Cities Index.
Item 06 2023-01047 Change Order City’s Combined Wastewater Treatment Plant (CWTP) Emergency Bypass Pipe Repair

Sacramento City Council
September 5, 2023

Document
Item 06 2023-01047 Change Order City’s Combined Wastewater Treatment Plant (CWTP) Emergency Bypass Pipe Repair
Meeting
September 5, 2023
Body
Sacramento City Council
Pages
3
Original file
842 KB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

City of Sacramento
City Council - 5PM Report
915 I Street Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2023-01047 9/5/2023 Consent Item 6.

Change Order: City’s Combined Wastewater Treatment Plant (CWTP) Emergency Bypass Pipe Repair
File ID: 2020-01474
Location: District 4, Represented by Councilmember Valenzuela Recommendation: Pass a Motion authorizing the City Manager or the City Manager’s designee to execute Change Order No. 4 for City Agreement 2022-0110 with Steve P. Rados, Inc. for the CWTP Emergency Sewer Bypass Pipe Repair (X140100000, Fund 6206) for an amount not-to-exceed $191,976.29.

Contact: Tim Moresco, Project Manager (916) 808-1432; Roxanne Dilley, Supervising Engineer (916) 808-1458; Sherill Huun, Engineering & Water Resources Division Manager, (916) 808-1455; Pravani Vandeyar, Director (916) 808-3765; Department of Utilities Presenter: None
Attachments:
1-Description/Analysis
2-Change Order
Additional Description/Analysis
Issue Detail: Staff recommends City Manager approval for Change Order No. 4 for City Agreement 2022-0110 with Steve P. Rados, Inc. for the CWTP Emergency Sewer Bypass Pipe Repair (X14010112) for an amount not-to-exceed $191,976.29, to compensate the contractor for performing additional work to repair the damaged force main from Sump 119 and various additional work associated with the site restoration including concrete curb and gutter restoration and landscape irrigation replacement.

A failure of the Sump 119 force main occurred on December 31, 2022. This led to a sanitary sewer overflow (SSO) at an access vault located in the City’s Combined Wastewater Treatment Plant (CWTP). City crews performed a temporary patch to help get through the winter, however a long-

Page 1 of 3 ends

File ID: 2023-01047 9/5/2023 Consent Item 6.
term repair was still needed. Based on the 2014 maintenance agreement, City staff maintains Sump 119, but Regional San owns it, and therefore is responsible for the costs. City staff coordinated with Regional San staff to determine the preferred alternative, which resulted in removing and replacing a 5 ft section of 24-inch pipe. This alternative required extensive dewatering and bypass to be installed. Total compensation for this work will be $166,000, which includes all labor, equipment, materials, overhead, and markup for performing the work.

The additional site restoration efforts revolved around the additional work to repair the curb and gutter and landscape irrigation that was damaged throughout the repair areas of the bypass sewer pipe. Total compensation for this work will be $25,976.29, which includes all labor, equipment, materials, overhead, and markup for performing the work.

Policy Considerations: This Change Order exceeds the City Manager’s approval authority and requires Council approval pursuant to City Code section 3.60.210.

Economic Impacts: This Change Order is expected to create 0.77 total jobs (0.44 direct jobs and

0.33 jobs through indirect and induced activities) and create $118,532.88 in total economic output ($74,712.18 of direct output and another $43,820.70 of output through indirect and induced activities).

The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER). CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical $1 million of spending in various construction categories within the City of Sacramento in an average one-year period. Actual impacts could differ significantly from the estimates and neither the City of Sacramento nor CSER shall be held responsible for consequences resulting from such differences.

Environmental Considerations: This project is exempt from the California Environmental Quality Act (CEQA) under Section 15301 of the CEQA Guidelines governing existing facilities, in that it meets the definition of restoration or rehabilitation of deteriorated or damaged structures, facilities, or mechanical equipment to meet current standards of public health and safety.

Sustainability: The proposed project is consistent with the 2035 General Plan as it improves infrastructure reliability and addresses existing safety and health impacts.

Commission/Committee Action: Not applicable.

Rationale for Recommendation: Change Order No. 4 is needed to provide compensation for all the labor, equipment, materials, markup, surcharges, and fees associated with the Sump 119 Force Main Spool replacement that occurred between June 26 and June 29, 2023, and the Site Restoration work that occurred between April 27 and May 30, 2023. This value exceeds the City Manager’s approval

Page 2 of 3 ends

File ID: 2023-01047 9/5/2023 Consent Item 6.
authority for change orders given that the original contract value was $249,999.

Financial Considerations: The original not-to-exceed amount of the contract was $249,999.00. The net change by previous change orders in the amount of $3,395,590.55, increased the contract not-to- exceed amount to $3,645,589.55. Proposed Change Order No. 4 in the amount of $191,976.29 would increase the contract not-to-exceed amount to $3,837,565.84.

Sufficient budget exists in the Combined Sewer System Capital Program (X14010000, Fund 6206) to cover the amount needed for proposed Change Order No. 4. The costs incurred for this project will be reimbursed by the Sacramento Regional County Sanitation District (Regional San) as the owners of the asset.

There are no General Funds allocated or planned for this project.

Local Business Enterprise (LBE): Steve P. Rados, Inc. is an LBE.

Page 3 of 3 ends

/0/1/2/3/4/5/0/3/i255
/4/1/7/3/8/2/9/i255/10/11/12/12/3/i255
/13/14/15/16/17/18/19/16/i255/13/14/21/22/17/23/24/14/25/16/26/15/27/i255/28/14/17/29/30/i255/31/25/32/16/i255/33/19/19/14/29/34/18/15/35/i255/33/36/36/i255/13/14/15/16/17/18/19/16/32/37/i255/38/14/39/22/21/22/17/40/i255/26/16/i255/26/32/i255/41/42/43/i255/34/18/17/16/i255/14/44/i255/16/38/22/i255/19/14/15/16/17/18/19/16/45/i255 /9/46/47/46/48/49/50/i255/8/47/51/52/48/53/49/54/55/52/47/i255/56/4/46/57/58/55/48/46/59/60/i255 /61/62/63/64/63/65/66/67/i255/69/70/65/71/62/66/72/71/i255/73/i255/74/75/76/77/77/67/78/79/78/65/71/75/i255/70/65/67/80/81/82/i255/83/83/83/83/83/83/83/83/i255/i255/i255/84/76/77/77/67/78/79/78/65/71/85/86/87/87/78/65/87/76/79/i255/73/82/i255/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /86/75/75/78/75/75/70/62/88/75/i255/89/66/62/72/78/67/i255/90/76/79/91/78/62/74/75/81/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83 /69/70/65/71/62/66/72/71/i255/92/93/93/78/72/71/63/94/78/i255/95/66/71/78/82/i255/83/83/83/83/83/83/83/83/83/i255/i255/i255/i255/69 /70/65/71/62/66/72/71/i255/92/96/77/63/62/66/71/63/70/65/i255/95/66/71/78/i255/74/63/93/i255/66/77/77/67/63/72/66/91/67/78/81/82/i255/83/83/83/83/83/83/83/83/83/i255 /97/i255/86/79/70/76/65/71/i255/74/90/70/71/i255/71/70/i255/92/96/72/78/78/87/81/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255/86/87/98/76/75/71/78/87/i255/97/i255/86/79/70/76/65/71/i255/74/99/85/100/81/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /61/71/101/78/62/i255/89/66/62/71/80/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /89/62/70/98/78/72/71/i255/102/63/71/67/78/82/i255/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /89/62/70/98/78/72/71/i255/73/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255/103/63/87/85/104/105/106/85/104/105/89/i255/73/82/i255/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /69/63/71/80/i255/69/70/76/65/72/63/67/i255/86/77/77/62/70/94/66/67/82/i255/63 /93/i255/107/92/84/108/i255/69/70/76/65/72/63/67/i255/105/63/67/78/i255/109/95/73/82/i255/83/83/83/83/83/83/83/83/83/83/i255 /0/52/47/54/48/49/111/54/i255/112/48/52/111/46/113/113/55/47/114/i255/0/52/47/54/49/111/54/113/i255 /95/78/77/66/62/71/79/78/65/71/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /69/70/65/71/62/66/72/71/i255/69/70/70/62/87/63/65/66/71/70/62/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /89/62/70/98/78/72/71/i255/115/66/65/66/64/78/62/82/i255/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83 /116/117/118/119/120/121/i255/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/123/83/83/83/83/83/83/i255 /124/46/125/49/48/54/53/46/47/54/i255/4/46/126/55/46/127/i255/49/47/59/i255/4/52/58/54/55/47/114/i255 /74/84/63/64/65/66/71/76/62/78/81/i255 /74/95/66/71/78/81/i255 /74/84/63/64/65/66/71/76/62/78/81/i255 /74/95/66/71/78/81/i255 /74/84/63/64/65/66/71/76/62/78/81/i255 /74/95/66/71/78/81/i255 /128/129/130/131/132/133/134/135/132/136/129/130/i255/138/139/140/132/141/i255 /143/144/145/146/147/148/149/150/151/147/141/i255/i255
/152/149/148/149/150/149/151/153/i255/154/155/153/155/156/146/147/141/i255/i255 /157/158/159/146/147/141/i255
/74/84/63/64/65/66/71/76/62/78/81/i255 /74/95/66/71/78/81/i255 /10/125/46/111/55/49/50/i255/8/47/113/54/48/58/111/54/55/52/47/160/0/52/53/53/46/47/54/113/i255/56/55/161/46/161/i255/48/46/111/52/48/59/55/47/114/i255/48/46/57/58/46/113/54/46/59/162/i255/52/54/163/46/48/i255/49/114/46/47/111/164/i255/113/55/114/47/49/54/58/48/46/113/i255/48/46/57/58/55/48/46/59/162/i255/46/54/111/161/60/i255 /83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/83/i255 /166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/28/42/24/i255/13/36/167/24/168/i255/169/i255/170/43/i255/171/167/172/33/24/43/31/167/41/43/173/i255/42/41/36/174/i255/175/i255/171/42/i255/41/42/43/i255/176/24/170/43/167/i255/177/167/36/42/176 /i255/43/178/170/173/i255/36/170/41/167/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/166/i255 /179/179/i255/181/182/183/184/i255/185/186/187/185/188/184/189/190/191/192/i255 /194/195/196/197/198/199/200/201/202/i255/194/195/204/205/195/206/207/195/199 /208/207/209/195/198/i255/210/211/198/207/212/i255/213/200/202/201/211/207/205/198/195/i255/194/195/204/205/200/198/195/199 /214/215/216/217/216/i255/219/220/i255/221/222/223/224/225/226/i255/227/228/229/220 /230/231/232/233/231/233/231/231/234
/233/232
/235/215/236/237/236/215/236/216/225
/233/238/239/233/232/239/234/233/234/240
/241/236/242/i255/243/224/244/216/225/229/224
/245/242/216/244/246/216/228/229/247
/248/242/222/244/215/236/228/216/249/250/229/236/215/247/224/251/225/222/229/244/222/242/216/228/215/224/220/224/244/246 /252/231/253/231/226/253/254/255/220/234/253
/0/1/241/219/i255/245/242/216/244/246/216/228/229/247/i255/214/216/2/216/244/i255/3/247/4/222/225/225/i255/219/236/4/216/i255/221/216/4/222/236/244 /234/233/234/240/5/233/231/233/232/254/6/245/214
/7/222/229/8/9/216/237/236/228/216/i255/243/222/244/215/236/228/216/249 /234/233/234/234/5/233/231/231/233
/252/240/226/238/240/254/226/10/255/10/220/238/232
/11/12
/13/14/15/i255/17/18/19/i255/20/21/20/22
/23/24/25/i255/27/28/29/i255/30/31/30/32
/33/34/35/36/37/38/38/i255/40/41/41/42/i255/43/44/41/45/i255/46/47/48/i255/49/50/49/51/i255/46/47/52/51/51/i255/53/54/55/56 /44/41/45/i255/46/47/48/i255/49/50/49/51 /0/1/2/i255/4/5/6/i255/7/8/7/9
/10/11/12/i255/14/15/16/i255/17/18/17/19
/0/1/2/3/4/3/5/i255/7/8/i255/9/10/11/12/i255/13/i255/14/15/i255/13/i255 /16/17/18/19/20/21/i255/23/24/25/21/24/i255
/21/26/17/27/28/27/29/i255/18/i255
/i255
/16/31/32/33/34/35/36/33/i255/37/i255/38/i255/25/35/33/39/40/i255/41/42/41/41/43/42/44/44/42/i255/44/41/45/41/46/45/41/44/i255/i255 /28/47/48/49/39/33/i255/37/40/i255/50/46/41/42/44/44/43/51/42/42/42/42/43/52/41/42/52/43/51/44/42/42/42/42/42/42/43/53/44/50 /42/44/42/44/44/41/i255
/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255 /i255/i255/i255/i255/i255/i255/i255 /54/47/34/36/55/35/56/39/i255/23/34/48/39/34/i255/37/40/i255/42/42/42/42/42/52/51/41/42/57/i255/i255 /i255 /16/55/35/32/49/39/i255/23/34/48/39/34/i255/19/31/40/i255/42/42/50/i255/i255/i255 /i255
/i255/i255/i255/58/59/60/61/62/63/i255/65/66/67/63/66/i255/68/69/63/70/71/72/i255 /i255
/74/75/i255/77/54/24/i255/78/78/i255/19/31/75/i255/79/80/i255/81/i255/77/47/82/83/i255/74/74/84/i255/85/31/34/36/39/i255/86/35/87/32/i255/77/83/31/31/88/i255/24/39/83/88/35/36/39/82/39/32/33/i255/81/i255/89/90/i255/91/92/92/93/94/95/91/90/92/96/i255/97/98/99/100/i255/101/96/92/99/98/93/90/i255/50/43/52/102/i255/103/104/105/99/94/91/i255/106/93/94/107/108/i255/93/109/i255/99/100/96/i255 /110/99/91/90/95/91/94/95/i255/110/111/96/92/98/109/98/92/91/99/98/93/90/101/102/i255/99/100/96/i255/112/93/90/99/94/91/92/99/93/94/i255/97/91/101/i255/95/98/94/96/92/99/96/95/i255/113/114/i255/99/100/96/i255/112/98/99/114/i255/99/93/i255/111/96/94/109/93/94/115/i255/91/95/95/98/99/98/93/90/91/116/i255/97/93/94/107/i255/99/93/i255/94/96/115/93/117/96/i255/91/90/95/i255 /94/96/111/116/91/92/96/i255/99/100/96/i255/95/91/115/91/118/96/95/i255/101/111/93/93/116/i255/101/96/92/99/98/93/90/i255/93/109/i255/99/100/96/i255/109/93/94/92/96/i255/115/91/98/90/i255/113/96/99/97/96/96/90/i255/110/119/115/111/i255/44/44/57/i255/91/90/95/i255/99/100/96/i255/120/44/44/i255/121/91/116/117/96/i255/110/99/94/119/92/99/119/94/96/i255/91/99/i255/99/100/96/i255 /112/98/99/114/122/101/i255/112/93/115/113/98/90/96/95/i255/106/91/101/99/96/97/91/99/96/94/i255/123/94/96/91/99/115/96/90/99/i255/124/116/91/90/99/125/i255/123/100/96/i255/91/95/95/98/99/98/93/90/91/116/i255/97/93/94/107/i255/98/90/92/116/119/95/96/95/102/i255/113/119/99/i255/90/93/99/i255/116/98/115/98/99/96/95/i255/99/93/102/i255/98/90/101/99/91/116/116/98/90/118/i255/91/i255 /113/114/111/91/101/101/i255/111/119/115/111/98/90/118/i255/101/114/101/99/96/115/102/i255/111/94/93/92/119/94/96/115/96/90/99/i255/93/109/i255/99/100/96/i255/92/119/101/99/93/115/i255/41/50/43/98/90/92/100/i255/101/111/93/93/116/i255/111/98/96/92/96/102/i255/95/96/97/91/99/96/94/98/90/118/i255/93/109/i255/99/100/96/i255/96/105/98/101/99/98/90/118/i255/101/114/101/99/96/115/102/i255/91/90/95/i255 /99/100/96/i255/94/96/115/93/117/91/116/i255/91/90/95/i255/94/96/111/116/91/92/96/115/96/90/99/i255/93/109/i255/99/100/96/i255/101/111/93/93/116/i255/111/98/96/92/96/i255/93/90/i255/99/100/96/i255/109/93/94/92/96/i255/115/91/98/90/125/i255/123/100/98/101/i255/97/93/94/107/i255/113/96/118/91/90/i255/93/90/i255/126/119/90/96/i255/41/52/102/i255/41/42/41/127/102/i255/91/90/95/i255/97/91/101/i255 /92/93/115/111/116/96/99/96/95/i255/113/114/i255/126/119/90/96/i255/41/57/102/i255/41/42/41/127/125/i255/123/93/99/91/116/i255/92/93/115/111/96/90/101/91/99/98/93/90/i255/93/109/i255/99/100/98/101/i255/98/99/96/115/i255/97/98/116/116/i255/113/96/i255/128/44/52/52/102/42/42/42/102/i255/97/100/98/92/100/i255/98/90/92/116/119/95/96/101/i255/91/116/116/i255/116/91/113/93/94/102/i255 /96/129/119/98/111/115/96/90/99/102/i255/115/91/99/96/94/98/91/116/101/102/i255/93/117/96/94/100/96/91/95/102/i255/91/90/95/i255/115/91/94/107/119/111/i255/109/93/94/i255/111/96/94/109/93/94/115/98/90/118/i255/99/100/98/101/i255/97/93/94/107/125/i255/120/93/i255/91/95/95/98/99/98/93/90/91/116/i255/97/93/94/107/98/90/118/i255/95/91/114/101/i255/97/98/116/116/i255/113/96/i255/91/95/95/96/95/i255 /99/93/i255/99/100/98/101/i255/92/93/90/99/94/91/92/99/i255/95/119/96/i255/99/93/i255/99/100/98/101/i255/91/95/95/98/99/98/93/90/91/116/i255/97/93/94/107/125/i255 /130/131/91/99/91/113/91/101/96/i255/112/93/95/96/132/i255/133/97/90/96/94/i255/134/96/129/119/96/101/99/96/95/i255/112/100/91/90/118/96/135/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255 /123/93/99/91/116/i255/123/100/98/101/i255/89/99/96/115/132/i255/128/44/52/52/102/42/42/42/125/42/42/i255 /i255
/79/75/i255/77/54/24/i255/78/78/i255/19/31/75/i255/79/84/i255/81/i255/77/87/33/39/i255/24/39/56/33/31/34/35/33/87/31/32/i255/136/31/34/137/i255/138/i255/89/90/i255/91/92/92/93/94/95/91/90/92/96/i255/97/98/99/100/i255/101/96/92/99/98/93/90/i255/50/43/52/102/i255/103/104/105/99/94/91/i255/106/93/94/107/108/i255/93/109/i255/99/100/96/i255/110/99/91/90/95/91/94/95/i255 /110/111/96/92/98/109/98/92/91/99/98/93/90/101/102/i255/99/100/96/i255/112/93/90/99/94/91/92/99/93/94/i255/111/96/94/109/93/94/115/96/95/i255/91/95/95/98/99/98/93/90/91/116/i255/97/93/94/107/i255/99/93/i255/100/96/116/111/i255/99/93/i255/94/96/101/99/93/94/96/i255/99/100/96/i255/101/98/99/96/i255/91/99/i255/99/100/96/i255/112/98/99/114/122/101/i255/112/93/115/113/98/90/96/95/i255 /106/91/101/99/96/97/91/99/96/94/i255/123/94/96/91/99/115/96/90/99/i255/124/116/91/90/99/125/i255/123/100/96/i255/91/95/95/98/99/98/93/90/91/116/i255/97/93/94/107/i255/98/90/92/116/119/95/96/95/102/i255/113/119/99/i255/90/93/99/i255/116/98/115/98/99/96/95/i255/99/93/102/i255/119/99/98/116/98/99/114/i255/92/93/90/95/119/98/99/i255/113/91/92/107/109/98/116/116/102/i255 /116/91/90/95/101/92/91/111/98/90/118/i255/91/90/95/i255/98/94/94/98/118/91/99/98/93/90/i255/94/96/101/99/93/94/91/99/98/93/90/102/i255/91/90/95/i255/92/119/94/113/i255/91/90/95/i255/118/119/99/99/96/94/i255/94/96/101/99/93/94/91/99/98/93/90/125/i255/123/100/98/101/i255/97/93/94/107/i255/113/96/118/91/90/i255/93/90/i255/139/111/94/98/116/i255/41/46/102/i255/41/42/41/127/i255/91/90/95/i255 /97/91/101/i255/92/93/115/111/116/96/99/96/95/i255/113/114/i255/140/91/114/i255/127/42/102/i255/41/42/41/127/125/i255/123/93/99/91/116/i255/92/93/115/111/96/90/101/91/99/98/93/90/i255/109/93/94/i255/99/100/98/101/i255/97/93/94/107/i255/97/98/116/116/i255/113/96/i255/128/41/51/102/57/46/52/125/41/57/102/i255/97/100/98/92/100/i255/98/90/92/116/119/95/96/101/i255/91/116/116/i255/116/91/113/93/94/102/i255 /96/129/119/98/111/115/96/90/99/102/i255/115/91/99/96/94/98/91/116/101/102/i255/93/117/96/94/100/96/91/95/102/i255/91/90/95/i255/115/91/94/107/119/111/i255/109/93/94/i255/111/96/94/109/93/94/115/98/90/118/i255/99/100/98/101/i255/97/93/94/107/125/i255/120/93/i255/91/95/95/98/99/98/93/90/91/116/i255/97/93/94/107/98/90/118/i255/95/91/114/101/i255/97/98/116/116/i255/113/96/i255/91/95/95/96/95/i255 /99/93/i255/99/100/98/101/i255/92/93/90/99/94/91/92/99/i255/95/119/96/i255/99/93/i255/99/100/98/101/i255/91/95/95/98/99/98/93/90/91/116/i255/97/93/94/107/125/i255 /130/131/91/99/91/113/91/101/96/i255/112/93/95/96/132/i255/133/97/90/96/94/i255/134/96/129/119/96/101/99/96/95/i255/112/100/91/90/118/96/135/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255/i255 /i255/i255/i255/123/93/99/91/116/i255/123/100/98/101/i255/89/99/96/115/132/i255/128/41/51/102/57/46/52/125/41/57/i255 /i255
/i255
/29/31/33/35/88/i255/29/55/87/56/i255/16/55/35/32/49/39/i255/23/34/48/39/34/40/i255/141/74/84/74/142/84/143/144/75/79/84/i255 /0/1/2/3/4/5/i255
/7/8/9/10/11/4/i255/12/13/14/4/13/5/i255/i255/7/15/0/16/i255/17/18/4/13/11/4/10/19/20/i255/21/20/22/9/23/23/i255/16/1/22/4/i255/24/4/22/9/1/13/i255 /i255
/26/1/3/4/i255/27/28/5/i255/i255/29/30/29/30/31/30/32/33/34/33/i255 /i255
/i255
/35/36/19/9/2/1/36/10/5/i255/37/38/39/40/41/38/42/40/i255/33/i255 /i255
/24/4/19/36/18/18/4/10/14/9/2/1/36/10/5/i255
/i255
/43/42/42/44/45/40/i255/46/47/48/i255/45/49/50/51/38/39/52/i255/53/54/41/i255/41/44/55/38/44/56/i255/46/i255/57/54/40/38/54/47/58/i255/32/59/i255/46/49/40/52/54/41/38/60/38/47/61/i255/40/52/44/i255/62/38/40/63/i255/57/46/47/46/61/44/41/i255/54/41/i255/40/52/44/i255/64/65/66/67/i255/69/70/71/70/72/73/74/75/76/i255 /48/44/39/38/61/47/44/44/i255/40/54/i255/44/77/44/42/49/40/44/i255/62/52/46/47/61/44/i255/78/41/48/44/41/i255/79/54/80/i255/33/i255/53/54/41/i255/62/38/40/63/i255/43/61/41/44/44/81/44/47/40/i255/29/30/29/29/31/30/32/32/30/i255/56/38/40/52/i255/82/40/44/55/44/i255/83/80/i255/84/46/48/54/39/85/i255 /86/47/42/i255/53/54/41/i255/40/52/44/i255/62/87/88/83/i255/89/81/44/41/61/44/47/42/63/i255/82/44/56/44/41/i255/90/63/45/46/39/39/i255/83/38/45/44/i255/84/44/45/46/38/41/i255/91/92/32/33/30/32/30/30/30/30/30/85/i255/93/49/47/48/i255/94/29/30/94/59/i255/53/54/41/i255/46/47/i255 /46/81/54/49/47/40/i255/47/54/40/31/40/54/31/44/77/42/44/44/48/i255/95/32/96/32/85/96/34/94/80/29/96/80/i255 /i255
/7/36/10/2/9/19/2/5/i255/88/38/81/i255/57/54/41/44/39/42/54/85/i255/83/41/54/97/44/42/40/i255/57/46/47/46/61/44/41/i255/91/96/32/94/59/i255/98/30/98/31/32/33/99/29/100/i255/84/54/77/46/47/47/44/i255/37/38/51/51/44/63/85/i255/82/49/45/44/41/55/38/39/38/47/61/i255 /89/47/61/38/47/44/44/41/i255/91/96/32/94/59/i255/98/30/98/31/32/33/101/98/100/i255/82/52/44/41/38/51/51/i255/102/49/49/47/85/i255/89/47/61/38/47/44/44/41/38/47/61/i255/103/i255/87/46/40/44/41/i255/84/44/39/54/49/41/42/44/39/i255/37/38/55/38/39/38/54/47/i255/57/46/47/46/61/44/41/85/i255 /91/96/32/94/59/i255/98/30/98/31/32/33/101/101/100/i255/37/44/45/46/41/40/81/44/47/40/i255/54/53/i255/104/40/38/51/38/40/38/44/39/i255 /i255
/16/13/4/23/4/10/2/4/13/5/i255/79/54/47/44/i255
/i255
/105/2/2/9/19/8/18/4/10/2/23/5/i255/i255
/32/31/37/44/39/42/41/38/45/40/38/54/47/106/43/47/46/51/63/39/38/39/i255 /29/31/62/52/46/47/61/44/i255/78/41/48/44/41/i255
/i255
/i255 /i255
/0/1/2/3/4/5/6/7/5/8/9/10/11/9/12/13/14/2/5/2/i255
/i255
/17/2/2/18/1/i255/0/1/7/12/5/13/19/i255/20/21/22/23/23/i255/24/25/26/27/28/28/25/29/30/31/i255/32/33/21/34/i255/35/22/29/22/36/25/24/i255/22/37/37/24/27/38/22/39/i255/23/27/24/i255/32/40/22/29/36/25/i255/41/24/30/25/24/i255/42/27/43/i255/44/i255/23/27/24/i255/32/33/21/34/i255 /45/36/24/25/25/28/25/29/21/i255/46/47/46/46/48/47/49/49/47/i255/50/33/21/40/i255/20/21/25/38/25/i255/51/43/i255/52/22/30/27/31/53/i255/54/29/26/i255/23/27/24/i255/21/40/25/i255/32/55/56/51/i255/57/28/25/24/36/25/29/26/34/i255/20/25/50/25/24/i255/58/34/37/22/31/31/i255/51/33/37/25/i255 /52/25/37/22/33/24/i255/59/60/49/44/47/49/47/49/49/46/61/i255/23/27/24/i255/22/29/i255/22/28/27/62/29/21/i255/29/27/21/48/21/27/48/25/63/26/25/25/30/i255/64/49/65/49/53/65/66/67/43/46/65/53/i255/21/27/i255/26/27/28/37/25/29/31/22/21/25/i255/21/40/25/i255/26/27/29/21/24/22/26/21/27/24/i255 /23/27/24/i255/37/25/24/23/27/24/28/33/29/36/i255/22/30/30/33/21/33/27/29/22/39/i255/50/27/24/68/i255/21/27/i255/24/25/37/22/33/24/i255/21/40/25/i255/30/22/28/22/36/25/30/i255/23/27/24/26/25/i255/28/22/33/29/i255/23/24/27/28/i255/20/62/28/37/i255/49/49/65/i255/22/29/30/i255/38/22/24/33/27/62/31/i255 /22/30/30/33/21/33/27/29/22/39/i255/50/27/24/68/i255/22/31/31/27/26/33/22/21/25/30/i255/50/33/21/40/i255/21/40/25/i255/31/33/21/25/i255/24/25/31/21/27/24/22/21/33/27/29/i255/33/29/26/39/62/30/33/29/36/i255/26/27/29/26/24/25/21/25/i255/26/62/24/69/i255/22/29/30/i255/36/62/21/21/25/24/i255 /24/25/31/21/27/24/22/21/33/27/29/i255/22/29/30/i255/39/22/29/30/31/26/22/37/25/i255/33/24/24/33/36/22/21/33/27/29/i255/24/25/37/39/22/26/25/28/25/29/21/43/i255 /i255
/45/i255/23/22/33/39/62/24/25/i255/27/23/i255/21/40/25/i255/20/62/28/37/i255/49/49/65/i255/23/27/24/26/25/i255/28/22/33/29/i255/27/26/26/62/24/24/25/30/i255/27/29/i255/70/25/26/25/28/69/25/24/i255/71/49/53/i255/46/47/46/46/43/i255/i255/56/40/33/31/i255/39/25/30/i255/21/27/i255/22/i255/31/22/29/33/21/22/24/34/i255 /72/73/74/73/75/i255/77/78/73/75/79/80/77/74/i255/81/82/82/83/84/i255/85/86/i255/85/87/i255/85/88/88/73/72/72/i255/78/85/89/80/86/i255/80/77/88/85/86/73/90/i255/91/87/i255/86/92/73/i255/93/91/86/94/95/72/i255/93/77/96/97/91/87/73/90/i255/98/85/72/86/73/74/85/86/73/75/i255 /56/24/25/22/21/28/25/29/21/i255/51/39/22/29/21/43/i255/i255/32/33/21/34/i255/26/24/25/50/31/i255/37/25/24/23/27/24/28/25/30/i255/22/i255/21/25/28/37/27/24/22/24/34/i255/37/22/21/26/40/i255/21/27/i255/40/25/39/37/i255/36/25/21/i255/21/40/24/27/62/36/40/i255/21/40/25/i255/50/33/29/21/25/24/53/i255 /40/27/50/25/38/25/24/i255/22/i255/39/27/29/36/48/21/25/24/28/i255/24/25/37/22/33/24/i255/50/22/31/i255/31/21/33/39/39/i255/29/25/25/30/25/30/43/i255/i255/58/22/31/25/30/i255/27/29/i255/21/40/25/i255/46/47/49/44/i255/28/22/33/29/21/25/29/22/29/26/25/i255/22/36/24/25/25/28/25/29/21/53/i255/32/33/21/34/i255 /31/21/22/23/23/i255/28/22/33/29/21/22/33/29/31/i255/20/62/28/37/i255/49/49/65/53/i255/69/62/21/i255/52/25/36/33/27/29/22/39/i255/20/22/29/i255/27/50/29/31/i255/33/21/53/i255/22/29/30/i255/21/40/25/24/25/23/27/24/25/i255/33/31/i255/24/25/31/37/27/29/31/33/69/39/25/i255/23/27/24/i255/21/40/25/i255/26/27/31/21/31/43/i255/i255 /32/33/21/34/i255/31/21/22/23/23/i255/26/27/27/24/30/33/29/22/21/25/30/i255/50/33/21/40/i255/52/25/36/33/27/29/22/39/i255/20/22/29/i255/31/21/22/23/23/i255/21/27/i255/30/25/21/25/24/28/33/29/25/i255/21/40/25/i255/37/24/25/23/25/24/24/25/30/i255/22/39/21/25/24/29/22/21/33/38/25/53/i255/50/40/33/26/40/i255 /24/25/31/62/39/21/25/30/i255/33/29/i255/24/25/28/27/38/33/29/36/i255/22/29/30/i255/24/25/37/39/22/26/33/29/36/i255/22/i255/99/i255/23/21/i255/31/25/26/21/33/27/29/i255/27/23/i255/46/44/48/33/29/26/40/i255/37/33/37/25/43/i255/i255/56/40/33/31/i255/22/39/21/25/24/29/22/21/33/38/25/i255/24/25/100/62/33/24/25/30/i255 /25/63/21/25/29/31/33/38/25/i255/30/25/50/22/21/25/24/33/29/36/i255/22/29/30/i255/69/34/37/22/31/31/i255/21/27/i255/69/25/i255/33/29/31/21/22/39/39/25/30/43/i255/56/27/21/22/39/i255/26/27/28/37/25/29/31/22/21/33/27/29/i255/23/27/24/i255/21/40/33/31/i255/50/27/24/68/i255/50/33/39/39/i255/69/25/i255 /64/49/67/67/53/47/47/47/53/i255/50/40/33/26/40/i255/33/29/26/39/62/30/25/31/i255/22/39/39/i255/39/22/69/27/24/53/i255/25/100/62/33/37/28/25/29/21/53/i255/28/22/21/25/24/33/22/39/31/53/i255/27/38/25/24/40/25/22/30/53/i255/22/29/30/i255/28/22/24/68/62/37/i255/23/27/24/i255/37/25/24/23/27/24/28/33/29/36/i255 /21/40/25/i255/50/27/24/68/43/i255
/i255
/56/40/25/i255/22/30/30/33/21/33/27/29/22/39/i255/31/33/21/25/i255/24/25/31/21/27/24/22/21/33/27/29/i255/25/23/23/27/24/21/31/i255/24/25/38/27/39/38/25/30/i255/22/24/27/62/29/30/i255/21/40/25/i255/22/30/30/33/21/33/27/29/22/39/i255/50/27/24/68/i255/21/27/i255/24/25/37/22/33/24/i255/21/40/25/i255/26/62/24/69/i255 /22/29/30/i255/36/62/21/21/25/24/i255/22/29/30/i255/39/22/29/30/31/26/22/37/25/i255/33/24/24/33/36/22/21/33/27/29/i255/21/40/22/21/i255/50/22/31/i255/30/22/28/22/36/25/30/i255/21/40/24/27/62/36/40/27/62/21/i255/21/40/25/i255/24/25/37/22/33/24/i255/22/24/25/22/31/i255/27/23/i255/21/40/25/i255 /69/34/37/22/31/31/i255/31/25/50/25/24/i255/37/33/37/25/43/i255/56/27/21/22/39/i255/26/27/28/37/25/29/31/22/21/33/27/29/i255/23/27/24/i255/21/40/33/31/i255/50/27/24/68/i255/50/33/39/39/i255/69/25/i255/64/46/99/53/65/66/67/43/46/65/53/i255/50/40/33/26/40/i255/33/29/26/39/62/30/25/31/i255/22/39/39/i255 /39/22/69/27/24/53/i255/25/100/62/33/37/28/25/29/21/53/i255/28/22/21/25/24/33/22/39/31/53/i255/27/38/25/24/40/25/22/30/53/i255/22/29/30/i255/28/22/24/68/62/37/i255/23/27/24/i255/37/25/24/23/27/24/28/33/29/36/i255/21/40/25/i255/50/27/24/68/43/i255 /33/29/i255/31/25/38/25/24/22/39/i255/69/33/30/i255/33/21/25/28/31/53/i255/30/25/39/22/34/31/i255/30/62/25/i255/21/27/i255/62/21/33/39/33/21/34/i255/26/27/29/23/39/33/26/21/31/53/i255/22/29/30/i255/27/21/40/25/24/i255/62/29/23/27/24/25/31/25/25/29/i255/26/40/22/29/36/25/31/43/i255/i255 /i255
/101/8/13/5/3/14/i255/102/8/9/2/5/103/1/4/12/7/5/8/9/2/19/i255/i255/104/92/91/72/i255/93/92/85/87/105/73/i255/83/75/90/73/75/i255/73/106/88/73/73/90/72/i255/86/92/73/i255/93/91/86/94/i255/107/85/87/85/105/73/75/95/72/i255/85/108/108/75/77/78/85/80/i255/85/89/86/92/77/75/91/86/94/i255 /22/29/30/i255/24/25/100/62/33/24/25/31/i255/32/27/62/29/26/33/39/i255/22/37/37/24/27/38/22/39/43/i255/i255 /i255
/109/3/8/9/8/110/5/3/i255/17/110/6/12/3/7/2/19/i255/i255/56/40/33/31/i255/32/40/22/29/36/25/i255/41/24/30/25/24/i255/33/31/i255/25/63/37/25/26/21/25/30/i255/21/27/i255/26/24/25/22/21/25/i255/47/43/66/66/i255/21/27/21/22/39/i255/111/27/69/31/i255/59/47/43/44/44/i255/30/33/24/25/26/21/i255/111/27/69/31/i255 /22/29/30/i255/47/43/71/71/i255/111/27/69/31/i255/21/40/24/27/62/36/40/i255/33/29/30/33/24/25/26/21/i255/22/29/30/i255/33/29/30/62/26/25/30/i255/22/26/21/33/38/33/21/33/25/31/61/i255/22/29/30/i255/26/24/25/22/21/25/i255/64/49/49/112/53/99/71/46/43/112/112/i255/33/29/i255/21/27/21/22/39/i255/25/26/27/29/27/28/33/26/i255 /27/62/21/37/62/21/i255/59/64/66/44/53/66/49/46/43/49/112/i255/27/23/i255/30/33/24/25/26/21/i255/27/62/21/37/62/21/i255/22/29/30/i255/22/29/27/21/40/25/24/i255/64/44/71/53/112/46/47/43/66/47/i255/27/23/i255/27/62/21/37/62/21/i255/21/40/24/27/62/36/40/i255/33/29/30/33/24/25/26/21/i255/22/29/30/i255 /33/29/30/62/26/25/30/i255/22/26/21/33/38/33/21/33/25/31/61/43/i255 /i255
/113/114/115/i255/117/118/119/117/120/121/122/115/119/i255/115/120/123/118/123/124/117/120/i255/117/124/125/121/120/122/126/i255/121/127/115/i255/115/126/122/117/124/121/122/115/126/i255/120/121/128/120/129/128/121/122/115/119/i255/129/126/117/118/130/i255/121/i255/120/121/128/120/129/128/121/122/117/123/118/i255/122/123/123/128/i255/119/115/131/115/128/123/125/115/119/i255/132/133/i255 /122/114/115/i255/134/115/118/122/115/127/i255/135/123/127/i255/136/122/127/121/122/115/130/117/120/i255/137/120/123/118/123/124/117/120/i255/138/115/126/115/121/127/120/114/i255/139/134/136/137/138/140/141/i255/i255/134/136/137/138/i255/129/122/117/128/117/142/115/119/i255/122/114/115/i255/143/144/145/146/147/148/i255/117/118/125/129/122/149/123/129/122/125/129/122/i255 /124/123/119/115/128/i255/139/150/151/151/152/i255/120/123/115/135/135/117/120/117/115/118/122/126/140/i255/122/123/i255/153/129/121/118/122/117/135/133/i255/122/114/115/i255/115/120/123/118/123/124/117/120/i255/117/124/125/121/120/122/126/i255/123/135/i255/121/i255/114/133/125/123/122/114/115/122/117/120/121/128/i255/154/155/i255/124/117/128/128/117/123/118/i255/123/135/i255 /126/125/115/118/119/117/118/130/i255/117/118/i255/131/121/127/117/123/129/126/i255/120/123/118/126/122/127/129/120/122/117/123/118/i255/120/121/122/115/130/123/127/117/115/126/i255/156/117/122/114/117/118/i255/122/114/115/i255/134/117/122/133/i255/123/135/i255/136/121/120/127/121/124/115/118/122/123/i255/117/118/i255/121/118/i255/121/131/115/127/121/130/115/i255/123/118/115/149 /133/115/121/127/i255/125/115/127/117/123/119/141/i255/i255/147/120/122/129/121/128/i255/117/124/125/121/120/122/126/i255/120/123/129/128/119/i255/119/117/135/135/115/127/i255/126/117/130/118/117/135/117/120/121/118/122/128/133/i255/135/127/123/124/i255/122/114/115/i255/115/126/122/117/124/121/122/115/126/i255/121/118/119/i255/118/115/117/122/114/115/127/i255/122/114/115/i255/134/117/122/133/i255/123/135/i255 /136/121/120/127/121/124/115/118/122/123/i255/118/123/127/i255/134/136/137/138/i255/126/114/121/128/128/i255/132/115/i255/114/115/128/119/i255/127/115/126/125/123/118/126/117/132/128/115/i255/135/123/127/i255/120/123/118/126/115/153/129/115/118/120/115/126/i255/127/115/126/129/128/122/117/118/130/i255/135/127/123/124/i255/126/129/120/114/i255 /119/117/135/135/115/127/115/118/120/115/126/141/i255
/i255
/109/9/157/5/4/8/9/110/1/9/7/12/13/i255/102/8/9/2/5/103/1/4/12/7/5/8/9/2/19/i255/i255/56/40/33/31/i255/37/24/27/111/25/26/21/i255/33/31/i255/25/63/25/28/37/21/i255/23/24/27/28/i255/21/40/25/i255/32/22/39/33/23/27/24/29/33/22/i255/57/29/38/33/24/27/29/28/25/29/21/22/39/i255 /0/1/2/3/4/5/6/i255/8/9/5/i255/10/11/12/0/8/13/i255/1/14/15/16/17/i255/18/16/9/5/4/19/14/i255/20/21/22/23/20/i255/19/24/i255/5/25/16/i255/11/12/0/8/i255/26/1/4/15/16/3/4/14/16/27/i255/28/19/29/16/17/14/4/14/28/i255/16/30/4/27/5/4/14/28/i255/24/2/9/4/3/4/5/4/16/27/31/i255 /4/14/i255/5/25/2/5/i255/4/5/i255/32/16/16/5/27/i255/5/25/16/i255/15/16/24/4/14/4/5/4/19/14/i255/19/24/i255/17/16/27/5/19/17/2/5/4/19/14/i255/19/17/i255/17/16/25/2/33/4/3/4/5/2/5/4/19/14/i255/19/24/i255/15/16/5/16/17/4/19/17/2/5/16/15/i255/19/17/i255/15/2/32/2/28/16/15/i255 /27/5/17/1/9/5/1/17/16/27/31/i255/24/2/9/4/3/4/5/4/16/27/31/i255/19/17/i255/32/16/9/25/2/14/4/9/2/3/i255/16/34/1/4/35/32/16/14/5/i255/5/19/i255/32/16/16/5/i255/9/1/17/17/16/14/5/i255/27/5/2/14/15/2/17/15/27/i255/19/24/i255/35/1/33/3/4/9/i255/25/16/2/3/5/25/i255/2/14/15/i255 /27/2/24/16/5/6/36/i255
/i255
/38/39/40/41/42/43/44/42/45/43/46/43
/41/47/48/i255/i255/i255
/49/25/16/i255/35/17/19/35/19/27/16/15/i255/35/17/19/50/16/9/5/i255/4/27/i255/9/19/14/27/4/27/5/16/14/5/i255/51/4/5/25/i255/5/25/16/i255/52/23/22/21/i255/26/16/14/16/17/2/3/i255/53/3/2/14/i255/2/27/i255/4/5/i255/4/32/35/17/19/29/16/27/i255/4/14/24/17/2/27/5/17/1/9/5/1/17/16/i255 /17/16/3/4/2/33/4/3/4/5/6/i255/2/14/15/i255/2/15/15/17/16/27/27/16/27/i255/16/30/4/27/5/4/14/28/i255/27/2/24/16/5/6/i255/2/14/15/i255/25/16/2/3/5/25/i255/4/32/35/2/9/5/27/36/i255 /i255
/54/55/56/56/43/40/40/43/55/44/57/54/55/56/56/43/41/41/58/58/i255/59/60/41/43/55/44/48/i255/i255/61/19/5/i255/2/35/35/3/4/9/2/33/3/16/36/i255 /i255
/62/42/41/43/55/44/42/46/58/i255/63/55/64/i255/62/58/60/55/56/56/58/44/65/42/41/43/55/44/48/i255/i255/11/25/2/14/28/16/i255/66/17/15/16/17/i255/61/19/36/i255/67/i255/4/27/i255/14/16/16/15/16/15/i255/5/19/i255/35/17/19/29/4/15/16/i255/9/19/32/35/16/14/27/2/5/4/19/14/i255/24/19/17/i255 /2/3/3/i255/5/25/16/i255/3/2/33/19/17/31/i255/16/34/1/4/35/32/16/14/5/31/i255/32/2/5/16/17/4/2/3/27/31/i255/32/2/17/68/1/35/31/i255/27/1/17/9/25/2/17/28/16/27/31/i255/2/14/15/i255/24/16/16/27/i255/2/27/27/19/9/4/2/5/16/15/i255/51/4/5/25/i255/5/25/16/i255/18/1/32/35/i255 /20/20/69/i255/70/19/17/9/16/i255/71/2/4/14/i255/18/35/19/19/3/i255/17/16/35/3/2/9/16/32/16/14/5/i255/5/25/2/5/i255/19/9/9/1/17/17/16/15/i255/33/16/5/51/16/16/14/i255/72/1/14/16/i255/52/73/i255/2/14/15/i255/72/1/14/16/i255/52/69/31/i255/52/23/52/22/31/i255/2/14/15/i255 /5/25/16/i255/18/4/5/16/i255/74/16/27/5/19/17/2/5/4/19/14/i255/51/19/17/68/i255/5/25/2/5/i255/19/9/9/1/17/17/16/15/i255/33/16/5/51/16/16/14/i255/8/35/17/4/3/i255/52/75/i255/2/14/15/i255/71/2/6/i255/22/23/31/i255/52/23/52/22/36/49/25/4/27/i255/29/2/3/1/16/i255 /16/30/9/16/16/15/27/i255/5/25/16/i255/2/35/35/17/19/29/2/3/i255/2/1/5/25/19/17/4/5/6/i255/24/19/17/i255/9/25/2/14/28/16/i255/19/17/15/16/17/27/i255/28/4/29/16/14/i255/5/25/2/5/i255/5/25/16/i255/19/17/4/28/4/14/2/3/i255/9/19/14/5/17/2/9/5/i255/29/2/3/1/16/i255/51/2/27/i255 /76/52/67/69/31/69/69/69/36/i255
/i255
/77/43/44/42/44/60/43/42/46/i255/54/55
/44/40/43/65/58/64/42/41/43/55/44/40/48/i255/i255/49/25/16/i255/19/17/4/28/4/14/2/3/i255/14/19/5/78/5/19/78/16/30/9/16/16/15/i255/2/32/19/1/14/5/i255/19/24/i255/5/25/16/i255/9/19/14/5/17/2/9/5/i255/51/2/27/i255 /76/52/67/69/31/69/69/69/36/23/23/36/i255/49/25/16/i255/14/16/5/i255/9/25/2/14/28/16/i255/33/6/i255/35/17/16/29/4/19/1/27/i255/9/25/2/14/28/16/i255/19/17/15/16/17/27/i255/4/14/i255/5/25/16/i255/2/32/19/1/14/5/i255/19/24/i255/76/22/31/22/69/21/31/21/69/23/36/21/21/31/i255 /4/14/9/17/16/2/27/16/15/i255/5/25/16/i255/9/19/14/5/17/2/9/5/i255/14/19/5/78/5/19/78/16/30/9/16/16/15/i255/2/32/19/1/14/5/i255/5/19/i255/76/22/31/73/67/21/31/21/79/69/36/21/21/36/i255/53/17/19/35/19/27/16/15/i255/11/25/2/14/28/16/i255/66/17/15/16/17/i255/61/19/36/i255/67/i255 /4/14/i255/5/25/16/i255/2/32/19/1/14/5/i255/19/24/i255/76/20/69/20/31/69/75/73/36/52/69/i255/51/19/1/3/15/i255/4/14/9/17/16/2/27/16/i255/5/25/16/i255/9/19/14/5/17/2/9/5/i255/14/19/5/78/5/19/78/16/30/9/16/16/15/i255/2/32/19/1/14/5/i255/5/19/i255 /76/22/31/79/22/75/31/21/73/21/36/79/67/36/i255/i255
/i255/i255/i255
/18/5/2/24/24/i255/17/16/9/19/32/32/16/14/15/27/i255/2/32/16/14/15/4/14/28/i255/5/25/16/i255/17/16/29/16/14/1/16/i255/2/14/15/i255/16/30/35/16/14/15/4/5/1/17/16/i255/33/1/15/28/16/5/27/i255/4/14/i255/5/25/16/i255/11/19/32/33/4/14/16/15/i255/18/16/51/16/17/i255 /18/6/27/5/16/32/i255/11/2/35/4/5/2/3/i255/53/17/19/28/17/2/32/i255/10/80/20/67/23/20/23/23/23/23/31/i255/70/1/14/15/i255/73/52/23/73/13/i255/4/14/i255/2/14/i255/2/32/19/1/14/5/i255/14/19/5/78/5/19/78/16/30/9/16/16/15/i255/76/20/23/23/31/23/23/23/31/i255 /51/25/4/9/25/i255/51/4/3/3/i255/33/16/i255/2/9/9/19/32/35/3/4/27/25/16/15/i255/33/6/i255/8/15/32/4/14/4/27/5/17/2/5/4/29/16/i255/8/1/5/25/19/17/4/5/6/36/i255/49/25/16/i255/9/19/27/5/27/i255/4/14/9/1/17/17/16/15/i255/24/19/17/i255/5/25/4/27/i255/35/17/19/50/16/9/5/i255/51/4/3/3/i255 /33/16/i255/17/16/4/32/33/1/17/27/16/15/i255/33/6/i255/5/25/16/i255/18/2/9/17/2/32/16/14/5/19/i255/74/16/28/4/19/14/2/3/i255/11/19/1/14/5/6/i255/18/2/14/4/5/2/5/4/19/14/i255/81/4/27/5/17/4/9/5/i255/10/74/16/28/4/19/14/2/3/i255/18/2/14/13/i255/2/27/i255/5/25/16/i255 /19/51/14/16/17/27/i255/19/24/i255/5/25/16/i255/2/27/27/16/5/36/i255 /i255
/49/25/16/17/16/i255/2/17/16/i255/14/19/i255/26/16/14/16/17/2/3/i255/70/1/14/15/27/i255/2/3/3/19/9/2/5/16/15/i255/19/17/i255/35/3/2/14/14/16/15/i255/24/19/17/i255/5/25/4/27/i255/35/17/19/50/16/9/5/36/i255 /i255
/83/55/60/42/46/i255/84/39/40/43/44/58/40/40/i255/85/44/41/58/64/86/64/43/40/58/i255/87/83/84/85/88/48/i255/i255/i255/18/5/16/29/16/i255/53/36/i255/74/2/15/19/27/31/i255/89/14/9/36/i255/4/27/i255/2/14/i255/90/91/12/36/i255 /i255
/0/1/2/i255/4/5/6/7/8/9/5/i255
/10/5/11/12/13/13/7/i255/14/1/15/15/7/16/i255
/17/18/19/20/21/22/i255/24/25/26/22/25/27/i255/i255/17/28/29/30/i255/31/32/22/25/21/22/20/33/34/i255/35/34/36/19/37/37/i255/30/38/36/22/i255/39/22/36/19/38/25/i255 /39/22/33/40/32/32/22/20/26/19/41/38/40/20/27/i255/42/9/9/7/43/44/i255/12/13/45/i255/43/46/47/15/1/8/48/i255/49/5/6/i255/6/7/50/1/7/51/i255/12/i255/4/5/44/1/5/13/52/i255/53/54/i255/12/46/44/48/5/6/1/55/1/13/56/i255/44/48/7/i255/57/1/44/16/i255/4/12/13/12/56/7/6/i255/5/6/i255/44/48/7/i255 /58/59/60/61/i255/63/64/65/64/66/67/68/69/70/i255/71/67/70/59/66/65/67/67/i255/44/5/i255/7/11/7/9/46/44/7/i255/57/48/12/13/56/7/i255/72/6/45/7/6/i255/73/5/74/i255/75/i255/49/5/6/i255/57/1/44/16/i255/42/56/6/7/7/2/7/13/44/i255/76/77/76/76/78/77/53/53/77/i255/51/1/44/48/i255 /79/44/7/50/7/i255/80/74/i255/10/12/45/5/8/81/i255/82/13/9/i255/49/5/6/i255/44/48/7/i255/57/83/0/80/i255/84/2/7/6/56/7/13/9/16/i255/79/7/51/7/6/i255/85/16/43/12/8/8/i255/80/1/43/7/i255/10/7/43/12/1/6/i255/86/87/53/75/77/53/77/77/77/77/77/81/i255/88/46/13/45/i255 /89/76/77/89/54/i255/49/5/6/i255/12/13/i255/12/2/5/46/13/44/i255/13/5/44/78/44/5/78/7/11/9/7/7/45/i255/90/53/91/53/81/91/92/89/74/76/91/74/i255 /93/94/37/41/38/95/38/33/19/41/38/40/20/27/i255/57/48/12/13/56/7/i255/72/6/45/7/6/i255/73/5/74/i255/75/i255/1/8/i255/13/7/7/45/7/45/i255/44/5/i255/43/6/5/50/1/45/7/i255/9/5/2/43/7/13/8/12/44/1/5/13/i255/49/5/6/i255/12/15/15/i255/44/48/7/i255/15/12/47/5/6/81/i255/7/96/46/1/43/2/7/13/44/81/i255 /2/12/44/7/6/1/12/15/8/81/i255/2/12/6/97/46/43/81/i255/8/46/6/9/48/12/6/56/7/8/81/i255/12/13/45/i255/49/7/7/8/i255/12/8/8/5/9/1/12/44/7/45/i255/51/1/44/48/i255/44/48/7/i255/79/46/2/43/i255/53/53/91/i255/88/5/6/9/7/i255/4/12/1/13/i255/79/43/5/5/15/i255 /6/7/43/15/12/9/7/2/7/13/44/i255/44/48/12/44/i255/5/9/9/46/6/6/7/45/i255/47/7/44/51/7/7/13/i255/98/46/13/7/i255/76/89/i255/12/13/45/i255/98/46/13/7/i255/76/91/81/i255/76/77/76/99/81/i255/12/13/45/i255/44/48/7/i255/79/1/44/7/i255/10/7/8/44/5/6/12/44/1/5/13/i255/51/5/6/97/i255/44/48/12/44/i255 /5/9/9/46/6/6/7/45/i255/47/7/44/51/7/7/13/i255/42/43/6/1/15/i255/76/92/i255/12/13/45/i255/4/12/16/i255/99/77/81/i255/76/77/76/99/74/0/48/1/8/i255/50/12/15/46/7/i255/7/11/9/7/7/45/8/i255/44/48/7/i255/12/43/43/6/5/50/12/15/i255/12/46/44/48/5/6/1/44/16/i255/49/5/6/i255/9/48/12/13/56/7/i255 /5/6/45/7/6/8/i255/56/1/50/7/13/i255/44/48/12/44/i255/44/48/7/i255/5/6/1/56/1/13/12/15/i255/9/5/13/44/6/12/9/44/i255/50/12/15/46/7/i255/51/12/8/i255/90/76/75/91/81/91/91/91/74/i255 /100/94/20/26/38/20/21/27/i255/83/12/8/44/7/51/12/44/7/6/i255/6/7/1/2/47/46/6/8/12/47/15/7/i255/49/46/13/45/i255/86/88/46/13/45/i255/89/76/77/89/54/i255 /101/102/103/104/102/105/106/102/107/i255
/109/110/104/111/112/113/114/i255
/115/116/116/117/110/118/119/114/i255
/107/119/106/102/i255
/120/102/116/106/102/121/122/102/117/i255
/123/124/i255/125/126/125/127/i255
/i255

← All documents from this meeting