducted following the Secretary of Interior Standards Treatment of Preservation. This treatment shall ensure retention of the historical resource’s character-defining features. Stabilization may temporarily impair the historic integrity of the building's design, material, or setting, and as such, the stabilization must be conducted in a manner that will not permanently impair a building's ability to convey its significance. Measures to shore or stabilize the building shall be installed in a manner that when they are removed, the historic integrity of the building remains, including integrity of material.

Finding: Mitigation Measure 4.6-2 would ensure all appropriate measures, including testing and stabilization measures, are taken to minimize damage to the historic Central Shops as a result of construction related activities adjacent to the historic Central Shops.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

Hazards and Hazardous Materials

4.8-1: Construction of the proposed projects could result in the exposure of people to health risk associated with contaminated soils and debris. (p.

4.8-36)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.8-1 (RSPU, West Jibboom only, SO)
If unidentified or suspected contaminated soil or groundwater evidenced by stained soil, noxious odors, or other factors, is encountered during site preparation or construction activities work shall stop in the area of potential contamination, and the type and extent of contamination shall be identified by qualified professional. The qualified professional shall prepare a report that includes, but is not limited to, activities performed for Resolution 2016-0379 November 10, 2016 Pa ge 42 of 134
the assessment, summary of anticipated contaminants and contaminant concentrations, and recommendations for appropriate handling and disposal. Site preparation or construction activities shall not recommence within the contaminated areas until remediation is complete and a “no further action” letter is obtained from the appropriate regulatory agency.

Finding: Mitigation Measure 4.8-1 would minimize risk of exposure to previously unidentified soil contamination by requiring that work stop in the event of a discovery and the appropriate analysis occur to identify the type and extent of the contamination. Depending on the results, appropriate remediation would be completed prior to resuming construction activities in the affected area. The handling, storage, transportation and disposal of any contaminated soil would be accomplished with applicable federal, State and local laws.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.8-3: Development of the proposed projects could expose people to existing contaminated groundwater during dewatering activities. (p. 4.8-47) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.8-3 (RSPU, West Jibboom only, SO)
Implement Mitigation Measure 4.8-1.

Finding: Mitigation Measure 4.8-3 would minimize risk of exposure to previously unidentified groundwater contamination by requiring that work stop in the event of a discovery and the appropriate analysis occur to identify the type and extent of the contamination. Depending on the results, appropriate remediation would be completed prior to resuming construction activities in the affected area. The handling, storage, transportation and disposal of any contaminated groundwater would be accomplished with applicable federal, State and local laws. The measure will reduce the impact to less than significant.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.8-4: Construction of the proposed projects’ infrastructure and buildings could interfere with remediation efforts. (p. 4.8-53)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.8-4 (RSPU, West Jibboom only, SO)
Resolution 2016-0379 November 10, 2016 Pa ge 43 of 134
Implement Mitigation Measure 4.8-1.

Finding: Mitigation Measure 4.8-4 would minimize risk of exposure to previously unidentified soil and/or groundwater contamination by requiring that work stop in the event of a discovery and the appropriate analysis occur to identify the type and extent of the contamination. Depending on the results, appropriate remediation would be completed prior to resuming construction activities in the affected area. The handling, storage, transportation and disposal of any contaminated soil or groundwater would be accomplished with applicable federal, State and local laws. Coordination with appropriate regulatory agencies would ensure that the public is not exposed to contaminated soil or groundwater as a result of the disruption of remediation activities.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.8-7: Operation of the proposed projects could result in the exposure of people to health risks associated with contaminated soils and groundwater. (p. 4.8-66)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.8-7 (RSPU, KPMC, MLS, SO)
a) In areas where the groundwater contamination has the potential to reach water, sewer or storm drainage pipelines due to fluctuations in the elevation of the groundwater table, or where volatile contaminants in soil vapor could enter porous utility lines, measures such as concrete trenches, membrane barriers and venting will be used to prevent infiltration in accordance with DTSC requirements. b) Routine monitoring of the above areas shall be performed by the landowners and/or the City, reported to DTSC and Regional Water Board, and corrective actions implemented if the results indicate adverse change in water quality. For stormwater, the monitoring may be conducted through the City’s MSR 4 program.

Finding: Mitigation Measure 4.8-7 would require adaptive management through monitoring and infiltration prevention measures or the development of measures to address areas of concern revealed through monitoring, in areas of concern. Thus, Mitigation Measure 4.8-7 would ensure all appropriate measures are taken to minimize contaminated groundwater reaching water, sewer or storm drainage pipelines.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

Resolution 2016-0379 November 10, 2016 Pa
ge 44 of 134

4.8-8: The proposed projects in combination with development of other projects in the surrounding area known to contain, or could contain contaminated soil or groundwater, could present a hazard to construction workers if not properly managed. (p. 4.8-73)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.8-8 (RSPU, West Jibboom only, SO)
Implement Mitigation Measure 4.8-1.

Finding: Mitigation Measure 4.8-8 would minimize risk of exposure to previously unidentified soil and/or groundwater contamination by requiring that work stop in the event of a discovery and the appropriate analysis occur to identify the type and extent of the contamination. Depending on the results, appropriate remediation would be completed prior to resuming construction activities in the affected area. The handling, storage, transportation and disposal of any contaminated soil or groundwater would be accomplished with applicable federal, State and local laws. Therefore, with implementation of Mitigation Measure 4.8-8 the contribution of the proposed projects to this cumulative impact would be less than considerable and this cumulative impact would be reduced to a less-than-significant level.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.8-9: The proposed projects could contribute to cumulative dewatering activities that could interfere with remediation of the existing South Plume and Lagoon Plume. (p. 4.8-74)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.8-9 (RSPU, West Jibboom only, SO)
Implement Mitigation Measure 4.8-1.

Finding: Mitigation Measure 4.8-9 would minimize risk of exposure to previously unidentified soil and/or groundwater contamination by requiring that work stop in the event of a discovery and the appropriate analysis occur to identify the type and extent of the contamination. Depending on the results, appropriate remediation would be completed prior to resuming construction activities in the affected area. The handling, storage, transportation and disposal of any contaminated soil or groundwater would be accomplished with applicable federal, State and local laws. Coordination with appropriate regulatory agencies would ensure that the public is not exposed to contaminated soil or groundwater Resolution 2016-0379 November 10, 2016 Pa
ge 45 of 134
as a result of the disruption of remediation activities. With the implementation of Mitigation Measure 4.8-9, the contribution of the proposed projects to this cumulative impact would be less than considerable and this cumulative impact would be less than significant.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

Noise and Vibration

4.10-3: The proposed projects could result in residential interior noise levels of 45 dBA Ldn or greater caused by noise level increases due to project operation. (p. 4.10-56)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.10-3(a) (RSPU)
Prior to the issuance of building permits for residential projects within the RSP Area, the City shall require project applicants for residential development to submit a detailed noise study, prepared by a qualified acoustical consultant, to identify design measures necessary to achieve the City interior standard of 45 Ldn in the proposed new residences. The study shall be submitted to the City for review and approval. Design measures such as the following could be required, depending on the specific findings of the noise study: double-paned glass windows facing noise sources; solid-core doors; increased sound insulation of exterior walls (such as through staggered-or double-studs, multiple layers of gypsum board, and incorporation of resilient channels); weather-tight seals for doors and windows; or sealed windows with an air conditioning system installed for ventilation. This study can be a separate report, or included as part of the Noise and Vibration Reduction Plan for the proposed projects. The building plans submitted for building permit approval shall be accompanied by certification of a licensed engineer that the plans include the identified noise-attenuating design measures and satisfy the requirements of this mitigation measure.

4.10-3(b) (MLS)
Implement Mitigation Measure 4.10-2(b) to minimize noise from outdoor amplified sound systems.

Finding: Implementation of Mitigation Measures 4.10-3(a) and 4.10-3(b) would ensure that future residences are designed such that interior noise levels would not exceed the City standard of 45 Ldn. This would be achieved by the Resolution 2016-0379 November 10, 2016 Pa ge 46 of 134
implementation of detailed noise studies to identify project-specific noise minimization and avoidance measures and the implementation of those measures. This impact would be considered less than significant.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.10-5: The residential, non-residential, and mixed-use buildings constructed pursuant to the RSPU could be exposed to vibration levels due to existing rail operations and/or I-5 traffic. (p. 4.10-65) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.10-5 (RSPU)
a) The historic structures in the Central Shops Historic District shall be stabilized using methods that would protect against vibration levels identified in the screening analysis (shown in Figure 6.8-3 of the 2007 RSP EIR).
b) Prior to design review, the applicant shall have a certified vibration consultant prepare a site-specific vibration analysis for residential uses and historic structures that are within the screening distance (shown in Figure 6.8-3 of the 2007 RSP EIR) for freight and passenger trains or light rail trains. The analysis shall detail how the vibration levels at these receptors would meet the applicable vibration standards to avoid potential structural damage and human annoyance. The results of the analysis shall be incorporated into project design.

Finding: Implementation of Mitigation Measure 4.10-5 would reduce impacts to a less-than-significant level by ensuring that vibration levels do not cause substantial annoyance for residents and users of the RSP Area.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.10-6: The proposed projects would result in exposure of people to cumulative increases in construction noise levels. (p. 4.10-70) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.10-6 (RSPU, KPMC, MLS)
Resolution 2016-0379 November 10, 2016 Pa ge 47 of 134
Implement Mitigation Measure 4.10-1.

Finding: Implementation of Mitigation Measure 4.10-6 would reduce the contribution of the proposed projects to cumulative construction noise levels at the existing noise-sensitive land uses located near and within the RSP Area.

With the implementation of Mitigation Measure 4.10-6 listed above, the contribution of the proposed projects to this cumulative impact would be less than considerable, and the impact would be reduced to a less-than-significant level.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.10-9: Implementation of the proposed projects would contribute to cumulative increases in residential interior noise levels of 45 dBA Ldn or greater. (p. 4.10-77)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.10-9(a) (RSPU)
Implement Mitigation Measures 4.10-3(a).

4.10-9(b) (RSPU, MLS)
Implement Mitigation Measure 4.10-3(b).

Finding: Implementation of Mitigation Measures 4.10-9(a) and (b) would ensure that existing and planned residences are designed such that interior noise levels would not exceed the City standard of 45 Ldn. This would be achieved by the implementation of detailed noise studies to identify project-specific noise minimization and avoidance measures and the implementation of those measures. This impact would be considered less than significant.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

Public Services

4.11-6: The proposed projects could result in a school located in proximity to existing hazards, specifically railroad tracks. (p. 4.11-39) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

Resolution 2016-0379 November 10, 2016 Pa ge 48 of 134

4.11-6 (RSPU)
Prior to school site approval within 1,500 feet of the railroad tracks, the SCUSD shall retain a competent professional to prepare a safety study that assesses cargo manifests, frequency, speed, and schedule of railroad traffic, grade, curves, type and condition of track, need for sound or safety barriers, need for pedestrian and vehicle safeguards at railroad crossings, presence of high pressure gas lines near the tracks that could rupture in the event of a derailment, and preparation of an evacuation plan. Based on this information and the proposed location and design of the school, the study shall demonstrate that the school design and construction would not expose students to risks associated with train accidents. In the event these conditions cannot be satisfied, SCUSD shall proceed in a manner that complies with California Code of Regulations, Title 5, section 14010(d).

Finding: Implementation of Mitigation Measure 4.11-6 would reduce the impact to a less-than-significant level by ensuring that proper precautions are taken to protect students from potential hazards and that school structures are designed in such a way as to reduce the impact of noise resulting from placing a school near a railroad track.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.11-8: The proposed projects would increase the demand for parks and recreational facilities. (p. 4.11-55)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.11-8 (RSPU)
Prior to filing of the final map, the project applicant shall reach agreement with the City on which of the proposed project elements and acreage meet the applicable City parkland dedication requirements. The project applicant shall pay in-lieu fees (Quimby) on the difference in acreage between the City parkland requirement and the amount of parkland the proposed project would supply. The applicant shall pay Park Impact Fees (PIF) or enter into a “turnkey” agreement to construct the park facilities to satisfy its PIF obligation.

Finding: Mitigation Measure 4.11-8 would ensure that City park standards reflective of urban residential needs are met through dedication of parks and open space, payment of in-lieu fees and/or provision of “turnkey” parks improvements. Consistent with General Plan Policy ERC 2.2.6, this mitigation Resolution 2016-0379 November 10, 2016 Pa ge 49 of 134
measure allows the City to consider the urban nature of the RSP Area, and the recreational value of project elements that are not typical parks, such as large plazas and the Central Shops. With the proposed mitigation, this measure would be less than significant.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.11-9: The proposed projects would contribute to cumulative increases in demand on City parks and recreational facilities. (p. 4.11-58) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.11-9 (RSPU)
Implement Mitigation Measure 4.11-8.

Finding: Mitigation Measure 4.11-8 would ensure that the RSPU would provide parks and recreational facilities adequate to offset its contribution to increased cumulative demand through parkland dedication, provision of “turnkey” parks and/or in-lieu fees. The City would use in lieu fees from this and other residential development projects to fund parks and recreational facilities as needed throughout the community, including regional parks, as indicated by the Parks Master Plan and applicable City policies. With mitigation, this impact would be less than significant.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

Transportation

4.12-1: The proposed projects could worsen conditions at intersections in the City of Sacramento. (p. 4.12-181)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.12-1(a) (RSPU)
i. Implement Event Transportation Management Plan (TMP) to the satisfaction of the City Traffic Engineer and subject to the performance standards set forth within, including:

Resolution 2016-0379 November 10, 2016 Pa
ge 50 of 134

1. Vehicle Queuing on City Streets: Through added intersections capacity and/or traffic management, traffic does not queue back to upstream locations during the Pre-Event peak hour including (but not limited to):
• Northbound 7
th Street traffic does not spill back from Railyards
Boulevard into the UPRR undercrossing (i.e., queues do not extend any greater than 600 feet from Railyards Boulevard) • Westbound North B Street traffic does not spill back from 7 th
Street to 8th Street
• Westbound North B Street traffic does not spill back from 8th Street to 12th Street
• Southbound 7th Street traffic does not spill back to LRT tracks at North B Street

2. Pedestrian Flows: Through pedestrian flow management, pedestrians do not spill out of sidewalks onto streets with moving vehicles, particularly along 7th Street between Richards Boulevard and G Street, Railyards Boulevard between 5th Street and 8th Street, and North B Street between 7th Street and 12th Street.

3. Vehicular Parking: A comprehens ive parking plan is implemented that includes (but is not limited to) a reservation system, smartphone parking app, directional signage, real-time parking garage occupancy, etc. that minimizes unnecessary vehicular circulation (while looking for parking) within and adjacent to the RSP Area.

4. Bicycle Parking: Signage is clearly visible to direct bicyclists to MLS Stadium event bicycle parking, which has an adequate supply to accommodate a typical MLS Stadium event.

5. Light Rail Transit: A new light r ail station/stop is constructed on 7th Street north of Railyards Boulevard and operational at the time the stadium opens, providing an adequate level of LRT service to meet the Pre- and Post-Event ridership demands.

6. Bus/Paratransit: Specific locations are provided to accommodate public buses and paratransit vehicle stops within one block of the MLS Stadium.

7. Ridesharing: Specific locations are provided for pick-up / drop-off areas such that taxi, Uber, or similar ridesharing services do not impede overall vehicular or pedestrian flow (including maintaining Resolution 2016-0379 November 10, 2016 Pa ge 51 of 134
uncongested conditions along 10th Street to enable emergency vehicle response).

8. Truck Staging: Delivery trucks asso ciated with special events do not park or idle along 7th Street, 8th Street, North B Street, or Railyards Boulevard.
ii. Each project developed pursuant to the RSPU (including the Land Use Variant) shall pay the applicable fee for the I-5 Subregional Corridor Mitigation Program (SCMP) prior to issuance of building permits. iii. Convert existing Dos Rios Street leg at 12
th Street/North B Street
intersection to a right-turn only intersection that does not operate as part of the traffic signal.

4.12-1(b) (KPMC)
The following measures shall be implemented prior to issuance of the Certificate of Occupancy for Phase 1 of the KP Medical Center. i. Implement Mitigation Measure 4.12-1(a)(ii).
ii. Implement Transportation Demand Management (TDM) Program. iii. Widen Railyards Boulevard at 7
th Street to provide a dedicated
northbound left-turn lane and dedicated southbound right-turn lane.

Operate signal with protected northbound left-turn phasing. iv. Coordinate traffic signals on Railyards Boulevard at 5 th, 6th, and 7th
Streets.
v. Implement either Option 1a, 1b, or Option 1c:
• Option 1a: Extend 5th Street northerly from South Park Street to North B Street. Install traffic signal at the 5th Street/South Park Street intersection. Operate with 5th Street/North B Street intersection with side-street stop-control. Widen eastbound North B Street at 7
th Street to include a dedicated left-turn lane
and a shared through/right lane and operate east-west
approaches with protected left-turn phasing.
• Option 1b: Extend South Park Street easterly from 5th Street and extend 6th Street northerly from South Park Street
extension to North B Street. Install traffic signal at the 5th Street/South Park Street intersection. Operate 6th Street/North B Street intersection with side-street stop-control. Widen eastbound North B Street at 7th Street to include a dedicated Resolution 2016-0379 November 10, 2016 Pa
ge 52 of 134
left-turn lane and a shared through/right lane and operate east- west approaches with protected left-turn phasing.
• Option 1c: Widen 7th Street/North B Street intersection to consist of a left-turn lane and a shared through/right lane on all approaches. Operate signal with protected left-turn phasing.

4.12-1(c) (MLS)
i. Implement Mitigation Measure 4.12-1(a)(i).
ii. Convert existing Dos Rios Street leg at 12th Street/North B Street intersection to a right-turn only intersection that does not operate as part of the traffic signal.
iii. Implement Transportation Demand Management (TDM) Program, if required by city code.
iv. Construct South Park Street between 6
th Street and 7th Street.
v. Construct 6 th Street between Railyards Boulevard and North B Street.
vi. Install traffic signals at 7th Street/South Park Street, 6th Street/North B Street, Railyards Boulevard/8th Street, and North B Street/8th Street.
vii. Widen 7
th Street at Railyards Boulevard to provide dedicated
northbound and southbound left-turn lanes, and operate signal with protected left-turn phasing.
viii. Widen/restripe 7th Street at Nort h B Street to consist of one left- turn lane and one shared through/right lane on all approaches, and operate signal with protected left-turn phasing.

Finding: The RSPU and Land Use Variant are located in a Tier 1 Priority Investment Area of the City, in which LOS F may be permitted under certain conditions. The RSPU and Land Use Variant each include a variety of transportation improvements intended to accommodate non-auto modes of travel, which allow for an LOS F condition to be permitted. Although certain City intersections that are adjacent to state highway facilities would operate at LOS F, the RSPU and Land Use Variant would pay the I-5 SCMP, which helps fund state highway improvements as well as transit service expansions. Therefore, with implementation of required mitigation measures, this impact is less than significant after mitigation.

Through payment of the I-5 SCMP, the KP Medical Center would mitigate impacts to the state highway system. Other mitigation options for the KP Medical Resolution 2016-0379 November 10, 2016 Pa
ge 53 of 134
Center include roadway system upgrades within the RSP Area that would substantially improve otherwise highly congested travel corridors. Further, mitigation calls for the project to develop and implement a TDM program.

Therefore, with implementation of required mitigation measures, this impact is less than significant after mitigation.

The Event TMP describes recommended vehicle routing, traffic management, pedestrian linkages, transit accommodation, and parking necessary to accommodate a sold-out 25,000-person MLS soccer match. As the data in Table

4.12-60 shows, implementation of the Event TMP would improve operations from LOS E or F at several intersections surrounding the stadium to LOS D or better.

Other mitigations for the MLS Stadium include roadway extensions, intersection widenings, and enhancements to bicycle and pedestrian facilities (as is described later). Therefore, with implementation of required mitigation measures, this impact is less than significant after mitigation.

4.12-2: The proposed projects could worsen conditions on freeway facilities maintained by Caltrans. (p. 4.12-207)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.12-2 (RSPU, KPMC)
Implement Mitigation Measure 4.12-1(a)(ii).

Finding: Through payment of the I-5 SCMP, the RSPU, Land Use Variant, and KP Medical Center would fully mitigate their impacts to the state highway system through fare-share contributions toward Caltrans facility improvements.

Therefore, this impact is less than significant after mitigation.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.12-6: The proposed projects could adversely affect existing or planned pedestrian facilities or fail to provide for access for pedestrians. (p. 4.12- 216)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.12-6 (MLS)
Implement Mitigation Measure 4.12-1(a)(i).

Resolution 2016-0379 November 10, 2016 Pa ge 54 of 134
Finding: The implementation of the Event Transportation Management Plan to the satisfaction of the City Traffic Engineer, would result in use of a variety of pedestrian management tools, that could include providing additional parking spaces within the RSPU to reduce pedestrian flows from the area north of North B Street, wider sidewalks, shuttles, special-event light rail trains, reduced parking supplies, and extended pedestrian walk phases would be improved pedestrian LOS at these facilities. Refer to Appendix J.2 for a detailed discussion of these and other potential improvements. Given the current uncertainty of specific MLS Stadium operations, conditions would be monitored once it is operational and the Event TMP would be revised to include other measures to improve these conditions. The Event TMP including the performance measures pertaining to pedestrian flow shall be approved by City Traffic Engineer prior to issuance of the Certificate of Occupancy for the proposed Stadium. Accordingly, pedestrian facility impacts on streets between the proposed Stadium and identified parking resources, including North 7th Street from North B Street to Railyards Boulevard would be mitigated to a less-than-significant level.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.12-7: The proposed projects could cause construction-related traffic impacts. (p. 4.12-218)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.12-7 (RSPU, KPMC, MLS)
Before issuance of grading permits for the project site, the project applicants shall prepare a detailed Construction Traffic Management Plan that will be subject to review and approval by the City Department of Public Works, in consultation with Caltrans, affected transit providers, and local emergency service providers including the City of Sacramento Fire and Police departments. The plan shall ensure that acceptable operating conditions on local roadways and freeway facilities are maintained. At a minimum, the plan shall include:
x The number of truck trips, time, and day of street closures x Time of day of arrival and departure of trucks
x Limitations on the size and type of trucks, provision of a staging area with a limitation on the number of trucks that can be waiting x Provision of a truck circulation pattern
Resolution 2016-0379 November 10, 2016 Pa
ge 55 of 134
x Identification of detour routes and signing plan for street closures x Provision of driveway access plan so that safe vehicular, pedestrian, and bicycle movements are maintained (e.g., steel plates, minimum distances of open trenches, and private vehicle pick up and drop off areas)
x Maintain safe and efficient access routes for emergency vehicles and transit
x Manual traffic control when necessary
x Proper advance warning and posted signage concerning street closures
x Provisions for pedestrian and bicycle safety
A copy of each construction traffic management plan shall be submitted to local emergency response agencies and transit providers, and these agencies shall be notified at least 30 days before the commencement of construction that would partially or fully obstruct roadways.

Finding: The implementation of Mitigation Measure 4.12-7 would reduce construction related traffic impacts to less than significant, through the development and implementation of a traffic management plan, that would include measures using a variety of traffic controls to minimize traffic impacts.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.12-8: The proposed projects could contribute to cumulatively unacceptable intersection operations in the City of Sacramento. (p. 4.12- 220)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.12-8(a) (RSPU)
i. Implement Mitigation Measure 4.12-1(a)(i).
ii. Implement Mitigation Measure 4.12-1(a)(ii).

4.12-8(b) (KPMC)
i. Implement Mitigation Measure 4.12-1(a)(ii).

Resolution 2016-0379 November 10, 2016 Pa ge 56 of 134
ii. Implement Mitigation Measure 4.12-1(b)(ii).

4.12-8(c) (MLS)
i. Implement Mitigation Measure 4.12-1(a)(i).
ii. Implement Mitigation Measure 4.12-1(c)(iii).

Finding: The RSPU and Land Use Variant are located in a Tier 1 Priority Investment Area of the City, in which LOS F may be permitted under certain conditions. The RSPU and Land Use Variant each include a variety of transportation improvements intended to accommodate non-auto modes of travel, which allow for an LOS F condition to be permitted. Although certain City intersections that are adjacent to state highway facilities would operate at LOS F, the RSPU and Land Use Variant would pay the I-5 SCMP, which helps fund state highway improvements as well as transit service expansions. Therefore, with implementation of required mitigation measures, this impact is less than significant after mitigation.

Through payment of the I-5 SCMP, the KP Medical Center would mitigate impacts to the state highway system. Further, mitigation calls for the project to develop and implement a TDM program. Therefore, with implementation of required mitigation measures, this impact is less than significant after mitigation.

The Event TMP describes recommended vehicle routing, traffic management, pedestrian linkages, transit accommodation, and parking necessary to accommodate a sold-out 25,000-person MLS soccer match. This impact is less than significant after mitigation.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.12-9: The proposed projects could worsen cumulative conditions on freeway facilities maintained by Caltrans. (p. 4.12-224) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.12-9 (RSPU, KPMC)
Implement Mitigation Measure 4.12-1(a)(ii).

Finding: Through payment of the I-5 SCMP, the RSPU and KPMC would fully mitigate their impacts to the state highway system. Therefore, this impact is less than significant after mitigation.

Resolution 2016-0379 November 10, 2016 Pa ge 57 of 134
With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.12-13: The proposed projects could adversely affect existing or planned pedestrian facilities or fail to provide for access for pedestrians under cumulative conditions. (p. 4.12-229)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.12-13 (MLS)
Implement Mitigation Measure 4.12-1(a)(i).

Finding: The implementation of the Event Transportation Management Plan to the satisfaction of the City Traffic Engineer would result in use of a variety of pedestrian management tools, that could include providing additional parking spaces within the RSPU to reduce pedestrian flows from the area north of North B Street, wider sidewalks, shuttles, special-event light rail trains, reduced parking supplies, and extended pedestrian walk phases would be improved pedestrian LOS at these facilities. Refer to Appendix J.2 for a detailed discussion of these and other potential improvements. Given the current uncertainty of specific MLS Stadium operations, conditions would be monitored once it is operational and the TMP would be revised to include other measures to improve these conditions.

The Event TMP including the performance measures pertaining to pedestrian flow shall be approved by City Traffic Engineer prior to issuance of the Certificate of Occupancy for the proposed Stadium. Accordingly, pedestrian facility impacts on streets between the proposed Stadium and identified parking resources, including North 7th Street from North B Street to Railyards Boulevard would be mitigated to less than significant.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

4.12-14: The proposed projects could cause construction-related traffic impacts under cumulative conditions. (p. 4.12-231)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.12-14 (RSPU, KPMC, MLS)
Implement Mitigation Measure 4.12-7.

Finding: The implementation of the above mitigation measure would reduce this impact to less than significant through the development and implementation Resolution 2016-0379 November 10, 2016 Pa ge 58 of 134
of a traffic management plan that would include measures that would use a variety of traffic controls to minimize traffic impacts. With the implementation of Mitigation Measure 4.12-14, construction related traffic impacts would be mitigated to less than significant.

With implementation of the mitigation measure(s), this impact is reduced to a less-than-significant level.

C. Significant or Potentially Significant Impacts for which Mitigation Measures Are Found To Be Infeasible.

Mitigation measures to mitigate, avoid, or substantially lessen the following significant and potentially significant environmental impacts of the project have been identified. However, pursuant to Section 21081(a)(3) of the Public Resources Code and Section 15091(a)(3) of the CEQA Guidelines, as to each such impact and mitigation measure, the City Council, based on the evidence in the record before it, specifically finds that the mitigation measures are infeasible. The impact and mitigation measures and the facts supporting the finding of infeasibility of each mitigation measure are set forth below.

Notwithstanding the disclosure of these impacts and the finding of infeasibility, the City Council elects to approve the projects due to the overriding considerations set forth below in Section F, the statement of overriding considerations.

Noise and Vibration

4.10-2: Operations of the proposed projects could result in a substantial permanent increase in ambient exterior noise levels in the project vicinity. (p. 4.10-28)
Finding: No feasible mitigation strategies have been identified to reduce the on-road transportation noise impacts to less than significant. Alternative modes of transportation (i.e., walking, biking, and transit) are already accounted for in the above traffic noise estimates, but the use of alternate modes of transportation cannot be required by the project. The reduction in vehicular use needed to mitigate these roadway noise impacts is not feasible for the proposed projects. In addition, typical measures to reduce roadway noise impacts, such as noise walls, setbacks, and rubberized asphalt, are not considered feasible mitigation for development in the urban core of the City. This impact is considered significant and unavoidable.

Impacts of non-transportation noise sources (i.e., HVAC units, amplified sound and loading docks), even with implementation of Mitigation Measure 4.10-2, are significant and are included in Section D, Significant and Unavoidable Impacts, below.

Resolution 2016-0379 November 10, 2016 Pa
ge 59 of 134
For these reasons, mitigation to reduce on-road transportation noise is infeasible and the impact remains significant and unavoidable.

D. Significant and Unavoidable Impacts.

The following significant and potentially significant environmental impacts of the project, including cumulative impacts, are unavoidable and cannot be mitigated in a manner that would lessen the significant impact to below the level of significance. Notwithstanding disclosur e of these impacts, the City Council elects to approve the project due to overriding considerations as set forth below in Section F, the statement of overriding considerations.

Aesthetics, Light and Glare

4.1-3: The proposed projects could create substantial new sources of light. (p. 4.1-78)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.1-3(a) (RSPU, MLS)
i. East of 6th Street, all exterior lighting and advertising (including signage) shall be directed onto the specific location intended for illumination (e.g., parking lots, driveways, and walkways) and shielded away from adjacent properties and public rights-of-way to minimize light spillover onto adjacent areas. Light structures for surface parking areas, vehicular access ways, and walkways shall not exceed a height of 25 feet. Monument lighting and night-lit signage is prohibited on building facades that face existing residential neighborhoods.
ii. Prior to issuance of a Site Plan and Design Review Permit for each specific development project, the applicant shall submit a lighting plan to the Development Services Department for review and approval. The plan shall specify the lighting type and placement to ensure that the effects of security and other outdoor lighting are minimized on adjacent uses and do not create spillover effects. iii. Landscape illumination and exteri or sign lighting shall follow the City Code.

4.1-3(b) (MLS)
i. The project applicant shall require construction contractors to ensure that all lighting related to construction activities shall be Resolution 2016-0379 November 10, 2016 Pa
ge 60 of 134
shielded or directed to restrict any direct illumination onto property located outside of the Stadium project site boundaries that is improved with light-sensitive uses.
ii. Prior to issuance of a building permit, the project applicant shall submit to the Community Development Department a signage and lighting design plan for the Stadium which establishes lighting design standards and guidelines. The lighting design plan shall, at a minimum:
- Require exterior lighting included within the Stadium to incorporate fixtures and light sources that focus light on-site to minimize spillover light;
- Ensure that project lighting shall not cause more than two foot-candles of lighting intensity or direct glare from the light source at any residential property. This would preclude substantial spillover light from bright lighting sources; and - Require that for exterior LED lighting, all light emitting diodes used within the integral electronic display shall have a horizontal beam spread of maximum 165 degrees wide and
65 degrees vertically, and shall be oriented downwards to the plaza/street, rather than upwards.
iii. Prior to issuance of a build ing permit for the Stadium signage displays, the project applicant shall retain a lighting design expert who shall develop plans and specifications for the proposed lighting displays, establish maximum luminance levels for the displays, and install and test the displays to insure compliance with all City lighting regulations and these mitigation measures.
iv. The project applicant shall comply with City Code Section

8.072.010, which establishes regulations regarding the use of searchlights.

Finding: Implementation of Mitigation Measure 4.1-3(a) and (b) would reduce potential lighting impacts to surrounding areas through appropriate site design and configuration. Review and approval of the proposed lighting plan through the City’s Site Plan and Design Review process would ensure thatthe potential that spillover lighting would be reduced and potential to create light pollution disturbances to adjacent uses minimized. Notwithstanding the implementation of these measures, the development of the Stadium on a site that is currently vacant and dark would result in a substantial change in the existing environment.

This impact associated with the proposed MLS Stadium would remain significant and unavoidable.

Resolution 2016-0379 November 10, 2016 Pa
ge 61 of 134
For these reasons, the impact remains significant and unavoidable.

Air Quality

4.2-3: The proposed projects could result in long-term (operational) emissions of NOx, ROG, PM10, and PM2.5. (p. 4.2-51)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

Consistent with the direction of the SMAQMD, no further mitigation required.

Finding: The incremental build-out of the RSPU, RSPU Land Use Variant, and KP Medical Center, MLS Stadium (during both an event day non-event day) would result in emissions of ROG and NOx that would exceed the significance thresholds specified by the SMAQMD. The operation of the Stormwater Outfall would not emit a substantial amount of criteria pollutant emissions during its operation; however, the combined operation emissions of all the proposed projects would result in ROG and NOx emissions that would exceed SMAQMD significance threshold, creating a significant impact.

As is described under Impact 4.2-1, the SMAQMD recommends that lead agencies require projects creating emissions that would exceed the District’s daily thresholds of ROG and/or NOx reduce their ozone precursor emissions from transportation sources by 15 percent. This percentage is based on the project location within the Sacramento Urban Core, which is part of the Sacramento Area Ozone Implementation Plan (SIP). SMAQMD calculates this 15 percent using NOxe, which is calculated by adding the mitigated ROG emissions (divided by 3) to mitigated NOx emissions. As described under Impact 4.2-1, and presented in the Draft RSPU AQMP in Appendix C.2, using the SMAQMD Recommended Guidance for Land Use Emission Reduction, the percent reduction of NOxe after mitigation for each proposed project that exceeds the SMAQMD significance threshold for ROG and NO
X are presented in Table 4.2-9.

As shown in Table 4.2-9, the RSPU without an MLS match and the RSPU Land Use Variant would result in a 17 and 16 percent reduction in NOxe emissions, respectively, by simply implementing the design features proposed under the Railyards Specific Plan Update. The RSPU with MLS match operation would result in a 15 percent reduction in NOxe emissions after mitigation. All proposed projects would meet or exceed the 15 percent emission reduction/mitigation guideline established by the SMAQMD.

Even with achievement of the SMAQMD-required 15 percent reduction in operational mobile source emissions through the incorporation of feasible project design elements and best management practices, NOx and ROG emissions Resolution 2016-0379 November 10, 2016 Pa
ge 62 of 134
associated with the RSPU and RSPU Land Use Variant would exceed the SMAQMD threshold of 65 pounds per day. Thus, this impact would remain significant and unavoidable. This impact conclusion is consistent with the 2007 RSP EIR.

For these reasons, the impact remains significant and unavoidable.

4.2-9: The proposed projects could contribute to cumulative increases in long-term (operational) emissions of NOx ROG, PM10 and PM2.5. (p. 4.2-75) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

Consistent with the direction of the SMAQMD, no further mitigation required.

Finding: As is described under Impact 4.2-3, above, the traffic reduction variables and other emission reductions built into the design and locality of the proposed projects would exceed 15 percent reduction in NOxe emissions after mitigation. Since the proposed RSPU would be designed as a high-density, mixed-use, transit-oriented development, much of the reduction would be achieved by project design and location within the Sacramento urban core with access to a variety of transportation options. Nonetheless, even with the inclusion of the above-mentioned feasible design features and best management practices, NO
X and ROG emissions associated with either of the project scenarios would still exceed the SMAQMD threshold of 65 lbs/day. Thus, operational emissions of ozone precursors would be significant and unavoidable.

For these reasons, the impact remains significant and unavoidable.

Biological Resources

4.3-2: Development of the proposed projects could result in the loss of potential nesting habitat for Swainson’s hawk, white-tailed kite, purple martin, and other sensitive and/or protected bird species. (p. 4.3-40) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.3-2(a) (RSPU, KPMC, MLS, SO)
The project applicant shall conduct any tree removal activities required for project construction outside of the migratory bird and raptor breeding season (February 1 through August 31) where feasible. For any construction activities that will occur between February 1 and August 31, Resolution 2016-0379 November 10, 2016 Pa ge 63 of 134
the applicant shall conduct preconstruction surveys in suitable nesting habitat within 500 feet of the construction area for nesting raptors and migratory birds. Surveys shall be conducted by a qualified biologist. In addition, all trees slated for removal during the nesting season shall be surveyed by a qualified biologist no more than 48-hours before removal to ensure that no nesting birds are occupying the tree. For Swainson’s hawk nesting habitat, surveys shall be conducted in accordance with the Swainson’s Hawk Technical Advisory Committee’s Recommended Timing and Methodology for Swainson’s Hawk Nesting Surveys in California’s Central Valley).

If active nests are found during the survey, the applicant shall implement appropriate mitigation measures to ensure that the species will not be adversely affected, which will include establishing a no-work buffer zone as, approved by CDFW, around the active nest.

Measures may include, but would not be limited to:
1) Maintaining a 500-foot buffer around each active raptor nest. No construction activities shall be permitted within this buffer.

Maintaining a 100-ft buffer around each active purple martin nest. No construction activities are permitted within this buffer. For other migratory birds, a no-work buffer zone shall be established, approved by CDFW, around the active nest. The no-work buffer may vary depending on species and site specific conditions as approved by CDFW.
2) Depending on conditions specific to each nest, and the relative location and rate of construction activities, it may be feasible for construction to occur as planned within the buffer without impacting the breeding effort. In this case (to be determined on an individual basis), the nest(s) shall be monitored by a qualified biologist during construction within the buffer. If, in the professional opinion of the monitor, the project would impact the nest, the biologist shall immediately inform the construction manager. The construction manager shall stop construction activities within the buffer until the nest is no longer active. Completion of the nesting cycle shall be determined by a qualified biologist.

4.3-2(b) (RSPU)
If three years of consecutive surveys of the suitable habitat (i.e., weep holes) within the I Street Bridge viaduct, I-5 elevated structure within the RSP Area, or the proposed new I Street Bridge over the Sacramento River do not indicate purple martins use of the area as breeding habitat, then no further mitigation is required. The following mitigation shall only be required if purple martin have been documented nesting in the suitable Resolution 2016-0379 November 10, 2016 Pa
ge 64 of 134
habitat (i.e., weep holes) within the I Street Bridge viaduct, or the I 5 elevated structure within the RSP Area, or the proposed new I Street Bridge for at least one of three previous years prior to development within 500 feet of aforementioned areas.

Prior to construction within 500 feet of an active purple martin colony (active within the past three years), the applicant shall retain a qualified biologist to prepare and then shall implement a Purple Martin Monitoring and Management Plan (PMMMP), to the satisfaction of the City. The PMMMP shall be enforced by the City in areas of suitable habitat (i.e., weep holes) within 500 feet of the I Street Bridge viaduct, or the elevated structure of Interstate 5 within the RSP Area. The PMMMP shall identify land use and building design requirements, landscape design and maintenance requirements, and management actions for the protection, enhancement, creation, and/or replacement of purple martin habitat within the RSP Area. Performance of the PMMMP shall be based on land use, and building design standards, landscape design, and maintenance criteria, and management actions that benefit purple martin. The PMMMP shall be tailored to the status and nesting locations of purple martins onsite at the time of plan creation, and will include at minimum the criteria below, or equivalent measures to conserve, protect, and restore purple martin habitat.
• Land Use and Building Design Criteria:
- Prohibit buildings that obstruct flight path to and from nest sites within 120 feet of nesting locations.
- Maintain a minimum of 21 feet of vertical space beneath weep holes
- Maintain 230 feet of perching wire within 200 feet of the colony • Landscape Design and Maintenance Requirements:
- Prohibit trees taller than nest height within 330 feet of nest sites - Limit tree plantings within 500 feet of the site to those that produce suitable nesting material (pine species). Areas beneath trees shall not be landscaped, and litter material left in place for next material use by birds
- Ensure suitable nesting material is available for martin use. If no nest material is available for martins, place nesting material (straw, pine needles, etc.) within area for use by purple martin during the breeding bird season
Resolution 2016-0379 November 10, 2016 Pa
ge 65 of 134
- Prohibit planting of ornamental fruit bearing trees within 500 feet of purples martin nests, including the colonization of weedy fruit- bearing trees such as privet
• Management Actions:
- Install, or cause to be installed, and/or maintain to ensure good working order, nest guards on weep holes where purple martin are known to nest, subject to approval from the facility’s owner.

Finding: Implementation of Mitigation Measure 4.3-2(a) would reduce impacts to nesting birds by requiring pre-construction surveys to identify any nesting birds, and if found, observing no-disturbance zones around nest sites, and therefore would reduce impacts to nesting birds during construction activities to less-than-significant levels.

Implementation of Mitigation Measure 4.2-2(b) would be enforced as long as the I Street purple martin colony uses habitat within the RSP Area for at least one of the previous three years prior to commencement of development within the Riverfront District. Mitigation Measure 4.2-2(b) would reduce potential impacts to the I Street Bridge purple martin colony by mitigating for habitat alterations (i.e., land use change, development) in the vicinity of nest sites. The Purple Martin Monitoring and Management Plan (PMMMP) would define and implement building setback, and height limitations to preserve flight approaches, define landscape designs and maintenance requirements to preserve availability of nest material near breeding sites, and identify and require habitat enhancement, creation, or replacement to compensate for indirect effects related to habitat alterations associated with development activities. While Mitigation Measure 4.2- 2(b) may reduce the effects of potential impacts to purple martin from development there remains considerable uncertainty of factors other than habitat modifications affecting the I Street colony of purple martin (i.e., disease, neonicotinoid pesticides). As such, given the downward trend in population numbers of the I Street Bridge purple martin colony, and because the PMMMP is not guaranteed to mitigate for the potential impacts to habitat surrounding purple martin nest sites, impacts related to the development of the proposed RSPU would remain significant and unavoidable.

For these reasons, the impact remains significant and unavoidable.

4.3-11: Implementation of the proposed projects, in combination with other cumulative development, could/would contribute to the cumulative harm to, or loss of nesting habitat, for Swainson’s hawk, white-tailed kite, purple martin, and other sensitive and/or protected bird species. (p. 4.3-71) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

Resolution 2016-0379 November 10, 2016 Pa ge 66 of 134

4.3-11(a) and 4.3-11(b) (RSPU)
Implement Mitigation Measure 4.3-2(a) and 4.3-2(b).

Finding: Implementation of Mitigation Measures 4.3-11(a) would reduce impacts to nesting birds by requiring pre-construction surveys to identify any nesting birds, and if found, observing no-disturbance zones around nest sites, and therefore would reduce impacts to nesting birds during construction activities to a less-than-significant level.

Implementation of Mitigation Measure 4.2-2(b) would be enforced as long as the I Street purple martin breeding colony is extant within the RSP Area for at least one of the previous three years from the time of commencement of development within the RSP Area. Mitigation Measure 4.2 2(b) would reduce potential impacts to the I Street Bridge purple martin colony by mitigating for habitat alterations (i.e., land use change, development) in the vicinity of the nest sites. The PMMMP would define and implement building setback, and height limitations to preserve flight approaches, define landscape design, and maintenance requirements to preserve availability of nest material near breeding sites, and identify, and require habitat enhancement, creation, or replacement to compensate for indirect effects related to habitat alterations. However, given the downward trend in population numbers of the I Street Bridge purple martin colony (and the Sacramento region population as a whole), and because the PMMMP is not guaranteed to mitigate for the proposed RSPU’s cumulative contribution to the I Street Bridge purple martin colony, the impact development of the proposed RSPU would remain significant and unavoidable.

For these reasons, the impact remains significant and unavoidable.

Cultural Resources

4.4-8: The proposed projects could contribute to the cumulative loss or alteration of archaeological resources, including human remains. (p. 4.4-77) Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.4-8 (RSPU, KPMC, MLS, SO)
Implement Mitigation Measure 4.4-1(a) through 4.4-1(d).

Finding: Implementation of Mitigation Measures 4.4-1(a) through 4.4 1(d) would ensure that existing archaeological resources are identified, evaluated and treated promptly before they can be damaged or destroyed during construction.

However, as noted above, archaeological resources are finite. As such, the loss Resolution 2016-0379 November 10, 2016 Pa ge 67 of 134
of this material record cannot be completely mitigated. Therefore, the project’s potential contribution to this impact would be significant and unavoidable.

For these reasons, the impact remains significant and unavoidable.

Noise and Vibration

4.10-1: Construction of the proposed pr ojects could generate noise that would conflict with City standards. (p. 4.10-21)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.10-1 (RSPU, KPMC, MLS)
The contractor shall ensure that the following measures are implemented during all phases of project construction:
a) Whenever construction occurs within 130 feet to occupied residences (on or offsite), temporary barriers shall be constructed around the construction sites to shield the ground floor of the noise-sensitive uses.

These barriers shall be of ¾-inch Medium Density Overlay (MDO) plywood sheeting, or other material of equivalent utility and appearance, and shall achieve a Sound Transmission Class of STC- 30, or greater, based on certified sound transmission loss data taken according to ASTM Test Method E90 or as approved by the City of Sacramento Building Official.
b) Construction equipment staging ar eas shall be located as far as feasible from residential areas while still serving the needs of construction contractors.
c) Use of auger displacement for inst allation of foundation piles, if feasible. If impact pile driving is required, “sonic” pile- drivers shall be used, unless engineering studies are submitted to the City that show this is not feasible, based on geotechnical considerations. d) Prior to impact pile driving activities in Blocks 49, 50 and 52, the applicant shall coordinate with the KCRA building management staff in order to minimize disruption from pile driving, to the extent feasible..

Finding: Implementation of Mitigation Measure 4.10-1 would reduce construction noise at the proposed project sites to the extent feasible. Restricting heavy-duty equipment operations in close proximity to buildings would substantially reduce exterior and interior noise at adjacent buildings. Use of auger displacement would reduce noise levels of pile installation to be Resolution 2016-0379 November 10, 2016 Pa ge 68 of 134
comparable to the existing noise levels of passing trains. If auger displacement is not feasible based on geotechnical considerations, use of sonic pile drivers would reduce noise levels by about 5dBA compared to impact pile drivers. These measures would minimize interior noise and associated sleep disturbance and any potential hearing loss effects at nearby receptors during excavation, and construction. However, even with implementation of these mitigation measures, it is likely that construction activities would result in increased levels of annoyance, interruption of conversation, and potential sleep disturbance at surrounding receptors during the day and occasionally at night, as permitted by the City. This impact would be considered significant and unavoidable during the short-term duration of construction activities on the proposed project sites.

For these reasons, the impact remains significant and unavoidable.

4.10-2: Operations of the proposed projects could result in a substantial permanent increase in ambient exterior noise levels in the project vicinity. (p. 4.10-28)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.10-2 (a) (RSPU, KPMC, MLS)
The project sponsor shall ensure that the following measures are implemented for all development under the proposed Specific Plan:
i. Prior to the issuance of building permits, the applicant shall submit engineering and acoustical specification for project mechanical HVAC equipment and the proposed locations of onsite loading docks to the Planning Director demonstrating that the HVAC equipment and loading dock design (types, location, enclosure, specification) will control noise from the equipment to at least 10 dBA below existing ambient levels at nearby residential and other noise-sensitive land uses.
ii. Noise-generating stationary equipment associated with proposed commercial and/or office uses, including portable generators, compressors, and compactors shall be enclosed or acoustically shielded to reduce noise-related impacts to noise-sensitive residential uses.
iii. In order to avoid the exposure of rail noise to onsite future sensitive receptors that would exceed the City of Sacramento exterior noise standards, residential units within Blocks 35, 49 and 50 shall not be placed closer than 190 feet from the centerline of the UPRR rail line.

Resolution 2016-0379 November 10, 2016 Pa
ge 69 of 134

4.10-2(b) (MLS)
i. The project applicant shall retain a qualified acoustical consultant to verify that the MLS Stadium architectural and outdoor amplified sound system designs incorporate all feasible acoustical features in order to comply with the City of Sacramento Noise Control Ordinance.
ii. The project applicant shall be required to limit speakers at temporary plaza stages outside the stadium to be no louder than 100 dBA measured five (5) feet from the source.

Finding: No feasible mitigation strategies have been identified to reduce the on-road transportation noise impacts to less than significant. On-road transportation noise is discussed in Section C, Significant or Potentially Significant Impacts for which Mitigation Measures Are Found To Be Infeasible.

Impacts of most non-transportation noise sources (i.e., HVAC units, amplified sound and loading docks), with implementation of Mitigation Measure 4.10-2(a), would be reduced to less-than-significant levels. While it is likely that through the implementation of Mitigation Measure 4.10-2(b) the outdoor amplified sound system at the proposed MLS Stadium could be designed to minimize noise exposure at off-site residences through such measures as speaker height, orientation, and volume control, outdoor speaker operations during concerts would be expected to exceed the exterior daytime and nighttime noise standards of the Noise Control Ordinance at the existing and future sensitive receptors. As a result, impacts of amplified exterior sound systems and game noise would be considered significant and unavoidable.

For these reasons the impact remains significant and unavoidable.

4.10-4: Construction of the proposed projects could expose existing and/or planned buildings, and persons within, to vibration that could disturb people and damage buildings. (p. 4.10-59)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.10-4 (RSPU, KPMC, MLS)
Prior to the issuance of any building permit for each phase of project development, the project applicant shall develop a Vibration Reduction Plan in coordination with an acoustical consultant, geotechnical engineer, and construction contractor, and submit the Plan to the City Chief Building Official for approval. The Plan shall include the following elements:

Resolution 2016-0379 November 10, 2016 Pa
ge 70 of 134
1) To mitigate vibration, the Plan shall include measures such that surrounding buildings will be exposed to less than 80 VdB and 83 VdB where people sleep and work, respectively, and less than 0.25 PPV for historic buildings to prevent building damage.

Measures and controls shall be identified based on project-specific final design plans, and may include, but are not limited to, some or all of the following:
1) Buffer distances and types of equipment selected to minimize vibration impacts during construction at nearby receptors in order to meet the specified standards.
2) Implement a vibration, crack, and line and grade monitoring program at existing historic buildings located within 47 feet of construction activities. The following elements shall be included in this program:
a. During building construction:
i. The construction contractor shall regularly inspect and photograph crack gauges, maintaining records of these
inspections to be included in post-construction reporting. Gauges shall be inspected every two weeks, or more frequently during periods of active project actions in close proximity to crack monitors, such as during the building construction of blocks 23 and 24.
ii. The construction contractor shall collect vibration data from receptors and report vibration levels to the City Chief Building Official on a monthly basis. The reports shall include annotations regarding project activities as necessary to explain changes in vibration levels, along with proposed corrective actions to avoid vibration levels approaching or exceeding the established threshold.
iii. With regards to historic struct ures, if vibration levels exceed the threshold and monitoring or inspection indicates that the project is damaging the building, the historic building shall be provided additional protection or stabilization. If necessary and with approval by the City Chief Building Official, the construction contractor shall install temporary shoring or stabilization to help avoid permanent impacts. Stabilization may involve structural reinforcement or corrections for deterioration that would minimize or avoid potential structural failures or avoid accelerating damage to the historic structure. Stabilization shall be conducted following the Secretary of Interior Standards Treatment of Preservation.

This treatment shall ensure retention of the historical resource’s Resolution 2016-0379 November 10, 2016 Pa
ge 71 of 134
character-defining features. Stabilization may temporarily impair the historic integrity of the building's design, material, or setting, and as such, the stabilization must be conducted in a manner that will not permanently impair a building's ability to convey its significance. Measures to shore or stabilize the building shall be installed in a manner that when they are removed, the historic integrity of the building remains, including integrity of material. b. Post-construction
i. The applicant (and its construction contractor) shall provide a report to the City Chief Building Official regarding crack and vibration monitoring conducted during demolition and
construction. In addition to a narrative summary of the monitoring activities and their findings, this report shall include photographs illustrating the post-construction state of cracks and material conditions that were presented in the pre-construction
assessment report, along with images of other relevant conditions showing the impact, or lack of impact, of project activities. The photographs shall sufficiently illustrate damage, if any, caused by the project and/or show how the project did not cause physical damage to the historic and non-historic buildings. The report shall include annotated analysis of vibration data related to project activities, as well as summarize efforts undertaken to avoid vibration impacts. Finally, a post-construction line and grade survey shall also be included in this report.
ii. The project applicant (and its construction contractor) shall be responsible for repairs from damage to historic and non-historic buildings if damage is caused by vibration or movement during the demolition and/or construction activities. Repairs may be necessary to address, for example, cracks that expanded as a result of the project, physical damage visible in post-construction assessment, or holes or connection points that were needed for shoring or stabilization. Repairs shall be directly related to project impacts and will not apply to general rehabilitation or restoration activities of the buildings. If necessary for historic structures, repairs shall be conducted in compliance with the Secretary of Interior Standards Treatment of Preservation. The project applicant shall provide a work plan for the repairs and a completion report to ensure compliance with the SOI Standards to the City Chief Building Official and City Preservation Director for review and comment.

Finding: Implementation of Mitigation Measure 4.10-4 would ensure that construction activities at the proposed project sites would not result in building damage at the nearest historic building structures, and would reduce human Resolution 2016-0379 November 10, 2016 Pa ge 72 of 134
disturbance to the extent feasible. However, the proposed projects would still result in infrequent but substantial vibration during construction that would likely result in disturbance impacts at the nearest onsite sensitive land uses if construction activities were to occur within 148 feet of receptors at night, as permitted by the City. While implementation of the mitigation measures described above would avoid building damage and would reduce vibration impacts to surrounding receptors, it is likely that construction activities would still adversely affect surrounding receptors at times during construction on the proposed project sites. Consequently, this impact would be significant and unavoidable during the short-term duration of construction activities on the proposed project sites.

For these reasons, the impact remains significant and unavoidable.

4.10-7: The proposed projects would contribute to cumulative construction that could expose existing and/or planned buildings, and persons within, to significant vibration. (p. 4.10-71)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.10-7 (RSPU, KPMC, MLS)
Implement Mitigation Measure 4.10-4.

Finding: Implementation of Mitigation Measure 4.10-7 would ensure that construction activities in the RSP Area would not result in building damage at the nearest historic and non-historic building structures, and would reduce human disturbance to the extent feasible. While implementation of the mitigation measures described above would avoid vibration-caused building damage and would reduce vibration impacts to surrounding receptors, it is likely that the combined cumulative construction activities could still adversely affect surrounding sensitive land uses during periods of construction. With the implementation of Mitigation Measure 4.10-7 listed above, the contribution of the proposed project to this cumulative impact would remain considerable, and the impact would remain significant and unavoidable.

For these reasons, the impact remains significant and unavoidable.

Transportation

4.12-3: The proposed projects could worsen vehicle queuing at off-ramps on I-5. (p. 4.12-209)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

Resolution 2016-0379 November 10, 2016 Pa ge 73 of 134

4.12-3 (RSPU, KPMC, MLS)
Implement Mitigation Measure 4.12-1(a)(ii).

Finding: Through payment of the I-5 SCMP, the RSPU, KP Medical Center, and MLS Stadium would mitigate impacts to the state highway system, particularly queuing impacts at the I-5/Richards Boulevard interchange off-ramps.

However, since the timing of this interchange upgrade is unknown, these queuing impacts could occur for a number of years prior to the interchange reconstruction. Therefore, impacts associated with queuing at the I-5/Richards Boulevard interchange off-ramp are considered significant and unavoidable in the short-term, and less than significant after interchange reconstruction.

None of the identified improvements within the I-5 SCMP would directly reduce queuing on the I-5 NB off-ramp at J Street. Since this impact occurs during AM and Pre-event peak hours, each of the proposed projects contributes to the creation of the impact. This impact is considered significant and unavoidable.

For these reasons, the impact remains significant and unavoidable.

4.12-10: The proposed projects could worsen vehicle queuing at off-ramps on I-5 under cumulative conditions. (p. 4.12-225)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.12-10 (RSPU, KPMC, MLS)
Implement Mitigation Measure 4.12-1(a)(ii).

Finding: Through payment of the I-5 SCMP, the RSPU, Land Use Variant, KP Medical Center, and MLS Stadium would mitigate impacts to the state highway system, particularly queuing impacts at the I-5/Richards Boulevard interchange off-ramps. Therefore, impacts associated with queuing at the I- 5/Richards Boulevard interchange off-ramp are considered less than significant after interchange reconstruction.

None of the identified improvements within the I-5 SCMP would directly reduce queuing on the I-5 NB off-ramp at J Street. Since this impact occurs during AM and Pre-event peak hours, each of the proposed projects contributes to the creation of the impact. This impact is considered significant and unavoidable.

For these reasons, the impact remains significant and unavoidable.

Utilities
Resolution 2016-0379 November 10, 2016 Pa ge 74 of 134

4.13-7: The proposed projects would contribute to cumulative increases in demand for water supply and treatment. (p. 4.13-41)
Mitigation Measure: The following mitigation measure(s) has been adopted to address this impact:

4.13-7 (RSPU)
In order to ensure that sufficient capacity would be available to meet cumulative demands, the City shall implement, to the extent needed in order to secure sufficient supply, one or more of the following:
a. Maximize Water Conservation
b. Implement New Water Diversion and/or Treatment Infrastructure c. Implement Additional Groundwater Pumping
Finding: Implementation of one or more of the above options could sufficiently increase water treatment capacity to meet cumulative demand.

However, because future water supply sources are not known and the specific method of securing additional water supply is still under consideration by the City and has not yet been determined, and because significant environmental effects could result from implementation of each of the above options, the impact is considered significant and unavoidable.

For these reasons, the impact remains significant and unavoidable.

E. Project Alternatives.

The City Council has considered the project alternatives presented and analyzed in the final SEIR and presented during the comment period and public hearing process. Some of these alternatives have the potential to avoid or reduce certain significant or potentially significant environmental impacts, as set forth below. The City Council finds, based on specific economic, legal, social, technological, or other considerations, that these alternatives are infeasible.

Based on the impacts identified in the Final EIR and other reasons summarized below, and as supported by substantial evidence in the record, the City Council finds that approval and implementation of the Projects as proposed is the most desirable, feasible, and appropriate action and hereby rejects the other alternatives and other combinations and/or variations of alternatives as infeasible based on consideration of the relevant factors set forth in CEQA Guidelines Section 15126.6, subdivision (f). (See also CEQA Guidelines, Section 15091, subd. (a)(3).) Each alternative and the facts supporting the finding of infeasibility of each alternative are set forth below.

Alternatives Considered and Dismissed from Further Consideration Resolution 2016-0379 November 10, 2016 Pa ge 75 of 134
In identifying alternatives to the proposed projects, primary consideration was given to alternatives that could reduce significant unavoidable impacts resulting from the proposed projects while still obtaining the projects’ objectives. Certain impacts that are identified as being significant and unavoidable under the proposed projects (e.g., increase in air pollutants from project construction and operation) are due primarily to developing an area that is currently undeveloped or intensifying development activity beyond current levels. These impacts would not be possible to eliminate, but could be reduced, for example, by limiting the size of the project, reconfiguring uses, or implementing mitigation measures.

Alternatives that reduce the intensity of development on the project site or change the location of the project are addressed later in this chapter.

The 2007 RSP EIR considered a number of alternatives that were dismissed from further analysis because they would not meet most of the basic project objectives and/or would not substantially reduce identified significant impacts.

The 2007 RSP EIR discusses those alternatives that were dismissed from further consideration on pages 8-4 through 8-7. This list is applicable to the RSPU as well. The alternatives that were considered but dismissed in the 2007 EIR are summarized below.
x Low Density Residential-Only Alternative: The low-density, residential- only alternative proposed to develop the RSP Area as mostly single-family residential units, but was determined to be economically infeasible based on the high cost of site remediation and a failure to meet most of the objectives of the 2007 RSP. Although extensive remediation has occurred since 2007, a low density residential development would still not be economically feasible due to the costs of infrastructure and developing in a downtown area, particularly given the residential restrictions in the 2015 Land Use Covenant and the remediation standards that require extensive fill wherever there would be contact with soil (e.g., backyards). Therefore, the reasons for rejecting this alternative in 2007 would be valid for the 2016 RSPU as well. In addition, a low-density development would not be consistent with the City’s 2035 General Plan, which envisions high-density residential development in the Central City.
x Low Building Height Alternative: The low building height alternative would keep the same densities for the RSP but limit building heights to four stories. This alternative would reduce impacts associated with dense development, such as traffic congestion, but was found to be unlikely to generate the revenues needed to support the high cost of infrastructure improvements. Further, it was likely that the reduction in residential, office and retail uses in the RSP Area would be shifted to other locations in the area, so the impacts would be dispersed rather than eliminated, and could even be greater than the 2007 RSP, particularly impacts stemming from increased vehicle miles traveled (VMT). The alternative was dismissed because it failed meet most of the basic objectives of the 2007 RSP and Resolution 2016-0379 November 10, 2016 Pa
ge 76 of 134
also failed to substantially lessen environmental impacts. The same rationale would apply to the RSPU, which is intended to be a high-density, urban mixed-use project.
x Central Shops Rehabilitation/Center City Park Alternative: This alternative would have focused around the redevelopment of the Central Shops and provide a large-scale active and passive park space in the remainder of the RSP Area. The alternative was dismissed from further consideration because it would result in greater environmental effects associated with housing, office, retail and other uses eliminated from the 2007 RSP being developed elsewhere in the greater Sacramento region, and because it would fail to meet any the objectives of the 2007 RSP. This would be true for the RSPU as well.

No other potentially feasible alternatives to the proposed RSPU have been identified that are not encompassed by or addressed in the alternatives analyzed in Chapter 6, Alternatives, of the SEIR.

For the proposed projects analyzed in the SEIR, there are three project-specific components, each of which would result in significant impacts, and are therefore subject to separate alternatives analyses. The following alternatives were considered but dismissed from further analysis for the project components because they would not fulfill most of the project objectives, would not eliminate or substantially lessen environmental effects, and/or would otherwise be infeasible.

KP Medical Center
x No Pile Driving Alternative: One of the significant impacts associated with development of the KP Medical Center is noise associated with pile driving during construction. A preliminary Foundations Assessment Report was prepared to assess site suitability for construction. Based on soil conditions, liquefaction potential and lack of bearing capacity, the Report concludes that pile driving would be required to construct the KP Medical Center as proposed. The maximum height that could be achieved on the KP Medical Center site using conventional construction techniques (without pile driving) would likely be 4 stories. In order to contain the hospital uses described for the hospital and hospital support building (658,000 sf and 210,000 sf, respectively, the floor plate would need to be approximately 5 acres (217,000 sf per floor). Floor plates of this size would be unwieldy, inefficient, and in some cases would not meet code.

For example, the entire 252 beds planned for Phase 1 would need to be placed on one floor, which would be against such code requirements as those for exits and windows in patient rooms. For these reasons, a “no pile driving” alternative was not further analyzed.

Resolution 2016-0379 November 10, 2016 Pa
ge 77 of 134
x Offsite Location: The primary objectives of the KP Medical Center are to relocate medical uses from Kaiser’s existing older facility located at Morse Avenue in Sacramento to a new, seismically-safe medical center. In order to accommodate the patient demand that currently exists at the Morse Avenue facility, the new KP Medical Center needs to be at least as large as the Morse Avenue facility. The number of inpatient beds, the square footage and types of services provided on site, and the medical office facilities must at least be comparable in size and scale to the Morse Avenue facility. For these reasons, an offsite location would need to be approximately 17.8 acres, and could be larger if placed in a suburban location necessitating surface parking and low-profile building forms.

In addition, the facility would need to be located near a major transportation corridor so that it could be quickly and easily accessed by emergency vehicles. A suburban location would be acceptable, if there could be adequate separation from residences and/or other sensitive uses so that they would not be subject to repeated helicopter noise. Access to transit is also important for Kaiser patients who do not drive. Finally, the hospital must be located in an area with greater than 100-year flood protection. One possible site, the Sleep Train Arena site in Natomas, would not have full 100-year flood protection in the near term. The City is not aware of another site within the city boundaries that would meet these criteria and would be available to Kaiser Permanente for purchase and use as a hospital, and would have fewer or less severe environmental effects than the proposed KP Medical Center in the Railyards. For these reasons, an offsite location alternative was not further analyzed. x Existing Morse Avenue Facility: Upgrading and/or expanding the Morse Avenue facility is also not considered feasible. The existing facility does not meet seismic code, so extensive and expensive retrofitting would be needed. Bringing the existing facility up to code would require larger hospital rooms and other facilities, so that the number of beds that could be accommodated within the existing facility would be substantially reduced. Renovation would also disrupt ongoing services. Expanding the existing facility and/or building a new 420-bed facility would be more costly and take longer than a new facility at the RSP Area. It would also be more disruptive of ongoing services at the Morse Avenue facility. A new building at Morse Avenue would require demolition of the existing hospital, which would result in additional construction air emissions. In addition, the RSP Area is better situated for transportation and transit than the Morse Avenue facility. For these reasons, an existing facility alternative was not further analyzed.

MLS Stadium
Resolution 2016-0379 November 10, 2016 Pa
ge 78 of 134
Enclosed Stadium: Among the impacts of the MLS Stadium is noise from crowds and amplified speech and entertainment. One way to reduce crowd noise and noise from events within the Stadium would be to cover the stadium, so that these noises would be confined to the interior. This alternative was not addressed further for several reasons:
x Soccer is an outdoor sport. The vast majority of all professional soccer stadiums do not have a fully enclosed roof. The few examples where soccer is played indoors exist within stadiums that accommodate a range of 30,000 to 75,000 attendees, are used as multipurpose venues and have retractable roofs. Few soccer stadiums in the world fit within this model.

For example, there is only one professional soccer team in the world that currently plays within a domed stadium (no retractable roof). The Sapporo Dome is located in Sapporo, Japan. The stadium has a fully retractable soccer pitch. A fully enclosed roof typically increases the stadium cost by approximately $100 Million. A retractable roof typically increases the stadium cost by approximately $150 Million.
x The MLS does not consider artificial turf to be acceptable for the play field.

A retractable roof would therefore require adding grow lights to the project.

This would not only add project costs but also substantially increase the energy loads of the building.
x A retractable roof would decrease the energy efficiency of the building. x There are typically three types of roofs used by professional soccer stadiums that are not enclosed— no roof, canopies that cover a portion of the stands, and full wraparound roof. Under the latter, which is the type of roof proposed for the MLS Stadium, the pitch and portions of the seating are open to the sky. This type of roof provides the most screening and protection from weather without being fully enclosed, along with energy optimization through solar utilization.

For the above reasons, a fully enclosed stadium was not analyzed.

Stormwater Outfall
Resolution 2016-0379 November 10, 2016 Pa
ge 79 of 134
x Alternative Location: The impacts of the Stormwater Outfall would be the result of construction activities along the Sacramento River bank. One option would be to relocate the Outfall. However, given that the Outfall must discharge to the river, any location is likely to have similar impacts.

Further, the current presence of the I Street Bridge limits the distance downstream that the Outfall structure could be constructed, and the planned location of the I Street Bridge replacement limits the distance upstream that the Outfall structure could be placed.
x Cistern: The 2007 RSP provided for the construction of a subsurface cistern, which would detain the first-flush component of stormflows, and then discharge the water to the City’s combined sewer system in the vicinity of 3rd & I Streets. Drainage flows in excess of the first-flush storage capacity would be detained in a second chamber and discharged to the Sacramento River. The proposed RSPU does not include the cistern because decentralized low impact development (LID) measures were determined to be more effective than the centralized water quality treatment that would have occurred within the cistern. Further, because it would require construction of both a cistern and an outfall on the river, this alternative would have similar impacts to the RSPU Stormwater Outfall.

For these reasons, the cistern was not considered further in the alternatives analysis.

Summary of Alternatives Considered
CEQA mandates that an EIR evaluate a reasonable range of alternatives to the project or project locations that generally reduce or avoid potentially significant impacts of the project. CEQA requires that every EIR also evaluate a “No Project” alternative. Alternatives provide a basis of comparison to the project in terms of their significant impacts and their ability to meet project objectives.

This comparative analysis is used to consider reasonable, potentially feasible options for minimizing environmental consequences of the project. The alternatives to the RSPU are the (1) No Project/No Build Alternative; (2) No Project/No Action Alternative; and the (3) Reduced Density Alternative. The alternatives to the KP Medical Center project are the (4) No Project/No KP Medical Center Alternative and (5) Reduced Medical Center Alternative. The MLS Stadium alternatives include the (6) No Project/No MLS Stadium Alternative; (7) Smaller Stadium Alternative; (8) Relocated Railyards Stadium Alternative; and (9) Natomas MLS Stadium Alternative. The Alternative to the Stormwater Outfall is the (10) No Project/Stormwater Outfall Alternative.

The City Council rejects the Alternatives set forth in the Final SEIR and summarized below because the City Council finds that there is substantial evidence, including evidence of economic, legal, social, technological, and other considerations described in this Section E in addition to those described in Resolution 2016-0379 November 10, 2016 Pa
ge 80 of 134
Section G below under CEQA Guidelines 15091(a)(3), that make infeasible such alternatives. In making these determinations, the City Council is aware that CEQA defines “feasibility” to mean “capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social, legal, and technological factors.” The Council is also aware that under CEQA case law the concept of “feasibility” encompasses (i) the question of whether a particular alternative promotes the underlying goals and objectives of a project and (ii) the question of whether an alternative is “desirable” from a policy standpoint to the extent that desirability is based on a reasonable balancing of the relevant economic, environmental, social, legal, and technological factors.

RSPU Alternatives
Alternative 1: No Project/No Build Alternative
Description
The CEQA Guidelines require the evaluation of the comparative impacts of the "No Project" alternative (CEQA Guidelines Section 15126.6(e)(1)). The No Project/No Build Alternative describes an alternative in which no development would occur in the RSP Area with the exception of the continued current use of the Sacramento Valley Station; office and retail uses in the adjacent Railway Express Annex (REA) building; parking lots that front on 7th Street between F and H Streets; and streets that were called for in the 2007 RSP, constructed following approval of the 2007 RSP, and will be opened in the coming months, including 5th and 6th Streets between H Street and Railyards Boulevard, as well as Railyards Boulevard from 7th Street to Bercut Drive. The site-specific conditions of the No Project/No Build alternative are best described by the existing conditions presented in the environmental setting sections in Chapter 4 of the Draft SEIR.

Under the No Project/No Build Alternative, the City Council would not approve the project, and none of the mitigation measures identified within the Draft SEIR would be implemented. The alternatives analysis must also describe conditions that could reasonably be expected to occur if the RSPU project is not approved.

In this case, it is reasonable to assume that, if the project is not approved, the project site would remain largely undeveloped, with the exception of the existing uses described above. Therefore, the impacts of the No Project/No Build Alternative would be identical to the existing conditions described in the settings of Chapter 4 of the Draft SEIR. Alternatively, if the RSPU project is not approved, the RSP Area could be redeveloped under current conditions consistent with the land use designations and allowable uses identified in the 2007 RSP and 2035 General Plan (see Alternative 2 below).

Resolution 2016-0379 November 10, 2016 Pa
ge 81 of 134
Relationship to Project Objectives
None of the RSPU objectives would be realized under Alternative 1. Nor would any of the KP Medical Center or MLS Stadium objectives be realized under this alternative.

Facts in Support of Finding of Infeasibility
Because the RSPU would accommodate growth that would inevitably occur within the Sacramento region, the No Project/No Development Alternative would result in development occurring in other locations in the region. Because of the lack of development capacity in the core of the region, it is reasonable to assume that the development would be further distant from the downtown core. There could be significant effects related to such development elsewhere in the region, and some effects could be more severe. To the extent that such development were more dispersed and less dense than the proposed RSPU, some impacts might be more significant. For example, VMT would increase, and as a result impacts on air quality and greenhouse gasses would be more severe. Depending on location and the acreage that is disturbed, impacts on biological and cultural resources could increase if development is located on undeveloped land on the urban edge. However, it is not known where or what type of development would occur if the RSPU is not approved, so it would be speculative to provide a more definitive discussion of potential impacts.

While the No Project/No Build Alternative would avoid impacts associated with the projects, this alternative would not further any of the projects’ objectives or provide any of the benefits contemplated by the projects. Additionally, this alternative would result in different and greater significant impacts than the proposed RSPU. Therefore, Alternative 1 is rejected.

Alternative 2: No Project/No Action Alternative
Description
The No Project/No Action Alternative assumes that the RSP Area would be redeveloped under current conditions consistent with the land use designations and allowable uses identified in the 2007 RSP and 2035 General Plan (see Figure 6-1). For the most part, the types of uses (e.g., office, high density residential, historic/cultural) are very similar, although the number of units, square footage, distribution and mix of uses differ. In addition, there would be no regional medical center under the 2007 RSP. The 2007 RSP did provide for a sports and entertainment center overlay, which could potentially be the site of a soccer stadium, although the overlay site is not located near the proposed MLS Stadium site.

Resolution 2016-0379 November 10, 2016 Pa
ge 82 of 134
In general, the amount of residential and office development could be higher under the No Action Alternative, while the amount of retail would be much higher (1.4 million sf for the 2007 RSP compared to 515,000 sf under the RSPU). Land uses have also been redistributed in some cases. For example, the area bound by 7th and 10th Streets, Railyards Boulevard and the northern embankment is designated residential/mixed use (allowing retail and neighborhood office, but not other office uses) in the 2007 RSP, but C-3 in the 2016 RSPU, which allows both residential and high rise office.

A number of elements would be very similar. The Central Shops District would have a similar amount of development (approximately 485,000 sf) with historic/cultural, retail, entertainment and office uses. Both the 2007 RSP and 2016 RSPU provide for an approximately 10-acre park in the northwest corner of the RSP Area. The assumed uses in the Transit Zone, such as the intermodal facility would be identical. The backbone infrastructure would be similar, with some variation in the street layout. Several roads have already been constructed along the alignments identified in the 2007 RSP, including Railyards Boulevard and the extensions of 5th and 6th Streets. The railroad tracks have also been relocated to the current alignment as called for in the 2007 RSP. Like the 2016 RSPU, this alternative would also have a conceptual location for a school, fire station and police substation.

Other key differences between the 2007 RSP and the 2016 RSPU include:
x The 2007 RSP included a Sports and Entertainment Facility Overlay on four blocks north of the rail line and on either side of 7th Street. The 2016 RSPU does not include this overlay, but does provide for the MLS Stadium farther north in the RSP Area, east of 7th Street. x The 2007 RSP would manage stormwater flows with a cistern that would detain those flows, and discharge them to both the City’s CSS and a new outfall on the Sacramento River. The 2016 RSPU does not include a cistern, and all stormwater would be discharged to the river through a new outfall.
x The 2016 RSPU anticipates both a new medical center and a soccer stadium. While these uses would be allowed under the 2007 RSP, they were not anticipated uses or analyzed in either the 2007 RSP or the 2007 RSP EIR.

The No Project/No Action Alternative allows for a maximum of 12,500 residential units (including 400 units in mixed-use flex), 2.9 million square feet of office uses (including 491,000 sf in mixed-use flex), 1.4 million square feet of retail uses, 491,000 sf of mixed-use flex space (which could be developed as 491,000 sf of office, retail, or other non-residential uses, or approximately 400 residential units, or some combination of these uses), 1,100 hotel rooms, 485,390 sf of historic Resolution 2016-0379 November 10, 2016 Pa
ge 83 of 134
and cultural uses, 41.2 acres of open space, 1.7 acres of utilities, and 9,700 parking spaces.

Relationship to Project Objectives
Alternative 2 would meet many of the RSPU project objectives, because it would contain a similar mix of uses. However, project objectives relating to the MLS Stadium and the KP Medical Center would be wholly unmet. Alternative 2 would develop the Railyards with transit-oriented, mixed-use development, and could promote a 24-hour urban village with a range of complementary uses (e.g., retail, office, hospitality, educational) and a mix of housing types. This development would be integrated into the existing Central City through the extension of roads, bike paths and pedestrian facilities, and would connect to the Sacramento River waterfront. Alternative 2 would provide a transportation corridor that accommodates a variety of transportation modes, and would complement and support the Sacramento Valley Station and the Sacramento Intermodal Transit Facility. The Central Shops would be used as a community resource, including a museum and tourist-oriented retail uses.

Facts in Support of Finding of Infeasibility
Many impacts caused by Alternative 2 would either be the same as or less than the impacts of the RSPU. However, because of the greater number of residential units, Alternative 2 would have a higher water demand than the proposed RSPU (approximately 2,107 to 2,186 afy compared to 1,871 to 2,278 afy). While this demand could be met under existing conditions, under cumulative conditions there could be times when total City water demand would exceed its available treated supply (Impact 4.13-7). This impact would be slightly more severe under Alternative 2, due to the higher demand.

While the No Project/No Action Alternative would avoid some of the impacts associated with the projects, this alternative would not further any of the project objectives or provide any of the benefits contemplated by the projects as relating to the MLS Stadium and KP Medical Center, and is therefore rejected. The No Project/No Action Alternative would not provide health care-oriented development, and would not promote downtown development to the extent that the RSPU would, because this alternative would not have two of the major regional draws— the KP Medical Center and the MLS Stadium. .

Alternative 3: Decreased Density/Intensity Alternative Description
The purpose of Alternative 3, Decreased Density/Intensity, is to reduce those impacts associated with the level of development that would occur within the RSP Area. By reducing the number of residential units and the square footage for retail, commercial and other uses, the resident, employee and visitor population Resolution 2016-0379 November 10, 2016 Pa ge 84 of 134
within the RSP Area would drop, resulting in a reduction in the number of vehicles associated with RSP Area development, and the associated levels of air emissions and traffic noise. The demand for public and utility services would also be reduced.

The Decreased Density/Intensity Alternative would retain the same distribution of land uses, but would reduce the total amount of development that would be allowed within the RSP Area. Under this alternative, there would be a 40 percent reduction in residential, office and retail uses. As shown in Table 6-2 of the SEIR, the number of residential uses would be reduced to 3,600 to 6,000 units, office would be reduced to 2.3 msf, and retail uses would be reduced from 514,000 to 308,000 sf. The number of hotel rooms would be reduced to 660. Flex space and office and retail uses within the Central Shops District would also be reduced by 40 percent. The KP Medical Center Phase 2 medical office buildings would also be reduced in size. Several components of the proposed projects would be unchanged, including:
x The location, acreage and layout of the Kaiser Permanente Medical Center would remain the same as proposed; however, the Phase 2 medical office buildings would be reduced in size by 40 percent in order to reduce peak hour trip generation associated with these offices, while maintaining the number of in-patient hospital beds.
x The MLS Stadium would remain the same.
x The roadway system and other infrastructure would not change. x The museum would remain 180,000 sf.

Relationship to Project Objectives
Alternative 3 would meet some of the project objectives, because it would contain a similar mix of uses, including the MLS Stadium and the KP Medical Center. For example, Alternative 3 would develop the Railyards with transit-oriented, mixed- use development, and could promote a 24-hour urban village with a range of complimentary uses (e.g., retail, office, hospitality, health care, educational) and a mix of housing types. This development would be integrated into the existing Central City through the extension of roads, bike paths and pedestrian facilities, and would connect to the Sacramento River waterfront. A transportation corridor that accommodates a variety of transportation modes and complements the Sacramento Valley Station and the Sacramento Intermodal Transit Facility would be developed. The Central Shops would be used as a community resource, including a museum and tourist-oriented retail uses. Alternative 3 would also promote downtown development by providing the major regional draws, specifically the KP Medical Center and the MLS Stadium. However, the extent to which objectives related to the level of development (e.g., creating a vibrant, transit-oriented 24-hour development) could be substantially less under Resolution 2016-0379 November 10, 2016 Pa
ge 85 of 134
Alternative 3 because there would be fewer residential units and less retail and office development. Further, the KP Medical Center objectives would not be realized due to the reduction in the size of the MOBs. For example, the KP Medical Center would not achieve objectives of efficiency, because some medical office uses would need to be located at a distance from the hospital, and would not be able to offer an expansion of advance medical services or accommodate the demands of future growth in membership. That growth would then have to be accommodated elsewhere in the region or City, resulting in additional environmental impacts, and a decrease in the efficiency gained my having a consolidated medical center with substantial medical office space.

Moreover, maximizing efficiency by developing a single KP regional medical center is the primary project objective of that project, and failure to achieve it undermines the entire rationale for considering relocation of the Sacramento Medical Center from Morse Avenue to the RSP Area.

This alternative would meet all of the objectives of the proposed MLS Stadium.

Facts in Support of Finding of Infeasibility
Alternative 3, Decreased Density/Intensity, would avoid or lessen some impacts associated with the projects; however, this alternative would not further the key project objectives related to the provision of the number of residential units, and would reduce the expansion of medical office uses in the RSP Area. Alternative 3 therefore is rejected.

KP Medical Center Alternatives
Alternative 4: No Project/No KP Medical Center
Description
As discussed above, typically there are two types of “No Project” alternatives.

The first assumes that no changes occur at the project site, so that the existing conditions are maintained. The second No Project alternative considers what could be expected to happen given existing zoning and reasonably foreseeable changes. For the KP Medical Center, under a No Project/No Build alternative, the existing site conditions would remain. That is, the site would remain undeveloped in close to its current state. Some additional grading could be undertaken in order to complete remediation activities, but then no additional changes would occur.

The outcome of the No Project/No Build alternative is described in the existing conditions sections of Chapter 4 of the SEIR and in Alternative 1 for the RSPU.

For the “No Project/No Action” alternative, it is assumed that the RSPU would be developed, but with a different set of land uses in the area zoned as the Hospital Special Planning District (H SPD) under the proposed project. Typically, the existing zoning for the site would be assumed to be developed in a “No Resolution 2016-0379 November 10, 2016 Pa
ge 86 of 134
Project/No Action” alternative. In this case, it is assumed that the RSPU would move forward without the KP Medical Center. Therefore, the land uses assumed under the Land Use Variant in Chapter 2 of the SEIR are assumed to be developed under this alternative. For this alternatives analysis, it is assumed that the approximately 17.8-acre site within the Railyards would remain zoned H SPD, which allows for office uses and conditionally allows residential uses (with a Conditional Use Permit), and the land uses would be those described for the Land Use Variant in Chapter 2 of the SEIR. The following uses are assumed to be developed within the KP Medical Center site:
x Office: 921,002 sf
x Retail: 92,100 sf
x Flex: 138,150 sf
x Residential: 250 dwelling units
It should be noted that these land uses are also allowed under the current zoning. The Residential/Commercial Mixed Use allows for up to 250 dwelling units per acre and a maximum FAR of 8.0. The above mix of land uses would require a minimum of 6.3 acres, which could easily be accommodated on the approximately 17.8-acre site.

A total of approximately 5,804 employees would be generated by Alternative 4.

The street system would be similar to the proposed KP Medical Center, except that Huntington Street would be extended between Railyards Boulevard and South Park Street. Utilities would also be similar, with main water and storm drain lines in Railyards Boulevard, Bercut Street, South Park Street and 5th Street, and main sewer lines in Railyards Boulevard and 5th Street.

Under this alternative, Kaiser would continue to operate its Sacramento Medical Center at the Morse Avenue location in unincorporated Sacramento County. The Morse Avenue facility offers a full hospital, inpatient and ambulatory surgical services, medical offices, emergency services, pharmacy, and other related healthcare services and administrative functions. However, as discussed previously, in order to continue using the Morse Avenue facility, seismic retrofits would be required to meet State requirements. At the same time, other changes would be required to meet code requirements, such as increasing the size of hospital rooms. As a result, the number of beds available within the existing facility would be reduced from 283 beds to approximately 70 beds, requiring a large addition and/or new facilities in order to maintain existing service levels.

Resolution 2016-0379 November 10, 2016 Pa
ge 87 of 134
Relationship to Project Objectives
Alternative 4 would not meet any of the KP Medical Center objectives, because it would not construct a new medical center campus in downtown Sacramento. In addition, Alternative 4 would not meet certain RSPU objectives, such as providing for a range of complimentary uses that include health care, and providing sufficient land, entitlements, and regulatory provisions to support the development of a Kaiser Permanente regional medical center.

Facts in Support of Finding of Infeasibility
While some of the impacts of the proposed projects would be lessened under Alternative 4, the demand for potable water would be higher than the proposed projects. Alternative 4, however, would not meet any of the basic project objectives of the KP Medical Center project. For instance, and without limitation, Alternative 4 would not locate a regional medical center downtown near existing and planned transit services. As a result, Kaiser Permanente medical services would continue to be provided at the Morse Avenue location, a hospital that does not meet current seismic requirements for hospitals. Therefore, Alternative 4, No Project/No KP Medical Center, is rejected.

Alternative 5: Reduced Medical Center
Description
Alternative 5 would replace the Morse Avenue facility, and would include an expansion beyond the existing services offered at Morse Avenue. Under Alternative 5, approximately 280 beds would be provided in the hospital. This size hospital would be large enough to replace the Morse Avenue facility, which currently has 287 beds. Other facilities would be reduced by a commensurate amount, so that Alternative 5 would be approximately two-thirds the size of the proposed KP Medical Center project. The Hospital Support Building (HSB) would be reduced from 210,000 sf to 140,000 sf. Similarly, only 200,000 sf of medical office buildings uses would be constructed, along with 2,440 parking spaces in parking garages. The Central Utility Plant would also be reduced by approximately one-third. A helistop would be located immediately west of the hospital building.

Alternative 5 would occupy the same blocks as the KP Medical Center project, bounded by South Park Street on the north, Bercut Street on the west, Railyards Boulevard on the south and 5th Street on the east. The footprint of the various structures would be similar, so the reduction in beds and square footage would be reflected primarily in building height. The hospital would be 10 floors in height, compared to 14 floors for the proposed KP Medical Center project. The medical office buildings would be 4 stories tall, rather than 6 stories. The western garage would be 5 levels, with 1 level below grade. The eastern garage would have 8 levels, with one below grade.

Resolution 2016-0379 November 10, 2016 Pa
ge 88 of 134
The roadway system for Alternative 5 would be the same as for the proposed KP Medical Center project. Access to the hospital would be provided from Railyards Boulevard, with access to the garage from Railyards Boulevard and Bercut Street. Utilities lines would also be similar, with the main water and stormwater lines in Railyards Boulevard, 5th Street, South Park Street and Bercut Street.

Main sewer lines would be located in Railyards Boulevard and 5th Street. The hospital would have a central utility plant (CUP), which could be smaller than the 60,000 sf plant proposed for the project. The CUP would be located on a 20,000 sf site near the southeast corner of South Park Street and Bercut Drive.

Under Alternative 5, there would be approximately 2,830 employees at the KP Medical Center site, compared to the 4,465 employees at the proposed KP Medical Center.

While Alternative 5 would replace the Morse Avenue facility, it would not provide for any growth in membership and/or expansion of services as provided for by the proposed KP Medical Center. Therefore, it would not serve as a regional medical center to the extent that the proposed KP Medical Center would.

Relationship to Project Objectives
Alternative 5 would partially achieve the KP Medical Center project objectives by replacing the Morse Avenue facility with a seismically safe, up-to-date facility.

However, because Alternative 5 would only provide for replacement, it would not have the flexibility to respond to evolving health care needs of KP members, provide capacity for long-term growth and development, nor allow for the provision of new advanced medical services beyond those currently provided at the Morse Avenue facility. In addition, because new facilities would need to be located elsewhere, there would be less opportunity for comprehensive planning for medical services and the efficiencies captured by the consolidation of those services at one location. Additionally, those new facilities at other locations would have their own environmental impacts. The Alternative 5 hospital would help transform downtown Sacramento into a commercial and community hub by diversifying the resources available within the downtown to include more medical facilities, but to a lesser extent than the proposed KP Medical Center project.

Similarly, Alternative 5 would meet the RSPU project objectives to provide a range of uses, including health care, and to support the development of a Kaiser Permanente regional medical center, but to a lesser extent than the proposed KP Medical Center, for the reasons stated above. Further, because fewer of the KP medical services would be located in the RSP Area, this Alternative would not support the RSPU objectives to promote downtown development that is a regional draw to the extent that the proposed KP Medical Center would.

Facts in Support of Finding of Infeasibility
While the Reduced Medical Center Alternative would avoid impacts associated with the projects, this alternative would not meet some of the KP Medical Center Resolution 2016-0379 November 10, 2016 Pa
ge 89 of 134
project objectives. Because Alternative 5 would provide only for the replacement of the Morse Avenue facility, Kaiser Permanente would need to build additional facilities elsewhere in the region to provide for membership growth. Depending on the location and size of such facilities, they could result in additional traffic, air quality, noise and related impacts that could be more severe than those under the RSPU. Moreover, the decentralization of member services to satellite MOBs would prevent the realization of the applicant’s overriding project objective of maximizing efficiency in the provision of services. Therefore, Alternative 5 is rejected.

MLS Stadium Alternatives
Alternative 6: No Project/No MLS Stadium
Description
Under this alternative, the MLS Stadium would not be built within the RSP Area.

As a result, there would not be a facility to accommodate a professional outdoor soccer team in Sacramento. As discussed earlier, a “No Build” alternative would assume that the MLS Stadium site would remain undeveloped and that the only changes that would occur would be related to finalizing remediation of the site.

The conditions described in Chapter 4 settings and Alternative 1 would continue.

For a “No Action” alternative, land uses are typically based on existing uses. In this case, because it is assumed that the RSPU would be implemented on the remainder of the site, it is assumed that the land uses identified in the Land Use Variant in Chapter 2 would be developed on the stadium site, including:
x Residential: 750 units
x Retail: 30,700 sf
x Flex Space: 46,050 sf
The above uses are also consistent with the existing zoning of Residential Mixed Use, which allows up to 310 dwelling units per acre and a maximum FAR of 1.0.

A minimum of 2.4 acres would be needed for the above residential uses and 1.76 acres for the retail and flex space uses. The stadium site is approximately 14 acres, which could accommodate these uses.

The roadway system would differ from the proposed MLS Stadium, because South Park Street, 8th Street and 9th Street would extend into the site to provide more circulation to the smaller blocks. Utilities would be similar, with main water and sewer lines in Railyards Boulevard, 7th Street and 10th Street, and storm drain lines in 7th Street and Railyards Boulevard.

Resolution 2016-0379 November 10, 2016 Pa
ge 90 of 134
A small park would be developed in the center of the site, and open space would continue to be provided along the embankment.

Relationship to Project Objectives
Alternative 6 would not achieve the objectives of the proposed MLS Stadium, because no new professional soccer stadium would be constructed. Further, Alternative 6 would not achieve RSPU project objectives related to providing a range of complementary uses that includes entertainment, promoting downtown development that is a regional draw for the City, and providing sufficient land, entitlements and regulatory provisions to support the development of a multi- purpose stadium that could accommodate a Major League Soccer franchise.

Facts in Support of Finding of Infeasibility
While the No Project/No MLS Stadium Alternative would avoid impacts associated with the MLS Stadium, this alternative would not meet any of the MLS Stadium project objectives. This alternative would not provide an additional entertainment venue near the City’s downtown core and would not help expand the City’s desire to attract additional professional sports franchises. Alternative 6 would also exacerbate some of the environmental impacts as analyzed in the SEIR. Therefore, Alternative 6, No Project/No MLS Stadium, is rejected.

Alternative 7: Smaller Stadium
Description
This alternative would reduce the size of the MLS stadium to 18,000 capacity, which is the same size as another professional soccer facility, Avaya Field in San Jose. Although the capacity would be reduced by 28 percent, the size of the building would not change substantially, because the size of the field could not be reduced and there would still need to be paved entryways and gathering spaces outside of and within the stadium.

The facilities at the Alternative 7 stadium would be essentially the same as for the 25,000-capacity stadium, but in some cases they would be smaller. For example, the seating bowl would be shorter and there would be fewer concessions. Some components would likely be similar in size, such as the field itself and team facilities and locker rooms. The reduction in square footage would result in a smaller footprint and a lower profile for the stadium. However, due to its location, it is unlikely that an additional, usable parcel could be created for non-stadium-related retail or other purposes. Therefore, this analysis assumes that Alternative 7 would use the entire area dedicated to the 25,000-capacity stadium, with any excess space dedicated to landscaping or plazas.

The smaller stadium is anticipated to host the same number of events as the proposed MLS Stadium; however, attendance levels would be reduced to the Resolution 2016-0379 November 10, 2016 Pa
ge 91 of 134
stadium’s smaller size. Estimated attendance would range from 4,000 people at community events to 21,500 at concerts. As with the 25,000-capacity stadium, the 18,000-capacity stadium is assumed to have additional capacity for concerts, because the field could be used for attendees. Soccer-related events would have an expected attendance of 12,600 to 18,000 under Alternative 7, compared to 18,000 to 25,000 under the proposed MLS Stadium. On an average daily and annual basis, attendance would be approximately 30 percent lower under Alternative 7, compared to the 25,000-capacity MLS Stadium.

Employment levels would also be similar, although reduced due to the reduction in attendance levels. The permanent staff would need to include the same number of staff for management, maintenance, and ticket sales. Players, coaches, trainers and scouts are also considered in the permanent employee number, although they would only be at the stadium on event days. For this analysis, it is assumed that the permanent staff would not change. Temporary, event-day staff would be more dependent on attendance levels. Alternative 7 is estimated to require from 102 to 330 temporary staff on event days, including police, EMTs, security, stagehands and cleaning staff.

Relationship to Project Objectives
Alternative 7 could meet some of the project objectives of bringing a state-of-the- art stadium and entertainment facility to RSP Area; it could provide a catalyst to development of the RSP Area and would be accessible by multiple modes of transportation. The ability of Alternative 7 to meet the basic objectives of the project such as serving as a catalyst and promoting major entertainment events could be limited by its size, with annual attendance reduced from 748,000 to 529,000. The smaller size of the stadium could also make it more difficult to achieve the objective of meeting MLS industry standards. Similarly, Alternative 7 would contribute to RSPU project objectives to a lesser extent than the proposed MLS Stadium, particularly those objectives related to providing a range of complementary uses that includes entertainment, promoting downtown development that is a regional draw for the City, and providing sufficient land, entitlements and regulatory provisions to support the development of a multi- purpose stadium that could accommodate a Major League Soccer franchise.

Facts in Support of Finding of Infeasibility
While the Smaller Stadium Alternative would lessen some impacts associated with the MLS Stadium, this alternative would only partially meet the MLS Stadium project objectives. However, because Alternative 5 would provide only 72 percent of the capacity as compared to the proposed project, the size and quality of events at the MLS Stadium could be affected, potentially reducing the number of visitors to the RSP Area and the downtown area. The reduced capacity of the MLS Stadium could also make it more difficult to construct a stadium that meets MLS industry standards. Therefore, Alternative 7 is rejected.

Resolution 2016-0379 November 10, 2016 Pa
ge 92 of 134
Alternative 8: Relocated Railyards Stadium
Description
Under Alternative 8, a 25,000-capacity stadium would be constructed in the RSP Area, but at a different location. Given that approximately 14 contiguous acres are needed for the stadium, the only location with the appropriate dimensions within the RSP Area is located directly to the west of the proposed MLS Stadium site. The Alternative 8 site would be bounded by 7
th Street on the east, Railyards
Boulevard on the south, 5th Street on the west and the embankment on the north.

This alternative location would reduce impacts specific to the MLS Stadium, such as crowd noise and lighting, by moving the source of those impacts farther from the sensitive uses east of 7th Street and south of the RSP Area. The entrance to the Alternative 8 stadium and the associated plazas and stages would front 7th Street. As shown in Figure 6-2 in the SEIR, there would be a strip of land to the west of the stadium, along 5th Street, that could be developed with commercial uses, similar to the land uses assumed to be located between 7th and 8th Streets for the proposed MLS Stadium site. Also as shown in Figure 6-2, the residential land uses that would be displaced by the relocated stadium would be moved to the former location, essentially swapped with the stadium. Therefore, the area bounded by 7
th Street, North 10th Street, Railyards Boulevard and the embankment would be zoned R-5.

Alternative 8 is assumed to have the same number of dwelling units and non- residential square footage as would occur under the proposed MLS Stadium.

The two sites are slightly different in size, which could affect the layout and design of the residential and commercial buildings. The current MLS Stadium/C-3 site is a total of 21 acres, including developable lots and open space. The stadium itself would occupy approximately 13.27 acres, and the residential and commercial development would occupy 6.89 acres. The R-5 Residential Site is composed of approximately 18.16 acres, including 17.03 acres of developable lots and 1.13 acres of open space. Under Alternative 8, the MLS Site/C-3 development program would need to occupy the 18.16-acre site. Assuming the stadium is the same size, there would be approximately 4.89 acres available for the accompanying residential and commercial development, a reduction of 2 acres or about 30 percent the area available under the proposed MLS Stadium.

The C-3 zone allows up to 450 dwelling units per acre and an FAR of 8.0, so the residential, retail and flex space could easily be accommodated on the smaller site. The current site of the proposed MLS Stadium is larger than the current area proposed for R-5 zoning, so that level of residential and retail development could be accommodated as well.

The roadway system would be altered to provide through access to the residential blocks east of 7th Street and 6th Street and Judah Street would not be extended north of Railyards Boulevard.

Resolution 2016-0379 November 10, 2016 Pa
ge 93 of 134
The Alternative 8 site is encumbered by an affordable and market rate housing covenant in favor of California Department of Housing and Community Development (HCD) regarding the obligation to construct a total of 1,100 residential units of which 267 are restricted as affordable rate units. Therefore, this alternative may prove not be feasible, because it would require that the covenant be rescinded. Nonetheless, the alternative is included in this analysis because it is the only alternate site within the RSP Area that is of sufficient size to accommodate the Stadium.

Relationship to Project Objectives
Alternative 8 would meet the project objectives related to building a multipurpose stadium and entertainment center that meets MLS industry standards, and that would serve as the long-term home to the Sacramento Republic FC. This alternative could also leverage the stadium to catalyze redevelopment of the RSP Area. Access to the stadium from multiple modes of transportation would also be achieved, although, as discussed above, transit and pedestrian access would not be as safe or efficient as the proposed MLS Stadium site. Because this site is encumbered by a covenant for affordable housing, the location of the MLS Stadium in this location may not achieve the RSPU objective of providing sufficient entitlements and regulatory provisions to support development of an MLS franchise.

Facts in Support of Finding of Infeasibility
While some environmental impacts of Alternative 8 would be less severe than under the proposed projects, other impacts such as noise, traffic and intersection levels of service, transportation network connectivity land use compatibility would be worse. The Alternative 8 location is much closer to the KP Medical Center project site than the proposed MLS Stadium site. Hospitals can be considered sensitive to noise levels. Under Alternative 8, buildings would be constructed immediately west of the stadium, so the hospital would be buffered from stadium noise. However, the upper floors of the hospital, which would contain patient rooms, could be more directly exposed to stadium noise, particularly before the buildings west of the stadium are constructed. The planned transportation network would be disrupted by eliminating the South Park Street connection between 5
th Street and 7th Street, as well as the connection of 6th Street from Railyards Boulevard to North B Street. The elimination of these streets would also remove part of the RSP grid and reduce the ‘walkability’ of the area.

Therefore, Alternative 8, Relocated Railyards Stadium, is rejected.

Alternative 9: Natomas MLS Stadium
Description
Alternative 9 assumes a 25,000-capacity stadium would be constructed at what is now the Sleep Train Arena complex located south of Del Paso Road, east of I- Resolution 2016-0379 November 10, 2016 Pa ge 94 of 134
5, west of Truxel Road and north of Arena Boulevard in North Natomas. The Natomas MLS Stadium would be located within approximately 200 acres of vacant land and existing paved parking lot. A partially constructed and now- abandoned baseball stadium is located in the northern portion of the site. Sleep Train Arena is located in the central portion of the site. The southern portion of the site is dominated by the Sleep Train Arena surface parking lot. The Natomas MLS Stadium site is shown in Figure 6-3 in the SEIR.

Perimeter access road surrounds the Natomas MLS Stadium Site on the south, west and eastern boundaries. Surrounding land uses include two-story office buildings and parking lots to the north, vacant land to the east, multifamily residential development to the southeast, vacant land and multifamily residential development to the west.

For purposes of this alternative, it is assumed that the existing Sleep Train Arena would be demolished, and replaced by the MLS Stadium with dimensions and design similar to the stadium proposed for the RSP Area. Approximately 14 acres would be used for the stadium, which would include the same amenities as the proposed MLS Stadium. Parking would be provided on site, in the existing parking lot, which has more than 12,000 spaces. The stadium would displace only a small number of these spaces, because it would be located on the same site that the Sleep Train Arena currently occupies.

No new circulation or utilities would be required for the Natomas stadium, because it is already configured to accommodate the basketball arena.

Construction activities would be similar to building a stadium in the RSP Area, except that groundwater is less prevalent at the Natomas site, so there would be less dewatering.

Under this alternative it is assumed that the proposed MLS Stadium site within the RSP Area would be developed under either the adopted 2007 RSP (if the 2016 RSPU is not adopted) or the Land Use Variant (if the RSPU is developed), as described in Alternative 6. The impacts of developing residential and commercial uses on the proposed MLS Stadium site are described in Chapter 4 under the Land Use Variant and in Alternative 6, above. Therefore, this analysis focuses on the differences between building a stadium on the proposed site in the RSP Area or at Natomas. A brief discussion is provided at the end of impacts on the RSP Area site.

Relationship to Project Objectives
Alternative 9 could achieve the objective of developing a state-of-the-art multipurpose stadium and entertainment facility that meets MLS industry standards, and it could be that the stadium could promote family and civic events compatible with the surrounding area, but would be unable to support and catalyze redevelopment of the RSP Area if it is located in Natomas. However, Alternative 9 would not meet any of the other basic objectives of the MLS Resolution 2016-0379 November 10, 2016 Pa
ge 95 of 134
Stadium project. The Natomas site would need to be acquired in order to construct a stadium there. Even assuming that the site could be acquired, the process could substantially affect the cost and timing of the project to accommodate MLS expansion efforts. In addition, as discussed above, the Natomas site is not as conducive to travel by bike, foot and/or transit, so it would not promote access by multiple modes of transportation.

Alternative 9 would not support a number of the RSPU project objectives, such as providing a range of complementary uses that includes entertainment, promoting downtown development that is a regional draw for the City, or promoting alternative modes of transportation.

Facts in Support of Finding of Infeasibility
Development of an MLS Stadium at the Sleep Train Arena site in North Natomas would preclude other types of development that could occur at that site, although no other redevelopment plans are proposed for the site at this time. The Sleep Train Arena site would not promote multi-modal transportation to the same degree as the proposed MLS Stadium location due to its distance from major transit corridors and lack of immediately surrounding development. Due to the likelihood for automobile travel to be higher to the Sleep Train Arena site as compared to the proposed RSP Area site, air emissions would be expected to increase considerably. Additionally, due to the Sleep Train Arena’s location in a A99 flood zone, mitigation may be required to ensure that flood protection at the Natomas site is adequate. Therefore, Alternative 9, Natomas MLS Stadium, is rejected.

Stormwater Outfall Alternatives
Alternative 10: No Project/Stormwater Outfall
Description
As discussed previously, an EIR must evaluate a “No Project” alternative. In the case of the Stormwater Outfall, under the No Project alternative, the outfall would not be built, and either the RSPU would use a different facility to manage stormwater, such as the cistern that was proposed in the 2007 RSP, or the RSP Area would not develop. Moving the stormwater outfall to a different location along the river would not avoid or lessen any significant impacts.

Relationship to Project Objectives
The proposed RSPU could not move forward if no outfall were constructed, so none of the project objectives would be achieved. Any storm drainage system for the RSPU would require a connection to the Sacramento River allowing for discharge of stormwater.

Resolution 2016-0379 November 10, 2016 Pa
ge 96 of 134
Facts in Support of Finding of Infeasibility
If a combination of outfall and cistern or similar infrastructure were constructed, some stormwater would need to be discharged to the City’s combined sewer system (CSS). The City’s CSS has limited capacity. In the short-term, projects within the RSP Area could rely on the basins to manage stormwater. However, at buildout, stormwater must be discharged either to the Sacramento River or the CSS. Without the proposed Stormwater Outfall, a portion of the stormwater would need to be discharged to the CSS, which does not now and is not planned to have capacity to accommodate increases in both wastewater and stormwater.

Therefore, Alternative 10, No Project/Stormwater Outfall, is rejected.

F. Statement of Overriding Considerations:

Pursuant to Guidelines Section 15092, the City Council finds that in approving the projects it has eliminated or substantially lessened all significant and potentially significant effects of the projects on the environment where feasible. The City Council further finds that it has balanced the economic, legal, social, technological, and other benefits of the project against the remaining unavoidable environmental risks in determining whether to approve the projects and has determined that those benefits outweigh the unavoidable environmental risks and that those risks are acceptable. The City Council makes this statement of overriding considerations in accordance with Section 15093 of the CEQA Guidelines in support of approval of the projects.

The City of Sacramento has considered the information contained in and related to the Final SEIR (the Draft SEIR, Comments and Responses to those documents, text changes and other revisions to the SEIR, and all other public comments, responses to comments, accompanying technical memoranda and staff reports, and findings included in the public record for the projects). Pursuant to CEQA Guidelines Section 15092, the City Council finds that in approving the Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium, & Stormwater Outfall projects, it has eliminated or substantially lessened all significant and potentially significant effects of the projects on the environment where feasible as shown in the findings. The City Council further finds that it has balanced the economic, social, technological and other benefits of the projects against the remaining unavoidable environmental risks in determining whether to approve the projects and has determined that those benefits outweigh the unavoidable risks and that those risks are acceptable. The City Council makes this statement of overriding considerations in accordance with CEQA Guidelines Section 15093 in support of approval of the projects. Specifically, in the City Council’s judgment, the each of the benefits of the projects as proposed separately and independently outweigh all of the unmitigated adverse impacts and the proposed projects should be approved.

The overall goals of the proposed projects are to update the plan for development within the RSP Area, and construct and operate the KP Medical Resolution 2016-0379 November 10, 2016 Pa
ge 97 of 134
Center, MLS Stadium, and Stormwater Outfall. Based on the objectives identified in the Final SEIR and administrative record, and through extensive public participation, the City Council has determined that the proposed projects should be approved, and any remaining significant environmental impacts attributable to the proposed projects are outweighed by the following specific environmental economic, fiscal, social, housing and other overriding considerations. Each benefit set forth below is supported by substantial evidence in the record and constitutes an overriding consideration warranting approval of the proposed projects, independent of the other benefits, despite each and every unavoidable impact.

The considerations that have been taken into account by the City Council in making this decision are identified below.

Land Use. The projects will develop the RSP Area in a way that updates the 2007 Railyards Specific Plan to better meet City’s existing goals for the Central City’s infill development. Redevelopment of the RSP Area will incorporate many of the best principles of smart growth and quality urban design and will advance the City’s land use goals and policies. Key land use-related benefits include the following:
x Integration of the RSP Area into the fabric of the existing Central City, consistent with 2035 General Plan goal LU 1.1; policies LU 1.1.4 and LU

1.1.12; goal LU 2.5; policies LU 2.5.1 and LU 2.5.2; goal LU 5.1; policy LU 5.1.1; goal LU 5.6; policies LU 5.6.1 and LU 5.6.6. The Railyards have historically been isolated from the City. The proposed projects would integrate the area from all points into a seamless patch of the City fabric. x Creation of mixed-use, pedestrian-friendly, transit-oriented urban infill development, including residential, hospital, recreation, retail, restaurant, hotel, office, open space, and other related uses in close proximity to a wide array of modes of transportation consistent with 2035 General Plan goal LU 2.1; policies LU 2.1.3 and LU 2.1.6; goal LU 2.5; policy LU 2.5.1; goal LU 2.6; policies LU 2.6.1 and LU 2.6.2; goal LU 4.1, policies LU

4.1.1, LU 4.1.2, LU 4.1.3, LU 4.1.4, LU 4.1.6, LU 4.4.6; goal LU 5.1; policies LU 5.1.2, and 5.1.3; goal LU 5.5; policy LU 5.5.1; goal LU 5.6; policies LU 5.6.2 and LU 5.6.3; goal LU 8.1; policy LU 8.1.1, LU 8.1.2, and LU 8.1.13; goal LU 8.2; policies LU 8.2.1 and 8.2.5; goal LU 9.1; policies LU 9.1.1, LU 9.1.2, and LU 9.1.3.

Housing. The projects will add between 6,000 and 10,000 housing units to the City’s housing stock. Key housing-related benefits include the following:
x Addition of market-rate, high-rise and mid-rise housing in the heart of the Central City, where little market rate housing currently exists, consistent with 2035 General Plan goal LU 2.4 and policy LU 2.4.5.

Resolution 2016-0379 November 10, 2016 Pa
ge 98 of 134
x Construction of housing as part of mixed-use development projects, consistent with 2035 General Plan goal LU 2.1; policy LU 2.1.6; goal LU

2.6; policy LU 2.6.2; goal LU 4.1; policy LU 4.1.1; goal LU 4.4; goal LU

5.1; policies LU 5.1.1, LU 5.1.2, LU 5.1.4, and LU 5.1.5; policy LU 5.6.3; policy M 1.3.1; and Central City Community Plan policies CC.H 1.1 and CC.SPD 1.1.
x Addition of between 6,000 and 10,000 units to the housing inventory, advancing the City’s ability to achieve its Regional Housing Needs Allocation established by SACOG and reflected in the 2013-2021 Housing Element, which requires 24,101 new units, including 3,200 above moderate income, multi-family units (see 2013-2021 Housing Element, Table H9-1). The proposed units would represent between 25% and 42% of the RHNA-required housing units; and
x Addition of up between 6,000 and 10,000 units in an area of the City unconstrained by flood risk, advancing the City’s achievement of 2013- 2021 Housing Element Policy H 2.3.4 and Implementation Program 29.

Sustainable Development. The projects would implement a comprehensive sustainability strategy, including LEED Silver certification or equivalent of the KP Medical Center and design for the MLS Stadium that achieves LEED-equivalent energy and environmental design to the extent feasible. For the KP Medical Center, Kaiser Permanente would implement many of its current green strategies, such as:
x Achievement of CALGreen Tier 1 water efficiency standards; x Use of select materials, including PVC-free materials, low or VOC-free paints, CFC-free refrigerants, Formaldehyde-free casework, and use of recycled building materials;
x Installation of high-efficiency HVAC systems, thermal fluid heaters as a high-efficiency water heating source;
x Onsite energy cogeneration electrical production and heat recovery, including solar power/photovoltaics; and
x Water conservation measures and permeable paving to reduce stormwater runoff and evaporation, including green roofs, turf-free and indigenous native planting.
x The projects will comply with Title 24 (California Energy Efficiency Standards), and where feasible, will employ additional energy conservation measures. This would include implementing energy conservation measure in design and construction. Development of the RSP Area would provide an opportunity to use innovative energy systems Resolution 2016-0379 November 10, 2016 Pa
ge 99 of 134
such as combined heating and power, which would provide significant energy savings. At this stage, it is unknown what exact energy conserving measures would be implemented. However, it is the goal for the proposed project to implement energy conserving measures wherever feasible. The Design Guidelines include sustainability requirements.
x The proposed project will reduce greenhouse gas emissions by creating an urban area that encourages the use of alternative modes of transportation. The project will create a walkable, bikeable transit-friendly community. This will reduce vehicle miles traveled, and in turn, will decrease consumption of natural resources, particularly fossil fuels.

The MLS Stadium would implement the following strategies with the goal of meeting LEED equivalency:
x To achieve 15% better than Title 24 energy reduction, the MLS Stadium would utilize systems to optimize energy performance, including energy metering, demand response, maximizing use of shade structures and wind resources on the site, use of LED and sensor lighting, and potential use of solar panels for on-site energy; and
x To achieve water reduction that is 25% better than the CALGreen Baseline, the MLS Stadium would employ water efficiency measures that reduce indoor and outdoor water use, including the use of low-flow fixtures and water metering.

Economic Development. The projects will provide opportunities to generate thousands of new annual construction jobs, encouraging participation by small and local business enterprises through a comprehensive employment and contracting policy. Key benefits of the project’s economic development plan include the following:
x Buildout of the RSPU would be consistent with the smart growth principals identified in the Sacramento Area Council of Governments’ (SACOG) Blueprint Preferred Scenario. The project promotes the City’s goal to develop the downtown area, including the project area, as the urban core of the City. The SACOG Blueprint calls for capturing a greater amount of regional employment, retail, and housing within, or contiguous to the existing urban footprint, to reduce urban sprawl and protect open space and agricultural land within the greater Sacramento region. The projects meet this objective by providing compact development that maximizes existing land while encouraging mixed land uses in close proximity to the downtown urban center. The projects also support the development of a distinctive and attractive urban village that would create a regional draw. x Buildout of the RSPU would be consistent with the Central City Community Plan urban development goal of revitalizing the Central City as Resolution 2016-0379 November 10, 2016 Pa
ge 100 of 134
a viable living, working, shopping and cultural environment. The projects propose to develop higher density development in close proximity to the existing downtown Central Business District. This will capture a greater amount of regional employment, retail and housing within the existing urban footprint, thereby reducing urban sprawl while protecting open space and agricultural land within the greater Sacramento region. The projects add residential, office and retail uses within close proximity to the urban core of the City. This creates a logical extension of the City’s downtown urban area while establishing a dynamic community, in which the uses strengthen each other and provide a full range of day and night activities.
x The RSPU, KP Medical Center and MLS Stadium will provide significant revenue to the City. The City will receive revenue from: the Property Tax in lieu of Vehicle License Fee, sales taxes generated by the commercial portions of the project, and utility taxes. The projects will also generate revenues for the City through payment of building fees and development impact fees, as well as transient occupancy taxes from hotel developments.
x The projects will provide significant employment for the City and the region. Full buildout of the project will be anticipated to yield between 18,985 and 22,903 employees. The projects are also expected to create a number of secondary jobs, as implementation of the projects would require construction jobs for the development of the buildings and associated site improvements. Such jobs will provide income and work experience for City residents and other workers and their families. x Development of the projects would increase economic and employment activity in the Central Business District of Sacramento. The operation of the retail stores, offices, KP Medical Center, MLS Stadium, restaurants, public market and food and beverage service will generate revenue. The creation of temporary construction jobs and permanent office and retail jobs will also financially benefit the City, as it will increase sales tax revenue from the purchase of goods by project residents and employees.

Resolution 2016-0379 November 10, 2016 Pa
ge 101 of 134
x Development of the neighborhood retail portion of the RSPU is projected to contribute up to $19.4 million in taxable sales to City revenue streams.1 x Development of the approximately $200,000,000 MLS Stadium will result in approximately 1,755 construction jobs, and approximately $15.3 million in annual spending by event attendees. Total net new annual spending will be approximately $30.5 million in the City of Sacramento. 2 Social Considerations. The projects will promote a dynamic 24-hour mixed-use urban village that provides a range of complementary uses – including cultural, office, hospitality, healthcare, entertainment, retail, residential, educational and open space – and a mixture of housing types, including affordable housing. x The proposed projects would provide a network of usable green spaces.

This includes parks, open spaces, and public plazas designed to enhance the urban experience of the Central City, while providing opportunities for social interaction and civic activity. This will enhance and strengthen the civic and public realm. The projects will also activate public use of the riverfront and feature the region’s natural landmarks.

Transportation/Transit Considerations. The projects will connect the RSP Area with Sacramento’s downtown office, retail, and government center, as well as Old Sacramento, the River District, and the Alkali Flat neighborhood, using pedestrian and bicycle facilities, roadways, and public transportation. x The projects will reduce vehicle trips and dependence on automobiles.

The projects’design is consistent with these smart growth principles. The high-density, mixed use development in an existing developed area will reduce vehicle miles traveled. Also, the projects will encourage and support transit use as well as pedestrian and bicycle transportation. The projects will shorten commute times and reduce traffic congestion. The projects’inclusion of space to accommodate an intermodal transit facility and an extension of the existing light rail system will accommodate future

1 Alfred Gobar Associates, 2013. Sacramento Railyards Feasibility Analysis; prepared for Downtown Railyards Venture. November, 2013.
2 Capitol/PFG, The Critical Mass Report, October 5, 2015, pages 15-18.

Resolution 2016-0379 November 10, 2016 Pa ge 102 of 134 growth by creating jobs and housing opportunities closer to transit. This will reduce vehicle trips that would otherwise use the mainline freeway system.
x The projects will develop 6,000 to 10,000 residential units within the core employment center for the region, thereby providing substantial opportunities for reduced vehicle miles traveled within the city’s largest employment zone.
x The projects will provide neighborhood and community-serving retail near residential development. The projects will also develop an extensive system of bicycle and walking paths, resulting in better, more realistic alternative transportation options. The retail and restaurant uses will allow residents to avoid having to drive to access common neighborhood- serving retail uses.
x The proposed projects are designed to facilitate access to Sacramento Valley Station (SVS). The projects will encourage use of bus and rail transit alternatives by residents and employees, including light rail, walking, and biking to reach the SVS.
x The proposed projects would provide space for the construction of platforms that would serve future High Speed Rail trains and passengers.

The projects will dedicate a right-of-way for the light rail line extension and 7 th Street light rail station and help fund construction to the 7th Street light rail station. The projects will also fund improvement to bus and light rail services, provide off-street and on-street bike routes, and construct pedestrian trails and access tunnels throughout the RSP Area. x The proposed projects would provide circulation links between the downtown area to the south and the River District to the north. Also, the circulation network would provide interconnectivity for automobiles, bicycles, and pedestrians. The key connections would include the extension of 5
th Street to Richards Boulevard, improved connectivity to Jibboom Street and Bercut Drive, the extension of 10th Street to North B Street, and the connection of Railyards Boulevard to 12th Street.

Historic Preservation. The RSPU will utilize the historic Central Shops buildings as a community resource and heritage tourism draw, as well as inspiration for a mix of uses that will help create a culturally vibrant urban City core. x The proposed projects would preserve and reuse onsite historic resources, including the Central Shops and historic rail Depot. The projects will develop the Central Shops District to showcase the historical character and importance of the Railyards. The RSPU will enhance public access to the preserved and restored historic Central Shops buildings, some of the oldest and most historic in Sacramento and the western US.

Resolution 2016-0379 November 10, 2016 Pa
ge 103 of 134
The historic Central Shops district will provide the public with a greater understanding of the City’s history and role within the development of the West.

Medical Center. The KP Medical Center project will provide a number of benefits relating to health care facilities and services. x The project will result in the proximate location of a state of the art medical center (including hospital, emergency department, and medical offices) in an area with demonstrated un-met needs with regard to medical services. In particular, the two closest zip codes to the project site feature median incomes that are substantially below the medians for Sacramento and Yolo counties, and the State of California as a whole. In general, economically disadvantaged communities have greater medical needs than non-advantaged areas. For instance, the referenced zip codes have emergency department visit and hospitalization rates for oral and dental diseases, asthma, and sexually transmitted diseases that are significantly higher than County and State averages. Furthermore, heart disease mortality is also high compared to mortality rates for the County and the State. The development of the proposed medical center will provide easy access to emergency services for these communities, as well as easy access to preventative medical care for Kaiser members, and should thereby improve the health of these communities.
x The project will replace the existing Sacramento Medical Center with a new medical center campus that will be modern and fully capable of accommodating new technology and state of the art medical care design, which is not currently possible at the existing medical center. This will result in an increase in the quality and efficiency of medical care delivery to patients.
x The project will create a new hospital that addresses concerns over the seismic safety of the existing hospital as well as risks due to the existing hospital's location within a floodplain, resulting in increased resiliency and effectiveness of the facility in case of natural disaster. x The project will improve geographic access to primary care for over 92,000 members. Under the project, 15-minute access improves from 73% to 91% of Sacramento members.

Having considered the benefits outlined above, the City Council finds that each and every one of the benefits of approving the projects separately and independently outweigh and override the unavoidable adverse environmental effects associated with the projects, and therefore, the projects’unavoidable adverse environmental effects are acceptable.

Resolution 2016-0379 November 10, 2016 Pa
ge 104 of 134
Sacramento Railyards Specific Plan Update 4-1 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 Exhibit B
CHAPTER 4
Mitigation Monitoring Plan

4.1 Introduction
Public Resources Code section 21081.6 and section 15097 of the California Environmental Quality Act (CEQA) Guidelines require public agencies to establish monitoring or reporting programs for projects approved by a public agency whenever approval involves the adoption of either a mitigated negative declaration or specified environmental findings related to environmental impact reports.

The following is the Mitigation Monitoring Plan (MMP) for the Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium, and Stormwater Outfall projects. The intent of the MMP is to track and successfully implement the mitigation measures identified within the Draft Subsequent Environmental Impact Report (SEIR) for this project.

4.2 Mitigation Measures
The mitigation measures are taken from the Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium, and Stormwater Outfall Draft SEIR and are assigned the same number as in the Draft SEIR. The MMP describes the actions that must take place to implement each mitigation measure, the timing of those actions, and the entities responsible for implementing and monitoring the actions.

4.3 MMP Components
The components of the attached table, which contains applicable mitigation measures, are addressed briefly, below.

Impact: This column summarizes the impact stated in the Draft SEIR.

Mitigation Measure:All mitigation measures that were identified in the Sacramento Railyards Specific Plan Update, KP Medical Center, MLS Stadium, and Stormwater Outfall Draft SEIR are presented, as revised in the Final SEIR, and numbered accordingly.

Action(s): For every mitigation measure, one or more actions are described. The actions delineate the means by which the mitigation measures will be implemented, and, in some instances, the Resolution 2016-0379 November 10, 2016 Pa ge 105 of 134

4. Mitigation Monitoring Plan
Sacramento Railyards Specific Plan Update 4-2 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 criteria for determining whether a measure has been successfully implemented. Where mitigation measures are particularly detailed, the action may refer back to the measure.

Component: This column identifies the relevant component of the proposed projects to which the mitigation measure applies. The mitigation measure may apply to the entire RSPU (Railyards Specific Plan Update) including its project-specific components, or individually to the KPMC (KP Medical Center), MLS (MLS Stadium), or SO (Stormwater Outfall). More than one project component may be identified.

Implementing Party:This item identifies the entity that will undertake the required action.

Timing: Implementation of the action must occur prior to or during some part of project approval, project design or construction or on an ongoing basis. The timing for each measure is identified.

Monitoring Party:The City of Sacramento is primarily responsible for ensuring that mitigation measures are successfully implemented. Within the City, a number of departments and divisions would have responsibility for monitoring some aspect of the overall project. Other agencies, such as the Sacramento Metropolitan Air Quality Management District, may also be responsible for monitoring the implementation of mitigation measures. As a result, more than one monitoring party may be identified.

Resolution 2016-0379 November 10, 2016 Pa ge 106 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-3 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

4.1 Aesthetics, Light, and Glare

4.1-1: The implementation of the
RSPU, including the potential
development of large-floor plate and
high-rise buildings in the RSP Area
east of I-5, could alter public views.

4.1-1
Within Lot 46, the maximum street-wall height for structures facing 7th Street shall be 35 feet in height.

Incorporate street-wall height requirements into design for structures facing 7th Street
RSPU Project applicant Prior to approval of site plan
and design review
City of Sacramento Community
Development Department

4.1-2: The potential development of
high-rise buildings adjacent to the
riverfront could conflict with the
character of the riverfront between
Old Sacramento and the Jibboom
Street Bridge.

4.1-2
For development within the allowable footprints on Lot 35, the following base height, bulk and massing requirements shall be added to the RSPU Design Guidelines and
enforced through the SPD and the City’s Site Plan and
Design Review permit process:
x On the southern development lot, any portion of a
building within 80 feet of the required setback from the riverbank shall be no greater than 35 feet in height.

Incorporate requirements for base height, bulk and
massing for Lot 35, as described in Mitigation Measure

4.1-2.

RSPU Project applicant Prior to approval of site plan
and design review
City of Sacramento Community
Development Department

4.1-3: The proposed projects could
create substantial new sources of
light.

4.1-3(a)
i. East of 6th S treet, all exterior lighting and advertising (including signage) shall be directed onto the specific location intended for illumination (e.g., parking lots, driveways, and walkways) and shielded away from
adjacent properties and public rights-of-way to
minimize light spillover onto adjacent areas. Light
structures for surface parking areas, vehicular access
ways, and walkways shall not exceed a height of 25
feet. Monument lighting and night-lit signage is
prohibited on building facades that face existing
residential neighborhoods.

Identify light fixtures to be used on Construction Plans and demonstrate that the fixtures minimize spill over.

RSPU, MLS Project applicant Prior to approval of site plan and design review for
applicable projects
City of Sacramento Community
Development Department
ii. Prior to issuance of a Site Plan and Design Review
Permit for each specific development project, the
applicant shall submit a lighting plan to the
Development Services Department for review and
approval. The plan shall specify the lighting type and
placement to ensure that the effects of security and
other outdoor lighting are minimized on adjacent uses
and do not create spillover effects.

Prepare and submit lighting plan to the City of Sacramento Development Services Department
RSPU, MLS Project applicant Prior to approval of site plan and design review of each
applicable development project
City of Sacramento Community
Development Department
iii. Landscape illum ination and exterior sign lighting shall follow the City Code. Demonstrate that lighting plan complies with City Code RSPU, MLS Project appli cant Prior to approval of site plan and design review of each
applicable development project
City of Sacramento Community
Development Department

4.1-3(b)
i. The project app licant shall require construction
contractors to ensure that all lighting related to
construction activities shall be shielded or directed to restrict any direct illumination onto property located
outside of the Stadium project site boundaries that is
improved with light-sensitive uses.

Identify light fixtures to be used on Construction Plans and demonstrate that the fixtures minimize spill over.

MLS Project applicant Prior to approval of site plan
and design review
City of Sacramento Community
Development Department
ii. Prior to issuance of a building permit, the project applicant shall submit to the Community Development
Department a signage and lighting design plan for the
Stadium which establishes lighting design standards
and guidelines. The lighting design plan shall, at a
minimum:
 Require exterior lighting included within the
Stadium to incorporate fixtures and light sources
that focus light on-site to minimize spillover light;
Prepare and submit signage and lighting design plan to the City of Sacramento Community Development Department,
consistent with the requirements described in Mitigation Measure 4.1-3(b).

MLS Project applicant Prior to issuance of building
permit
City of Sacramento Community
Development Department
Resolution 2016-0379 November 10, 2016 Page 107 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-4 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party  Ensure that project lighting shall not cause more
than two foot-candles of lighting intensity or
direct glare from the light source at any
residential property. This would preclude
substantial spillover light from bright lighting
sources; and
 Require that for exterior LED lighting, all light
emitting diodes used within the integral
electronic display shall have a horizontal beam
spread of maximum 165 degrees wide and 65
degrees vertically, and shall be oriented
downwards to the plaza/street, rather than
upwards.
iii. Prior to issuance of a building permit for the Stadium signage displays, the project applicant shall retain a
lighting design expert who shall develop plans and
specifications for the proposed lighting displays,
establish maximum luminance levels for the displays,
and install and test the displays to insure compliance
with all City lighting regulations and these mitigation measures.

Design and test lighting and signage to comply with City Code
MLS Project appli cant Prior to issuance of building
permit
City of Sacramento Community
Development Department
iv. The project applicant shall comply with City Code
Section 8.072.010, which establishes regulations
regarding the use of searchlights.

Comply with City Code Section 8.072.010 regarding use of searchlights
MLS Project appli cant During events/operation City of Sacramento Community Development Department

4.1-4: The proposed projects could
create a new source of glare.

4.1-4
Highly reflective mirrored glass walls shall not be used as a primary building material (no more than 35 percent) for building facades adjacent to major roadways. Instead, low emission (Low-E) glass shall be used in order to reduce the reflective qualities of the building, while maintaining energy efficiency.

Include low emission (Low-E) glass specifications on
Construction Plans.

RSPU Project applicant Prior to site plan and design
review
City of Sacramento Community
Development Department

4.1-6: The proposed projects could
cause an introduction of building
height and mass that conflicts with the
character of the Sacramento River
riverfront between Old Sacramento
and Discovery Park.

4.1-6
Implement Mitigation Measure 4.1-2.

See Mitigation Measure 4.1-2 See Mitigation Measure 4.1-2 See Mitigation Measure 4.1-2 See Mitigation Measure 4.1-2 See Mitigation M easure 4.1-2

4.1-8: The proposed projects could
contribute to cumulative sources of
glare.

4.1-8
Implement Mitigation Measure 4.1-4.

See Mitigation Measure 4.1-8 See Mitigation Measure 4.1-8 See Mitigation Measure 4.1-8 See Mitigation Measure 4.1-8 See Mitigation Measure 4.1-8

4.2 Air Quality

4.2-2: Construction of the Proposed
Project would result in short-term
emissions of NOx, PM10 and PM2.5.

4.2-2(a)
City approval of any grading or improvement plans shall include the following SMAQMD Basic Construction
Emission Control Practices:
x All exposed surfaces shall be watered two times daily.

Exposed surfaces include, but are not limited to soil
piles, graded areas, unpaved parking areas, staging
areas, and access roads.
x Cover or maintain at least two feet of free board space on haul trucks transporting soil, sand, or other loose
material on the site. Any haul trucks that would be
traveling along freeways or major roadways shall be
covered.

Include construction site and equipment specifications
identified in Mitigation Measure 4.2-2(a) on Grading and Construction Plans.

RSPU, KPMC, MLS, SO Project applicant Prior to issuance of demolition or grading permit
City of Sacramento Community
Development Department,
Sacramento Metropolitan Air
Quality Management District
(SMAQMD)
Resolution 2016-0379 November 10, 2016 Page 108 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-5 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party x Use wet power vacuum street sweepers to remove any
visible trackout mud or dirt onto adjacent public roads at least once a day. Use of dry power sweeping is
prohibited.
x Limit vehicle speeds on unpaved roads to 15 miles per hour.
x All roadways, driveways, sidewalks, parking lots shall be paved as soon as possible. In addition, building pads
shall be laid as soon as possible after grading unless
seeding or soil binders are used.
x Minimize idling time either by shutting equipment off when not in use or reducing the time of idling to 5
minutes (as required by the state airborne toxics
control measure [Title 13, Section 2485 of the
California Code of Regulations]). Provide clear signage that posts this requirement for workers at the entrances to the site.
x Maintain all construction equipment in proper working condition according to manufacturer’s specifications.

The equipment shall be checked by a certified
mechanic and determine to be running in proper
condition before it is operated.

4.2-2(b)
City approval of any grading or improvement plans shall include the following SMAQMD Enhanced Exhaust Control
Practices:
x Provide a comprehensive inventory of all off-road
construction equipment, equal to or greater than 50
horsepower, that will be used an aggregate of 40 or
more hours during any portion of the Proposed Project
to the City and the SMAQMD. The inventory shall
include the horsepower rating, engine model year, and
projected hours of use for each piece of equipment.

The construction contractor shall provide the
anticipated construction timeline including start date, and name and phone number of the project manager
and on-site foreman. This information shall be
submitted at least 4 business days prior to the use of
subject heavy-duty off-road equipment. The inventory
shall be updated and submitted monthly throughout the
duration of the Proposed Project, except that an
inventory shall not be required for any 30-day period in which no construction activity occurs.
x Provide a plan in conjunction with the equipment
inventory, approved by the SMAQMD, demonstrating
that the heavy-duty (50 horsepower or more) off-road
vehicles to be used in the construction project, including owned, leased, and subcontractor vehicles, will achieve a project wide fleet-average 20% NOx reduction and
45% particulate reduction compared to the most recent
CARB fleet average. Acceptable options for reducing
emissions may include use of late model engines, low-
emission diesel products, alternative fuels, engine
retrofit technology, after-treatment products, and/or
other options as they become available.

Include construction equipment specifications listed in Mitigation Measure 4.2-2(b) on Grading and Construction Plans.

RSPU, KPMC, MLS, SO Project applicant Prior to issuance of demolition permit or grading permit
City of Sacramento Community
Development Department,
Sacramento Metropolitan Air
Quality Management District
(SMAQMD)
Resolution 2016-0379 November 10, 2016 Page 109 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-6 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party x Emissions from all off-road diesel powered equipment
used on the project site shall not exceed 40% opacity
for more than three minutes in any one hour. Any
equipment found to exceed 40 percent opacity (or
Ringelmann 2.0) shall be repaired immediately, and the
City and SMAQMD shall be notified within 48 hours of
identification of non-compliant equipment. A visual
survey of all in-operation equipment shall be made at
least weekly, and a monthly summary of the visual
survey results shall be submitted throughout the
duration of the project, except that the monthly
summary shall not be required for any 30-day period in
which no construction activity occurs. The monthly
summary shall include the quantity and type of vehicles surveyed as well as the dates of each survey. The
SMAQMD and/or other officials may conduct periodic
site inspections to determine compliance. Nothing in
this measure shall supersede other SMAQMD or state
rules or regulations.
x If at the time of granting of each building permit, the SMAQMD has adopted a regulation applicable to
construction emissions, compliance with the regulation
may completely or partially replace this mitigation.

Consultation with the SMAQMD prior to construction
will be necessary to make this determination.

4.2-2(c)
City approval of any grading or improvement plans shall include the following SMAQMD Fugitive Dust Control
Practices:
x Water exposed soil with adequate frequency for
continued moist soil.
x Suspend excavation, grading, and/or demolition activity when wind speeds exceed 20 mph.
x Install wind breaks (e.g., plant trees, solid fencing) on windward side(s) of construction areas.
x Plant vegetative ground cover (fast-germinating native grass seed) in disturbed areas as soon as possible.

Water appropriately until vegetation is established.
x Install wheel washers for all exiting trucks, or wash off all trucks and equipment leaving the site.
x Treat site accesses to a distance of 100 feet from the paved road with a 6 to 12-inch layer of wood chips,
mulch, or gravel to reduce generation of road dust and
road dust carryout onto public roads.
x Post a publicly visible sign with the telephone number and person to contact at the lead agency regarding dust complaints. This person shall respond and take
corrective action within 48 hours. The phone number of
the District shall also be visible to ensure compliance.

Include SMAQMD Fugitive Dust Control Practices on
grading or improvement plans as described in Mitigation Measure 4.2-2(c).

RSPU, KPMC, MLS, SO Project applicant Prior to approval of grading or improvement plans
City of Sacramento Community
Development Department,
Sacramento Metropolitan Air
Quality Management District
(SMAQMD)

4.2-2(d)
The project applicants shall pay into the SMAQMD’s
construction mitigation fund to offset construction-generated emissions of NOx that exceed SMAQMD’s daily emission
threshold of 85 lbs/day. Fees shall be paid to SMAQMD
based upon the previously agreed upon Railyards Specific Plan fee of $2,603 per acre developed.

Provide proof of payment of SMAQMD fees to the City of
Sacramento Community Development Department.

Amount of payment shall be directly correlated to acreage of development per project proposed.

RSPU Project applicant Prior to issuance of grading or
building permit for each
development project
City of Sacramento Community
Development Department,
Sacramento Metropolitan Air
Quality Management District
(SMAQMD)
Resolution 2016-0379 November 10, 2016 Page 110 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-7 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

4.2-7: Implementation of the proposed
projects could alter wind speed at
ground level (pedestrian level).

4.2-7
The following measures are recommended to assure that
future buildings developed in the RSP Area do not cause hazardous wind conditions for pedestrians in areas of
substantial public use:
1) New buildings with heights of more than 85-feet shall be evaluated by a qualified wind expert to determine
the potential to cause a new wind hazard or aggravate
an existing wind hazard for pedestrians in areas of
substantial public use. Based on a review of wind
conditions, other development in the vicinity, and the
project design, the evaluator may have sufficient
evidence to form a professional opinion about the
potential for the project to cause a hazardous wind
environment. If sufficient evidence is available to
conclude that no wind hazards will be created, no
further mitigation is required. If sufficient evidence to establish safe pedestrian conditions is not available,
the City shall require wind-tunnel testing to provide the evidence that a wind hazard would not result in public
areas.

For buildings that meet the criteria described in Mitigation Measure 4.2-7, retain a qualified wind expert to evaluate potential wind hazards, as described in Mitigation Measure

4.2-7(1).

RSPU, KPMC Project applicant Prior to issuance of a building permit
City of Sacramento Community
Development Department
2) If required wind tunnel testing identifies wind hazards, the qualified wind expert shall work with the City and/or project proponent to develop corrective measures such
as building design changes, protective structures, or
landscaping modifications to help reduce pedestrian-
level wind speeds to acceptable levels. The City shall
require implementation of such corrective measures as
a condition of the building permit.

For wind hazards identified in wind hazard testing,
incorporate corrective measures developed in consultation with qualified wind expert and the City of Sacramento
Community Development Department, into building designs and construction plans, as described in Mitigation Measure

4.2-7(2).

RSPU, KPMC Project applicant Prior to issuance of a building permit
City of Sacramento Community
Development Department.

4.2-8: The proposed projects could
contribute to cumulative increases in
short-term (construction) emissions.

4.2-8
Implement Mitigation Measures 4.2-2(a) through 4.2-2(d).

See Mitigation Measures 4.2-2(a) through 4.2-2(d). See Mitigation Measures

4.2-2(a) through 4.2-2(d).

See Mitigation Measures

4.2-2(a) through 4.2-2(d).

See Mitigation Measures

4.2-2(a) through 4.2-2(d).

See Mitigation Measures

4.2-2(a) through 4.2-2(d).

4.3 Biological Resources

4.3-2: Development of the proposed
projects could result in the loss of
potential nesting habitat for
Swainson’s hawk, white-tailed kite,
purple martin, and other sensitive
and/or protected bird species.

4.3-2(a)
The project applicant shall conduct any tree removal
activities required for project construction outside of the migratory bird and raptor breeding season (February 1
through August 31) where feasible. For any construction activities that will occur between February 1 and August 31, the applicant shall conduct preconstruction surveys in
suitable nesting habitat within 500 feet of the construction area for nesting raptors and migratory birds. Surveys shall be conducted by a qualified biologist. In addition, all trees slated for removal during the nesting season shall be
surveyed by a qualified biologist no more than 48-hours before removal to ensure that no nesting birds are
occupying the tree. For Swainson’s hawk nesting habitat, surveys shall be conducted in accordance with the
Swainson’s Hawk Technical Advisory Committee’s
Recommended Timing and Methodology for Swainson’s
Hawk Nesting Surveys in California’s Central Valley).

If active nests are found during the survey, the applicant shall implement appropriate mitigation measures to ensure that the species will not be adversely affected, which will include establishing a no-work buffer zone as, approved by CDFW, around the active nest.

Conduct nesting surveys prior to tree removal.

Conduct any tree removal and construction activities
according to the protocol described in Mitigation Measure

4.3-2(a).

Include tree removal timing and/or tree protection
requirements on Grading and Construction Plans
RSPU, KPMC, MLS, SO Project applicant Between February 1 and August 31, conduct surveys no
more than 48-hours before tree
removal
City of Sacramento Community
Development Department,
California Department of Fish
and Wildlife (CDFW)
Resolution 2016-0379 November 10, 2016 Page 111 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-8 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party Measures may include, but would not be limited to:
(1) Maintaining a 500-foot buffer around each active
raptor nest. No construction activities shall be
permitted within this buffer. For migratory birds, a no- work buffer zone shall be established, approved by
CDFW, around the active nest. The no-work buffer may
vary depending on species and site specific conditions
as approved by CDFW.

Establish 500-buffer around active raptor nests. RSPU, KPM C, MLS, SO Project applicant Establish buffer no more than 48-hours before tree removal;
leave buffer in place through
construction of each applicable
development project
City of Sacramento Community
Development Department,
California Department of Fish
and Wildlife (CDFW)
(2) Depending on conditions specific to each nest, and the relative location and rate of construction activities, it may be feasible for construction to occur as planned
within the buffer without impacting the breeding
effort. In this case (to be determined on an individual basis), the nest(s) shall be monitored by a qualified
biologist during construction within the buffer. If, in the professional opinion of the monitor, the project
would impact the nest, the biologist shall immediately
inform the construction manager. The construction
manager shall stop construction activities within the
buffer until the nest is no longer active.

Monitor nesting activity within the 500-foot buffer RSPU, KPM C, MLS, SO Project applicant Monitor active nests through construction of each applicable
development project
City of Sacramento Community
Development Department,
California Department of Fish
and Wildlife (CDFW)

4.3-2(b)
If three years of consecutive surveys of the suitable habitat (i.e., weep holes) within the I Street Bridge viaduct, I-5 elevated structure within the RSP Area, or the proposed new I Street Bridge over the Sacramento River do not
indicate purple martins use of the area as breeding habitat, then no further mitigation is required. The following
mitigation shall only be required if purple martin have been documented nesting in the suitable habitat (i.e., weep
holes) within the I Street Bridge viaduct, or the I 5 elevated structure within the RSP Area, or the proposed new I Street Bridge for at least one of three previous years prior to development within 500 feet of aforementioned areas.

Determine presence/absence of purple martins within
identified geography.

RSPU Project applicant Prior to site plan and design
review for individual projects
City of Sacramento Community
Development Department,
California Department of Fish
and Wildlife (CDFW)
Prior to construction within 500 feet of an active purple martin colony (active within the past three years), the applicant shall retain a qualified biologist to prepare and then shall implement a Purple Martin Monitoring and
Management Plan (PMMMP), to the satisfaction of the City.

The PMMMP shall be enforced by the City in areas of
suitable habitat (i.e., weep holes) within 500 feet of the I Street Bridge viaduct, or the elevated structure of Interstate 5 within the RSP Area. The PMMMP shall identify land use and building design requirements, landscape design and
maintenance requirements, and management actions for
the protection, enhancement, creation, and/or replacement of purple martin habitat within the RSP Area. Performance of the PMMMP shall be based on land use, and building
design standards, landscape design, and maintenance
criteria, and management actions that benefit purple martin.

The PMMMP shall be tailored to the status and nesting
locations of purple martins onsite at the time of plan
creation, and will include at minimum the criteria below, or equivalent measures to conserve, protect, and restore
purple martin habitat.

Retain a qualified biologist to prepare and implement a Purple Martin Monitoring and Management Plan (PMMMP)
as described in Mitigation Measure 4.3-2(b), if necessary.

Follow recommendations of the PMMMP.

RSPU Project applicant Prior to site plan and design
review for individual projects
City of Sacramento Community
Development Department,
California Department of Fish
and Wildlife (CDFW)
Resolution 2016-0379 November 10, 2016 Page 112 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-9 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party x Land Use and Building Design Criteria:
 Prohibit buildings that obstruct flight path to and
from nest sites within 120 feet of nesting
locations.
 Maintain a minimum of 21 feet of vertical space
beneath weep holes
 Maintain 230 feet of perching wire within 200 feet
of the colony
x Landscape Design and Maintenance Requirements:
 Prohibit trees taller than nest height within 330
feet of nest sites
 Limit tree plantings within 500 feet of the site to
those that produce suitable nesting material
(pine species). Areas beneath trees shall not be
landscaped, and litter material left in place for
next material use by birds
 Ensure suitable nesting material is available for
martin use. If no nest material is available for
martins, place nesting material (straw, pine
needles, etc.) within area for use by purple
martin during the breeding bird season
 Prohibit planting of ornamental fruit bearing trees
within 500 feet of purples martin nests, including
the colonization of weedy fruit-bearing trees
such as privet
Design buildings and landscaping to meet the setback
requirements, provision of perching wire, and nesting
material as described.

RSPU Project applicant Prior to site plan and design
review
City of Sacramento Community
Development Department,
California Department of Fish
and Wildlife (CDFW)
x Management Actions:
 Install, or cause to be installed, and/or maintain to ensure good working order, nest guards on
weep holes where purple martin are known to
nest, subject to approval from the facility’s
owner
Install and/or maintain nest guards RSPU Project appli cant Prior to site plan and design review through nest
abandonment
City of Sacramento Community
Development Department,
California Department of Fish
and Wildlife (CDFW)

4.3-3: The proposed projects could
result in impacts to special-status fish
species and degradation of
designated critical habitat.

4.3-3
To avoid, minimize, or compensate for potential impacts to protected and sensitive riverine species and critical habitat, and prevent impacts to special-status fish species the
following actions shall be undertaken by the project
applicant:
a) Unless prior approval is granted by NMFS, USFWS,
and/or CDFW, (as applicable) in-water work shall be
restricted to the August 1 to October 31 period to
avoid/minimize construction impacts to special-status
fish species.

Conduct in-water work between August 1 and October 31 SO Project appli cant Prior to issuance of building permit
City of Sacramento Community
Development Department,
NMFS, USFWS, and CDFW
b) Project-rela ted impacts to riverine (e.g., valley-foothill) riparian vegetation shall be minimized by replacing lost vegetation onsite at a minimum ratio of 1:1, along the
Sacramento River, if feasible. Mitigation and/or
restoration plans for all habitats that require
revegetation, habitat creation, restoration, and
enhancement shall be approved by the regulatory
agencies, as applicable, and shall include construction specifications; irrigation schedules; planting palettes (showing container stock/box plantings, cutting
specifications, and seed mixes); monitoring,
maintenance, and remediation schedules; and success
criteria, assurances and contingency measures.

Revegetation specifications, species composition and
density shall be developed by an experienced
Replace vegetation at 1:1 ratio at a minimum. Document
restoration activities. Monitor restoration sites for three to five years.

SO Project applicant Restoration immediately
following construction
completion; monitoring for three
to five years post-restoration
City of Sacramento Community
Development Department,
NMFS, USFWS, and CDFW
Resolution 2016-0379 November 10, 2016 Page 113 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-10 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party restoration ecologist. The restoration sites shall be
evaluated to ensure that required revegetation has
been performed in areas where temporary construction
has been completed. A report documenting restoration
efforts shall be submitted by the applicant to the City and applicable regulatory agencies. If necessary,
remedial revegetation should occur during the same
rainy season that the remedial recommendation is
made. Restoration sites shall be monitored by qualified restoration ecologists for three to five years, or until success criteria are achieved. Restoration plans shall
be included in the final construction documents.

Grading and revegetation activities shall comply with
applicable regulations and mitigation measures
identified in this EIR pertaining to dust, air emissions, noise, water quality and other potential environmental
effects. Alternatively, if approved by regulatory
agencies, the applicant may purchase mitigation credits from approved mitigation banks. Final mitigation ratios and locations are to be established in consultation with the regulatory agencies prior to riverbed disturbing
activities and detailed mitigation requirements will be identified in the final regulatory agency permits.
c) To the extent feasible, the project applicant shall plant riparian vegetation and install biotechnical features,
such as brush piles, logs, and root wads, to replace
habitat impacted by construction of the outfall structure.

These structures shall compensate for potential
impacts associated with increased predation around
the new structure. Specific measures shall include
elements that contribute to nearshore cover in the
immediate vicinity of the structure to increase the
potential for juvenile fish while discouraging occupancy of the same structures by predaceous species. The
precise amount and relative value of affected riparian
and cover habitat would be determined during project-
level analysis of proposed activities.

Plant riparian vegetation and install biotechnical features. SO Project appli cant Immediately following construction completion
City of Sacramento Community
Development Department,
NMFS, USFWS, and CDFW
d) Mitigation of riverine habitat would occur through
creation, restoration, enhancement, and/or
preservation of this habitat type within an approved off- site location and/or mitigation bank at a ratio to be
established in consultation with the regulatory
agencies. Mitigation banking would involve using
mitigation credits from mitigation banks approved by
the regulatory agencies. Final mitigation ratios and
locations are to be established in consultation with the regulatory agencies prior to riverbed disturbing
activities and detailed mitigation requirements will be identified in the final regulatory agency permits.

Enhance riverine habitat or purchase mitigation credits. SO Project appli cant Prior to riverbed disturbing activities
City of Sacramento Community
Development Department,
NMFS, USFWS, and CDFW
e) The cofferdam sheetpiles at the outfall structure
construction site shall be installed using a vibratory
hammer where possible to minimize underwater sound
pressure levels to the greatest extent feasible and
associated effects to sensitive fish species. If impact pile driving is required, sound pressure levels shall be managed (through operational controls) to achieve
single-strike sound levels less than 206 dB peak
(dBpeak) and 183 dB sound exposure level (dBSEL)
measured at a distance of 10 meters. Additionally, pile driving shall only be conducted during daytime hours
Use vibratory hammer during construction. Consult with
NMFS, USFWS, and CDFW to determine disturbance
minimization measures.

SO Project applicant Establish measures prior to
regulatory permit issuance;
during insertion of piles
City of Sacramento Community
Development Department,
NMFS, USFWS, and CDFW
Resolution 2016-0379 November 10, 2016 Page 114 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-11 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party (allowing for regular periods of no impact) and shall
commence at low-energy levels and slowly build to
impact force (allowing for fish to move away from the
construction site).

The project applicant shall also consult with NMFS,
USFWS, and CDFW (as part of obtaining permit
approvals, e.g., FESA Section 7 and Fish and Game
Code Section 1600) to determine necessary impact
minimization actions, which may include surveying the
outfall site to determine fish presence prior to
installation. The project applicant shall implement any additional measures developed through the FESA
Section 7 and Fish and Game Code Section 1600
permit processes, to ensure that impacts are avoided
and/or minimized.
f) To reduce the potential for fish stranding or minimize the potential for harm during cofferdam dewatering
activities, the project applicant or its contractor shall implement a fish rescue plan. Prior to the closure of the cofferdam in the Sacramento River, seining by a
qualified fisheries biologist will be conducted within the cofferdam using a small-mesh seine to direct and move
fish out of the cofferdam area. Upon completion of
seining, the entrance to the cofferdam will be blocked
with a net to prevent fish from entering the cofferdam
isolation area before the cofferdam is completed. Once
the cofferdam is completed and the area within the
cofferdam is closed and isolated, additional seining will be conducted within the cofferdam to remove any
remaining fish. Once most of the fish have been
removed from the isolated area, portable pumps with
intakes equipped with 1.75 mm mesh screen shall be
used to dewater to a depth of 1.5-2 feet. A qualified
biologist shall implement further fish rescue operations using electrofishing and dip nets. All fish that are
captured will be placed in clean 5-gallon buckets and/or coolers filled with Sacramento River water, transported downstream of the construction area, and released
back into suitable habitat in the Sacramento River with minimal handling. After all fish have been removed
using multiple seine passes, electrofishing, and dip
nets (as necessary), portable pumps with screens (see
above) will be used for final dewatering. NMFS,
USFWS, and CDFW shall be notified at least 48 hours
prior to the fish rescue.

Develop and implement a fish rescue plan. SO Project appli cant Establish plan prior to regulatory permit issuance
City of Sacramento Community
Development Department,
NMFS, USFWS, and CDFW

4.3-4: Development of the proposed
projects could result in removal of
habitat for the Valley Elderberry
Longhorn Beetle.

4.3-4
(1) Prior to construction within the RSP Area, the site shall be surveyed for the presence of the valley elderberry
longhorn beetle and its elderberry host plant by a
qualified biologist in accordance with USFWS
protocols. If elderberry plants with one or more stems
measuring 1.0 inch or greater in diameter at ground
level occur on or adjacent to the project site, or are
otherwise located where they may be directly or
indirectly affected by the proposed project,
minimization and compensation measures, which
include transplanting existing shrubs and planting
replacement habitat (conservation plantings), are
required (see below). Surveys are valid for a period of two years. Elderberry plants with no stems measuring
Retain a qualified biologist who shall conduct
preconstruction surveys for elderberry shrubs.

RSPU Project applicant Prior to ground disturbance
such as grading and excavation
activities
City of Sacramento Community
Development Department
Resolution 2016-0379 November 10, 2016 Page 115 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-12 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

1.0 inch or greater in diameter at ground level are
unlikely to be habitat for the beetle because of their
small size and/or immaturity. Therefore, no
minimization measures are required for removal of
elderberry plants with all stems measuring 1.0 inch or
less in diameter at ground level.
(2) For shrubs with stems measuring 1.0 inch or greater, the City shall ensure that elderberry shrubs within 100 feet of proposed development be protected and/or
compensated for in accordance with the “U.S. Fish and
Wildlife Services’ (USFWS) Conservation Guidelines
for the Valley Elderberry Longhorn Beetle and the
Programmatic Formal Consultation Permitting Projects
with Relatively Small Effects on the Valley Elderberry
Longhorn Beetle Within the Jurisdiction of the
Sacramento Field Office.”
Protect shrubs within 100 feet of construction activities; compensate for removed shrubs.

RSPU Project applicant Prior to issuance of building
permit
City of Sacramento Community
Development Department and
USFWS

4.3-6: Development of the proposed
projects could result in impacts to bat
species.

4.3-6
Minimize potential adverse effects to bat species.

Vegetation removal, including tree removal, shall be
conducted between September 16 and January 31, to the
extent feasible, to minimize the potential loss of bat
maternity roosts.

The applicant shall conduct pre-construction surveys for roost sites prior to construction activities within 100 feet of the I-5, I Street Bridge, and riparian habitat along the Sacramento River during the bat pupping season (April 1 through July 31). This survey shall be conducted by a
wildlife biologist qualified to identify bat species. If no bats are roosting, then no further mitigation is required.

If a bat maternity roost is identified, buffers around the roost site shall be determined by a qualified biologist and
implemented to avoid destruction or abandonment of the
roost resulting from tree removal or other project activities.

Retain a qualified biologist to conduct preconstruction surveys and prepare a report; provide the report to the City of Sacramento Community Development Department.

Provide buffer around bat maternity roosts, if applicable.

RSPU, SO Project applicant Prior to issuance of grading permit or tree removal permit;
provide buffer through
completion of construction or
abandonment of the roosts
City of Sacramento Community
Development Department

4.3-7: Development of the proposed
projects could result in net reduction
of sensitive habitats including
protected wetland habitat as defined
in Section 404 of the Clean Water
Act, riparian vegetation, and state
jurisdictional waters/wetlands.

4.3-7
If the applicant shall prepare a wetland and riparian
mitigation plan that ensures no net loss of waters of the U.S. and riparian vegetation. The wetland and riparian
mitigation plan shall be based on a wetland delineation verified by USACE. This measure may be implemented
through the 404 permit and Streambed Alteration
Agreement process. The plan shall include the following:

Prepare a wetland and riparian mitigation plan. SO Project appli cant Concurrent with 404 permit process and Streambed
Alteration Agreement process
City of Sacramento Community
Development Department,
USACE, and CDFW
1) The project proponent shall compensate for the loss of wetland and riparian habitat through a combination of
restoration/enhancement, and the purchase of
mitigation credits at an approved mitigation bank. The
ratio of compensation shall be determined in
consultation with USACE and California Department of
Fish and Wildlife (CDFW), as part of the 404 permit
and Streambed Alteration Agreement process, but shall
not be less than 1:1.

Provide restoration/enhancement of habitat or purchase
mitigation credits.

SO Project applicant Concurrent with 404 permit
process and Streambed
Alteration Agreement process
City of Sacramento Community
Development Department,
USACE, and CDFW
Resolution 2016-0379 November 10, 2016 Page 116 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-13 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party 2) Prior to any construction activities on the site, a
protective fence shall be erected around the
boundaries of areas that would be disturbed by
construction. This fence shall remain in place until all construction activity in the immediate area is
completed. No activity shall be permitted within the
protected areas except for those expressly permitted
by USACE and/or CDFW.

Install protective fencing. SO Project appli cant Prior to and during construction on individual applicable
development sites
City of Sacramento Community
Development Department,
USACE, and CDFW
3) Water quality in the Sacramento River shall be
protected using erosion control techniques during
construction including, but not necessarily limited to, preservation of existing vegetation, mulches (e.g.,
hydraulic, straw, wood), and geotextiles and mats,
during construction.

Implement erosion control measures including adding
measures to construction plans.

SO Project applicant During construction activities in- water and adjacent to the
Sacramento River
City of Sacramento Community
Development Department,
USACE, and CDFW

4.3-8: Development of the proposed
projects could result in isolation or
interruption of contiguous habitat
which would interfere substantially
with the movement of resident or
migratory fish or wildlife species,
migratory corridors, or impede the use
of native wildlife nursery sites.

4.3-8
The applicant shall reduce spillover lighting from the
proposed project onto the Sacramento River by
implementing the following:

The applicant shall place structural barriers to screen automobile headlights that are directed perpendicular to the river shall be screened along the western project edge. This may be accomplished through the placement of a 3-4 foot vegetated hedge or other structural methods that would not additionally hinder wildlife movement through riverine
riparian vegetation.

Outdoor lighting within the RSP Area west of I-5 shall be of the minimum wattage required for the particular use and shall be directed to the specific location intended for illumination (e.g., roads, walkways, or recreation fields) to prevent stray light spillover onto sensitive riverine habitat.

All fixtures on elevated light standards within the RSP Area west of I-5, such as in parking lots or along roadways, shall be shielded to reduce direct exposure to the Sacramento River.

Implement spillover light and minimization measures
through screening and screening. Use minimum wattage
required.

RSPU, KPMC, SO Project applicant During site plan and design review
City of Sacramento Community
Development Department

4.3-9: Development of the proposed
projects could conflict with local
policies protecting trees.

4.3-9
All tree removal within the RSP Area shall comply with the current City of Sacramento tree protection ordinance The applicant shall implement mitigation measures to protect retained trees, and replace for the loss of tree resources (tree protection, and replacement measures shall be
determined in consultation with the City).

Conduct tree removal activities in accordance with City tree protection ordinance.

RSPU, KPMC, MLS, SO Project applicant During site plan and design review and in compliance with
tree protection ordinance
requirements
City of Sacramento Community
Development Department

4.3-11: Implementation of the
proposed projects, in combination
with other cumulative development,
could/would contribute to the
cumulative harm to, or loss of nesting
habitat, for Swainson’s hawk, white-
tailed kite, purple martin, and other
sensitive and/or protected bird
species.

4.3-11
Implement Mitigation Measures 4.3-2(a) and 4.3-2(b)
See Mitigation Measure 4.3-2(a) and Mitigation Measure

4.3-2(b).

See Mitigation Measure 4.3-2(a)
and Mitigation Measure 4.3-2(b).

See Mitigation Measure

4.3-2(a) and Mitigation
Measure 4.3-2(b).

See Mitigation Measure

4.3-2(a) and Mitigation
Measure 4.3-2(b).

See Mitigation Measure

4.3-2(a) and Mitigation
Measure 4.3-2(b).

Resolution 2016-0379 November 10, 2016 Page 117 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-14 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

4.3-12: Implementation of the
proposed projects, in combination
with other cumulative development,
could/would contribute to cumulative
impacts to special-status fish species
and degradation of designated critical
habitat.

4.3-12
Implement Mitigation Measures 4.3-2(a) through 4.3-2(f) See Mitigation Measure 4.3-2(a) through Mitigation
Measure 4.3-2(f).

See Mitigation Measure 4.3-2(a)
through Mitigation Measure

4.3-2(f).

See Mitigation Measure

4.3-2(a) through Mitigation
Measure 4.3-2(f).

See Mitigation Measure

4.3-2(a) through Mitigation
Measure 4.3-2(f).

See Mitigation Measure

4.3-2(a) through Mitigation
Measure 4.3-2(f).

4.3-13: Implementation of the
proposed project, in combination with
other cumulative development, could/
would contribute to the cumulative
loss of habitat for the Valley
Elderberry Longhorn Beetle.

4.3-13
Implement Mitigation Measure 4.3-4
See Mitigation Measure 4.3-4. See Mitigation Measure 4.3-4. See Mitigation Measure 4.3-4. See Mitigation Measure 4.3-4. See Mitigat ion Measure 4.3-4.

4.3-15: Implementation of the
proposed projects, in combination
with other cumulative development,
could/would contribute to the
cumulative loss of habitat, or impacts
to for bat species.

4.3-15
Implement Mitigation Measure 4.3-6
See Mitigation Measure 4.3-6. See Mitigation Measure 4.3-6 See Mitigation Measure 4.3-6 See Mitigation Measure 4.3-6 See Mitigation Measure 4.3-6

4.3-16: Implementation of the
proposed projects, in combination
with other cumulative development,
could/would contribute to the
cumulative loss of sensitive habitats
including protected wetland habitat as
defined in Section 404 of the Clean
Water Act, riparian vegetation, and
state jurisdictional waters/wetlands.

4.3-16
Implement Mitigation Measure 4.3-7
See Mitigation Measure 4.3-7. See Mitigation Measure 4.3-7 See Mitigation Measure 4.3-7 See Mitigation Measure 4.3-7 See Mitigation Measure 4.3-7

4.3-17: Implementation of the
proposed projects, in combination
with other cumulative development,
could/would contribute to the
cumulative isolation or interruption of
contiguous habitat which would
interfere substantially with the
movement of resident or migratory
fish or wildlife species, migratory
corridors, or impede the use of native
wildlife nursery sites.

4.3-17
Implement Mitigation Measure 4.3-8
See Mitigation Measure 4.3-8. See Mitigation Measure 4.3-8 See Mitigation Measure 4.3-8 See Mitigation Measure 4.3-8 See Mitigation Measure 4.3-8

4.4 Cultural Resources

4.4-1: The proposed projects could
cause a substantial adverse change
in the significance of an
archaeological resource, including
human remains.

4.4-1(a)
i. Prior to any ground-disturbing activity in
Archaeologically Sensitive Areas (ASAs), a focused
Archaeological Testing Plan (ATP) shall be prepared
and implemented to determine the presence/absence
of archaeological resources and to assess their
eligibility to the CRHR. The ATP shall be reviewed and
approved by the Preservation Director prior to
implementation. An example outline of the ATP is
included in Appendix E of this Draft SEIR.

Retain a qualified archaeologist to prepare and implement an Archaeological Testing Plan (ATP).

RSPU (ASAs only) Project applicant Prior to ground disturbance such as grading and excavation
activities for individual
applicable development
projects
City of Sacramento Community
Development Department
ii. If the testing program identifies CRHR-eligible
archaeological resources, an Archaeological Mitigation
Plan shall be prepared and implemented.

Prepare an Archaeological Mitigation Plan, if necessary. RSPU (ASAs only) Project applicant Prior to ground disturbance such as grading and excavation
activities for individual
applicable development
projects
City of Sacramento Community
Development Department
Resolution 2016-0379 November 10, 2016 Page 118 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-15 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party iii. Based upon the results of test excavations, it may be necessary to conduct archaeological monitoring in
some areas. In these areas, an Archaeological
Monitoring Plan shall be prepared and implemented to
ensure appropriate identification and treatment of
anticipated archaeological resources, if any are
discovered during grading or construction activities. At a minimum, the Monitoring Plan shall include
provisions to result in the cessation of activities upon discovery, evaluation of such resources for historic
significance, and if the resource is significant,
appropriate treatment based on recommendations of a
qualified archaeologist. Appropriate treatment shall
include protection of the resource from further damage, and one of the following, as appropriate:
(1) preservation in place; (2) return of the resource to the most likely descendent (MLD) (if determined to be
of Native American origin), (3) curation in an
appropriate location or facility, and/or (4) recordation.

The City Preservation Director shall approve the
Archaeological Monitoring Plan prior to implementation.

An example outline of an Archaeological Monitoring
Plan is included in Appendix E of this Draft SEIR.

Prepare and implement an Archaeological Monitoring Plan. RSPU (ASAs only) Project applicant During excavation and grading activities
City of Sacramento Community
Development Department
iv. Prior to construction activities, an archaeologist will lead an in-field tailgate training session for project
construction crews on the kinds and types of resources
that may be present, and give plans for actions of work stoppage to occur should archeological features be
encountered.

Retain a qualified archaeologist to conduct archaeological resources pre-construction training.

RSPU (ASAs only) Project applicant Immediately prior to ground- disturbing activities (grading or
excavation) for individual
applicable development
projects
City of Sacramento Community
Development Department

4.4-1(b)
Within the current footprint of the northern levee
embankment, prior to ground-disturbing activities that are anticipated to extend below the level of North B Street (e.g., excavation below the base of the extant levee
embankment), an Archaeological Monitoring Plan shall be prepared and implemented to ensure appropriate
identification and treatment of anticipated archaeological resources, if any are discovered during grading or
construction activities. In the event of inadvertent discovery of a potential archaeological resource or human remains, Mitigation Measure 4.4-1(c) will be implemented.

Retain a qualified archaeologist to prepare and implement an Archaeological Monitoring Plan for the area within the footprint of the northern levee embankment.

RSPU (footprint of the northern
levee embankment only)
Project applicant Prepare plan prior to ground-
disturbing activities (grading or
excavation) that are anticipated
to extend below the level of
North B Street; implement plan
during ground-disturbing
activities
City of Sacramento Community
Development Department

4.4-1(c)
In the event that unanticipated archaeological resources or human remains are encountered, compliance with federal
and state regulations and guidelines regarding the
treatment of cultural resources and human remains shall be required. The following details the procedures to be
followed in the event that new cultural resource sites or human remains are discovered.
i. If a monitoring archaeologist or a member of the
construction team believes that an archaeological
resource has inadvertently been uncovered, all work
adjacent to the discovery shall cease, and an SOI
qualified archaeologist immediately notified.

Appropriate steps shall be taken, as directed by the
archaeologist, to protect the discovery site. The area of work stoppage will be adequate to provide for the
security, protection, and integrity of the archaeological resources in accordance with Federal and State Law.

Cease work if a discovery is made. Conduct field
investigation. Recover data and record resources on
appropriate DPR forms, as appropriate.

RSPU, KPMC, MLS, SO Project applicant During ground-disturbing activities for individual
applicable development
projects
City of Sacramento Community
Development Department
Resolution 2016-0379 November 10, 2016 Page 119 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-16 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party At a minimum the area will be secured to a distance of
50 feet from the discovery. Vehicles, equipment, and
unauthorized personnel shall not be permitted to
traverse the discovery site. The archaeologist shall
conduct a field investigation and assess the
significance of the find. Impacts to cultural resources shall be lessened to a less-than-significant level
through data recovery or other methods determined
adequate by the archaeologist and consistent with the
Secretary of the Interior's Standards for Archaeological Documentation. All identified cultural resources shall be recorded on the appropriate DPR 523 (A-L) form and
filed with the North Central Information Center.
ii. If human remains are discovered at the project
construction site during any phase of construction, all ground-disturbing activity within 50 feet of the
resources shall be halted and the County Coroner shall
be notified immediately, according to Section 5097.98
of the State Public Resources Code and Section
7050.5 of California’s Health and Safety Code. If the
remains are determined by the County Coroner to be
Native American, the Native American Heritage
Commission (NAHC) shall be notified within 24 hours,
and the guidelines of the NAHC shall be adhered to in
the treatment and disposition of the remains. If the
remains are determined to be Chinese, or any other
ethnic group, the appropriate local organization
affiliated with that group shall be contacted and all
reasonable effort shall be made to identify the remains and determine and contact the most likely descendant.

The approved mitigation shall be implemented before
the resumption of ground-disturbing activities within 50 feet of where the remains were discovered.

If the remains are of Native American origin, the
landowner or the landowner’s representative shall
contact the Native American Heritage Commission to
identify the Most Likely Descendant. That individual
shall be asked to make a recommendation to the
landowner for treating or disposing of, with appropriate dignity, the human remains and any associated grave
goods as provided in Public Resources Code Section
5097.983.

If the Most Likely Descendant fails to make a
recommendation or the landowner or his or her
authorized representative rejects the recommendation
of the descendant, and if mediation by the Native
American Heritage Commission fails to provide
measures acceptable to the landowner, then the
landowner or authorized representative shall rebury the Native American human remains and associated grave
goods with appropriate dignity on the property in a
location not subject to further subsurface disturbance.

Cease work and notify the County Coroner. Follow protocol for further notification including to the NAHC, if applicable.

Contact the Native American Heritage Commission to
identify the Most Likely Descendant, if applicable.

RSPU, KPMC, MLS, SO Project applicant During ground-disturbing activities for individual
applicable development
projects
City of Sacramento Community
Development Department
Resolution 2016-0379 November 10, 2016 Page 120 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-17 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

4.4-1(d)
The title to all abandoned shipwrecks, archaeological sites, and historic or cultural resources on or in the tide and submerged lands of California is vested in the State and under the jurisdiction of the California State Lands
Commission (CSLC) (PRC Section 6313[a]). In the case of an inadvertent discovery of a submerged shipwreck or
related artifacts, all work must cease in the immediate vicinity of the find and the lead agency’s archaeological resource staff will be notified immediately in order to initiate consultation with the CSLC staff within two business days of such discovery.

PRC Section 6313 (c) states any submerged historic
resource remaining in state waters for more than 50 years will be presumed to be archaeologically or historically significant. If the lead agency’s archaeologist, in
consultation with the CSLC staff, determines that a
historical resource may be present, the lead agency will retain the services of a qualified maritime archeological consultant. The maritime archeological consultant will
recommend whether the discovery is an
historical/archeological resource that retains sufficient integrity and is of potential historical or scientific
significance. The maritime archeological consultant also will recommend as to what action, if any, is warranted. Based on this information, and consultation with the CSLC,
implementation of additional measures may be required.

Measures shall include preservation in situ of the historical resource, implementation of a data recovery program, or other such action that preserves the cultural value of the resource. The maritime archeological consultant will submit a Final Cultural Resources Technical Report to the lead agency, NCIC, and the CSLC staff. This report will include an evaluation of the historical significance, with a
description of the archeological and historical research methods employed in any archeological data recovery
program undertaken.

In the event of an inadvertent discovery of a submerged shipwreck or related artifacts, cease work and consult with the CSLC staff to determine significance. Follow actions prescribed by maritime archaeological consultant.

SO Project applicant During in-water construction City of Sacramento Community Development Department,
California State Lands
Commission

4.4-2: The proposed projects could
cause a substantial adverse change
to the Central Shops Historic District,
or the Water Tower.

4.4-2(a)
Consistent with Section 17.604 and other sections of
Title 17 of the City’s Planning & Development Code, and in coordination and consultation with the Preservation Director and the Preservation Commission, and adopted by the City Council, a Historic District Plan that is specifically focused on the Historic District in the Central Shops shall be
prepared. Any development within the Historic District shall comply with the standards and criteria identified in the plan.

The Historic District Plan shall include, at a minimum, the following components:

1. Statement of the goals for review of development
projects within the Historic District;

2. A representation of the historical development of land uses, existing land uses, and any adopted plans for
future land uses;

3. A statement of findings, including the following:
a. The historical or pre-historical period to which the area is significant.
b. The predominant periods or styles of the structures
or features therein.

Prepare a Historic District Plan consistent with the
requirements of the City’s Planning and Development
Code.

RSPU Central Shops District Project applicant Prior to issuance of building permit in the Central Shops
District
City of Sacramento Community
Development Department, City
of Sacramento Preservation
Director, City of Sacramento
Preservation Commission
Resolution 2016-0379 November 10, 2016 Page 121 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-18 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party c. The significant features and characteristics of such periods or styles, as represented in the Historic
District and incorporating the findings of the historic district designation completed by the City in 2007,
including, but not limited to, structure height, bulk,
distinctive architectural details, materials, textures, archeological and landscape, hardscape and site
features and fixtures.
d. A statement, consistent with Title 17, Sacramento
Register of Historic and Cultural Resources, of this
chapter, of the standards and criteria to be used in
determining the appropriateness of any
development project involving a landmark,
contributing resource or noncontributing resource
within the Historic District.

4.4-2(b)
A copy of the full Southern Pacific Company Sacramento
Shops HAER document (HAER CA303) shall be completed,
and filed with the City’s Preservation Office and Center for Sacramento History, including the historic narrative,
architectural drawings, and photographs, and archive
quality copies disseminated to the appropriate state,
regional, and local repositories.

Prepare and file the full Southern Pacific Company
Sacramento Shops HAER document.

RSPU Central Shops District Project applicant Prior to issuance of building permit in the Central Shops
District
City of Sacramento Community
Development Department, City
of Sacramento Preservation
Office, and Center for
Sacramento History.

4.4-3: The proposed projects could
cause a substantial adverse change
to the Central Shops Historic District,
or Water Tower, by new construction
surrounding and affecting the
contributing resources and the
significant features and
characteristics of the district.

4.4-3
Any proposed new project within the Central Shops Historic District (including new construction on Lot 22) shall be designed in compliance with the Secretary of the Interior’s Standards for the Treatment of Historic Properties,
specifically the standards for rehabilitation and new
construction within a historic district. Standards 9 and 10 for Rehabilitation state that:

9. New additions, exterior alterations, or related new
construction will not destroy historic materials, features, and spatial relationships that characterize the property.

The new work shall be differentiated from the old and
shall be compatible with the historic materials, features, size, scale and proportion, and massing to protect the
integrity of the property and its environment.

10. New additions and adjacent or related new construction shall be undertaken in such a manner that, if removed
in the future, the essential form and integrity of the
historic property and its environment would be
unimpaired.

Design buildings to comply with SOI standards. Conduct
appropriate consultation with the City of Sacramento
Preservation Director for any new projects to ensure that new projects protect the integrity of the historic property.

RSPU Central Shops and
Transition Zone
Project applicant During site plan and design
review
City of Sacramento Community
Development DepartmentThe RSPU Design Guidelines and policies shall be consistent with these standards. In addition to compliance with the above, with the proposed adopted Historic District plan, and with the Design Guidelines established as part of the proposed RSPU, the project developer shall ensure that any new project involving the design of a new building shall not have a significant impact on the Historic District’s contributing resources or its features and characteristics.

The City of Sacramento Historic Preservation Director, or the Commission, as appropriate per Preservation
Development Project Site Plan & Design Review
requirements of Title 17 of the City Code, shall review any proposed project’s site plan and design to ensure its
compatibility with the SOI Standards and the adopted
Historic District plan.

Design new buildings to not have a significant impact on the Historic District’s contributing resources or its features and characteristics.

RSPU Central Shops and
Transition Zone
Project applicant During site plan and design
review
City of Sacramento Community
Development Department
Resolution 2016-0379 November 10, 2016 Page 122 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-19 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

4.4-7: Construction of the proposed
projects could damage and/or destroy
paleontological resources.

4.4-7
If discovery is made of items of paleontological interest, the contractor shall immediately cease all work activities in the vicinity (within approximately 100 feet) of the discovery.

After cessation of excavation the contractor shall
immediately contact the City. The contractor shall not
resume work until authorization is received from the City.

Any inadvertent discovery of paleontological resources
during construction shall be evaluated by a qualified
paleontologist. If it is determined that the project could damage a unique paleontological resource (as defined
pursuant to the CEQA Guidelines), mitigation shall be
implemented in accordance with PRC Section 21083.2 and
Section 15126.4 of the CEQA Guidelines. If avoidance is not feasible, the paleontologist shall develop a treatment plan in consultation with the City.

Implement protocols for the inadvertent discovery and
treatment of paleontological resources.

RSPU, KPMC, MLS, SO Project applicant During ground-disturbing activities (grading or
excavation) for individual
applicable development
projects
City of Sacramento Community
Development Department4.4-8: The proposed projects could contribute to the cumulative loss or
alteration of archaeological resources,
including human remains.

4.4-8
Implement Mitigation Measure 4.4-1(a) through 4.4-1(d).

See Mitigation Measure 4.4-1(a) through 4.4-1(d). See Mitigation Measure 4.4-1(a) through 4.4-1(d)
See Mitigation Measure 4.4-
1(a) through 4.4-1(d)
See Mitigation Measure

4.4-1(a) through 4.4-1(d)
See Mitigation Measure

4.4-1(a) through 4.4-1(d)

4.4-9: The proposed projects could
contribute to the cumulative loss or
alteration of historic built resources,
including the Central Shops Historic
District (the Southern Pacific Railroad
Shops), the Water Tower, the
Sacramento Valley Station, or the
Alkali Flat Historic Districts.

4.4-9
Implement Mitigation Measure 4.4-2 and 4.4-3.

See Mitigation Measures 4.4-2 and 4.4-3. See Mitigation Measures 4.4-2 and 4.4-3
See Mitigation Measures 4.4-2
and 4.4-3
See Mitigation Measures 4.4-2
and 4.4-3
See Mitigation Measures 4.4-2
and 4.4-3

4.4-10: The proposed projects would
contribute to cumulative losses of
paleontological resources.

4.4-10
Implement Mitigation Measure 4.4-7.

See Mitigation Measure 4.4-7. See Mitigation Measure 4.4-7 See Mitigation Measure 4.4-7 See Mitigation Measure 4.4-7 See Mitigation Measure 4.4-7

4.6 Geology, Soils, and Seismicity

4.6-2: The proposed projects could
result in damage to the historic
Central Shops.

4.6-2
a) To the exten t feasible, the historic buildings shall be stabilized and reinforced prior to trenching or other
construction activities within 50 feet of the buildings.

Implement historic building stabilization measures,
including incorporation into construction plans, for ground disturbing (grading or excavation) activity within 50 feet of historic structures.

RSPU Project applicant Prior to ground-disturbing
activities (grading or
excavation) within 50 feet of
Central Shops
City of Sacramento Community
Development Departmentb) A pre-excavation settlement-damage survey shall be prepared that shall include, at a minimum, visual
inspection of existing vulnerable structures for cracks and other settlement defects, and establishment of
horizontal and vertical control points on the buildings.

A monitoring program of surveying horizontal and
vertical control points on structures and shoring shall be followed to determine the effects of dewatering,
excavation, and construction on the particular building site. If it is determined by the engineer that the existing buildings could be subject to damage, work shall cease
until appropriate remedies to prevent damage are
identified.

Prepare a pre-excavation settlement-damage survey and
prepare and implement a monitoring program for surveying horizontal and vertical control points.

RSPU Project applicant Prior to issuance of grading
permit within 50 feet of Central
Shops
City of Sacramento Community
Development Department
Resolution 2016-0379 November 10, 2016 Page 123 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-20 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party c) If necessary and with approval by the City Chief
Building Official, the construction contractor shall install temporary shoring or stabilization to help avoid
permanent impacts. Stabilization may involve structural reinforcement or corrections for deterioration that would minimize or avoid potential structural failures or avoid accelerating damage to the historic structure.

Stabilization shall be conducted following the Secretary of Interior Standards Treatment of Preservation. This
treatment shall ensure retention of the historical
resource’s character-defining features. Stabilization
may temporarily impair the historic integrity of the
building's design, material, or setting, and as such, the stabilization must be conducted in a manner that will
not permanently impair a building's ability to convey its significance. Measures to shore or stabilize the building shall be installed in a manner that when they are
removed, the historic integrity of the building remains, including integrity of material.

If determined necessary, implement temporary shoring or stabilization measures, as approved by the City Chief
Building Official.

RSPU Project applicant Prior to ground-disturbing
activities (grading or
excavation) within 50 feet of
Central Shops
City of Sacramento Community
Development Department and
City Chief Building Official.

4.8 Hazards and Hazardous Materials

4.8-1: Construction of the proposed
projects could result in the exposure
of people to health risk associated
with contaminated soils and debris.

4.8-1
If unidentified or suspected contaminated soil or
groundwater evidenced by stained soil, noxious odors, or other factors, is encountered during site preparation or construction activities work shall stop in the area of potential contamination, and the type and extent of contamination shall be identified by qualified professional. The qualified professional shall prepare a report that includes, but is not limited to, activities performed for the assessment,
summary of anticipated contaminants and contaminant
concentrations, and recommendations for appropriate
handling and disposal. Site preparation or construction activities shall not recommence within the contaminated areas until remediation is complete and a “no further action” letter is obtained from the appropriate regulatory agency.

Implement contamination avoidance and treatment
measures. If contaminated soil or groundwater is
encountered, cease work, identify the contaminant, and
execute a remediation plan.

RSPU (West Jibboom only), SO Project applicant During ground-disturbing activities (grading or
excavation)
City of Sacramento Community
Development Department.

4.8-3: Development of the proposed
projects could expose people to
existing contaminated groundwater
during dewatering activities.

4.8-3
Implement Mitigation Measure 4.8-1.

See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1. See Mitigat ion Measure 4.8-1.4.8-4: Construction of the proposed projects’ infrastructure and buildings
could interfere with remediation
efforts.

4.8-4
Implement Mitigation Measure 4.8-1.

See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1. See Mitigat ion Measure 4.8-1.4.8-7: Operation of the proposed projects could result in the exposure
of people to health risks associated
with contaminated soils and
groundwater.

4.8-7
a) In areas where the groundwater contamination has the potential to reach water, sewer or storm drainage
pipelines due to fluctuations in the elevation of the
groundwater table, or where volatile contaminants in
soil vapor could enter porous utility lines, measures
such as concrete trenches, membrane barriers and
venting will be used to prevent infiltration in accordance with DTSC requirements.

Implement measures to prevent infiltration of contaminants into pipelines. Identify measures on construction drawings.

RSPU, KPMC, MLS, SO Project applicant During site plan and design review
City of Sacramento Community
Development Department,
Department of Toxic
Substances Control (DTSC)
b) Routine monitoring of the above areas shall be
performed by the landowners and/or the City, reported
to DTSC and Regional Water Board, and corrective
actions implemented if the results indicate adverse
change in water quality. For stormwater, the monitoring may be conducted through the City’s MSR 4 program.

If contaminants are encountered, monitor the area and take corrective action as required by DTSC and/or Regional
Water Board.

RSPU, KPMC, MLS, SO Project applicant Following identification of contaminants through
completion of corrective actions
City of Sacramento Community
Development Department,
Department of Toxic
Substances Control (DTSC),
Regional Water Board
Resolution 2016-0379 November 10, 2016 Page 124 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-21 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

4.8-8: The proposed projects in
combination with development of
other projects in the surrounding area
known to contain, or could contain
contaminated soil or groundwater,
could present a hazard to
construction workers if not properly
managed.

4.8-8
Implement Mitigation Measure 4.8-1.

See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1. See Mitigati on Measure 4.8-1.4.8-9: The proposed projects could contribute to cumulative dewatering
activities that could interfere with
remediation of the existing South
Plume and Lagoon Plume.

4.8-9
Implement Mitigation Measure 4.8-1.

See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1. See Mitigation Measure 4.8-1.

4.10 Noise and Vibration

4.10-1: Construction of the proposed
projects could generate noise that
would conflict with City standards.

4.10-1
The contractor shall ensure that the following measures are implemented during all phases of project construction:
a) Whenever construction occurs within 130 feet to
occupied residences (on or offsite), temporary barriers shall be constructed around the construction sites to
shield the ground floor of the noise-sensitive uses.

These barriers shall be of ¾-inch Medium Density
Overlay (MDO) plywood sheeting, or other material of
equivalent utility and appearance, and shall achieve a
Sound Transmission Class of STC-30, or greater,
based on certified sound transmission loss data taken
according to ASTM Test Method E90 or as approved
by the City of Sacramento Building Official.

Implement temporary noise barriers to shield construction sites from sensitive uses.

RSPU, KPMC, MLS Project applicant Prior to issuance of demolition or grading permit; include
measures on construction
drawings
City of Sacramento Community
Development Department
b) Construction equipment staging areas shall be located as far as feasible from residential areas while still
serving the needs of construction contractors.

Stage construction equipment away from residential areas. RSPU, KPMC, MLS Project applicant Include measures on construction drawings
City of Sacramento Community
Development Department
c) Use of auger displacement for installation of foundation piles, if feasible. If impact pile driving is required, “sonic” pile- drivers shall be used, unless engineering studies are submitted to the City that show this is not feasible, based on geotechnical considerations.

Use auger displacement drilling, or “sonic” pile driving to the extent feasible.

RSPU, KPMC, MLS Project applicant Prior to issuance of demolition or grading permit; include
measures on construction
drawings
City of Sacramento Community
Development Department
d) Prior to imp act pile driving activities in Blocks 49, 50 and 52, the applicant shall coordinate with the KCRA
building management staff in order to minimize
disruption from pile driving, to the extent feasible.

Coordinate with KCRA. RSPU, KPM C, MLS Project applicant Prior to issuance of demolition or grading permit; include
measures on construction
drawings
City of Sacramento Community
Development Department

4.10-2: Operations of the proposed
projects could result in a substantial
permanent increase in ambient
exterior noise levels in the project
vicinity.

4.10-2(a)
The project sponsor shall ensure that the following
measures are implemented for all development under the
proposed Specific Plan:
i. Prior to the issuance of building permits, the applicant shall submit engineering and acoustical specification
for project mechanical HVAC equipment and the
proposed locations of onsite loading docks to the
Planning Director demonstrating that the HVAC
equipment and loading dock design (types, location,
enclosure, specification) will control noise from the
equipment to at least 10 dBA below existing ambient
levels at nearby residential and other noise-sensitive
land uses.

Submit engineering and acoustical specification for project mechanical HVAC equipment and the proposed locations
of onsite loading docks.

RSPU, KPMC, MLS Project applicant Prior to issuance of building permits
City of Sacramento Community
Development Department
Resolution 2016-0379 November 10, 2016 Page 125 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-22 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party ii. Noise-generating stationary equipment associated with proposed commercial and/or office uses, including
portable generators, compressors, and compactors
shall be enclosed or acoustically shielded to reduce
noise-related impacts to noise-sensitive residential
uses.

Enclose or shield noise-generating equipment. RSPU, KPM C, MLS Project applicant Prior to issuance of demolition or grading permit; include
measures on construction
drawings
City of Sacramento Community
Development Department
iii. In order to avoid the exposure of rail noise to onsite future sensitive receptors that would exceed the City of Sacramento exterior noise standards, residential units
within Blocks 35, 49 and 50 shall not be placed closer
than 190 feet from the centerline of the UPRR rail line.

Locate residential units on Blocks 35, 49 and 50 shall not be placed closer than 190 feet from the centerline of the UPRR rail line.

RSPU, KPMC, MLS Project applicant During site plan and design review
City of Sacramento Community
Development Department

4.10-2(b)
i. The project app licant shall retain a qualified acoustical consultant to verify that the MLS Stadium architectural and outdoor amplified sound system designs
incorporate all feasible acoustical features in order to comply with the City of Sacramento Noise Control
Ordinance.

Retain a qualified acoustical consultant to evaluate
architectural and outdoor amplified sound system design.

MLS Project applicant During site plan and design
review
City of Sacramento Community
Development Department
ii. The project applicant shall be required to limit speakers at temporary plaza stages outside the stadium to be no
louder than 100 dBA measured fie (5) feet from the
source.

Limit volume of outdoor speakers. MLS Project appli cant During site plan and design review
City of Sacramento Community
Development Department

4.10-3: The proposed projects could
result in residential interior noise
levels of 45 dBA Ldn or greater
caused by noise level increases due
to project operation.

4.10-3(a)
Prior to the issuance of building permits for residential projects within the RSP Area, the City shall require project applicants for residential development to submit a detailed noise study, prepared by a qualified acoustical consultant, to identify design measures necessary to achieve the City interior standard of 45 Ldn in the proposed new residences.

The study shall be submitted to the City for review and approval. Design measures such as the following could be required, depending on the specific findings of the noise study: double-paned glass windows facing noise sources; solid-core doors; increased sound insulation of exterior walls (such as through staggered-or double-studs, multiple layers of gypsum board, and incorporation of resilient
channels); weather-tight seals for doors and windows; or sealed windows with an air conditioning system installed for ventilation. This study can be a separate report, or included as part of the Noise and Vibration Reduction Plan for the proposed projects. The building plans submitted for building permit approval shall be accompanied by certification of a licensed engineer that the plans include the identified noise- attenuating design measures and satisfy the requirements of this mitigation measure.

Retain a qualified acoustical consultant to prepare a
detailed noise study to be submitted to the City. Implement findings of required noise study. Incorporate noise-
attenuating design measures into building plans and obtain verification of those incorporated measures from a licensed engineer.

RSPU Project applicant During site plan and design
review
City of Sacramento Community
Development Department

4.10-3(b)
Implement Mitigation Measure 4.10-2(b) to minimize noise from outdoor amplified sound systems.

Retain a qualified acoustical consultant to prepare a
detailed noise study to be submitted to the City. Implement findings of required noise study. Incorporate noise-
attenuating design measures into building plans and obtain verification of those incorporated measures from a licensed engineer.

MLS Project applicant During site plan and design
review
City of Sacramento Community
Development Department
Resolution 2016-0379 November 10, 2016 Page 126 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-23 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

4.10-4: Construction of the proposed
projects could expose existing and/or
planned buildings, and persons
within, to vibration that could disturb
people and damage buildings.

4.10-4
Prior to the issuance of any building permit for each phase of project development, the project applicant shall develop a Vibration Reduction Plan in coordination with an acoustical consultant, geotechnical engineer, and construction
contractor, and submit the Plan to the City Chief Building Official for approval. The Plan shall include the following elements:

Prepare and submit a Vibration Reduction Plan. Implement vibration avoidance, minimization, and monitoring
requirements within the Vibration Reduction Plan.

RSPU, KPMC, MLS Project applicant Prior to issuance of a building permit for individual applicable
development projects
City of Sacramento Community
Development Department1) To mitigate vibration, the Plan shall include measures such that surrounding buildings will be exposed to less than 80 VdB and 83 VdB where people sleep and work,
respectively, and less than 0.25 PPV for historic
buildings to prevent building damage.

Limit vibration during construction. RSPU, KPM C, MLS Project applicant Prior to issuance of a building permit for individual applicable
development projects
City of Sacramento Community
Development Department
Measures and controls shall be identified based on project- specific final design plans, and may include, but are not limited to, some or all of the following:
1) Buffer distances and types of equipment selected to
minimize vibration impacts during construction at
nearby receptors in order to meet the specified
standards.

Establish buffers around sensitive uses. RSPU, KPM C, MLS Project applicant Prior to issuance of a building permit for individual applicable
development projects
City of Sacramento Community
Development Department
2) Implem ent a vibration, crack, and line and grade
monitoring program at existing historic buildings
located within 47 feet of construction activities. The
following elements shall be included in this program:

Prepare crack monitoring plan for existing historic buildings located within 47 feet of construction activities. Project applicant shall provide City with regular reporting.

RSPU, KPMC, MLS Project applicant Prior to issuance of a building permit for individual applicable
development projects
City of Sacramento Community
Development Department
a. During building construction:
i. The constru ction contractor shall regularly
inspect and photograph crack gauges,
maintaining records of these inspections to be
included in post-construction reporting. Gauges
shall be inspected every two weeks, or more
frequently during periods of active project
actions in close proximity to crack monitors,
such as during the building construction of
blocks 23 and 24.

Monitor crack gauges during construction. RSPU, KPM C, MLS Project applicant During construction activities within 47 feet of a historic
building
City of Sacramento Community
Development Department
ii. The constru ction contractor shall collect
vibration data from receptors and report
vibration levels to the City Chief Building Official
on a monthly basis. The reports shall include
annotations regarding project activities as
necessary to explain changes in vibration
levels, along with proposed corrective actions to
avoid vibration levels approaching or exceeding
the established threshold.

Collect and report vibration data to City Chief Building Official.

RSPU, KPMC, MLS Project applicant During construction activities within 47 feet of a historic
building
City of Sacramento Community
Development Department
iii. With regards to historic structures, if vibration
levels exceed the threshold and monitoring or
inspection indicates that the project is damaging
the building, the historic building shall be
provided additional protection or stabilization. If
necessary and with approval by the City Chief
Building Official, the construction contractor
shall install temporary shoring or stabilization to
help avoid permanent impacts. Stabilization
may involve structural reinforcement or
corrections for deterioration that would minimize
or avoid potential structural failures or avoid
accelerating damage to the historic structure.

Stabilization shall be conducted following the
Secretary of Interior Standards Treatment of
Provide additional protection or stabilization of historic structures, as needed.

RSPU, KPMC, MLS Project applicant During construction activities within 47 feet of a historic
building
City of Sacramento Community
Development Department
Resolution 2016-0379 November 10, 2016 Page 127 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-24 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party Preservation. This treatment shall ensure
retention of the historical resource’s character-
defining features. Stabilization may temporarily
impair the historic integrity of the building's
design, material, or setting, and as such, the
stabilization must be conducted in a manner
that will not permanently impair a building's
ability to convey its significance. Measures to
shore or stabilize the building shall be installed
in a manner that when they are removed, the
historic integrity of the building remains,
including integrity of material.
b. Post-construction
i. The applicant (and its construction contractor)
shall provide a report to the City Chief Building
Official regarding crack and vibration monitoring
conducted during demolition and construction.

In addition to a narrative summary of the
monitoring activities and their findings, this
report shall include photographs illustrating the
post-construction state of cracks and material
conditions that were presented in the pre-
construction assessment report, along with
images of other relevant conditions showing the
impact, or lack of impact, of project activities.

The photographs shall sufficiently illustrate
damage, if any, caused by the project and/or
show how the project did not cause physical
damage to the historic and non-historic
buildings. The report shall include annotated
analysis of vibration data related to project
activities, as well as summarize efforts
undertaken to avoid vibration impacts. Finally, a
post-construction line and grade survey shall
also be included in this report.

Prepare crack monitoring and vibration monitoring final report to the City. Include post-construction photographs of cracks, as applicable.

RSPU, KPMC, MLS Project applicant Upon completion of
construction activities within 47
feet of a historic building
City of Sacramento Community
Development Department
ii. The project app licant (and its construction
contractor) shall be responsible for repairs from
damage to historic and non-historic buildings if
damage is caused by vibration or movement
during the demolition and/or construction
activities. Repairs may be necessary to
address, for example, cracks that expanded as
a result of the project, physical damage visible
in post-construction assessment, or holes or
connection points that were needed for shoring
or stabilization. Repairs shall be directly related
to project impacts and will not apply to general
rehabilitation or restoration activities of the
buildings. If necessary for historic structures,
repairs shall be conducted in compliance with
the Secretary of Interior Standards Treatment of
Preservation. The project applicant shall
provide a work plan for the repairs and a
completion report to ensure compliance with the
SOI Standards to the City Chief Building Official
and City Preservation Director for review and
comment.

Make repairs to damages historic and non-historic buildings caused by project construction, as applicable.

RSPU, KPMC, MLS Project applicant Upon completion of
construction activities within 47
feet of a historic building
City of Sacramento Community
Development Department
Resolution 2016-0379 November 10, 2016 Page 128 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-25 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

4.10-5: The residential, non-
residential, and mixed-use buildings
constructed pursuant to the RSPU
could be exposed to vibration levels
due to existing rail operations and/or
I-5 traffic.

4.10-5(a)
The historic structures in the Central Shops Historic District shall be stabilized using methods that would protect against vibration levels identified in the screening analysis (shown in Figure 6.8-3 of the 2007 RSP EIR).

Stabilize historic structures in the Central Shops Historic District.

RSPU Project appli cant Prior to construction activities within 47 feet of a historic
building
City of Sacramento Community
Development Department

4.10-5(b)
Prior to design review, the applicant shall have a certified vibration consultant prepare a site-specific vibration
analysis for residential uses and historic structures that are within the screening distance (shown in Figure 6.8-3 of the 2007 RSP EIR) for freight and passenger trains or light rail trains. The analysis shall detail how the vibration levels at these receptors would meet the applicable vibration
standards to avoid potential structural damage and human annoyance. The results of the analysis shall be
incorporated into project design.

Retain a certified vibration consultant to prepare a site- specific vibration analysis for residential and historic structures within the screening distance near rail lines.

RSPU Project applicant Prior to design review City of Sacramento Community Development Department

4.10-6: The proposed projects would
result in exposure of people to
cumulative increases in construction
noise levels.

4.10-6
Implement Mitigation Measure 4.10-1 to minimize noise
from outdoor amplified sound systems.

See Mitigation Measure 4.10-1. See Mitigation Measure 4.10-1. See Mitigation Measure 4.10-1. See Mitigation Measure 4.10-1. See Mitigation Measure 4.10-1.

4.10-7: The proposed projects would
contribute to cumulative construction
that could expose existing and/or
planned buildings, and persons
within, to significant vibration.

4.10-7
Implement Mitigation Measure 4.10-4 to minimize noise
from outdoor amplified sound systems.

See Mitigation Measure 4.10-4. See Mitigation Measure 4.10-4. See Mitigation Measure 4.10-4. See Mitigation Measure 4.10-4. See Mitigation Measure 4.10-4.

4.10-9: Implementation of the
proposed projects would contribute to
cumulative increases in residential
interior noise levels of 45 dBA Ldn or
greater.

4.10-9(a)
Implement Mitigation Measure 4.10-3(a) to minimize noise from outdoor amplified sound systems.

See Mitigation Measure 4.10-3(a). See Mitigation Measure 4.10-3(a). See Mitigation Measure

4.10-3(a).

See Mitigation Measure

4.10-3(a).

See Mitigation Measure

4.10-3(a).4.10-9(b)
Implement Mitigation Measure 4.10-3(b) to minimize noise from outdoor amplified sound systems.

See Mitigation Measure 4.10-3(b). See Mitigation Measure 4.10-3(b). See Mitigation Measure

4.10-3(b).

See Mitigation Measure

4.10-3(b).

See Mitigation Measure

4.10-3(b).

4.11 Public Services

4.11-6: The proposed projects could
result in a school located in proximity
to existing hazards, specifically
railroad tracks.

4.11-6
Prior to school site approval within 1,500 feet of the railroad tracks, the SCUSD shall retain a competent professional to prepare a safety study that assesses cargo manifests,
frequency, speed, and schedule of railroad traffic, grade, curves, type and condition of track, need for sound or safety barriers, need for pedestrian and vehicle safeguards at railroad crossings, presence of high pressure gas lines near the tracks that could rupture in the event of a derailment, and preparation of an evacuation plan. Based on this
information and the proposed location and design of the school, the study shall demonstrate that the school design and construction would not expose students to risks
associated with train accidents. In the event these
conditions cannot be satisfied, SCUSD shall proceed in a manner that complies with California Code of Regulations, Title 5, section 14010(d).

Prepare a safety study relative to school sites’ proximity to rail lines.

RSPU SCUSD Prior to school site approval City of Sacramento Community Development Department,
California Department of
Education
Resolution 2016-0379 November 10, 2016 Page 129 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-26 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

4.11-8: The proposed projects would
increase the demand for parks and
recreational facilities.

4.11-8
Prior to filing of the final map, the project applicant shall reach agreement with the City on which of the proposed
project elements and acreage meet the applicable City
parkland dedication requirements. The project applicant shall pay in-lieu fees (Quimby) on the difference in acreage between the City parkland requirement and the amount of parkland the proposed project would supply. The applicant shall pay Park Impact Fees (PIF) or enter into a “turnkey” agreement to construct the park facilities to satisfy its PIF obligation.

Pay in lieu park dedication fees (Quimby). Pay Park Impact Fees or enter into a “turnkey” parkland agreement.

RSPU Project applicant Prior to filing of final map City of Sacramento Community Development Department

4.11-9: The proposed projects would
contribute to cumulative increases in
demand on City parks and
recreational facilities.

4.11-9
Implement Mitigation Measure 4.11-8.

See Mitigation Measure 4.11-8. See Mitigation Measure 4.11-8. See Mitigation Measure 4.11-8. See Mitigation Measure 4.11-8. See Mitigation Measure 4.11-8.

4.12 Transportation

4.12-1: The proposed projects could
worsen conditions at intersections in
the City of Sacramento.

4.12-1(a)
i. Implem ent Event Transportation Management Plan
(TMP) to the satisfaction of the City Traffic Engineer
and subject to the performance standards set forth
within, including:

Implement Event Transportation Management Plan (TMP)
to meet performance standards.

RSPU Project applicant TMP approved prior to
issuance of certificate of
occupancy; implement during
operation and during events at
the MLS Stadium
City of Sacramento, Community
Development Department and
Department of Public Works

1. Vehicle Queuing on City Streets: Through added
intersections capacity and/or traffic management,
traffic does not queue back to upstream locations
during the Pre-Event peak hour including (but not
limited to):
x Northbound 7
th Street traffic does not spill back
from Railyards Boulevard into the UPRR
undercrossing (i.e., queues do not extend any
greater than 600 feet from Railyards Boulevard).
x Westbound North B Street traffic does not spill
back from 7th Street to 8th Street
x Westbound North B Street traffic does not spill
back from 8th Street to 12th Street
x Southbound 7th Street traffic does not spill back
to LRT tracks at North B Street

2. Pedestrian Flows: Through pedestrian flow
management, pedestrians do not spill out of
sidewalks onto streets with moving vehicles,
particularly along 7th Street between Richards
Boulevard and G Street, Railyards Boulevard
between 5th Street and 8th Street, and North B
Street between 7th Street and 12th Street.

3. Vehicular Parking: A comprehensive parking plan is
implemented that includes (but is not limited to) a
reservation system, smartphone parking app,
directional signage, real-time parking garage
occupancy, etc. that minimizes unnecessary
vehicular circulation (while looking for parking)
within and adjacent to the RSP Area.

4. Bicycle Parking: Signage is clearly visible to direct bicyclists to MLS Stadium event bicycle parking,
which has an adequate supply to accommodate a
typical MLS Stadium event.

Resolution 2016-0379 November 10, 2016 Page 130 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-27 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

5. Light Rail Transit: A new light rail station/stop is constructed on 7th Street north of Railyards
Boulevard and operational at the time the stadium
opens, providing an adequate level of LRT service
to meet the Pre- and Post-Event ridership
demands.

6. Bus/Paratransit: Specific locations are provided to
accommodate public buses and paratransit vehicle
stops within one block of the MLS Stadium.

7. Ridesharing: Specific locations are provided for
pick-up / drop-off areas such that taxi, Uber, or
similar ridesharing services do not impede overall
vehicular or pedestrian flow (including maintaining
uncongested conditions along 10
th Street to enable
emergency vehicle response).

8. Truck Staging: Delivery trucks associated with
special events do not park or idle along 7th Street,
8th Street, North B Street, or Railyards Boulevard.
ii. Each project developed pursuant to the RSPU
(including the Land Use Variant) shall pay the
applicable fee for the I-5 Subregional Corridor
Mitigation Program (SCMP) prior to issuance of
building permits.

Pay I-5 Subregional Corridor Mitigation Program (SCMP)
fees.

RSPU Project appli cant Prior to issuance of building
permits for individual applicable
development projects
City of Sacramento, Community
Development Department and
Department of Public Works
iii. Convert e xisting Dos Rios Street leg at 12th
Street/North B Street intersection to a right-turn only intersection that does not operate as part of the traffic signal.

Implement intersection improvements on the Dos Rios
Street leg at 12th Street/North B Street intersection.

RSPU Project applicant Prior to issuance of occupancy
permits for the MLS Stadium
City of Sacramento, Community
Development Department and
Department of Public Works

4.12-1(b)
The following measures shall be implemented prior to
issuance of the Certificate of Occupancy for Phase 1 of the KP Medical Center.
i. Implement Mitigation Measure 4.12-1(a)(ii).

Pay I-5 Subregional Corridor Mitigation Program (SCMP)
fees.

KPMC Project appli cant Prior to issuance of Certificate of Occupancy for Phase 1 of
the KP Medical Center
City of Sacramento Community
Development Department and
Department of Public Works
ii. Implement Transportation Demand Management
(TDM) Program. Implement Transportation Demand Management Program as directed by Mitigation Measure 4.12-1(b)(ii).

KPMC Project applicant Prior to issuance of Certificate of Occupancy for Phase 1 of
the KP Medical Center
City of Sacramento Community
Development Department and
Department of Public Works
iii. Widen Railyards Boulevard at 7 th Street to provide a dedicated northbound left-turn lane and dedicated
southbound right-turn lane. Operate signal with
protected northbound left-turn phasing.

Improve Railyards Boulevard/7th Street intersection. KPMC Project applicant Prior to issuance of Certificate of Occupancy for Phase 1 of
the KP Medical Center
City of Sacramento Community
Development Department and
Department of Public Works
iv. Coordinate traffic signals on Railyards Boulevard at 5 th, 6th, and 7th Streets. Coordinate traffic signals. KPMC Project appli cant Prior to issuance of Certificate of Occupancy for Phase 1 of
the KP Medical Center
City of Sacramento Community
Development Department and
Department of Public Works
v. Implem ent either Option 1a, 1b, or Option 1c:
x Option 1a: Extend 5th Street northerly from South
Park Street to North B Street. Install traffic signal at the 5th Street/South Park Street intersection.

Operate with 5th Street/North B Street intersection
with side-street stop-control. Widen eastbound
North B Street at 7th Street to include a dedicated
left-turn lane and a shared through/right lane and
operate east-west approaches with protected left-
turn phasing.

Implement one of the three available options to improve circulation through the RSP Area.

KPMC Project applicant Prior to issuance of Certificate of Occupancy for Phase 1 of
the KP Medical Center
City of Sacramento Community
Development Department and
Department of Public Works
Resolution 2016-0379 November 10, 2016 Page 131 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-28 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party x Option 1b: Extend South Park Street easterly from
5th Street and extend 6th Street northerly from
South Park Street extension to North B Street.

Install traffic signal at the 5th Street/South Park
Street intersection. Operate 6th Street/North B
Street intersection with side-street stop-control.

Widen eastbound North B Street at 7th Street to
include a dedicated left-turn lane and a shared
through/right lane and operate east-west
approaches with protected left-turn phasing.
x Option 1c: Widen 7
th Street/North B Street
intersection to consist of a left-turn lane and a
shared through/right lane on all approaches.

Operate signal with protected left-turn phasing.

4.12-1(c)
i. Implem ent Mitigation Measure 4.12-1(a)(i).

Implement Event Transportation Management Plan (TMP)
to meet performance standards.

MLS Project applicant TMP approved prior to
issuance of certificate of
occupancy; implement during
operation and during events at
the MLS Stadium
City of Sacramento, Community
Development Department and
Department of Public Works
ii. Convert existing Dos Rios Street leg at 12th
Street/North B Street intersection to a right-turn only intersection that does not operate as part of the traffic signal.

Implement intersection improvements on the Dos Rios
Street leg at 12
th Street/North B Street intersection.

MLS Project applicant Prior to issuance of occupancy
permits for the MLS Stadium
City of Sacramento, Community
Development Department and
Department of Public Works
iii. Implem ent Transportation Demand Management
(TDM) Program, if required by city code. Develop and implement Transportation Demand Management (TDM) Program.

MLS Project applicant Prior to issuance of occupancy
permit
City of Sacramento Community
Development Department and
Department of Public Works
iv. Construct South Park Street between 6th Street and
7th Street. Incorporate into project design and implement roadway construction and improvements.

MLS Project applicant Prior to and during project
construction and operations
City of Sacramento Community
Development Department and
Department of Public Works
v. Construct 6 th Street between Railyards Boulevard and North B Street. Incorporate into project design and implement roadway construction and improvements.

MLS Project applicant Prior to and during project
construction and operations
City of Sacramento Community
Development Department and
Department of Public Works
vi. Install traffic signals at 7th Street/South Park Street, 6th Street/North B Street, Railyards Boulevard/8th Street,
and North B Street/8th Street.

Incorporate into project design and implement roadway
construction and improvements.

MLS Project applicant Prior to and during project
construction and operations
City of Sacramento Community
Development Department and
Department of Public Works
vii. Widen 7th Street at Railyards Boulevard to provide dedicated northbound and southbound left-turn lanes,
and operate signal with protected left-turn phasing.

Incorporate into project design and implement roadway
construction and improvements.

MLS Project applicant Prior to and during project
construction and operations
City of Sacramento Community
Development Department and
Department of Public Works
viii. Widen/restripe 7th Street at North B Street to consist of one left-turn lane and one shared through/right lane on all approaches, and operate signal with protected left- turn phasing.

Incorporate into project design and implement roadway
construction and improvements.

MLS Project applicant Prior to and during project
construction and operations
City of Sacramento Community
Development Department and
Department of Public Works

4.12-2: The proposed projects could
worsen conditions on freeway
facilities maintained by Caltrans.

4.12-2
Implement Mitigation Measure 4.12-1(a)(ii).

See Mitigation Measure 4.12-1(a)(ii). RSPU,KPMC,M LS See Mitigation Measure

4.12-1(a)(ii).

See Mitigation Measure

4.12-1(a)(ii).

See Mitigation Measure

4.12-1(a)(ii).

4.12-3: The proposed projects could
worsen vehicle queuing at off-ramps
on I-5.

4.12-3
Implement Mitigation Measure 4.12-1(a)(ii).

See Mitigation Measure 4.12-1(a)(ii). RSPU,KPMC,M LS See Mitigation Measure

4.12-1(a)(ii).

See Mitigation Measure

4.12-1(a)(ii).

See Mitigation Measure

4.12-1(a)(ii).

4.12-6: The proposed projects could
adversely affect existing or planned
pedestrian facilities or fail to provide
for access for pedestrians.

4.12-6
Implement Mitigation Measure 4.12-1(a)(i).

See Mitigation Measure 4.12-1(a)(i). MLS See Mitigation Measure

4.12-1(a)(i).

See Mitigation Measure

4.12-1(a)(i).

See Mitigation Measure

4.12-1(a)(i).

Resolution 2016-0379 November 10, 2016 Page 132 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-29 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

4.12-7: The proposed projects could
cause construction-related traffic
impacts.

4.12-7
Before issuance of grading permits for the project site, the project applicants shall prepare a detailed Construction Traffic Management Plan that will be subject to review and approval by the City Department of Public Works, in
consultation with Caltrans, affected transit providers, and local emergency service providers including the City of Sacramento Fire and Police departments. The plan shall
ensure that acceptable operating conditions on local
roadways and freeway facilities are maintained. At a
minimum, the plan shall include:
x The number of truck trips, time, and day of street
closures
x Time of day of arrival and departure of trucks
x Limitations on the size and type of trucks, provision of a staging area with a limitation on the number of trucks
that can be waiting
x Provision of a truck circulation pattern
Prepare Construction Traffic Management Plan with
sufficient detail, and consult with identified public and private agencies. Submit a copy of each construction traffic management plan to local emergency response agencies
and transit providers.

RSPU, KPMC, MLS Project applicant Prior to issuance of building permits for individual
development projects
City of Sacramento Department
of Public Works, Caltrans,
affected transit providers, and
local emergency service
providers including City of
Sacramento Fire and Police
Departments.
x Identification of detour routes and signing plan for street closures
x Provision of driveway access plan so that safe
vehicular, pedestrian, and bicycle movements are
maintained (e.g., steel plates, minimum distances of
open trenches, and private vehicle pick up and drop off areas)
x Maintain safe and efficient access routes for emergency vehicles and transit
x Manual traffic control when necessary
x Proper advance warning and posted signage
concerning street closures
x Provisions for pedestrian and bicycle safety
A copy of each construction traffic management plan shall be submitted to local emergency response agencies and
transit providers, and these agencies shall be notified at least 30 days before the commencement of construction
that would partially or fully obstruct roadways.

4.12-8: The proposed projects could
contribute to cumulatively
unacceptable intersection operations
in the City of Sacramento.

4.12-8(a)
i. Implem ent Mitigation Measure 4.12-1(a)(i)
ii. Implement Mitigation Measure 4.12-1(a)(ii).

See Mitigation Measures 4.12-1(a)(i) and 4.12-1(a)(ii). RSPU See Mitigation Measures

4.12-1(a)(i) and 4.12-1(a)(ii).

See Mitigation Measures

4.12-1(a)(i) and 4.12-1(a)(ii).

See Mitigation Measures

4.12-1(a)(i) and 4.12-1(a)(ii).

4.12-8(b)
i. Implem ent Mitigation Measure 4.12-1(a)(ii)
ii. Implement Mitigation Measure 4.12-1(b)(ii).

See Mitigation Measures 4.12-1(a)(ii) and 4.12-1(b)(ii). KPMC See Mitigation Measures

4.12-1(a)(ii) and 4.12-1(b)(ii).

See Mitigation Measures

4.12-1(a)(ii) and 4.12-1(b)(ii).

See Mitigation Measures

4.12-1(a)(ii) and 4.12-1(b)(ii).

4.12-8(c)
i. Implem ent Mitigation Measure 4.12-1(a)(i)
ii. Implement Mitigation Measure 4.12-1(c)(iii).

See Mitigation Measures 4.12-1(a)(i) and 4.12-1(c)(iii). MLS See Mitigation Measures

4.12-1(a)(i) and 4.12-1(c)(iii).

See Mitigation Measures

4.12-1(a)(i) and 4.12-1(c)(iii).

See Mitigation Measures

4.12-1(a)(i) and 4.12-1(c)(iii).

4.12-9: The proposed projects could
worsen cumulative conditions on
freeway facilities maintained by
Caltrans.

4.12-9
Implement Mitigation Measure 4.12-1(a)(ii).

See Mitigation Measure 4.12-1(a)(ii). RSPU, KPMC See Mitigation Measure

4.12-1(a)(ii).

See Mitigation Measure

4.12-1(a)(ii).

See Mitigation Measure

4.12-1(a)(ii).

Resolution 2016-0379 November 10, 2016 Page 133 of 134

4. Mitigation Monitoring Plan
RSPU = Railyards Specific Plan Update; KPMC = Kaiser Permanente Medical Center; MLS = Major League Soccer Stadium; SO = Stor mwater Outfall Sacramento Railyards Specific Plan Update 4-30 City of Sacramento KP Medical Center, MLS Stadium, & Stormwater Outfall ESA / 150286 Final Subsequent Environmental Impact Report October 2016 TABLE 4-1

SACRAMENTO RAILYARDS SPECIFIC PLAN UPDATE, KP MEDICAL CENTER, MLS STADIUM, & STORMWATER OUTFALL MITIGATION MONITORING PLAN Impact Mitigation Measure Action(s) Component Implementing Party Timing Monitoring Party

4.12-10: The proposed projects could
worsen vehicle queuing at off-ramps
on I-5 under cumulative conditions.

4.12-10
Implement Mitigation Measure 4.12-1(a)(ii).

See Mitigation Measure 4.12-1(a)(ii). RSPU, KPMC, MLS See Mitigation Measure

4.12-1(a)(ii).

See Mitigation Measure

4.12-1(a)(ii).

See Mitigation Measure

4.12-1(a)(ii).

4.12-13: The proposed projects could
adversely affect existing or planned
pedestrian facilities or fail to provide
for access for pedestrians under
cumulative conditions.

4.12-13
Implement Mitigation Measure 4.12-1(a)(i).

See Mitigation Measure 4.12-1(a)(i). MLS See Mitigation Measure

4.12-1(a)(i).

See Mitigation Measure

4.12-1(a)(i).

See Mitigation Measure

4.12-1(a)(i).4.12-14: The proposed projects could
cause construction-related traffic
impacts under cumulative conditions.

4.12-14
Implement Mitigation Measure 4.12-7.

See Mitigation Measure 4.12-7. RSPU, KPM C, MLS See Mitigation Measure 4.12-7. See Mitigation Measure 4.12-7. See Mitigation Measure 4.12-7.4.13 Utilities

4.13-7: The proposed projects would
contribute to cumulative increases in
demand for water supply and
treatment.

4.13-7
In order to ensure that sufficient capacity would be available to meet cumulative demands, the City shall implement, to the extent needed in order to secure sufficient supply, one or more of the following:

Implement, to the extent needed in order to secure
sufficient water supply, one or a combination of the actions listed in Mitigation Measure 4.13-7.

RSPU City of Sacramento To be determined by the City
based on citywide water
demand and supply
City of Sacramento Public
Works Department
a. Maximize Water Conservation
b. Implement New Water Diversion and/or Treatment
Infrastructure
c. Implement Additional Groundwater Pumping
Resolution 2016-0379 November 10, 2016 Page 134 of 134
ORDINANCE NO. 2023-
Adopted by the Sacramento City Council
March 14, 2023

APPROVING AMENDMENT 2 TO THE AMENDED AND RESTATED DEVELOPMENT AGREEMENT

FOR THE SACRAMENTO RAILYARDS PROJECT BETWEEN THE CITY OF SACRAMENTO AND DOWNTOWN RAILYARD VENTURE, LLC (P23-001)

BE IT ENACTED BY THE COUNCIL OF THE CITY OF SACRAMENTO:

Section 1. Background. The City of Sacramento (“City”), a municipal corporation, and Downtown Railyard Venture, LLC (“DRV” or “Landowner”), a Delaware limited liability company, are parties to the Amended and Restated Development Agreement by and between the City of Sacramento and Downtown Railyard Venture, LLC for The Railyards Project, which is designated as City Agreement No. 2008-0150-02 (the “Amended and Restated Agreement”). The City and the Landowner are parties to Amendment 1 to Amended and Restated Development Agreement by and between the City of Sacramento and Downtown Railyard Venture, LLC for The Railyards Project, which is designated as City Agreement No. 2008-0150-04 (the “First Amendment”). The Amended and Restated Agreement and the First Amendment collectively constitute the “Development Agreement.”

Section 2. Incorporation of Agreement. This ordinance incorporates Amendment 2 to Amended and Restated Development Agreement by and between the City of Sacramento and Downtown Railyard Venture, LLC for The Railyards Project, a copy of which is attached to this ordinance as Exhibit A (the “Second Amendment”).

Section 3. Hearing before the Planning and Design Commission. On February 9, 2023, in accordance with Government Code section 65867 and Sacramento City Code chapter 18.16, the Planning and Design Commission conducted a noticed public hearing on an application to amend the Development Agreement. During the hearing, the Planning and Design Commission received and considered evidence and testimony. After the hearing concluded, the Planning and Design Commission forwarded to the City Council a recommendation to approve the proposed amendment.

Section 4. Hearing before the City Council; Findings. On March 14, 2023, in accordance with Government Code section 65867 and Sacramento City Code chapter 18.16, the City Council conducted a noticed public hearing on an application to amend the Development Agreement.

During the hearing, the City Council received and considered evidence and testimony concerning the proposed amendment. Based on the information in the application and the evidence and testimony received at the hearing, the City Council finds as follows:

(a) The Second Amendment is consistent with the City’s general plan and the goals, policies, standards, and objectives of the Railyards Specific Plan.

(b) The Second Amendment will facilitate Landowner’s development of the property subject to the amendment, which should be encouraged in order to meet important economic, social, environmental, or planning goals of the Railyards Specific Plan.

(c) Without the Second Amendment, Landowner would be unlikely to proceed with development of the property subject to the Second Amendment in the manner proposed.

(d) Landowner will incur substantial costs to provide public improvements, facilities, or services from which the general public will benefit.

(e) Landowner will participate in all programs established or required under the general plan or any applicable specific or community plan and all of its approving resolutions (including any mitigation-monitoring plan) and has agreed to the financial participation required under the applicable financing plan and its implementation measures, all of which will accrue to the benefit of the public.

(f) Landowner has made commitments to a high standard of quality and has agrees to all applicable land-use and development regulations.

(g) The property subject to the proposed Second Amendment is within a flood hazard zone and is an area covered by SAFCA’s Improvements to the State Plan of Flood Control System, and specific findings related to the level of protection have been incorporated as part of this project. Even though the project site is within a flood hazard zone, the local flood management agency, SAFCA, has made adequate progress on the construction of a flood protection system that will ensure protection from a 200-year flood event or will achieve that protection by 2025. This is based on the SAFCA Urban level of flood protection plan, adequate progress baseline report, and adequate progress toward an urban level of flood protection engineer’s report that were accepted by City Council Resolution No. 2016-0226 on June 21, 2016, and the SAFCA 2022 Adequate Progress Annual Report accepted by City Council Resolution No. 2022-0313 on October 11, 2022.

Section 5. Approval and Authorization. The City Council hereby approves the Second Amendment. The City Council hereby authorizes the mayor to sign on the City’s behalf, on or after the effective date of this ordinance.

TABLE OF CONTENTS:

Exhibit A - Amendment 2 to Amended and Restated Development Agreement by and between the City of Sacramento and Downtown Railyard Venture, LLC for The Railyards Project

Amendment 2 to Amended and Restated Railyards Development Agreement Revision Date: 1-24-2023

FOR CITY CLERK USE ONLY

CITY AGREEMENT NO. 2008-0150-5
Recording Requested by and Benefiting
the City of Sacramento, a Government Entity –
No Fee Required per Government Code §§6103,
27383

RECORDING REQUESTED BY
AND WHEN RECORDED RETURN TO:

City Clerk
City of Sacramento
915 I Street
Sacramento, CA 95814

AMENDMENT 2 TO AMENDED AND RESTATED

DEVELOPMENT AGREEMENT

FOR

SACRAMENTO RAILYARDS PROJECT

Project No. P15-040

Between

CITY OF SACRAMENTO

and

DOWNTOWN RAILYARD VENTURE, LLC

Amendment 2 to Amended and Restated Railyards Development Agreement Revision Date: 1-24-2023 2 FOR CITY CLERK USE ONLY

CITY AGREEMENT NO. 2008-0150-5
AMENDMENT 2 TO AMENDED AND RESTATED

DEVELOPMENT AGREEMENT

BY AND BETWEEN

THE CITY OF SACRAMENTO
AND

DOWNTOWN RAILYARD VENTURE, LLC
FOR

THE RAILYARDS PROJECT

This AMENDMENT 2 TO AMENDED AND RESTATED DEVELOPMENT AGREEMENT dated [date], 2023, for purposes of identification, is between the CITY OF SACRAMENTO, a municipal corporation (the "City"), and DOWNTOWN RAILYARD VENTURE, LLC, a Delaware limited liability company (the "Landowner").

Background

The City and Landowner are the parties to the amended and restated development agreement for the Sacramento Railyards project, which is identified as City agreement number 2008-0150-2 (the “Amended and Restated DA”). The Amended and Restated DA was adopted by City ordinance 2016-0044 and recorded in the official records of Sacramento County in book 20170106, page 0536.

The parties entered into Amendment 1 to Amended and Restated Development Agreement, dated October 7, 2021, and identified as City agreement number 2008-0150-4, to modify terms of the Amended and Restated DA related to parks based on changes to the City’s Quimby ordinance.

The parties now desire to amend terms of Exhibit P and Exhibit Q to the Amended and Restated DA related to parking to facilitate Landowner’s development of a live entertainment venue (the “Music Venue”) within the Central Shops Historic District. The changes allow temporary off-site surface parking related to the Music Venue on a lot that previously could be used only for parking for a multi-purpose outdoor stadium to serve as the home of a major league soccer team and on other lots that previously could not be used for temporary off-site surface parking for any use.

Amendment 2 to Amended and Restated Railyards Development Agreement Revision Date: 1-24-2023 3 FOR CITY CLERK USE ONLY

CITY AGREEMENT NO. 2008-0150-5
The city manager has determined that because this amendment modifies provisions of the Amended and Restated DA dealing with permitted uses, it is a substantive amendment and must be approved as such in accordance with City Code section 18.16.130.B.

With these background facts in mind, the parties agree to amend the Amended and Restated DA as follows:

1. Exhibit P. Exhibit P is hereby amended by replacing existing Exhibit P with amended Exhibit P, which is attached to this agreement as attachment 1.

2. Exhibit Q. Exhibit Q is hereby amended by replacing existing Exhibit Q with amended Exhibit Q, which is attached to this agreement as attachment 2.

3. Effective date. This agreement is effective on the date both parties have signed it, as indicated by the dates in the signature blocks below.

4. No Third-Party Beneficiaries. This agreement is solely for the benefit of the parties. It is not intended to benefit any third parties.

5. Integration and Modification. This agreement sets forth the parties’ entire understanding regarding the matters set forth above and is intended to be their final, complete, and exclusive expression of those matters. It supersedes all prior or contemporaneous agreements, representations, and negotiations—written, oral, express, or implied—and may be modified only by another written agreement signed by both parties.

6. Interpretation. This agreement is to be interpreted and applied in accordance with California law, except that that the rule of interpretation in California Civil Code section 1654 will not apply. Attachments 1 and 2 are part of this agreement.

7. Severability. If a court with jurisdiction rules that any nonmaterial part of this agreement is invalid, unenforceable, or contrary to law or public policy, then the rest of this agreement remains valid and fully enforceable.

8. Counterparts. The parties may sign this agreement in counterparts, each of which is considered an original, but all of which constitute the same agreement. Facsimiles, pdfs, and photocopies of signature pages of the agreement have the same binding effect as originals.

Amendment 2 to Amended and Restated Railyards Development Agreement Revision Date: 1-24-2023 9 FOR CITY CLERK USE ONLY

CITY AGREEMENT NO. 2008-0150-5
Attachment 1 – Exhibit P

Amendment 2 to Amended and Restated Railyards Development Agreement Revision Date: 1-24-2023 10 FOR CITY CLERK USE ONLY

CITY AGREEMENT NO. 2008-0150-5

EXHIBIT P

SPECIAL CONDITIONS

I. PURPOSE AND INTENT

The definitions applicable to the body of the Agreement shall apply to this Exhibit P.

Under no circumstances can Development of the Property proceed without satisfaction of the conditions specified in this Exhibit P. These Special Conditions shall constitute binding and legally enforceable obligations of LANDOWNER and its successors and assigns, and binding and legally enforceable requirements and conditions for the Development of the Property for the Project, in addition to other obligations, requirements and conditions imposed as set out in the Agreement.

II. LANDOWNERS’ OBLIGATIONS

A. Compliance with Law Respecting Other Public Agencies. As required under this Agreement and by CITY as a condition of the Project Entitlements or a Subsequent Approval, LANDOWNER shall comply with applicable law with respect to the following matters concerning other Public Agencies:

1. Appropriate sanitation districts, including but not limited to Sacramento County Regional Sanitation District, for provision of Public Facilities, payment of fees and charges, and payment (if applicable) associated therewith.

2. The State Department of Toxic Substance Control in regards to compliance with applicable land use covenants.

3. Applicable School District(s) in regard to school facilities for the students that will reside within the Project.

4. The Sacramento Regional Transit District in regard to the light rail transit system within the Property.

III. PARKING

A. If LANDOWNER Develops one or both of the following on the Property: (i) a multi- purpose outdoor stadium to serve as the home of a major league soccer team (the “Stadium”), or (ii) a music venue within the Central Shops Historic District (the “Music Venue”), then LANDOWNER may

Amendment 2 to Amended and Restated Railyards Development Agreement Revision Date: 1-24-2023 11 FOR CITY CLERK USE ONLY

CITY AGREEMENT NO. 2008-0150-5
Develop temporary off-site surface parking lots designed to serve the needs of the Stadium or Music Venue or both (“Temporary Parking Lots”) on the following terms:

1. Except as provided in section III.A.9., the Temporary Parking Lots are limited to the locations shown in the “Temporary Parking Plan” attached as Exhibit Q, subject to the following terms:

(a) The Temporary Parking Lots identified as “Daily Use & Music Venue” may be used for Music Venue parking and daily parking for the Central Shops Historic District; and

(b) The Temporary Parking Lot identified as “Music Venue & Stadium” may be used for both Stadium parking and Music Venue parking.

2. LANDOWNER must obtain a conditional use permit for each Temporary Parking Lot in accordance with the CITY’s Land Use and Development Regulations.

3. LANDOWNER agrees that the CITY may include as conditions on each conditional use permit issued for a Temporary Parking Lot: (a) a termination date, and (b) a provision that allows the CITY to modify or terminate the conditional use permit if the CITY determines, based on the review under section III.6., that the parking stalls are no longer needed to serve the Stadium or Music Venue or both, as applicable. LANDOWNER waives the right to administratively appeal or judicially challenge a decision by the CITY to modify or terminate a conditional use permit in accordance with this section III.A.3.

4. The total number of parking stalls allowed in the Temporary Parking Lots combined is 4,128 (“Baseline Temporary Parking Allotment”), except as the Baseline Temporary Parking Allotment may be adjusted in accordance with section III.A.6.

5. The Temporary Parking Lots may be used only for parking for events at the Stadium or Music Venue or both, as designated in Exhibit Q, subject to the following:

(a) The Temporary Parking Lots identified as “Daily Use & Music Venue” may be used for Music Venue parking and daily parking for the Central Shops Historic District; and

(b) The Temporary Parking Lot identified as “Music Venue & Stadium” may be used for both Stadium parking and Music Venue parking.

6. After the completion of (i) each of the first four soccer seasons after a certificate of occupancy is issued for the Stadium, and (ii) each of the first four 12-month periods after a certificate

Amendment 2 to Amended and Restated Railyards Development Agreement Revision Date: 1-24-2023 12 FOR CITY CLERK USE ONLY

CITY AGREEMENT NO. 2008-0150-5
of occupancy is issued for the Music Venue (each such 12-month period is referred to as an “Evaluation Period”), the CITY shall, in consultation with LANDOWNER, prepare an evaluation of the usage inside and outside the Temporary Parking Lots within the Property (the “Annual Parking Review”) as part of the annual event transportation management plan review for the Stadium or Music Venue or both, as applicable, to determine whether the Baseline Temporary Parking Allotment should be adjusted to reflect actual parking usage. Based on the Annual Parking Review, the CITY may adjust the Baseline Temporary Parking Allotment that is then in effect up or down, and the conditional use permit for any affected Temporary Parking Lot will be modified accordingly pursuant to the following schedule and method:

(a) Stadium Parking (applies to the following Temporary Parking Lots:

Stadium Only and Music Venue & Stadium (but only as to the parking that is attributable to the Stadium)):

(i) After first season: No adjustment.

(ii) After second season: Adjustment based on highest use during prior two seasons and the anticipated use for the following season.

(iii) After third season: Adjustment based on highest use during prior two seasons and the anticipated use for the following season..

(iv) After fourth season: Adjustment based on highest use during prior two seasons and the anticipated use for the following season.

(b) Music Venue Parking (applies to the following Temporary Parking Lots:

Music Venue Only, Daily Use & Music Venue, and Music Venue & Stadium (but only as to the parking that is attributable to the Music Venue):

(i) After first Evaluation Period: No adjustment.

(ii) After second Evaluation Period: Adjustment based on highest use during prior two Evaluation Periods and the anticipated use for the following 12-month period.

(iii) After third Evaluation Period: Adjustment based on highest use during prior two Evaluation Periods and the anticipated use for the following 12-month period.

Amendment 2 to Amended and Restated Railyards Development Agreement Revision Date: 1-24-2023 13 FOR CITY CLERK USE ONLY

CITY AGREEMENT NO. 2008-0150-5
(iv) After fourth Evaluation Period: Adjustment based on highest use during prior two Evaluation Periods and the anticipated use for the following 12-month period.

The CITY shall provide LANDOWNER with at least 90 days’ notice before adjusting the Baseline Temporary Parking Allotment. If LANDOWNER is dissatisfied with the CITY’s decision to adjust the Baseline Temporary Parking Allotment, LANDOWNER may appeal the decision to the City Council in accordance with City Code chapter 1.24 by filing an appeal with the City Clerk no more than 10 days after receiving notice of the CITY’s decision. For purposes of section 1.24.030, the City Clerk shall fix the hearing date. In reaching its decision on the appeal, the City Council has the sole discretion to accept, reject, modify, or condition the CITY’s proposed adjustment of the Baseline Temporary Parking Allotment.

The CITY's review under this section is independent of the CITY's annual compliance review conducted under Government Code section 65865.1 and City Code section 18.16.160.

7. To encourage the relocation of parking for the Stadium and Music Venue from the Temporary Parking Lots into permanent parking structures parking (“Parking Structures”) (which may be free standing or integrated into office, commercial, or retail buildings) within the Property during the course of Development of the Project:

(a) In conjunction with the sale or transfer by LANDOWNER of any portion of the Property to a third party who intends to construct a Parking Structure (which may be free standing or integrated into office, commercial, or retail buildings) as part of its Development of the Property (“Improved Lot Owner”), LANDOWNER shall present the opportunity to the Improved Lot Owner of entering into a “Parking Agreement” with the owner or operator of the Stadium or Music Venue, as applicable. A Parking Agreement is an agreement that sets forth the terms by which people may use parking stalls in the Parking Structure while attending events at the Stadium or Music Venue, as applicable, including the number of parking stalls that will be available for use by people who attend events at the Stadium or Music Venue, as applicable. The Parties acknowledge that Parking Agreements are subject to negotiation between the owner or operator of the Stadium or Music Venue, as applicable, and the Improved Lot Owner and that neither is obligated to enter into a Parking Agreement.

(b) If LANDOWNER intends to construct a Parking Structure as part of its Development of the Property, then LANDOWNER shall offer to enter into a Parking Agreement with the owner or operator of the Stadium and Music Venue. The owner or operator of the Stadium or Music Venue is not required to enter a Parking Agreement with LANDOWNER. For clarification, certain parking uses at structured parking are incompatible with the parking requirements for events at the Stadium or Music Venue (such as medical, residential or retail that requires after traditional business hours parking) and such parking may be fully or partially exempt from the above requirements.

Amendment 2 to Amended and Restated Railyards Development Agreement Revision Date: 1-24-2023 14 FOR CITY CLERK USE ONLY

CITY AGREEMENT NO. 2008-0150-5

8. For each parking stall that is relocated from a Temporary Parking Lot to a Parking Structure within the Property, the Baseline Temporary Parking Allotment will be reduced on a pro-rata basis. The desire of the Parties is to eliminate all Temporary Parking Lots, one by one, during the course of the Development of the Property for the Project, with the goal that all Stadium and Music Venue parking within the Property, except for limited parking onsite, will eventually be in Parking Structures.

9. During the first five soccer seasons after a certificate of occupancy is issued for the Stadium, LANDOWNER may develop a Temporary Parking Lot in a location other than one shown in Exhibit Q if:

(a) LANDOWNER sells or transfers a portion of the Property that contains a Temporary Parking Lot and the purchaser or transferee (i) constructs a Parking Structure on the lot that contained the Temporary Parking Lot and (ii) does not enter into an a Parking Agreement to allow Stadium parking in the Parking Structure;

(b) A new Temporary Parking Lot is required to meet the Baseline Temporary Parking Allotment that is then in effect;

(c) The new Temporary Parking Lot is located in a C-3 SPD zone;

(d) The new Temporary Parking Lot replaces the Temporary Parking Lot that was displaced under section III.A.9.(a); and

(e) All the conditions in III.A.2. —8 (except III.A.4.) apply to the new Temporary Parking Lot.

10. In no event may a lot within the Property be used as a Temporary Parking Lot after December 31, 2030.

11. In reviewing any application for a Subsequent Approval for a Stadium, other than the sports complex identified as a Project Entitlement in Exhibit C, the CITY shall review the total number of parking stalls allowed in section III.A.4 in accordance with the CITY’s Land Use and Development Regulations. The CITY may adjust the total number of parking stalls in section III.A.4 and the conditional use permit for any affected Temporary Parking Lot to reflect the anticipated Stadium parking use.

B. LANDOWNER has identified certain lots within the Property that it desires to Develop as long-term surface parking lots to serve some of the parking needs of the Project during the Initial Term

Amendment 2 to Amended and Restated Railyards Development Agreement Revision Date: 1-24-2023 15 FOR CITY CLERK USE ONLY

CITY AGREEMENT NO. 2008-0150-5
and any applicable Extension Period (“Improved Surface Lots”). Improved Surface Lots may be Developed on the Property on the following terms:

1. Except as provided in section III.B.5., the Improved Surface Lots are limited to the locations to be agreed upon by the Parties, which will be shown in a “Project Parking Plan” to be attached as Exhibit R.

2. LANDOWNER must obtain a conditional use permit for each Improved Surface Lot in accordance with the CITY’s Land Use and Development Regulations.

3. LANDOWNER agrees that the CITY may include a termination date as a condition on each condition use permit issued for an Improved Surface Lot. LANDOWNER waives the right to administratively appeal or judicially challenge the decision of the CITY to terminate a conditional use permit in accordance with this section III.B.3.

4. The Improved Surface Lots may be used only for parking (i) for uses located inside the Central Shops Historic District, (ii) for uses as part of initial phases of a phased commercial complex on a parcel in which the subsequent development of the phased commercial complex will include a Parking Structure that replaces the Improved Surface Lot, or (iii) if agreed upon by the CITY and LANDOWNER in a separate written contract, for uses located outside the Property (a default under such a contract will not constitute a default under this Agreement).

5. Until January 1, 2027, LANDOWNER may Develop an Improved Surface Lot in a location other than one shown in Exhibit R, subject to the following:

(a) Development of a lot on which an Improved Surface Lot is located: (i) eliminates all parking stalls that were available in the Improved Surface Lot and (ii) does not include any structured parking;

(b) The new Improved Surface Lot is located in a C-3 SPD zone; and

(c) All the conditions in III.B.2. —4 apply to the new Improved Surface Lot.

Amendment 2 to Amended and Restated Railyards Development Agreement Revision Date: 1-24-2023 16 FOR CITY CLERK USE ONLY

CITY AGREEMENT NO. 2008-0150-5
Attachment 2 – Exhibit Q

Amendment 2 to Amended and Restated Railyards Development Agreement Revision Date: 1-24-2023 17 FOR CITY CLERK USE ONLY

CITY AGREEMENT NO. 2008-0150-5

RESOLUTION NO. 2023-
Adopted by the Sacramento City Council
March 14, 2023

ADOPTING FINDINGS OF FACT AND CONDITIONS OF APPROVAL FOR THE RAILYARDS TEMPORARY SURFACE PARKING LOTS PROJECT (P23-001)

BACKGROUND
A. On February 9, 2023, the Planning and Design Commission conducted a public hearing, for which notice was given pursuant to Sacramento City Code chapter 17.812, received, and considered evidence concerning the Railyards Temporary Surface Parking project (“Project”), and forwarded to the city Council a recommendation to approve the Project.

B. On March 14, 2023, the City Council conducted a public hearing, for which notice was given pursuant to Sacramento City Code chapter 17.812, received, and considered evidence concerning the Project.

BASED ON THE FACTS SET FORTH IN THE BA CKGROUND, THE CITY C OUNCIL RESOLVES AS FOLLOWS:

Section 1. Based on the verbal and documentary evidence received at the hearing on the Railyards Temporary Surface Parking Lots project (Project), the City Council approves the Project entitlements based on the findings of fact and subject to the conditions of approval as set forth below.

Section 2. The City Council approves the Project entitlements based on the following findings of fact:

A. Environmental Determination: The California Envi ronmental Quality Act determination for the Project has been adopted by Resolution No. _____.

B. Development Agreement Amendment: Amendment 2 to the Amended and Restated Development Agreement for the Sacramento Railyards Project between the City of Sacramento and Downtown Railyard Venture, LLC (P23 -001) has been adopted by Ordinance No. _________.

C. Temporary Conditional Use Permit for stand-alone parking facilities on property referred to as Lots 4a, 4b, 4c, 4d, partial 8b, 9a, 9b, 9c, 15a, 15b, 15c, 15d, and partial 21b (collectively “site”) as described in the Tentative Subdivision Map for The Railyards (Record No. Z21 -107) within the Central Business District (“C -3-SPD”) zone and the Railyards Special Planning District (“SPD”) is approved based on the following Findings of Fact:

1. The proposed use and its operating characteristics are consistent with the General Plan land use designation of Central Business District (CBD) and the Railyards Specific Plan as a significant element in the future CBD includes a mix of new commercial and residential uses. The proposed project supports continued redevelopment of the Sacramento Railyards by allowing for temporary parking facilities that serve a variety of uses that are gradually being constructed.

2. The proposed use and its operating characteristics are consistent with the applicable standards, requirements, and regulations of the zoning district in which it is located, and of all other provisions of title 17 of the Sacramento City Code . Condition of approval have been i mposed that authorizes use of the parking lots through December 2029. The applicant asserts that will allow sufficient time to realize a fair return on their investment of this interim use. Additionally, the Development Agreement limits the use of temporary park ing approved in 2016 through 2030.Although the proposed lots have been designed and conditioned to mitigate potential impacts to the community, the project’s ability to create impacts is limited given the temporary nature and temporary quality of the facil ity. Furthermore, it is the desire of the City to promote the viability of the music venue and Central Shops Plaza which furthers adopted City goals related to high -quality design, sustainable building practices, and the ability to access the district by a wider population with varying physical abilities.

3. The proposed use is situated on a parcel that is physically suitable in terms of location, size, topography, and access, and that is adequately served by public services and utilities in that the proposed project provides onsite and offsite improvements to sufficiently serve the project and its users through appropriate stormwater management, extension of necessary public and private utility infrastructure, and parking and landscaping improvements.

4. The proposed use and its operating characteristics are not detrimental to the public health, safety, convenience, or welfare of persons residing, working, visiting, or recreating in the surrounding neighborhood and will not result in the creation of a nuisance in that the project has been evaluated for any negative traffic externalities and has been designed and conditioned so that the project will not spill traffic into the nearby public roadways and provides internal pedestrian connections.

Additionally, while th e majority of the lots utilize gravel surfaces, accessible spaces and paths of travel are provided in concrete.

D. Site Plan and Design Review for stand-alone parking facilities with deviations to waive development standards including surface paving, tree sha ding, and onsite perimeter landscape planters within the C-3-SPD zone and the Railyards SPD is approved based on the following Findings of Fact:

1. The design, layout, and physical characteristics of the proposed development are consistent with the General Plan land use designation of Central Business District and the Railyards Specific Plan as a significant element in the future CBD includes a mix of new commercial and residential uses. The proposed project supports continued redevelopment of the Sacramento Railyards by allowing for temporary parking facilities that serve a variety of uses that are gradually being constructed;

2. The design, layout, and physical characteristics of proposed development are consistent with all applicable design g uidelines and with all applicable development standards. A condition of approval has been imposed that authorizes use of the parking lots through December 2029. The applicant asserts that will allow sufficient time to realize a fair return on their investm ent of this interim use. Authorizing deviations to parking facility development standards reduce the costs associated with the lots, further reducing the amount invested to further encourage the development of the lots with permanent uses and structured parking facilities to serve the district.

Additionally, the Development Agreement limits the use of temporary parking approved in 2016 through 2030. Although the proposed lots have been designed and conditioned to mitigate potential impacts to the community, the project’s ability to create impacts is limited given the temporary nature and temporary quality of the facility. Furthermore, it is the desire of the City to promote the viability of the music venue and Central Shops Plaza which furthers adopted City goals related to high - quality design, sustainable building practices, and the ability to access the district by a wider population with varying physical abilities.

3. All streets and other public access ways and facilities, parking facilities, and utility infrastructure are adequate to serve the proposed development and comply with all applicable design guidelines and development standards in that in that the proposed project provides onsite and offsite improvements to sufficiently serve the project and its users through appropriate stormwater management, extension of necessary public and private utility infrastructure, and parking and landscaping improvements;

4. The design, layout, and physical characteristics of the proposed development are visually and functi onally compatible with the surrounding neighborhood in that the project is consistent with the overall vision of the Railyards development as the temporary lots are designed to be gradually replaced with permanent structures as development occurs;

5. The design, layout, and physical characteristics of the proposed development ensure energy consumption is minimized and use of renewable energy sources is encouraged; and

6. The design, layout, and physical characteristics of the proposed development are not detrimental to the public health, safety, convenience, or welfare of persons residing, working, visiting, or recreating in the surrounding neighborhood and will not result in the creation of a nuisance in that the project has been evaluated for impacts internally and at the right -of-way. Lastly, the project has been conditioned to ensure a long - lasting operation that will function harmoniously with the surrounding uses.

E. 200-Year Flood Protection

1. The project site is within a flood hazard zone and is an area covered by SAFCA’s Improvements to the State Plan of Flood Control System, and specific findings related to the level of protection have been incorporated as part of this project. Even though the project site is within a flood hazard zone, the local flood manageme nt agency, SAFCA, has made adequate progress on the construction of a flood protection system that will ensure protection from a 200-year flood event or will achieve that protection by 2025. This is based on the SAFCA Urban level of flood protection plan, adequate progress baseline report, and adequate progress toward an urban level of flood protection engineer’s report that were accepted by City Council Resolution No. 2016- 0226 on June 21, 2016, and the SAFCA 202 2 Adequate Progress Annual Report accepted by City Council Resolution No. 2022-0313 on October 11, 2022.

Section 3. The City Council approves the Project entitlements subject to the following conditions of approval:

C. Temporary Conditional Use Permit for stand-alone parking facilities on the site within the C-3-SPD zone and the Railyards SPD is approved subject to the following conditions of approval:

PLANNING
C1. This Conditional Use Permit (“permit”) authorizes the temporary use of the site as set forth herein and shall be valid for a period extending from the date of approval of this permit until December 31, 2029.
a. This permit terminates on the earliest of the following dates: 1) December 31, 2029; 2) the date City Agreement No. 2008 -0150 (“Development Agreement”) terminates; or 3) the date the City terminates this permit in accordance with the terms of the Development Agreement.
b. Upon the termination of this permit, it is of no further force and effect and the applicant must immediately cease operations and return the site to its previous condition, as it was prior to the installation of improvements authorized by this permit.
c. This permit does not create a vested right to operate the proposed use beyond the termination date and does not confer nonconforming status on the temporary use authorized herein.
d. Upon termination of this permit, the applicant may submit a new application for a conditional use permit for the same use, which the City will review and evaluate at that time in accordance with the Sacramento City Code (“SCC”) in effect at that time.
e. The City may modify this permit prior to the termination date in accordance with the Development Agreement.

C2. The operations of the stand-alone parking facility shall include:
a. The site shall be maintained in a clean and orderly manner. Waste shall not be allowed to accumulate outside of waste receptacles during daily operations, and at minimum, the waste shall be removed from the site daily. b. Waste generated by the temporary use shall not be placed within waste receptacles located within the right-of-way.
c. Aggregate base from the site shall be removed from the right-of-way promptly. d. Outdoor storage of any inventory or supplies in view of any public right -of-way is prohibited.

PUBLIC WORKS
C3. Comply with requirements included in the Mitigation Monitoring Plan developed by, and kept on file in, the Planning Division Office (P15-040 and Z21-107).

C4. Meet all conditions of the Development Agreement for the Railyards Project (P15 -040) and as amended thereafter.

C5. For all Public and private street rights-of-way, provide a remedial action certification form or other writing from the California Department of Toxic Substances Control (DTSC) that demonstrates that: (i) remediation of the soil in right -of-way has been completed as required by DTSC; (ii) a DTSC -approved land use covenant has been recorded against all parcels that contain the right -of-way; (iii) all soil placed in the right -of-way meets the remedial goals established by DTSC for the parcels that contain the right -of-way and complies with the DTSC-approved land use covenant applicable to that parcel or parcels; and (iv) the right-of-way can be developed as a public street.

C6. The applicant shall update, implement, and comply with the Event Transportation Management Plan (ETMP) that has been prepared for this project which includes pre and post event plans for parking and traffic control (i.e., Parking management, Parking attendants, the use of traffic control officers, TNC operations and locations, traffic control and conning, etc.) to the satisfaction of the Department of Public Works.

C7. Prior to obtaining occupancy permits, the applicant shall prepare and submit to the City Traffic Engineer a Traffic Control Plan consistent with the recommendations of the ETMP for approval to the satisfaction of the City Traffic Engineer. The Traffic Control plans shall show and provide details specific to pre-event and to post-event conditions on all needed signage (including sign type, location and mounting details), conning, access restrictions, street closures, barricades, Temporar y Control Officers, temporary changes to on -street metered parking etc. to City standards and to the satisfaction of the Department of Public Works.

C8. The applicant shall provide initial and on-going monitoring of the music venue operations and associated temporary parking lots as described in the approved Event Transportation Management Plan to the satisfaction of the Department of Public Works.

C9. The layout of all proposed temporary parking Lots (4, 5, 6, 8, 9, 15 and partially 21b) shall be consistent with approved Event Transportation Management Plan (ETMP) to the satisfaction of the Department of Public Works. The applicant shall comply with the recommendations listed in the ETMP regarding driveway locations, throat depth, allowed turning movements at driv eways, and all other recommendations to the satisfaction of the Department of public Works.

C10. Construct standard public improvements as noted in these conditions pursuant to Title 17 of the City Code. Improvements shall be designed to City Standards and assured as set forth in Section 17.502.130 of the City Code. Any public improvement not specifically noted in these conditions shall be designed and constructed to City Standards. This shall include the repair or replacement/reconstruction of any existing deteriorated curb, gutter and sidewalk adjacent to the subject property per City standards to the satisfaction of the Department of Public Works.

C11. Dedicate right-of-way and construct Telegrapher Avenue (Formerly Camille Lane) per City standards and specificatio ns for street construction and the approved Tentative Subdivision Map to the satisfaction of Department of Public Works. The limit of work shall be from 6th Street to Bercut Drive.

C12. Dedicate right-of-way and construct Bercut Drive per City standards and specifications for street construction, the Tentative Subdivision Map, and recommendations of the Traffic Study included in the DSEIR to the satisfaction of Department of Public Works. The limits of work shall be from Railyards Boulevard to Telegrapher Avenue to the satisfaction of the Department of Public Works.

C13. Construct or modify traffic signals at the following intersections when required by the Department of Public Works (if not already in place):
a. Telegrapher Avenue and 5th Street
b. Telegrapher Avenue and 6th Street
c. Stevens Street and 5th Street
d. Railyards Boulevard and Stanford Street (existing, prior to re-location) NOTE: The Department of Public Works shall determine the need for signals, based on CalTrans signal warrants and known pending development projects prior to the Issuance of any building permit. If required, signals shall be constructed as part of the public improvements for the Site Plan and Design Review Application. Signal design and construction shall be to the satisfaction of the Department of Public Works. The applicant shall provide all on-site easements and right-of-way needed for turn lanes, signal facilities and related appurtenances.

C14. The applicant shall submit a Traffic Signal Design Concept Report (TSDCR) per section

15.10 of the City’s Design and Procedures Manual to the Department of Public Works for review and approval prior to the submittal of any improvement plans involving traffic signal work. The TSDCR provides crucial geometric information for signal design which may lead to additional right-of-way dedication and should be started as early as possible to avoid delays during the plan check process.

C15. The applicant shall relocate any existing utilities and appurtenances that conflict with constructing the required improvements per City standards and to the satisfaction of the Department of Public Works.

C16. Bulb outs/curb extensions are required where there is on -street parking in the central City area or as directed by the Department of Public Works. Locations of bulb outs must be reviewed and approved by the City Traffic Engineer. The applicant shall construct bulb- outs/ curb extensions to the satisfaction of the Department of Public Works.

C17. All new and existing driveways shall be designed and constructed to City Standards to the satisfaction of the Department of Public Works.

C18. This project will require the installation of streetlights on all public streets fronting this property to the satisfaction of Public Works. The number and locations of these lights will be determined when development plans are submitted for review.

C19. The project shall construct ADA -compliant accessible parking as identified on the approved site plan, with an accessible path of travel to the public R/W.

C20. The parking lots are temporary in nature and lot shall meet the approved terms found in the Development Agreement and the variances set forth in the Planning conditions.

Asphalt paving, curbs, striping, landscaping, trees, and irrigation are not required for this temporary facility; the surface lots within the Sacramento Railyards are intended to phase out as described in the Development Agreement and these conditions, an intent which would be inhibited by the installation of full parking lot improvements.

C21. The applicant shall provide a signing and striping improvement plan if new signage or striping is proposed within the public right-of-way; or if existing signing and/or striping is removed or relocated. The plans shall be to the satisfaction of the Department of Public Works.

C22. All right-of-way and street improvement transit ions that result from changing the right - of-way of any street shall be located, designed and constructed to the satisfaction of the Department of Public Works.

C23. Provide an exhibit with metes and bounds for each temporary parking lot consistent with the approved Site Plan and Design Review and the conditional Use Permit application.

C24. The design of walls fences and signage near intersections and driveways shall allow stopping sight distance per Caltrans standards and comply with City Code Section

12.28.010 (25' sight triangle). Walls shall be set back 3' behind the sight line needed for stopping sight distance to allow sufficient room for pilasters. Landscaping in the area required for adequate stopping sight distance shall be limited 3.5' in height at maturity.

The area of exclusion shall be determined by the Department of Public Works.

UTILITIES
C25. The applicant shall comply with the conditions of the Railyard Tentative Subdivision Map (P15-040) as applicable unless otherwise approved by the Department of Utilities.

C26. The development of this site must comply with the current drainage design standards and mitigate for any increase in impervious area that exceeds the allowable percentage of imperviousness as stated in the Railyards Drainage Master Plan. The applicant shall prepare a project specific drainage study meeting the criteria specified in the current Design and Procedures Manual, for review and approval by the DOU. The drainage study shall be consistent with the Railyards Drainage Master Plan prepared in June 2016 by Kimley-Horn and Associates. The applicant is advised to contact the City of Sacramento Utilities Department Development Review Section (916 -808-7890) at the early planning stages to address any drainage related requirements. Failure to submit the drainage study may delay review and approval.

C27. Drainage retention is required for any increase in imperviousness until the drainage pump station is completed and accepted by the DOU. Any drainage retention required shall be sized per the approved Railyards D rainage Master Plan. Once the pump station is in operation, the drainage retention may be removed, and drainage service connection will be allowed to the City’s public drainage system.

C28. The existing temporary retention basin on lots 6a -6d, 5, and 5a of the Railyard Tentative Subdivision Map cannot be filled or partially removed until the drainage pump station is completed and accepted by the DOU. (Note: Once the pump station is in operation, the temporary retention basin may be removed.) For partial filling of the basin area to achieve access at Lot 5a as shown on the entitlement plan, prior to completion of the pump station, the Applicant shall provide the equivalent volume elsewhere within Railyards as approved per project specific drainage study.

C29. The tempo rary parking lots are proposed with gravel surfacing; therefore, onsite stormwater quality measure will not be required. However, to minimize the increase of urban runoff pollution caused by development of the area, source control measures may be required.

SMUD
C30. SMUD has existing underground 21kV facilities along the west side of 5th Street adjacent to the proposed parking lots that will need to remain. The Applicant shall be responsible for maintaining all CalOSHA and State of California Public Utilities Commission General Order No. 128 safety clearances during construction and upon building completion. If the required clearances cannot be maintained, the Applicant shall be responsible for the cost of relocation.

C31. Any necessary future SMUD facilities located on the Applicant’s property shall require a dedicated SMUD easement. This will be determined prior to SMUD performing work on the Applicant’s property.

C32. In the event the Applicant requires the relocation or remova l of existing SMUD facilities on or adjacent to the subject property, the Applicant shall coordinate with SMUD. The Applicant shall be responsible for the cost of relocation or removal.

C33. SMUD reserves the right to use any portion of its easements on or adjacent to the subject property that it reasonably needs and shall not be responsible for any damages to the developed property within said easement that unreasonably interferes with those needs.

C34. The Applicant shall not place any building foundations within 5 -feet of any SMUD trench to maintain adequate trench integrity. The Applicant shall verify specific clearance requirements for other utilities (e.g., Gas, Telephone, etc.).

C35. The Applicant shall comply with SMUD siting requirements (e.g., panel size/location , clearances from SMUD equipment, transformer location, service conductors).

Information regarding SMUD siting requirements can be found at:
https://www.smud.org/en/Business-Solutions-and-Rebates/Design-and-Construction- Services.

ADVISORIES
C36. All-Electric New Buildings Requirement. Pursuant to Chapter 15.30 of Sacramento City Code, new buildings of 1-3 stories will be required to be all-electric beginning on January 1, 2023, and new buildings 4 stories or more will be required to be all -electric beginning on January 1, 2026. An all-electric building is a building that does not have natural gas piping or propane plumbing installed on a lot or within a building.

Complete building permit applications (including payment of all required fees) filed with and accepted by the City’s Building Division prior to the effective dates will not be subject to all-electric requirements.

C37. Planning. Applicants are advised to pl an for all-electric compliance beginning with initial early design. Solutions include but are not limited to: Designing projects to create space for electric infrastructure and equipment; utilizing energy efficiency to reduce electrical loads; and consulti ng with SMUD to address electric infrastructure issues. Limited exemptions may apply. For more information, please visit the City’s website:
http://www.cityofsacramento.org/SacElectrificationOrdinance C38. Planning. Please note that as part of recent State legislation (SB 1383), trash facilities for organic waste must be provided on -site. Please ensure that your trash enclosure will be sufficient in size to accommodate the necessary trash bins, including a separate bin for organic waste.

C39. Infrastructure Finance. The project sit e is located within the Railyards Impact Fee boundaries and will be subject to the applicable impact fees with future development and/or change of land use of the site, during the building permit process. Contact Infrastructure Finance (916-808-1440) with any questions on the Railyards Impact Fee.

C40. Parks. Lots 8b and 9a are currently identified as providing Access Easements on the Railyards Tentative Subdivision Map. At the time of recordation, the parcels should show how an access easement could be facilitated through the stand-alone parking facilities to allow for pedestrian access.

C41. Utilities. The proposed project is located in a Zone X on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps (FIRMs). Accordingly, the project site lies in an area with no requirements to elevate or flood proof.

C42. Utilities. The applicant is responsible for obtaining all necessary permits, easements, and approvals from federal, state, and applicable local agencies (i.e. California Department of Transportation (Caltrans), Union Pacific Railroad (UPRR), etc.) for the construction of this project.

D. Site Plan and Design Review for stand-alone parking facilities with deviations to waive development standards including surface paving, tree shading, and onsite perimete r landscape planters within the C-3-SPD zone and the Railyards SPD is approved subject to the following conditions of approval:

PLANNING & DESIGN REVIEW
D1. Deviations to the following development standards as established in Sacramento City Code (“SCC”) are authorized as follows:
a. Surface paving, curbs and striping as established in SCC sections 17.608.040.E and

17.612.020 shall not be required.
b. Tree shading as established in SCC sections 17.608.040.K and 17.612.040 shall not be required.
c. Onsite perimeter landscape planters as established in SCC section 17.612.010.B shall not be required.

D2. Vehicle parking spaces will not be marked, but have been evaluated to conform with width, space depth, and maneuvering width as established in SCC section 17.608.040.F.

D3. Pedestrian openings shall be provided as shown on the attached plans.

D4. Onsite lighting shall be provided and maintained in all open parking areas during event times after dark. Light shall be shielded to prevent adverse glare on any nearby residential uses.

D5. Curbs, decorative bollards, fence, or similar barriers shall be installed adjacent to the water tower, a historic structure, located on Lot 4e of the site.

PUBLIC WORKS
D6. Comply with requirements included in the Mitigation Monitoring Plan developed by, and kept on file in, the Planning Division Office (P15-040 and Z21-107).

D7. Meet all conditions of the Development Agreement for the Railyards Project (P15 -040) and as amended thereafter.

D8. For all Public and private street rights-of-way, provide a remedial action certification form or other writing from the California Department of Toxic Substances Control (DTSC) that demonstrates that: (i) remediation of the soil in right -of-way has been completed as required by DTSC; (ii) a DTSC -approved land use covenant has been recorded against all parcels that contain the right -of-way; (iii) all soil placed in the right -of-way meets the remedial goals established by DTSC for the parcels that contain the right -of-way and complies with the DTSC-approved land use covenant applicable to that parcel or parcels; and (iv) the right-of-way can be developed as a public street.

D9. The applicant shall update, implement, and comply with the Event Transportation Management Plan (ETMP) that has been prepared for this project which includes pre and post event plans for parking and traffic control (i.e., Parking management, Parking attendants, the use of traffic control officers, TNC operations and locations, traffic control and conning, etc.) to the satisfaction of the Department of Public Works.

D10. Prior to obtaining occupancy permits, the applicant shall prepare and submit to the City Traffic Engineer a Traffic Control Plan consistent with the recommendations of the ETMP for approval to the satisfaction of the City Traffic Engineer. The Traffic Control plans shall show and provide details specific to pre-event and to post-event conditions on all needed signage (including sign type, location and mounting details), conning, access restrictions, street closures, barricades, Temporary Control Officers, te mporary changes to on-street metered parking etc. to City standards and to the satisfaction of the Department of Public Works.

D11. The applicant shall provide initial and on-going monitoring of the music venue operations and associated temporary parking lots as described in the approved Event Transportation Management Plan to the satisfaction of the Department of Public Works.

D12. The layout of all proposed temporary parking Lots (4, 5, 6, 8, 9, 15 and partially 21b) shall be consistent with approved Event Transpor tation Management Plan (ETMP) to the satisfaction of the Department of Public Works. The applicant shall comply with the recommendations listed in the ETMP regarding driveway locations, throat depth, allowed turning movements at driveways, and all other re commendations to the satisfaction of the Department of public Works.

D13. Construct standard public improvements as noted in these conditions pursuant to Title 17 of the City Code. Improvements shall be designed to City Standards and assured as set forth in Sec tion 17.502.130 of the City Code. Any public improvement not specifically noted in these conditions shall be designed and constructed to City Standards. This shall include the repair or replacement/reconstruction of any existing deteriorated curb, gutter and sidewalk adjacent to the subject property per City standards to the satisfaction of the Department of Public Works.

D14. Dedicate right-of-way and construct Telegrapher Avenue (Formerly Camille Lane) per City standards and specifications for street construct ion and the approved Tentative Subdivision Map to the satisfaction of Department of Public Works. The limit of work shall be from 6th Street to Bercut Drive.

D15. Dedicate right-of-way and construct Bercut Drive per City standards and specifications for street construction, the Tentative Subdivision Map, and recommendations of the Traffic Study included in the DSEIR to the satisfaction of Department of Public Works. The limits of work shall be from Railyards Boulevard to Telegrapher Avenue to the satisfaction of the Department of Public Works.

D16. Construct or modify traffic signals at the following intersections when required by the Department of Public Works (if not already in place):
a. Telegrapher Avenue and 5th Street
b. Telegrapher Avenue and 6th Street
c. Stevens Street and 5th Street
d. Railyards Boulevard and Stanford Street (existing, prior to re-location) NOTE: The Department of Public Works shall determine the need for signals, based on CalTrans signal warrants and known pending development projects prior to the Issuance of any building permit. If required, signals shall be constructed as part of the public improvements for the Site Plan and Design Review Application. Signal design and construction shall be to the satisfaction of the Department of Public Works. The applicant shall provide all on-site easements and right-of-way needed for turn lanes, signal facilities and related appurtenances.

D17. The applicant shall submit a Traffic Signal Design Con cept Report (TSDCR) per section

15.10 of the City’s Design and Procedures Manual to the Department of Public Works for review and approval prior to the submittal of any improvement plans involving traffic signal work. The TSDCR provides crucial geometric i nformation for signal design which may lead to additional right-of-way dedication and should be started as early as possible to avoid delays during the plan check process.

D18. The applicant shall relocate any existing utilities and appurtenances that conflict with constructing the required improvements per City standards and to the satisfaction of the Department of Public Works.

D19. Bulb outs/curb extensions are required where there is on -street parking in the central City area or as directed by the Department of P ublic Works. Locations of bulb outs must be reviewed and approved by the City Traffic Engineer. The applicant shall construct bulb- outs/ curb extensions to the satisfaction of the Department of Public Works.

D20. All new and existing driveways shall be designed and constructed to City Standards to the satisfaction of the Department of Public Works.

D21. This project will require the installation of streetlights on all public streets fronting this property to the satisfaction of Public Works. The number and locations of these lights will be determined when development plans are submitted for review.

D22. The project shall construct ADA -compliant accessible parking as identified on the approved site plan, with an accessible path of travel to the public R/W.

D23. The parking lots are temporary in nature and lot shall meet the approved terms found in the Development Agreement and the variances set forth in the Planning conditions.

Asphalt paving, curbs, striping, landscaping, trees, and irrigation are not required for this temporary facility; the surface lots within the Sacramento Railyards are intended to phase out as described in the Development Agreement and these conditions, an intent which would be inhibited by the installation of full parking lot improvements.

D24. The applicant sha ll provide a signing and striping improvement plan if new signage or striping is proposed within the public right-of-way; or if existing signing and/or striping is removed or relocated. The plans shall be to the satisfaction of the Department of Public Works.

D25. All right-of-way and street improvement transitions that result from changing the right - of-way of any street shall be located, designed and constructed to the satisfaction of the Department of Public Works.

D26. Provide an exhibit with metes and bounds for each temporary parking lot consistent with the approved Site Plan and Design Review and the conditional Use Permit application.

D27. The design of walls fences and signage near intersections and driveways shall allow stopping sight distance per Caltrans standar ds and comply with City Code Section

12.28.010 (25' sight triangle). Walls shall be set back 3' behind the sight line needed for stopping sight distance to allow sufficient room for pilasters. Landscaping in the area required for adequate stopping sight di stance shall be limited 3.5' in height at maturity.

The area of exclusion shall be determined by the Department of Public Works.

UTILITIES
D28. Applicant shall participate in the Railyards Finance Plan and pay all required fees.

Improvement plans shall be consistent with both the “Utilities and Services: Infrastructure Section” of the Sacramento Railyards Specific Plan, and the approved Railyards Water, Sewer and Drainage Master Plans. (Note: All Utilities development impact fees are in addition to the Railyards Finance fees.)
D29. The development of this site must comply with the current drainage design standards and mitigate for any increase in impervious area that exceeds the allowable percentage of imperviousness as stated in the Railyards Drainage Master Plan. The applicant shall prepare a project specific drainage study meeting the criteria specified in the current Design and Procedures Manual, for review and approval by the DOU. The drainage study shall be consistent with the Railyards Drainage Master Plan prepa red in June 2016 by Kimley-Horn and Associates. The applicant is advised to contact the City of Sacramento Utilities Department Development Review Section (916 -808-7890) at the early planning stages to address any drainage related requirements. Failure to submit the drainage study may delay review and approval.

D30. Drainage retention is required for any increase in imperviousness until the drainage pump station is completed and accepted by the DOU. Any drainage retention required shall be sized per the approved Railyards Drainage Master Plan. Once the pump station is in operation, the drainage retention may be removed, and drainage service connection will be allowed to the City’s public drainage system.

D31. The existing temporary retention basin on lots 6a -6d, 5, and 5a of the Railyard Tentative Subdivision Map cannot be filled or partially removed until the drainage pump station is completed and accepted by the DOU. (Note: Once the pump station is in operation, the temporary retention basin may be removed.) For partial filling of the basin area to achieve access at Lot 5a as shown on the entitlement plan, prior to completion of the pump station, the Applicant shall provide the equivalent volume elsewhere within Railyards as approved per project specific drainage study.

D32. Any onsite proposed onsite storm drain systems shall be private systems maintained by the association or other approved entity.

D33. No more than 6,000 square feet is allowed to sheet drain over a public sidewalk. If the area is larger than 6,000 square feet, then an on-site surface drainage system is required and shall be connected to the street drainage system by means of a storm drain service tap. All on -site systems shall be designed to the standard specified in the DOU onsite manual.

D34. A grading plan showi ng existing and proposed elevations is required. Adjacent off -site topography shall also be shown to the extent necessary to determine impacts to existing surface drainage paths. No grading shall occur until the grading plan has been reviewed and approved by the DOU.

D35. If the project disturbs more than once of land, the project will be required to comply with the State’s “Construction General Permit”. To comply with the State Permit, the applicant must file a Notice of Intent (NOI) through the State’s Storm W ater Multiple Application and Report Tracking System (SMARTS). A valid WDID number must be obtained and provided to the DOU prior to the issuance of any grading permits.

D36. The applicant must comply with the City of Sacramento's Grading, Erosion and Sediment Control Ordinance. This ordinance requires the applicant to show erosion and sediment control methods on the construction drawings. These plans shall also show the methods to control urban runoff pollution from the project site during construction.

D37. The tem porary parking lots are proposed with gravel surfacing, therefore, onsite stormwater quality measure will not be required. However to minimize the increase of urban runoff pollution caused by development of the area, source control measures may be required.

D38. If an on -site drainage system is installed, then the project is required to incorporate certified full capture trash control devices, please refer to Appendix H in the “Stormwater Quality Design Manual for the Sacramento Region (July 2018)” for more details.

D39. A maintenance agreement will be required for all on-site treatment control measures and on-site full capture trash control systems. Contact DOU for a list of accepted proprietary devices if considered for treatment control and full capture trash control. Construction drawings must include all proposed source controls, on-site water quality measures, and on-site full capture trash control features and devices selected for the site. Refer to the latest edition of the “Stormwater Quality Design Manual for the Sacramento Region” for appropriate measures.

SMUD
D40. SMUD has existing underground 21kV facilities along the west side of 5th Street adjacent to the proposed parking lots that will need to remain. The Applicant shall be responsible for maintaining a ll CalOSHA and State of California Public Utilities Commission General Order No. 128 safety clearances during construction and upon building completion. If the required clearances cannot be maintained, the Applicant shall be responsible for the cost of relocation.

D41. Any necessary future SMUD facilities located on the Applicant’s property shall require a dedicated SMUD easement. This will be determined prior to SMUD performing work on the Applicant’s property.

D42. In the event the Applicant requires the relocation or removal of existing SMUD facilities on or adjacent to the subject property, the Applicant shall coordinate with SMUD. The Applicant shall be responsible for the cost of relocation or removal.

D43. SMUD reserves the right to use any portion of its easements on or adjacent to the subject property that it reasonably needs and shall not be responsible for any damages to the developed property within said easement that unreasonably interferes with those needs.

D44. The Applicant shall not place any building foundations within 5-feet of any SMUD trench to maintain adequate trench integrity. The Applicant shall verify specific clearance requirements for other utilities (e.g., Gas, Telephone, etc.).

D45. The Applicant shall comply with SMUD siting requirements (e.g., panel siz e/location, clearances from SMUD equipment, transformer location, service conductors).

Information regarding SMUD siting requirements can be found at:
https://www.smud.org/en/Business-Solutions-and-Rebates/Design-and-Construction- Services.

ADVISORIES
D46. All-Electric New Buildings Requirement. Pursuant to Chapter 15.30 of Sacramento City Code, new buildings of 1-3 stories will be required to be all-electric beginning on January 1, 2023, and new buildings 4 stories or more will be required to be all -electric beginning on January 1, 2026. An all-electric building is a building that does not have natural gas piping or propane plumbing installed on a lot or within a building.

Complete building permit applications (including payment of all required fees) filed with and accepted by the City’s Building Division prior to the effective dates will not be subject to all-electric requirements.

Applicants are advised to pla n for all -electric compliance beginning with initial early design. Solutions include but are not limited to: Designing projects to create space for electric infrastructure and equipment; utilizing energy efficiency to reduce electrical loads; and consultin g with SMUD to address electric infrastructure issues. Limited exemptions may apply. For more information, please visit the City’s website:
http://www.cityofsacramento.org/SacElectrificationOrdinance D47. Planning. Please note that as part of recent State legislation (SB 1383), trash facilities for organic waste must be provided on -site. Please ensure that your trash enclosure wi ll be sufficient in size to accommodate the necessary trash bins, including a separate bin for organic waste.

D48. Infrastructure Finance. The project site is located within the Railyards Impact Fee boundaries and will be subject to the applicable impact fees w ith future development and/or change of land use of the site, during the building permit process. Contact Infrastructure Finance (916-808-1440) with any questions on the Railyards Impact Fee.

D49. Parks. Lots 8b and 9a are currently identified as providing Acce ss Easements on the Railyards Tentative Subdivision Map. At the time of recordation, the parcels should show how an access easement could be facilitated through the stand-alone parking facilities to allow for pedestrian access.

D50. Utilities. The proposed proj ect is located in a Zone X on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps (FIRMs). Accordingly, the project site lies in an area with no requirements to elevate or flood proof.

D51. Utilities. The applicant is responsible for obtaining all necessary permits, easements, and approvals from federal, state, and applicable local agencies (i.e. California Department of Transportation (Caltrans), Union Pacific Railroad (UPRR), etc.) for the construction of this project.

Section 4. Exhibit A is a part of this resolution.

EXHIBITS:

Exhibit A: Project Plans

Amended and Restated Railyards Development Agreement Revision Date: 12-1-2016

171

FOR CITY CLERK USE ONLY
ORDINANCE NO. 2016-0044
CITY AGREEMENT NO. 2008-0150-1 DA TE ADOPTED: November 10, 2016

EXHIBIT P

SPECIAL CONDITIONS

I. PURPOSE AND INTENT

The definitions applicable to the body of the Agreement shall apply to this Exhibit P.

Under no circumstances can Development of the Property proceed without satisfaction of the conditions specified in this Exhibit P. These Special Conditions shall constitute binding and legally enforceable obligations of LANDOWNER and its successors and assigns, and binding and legally enforceable requirements and conditions for the Development of the Property for the Project, in addition to other obligations, requirements and conditions imposed as set out in the Agreement.

II. LANDOWNERS' OBLIGATIONS

A. Compliance with Law Respecting Other Public Agencies. As required under this Agreement and by CITY as a condition of the Project Entitlements or a Subsequent Approval, LANDOWNER shall comply with applicable law with respect to the following matters concerning other Public Agencies:

1. Appropriate sanitation districts, including but not limited to Sacramento County Regional Sanitation District, for provision of Public Facilities, payment of fees and charges, and payment (if applicable) associated therewith.

2. The State Department of Toxic Substance Control in regards to compliance with applicable land use covenants.

3. Applicable School District(s) in regard to school facilities for the students that will reside within the Project.

4. The Sacramento Regional Transit District in regard to the light rail transit system within the Property.

III. CONDITIONS OF DEVELOPMENT; SPECIAL FINDINGS REQUIRED

A. In addition to other findings and conditions as may be deemed applicable, no Subsequent Approvals for Development of the Property shall be approved unless the approving body either: (1) makes the following findings; or (2) expressly waives such findings, in whole or Ordinance 2016-0044 November 10, 2016 Pa
ge 175 of 183

Amended and Restated Railyards Development Agreement Revision Date: 12-1-2016

172

FOR CITY CLERK USE ONLY
ORDINANCE NO. 2016-0044
CITY AGREEMENT NO. 2008-0150-1 DA TE ADOPTED: November 10, 2016 in part, as not applicable to the Property and stating the reasons therefor with such waiver and the reasons therefor appear in the record or document of approval. These findings are:

1. The approval of the proposed project is consistent with the policies, goals, standards and objectives of the Specific Plan and LANDOWNER is in compliance with its obligations set forth in the Development Agreement.

2. The actions needed to implement the Financing Plan for financing of the Public Facilities required for Subsequent Approval have been adopted by the City Council.

3. All transfers of land, owned by or under the control of LANDOWNER, necessary for Public Facilities, have been transferred to CITY, City Agency or Public Agency as appropriate

4. LANDOWNER has complied with applicable law pursuant to Sections II.A, above.

5. Appropriate environmental review of the proposed project has been completed, and any suggested mitigation measures resulting therefrom have been included in the approval of the project to the extent feasible.

B. In the event that any of the special findings required herein cannot be made and are not waived, approval may nevertheless be given to the proposed project if all of the following conditions can be satisfied with respect to each such special finding not made:

1. Practicable and feasible requirements or mitigation measures can be imposed upon the project, the implementation of which would allow such special finding to be made;

2. The applicant has agreed to be bound (through written agreement satisfactory to the City Attorney) by and to implement such requirements or mitigation measures, and has posted such security for compliance therewith as may be required by the City Manager; and

3. It is in the public interest and consistent with the policies, goals, standards and objectives of the General Plan, Community Plan and Specific Plan for the project to be approved with such requirements and mitigation measures.

IV. PARKING
A. If a multi-purpose outdoor stadium (the “Stadium”) is Developed on the Property to serve as the home of a major league soccer team, then temporary off-site surface parking Ordinance 2016-0044 November 10, 2016 Pa ge 176 of 183

Amended and Restated Railyards Development Agreement Revision Date: 12-1-2016

173

FOR CITY CLERK USE ONLY
ORDINANCE NO. 2016-0044
CITY AGREEMENT NO. 2008-0150-1 DA TE ADOPTED: November 10, 2016 lots designed to serve the needs of the Stadium (“Temporary Stadium Lots”) may be Developed on the Property on the following terms:

1. Except as provided in section IV.A.9., the Temporary Stadium Lots are limited to the locations shown in the “Stadium Parking Plan” attached in as Exhibit Q.

2. LANDOWNER must obtain a conditional use permit for each Temporary Stadium Lot in accordance with the CITY’s Land Use and Development Regulations.

3. LANDOWNER agrees that the CITY may include as conditions on each condition use permit issued for a Temporary Stadium Lot: (a) a termination date, and (b) a provision that allows the CITY to modify or terminate the conditional use permit if the CITY determines, based on the review under section IV., 7., that the parking stalls are no longer needed to serve the Stadium. LANDOWNER waives the right to administratively appeal or judicially challenge a decision by the CITY to modify or terminate a conditional use permit in accordance with this section IV.A.3.

4. The total number of parking stalls in the Temporary Stadium Lots combined is 4,000 (“Baseline Temporary Parking Requirement”), except as the Baseline Temporary Parking Requirement may be adjusted in accordance with section IV.A.6.

5. The Temporary Stadium Lots may be used only for parking for events at the Stadium.

6. After the completion of each of the first four major league soccer seasons after the Stadium is Developed, the CITY shall, in consultation with LANDOWNER, prepare an evaluation of Stadium parking usage inside and outside the Temporary Stadium Lots within the Property (the “Annual Parking Review”) as part of the annual Stadium event transportation management plan review to determine whether the Baseline Temporary Parking Requirement should be adjusted to reflect actual parking usage for events at the Stadium. Based on the Annual Parking Review, the CITY may adjust the Baseline Temporary Parking Requirement that is then in effect up or down, and the conditional use permit for any affected Temporary Stadiums Lot will be modified accordingly pursuant to the following schedule and method:
(a) After first season: No adjustment.
(b) After second season: Adjustment based on highest use during prior two seasons.

Ordinance 2016-0044 November 10, 2016 Pa ge 177 of 183

Amended and Restated Railyards Development Agreement Revision Date: 12-1-2016

174

FOR CITY CLERK USE ONLY
ORDINANCE NO. 2016-0044
CITY AGREEMENT NO. 2008-0150-1 DA TE ADOPTED: November 10, 2016 (c) After third season: Adjustment based on highest use during prior two seasons.
(d) After fourth season: Adjustment based on highest use during prior two seasons.

The CITY shall provide LANDOWNER with at least 30 days’ notice before adjusting the Baseline Temporary Parking Requirement. If LANDOWNER is dissatisfied with the CITY’s decision to adjust the Baseline Temporary Parking Requirement, LANDOWNER may appeal the decision to the City Council in accordance with City Code chapter 1.24 by filing an appeal with the City Clerk no more than 10 days after receiving notice of the CITY’s decision. For purposes of section

1.24.030, the City Clerk shall fix the hearing date. In reaching its decision on the appeal, the City Council has the sole discretion to accept, reject, modify, or condition the CITY’s proposed adjustment of the Baseline Temporary Parking Requirement.

The CITY’s review under this section is independent of the CITY’s annual compliance review conducted under Government Code section 65865.1 and City Code section 18.16.160.

7. To encourage the relocation of parking for the Stadium from the Temporary Stadium Lots into permanent parking structures parking (“Parking Structures”) (which may be free standing or integrated into office, commercial, or retail buildings) within the Property during the course of Development of the Project:
(a) In conjunction with the sale or transfer by LANDOWNER of any portion of the Property to a third party who intends to construct a Parking Structure (which may be free standing or integrated into office, commercial, or retail buildings) as part of its Development of the Property (“Improved Lot Owner”), LANDOWNER shall present the opportunity to the Improved Lot Owner of entering into a “Stadium Parking Agreement” with the owner or operator of the Stadium. A Stadium Parking Agreement is an agreement that sets forth the terms by which people may use parking stalls in the Parking Structure while attending events at the Stadium, including the number of parking stalls that will be available for use by people who attend events at the Stadium. The Parties acknowledge that Stadium Parking Agreements are subject to negotiation between the owner or operator of the Stadium and the Improved Lot Owner and that neither is obligated to enter into a Stadium Parking Agreement. (b) If LANDOWNER intends to construct a Parking Structure as part of its Development of the Property, then LANDOWNER shall offer to enter into a Stadium Parking Ordinance 2016-0044 November 10, 2016 Pa
ge 178 of 183

Amended and Restated Railyards Development Agreement Revision Date: 12-1-2016

175

FOR CITY CLERK USE ONLY
ORDINANCE NO. 2016-0044
CITY AGREEMENT NO. 2008-0150-1 DA TE ADOPTED: November 10, 2016 Agreement with the owner or operator of the Stadium. The owner or operator of the Stadium is not required to enter a Stadium Parking Agreement with LANDOWNER. For clarification, certain parking uses at structured parking are incompatible with the parking requirements for events at the Stadium (such as medical, residential or retail that requires after traditional business hours parking) and such parking may be fully or partially exempt from the above requirements.

8. For each parking stall that is relocated from a Temporary Stadium Lot to a Parking Structure within the Property, the Baseline Temporary Parking Requirement will be reduced on a pro-rata basis. The desire of the Parties is to eliminate all Temporary Stadium Lots, one by one, during the course of the Development of the Property for the Project, with the goal that all Stadium parking within the Property, except for limited parking onsite, will eventually be in Parking Structures.

9. During the first five major leag ue soccer seasons after the Stadium is Developed, LANDOWNER may Develop a Temporary Stadium Lot in a location other than one shown in Exhibit Q if:
(a) LANDOWNER sells or transfers a portion of the Property that contains a Temporary Stadium Lot and the purchaser or transferee (i) constructs a Parking Structure on the lot that contained the Temporary Stadium Lot and (ii) does not enter into an a Stadium Parking Agreement to allow Stadium parking in the Parking Structure; (b) A new Temporary Stadium Lot is required to meet the Baseline Temporary Parking Requirement that is then in effect;
(c) The new Temporary Stadium Lot is located in a C-3 SPD zone; (d) The new Temporary Stadium Lot replaces the Temporary Stadium Lot that was displaced under section IV.A.9.(a); and
(e) All the conditions in IV.A.2. – 8 (except IV.A.4.) apply to the new Temporary Stadium Lot.

10. In no event may a lot within the Property be used as a Temporary Stadium Lot after December 31, 2030.

Ordinance 2016-0044 November 10, 2016 Pa
ge 179 of 183

Amended and Restated Railyards Development Agreement Revision Date: 12-1-2016

176

FOR CITY CLERK USE ONLY
ORDINANCE NO. 2016-0044
CITY AGREEMENT NO. 2008-0150-1 DA TE ADOPTED: November 10, 2016 B. LANDOWNER has identified certain lots within the Property that it desires to Develop as long-term surface parking lots to serve some of the parking needs of the Project during the Initial Term and any applicable Extension Period (“Improved Surface Lots”).

Improved Surface Lots may be Developed on the Property on the following terms:

1. Except as provided in section IV.B.5., the Improved Surface Lots are limited to the locations to be agreed upon by the Parties, which will be shown in a “Project Parking Plan” to be attached as Exhibit R.

2. LANDOWNER must obtain a conditional use permit for each Improved Surface Lot in accordance with the CITY’s Land Use and Development Regulations.

3. LANDOWNER agrees that the CITY may include a termination date as a condition on each condition use permit issued for an Improved Surface Lot. LANDOWNER waives the right to administratively appeal or judicially challenge the decision of the CITY to terminate a conditional use permit in accordance with this section IV.B.3.

4. The Improved Surface Lots may be used only for parking (i) for uses located inside the Central Shops Historic District, or (ii) for uses as part of initial phases of a phased commercial complex on a parcel in which the subsequent development of the phased commercial complex will include a Parking Structure that replaces the Improved Surface Lot.

5. Until the fifth anniversary of the Effective Date, LANDOWNER may Develop an Improved Surface Lot in a location other than one shown in Exhibit R if:
(a) If Development of a lot on which an Improved Surface Lot is located: (i) eliminates all parking stalls that were available in the Improved Surface Lot and (ii) does not include any structured parking;
(b) The new Improved Surface Lot is located in a C-3 SPD zone; and (c) All the conditions in IV.B.2. – 4 apply to the new Improved Surface Lot.

C. Lots 46 and 47 may be used for parking vehicles having a manufacturer’s gross vehicle weight rating of 10,000 pounds or more (“Commercial Vehicles”) in connection with events at the Golden 1 Center on the following terms:

Ordinance 2016-0044 November 10, 2016 Pa
ge 180 of 183

Amended and Restated Railyards Development Agreement Revision Date: 12-1-2016

177

FOR CITY CLERK USE ONLY
ORDINANCE NO. 2016-0044
CITY AGREEMENT NO. 2008-0150-1 DA TE ADOPTED: November 10, 2016

1. The ingress, egress, and parking ar eas on the lots must be improved with “all-weather” gravel or shale similar to that conditioned for Temporary Stadium Lots.

2. The Department of Public Works may reasonably condition future parking operations of Commercial Vehicles on the lots (including the necessary improvements) as needed to protect the health or safety of the public in general or to residents or employees who are occupying or will occupy the Property.

3. Lots 46 and 47 may not be used for parking Commercial Vehicles after (i) the fourth anniversary of the Effective Date or (ii) the date when lots 46 and 47 are first required as Temporary Stadium Lots to meet the Baseline Temporary Parking Requirement, whichever occurs first.

Ordinance 2016-0044 November 10, 2016 Pa
ge 181 of 183

Amended and Restated Railyards Development Agreement Revision Date: 12-1-2016

178

FOR CITY CLERK USE ONLY
ORDINANCE NO. 2016-0044
CITY AGREEMENT NO. 2008-0150-1 DA TE ADOPTED: November 10, 2016

EXHIBIT Q

MLS PARKING PLAN

SEE ATTACHED

Ordinance 2016-0044 November 10, 2016 Pa
ge 182 of 183

Amended and Restated Railyards Development Agreement Revision Date: 12-1-2016

179

FOR CITY CLERK USE ONLY
ORDINANCE NO. 2016-0044
CITY AGREEMENT NO. 2008-0150-1 DA TE ADOPTED: November 10, 2016

Ordinance 2016-0044 November 10, 2016 Pa ge 183 of 183

SUMMIT TUNNEL AVENUE
NORTH 10TH STREET
EX. 5TH STREETH STREETG STREETF STREET7TH STREETSUMMIT TUNNEL AVENUE5TH STREET6TH STREET

JIBBOOM STREETBERCUT DRIVE
5TH STREET7TH STREETRAILYARDS BOULEVARD8TH STREETNORTH B STREET

TELEGRAPHER AVENUE
7TH STREET6TH STREETJUDAH STREET5TH STREETI STREETEX. UPRR TRACKSVISTA PARKVALLEY STATIONINTERSTATE 5WATER TREATMENT PLANTSACRAMENTOI STREETEX. 6TH STREETCITY OF SACRAMENTOSTANFORD ST. (PRIVATE)STEVENS STREET(PUBLIC)STEVENS ST. (PRIVATE)BANNONSTREET NORTH 10TH STREET

RAILYARDS BOULEVARDBERCUT DRIVEHUNTINGTON STREET
002-0074-012002-0076-005002-0076-018002-0076-024002-0076-011002-0076-019 002-0061-011
002-0141-009002-0143-017002-0142-015002-0141-008002-0141-006002-0010-060002-0010-054 002-0102-023002-0102-018002-0102-019002-0102-020002-0102-021002-0105-015002-0105-016002-0105-026002-0105-022002-0105-020002-0010-054 002-0031-002002-0031-001
002-0210-035
002-0210-010001-0031-023
001-0031-004
001-0063-003001-0064-014001-0064-010001-0064-004
001-0210-038001-0210-038001-0064-015001-0064-09001-0064-008001-0064-007001-0064-011001-0064-012001-0064-013SMUD002-0010-062 002-0010-054
5TH STREET
\\US0312-PPFSS01\workgroup\2042\active\185702567\drawing\exhibit_files\EX078_Development Agreement\Railyards-Parking-Development-Agreement.dwg2022/08/08 5:21 PM By: Sy, Philip555 CAPITOL MALL, SUITE 650SACRAMENTO, CA 95814www.stantec.com 8/8/2022SACRAMENTO, CATHE RAILYARDSPROPOSED OFF-STREET PARKING

STADIUM
465 TOTAL SPACES

3.81 TOTAL ACRES
122 SPACES PER ACRE
667 TOTAL SPACES

5.62 TOTAL ACRES
118 SPACES PER ACRE
355 TOTAL SPACES

3.36 TOTAL ACRES
105 SPACES PER ACRE
549 TOTAL SPACES

5.86 TOTAL ACRES
93 SPACES PER ACRE
337 TOTAL SPACES

3.19 TOTAL ACRES
105 SPACES PER ACRE
321 TOTAL SPACES

2.66 TOTAL ACRES
120 SPACES PER ACRE
398 TOTAL SPACES

2.66 TOTAL ACRES
150 SPACES PER ACRE
316 TOTAL SPACES

2.23 TOTAL ACRES
142 SPACES PER ACRE
286 TOTAL SPACES

2.19 TOTAL ACRES
130 SPACES PER ACRE

NO SCALE
349 TOTAL SPACES

2.89 TOTAL ACRES
120 SPACES PER ACRE

ROADWAY OPEN TO TRAFFIC
(TELEGRAPHER & STEVENS PENDING

CONSTRUCTION)

TEMPORARY ROADWAY CONNECTION

NEEDED TO PROVIDE ACCESS TO PARKING

ROADWAY CLOSED/NON-ACCESSIBLE TO

TRAFFIC

ROADWAY LEGEND

STADIUM ONLY

DAILY USE & MUSIC VENUE ONLY

MUSIC VENUE ONLY

MUSIC VENUE PLUS STADIUM

PARKING LOT LEGEND
422 TOTAL SPACES

3.26 TOTAL ACRES
129 SPACES PER ACRE

1 Robby Thacker
From: Jenna Abbott <[email protected]>
Sent: Wednesday, January 20, 2021 10:07 AM
To: Robby Thacker
Subject: RE: Z20-127 - Project Routing - Railyards Temp Surface Parking Categories: Red Category
Hello Robby,
The River District does not have any qualms about this temporary parking plan.

Best Regards,

Jenna Abbott, Executive Director
The River District
Capitol Station Associates

From: Robby Thacker <[email protected]>
Sent: Wednesday, January 6, 2021 4:00 PM
To: Robby Thacker <[email protected]>
Subject: Z20‐127 ‐ Project Routing ‐ Railyards Temp Surface Parking

Good Afternoon,
Please see the attached routing form for the above referenced planning entitlement application for the Railyards Temporary Surface Parking project. The request consists of the following: 1) Conditional Use Permit to allow stand‐ alone parking facilities on future lots 5, 5a, 6a, 6b, 6c, 6d, 9a, 9b, 9c, 21c, 15a, 15b, and 15d as identified on the Railyard Tentative Subdivision Map (Previous temporary parking approved for lots 4a, 4b, 4c, 4d, 8a, 8b, 8c under P15‐040) on approximately 10.6 acres located within the Central Business District zone and Railyards Special Planning District (SPD); and 2) Site Plan and Design Review to construct stand‐alone parking facilities with deviations to paving, tree shading, and landscaping standards. The temporary parking is intended to serve the future Central Shops and MLS Stadium under a temporary basis until future structured parking is constructed within the Railyards. The project requires a Director level hearing approval. Please respond with comments and/or conditions of approval by February 3 rd, 2021.

Robby Thacker, Associate Planner, Central City and East Sacramento City of Sacramento | Community Development Department
300 Richards Boulevard, 3
rd Floor
(916) 808‐5584; [email protected]

2