CITY COUNCIL
Darrell Steinberg, Mayor
Lisa Kaplan, District 1
Sean Loloee, District 2
Karina Talamantes, District 3
Katie Valenzuela, District 4
Caity Maple, District 5
Eric Guerra, Vice Mayor, District 6
Rick Jennings, II, District 7
Mai Vang, Mayor Pro Tem, District 8
CHARTER OFFICERS
Mindy Cuppy, City Clerk
Susana Alcala Wood, City Attorney
Jorge Oseguera, City Auditor
Howard Chan, City Manager
John Colville, City Treasurer
City Council
Financing Authority
Housing Authority
Public Financing Authority
Redevelopment Agency
Successor Agency
915 I Street, 1st Floor, Sacramento
Published by the Office of the City Clerk
(916) 808-7200
SUPPLEMENTAL MATERIAL
Description: Attached is supplemental material received after publishing the agenda which includes the most recent and correct version of the report included as Attachment 7, Mixed Income Housing Ordinance Draft Report, for Discussion Item 15. The attached replaces the original Attachment 7 in its entirety.
For the Meeting of: Tuesday, December 5, 2023, at 5:00 p.m.
Agenda Item: Discussion Item 15
15. Mixed Income Housing Ordinance - Preliminary Recommendations
File ID: 2023-1202
Location: Citywide
Recommendation: Review and comment on Mixed Income Housing Ordinance Preliminary Recommendations.
Contact: Greta Soos, Associate Planner, (916) 808-2027, [email protected]; Matt Hertel, AICP, Long Range Planning Manager, (916) 808-7158, [email protected], Community Development Department
DRAFT
FEASIBILIT
Y ANALYSIS,
HISTORICAL PERFORMANCE and
CASE STUDY RESEARCH
Suppo
rting Proposed Updates to the
MIXED INCOME HOUSING ORDINANCE
Prepared for
City of Sacramento
Prepared by
Keyser Marston Associates, Inc.
August 2023
T
able of Contents
1.0 EXECUTIVE SUMMARY 1
2.0 INTRODUCTION AND SUMMARY OF FINDINGS 4
2.1 Existing MIHO Requirements 4
2.2 MIHO History and Historic Performance 5
2.3 Market Conditions 6
2.4 Prototypes and Submarkets 7
2.5 Household Income Categories 9
2.6 Feasibility Analysis Findings 9
2.7 Compliance Cost and Other Metrics 13
2.8 Requirements in Other Jurisdictions and Case Study Research 14
3.0 HISTORIC PERFOMANCE OF MIXED INCOME HOUSING ORDINANCE 16
3.1 Citywide Total Housing Production Since 2000 16
3.2 Historical Performance: 2000 Mixed Income Housing Ordinance 18
3.3 Funding Sources for Multifamily Affordable Units Produced Under 2000 Ordinance 21
3.4 Historical Performance: 2015 Ordinance 22
3.5 Affordable Unit Production Attributed to HIF Funding by SHRA 23
3.6 Additional Units Provided Under Large Sites Provision of 2015 Ordinance 24
3.7 Funding Sources for Multifamily Affordable Units Produced under 2015 Ordinance 25
3.8 Forgone Revenue from $0 Housing Impact Fee Rate for High-Density Projects 26
3.9 Exemptions and $0 Housing Impact Fee Rate Units 27
3.10 What-If Analysis: Applying the 2000 Ordinance to Projects Permitted Since 2015 28
3.11 2000 and 2015 Ordinances: Different Policies for Differing Conditions 29
4.0 FINANCIAL FEASIBILITY ANALYSIS 31
4.1 Housing Market Context 31
4.2 Analysis Limitations 36
4.3 Subarea
s Evaluated 36
4.4 Residential Prototypes 37
4.5 Affordability Levels Addressed 38
4.6 Methodology for Financial Feasibility Analysis 39
4.7 Approach to Current Market Conditions 40
4.8 Revenue / Supported Unit Values 41
4.9 Development Cost Estimates 45
4.10 Residential Land Sales Values 46
4.11 Feasibility Analysis Findings 49
4.12 Feasibility Findings: For-Sale Projects 50
4.13 Feasibility Findings: Rental Projects 52
4.14 Scenario Testing 53
4.15 Compliance Cost Analysis 57
4.16 Potential Ways Development Projects May Respond to an Increased Requirement 61
4.17 Changes in Prices and Rents Sufficient to Offset Cost of Increased Affordable Housing Requirements 63
5.0 DEVELOPMENT COMMUNITY CONTACTS 65
6.0 REQUIREMENTS IN OTHER JURISDICTIONS AND CASE STUDIES 70
6.1 Local Jurisdiction Requirements 70
6.2 Large City Inclusionary Programs 75
6.3 Additional Review of Select Local and Large City Programs 76
List of Charts
Chart 3-1. Total Housing Units Permitted, City of Sacramento ....................................................................................................... 16 Chart 4-1. Median Home Prices, Sacramento County .................................................................................................................... 32 Chart 4-2. Median Number of Days on Market, Sacramento County ............................................................................................. 32 Chart 4-3. Trend in Home Sale Prices Per Square Foot, City of Sacramento ................................................................................ 33 Chart 4-4. Rents and Vacancy Rate Trends, City of Sacramento .................................................................................................. 34 Chart 4-5. New Home Pricing by Subarea, Summer 2022, and Estimated Prototype Pricing ........................................................ 42 Chart 4-6. New Home Pricing by Subarea, Winter 2023, and Estimated Prototype Pricing ........................................................... 42 Chart 4-7. Asking Rents, Recently Built Apartments, Winter 2023 ................................................................................................. 43 Chart 4-8. Per Square Foot Costs, Alternative Requirements, For-Sale Projects, Central City ..................................................... 58 Chart 4-9. Per Square Foot Costs, Alternative Requirements, Inner South and East Neighborhoods ........................................... 59 Chart 4-10. Per Square Foot Costs, Alternative Requirements, Average of Three Submarkets: Southern Neighborhoods, N.
Natomas, and N. Sacramento / S. Natomas Submarkets, For-Sale ............................................................................................... 59 Chart 4-11. Per Square Foot Costs, Alternative Requirements, Rental Projects, Central City ....................................................... 60 Chart 4-12. Per Square Foot Costs, Alternative Requirements, Inner South and East Neighborhoods, Rental Projects .............. 60 Chart 4-13. Per Square Foot Costs, Alternative Requirements, Average of Three Submarkets: ................................................... 61 Chart 6-1. Housing Units Permitted by Year, West Sacramento .................................................................................................... 81 Chart 6-2. Housing Units Permitted by Year, Roseville .................................................................................................................. 84 Chart 6-3. Housing Units Permitted by Year, Folsom ..................................................................................................................... 87 Chart 6-4. Housing Units Permitted by Year, Davis ........................................................................................................................ 91 Chart 6-5. Multifamily Units Permitted and Produced by Year, Portland ........................................................................................ 95 Chart 6-6. Single Family Units Permitted and Produced by Year, Portland .................................................................................... 96 Chart 6-7. Permitted Housing Units by Year, Denver ................................................................................................................... 101 Chart 6-8. Permitted Housing Units by Year, San Jose ................................................................................................................ 105
List of Tables
Table 2-1. Overview of Submarkets .................................................................................................................................................. 7 Table 2-2. Affordable Prices and Rents ............................................................................................................................................ 9 Table 2-3. For Sale Project Scenario Testing ................................................................................................................................. 11 Table 2-4. Rental Project Scenario Testing .................................................................................................................................... 13 Table 3-1. Housing Units Permitted Citywide ................................................................................................................................. 17 Table 3-2. Inclusionary Units Produced Under 2000 Ordinance ..................................................................................................... 20 Table 3-3. Funding Sources for Multifamily Affordable Units Built Under 2000 Ordinance ............................................................ 21 Table 3-4. Housing Impact Fee Revenues and Expenditures ........................................................................................................ 23 Table 3-5. Mixed Income Housing Fund Expenditures ................................................................................................................... 24 Table 3-6. 2015 Ordinance Large Sites - Mixed Income Housing Strategies ................................................................................. 24 Table 3-7. Affordable Units Produced, 2015 Ordinance, Large Sites – Mixed Income Housing Strategies ................................... 25 Table 3-8. Summary of Funding Sources for Affordable Units Produced Under the 2015 Ordinance ............................................ 26 Table 3-9. Forgone Fee Revenue from $0 HIF Rate for High-Density Development ..................................................................... 27 Table 3-10. Exemptions and $0 Fee Projects, 11/1/2015 through 12/9/2022 ................................................................................. 28 Table 3-11. Estimated Number of Forgone Inclusionary Units ....................................................................................................... 29 Table 4-1. Submarkets .................................................................................................................................................................... 36 Table 4-2. Prototype Residential Projects Evaluated ...................................................................................................................... 37 Table 4-3: 2023 Sacramento County Income Limits ....................................................................................................................... 38 Table 4-4: 2023 Affordable Prices .................................................................................................................................................. 38 Table 4-5: 2023 Affordable Rents (Monthly) ................................................................................................................................... 38 Table 4-6. Estimated Household Income (% of AMI) Required to Afford Market Prices and Rents for New Units ......................... 39 Table 4-7. Estimated Home Prices ................................................................................................................................................. 41 Table 4-8. Market Rent Estimates .................................................................................................................................................. 43 Table 4-9. Net Operating Income and Investment Supported, Current Market, 100% Market Rate ............................................... 44 Table 4-10. Development Costs and Builder Margin, Current Market, Not Including Land ............................................................ 45 Table 4-11. Residential Land Sale Transactions, 2019 to 2022 ..................................................................................................... 48 Table 4-12. Land Cost Estimates, Prototype Projects (Minimum Supported Land Values for Feasible Project) ............................ 48 Table 4-13. Feasibility Criteria ........................................................................................................................................................ 50 Table 4-14. For-Sale Feasibility Findings, Current Market Conditions, Proposed Utility Fees, Existing HIF .................................. 51 Table 4-15. For-Sale Feasibility Findings, Prior More Favorable Market Conditions, Existing Utility Fees, Existing HIF ............... 51 Table 4-16. Rental Feasibility Findings, Current Market Conditions, New Utility Fees, Existing HIF ............................................. 52 Table 4-17. Rental Feasibility Findings, Prior More Favorable Market Conditions, Existing Utility Fees, Existing HIF .................. 53 Table 4-18. For Sale Project Scenario Testing ............................................................................................................................... 55 Table 4-19. For Sale Project Scenario Testing ............................................................................................................................... 56 Table 4-20. Rental Project Scenario Testing .................................................................................................................................. 57 Table 4-21. Market Price Increase Sufficient to Offset Incremental Cost of Affordable Housing Requirements ........................... 64 Table 4-22. Market Rent Increase Sufficient to Offset Incremental Cost of Affordable Housing Requirements ............................. 64 Table 6-1. Affordable Housing Requirements, SACOG Region, Jurisdictions with Population over 50,000 .................................. 70 Table 6-2. Affordable Housing Requirements, Local Jurisdictions ................................................................................................. 72 Table 6-3. Large City Inclusionary Program Overview ................................................................................................................... 75 Table 6-4. City o
f Sacramento and State of California Housing Permitting .................................................................................... 77 Appendix A Tables
Appendix B Tables
Keyser Marston Associates, Inc. Page 1
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
1.0 EXECUTIVE SUMMARY
The City of Sacramento’s (“City”) is pursuing a comprehensive update to its Mixed Income Housing Ordinance (“MIHO”). This report provides an analysis of financial feasibility, a review of the historic performance of the MIHO, and provides information on inclusionary programs regionally and nationally to support the proposed update.
The MIHO requires payment of an affordable housing impact fee for all new housing units and large subdivisions to assist with the provision of housing for a variety of incomes and household types. The fee-generated revenue is placed in the citywide Housing Trust Fund administered by the Sacramento Housing and Redevelopment Agency (SHRA). Funds are used to develop affordable housing units with the goal of increasing the supply of housing for very low and low- income workers.
When the MIHO was last updated in 2015, the City was just emerging from the Great Recession and foreclosure crisis. Inclusionary requirements could not legally be applied to rentals.
Inclusionary programs had been the subject of a court challenge and a petition for review by the U.S. Supreme Court was pending. High density housing development was in its nascent stages.
These conditions informed the establishment of the fee-based program in place today.
Since 2015, high density development has become well established through numerous built projects. Authority to implement inclusionary programs was re-affirmed and broadened to include rental developments. The City experienced a sustained period of strong housing development activity, although feasibility has recently become more challenging. As the landscape for housing development and inclusionary programs has continued to evolve, the City is pursuing an update to the MIHO for the years ahead.
Feasibility Analysis Findings
The feasibility analysis examines the financial feasibility of a range of for-sale and rental residential development types in Sacramento across five separate submarkets, described in detail in Section 2.4. These submarkets include:
1. Central City,
2. Southern Neighborhoods,
3. North Sacramento and South Natomas,
4. North Natomas, and
5. Inner South and East Neighborhoods.
The feasibi
lity analysis incorporates the proposed increase to the Department of Utilities’ Impact Fees. If proposed fees change materially prior to City Council adoption, the feasibility analysis may need to be updated.
Keyser Marston Associates, Inc. Page 2
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Residential development has been broadly feasible in Sacramento, as demonstrated by the substantial development activity experienced in recent years. However, favorable conditions have given way to a more challenging environment as higher interest rates have put downward pressure on home prices and slowed sales activity, while softening rents, more conservative underwriting, and higher financing costs have contributed to greater feasibility challenges for rentals. When feasibility is evaluated under current more challenging market conditions:
Rental projects are challenged and unable to support an increase in fees or an on-site affordabilit
y requirement.
Support for an increase in affordable housing fees is limited to for-sale projects in the Central City and Inner South and East Neighborhoods submarkets.
Only for-sale projects within the Inner South and East Neighborhoods submarket were found to support an on-site affordability requirement at a modest level of 5%, or 10% if affordable units are priced at 110% of Area Medi
an Income (AMI).
Residential
development projects are more likely to move forward when market conditions support feasibility or when developers expect conditions to have improved by the time units are being marketed for sale or lease. In recognition of this dynamic, the feasibility of alternative affordable housing requirements is also tested relative to a baseline pro forma for projects that are feasible under current requirements, consistent with conditions that prevailed until recently.
Results are as follows:
For-sale projects support an on-site affordable unit requirement of up to 10% at 90% of AMI
in three of five submarkets, and 5%
at 90% AMI in all areas, with the exception of lower
density
single unit projects in the North Sacramento and South Natomas submarket, where pricing is lower.
For rental projects, feasibility is challenged by even a modest on-site affordability requirement, unless a fe
e option is provided. The Central City submarket and Inner South and East Neighborhoods were the only submarkets found to support a modest on-site affordabilit
y requirement of 5%, at either 60% or 80% AMI in Central City, and at 80% AMI only in the Inner South and East Neighborhoods submarket.
Larger master plans able to deliver affordable units in a stand-alone multi-family affordable project leveraging tax cr
edits have a greater ability to support an on-site affordability requirement.
For-sale projects support affordable housing fees up to $10 per square foot in four of five submarkets,
the North Sacramento and South Natomas submarket being the exception.
Keyser Marston Associates, Inc. Page 3
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Support for higher fees is indicated in North Natomas and Inner South and East Neighborhoods submarket.
For rental projects, removal of existing incentives including the $0 rate for higher density projects and
the Housing Incentive Zone is supported. In addition, fees up to $10 per square foot are sup
ported in the Inner South and East Neighborhoods submarket and $15 in the Central City submarket.
Best Practices
Themes that emerged from the review of programs in other jurisdict ions regionally and
nationally included the following:
Larger cities with diverse market conditions typically distinguish requirements by geography o
r market area.
Providing a fee option coupled with incentives for projects to provide units on-site is a common approach among larger cities.
A menu of compliance options can provide flexibility to projects in meeting requirements while allowing the program to serve a broader range of income levels.
For larger master plans, the practice of requiring inclusion of affordable units within the development, generally
in one or more standalone multifamily affordable projects, has a successful tr
ack record both in Sacramento and elsewhere in the region.
Keyser Marston Associates, Inc. Page 4
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
2.0 INTRODUCTION AND SUMMARY OF FINDINGS
The City of Sacramento’s (“City”) is pursuing a comprehensive update to its Mixed Income Housing Ordinance (“MIHO”). This report was prepared to support the City in updating the MIHO. This report was prepared by Keyser Marston Associates, Inc. (KMA) on behalf of the City and includes the following components:
Historic Performance of the MIHO (Section 3) – Market rate and affo rdable housing
production u
nder the MIHO was examined and two “what if” scenarios regarding alternative
s to requirements enacted in 2015 are explored.
Financial Feasibility Analysis (Section 4) – Th
e financial feasibility analysis evaluates
the abilit
y of residential developments to sustain existing or modified affordable housing requirements.
Developer Interviews (Section 5) –
Feedback from a series of interviews with local
development profession
als is summarized.
Other Communities (Section 6) – affordable housing requirements in communities throughout t
he Sacramento Area Council of Governments (SACOG) region and select large citie
s are summarized and in-depth case study summaries are included for four local and thr
ee national examples.
2.1 Existing MIHO Requirements
The City’s existing MIHO establishes a Housing Impact Fee (HIF) applicable to new residential developments throughout the city. The HIF-generated revenue is transferred to the Housing Trust Fund, which is administered by SHRA to develop affordable housing units with the goal of increasing the supply of housing for very low and low-income households earning up to 80 percent of the area median income.
FY 2023-24 HIF rates are as follows:
$3.54 per square foot for multifamily and single unit developments;
$1.53 per square foot in Housing Incentive Zones (see map Section 3.4);
$0 for multi-unit projects over 40 dwelling units per acre; and $0 for single-unit and duplex projects over 20 units per acre.
Projects that
include at least 10% affordable units are exempt from the HIF.
Projects over 100 gross acres in size are required to have an approved Mixed Income Housing Strategy that identifies how the project will provide housing for a variety of incomes and family types. The six projects with approved mixed income housing strategies all include on-site Keyser Marston Associates, Inc. Page 5
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
affordable units, typically provided by partnering with an affordable developer or dedicating a site for affordable housing. Provided affordable units are credited toward the HIF amount due.
2.2 MIHO History and Historic Performance
The MIHO was originally established in 2000 (“2000 Ordinance”) as an inclusionary policy. The 2000 Ordinance was focused on new growth areas (see map Section 3.2) and required projects in these areas to provide 15% affordable units (mix of Very Low and Low). Most large-scale developments satisfied the inclusionary obligation by partnering with an affordable housing developer that provided affordable units in a stand-alone multifamily project financed using low income housing tax credits (LIHTC). A total of 1,985 affordable units were produced under the 2000 Ordinance, counting units that exceeded the 15% requirement 1, and 1,557 units were
produced (average of 104 per year) if only units required to meet the 15% requirement are counted. Market rate developers typically provided land and a cash contribution for a portion of the financial gap for these projects, with the rest provided through tax credits and other public subsidy sources.
Market rate and affordable housing development under the 2000 Ordinance was robust during the period from 2000 to 2007. Then, from 2009 to 2014, the Great Recession brought housing development to a near halt. When Sacramento began to emerge from the Great Recession, the development landscape was significantly changed. There was a transition away from large- scale greenfield developments toward smaller infill residential development at higher densities, although still in its nascent stages. The end of redevelopment in California substantially reduced availability of local funding for affordable housing. Legal authority to implement inclusionary programs was under scrutiny through a case before the California Supreme Court and a subsequent petition for U.S. Supreme Court review. A separate ruling precluded application of inclusionary programs to rental housing. These factors set the stage for amendments to the program in 2015 (“2015 Ordinance”), which included expansion of the program citywide and conversion to a fee-based program in light of the uncertain legal environment and recent loss of redevelopment funding.
Under the 2015 Ordinance, a total of $6.6 million in HIF was collected through the end of 2021.
As of November 2022, $4.7 million of these funds had been committed to three affordable housing projects with a combined 449 units. Of these 449 affordable units, SHRA attributes 27 workforce affordable housing units to the HIF funding based on a formula tied to the per unit financial gap, which is different from the approach used to track affordable production under the 2000 Ordinance of counting all units provided to meet the 15% requirement, regardless of how funded. An additional 407 units are included in affordable projects built as part of mixed income housing strategies for large acreage projects.
1 Affordable projects sometimes exceeded the size needed to meet the 15% requirement.
Keyser Marston Associates, Inc. Page 6
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Meaningful comparison of outcomes between the two ordinances is challenging because market conditions were fundamentally different, the types of housing being built differed, and production of affordable units was measured differently. While the 2000 Ordinance was in place, greenfield development was more prevalent, land values and development costs were lower, and local funding to offset the cost of affordable units was more available through the former redevelopment agency, contributing to the success of the program during this period. However, the success of the 2000 Ordinance could not have been replicated with the higher density rental and in-fill market rate projects that became more prevalent after 2015, as demonstrated by the findings of the feasibility analysis indicating such projects would face significant feasibility challenges with a 15% on-site requirement.
2.3 Market Conditions
Sacramento has experienced a sustained period where both for-sale and rental residential development have been broadly feasible. However, over the past year, conditions have shifted, and feasibility has become more challenging.
The for-sale housing market experienced a boom period during the pandemic driven by a confluence of factors, including historically low interest rates and increased demand, which drove a substantial escalation in prices. The for-sale housing market has now cooled substantially, driven by rising interest rates. Sales activity slowed through the second half of 2022 as borrowing costs increased, pushing some buyers out of the market and encouraging others to wait for a pricing correction. Despite less favorable conditions, homebuilders have expressed optimism of a return to stronger market conditions in a year or two. A healthy economy with low unemployment, chronic undersupply of housing, and potential for moderating interest rates once inflation cools, support optimism that stronger conditions will return relatively soon.
Recent shifts in the market have also altered conditions that supported a sustained period of strong feasibility for rental housing development. Emerging trends that are constraining feasibility include rising vacancy rates driven by a large supply of new units being delivered to the market, softening rental rates, higher development costs relative to earlier in the cycle, increased financing costs driven by higher interest rates, and upward pressure on cap rates and returns that investors are seeking in the current investment climate. These factors point to a likely pause or slowdown in new rental construction starts. Rental developers interviewed for this assignment viewed more challenging conditions as temporary and advised that they were continuing to look for ways to move forward with current projects, and/or to position projects to move forward when conditions improve.
Keyser Marston Associates, Inc. Page 7
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
The feasibility analysis addresses both:
“Current market conditions,” which incorporates market data available at the time of analysis pre
paration in winter / spring 2023; and
“Recent more favorable conditions,” which incorporates market data on rents and home prices ava
ilable as of spring / summer 2022, interest rates preceding the significant escalation in rates over the course of 2022, and representing a baseline condition in which projects were broadly feasible
under existing requirements, as evidenced by
substantia
l recent development activity.
Scenarios a
ddressing more favorable conditions are provided to enable an understanding of the impacts of potential policy changes relative to feasible projects. This approach aligns, in concept, with the way some developers have indicated that they are approaching the current market, by looking to weather a correction while positioning future projects to move forward as conditions improve.
2.4 Prototypes and Submarkets
The feasibility analysis evaluates “prototypical” or representative residential projects in various locations or “submarkets” within Sacramento. The following residential unit types are evaluated:
Single Family Detached
Small Lot Single Family
Attached
Townhomes
Rental Apartments
The prototypes are evaluated within
five geographic “subareas” or “submarkets” as summarized in Table 2-1 and Map 1. The purpose is to capture differences in market and feasibility conditions and variations in the types of housing being built. Prototypes are customized by submarket as described in Section 4.
Table 2-1. Overview of Submarkets
Submarket Description
1 Central City Includes Railyards, River District, Central City Specific Plan 2 Southern Neighborhoods Bounded by I-5, Fruitridge, Broadway, 65th, US. 50, southern City limits. 3 North Sacramento and South Natomas North of American River Except North Natomas 4 North Natomas North of I-80, West of Steelhead Creek
5 Inner South and East Neighborhoods South of American River to Fruitridge / Broadway / US-50, plus West of the I-5 Note: See map on the following page.
Keyser Marston Associates, Inc. Page 8
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Map 1. Geographic Areas Addressed (Submarkets)
North
Natomas
North Sacramento
/ South Natomas
Southern
Neighborhoods
Inner South
and East
Neighborhoods
Central
City
Keyser Marston Associates, Inc. Page 9
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
2.5 Household Income Categories
The analysis addresses the following income categories defined by the California Department of Housing and Community Development (HCD) in relation to the Area Median Income (AMI):
Very Low Income: households earning up to 50% of AMI; Low Income: households earning over 50% of AMI, up to 80% of AMI; and
Moderate Income: households earning over 80% of AMI, up to 120% of AMI.
For reference, the 2023 median income for a family of four in Sacramento County is $113,900.
Table 4-3 identifies income limits for each income category and household size. Affordable rents and home prices used in this analysis are shown in Table 2-2 for an example unit size. See Table 4-4 and 4-5 for additional unit sizes.
Table 2-2. Affordable Prices and Rents
Affordable Sales Prices
three bedroom unit example
Affordable Rent
two bedroom unit example
Low Income, 70% of AMI $205,400 Very Low Income, 50% of AMI $1,147 / Month Moderate Income, 90% of AMI $333,600 Low Income, 60% of AMI $1,404 / Month Moderate Income, 110% of AMI $419,000 Low Income, 80% of AMI $1,916 / Month Based on 2023 Income Limits. Affordable rents are net of utility allowance.
See Appendix A Tables 11 and 12 for additional unit sizes and supporting calculations.
Moderate prices at 110
% of AMI and Low income rents at 80% of AMI are near average market rate rents and sales prices in Sacramento2, inclusive of both newer and older existing units. This is an indication 110% AMI for-sale units and 80% AMI rental units provide limited affordability benefits in the Sacramento market relative to market rate housing and a focus on lower income levels may be warranted.
2.6 Feasibility Analysis Findings
The feasibility analysis evaluates the development economics of the prototype projects and the viability of existing and potential modified affordable housing requirements. This feasibility analysis is intended to reflect prototypical projects in Sacramento, but it is recognized that the economics of some projects may look better, and some may look worse than those of the prototypes analyzed.
Feasibility findings with existing housing impact and utility fees are summarized in Table 2-2 under current market conditions and recent more favorable conditions. 2 The average market rate rent in Sacramento reported by Costar is approximately $1,650 per month, which is less than the 80% AMI rent for a two-bedroom. Sacramento’s median home price was approximately $455,000 as of March 2023 according to Redfin, about 9% higher than the 110% AMI pricing for a three bedroom home.
Keyser Marston Associates, Inc. Page 10
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 2-2. Summary of Feasibility Findings with Current Utility Fees and Housing Impact Fees Current
Market Conditions,
Existing Utility Fees, Existing HIF (1)
Recent More Favorable Conditions,
Existing Utility Fees, Existing HIF (1)
Single Family Detached Marginally feasible or infeasible in most submarkets, feasible in North Natomas. Feasible in all submarkets
Small Lot SFD or Townhomes
Feasible in most submarkets,
Marginally feasible in North Sacramento and South
Natomas
Feasible in all submarkets
Rentals Infeasible in most submarkets,
Marginally feasible for Central City higher density Feasible in all submarkets (1) Incorporates existing $0 HIF rate for higher density projects an d reduced HIF rates within the housing incentive zone.
Under recent more favorable market conditions, t
he rental and for-sale prototypes were found to
be broadly feasible, consistent with the robust development activity the city has been experiencing. However, the feasibility of both for-sale and rental projects has become more challenging under current market conditions. Downward pressure on prices and higher financing costs in today’s market have eroded the economics of for-sale projects. A combination of softening rents, upward pressure on cap rates and return requirements, and higher financing costs have contributed to a deterioration in the economics of rental projects.
Scenario Testing
A wide range of scenarios are tested regarding affordable housing fees and on-site affordable unit requirements.
Base Case for comparison: existing housing impact fees and existing utility fees.
On-Site Affordable Units, with 5%, 10% and 15% affordable units and proposed utility fees
o
Affordable pricing at Low (70% of AMI) and Moderate at 90% and 110% of AMI; o Affordable rents at Very Low (50% AMI), and Low at 60% and 80% of AMI. Provision of affordable units in a stand-alone LIHTC affordable project was evaluated in certain suba
reas. This solution will likely be limited to larger master plans with adequate scale to
set aside a site for a stand-alone affordable project.
Affordable housing fee scenarios – potential fee levels from retention of the existing housing impact fee rate
up to an increased fee of $20 per square foot.
Scenario testing measures the impact of alternat
ive affordable housing requirements relative to
a base case pro forma for a feasible project under recent more favorable market conditions and with existing requirements in place. Evaluating impacts relative to a feasible project allows the impact of potential modified requirements to be understood apart from recent adverse changes in market conditions.
Keyser Marston Associates, Inc. Page 11
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Scenarios incorporate proposed increased utility fees except where otherwise noted. Proposed increased utility fees are a material consideration as they add between $5 and $14 per square foot to development costs. If the proposed fees change materially prior to City Council adoption, the feasibility analysis may need to be updated.
For-Sale Projects Scenario Testing
Results of the scenario testing for for-sale projects are summarized in Table 2-3.
Table 2-3. For Sale Project Scenario Testing
Assuming Prior Market Conditions and Proposed Utility Fees Except as Noted No. Description
App
A
Table
Central
City
Southern
Neighborhoods
N. Sacramento
and South
Natomas
North
Natomas
Inner
South and
East
Townhome SF Sm lot SF Sm lot SF
Sm
lot SF
Sm
lot
1 Current Market, Proposed Utility Fees,
Existing HIF 5A F M M I I M M M F
2 Current Market, Existing HIF & Utility Fee 5B F M F I M F F M F 3 Prior Market, Existing HIF & Utility Fees 5C F F F F F F F F F 4 5% Moderate at 110% AMI 5D F F F M F F F F F
5 5% Moderate at 90% AMI 5E F F F M F F F F F
6 5% Low at 70% AMI 5F F F F M F F F F F
7 10% Moderate at 110% AMI 5G F F F M F F F F F
8 10% Moderate at 90% AMI 5H F F F M F F F M F
9 10% Low at 70% AMI 5I F M F I M F F M F
10 15% Moderate at 110% AMI 5J F F F M F F F M F
11 15% Moderate at 90% AMI 5K M M F M F F F M F
12 15% Low at 70% AMI 5L M M M I I M F M F
13 10% in Stand-Alone LIHTC Project (1) 5M n/a F F M F F F n/a n/a 14 15% in Stand-Alone LIHTC Project (1) 5N n/a F F M F F F n/a n/a 15 20% in Stand-Alone LIHTC Project (1) 5O n/a F F M F F F n/a n/a 16 No Change to HIF 5P F F F M F F F F F
17 Existing HIF with incentives removed 5Q F F F M F F F F F 18 HIF @$5/SF 5R F F F M F F F F F
19 HIF @$7.50/SF 5S F F F M F F F F F
20 HIF @$10/SF 5T F F F I M F F F F
21 HIF @$15/SF 5U F M M I M F F F F
22 HIF @$20/SF 5V F M M I I F F F F
(1) Primarily an option for larger master plans. Would have an average affordability level of 60% AMI or less. This option is not likely to be practical for most projects in Central City and Inner South and East Neighborhoods based on typically smaller site / project size, thus lacking the scale to do a sepa rate stand-alone LIHTC project.
F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
Keyser Marston Associates, Inc. Page 12
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
The North Sacramento and South Natomas for-sale prototypes show the weakest feasibility across all scenarios, indicating greater sensitivity to potential increases in requirements, driven by the lower market pricing in this area.
The Southern neighborhood prototypes remained in a feasible range with requirements up to 10% Moderate units or an increased housing impact fee of up to $10 per square foot.
Projects in the Central City, North Natomas, and small lot single family projects in the Inner South and East Neighborhoods remained in a feasible range with up to 10% Low or 15% at 110% of AMI, or fees up to $20 per square foot.
Table 4-19 provides another version of the for-sale scenario testing in which current less favorable market conditions are assumed in all scenarios. As shown, projects in the Central City can absorb an increase in the HIF to $7.50 plus the proposed utility fees. Projects in the Inner South and East neighborhoods could support a 5% on-site requirement, 10% at 110% AMI, or fees up to $15 per square foot; however, projects in all other submarkets would be challenged by any increase in requirements with current less favorable market conditions and proposed utility fees.
Rental Project Scenario Testing
Results of the scenario testing for rental projects are summarized in Table 2-4. The combination of proposed increased utility fees and an on-site affordability requirement was found to be challenging for rental projects to sustain, even at a modest 5% affordability requirement.
Projects were able to sustain increased utility fees and application of the full existing HIF rate to all projects (removing the $0 rate for higher density and Housing Incentive Zone). Projects in some areas were able to sustain a larger increase in fees, as indicated. The greater sensitivity to increased requirements in rental projects compared to for-sale is partly a function of proposed utility fees that are estimated to be higher for rental projects on a per square foot basis compared to for-sale projects.
Keyser Marston Associates, Inc. Page 13
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 2-4. Rental Project Scenario Testing
Assuming Prior Market Conditions and Proposed Utility Fees Except as Noted App
A
Table
Central City Southern
Neighborhoods
North
Sacramento
and South
Natomas
North
Natomas
Inner
South
and East No. Description Med Den High Den
1 Current Mkt, Proposed Utility Fees,
Existing HIF
6A I I I I I I
2 Current Market, Existing HIF & Utility Fee 6B I M I I I I 3 Prior Market, Existing HIF & Utility Fees
(Base Case for scenarios 4-19)
6C F F F F F F
4 5% Low @80% AMI 6D F F M M M F
5 5% Low @60% AMI 6E F F M M M M
6 5% Very Low @50% AMI 6F M F M M M M
7 10% Low @80% AMI 6G M F M M M M
8 10% Low @60% AMI 6H M F I I I I
9 10% Very Low @50% AMI 6I I F I I I I
10 15% Low @80% AMI 6J M F I I I M
11 15% Low @60% AMI 6K I M I I I I
12 15% Very Low @50% AMI 6L I I I I I I
13 No Change to HIF 6M F F F F F F
14 HIF @$5/SF 6N F F M F M F
15 HIF @$7.50/SF 6O F F M M M F
16 HIF @$10/SF 6P F F M M M F
17 HIF @$15/SF 6Q F F M M M M
18 HIF @$20/SF 6R M F I M I M
19 Existing HIF with incentives removed 6S F F F F F F F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
When the rental project scenario testing is performed a ssuming current less favorable
market conditions, all scenarios with increased affordable housing requirements and the proposed increased utility fees are infeasible, as projects are challenged even with existing requirements.
2.7 Compliance Costs and Other Metrics
The cost of
complying with alternative affordable housing requirements was expressed as a cost per square to assist in understanding the relative impact of various fee and on-site alternatives on the economics of residential development projects. This analysis is provided in Section 4.15 in a series of charts. Costs associated with on-site affordable units are generally higher where there is a larger gap between market rate and affordable prices and rents. Providing affordable units on-site often far exceeds the cost associated with the affordable housing fee scenarios that were evaluated.
Keyser Marston Associates, Inc. Page 14
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
An analysis
of the change in prices or rents that would be sufficient to offset the cost of affordable housing requirements is provided in Section 4.17. Other metrics are provided in the appendix including the impact of increased requirements to residual land values, and aggregate fees, permits and affordable housing costs as a percentage of the total development cost of a project.
2.8 Requirements in Other Jurisdictions and Case Study Research Section 6 presents a summary of affordable housing requirements in other jurisdictions.
Requirements are summarized for jurisdictions in the SACOG region as well as select larger cities nationally.
Following are themes identified through the review of local programs:
Within the SACOG region, eleven of the seventeen jurisdictions with a population over 50,000 have an affordable housing requirement for residential developments.
Among local programs, a 10% onsite option or requirement is the most prevalent.
Most local programs allow use of fees to meet the requirement. Fees are assessed in a wide range of formats, including per
square foot, per affordable unit, per market rate unit, and as a per
centage of sales price. Some programs require approval for use of in-lieu fees, including Davis for
projects over 200 units, and West Sacramento, which requires approval to
use fees but has usually granted it.
Programs with onsite requirements allow for alternative compliance options including land dedicat
ion and offsite construction. Additional compliance options allowed in some jurisdi
ctions include acquisition and rehabilitation of affordable units, credits for excess affordable u
nits produced by other projects, preservation of existing units, and custom proposals.
Use of alternatives generally requires approval.
The review of large city programs, including Atlanta, Boston, Chicago, Denver, Los Angeles, Portland, San Diego, San Jose, Seattle, identified the following:
Six of the large cities have city-wide programs, three have programs triggered by rezoning, an
d one applies requirements only in certain areas;
Nearly all large cities vary on-site requirements and/or fees by market area or zone; On-site requirements range from a low of 5% to a high of 20%.
Some programs provide multiple options, with the inclusionary percentage varying depending o
n the AMI level of the affordable units provided.
All of the large city programs have a fee option, with approximately half assessed per square foot
and half on a per unit basis.
Keyser Marston Associates, Inc. Page 15
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Several of the programs provide incentives for projects that include units on-site, such as additional density, parking reductions, or property tax exemptions.
A more in-depth review of programs in seven selected communities is provided in Section 6, including: Davis, Folsom Roseville, West Sacramento, Denver, Portland, and San Jose. Some highlights from this more in-depth review include:
Each jurisdiction determines the appropriate balance between requiring or encouraging onsite units and collecting fee revenues. Onsite units have the benefits of creating mixed income housing, building affordable units at the same time as the market rate units, and encouraging market rate developers to produce units cost-effectively. Collecting fee revenues creates a funding source that cities can leverage to provide gap funding for 100% affordable projects, with the potential to develop more units at deeper affordability levels.
Unless fees are set at a level to encourage onsite units, developers tend to choose a fee option if it is available. Many cities have onsite requirements with an in-lieu fee option that in practice is mainly a fee-based program.
Incentives can be effective in encouraging policy goals if they are meaningful in the local market. The value of density bonuses, for example, varies widely by jurisdiction and neighborhood.
Large cities with diverse market areas tend to vary requirements and incentives by geographic area.
The large cities surveyed (Portland, Denver, San Jose) have newer programs. A key feature of all three programs is a menu of compliance choices for developers. The menus provide flexibility and ideally will create a range of affordable unit types in the city.
Keyser Marston Associates, Inc. Page 16
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
3.0 HISTORIC PERFORMANCE OF MIXED INCOME HOUSING ORDINANCE The following section examines the historic performance of the City of Sacramento’s Mixed Income Housing Ordinance as originally adopted in 2000 (“2000 Ordinance”) and revised in 2015 (“2015 Ordinance"). The following metrics are examined:
Total
housing production;
Inclusionary unit production;
Funding sources for the affordable units that were produced;
Forgone revenue as a result of the 2015 Ordinance $0 Housing Impact Fee rate for high- density development; and
Inclusionary unit production had the 2000 Ordinance remained in place.
3.1 Citywide Total Housing Production Since 2000
Chart 3-1 shows the number of total housing units permitted in the City under the 2000 and 2015 Ordinances. Blue bars show units permitted while the 2000 Ordinance was in effect. Red bars show units permitted after adoption of the 2015 Ordinance. For comparison, the gray line with the axis on the right shows total housing units permitted in California over the same time period.
Chart 3-1. Total Housing Units Permitted, City of Sacramento Source: City of Sacramento, Housing Element Progress Reports and U.S. Census Bureau.
Housing production during the 2000
-2008 period consisted primarily of greenfield developments within new growth areas of the city, mainly within large master-planned communities. Housing production slowed in 2007 and 2008, and essentially stopped in 2009 as the Great Recession made new development infeasible. Housing production remained minimal from 2009 through 0 50,000
100,000
150,000
200,000
250,000
300,000
350,000
0 1,000
2,000
3,000
4,000
5,000
6,000
California Units
Sacramento Units
Units Permitted Under 2000 Ordinance Units Permitted Under 2015 Ordinance Units Permitted in California
Keyser Marston Associates, Inc. Page 17
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
2014 during the Great Recession and foreclosure crisis as home prices plunged nearly 50% from their peak.3 Recovery from the Great Recession took longer to gain momentum in Sacramento relative to California as a whole, as illustrated by the statewide trend line, due to differential impacts of the foreclosure crises on certain communities, including Sacramento.
In 2015, housing production began to increase as the market recovery took hold and rising rents and home values helped make projects feasible again. There was also a transition toward a larger share of infill residential development at higher densities. Prior to 2015, higher density housing was rarely built without a subsidy. According to the City’s Housing Element 2021-2029, by December 2020, approximately 73% of units in the development pipeline were in higher density multi-unit or attached housing. The remaining 27% consisted of lower-density single-unit developments. Approximately 60 percent of pipeline units were in large master-planned communities, such as the Railyards, Delta Shores, and the Panhandle. The remaining 40 percent of the residential pipeline were in individual infill developments, which include market rate condominiums, multifamily development, and mixed-use projects.
Table 3-1 summarizes the number of housing units permitted since 2000. While the 2000 Ordinance was in place, approximately 35,000 total units were permitted, representing an average of approximately 2,200 units per year over the entire period and 3,700 units per year excluding the 2008 to 2015 period impacted by the Great Recession. Under the 2015 Ordinance, a total of approximately 17,000 units were permitted, an average of approximately 2,800 units per year.
Table 3-1. Housing Units Permitted Citywide
Time Period Total Annual Average
2000 – 2007 29,873 3,734
2008 – 2015 (Great Recession) 5,014 627
Subtotal, 2000 - 2015 34,887 2,180
2016 – 2021 17,037 2,840
Total, 2000-2021 56,938 2,588
Source: Housing Element Annual Progress Reports, City of Sacramento.
Although the time periods shown in Table 3-1 are organized to enable a comparison between housing production under the two ordinances, trends are not attributable to differences in the ordinances, as evidenced by:
A similar pattern of housing production state-wide.
The periods of robust housing production that occurred under both ordinances; and
3 Based on data from the U.S. Federal Housing Finance Agency, All-Transactions House Price Index for Sacramento- Roseville-Folsom, CA (MSA) [ATNHPIUS40900Q], retrieved from FRED, Federal Reserve Bank of St. Louis; https://fred.stlouisfed.org/series/ATNHPIUS40900Q, November 1, 2022.
Keyser Marston Associates, Inc. Page 18
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
The shift towards high-density infill developments in the post-2015 period that, while paying a $0 fee rate under the 2015 Ordinance, were also generally not subject to the 2000 Ordinance due to location, such that the increase in infill housing production cannot be attributed to the ordinance change.
Market cycles, a diminishing supply of greenfield sites on the periphery of the City, and the trend toward multifamily infill projects are the driving forces behind the pattern seen in the housing production data.
3.2 Historical Performance: 2000 Mixed Income Housing Ordinance
The 2000 Ordinance required all residential
developments of 10 or more units located in
new growth areas of the city to set aside
15% of the housing as affordable, with 10%
set aside for very low income households
and 5% for low income households.
Map 2 shows the new growth areas that
were subject to the 2000 Ordinance, which
consisted of greenfield development areas
on northern, southern and eastern edges of
the city, future annexation areas, and two
large-acreage redevelopment sites
previously used as railyards.
Most large-scale developments chose to
satisfy the inclusionary obligation by
partnering with an affordable housing
developer. Typically, market rate projects
would donate land and make a cash
contribution to a stand-alone multifamily
project financed with low income housing
tax credits (LIHTC). The market rate
projects would generally fund a portion of
the gap, but affordable projects typically also
received other public subsidy sources,
including through SHRA. Local subsidies to
offset the cost of inclusionary requirements
were more common prior to the 2012
dissolution of redevelopment agencies in California, through use of housing set aside funds.
Map 2. Map of Areas Subject to 2000 Ordinance
Keyser Marston Associates, Inc. Page 19
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Smaller market rate developments, for whom partnering with a third-party affordable developer may not have been feasible, typically constructed for-sale affordable units onsite. In total, approximately 88% of the affordable units provided were in multifamily LIHTC projects and 12% were for-sale inclusionary units.
Table 3-2 summarizes the inclusionary units produced under the 2000 Ordinance by market rate project. Approximately half of the stand-alone tax credit projects produced affordable units that exceeded the developer’s 15% inclusionary obligation. Including affordable units produced in excess of the inclusionary unit obligation, there are a total of 1,985 affordable units produced as a result of the 2000 Ordinance. If only those affordable units that were required to meet the 15% requirement are counted, the number of affordable units produced under the 2000 Ordinance totals 1,557 units.
The “Affordable Units in Project” column in Table 3-2 identifies the total number of income- restricted units. The “Inclusionary Requirement Units” column shows the number of units restricted to meet the requirements of the 2000 Ordinance. While not provided to meet the requirement, the excess affordable units could arguably be attributed to the 2000 Ordinance as well, since the units were part of a project built to satisfy the requirements. For this reason, both figures are provided.
Keyser Marston Associates, Inc. Page 20
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 3-2. Inclusionary Units Produced Under 2000 Ordinance Project/Subdivision Inclusionary Project Address
Affordable
Units in
Project
Inclusionary
Requirement
Units
Multifamily Rental Inclusionary Units Provided
Cambay West Terracina Meadows Apts 4500 Tynebourne Street 120 70 The Meadows Natomas Park Apts 1850 Club Center Drive 93 22 Parkview Atrium Court Apts 3801 Duckhorn Drive 179 126
Parkview The Lofts at Natomas 3351 Duckhorn Drive 38 37 Natomas Park Commons / Cottages Northpointe Apts 2101 Zurlo Way 144 30 Silverado Creek Silverado Creek Apts 8501 Bruceville Road 135 81 JMA N. Natomas / Village Greens Westview Ranch Apts 500 Bankside Way 126 126 Natomas Field Vintage at Natomas Field 4000 Alan Shepard St 199 171 Natomas Central Valencia Point Apts 3600 Del Paso Road 166 166 Natomas Central Hurley Creek Apts 4275 El Centro Road 206 206 Natomas Place Willow Glen Apts 1625 Scarlet Ash Avenue 134 134 College Square Copperstone Apts 8000 West Stockton Blvd 102 56 Wolf Ranch Condominiums Wolf Ranch Condos 7200 Jacinto Ave 24 24 Curtis Park Railyards Curtis Pa rk Senior Apts 2315 10th Ave 90 79 Subtotal, Multifamily Rental 1,756 1,328
For Sale Inclusionary Units Provided
Parkview Ryland - Parkview 2883 Frigate Bird Drive 2 2
Parkview Ryland - Las Casitas 253 Dragonfly Circle 5 5
Meadowview Estates JTS - The Meadows 1954 Bonavista Way 19 19 Sheldon Whitehouse Serenade (Centex) 8607 Statue Way 8 8 Machado Beazer-Nottingham
(Vintage at Natomas) 3767 Naturita Way 4 4
Riverdale Beazer-Riverdale North 2748 San Juan Road 27 27 Astoria Place Astoria Place 4111 Vowell Street 6 6
Alta Vista Meadows Alta Vista Meadows 4660 Debralee Way 8 8 Cameron V Serenade (CamV) 6 Press Court 4 4
Sheldon 20 Centex Serenade II 8706 Longwill Way 14 14
North Laguna Pointe Laguna Pointe Condos 7515 Sheldon Rd #15102 23 23 Sheldon Farms Sheldon Farms 8581 Neapolitan Way 15 15
Wickford Square Wickford Square 100 Cinema Street 15 15 Dry Creek Pointe Dry Creek Pointe 4 4
Jessie Ave Condos Jessie Ave Condos 9 9
Patterson Subdivision Meadow Vista 9 9
Strawberry Field Strawberry Field 22 22
Sycamore Park Sycamore Park 3 3
Bruceville Amer. Dream Woodside Homes Forte/Staccato Sts. 7 7 Somerset Development Somerset 220 Ashwick Loop 25 25
Subtotal, For-Sale 229 229
TOTAL, ALL UNITS 1,985 1,557
Source: SHRA
Keyser Marston Associates, Inc. Page 21
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
3.3 Funding Sources for Multifamily Affordable Units Produced Under 2000 Ordinance Funding sources utilized to finance the multifamily projects built under the 2000 Ordinance are summarized in Table 3-3 for 12 of the 14 multifamily projects for which this information could be identified. For these 12 projects, market rate developers donated the site on which affordable projects were built for two thirds of the projects and contributed an average of approximately $9,000 per affordable unit in additional funding. The balance of funding for the affordable units came from LIHTCs and tax exempt debt (77%), the Sacramento Housing and Redevelopment Agency (SHRA) (6%), deferral of developer fees by the affordable developers (4%), and State and other funding sources (10%). On average, SHRA provided approximately $11,000 in assistance per affordable unit produced for these 12 projects.
Table 3-3. Funding Sources for Multifamily Affordable Units Built Under 2000 Ordinance Market
Developer
contributed land(1)
Funding Source as % of Total Development Cost
Project Year
Developer
funding (2)
LIHTC +
TE Debt(3)
Deferred
Fee(4) SHRA
State /
Other
Natomas Park 2002 No 1% 84% 3% 4% 7%
Atrium Court 2002 No 1% 83% 7% 7% 3%
Lofts at Natomas 2002 No 1% 92% 5% 0% 2%
Northpointe Park 2003 No 0% 78% 10% 4% 7%
Silverado Creek 2005 Yes 6% 82% 0% 8% 3%
Westview Ranch 2006 Yes 8% 75% 7% 7% 3%
Vintage at Natomas Field 2006 Yes 17% 76% 5% 0% 2%
Valencia Point 2006 Yes 7% 75% 0% 4% 14%
Hurley Creek 2006 Yes 7% 79% 0% 4% 10%
Copperstone 2009 Yes 4% 73% 5% 13% 4%
Willow Glen 2010 Yes 4% 58% 3% 4% 31%
Curtis Park Court 2014 Yes 0% 66% 1% 15% 18%
Average 5% 77% 4% 6% 9%
(1) Inferred from reported land costs. Affordable projects with no or minimal land costs are assumed to have received a donated site fr om the market rate developer.
(2) In most cases, data on financing sources does not specify whether contributions are by the market rate or affordable developer but are assumed to be by the market rate developer for purposes of this summary, with the exception of deferred developer fees identified in a separate column.
(3) For Curtis Park Court, this column represents 9% LIHTC and a conventional loan. (4) Affordable housing developers typically receive a development fee to fund their operational costs out of the project budget for each affordable development. Generally, a portion is funded upfront, and a portion is “deferred” and paid out of net rental revenue after the project is complete. Deferral of fees reduces the need for other upfront funding and so is treated as a funding source.
LIHTC = Low Income Housing Tax Credits. TE Debt = Tax Exempt Debt. SHRA = Sacramento Housing and Redevelopment Agency.
Source: SHRA.
For illustration, market rate developer contributions to the affordable projects in Table 3-3 were converted to an illustrative dollar per square foot cost. Assuming a historic land value of $11,000 Keyser Marston Associates, Inc. Page 22
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
per affordable unit4 and an average unit size of approximately 1,800 square feet for the primarily single-unit market rate developments that were subject to the 2000 Ordinance, the cash and land contributed by market rate developers to affordable projects during the 2002 to 2014 period are estimated to equate to roughly $1.60 per square foot of the market rate units. 5 This is a
historic figure and not representative of the current cost of meeting a similarly structured requirement. For comparison, the fee under the 2015 Ordinance was $2.58 outside of the Housing Incentive Zone at the time of adoption, and thus was similar to the per square foot cost projects were incurring in complying with the 2000 Ordinance, at that time.
3.4 Historical Performance: 2015 Ordinance
The City revised its Mixed Income Housing
Ordinance in November 2015 to convert to a
housing impact fee program and expand the
program citywide. The FY 2022-23 Housing
Impact Fee (HIF) is $3.49 per square foot for
multifamily and single unit developments. A fee
of $1.51 per square foot applies in Housing
Incentive Zones, shown on Map 3, which were
defined based on having home prices below a
certain threshold as of 2015. These fees are
adjusted automatically each year based on
increases in the construction cost index.
Multifamily projects over 40 dwelling units per
acre and single unit and duplex projects over
20 units per acre are eligible for a $0 rate.
Projects that include at least 10% affordable
units are exempt from the fee requirement.
Since going into effect in late 2015, the HIF has
generated $6.6 million in revenues, including
interest. SHRA has received $6.4 million
including interest, averaging $1.0 million per
year. As of November 2022, SHRA has
committed $4.7 million of these funds to assist
three affordable housing projects with a combined total of 449 units. The City has received $193,000 (3.2%) for the City’s administrative expenses, SHRA has used $485,000 (8%) in 4 This illustrative $11,000 per unit historic land value assumption is based on the average per unit land cost reported for five of the projects listed in Table 3-3 for which land costs were reported. 5 Estimated based on the following calculation: Average historic developer contribution ($9,000 + 66% of $11,000 land donation) times inclusionary requirement per market rate unit (15% inclusionary divided by 85% market rate) divided by a market rate unit size of 1,800 sf = $1.60 per square foot effective cost for market rate units.
Map 3. Housing Incentive Zone Map
Keyser Marston Associates, Inc. Page 23
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
administrative expenses, leaving $1.2 million available for additional affordable housing commitments.
Annual revenue and expenditure data through 2021 was provided by SHRA and the City and is shown in Table 3-4.
Table 3-4. Housing Impact Fee Revenues and Expenditures 2016 2017 2018 2019 2020 2021 TOTAL
Fee Revenues Collected
SHRA Revenues $565,192 $1,103,186 $626,768 $2,179,716 $1,059,719 $695,522 $6,230,103 City Revenues $17,080 $34,063 $17,759 $63,696 $39,640 $21,011 $193,250 Interest Earned $6,563 $30,399 $51,530 $56,907 $22,963 $168,362 Total Income $582,272 $1,143,812 $674,926 $2,294,942 $1,156,266 $739,496 $6,591,715
Expenses
SHRA Administration $73,259 $35,137 $60,757 $163,275 $57,985 $94,741 $485,154 City Administration $17,080 $34,063 $17,759 $63,696 $39,640 $21,011 $193,250 Projects $2,300,000 $510,839 $2,810,839
Total Expenses $90,339 $69,200 $78,516 $226,971 $2,397,625 $626,591 $3,489,243
Ending Balance $491,933 $1,566,545 $2,162,955 $4,230,926 $2,989,567 $3,102,472 $3,102,472
Funds Disbursed after 2021(1) $1,889,161
Total Funding Spent on Projects $4,700,000
Adjusted Ending Balance $1,213,311
1 Includes remainder of funding for 4995 Stockton and an SHRA 2022 commitment to provide $1.4 million to Mirasol Block D.
See Table 3-5.
Source; SHRA, City.
3.5 Affordable Unit Production Attributed to HIF Funding by SHRA
There are a total of 449 affordable units in the three projects SHRA has funded or committed to fund using HIF funds, shown in Table 3-5. Of these 449 units, SHRA attributes production of 27 units to the HIF funding. The 27-unit figure is based on the amount of HIF funds contributed divided by the maximum per unit subsidy specified in U.S. Department of Housing and Urban Development (HUD) regulations. This methodology reflects HIF funding covering a large share of the public subsidy for the 27 units. This is different than how affordable units were counted under the 2000 Ordinance, where all restricted units necessary to meet the 15% requirement were counted, although developer funding and contributed land typically represented a smaller share of the overall subsidy required.
Keyser Marston Associates, Inc. Page 24
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 3-5. Mixed Income Housing Fund Expenditures
Project Name Capitol Park 4995 Stockton Mirasol Block D Combined Total Amount $2,300,000 $1,000, 000 $1,400,000 $4,700,000 Number of MIHO Units 16 5 6 27
Total Regulated
Affordable Units 134 200 115 449
Source: SHRA. “MIHO Units” are Mixed Income Housing Ordinance units, “Total Affordable Units” are the total number of affordable housing units in the project.
3.6 Additional Units Provided Under Large Sites Provision of 2015 Ordinance
The 2015 Ordinance requires projects larger than 100 acres to submit a Mixed Income Housing Strategy for City approval. Six projects were identified with Mixed Income Housing Strategies approved under the 2015 Ordinance. Table 3-6 summarizes the strategies. The strategies include a mix of approaches including: land dedication to SHRA for multifamily affordable housing development, onsite units incorporated into the project, a stand-alone affordable development, and HIF payment. Most strategies include more than one compliance method for providing affordable units.
Table 3-6. 2015 Ordinance Large Sites - Mixed Income Housing Strategies Project Market Rate Units Affordable Units
Railyards 6,000 - 10,000 units 600 units @ 40% - 60% AMI. Half can be provided by land dedication.
Innovation Park
(Former Sleep Train
Arena Site)
Est. 3,000 units. High density
(20 -150 dua)
10% Low income units and 2.0 acre affordable site (150 units).
Delta Shores 5,921 market rate units Land dedicati on to SHRA for 429 affordable units (7%).
Panhandle 1,662 single family units Housing impact fees ($7.7 million) and 16 affordable units.
Greenbriar 2,526 single family and multifamily 189 a ffordable senior units plus two manager units.
Aspen 1/New
Brighton
1,365 total units, single family and
multifamily
10% of units (137 units)
Of the six large site mixed income housing strategies, two have produced inclusionary units so far – the Railyards and Greenbriar. The Railyards project donated land and provided 24% of the funding for “The AJ”, which is an apartment building with 20% of the units restricted to 50% AMI and the rest of the units at market rate. The project received tax-exempt financing and 4% tax credits. SHRA did not provide financial assistance for these units. The Railyards project also donated land and funding for “The Wong Center,” in which 149 affordable senior units are under construction. The project received tax-exempt bond financing and 4% tax credits; the City provided $3.5 million in financing through SHRA. The Northlake Senior Apartments were built as part of the Greenbriar project’s compliance with the 2015 Ordinance. The project received tax- exempt financing and 4% tax credits and no SHRA assistance.
Keyser Marston Associates, Inc. Page 25
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 3-7. Affordable Units Produced, 2015 Ordinance, Large Sites – Mixed Income Housing Strategies Project Name Address Inclusionary Units
Railyards Block 48 (The AJ) 305 6th Street 69
The Wong Center 331 J Street 149
Northlake (Greenbriar) 3500 Hammock Ave 189
Affordable Units Produced through Large Site Mixed Income Housing Strategies, 2015 Ordinance
407
3.7 Funding Sources for Multifamily Affordable Units Produced under 2015 Ordinance Table 3-8 summarizes finance sources for the affordable units produced under the 2015 Ordinance. This includes the three projects that received HIF funds, and the three projects built as part of large site mixed income housing strategies.
For the SHRA-Funded projects, funding came from LIHTCs and tax exempt bonds (58%), HIF funds (2%), other SHRA funding (16%), deferred fees by the affordable developers (2%), general partner / affordable developer funds (7%), and State and other funding sources (14%).
For the large site mixed income strategy projects, funding came from LIHTCs, tax exempt bonds and permanent loans (72%), market rate developer funds (15%), deferred fees by the affordable developers (1%), affordable developer funds (2%), City funding provided through SHRA (1%), and other sources (8%).
Keyser Marston Associates, Inc. Page 26
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 3-8. Summary of Funding Sources for Affordable Units Produced Under the 2015 Ordinance Funding Source as % of Total Development Cost
Project Year
Total
Aff.
Units
Mkt Rate
developer
contributed
land
Mkt Rate
Dev funds
/ HIF
Funds
LIHTC,
TE Debt,
Perm Loan
Deferred
Fee (2)
GP /
Aff
Dev.
Funds
Other
SHRA
Loans /
Grants
State
&
Other
Capitol Park 2020 134 no 3% 30% 0% 15% 25% 27%
4995 Stockton 2021 198 no 1% 75% 3% 6% 14% 0%
Mirasol Block D 2022 115 N/A(leased) 2% 62% 4% 0% 9% 23% Wtd. Average, HIF-Funded Units 2% 58% 2% 7% 16% 14%
Railyards Block 48 (The AJ) (1) 2021 69 yes 24% 74% 1% 0% 0% 2% The Wong Center 2021 149 yes 4% 55% 2% 6% 6% 27%
Northlake (Greenbriar) 2022 191 par tial 0% 91% 4% 5% 0% 0% Wtd. Average, Large Site Mixed Income Strategy Units 15% 72% 1% 2% 1% 8% Combined Average 9% 65% 2% 5% 9% 11%
(1) 80% market, 20% affordable project.
(2) Affordable housing developers typically receive a development fee to fund their operational costs out of the project budget for each affordable development. Generally, a portion is funded upfront, and a portion is “deferred” and paid out of net rental revenue after the project is complete. Deferral of fees reduces the need for other upfront funding and so is treated as a funding source.
LIHTC = Low Income Housing Tax Credits. TE Debt = Tax Exempt Debt. SHRA = Sacramento Housing and Redevelopment Agency.
Source: SHRA, LIHTC applications, City of Sacramento staff reports. Totals may not add due to rounding.
3.8 Forgone Revenue from $0 Housing Impact Fee Rate for High-Density Projects
When the HIF was adopted in 2015, fee levels for high density projects were set to $0 per square foot (“$0 HIF Rate”). High density was defined as 20 dwelling units per net acre or more for single-units and duplexes, and 40 dwelling units per net acre or more for multifamily projects.
The City provided data on projects that were eligible for the $0 HIF Rate based on their density.
Table 3-9 calculates the forgone fee revenue for projects that qualified for the high-density $0 HIF Rate. In total, nearly 3 million square feet of multifamily and almost 500,000 square feet of single unit / duplex development were eligible for the $0 HIF rate due to the density of the project. A total of $9.8 million would have been owed had the full HIF rate applied to these projects.
This $9.8 million in forgone HIF revenue assumes projects would have moved forward had the full HIF rate applied, although we cannot categorically affirm this. This assumption aligns with the Section 4 findings indicating projects were generally feasible at the full HIF rate under prior market conditions. Each project is unique, went forward at slightly different times, and would have evaluated the decision to move forward based on the facts and expectations at the time.
Keyser Marston Associates, Inc. Page 27
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 3-9. Forgone Fee Revenue from $0 HIF Rate for High-Density Development Project Type Fiscal Year
Issued
High-Density
Square Footage
Housing Impact Fee Rate
(rate that would have applied,
but for the $0 HIF rate)
Forgone Fee Revenue
(amount that would have been
due, but for the $0 HIF Rate)
Multifamily Projects 2016/17 13,654 $2.58 $35,227
(Commercial Permits) 2017/18 559,727 $2.68 $1,500,068 2018/19 229,429 $2.77 $635,518
2019/20 1,154,771 $2.78 $3,210,263
2020/21 364,229 $2.95 $1,074,476
2021/22 554,189 $3.03 $1,679,193
2022/23YTD 95,190 $3.49 $332,213
Total, MF 2,971,189 $8,466,958
Single-Unit/Duplex 2016/17 89,992 $2.58 $232,179 (Residential Permits) 2017/18 48,860 $2.68 $130,945 2018/19 99,019 $2.77 $274,283
2019/20 (1) 152,034 $2.78 $418,725
2020/21 64,099 $2.95 $189,092
2021/22 35,670 $3.03 $108,080
2022/23YTD 2,898 $3.49 $10,114
Total, SF 492,572 $1,363,418
Total, All $0 Fee High-Density
Projects
3,463,761
$9,830,376
(1) Two units located in Incentive Zone; reduced fee of $1.20 psf assessed.
Source: City of Sacramento.
3.9 Exemptions and $0 Housing Impact Fee Rate Units
The 2015 Ordinance allows for HIF exemptions for the following project types: second residential units, developments with 10% regulated low income housing units, a new single-unit dwelling built by an owner-builder, projects with an in-force development agreement adopted prior to the 2015 Ordinance, development projects that were not previously subject to the 2000 Ordinance that received approval of site plan and design review and/or a tentative map prior to November 1, 2015, and multi-unit dwelling developments that submitted an application for Site Plan and Design Review (SPDR) prior to November 1, 2015. Projects that are eligible for the $0 HIF rate include the higher density projects discussed above, and projects that are converting a non-residential use to residential use. The City provided data on projects that received an exemption from the HIF or paid a $0 HIF rate. The number of units that received each of the exemptions is shown in Table 3-10.
Keyser Marston Associates, Inc. Page 28
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 3-10. Exemptions and $0 Fee Projects, 11/1/2015 through 12/9/2022 $0 Housing Impact Fee Units
Multifamily High Density 4,034
Single Family High Density 419
Conversion of Non-Residential to Residential 601
Total, $0 Housing Impact Fee 5,054
Exemptions
Approved SPDR or Tentative Map Prior to 11/1/2015 2,648 SPDR Submitted for Multi-Unit Development Prior to 11/1/2015 566 10% Low Income Housing Units 1,610
In-force Development Agreement Prior to 2000 1,610
Second Residential Unit 558
Single Family Home Built by Owner-Builder 108
Total, Exempted Units 7,100
Total Number of Units Receiving Exemptions / $0 Fee 12,154 Source: City of Sacramento
3.10 What-If Analysis: Applying the 2000 Ordinance to Projects Permitted Since 2015 This section summarizes a “what-if” analysis that estimates how many inclusionary units would have been produced had the 2000 Ordinance remained in effect. KMA used HIF collection data provided by the City to identify projects that would have been subject to the 2000 Ordinance, had it remained in effect. The 2000 Ordinance applied only in certain geographic areas, and it applied only to projects with more than 10 units. Therefore, projects outside of the new growth areas were excluded from the analysis, as were projects with fewer than 10 units.
As shown in Table 3-11, an estimated 812 market rate units built during the November 2015 to October 2022 period would have been required to provide inclusionary units under the 2000 Ordinance, had it remained in effect, instead of paying the HIF. Had the 2000 Ordinance applied instead, the 15% inclusionary requirement would have resulted in a requirement for 120 inclusionary units. Instead of providing these 120 units, an aggregate of $3.6 million in HIFs was paid, which equates to approximately $30,000 per forgone inclusionary unit. The remaining approximately $3.0 million of the $6.6 million in total HIF collections were from small projects and geographic areas that were not subject to the 2000 Ordinance.
Keyser Marston Associates, Inc. Page 29
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 3-11. Estimated Number of Forgone Inclusionary Units Project Type
# of Units in
Project (1)
15% of units
in Project Impact Fees Paid
50 Regency Park Circle Condos 42 6 $155,319
Bruceville Terrace SFD 85 13 $499,597
Calistoga SFD 35 5 $191,785
Cottages at Laguna Condos / Rental 62 9 $153,197
Entrada SFD 89 13 $467,439
Renaissance at Dry Creek SFD/ Half-plex 51 8 $92,902
Rio Villas / Riverland SFD 36 5 $75,888
Serenade Duets Half-plex 10 2 $350,280
Shasta Ridge / Silverleaf SFD 35 5 $237,975
Sheldon Apartments Rentals 289 43 $1,156,163
Westshore / Natomas Village SFD 22 3 $99,227
Wickford Square SFD 56 8 $123,818
Total 812 120 $3,603,592
(1) Condos/rentals: estimated from permitting and assessor’s data. SFD/Half-plex: number of units that paid housing impact fee.
Source: City of Sacramento.
The remaining units located in new growth areas that were permitted after the 2015 Ordinance went into effect either had already satisfied their inclusionary obligation, had an adopted MIHS that provided affordable housing (which was credited towards the fee), had a development agreement adopted prior to the 2000 Ordinance that exempted the project from both the 2000 and 2015 ordinances, or received one of the other exemptions.
3.11 2000 and 2015 Ordinances: Different Policies for Differing Conditions
Market rate and affordable housing production in Sacramento has evolved since 2000 for many reasons. For most of the 2000s, housing production was characterized by greenfield developments of master-planned communities within new growth areas of the city. The scale of these market-rate projects combined with low land values and the availability of funding for affordable housing allowed for developments to comply with the 2000 Ordinance by partially funding units in stand-alone affordable projects developed by third parties. The affordable units received additional funding from SHRA, 4% tax credits and tax-exempt bonds.
The Great Recession brought housing development to a near halt from 2009 to 2014. By the time Sacramento began to emerge from the Great Recession, the development landscape was significantly changed. In Sacramento, there was a transition away from large-scale greenfield developments toward smaller infill residential development at higher densities, although still in its nascent stages. The end of redevelopment in California substantially reduced availability of local funding for affordable housing. Land and construction costs increased. Legal authority to implement inclusionary programs was under scrutiny through a case before the California Keyser Marston Associates, Inc. Page 30
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Supreme Court and a subsequent petition for U.S. Supreme Court review. A separate ruling precluded application of inclusionary programs to rental housing. These factors set the stage for amendments to the program in 2015, including expansion of the program citywide and conversion to a fee-based program in light of the uncertain legal environment and recent loss of redevelopment funding. The $0 HIF rate for higher density development was aimed at encouraging higher density projects that had historically faced greater feasibility challenges.
Since adoption of the 2015 Ordinance, high density development in Sacramento has become well established. The legal authority to implement inclusionary programs was re-affirmed and broadened to include rental developments through a change in State law. Costs have continued to escalate, weighing on market rate projects and pushing affordable projects to cobble together additional layers of funding. Rising interest rates have created new headwinds for the housing market, pushing some homebuyers out of the market. As the landscape for housing development and inclusionary programs has continued to evolve since the 2015 Ordinance was adopted, the City is now pursuing an update to the Ordinance for the years ahead.
Keyser Marston Associates, Inc. Page 31
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
4.0 FINANCIAL FEASIBILITY ANALYSIS
This section presents a financial feasibility analysis addressing a range of residential development types in Sacramento and the ability to sustain alternative affordable housing fee and on-site inclusionary requirements. The purpose is to help inform the design of updated requirements at levels that are sustainable for market rate projects and to provide information regarding how alternatives requirements compare in terms of effects on the economics of new residential development projects.
4.1 Housing Market Context
For-Sale Housing Market
After a boom period during the pandemic driven by a confluence of factors, including historically low interest rates and increased demand, which drove a substantial escalation in prices, the for- sale housing market has cooled substantially. Median prices countywide rose 360% over a ten- year period from 2012 to their peak in mid-2022. Since peaking in mid-2022, median prices have declined approximately 9%, driven by the increase in mortgage interest rates.
Sales activity slowed through the second half of 2022 as borrowing costs increased, pushing some buyers out of the market and encouraging others to wait for an anticipated pricing correction. Existing homeowners who locked in very low rates that were available until recently now have a powerful incentive to remain in their existing home, which has stifled demand from “move up” buyers but has also contributed to limited inventory and may be helping to offset downward pressure on pricing associated with rising interest rates.
Charts 4-1, 4-2 and 4-3 on the following pages show longer-term trends in median prices and median number of days units are on the market, as well as a shorter term view of pricing trends.
Keyser Marston Associates, Inc. Page 32
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Chart 4-1. Median Home Prices, Sacramento County
Source: California Association of Realtors
Chart 4-2. Median Number of Days on Market, Sacramento County Source: California Association of Realtors
$0
$100,000
$200,000
$300,000
$400,000
$500,000
$600,000
$700,000
Jan‐00
Nov‐00
Sep‐01
Jul‐02
May‐03
Mar‐04
Jan‐05
Nov‐05
Sep‐06
Jul‐07
May‐08
Mar‐09
Jan‐10
Nov‐10
Sep‐11
Jul‐12
May‐13
Mar‐14
Jan‐15
Nov‐15
Sep‐16
Jul‐17
May‐18
Mar‐19
Jan‐20
Nov‐20
Sep‐21
Jul‐22
May‐23
0 10
20 30
40 50
60 70
Jan‐00
Oct‐00
Jul‐01
Apr‐02
Jan‐03
Oct‐03
Jul‐04
Apr‐05
Jan‐06
Oct‐06
Jul‐07
Apr‐08
Jan‐09
Oct‐09
Jul‐10
Apr‐11
Jan‐12
Oct‐12
Jul‐13
Apr‐14
Jan‐15
Oct‐15
Jul‐16
Apr‐17
Jan‐18
Oct‐18
Jul‐19
Apr‐20
Jan‐21
Oct‐21
Jul‐22
Apr‐23
Keyser Marston Associates, Inc. Page 33
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Chart 4-3. Trend in Home Sale Prices Per Square Foot, City of Sacramento Sales between July 2021 and February 2023 of units built since 1990 between 1,700 and 2,200 square feet and priced between $200 and $450 per square foot.6 Source: CoreLogic
Despite curr
ently less favorable conditions, homebuilders have expressed optimism of a return to stronger market conditions in a year or two. As homebuilder Lennar put it in their 2022 annual report:
….. very limited new home inventory, existing homeowners protecting extremely low mortgage interest rates, and a now chronic production shortfall over the past decade, have left the industry in the middle of what we believe can be a fairly short duration correction without an inventory overhang to resolve, since the fundamental underpinnings of supply and demand in the housing market remain strong. 7 Multiple local homebuilders shared the optimism that current conditions may represent more of a shorter-term correction than a sustained downturn. A healthy economy with low unemployment, chronic undersupply of housing, and potential for moderating interest rates once inflation cools, support this optimism. Local builders are proceeding with pipeline projects on the expectation of improved conditions on the horizon and are looking to position themselves to take advantage of it.
6 This narrow band of unit sizes is intended to isolate trends in pricing from changes in the types of units that are being sold. 7 Lennar 2022 annual report accessed at https://investors.lennar.com/~/media/Files/L/Lennar-IR-V3/documents/annual- reports/2022-annual-report-v1.pdf
$150
$200
$250
$300
$350
$400
$450
$500
Jul‐21 Oct‐ 21 Jan ‐22 Apr ‐22 Aug ‐22 Nov ‐22 Feb ‐23
Home Price Per Square Foot
Keyser Marston Associates, Inc. Page 34
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Cooling market conditions have also helped to rein in construction cost increases, which had escalated substantially during the pandemic. Multiple local developers indicated that construction costs have decreased relative to 2022, driven by an increase in the number of contractors bidding on work, more competitive bidding, as well as an easing of pandemic- related supply chain issues, although costs are still higher than pre-pandemic.
Rental Housing Market Trends
Sacramento has experienced a strong cycle for development of new rental housing with approximately 5,000 rental units produced in five years. Strong feasibility for development of new rentals has been supported by rapid escalation in market rents; interest in living in the urban core; supportive City land use policies aimed at encouraging new housing such as flexibility on density and parking; and a favorable investment climate and low interest rate environment that put upward pressure on valuations of completed projects and downward pressure on the returns needed for feasibility.
Chart 4-4 shows trends in rents and vacancy rates since 2012. Average rents in Sacramento increased approximately 70% over the 2012 to 2022 period to approximately $1,650 per month.
Rents for newly built apartments reflect an approximately 50% premium over averages for existing units. As a large supply of new units have been delivered to the market over the last year, vacancy rates have risen from a low near 4% to approaching 8%. Average rents for newly built units have also decreased slightly from their 2021 peak. Vacancy rates in new projects are currently substantially higher than these averages as lease up of newly delivered units occurs.
Chart 4-4. Rents and Vacancy Rate Trends, City of Sacramento
Source: CoStar
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
8.0%
9.0%
$‐
$500
$1,000
$1,500
$2,000
$2,500
$3,000
2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 YTD
Vacancy Rate
Asking Rent Per Month
Avg Rent ‐ All Units Avg. Rent ‐ Units Built Since 2017 Overall Vacancy
Keyser Marston Associates, Inc. Page 35
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Recent shifts in the market have altered the conditions that supported a sustained period of strong feasibility for rentals. Emerging trends that are now constraining feasibility of rentals include:
The historically large number of new rental units under construction or recently completed are placing downward pressure on rents, as the market absorbs the new units.
Development costs have increased substantially from earlier in the market cycle. Until recently, these rising costs could be sustained by rising rents, increasing market values, and strong demand. However, rent growth has now peaked and turned slightly negative.
Rising interest rates mean projects must achieve higher returns to justify development risk relative to safer investment alternatives which now pay far higher interest rates than a year or two ago. Higher borrowing costs means a given amount of rental income can no longer support the same level of debt, which places downward pressure on building valuations, upward pressure on cap rates, and upward pressure on the returns a project must generate to attract investors. Rising interest rates also increase the cost of construction financing, adding to development cost.
Rental developers are reporting that some equity investors have paused further investments in new projects or are waiting until it is clearer how the market will respond to the new supply now under construction and other market changes. Some investors are reportedly demanding substantially higher returns, which projects are unable to support.
These factors suggest a pause or slowdown in new rental construction starts is likely until conditions improve. Examples of market adjustments that would support improved feasibility include reduced land prices, more competitive bidding by contractors, renewed rent growth, moderating interest rates, renewed interest by equity investors, or some combination of these factors.
Rental developers interviewed for this assignment viewed the current more challenging conditions for rental feasibility as temporary and many indicated they would continue to pursue opportunities for future projects in Sacramento. Developers expressed optimism that projects currently experiencing challenges securing financing, eventually would be financed and move forward. In fact, one developer was closing on construction financing for a local rental project on the day interviewed. Land transactions for multifamily development sites in late 2022, including a multifamily site in Delta Shores
8 and a site in downtown9, also demonstrate optimism among
8 https://www.bizjournals.com/sacramento/news/2022/11/04/jackson-square-properties-delta-shores.html 9 https://www.bizjournals.com/sacramento/news/2022/11/23/skk-buys-cascade-site-d-s.html
Keyser Marston Associates, Inc. Page 36
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
market participants that multifamily development will “pencil” in the future, although several state that they are looking for opportunities at a low land basis.
4.2 Analysis Limitations
This analysis, by its nature, can only provide an overview-level assessment of development economics because it is based on prototypical projects rather than specific projects. Every project has unique characteristics that will dictate rents or sale prices supported by the market as well as development costs and developer return requirements. Each developer will assess the project’s risk and return and assemble project financing differently. This feasibility analysis is intended to reflect prototypical projects in Sacramento, but it is recognized that the economics of some projects may look better, and some may look worse than those of the prototypes analyzed.
The feasibility analysis represents a snapshot of real estate market conditions as of the time this analysis was prepared in winter and early spring 2023. Real estate development economics are fluid and are impacted by constantly changing conditions with regard to rent potential and sale prices, construction costs, land costs, and costs of financing. A year or two from now, conditions will undoubtedly be different than they are today.
4.3 Subareas Evaluated
The feasibility analysis provides separate findings for five geographic “subareas” or “submarkets” of Sacramento. The purpose is to capture differences in market and feasibility conditions by location, and to capture variation in the types of housing, unit sizes, and density of housing being built by area. The five submarkets are identified in Table 4-1 and are shown in map form in Section 2.4. Submarkets were selected based on a review of development activity and market data, with a goal of grouping areas that are seeing similar projects at similar prices and rents. City staff provided input on the submarket definitions and feedback was also solicited as part of a Housing Policy Working Group meeting in September 2022.
Table 4-1. Submarkets
Subarea Name Description
1 Central City Includes Railyards, River District, Central City Specific Plan 2 Southern Neighborhoods Bounded by I-5, Fruitridge, Broadway, 65th, US. 50, southern City limits. 3 North Sacramento and South Natomas North of American River Except North Natomas 4 North Natomas North of I-80, West of Steelhead Creek
5 Inner South and East Neighborhoods South of American River to Fruitridge / Broadway / US-50, plus West of the I-5
Keyser Marston Associates, Inc. Page 37
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
4.4 Residential Prototypes
For purposes of this feasibility analysis, KMA analyzed the following residential unit types:
Single Family Detached
Small Lot Single Family
Attached
Townhomes
Rental apartments
o Higher density (7-8 stories, wood frame over a podium) o
Medium density rentals (4-5 stories, surface or tuck under parking) o Lower density rentals (3-4 stories, surface or tuck under parking) These proto
types are based on projects in the City’s current development pipeline and are intended as representative of the range of projects the City is currently seeing. Prototypes are customized for each submarket in terms of representative average unit sizes and densities, as summarized in Table 4-2. Appendix B Tables 2A to 2E provide a summary of the pipeline projects reviewed by KMA in identifying programmatic assumptions for the prototypes.
Programmatic details and estimated pricing were reviewed as part of a Housing Policy Working Group meeting in September 2022 and were circulated by email for review and input at that time.
Table 4-2. Prototype Residential Projects Evaluated
For-Sale Rental
Single
Family
Detache d
Small Lot
Detached and
Townhomes(1)
Higher
Density
Medium
Density Lower Density
Parking Type Attached
garage
Attached
garage
Podium
garage (0.75
spc/unit)
Surface /
Tuck Under
(0.5 spc/unit)
Surface / Tuck
Under (1-1.5
spc/unit)
No. of Stories one to two two to three 7 to 8 4 to 5 3 to 4 Density (units per acre)
North Natomas 9 dua 18 dua N/A N/A 30 dua
North Sacramento / South Natomas 9 dua 18 dua N/A N/A 30 dua Central City N/A 26 dua 200 dua 100 dua N/A
Inner South and East
Neighborhoods
8 dua 20 dua N/A N/A 37 dua
Southern Neighborhoods 11 dua 18 dua N/A N/A 30 dua
Average Unit Size (square feet)
North Natomas 2,100 sf 1,600 sf N/A N/A 900 sf
North Sacramento / South Natomas 1,900 sf 1,500 sf N/A N/A 900 sf Central City N/A 1,850 sf 690 sf 770 sf N/A
Inner South and East
Neighborhoods
2,300 sf 1,700 sf N/A N/A 770 sf
Southern Neighborhoods 1,750 sf 1,450 sf N/A N/A 900 sf (1) Analyzed as attached townhomes in Central City area and small lot detached homes in other locations.
Keyser Marston Associates, Inc. Page 38
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
4.5 Affordability Levels Addressed
The analysis includes evaluation of units affordable to the following household income categories:
Very Low Income: households earning up to 50% of Area Median Income (AMI); Low Income: households earning over 50% of AMI, up to 80% of AMI; and Moderate Income: households earning over 80% of AMI, up to 120% of AMI
Households are categorized by income tier based on income limits published by the California Department of Housing and Community Development (HCD). For reference, the 2023 median income for a family of four in Sacramento County is $113,900. Table 4-3 identifies income limits for each income category. Income limits increased by 11% from 2022.
Table 4-3: 2023 Sacramento County Income Limits
Household Size (Persons)
Income Category % of AMI 1 2 3 4 5 6
Very Low Income 50% AMI $37,550 $42,900 $48,250 $53,600 $57,900 $62,200 Low Income 80% AMI $60,050 $68,600 $77,200 $85,750 $92,650 $99,500 Median Income 100% AMI $79,750 $91,100 $102,500 $113,900 $123,000 $132,100 Moderate Income 120% AMI $95,700 $109,350 $123,050 $136,700 $147,650 $158,550 Source: California Department of Housing and Community Development, 2023 Income Limits.
AMI = Area Median Income
Affordable prices and rents for the income categories addressed in the analysis are shown in Table 4-4 and 4-5. Supporting calculations are provided in Appendix A Tables 11 and 12.
Table 4-4: 2023 Affordable Prices
2-BR 3-BR 4-BR
Low Income, 70% of AMI $187,000 $205,400 $219,700
Moderate Income, 90% of AMI $302,400 $333,600 $358,100 Moderate Income, 110% of AMI $379,400 $419,000 $450,400
Table 4-5: 2023 Affordable Rents (Monthly)
Studio 1-BR 2-BR 3-BR
Very Low Income, 50% of AMI $901 $1,030 $1,147 $1,264 Low Income, 60% of AMI $1,100 $1,258 $1,404 $1,549
Low Income, 80% of AMI $1,499 $1,713 $1,916 $2,118
Estimated market rate prices and rents discussed in the following section were also translated into the estimated percentage of area median income that households would need to have to be able to afford the units. Estimates are presented in Table 4-6. As shown:
Keyser Marston Associates, Inc. Page 39
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Market prices for newly built for-sale housing are estimated to require between 86% to 241% of area median income to afford, dependin
g on location and whether the
household h
as a 20% cash down payment10.
Market rate rents for newly built apartments are estimated to range from 102% of median to 120% of median, depending on location.
Market rents are estimated to be affo
rdable to Moderate Income households in all areas (up to 120% AMI). Market prices in the North Sacramento / South Natomas, North Natomas, and Southern Neighborhoods submarkets are estimated to be within a range that Moderate Income households can afford, with some exceptions depending on the prototype and whether the homebuyer has a 20% cash down payment.
Table 4-6. Estimated Household Income (% of AMI) Required to Afford Market Prices and Rents for New Units Single Family Small Lot SFD and Attached Rentals
5% down
payment
20% down
payment
5% down
payment
20% down
payment
North Natomas 155% 124% 128% 103% 108%
North Sacramento / South Natomas 123% 98% 108% 86% 102% Central City* n/a n/a 221% 177% 116%
Inner South and East Neighborhoods 241% 193% 194% 155% 120% Southern Neighborhoods 126% 101% 112% 90% 107%
* Estimate for rentals in the Central City area represe nts the average of the two rental prototypes.
4.6 Methodology for Financial Feasibility Analysis
The financial feasibility analysis estimates the costs to develop a new market rate residential project and the sales revenues or rental income that would be generated by the project upon completion. If the sales revenues or rental income are sufficient to support the development costs and generate a sufficient profit margin, the prototype is considered feasible. This approach to financial feasibility, known as a pro forma approach or income approach, is standard practice in the real estate industry and is utilized in one form or another by all developers when analyzing new construction projects.
This analysis organizes the pro forma as a “residual land value analysis,” meaning the pro forma solves for what the project can afford to pay for a development site based on the sales/income projections and the non-land acquisition costs of the project. It then compares the residual land values with land costs in the current market in order to test whether developers can afford to buy land and develop projects. For rentals, the pro forma analysis also identifies returns assuming purchase of a site at a representative land cost. 10 A 20% down payment reduces monthly mortgage payments and eliminates a need for mortgage insurance, this in turn reduces the income estimated to be needed to afford the unit, due to lower monthly housing costs.
Keyser Marston Associates, Inc. Page 40
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
4.7 Approach to Current Market Conditions
As evident from a substantial track record of recently completed projects, Sacramento has experienced a sustained period where residential development has been generally feasible. As described above, over the past year, conditions have become less favorable, and feasibility has become more challenging.
Developers interviewed for this assignment advised that they were continuing to look for ways to move forward with current projects, would continue to pursue opportunities for future projects in Sacramento, and would continue to make progress on predevelopment work for planned projects with the goal of positioning projects to move forward when conditions are right.
Given the on-the-ground evidence of recent strong feasibility conditions and optimism regarding improved conditions expressed by market participants, the pro forma analysis incorporates two scenarios with respect to market conditions:
Current Market Conditions – which reflect softening of home prices and rents, higher financing costs, and increased threshold return on cost requirements for rentals. The analysis is based on market data available as of late winter / early spring 2023 when the analysis was prepared.
More Favorable Recent Conditions – a pro forma reflecting more favorable recent conditions in which projects were broadly feasible is provided to allow the impact of affordable housing requirements on the economics of feasible projects to be understood.
Scenarios based on recent more favorable conditions reflect market data on rents and home prices as of spring / summer 2022, interest rates available prior to the significant increase in rates occurring over the course of 2022, and a market cap rate for rental projects derived from multi-family property sales from 2020 through early 2022, prior to the recent increase in interest rates. The approach of testing how potential modified requirements impact the economics of projects, starting from a baseline of a feasible project under current requirements, is arguably more informative than evaluating how requirements would affect the economics of projects under conditions in which projects are less likely to move forward. This approach is also generally in line with how some developers indicated they are approaching current conditions, seeking to weather a correction in the market while positioning projects to take advantage of potentially improved conditions in the future.
Keyser Marston Associates, Inc. Page 41
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
4.8 Revenue / Supported Unit Values
For-Sale Project Sales Revenues
Market home prices were estimated based upon a review of prices for new homes being marketed for sale and resales of newer existing homes. Market data was originally reviewed, and prices were estimated in summer 2022. Pricing was subsequently adjusted downward as of winter 2023 based on updated pricing data for new homes and a review of trends in resale prices for existing homes. Pricing data for both periods is presented in Charts 4-5 and 4-6 on the following pages. Additional market data supporting pricing estimates is provided in Appendix B.
Pricing estimates are summarized in Table 4-7.
Table 4-7. Estimated Home Prices
Average Winter 2023 Estimate Summer 2022 Estimate
Unit Size Price Price/SF Price Price/SF
Single Family Detached
North Natomas 2,100 sf $611,000 $291 $650,000 $310
North Sacramento / South Natomas 1,900 sf $484,000 $255 $515,000 $271 Inner South and East Neighborhoods 2,300 sf $940,000 $409 $1,000,000 $435 Southern Neighborhoods 1,750 sf $484,000 $277 $515,000 $294
Small Lot SFD and Townhomes
North Natomas 1,600 sf $494,000 $309 $525,000 $328
North Sacramento / South Natomas 1,500 sf $414,000 $276 $440,000 $293 Central City 1,850 sf $817,000 $442 $860,000 $465
Inner South and East Neighborhoods 1,700 sf $729,000 $429 $775,000 $456 Southern Neighborhoods 1,450 sf $423,000 $292 $450,000 $310
Keyser Marston Associates, Inc. Page 42
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Chart 4-5. New Home Pricing by Subarea, Summer 2022, and Estimated Prototype Pricing
Chart 4-6. New Home Pricing by Subarea, Winter 2023, and Estimated Prototype Pricing
Keyser Marston Associates, Inc. Page 43
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Rental Project Income
Rental income for the apartment prototypes is estimated based on rental data for recently built apartments in Sacramento by geographic area. Estimated rents are summarized in Table 4-8.
Chart 4-7 shows rent data as of winter 2023 and rent estimates for each apartment prototype.
Additional supporting data on market rents is provided in Appendix B. Comparing asking rents for the same properties in summer 2022 versus winter 2023, asking rents decreased within the Central City and North Sacramento / South Natomas area but appeared to be more stable in other locations. This is likely driven by absorption of a large supply of new units being delivered primarily in and around the Downtown.
Table 4-8. Market Rent Estimates
Average Winter 2023 Estimate Summer 2022 Estimate
Unit Size Rent/Mo Rent/SF/Mo Rent/Mo Rent/SF/Mo
North Natomas 900 sf $2,500 $2.78 $2,500 $2.78
North Sacramento / South Natomas 900 sf $2,350 $2.61 $2,450 $2.72 Central City - Medium Density 770 sf $2,450 $3.18 $2,600 $3.38 Central City - Higher Density 690 sf $2,550 $3.70 $2,700 $3.91 Inner South and East Neighborhoods 770 sf $2,350 $3.05 $2,350 $3.05 Southern Neighborhoods 900 sf $2,300 $2.56 $2,300 $2.56 Chart 4-7. Asking Rents, Recently Built Apartments, Winter 2023
Keyser Marston Associates, Inc. Page 44
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
For the Southern Neighborhoods subarea, only one newer rental property was identified, and it was built a few years prior to other comparables. As such rents in this subarea are estimated to exceed this comp.
Developer Investment Supported, Rental Projects
The first step in estimating the amount of developer investment that can be supported in a new rental development is to calculate Net Operating Income (NOI). NOI is equal to the annual rental income, minus operating expenses and a 5% allowance for credit loss and vacancy. As shown in Table 4-9, the NOI for market rate units is estimated to range from $18,200 to $23,400/unit/year depending on the submarket and average unit size under current market conditions.
NOI is divided by a return on cost (ROC)
11 to estimate the amount of developer investment
(debt and equity) that can be supported by the rental income from the project. A 6.5% threshold developer return on cost is used, which represents a 1.5% spread over the 5% capitalization rate
12 applicable to the most recent newer multifamily property sale we identified in Sacramento, which occurred in August 2022 (H16 and Eleanor Apartments). Rising interest rates are placing upward pressure on cap rates, which in turn places upward pressure on the ROC developers need to finance projects. Published investor surveys show a market expectation that cap rates are likely to increase.
On this basis, the supported investment under current conditions with 100% market rate units is estimated to range from $280,000 to $361,000 depending on the prototype and estimated rents by area, as shown in Table 4-9.
Table 4-9. Net Operating Income and Investment Supported, Current Market, 100% Market Rate
Net Operating
Income (NOI)
Return on Cost
(ROC) Requirement
Developer Investment Supported
(=NOI/ ROC)
North Natomas $20,210 6.5% $310,900
North Sacramento / South Natomas $18,500 6.5% $284,600 Central City - Medium Density $21,365 6.5% $328,700
Central City - Higher Density $23,465 6.5% $361,000
Inner South and East Neighborhoods $19,700 6.5% $303,100 Southern Neighborhoods $18,230 6.5% $280,500
Note: See Appendix A Table 6 for supporting details and estimates for other scenarios.
For scenarios based on prior more favorable market conditions, a lower threshold ROC of
6.05% is applied, which reflects a lower 4.7% cap rate, based on the average cap rate for four multifamily property sales, summarized in Appendix A Table 7, that occurred from 2020 through February 2022, prior to the significant rise and interest rates, and a spread of 1.35% over this
11 Return on Cost (ROC) represents the ratio between net operating income and development cost of the project. 12 A capitalization rate or “cap rate” represents the ratio between net operating income and the market value of the completed project.
Keyser Marston Associates, Inc. Page 45
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
average cap rate, between the 1.25% to 1.5% spread cited by multiple local multifamily developers.
4.9 Development Cost Estimates
The direct costs of development include all contractor labor and material costs to construct the project including general requirements, contractor fees, and contingencies. As shown in Table 4-10, the direct construction costs are estimated between $194,000 to $333,000/unit depending upon the unit type and size. Key variables with respect to direct costs include the size of the unit, the type of parking, and overall density. In general, higher density prototypes are more costly on a per square foot basis than lower density prototypes. The cost estimates have been made based on cost figures for current and pipeline projects provided by developers who are active in the local market, cost figures sourced to local developers included in official statements for recent Community Facilities District bonds, review of developer pro formas for similar building types, and third party sources such as RS Means and the Marshall and Swift Valuation Service.
Table 4-10. Development Costs and Builder Margin, Current Market, Not Including Land
Unit
Size
Direct
Const
Fees and
Permits(1)
Other
Indirects Financing
Builder
Margin(2)
Sales &
Closing
Costs
Development
Cost, Builder
Margin,
Except Land
Single Family Detached
North Natomas 2,100 sf $248,000 $84,300 $60,500 $31,900 $61,100 $19,900 $505,700 N Sacramento / S Natomas 1,900 sf $219,000 $57,100 $50,000 $27,800 $48,400 $15,700 $418,000 Inner South & East Neighborhoods 2,300 sf $315,000 $65,900 $87,200 $50,700 $94,000 $30,600 $643,400 Southern Neighborhoods 1,750 sf $217,000 $56,800 $49,800 $26,300 $48,400 $15,700 $414,000
Small Lot SFD or Townhomes
North Natomas 1,600 sf $218,000 $72,500 $50,400 $25,600 $49,400 $16,100 $432,000 N Sacramento / S Natomas 1,500 sf $194,000 $51,200 $43,300 $22,400 $41,400 $13,500 $365,800 Central City 1,850 sf $333,000 $61,200 $81,100 $41,900 $81,700 $26,600 $625,500 Inner South & East Neighborhoods 1,700 sf $286,000 $50,800 $71,300 $36,200 $72,900 $23,700 $540,900 Southern Neighborhoods 1,450 sf $196,000 $49,100 $44,000 $22,400 $42,300 $13,700 $367,500
Rentals
North Natomas 900 sf $261,200 $43,200 $37,400 $20,200 n/a n/a $362,000 N Sacramento / S Natomas 900 sf $261,200 $30,800 $37,400 $18,500 n/a n/a $347,900 Central City - Medium Density 770 sf $248,400 $31,200 $35,500 $21,400 n/a n/a $336,500 Central City - Higher Density 690 sf $267,000 $30,700 $38,200 $23,500 n/a n/a $359,400 Inner South & East Neighborhoods 770 sf $233,800 $31,900 $33,400 $19,700 n/a n/a $318,800 Southern Neighborhoods 900 sf $238,800 $31,200 $34,100 $18,200 n/a n/a $322,300 (1) Includes existing housing impact fee and proposed increased utility fees. (2) Threshold net builder profit margin estimated at 10% of sales. For rentals, developer returns are reflected as part of the return on cost used to identify supported investment, described in Section 4-8.
See Appendix A Tables 5 and 6 for additional information.
Keyser Marston Associates, Inc. Page 46
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Indirect costs of development include architecture and engineering (A&E), municipal fees and permits costs, taxes, insurance, overhead, debt financing costs, etc. The higher density prototypes tend to have higher indirect costs on a per square foot basis because they have more complex design and engineering issues than single family homes and because they take longer to build, which increases financing costs.
Estimated fees and permit costs include proposed new utility fees that have not yet been adopted by the City. Proposed utility fees represent an estimated net increase of between $7,900 and $17,400 per unit over existing fees. For scenarios that include affordable housing on-site, the City’s existing program of exempting affordable units from certain municipal fees is taken into consideration in the estimates.
Estimated financing costs under current market conditions reflect an interest rate of 9%. For scenarios that reflect prior more favorable conditions, an interest rate of 6% is applied.
The for-sale pro forma analyses reflect a threshold builder net profit margin of 10% of sales revenue. For rental projects, profit to the developer is captured as part of the return on cost, discussed in the prior section.
Total development cost plus a threshold builder profit margin is estimated to range from roughly $319,000 to $643,000/unit depending on the prototype, not including land, as summarized in Table 4-8. See Appendix A Tables 5 and 6 for additional details.
Dev
rent Market, Not Including Land
4.10 Residential Land Sales Values
Data on residential land sales was accessed from sources including CoStar, a third-party vendor of market data, reporting by the Sacramento Business Times on land transactions, and comparable sales presented in appraisals. Table 4-11 provides a summary of the residential land sale transactions by type.
Medium and High Density Residential Sites – Land targeted for higher de nsity
development in the Central City area
, generally at densities of 100 units per acre or
more (consistent with th
e medium and high density apartment prototypes) sold at an average price of $149 per land square foot and $36,000 per unit based on nine transaction
s since 2019. Outside of the Central City, medium and high density sites were located mainly in the In
ner South and East Neighborhoods subarea and had average pricing of $7
3 per land square foot or $45,000 per unit. Generally, sites targeted at higher densities were priced lower o
n a per unit basis, but higher on a per square foot
basis, compared to deve
lopment sites targeted for lower densities.
Lower Density Apartment Sites – Land targeted for lower density apartment development outside of t
he Central City area, ranging from 21 to 40 units per acre, Keyser Marston Associates, Inc. Page 47
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
(consistent with the lower density apartment prototype) sold at an average price of $17 per land square foot and $25,000 per unit based on 12 transactions since 2019. Lower Density Single Family and Attached For-Sale sites – Residential lots outside of the Central City area sold for an ave
rage price of $26 per land square foot and $125,000
per unit based on 18 tra
nsactions since 2019. The condition of lots at sale is an important consideration in pricing. Finished lot
s with necessary intract street and utility
improvemen
ts will sell for a premium over lots without these improvements in place.
Finished lo
ts in Northlake sold for an average of $24 per square foot and $130,000 per unit. Finishe
d lots in Parkbridge Village sold for an average of $105,000 per unit and around $20 per square foot.
Raw and Pa
rtially Improved Land – Raw or partially improved land that lacks infrastructur
e necessary for development sold for an average of $3 per square foot of land or $23,000 per unit. Sales were primarily in the North Natomas area and consisted of land plan
ned for development primarily at single family densities. Appendix A Table 9 provides tw
o examples of horizontal land development costs for the Delta Shores and Northlake projects draw
n from developer-reported information included in recent bond offering documents. For Delta Shores, the expen
diture represents a cost of $19 per land
square foot
and for Northlake $12 per land square foot, not including land purchase and $28 and $17
per square foot, respectively, with land purchase costs included. This, along with t
he sales data for unimproved land, demonstrates that most of the value associat
ed with finished lots within larger master plans is represented by horizontal improvements such as new streets and utilities that the developer makes in creating buildable lo
ts. A small share of finished lot values for greenfield development sites is represented
by the underlying value of raw land prior to infrastructure improvements and entitlements.
Commercial and Industrial Land – since some residential sites in areas with limited land
availability o
ccur on former commercial and industrial properties, sales data for commercial land was also accessed.
Prices averaged $30 per square foot based on
eleven transactions in th
e inner south and east neighborhoods and spanned a wide range of pricing from $13 to $95 per square foot.
Keyser Marston Associates, Inc. Page 48
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 4-11. Residential Land Sale Transactions, 2019 to 2022 No. of Average Sale Price
Development Type Sales Density Min. Max. Average (1)
Apartment Sites
Medium & High Density, Central City (99 - 208 du/ac) 9 181 dua Land Price/ sf land $83 $201 $149
Land Price/ unit $22,000 $64,000
$36,000
Medium Density, outside Central City (63-110 du/ac) 5 70 dua Land Price/ sf land $62 $101 $73
Land Price/ unit $22,000 $50,000 $45,000
Lower Density Apartment Sites (21-40 du/ac) 12 29 dua
Land Price/ sf land $8 $30 $17
Land Price/ unit $13,000 $45,000 $25,000
Commercial / Industrial Land, Inner S&E Neigh. 11 n/a $13 $95 $30 Land Price/ sf land
For-Sale Residential Development Sites
Residential Lots 18 9 dua
Land Price/ sf land $11 $41 $26
Land Price/ unit $45,000 $341,000 $125,000
Raw Land and Paper Lots (lacks infrastructure) 6 6 dua
Land Price/ sf land $1 $6 $3
Land Price/ unit $4,000 $36,000
$23,000
(1) Averages weighted based on land area and unit count, for price per square foot and price per unit, respectively. dua = dwelling units per acre. See Appendix A, Table 8 for details.
The land sale data descr
ibed above was used to estimate land costs by prototype project, as shown in Table 4-12. Figures represent the supported land value targeted in the analysis for a project to be identified as feasible.
Table 4-12. Land Cost Estimates, Prototype Projects (Supported Land Values for Feasible Project) Values Per Square Foot of Land Values Per Residential Unit Single
Family
Small Lot
and Attached Rental
Single
Family
Small Lot and
Attached Rental
Central City N/A $120 Med. Dens: $103
High Dens: $161
N/A $201,000 Med. Dens: $45,000
High Dens: $35,000
Inner South and East Neighborhoods $65 $80 $42 $354,000 $174,000 $50,000 North Natomas $25 $30 $17 $121,000 $73,000 $25,000
North Sacramento / South Natomas $25 $30 $17 $121,000 $73,000 $25,000 Southern Neighborhoods $25 $30 $17 $99,000 $73,000 $25,000 Keyser Marston Associates, Inc. Page 49
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
4.11 Feasibility Analysis Findings
The financial feasibility analysis is based on the relationship between the project’s revenue potential, the estimated development costs, and a reasonable developer return commensurate with the cost of funds and development risk.
For-Sale Projects Feasibility Analysis Approach – The pro forma analysis for for-sale projects is structured as a residual value analysis. Residual land values are derived by subtracting the development costs and builder profit margin before land acquisition from the estimated net sales revenues. If the residual value exceeds the cost to acquire a site for development, the prototype is generally determined to be feasible. If the residual value is less than the cost to acquire and prepare the site, the prototype will need to address economic challenges. The for-sale pro forma provides a land residual for a finished lot condition and must be compared to values for finished lots with intract and backbone streets in place.
Rental Project Feasibility Analysis Approach -The pro forma analysis for rental projects is, like for-sale projects, structured as a residual value analysis. With the land values supported by the economics of rental projects compared to land costs as one metric for evaluating feasibility. An additional metric presented is the total development cost as a percentage of the amount of debt and equity investment that can be supported by the rental income from the project. Land values are a smaller share of overall development costs for rental projects than with for-sale projects and tend to be far more sensitive to changes in the pro forma. The additional metric is provided as a separate indicator of feasibility tied to overall project economics.
Each prototype project is placed into one of the following three feasibility categories for each scenario that is tested:
1) Feasible – p
roject type is generally feasible and likely to develop. 2) Marginal Feasibility – pr
ojects type has weaker feasibility and may require some improvemen
t in its economics to move forward.
3) Infeasible /
Challenged – project type has more challenging feasibility and is not likely to move forward without more significa
nt improvements to the pro forma, such as higher
prices and rents or lower costs.
Table 4-13 shows the sp
ecific criteria applied in placing projects into these three feasibility categories. While criteria used with for-sale and rental projects are expressed differently, they are roughly equivalent
13. 13 For example, if a for-sale project supports a land value within 10% of prevailing land costs, the threshold used to determine feasibility, its development costs plus a builder margin would be within 2% to 4% of project revenues, which is roughly equivalent to the feasibility criteria applied to rental projects.
Keyser Marston Associates, Inc. Page 50
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 4-13. Feasibility Criteria
Feasibility Category For-Sale Feasibility Criteria Rental Feasibility Criteria Feasible Sales revenues support the development cost
of the project, threshold developer return, and
purchase of a site at prevailing land costs
(within 10% of estimated land cost).
Development costs including land are in
balance with the developer investment
supported by the project’s rental income
(within 3%).
Marginal Feasibility Supported land value of 70% or more of the estimated land cost
Development costs including land are more
than the developer investment that can be
supported by the project’s rental income, but
within 3-7%.
Infeasible / Challenged Supported land value less than 70% of the estimated land cost
Development costs including land significantly
exceed (by more than 7%) the developer
investment supported by the project’s rental
income.
4.12 Feasibility Findings: For-Sale Projects
Findings with current market conditions and proposed new utility fees – Table 4-14 summarizes the residual land value conclusions for the for-sale prototypes under current market conditions, assuming proposed new utility fees, and assuming payment of the City’s existing housing impact fee (with all the existing incentives in place including the $0 fee for higher density). The financial feasibility analysis shows that for-sale projects are being challenged by downward pressure on prices, the new utility fees that are proposed, and higher financing costs in today’s market. The only prototypes classified as feasible are the small lot and attached prototypes in the Central City and Inner South and East neighborhoods, supported by higher pricing in those locations. The other prototypes had more marginal feasibility based on supported land values below prevailing land costs. The North Sacramento / South Natomas prototypes were found to be infeasible, driven primarily by lower sales prices. The supporting pro forma table for this scenario is provided in Appendix A Table 5A.
Keyser Marston Associates, Inc. Page 51
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 4-14. For-Sale Feasibility Findings, Current Market Conditions, Proposed Utility Fees, Existing HIF Unit Size
Sales
Prices
Development
Cost
Excluding
Land
Supported
Land
Value
Estimated
Land Cost
Supported
Land Value
as % of
Land Cost
Feasibility
Conclusion
Single Family Detached
North Natomas 2,100 sf $611,000 ($505,700) $105,300 $121,000 87% M N Sacramento / S Natomas 1,900 sf $484,000 ($418,000) $66,000 $121,000 55% I Inner South and East Neighborhoods 2,300 sf $940,000 ($643,400) $296,600 $354,000 84% M Southern Neighborhoods 1,750 sf $484,000 ($414,000) $70,000 $99,000 71% M
Small Lot SFD and Townhomes
North Natomas 1,600 sf $494,000 ($432,000) $62,000 $73,000 85% M N Sacramento / S Natomas 1,500 sf $414,000 ($365,800) $48,200 $73,000 66% I Central City 1,850 sf $817,000 ($625,500) $191,500 $201,000 95% F Inner South and East Neighborhoods 1,700 sf $729,000 ($540,900) $188,100 $174,000 108% F Southern Neighborhoods 1,450 sf $423,000 ($367,500) $55,500 $73,000 76% M F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
Findings with prior market conditions and existing utility fees – Feasibility was also tested under recent more favorable market conditions, before rising interest rates began to have more of an impact on pricing, and with current lower utility fees. Findings are shown in Table 4-15. As shown, the for-sale prototype projects are identified as generally feasible, which is consistent with the fact that substantial new market rate development has been occurring. The supporting pro forma table for this scenario is provided in Appendix A Table 5C.
Table 4-15. For-Sale Feasibility Findings, Prior More Favorable Market Conditions, Existing Utility Fees, Existing HIF Unit Size
Sales Price or
Supported
Investment
Per Unit
Development
Cost
Excluding
Land
Supported
Land
Value
Estimated
Land Cost
Per Unit
Supported
Land
Value as
% of Land
Cost
Feasibility
Conclusion
Single Family Detached
North Natomas 2,100 sf $650,000 ($493,400) $156,600 $121,000 129% F N Sacramento / S Natomas 1,900 sf $515,000 ($401,600) $113,400 $121,000 94% F Inner South & East Neighborhoods 2,300 sf $1,000,000 ($622,400) $377,600 $354,000 107% F Southern Neighborhoods 1,750 sf $515,000 ($401,800) $113,200 $99,000 114% F
Small Lot SFD and Townhomes
North Natomas 1,600 sf $525,000 ($420,200) $104,800 $73,000 144% F N Sacramento / S Natomas 1,500 sf $440,000 ($350,400) $89,600 $73,000 123% F Central City 1,850 sf $860,000 ($603,800) $256,200 $201,000 127% F Inner South & East Neighborhoods 1,700 sf $775,000 ($524,100) $250,900 $174,000 144% F Southern Neighborhoods 1,450 sf $450,000 ($355,800) $94,200 $73,000 129% F F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
Keyser Marston Associates, Inc. Page 52
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
4.13 Feasibility Findings: Rental Projects
Rental findings with current market conditions and proposed new utility fees – Table 4-16 summarizes the residual land value conclusions for the rental prototypes under current market conditions, assuming proposed new utility fees, and assuming payment of the City’s existing housing impact fee (with all the existing incentives in place including the $0 fee for higher density). The financial feasibility analysis shows that rental projects are currently challenged, despite a recent and sustained period of strength in the Sacramento market. A combination of softening rents, upward pressure on cap rates and return requirements from rising interest rates, higher financing costs, and the proposed increase in utility fees results in deterioration of the economics of rental projects. As indicated in Table 4-16, all of the prototype rental projects were found to be infeasible in this scenario. Development costs are out of balance with the amount of investment supported by rental income. As shown, the rental income from the prototype projects is estimated to support only approximately 76% to 92% of estimated development costs. A more detailed pro forma table is provided in Appendix A, Table 6A.
Table 4-16. Rental Feasibility Findings, Current Market Conditions, New Utility Fees, Existing HIF
Unit
Size
Developer
Investment
Supported
by Rent
Dev. Cost,
Except
Land
Supported
Land
Value
Land
Cost
Per Unit
Dev.
Cost with
Land
Investment
Supported
by Rents
as % of
Dev Cost
Feasibility
Finding
North Natomas 900 sf $310,900 ($362,000) ($51,100) $25,000 $387,000 80% I N. Sacramento / S. Natomas 900 sf $284,600 ($347,900) ($63,300) $25,000 $372,900 76% I Central City - Med. Density 770 sf $328,700 ($336,500) ($7,800) $45,000 $381,500 86% I Central City - High Density 690 sf $361,000 ($359,400) $1,600 $35,000 $394,400 92% I Inner South & East Neighborhoods 770 sf $303,100 ($318,800) ($15,700) $50,000 $368,800 82% I Southern Neighborhoods 900 sf $280,500 ($322,300) ($41,800) $25,000 $347,300 81% I F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
Rental feasibility findings with more favorable recent conditions and current utility fees – Feasibility was also tested under recent more favorable market conditions and existing utility fees. Findings are presented in Table 4-17. Rents in this scenario are 4% to 6% higher than estimates under current conditions for the North Sacramento / South Natomas and Central City prototypes and are the same for other areas (softening of rents appears greater in the Central City where more new units are undergoing initial lease up). The threshold return on cost was set at 6.05%, as described above, based on lower recent cap rates. Financing costs are lower based on lower recent interest rates. Development costs were adjusted to reverse a portion of recent escalation. In essence, this scenario models the economics of rental projects as they existed under recent conditions that supported a robust period for rental development activity in Sacramento, although these conditions have since deteriorated. As shown, development costs are in balance with the developer investment supported by the rental income from the project.
The supporting pro forma table for this scenario is provided in Appendix A, Table 6C.
Keyser Marston Associates, Inc. Page 53
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 4-17. Rental Feasibility Findings, Prior More Favorable Market Conditions, Existing Utility Fees, Existing HIF
Unit
Size
Developer
Investment
Supported
by Rent
Dev. Cost,
Except
Land
Supported
Land
Value
Land
Cost Per
Unit
Dev.
Cost with
Land
Investment
Supported
by Rents
as % of
Dev Cost
Feasibility
Finding
North Natomas 900 sf $334,000 ($310,300) $23,700 $25,000 $335,300 100% F N. Sacramento / S. Natomas 900 sf $324,600 ($295,300) $29,300 $25,000 $320,300 101% F Central City - Med. Density 770 sf $381,400 ($322,600) $58,800 $45,000 $367,600 104% F Central City - High Density 690 sf $416,100 ($344,900) $71,200 $35,000 $379,900 110% F Inner South & East Neighborhoods 770 sf $325,600 ($269,200) $56,400 $50,000 $319,200 102% F Southern Neighborhoods 900 sf $301,300 ($274,600) $26,700 $25,000 $299,600 101% F F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
4.14 Scenario Testing
As described above, two versions of the pro forma were developed, one assuming current market conditions, for which project feasibility is weaker, even under existing requirements, and one based on more favorable recent conditions when projects were generally feasible. Scenario testing measures the impact of alternative affordable housing requirements and increased utility fees relative to a base case pro forma for a feasible project under recent more favorable market conditions. Projects are likely to proceed when conditions support improved feasibility or when there is an expectation improved conditions will exist by the time new units are marketed for sale or rent. The approach of evaluating impacts relative to a feasible project allows the impact of potential requirements to be understood apart from recent adverse changes in market conditions. Scenarios assume increased utility fees unless otherwise noted. Base Case for comparison: existing housing impact fees and existing utility fees. On-Site Affordable Units, with 5%, 10% and 15% affordable units and new utility fees o Affordable pricing at Low (70% of AMI) and Moderate at 90% and 110% of AMI; o Affordable rents at Very Low (50% AMI), and Low at 60% and 80% of AMI. Provision of affordable units in a stand-alone LIHTC affordable project was evaluated in certain subareas. This solution will likely be limited to larger master plans with adequate scale to set aside a site for a stand-alone affordable project. Affordable Housing Fee Scenarios – potential fee levels were tested at a range of fee levels ranging from retention of the existing housing impact fee up to an increased rate of $20 per square foot of net livable area.
Keyser Marston Associates, Inc. Page 54
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
For-Sale Projects Scenario Testing
Results of the scenario testing for for-sale projects are summarized in Table 4-18.
The North Sacramento and South Natomas for-sale prototypes show the weakest feasibility across all scenarios, indicating greater sensitivity to potential increases in requirements, driven by the lower market pricing in this area.
The Southern Neighborhood prototypes remained in a feasible range with requirements up to 10% Moderate units or an increased housing impact fee of up to $10 per square foot.
Projects in the Central City, North Natomas, and small lot single family projects in the Inner South and East Neighborhoods remained in a feasible range with up to 10% Low or 15% Moderate units or fees up to $20 per square foot.
Providing affordable units in a separate stand-alone affordable project supported by tax credits and other funding sources in conjunction with a non-profit partner could reduce the cost of producing the affordable units and generally enhances feasibility relative to providing for-sale affordable units. However, this is mainly an option for larger master plans and most smaller projects will not have sufficient scale or an appropriate site for a standalone tax credit rental project to be a workable option.
Keyser Marston Associates, Inc. Page 55
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 4-18. For Sale Project Scenario Testing
Assuming Prior Market Conditions and Proposed Utility Fees Except as Noted No. Description
App A
Table
Central
City
Southern
Neighborhoods
North
Sacramento
and South
Natomas
North
Natomas
Inner
South and
East
Townhome SF Sm lot SF
Sm
lot SF
Sm
lot SF
Sm
lot
1 Current Market, Proposed Utility Fees,
Existing HIF 5A F M M I I M M M F
2 Current Market, Existing Utility & HIF 5B F M F I M F F M F 3 Prior Market, Existing HIF & Utility Fees
(Base Case for scenarios 4 to 22) 5C F F F F F F F F F
4 5% Moderate at 110% AMI 5D F F F M F F F F F
5 5% Moderate at 90% AMI 5E F F F M F F F F F
6 5% Low at 70% AMI 5F F F F M F F F F F
7 10% Moderate at 110% AMI 5G F F F M F F F F F
8 10% Moderate at 90% AMI 5H F F F M F F F M F
9 10% Low at 70% AMI 5I F M F I M F F M F
10 15% Moderate at 110% AMI 5J F F F M F F F M F
11 15% Moderate at 90% AMI 5K M M F M F F F M F
12 15% Low at 70% AMI 5L M M M I I M F M F
13 10% in Stand-Alone LIHTC Project (1) 5M n/a F F M F F F n/a n/a 14 15% in Stand-Alone LIHTC Project (1) 5N n/a F F M F F F n/a n/a 15 20% in Stand-Alone LIHTC Project (1) 5O n/a F F M F F F n/a n/a 16 No Change to HIF 5P F F F M F F F F F
17 Existing HIF with incentives removed 5Q F F F M F F F F F 18 HIF @$5/SF 5R F F F M F F F F F
19 HIF @$7.50/SF 5S F F F M F F F F F
20 HIF @$10/SF 5T F F F I M F F F F
21 HIF @$15/SF 5U F M M I M F F F F
22 HIF @$20/SF 5V F M M I I F F F F
(1) Primarily an option for larger master plans. Would have an average affordability level of 60% AMI or less. This option is not likely to be practical for most projects in Central City and Inner South and East Neighborhoods based on typically smaller site / project size, thus lacking the scale to do a separate stand-alone LIHTC project.
F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
Table 4-19 provides another version of the for-sale scenario testing in which current less favorable market conditions are assumed in all scenarios. As shown, projects in the Central City can absorb an increase in the HIF to $7.50 plus the proposed new utility fees. Small lot single family projects in the Inner South and East Neighborhoods could support a 5% on-site requirement, 10% at 110% AMI, or fees up to $15 per square foot; however, projects in other submarkets would be challenged by any increase in requirements with current less favorable market conditions and proposed new utility fees.
Keyser Marston Associates, Inc. Page 56
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 4-19. For Sale Project Scenario Testing
Assuming Current Market Conditions and Proposed Utility Fees No. Description
App A
Table
Central
City
Southern
Neighborhoods
North
Sacramento
and South
Natomas
North
Natomas
Inner
South and
East
Townhome SF Sm lot SF
Sm
lot SF
Sm
lot SF
Sm
lot
4 5% Moderate at 110% AMI 5D M M M I I F F M F
5 5% Moderate at 90% AMI 5E M I M I I M M M F
6 5% Low at 70% AMI 5F M I I I I M M M F
7 10% Moderate at 110% AMI 5G M M M I M M F M F
8 10% Moderate at 90% AMI 5H M I I I I M M M M
9 10% Low at 70% AMI 5I M I I I I I I M M
10 15% Moderate at 110% AMI 5J M M M I M M F M M
11 15% Moderate at 90% AMI 5K I I I I I M M I M
12 15% Low at 70% AMI 5L I I I I I I I I M
13 10% in Stand-Alone LIHTC Project (1) 5M n/a M M I I F M n/a n/a 14 15% in Stand-Alone LIHTC Project (1) 5N n/a I I I I F M n/a n/a 15 20% in Stand-Alone LIHTC Project (1) 5O n/a I I I I M M n/a n/a 16 Current HIF + proposed Utility Fees 5P F M M I I M M M F 17 Existing HIF with incentives removed 5Q F I I I I M M M F 18 HIF @$5/SF 5R F I I I I M M M F
19 HIF @$7.50/SF 5S F I I I I M M M F
20 HIF @$10/SF 5T M I I I I M I M F
21 HIF @$15/SF 5U M I I I I I I M F
22 HIF @$20/SF 5V M I I I I I I M M
(1) Primarily an option for larger master plans. Would have an average affordability level of 60% AMI or less. This option is not likely to be practical for most projects in Central City and Inner South and East Neighborhoods based on typically smaller site / project size, thus lacking the scale to d o a separate stand-alone LIHTC project.
F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
Rental Project Scenario
Testing
Results of the scenario testing for rental projects are summarized in Table 4-20. The combination of proposed increased utility fees and an on-site affordability requirement was found to be challenging for rental projects to sustain, even at a relatively modest 5% affordability requirement. Projects were able to sustain increased utility fees and application of the full existing HIF rate to all projects (removing the $0 rate for higher density). Projects in some areas were able to sustain a larger increase in fees, as indicated. The greater sensitivity to increased requirements in rental projects compared to for-sale is partly a function of proposed utility fees that are estimated to be higher for rental projects on a per square foot basis compared to for- sale projects.
Keyser Marston Associates, Inc. Page 57
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 4-20. Rental Project Scenario Testing
Assuming Prior Market Conditions and Proposed Utility Fees Except as Noted App
A
Table
Central City Southern
Neighborhoods
North
Sacramento
and South
Natomas
North
Natomas
Inner
South
and East No. Description Med Den High Den
1 Current Mkt, Proposed Utility Fees,
Existing HIF
6A I I I I I I
2 Current Mkt, Existing Utility and HIF 6B I M I I I I
3 Prior Market, Existing HIF & Utility Fees
(Base Case for scenarios 4-19)
6C F F F F F F
4 5% Low @80% AMI 6D F F M M M F
5 5% Low @60% AMI 6E F F M M M M
6 5% Very Low @50% AMI 6F M F M M M M
7 10% Low @80% AMI 6G M F M M M M
8 10% Low @60% AMI 6H M F I I I I
9 10% Very Low @50% AMI 6I I F I I I I
10 15% Low @80% AMI 6J M F I I I M
11 15% Low @60% AMI 6K I M I I I I
12 15% Very Low @50% AMI 6L I I I I I I
13 No Change to HIF 6M F F F F F F
14 HIF @$5/SF 6N F F M F M F
15 HIF @$7.50/SF 6O F F M M M F
16 HIF @$10/SF 6P F F M M M F
17 HIF @$15/SF 6Q F F M M M M
18 HIF @$20/SF 6R M F I M I M
19 Existing HIF with incentives removed 6S F F F F F F F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
If the scenario testing in Table 4-20 were performed assuming current less favorable market conditions, all the scenarios with increased affordable housing requirements and proposed increased utility fees would be identified as infeasible.
4.15 Compliance Cost Analysis
The cost of complying with alternative affordable housing requirements was expressed as a cost per net square foot of livable area within the project. The purpose is to assist in understanding the relative impact of various alternatives on the economics of residential development projects.
The proposed net increase in utility fees is illustrated and is reflected in all scenarios.
The identified dollar per square foot costs of providing affordable units within the project is based on the net impact to the pro forma from setting aside a share of units at affordable prices
Keyser Marston Associates, Inc. Page 58
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
and rents. The term “cost” is used, although technically the impact of an affordability restriction is forgone rent revenue or sales proceeds. Costs are higher where there is a larger difference between market rate and affordable prices and rents.
Charts 4-8 through 4-10 present the results of the compliance cost analysis for for-sale projects.
Charts 4-11 through 4-13 present the compliance cost analysis for rental projects. Where there are multiple prototypes within a particular subarea, an average of the two prototypes is presented in the charts. The North Natomas, Southern Neighborhoods and North Sacramento and South Natomas submarkets are combined as an average given similar compliance costs.
Supporting analysis is provided in Appendix A Tables 2A and 2B.
Chart 4-8. Per Square Foot Costs, Alternative Requirements, For-Sale Projects, Central City
Keyser Marston Associates, Inc. Page 59
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Chart 4-9. Per Square Foot Costs, Alternative Requirements, Inner South and East Neighborhoods For-Sale
Chart 4-10. Per Square Foot Costs, Alternative Requirements, Average of Three Submarkets:
Southern Neighborhoods, N. Natomas, and N. Sacramento / S. Natomas Submarkets, For-Sale
Keyser Marston Associates, Inc. Page 60
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Chart 4-11. Per Square Foot Costs, Alternative Requirements, Rental Projects, Central City
Chart 4-12. Per Square Foot Costs, Alternative Requirements, Inner South and East Neighborhoods, Rental Projects
Keyser Marston Associates, Inc. Page 61
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Chart 4-13. Per Square Foot Costs, Alternative Requirements, Average of Three Submarkets:
Southern Neighborhoods, N. Natomas, and N. Sacramento / S. Natomas Submarkets, Rentals
Additional metrics to assist in evaluating the alternative affordable housing requirements are provided in the appendix including:
Estimated impact on residual land values (Appendix A Tables 3A and 3B); and Combined cost of fees, permits and affordable housing requirements as a percentage of total development costs of the project (Appendix A Tables 4A and 4B).
4.16 Potential Ways Development Projects May Respond to an Increased Requirement
There are a variety of ways development projects could potentially respond to a new or significantly increased requirement, just as projects adapt to fluctuations in home prices, rents, construction costs and other factors. A minor change in costs may not result in a substantive adjustment to the economics of projects and may not lead to material effects, while a more substantive change might elicit one or more of the following possible outcomes:
Adjustments to Land Costs – Developers purchase development sites at values that will allow for financially feasible projects. When a housing fee or inclusionary housing requirement is in place, developers “price in” the requirement when evaluating a project’s economics and negotiating the purchase price for development sites. When affordable housing fees or inclusionary requirements are increased, it is possible that downward pressure on land costs could result as developers adjust what they can afford
Keyser Marston Associates, Inc. Page 62
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
to pay for land. This downward pressure on land prices can, to some degree, bring costs back into better balance with the overall economics supported by projects. While adjustments to land costs are possible, several factors limit the extent to which adjustments can occur. Existing uses on a site that generate income or alternative land uses that compete for a site will tend to dampen the potential for downward adjustments to land price. Landowners have expectations regarding the value of their property and may hold the property off the market rather than accept a less attractive price, especially if the property is generating income, or it may take time for pricing expectations to adjust.
For larger master plan developments with substantial infrastructure requirements, a reduction in the value supported by the residential units affects the resources available to fund infrastructure and constrains the ability to absorb reduced land values while maintaining a viable financing plan for required infrastructure. As indicated in the analysis in Appendix A Tables 3A and 3B, adjustments to land values needed to absorb potential modified requirements can be quite substantial depending on the scenario, suggesting that adjustments to land values are unlikely to be the only shock absorber needed for projects to adapt to a substantial increase in requirements, particularly with respect to rentals.
Improving Market Conditions Sustain Feasibility – When prices and rents are rising, it can help absorb the cost of a new requirement and allow projects to move forward despite an added cost.
Narrower Range of Market Conditions where Projects Pencil – If a new requirement makes projects significantly more challenging, projects may only move forward under a narrower range of market conditions, or in the extreme case, not at all. For example, following a downturn in the market, once conditions begin to improve again and new development projects start to move forward, a significant new requirement could increase the length of time for projects to begin moving again. In effect, projects may wait for market conditions to support somewhat higher market prices or rents before they move forward. In the extreme case, projects may not develop at all if requirements are too high for any market condition the jurisdiction is likely to see.
Shift in Development to Other Communities – If a new requirement makes it substantially more costly to build in the City of Sacramento relative to other nearby communities, projects in nearby communities may “pencil” before projects in the City of Sacramento do. This could result in other communities absorbing a larger share of new residential development compared to the City of Sacramento. As we all know, decisions about where to live often balance a complex set of considerations, personnel preferences, and connections to place and family. As the urban core of the region and capital of California, Sacramento will always have something special to offer. These factors may mitigate, to some degree, the potential that development would shift elsewhere.
Keyser Marston Associates, Inc. Page 63
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Changes that represent a tiny fraction of the overall development cost of a project may not have a material effect. For more substantive changes, a combination of all the above adjustments may occur, or changes may be weighted toward one type of adjustment or another, depending on conditions specific to the jurisdiction. For example, a community or neighborhood where market conditions are very strong and supply is very limited may see new requirements absorbed mainly through adjustments to land values, while a community where market conditions are not as strong and potential purchasers of new units tend to be more cost sensitive may be more likely to see projects shift toward other jurisdictions or move forward under a narrower set of market conditions.
4.17 Changes in Prices and Rents Sufficient to Offset Cost of Increased Affordable Housing Requirements
To the extent market prices and rents increase, it can help absorb the cost of a new or increased requirement. Tables 4-21 and 4-22 illustrate market price and rent increases that would be adequate on their own to fully offset the incremental cost of changes in affordable housing requirements. Development costs are held constant for this illustration and adjustments would have been larger if costs were assumed to move in the same direction as prices and rents. Figures reflect changes to affordable housing requirements only and do not include adjustments based on proposed utility fee increases.
Keyser Marston Associates, Inc. Page 64
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 4-21. Market Price Increase Sufficient to Offset Incremental Cost of Affordable Housing Requirements Central
City
Southern
Neighborhoods
North
Sacramento
and South
Natomas
North
Natomas
Inner South
and East
Neighborhoods
Townhome SF
SF sm
lot SF
SF sm
lot SF
SF sm
lot SF
SF sm
lot
5% Moderate at 110% AMI 1.8% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 2.1% 2.5% 5% Moderate at 90% AMI 2.4% 1.1% 0.7% 1.0% 0.4% 0.8% 0.2% 2.6% 3.2% 5% Low at 70% AMI 3.2% 2.5% 2.3% 2.4% 2.2% 2.0% 1.6% 3.3% 4.1% 10% Moderate at 110% AMI 5.0% 1.0% 0% 0.8% 0.0% 1.8% 0.0% 5.5% 5.4% 10% Moderate at 90% AMI 6.2% 3.1% 2.1% 2.9% 1.7% 3.5% 2.0% 6.6% 6.7% 10% Low at 70% AMI 8.0% 6.2% 5.6% 6.1% 5.3% 6.0% 5.0% 8.2% 8.7% 15% Moderate at 110% AMI 8.6% 2.1% 0.1% 1.7% 0% 3.7% 0.9% 9.4% 8.6% 15% Moderate at 90% AMI 10.5% 5.3% 3.8% 5.0% 3.1% 6.4% 4.1% 11.2% 10.7% 15% Low at 70% AMI 13.3% 10.2% 9.3% 10.1% 9.0% 10.4% 8.9% 13.7% 13.9% 10% in Stand-Alone LIHTC Project (1) n/a 0.4% 0.6% 0.4% 0.6% 0% 0% n/a n/a 15% in Stand-Alone LIHTC Project (1) n/a 1.1% 1.3% 1.0% 1.4% 0% 0.3% n/a n/a 20% in Stand-Alone LIHTC Project (1) n/a 1.8% 2.2% 1.8% 2.2% 0.5% 1.0% n/a n/a Remove HIF Incentives 0.0% 0.9% 0.8% 1.0% 0.9% 0.0% 0.0% 0.0% 0.0% HIF @$5/SF 0.4% 1.6% 1.5% 1.7% 1.5% 0.6% 0.5% 0.4% 1.4% HIF @$7.50/SF 1.1% 2.6% 2.5% 2.9% 2.7% 1.7% 1.5% 1.2% 2.1% HIF @$10/SF 1.8% 3.8% 3.6% 4.1% 3.7% 2.7% 2.5% 1.9% 2.8% HIF @$15/SF 3.2% 6.0% 5.7% 6.4% 6.0% 4.8% 4.5% 3.4% 4.3% HIF @$20/SF 4.6% 8.2% 7.8% 8.9% 8.2% 6.9% 6.5% 4.9% 5.7% (1) Primarily an option for larger master plans. Would have an average affordability level of 60% AMI or less. This option is not likely to be practical for most projects in the Central City and Inner South and East neighborhoods based on typically smaller site / project size, thus lacking the scale to do a separate stand- alone LIHTC project.
Table 4-22. Market Rent Increase Sufficient to Offset Incremental Cost of Affordable Housing Requirements Scenario Central City
Southern
Neighborhoods
N. Sacramento
& South
Natomas
North
Natomas
Inner South and
East
Neighborhoods
Med Den High Den.
5% Low @80% AMI 2.4% 2.9% 1.1% 1.3% 0.9% 1.0%
5% Low @60% AMI 3.3% 3.8% 2.2% 2.4% 1.9% 2.1%
5% Very Low @50% AMI 3.7% 4.2% 2.7% 2.9% 2.4% 2.6%
10% Low @80% AMI 4.6% 5.8% 2.7% 3.2% 2.7% 2.8%
10% Low @60% AMI 6.6% 7.6% 5.0% 5.4% 4.9% 5.0%
10% Very Low @50% AMI 7.5% 8.5% 6.2% 6.5% 5.9% 6.1%
15% Low @80% AMI 7.5% 9.0% 4.4% 5.3% 4.7% 4.9%
15% Low @60% AMI 10.6% 11.9% 8.1% 8.8% 8.1% 8.3%
15% Very Low @50% AMI 12.2% 13.3% 10.0% 10.5% 9.8% 10.1% HIF @$5/SF 0.8% 0.7% 0.8% 0.7% 0.3% 0.3%
HIF @$7.50/SF 1.2% 1.1% 1.3% 1.2% 0.8% 0.7%
HIF @$10/SF 1.6% 1.4% 1.8% 1.7% 1.3% 1.2%
HIF @$15/SF 2.5% 2.1% 2.9% 2.7% 2.3% 2.1%
HIF @$20/SF 3.3% 2.9% 4.0% 3.8% 3.3% 3.0%
Remove existing HIF incentives 0.6% 0.5% 0.4% 0.4% 0.0% 0.0% Keyser Marston Associates, Inc. Page 65
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
5.0 DEVELOPMENT COMMUNITY CONTACTS
KMA reached out to developers active in the Sacramento market to help inform the feasibility analysis and to supplement available market data. Development professionals with the following organizations were interviewed:
SKK Developments
Anthem
Properties
St. Anton Communities
Signature Homes
Urban Capital
Next Generation Capital
Bardis Homes
Jamboree
Housing
Mutual
Housing
29th Street Capital
In addition t
o the developers listed above, KMA contacted approximately seven additional developers who either declined or did not respond to one or more requests for an interview.
The developers we spoke with provided a wide range of insights on topics including market conditions, construction and development cost estimates, expectations regarding their own projects, how affordable housing obligations affect their pro forma, preferences regarding on- site units versus fee payment, among other topics. The following themes emerged from these developer interviews:
1. Feasibility h
as become challenging for new rentals – Although Sacramento has experienced a cycle
of strong feasibility for new rental developments; recent shifts in market conditions have eroded
the more favorable conditions that existing until recently. Key factors that have impacted feasibility of re
ntals include:
Thousands of units are now under construction or have been recently completed. New deliverie
s of completed projects have caused rents to soften. The ability of the market to absorb this
level of new supply has not been tested.
Development costs have increased substantially from the early years of the strong cycle for rental de
velopment that Sacramento has experienced. Previously, rising costs were offset by rising rents and
strong demand; however, rent growth has abated.
Remote work has persisted, reducing the daytime population that contributes to the vibrancy o
f the urban core and the incentive to live near work, reducing the attractivene
ss of rentals within the Central City and contributing to softening rents.
Keyser Marston Associates, Inc. Page 66
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Cap rates have been drifting upward, which in turn places upward pressure on the returns nee
ded for a project to pencil.
Rising interest rates mean projects must achieve higher returns to justify development risk relat
ive to safer investment alternatives such as U.S. treasuries, which now pay much higher interest rates.
Developers are being more cautious about underwriting, for example, not projecting rents will co
ntinue to trend upward.
Some equity investors have exited the market or are waiting until it is clearer how the market will respond to th
e new supply now under construction and other market
changes. So
me equity investors are seeking substantially higher returns that many projects are not able to support.
2. Adverse con
ditions are viewed as temporary – Adverse conditions for rental development are viewed
as potentially temporary or cyclical in nature. Rental developers expressed greater optimism regard
ing the medium- to longer-term time horizon and were exploring approaches
to move forward with the pipeline projects they have, are continuing to seek equity in
vestors, and / or are positioning projects to move ahead when conditions improve.
Despite a ch
allenging environment one developer was closing on construction financing for a new rental project and
another had applied for building permits for a multifamily project.
Others are pursuing sit
es for future projects at lower land prices. Examples of adjustments that were cit
ed as potentially enabling projects to move forward include changes in expectation
s for land prices, more competitive bidding by contractors, more favorable market conditions (rent g
rowth), renewed interest by equity investors, or some combination of these.
3. For-sale ho
using market conditions – For-sale developers noted that the market slowed substantia
lly in the second half of 2022 as many buyers stayed on the sidelines. With interest rates peaking in late fall and then dropping somewhat, buyers began to come back into the market and sale
s picked up. For-sale developers agreed that current market conditions a
re less favorable than they have been, but opinions varied regarding both current conditions and near-term expectations for improvement. On the more optimistic side, there was an expectatio
n for a “normal” year in 2023 and a good year in 2024 and confidence
about moving forward with current projects. Another characterized current conditions as not great but not as adverse as the great recession, with optimism for significant improvement
by 2025. On the more pessimistic end of the spectrum, a substantial drop in pricing of 15% t
o 20% was cited, with differential impacts to the middle of the pricing spectrum oriented to “move-up” buyers, who now have little incentive to sell their existing
home and give up existin
g favorable interest rates on current mortgages. Developers cited a lack of
supply as something that would help drive a recovery.
Keyser Marston Associates, Inc. Page 67
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
4. Costs – A number of developers in
terviewed provided information regarding current
construction costs, which helped inform development of the pro forma analysis described in the prior section. Several developers
confirmed that construction costs have decreased from
last year a
s contractor bids have become more competitive and lumber pricing has eased.
Cost decrea
ses in the range of 10 to 15% were cited relative to last year, although still higher than in 2019, befo
re the pandemic.
5. Fees versu
s on-site requirements – Several developers expressed a strong preference to have a fee o
ption and strongly encouraged the City to consider retention of the fee option rather than move toward a mandatory requirement to includ e affordable units within the
project. One developer cited greater
uncertainty regarding the ultimate cost of an affordable housing obligation compared to a fee requirement that makes the fee much easier to evaluate dur
ing the predevelopment stage. One developer cited very high gaps between market prices and afford
able prices for an on-site for-sale product. Providing a site for an affordable p
roject financed with Low Income Housing Tax Credits within a larger master plan community was seen as a more favorable solutio
n that would not present the same
challenges
as a mixed income on-site requirement would, and several developers had experience
with this approach. One market rate developer was somewhat of an outlier in indicating
a more optimistic view that developers could make an on-site affordable unit requirement work, presu
ming incomes in the moderate range are targeted and cautioning that flexib
ility on the City’s part was very important. One developer indicated that proposed changes to t
he MIHO are viewed as a “threat” and expressed concerns an on-site requirement or significa
ntly increased fee would substantially impair the feasibility of projects, par
ticularly given a more challenging environment at this time.
6. Property management consideration
s – Several developers cited property management and
service de
livery challenges with including a limited number of on-site affordable units dispersed within a larger
market rate rental project. The reason is that market rate property managers and owners do not have e
xperience qualifying households for occupancy of
affordable u
nits and are not equipped to provide supportive services to those who need it.
With only a
small number of affordable units, projects would likely lack the scale needed to hire a dedicated property manager with the relevant expertise.
7. Value of Density Bonus
– Several developers suggested that a density bonus, which is available t
hrough State law, would be unlikely to encourage them to include affordable units on-site in th
e Sacramento market. In part, this is due to sufficient flexibility in zoning regulations,
such that a density bonus was not seen as necessary. Another factor was the expectation
that including affordable units on-site would be challenging financially. Some developers
expressed a favorable view of density bonus policies generally, without indicating w
hether such a policy is likely to be utilized in the Sacramento context.
Keyser Marston Associates, Inc. Page 68
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
8. Impact of New Requirements - Several developers indicated that the cost of affordable housing requirements comes out of residual land value while several other developers suggested that costs are passed on to market rate home buyers and renters.
9. Affordable Housing Projects Financed with LIHTCs – At least three of the developers interviewed had experience with 100% affordable projects. The following summarizes feedback that relates to 100% affordable projects financed with tax credits:
Land is one of the most important factors for an affordable project to move forward. Not all sites are equal, sites in areas where projects are able to earn the required points for access to amenities is important and location in a high resource area is also a benefit.
A minimum project size of 50 to 80 units was cited while a project size of 120 to 150 units was cited as preferable. Smaller projects were cited as more difficult due to a lack of operating economies of scale for property management and services.
Recently there has been more funding for affordable housing available through the State, but the private activity bond volume cap has been reached, which has made securing tax exempt bonds and 4% tax credit financing competitive and resulted in a backlog of projects.
The ordinance should allow sufficient flexibility so that 100% affordable projects can respond to how funding is prioritized at the State level, which changes over time.
Fee waivers for affordable units that the City provides are very helpful. Expediting plan check or putting affordable units at the front of the line would also be helpful.
Providing a seamless or more coordinated process between the City, County and SHRA would be helpful for supporting affordable projects.
One affordable developer raised concerns regarding SHRA fees and requirements as adding cost and time to affordable projects relative to other jurisdictions. One example cited was requiring affordable units to use more costly materials for countertops.
State subsidy sources typically require payment of prevailing wage, which results in higher development costs in the range of 20% to 40%. Some affordable developers have a model of avoiding the payment of prevailing wage by structuring projects in a manner that avoids pursuing certain subsidy sources that would trigger prevailing wage, but this approach also drives what affordability levels the project is able to serve.
Affordable developers were asked to provide feedback on whether or how an inclusionary requirement affects their financing, given concerns raised by building Keyser Marston Associates, Inc. Page 69
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
industry representatives to that effect. In response, it was clarified that, if a LIHTC affordable project is being built to meet an inclusionary requirement for a market rate project, there can be scoring implications for certain project types in certain locations under the 9% tax credit program but not the 4% tax credit program. Under the 9% tax credit program, large family projects located in a High or Highest Resource area 14 are
eligible to receive a scoring boost that can help them secure financing, but only if the project is not also satisfying an inclusionary requirement. In contrast, with the 4% tax credit and tax exempt bond program, projects meeting an inclusionary requirement are eligible for the same scoring boost as other projects in a High or Highest Resource Area.
While there are provisions related to adjustments to threshold basis limits as well, which place upper limits on amounts considered for calculation of tax credits, we were advised threshold basis limits are generally not an operative constraint in the Sacramento market because the eligible basis on which tax credits are calculated is generally below threshold basis limits.
14 A map showing the location of these areas is available here: https://belonging.berkeley.edu/2023-ctcac-hcd-opportunity-map . The North Natomas, Inner South and East and Central City submarkets include areas designated as High or Highest Resource, but designations vary by U.S. Census tract.
Keyser Marston Associates, Inc. Page 70
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
6.0 REQUIREMENTS IN OTHER JURISDICTIONS AND CASE STUDIES Understanding affordable housing requirements in other jurisdictions can provide helpful context in considering revised requirements for the City of Sacramento. This section provides an overview of inclusionary programs and affordable housing fees in jurisdictions within the Sacramento region as well as other large cities. A more in-depth review is provided for the following seven cities: West Sacramento, Roseville, Folsom, Davis, Denver, Portland, and San Jose.
6.1 Local Jurisdiction Requirements
An overview of affordable housing requirements applicable to residential development in ten local jurisdictions and the City of Sacramento is provided in Table 6-1. The jurisdictions include cities within the SACOG area with populations over 50,000 plus Yolo, Sacramento, Sutter and Placer Counties. The summary provides an overview of the basic requirements (affordable units onsite, affordable housing impact fees, etc.) and alternative compliance options, organized by type of program.
Table 6-1. Affordable Housing Requirements, SACOG Region, Jurisdictions with Population over 50,000 Program Type Ownership Housing Only Both Rental and Ownership Impact fees only Elk Grove
Choice of fee or on-site units Folsom Sacramento
Sutter County
Sacramento County
Placer County**
On-site units are required;
alternatives by approval only
West Sacramento
Yolo County*
Davis
Other program structures Roseville (Requirements vary by Specific Plan and parcel.) Rancho Cordova (Affordable Housing Plans in certain areas.) SACOG cities and counties over
50,000 with no program
El Dorado County
Yuba County
Citrus Heights
Yuba City
Lincoln
Rocklin
*Allows fees for smaller projects.
** Requires units for large projects.
Table 6-2 pr
ovides information regarding the provisions of each program, including:
Population from the US Census Bureau and the California Department of Finance. Year adopted or most recently updated.
Program requirements including whether the program requires onsite units, a fee payment, offsite unit
s, or a choice. While some cities technically offer a choice, the fee payment is often significantly less costly than onsite units, suggesting that most projects are likely to
pay the fee.
Keyser Marston Associates, Inc. Page 71
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Minimum project size. Many programs exempt small projects, either from providing onsite unit
s (allowing fee payment instead of units) or from any housing obligation. The minimu
m project size is presented by unit tenure and is shown separately for fee payment and build requirements.
Onsite Requirement / Option. Percent of units required and income level of the affordable u
nits.
Impact / In-lieu Fee. Current fee levels and how the fees are assessed. Deed Restriction Term. The length of the deed restriction for the inclusionary units by tenure.
Other Compliance Options. Alternative compliance options such as off-site units and dedicating
land for affordable housing. Some programs require City/County approval of these option
s, while others allow them by right.
The review of local prog
rams identified the following:
Many local programs have a 10% onsite option or requirement, including Sacramento, Folsom, West Sacramento, Placer
County and Roseville. Yolo County and Davis have
higher onsit
e percentages, while Sutter County has a lower requirement.
Fees in the Greater Sacramento area are assessed in a wide range of formats, including per square f
oot of market rate units, a flat rate per affordable unit owed, a flat rate per market rate unit, and 1% of the lowest market sales price in the project.
Programs with onsite requirements allow for alternative compliance options including land dedicat
ion and offsite construction. Additional compliance options allowed in some jurisdi
ctions include acquisition and rehabilitation of affordable units, credits, preservation
of existing units and custom proposals. Most require approval from the jurisdiction.
The information is summarized from ordinances, guidelin es, staff reports, and fee resolutions.
For more detailed information, please consult the source documents or city/county staff.
Affordable Housing Requirements Survey
Prepared by Keyser Marston Associates, Inc.
Filename: \\SF-FS2\wp\18\18996\036\Table 6-2.xlsx; OtherCities; 5/24/2023;hgr Table 6-2
City of Sacramento City of Folsom City of West Sacramento City of Elk Grove 528,001 83,269 55,064 177,558
Adopted 2000; Updated 2015 Updated 2013 Updated 2014 / 2020 Adopted 2013 Fee w/ onsite option For sale units only - onsite requirement w/ fee option. Onsite requirement. Fee per unit.
For In-lieu/Impact Fee 1 No rental req. n/a 1
For Build Requirement n/a 5 n/a
For In-lieu/Impact Fee 1 10 units n/a 1
For Build Requirement n/a n/a 5 n/a
Projects providing at least 10%
affordable units are exempt from the
HIF
FS: 3% VL and 7% Low R: 5% VL and 5% Low
FS: 10% Low none
Income Levels for Pricing Low @ 80% AMI Not specified. R: VL @ 50%AMI, L @ 60% AMI or in accordance with funding programs used to finance
units
FS: 70% AMI
n/a
Impact / In-Lieu Fee 1-2 units <20 dua: $3.49 psf
Multi-units <40 dua: $3.49 psf
Housing Inventive Zn: $1.51 psf
high density, converted units: $0
(22-23 rates)
FS: 1% of the lowest priced for-sale unit multiplied by # of units in project
For custom lot subdivisions, 0.5% of estimated cost of
least expensive e home anticipated, multiplied by # of
units
w/Council approval: $7,551/ mkt unit 1-2 units: $6,030 / unit 3 + units: $3,617 / unit
Deed Restriction Term 30 years FS: 20 years / R: 30 years FS: 45 years R: 55 years
n/a
Other Compliance Options None specified. Off-site units, Credits, Land dedication, Acq/rehab, other proposals approved by City Council.
FS projects can provide rental units.
With Council approval: Acq/rehab, off-site units,
preservation of units, other proposals.
Comments Fee deferrals and modified development standards available for on-site units.
75 units have been created. From 2014-6/2022, no
onsite units were produced and $16 million in in-lieu fees were collected. The city has assisted six affordable
projects with the fee revenue.
Regulatory and financial incentives may be considered.
Abbreviations: FS - For Sale, R - RenAbbreviations: FS - For Sale, R - Rental, Mod - Moderate Income, L - Low Income, VL - Very Low Income, ELI - Extremely Low Income psf - per square foot, dua - dwelling upsf - per square foot, dua - dwelling units per acre Population Data for cities from US Census and unincorporated county populations from CA Dept. of Finance.
Chart data from City / County websiteChart data from City / County websites, Housing Elements, Municipal Codes, etc.
Notes: This chart presents an overview, and as a result, terms are simplified. For use other than general comparison, please consult the code and staff of the jurisdiction.
Population
Minimum Project Size - For Sale
Year Adopted / Updated
Minimum Project Size - Rental
Onsite Requirement/Option
Base Obligation
Prepared by Keyser Marston Associates, Inc.
Filename: \\SF-FS2\wp\18\18996\036\Table 6-2.xlsx; OtherCities; 5/24/2023;hgr Table 6-2
For In-lieu/Impact Fee
For Build Requirement
For In-lieu/Impact Fee
For Build Requirement
Income Levels for Pricing
Impact / In-Lieu Fee
Deed Restriction Term
Other Compliance Options
Comments
Population
Minimum Project Size - For Sale
Year Adopted / Updated
Minimum Project Size - Rental
Onsite Requirement/Option
Base Obligation
Affordable Housing Requirements Survey
City of Davis City of Roseville City of Rancho Cordova Yolo County 67,084 154,817 80,598 35,991 (unincorporated)
1990, temporary amendment 2018. Update in process. 1988 2015 Onsite units. Onsite units. Onsite
5 1
temporary amendment - city may approve fee pmt. 7
5 1
200 (partial build requirement) FS: 10
FS: SFD on lots > 5,000 sf, 25%. SFD on lots <5,000 sf, 15%.
Attached, 10%. Stacked condos or mixed use, 5%.
R: temporary requirement is 5% L, 5% VL and 5% ELI . Percent of units, bedrooms, or beds.
FS: 10% (4% VL, 4% L, 2% Mod)
R: 10% (5% Low, 5% VL)
FS: 10% Low and 10% Mod
R: 20+ units: 25% VL and 10% Low
R: 7-19 units: 15% VL and 10%
Low
FS: Moderate, with average at 100%.
R in FS projects: <65% AMI average, with 80% max.
R: Low @ 80%, VL @ 50%, ELI @ 30%
Not specified.
$78,150 per affordable unit with Council approval
(Fees can only be paid for up to 50% of obligation in projects with 200+ dwelling units.)
Case-by-case and currently $278,849 Sliding scale based on units in project. Single units fee $1,292
(FS) and $1,761 (R). Full fee:
$12,920 (FS) and $17,610 (R)
R: In perpetuity
FS: Capped appreciation, city has right of first refusal.
FS: 20 years (resets at sale)
R: permanent
Developer may proposed an individualized program.
Acquisition and deed-restriction of existing units with 30+ year lifespan.
Land dedication.
Temporary Amendment allows for an ongoing payment of funds from the project (at least annual).
Offsite, Land Dedication
FS units must be >50% 3BR, with remainder 2BR.
Onsite units that meet state density bonus requirements are also awarded one-for-one city density bonus.
Small projects (<15 units) in city core may request financial assistance from City, pay fee, or use combination fee/ onsite.
City has had the 10% Affordable Housing Goal since inception and has produced over 3,500 units.
Abbreviations: FS - For Sale, R - Rental, Mod - Moderate Income, L - Low Income, VL - Very Low Income, ELI - Extremely Low Income psf - per square foot, dua - dwelling units per acre
Population Data for cities from US Census and unincorporated county populations from CA Dept. of Finance.
Chart data from City / County websites, Housing Elements, Municipal Codes, etc.
Notes: This chart presents an overview, and as a result, terms are simplified. For use other than general comparison, please consult the code and staff of the jurisdiction.
The City has a Housing Element Policy that
requires new residential projects within the
newly developing areas of the City
(generally in the large, vacant areas south
of Highway 50) to include an Affordable
Housing Plan for the project that identifies
the project’s plan for providing affordable
housing. These areas are typically high
resource and promote inclusion of
affordable housing in high opportunity areas.
Compliance options includes onsite
affordable units, land dedication, rehab of
existing units, or in-lieu fees. For example,
the Affordable Housing Plan for Jaeger
Ranch (K. Hovnanian) includes in-lieu fees
of $3,808 to $4,800 per unit, depending on
unit type.
The City of Roseville does not have a city-wide inclusionary housing policy but has a General Plan Goal that 10% of all new housing units will be affordable to moderate, low and very low income households. The goal is implemented through the City’s Specific Plans, which assign affordable housing obligations on a parcel-by-parcel basis.
Prepared by Keyser Marston Associates, Inc.
Filename: \\SF-FS2\wp\18\18996\036\Table 6-2.xlsx; OtherCities; 5/24/2023;hgr Table 6-2
For In-lieu/Impact Fee
For Build Requirement
For In-lieu/Impact Fee
For Build Requirement
Income Levels for Pricing
Impact / In-Lieu Fee
Deed Restriction Term
Other Compliance Options
Comments
Population
Minimum Project Size - For Sale
Year Adopted / Updated
Minimum Project Size - Rental
Onsite Requirement/Option
Base Obligation
Affordable Housing Requirements Survey
Sutter County Sacramento County Placer County
20,078 (unincorporated) 603,090 (unincorporated) 112,788 (unincorporated) 1995 2014 2020
Onsite Fee Onsite
10 1 8
n/a n/a 100
10 1 8
n/a n/a 100
FS: 5% Mod
R: 2.5% VL and 2.5% Low
The fee amount owed is
converted to units owed
based on the "Average
Public Subsidy/Unit."
For Sale:
Specific Plan/ Master Plan: 10% (4% VL, 4% L, 2% Mod)
All Other: 10% Mod
Rentals:
Specific Plan/ Master Plan: 10% (4% VL, 4% L, 2% Mod)
All Other: 10% (4% VL, 6% L)
Not specified Low @ 80%, VL @ 50% Not specified.
$28,900/unit owed
(10% of CA HOME single family max
purchase price for County)
$3.66 psf $2.45 psf
FS: 5 years
R: 5 years
FS: 30 years
R: 55 years
55 years
Off-site construction, land dedication Onsite units, land dedication, purchase credits
banked with SHRA.
Equivalency proposals may be submitted with alternative compliance actions.
Projects with onsite units may receive
fast track processing, fee waivers,
reduction of design standards,
infrastructure improvements, technical
and financial assistance.
Mixed income developments
at a density of at least 17
dua with 20% low onsite are
exempt.
Residential projects with 50% of units smaller than 1,600 sf are exempt. Mixed use projects with >70% residential are exempt.
Infill sites and sites located in "transit priority area" are exempt.
Incentives available include fee waivers and priority processing.
Abbreviations: FS - For Sale, R - Rental, Mod - Moderate Income, L - Low Income, VL - Very Low Income, ELI - Extremely Low Income psf - per square foot, dua - dwelling units per acre
Population Data for cities from US Census and unincorporated county populations from CA Dept. of Finance.
Chart data from City / County websites, Housing Elements, Municipal Codes, etc.
Notes: This chart presents an overview, and as a result, terms are simplified. For use other than general comparison, please consult the
Keyser Marston Associates, Inc. Page 75
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
6.2 Large City Inclusionary Programs
Inclusionary requirements for nine major cities with inclusionary programs are summarized in Table 6-3. The jurisdictions include Atlanta, Boston, Chicago, Denver, Los Angeles, Portland, San Diego, San Jose, and Seattle. Six have city-wide programs, three have programs that are triggered by rezoning, and one program applies in certain geographic zones of the city (Los Angeles has both a city-wide program and a program triggered by rezoning). Of the nine cities surveyed, only Los Angeles has an impact fee program, while the others all have inclusionary requirements with an in-lieu option. All allow payment of fees with approximately half assessed per square foot and half on a per unit basis.
Table 6-3. Large City Inclusionary Program Overview
City
Applies
to Program Type
On-Site
Inclusionary
Percentage
Fee
Structure Description
Year
Adopted
Atlanta Certain
zones
Inclusionary
with fee option
10 to 15% Per Unit Requires 15% at 80% AMI or 10% at 60% AMI. In-lieu fee varies by area. Menu of
incentives for projects subject to ordinance.
2018
Boston Rezonings Inclusionary
with fee option
13% Per Unit Triggered by re-zoning, City land or
assistance. 13% on-site affordable. In-lieu
fee varies by zone. Update pending.
2000,
updated
2015
Chicago Rezonings Inclusionary
with fee option
8% to 20% Per Unit Rental: 10-20% depending on AMI level and location. Ownership: 8% to 20% depending
on AMI level and location. In-lieu fee option
per unit owed that varies by zone and share
of required units provided on-site.
2007,
updated
2021
Denver Citywide Inclusionary
with fee option
8% to 15% Per Unit New on-site requirement of 8% to 15% depending on zone and AMI level; parking
and fee reductions apply for onsite units;
density bonus available for projects
exceeding base requirements. Replaced a
prior fee program, which was preceded by an
inclusionary requirement.
2001
amended
2017,
2022
Los
Angeles
Varies by
program
Impact Fee;
Inclusionary
(triggered by
rezoning);
Density bonus
and incentive
(transit areas)
varies by
program
both per
square
foot and
per unit
fees used
(varies by
program)
City-wide impact fee program + an
inclusionary program triggered by rezonings
that comes with a prevailing wage
requirement + density bonus and incentive
program substantially exceeding State
density bonus focused on transit-rich
locations.
2017;
2016
Keyser Marston Associates, Inc. Page 76
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Table 6-3. Large City Inclusionary Program Overview
City
Applies
to Program Type
On-Site
Inclusionary
Percentage
Fee
Structure Description
Year
Adopted
Portland Citywide Inclusionary
with fee option
10% to 20% Per
Square
Foot
20% inclusionary with option of 10% at lower
AMI. In-lieu fee applies on per square foot
basis and varies by market area. Incentives
for on-site units include property tax and
excise tax exemptions, parking requirement
exemptions, density / FAR bonus.
2016
San Diego Citywide Inclusionary
with fee option
10 to 15% Per
Square
Foot
Rental: 10% at low or very low; For-sale 10%
at median or 15% at moderate.
2003,
updated
2019
San Jose Citywide Inclusionary
with fee option
15% Per
Square
Foot
15% inclusionary requirement. Rental
requirement split between three income
categories with in-lieu fee varying based on
AMI level and percent affordable units on-
site. Fee structure provides large incentive
for at least 5% on-site.
2010; in
litigation
until
2015;
amended
2021
Seattle Citywide Inclusionary
with fee option
5% to 11% Per
Square
Foot
Inclusionary percentage from 5% to 11%
depending on market area and level of up
zoning that occurred. In-lieu fee varies by
market area and zone.
2016
amended
2019
6.3 Additional Review of Select Local and Large City Programs Of the programs surveyed, seven were selected for more in-depth research. Selections were made by the City and informed by input from the City’s Housing Policy Working Group. Four local cities were chosen: West Sacramento, Roseville, Folsom and Davis. Three large cities were chosen: Denver, Portland and San Jose.
KMA accessed available information regarding program provisions and contacted city staff in each community to help provide a more in-depth understanding of how the programs work in practice. Following are highlights and key themes that emerged from this review:
Each jurisdiction determines the appropriate balance between onsite units and collecti ng
fee revenue
s. Onsite units have the benefits of creating mixed income housing, building affordable u
nits at the same time as the market rate units, and encouraging market rate developers t
o produce units cost-effectively. Collecting fee revenues creates a funding source that
cities can leverage to provide gap funding for 100% affordable projects, with the potential
to develop more units at deeper affordability levels.
Unless fees are set at a level to encourage onsite units, developers tend to choose a fee option if it
is available. Many cities have onsite requirements with an in-lieu fee option Keyser Marston Associates, Inc. Page 77
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
that in practice are essentially a fee-only program. Cities that set fees high enough to encourage onsite units have had success with developers building units onsite. Incentives can be effective in encouraging policy goals if they are meaningful in the local market. The value of de
nsity bonuses, for example, varies widely by jurisdiction and neighborhoo
d. Portland and West Sacramento vary incentives by geographic area.
Cities with diverse market areas can vary requirements and incentives by geographic area or a measure of lo
cal market strength. For example, Denver’s requirements vary by the median land value p
er square foot for each census tract, with stronger requirements in tracts with
higher land values. Portland’s fees and incentives are different in two of the city’s Plan A
reas.
The large cities surveyed (Portland, Denver, San Jose) have newer programs. A key feature of all three programs is a menu of compliance choice s for developers. The
choices
are calibrated by the cities to encourage certain policy goals, such as onsite units in general or units at particular income levels. The menus provide flexibility for developers
and ideally will create a range of affordable unit types in the city.
The City of Denver designates sites larger than 10 acres and sites receiving public financing a
s “High Impact Developments,” and requires an enhanced approval process with public engagement for these projects.
Both Portland and Davis allow inclusionary obligations to be determined by the number of bedrooms instead of t
he number of units. The cities’ programs differ in how they are structured, b
ut both allow developers to set aside fewer larger units, which can benefit both the city and the developer.
Housing production figur
es over a historic period are cited for each of the seven jurisdictions.
For purposes of comparison, figures for the City of Sacramento and State of California are provided in Table 6-4:
Table 6-4. City of Sacramento and State of California Housing Permitting City of Sacrame nto Statewide
10-Year Housing Permitted1
Very Low and L
ow:
Moderate:
Above Moderate:
Ten-Year Total:
4,133 20%
8,927 43%
7,649 37%
20,709 100%
126,488 13%
119,301 12%
761,412 76%
1,007,201 100%
Units Per 1,000 Residents2
Total Units 39 units per 1,000 residents 26 units per 1,000 residents Low and Very Low Units 8 units per 1,000 residents 3 units per 1,000 residents
1. 2013-2022. Annual Housing Element Progress Report data, CA Housing and Community Development.
2. Based on population as of July 1, 2022, from US Census Bu reau (528,001 and 39,029,342).
Keyser Marston Associates, Inc. Page 78
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
WEST SACRAMENTO
Program Hi
story and Requirements
The City of West Sacramento first
adopted a citywide ordinance in 2005; it
was significantly modified in 2014, with
additional revisions in 2020. The
ordinance requires 10 percent of all
multifamily rental units be made available
at affordable rents, with half at Very Low
and half at Low. Ten percent of all for-
sale units must be made available at
affordable prices to Low Income households. Rental units can be substituted for for-sale units.
Inclusionary units must generally be built on-site and dispersed throughout the project to avoid over-concentration of inclusionary units.
Units must be similar in materials and appearance to market rate units within the same subdivision. Inclusionary units may be smaller than market rate units but must contain at least 90 percent of the interior living space of the smallest market rate unit. The number of bedrooms in multifamily rental inclusionary units should be generally consistent with the bedroom mix of market rate units within the same residential project. The minimum affordability term is 55 years for rental units and 45 years for for-sale units.
The ordinance provides alternatives to the onsite requirements including payment of in-lieu fees (which are placed in the City’s Housing Trust Fund); acquiring, rehabilitating, and converting existing market rate units to inclusionary units; construction of inclusionary housing units at an off-site location; or acquiring and preserving at-risk affordable rental units. The in-lieu fee is currently set at $7,551 per market rate unit for both rental and for-sale units. Approval of an alternative is solely at the discretion of the City Council.
The City Council approves payment of in-lieu fees only if the Council determines that doing so would advance the goals set out in the City’s Housing Element. For example, the City might allow fee payment if a project is located in a neighborhood with significant existing affordable Population 55,064
Land Area 21 square miles
Adopted 2005, amended in 2014 and 2020
Program Structure Inclusionary requirement, in-lieu fee with approval
Inclusionary Percentage 10%
Income Levels for
Inclusionary Units
Rental: Very Low and Low
For-Sale: Low
In-Lieu Fee Amount $7,551/ market rate unit, (in-lieu fee option requires Council approval)
10-Year Housing Permitted1
Very Low and Low:
Moderate:
Above Moderate:
Ten-Year Total
268 8%
1,457 46%
1,464 46%
3,189 100%
Units Per 1,000 Residents
Total Units 58 units per 1,000 residents
Low and Very Low Units 5 units per 1,000 residents
1 2013-2022.
Sources: US Census, Housing Element Annual Progress Reports.
Keyser Marston Associates, Inc. Page 79
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
housing, or if the City has identified a 100% affordable project in the development pipeline that it would like to provide with funding assistance. West Sacramento states that it has a clear preference for onsite compliance but in practice has approved use of in-lieu fees for most projects.
In-lieu fees are deposited into the City’s Housing Trust Fund and are used to promote development of affordable housing as follows:
Gap financing loans to residential projects containing affordable housing; Infrastructure improvements in support of affordable housin g; and
Predevelopment activities in support of affordable housing.
A unique feature of the program is the City’s
incentives within the City’s priority Urban Infill
Area (UIA), if an applicant’s project is located
within the City’s priority Urban Infill Area (UIA),
the project may be eligible for the Urban Infill Area
Incentive and subsequent discount on their in-lieu
fee. UIA Incentive discounts are granted based on the adjusted density of a project. The adjusted density allows applicants to receive dwelling unit equivalents (DUEs) for project features such as structured parking, public open space, and ground floor commercial space.
The objective of the UIA Incentive is to facilitate development in the City’s priority Urban Infill Areas where development costs are typically higher than in other areas of the City. This incentive program is designed to encourage the type of development that the City would like to see in these areas of the City. The City tends to accept in-lieu fee payments for projects in the UIA because there is a significant amount of existing affordable housing in these areas and the City does not want to create an over-concentration of affordable housing in a particular area.
Affordable Housing Production
Since 2014, 14 projects were approved to satisfy the inclusionary requirement through in-lieu fee payment with aggregate in-lieu fee revenue from the 14 projects of $6.3 million. Just one project, the KIND project, provided unassisted onsite rental units. The KIND project provided 23 deed restricted Low Income units.
The City assisted several affordable housing projects using in-lieu fee funds in the Housing Trust Fund. Recent projects include Mercy Housing’s 85-unit permanent supportive housing project, which leveraged approximately $3.7 million in local funds for the $30+ million project, and Jamboree’s proposed West Gateway Place Phase II 59-unit affordable housing development, which will leverage approximately $2.7 million in local Housing Trust Funds for the $24 million project. The City also assisted the earlier phase of the West Gateway Place project, Projects in the West Sacramento’s Urban
Infill Area may qualify for reductions in in-lieu
fees based on inclusion of features such as
structured parking, public open space, and
ground floor commercial.
Keyser Marston Associates, Inc. Page 80
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
which created 76 units of affordable housing, and The Rivermark Apartments, which created 69 units.
In total, the City’s inclusionary housing program contributed to the development of 312 affordable units since 2014, including 23 units produced within the market rate development and 289 units within affordable housing developments assisted using in-lieu fee funds.
Overall, Very Low and Low income units represented 8% of total housing permitted between 2013 and 2022. Units affordable to Moderate Income households represented an additional 46% of all housing permitted during that time period.
Overall Housing Production Trends
Chart 6-1 shows overall trends in housing unit production in West Sacramento over the prior ten years. There was a robust level of permitting in 2013, followed by a reduced level of permitting over the succeeding five years, and then a return to more robust housing production over the 2019 to 2022 period. Over the prior ten years, 58 units were produced per 1,000 residents, approximately double the statewide rate. The City updated its inclusionary program in 2014. The 2014 modifications to the inclusionary housing program were designed to reduce the financial impact of the program on market rate development, by lowering the onsite percentage, introducing an in-lieu fee option, and allowing developers to propose alternative compliance strategies. Housing production in West Sacramento was reduced in the years immediately following the program changes, although requirements had been reduced, which suggests that this production trend was not attributable to changes in the inclusionary program. The pace of housing development over the period, double the per capita rate statewide, suggests projects are generally able to sustain the City’s requirements.
Keyser Marston Associates, Inc. Page 81
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Chart 6-1. Housing Units Permitted by Year, West Sacramento
Program Effectiveness
West Sacramento’s inclusionary ordinance provides the City with flexibility to accept alternative compliance options when it is in the City’s best interest to do so, and otherwise requires onsite units. City staff indicate that the combination of flexibility and control provided by the program’s structure enables the City to achieve a variety of affordable housing objectives. In addition, the ordinance provides incentives to encourage development of desired housing types in certain areas of the City. City staff believe that these incentives have been effective in encouraging high-density housing in the City’s priority Urban Infill Areas.
The program requires onsite for sale units at Low Income. As noted above, just one project has provided on-site for-sale Low Income units since 2014 with the remaining projects paying in-lieu fees. Ownership units at the Low Income level can be challenging administratively, as it is sometimes difficult to find qualified buyers. In addition, the lower price point can make feasibility challenging for developers. This is an issue future updates to the program may seek to address.
The flat-rate per unit in-lieu fee structure for both rental and for-sale projects is another feature staff indicated the City may consider revising as part of a future update.
Program updated
2014
Keyser Marston Associates, Inc. Page 82
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
ROSEVILLE
Program History and Requirements
The City of Roseville does not have a
city-wide inclusionary housing policy but
has a General Plan Goal that 10% of all
new housing units will be affordable to
moderate, low and very low income
households. The goal is implemented
through the City’s specific plans, which
assign affordable housing obligations on
a parcel-by-parcel basis. A specific plan is a comprehensive planning document that guides the development of a defined geographic area.
The City of Roseville has sixteen subareas that
have been planned for urban development.
These include an Infill Area, the North Industrial
area, and fourteen specific plan areas. Within
each specific plan, the City identifies certain
parcels that carry affordable housing obligations.
The number of required affordable units,
whether the units are rental or for-sale, and the
income levels of the units are specified.
The City’s specific plans vary widely. In general,
each specific plan estimates the total housing
that will be built in the plan area, and then
calculates the minimum affordable housing
obligation at 10% of the total. The plans then
identify the specific parcels that will include
affordable units to achieve the 10% goal, with a mix of income levels specified in the General Plan policy (20% middle – defined as 80 to 100% AMI, 40% low and 40% very low). A table excerpted from the City’s Sierra Vista Specific Plan is included here as an example.
Population 154,817
Land Area 44 square miles
Adopted 1988
Program Structure General Plan policy implemented
through Specific Plans. Onsite units.
Inclusionary Percentage 10%
Income Levels for
Inclusionary Units
Rental: Low, Very Low
For Sale: Moderate, Low, Very Low
In-Lieu Fee Amount $278,849 / aff unit w/approval
10-Year Housing Permitted1
Very Low and Low:
Moderate:
Above Moderate:
Ten-Year Total
380 3%
4,645 39%
6,959 58%
11,984 100%
Units Per 1,000 Residents
Total Units
77 units per 1,000 residents
Low and Very Low Units 3 units per 1,000 residents
12013-2022
Sources: US Census, Housing Element Annual Progress Reports.
Keyser Marston Associates, Inc. Page 83
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Alternatives to onsite construction vary by specific plan. Typical alternatives include an in-lieu fee, transfers/credits, density bonuses, and allowing carriage units or granny flats in lower density areas. Compliance strategies also vary by specific plan area, with some plan areas building out according to the plan and others involving trading of affordable housing obligations across parcels. The City does not allow clusters of affordable housing development but does encourage and prefer 100% affordable projects funded with Low Income Housing Tax Credits.
Occasionally, the City will provide financial assistance to these 100% affordable developments, but not typically. Market rate parcels are generally allowed to be built out independently of the timing of the affordable units, such that the market rate development can go forward even if the affordable units are not yet built.
The City’s in-lieu fee is based on average development costs of recent affordable housing units.
It is currently set at $278,849 per affordable unit. Not all Specific Plan Areas allow for payment of an in-lieu fee. In general, the City Council requires projects to build affordable units instead of paying a fee. City staff estimates that only 10% of projects comply through in-lieu fee payment.
A recent example of a project that paid an in-lieu fee is a small ownership project that owed two affordable units; the City requested an in-lieu fee based on the affordability gap of the ownership units (the difference between the market price and the restricted price) and the developer agreed to pay the city $700,000 instead of providing the units.
The inventory of parcels with affordable housing obligations is published on the City’s website.
Since the program was adopted, the City has seen a wide range of compliance strategies, depending on market conditions, project feasibility, and the attributes of specific sites.
Affordable Housing Production
According to the City, a total of 3,509 affordable units have been developed as part of the Roseville Affordable Housing Program, with 78% rental units and 22% for sale units. This production total amounts to an average of approximately 110 affordable units developed per year, although permitting for Very Low and Low income units has been at a pace of 38 units per year over the last ten years. The City recently announced $10 million in funding commitments to three proposed multifamily rental affordable housing developments, totaling 264 new affordable units.
According to the City’s Housing Element Program Reports, permitting for Very Low and Low Income units represented only 3% of all permitted units between 2013 and 2022. Units affordable to Moderate Income represented almost 40% of all permitted units.
Overall Housing Production Trends
Roseville experienced robust housing production over the past ten years, approximately three times the statewide average per capita housing production. Roseville’s program was in place
Keyser Marston Associates, Inc. Page 84
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
over the duration of the ten year period, thus the robust housing production that occurred provides a good indicator that projects are able to sustain the cost of complying with Roseville’s policy.
Chart 6-2. Housing Units Permitted by Year, Roseville
Program Effectiveness
According to the City, the success of this program
is due to the City’s commitment to its goal and its
collaborative process with development
proposals in the production of this housing, as
well as partnerships with local affordable housing
developers. The City has a reputation of requiring affordable units to be built and does not typically allow developers to pay in-lieu fees. The City’s program is well-established, consistent, and predictable, allowing developers to predict and plan their compliance.
Consistency and predictability allow
landowners and developers to predict
and plan their compliance
Keyser Marston Associates, Inc. Page 85
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
FOLSOM
Program History and Requirements
The City of Folsom has an inclusionary
housing program that requires developers
of all new for-sale residential projects
greater than 10 units to include at least
10% of their units as affordable to lower-
income households. The City does not
apply inclusionary requirements to rentals.
First established in 2002, the City's inclusionary program has undergone several revisions, including significant revisions in 2013, which reduced the inclusionary requirement from 15% to 10%, added an in-lieu fee alternative, and removed inclusionary requirements pertaining to rental units. Since then, all developments have paid the in-lieu fee instead of providing units onsite.
The in-lieu fee is set at 1% of the sales price for
the lowest priced unit in the development multiplied
by the total number of units in the project. The in-
lieu fee is payable at the time of the building permit
on a per-unit basis. Once the in-lieu fee has been
set for an initial twelve months, the amount of the fee is evaluated on January 1st of each following year. In the event the lowest priced for-sale residential unit or anticipated home in the subdivision changes by ten percent or more, the amount of the in-lieu fee is adjusted for the remaining units or lots in the subdivision. The fee is typically in the range of $6,000 - $10,000 per market rate unit.
Population 83,269
Land Area 28 sq. miles
Adopted 2002, amended 2013
Program Structure Inclusionary requirement w/ fee option, for sale units only.
Inclusionary Percentage 10%
Income Levels for
Inclusionary Units
For Sale: Low and Very Low
In-Lieu Fee Amount 1% of sales price for lowest priced unit per market rate unit.
10-Year Housing Permitted1
Very Low and Low:
Moderate:
Above Moderate:
Ten-Year Total
468 8%
884 15%
4,600 77%
5,952 100%
Units Per 1,000 Residents
Total Units
71 units per 1,000 residents
Low and Very Low Units 6 units per 1,000 residents
1 2013-2022.
Sources: US Census, Housing Element Annual Progress Reports.
Folsom’s onsite requirement paired
with a low in-lieu fee is effectively a
fee-based program.
Keyser Marston Associates, Inc. Page 86
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Affordable Housing Production
Prior to 2013, when the in-lieu fee option was added, the City’s inclusionary program produced about 80 deed-restricted affordable ownership condominiums. These units are still deed- restricted and typically owned by seniors.
From 2013 through June 2022, the City collected $16 million in in-lieu fees. Since 2013, the City’s Housing Fund has assisted six affordable rental projects. (The City’s Housing Fund is primarily funded by inclusionary in-lieu fees, with some additional funding from commercial linkage fees and former redevelopment bond funds) The projects include Bidwell Pointe Apartments (100 low-income units), Talavera Ridge Apartments (6 extremely-low-income units), the Parkway Apartments (72 low-income units), Bidwell Place Apartments (75 units), Sage Senior (110 units), and Mangini Place (150 units).
Overall, Very Low and Low income units represented 8% of total housing permitted between 2013 and 2022. Units affordable to Moderate Income households represented an additional 15% of all housing permitted.
Overall Housing Production Trends
Housing production in Folsom was low during the 2013 to 2016 period but has increased since then. Over the prior ten years, 71 units were permitted per 1,000 in population, approximately three times the statewide average. The housing production data suggests that projects are able to sustain Folsom’s inclusionary requirements. Changes to the program enacted in 2013 were designed to reduce the financial impact of the program on market rate development, by lowering the onsite percentage, introducing an in-lieu fee option and allowing developers to propose alternative compliance strategies. It also removed an inclusionary obligation on rental housing.
Despite the reduction in requirements, the City continued to experience low permitting activity for several years, which suggests the low rate of production early in the period may have been driven by market conditions or other factors and not attributable to changes in the inclusionary policy.
Keyser Marston Associates, Inc. Page 87
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Chart 6-3. Housing Units Permitted by Year, Folsom
Program Effectiveness
The City of Folsom experienced rapid growth over the past few years and the fee-based program has been successful in generating funds that the City uses to assist in the production of affordable rental housing. The structure of the fee (1% of the lowest sales price of the market rate units) is more difficult to administer than a typical per square foot or per unit fee, as it creates a timing issue and can be complicated for large projects. The City may consider moving toward a fee per square foot if the program is updated in the future, as it is easier to administer and apply. The City has explored expanding the program to include rental development but has chosen not to move forward with this so far. City staff indicated that updating the ordinance would have limited impact, at least in the near term, as most pipeline development projects have development agreements in place that lock in compliance with the existing ordinance.
In on-going monitoring and compliance of the stock of approximately 80 affordable ownership units that were produced prior to program changes adopted in 2013, some challenges have arisen due to homeowner misunderstandings or gaps in communication regarding the nature of resale restrictions that apply to inclusionary units and fluctuations in affordable resale prices that have occurred due to changes in mortgage interest rates.
Program
updated 2013
Keyser Marston Associates, Inc. Page 88
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
DAVIS
Program History and Requirements
The City of Davis adopted an inclusionary
ordinance in 1990 and has updated the
program several times since. The City is
currently in the process of updating the
inclusionary requirements for rental
projects.
Davis’s current requirement is as follows:
Rental Projects
Rental units within vertical mixed-
use development must provide 5% at Low.
Rental projects with 20 or more units, other than vertical mixed use projects, are required to set aside 10% of units at Very-Low Income and 25% of units at Low Income. Smaller rental projects (5 to 19 units), other than vertical mixed use projects, are required to set aside 10% at Very Low and 15% at Low.
See also the temporary rental requirements listed below.
For-Sale Projects
Single family detached projects with large lots (5,000 sf or larger) are required to set aside 25% at Moderate, while single family
detached projects with smaller lots (<5,000 sf)
are required to set aside 15% at Moderate.
(Projects in Davis have been primarily higher
density, with few single family detached projects.)
Single family attached units are required to
provide 10% at Moderate.
Population 67,048
Land Area 10 square miles
Adopted / Updated 1990, temporary update 2018.
Update in process.
Program Structure Inclusionary requirement, in-lieu fee with approval.
Inclusionary Percentage Rental: 15% (temporary requirement) For Sale: 5% - 25%, depending on
unit type and size.
Income Levels for
Inclusionary Units
Rental: Low, Very Low, Extremely
Low
For Sale: Moderate
In-Lieu Fee Amount $78,150 per affordable unit, with
approval.
10-Year Housing Permitted1
Very Low and Low:
Moderate:
Above Moderate:
Ten-Year Total
316 18%
752 43%
666 38%
1,734 100%
Units Per 1,000 Residents
Total Units
26 units per 1,000 residents
Low and Very Low Units 5 units per 1,000 residents
1 2013-2022
Sources: US Census, Housing Element Annual Progress Reports.
Adoption of AB 1505 spurred
Davis to temporarily reduce its
rental inclusionary requirements;
reduction may become
permanent.
Keyser Marston Associates, Inc. Page 89
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Stacked condominiums or ownership units within vertical mixed-use development must provide 5% at Moderate.
Projects with fewer than five units are exempt.
Temporary Rental Inclusionary Requirement
In 2018, the City Council “temporarily” amended its rental inclusionary requirements in response to enactment of AB 1505 (which restored the ability to implement inclusionary requirements for rentals statewide, effective January 1, 2018). Temporary requirements were meant to serve as a bridge until the City could complete a comprehensive update, the change added an alternative affordable housing requirement option:
Rental projects may provide affordable units onsite, 15% of units or 15% of bedrooms, with an even mix of Low, Very Low, and Extremely Low Income units.
Alternatives
Compliance options for rental projects under the permanent ordinance are limited to onsite construction and land dedication. In addition, the City allows for an individualized compliance program as long as it generates an equivalent level of affordability as the onsite requirement.
The temporary requirements allow rental projects to propose alternative compliance strategies, including but not limited to “providing affordable housing by bedroom or individual bed, or pledging to the city a continuing payment of funds to be submitted to the city at least annually.”
The temporary requirements also allow the City Council to consider several factors in determining whether to approve an alternative rental affordable housing proposal, including whether the project meets a specific housing need, includes unusually high infrastructure costs or other cost burdens, includes a public subsidy or other public financing from a source other than the City, or provides a deeper level of affordability such as the extremely low income level.
Further, the Council may, at its discretion, require a higher total percentage for larger market rate projects that have greater economies of scale, or require a lesser percentage for smaller projects that have lesser economies of scale. The sunset date on this temporary amendment has been extended multiple times and was June 30, 2023, as of the time of review.
Compliance options for for-sale developments with fewer than 200 units include:
On-site construction of affordable ownership or rental units; Acquisition and recordation of permanent affordability restrictions on existing housing units within the city;
Dedication of an affordable housing site; and/or
Payment of in-lieu fees, if approved by the City Council.
Keyser Marston Associates, Inc. Page 90
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Compliance options for for-sale developments with more than 200 units include:
On-site construction of affordable ownership units;
On-site construction of affordable rental units;
On-site construction of accessory dwelling units for rental to fulfill up to half of the requirement;
Payment of in-lieu fees for no more than 50 percent of the affordable housing obligation of the project, if approved by the City Council; and/or Dedication of an affordable housing site.
An alternative approach to meeting affordable housing requirements may be approved if it provides equal or greater affordability. On-site construction of affordable units for ownership developments must provide a mix of two- and three-bedroom units, with at least 50 percent three-bedroom units. Smaller and larger size units can be provided depending on local housing needs and project character.
Payment of in-lieu fees must be approved by the City Council. The payments are determined according to the adopted fee schedule revised annually. The housing in-lieu fee is currently $78,150 per affordable unit. Discounts are given for vertical mixed-use projects and projects that include 75 percent stacked condominiums.
Incentives
The City awards a one-for-one density bonus for projects that include on-site affordable units.
The City also typically offers reduced parking standards for projects that provide affordable units.
In addition, city staff will work with the developers of small projects (15 units or fewer) located within the City’s core area to provide construction subsidies to encourage onsite affordable units, as necessary. These projects are eligible to pay the in-lieu fee as well, or a combination of the in-lieu fee and onsite compliance.
Affordable Housing Production
Approximately 1,800 affordable units have been produced since the adoption of the ordinance in 1990, with 1,100 of those units remaining permanently affordable. The City cites the variety of development types that have been provided to meet the housing needs of the community as one of the biggest accomplishments of the program. There are affordable homes and apartments, for rent and for purchase, spread throughout the City, in mixed income developments, and 100% affordable developments. There are cooperative housing projects, senior-specific housing, and supportive housing for individuals with special needs.
Keyser Marston Associates, Inc. Page 91
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
According to City staff, developers choose a wide range of compliance options, including onsite, land dedication, in-lieu fees, and individualized housing plans. One development project will provide profit-sharing with the Housing Trust Fund, with annual payments in perpetuity based on the revenue stream of the development. Projects that are eligible to pay the in-lieu fee typically select the fee option, as the fee is set below the cost of other compliance options.
Overall, Very Low and Low income units represented 18% of total housing permitted between 2013 and 2022, the largest share among the local jurisdictions reviewed, and just below the City of Sacramento, which was at 20%. Units affordable to Moderate Income households represented an additional 43% of all housing permitted.
Overall Housing Production Trends
Housing production in Davis over the last decade equated to 26 units per 1,000 residents, matching the Statewide average, but less than the City of Sacramento figure at 39 units per 1,000 residents and the other regional comparisons cited above. A range of factors including availability of land, zoning policies, City fees and other requirements, and / or the City’s inclusionary policy may have influenced the comparatively muted housing production level. The trends data does not allow the influence of the inclusionary housing policy to be separated from other factors that may be influencing the pattern in Davis. Although low relative to the other jurisdictions cited, market rate housing development activity is occurring. Trends in Davis have tended to be “lumpy,” which may indicate larger multi-family projects pulling permits in particular years. The section below details the City’s current and forthcoming efforts to ensure that the program is creating affordable housing without constraining overall housing production.
Chart 6-4. Housing Units Permitted by Year, Davis
Program updated
2018
Keyser Marston Associates, Inc. Page 92
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Proposed Update
The City’s Housing Element includes a plan to undertake a comprehensive update to the City’s Affordable Housing Ordinance. The process for updating the ordinance includes conducting a study to determine appropriate inclusionary proportions and affordability levels, analyze in-lieu fees and other alternatives to providing units on site, and evaluate other parameters of the ordinance as appropriate. As a part of the update process, the City will evaluate whether new policies increase affordable housing opportunities throughout the City to avoid over concentration of affordable housing in any particular area of the City.
The City is currently conducting a comprehensive review of the inclusionary requirements for rental developments, with a goal of adopting a permanent ordinance before the temporary requirements sunset in June 2023. A feasibility analysis of multifamily rental housing was presented to City Council in January 2023, as part of this update process. Based on the findings of the feasibility analysis, it is likely that the City will adopt an onsite requirement similar to the temporary requirement, with alternative compliance options that provide flexibility for developers. If the updated ordinance still allows for payment of an in-lieu fee, it is likely that the City will update the in-lieu fee to more accurately reflect the affordability gap between market rate and affordable inclusionary units.
Keyser Marston Associates, Inc. Page 93
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
PORTLAND
Program History and Requirements
The City of Portland adopted an
Inclusionary Housing ordinance in 2016,
in response to a change in Oregon law
that reversed a statewide ban on
inclusionary ordinances.
Oregon law places the following limits on
inclusionary housing ordinances:
Cities cannot require more than 20% of units to be affordable, Affordable rents and prices must be at a level affordable to households earning 80% of Median Family Income (MFI) or higher (providing alternative compliance options at income levels less than 80% of MFI is permitted),
Inclusionary housing ordinances can only apply to multifamily structures with 20 or more units,
Cities must provide incentives, and
There must be a fee option.
Compliance Options
Consistent with the maximums permitted under Oregon law, Portland requires projects with 20 or more units to set aside 20% of units at a rent or price affordable to households earning 80% of MFI. To qualify for the affordable units, renters must have an income of 80% of MFI or below while purchasers of for-sale affordable units must have incomes of 100% AMI or below.
Alternatively, developers may choose one of the following compliance options:
Set aside 10% of units at 60% MFI.
Build units offsite equal to 20% of units at 60% MFI or 10% at 30% MFI.
Population 635,067
Land Area 133 square miles
Adopted / Updated 2016
Program Structure Inclusionary requirement w/ fee
option.
Inclusionary Percentage 20%
Income Levels for
Inclusionary Units
80% Median Family Income
In-Lieu Fee Amount $23 - $27 per gross square foot.
10-Year Housing Permitted,
2012-2021
Multi-Family:
Single-Family:
Ten-Year Total
City-Regulated Affordable
Units (<80% AMI) 2015-2022:
35,601
7,146
42,747
7,780
Units Per 1,000 Residents
67 units per 1,000 residents
Sources: US Census, City of Portland Housing Bureau.
Keyser Marston Associates, Inc. Page 94
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Establish affordability restrictions for existing
offsite units, equal to 25% at 60% MFI or 15%
at 30% MFI.
Provide a modified percentage of affordable
units that maintains the same total number of
bedrooms within the affordable units
(“reconfiguration of bedrooms option”).
Payment of an in-lieu fee of $23 per gross
square foot, or $27 in the Central City and
Gateway Plan Districts.
Affordable renter households must have an income at or below the identified income level to be eligible, while purchasers of for-sale affordable units may have incomes that exceed the level used to set affordable prices by up to 20%.
Incentives
The City’s program provides a range of incentives
designed to reduce compliance costs and
encourage onsite units. Incentives include a 10-
year property tax exemption for affordable units,
construction excise tax exemption for affordable units, parking exemptions, FAR bonuses, and System Development Charge (impact fee) exemptions for the affordable units. Projects located in the Central City Plan District with an FAR of 5 or greater that provide inclusionary units are eligible to receive the 10-year property tax exemption on the full residential portion of the building, not just the affordable units.
For projects with multiple buildings, inclusionary units may be consolidated in one building onsite. The consolidated building is not eligible to receive subsidy funding from the Portland Housing Bureau.
The City is currently conducting a “Calibration Study” to examine and assess the Inclusionary Housing program. In particular, the City is studying adjustments to the program for for-sale projects, offsite production of units, the reconfiguring of bedrooms option, and possible changes to the tax-exemption incentive.
Affordable Housing Production
Since the program’s inception in 2017, privately funded market rate projects have provided 332 inclusionary units. An additional 274 inclusionary units are under construction and 327 are in permitting. There are 990 projected affordable units in predevelopment. The units are an even mix of income targeting between 60% and 80% MFI. The City collected in-lieu fee revenues Incentives offered under Portland’s
inclusionary program vary by
geographic area.
Keyser Marston Associates, Inc. Page 95
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
from one project totaling $4.2 million. The City has not yet allocated the fee revenues to an affordable project.
Compliance Options Being Utilized
The City’s program is designed to comply with state law while providing incentives to achieve policy goals. In particular, the City is most interested in inclusionary units at 60% MFI. The program has been successful in achieving this outcome, as most projects comply by setting aside units onsite, and almost half of the units are set at 60% MFI. The in-lieu fee option, which is set at a level to encourage the production of units, has only been used by one project. In addition, one developer has complied with the ordinance by providing offsite units (two buildings “sent” their inclusionary units to a third building in the same neighborhood with similar units).
Developers have chosen to reconfigure the bedroom mix of the inclusionary units in order to provide fewer overall units, particularly in the Central City Plan Area, where the tax exemption incentives can apply to the entire building in certain circumstances.
Overall Housing Production Trends
Charts 6-5 and 6-6 show multi-family and single family housing production trends in Portland since 2005. The chart was prepared by the City as part of its 2022 State of Housing report.
Chart 6-5. Multifamily Units Permitted and Produced by Year, Portland
Ordinance
implemented
Keyser Marston Associates, Inc. Page 96
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Chart 6-6. Single Family Units Permitted and Produced by Year, Portland The City experienced a spike in permits and completions of multifamily units in 2017, just prior to the effective date of the Inclusionary Housing requirements, with permits issued in the subsequent years less than this peak year. Critics of the program point to the decline in housing production from this peak as evidence that the inclusionary housing program has slowed overall housing production in the city.
The Portland Housing Bureau conducts periodic reviews of the Inclusionary Housing program options and incentives in an effort to monitor the effect and impact of the program. In addition, the City produces an annual “State of Housing” report, which provides a comprehensive look at the Portland housing market. The city’s periodic reviews and the State of Housing reports suggest that the reduction in housing permitting and production since 2017 may have been a result of several factors, including a natural decline after the large spike and broader economic conditions.
In 2017, annual housing production and permitting levels peaked higher than any point in nearly two decades, as many developers rushed to submit permit applications prior to the February 2017 effective date of the City's new Inclusionary Housing requirements. This was especially true for multifamily housing development, which saw more than 6,000 permits issued—a record high—and 8,000 units produced that year. Both production and permitting have since declined and are closer to historic averages, with an average of 2,347 multifamily units produced annually in both 2019 and 2020. These declines were not only seen in Portland but also in surrounding cities in Washington and Clackamas counties, due in large part to rising construction and labor costs, and tariff uncertainties, followed by the economic impacts of the COVID-19 pandemic in 2020.
While the drop in new construction permits in 2020 to 1,555 seemed to signal an impending slowdown in housing production, permitting levels rebounded in 2021 with 4,257 permits issued.
15 15 2021 State of Housing, Portland Housing Bureau.
Ordinance
implemented
Keyser Marston Associates, Inc. Page 97
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
The City’s program applies to projects with 20 units or more, leading to the question of whether developers are producing smaller projects than they otherwise would have (19 or fewer units), or building multiple smaller buildings on a site to avoid the program’s requirements. As part of the current Inclusionary Housing Calibration study, the City analyzed this question and found the following:
The most significant finding is that 12-to-19-unit buildings do not make up a large share of housing production. Less than 10 percent of the last three years of housing units produced are within 12-to-19-unit buildings. Most 12-to19-unit buildings are built on smaller lots that accommodate smaller building types. In terms of projects with multiple buildings on one site, this type of evasion of IH requirements has only happened six times in the past three years (four instances in 2019, once in 2020 and once again in 2021). In conclusion, the avoidance of Inclusionary Housing requirements by building just below the threshold of the requirements is not prevalent within recent years of housing production trends.
16 The City continues to conduct reviews and in-depth analyses of housing production and the inclusionary housing ordinance to calibrate the program to best achieve the City’s housing goals.
16 12-to-19-Unit Building Production Analysis, Bureau of Planning and Sustainability, City of Portland, December 2022.
Keyser Marston Associates, Inc. Page 98
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
DENVER
Program History and Requirements
In 2021, Colorado passed state legislation
enabling cities to apply inclusionary
housing requirements to rental projects.
The new law requires cities to offer
options and at least one alternative to
onsite compliance. In addition, it requires
incentives to help offset the cost of
compliance.
Following enactment of the new State legislation, the City of Denver adopted its “Expanding Housing Affordability” policy, which modified the City’s existing affordable housing linkage fee, adopted in 2017.
Base Requirement
Residential developments of 10 or more units must set aside 8% to 15% of the units as affordable or pay an in-lieu fee. The in-lieu fee ranges from $250,000 to $478,000 depending on unit type and market area. The City offers incentives including flexible parking requirements, height incentives and permit fee reductions to help offset the cost of the inclusionary units.
Projects less than ten units are required to pay the affordable housing linkage fee that was previously in place, but the amount is being increased and is set to be fully phased in by July 2025. For units less than 1,600 square feet, the fully phased in fee will be $5 per square foot.
For units larger than 1,600 square feet, the fee will be $8 per square foot. (The fee for other residential uses such as congregate living will be $7 per square foot.)
Population 713,252
Land Area 153 square miles
Adopted / Updated 2001, updated 2017, 2022
Program Structure Inclusionary requirement w/ fee
option
Inclusionary Percentage 8% - 15%, depending on income
level, unit type, market area
Income Levels for
Inclusionary Units
Rental: 60% or 70% (average)
For Sale: 80% or 90% (average)
In-Lieu Fee Amount $250,000 - $478,000, depending
on unit type and market area
10-Year Housing Units
Permitted, 2012-2021
10-Year Affordable Units
Produced (<100% AMI),
2011-2020
73,941
5,759
Units Per 1,000 Residents
Total Units
104 units per 1,000 residents
Low and Very Low Units 8 units per 1,000 residents
Sources: US Census; Denver Housing Market Analysis, Root Policy Research, 2022.
Keyser Marston Associates, Inc. Page 99
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
The Expanding Housing Affordability program establishes two distinct market areas with differing requirements. Market areas are updated every three years and are based on the median land value per square foot by census tract. The market areas are:
High Market Areas, which includes census tracts with a median land value equal to five (5) or more times greater than the citywide median land value; and
Typical Market Areas, which include all other census tracts.
In Typical Market Areas, projects with 10 or more units can choose to set aside 8% of units at 60% AMI (rental) and 80% AMI (ownership), or 12% at an effective average of 70% AMI (rental) and 90% AMI (ownership). In High Market Areas, the onsite percentages increase to 10% and 15% of total dwelling units.
Incentives
There are three base incentives for projects providing
onsite affordable units. Projects are eligible for a building permit fee reduction equal to $6,500 per affordable unit in Typical Market Areas and $10,000 per affordable unit in High Market Areas. Projects are also eligible for a
reduced parking standard. Ground floor commercial
uses in residential buildings providing onsite affordable units are exempt from paying the affordable housing
linkage fee.
Projects that set aside a higher percentage of affordable units are eligible for an increase in building height and floor area ratio and an exemption from parking requirements, in addition to the base incentives. In Typical Market Areas, enhanced incentives are available to projects that provide 10% at 60% AMI (rental) and 80% AMI (ownership), or 15% at an average of 70% AMI (rental) and 90% (owner). In High Market Areas, the percentage thresholds to qualify for enhanced incentives are 12% and 18%, depending on the income level of the units.
Alternatives
Consistent with state law in Colorado, Denver provides an in-lieu fee option, in the amounts shown in the table below. Fees are adjusted annually based on the CPI-U index.
Denver’s
requirements vary
by market area.
Keyser Marston Associates, Inc. Page 100
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Denver In-Lieu Fees
Market Area
Onsite Percentage to be used
for the Fee Calculations Development Types
Fee per affordable
unit required
High Market Area 10% of dwelling units Rental development $311,000 Ownership development $478,000
Typical Market Area 8% of dwelling units
Townhouses $250,000
Ownership development, dwelling
units other than townhouses $408,000
Rental development of one to
seven stories $250,000
Rental development of eight or
more stories $295,000
Affordable units must remain affordable for 99 years. Units must be functionally equivalent in construction and appearance, interspersed among the other units in the development, and proportionate in the number of bedrooms.
Applicants may propose an alternative approach to satisfy the requirements of the Expanded Housing Affordability policy, such as land dedication, deeper affordability, larger family units, or offsite units. The applicant must demonstrate how the proposed alternative provides outcomes that better support the city’s goals and policies. Alternatives may be approved at the staff level.
The City designates large projects (10 or more acres) or projects receiving public financing as “High Impact Developments.” High Impact Developments must finalize and record a compliance plan approved by the City. The plan must demonstrate how the proposed development meets or exceeds the affordability requirements, and it must also be informed by and responsive to a documented community engagement process.
Affordable Housing Production
The prior affordable housing linkage fee program, which also applies to non-residential development, generated $24 million in fees between 2017 and 2020. Under that program, onsite units were allowed as an alternative to the fee, but no incentives were provided. Only three affordable units were provided on-site under the former program between 2017 and 2020. The Expanding Housing Affordability ordinance went into effect July 1, 2022; however, projects approved since then and through June 2023 are grandfathered under the prior linkage fee program rules and are not subject to the new program. As such there is not yet data on housing production under the new program.
Keyser Marston Associates, Inc. Page 101
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Overall Housing Production Trends
Chart 6-7 shows housing unit permitting since 2010. There was an elevated level of permitting in 2017, prior to the effective date of the new 2017 affordable housing fee. Permitting was also elevated in 2021, which may be due in part to the impending new inclusionary ordinance. On a per capita basis, Denver’s housing production exceeded all of the other comparisons, which may by driven by a range of factors including population growth in the Denver metro area, differences in costs, among others. The housing production data is an indication that projects were able to sustain the affordable housing fee requirements in place prior to 2022. The City’s new inclusionary policy took effect in mid-2022 but has provisions for qualifying pipeline projects to proceed under prior fee requirements through June 2023; therefore, there is no data yet on housing production trends under the new ordinance.
Chart 6-7. Permitted Housing Units by Year, Denver
0 2,000
4,000
6,000
8,000
10,000
12,000
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Program updated
2017
Keyser Marston Associates, Inc. Page 102
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
SAN JOSE
Program History and Requirements
San Jose has had an inclusionary policy
since 1988. The 1988 program applied
only within redevelopment areas, which
covered extensive areas of the City, and
required 20% of units to be affordable.
The program was expanded citywide in
2010. The citywide program was
scheduled to take effect in January 2013;
however, the California Building Industry
Association (CBIA) sued the City.
Implementation was suspended while the
litigation proceeded through superior
court, appeals court, and finally to the
California Supreme Court. The California
Supreme Court ruled in favor of the City,
upholding the ability of cities to implement inclusionary policies. A petition for review by the United States Supreme Court was denied in 2016. This cleared the way for the City to begin implementing its citywide inclusionary program in 2016, replacing the redevelopment area policy which had been continuously implemented through that point.
Affordable Housing Impact Fee Program
While litigation over the City’s program was pending, the City adopted a separate affordable housing impact fee (“AHIF”) program in 2014 that applied to rental developments. The fee was set at an initial rate of $17 per square foot and had escalated to $19.61 per square foot as of FY 22-23. Adoption of the AHIF program occurred during a period when inclusionary requirements could not be applied to rental developments based on a separate court ruling (Palmer). The ability to apply inclusionary requirements to rentals was restored through enactment of AB 1505 in 2017, at which point the City began a process of transitioning away Population 971,233
Land Area 178 square miles
Adopted / Updated 1988; expanded Citywide 2010;
first implemented 2016; amended
2021
Program Structure Inclusionary w/ fee option
Inclusionary Percentage 15%
Income Levels for
Inclusionary Units
R: 5% each at Very Low,
Low, Median
FS: 15% at Moderate
In-Lieu Fee Amount Rental
Moderate Market Areas:
$19.68/SF net livable area
Strong Market Areas:
$45.26/SF net livable area
For-Sale
$26.32/SF net livable area
10-Year Housing Permitted1
Very Low and Low:
Moderate:
Above Moderate:
Ten-Year Total
3,140 12%
2,873 11%
19,590 77%
25,603 100%
Units Per 1,000 Residents
Total Units
26 units per 1,000 residents
Low and Very Low Units 3 units per 1,000 residents
1 2013-2022.
Sources: US Census, Housing Element Annual Progress Reports.
Keyser Marston Associates, Inc. Page 103
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
from its AHIF program and toward a single inclusionary policy for both rental and for sale projects. As a number of projects were entitled under the AHIF policy, the City has continued to collect fees under the program as the transition process occurs. 2010 Citywide Inclusionary Ordinance
The City’s 2
010 original citywide inclusionary ordinance reflected the following requirement:
On-site affordable requirement of 15%
o
For-sale projects must provide moderate income units priced at 110% of AMI. o Rental projects are required to provide a mix of Very Low (50% AMI) and Moderate units with ren
ts at 80% of AMI, which mirrored redevelopment law
production requirements.
In-lieu fees were permitted for all projects and were structured on a flat per affordable unit basis. I
n-lieu fees for rental projects were $125,000 per affordable unit and fees for for-sale
projects were $157,858 per affordable unit prior to the 2021 amendments of the program. The calculation of t
he in-lieu fee due is based on a higher 20%
requirement.
Other alternatives permitted under the 2010 ordinance included land dedication, credits for
surplus inclusionary units, acquisition and rehab of existing units, among others.
2021 Amen
ded Citywide Ordinance
In 2021, the
City implemented a comprehensive set of updates to the inclusionary ordinance which included a modification of the structure of the in-lieu fee from a per unit basis to a per square foot basis and a restructuring of requirements to add additional flexibility to the program and encourage rental projects to provide a portion of required affordable units on- site.
The basic 15% requirement was maintained but the mix of affordability levels for rentals was modified away from the old redevelopment law standards toward a mix of 5% at each of three income levels, Median (100% AMI), Low (60% AMI)
and Very Low (50% AMI). The smallest project size subject to the ordinance was reduced to ten units from twenty. Flexibility was added to allow clustering of affordable units where required by financing sources.
In-lieu fees for rentals were distinguished by market area. Higher fees apply in “strong market areas,” identified based on a greater level of development activity. The majority of the City’s San Jose’s new rental in-lieu
fee structure provides a
powerful incentive for rental
projects to include at least 5%
inclusionary units on-site.
Keyser Marston Associates, Inc. Page 104
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
geography is designated a “moderate market area” in which a lower in-lieu fee rate that mirrors the prior affordable housing impact fee rate applies. In-lieu fees for for-sale units are at a flat per square foot rate across market areas.
The revised rental in-lieu fee structure is designed to provide a powerful incentive for rental projects in strong market areas to provide at least 5% inclusionary units on-site. The full in-lieu fee rate for rentals in strong market areas is $45.26 per square foot; however, by providing 5% affordable units within the project, the in-lieu fee is reduced by over half to $19.68 per square foot for median income units, $13.13 for 60% AMI units and $10.60 for 50% AMI units. This translates into an effective reduction in in-lieu fees of $420,000 to $583,000 per affordable unit provided within the project
17, depending on the income level, providing a strong incentive to include the affordable units on-site. Providing 5% affordable units at 50% of AMI also qualifies the project for a 20% density bonus under State law.
In-Lieu Fees (22-23 rates), City of San Jose, Rentals
Affordable rents Strong Market M oderate Market
No Inclusionary Units n/a $45.26 $19.68
5% Inclusionary
Units On-Site
100% AMI rents $19.68 $12.49
60% AMI rents $13.13 $8.34
50% AMI rents $10.60 $6.73
10% Inclusionary
Units On-Site
100% AMI & 60% AMI $11.11 $7.05
100% AMI & 50% AMI $8.58 $5.44
60% AMI & 50% AMI $2.02 $1.28
30% AMI $0.00 $0.00
Overall Housing Production Trends
The overall level of housing production in San Jose, at 26 units per 1,000 in population over the past decade is consistent with the statewide average. Most housing units being built in San Jose are multi-family. The City experienced a robust level of multifamily permitting activity in 2013 and 2014 driven by favorable conditions for these projects. The pace of multifamily development slowed in the latter half of the decade. Feasibility studies conducted on behalf of San Jose have indicated that rising construction costs contributed to greater feasibility challenges for market rate multi-family projects in San Jose compared to cities in the West Valley and Peninsula where higher rents are achievable and better able to support rising costs. The City also reached a limit under its North San Jose Development Policy, which resulted from a settlement agreement, which prevented additional housing units from being built within an area that had attracted significant housing development.
17 Assuming a 900 square foot average unit size.
Keyser Marston Associates, Inc. Page 105
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
The City’s in
clusionary policies underwent four major changes over the prior decade, as noted in Chart 6-8. Policy changes have included provisions allowing pipeline projects to proceed under prior requirements, such that adoption dates don’t necessarily provide clear delineation between the policies applicable to specific projects in specific years. For example, the AHIF was adopted in 2014; however, projects were generally exempt if they received approvals prior to June 30, 2016, and no fees were paid until fiscal year 2017-18. As such, reduced permitting activity in 2015 and 2016 would not be attributable to the AHIF, as projects built in these years were not subject to the AHIF. The complexity of four separate policy changes, pipeline provisions of the programs, the shifts in market dynamics and rising construction costs, and the cap on units in the North San Jose area make it difficult to draw any meaningful conclusions from the permitting data regarding the influence the City’s inclusionary policies might or might not have had on market rate housing production over the period, as distinct from other factors.
Chart 6-8. Permitted Housing Units by Year, San Jose
Outcomes
1988 Redevelopment Area Inclusionary Policy
The 1988 in
clusionary policy that applied within former redevelopment areas until 2016 created 1,780 total income-restricted affordable units (comprised of 346 for-sale homes and 1,434 rental units) on-site within 52 separate mixed income projects (representing approximately 19% of the Citywide inclusionary
implemented, 2016
for-sale units only
Update to
inclusionary
program
2021
Rental fee
Adopted 2014 Transition to rental
inclusionary begins
Keyser Marston Associates, Inc. Page 106
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
units within the 52 projects subject to the 1988 policy), primarily between 1996 and 2017.
According to a City staff report, all of these affordable units were built without a financial subsidy from the redevelopment agency. In addition, a total of $21 million in-lieu fees were paid, and an additional $16 million in-lieu fees remained to be collected from projects that had not yet fully built out. These in-lieu fee funds were committed to assist affordable projects around the city and a first-time homebuyer program.
AHIF Program
The City first collect
ed affordable housing impact fees under its AHIF program in FY 2017-18 and had collected $21 million through 2021-22. Funds were committed to three affordable projects including $2.2 million a 14-unit habitat for humanity project (101 S Jackson), $5.4 million to Kelsey Ayer Station (115 units), and $5 million to Parkmoor Community Apartments (81 units).
Citywide Inclusionary Policy
Of the seve
n projects that submitted compliance plans under the original citywide policy from 2016 to 2019, all but one project planned to comply through in-lieu fee payment. One 494-unit rental project proposed to provide on-site affordable rental units. The cost of including affordable units on-site was determined to be significantly higher than the cost of the in-lieu fee, based on a 2019 analysis.
The 2021 amendments to the citywide policy were designed to produce more on-site inclusionary units by strengthening the incentives to do so and incorporating additional flexibility into the program for projects that do provide on-site affordable units. Data on compliance options proposed by applicants since the 2021 amendments were adopted show that the City has been successful in encouraging projects to provide affordable units on-site. Applicants are proposing a variety of compliance options to meet the requirements of the ordinance including on-site units, in-lieu fees, and a mix of units and fees. Staff indicated that three options have seen particular interest:
Providing 5% rental units at 100% of AMI + payment of an in-lieu fee for the remaining
10% requirement.
Partnering with an affordable developer and clustering the required inclusionary units on a portion of the site.
A combination of methods or alternative proposed by the applicant that provides the same or greater affordability.
Keyser Marston Associates, Inc. Page 107
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
Satisfying the entire inclusionary obligation with in-lieu fees has become less common than it once was and represented only about one third of a sampling of 29 affordable housing compliance plans for proposed projects.
While the policy has been successful in encouraging on-site affordable units, some challenges have emerged based on the track record with the revised ordinance to date. Specifically, some applicants have used the option to propose an alternative compliance method to push the boundaries of the flexibility under the program including by requesting modification of standards that may not align with the intent, although use of this option remains subject to City approval.
Another challenge has resulted from the rapid increases in published income limits for Santa Clara County, which have increased by 28% in the four years since the proposed policy was initially brought to Council in a 2019 study session. With this rapid increase in income limits and therefore affordable rents, the affordability benefit originally associated with the 100% AMI tier is greatly reduced or eliminated under current market conditions. In part because 100% AMI rents are now effectively at or near market, use of the option to provide 5% of rental units at 100% of AMI and qualify for a reduced in-lieu fee has been common.
Keyser Marston Associates, Inc. Page 108
\\SF-FS2\wp\18\18996\036\001-003.docx DRAFT
APPENDIX TABLES
Part A - Summary Tables Appendix A
Summary of Scenario Testing, For-Sale, Prior More Favorable Market Conditions Table 1A Summary of Scenario Testing, For-Sale, Assuming Current Market Conditions Table 1B Summary of Scenario Testing, Rentals, Prior More Favorable Market Conditions Table 1C Summary of Scenario Testing, Rentals, Current Market Conditions Table 1D Dollar Per Square Foot Cost Relative to Existing Requirements: For-Sale Table 2A Dollar Per Square Foot Cost Relative to Existing Requirements: Rentals Table 2B Percentage Change In Residual Land Value: For-Sale Table 3A Percentage Change In Residual Land Value: Rental Table 3B Total Fees/Permits/Affordable Housing Costs as % of Total Development Cost of Unit: For-Sale Table 4A Total Fees/Permits/Affordable Housing Costs as % of Total Development Cost of Unit: Rental Table 4B Part B - For-Sale Pro Forma Tables
For-Sale Pro Forma Tables, Sce
narios 1 to 22 Table 5A to 5V
Part C - Rental Pro Forma Tables
Rental Pro Form
a Tables, Scenarios 1 to 19 Table 6A to 6S
Part D - Supporting Analysis and Data
Recent Multifamily Residential Property Tran
sactions Table 7
Residential Land Sales Table 8
Infrastructure Costs Comps, Master Plan Developments Table 9 Estimated Cost, Provision of Units in Stand Alone LIHTC Project Table 10 Affordable Rents Table 11
Affordable Home Price Calculation Table 12
Estimated Fees and Permit Cost Detail Table 13
Appendix B - Market Survey Tables Appendix B
Prototype Projects Table 1
Projects: Central City Area Table 2A
Projects: South Neighborhoods Table 2B
Projects: North Sacramento and South Natomas Table 2C
Projects: North Natomas Table 2D
Projects: Inner South and East Neighborhoods Table 2E
Change in Asking Rents in Newer Apartment Buildings, Summer 2022 to Winter 2023 Table 3 Apartment Unit Mix Table 4
New Homes for Sale April 2022 and January 2023 Table 5
New Homes Marketing as of April 2022 Table 6
New Homes Marketing as of January 2023 Table 7
New Home Re-Sales by Geographic Area Table 8
Home Price Trends, July 2021 to February 2023 Table 9
APPENDIX A - PART A
FINANCIAL FEASIBILITY ANALYSIS SUMMARY TABLES
Appendix A Table 1A
Summary of Scenario Testing, For-Sale, Assuming Prior More Favorable Market Conditions for Scenario Testing Feasibility Analysis
Sacramento MIHO Review DRAFT
Appendix A
Table
Central
City
Townhome SF SF sm lot SF SF sm lot SF SF sm lot SF SF sm lot Existing HIF, Current and Prior Market Conditions, With and Without New Utility Fees 1 Current Market, Proposed Utility Fees, Existing HIF Table 5A FMM I I MM M F 2 Current Market, Existing Utility Fees, Existing HIF Table 5B FMF I M FF M F 3 Prior Market, Existing Utility Fees, Existing HIF Table 5C FFF F F FF F F 5% On-Site For-Sale Affordable Units
4 Prior Market, Proposed Utility Fees, 5% @ Mod@110% AMI Table 5D FFF M F FF F F 5 Prior Market, Proposed Utility Fees, 5% @ Mod@90% AMI Table 5E FFF M F FF F F 6 Prior Market, Proposed Utility Fees, 5% @ Low @70% AMI Table 5F FFF M F FF F F 10% On-Site For-Sale Affordable Units
7 Prior Market, Proposed Utility Fees, 10% @ Mod@110% AMI Table 5G FFF M F FF F F 8 Prior Market, Proposed Utility Fees, 10% @ Mod@90% AMI Table 5H FFF M F FF M F 9 Prior Market, Proposed Utility Fees, 10% @ Low@70% AMI Table 5I FMF I M FF M F 15% On-Site For-Sale Affordable Units
10 Prior Market, Proposed Utility Fees, 15% @ Mod@110% AMI Table 5J FFF M F FF M F 11 Prior Market, Proposed Utility Fees, 15% @ Mod@90% AMI Table 5K M M FM FF FM F 12 Prior Market, Proposed Utility Fees, 15% @ Low@70% AMI Table 5L MMM I I MF M F Include Stand-Alone LIHTC Affordable Project (primarily an option for larger master plans) 13 Prior Market, Proposed Utility Fees, 10% in LIHTC Project Table 5M n/a F F M F F F n/a n/a 14 Prior Market, Proposed Utility Fees, 15% in LIHTC Project Table 5N n/a F F M F F F n/a n/a 15 Prior Market, Proposed Utility Fees, 20% in LIHTC Project Table 5O n/a F F M F F F n/a n/a n/a = not likely to be practical based on typically smaller site / project size Affordable Housing Fee Scenarios
16 Prior Market, Proposed Utility Fees, Existing HIF Table 5P FFF M F FF F F 17 Prior Market, Proposed Utility Fees, remove HIF incentives Table 5Q FFF M F FF F F 18 Prior Market, Proposed Utility Fees, HIF @$5/SF Table 5R FFF M F FF F F 19 Prior Market, Proposed Utility Fees, HIF @$7.50/SF Table 5S FFF M F FF F F 20 Prior Market, Proposed Utility Fees, HIF @$10/SF Table 5T FFF I MFF F F 21 Prior Market, Proposed Utility Fees, HIF @$15/SF Table 5U FMM I M FF F F 22 Prior Market, Proposed Utility Fees, HIF @$20/SF Table 5V FMM I I FF F F F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
Scenario
Southern
Neighborhoods
North Sacramento
and South Natomas North Natomas
Inner South and
East Neighborhoods
Prepared by: Keyser Marston Associates
Filename:Sac City Feas 8-4-23; FSsum
Appendix A Table 1B
Summary of Scenario Testing, For-Sale, Assuming Current Market Condition for Scenario Testing Feasibility Analysis
Sacramento MIHO Review DRAFT
Central
City
Townhome SF SF sm lot SF SF sm lot SF SF sm lot SF SF sm lot Existing HIF, Current and Prior Market Conditions, With and Without Proposed Utility Fees 5% On-Site For-Sale Affordable Units
4 Current Market, Proposed Utility Fees, 5% @ Mod@110% AMI MMM I I F F M F 5 Current Market, Proposed Utility Fees, 5% @ Mod@90% AMI MIM I IM MM F 6 Current Market, Proposed Utility Fees, 5% @ Low @70% AMI MI I I IM MM F 10% On-Site For-Sale Affordable Units
7 Current Market, Proposed Utility Fees, 10% @ Mod@110% AMI MMM I M MF M F 8 Current Market, Proposed Utility Fees, 10% @ Mod@90% AMI MI I I IM MM M 9 Current Market, Proposed Utility Fees, 10% @ Low@70% AMI MI I I I I I M M 15% On-Site For-Sale Affordable Units
10 Current Market, Proposed Utility Fees, 15% @ Mod@110% AMI MMM I M MF M M 11 Current Market, Proposed Utility Fees, 15% @ Mod@90% AMI III I I M MI M 12 Current Market, Proposed Utility Fees, 15% @ Low@70% AMI I I II I I IIM Include Stand-Alone LIHTC Affordable Project (primarily an option for larger master plans) 13 Current Market, Proposed Utility Fees, 10% in LIHTC Project n/a M M I I F M n/a n/a 14 Current Market, Proposed Utility Fees, 15% in LIHTC Project n/a I I I I F M n/a n/a 15 Current Market, Proposed Utility Fees, 20% in LIHTC Project n/a I I I I M M n/a n/a n/a = not likely to be practical based on typically smaller site / project size Affordable Housing Fee Scenarios
16 Current Market, Proposed Utility Fees, Existing HIF FMM I I MM M F 17 Current Market, Proposed Utility Fees, remove HIF incentives FI I I IM MM F 18 Current Market, Proposed Utility Fees, HIF @$5/SF FI I I IM MM F 19 Current Market, Proposed Utility Fees, HIF @$7.50/SF FI I I IM MM F 20 Current Market, Proposed Utility Fees, HIF @$10/SF MI I I IMI M F 21 Current Market, Proposed Utility Fees, HIF @$15/SF MI I I I I I M F 22 Current Market, Proposed Utility Fees, HIF @$20/SF MI I I I I I M M F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
Scenario
Southern
Neighborhoods
North Sacramento
and South Natomas North Natomas
Inner South & East
and West of I-5
Prepared by: Keyser Marston Associates
Filename:Sac City Feas 8-4-23; FSsum (CM)
Appendix A Table 1C
Summary of Scenario Testing, Rentals, Assuming Prior More Favorable Market Conditions for Scenario Testing Feasibility Analysis
Sacramento MIHO Review DRAFT
Appendix A
Table
Southern
Neighborhoods
North Sacramento
and South
Natomas
North
Natomas
Inner South and
East
Neighborhoods
Med Density High Density
Existing HIF, Current and Prior Market Conditions, With and Without Proposed Utility Fees 1 Current Mkt, Proposed Utility Fees, Existing HIF Table 6A II I I I I 2 Current Mkt, Existing Utility Fees, Existing HIF Table 6B IM I I I I 3 Prior Mkt, Existing Utility Fees, Existing HIF Table 6C FF F F F F 5% On-Site Affordable Units
4 Prior Mkt, Proposed Utility Fees, 5% Low @80% AMI Table 6D FF M M M F 5 Prior Mkt, Proposed Utility Fees, 5% Low @60% AMI Table 6E FF M M M M 6 Prior Mkt, Proposed Utility Fees, 5% Very Low @50% AMI Table 6F MF M M M M 10% On-Site Affordable Units
7 Prior Mkt, Proposed Utility Fees, 10% Low @80% AMI Table 6G MF M M M M 8 Prior Mkt, Proposed Utility Fees, 10% Low @60% AMI Table 6H MF I I I I 9 Prior Mkt, Proposed Utility Fees, 10% Very Low @50% AMI Table 6I IF I I I I 15% On-Site Affordable Units
10 Prior Mkt, Proposed Utility Fees, 15% Low @80% AMI Table 6J MF I I I M 11 Prior Mkt, Proposed Utility Fees, 15% Low @60% AMI Table 6K IM I I I I 12 Prior Mkt, Proposed Utility Fees, 15% Very Low @50% AMI Table 6L II I I I I Affordable Housing Fee Scenarios
13 Prior Mkt, Proposed Utility Fees, Existing HIF Table 6M FF F F F F 14 Prior Mkt, Proposed Utility Fees, HIF @$5/SF Table 6N FF M F M F 15 Prior Mkt, Proposed Utility Fees, HIF @$7.50/SF Table 6O FF M M M F 16 Prior Mkt, Proposed Utility Fees, HIF @$10/SF Table 6P FF M M M F 17 Prior Mkt, Proposed Utility Fees, HIF @$15/SF Table 6Q FF M M M M 18 Prior Mkt, Proposed Utility Fees, HIF @$20/SF Table 6R MF I M I M 19 Prior Mkt, Proposed Utility Fees, remove HIF incentives Table 6S FF F F F F F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
Central CityScenario
Prepared by: Keyser Marston Associates
Filename:Sac City Feas 8-4-23; Rsum
Appendix A Table 1D
Summary of Scenario Testing, Rentals, Assuming Current Market Condition for Scenario Testing Feasibility Analysis
Sacramento MIHO Review DRAFT
Appendix A
Table
Southern
Neighborhoods
North Sacramento
and South
Natomas
North
Natomas
Inner South and
East
Neighborhoods
Med
Density
High
Density
5% On-Site Affordable Units
4 Current Mkt, Proposed Utility Fees, 5% Low @80% AMI Table 6D II I I I I 5 Current Mkt, Proposed Utility Fees, 5% Low @60% AMI Table 6E II I I I I 6 Current Mkt, Proposed Utility Fees, 5% Very Low @50% AMI Table 6F II I I I I 10% On-Site Affordable Units
7 Current Mkt, Proposed Utility Fees, 10% Low @80% AMI Table 6G II I I I I 8 Current Mkt, Proposed Utility Fees, 10% Low @60% AMI Table 6H II I I I I 9 Current Mkt, Proposed Utility Fees, 10% Very Low @50% AMI Table 6I II I I I I 15% On-Site Affordable Units
10 Current Mkt, Proposed Utility Fees, 15% Low @80% AMI Table 6J II I I I I 11 Current Mkt, Proposed Utility Fees, 15% Low @60% AMI Table 6K II I I I I 12 Current Mkt, Proposed Utility Fees, 15% Very Low @50% AMI Table 6L II I I I I Affordable Housing Fee Scenarios
13 Current Mkt, Proposed Utility Fees, Existing HIF Table 6M II I I I I 14 Current Mkt, Proposed Utility Fees, HIF @$5/SF Table 6N II I I I I 15 Current Mkt, Proposed Utility Fees, HIF @$7.50/SF Table 6O II I I I I 16 Current Mkt, Proposed Utility Fees, HIF @$10/SF Table 6P II I I I I 17 Current Mkt, Proposed Utility Fees, HIF @$15/SF Table 6Q II I I I I 18 Current Mkt, Proposed Utility Fees, HIF @$20/SF Table 6R II I I I I 19 Current Mkt, Proposed Utility Fees, remove HIF incentives Table 6S II I I I I F= Feasible
M= Marginal Feasibility
I= Infeasible / Challenged
Scenario Central City
Prepared by: Keyser Marston Associates
Filename:Sac City Feas 8-4-23; Rsum (CM)
Appendix A Table 2A
Dollar Per Square Foot Cost Relative to Existing Requirements: For-Sale Feasibility Analysis
Sacramento MIHO Review DRAFT
Appendix A
Table
Central
City
Townhome SF SF sm lot SF SF sm lot SF SF sm lot SF SF sm lot 3 Prior Market, No Change in Requirements Table 5C $0 $0 $0 $0 $0 $0 $0 $0 $0 5% On-Site For-Sale Affordable Units
4 Prior Market, Proposed Utility Fees, 5% @ Mod@110% AMI Table 5D $16 $6 $6 $7 $7 $5 $4 $14 $17 5 Prior Market, Proposed Utility Fees, 5% @ Mod@90% AMI Table 5E $18 $8 $9 $9 $10 $7 $7 $16 $20 6 Prior Market, Proposed Utility Fees, 5% @ Low@70% AMI Table 5F $21 $11 $12 $12 $14 $10 $10 $18 $23 10% On-Site For-Sale Affordable Units
7 Prior Market, Proposed Utility Fees, 10% @ Mod@110% AMI Table 5G $26 $8 $6 $8 $7 $9 $6 $24 $26 8 Prior Market, Proposed Utility Fees, 10% @ Mod@90% AMI Table 5H $29 $12 $11 $12 $12 $12 $11 $28 $30 9 Prior Market, Proposed Utility Fees, 10% @ Low@70% AMI Table 5I $35 $18 $19 $19 $20 $18 $18 $33 $37 15% On-Site For-Sale Affordable Units
10 Prior Market, Proposed Utility Fees, 15% @ Mod@110% AMI Table 5J $35 $9 $7 $9 $7 $12 $8 $34 $34 11 Prior Market, Proposed Utility Fees, 15% @ Mod@90% AMI Table 5K $41 $16 $14 $16 $14 $18 $15 $39 $41 12 Prior Market, Proposed Utility Fees, 15% @ Low@70% AMI Table 5L $50 $25 $26 $25 $26 $26 $25 $47 $50 Include Stand-Alone LIHTC Affordable Project (primarily an option for larger master plans) 13 Prior Market, Proposed Utility Fees, 10% in LIHTC Project Table 5M n/a $7 $9 $8 $11 $4 $6 n/a n/a 14 Prior Market, Proposed Utility Fees, 15% in LIHTC Project Table 5N n/a $9 $11 $10 $13 $5 $7 n/a n/a 15 Prior Market, Proposed Utility Fees, 20% in LIHTC Project Table 5O n/a $10 $13 $11 $15 $6 $9 n/a n/a n/a = not likely to be practical based on typically smaller site / project size Affordable Housing Fee Scenarios
16 Prior Market, Proposed Utility Fees, Existing HIF Table 5P $10 $6 $7 $8 $9 $5 $7 $8 $9 17 Prior Market, Proposed Utility Fees, remove HIF incentives Table 5Q $10 $8 $9 $10 $11 $5 $7 $8 $13 18 Proposed Utility Fees, HIF @$5/SF Table 5R $11 $10 $11 $11 $13 $7 $8 $9 $14 19 Proposed Utility Fees, HIF @$7.50/SF Table 5S $14 $12 $14 $14 $16 $9 $11 $12 $17 20 Proposed Utility Fees, HIF @$10/SF Table 5T $17 $15 $16 $16 $18 $12 $13 $15 $19 21 Proposed Utility Fees, HIF @$15/SF Table 5U $22 $20 $21 $22 $23 $17 $19 $20 $25 22 Proposed Utility Fees, HIF @$20/SF Table 5V $27 $25 $27 $27 $29 $22 $24 $25 $30 Note: figures are calculated using the pro forma results and reflect the net change in supported land value per square foot of net livable area.
Inner South and
East Neighborhoods
Dollar Per Square Foot Cost Increase Relative to Existing Requirements (includes combined impact of affordable housing changes and utility fee increase) Scenario
Southern
Neighborhoods
North Sacramento
and South Natomas North Natomas
Prepared by: Keyser Marston Associates
Filename:Sac City Feas 8-4-23; FSCC
Appendix A Table 2B
Dollar Per Square Foot Cost Relative to Existing Requirements: Rentals Feasibility Analysis
Sacramento MIHO Review DRAFT
Appendix A
Table
Southern
Neighborhoods
North Sacramento
and South
Natomas
North
Natomas
Inner South and
East
Neighborhoods
Med Density High Density
3 No Change Table 6C $0 $0 $0 $0 $0 $0
5% On-Site Affordable Units
4 Proposed Utility Fees, 5% Low @80% AMI Table 6D $25 $33 $12 $16 $12 $17 5 Proposed Utility Fees, 5% Low @60% AMI Table 6E $32 $38 $18 $22 $18 $22 6 Proposed Utility Fees, 5% Very Low @50% AMI Table 6F $34 $40 $20 $24 $20 $26 10% On-Site Affordable Units
7 Proposed Utility Fees, 10% Low @80% AMI Table 6G $37 $49 $19 $23 $20 $25 8 Proposed Utility Fees, 10% Low @60% AMI Table 6H $46 $62 $29 $33 $30 $37 9 Proposed Utility Fees, 10% Very Low @50% AMI Table 6I $54 $67 $33 $39 $34 $42 15% On-Site Affordable Units
10 Proposed Utility Fees, 15% Low @80% AMI Table 6J $49 $65 $24 $32 $27 $33 11 Proposed Utility Fees, 15% Low @60% AMI Table 6K $66 $83 $40 $46 $43 $49 12 Proposed Utility Fees, 15% Very Low @50% AMI Table 6L $75 $91 $46 $52 $49 $59 Affordable Housing Fee Scenarios (net increase above existing, including Proposed Utility fees) 13 Proposed Utility Fees Only, No HIF Change Table 6M $13 $14 $9 $11 $9 $13 14 Proposed Utility Fees, HIF @$5/SF Table 6N $18 $19 $12 $15 $10 $14 15 Proposed Utility Fees, HIF @$7.50/SF Table 6O $20 $22 $15 $17 $13 $17 16 Proposed Utility Fees, HIF @$10/SF Table 6P $23 $24 $17 $20 $15 $19 17 Proposed Utility Fees, HIF @$15/SF Table 6Q $28 $29 $22 $25 $20 $24 18 Proposed Utility Fees, HIF @$20/SF Table 6R $33 $34 $27 $30 $25 $29 19 Prior Mkt, Proposed Utility Fees, remove HIF incentives Table 6S $16 $18 $11 $13 $9 $13 Note: Figures are calculated using the pro forma results and reflect the net change in supported land value per square foot of net rentable area.
Scenario Central City
Dollar Per Square Foot Cost Increase Relative to Existing Requirements (includes combined impact of affordable housing changes and utility fee increase)
Prepared by: Keyser Marston Associates
Filename:Sac City Feas 8-4-23; RCC
Appendix A Table 3A
Percentage Change In Residual Land Value: For-Sale
Feasibility Analysis
Sacramento MIHO Review DRAFT
Appendix A
Table
Central
City
Townhome SF SF sm lot SF SF sm lot SF SF sm lot SF SF sm lot 3 Prior Market, No Change in Requirements Table 5C 0% 0% 0% 0% 0% 0% 0% 0% 0% Baseline Residual Land Value/Unit for Feasible Project $256,200 $113,200 $94,200 $113,400 $89,600 $156,600 $104,800 $377,600 $250,900 5% On-Site For-Sale Affordable Units
4 Prior Market, Proposed Utility Fees, 5% @ Mod@110% AMI Table 5D -11% -9% -9% -12% -12% -7% -7% -9% -12% 5 Prior Market, Proposed Utility Fees, 5% @ Mod@90% AMI Table 5E -13% -13% -13% -15% -17% -9% -10% -10% -13% 6 Prior Market, Proposed Utility Fees, 5% @ Low@70% AMI Table 5F -15% -18% -19% -20% -23% -13% -16% -11% -15% 10% On-Site For-Sale Affordable Units
7 Prior Market, Proposed Utility Fees, 10% @ Mod@110% AMI Table 5G -18% -12% -10% -14% -12% -11% -9% -15% -17% 8 Prior Market, Proposed Utility Fees, 10% @ Mod@90% AMI Table 5H -21% -19% -18% -21% -20% -16% -17% -17% -20% 9 Prior Market, Proposed Utility Fees, 10% @ Low@70% AMI Table 5I -25% -28% -29% -31% -33% -24% -27% -20% -25% 15% On-Site For-Sale Affordable Units
10 Prior Market, Proposed Utility Fees, 15% @ Mod@110% AMI Table 5J -25% -14% -10% -16% -11% -16% -12% -21% -23% 11 Prior Market, Proposed Utility Fees, 15% @ Mod@90% AMI Table 5K -30% -24% -22% -26% -24% -24% -23% -24% -28% 12 Prior Market, Proposed Utility Fees, 15% @ Low@70% AMI Table 5L -36% -39% -40% -42% -43% -35% -39% -29% -34% Include Stand-Alone LIHTC Affordable Project (primarily an option for larger master plans) 13 Prior Market, Proposed Utility Fees, 10% in LIHTC Project Table 5M n/a -11% -14% -14% -18% -5% -9% n/a n/a 14 Prior Market, Proposed Utility Fees, 15% in LIHTC Project Table 5N n/a -13% -17% -16% -21% -7% -11% n/a n/a 15 Prior Market, Proposed Utility Fees, 20% in LIHTC Project Table 5O n/a -16% -20% -19% -24% -8% -14% n/a n/a n/a = not likely to be practical based on typically smaller site / project size Affordable Housing Fee Scenarios
16 Prior Market, Proposed Utility Fees, Existing HIF Table 5P -7% -9% -11% -13% -16% -7% -10% -5% -6% 17 Prior Market, Proposed Utility Fees, remove HIF incentives Table 5Q -7% -13% -15% -16% -19% -7% -10% -5% -9% 18 Proposed Utility Fees, HIF @$5/SF Table 5R -8% -15% -17% -19% -22% -9% -13% -6% -10% 19 Proposed Utility Fees, HIF @$7.50/SF Table 5S -10% -19% -21% -23% -26% -12% -16% -7% -11% 20 Proposed Utility Fees, HIF @$10/SF Table 5T -12% -23% -25% -28% -30% -16% -20% -9% -13% 21 Proposed Utility Fees, HIF @$15/SF Table 5U -16% -31% -33% -36% -39% -23% -28% -12% -17% 22 Proposed Utility Fees, HIF @$20/SF Table 5V -19% -39% -41% -45% -48% -30% -36% -15% -20% Note: includes combined impact of affordable housing changes and proposed utility fee increase.
Inner South and
East Neighborhoods
Percentage Change In Residual Land Value
Scenario
Southern
Neighborhoods
North Sacramento
and South Natomas North Natomas
Prepared by: Keyser Marston Associates
Filename:Sac City Feas 8-4-23; FSRLV
Appendix A Table 3B
Percentage Change In Residual Land Value: Rental
Feasibility Analysis
Sacramento MIHO Review DRAFT
Appendix A
Table
Southern
Neighborhoods
North Sacramento
and South
Natomas
North
Natomas
Inner South and
East
Neighborhoods
Med Density High Density
3 No Change Table 6C 0% 0% 0% 0% 0% 0%
Baseline Residual Land Value/Unit for Feasible Project $58,800 $71,200 $26,700 $29,300 $23,700 $56,400 5% On-Site Affordable Units
4 Proposed Utility Fees, 5% Low @80% AMI Table 6D -33% -32% -41% -51% -45% -24% 5 Proposed Utility Fees, 5% Low @60% AMI Table 6E -42% -37% -61% -69% -67% -30% 6 Proposed Utility Fees, 5% Very Low @50% AMI Table 6F -45% -39% -68% -75% -75% -36% 10% On-Site Affordable Units
7 Proposed Utility Fees, 10% Low @80% AMI Table 6G -49% -47% -64% -72% -77% -34% 8 Proposed Utility Fees, 10% Low @60% AMI Table 6H -61% -60% -98% -102% -115% -50% 9 Proposed Utility Fees, 10% Very Low @50% AMI Table 6I -70% -65% -111% -121% -130% -57% 15% On-Site Affordable Units
10 Proposed Utility Fees, 15% Low @80% AMI Table 6J -64% -63% -81% -99% -102% -45% 11 Proposed Utility Fees, 15% Low @60% AMI Table 6K -86% -80% -135% -142% -162% -67% 12 Proposed Utility Fees, 15% Very Low @50% AMI Table 6L -98% -88% -155% -161% -185% -80% Affordable Housing Fee Scenarios
13 Proposed Utility Fees Only, No HIF Change Table 6M -17% -14% -29% -34% -33% -18% 14 Proposed Utility Fees, HIF @$5/SF Table 6N -23% -19% -41% -45% -39% -20% 15 Proposed Utility Fees, HIF @$7.50/SF Table 6O -27% -21% -49% -53% -48% -23% 16 Proposed Utility Fees, HIF @$10/SF Table 6P -30% -24% -58% -60% -58% -26% 17 Proposed Utility Fees, HIF @$15/SF Table 6Q -36% -28% -75% -76% -77% -33% 18 Proposed Utility Fees, HIF @$20/SF Table 6R -43% -33% -91% -91% -96% -40% 19 Prior Mkt, Proposed Utility Fees, remove HIF incentives Table 6S -21% -17% -36% -41% -33% -18% Note: includes combined impact of affordable housing changes and proposed utility fee increase.
Scenario Central City
Percentage Change In Residual Land Value
Prepared by: Keyser Marston Associates
Filename:Sac City Feas 8-4-23; RRLV
Appendix A Table 4A
Total Fees/Permits/Affordable Housing Costs as % of Total Development Cost of Unit: For-Sale Feasibility Analysis
Sacramento MIHO Review DRAFT
Appendix
A Table
Central
City
Townhome SF SF sm lot SF SF sm lot SF SF sm lot SF SF sm lot 3 Existing Requirements Table 5C 6.4% 10.7% 10.6% 9.5% 10.3% 14.0% 14.7% 5.8% 6.1% 5% On-Site For-Sale Affordable Units
4 Prior Market, Proposed Utility Fees, 5% @ Mod@110% AMI Table 5D 9.2% 12.1% 11.7% 11.2% 12.0% 14.1% 14.5% 8.4% 10.4% 5 Prior Market, Proposed Utility Fees, 5% @ Mod@90% AMI Table 5E 9.7% 12.9% 12.7% 12.1% 13.0% 14.8% 15.4% 8.8% 11.1% 6 Prior Market, Proposed Utility Fees, 5% @ Low@70% AMI Table 5F 10.5% 14.2% 14.2% 13.3% 14.5% 15.9% 16.7% 9.5% 12.0% 10% On-Site For-Sale Affordable Units
7 Prior Market, Proposed Utility Fees, 10% @ Mod@110% AMI Table 5G 11.6% 12.5% 11.6% 11.5% 11.6% 15.3% 14.8% 10.9% 12.6% 8 Prior Market, Proposed Utility Fees, 10% @ Mod@90% AMI Table 5H 12.6% 14.2% 13.6% 13.2% 13.7% 16.7% 16.6% 11.9% 13.8% 9 Prior Market, Proposed Utility Fees, 10% @ Low@70% AMI Table 5I 14.2% 16.8% 16.5% 15.7% 16.7% 18.9% 19.2% 13.2% 15.6% 15% On-Site For-Sale Affordable Units
10 Prior Market, Proposed Utility Fees, 15% @ Mod@110% AMI Table 5J 14.0% 12.9% 11.5% 11.8% 11.2% 16.4% 15.0% 13.5% 14.8% 11 Prior Market, Proposed Utility Fees, 15% @ Mod@90% AMI Table 5K 15.6% 15.5% 14.5% 14.3% 14.2% 18.6% 17.7% 14.9% 16.6% 12 Prior Market, Proposed Utility Fees, 15% @ Low@70% AMI Table 5L 17.9% 19.4% 18.9% 18.0% 18.8% 21.9% 21.8% 16.9% 19.3% Include Stand-Alone LIHTC Affordable Project (primarily an option for larger master plans) 13 Prior Market, Proposed Utility Fees, 10% in LIHTC Project Table 5M n/a 13.5% 14.0% 12.7% 14.5% 14.5% 16.1% n/a n/a 14 Prior Market, Proposed Utility Fees, 15% in LIHTC Project Table 5N n/a 14.6% 15.3% 13.8% 15.8% 15.4% 17.2% n/a n/a 15 Prior Market, Proposed Utility Fees, 20% in LIHTC Project Table 5O n/a 15.8% 16.7% 14.9% 17.2% 16.4% 18.5% n/a n/a n/a = not likely to be practical based on typically smaller site / project size Affordable Housing Fee Scenarios
16 Prior Market, Proposed Utility Fees, Existing HIF Table 5P 8.6% 12.8% 13.0% 12.1% 13.5% 15.6% 16.7% 7.7% 8.3% 17 Prior Market, Proposed Utility Fees, remove HIF incentives Table 5Q 8.6% 14.3% 14.4% 13.7% 15.0% 15.6% 16.7% 7.7% 10.2% 18 Proposed Utility Fees, HIF @$5/SF Table 5R 9.4% 15.4% 15.5% 14.8% 16.1% 16.7% 17.7% 8.5% 11.0% 19 Proposed Utility Fees, HIF @$7.50/SF Table 5S 10.7% 17.2% 17.2% 16.7% 18.0% 18.5% 19.4% 9.8% 12.3% 20 Proposed Utility Fees, HIF @$10/SF Table 5T 11.9% 18.9% 18.9% 18.5% 19.7% 20.2% 21.0% 11.0% 13.6% 21 Proposed Utility Fees, HIF @$15/SF Table 5U 14.4% 22.4% 22.3% 22.0% 23.2% 23.6% 24.3% 13.5% 16.1% 22 Proposed Utility Fees, HIF @$20/SF Table 5V 16.7% 25.7% 25.5% 25.4% 26.5% 26.9% 27.4% 16.0% 18.6% Proposed Utility Fee Increase as % of Development Cost 2.3% 2.0% 2.4% 2.6% 3.2% 1.6% 2.0% 1.9% 2.3% Inner South and
East
NeighborhoodsScenario
Southern
Neighborhoods
North Sacramento
and South
Natomas North Natomas
Prepared by: Keyser Marston Associates
Filename:Sac City Feas 8-4-23; FS%TDC
Appendix A Table 4B
Total Fees/Permits/Affordable Housing Costs as % of Total Development Cost of Unit: Rental Feasibility Analysis
Sacramento MIHO Review DRAFT
Appendix
A Table
Southern
Neighborhoods
North Sacramento
and South
Natomas
North
Natomas
Inner South and
East
Neighborhoods
Med Density High Density
3 No Change Table 6C 5.8% 5.5% 7.8% 6.5% 10.5% 6.9%
5% On-Site Affordable Units
4 Proposed Utility Fees, 5% Low @80% AMI Table 6D 10.5% 10.9% 10.6% 10.2% 12.3% 9.8% 5 Proposed Utility Fees, 5% Low @60% AMI Table 6E 11.9% 11.9% 12.4% 11.8% 13.9% 10.9% 6 Proposed Utility Fees, 5% Very Low @50% AMI Table 6F 12.4% 12.3% 13.0% 12.4% 14.4% 12.0% 10% On-Site Affordable Units
7 Proposed Utility Fees, 10% Low @80% AMI Table 6G 12.8% 13.6% 12.5% 11.9% 14.3% 11.4% 8 Proposed Utility Fees, 10% Low @60% AMI Table 6H 14.8% 15.9% 15.5% 14.7% 17.0% 14.2% 9 Proposed Utility Fees, 10% Very Low @50% AMI Table 6I 16.2% 16.9% 16.6% 16.3% 18.1% 15.4% 15% On-Site Affordable Units
10 Proposed Utility Fees, 15% Low @80% AMI Table 6J 15.1% 16.3% 13.8% 14.2% 15.8% 13.0% 11 Proposed Utility Fees, 15% Low @60% AMI Table 6K 18.5% 19.6% 18.6% 18.1% 20.2% 17.0% 12 Proposed Utility Fees, 15% Very Low @50% AMI Table 6L 20.5% 21.0% 20.4% 19.8% 21.8% 19.3% Affordable Housing Fee Scenarios
13 Proposed Utility Fees Only, No HIF Change Table 6M 8.3% 7.9% 10.1% 9.3% 12.6% 9.7% 14 Proposed Utility Fees, HIF @$5/SF Table 6N 10.2% 9.6% 12.0% 11.1% 13.3% 10.4% 15 Proposed Utility Fees, HIF @$7.50/SF Table 6O 11.2% 10.4% 13.4% 12.4% 14.5% 11.5% 16 Proposed Utility Fees, HIF @$10/SF Table 6P 12.1% 11.2% 14.7% 13.6% 15.7% 12.5% 17 Proposed Utility Fees, HIF @$15/SF Table 6Q 14.0% 12.8% 17.3% 16.1% 18.0% 14.7% 18 Proposed Utility Fees, HIF @$20/SF Table 6R 15.8% 14.4% 19.9% 18.4% 20.3% 16.8% 19 Prior Mkt, Proposed Utility Fees, remove HIF incentives Table 6S 9.6% 9.1% 11.3% 10.4% 12.6% 9.7% Proposed Utility Fee Increase as % of Development Cost 2.5% 2.4% 2.3% 2.9% 2.1% 2.8% Scenario Central City
Prepared by: Keyser Marston Associates
Filename:Sac City Feas 8-4-23; R%TDC
APPENDIX A - PART B
FOR-SALE PRO FORMA TABLES
Appendix A Table 5A Current Market (downward pricing trend / more incentives, higher interest) For-Sale Pro Forma Existing HIF Requirement
Feasibility Analysis New Water/Sewer/Drainage Fees
Sacramento MIHO Review Page 1 of 3 DRAFT
Living Area Net SF 1,850 sf 1,750 sf 1,450 sf
Average Number of Bedrooms 2.8 bedrooms 3.25 bedrooms 3.0 bedrooms Density 26 du/acre 11 du/acre 18 du/acre
Stories/ Construction Type 3 stories/ wood 1-2 stories/ wood 2 stories/ wood Parking Ratio/ Type 2.0 garage 2.0 garage 2.0 garage
Revenue Per SF Per Unit Per SF Per Unit Per SF Per Unit Market Rate Units 100% $442 $817,000 $277 $484,000 $292 $423,000 Low 0% $109 $201,720 $119 $208,975 $142 $205,400
Mod@90% AMI 0% $177 $327,360 $194 $339,725 $230 $333,600 Mod@110% AMI 0% $222 $411,080 $244 $426,850 $289 $419,000 Average Gross Sales Price $442 $817,000 $277 $484,000 $292 $423,000 <Less> Closing Costs 3.25% sales ($14) ($26,600) ($9) ($15,700) ($9) ($13,700) Revenue Net of Sales Expense $427 $790,400 $268 $468,300 $282 $409,300 Development Costs Per NSF Per Unit Per NSF Per Unit Per NSF Per Unit Direct House Costs $180 $333,000 $124 $217,000 $135 $196,000 Fees & Permits, excl. hsg $30 $54,700 $31 $54,100 $32 $46,900 Housing Impact Fee $4 $6,500 $2 $2,700 $2 $2,200
Marketing 1.5% sales $7 $12,300 $4 $7,300 $4 $6,300
Warranty/Insurance 1.75% sales $8 $14,300 $5 $8,500 $5 $7,400 Other Indirects 9% directs $16 $30,000 $11 $19,500 $12 $17,600 Builder Overhead/G&A 3% sales $13 $24,500 $8 $14,500 $9 $12,700 Financing $23 $41,900 $15 $26,300 $15 $22,400
Total House Costs $280 $517,200 $200 $349,900 $215 $311,500 Finished Lot Residual
Net Sales Revenue $427 $790,400 $268 $468,300 $282 $409,300 <Less> Development Costs ($280) ($517,200) ($200) ($349,900) ($215) ($311,500) <Less> Net Builder Profit 10% sales ($81,700) ($48,400) ($42,300) Lot Value (Finished Lot) $191,500 $70,000 $55,500
$/Land SF $M/Acre Land $/Land SF $M/Acre Land $/Land SF $M/Acre Land Residual Lot Value $115 $5.0 $18 $0.8 $23 $1.0
Lot Cost Estimate $120 $5.2 $25 $1.1 $30 $1.3
Feasibility Finding
Single Family Detached
Southern Neighborhoods
Feasible Marginal Feasibility Marginal Feasibility
Appendix A Table 13
Attached Townhomes Small Lot Detached
Central City
Prepared by Keyser Marston Associates, Inc.
Sac City Feas 8-8-23
Appendix A Table 5A
For-Sale Pro Forma
Feasibility Analysis
Sacramento MIHO Review
Living Area Net SF
Average Number of Bedrooms
Density
Stories/ Construction Type
Parking Ratio/ Type
Revenue
Market Rate Units
100%
Low 0%
Mod@90% AMI 0%
Mod@110% AMI 0%
Average Gross Sales Price
<Less> Closing Costs
3.25% sales
Revenue Net of Sales Expense
Development Costs
Direct House Costs
Fees & Permits, excl. hsg
Housing Impact Fee
Marketing
1.5% sales
Warranty/Insurance 1.75% sales
Other Indirects 9% directs
Builder Overhead/G&A 3% sales
Financing
Total House Costs
Finished Lot Residual
Net Sales Revenue
<Less> Development Costs
<Less> Net Builder Profit
10% sales
Lot Value (Finished Lot)
Residual Lot Value
Lot Cost Estimate
Feasibility Finding
Appendix A Table 13
Current Market (downward pricing trend / more incentives, higher interest) Existing HIF Requirement
New Water/Sewer/Drainage Fees
1,900 sf 1,500 sf 2,100 sf 1,600 sf
3.60 bedrooms 3.3 bedrooms 3.6 bedrooms 3.3 bedrooms
9 du/acre 18 du/acre 9 du/acre 18 du/acre
2 stories/ wood 2 stories/ wood 2 stories/ wood 2 stories/ wood
2.0 garage 2.0 garage 2.0 garage 2.0 garage
Per SF Per Unit Per SF Per Unit Per SF Per Unit Per SF Per Unit $255 $484,000 $276 $414,000 $291 $611,000 $309 $494,000 $113 $213,980 $140 $209,690 $102 $213,980 $131 $209,690 $183 $348,300 $227 $340,950 $166 $348,300 $213 $340,950 $230
$437,840 $286 $428,420 $208 $437,840 $268 $428,420
$255 $484,000 $276 $414,000 $291 $611,000 $309 $494,000 ($8) ($15,700) ($9) ($13,500) ($9) ($19,900) ($10) ($16,100) $246 $468,300 $267 $400,500 $281 $591,100 $299 $477,900 Per NSF Per Unit Per NSF Per Unit Per NSF Per Unit Per NSF Per Unit $115 $219,000 $129 $194,000 $118 $248,000 $136 $218,000 $29 $54,200 $33 $48,900 $37 $76,900 $42 $66,800
$2 $2,900 $2 $2,300 $4 $7,400 $4 $5,700
$4 $7,300 $4 $6,200 $4 $9,200 $5 $7,400
$4 $8,500 $5 $7,200 $5 $10,700 $5 $8,600
$10 $19,700 $12 $17,500 $11 $22,300 $12 $19,600
$8 $14,500 $8 $12,400 $9 $18,300 $9 $14,800
$15 $27,800 $15 $22,400 $15 $31,900 $16 $25,600
$186 $353,900 $207 $310,900 $202 $424,700 $229 $366,500 $246 $468,300 $267 $400,500 $281 $591,100 $299 $477,900 ($186) ($353,900) ($207) ($310,900) ($202) ($424,700) ($229) ($366,500) ($48,400) ($41,400) ($61,100) ($49,400)
$66,000 $48,200 $105,300 $62,000
$/Land SF $M/Acre Land $/Land SF $M/Acre Land $/Land SF $M/Acre Land $/Land SF $M/Acre Land $14 $0.6 $21 $0.9 $21 $0.9 $25 $1.1
$25 $1.1 $30 $1.3 $25 $1.1 $30 $1.3
Infeasible / Challenged
Small Lot Detached
North Sacramento and South Natomas North Natomas
Small Lot Detached Single Family Detached
Infeasible / Challenged Marginal Feasibility Marginal Feasibility Single Family Detached
Prepared by Keyser Marston Associates, Inc.
Sac City Feas 8-8-23
Appendix A Table 5A
For-Sale Pro Forma
Feasibility Analysis
Sacramento MIHO Review
Living Area Net SF
Average Number of Bedrooms
Density
Stories/ Construction Type
Parking Ratio/ Type
Revenue
Market Rate Units
100%
Low 0%
Mod@90% AMI 0%
Mod@110% AMI 0%
Average Gross Sales Price
<Less> Closing Costs
3.25% sales
Revenue Net of Sales Expense
Development Costs
Direct House Costs
Fees & Permits, excl. hsg
Housing Impact Fee
Marketing
1.5% sales
Warranty/Insurance 1.75% sales
Other Indirects 9% directs
Builder Overhead/G&A 3% sales
Financing
Total House Costs
Finished Lot Residual
Net Sales Revenue
<Less> Development Costs
<Less> Net Builder Profit
10% sales
Lot Value (Finished Lot)
Residual Lot Value
Lot Cost Estimate
Feasibility Finding
Appendix A Table 13
Current Market (downward pricing trend / more incentives, higher interest) Existing HIF Requirement
New Water/Sewer/Drainage Fees
2,300 sf 1,700 sf
3.5 bedrooms 3.0 bedrooms
8 du/acre 20 du/acre
1-2 stories/ wood 3 stories/ wood
2.0 garage 2.0 garage
Per SF Per Unit Per SF Per Unit
$409 $940,000 $429 $729,000
$92 $212,550 $121 $205,400
$150 $345,850 $196 $333,600
$189 $434,700 $246 $419,000
$409 $940,000 $429 $729,000
($13) ($30,600) ($14) ($23,700)
$395 $909,400 $415 $705,300
Per NSF Per Unit Per NSF Per Unit
$137 $315,000 $168 $286,000
$25 $57,800 $30 $50,800
$4 $8,100 $0 $0
$6 $14,100 $6 $10,900
$7 $16,500 $8 $12,800
$12 $28,400 $15 $25,700
$12 $28,200 $13 $21,900
$22 $50,700 $21 $36,200
$226 $518,800 $261 $444,300
$395 $909,400 $415 $705,300
($226) ($518,800) ($261) ($444,300)
($94,000) ($72,900)
$296,600 $188,100
$/Land SF $M/Acre Land $/Land SF $M/Acre Land
$55 $2.4 $87 $3.8
$65 $2.8 $80 $3.5
Small Lot Detached Single Family Detached
Inner South and East Neighborhoods
Marginal Feasibility Feasible
Prepared by Keyser Marston Associates, Inc.
Sac City Feas 8-8-23
Appendix A Table 5B Current Market (downward pricing trend / more incentives, higher interest) For-Sale Pro Forma Existing HIF Requirement
Feasibility Analysis Existing Water/Sewer/Drainage Fees Sacramento MIHO Review Page 1 of 3 DRAFT
Living Area Net SF 1,850 sf 1,750 sf 1,450 sf
Average Number of Bedrooms 2.8 bedrooms 3.25 bedrooms 3.0 bedrooms Density 26 du/acre 11 du/acre 18 du/acre
Stories/ Construction Type 3 stories/ wood 1-2 stories/ wood 2 stories/ wood Parking Ratio/ Type 2.0 garage 2.0 garage 2.0 garage
Revenue Per SF Per Unit Per SF Per Unit Per SF Per Unit Market Rate Units 100% $442 $817,000 $277 $484,000 $292 $423,000 Low 0% $109 $201,720 $119 $208,975 $142 $205,400
Mod@90% AMI 0% $177 $327,360 $194 $339,725 $230 $333,600 Mod@110% AMI 0% $222 $411,080 $244 $426,850 $289 $419,000 Average Gross Sales Price $442 $817,000 $277 $484,000 $292 $423,000 <Less> Closing Costs 3.25% sales ($14) ($26,600) ($9) ($15,700) ($9) ($13,700) Revenue Net of Sales Expense $427 $790,400 $268 $468,300 $282 $409,300 Development Costs Per NSF Per Unit Per NSF Per Unit Per NSF Per Unit Direct House Costs $180 $333,000 $124 $217,000 $135 $196,000 Fees & Permits, excl. hsg $20 $37,400 $25 $43,900 $25 $36,700 Housing Impact Fee $4 $6,500 $2 $2,700 $2 $2,200
Marketing 1.5% sales $7 $12,300 $4 $7,300 $4 $6,300
Warranty/Insurance 1.75% sales $8 $14,300 $5 $8,500 $5 $7,400 Other Indirects 9% directs $16 $30,000 $11 $19,500 $12 $17,600 Builder Overhead/G&A 3% sales $13 $24,500 $8 $14,500 $9 $12,700 Financing $22 $40,800 $15 $25,600 $15 $21,800
Total House Costs $270 $498,800 $194 $339,000 $207 $300,700 Finished Lot Residual
Net Sales Revenue $427 $790,400 $268 $468,300 $282 $409,300 <Less> Development Costs ($270) ($498,800) ($194) ($339,000) ($207) ($300,700) <Less> Net Builder Profit 10% sales ($81,700) ($48,400) ($42,300) Lot Value (Finished Lot) $209,900 $80,900 $66,300
$/Land SF $M/Acre Land $/Land SF $M/Acre Land $/Land SF $M/Acre Land Residual Lot Value $126 $5.5 $21 $0.9 $28 $1.2
Lot Cost Estimate $120 $5.2 $25 $1.1 $30 $1.3
Feasibility Finding
Central City Southern Neighborhoods
Feasible Marginal Feasibility Feasible
Appendix A Table 13
Attached Townhomes Single Family Detached Small Lot Detached Prepared by Keyser Marston Associates, Inc.
Sac City Feas 8-8-23
Appendix A Table 5B
For-Sale Pro Forma
Feasibility Analysis
Sacramento MIHO Review
Living Area Net SF
Average Number of Bedrooms
Density
Stories/ Construction Type
Parking Ratio/ Type
Revenue
Market Rate Units
100%
Low 0%
Mod@90% AMI 0%
Mod@110% AMI 0%
Average Gross Sales Price
<Less> Closing Costs
3.25% sales
Revenue Net of Sales Expense
Development Costs
Direct House Costs
Fees & Permits, excl. hsg
Housing Impact Fee
Marketing
1.5% sales
Warranty/Insurance 1.75% sales
Other Indirects 9% directs
Builder Overhead/G&A 3% sales
Financing
Total House Costs
Finished Lot Residual
Net Sales Revenue
<Less> Development Costs
<Less> Net Builder Profit
10% sales
Lot Value (Finished Lot)
Residual Lot Value
Lot Cost Estimate
Feasibility Finding
Appendix A Table 13
Current Market (downward pricing trend / more incentives, higher interest) Existing HIF Requirement
Existing Water/Sewer/Drainage Fees