File ID: 2023-01473 11/14/2023 Consent Item 45.
(Pass for Publication) Ordinance Approving Rezone for La Familia Opportunity Center (P23- 002)
File ID: 2023-01473
Location: 5900 Franklin Blvd.; APNs: 025-0231-011; -012, -015, -016, 017, -018, -032; District 5, Represented by Councilmember Maple
Recommendation: 1) Review: a) the Environmental Exemption (Per CEQA Guidelines sections 15332 and 15061(b)(3)); b) an Ordinance rezoning ±0.2 acres from the Single-Unit Dwelling (R-1-EA -4) zone to the Limited Commercial (C-1-EA-4) zone; and, c) a Resolution adopting findings of fact and conditions of approval for project entitlements including a Conditional Use Permit for a non-profit organization use involving meal service, a Conditional Use Permit for a non-profit organization use involving food preparation for offsite consumption, a Conditional Use Permit for a non-profit organization use involving food storage and distribution, and Site Plan and Design Review to construct a ±25,000 square foot vocational skills training and community service center and associated site improvements on a ±2.2-acre vacant site immediately west of Franklin Blvd. between 37th and 38th Avenues; and 2) pass for publication the Ordinance title per Sacramento City Code section 32(c) for City Council consideration on November 28, 2023.
Contact: Danny Abbes, Associate Planner, [email protected], 916-808-5873, Marcus Adams, Senior Planner, 916-808-5044, [email protected], Community Development Department.
Presenter: None.
Property Owner: La Familia Counseling Centers, Inc., 5523 34th Street Sacramento, CA 95820, (916) 452-3601
Applicant: WMB Architects c/o Tim Mattheis, (209) 944-9110, [email protected] Attachments:
1-Description/Analysis
2-Background
3-Draft Ordinance: Rezone
4-Draft Resolution: Findings of Fact and Conditions of Approval for Project Entitlements 5-Project Plans
6-CEQA Memorandum
File ID: 2023-01473 11/14/2023 Consent Item 45.
7-Community Comments
Description/Analysis
Issue Detail: The project includes the construction of a skills training and community-serving center and site improvements on a vacant 2.2-acre site. A majority of the site (approximately 2 acres) is currently zoned Limited Commercial (C-1). Two smaller parcels totaling approximately 0.2 acres are zoned Single-Unit Dwelling (R-1). Since commercial facilities are not allowed within the R-1 zone, a rezone is required to construct the proposed skills training and community service center at the site.
Other necessary entitlement approvals include Conditional Use Permits for a non-profit organization involved in food preparation for off-site consumption, meal service, food storage and distribution, as well as a Site Plan and Design Review entitlement for review of the proposed buildings and site layout.
The programming offered at La Familia Opportunity Center site is anticipated to include:
· Training and Career Center (including culinary skills training) · Parenting workshops and support groups (including School Readiness activities), Early Learners, and other activities to strengthen families
· Mental health services
· A satellite health clinic
· Community health services, such as workshops and preventive screenings · Youth programs including youth groups, homework club, girl scouts, and STEM (Science, Technology, Engineering, and Mathematics)
· Older Adult programs
· Occasional community events
· Other community supportive services
La Familia hopes to construct the entire site at the outset but, with consideration of financial capabilities, may phase the construction and operation into two parts. Phase 1 would include the Training Center and site improvements, and phase 2 would include the two-story Programs building.
An Interim Landscape Plan within Attachment 5 shows the Phase 1 layout, including a lawn and pedestrian pathway where the future Programs building will be located.
Section 17.808.230 of Title 17 requires rezones to be heard at the City Council, and section
17.808.310 requires all associated project entitlements to be heard at the highest level required for the project. Therefore, the requested Rezone, Conditional Use Permit, and Site Plan and Design Review entitlements are required to be reviewed and decided at the City Council level.
Public/Neighborhood Outreach and Comments: As part of the application review process, the proposal was routed to the Franklin Boulevard Business Association, Region Builders, Civic Thread, Sacramento Area Bicycle Advocates, Environmental Council of Sacramento, the Sacramento Metropolitan Air Quality Management District, and Preservation Sacramento.
Staff received community correspondence from Sacramento Area Bicycle Advocates (SABA), Civic Thread, and the Sacramento Metropolitan Air Quality Management District. Both SABA and Civic Thread provided letters of project support and made note that 1) the project will provide needed services to area residents, reducing travel distance to those services and encouraging active
File ID: 2023-01473 11/14/2023 Consent Item 45.
transportation, and 2) the project design includes quality crossings with curb protection for pedestrians.
Project recommendations within the letters included the following:
· Increase the number of bicycle facilities and locate racks at entrance points to both buildings.
Staff response: The plans were revised to provide additional bicycle facilities and at entrance points to each building.
· Locate the buildings closer to the street with vehicle parking behind the buildings for more direct pedestrian access.
Staff response: Planning staff also considered this during early project review but ultimately believes the proposed design provides quality pedestrian infrastructure and connectivity to the external sidewalk system, including a 25-foot-wide pedestrian connection between Franklin Blvd. to the center of the site, and direct pathways with a significant amount of curb protection from both 37th and 38th Avenues. Additionally, the proposed parking layout further separates vehicle noise and lighting from existing adjacent residences.
Staff mailed hearing notices to all property owners and occupants within 500 feet of the project site and posted the site prior to the public hearing.
Policy Considerations: The primary General Plan designation for the subject site is Suburban Corridor. Sacramento’s suburban corridors are envisioned as auto-oriented, moderate-density retail, office, and residential corridors that support surrounding neighborhoods. A small portion of the site is designated Traditional Neighborhood Low Density (TNLD), which allows for neighborhood compatible quasi-public and special uses. In the context of the General Plan, staff considers La Familia to be a neighborhood compatible special use and therefore consistent with the Suburban Corridor and TNLD designations.
Staff finds that the project is consistent with the following General Plan goals and policies:
Goal LU 1.1 Growth and Change. Support sustainable growth and change through orderly and well-planned development that provides for the needs of existing and future residents and businesses, ensures the effective and equitable provision of public services, and makes efficient use of land and infrastructure.
· Policy LU 1.1.4 Leading Infill Growth. The City shall facilitate infill development through active leadership and the strategic provision of infrastructure and services and supporting land uses. · Policy LU 1.1.5 Infill Development. The City shall promote and provide incentives (e.g., focused infill planning, zoning/rezoning, revised regulations, provision of infrastructure) for infill development, reuse, and growth in existing urbanized areas to enhance community character, optimize City investments in infrastructure and community facilities, support increased transit
File ID: 2023-01473 11/14/2023 Consent Item 45.
use, promote pedestrian and bicycle-friendly neighborhoods, increase housing diversity, ensure integrity of historic districts, and enhance retail viability.
Staff response: Approval of the proposed rezone and associated entitlements would facilitate development of a long vacant urban infill site with a community-oriented facility offering beneficial health, medical, and employment services to the surrounding neighborhoods. The project’s location within an established residential area will allow residents nearby access to needed services without the need for vehicle transportation.
Goal LU 2.8 City Fair and Equitable. Ensure fair and equitable access for all citizens to employment, housing, education, recreation, transportation, retail, and public services, including participation in public planning for the future.
· Policy LU 2.8.1 Equitable Distribution of Uses and Amenities. The City shall strive to ensure that desirable uses and neighborhood amenities are distributed equitably throughout the city. · Policy LU 2.8.6 Jobs-Housing Balance. The City shall encourage a balance between job type, the workforce, and housing development to reduce the negative impacts of long commutes and provide a range of employment opportunities for all city residents.
Staff response: The project would create an accessible, desirable community amenity, provide nearby job opportunities for residents, and facilitate general employment throughout the city through on-site career training opportunities.
Goal LU 4.1 Neighborhoods. Promote the development and preservation of neighborhoods that provide a variety of housing types, densities, and designs and a mix of uses and services that address the diverse needs of Sacramento residents of all ages, socio-economic groups, and abilities.
· Policy LU 4.1.2 Neighborhood Amenities. The City shall encourage appropriately scaled community-supportive facilities and services within all neighborhoods to enhance neighborhood identity and provide convenient access within walking and biking distance of city residents.
Goal LU 4.2 Suburban Neighborhoods. Encourage the creation of more complete and well- designed suburban neighborhoods that provide a variety of housing choices and mix of uses that encourage walking and biking.
· Policy LU 4.2.1 Enhanced Walking and Biking. The City shall pursue opportunities to promote walking and biking in existing suburban neighborhoods through improvements such as:
File ID: 2023-01473 11/14/2023 Consent Item 45.
o Introducing new pedestrian and bicycle connections
o Adding bike lanes and designating and signing bike routes o Narrowing streets where they are overly wide
o Introducing planting strips and street trees between the curb and sidewalk Staff response: The proposed La Familia Opportunity Center would provide convenient access to needed services of nearby residents within walkable and bikeable range of multiple South Sacramento neighborhoods and establish itself as an identifiable community asset and place.
Forthcoming improvements to Franklin Boulevard as part of the City-adopted Franklin Boulevard Complete Street Plan will enhance walking and biking access to and from the site with vehicle lane reductions and buffered bike lanes. Site improvements as part of the La Familia project would add large-canopy trees adjacent to the Franklin Boulevard sidewalk, shading pedestrians.
Goal LU 6.1 Corridors. Support the development of major circulation corridors that balance their vehicular function with a vibrant mix of uses that contribute to meeting local and citywide needs for retail, services, and housing and provide pedestrian-friendly environments that serve as gathering places for adjacent neighborhoods.
· Policy LU 6.1.1 Mixed-Use Corridors. The City shall create or improve mixed-use corridors by requiring compact development patterns that are oriented to and frame the street, establish a safe and comfortable environment for walking, and avoid encroachment upon adjacent residential areas.
· Policy LU 6.1.3 Efficient Parcel Utilization. The City shall promote the aggregation of small and irregular shaped parcels along corridors into larger development sites to facilitate their reuse. · Policy LU 6.1.9 Enhanced Pedestrian Environment. The City shall require that sidewalks along mixed-use corridors are wide enough to accommodate significant pedestrian traffic and promote the transformation of existing automobile-dominated corridors into boulevards that are attractive, comfortable, and safe for pedestrians by incorporating the following:
o Few curb cuts and driveways
o Enhanced pedestrian crossings
o Building entrances oriented to the street
o Street trees
Staff response: The proposed project implements goals and policies for Corridors in that the project 1) aggregates small and irregular parcels to facilitate a use, 2) utilizes limited curb cuts and driveways, 3) provides quality pedestrian crossings, and 4) beautifies the public view and shades the pedestrian realm with street-adjacent trees.
File ID: 2023-01473 11/14/2023 Consent Item 45.
Goal LU 8.1 Public / Quasi-Public. Provide for governmental, utility, institutional, educational, cultural, religious, and social facilities and services that are located and designed to complement Sacramento’s neighborhoods, centers, and corridors and to minimize incompatibility with neighborhoods and other sensitive uses.
· Policy LU 8.1.1 Public Places. The City shall create vibrant public places in Sacramento’s neighborhoods, centers, and corridors that serve as gathering places. · Policy LU 8.1.2 Adequate Community Supporting Uses. The City shall seek to ensure that all manner of public and private community-supportive facilities and services are located throughout the city to provide places that serve the varied needs of the community, provide for community meeting places, and provide community and neighborhood landmark buildings and places.
Staff response: The proposed Opportunity Center would create a neighborhood landmark building and provide a place for community gathering and assistance.
Goal PHS 5.1.1 Human Services and Healthy Communities. Improve the provision of human services and promote public health and safety.
· Policy PHS 5.1.9 Healthy Communities. The City shall encourage the planning of new communities and revitalization of existing urban areas to achieve improvements in overall public health by encouraging a healthier living environment that includes walkable neighborhoods, access to recreation and open space, healthy foods, medical services, and public transit.
Staff response: The proposed project provides health, medical, and employment services within a residential area that can be easily accessed by walking and biking.
South Area Community Plan Area: The South Area Community Plan includes policies derived from extensive public input and previous relevant South Area plans and studies. These policies are specific to the South Area and intended to supplement citywide policies. Staff finds that the proposed project is compatible with the South Area Community Plan and helps implement the following Economic Development policies within the plan related to increased employment opportunities, career training, and health services for area residents. · Policy SA.ED 1.1 Health Care Investment and Real Estate Growth. The City shall actively support spin-off investments and medical-service real estate growth and expansion related to Kaiser Permanente, Catholic Healthcare West, and any affiliated providers to increase employment opportunities and health services in the South Area in accordance with their long- range plans.
File ID: 2023-01473 11/14/2023 Consent Item 45.
· Policy SA.ED 1.2 Health Care Employee Training and Job Growth. The City shall work with the major health care providers in the South Area and with Cosumnes River College to develop employee training and job growth programs in the health care industry to assist in the creation of more employment opportunities for South Area residents.
Economic Impacts: The La Familia Opportunity Center project is anticipated to provide 10-15 new jobs (including mental health clinicians, job coaches, youth workers and administrative staff) within the organization, plus on-site job training to residents of South Sacramento in the areas of health, service, and green jobs. This would include community health worker training, other entry level health careers, solar installation training and placement, manufacturing, and EV repair. It is expected that the project will facilitate increased employment opportunities within the city of Sacramento.
Environmental Considerations: The applicant seeks to construct and operate a ±25,000 square foot vocational skills training and community service center on a ±2.2-acre vacant site immediately west of Franklin Blvd. between 37th and 38th Avenues in the Limited Commercial (C-1-R-EA-4) and Single-Unit Residential (R-1-EA-4) zones. The request requires a rezone of two parcels from R-1-EA- 4 to C-1- R-EA-4, Conditional Use Permits for a non-profit organization use involving meal service, food preparation for off-site consumption, food storage and distribution, and assembly use, and Site Plan and Design Review for building and site construction.
For the part of the project that falls within the C-1-R-EA-4 zone, the project meets the requirements for an exemption from the California Environmental Quality Act (CEQA) as infill development described in CEQA Guidelines section 15332. The project satisfies the following requirements:
n The project is consistent with the general plan designation and all applicable general plan policies as well as with the applicable zoning designation and regulations; n The project site is within the city limits, is no more than five acres is size, and is surrounded by urban uses;
n The site has no value as habitat for endangered, rare or threatened species; n Approval of the project would result in no significant effects relating to traffic, noise, air quality or water quality; and
n The site can be adequately served by all required public utilities and services.
The entirety of the project, however, including the part that falls within the R-1-EA-4 zone, is consistent with CEQA’s “common-sense exemption” - CEQA Guidelines section 15061(b)(3), which exempts projects where it can be seen with certainty that the project would have no significant effect on the environment.
See Attachment 7 to this staff report for a memorandum that generally covers issue areas of concern in the CEQA process, and which provides substantial evidence that the project would not have a significant effect on the environment.
File ID: 2023-01473 11/14/2023 Consent Item 45.
Based on the substantial evidence in the record, staff has determined that the project would not have a significant effect on the environment, and that the project is exempt from CEQA review pursuant to CEQA Guidelines section 15061(b)(3).In addition, environmental review staff have reviewed the project to determine whether it would result in any significant effects or would have cumulative effects that have not been identified and evaluated in the City’s Master EIR. There are none. The project would facilitate infill development that provides many convenient and beneficial services to the community. Additionally, the project would promote active transportation, and the change that could be allowed by the requested zoning change would not affect the analysis and conclusions in the Master EIR. Staff have identified no significant effects that would otherwise result from project approval.
200-Year Flood Protection: State Law (SB 5) and Planning and Development Code chapter 17.810 require that the City must make specific findings prior to approving certain entitlements for projects within a flood hazard zone. The purpose is to ensure that new developments will have protection from a 200-year flood event or will achieve that protection by 2025. The project site is within a flood hazard zone and is an area covered by SAFCA’s Improvements to the State Plan of Flood Control System, and specific findings related to the level of protection have been incorporated as part of this project. Even though the project site is within a flood hazard zone, the local flood management agency, SAFCA, has made adequate progress on the construction of a flood protection system that will ensure protection from a 200-year flood event or will achieve that protection by 2025. This is based on the SAFCA Urban level of flood protection plan, adequate progress baseline report, and adequate progress toward an urban level of flood protection engineer’s report that were accepted by City Council Resolution No. 2016-0226 on June 21, 2016 and the SAFCA 2022 Adequate Progress Annual Report accepted by City Council Resolution No. 2022-0313 on October 11, 2022.
No net loss findings (Gov. Code, § 65584): This project includes a 0.57-acre parcel (025-0231-018- 0000) which is located on a site listed in the 2021-2029 RHNA Housing Element Sites Inventory, which anticipates 6 total units of lower income housing. This project proposes no housing units. As of July 21, 2023, the lower income capacity on remaining sites identified in the Housing Element is 15,557, which is adequate to meet the jurisdictions remaining low income RHNA of 14,614 for the 2021-2029 planning period. As the remaining sites identified in the Housing Element are adequate to meet the requirements of Section 65583.2 of the California Government Code and to accommodate the City’s share of the regional housing need pursuant to Section 65584, this project is consistent with the Housing Element.
Sustainability: The proposed development will ensure energy consumption is minimized and use of renewable energy sources is encouraged in that the project will be located at an urban infill site and provide services to nearby existing neighborhoods, allowing for walking and bicycling access and shorter travel distances to services.
Commission/Committee Action: On October 26, 2023, the Planning and Design Commission held a public hearing on the project and passed a motion to forward a recommendation of approval to City Council to adopt the ordinance and resolution approving the La Familia Opportunity Center project.
Financial Consideration: None.
File ID: 2023-01473 11/14/2023 Consent Item 45.
Local Business Enterprise (LBE): None.
Rationale for Recommendation: Staff supports the La Familia Opportunity Center project since it will 1) provide conveniently accessible health, medical, and employment services to city residents, 2) generate new jobs on-site, and help to facilitate general employment within the city, 3) create an identifiable community place and asset, and 4) make use of a long-term vacant urban site.
Staff recommends the City Council approve the requested entitlements based on the rationale above and the findings of fact, and subject to the conditions listed within Attachment 4.
Background Information
The applicant proposes to construct and operate a 25,000 square foot vocational skills training and community service facility on a vacant 2.2-acre site at 5900 Frank lin Boulevard between 37th and 38th Avenues. The subject site is encompassed by St. Patrick Academy across Franklin Boulevard, La Familia’s Maple Neighborhood Center across 37th Street, and otherwise generally by neighborhood residential development.
According to historic aerial imagery, t wo of the seven on-site parcels were previously developed with dwelling units circa the 19 50s. The dwellings were removed between 2010 and 2020. Much of the site has never been developed. It is currently entirely vacant.
The programming offered at La Familia Opportunity Center si te is anticipated to include employment and career training, parenting workshops, mental health services, a satellite health clinic, community health services such as workshops and preventative screenings, youth programs, older adult programs, and other community support services.
La Familia hopes to construct the entire site at once but may phase the construction and operation into two parts pending funding. Phase 1 would include the Training Center and site improvements, and phase 2 , the Programs building. An Interim Landscape Plan within Attachment 5 shows a potential Phase 1 layout, including a lawn and pedestrian pathway where the future Programs building would eventually be located.
Requested entitlements to complete the project i nclude a Rezone, Conditional Use Permits, and Site Plan and Design Review. Because the project involves a rezone request, all project entitlements require final approval from City Council.
Figure 1 – Aerial of Site and Surroundings (Google Images)
Figure 2 – Proposed Site Plan
Table 1: Project Information
General Plan Designation: Suburban Corridor (SCOR) and Traditional Neighborhood Low Density (TNLD)
Existing Zoning of Site: Single-Unit Dwelling (R-1-EA-4) and Limited Commercial (C-1-EA-4)
Proposed Zoning of Site: Limited Commercial (C-1-EA-4)
Existing Site Use: Vacant
Proposed Site Use: Community service center
Site Area: Approximately 2.2 acres
Store Size: ±25,000 square feet
Hours of Operation: Generally M-F, 8:30 am to 6:00 pm*
Anticipated Additional Employees: 10-15 new staff members** *Events occasionally occur in the evening until 8pm, and during a weekend day. **Additional staff anticipated to be hired include Mental Health Clinicians, Job Coaches, Youth workers and Administrative staff
Entitlement Review
Rezone (R-1-EA-4 to C-1-EA-4)
Approximately 2 acres of the ±2.2 -acre site are zoned Limited Commercial (C -1). Two small parcels totaling ±0.2 -acres at the interior side of 37 th Avenue have a Single -Unit Dwelling (R-1) zoning designation. Since commercial building sites are not allowed within the R -1 zone, the applicant is requesting to rezone these parcels to C -1 to allow the Opportunity Center project to be constructed.
Figure 3: Rezone Exhibit
The subject site is in the Executive Airport Overlay “overflight safety (EA-4)” zone as designated by city code and the Executive Airport Comprehensive Land Use Plan (CLUP). City code and the CLUP permit the proposed use within this zoning designation.
The purpose of the C-1 zone is to provide for certain offices, retail stores, and commercial service establishments that are compatible with residential developments.
Section 17.808.230.C.1.D of Title 17 requires the following findings be met to approve a rezone:
1. The rezoning is consistent with the applicable general plan designation, use, and development standards; the goals, policies, or other provisions of the general plan; and any applicable specific plan.
2. The amendment promotes the public health, safety, convenience, and welfare of the City.
Staff believes the proposed rezone meets these findings because the project addresses General Plan infill goals and policies by providing for infill development on vacant property with uses that are compatible and that provide beneficial services to the surrounding area.
The rezone would facilitate the construction and operation of a quasi -public neighborhood-serving facility, which is consistent with the allowed uses of the Traditional Neighborhood Low Density designation as stated within the General Plan. The proposed project also complies with lot size and dimension development standards of the C-1 zone.
Furthermore, the project promotes the public health, safety, convenience, and welfare of the City by providing city residents with convenient access to health, medical, and employment services.
Conditional Use Permits (CUPs)
Non-profit organizations involved with on-site meal service, food preparation for off-site consumption, and food storage and distribution uses are all permitted uses within the General Commercial (C-1) zone with the support of Conditional Use Permits.
La Familia does not anticipate serving meals on a regular basis and that most meals served would be purchased or prepared off-site. The site will not be a food bank and would only act as a satellite food bank, if needed during an emergency.
La Familia anticipates the following food-related and assembly-related operations which relate to the requested Conditional Use Permits:
Partnering with food cart vendors and renting them kitchen space to prepare food (including training programs for vendors seeking a license) Meal service for occasional on-site events
Meals on Wheels food service to seniors who are participating in group activities Short-term storage of food as a resiliency center – mostly non-perishables (water, canned food) in case of local or national emergency The decision-makers must make the following findings to approve the CUPs:
1. The proposed use and its operating characteristics are consistent with the goals and policies of the General Plan land use designations of Suburban Corridor and Traditional Neighborhood Low Density, and with any applicable specific plan or transit village plan.
2. The proposed use and its operating characteristics are consistent with the applicable standards, requirements, and regulations of the General Commercial (C-1) zone, and of all other provisions of this title and this code.
3. The proposed use is situated on a parcel that is physically suitable in terms of location, size, topography, and access, and that is adequately served by public services and utilities.
4. The proposed use and its operating characteristics are not detrimental to the public health, safety, convenience, or welfare of persons residing, working, visiting, or recreating in the surrounding neighborhood and will not result in the creation of a nuisance.
Staff supports granting the Conditional Use Permits and believes the project meets the above findings since: 1) the project will provide services that support city neighborhoods, 2) the proposed uses and operations are permitted within the C-1 zone with approvals of Conditional Use Permits, 3) the project has been reviewed by City Departments including Public Works and Utilities to ensure compliance with standards, and 4) the proposed uses support the health, convenience, and welfare of the community through beneficial social, health, medical, employment and general community-oriented programming.
Site Plan and Design Review
Table 2: C-1 Zone Development Standards
Standard Required Proposed Deviation?
Franklin Blvd. Setback None ±100 feet No
37th Avenue Setback None ±65 feet No
38th Avenue Setback None ±80 feet No
Rear (East) Setback 15 feet ±38 feet No
Height 35’ maximum 35 feet No
Vehicle Parking Spaces None 84 spaces No
Bicycle Parking Spaces 5 short-term
4 long-term
16 short-term
7 long-term No
Floor Area Ratio (FAR) 0.15 – 2.0 ±.26 No
Parking Lot Shade Coverage 50% ±51% No
Site Access
Vehicular ingress and egress would occur at one driveway located at 37 th Avenue, and one driveway located at 38th Avenue. No driveways are proposed along the Franklin Blvd. frontage. Pedestrian walkways are located along both 37 th and 38th Avenues as well as Franklin Blvd. These connect directly to the on -site buildings via enhanced crosswalks.
The main entrance at Franklin Blvd. includes a 25-foot-wide pedestrian walkway into the center of the site. As part of proposed project conditions o f approval, all pedestrian entrance gates shall remain open during business hours, and all on-site crosswalks shall be enhanced with differentiating surface textures and color to increase pedestrian safety.
Parking
The project site is located within an AB 2097 area, meaning that it is within one half-mile from a major transit stop (47th Avenue light rail station) and no minimum parking standards may be imposed , absent findings supported by a preponderance of evidence that not imposing minimum parking would cause a substantially negative impact.
As designed, the project provides 84 vehicle parking spaces including 17 Electric Vehicle Capable Spaces, 4 Installed Electric Vehicle charging spaces, and 4 accessible spaces.
Per requirements within the Traditional Parking District bicycle parking district, the project requires a minimum of 2 short-term bicycle spaces (1 space per 20,000 square feet of building or 2 spaces, whichever is greater) and 4 long-term bicycle spaces (1 space per 6,667 square feet of building or 2 spaces, whichever is greater ). Sixteen short-term bicycle parking spaces are provided, and 7 long-term bicycle parking spaces are provided. Bicycle parking is conveniently sited near the entrances of each building.
Compatibility with Commercial Design Guidelines
The City’s Commercial Design Guidelines serve to encourage high -quality development and protect and enhance property values and community economic viability. These guidelines address the exterior of buildings, as well as the relationship of these buildings to the surrounding built environment. It is necessary to ensure that the design complements the community setting and contributes to the public realm. Commercial buildings should be visually welcoming and constructed of high-quality materials that will contribute to their longevity and role in the community. This project has been reviewed with these guidelines in mind. Additionally, this project is evaluated for consistency with the development standards of the Limited Commercial (C-1) zone as detailed in Table 2 above.
Staff finds the proposed project compatible with applicable Commercial Design Guidelines including the following examples:
Circulation of Cars, Trucks, Pedestrians, and Bicycles: Balanced circulation routes must be provided for both vehicular and pedestrian movement with a priority to pedestrians and bicyclists. Conflict between all modes of transportation should be minimized, and convenience to pedestrians should be maximized.
Pedestrian Circulation:
Pedestrian routes should be obvious, direct, and simple. Pedestrian walkways should connect each primary entrance of a commercial building to adjacent parking lots and public sidewalks. Separate pedestrian and vehicular entries. Employ changes in grade, color, texture, material, color, and/or finish to differentiate pedestrian access from driveways.
Locate bicycle parking close to and with direct access to buildings.
Vehicle Circulation:
Consolidate driveways, parking lots, and access routes wherever feasible to limit curb cuts, minimize development costs, and reduce auto/pedestrian conflicts.
Minimize curb cuts to reduce impacts to pedestrians, cyclists and on -street parking.
Provide access to parking lots from side streets.
If gates are used to secure vehicle or par king areas, treat them as a design element.
Staff Response: Pedestrian routes are obvious and lead directly to building entrances from each surrounding street. Bicycle parking is sited near the entrances of each building.
Only t wo driveways , each from secondary streets , serve the site. The primary street entrance on Franklin Blvd. is solely for pedestrians. Furthermore, fencing incorporates into the site and building design since it 1) is set back with landscaping in front of it, 2) is painted mostly in a muted grey tone, and 3) uses coloring to relate to the building accents.
Figure 4: Pedestrian Entrance at Franklin Blvd.
Streetscape/Pedestrian Edges: Incorporate design elements that soften the edges between the street and individual properties , to provide a people -oriented scale and character.
Staff response: Attractive landscape planting and large trees soften the perimeter of the development and add a comfortable and inviting scale and appearance.
Figure 4: Site Rendering
Site Amenities: Projects must be designed whenever feasible to maximize opportunities for creating usable, attractive, and integrated public spaces and site amenities.
Staff Response: The site offers a spacious area for people to sit, eat, and walk outside and provides designated food cart/trailer parking, tables, chairs, benches, landscaping, and wide walking paths.
Entry Features: Entry features should be clearly visible to pedestrians, approaching from street and sidewalk. Locate primary entries on major sidewalks to provide clearly visible pedestrian access.
Staff response: A large, distinguished pathway guides pedestrians to the central entrance from the primary street.
Materials: Buildings should be constructed of durabl e materials that will promote the longevity of the structure and provide a pleasing appearance as the materials age.
Staff response: The design presents quality and durable exterior materials including painted stucco, fiber cement panels, metal panels, anodized aluminum storefront system, and colorful decorative tile.
Equipment/Services/Accessory Structures: Service elements and infrastructure such as trash enclosures, loading docks, storage, and mechan ical equipment must be screened from street views and integrated into the design to make it as unobtrusive as possible.
Staff response: The trash enclosure is located at the rear of the Training Center building away from pedestrian areas and generally outside of views from both within the site and from public streets. The enclosure and loading area have head -on access for service vehicles in an area away from pedestrian paths and parking, creating convenience and avoiding disruption. Building parapets screen rooftop mechanical equipment from views.
ORDINANCE NO. 2023-
Adopted by the Sacramento City Council
November 28, 2023
ORDINANCE AMENDING TITLE 17 OF THE SACRAMENTO CITY CODE BY REZONING 0.2± GROSS ACRES FROM THE SINGLE-UNIT DWELLING (R-1-EA-4) ZONE TO THE LIMITED COMMERCIAL (C-1-EA-4) ZONE AT 3330 37th AVENUE. (025-0231-011-0000 & 025-0231-012-0000)
BE IT ENACTED BY THE COUNCIL OF THE CITY OF SACRAMENTO:
SECTION 1
As used in this ordinance, “Property” means the real property depicted in attached and incorporated in Exhibit A and contains two (2) APNs.
SECTION 2
Title 17 of the Sacramento City Code (“Planning and Development Code”) is hereby amended by rezoning 0.2± gross acres from the Single-Unit Dwelling (R-1-EA-4) zone to the Limited Commercial (C-1-EA-4) zone, as shown on Exhibit A.
SECTION 3
As required by section 17.808.230.C.1.d of the Planning and Development Code, the City Council finds that the rezoning of the property is consistent with the General Plan, proposed use, and development standards in that the proposed project 1) provides for infill development on a vacant piece of property with supportive services to surrounding neighborhood residents, 2) complies with lot size and dimension development standards of the C-1 zone, 3) provides a quasi-public, neighborhood-serving special use compatible with the site’s General Plan land use designation of Traditional Neighborhood Low Density, and 4) promotes the public health, safety, convenience, and welfare of the City by facilitating the development of a community-oriented service center offering convenient neighborhood access to health, medical, and employment services.
SECTION 4
The City Clerk is hereby directed to amend the City’s official zoning maps to conform with this ordinance.
Table of Contents:
Exhibit A: Rezone Map (1 Page) is part of this ordinance.
Adopted by the City of Sacramento City Council on November 28, 2023, by the following vote:
Ayes:
Noes:
Abstain:
Absent:
Attest:
RESOLUTION NO. 2023-
Adopted by the Sacramento City Council
November 28, 2023
ADOPTING FINDINGS OF FACT, CONDITIONS OF APPROVAL TO APPROVE THE LA FAMILIA OPPORTUNITY CENTER PROJECT (P23-002) (APNs: 025-0231-011, 025- 0231-012, 025-031-015, 025-031-016, 025-031-017, 025-031-018, 025-0231-032)
BACKGROUND
A. On October 26, 2023, the City Planning and Design Commission conducted a public hearing and forwarded to the City Council a recommendation to approve the La Familia Counseling Centers Opportunity Center Project.
B. On November 28, 2023, the City Council conducted a public hearing, for which notice was given under Sacramento City Code Section 17.812.010(2)(b).
BASED ON THE FACTS SET FORTH IN THE BACKGROUND, THE CITY COUNCIL RESOLVES AS FOLLOWS:
Section 1. Based on the verbal and documentary evidence received at the hearing on the La Familia Counseling Centers Opportunity Center (Project), the City Council approves the Project entitlements based on the findings of fact and subject to the conditions of approval as set forth below.
Section 2. The City Council approves the Project entitlements based on the following findings of fact:
A. The Conditional Use Permit for a non-profit organization, meal service facility within the Limited Commercial (C-1) Zone is approved based on the following findings:
1. The proposed use and its operating characteristics are consistent with the goals and policies of the General Plan land use designations of Suburban Corridor and Traditional Neighborhood Low Density which allow for quasi-public neighborhood-supporting uses. The site is not subject to a specific plan or a transit village plan.
2. The proposed use and its operating characteristics are consistent with the applicable standards, requirements, and regulations of the Limited Commercial (C-1-EA-4) zone, and of all other provisions of this title and this code in that a non-profit organization involved with meal service is a permitted use within the Limited Commercial (C-1) zone with the approval of a Conditional Use Permit.
3. The proposed use is situated on a parcel that is physically suitable in terms of location, size, topography, and access, and that is adequately served by public services and utilities in that the project has been reviewed by City Departments including Public Works and Utilities to ensure compliance with standards.
4. The proposed use and its operating characteristics are not detrimental to the public health, safety, convenience, or welfare of persons residing, working, visiting, or recreating in the surrounding neighborhood and will not result in the creation of a nuisance in that the proposed project will offer convenient and beneficial services to area residents.
B. The Conditional Use Permit for a non-profit organization that involves food preparation for off-site consumption within the Limited Commercial (C-1) Zone is approved based on the following findings:
1. The proposed use and its operating characteristics are consistent with the goals and policies of the General Plan land use designations of Suburban Corridor and Traditional Neighborhood Low Density which allow for quasi-public neighborhood-supporting uses. The site is not subject to a specific plan or a transit village plan.
2. The proposed use and its operating characteristics are consistent with the applicable standards, requirements, and regulations of the Limited Commercial (C-1-EA-4) zone, and of all other provisions of this title and this code in that a non-profit organization involved with food preparation for off-site consumption is a permitted use within the Limited Commercial (C-1) zone with the approval of a Conditional Use Permit.
3. The proposed use is situated on a parcel that is physically suitable in terms of location, size, topography, and access, and that is adequately served by public services and utilities in that the project has been reviewed by City Departments including Public Works and Utilities to ensure compliance with standards.
4. The proposed use and its operating characteristics are not detrimental to the public health, safety, convenience, or welfare of persons residing, working, visiting, or recreating in the surrounding neighborhood and will not result in the creation of a nuisance in that the proposed project will offer convenient and beneficial services to area residents.
C. The Conditional Use Permit to for a non-profit organization use that involves food storage and distribution within the Limited Commercial (C-1) Zone is approved based on the following findings:
1. The proposed use and its operating characteristics are consistent with the goals and policies of the General Plan land use designations of Suburban Corridor
and Traditional Neighborhood Low Density which allow for quasi-public neighborhood-supporting uses. The site is not subject to a specific plan or a transit village plan.
2. The proposed use and its operating characteristics are consistent with the applicable standards, requirements, and regulations of the Limited Commercial (C-1-EA-4) zone, and of all other provisions of this title and this code in that a non-profit organization involved with food storage and distribution is a permitted use within the Limited Commercial (C-1) zone with the approval of a Conditional Use Permit.
3. The proposed use is situated on a parcel that is physically suitable in terms of location, size, topography, and access, and that is adequately served by public services and utilities in that the project has been reviewed by City Departments including Public Works and Utilities to ensure compliance with standards.
4. The proposed use and its operating characteristics are not detrimental to the public health, safety, convenience, or welfare of persons residing, working, visiting, or recreating in the surrounding neighborhood and will not result in the creation of a nuisance in that the proposed project will offer convenient and beneficial services to area residents.
D. Site Plan and Design Review to construct a ±25,000 square foot vocational skills training and community service center and associated site improvements is approved based on the following findings:
1. The design, layout, and physical characteristics of the proposed development are consistent with the General Plan and the Suburban Corridor and Traditional Neighborhood Low Density General Plan designations in that the proposed project provides a quasi-public neighborhood-serving use within the area that enhances vehicle and pedestrian connections. Building entrances and site amenities are visible and accessible from Franklin Blvd as well as 37th and 38th Avenues. There is no applicable specific plan or transit village plan.
2. The design, layout, and physical characteristics of proposed development are consistent with all applicable design guidelines and with all applicable development standards in that the proposed project meets applicable development standards within the C-1 zone including building height, setbacks, and floor-area ratio, and the project meets applicable Commercial design guidelines related to site and building design.
3. All streets and other public access ways and facilities, parking facilities, and utility infrastructure are adequate to serve the proposed development and comply with all applicable design guidelines and development standards. The project has been analyzed by City departments and it is determined that all
streets and public accessways and facilities, parking facilities, and utility infrastructure proposed and required to be constructed with this approval are adequate to serve the development and comply with applicable design guidelines and design standards.
4. The design, layout, and physical characteristics of the proposed development are visually and functionally compatible with the surrounding neighborhood in that 1) onsite pedestrian and vehicular circulation connect well with external sidewalk and street systems, 2) the building is attractively designed and compatible with area architecture, and 3) site design provides for aesthetic landscaping along street frontages.
5. The design, layout, and physical characteristics of the proposed development ensure energy consumption is minimized and use of renewable energy sources is encouraged in that the project provides new jobs and services within an established neighborhood that will allow for shorter travel distances to jobs and services, and opportunities to walk or bicycle to the site.
6. The design, layout, and physical characteristics of the proposed development are not detrimental to the public health, safety, convenience, or welfare of persons residing, working, visiting, or recreating in the surrounding neighborhood and will not result in the creation of a nuisance in that the proposed development 1) offers area improvements and amenities including enhanced pedestrian infrastructure, tree shading, and landscaping, and 2) the center is attractively designed and contributes to the enhancement of area architecture.
E. 200-Year Flood Protection Finding Consistent with State Law (SB 5) and Planning and Development Code Section 17.810:
1. The project site is within an area for which the local flood-management agency has made adequate progress (as defined in California Government Code section 65007) on the construction of a flood-protection system that, for the area intended to be protected by the system, will result in flood protection equal to or greater than the urban level of flood protection in urban areas for property located within a flood-hazard zone, as demonstrated by the SAFCA Urban Level of Flood Protection Plan and Adequate Progress Baseline Report and the SAFCA Adequate Progress Toward an Urban Level of Flood Protection Engineer’s Report, each accepted by the City Council on June 21, 2016 (Resolution No. 2016-0226), and the SAFCA 2022 Adequate Progress Annual Report accepted by the City Council on October 11, 2022 (Resolution No. 2022-0313).
F. No net loss findings (Gov. Code, § 65584):
1. This project includes a 0.57-acre parcel (025-0231-018-0000) which is located on a site listed in the 2021-2029 RHNA Housing Element Sites Inventory, which anticipates 6 total units of lower income housing. This project proposes no housing units. As of July 21, 2023, the lower income capacity on remaining sites identified in the Housing Element is 15,557, which is adequate to meet the jurisdictions remaining low income RHNA of 14,614 for the 2021-2029 planning period. As the remaining sites identified in the Housing Element are adequate to meet the requirements of Section 65583.2 of the California Government Code and to accommodate the City’s share of the regional housing need pursuant to Section 65584, this project is consistent with the Housing Element.
Conditions of Approval
A. The Conditional Use Permit for a non-profit organization, meal service facility within the Limited Commercial (C-1) Zone is approved subject to the following conditions of approval:
Planning
A1. The operator shall be responsible for the daily removal of all litter from the site.
A2. Pedestrian access gates, including the main gate at Franklin Boulevard, shall remain completely open during all hours of operation.
A3. Obtain any required County Health permits related to business operation and provision of food.
A4. Any graffiti painted or marked upon the premises or on any adjacent area under the control of the applicant shall be removed or painted over with matching paint within 72 hours of being applied.
A5. Any modification to the attached plans shall be subject to review and approval by Planning staff prior to the issuance of any Building permits.
B. The Conditional Use Permit for a non-profit organization use that involves food preparation for off-site consumption within the Limited Commercial (C-1) Zone is approved subject to the following conditions of approval:
Planning
B1. The operator shall be responsible for the daily removal of all litter from the site.
B2. Pedestrian access gates, including the main gate at Franklin Boulevard, shall remain completely open during all hours of operation.
B3. Obtain any required County Health permits related to business operation and provision of food.
B4. Any graffiti painted or marked upon the premises or on any adjacent area under the control of the applicant shall be removed or painted over with matching paint within 72 hours of being applied.
B5. Any modification to the attached plans shall be subject to review and approval by Planning staff prior to the issuance of any Building permits.
C. The Conditional Use Permit for a non-profit organization use that involves food storage and distribution within the Limited Commercial (C-1) Zone is approved subject to the following conditions of approval:
Planning
C1. The operator shall be responsible for the daily removal of all litter from the site.
C2. Pedestrian access gates, including the main gate at Franklin Boulevard, shall remain completely open during all hours of operation.
C3. Obtain any required County Health permits related to business operation and provision of food.
C4. Any graffiti painted or marked upon the premises or on any adjacent area under the control of the applicant shall be removed or painted over with matching paint within 72 hours of being applied.
C5. Any modification to the attached plans shall be subject to review and approval by Planning staff prior to the issuance of any Building Permits.
D. Site Plan and Design Review to construct a ±25,000 square foot vocational skills training and community service center and associated site improvements on a vacant 2.2-acre site is approved subject to the following conditions of approval:
Planning
D1. The project shall be constructed per the approved plans and these conditions of approval.
D2. Any modification to the project shall be subject to review and approval by Planning staff (and may require additional entitlements) prior to the issuance of building permits.
D3. Building materials and finishes shall be provided in accordance with the
materials and colors shown on the plans. The building shall be constructed with the following materials where provided in the approved plans:
a. Painted stucco
b. Fiber cement wall panel system
c. Aluminum storefront window and door system
d. Decorative, colorful accent tile
e. Steel stairs and railing
f. Metal roofing
D4. All building elevations shall have a form and design consistent with the final approved plans.
D5. All on-site crosswalks shall be enhanced with differentiating surface textures and colors to increase pedestrian safety.
D6. Landscaping shall be provided as indicated on the approved plans.
D7. Provide bicycle parking spaces as shown on the approved site plan. Bicycle rack design shall meet the City Bike Rack Design and Placement Design Standards.
D8. Trash enclosures shall comply with section 17.616.040 of the code. The walls of the enclosures shall be a minimum of 6 feet in height and be constructed of solid masonry material that matches the color of the main building.
D9. Mechanical equipment shall be screened and shall not be visible from any street or pedestrian views.
D10. All signage shall comply with City Sign Code requirements. All signage is subject to a separate review and approval process through a sign permit.
Public Works
D11. Construct standard public improvements as noted in these conditions pursuant to Title 17 of the City Code. Improvements shall be designed to City Standards and assured as set forth in Section 17.502.130 of the City Code. All improvements shall be designed and constructed to the satisfaction of the Department of Public Works. Any public improvement not specifically noted in these conditions shall be designed and constructed to City Standards. This shall include the repair or replacement/reconstruction of any existing deteriorated curb, gutter and sidewalk adjacent to the subject property along Franklin Boulevard, 37th Avenue, and 38th Avenue per City standards to the satisfaction of the Department of Public Works.
D12. The applicant shall construct sidewalk extensions/widening around existing power poles along Frankling Boulevard where needed to meet ADA clearance requirements to the satisfaction of the Department of Public Works.
D13. All proposed vehicular gates must remain open during business hours and shall be equipped with a locking mechanism acceptable to the Fire and Police Departments.
D14. All right-of-way and street improvement transitions that result from changing the right-of-way of any street shall be located, designed, and constructed to the satisfaction of the Department of Public Works.
D15. The applicant shall merge the existing parcels that cover the project site which creates the parcel boundary shown on the proposed site plan prior to obtaining any Building permits.
D16. All new and existing driveways shall be designed and constructed to City Standards to the satisfaction of the Department of Public Works. The applicant shall remove all existing driveways not proposed for use with the project and reconstruct the frontage improvements to match existing improvements to the satisfaction of the Department of Public Works.
D17. The site plan shall conform to A.D.A. requirements in all respects. This shall include the replacement of any curb ramp that does not meet current A.D.A. standards at the following locations:
a) Southwest corner of Franklin Blvd. and 37th Avenue intersection b) Northwest corner of Franklin Blvd. and 38th Avenue intersection D18. This project will require the installation of streetlights on all public streets fronting this property to the satisfaction of Public Works. The number and location of these lights will be determined when development plans are submitted for review.
D19. The site plan shall conform to the parking standards set forth in City Code
17.608.040.
D20. The applicant shall provide a signing and striping improvement plan if new signage or striping is proposed; or if existing signing and/or striping is removed or relocated. The plans shall be to the satisfaction of the Department of Public Works.
SMUD
D21. SMUD has existing overhead 12kV and low voltage secondary facilities that run through the project site that will need to remain. The applicant shall be responsible for maintaining all CalOSHA and State of California Public Utilities Commission General Order No. 95 safety clearances during construction and upon building completion. If the required clearances cannot be maintained, the Applicant shall be responsible for the cost of relocation.
D22. Any necessary future SMUD facilities located on the Applicant's property shall require a dedicated SMUD easement. This will be determined prior to SMUD performing work on the Applicant's property.
D23. In the event the Applicant requires the relocation or removal of existing SMUD facilities on or adjacent to the subject property, the Applicant shall coordinate with SMUD. The applicant shall be responsible for the cost of relocation or removal.
D24. SMUD reserves the right to use any portion of its easements on or adjacent to the subject property that it reasonably needs and shall not be responsible for any damages to the developed property within said easement that unreasonably interferes with those needs.
D25. The Applicant shall not place any building foundations within 5-feet of any SMUD trench to maintain adequate trench integrity. The applicant shall verify specific clearance requirements for other utilities (e.g. Gas, Telephone, etc.).
D26. In the event the City requires an Irrevocable Offer of Dedication (IOD) for future roadway improvements, the Applicant shall dedicate a 12.5-foot public utility easement (PUE) for overhead and/or underground facilities and appurtenances adjacent to the City’s IOD.
D27. The applicant shall comply with SMUD siting requirements (e.g. panel size/location, clearances from SMUD equipment, transformer location, service conductors). Information regarding SMUD siting requirements can be found at: https://www.smud.org/em/Business-Solutions-and-Rebates/Design- and-Construction-Services.
Department of Utilities (DOU)
D28. Per City Code Section, 13.04.070, multiple water services to a single lot or parcel may be allowed if approved by DOU Development Review and Operations and Maintenance staff. Any new water services (other than fire) shall be metered. Excess services shall be abandoned to the satisfaction of the DOU. (Note: Fire and domestic shall each have a separate tap from the City main.)
D29. Per City Code Section, 13.04.070, multiple water service to a single lot or parcel may be allowed if approved by DOU Development Review and Operations and Maintenance staff. Any new water services (other than fire) shall be metered. Excess services shall be abandoned to the satisfaction of the DOU.
D30. Prior to or concurrent with the submittal of improvement plans, prepare a project specific water study for review and approval by the DOU. The water distribution system shall be designed to satisfy the more critical of the two following conditions: (1) at maximum day peak hour demand, the operating or "residual" pressure at all water service connections shall be at least 30 pounds per square inch, (2) at average maximum day demand plus fire flow, the operating or "residual" pressure in the area of the fire shall not be less than 20 pounds per square inch. The water study shall determine if the existing and proposed water distribution system is adequate to supply fire flow demands for the project. A water supply test may be required for this project. The applicant is advised to contact the City of Sacramento Utilities Department Development Review Section (916-808-7890) at the early planning stages to address any water related requirements. Failure to submit the water study may delay review and approval.
D31. Common area landscaping shall have a separate street tap for a metered irrigation service.
D32. Projects that generate 25 ESD’s or more will require a sanitary sewer Plan Study as described in Section 9 of the City Design and Procedures Manual.
This study and shed map shall be approved by the DOU. The applicant is advised to contact the City of Sacramento Utilities Department Sewer Planning Section (916-808-7890) at the early planning stages to address any sewer related requirements.
D33. Prior to or concurrent with the submittal of the building permit application, the applicant shall prepare a project specific drainage study meeting the criteria specified in the current Onsite Design Manual and/or the Design and Procedures Manual, for review and approval by the DOU. Per the current DOU Onsite Design Manual, either a static or dynamic analysis for mitigating sizing and drainage system design may be used. Using the static analysis and per the DOU onsite project storage method, an estimated 11,600 cubic feet of detention must be provided per each additional acre of impervious area. The maximum discharge rate must be limited to an estimated 0.08 cfs/acre. The drainage study shall be consistent with the latest City Basin 252 Master Plan. The applicant is advised to contact the City of Sacramento Utilities Department Development Review Section (916-808-7890) at the early planning stages to address any drainage related requirements. Failure
to submit the drainage study may delay review and approval. (Note: A maintenance agreement may be required for detention and Low Impact Development (LID) features.)
D34. The onsite water, sewer and storm drain systems shall be private systems maintained by the owner or other approved entity.
D35. All on-site drainage systems shall be designed to the standards specified in the DOU onsite design manual.
D36. Finished floor elevations shall be a minimum of 6-inches above the 100-year HGL or 1-foot above the overland flow release elevation, whichever is higher or as approved by the DOU.
D37. No more than 6,000 square feet is allowed to sheet drain over a public sidewalk. If the area is larger than 6,000 square feet, then an on-site surface drainage system is required and shall be connected to the street drainage system by means of a storm drain service tap. All on-site systems shall be designed to the standard specified in the DOU onsite manual.
D38. A grading plan showing existing and proposed elevations is required.
Adjacent off-site topography shall also be shown to the extent necessary to determine impacts to existing surface drainage paths. No grading shall occur until the grading plan has been reviewed and approved by the DOU.
D39. This project will disturb more than one acre of land; therefore, the project is required to comply with the State’s “Construction General Permit”. To comply with the State Permit, the applicant must file a Notice of Intent (NOI) through the State’s Storm Water Multiple Application and Report Tracking System (SMARTS). A valid WDID number must be obtained and provided to the DOU prior to the issuance of any grading permits.
D40. The applicant must comply with the City of Sacramento's Grading, Erosion and Sediment Control Ordinance. This ordinance requires the applicant to show erosion and sediment control methods on the construction drawings.
These plans shall also show the methods to control urban runoff pollution from the project site during construction.
D41. Post construction (permanent), stormwater quality control measures shall be incorporated into the development to minimize the increase of urban runoff pollution caused by development of the area. The project is an area not served by an existing regional water quality control facility and/or the project has more than one-acre of new or modified impervious area, therefore, Low Impact Development (LID), certified full capture trash control devices and on- site treatment control measures will be required. The on-site storm water
treatment control measures required may affect site design and site configuration and should be considered during early planning stages.
D42. A separate maintenance agreement may be required for both on-site treatment control measures and full capture control devices. Contact DOU for a list of accepted proprietary devices considered for treatment control and full capture trash control. Construction drawings must include all proposed source controls and on-site water quality measures selected for the site.
Refer to the latest edition of the “Stormwater Quality Design Manual for the Sacramento Region” for appropriate measures.
Fire Department
D43. Provide the required fire the required fire hydrants in accordance with California Fire Code Section 507 and Appendix C, Section C102.1 as amended the Sacramento City Code Section 507.5.1. Additional on-site fire hydrants must be provided where the structures are greater than 150’ from an approved water supply (fire hydrant) located on a public street.
D44. Fire service mains shall not cross property lines unless a reciprocal easement agreement is provided. (Only applicable if the proposed development occurs over multiple parcels.)
D45. A reciprocal ingress egress agreement shall be provided for review by City Attorney for all shared driveways being used for Fire Department access. (Only applicable if the proposed development occurs over multiple parcels.) D46. Maintenance agreements shall be provided for the interior roadways of the proposed complex and for the fire protection systems. The agreement shall be record with the Public Recorders Office having jurisdiction and shall provide for the following: (Only applicable if the proposed development occurs over multiple parcels.)
a. Provisions for the necessary repair and maintenance of the roadway surface
b. Removal of vegetation overgrowing the roadway and infringing on the roadway clear vertical height of thirteen feet six inches (13’6”) and/or width of twenty feet (20’)
c. Provisions for the maintenance, repair, and/or replacement of NO PARKING-FIRE LANE signage or striping
d. Provisions for the necessary repair and maintenance of vehicle and pedestrian access gates and opening systems
e. Unrestricted use of and access to the roadways covered by the agreements.
f. Provisions for the control of vehicle parking in prohibited areas and a
mechanism for the removal of vehicles illegally parked. g. Maintenance and timely repair of all fire protection systems, including but not limited to hydrants, fire alarm systems and fire sprinklers.
D47. Timing and Installation. When fire protection, including fire apparatus access roads and water supplies for fire protection, is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. California Fire Code Section 501.4 D48. Roads used for Fire Department access that are less than 28 feet in width shall be marked "No Parking Fire Lane" on both sides; roads less than 36 feet in width shall be marked on one side.
D49. All turning radii for fire access shall be designed as 35’ inside and 55’ outside. California Fire Code Section 503.2.4
D50. Fire Apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. California Fire Code Section 503.2.3 D51. Provide a water flow test. (Make arrangements with the Department of Utilities at 916-808-7890 or by email at
[email protected] California Fire Code Section 507.4
D52. Provide appropriate Knox access for site. California Fire Code Section 506 D53. An automatic fire sprinkler system shall be installed in any portion of a building when the floor area of the building exceeds 3,599 square feet or a change of use or occupancy that creates a greater fire or life safety hazard, and the floor area of that portion of the building, which is changed exceeds 3,599 square feet in area. California Fire Code as amended by the Sacramento City Code Amendments 903.2 (2&4)
D54. Locate and identify Fire Department Connections (FDCs) on address side of building no farther than 50 feet and no closer than 15 feet from a fire hydrant and not more than 30 feet from a paved roadway as accessed from an approved fire hydrant.
D55. Automatic gates shall have AC power and be provided with Key override switch (Knox) and Radio operated controller (Click2Enter). For gates that do not fail safe in the open position upon loss of AC power or are provided with battery back-up power, an approved pedestrian gate shall be installed within 10 feet of all vehicle gates. An approved key box (Knox) shall be installed at least 48 inches above grade on the outside of the gate. It shall be provided
with a key to open the pedestrian gate.
Recycling and Solid Waste
D56. Project must meet the requirements outlined in City Code Chapter 13.24 and
17.616.
D57. The trash enclosure must have sufficient space to accommodate bins for trash, recycling, and organics. Smaller containers may be used with an increase in collection frequency. A concrete apron must be constructed in front of the enclosure so the pavement is protected while bins are rolled out and serviced.
D58. Applicant must provide a statement of how trash, recycling and organics will be organized and collected after the project is complete, per City Code Chapter 17.616.020. This statement must explain how the property manager will collect from the trash, recycling and organics receptacles located around the site and place each material type in the appropriate bin in the trash enclosure.
D59. Solid waste trucks must be able to safely move about the project, with minimum backing, and able to empty the bins and cans safely.
D60. This project may be required to submit a Construction and Demolition (C&D) Debris plan, as outlined on the City’s web site at
http://www.cityofsacramento.org/public-works/RSW/Collection- Services/Recycling/Construction-and-Demolition.
Police Department
Lighting:
D61. Exterior lighting shall be white light using LED lamps with full cutoff fixtures to limit glare and light trespass. Color temperature shall be between 2700K and 4100K with a color rendering index of 80 or higher and a light loss factor of .95 or better. When choosing lamps, the applicant shall look for efficiency of 110 lumens per watt or better. All existing exterior fixtures shall be replaced with fixtures that meet this requirement.
D62. Light poles, if applicable, shall be no higher than 25’.
D63. Broken or damaged exterior lighting shall be repaired or replaced within 48 hours of being noted.
D64. Entry drives, drive aisles, parking and bicycle parking shall be illuminated to a maintained minimum of 1.5-foot candles per square foot of parking area at
a 6:1 average to minimum ratio.
D65. Exterior walkways, alcoves and passageways shall be illuminated to a maintained minimum of 1/3 foot candles per square foot of surface area at a 6:1 average to minimum ratio.
D66. Exterior lighting distribution and fixtures shall be approved by the Sacramento Police Department CPTED Sergeant (or designee) prior to issuance of a building permit.
D67. Exterior lighting shall be designed in coordination with the landscaping plan to minimize interference between the light standards and required illumination and the landscape trees and required shading.
D68. Exterior lighting shall be shielded or otherwise designed to avoid spill-over illumination to adjacent streets and properties.
Landscaping:
D69. All mature landscaping shall follow the two-foot, six-foot rule. All landscaping shall be ground cover, two feet or less and lower tree canopies of mature trees shall be above six feet. This increases natural surveillance, eliminates hiding areas within the landscape, and provides tenants and users a safer environment.
D70. Tree canopies shall not interfere with or block lighting. This creates shadows and areas of concealment. The landscaping plan shall allow for proper illumination and visibility regarding lighting and surveillance cameras through the maturity of trees and shrubs.
Security:
D71. Fencing, if applicable, shall be of decorative tubular steel, no climb type and a minimum of 6’ in height.
D72. Business shall be equipped with and maintain a security system with:
a) An alarm system with a valid UL Certificate in accordance with ANSI/UL Standard 681-2014 (Standard for Installation and Classification of Burglar and Holdup Alarm), Extent Number 4
b) a Video Assessment and Surveillance System (VASS)
D73. Holdup alarm system shall be employed near the Welcoming/Reception Area.
D74. A Video Assessment and Surveillance System (VASS) shall be installed at the site and maintained by a property management company, security
company, or designee.
D75. Manager with access to VASS storage shall be able to respond to any activation within two hours.
D76. Cameras shall be day/night capable with a resolution of no less than two (2) megapixels and a minimum frame rate of 15 frames per second.
D77. Each driveway entrance and each building entrance shall be covered by a camera set at 100 pixels per foot or higher.
D78. VASS shall be capable of exporting footage to common media in a standard viewing format and shall not require proprietary software for third party viewing.
D79. VASS shall be placed in drive-thru areas so as to capture driver faces and vehicle license plates.
D80. VASS shall be capable of storing no less than 30 days’ worth of activity.
D81. VASS shall provide comprehensive coverage of:
safe(s)
manager’s office
areas of ingress and egress (doors, driveways)
parking lot
adjacent public rights of way
trash enclosure(s)
areas not clearly visible from public streets
coverage of all four (4) exterior sides of the building(s) at least one camera shall be positioned to get a front face shot at the main entrance
D82. No more than 10 percent of the square footage of windows and clear doors for retail purposes shall be blocked by advertising, signs, shelves or anything else. All advertising, signs, and shelving shall be placed and maintained in a manner that ensures that law enforcement personnel have a clear and unobstructed view of the interior of the premises from the exterior public sidewalk or entrance to the premises. All signs shall comply with the City Code.
D83. All dumpsters shall be kept locked or in locked enclosures. Gating for dumpster enclosures should be slatted to allow visual surveillance of the interior.
D84. Exterior trash receptacles shall be of a design to prevent unauthorized
removal of articles from the trash bin.
D85. Welcoming/Check-In areas should be designed so as to allow employees/volunteers visual surveillance of the main entrance and parking lot.
D86. Any graffiti painted or marked upon the premises or on any adjacent area under the control of the applicant shall be removed or painted over with matching paint within 72 hours of being applied.
D87. Property management shall be responsible for the daily removal of all litter from the site.
D88. Applicant shall install a law enforcement “Knox Box” at the vehicle entrances AND the main entrance for each building for police access to the premises after hours in an emergency.
During Construction:
D89. The applicant shall enclose the entire perimeter of the project with a chain link fence with necessary construction gates to be locked after normal construction hours.
D90. The location shall be monitored by security after normal construction hours during all phases of construction. This can be done via remote camera monitoring.
D91. Adequate security lighting shall be provided to illuminate vulnerable equipment and materials. Lighting shall be white light with full cut off fixtures.
Site Plan and Design Review Advisory Notes:
D92. The City of Sacramento (City) is responsible for providing local sewer service to the proposed project site via their local sanitary sewer collection system.
Regional San is responsible for the conveyance of wastewater from the City collection system to the Sacramento Regional Wastewater Treatment Plant (SRWTP).
D93. Many projects within the City of Sacramento require on-site booster pumps for fire suppression and domestic water systems. Prior to design of the subject project, the DOU suggests that the applicant request a water supply test to determine what pressure and flows the surrounding public water distribution system can provide to the site. This information can then be used to assist the engineers in the design of the on-site fire suppression system. (DOU)
D94. Water meters shall be located at the point of service, which is back of curb for separated sidewalks, back of walk for connected sidewalks or at the inside edge of the right-of-way for public alleys. (DOU) D95. Water meter boxes located in driveways shall be traffic rated per the requirements of the City Standard Specifications. (DOU) D96. The proposed project is located in a Zone X on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps (FIRMs).
Accordingly, the project site lies in an area with no requirements to elevate or flood proof. (DOU)
D97. Building permits filed on or after July 1, 2023 for all new commercial nonresidential buildings shall comply with the Alternate Water Systems Ordinance as stated in the Sacramento City Code section 15.24.030,
15.24.040 and 15.24.050. The requirement at minimum for all new commercial nonresidential buildings that are 10,000 square feet or greater must include a gray water system that can be utilized to provide subsurface irrigation. (DOU)
D98. Funding for EV infrastructure may be available through Sac Metro Air District incentive programs, additional information on incentive programs is available on the District’s website: http://www.airquality.org/residents/incentive- programs. (SMAQMD)
D99. Parking spaces with EV chargers should have appropriate signage to ensure the spaces remain available for electric vehicle charging. (SMAQMD) D100. All projects are subject to Sac Metro Air District rules in effect at the time of construction. A complete listing of current rules is available at www.airquality.org or by calling (916) 874-4800. (SMAQMD) D101. City of Sacramento permits must be obtained for private patrol, alarms, and camera systems. (Police)
D102. The subject property is outside the boundaries of SacSewer but within the Urban Service Boundary and Sacramento Regional County Sanitation District (Regional San) boundaries. Regional San will provide ultimate conveyance and treatment of the sewer generated from this site, but the City of Sacramento Utilities Department’s approval will be required for local sewage service.
D103. Prior to the ISSUANCE OF A BUILDING PERMIT: The owner must contact Permit Services Unit at [email protected] or by phone at (916) 876-6100 to determine if Regional San impact fees are due. Fees are to be
paid prior to the issuance of building permits. (Sacramento Area Sewer District)
D104. As per City Code, the applicant will be responsible to meet their obligations regarding:
a. Title 18, 18.56 Park Development Impact Fee, due at the time of issuance of building permit. The Park Development Impact Fee due for this project is estimated at $4,980. The PIF due on this project is based on the Remaining City Zone Rate of $0.20 per square foot for commercial services projects. Any change in these factors will change the amount of the PIF due. The fee is calculated using factors at the time that the project is submitted for Building permit. (Parks)
Adopted by the City of Sacramento City Council on November 28, 2023, by the following vote: