Cities Index.
Item 12 2023-00624 Budgetary Adjustments and Contract Award for the Highway Safety Improvements Project (HSIP) Florin Road Signal Improvements (T15185800) Part 1

Sacramento City Council
June 13, 2023

Document
Item 12 2023-00624 Budgetary Adjustments and Contract Award for the Highway Safety Improvements Project (HSIP) Florin Road Signal Improvements (T15185800) Part 1
Meeting
June 13, 2023
Body
Sacramento City Council
Pages
5
Original file
39.7 MB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

City of Sacramento
City Council - 5PM Report
915 I Street Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2023-00624 6/13/2023 Consent Item 12.

Budgetary Adjustments and Contract Award for the Highway Safety Improvements Project (HSIP) Florin Road Signal Improvements (T15185800) and the HSIP Florin Road Safety Improvements Project (T15205400) [Published for 10-Day Review 6/2/2023] File ID: 2023-00624
Location: District 5, Represented by Councilmember Maple; District 7, Represented by Councilmember Jennings; District 8 Represented by Mayor Pro Tem Vang, and District 8 Represented by Mayor Steinberg
Recommendation: Adopt a Resolution: 1) approving the Plans and Specifications for the HSIP Florin Road Signal Improvements (T15185800) and the HSIP Florin Road Safety Improvements (T15205400); 2) authorizing the City Manager or the City Manager’s designee to increase the revenue and expenditure budgets of the HSIP Florin Road Signal Improvements (T15185800) by $5,602,899 (Federal Capital Grants, Fund 3703); 3) authorizing the City Manager or the City Manager’s designee to transfer $545,346 (Major Street Construction, Fund 2007) from the expenditure budget of the State and Federal Grant Match Project (T15007200) to the expenditure budget of the HSIP Florin Road Signal Improvements (T15185800); 4) authorizing the City Manager or the City Manager’sdesignee to increase the revenue and expenditure budgets of the HSIP Florin Road Safety Improvements (T15205400) by $1,053,540 (Federal Capital Grants, Fund 3703); 5) authorizing the City Manager or the City Manager’s designee to transfer $351,460 (Major Street Construction, Fund 2007) from the expenditure budget of the State and Federal Grant Match Project (T15007200) to the expenditure budget of the HSIP Florin Road Safety Improvements (T15205400); 6) awarding the construction contract for the HSIP Florin Road Signal Improvements (T15185800) and the HSIP Florin Road Safety Improvements (T15205400) to Pacific Excavation in an amount not to exceed $6,368,032; and 7) authorizing the City Manager or the City Manager’s designee to execute the construction contract for the HSIP Florin Road Signal Improvements (T15185800) and the HSIP Florin Road Safety Improvements (T15205400).

Contact: Adam Randolph, Senior Engineer (916) 808-7803, [email protected]; Judy Matsui-Drury, Supervising Engineer (916) 808-7610, [email protected] Ofelia Avalos, Engineering Manager (916) 808-5054, [email protected]; Department of Public Works
Presenter: None

Page 1 of 5 ends

File ID: 2023-00624 6/13/2023 Consent Item 12.

Attachments:
1-Description/Analysis
2-Resolution
3-Project Plans
4-Construction Contract
Additional Description/Analysis
Issue Detail: In order to address safety issues, the City applied for and received federal grant funding to support projects on Florin Road through the Highway Safety Improvement Program (HSIP) in two different grant funding cycles. Despite its name, the HSIP is a federal program that can be used to address safety issues on local roadways, not just highways.

The project limits for the HSIP Florin Road Safety Improvements (T15205400) and HSIP Florin Road Signal Improvements (T15185800) overlap and are located between Greenhaven Drive and Franklin Boulevard. In coordination with Caltrans, the oversight agency for the federal funds, staff identified an opportunity for streamlined delivery of both projects through the procurement under one contract.

This approach introduces cost savings in project delivery costs, more competitive construction bids, and minimizes inconvenience to the public during construction.

The HSIP Florin Road Signal Improvements (T15185800) is a traffic safety project that will convert traffic signal heads that are currently mounted on pedestals located in street median islands to roadside traffic signal mast arm poles with updated traffic signal heads. This approach has been demonstrated to better to address the kinds of vehicle crashes occurring along the Florin Road corridor. Converting pedestal mounted traffic signal heads to traffic signal mast arm poles will result in consistently placed signal heads located where drivers are used to seeing them and improve traffic signal visibility. Also, the intersections at Freeport Boulevard and 24th Street have poorly located advanced signal detection which is not adequate for the speed of traffic on Florin Road. Relocating the advanced signal detection based on the speed of traffic will improve the traffic signal operations.

Other safety related improvements within the project limits include upgrading eight-inch vehicle heads to twelve-inch heads for improved visibility and upgrading pedestrian signal heads to countdown pedestrian heads.

Where the existing frontage roads front Florin Road at the intersections of Amherst Street, 21st Street, and Tamoshanter Way, additional pedestrian improvements are proposed. Medians between the frontage roads and Florin Road will be reconstructed with proper pedestrian passageways and Americans with Disabilities Act (ADA) accessible bus stops. Florin Road crossings will be controlled by a pedestrian signal, and medians will be reconstructed as needed so that the crossing is unobstructed.

The HSIP Florin Road Safety Improvements (T15205400) is also installing two pedestrian signals to

Page 2 of 5 ends

File ID: 2023-00624 6/13/2023 Consent Item 12.

The HSIP Florin Road Safety Improvements (T15205400) is also installing two pedestrian signals to provide safer crossing for pedestrians on Florin Road. It will also construct raised medians to close gaps in existing raised medians, which would add consistency to the roadway and control access into and out of the driveways along the segment. A raised median would also provide a pedestrian refuge island. Additionally, this project would install pedestrian fencing in raised medians to prevent pedestrian crossing at uncontrolled locations and encourage safer crossings.

The Project plans and specifications for the Project have been completed. See Attachment 3 for Project Plans.

Policy Considerations: The project is consistent with the City General Plan goals and key policies of managing the travel system to ensure safe operating conditions, and to effectively operate and maintain transportation facilities and infrastructure to preserve the quality of the system.

The Sacramento City Code Section 4.04.020 and Council Rules of Procedure (Chapter 7, Section E.2.d) mandate that unless waived by a 2/3 vote of the City Council, all labor agreements and all agreements greater than $1,000,000 shall be made available to the public at least ten (10) days prior to City Council action. This item was published for 10-day review on June 2, 2023, in compliance with the City Code.

Economic Impacts: This new infrastructure is expected to create 25.47 total jobs (14.65 direct jobs and 10.83 jobs through indirect and induced actives) and create $3,931,846 in total economic output ($2,478,273 of direct output and another $1,453,573 of output through indirect and induced activities).

The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER). CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical $1 million of spending in various construction categories within the City of Sacramento in an average one-year period. Actual impacts could differ significantly from the estimates and neither the City of Sacramento nor CSER shall be held responsible for consequences resulting from such differences.

Environmental Considerations:

California Environmental Quality Act (CEQA): The City of Sacramento Environmental Planning Services has reviewed the proposed projects and determined that they are exempt from the provisions of CEQA under the Categorical Exemption for the operation, repair or minor alteration of existing public facilities involving negligible or no expansion of use and for new construction or conversion of small facilities, including street improvements, set forth in Sections 15301(c) and 15303(d)(e) respectively.

National Environmental Policy Act (NEPA): Caltrans is the lead agency for NEPA on this

Page 3 of 5 ends

File ID: 2023-00624 6/13/2023 Consent Item 12.

National Environmental Policy Act (NEPA): Caltrans is the lead agency for NEPA on this project. Caltrans approved a Categorical Exclusion in compliance with NEPA for HSIP Florin Road Signal Improvements on August 16, 2021, and HSIP Florin Road Safety Improvements on November 15, 2021.

Sustainability: This Project is consistent with the City’sGeneral Plan Climate Action Plan policies and programs to support active transportation connections.

Commission/Committee Action: The HSIP Florin Road projects were presented to the Active Transportation Commission (ATC) on April 20, 2023. The Projects were presented to the Disabilities Advisory Commission (DAC) on January 4, 2023.

The ATC expressed some concerns over aesthetics of proposed pedestrian railings. Staff explained that constraints with both project funding and ongoing maintenance restrict the options available for use.

Rationale for Recommendation: The HSIP Florin Road Signal Improvements (T15185800) and HSIP Florin Road Safety Improvements (T15205400) will improve traffic safety and operations and improve conditions for pedestrian safety.

The City received Caltrans authorization for the appropriation of $6,656,440 in construction funding on September 19, 2022, which allowed it to move ahead with advertising the project for construction bids.

The HSIP Florin Road Signal Improvements and HSIP Florin Road Safety Improvements projects were advertised for construction, and one (1) bid was received on April 13, 2023. The result of the bid is summarized below:

Contractor Bid DBE (22% Min
Goal)
Pacific Excavation $6,368,032 22.2%
The engineer’s estimate was $6,350,000.

The bidder met all required bid conditions. Staff recommends that the construction contract be awarded to the lowest responsive and responsible bidder, Pacific Excavation.

Construction is anticipated to begin October 2023 and be completed May 2024.

Financial Considerations: The estimated total cost to complete design, right-of-way, and construction activities for the HSIP Florin Road Signal Improvements (T15185800) is approximately $6.7 million and the HSIP Florin Road Safety Improvements Project (T15205400) is approximately

Page 4 of 5 ends

File ID: 2023-00624 6/13/2023 Consent Item 12.
$6.7 million and the HSIP Florin Road Safety Improvements Project (T15205400) is approximately $1.8 million. With the approval of $5,602,899 (Federal Capital Grants, Fund 3703) to HSIP Florin Road Signal Improvements (T15185800), the approval of $1,053,540 (Federal Capital Grants, Fund 3703) to HSIP Florin Road Safety Improvements Project (T15205400), the transfer of $545,346 (Major Street Construction, Fund 2007) from the expenditure budget of the State and Federal Grant Match Project (T15007200) to the expenditure budget of the HSIP Florin Road Signal Improvements (T15185800), and the transfer of $351,460 (Major Street Construction, Fund 2007) from the expenditure budget of the State and Federal Grant Match Project (T15007200) to the expenditure budget of the HSIP Florin Road Safety Improvements Project (T15205400), there will be sufficient funding to award the construction contract to Pacific Excavation for an amount not to exceed $6,368,032 and cover the remaining construction management and all other project related costs.

There is sufficient funding within the Federal Grant Match Project (T15007200) to support the transfers to the HSIP Florin Road Signal Improvements (T15185800) and the HSIP Florin Road Safety Improvements (T15205400) in the total amount of $896,806 including $545,346 for the HSIP Florin Road Signal Improvements (T15185800) and $351,460 for the HSIP Florin Road Safety Improvements Project (T15205400).

There are no additional General Funds planned or allocated for this project.

Local Business Enterprise (LBE): The contract with Pacific Excavation is a federally funded contract and as a result Disadvantaged Business Enterprise (DBE) project participation requirements apply. The City’sLBE policy is held in abeyance. The DBE goal for the project is 22%. Pacific Excavation exceeded the DBE by pledging 22.2%.

Page 5 of 5 ends

RESOLUTION NO. 2023-

Adopted by the Sacramento City Council

June 13, 2022

Budgetary Adjustments and Contract Award: Highway Safety Improvement Program (HSIP) Florin Road Signal Improvements (T15185800) and the HSIP Florin Road Safety Improvements (T15205400) [Published for 10-Day Review xx/xx/2023]

BACKGROUND
A. The HSIP Florin Road Signal Improvements (T15185800) is a traffic safety project that will convert traffic signal heads mounted on pedestals located in street median islands to roadside traffic signal mast arms with updated traffic signal heads to address vehicle crashes occurring along the Florin Road corridor. Converting pedestal mounted traffic signal heads to mast arm poles will result in consistently placed signal heads located where drivers are used to seeing them, and improved traffic signal visibility. Also, the intersections at Freeport Boulevard and 24th Street have poorly located advanced signal detection which is not adequate for the speed of traffic on Florin Road. Relocating the advanced signal detection based on the speed of traffic will improve the traffic signal operations. Other safety related improvements within the project limits include upgrading eight-inch vehicle heads to twelve-inch heads for improved visibility and upgrading pedestrian signal heads to countdown pedestrian heads.

B. Where the existing frontage roads front Florin Road at the intersections of Amherst Street, 21st Street, and Tamoshanter Way, additional pedestrian improvements are proposed. Medians between the frontage roads and Florin Road will be reconstructed with proper pedestrian passageways and Americans with Disabilities Act accessible bus stops. Florin Road crossings will be controlled by a pedestrian signal, and medians will be reconstructed as needed so that the crossing is unobstructed.

C. The HSIP Florin Road Safety Improvements (T15205400) is also installing two pedestrian signals to provide safer crossing for pedestrians on Florin Road. It will also construct raised medians to close gaps in existing raised medians, which would add consistency to the roadway and control access into and out of the driveways along the segment. A raised median would also provide a pedestrian refuge island. Additionally, this project would also install pedestrian fencing in raised medians to prevent pedestrian crossing at uncontrolled locations and encourage safer crossings.

The City received federal grant funds for two projects on Florin Road through the Highway Safety Improvement Program during Cycle 8 and Cycle 9, two different grant funding years. The project limits for the HSIP Florin Road Safety Improvements (T15205400) and HSIP Florin Road Signal Improvements (T15185800) overlap and are located between Greenhaven Drive and Franklin Boulevard. In coordination with Caltrans Local Assistance, the oversight agency for the federal funds, staff identified an opportunity for streamlined delivery of both projects through the procurement under one contract. This approach introduces a cost savings in project delivery costs; more competitive construction bids; and minimized inconvenience to the public during construction.

D. The Project plans and specifications for the Project have been completed.

E. The two projects were previously authorized $578,740 in federal funding for preliminary engineering. The City received Caltrans authorization for the appropriation of $6,656,440 in construction funding on September 19, 2022.

F. The HSIP Florin Road Signal Improvements (T15185800) and HSIP Florin Road Safety Improvements (T15205400) were advertised for construction, and a single bid was received on April 13, 2023. The result of the bid is summarized below:

Contractor Bid
DBE
(22% Min
Goal)
Pacific Excavation $6,368,032 22.2%

G. Staff recommends that the construction contract be awarded to the lowest responsive and responsible bidder, Pacific Excavation.

BASED ON THE FACTS SET FORTH IN THE BACKGROUND, THE CITY COUNCIL RESOLVES AS FOLLOWS:

Section 1. Plans and Specifications for the HSIP Florin Road Signal Improvements (T15185800) and the HSIP Florin Road Safety Improvements (T15205400) are approved.

Section 2. The City Manager or the City Manager’s designee is authorized to increase the revenue and expenditure budgets of the HSIP Florin Road Signal Improvements (T15185800) by $5,602,899 (Federal Capital Grants, Fund 3703).

Section 3. The City Manager or the City Manager’s designee is authorized to transfer $545,346 (Major Street Construction, Fund 2007) from the expenditure budget of the State and Federal Grant Match Project (T15007200) to the expenditure budget of the HSIP Florin Road Signal Improvements (T15185800).

Section 4. The City Manager or the City Manager’s designee is authorized to increase the revenue and expenditure budgets of the HSIP Florin Road Safety Improvements Project (T15205400) by $1,053,540 (Federal Capital Grants, Fund 3703).

Section 5. The City Manager or the City Manager’s designee is authorized to transfer $351,460 (Major Street Construction, Fund 2007) from the expenditure budget of the State and Federal Grant Match Project (T15007200) to the expenditure budget of the HSIP Florin Road Safety Improvements Project (T15205400).

Section 6. The construction contract for the HSIP Florin Road Signal Improvements (T15185800) and the HSIP Florin Road Safety Improvements (T15205400) is awarded to Pacific Excavation in an amount not to exceed $6,368,032.

Section 7. The City Manager or the City Manager’s designee is authorized to execute the construction contract for the HSIP Florin Road Signal Improvements (T15185800) and the HSIP Florin Road Safety Improvements (T15205400).

C-1
1 COVER SHEET
INDEX OF SHEETS:

SITE PLAN

LOCATION MAP
FLORIN ROAD HSIP SIGNAL AND SAFETY IMPROVEMENT PROJECT (PN: T15185800, T15205400)

IMPROVEMENT PLANS FOR

STANDARD ABBREVIATIONS

GENERAL NOTES
45 1476
FREEPORT Blvd
21st St
FLORIN Rd

TAMOSHANTER
24th St
S LANDPARK Dr
GREENHAVEN Dr
AMHERST St
17th St
CROMWELL Wy
99 Wy
BENCH MARK DESCRIPTION:
2023.03.17
13:39:46 -07'00'
Digitally signed by Kaleb Haile
Date: 2023.03.20 14:49:40
-07'00'
Digitally signed by Judith
Matsui-Drury
Date: 2023.03.20 10:29:26
-07'00'
Digitally signed by David
Edroslan
Date: 2023.03.17 14:28:19
-07'00'
Digitally signed by Brett Grant
Date: 2023.03.20 15:32:09
-07'00'
C-2
2 SURVEY CONTROL 45
1476

MATCHLINE

SEE BELOW

MATCHLINE

SEE ABOVE FLORIN ROAD
END "F" LINE
STA 135+50.00
N 1942793.16
E 6709921.22

FLORIN ROAD

FLORIN ROAD

FLORIN ROAD
GREENHAVEN Dr
BEGIN
"F" LINE
STA 16+00.00
N 1942786.35
E 6697988.98
"F" LINE
STA 49+00.00
N 1942661.42
E 6701272.91
"F" LINE
STA 67+75.00
N 1942728.49
E 6703146.53
"F" LINE
STA 123+50.00
N 1942779.09
E 6708721.30
"F" LINE
STA 71+50.00
N 1942732.91
E 6703521.50
TAMOSHANTER Wy
FREEPORT Blvd
S LAND PARK Dr
24th St

MATCHLINE

SEE ABOVE

MATCHLINE

SEE ABOVE

MATCHLINE

SEE BELOW

MATCHLINE

SEE BELOW
2023.03.17
13:40:22 -07'00'
C-3
3 FLORIN ROAD
GREENHAVEN Dr

FLORIN ROAD
MATCHLINE 20+50

SEE ABOVE
MATCHLINE 20+50

SEE BELOW
DD
DD
EE
- AT GREENHAVEN DRIVE - STA. 16+00 TO 26+00 45
1476
LAYOUT
2023.03.17
13:40:43 -07'00'

FLORIN ROAD
S LAND PARK Dr
C-4
4 FLORIN ROAD
MATCHLINE 54+50

SEE ABOVE
MATCHLINE 54+50

SEE BELOW
MATCHLINE 60+50
SEE SHT. C-5
A
A
DETAIL 1 DETAIL 2
SEE DETAIL 1 THIS SHEET
SEE DETAIL 2 THIS SHEET
B B
D D
D D
SEE DETAIL 3 SHEET G-5
- PEDESTRIAN SIGNAL No.1 - STA. 48+00 TO 60+50 45
1476
LAYOUT
SEE DETAIL A SHEET C-6
2023.03.17
13:41:08 -07'00'

FLORIN ROAD
C-5
5 MATCHLINE 60+50
SEE SHEET C-4

SECTION A-A

SECTION B-B

SECTION C-C
CC

SECTION D-D SECTION E-E
EE
DETAIL 4

FENCE INSTALLATION
DETAIL 3

FLORIN ROAD
- MEDIAN FENCE No. 2 - STA. 60+50 TO 67+00 45
1476
LAYOUT
DD
FREEPORT Blvd
SEE INSET "B" SHEET C-6
SEE INSET "C" SHEET C-6
2023.03.17
13:41:36 -07'00'
C-6
6 45
1476

INSET 'B'
SCALE 1" = 5'
FREEPORT Blvd
FLORIN Rd

CURVE DATA
¬

INSET 'C'
SCALE 1" = 5'
FREEPORT Blvd
NOTES:
- AT FREEPORT BOULEVARDLAYOUT
INSET "A"
SCALE 1" = 5'
S LAND PARK Dr
FLORIN Rd
2023.03.17
13:42:06 -07'00'
C-7
7 45
1476
FLORIN Rd
AMHERST St
SEE INSET "E"
INSET "E"
SCALE 1" = 5'
SEE INSET "G" SHEET C-8
SEE INSET "D" SHEET C-8

CURVE DATA
¬
SEE INSET "F"
INSET "F"
SCALE 1" = 5'
AMHERST St
FLORIN Rd
AMHERST St
NOTES:
- AT AMHERST STREETLAYOUT
2023.03.17
13:42:54 -07'00'
C-8
8 45
1476

CURVE DATA
¬
INSET "D"
SCALE 1" = 5'
AMHERST St
FLORIN Rd
INSET "G"
SCALE 1" = 5'
FLORIN Rd
AMHERST St
NOTES:
- AT AMHERST STREET (CONT)LAYOUT
2023.03.17
13:43:21 -07'00'
C-9
9 45
1476
FLORIN Rd
21ST St
21ST St

CURVE DATA
¬
SEE INSET "H"
SEE INSET "K" SEE INSET "L" SHEET C-10
SEE INSET "I" SHEET C-10
SEE INSET "J" SHEET C-10
INSET "K"
SCALE 1" = 5'
FLORIN Rd
21ST St
INSET "H"
SCALE 1" = 5'
FLORIN Rd
21ST St
NOTES:
- AT 21ST STREETLAYOUT
2023.03.17
13:38:45 -07'00'
C-10
10 CURVE DATA
¬
45 1476
21ST St
INSET "L"
SCALE 1" = 5'
FLORIN Rd
INSET "J"
SCALE 1" = 5'
FLORIN Rd
21ST St
INSET "I"
SCALE 1" = 5'
21ST St
NOTES:
- AT 21ST STREET (CONT)LAYOUT
2023.03.17
13:38:26 -07'00'
45 1476
FLORIN Rd
TAMOSHANTER Wy
SEE INSET "P" SHEET C-12

CURVE DATA
¬
SEE INSET "O" SHEET C-12
SEE INSET "M"
SEE INSET "N"
NOTES:

INSET "N"
SCALE 1" = 5'
FLORIN Rd
TAMOSHANTER Wy
INSET "M"
SCALE 1" = 5'
TAMOSHANTER Wy
C-11
11 - AT TAMOSHANTER WAYLAYOUT
2023.03.17
13:38:08 -07'00'
45 1476

CURVE DATA
¬
INSET "P"
SCALE 1" = 5'
FLORIN Rd
TAMOSHANTER Wy
INSET "O"
SCALE 1" = 5'
FLORIN Rd
C-12
12 NOTES:
- TAMOSHANTER WAY (CONT)LAYOUT
2023.03.17
13:37:52 -07'00'
TAMOSHANTER Wy

FLORIN ROAD
C-13
13MATCHLINE 130+00

SEE BELOW
24th St
MATCHLINE 130+00

SEE ABOVE

FLORIN ROAD
A
A
SEE DETAIL 4 SHEET C-14
SEE DETAIL 5 SHEET C-14
B B
DD
DD
- PEDESTRIAN CROSSING No. 2 45
1476
LAYOUT
SEE INSET "Q" SHEET C-14
SEE SHEET C-11
SEE SHEET C-11
SEE SHEET C-11
2023.03.17
13:37:37 -07'00'
C-14
14 45
1476

CURVE DATA
¬
INSET "Q"
SCALE 1" = 5'
24TH St
FLORIN Rd
NOTES:
- AT 24TH STREETLAYOUT
DETAIL 4
DETAIL 5
2023.03.17
13:37:11 -07'00'
SS-1
15 45
1476
FLORIN Rd
GREENHAVEN Dr
LEGEND:

STRIPING AND SIGNING GENERAL NOTES:

GREENHAVEN Dr
CONSTRUCTION NOTES:

CROSSWALK & LIMIT LINE

FOR SIGNALIZED INTERSECTIONS
NTS
- AT GREENHAVEN DRIVESIGNING AND STRIPING
MATCHLINE 18+50
SEE SHEET SS-2
Digitally signed by Alex
Goloveshkin
Date: 2023.03.16 18:46:20
-07'00'

FLORIN ROAD
SS-2
16 FLORIN ROAD
MATCHLINE 54+00

SEE ABOVE
MATCHLINE 54+00

SEE BELOW
MATCHLINE 59+00
SEE SHT. SS-2
SIGNING AND STRIPING 45
1476
S LAND PARK Dr
- AT S. LAND PARK (STA. 48+00 TO 59+00)
Digitally signed by Alex
Goloveshkin
Date: 2023.03.16 18:46:43
-07'00'
FREEPORT Blvd

FLORIN ROAD

FLORIN ROAD
SS-3
17 MATCHLINE 59+00
SEE SHEET SS-2
MATCHLINE 64+50

SEE BELOW
MATCHLINE 20+50

SEE ABOVE
45 1476
SIGNING AND STRIPING - AT FREEPORT BLVD (STA. 59+00 TO 68+00) Digitally signed by Alex
Goloveshkin
Date: 2023.03.16 18:48:48
-07'00'
SIGNING AND STRIPING 45
1476
FLORIN Rd
AMHERST St
SS-4
18 - AT AMHERST STREET
AMHERST St
Digitally signed by Alex
Goloveshkin
Date: 2023.03.16 18:53:06
-07'00'
SIGNING AND STRIPING 45
1476
FLORIN Rd
21ST St21ST St
SS-5
19 - AT 21st STREET
CITY STANDARD DETAIL T-304
st
Digitally signed by Alex
Goloveshkin
Date: 2023.03.16 18:55:19
-07'00'
TAMOSHANTER Wy

FLORIN ROAD

FLORIN ROAD
SS-6
20 MATCHLINE 130+00

SEE BELOW
MATCHLINE 130+00

SEE ABOVE

SIGNING AND STRIPING
FLORIN Rd
24TH St
45 1476
- TAMOSHANTER WAY TO 24TH STREET
Digitally signed by Alex
Goloveshkin
Date: 2023.03.16 18:57:36
-07'00'

ELECTRICAL PLANS

FLORIN ROAD

GREENHAVEN DRIVE

POLE SCHEDULE
CONTRACTOR TO PROVIDE AND INSTALL ALL EQUIPMENT SHOWN IN POLE SCHEDULE.

CONSTRUCTION NOTES:

DETAIL 'B'

DETAIL 'A'

DETAIL 'B'

DETAIL 'A'
45 1476 E-1
21 - AT GREENHAVEN DRIVE
John Matoba
2023.03.20
14:20:15 -07'00'

ELECTRICAL PLANS

FLORIN ROAD

S LAND PARK DRIVE

S LAND PARK DRIVE

POLE SCHEDULE
CONTRACTOR TO PROVIDE AND INSTALL ALL EQUIPMENT SHOWN IN POLE SCHEDULE.

CONSTRUCTION NOTES:

DETAIL 'A'

DETAIL 'A'
45 1476 E-2
22 - AT SOUTH LAND PARK DRIVE
John Matoba
2023.03.20
14:24:56 -07'00'
S LAND PARK Dr
E-3
23 FLORIN ROAD
FREEPORT Blvd

FOR CONTINUATION
SEE SHEET E-4

FOR CONTINUATION
SEE SHEET E-4

POLE SCHEDULE
CONTRACTOR TO PROVIDE AND INSTALL ALL EQUIPMENT SHOWN IN POLE SCHEDULE.

CONSTRUCTION NOTES:

ELECTRICAL PLANS - PEDESTRIAL SIGNAL #1
LEGEND:
45 1476
A A
B B
John Matoba
2023.03.20
14:27:20 -07'00'
E-4
24 FLORIN ROAD

FOR CONTINUATION
SEE SHEET E-3

FLORIN ROAD

FOR CONTINUATION
SEE SHEET E-3

FOR CONTINUATION
SEE SHEET E-5
CONSTRUCTION NOTES:

ELECTRICAL PLANS - PEDESTRIAL SIGNAL #1 - CONT. 1 45
1476
B B
A A
C C
John Matoba
2023.03.20
14:27:37 -07'00'
E-5
25 FLORIN ROAD

FOR CONTINUATION
SEE SHEET E-4

FREEPORT BLVD
LUMINAIRE SCHEDULE:(NEW)

DETAIL 'A'
CONSTRUCTION NOTES:

ELECTRICAL PLANS - PEDESTRIAL SIGNAL #1 - CONT. 2 45
1476
C C
John Matoba
2023.03.20
14:28:09 -07'00'

ELECTRICAL PLANS

FLORIN ROAD

FREEPORT BOULEVARD
CONSTRUCTION NOTES:

DETAIL 'A'

DETAIL 'A'

FOR CONTINUATIONA A
SEE SHEET E-7

FOR CONTINUATION
B B
SEE SHEET E-7
CC SEE SHEET E-8
SEE SHEET E-8
D
45 1476 E-6
26 D
CONSTRUCTION NOTES (CONTINUED):
- AT FREEPORT BLVD

FOR CONTINUATION

FOR CONTINUATION
John Matoba
2023.03.20
14:55:36 -07'00'

ELECTRICAL PLANS

FLORIN ROAD

FLORIN ROAD
CONSTRUCTION NOTES:

SEE SHEET E-10

FOR CONTINUATIONB B
SEE SHEET E-6

FOR CONTINUATION
A A
SEE SHEET E-6
45 1476 E-7
27 POLE SCHEDULE
CONTRACTOR TO PROVIDE AND INSTALL ALL EQUIPMENT SHOWN IN POLE SCHEDULE.FLORIN ROAD AND FREEPORT BOULEVARD - AT FREEPORT BLVD (CONT. 1)
John Matoba
2023.03.20
14:28:53 -07'00'

ELECTRICAL PLANS

FREEPORT BLVD
CONSTRUCTION NOTES:

FLORIN ROAD

FOR CONTINUATION CC
SEE SHEET E-6

FOR CONTINUATION
DD
SEE SHEET E-6
45 1476 E-8
28 - AT FREEPORT BLVD (CONT. 2)
John Matoba
2023.03.20
14:43:44 -07'00'

ELECTRICAL PLANS

FLORIN ROAD

AMHERST STREET
CONSTRUCTION NOTES:

DETAIL 'A'

DETAIL 'A'

DETAIL 'B'

DETAIL 'B'

DETAIL 'C'

DETAIL 'C'

FOR CONTINUATIONA A
SEE SHEET E-10

FOR CONTINUATION
B B
SEE SHEET E-10
45 1476 E-9
29 - AT AMHERST STREET
John Matoba
2023.03.20
14:29:26 -07'00'

ELECTRICAL PLANS

FLORIN ROAD
CONSTRUCTION NOTES:

FLORIN ROAD
SEE SHEET E-7

FOR CONTINUATION
A A
SEE SHEET E-9

FOR CONTINUATION
B B
SEE SHEET E-9
45 1476

POLE SCHEDULE
CONTRACTOR TO PROVIDE AND INSTALL ALL EQUIPMENT SHOWN IN POLE SCHEDULE.

E-10
30 FLORIN ROAD AND AMHERST STREET
- AT AMHERST STREET (CONT. 1)
John Matoba
2023.03.20
14:34:42 -07'00'

ELECTRICAL PLANS

FLORIN ROAD
21ST STREET
CONSTRUCTION NOTES:

DETAIL 'A'

DETAIL 'A'

DETAIL 'B'

DETAIL 'C'DETAIL 'D'

DETAIL 'B'

DETAIL 'C'DETAIL 'D'
FOR CONTINUATION SEE SHEET E-12A A

FOR CONTINUATION
B B
SEE SHEET E-12
45 1476 E-11
31 - AT 21ST STREET
John Matoba
2023.03.20
14:35:12 -07'00'

ELECTRICAL PLANS

FLORIN ROAD

FLORIN ROAD
CONSTRUCTION NOTES:

POLE SCHEDULE
CONTRACTOR TO PROVIDE AND INSTALL ALL EQUIPMENT SHOWN IN POLE SCHEDULE.

FOR CONTINUATION
B B
SEE SHEET E-11

FOR CONTINUATION
A A
SEE SHEET E-11
45 1476 E-12
32 FLORIN ROAD AND 21ST STREET

SMUD COMMITMENT
SKETCH. SEE NOTE 14.
- AT 21ST STREET
John Matoba
2023.03.20
14:35:39 -07'00'

ELECTRICAL PLANS
FLORIN Rd
TAMOSHANTER Wy
CONSTRUCTION NOTES:

DETAIL 'A'

DETAIL 'A'

DETAIL 'B'

DETAIL 'C'

DETAIL 'B'

DETAIL 'C'

DETAIL 'D'

DETAIL 'D'

FOR CONTINUATIONA A
SEE SHEET E-14

FOR CONTINUATION
B B
SEE SHEET E-14
FLORIN Rd
45 1476 E-13
33 CONSTRUCTION NOTES:
- AT TAMOSHANTER WAY
John Matoba
2023.03.20
14:36:04 -07'00'
FLORIN Rd
CONSTRUCTION NOTES:

FOR CONTINUATIONB B
SEE SHEET E-13

FOR CONTINUATION
A A
SEE SHEET E-13
45 1476

POLE SCHEDULE
CONTRACTOR TO PROVIDE AND INSTALL ALL EQUIPMENT SHOWN IN POLE SCHEDULE.

E-14
34 FLORIN ROAD AND TAMOSHANTER WAY
ELECTRICAL PLANS - AT TAMOSHANTER WAY (CONT. 1)
John Matoba
2023.03.20
14:36:32 -07'00'
TAMOSHANTER Wy
E-15
35 FLORIN ROAD
24th STREET

POLE SCHEDULE
CONTRACTOR TO PROVIDE AND INSTALL ALL EQUIPMENT SHOWN IN POLE SCHEDULE.

CONSTRUCTION NOTES:

ELECTRICAL PLANS
LEGEND:
- PEDESTRIAL SIGNAL #2 45
1476

FOR CONTINUATION
SEE SHEET E-16
A A

FOR CONTINUATIONB B
SEE SHEET E-16
John Matoba
2023.03.20
14:42:39 -07'00'

FLORIN ROAD
E-16
36 ELECTRICAL PLANS

FLORIN ROAD
TAMOSHANTER Wy
24th STREET
LUMINAIRE SCHEDULE:(NEW)
CONSTRUCTION NOTES:
- PEDESTRIAL SIGNAL #2 - CONT. 45
1476

FOR CONTINUATIONA A
SEE SHEET E-15

FOR CONTINUATION
SEE SHEET E-15
B B
John Matoba
2023.03.20
14:37:04 -07'00'

ELECTRICAL PLANS
FLORIN Rd
24TH St
CONSTRUCTION NOTES:

DETAIL 'B'

DETAIL 'C'

DETAIL 'D'

DETAIL 'B'

DETAIL 'C'DETAIL 'D'

FOR CONTINUATIONA
SEE SHEET E-19

FOR CONTINUATION
B
SEE SHEET E-19

FOR CONTINUATION
CC SEE SHEET E-18

FOR CONTINUATION DD
SEE SHEET E-18

DETAIL 'A'

DETAIL 'A'
45 1476 E-17
37 24TH St
- AT 24TH STREET
A
B
CONSTRUCTION NOTES (CONTINUED):

John Matoba
2023.03.20
14:37:39 -07'00'
SMUD O

ELECTRICAL PLANS
24TH St
CONSTRUCTION NOTES:

POLE SCHEDULE
CONTRACTOR TO PROVIDE AND INSTALL ALL EQUIPMENT SHOWN IN POLE SCHEDULE.

FOR CONTINUATION
DD SEE SHEET E-17

FOR CONTINUATION CC
SEE SHEET E-17
45 1476 E-18
38 FLORIN ROAD AND 24TH STREET
- AT 24TH STREET (CONT. 1)
24TH St
John Matoba
2023.03.20
14:38:13 -07'00'

ELECTRICAL PLANS

FLORIN ROAD
CONSTRUCTION NOTES:

FOR CONTINUATION
A A
SEE SHEET E-17

FOR CONTINUATION
B B
SEE SHEET E-17
45 1476 E-19
39 - AT 24TH STREET (CONT. 2)
John Matoba
2023.03.20
14:38:49 -07'00'
(((((
45 1476
40 FLORIN Rd
S. LAND PARK Dr
FLORIN Rd
FREEPORT Blvd
FLORIN Rd
AMHERST St
17TH St
CONSTRUCTION NOTES:

DETAIL 'A'

FOR CONTINUATIONA A

FOR CONTINUATION
A A

FOR CONTINUATIONB B

FOR CONTINUATION
B B

DETAIL 'C'

DETAIL 'D'

DETAIL 'A'

DETAIL 'C'

DETAIL 'D'

FOR CONTINUATIONC C
SEE SHEET E-21
S. LAND PARK Dr
FLORIN Rd &
FREEPORT BlvdFLORIN Rd &
AMHERST StFLORIN Rd &
E-20

DETAIL 'B'

DETAIL 'B'
BETWEEN S. LAND PARK DRPEDESTRIAN CROSSING

AND FREEPORT BLVD

ELECTRICAL PLANS
John Matoba
2023.03.20
14:39:40 -07'00'

ELECTRICAL PLANS
FLORIN Rd
FLORIN Rd
FLORIN Rd
21ST St

TAMOSHANTER WAY
CONSTRUCTION NOTES:

SEE SHEET E-20
C C

FOR CONTINUATION

FOR CONTINUATIOND D

FOR CONTINUATION
D D

DETAIL 'A'

FOR CONTINUATIONE E

FOR CONTINUATION
E E

DETAIL 'B'

FOR CONTINUATIONF F
SEE SHEET E-22

DETAIL 'A'

DETAIL 'B'
45 1476
FLORIN Rd &
21ST St
FLORIN Rd &
TAMOSHANTER Wy
E-21
41 CROMWELL Wy
20TH St
John Matoba
2023.03.20
14:40:16 -07'00'
FLORIN Rd
24TH STREET
CONSTRUCTION NOTES:

SEE SHEET E-21
F F

FOR CONTINUATION

DETAIL 'B'

DETAIL 'B'
45 1476
FLORIN Rd &
24TH STREET
E-22
42 DETAIL 'A'

DETAIL 'A'

BETWEEN TAMOSHANTER WAY

PEDESTRIAN CROSSING
24TH STREET

ELECTRICAL PLANS
John Matoba
2023.03.20
14:40:59 -07'00'
ELECTRICAL PLANS 45
1476
E-24
44 ELECTRICAL PLANS 45
1476

TYPICAL DETECTOR LAYOUT VIDEO & LOOPS
NOTES:

VIDEO DETECTION FIELD OF VIEW

VIDEO DETECTION

MAST MOUNTING

LUMINARE MOUNTING
NOTES:

DUAL CAMERA DETECTION MOUNTING

LOOP DISTANCE

AND MOUNTING DETAIL

SINGLE CAMERA DETECTION MOUNTING
E-25
45 ELECTRICAL PLANS 45
1476