Item 10 2024-01510 Sacramento River Watershed Sanitary Survey 2025 Update, Memorandum of Understanding [Published for 10-day Review on 09.06.2024]

Sacramento City Council
September 17, 2024

Document
Item 10 2024-01510 Sacramento River Watershed Sanitary Survey 2025 Update, Memorandum of Understanding [Published for 10-day Review on 09.06.2024]
Meeting
September 17, 2024
Body
Sacramento City Council
Pages
5
Original file
439 KB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

City of Sacramento
City Council - 5PM Report
915 I Street Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2024-01510 9/17/2024 Consent Item 10.

Sacramento River Watershed Sanitary Survey 2025 Update, Memorandum of Understanding [Published for 10-day Review on 09/06/2024]
File ID: 2024-01510
Location: Citywide
Recommendation: Pass a Motion authorizing the City Manager or the City Manager's designee to:
1) execute a Memorandum of Understanding with five other municipal water purveyors for a sanitary survey update of the Sacramento River watershed area, for a total project cost not-to-exceed $240,450, with the option for participating agencies to share costs of follow-up activities in an amount not-to-exceed $800,000 for Fiscal Year (FY) 2025/26 through FY 2029/30, for a total cost not-to- exceed $1,040,450.

Contact: Karen Newton, Project Manager, [email protected], (916) 808-1449; Lisa Moretti, Supervising Engineer, [email protected], (916) 808-5390; Sherill Huun, Engineering & Water Resources Division Manager, [email protected], (916) 808-1455; Pravani Vandeyar, Director, [email protected], (918) 808-2765; Department of Utilities
Presenter: None
Attachments:
1-Description/Analysis
2-Memorandum of Understanding
Description/Analysis
Issue Detail: The California Surface Water Treatment Rule requires communities that divert and treat surface waters for domestic water supplies, such as the City, to perform sanitary survey updates within their respective watersheds every five years. Staff recommends City Council approval of a Memorandum of Understanding (MOU) with five other municipal water purveyors for preparation of a Sacramento River Watershed Sanitary Survey (SRWSS) 2025 Update to fulfill this requirement.

Policy Considerations: Council approval is required for all City MOUs with outside agencies in excess of $250,000.

Page 1 of 5 ends

File ID: 2024-01510 9/17/2024 Consent Item 10.

The Sacramento City Code Section 4.04.020 and Council Rules of Procedure (Chapter 7, Section E.2.d) mandate that unless waived by a 2/3 vote of the City Council, all labor agreements and all agreements greater than $1,000,000 shall be made available to the public at least ten (10) days prior to council action. This item was published for 10-day review on September 6, 2024, incompliance with the City Code.

Economic Impacts: None.

Environmental Considerations: The proposed activities have been determined to be exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15308 (Actions by Regulatory Agencies for Protection of the Environment). Authorization to enter into the MOU and Agreement regarding apportionment of costs for the watershed sanitary sewer update of the Sacramento River watershed area is an action directed by the State that will help assure the maintenance and protection of the environment.

Sustainability: Conducting the SRWSS 2025 Update and source water protection follow-up activities are consistent with the City's 2040 General Plan Policies and Programs by supporting the policy to “continue ongoing Sacramento and American River source water protection efforts based on watershed sanitary survey recommendations” (Goal ERC-1.2).

Commission/Committee Action: Not applicable.

Rationale for Recommendation: The City is required by the State Division of Drinking Water (DDW) to comply with regulations passed in June 1991, mandating that all water suppliers using surface water sources complete a sanitary survey of their respective watershed(s) and provide an update report every five years. By partnering with other water purveyors with this same requirement and geographical area of interest, the City can cost effectively meet this regulatory requirement.

Financial Considerations: The proposed MOU is for a total project cost with a not-to-exceed amount of $1,040,450. The estimated SRWSS 2025 Update project cost is $240,450 with the optional source water protection follow-up activities totaling a not-to-exceed amount of $1,040,450. A summary of the cost-share amounts and the total project amounts is presented in the table below.

The City’s total maximum cost share not-to-exceed amount for FY 2024/25 is $40,075 for the SRWSS 2025 Update project. Optional follow-up City cost share is not-to-exceed $32,000 per year per partner for FY 2025/26 through FY 2029/30, contingent upon funding availability in the adopted budget for the applicable fiscal year. If requested by the City, the agencies participating in the follow- up activities will each pay an equal share of the cost of the City’s project management services for each activity in an amount of up to $600 per participating agency.

Item Task Schedule (a), (b) Not to
Exceed
Annual
Amount
Per
Partner
Total
Ceiling
Project
Costs per
MOU
A Sacramento River Watershed
Sanitary Survey 2025 Update
December 2024 -
approximately June
2026
$40,075 $240,450
B Annual Sacramento River Joint
Source Water Protection
Program (JSWP) and Keep Our
Waters Clean (KOWC)
Participation
FY2025/26 -
FY2029/30
$32,000
(c)
$800,000
$1,040,45
0

Page 2 of 5 ends

File ID: 2024-01510 9/17/2024 Consent Item 10.

Item Task Schedule (a), (b) Not to
Exceed
Annual
Amount
Per
Partner
Total
Ceiling
Project
Costs per
MOU
A Sacramento River Watershed
Sanitary Survey 2025 Update
December 2024 -
approximately June
2026
$40,075 $240,450
B Annual Sacramento River Joint
Source Water Protection
Program (JSWP) and Keep Our
Waters Clean (KOWC)
Participation
FY2025/26 -
FY2029/30
$32,000
(c)
$800,000
$1,040,45
0 Footnotes:
(a) Additional years for the optional source water protection follow-up activities will be covered by the proposed MOU until a new MOU is in place for the 2030 update to the Sacramento River Watershed Sanitary Survey.
(b) Annual source water protection work may need to be completed after June of each year. (c) $32,000 is the annual ceiling cost per participating Partner for Items B, plus cost share of program management cost at option of City of Sacramento. A Party shall not be required to participate in cost sharing for Item B unless and until the Party’s representative confirms the Party’s participation and financial commitment in writing annually.

Sufficient funds exist in the Sacramento River Source Water Protection Multi-Year Operating Project within I14520300, Fund 6005 for the City shared portion of $40,075 and within I14520300, Fund 6205 for the participating agencies reimbursable cost-share portion of $200,375 for FY 2024/25.

There are no General Funds allocated or planned for this project.

Local Business Enterprise (LBE): LBE participation consistent with City policy will be included in any professional services agreements administered by the City.

Background: The California Code of Regulations, Title 22, Chapter 17 establishes the California Surface Water Treatment Rule (SWTR) which requires that all surface water suppliers conduct a sanitary survey of their watershed(s) at least once every five years. The first of these studies was

Page 3 of 5 ends

File ID: 2024-01510 9/17/2024 Consent Item 10.
required to be completed prior to January 1, 1996, or the issuance of a DDW permit for a new or expanded surface water treatment facility, whichever came first. In December 1995, the City and one other municipal water purveyor in the Sacramento River watershed submitted a sanitary survey of the Sacramento River watershed to the state. Five updates have been submitted to the state since 1995, with a sixth update due to DDW by December 2025.

The main purpose of the sanitary survey requirement is to determine the level of treatment required to assure, to the greatest degree possible, that water supplies are free of microbial and other types of contamination. To comply with this requirement and obtain the necessary information to determine required levels of treatment, watershed sanitary surveys must provide a description of the source waters' watershed, identify potential sources of contamination within the watershed, describe watershed management practices, and assess the microbial contaminant load at the point where the raw water is diverted to the treatment plant.

Staff from the participating water purveyors met to consider whether the SWTR watershed sanitary survey requirements for their respective Sacramento River water treatment plants would best be met through a jointly administered and financed project. This effort has resulted in the development of an MOU Regarding Contracting and Apportionment of Costs for a Sanitary Survey Update of the Sacramento River Watershed and Related Activities. The other participating water purveyors have approved the MOU to participate in the project and pay its cost share.

The key provisions of the MOU provide for the following:
• Formation of a technical committee to share information related to the contract negotiations, review work products and consultant progress reports and discuss report recommendations.

Work products include the SRWSS 2025 Update report and two technical memoranda that various agencies are cost sharing with the City.
• Cost sharing arrangements.
• The City as the lead agency in administration of the Professional Services Agreement and for cost sharing of City staff costs for project management, consisting of work of mutual benefit to the participating agencies.
• The option for participating agencies to share costs of source water protection follow-up activities based on the results of the watershed sanitary survey.

The water purveyors developed a cost-effective approach for the SRWSS 2025 Update to utilize information previously collected in the original SRWSS and five previous update reports by optimizing the use of information from watershed programs, providing updates on various sources of concern in the watershed, evaluating new data on sources and constituents of concern, determining required levels of treatment, and providing an updated set of recommendations. The study area for the SRWSS 2025 Update will be the Sacramento River from the Feather River confluence to Freeport.

The report will also include some coverage of the larger Sacramento River Watershed and the area

Page 4 of 5 ends

File ID: 2024-01510 9/17/2024 Consent Item 10.
in proximity to the Sacramento River/American River confluence as necessary.

Page 5 of 5 ends

Memorandum of Understanding 2025 Sanitary Survey Update Page 1 of 15 of the Sacramento River Watershed Area

MEMORANDUM OF UNDERSTANDING

REGARDING CONTRACTING AND APPORTIONMENT OF COSTS FOR

A SANITARY SURVEY UPDATE OF

THE SACRAMENTO RIVER WATERSHED AREA AND FOLLOW-UP ACTIVITIES

This Memorandum of Understanding (the “MOU”) is entered into on _____________, 2024, by and among the City of Sacramento (“Sacramento”), the City of West Sacramento (“West Sacramento”), East Bay Municipal Utility District (“EBMUD”), Placer County Water Agency (“PCWA”), Sacramento County Water Agency (“SCWA”) , and Woodland-Davis Clean Water Agency (“WDCWA”), each referred to herein as a “Party” and collectively referred to herein as the “Parties”.

RECITALS

A. The purpose of this MOU is to memorialize an agreem ent and understanding of the Parties with respect to contracting and apportionment of costs for the 2025 watershed sanitary survey update of the Sacramento River Watershed Area (“Update”) and for optional source water protection follow-up activities related to the Update recommendations.

B. The Parties each are required by the State Water Resources Control Board, Division of Drinking Water to comply with regulations passed in June 1991 requiring all water suppliers using surface water sources to complete a sanitary survey of their respective watershed(s) and to provide an update report every five years (see California Code of Regulations, Title 22, Division 4, Chapter 17, Article 7, § 64665).

C. This Update also will be used to complete the watershed portion of the sanitary survey required for all surface water users as part of the Federal Interim Enhanced Surface Water Treatment Rule passed in December 1998 (see Federal Register, Vol. 63, No. 241, December 16, 1998, pp. 69478 et seq., amended Jan. 16, 2001, 66 Fed. Reg. 3770).

D. The Parties believe it to be in their best interest, as well as in the public’s best interest, to enter into a contract with a consultant to conduct the Update and to cooperatively and jointly share in the cost of this Update.

E. Some of the Parties also may desire to share costs of source water protection follow-up activities.

NOW THEREFORE, in consideration of the mutual obligations set forth herein, the Parties agree as follows:

1. Technical Committee: The Parties hereby form a Technical Committee consisting of one representative of each of the Parties, as identified on the list titled: “ Sacramento River Watershed Sanitary Survey 2025 Update - Representatives”, attached hereto as Exhibit A and fully incorpora ted herein by this reference. A named representative may designate an individual to act on the representative’s behalf for a specified time.

Memorandum of Understanding 2025 Sanitary Survey Update Page 2 of 15 of the Sacramento River Watershed Area

The purpose of the Technical Committee will be: a) to share information related to the technical work for the Update; b) to review consultant progress reports and work products for the Update; c) to discuss consultant recommendations concerning the Update; d) to consider optional source water protection follow -up activities related to the Update; and e ) to take suc h other action as the Technical Committee deems appropriate to further the interest s of the Parties related to the Update.

The Technical Committee shall meet as needed, at such times and places as the Technical Committee may agree. The Technical Committee serves the limited purposes set forth above and shall be dissolved once the specific tasks set forth in this Update have been completed.

Attendance at meetings may be in person, by telephone, by video conference, or by any other means agreed to by a majority of the Parties’ representatives.

2. Decisions of Technical Committee : A minimum of 4 representatives shall constitute a quorum which shall be necessary for the Technical Committee to hold a meeting.

The Parties expect and intend those decisio ns of the Technical Committee will be made by unanimous agreement of the representatives present at the meetings, except that in the event of disagreement over any decision, the representatives present will vote to resolve the disagreement, with each repre sentative having one vote, and the vote of the majority of representatives present will be the decision of the Technical Committee.

If a decision cannot be made by consensus or majority vote, as described above, then a meeting will be held among the representatives listed in Exhibit A to resolve the disagreement.

3. Selection of Consultant: Sacramento will administer the selection of and contracting with one or more consultants to complete the Update. The Technical Committee shall select the consultant(s) in accordance with standard City of Sacramento consultant selection procedures.

Sacramento’s professional services agreement will require the consultant to: (a) carry workers’ compensation insurance (subject to waiver for sole proprietors), commercial general insurance, professional liability insurance, and business automobile liability insurance; and (b) name the other Parties to this MOU as additional insureds, and indemnify, defend and hold harmless the other Parties to this MOU, to the sa me exten t that the consultant is required to name Sacramento as an additional insured and to indemnify, defend and hold harmless Sacramento.

At any Party’s request, Sacramento shall provide a copy of any agreement, procedure, or other related material, whether draft or final.

4. Cost Sharing, Invoices: Sacramento will be responsible for administering all contracts for consultant services to perform the Update. It is understood and agreed, however, the Parties shall each pay a percentage of the contract amount. The Parties also shall share project management costs incurred by Sacramento for activities of mutual benefit to the Parties, such as contract management, agency coordination, and oversight of the consultant, in a total amount not to exceed $10,000. The Parties’ percentage shares for the consultant contract(s), for the Sacramento project management costs for activities related to the Update, and for the

Memorandum of Understanding 2025 Sanitary Survey Update Page 3 of 15 of the Sacramento River Watershed Area

not-to-exceed amounts are set forth in Exhibit B, attached hereto and incorporated by this reference.

Consistent with Exhibit B, (i) the estimated project costs for the Update, including the project management costs described above, are approximately $200,450; and (ii) this MOU provides for an additional $40,000 to provide a contingency for unforeseen additional costs.

Sacramento will invoice the other Parties in arrears for consultant and project management costs. Within 45 days of invoice (s) receipt each Party shall remit its percentage share of the invoice(s) to reimburse Sacramento for payment of the consultant and project management costs. Sacramento will make all reasonable efforts to provide invoices on a quarterly basis.

Copies of consultant invoices will be distributed to the Technical Committee representatives at the time of invoicing for partner agency cost share , or upon request at any time. In the event one or more Parties believe an invoice should not be paid in whole or in part, the dispute shall be resolved by the Technical Committee as set forth in Section 2 herein.

The Parties agree to exercise good faith and diligence in the resolution of any disputed invoice amounts; provided, however, that notwithstanding any provision contained herein (except Section 5 of this MOU), Sacramento shall be reimbursed by each of the other Parties for their respective percentage share of any and all money ultimately paid to the consultant by Sacramento and project management costs incurred by Sacramento for the Update, subject to the provisions of this Section 4 and the price ceiling specified in Section 5.

The Parties’ percentage shares set forth in Exhibit B may only be changed by amendment to this MOU as provided in Section 10, below.

5. Price Ceiling: In no case shall the total costs shared for the Update exceed $240,450, except by amendment of this MOU . The Cost Sharing and the Scope, Schedule, and Budget Summary for the Update are set forth in Exhibit B and in row A of Exhibit C, attached hereto and incorporated by this reference.

6. Supplemental Tasks: In the event that any supplemental task is identified or proposed related to the Update, any and all Parties electing to participate in the supplemental task(s) shall enter into a separate written agreement. The price ceiling of Section 5 shall not apply to costs for any supplemental tasks entered into by separate written agreement.

7. Optional Joint Source Water Protection Follow-up Activities: Based on the results of the Update, the Parties may wish to share in the costs of optional joint source water protection follow-up activities. By way of example only, the Parties may wish to agree to:

 Watershed activities from Feather River confluence to George Kristoff Water Treatment Plant (WTP) intake: benefits all Parties to this MOU.

Memorandum of Understanding 2025 Sanitary Survey Update Page 4 of 15 of the Sacramento River Watershed Area

 Watershed activities downstream of George Kristoff WTP to Sacramento River WTP intake: benefits Sacramento, EBMUD, and SCWA.

 Watershed activities downstream of Sacramento River WTP intake to Freeport intake:
benefits EBMUD and SCWA.

Participation in such activities shall be at the option of each Party. For participating Parties, such activities shall be conducted, and costs shall be shared as provided in this Section 7. For these optional activities, Sacramento will contract with the consultant(s) performing such activities and will provide project management and direction to such consultant(s), with input from the participating Parties’ Technical Committee representatives. Sacramento shall provide the participating Parties with a proposed budget for these activities on an annual basis . Prior to incurring any such costs, a Party’s participation in such activities shall be confirmed in writing by the participating Party’s Representative after receipt of the proposed annual budget. The costs of each such activity will be split evenly among the participating Parties that benefit from such activity.

The Scope, Schedule, and Budget Summary for the optional joint source water protection follow-up activities are set forth in rows B through F of Exhibit C . Notwithstanding any other provision of this MOU, and consistent with Exhibit C, no participating Party shall be required to pay more than $ 32,000 during a fiscal year for its share of all optional joint source water protection follow-up activities under this Section 7, except as may be otherwise agreed in writing by each such participating Party. If requested by Sacramento, the Parties participating in an optional joint source water protection follow-up activity will each pay an equal share o f the cost of Sacramento’s project management services for such activity, provided that such cost share shall not exceed $600 per participating Party for any given optional joint source water protection follow-up activity, except as may be otherwise agreed in writing by each such participating Party.

Sacramento will invoice in arrears the Parties participating in such additional activities for each Party’s share of the applicable consultant and project management costs. Within 45 days of invoice receipt, each participating Party shall remit its payment of the invoice, to reimburse Sacramento for payment of consultant and project management costs. Sacramento will make all reasonable efforts to provide the invoices on a quarterly basis.

Copies of consultant invoices will be distributed to the participating Parties’ Technical Committee representatives on a quarterly basis, or upon request at any time. In the event one or mor e participating Parties believe an invoice should not be paid in whole or in part, the dispute shall be resolved by the participating Parties’ Technical Committee representatives, as set forth in Section 2 herein.

The Parties agree to exercise good faith and diligence in the resolution of any disputed invoice amounts. Notwithstanding any provision contained herein, Sacramento shall be reimbursed by each of the other participating Parties for their respective share of any and all money ultimately paid to the consultant(s) by Sacramento for the performance of any optional joint source water

Memorandum of Understanding 2025 Sanitary Survey Update Page 5 of 15 of the Sacramento River Watershed Area

protection follow -up activities and of any and all project management costs incurred by Sacramento regarding the same, subject to the provisions of this Section 7 and provided that the participating Party has provided written confirmation of its participation in the optional joint source water protection follow-up activity(ies).

8. Notices: Any invoice, payment, notice or other written communication related to this MOU will be provided to those representatives identified on Exhibit A.

9. Term of MOU: This MOU shall be effective as of the date it is signed by all Parties and shall remain in effect until a new MOU is in place for the 2030 update to the Sacramento River watershed sanitary survey, until all services and contracts covered by this MOU have been completed and performed and all payments required under this MOU have been made, or until terminated by the mutual written agreement of all Parties, whichever occurs first.

10. Amendments: Any amen dments to this MOU must be in writing and executed by all Parties.

11. Counterparts: This MOU may be executed by the Parties in separate duplicate counterparts, each of which when so executed and delivered to Sacramento shall be an original, but all such counterparts shall together constitute but one and the same instrument.

After all Parties’ signature pages are returned to Sacramento, copies of the complete MOU will be mailed to each Party.

12. General Provisions: Each Party understands and agrees that there is no agency or joint venture relationship among the Parties. It is further understood and agreed by the Parties that notwithstanding anything contained herein, the employees of each Party shall continue to be entirely and exclusively under the direction, supervision, and control of the employing Party.

With the exception of the agreed cost sharing of Sacramento project management costs, each Party understands and agrees that any internal, in -house or administrative costs or expenses incurred by any Party related to that Party’s obligations under this MOU shall be the sole responsibility of the Party incurring the costs and expenses.

The Parties understand and agree that this MOU creates rights and obligations solely among the Parties and is not intended to benefit any other person or entity. No provision of this MOU shall in any way inure to the benefit of any person or entity not a party to this MOU so as to make such person or entity a third‐party beneficiary of this MOU or any of its terms.

If any provision of this MOU is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remaining provisions will continue in full force and effect without being impaired or invalidated in any way, but only to the extent that the intent of the Parties can be effectuated without the provision or provisions held invalid, void, or unenforceable.

Memorandum of Understanding 2025 Sanitary Survey Update Page 6 of 15 of the Sacramento River Watershed Area

The waiver by any Party to this MOU of any requirement, condition or provision of this MOU shall not be deemed a waiver of any subsequent breach of that or any other requirement, condition, or provision of this MOU.

The Parties represent that the undersigned individuals executing this MOU on their respective behalf are fully authorized to do so by law or other appropriate instrument and to bind the Parties to the obligations set forth herein.

This instrument and any attachments hereto constitute the entire MOU between the Parties concerning the subject matter hereof.

************************************

Memorandum of Understanding 2025 Sanitary Survey Update Page 7 of 15 of the Sacramento River Watershed Area

CITY OF SACRAMENTO (Sacramento)

Date: _____________________________ By: ___________________________

Title

ATTEST: APPROVED AS TO FORM:

___________________________________ _______________________________ Title Title

Memorandum of Understanding 2025 Sanitary Survey Update Page 8 of 15 of the Sacramento River Watershed Area

CITY OF WEST SACRAMENTO (West Sacramento)

Date: _____________________________ By: ___________________________

Aaron Laurel, City Manager

Memorandum of Understanding 2025 Sanitary Survey Update Page 9 of 15 of the Sacramento River Watershed Area

EAST BAY MUNICIPAL UTILITY DISTRICT (EBMUD)

Date: ____________________________ By: ___________________________

David Briggs, Director of Operations and
Maintenance

APPROVED AS TO FORM:

By:________________________________
for the Office of the General Counsel

Memorandum of Understanding 2025 Sanitary Survey Update Page 10 of 15 of the Sacramento River Watershed Area

PLACER COUNTY WATER AGENCY (PCWA)

Date: _________________ By: ____________________________________

Robert Dugan, Chair of the Board
Placer County Water Agency

ATTEST:

___________________________________
Lori Young
Clerk to the Board

Memorandum of Understanding 2025 Sanitary Survey Update Page 11 of 15 of the Sacramento River Watershed Area

SACRAMENTO COUNTY WATER AGENCY (SCWA)

Date: _____________________________ By: ___________________________ Title

ATTEST: APPROVED AS TO FORM:

___________________________________ _______________________________ Title Title

Memorandum of Understanding 2025 Sanitary Survey Update Page 12 of 15 of the Sacramento River Watershed Area

Woodland-Davis Clean Water Agency (WDCWA)

Date: _____________________________ By: ______________________________ Title

ATTEST: APPROVED AS TO FORM:

___________________________________ __________________________________ Title Title

Memorandum of Understanding 2025 Sanitary Survey Update Page 13 of 15 of the Sacramento River Watershed Area

Exhibit A

Sacramento River Watershed Sanitary Survey 2025 Update - Representatives

Ms. Sherill Huun Mr. Tim Busch
Engineering and Water Resources General Manager
Division Manager Woodland-Davis Clean Water Agency
City of Sacramento Department of Utilities 855 County Road 102 1395 35th Avenue Woodland, CA 95776
Sacramento, CA 95822 (530) 661-5963
(916) 808-1419 [email protected]
[email protected]

Mr. Aaron Laurel
City Manager
City of West Sacramento
1110 West Capitol Avenue
West Sacramento, CA 95691
(916) 617-4500
[email protected]

Mr. Jeremy Shepard
Director of Technical Services
Placer County Water Agency
POB 6570
Auburn, CA 95604
(530) 823-2066
[email protected]

Mr. David Briggs
Director of Operations and Maintenance
East Bay Municipal Utility District
POB 24055, MS 606
Oakland, CA 94607-4240
(510) 287-7056
[email protected]

Mr. Matt Satow
Director
Sacramento County Water Agency
827 7th Street, Room 301
Sacramento, CA 95816
(916) 874-6851
[email protected]

Memorandum of Understanding 2025 Sanitary Survey Update Page 14 of 15 of the Sacramento River Watershed Area

Exhibit B

Sacramento River Watershed Sanitary Survey 2025 Update:

Watershed Sanitary Survey Cost Sharing

Participating Agency Equal Share
(in %) (a)
Not-to-Exceed
Amount for
Sharing Costs of
Update (b)

Sacramento 16.67 $40,075
West Sacramento 16.67 $40,075
EBMUD 16.66 $40,075
PCWA 16.66 $40,075
Sacramento County
Water Agency 16.67 $40,075

WDCWA 16.67 $40,075

(a) Equal shares for consultant costs (for project management, watershed evaluation, compliance evaluation, water quality review, and report preparation), and for City of Sacramento project management costs.
.
(b) Equal shares for not-to-exceed amount for sharing costs of update includes contingency.

Memorandum of Understanding 2025 Sanitary Survey Update Page 15 of 15 of the Sacramento River Watershed Area

Exhibit C
Sacramento River Watershed Sanitary Survey 2025 Update
Scope, Schedule, and Budget Summary

Item

Task

Schedule (a), (b)

Not to Exceed
Annual Amount
Per Partner

A

Sacramento River Watershed Sanitary
Survey 2025 Update

December 2024 -
approximately June
2026

See Exhibit B

B

Sacramento River Joint Source Water
Protection Program (JSWP) and Keep
Our Waters Clean (KOWC) FY 2025-26

July 2025-June 2026

$32,000 (c)

C

Sacramento River JSWP and KOWC FY
2026-27

July 2026-June 2027

$32,000 (c)

D

Sacramento River JSWP and KOWC FY
2027-28

July 2027-June 2028

$32,000 (c)

E

Sacramento River JSWP and KOWC FY
2028-29

July 2028-June 2029

$32,000 (c)

F

Sacramento River JSWP and KOWC FY
2029-30

July 2029-June 2030

$32,000 (c)

Footnotes:

(a) Additional years for the optional source water protection follow-up activities will be covered by this MOU until a new MOU is in place for the 2030 update to the Sacramento River Watershed Sanitary Survey. (b) Annual source water protection work may need to be completed after June of each year. (c) $32,000 is the annual ceiling cost per participating Partner for Items B-F, plus cost share of program management cost at option of City of Sacramento. A Party shall not be required to participate in cost sharing for Items B through F unless and until the Party’s representative confirms the Party’s participation and financial commitment in writing.