Cities Index.
Item 08 2024-01515 Suspend Competitive Bidding and Issue Request for Proposals (RFP) for Department of Utilities (DOU) Lavender Heights Water Main Replacement Project (Two-Thirds Vote Required)

Sacramento City Council
September 24, 2024

Document
Item 08 2024-01515 Suspend Competitive Bidding and Issue Request for Proposals (RFP) for Department of Utilities (DOU) Lavender Heights Water Main Replacement Project (Two-Thirds Vote Required)
Meeting
September 24, 2024
Body
Sacramento City Council
Pages
157
Original file
32.1 MB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

PART 3 - EXECUTION

3.01 GENERAL
Written notices to all affected property owners is required a minimum of 24 hours prior to any disruption of water service as a result of the temporary system.

Temporary water services shall be connected to the temporary water main for each residential unit or other building.

Connection of the Residential Water Service shall be via an outside hose bib (3/4” or greater) or connection into the existing system where the permanent water service connection will be made.

The connection of residential water service in series is not permitted. Each temporary water service shall have its own valve connection to the temporary water main.

Connection to other buildings shall be as specified in the Contract Documents.

An adequate water supply shall be available at all times (24/7). If the temporary potable water supply service fails, it shall be restored immediately upon being reported or discovered. Care shall be given during making any repairs to prevent contaminating the system. At all times, the Contractor shall be responsible adequate disinfection of the TWPSS in accordance with the City Standard Specifications.

Prior to installing the TPWSS, the Contractor shall coordinate and schedule with the City for the City crews to operate valves in order to implement the TPWSS. The Contractor shall not operate City valves without prior approval.

The Contractor shall exercise care during the installation of temporary potable water supply system to avoid contamination of the services. The Contractor shall adhere to the City disinfection procedures and AWWA standards.

No fire hydrants are anticipated to be off-line while the TPWSS is active. In the event a fire hydrant needs to be taken out of service, the Contractor shall notify the City, Fire Department, and Engineer in advance and schedule a meeting to identify any possible additional measures needed.

3.02 Temporary Potable Water Supply Services
Temporary potable water supply services for residential water service shall be, as defined in Table 1, minimum 1-inch inside diameter. Temporary potable water supply services for the impacted address are shown below.

The temporary potable water supply service connections shall have an isolation valve near the point of connection to the temporary water main. The service line to the point of connection of each residential water service shall have the ability to be temporarily capped allowing both the temporary water main and the temporary potable water supply services to be disinfected per the City Standard Specifications prior to making the connection.

3.03 Valves
Each point of connection to the temporary water source shall have a gate valve installed or utilize an existing valve that would allow the entire TPWSS to be shut down.

Each branch off the temporary water main shall have, at a minimum, a valve installed to isolate each residential water service from the temporary main.

Before permanently shutting down the existing water main, the valves shall be tested to ensure that they are in proper working order.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 63 of 157 ends

Valves shall be equipped with a tamper proof device preventing the valves to be closed or open from unauthorized personnel. At a minimum, the contractor shall install chains to prevent the turning of the valve.

3.04 Protection
The Contractor shall provide protection of the above ground temporary potable water supply system at locations such as road crossings, sidewalks, driveways, and walkways. Safety flashers, barricades, and ramps, as may be required, shall be furnished and maintained while the system is in place. In general, the temporary potable water supply system pipe shall be installed where it causes the least obstruction and safety hazard and is least likely to be damaged. If the safety system proposed by the Contractor is deemed inadequate by the City or Engineer the Contractor shall provide additional safety measures at no additional cost to the City.

When temporary water mains cross over the roadway and driveways, temporary vehicle ramps that allow continuous travel shall be implemented. As an alternative with City approval, the asphalt pavement may be saw cut and removed and the temporary water main buried. Under no circumstance is a pipe crossing a road, driveway, or pedestrian path to remain open and unprotected. If a concrete base exists, it shall not be disturbed. All surfaces shall be restored to City Standards.

The temporary potable water supply system will be installed above ground. Some locations exist that may require portions of the TPWSS to be buried. It is anticipated that the TPWSS will be installed both in and adjacent to the City’s right-of-way. The Contractor shall obtain written permission from the property owners where the TPWSS is installed on property outside the City right-of-way.

The Contractor shall take precautionary measures to prevent or discourage vandalism and theft on the temporary potable water supply system. Such measures may consist of, but not limited to:
locking or chaining valves, placing valves and other fittings is in temporary boxes, or having removablevalve handles.

3.05 Leakage Testing
The temporary potable water supply service shall be watertight.

The Contractor shall conduct regular visual inspection on the system for leaks and other potential concerns. The Contractor shall correct all leaks and other potential concerns immediately and notify the City of any repairs.

3.06 Flushing and Disinfecting Temporary Water Mains and Services Flushing and disinfecting operations shall be conducted in the presence of the City. The City shall be notified at least 2 Business Days in advance of the proposed date on which flushing and disinfecting operations are to commence. All temporary water sources shall be flushed and disinfected prior to connecting to the temporary water main. Temporary water mains shall be flushed in a sequence approved by the Engineer. All temporary water mains and services shall be flushed at a flow velocity adequate to remove any foreign debris and until the discharged water runs clear.

The disinfection and flushing shall be done in accordance with the City Standard Specifications and manufactures disinfection recommendations.

The Contractor shall be responsible for obtaining any permits and fees associated with flushing and disinfection, and coordinating with the City and other agencies with jurisdiction.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 64 of 157 ends

**END OF SECTION**

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 65 of 157 ends

SECTION 02220

DEMOLITION AND SALVAGE OF MATERIALS
PART 1 - GENERAL

1.01 DESCRIPTION
A. Scope of Work

1. The work includes demolition, removal, and salvage where specified of all items indicated on the drawings, or specified herein.

B. All materials resulting from demolition work, except as otherwise indicated on the drawings or specified herein for re-use by the Contractor or re-use by the City shall become the property of the Contractor.

1.02 AVAILABILITY OF WORK AREAS
A. Subject to all related Contract stipulations, the contract area will be released to the Contractor, at one time, upon issuance of the Notice-to-Proceed. Unless otherwise directed, the Contractor shall maintain access to and shall not begin demolition of t he existing well electrical and mechanical facilities until authorized in writing by the Engineer.

1.03 SUBMITTALS
A. The procedures proposed for the accomplishment of demolition and storage of salvaged materials shall be submitted for approval. The procedures shall provide for safe performance of work, careful removal and disposition of materials specified to be stored, protection of property which is to remain undisturbed, and coordination with other work in progress . The procedures shall include a detailed description of the methods and equipment to be reused for each operation, and the sequence of operations.

B. Submit schedule for demolition activities.

1.04 SAFETY PROCEDURES AND WORKER PROTECTION
A. Take all precautions and measures required to protect employees, related trade employees, City employees, residents, and the general public from exposure to energized parts.

1. All personnel authorized for entry into work areas shall be instructed in the proper procedures for high voltage work. In instances where off -line equipment may require removal from high voltage installations, personnel will be instructed and properly supervised for working in the vicinity of high-voltage equipment.

2. All electrical equipment upon which activities are to be performed shall be de -energized and permanently disconnected from any power source prior to commencing any work.

B. Erect barriers, fences, guard rails, enclosures, chutes, and shoring to protect personnel, structures, and utilities remaining intact. Protect trees and plants from damage.

PART 2 - PRODUCTS
Not Used.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 66 of 157 ends

PART 3 - EXECUTION

3.01 INSPECTION
A. Verify that areas to be demolished are unoccupied and no longer are in use.

B. Do not commence work until conditions are acceptable to the City.

3.02 PREPARATION
A. Contractor shall hold a field meeting at the existing well site prior to beginning demolition work.

Meeting shall cover the Contractors procedures for removal and transportation of salvaged items.

Attendees shall include as a minimum: Tim Giffin (916) 808-7997, Vernon Fields (916) 808-5542, and Amy Kral (916) 808-5651 of the Department of Utilities, Plant Services Division. Contractor shall give attendees forty-eight (48) hours of notice in advance of said field meeting.

B. Remove items scheduled to be salvaged for City, and place in designated storage area or as otherwise directed by the Engineer.

3.03 DEMOLITION
A. Salvage existing equipment as directed by City.

B. Protect fencing, landscaping, and other improvements on adjacent private properties that are exposed by demolition work.

C. Make neat saw cuts a minimum of one inch (1") in depth, around perimeter of Portland cement concrete or asphaltic concrete to be removed, where remaining concrete surface is to be incorporated into new work. Where new asphalt paving is to match existing a sphalt paving, sawcut existing pavement to a neat straight line and apply a tack coat of asphaltic emulsion to the surface of the existing pavement prior to placing new asphalt paving.

D. Remove existing exposed conduit and electrical wiring and conduit to be abandoned to structural surface, cut flush, and finish to match existing surfaces.

3.04 SALVAGE
A. The Contractor shall deliver any item to be salvaged to the City's Combined Sewage Treatment Plant, located at 1391 35th Avenue between the hours of 8:00AM and 2:00PM. The Contractor shall contact Tim Giffin at (916) 808 -7997 or Vernon Fields at (916) 808 -5542 to coordinate delivery of these items. All removed conduit and conductors shall become property of the Contractor, unless otherwise directed by the Engineer.

3.05 CLEAN-UP
A. Debris and Rubbish

1. Debris and rubbish shall be removed from the limits of work daily to a location approved in advance by the Engineer. Do not allow to accumulate on-site.

B. Debris Control

1. Debris shall be removed and transported in a manner as to prevent spillage on streets or adjacent areas. Local regulations regarding hauling and disposal apply. ** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 67 of 157 ends

SECTION 02240

CONTROL OF WATER
PART 1 - GENERAL

1.01 DESCRIPTION
A. Scope

1. This Section provides specifications for dewatering systems and appurtenances to be used during construction including those for maintaining drainage flows throughout the project.

B. Contractor shall furnish, install, operate, and maintain sufficiently sized water control equipment that will maintain excavations free of water, regardless of source, until backfilled to final grade.

C. The Contractor shall comply with all federal, state, and local laws and regulations concerning environmental pollution arising from construction activities.

1.02 SUBMITTALS
A. Before any diversion and/or dewatering commences, the Contractor shall submit the methods, installation, and details of the proposed systems for review and approval. If dewatering plan indicates discharge into another agencies’ facility, the plan shall be approved by the agency having jurisdiction. The dewatering system plans shall indicate at least the following:

1. Sizes of pumps, discharge piping, and piping appurtenances

2. Personnel responsible for monitoring the dewatering system and dewatered excavations

3. Provisions to confine fuel and oil spills in the event of their occurrence

4. Plans to segregate construction water (contaminated with form oils, concrete residues, etc.) from clean water

5. Plans to dispose of the construction water and residue solids

6. Supporting design documentation
PART 2 - PRODUCTS
Not Used.

PART 3 - EXECUTION

3.01 GENERAL
A. The Contractor shall furnish, install, operate, and maintain all machinery, appliances, and equipment to maintain all excavations free from water during construction, and shall dewater and dispose of the water so as not to cause injury to public or private property, or to cause a nuisance or menace to the public.

B. The control of groundwater shall be such that softening of the bottom of excavations, or formation of “quick” conditions or “boils,” does not occur. Dewatering systems shall be designed and

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 68 of 157 ends

operated so as to prevent removal of the natural soils. Dewatering shall allow the required compaction of the subgrade to the values specified.

C. Dewatering systems shall operate continuously until backfill has been completed to one foot (1') above the normal groundwater level and all sources of water entering the excavation have stopped and all water has been removed.

D. Contractor shall be fully responsible and liable for damages which may result from failure to adequately keep excavations dewatered or to maintain drainage flows.

3.02 DISPOSAL OF WATER
A. Contractor shall dispose of water resulting from the dewatering operation in a suitable manner without damage to adjacent property. Only clean, uncontaminated water resulting from the dewatering operation shall be pumped into any existing waterway. ** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 69 of 157 ends

SECTION 02250

SHEETING, SHORING, AND BRACING
PART 1 - GENERAL

1.01 SCOPE
A. This Section specifies requirements for sheeting, shoring and bracing of trenches and excavations greater than five feet (5') in depth.

1.02 REFERENCES
A. The publications referred to hereinafter form a part of this specification to the extent referenced.

The publications are referred to in the text by the basic designation only. Unless otherwise indicated, the latest edition of referenced publications in effect at the time of the bid shall govern.

In case of conflict between the requirements of this Section and those of the listed documents, the requirements of this Section shall prevail.

Reference Title
CAL OSHA State of California Construction Safety Orders, California State Labor Code

1.03 DESIGN REQUIREMENTS
A. The Contractor shall design sheeting, shoring, and bracing in accordance with Article 6 of CAL OSHA and the California State Labor Code. The standards of design referred to in the Labor Code shall be those of CAL OSHA. The shoring procedure designed by the Contractor shall be suitable for the site subsurface conditions and project operational constraints.

1.04 SUBMITTALS
A. Contractor shall submit information required by Section 6705 of the California State Labor Code to the Engineer in accordance with Section 01330, “Submittals”.

PART 2 - PRODUCTS
Not Used.

PART 3 - EXECUTION

3.01 GENERAL
A. Construction of sheeting, shoring and bracing shall not disturb the state of soil adjacent to or below the trench or excavation.
** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 70 of 157 ends

SECTION 02315

EARTHWORK
PART 1 - GENERAL

1.01 DESCRIPTION
A. Scope of Work

1. Contractor shall furnish all labor, materials, equipment and incidentals necessary to perform all excavation, backfill, grading, and compaction, regardless of type or class, that is required to complete the work shown on the drawings and specified herein. The work shall include, but not necessarily be limited to: clearing; excavation for structures, footings, fence posts, hand holes, pull boxes, duct, conduit, pipe, and paving; backfilling; filling; embankment construction; grading; disposal of surplus and unsuitable materials; and all related work such as dust control, sheeting, shoring, bracing, and control of water.

B. Related Work

1. Section 01410, “Quality Control”

2. Section 02321, “Controlled Density Fill”

3. Section 02240, “Control of Water”

4. Section 02250, “Sheeting, Shoring, and Bracing”

5. Section 02740, “Paving and Gravel Surfacing”

1.02 DEFINITIONS
A. Relative Compaction - the measured field dry density divided by the maximum dry density determined in accordance with ASTM D1557, expressed as a percentage B. Prepared Subgrade - any excavated or graded surface formed as the result of work by the Contractor upon which any fill, aggregate base, sand, gravel, structure, or other material is to be placed.

1.03 REFERENCES
A. The publications referred to hereinafter form a part of this specification to the extent referenced.

The publications are referred to in the text by the basic designation only. Unless otherwise indicated, the latest edition of referenced publications in effect at the time of the bid shall govern.

In case of conflict between the requirements of this Section and those of the listed documents, the requirements of this Section shall prevail.

American Society of Testing Materials (ASTM)
ASTM D1557 Test Methods for Moisture -Density Relations of Soils and Soil - Aggregate Mixtures using a 10-lb Rammer and 18-inch Drop ASTM D2487 Test Method for Classification of Soils for Engineering Purposes ASTM D2922 Density of Soil and Soil Aggregate in place by Nuclear Methods ASTM D3017 Moisture Content of Soil and Soil Aggregate in Place by Nuclear Methods

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 71 of 157 ends

ASTM D4318 Liquid Limit, Plastic Limit and Plasticity Index of Soils

State of California - Department of Transportation
Caltrans Standard Plans & Specifications (July 1992)

City of Sacramento (CSSS)
CSSS Standard Specifications, latest edition

1.04 SUBMITTALS
A. Submit the following for approval in accordance with Section 01330, “Submittals”:

1. Test Reports of measured fill/ backfill/ or embankment density, moisture, and relative compaction.

2. Samples and index property test results indicating conformance with the specifications of each imported material and any embankment fill material proposed for use. Contractor shall notify the Engineer of the source of the material and shall furnish for approval to the inspector a representative s ample weighing approximately 50 -pounds, at least ten (10) calendar days prior to the date of anticipated use of such material.

PART 2 - PRODUCTS

2.01 GENERAL
A. Materials shall be furnished as required from on-site sources or hauled to the site from off-site sources.

2.02 ENGINEERED FILL
A. Engineered fill shall be used for general structural backfill, channel bottom, and trench backfill.

Material shall consist of soil excavated on site or hauled in from off -site sources. Material shall be substantially well graded from coarse to fine with no gap or uniform grading of any particular size particle, and shall be free of organic material, wood, trash, peat and other objectionable material which cannot be compacted properly. Engineered fill shall not contain stones, broken concrete, masonry, rubble or other similar material larger than 2 -inches in any dimension.

Material used must be acceptable to the Engineer.

2.03 SAND
A. Sand shall be used for handholes, pull boxes, duct and pipe bedding in conformance with applicable Sections of the CSSS and the details on the drawings.

B. Sand shall be unwashed river -type, clean and free of organic material, trash, peat, and other objectionable material conforming to the following gradation:

Sieve Size % Passing
No. 4 100
No. 8 80 - 100

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 72 of 157 ends

No. 100 0 - 35
No. 200 0 - 8

2.04 PEA GRAVEL
A. Pea gravel may be used as an alternative to sand for bedding and cover, provided that it is clean, free-draining, and conforms to the following gradation:

Sieve Size % Passing
1/2 inch 100
3/8 inch 80 - 100
No. 200 0 - 5

2.05 DRAIN ROCK
A. Drain rock shall be 1 -inch maximum, clean, free draining gravel or crushed rock conforming to the following gradation:

Sieve Size %Passing
3/4 inch 90 - 100
½ inch 30 - 60
3/8 inch 0 - 20
No. 4 0 - 5
No. 200 0 - 2
B. Drain rock shall have a minimum sand equivalent of 50, and the material retained on the 3/8-inch sieve shall contain at least 50% of particles having three or more fractured faces.

2.06 CRUSHED ROCK
A. Crushed rock shall meet the specifications for course crushed screenings as described in Caltrans Section 37-1.02, and the following gradation:

Sieve Size % Passing
3/4 inch 100
1/2 inch 95 - 100
3/8 inch 50 - 80
No. 4 0 - 15
No. 8 0 - 5
No. 200 0 - 2
B. Crushed rock shall have a minimum sand equivalent of 30.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 73 of 157 ends

2.07 AGGREGATE BASE
A. Conform to the requirements for Class II aggregate base, 3/4" maximum aggregate size in accordance with CSSS Section 10-7.

PART 3 - EXECUTION

3.01 GENERAL EARTHWORK REQUIREMENTS
A. Perform clearing, grubbing, and tree removal in accordance with CSSS Section 12.

B. Construction, including excavation, backfill, compaction, dewatering, and bracing systems, shall conform to the plans and these specifications.

C. Neither the elevation of the bottom of any completed excavation nor the top layer of any compacted graded surface material shall vary more than +0.08 or -0.08 feet respectively from the elevations indicated in these specifications or on the drawings.

D. Control water in accordance with Section 02240, “Control of Water”.

E. If, in the opinion of the Engineer, the surface of the prepared subgrade is not in suitable condition at any time, due to failure of the Contractor to properly care for, dewater, or otherwise conduct earthwork operations properly, then the Contractor shall remove the unsuitable material and replace it with material compacted to at least ninety percent (90%) relative compaction at his own expense. The condition of the prepared subgrade shall meet with approval of the Engineer before any work is placed thereon.

F. During earthwork operations, surface grades shall be maintained in such condition that work areas, as much as practicable, will be well drained at all times. When directed, temporary drains and drainage ditches shall be installed to intercept or divert su rface water which may affect the prosecution of the work.

G. Where trenching or other excavation crosses established landscaped areas, remove all plant growth with approved equipment. Cut to the lines shown or as directed, and if practical, store and maintain removed plants for later replacement. If any relocated plant deteriorates within three months of being planted, replace in kind with new plant of same variety and equal or better quality and size.

3.02 EXCAVATION
A. Excavate to the lines and grades shown or required to complete the construction. Make allowance for forms, supports, etc.

B. If over -excavation occurs due to Contractor error, at any foundation, or where proposed structures will bear thereon, or at the bottom of any channel, over-excavated areas will be filled to finish subgrade with Controlled Density Fill, properly leveled to finish lines and grades.

C. Side slopes of excavations shall be no steeper than the safe stable slope for the soils encountered. Refer to Section 02250, “Sheeting, Shoring, and Bracings”.

D. If, at the time of excavation, it is not possible to place material in its intended permanent location, then the material shall be stockpiled in approved areas for later use. No extra payment will be considered for stockpiling or double handling of excavated material.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 74 of 157 ends

3.03 TRENCH EXCAVATION AND BACKFILL
A. Trench excavation and backfill for laying pipe shall be in accordance with Section 26 of CSSS and these specifications. Excavation for all trenches required for the installation of ducts and handholes shall be made to the depths indicated on the Drawings.

B. Shape excavated trench bottom to assure uniform contact with the full length of the installed line and remove any sharp edged materials that might damage the line. Compaction shall be maintained beneath the line. Place initial backfill by hand placement around the utility to just over half depth, and compact in a manner to insure against lateral or vertical displacement. Place initial backfill to 6-inches above the utility line by hand placement. Compact backfill above the initial backfill to at least ninety percent (90%) relative compaction.

3.04 PLACEMENT OF GEOTEXTILE FABRIC
A. Refer to Section 02620, “Geotextiles”. Where geotextile fabrics are placed under aggregate beneath structures, unless otherwise directed, the geotextile shall extend up the sides of the excavation and wrap atop the aggregate, and be extended at least 1-foot back under the bottom of the structural slab so as to encase the aggregate.

3.05 PLACEMENT OF ENGINEERED FILL AND EMBANKMENT FILL
A. Engineered fill shall be spread in layers and shall have a uniform moisture content that will provide the specified dry density after compaction. Embankment fill shall be placed at a moisture content at least two percent (2%) wet of optimum. If necessary to obtain uniform distribution of moisture, water shall be added to each layer by sprinkling and the soil disced, harrowed, or otherwise manipulated after the water is added. The loose layer thickness of the fill material shall not exceed eight (8) inches and each layer shall be compacted with suitable compaction equipment to provide the specified dry densities.

B. No fill shall be placed during weather conditions for which the Contractor cannot insure the specified compaction. After placing operations have been stopped because of adverse weather conditions, no additional fill material shall be placed until the last layer compacted has been checked and found to be compacted to the specified density.

C. Independent testing may be made on each layer to assure adequate compaction throughout the entire area. If the dry densities are not satisfactory to the Engineer, the Contractor will be required to increase the weight of the compactor or the number of passes as required to produce the specified densities.

D. Backfill shall not be placed against walls until the concrete has obtained a compressive strength equal to the specified 28-day compressive strength. Where backfill is to be placed on both sides of the wall, the backfill shall be place simultaneously on both sides to prevent differential pressures. The Contractor shall submit a schedule of wall shoring, bracing, and backfilli ng that is coordinated with the concrete curing, test cylinder reports, and the design assumptions, and obtain approval from the Engineer prior to proceeding.

3.06 COMPACTION
A. Embankment Fill, Engineered Fill, Backfill, and Trench Backfill shall be compacted to at least ninety percent (90%) relative compaction.

B. The uppermost 0.5 -feet of the prepared subgrade beneath all paving and/or gravel surfacing placed this contract, whether in an excavated, original grade, filled, or backfilled area, shall be compacted to at least ninety-five percent (95%) relative compaction.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 75 of 157 ends

C. Do not place any form work, concrete, or surfacing material until underlying compaction tests are satisfactory to the Engineer.

3.07 GRADING AND SURFACE FINISH WORK
A. Grading shall be performed at such places as are required to obtain the final lines, grades and elevations shown on the drawings. All unacceptable material encountered, of whatever nature within the limits of grading, shall be removed and disposed off-site.

B. All fill slopes shall be compacted by slope rolling and trimming, or shall be overfilled and trimmed back to planned grade, to expose a firm, smooth surface free of loose material.

C. Prepare landscaped areas for proper planting of previously removed plants or new plants.

Remove trench and backfill materials from adjacent areas to permit unhindered growth of plants.

Replace all damaged existing plant material to original or better condition. Planted areas that do not reestablish at the commencement of the next growing season shall be replaced at Contractor's cost.

D. Cleanup

1. Prior to final inspection and acceptance, remove all rubbish and excess material for disposal as approved, and leave area in a neat, satisfactory condition.

3.08 DISPOSAL
A. All surplus excavated and imported material not utilized in the construction shall be removed and disposed of off-site.

3.09 DUST CONTROL
A. Contractor shall provide dust control during excavation and backfill operations. At least one (1) mobile unit with 1,000 gallon capacity shall be available for applying water or dust palliative in accordance with Section 18 of the Caltrans Standard Specifications. Dust control mobile unit shall have a positive shut off valve, and shall apply water or palliative with pressure type distribution nozzles to insure uniform application. The amount of dust control shall be to the satisfaction of the Engineer.

3.10 TESTING
A. Refer to Section 01410, “Quality Control”. The City will pay for initial compaction testing during placement of embankment and backfill materials, but the Contractor shall pay for all additional tests required until compliance is obtained. Remove surface material at locations designated by the Inspector and provide such assistance as necessary for sampling and testing by the testing laboratory.
** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 76 of 157 ends

SECTION 02321

CONTROLLED DENSITY FILL
PART 1 - GENERAL

1.01 DESCRIPTION
A. This Section covers the use of controlled low strength material (CLSM) for backfill. CLSM should develop between 50 and 150 psi compressive strength so it can be excavated by hand in the future.

1.02 SUBMITTALS
A. At least ten (10) days before placing CLSM, Contractor shall submit a mix design for the CLSM.

The mix design shall include trial laboratory and testing data with cylinder breaks performed at 7, 14, and 28 days.

PART 2 - PRODUCTS

2.01 CLSM
A. Contractor and its supplier shall determine the materials and proportions used to meet the requirements of these specifications.

B. Provide a mixture of cement, fly ash, aggregate, and admixtures as required to provide a non - segregating, self-consolidating, free-flowing and hand-excavatable material, which will result in a hardened, dense, non -settling fill. The unconfined compressive strength at 28 days shall be 100 psi (±50 psi) per ASTM D4832.

C. Component materials shall conform to the following:

1. Cement - ASTM C150, Type II or V

2. Aggregate - Aggregate shall consist of fine aggregate, with or without coarse aggregate, with a maximum size of 1 -inch, free of clay, organics, and other deleterious materials.

Less than ten percent (10%) by weight shall pass the No. 200 sieve, and material passing the No. 40 sieve shall be non-plastic as determined in accordance with ASTM D4318.

3. Water - Potable

4. Fly Ash - ASTM C618, Class F unless otherwise approved

5. Admixture (if used) - Air Entraining per ASTM C260
D. Prior to CLSM placement on the project, prepare field trial mixes utilizing the actual equipment that will be used on the job. Vary proportions as required to produce a dense, homogeneous material with good workability.

E. Six (6) standard test cylinders shall be obtained from each trial mix produced. Sampling shall be in accordance with either ASTM C94 or C685. Compressive testing shall be in accordance with ASTM D4832, with one specimen tested at 7 days, one at 14 days, one at 2 1 days, and two at 28 days. One specimen shall be held as a "spare" and may be used in the event of questionable results from one of the scheduled tests.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 77 of 157 ends

PART 3 - EXECUTION

3.01 PLACING CLSM
A. CLSM batching, mixing, and placing may be started if the weather conditions are favorable and when the air temperature is 34 F and rising. At the time of placement, the CLSM must have a temperature of at least 40F. Mixing and placing shall stop when the air temperature is 38F or less and falling.

B. Subgrade on which CLSM is to be placed shall be free of disturbed or softened material, debris, and water.

C. Contain CLSM using bulkheads or fill materials to confine the flow of material. Take appropriate precautions to prevent displacement and/or flotation of adjacent facilities.

D. CLSM shall be placed in lifts not exceeding 6 feet in height, with a time interval of not less than one (1) hour between lifts.

E. No traffic or construction equipment shall be allowed on CLSM for at least 24 -hours after placement, or until the material is hard enough to prevent rutting or damage.

3.02 FIELD TESTING
A. CLSM shall be sampled and tested in accordance with either ASTM C94 or C685. At a minimum, samples for tes ts shall be taken from each 150 -cubic yards or fraction thereof for each day's placement. Tests shall include four (4) compressive strength cylinders. Compressive strength sampling and testing shall conform to ASTM D4832 with one sample tested at 7 days, two samples at 28 days, and one held from each batch.
** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 78 of 157 ends

SECTION 02740

PAVING AND GRAVEL SURFACING
PART 1 – GENERAL

1.01 DESCRIPTION
A. Scope of Work

1. Contractor shall furnish all labor, materials, equipment, and incidentals necessary to construct all paving and gravel surfacing shown on the drawings, and/or specified herein.

The work shall include, but not necessarily be limited to preparing the subgrade, placing and compacting aggregate base, saw cutting existing pavement, applying paint binder, placing and compacting asphalt concrete, applying seal coats, and all related work.

2. Areas to receive gravel surfacing shall be prepared, then aggregate base material placed and compacted as specified herein for paving, except that no paint binder or paving shall be placed.

B. Related Work

1. Section 01410, “Quality Control”

2. Section 02315, “Earthwork”

1.02 SUBMITTALS
A. The following information shall be submitted for approval in accordance with the General Conditions and Section 01330, “Submittals”.

1. Manufacturer's Data
a. Aggregate base
b. Paint binder
c. Asphalt concrete mix design and copies of delivery tickets

2. A certificate of compliance, signed by the manufacturer, shall be furnished prior to the use of any project site asphalt materials . The certificate shall state that the furnished materials will comply with the requirements of these Specifications.

3. A delivery ticket that clearly identifies the product and quantity of each lot of material shall accompany each load delivered to the site . Unless requested earlier by the Engineer, retain the delivery tickets until the end of the job.

1.03 REFERENCE PUBLICATIONS
American Society of Testing Materials (ASTM)
ASTM D1557 Test Methods for Moisture-Density Relations of Soil and Soil- Aggregate Mixtures
ASTM D2041 Test Method for Theoretical Maximum Specific Gravity and Density of Bituminous Paving Mixtures.

ASTM D2922 Density of Soil and Soil Aggregate In-Place by Nuclear Methods

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 79 of 157 ends

ASTM D3017 Moisture Content of Soil and Soil Aggregate In-Place by Nuclear Methods
State of California - Department of Transportation
Caltrans Standard Plans & Specifications (July 1992)
PART 2 - PRODUCTS

2.01 AGGREGATE BASE
Aggregate base shall be as specified in Section 02315, “Earthwork”, of these specifications.

2.02 PAINT BINDER
Paint binder (tack coat) shall meet all the requirements of Caltrans Specification Section 94.

2.03 ASPHALT CONCRETE
A. Asphalt concrete shall be commercially available material that meets the performance an d grading requirements for Type A Asphalt Concrete (½ -inch maximum, medium grading) as specified in Caltrans Standard Specification Section 39 -2. Unless otherwise approved, the bitumen content shall be between 4.8 and 7.0 percent . A job mix formula will not be required provided that the material conforms to the requirements herein, and the mix design to be used has been approved by the City, County of Sacramento, or Caltrans, for placement on any project constructed within the last three years in Sacramento County.

B. Asphalt shall conform to the requirements of Caltrans Standard Specification Section 92-1.02 for viscosity grade AR 4000 steam-refined paving asphalt.

2.04 HEADER BOARD
A. Header board, where installation is required, shall consist of continuous pressure treated douglas fir 2”x4” attached to 18-inch pressure treated douglas fir 2”x4” stakes at 4-feet on center.

2.05 SLURRY SEAL
A. Slurry seal shall conform to CSSS Section 23-9.

PART 3 - EXECUTION

3.01 SUBGRADE PREPARATION
A. The uppermost 0.50-feet of all existing subgrade that will underlie aggregate base placed this contract, shall be cleared and stripped, and then scarified to a depth of at least six (6) inches, moisture conditioned as required, and compacted to a relative compaction of not less than ninety- five percent (95%) in accordance with Section 02315, “Earthwork”.

B. Wherever engineered fill material is to be placed under paved or gravel surfaced areas, it shall be placed and compacted to a relative compaction of not less than ninety percent (90%) to within the top six (6) inches and ninety-five percent (95%) for the top six (6) inches in accordance with Section 02315, “Earthwork”.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 80 of 157 ends

3.02 CLASS 2 AGGREGATE BASE
A. Class 2 aggregate base shall be placed to a depth as shown on the Plans and in these Specifications. Placement, moisturizing, spreading, and compaction of Class 2 aggregate base shall meet all requirements of Caltrans Standard Specification Sections 26-1.03 through 26-1.05, CSSS Specification Section 17-1, and the details on the drawings. Class 2 aggregate base shall be compacted to not less than ninety-five percent (95%) of maximum dry density.

3.03 PRIME COAT AND PAINT BINDER (TACK COAT)
A. After the sub-base and aggregate base are placed, compacted, and tested, to the satisfaction of the Engineer, the prime coat and tack coat shall be applied in accordance with Caltrans Standard Specification Section 39 -4.02. Prime coat shall not be required atop aggregate base unless specifically called for on the plans.

3.04 ASPHALT CONCRETE
A. Place asphalt concrete where shown on the drawings, and to at least the minimum thicknesses indicated. Storing, proportioning, mixing, spreading, and compacting asphalt concrete shall conform to the requirements of Caltrans Standard Specification Sections 39-3 through 39-7, and CSSS Section 22.

3.05 SLURRY SEAL
A. Place slurry seal where shown on the drawings in accordance with CSSS Section 23.

3.06 HEADER BOARD
A. Header board shall not be required unless specifically called for on the drawings. Place header board at the limit of paving not abutting a concrete structure or saw cut line where it is specifically shown or called for on the drawings.

3.07 FINAL GRADING
A. The final grade of asphalt concrete and gravel surfacing shall vary not more than ±0.05-foot from the elevations indicated on the drawings, and shall conform to the requirements of Caltrans Standard Specification Section 39-6. All areas shall be graded to drain.

3.08 TESTING
A. The City will perform the initial field testing for density, moisture, and compaction of asphalt and aggregate base. The Contractor shall pay for re-testing of locations failing to meet the specified compaction in the initial test.
** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 81 of 157 ends

SECTION 02741

ASPHALT CONCRETE PAVING
PART 1 – GENERAL

1.01 SUMMARY
A. This Section describes furnishing, placing, installing, and compacting Aggregate Base and Asphalt Concrete Paving . Workmanship and materials specified herein that are required for project construction, shall be considered as part of the project, and no separate payment will be made therefore. Unless otherwise directed or approved by the Engineer, herbicide, prime coat, and slurry seal coatings are not required.

1.02 REFERENCE STANDARDS
A. Reference standards for the work herein shall be Sections 10, 17, and 22 of the Standard Specifications.

B. In the event of a conflict, the requirements herein shall take precedence over those in the Standard Specifications.

1.03 SUBMITTALS
A. Submittals shall be made in conformance with Section 01330, “Submittals”, and shall include:

1. Certificate of compliance for the Aggregate Base

2. Asphalt Concrete Job-Mix formula

3. Certificate of Compliance for the Asphalt Concrete and the Striping Paint PART 2 - PRODUCTS

2.01 AGGREGATE BASE
A. Conform to Sections 10-7 and 17-1 of the Standard Specifications.

2.02 ASPHALT CONCRETE
A. Asphalt Concrete shall be Type A, 1/2-inch maximum, medium gradation, conforming to Sections 22-1 thru 22-8 of the Standard Specifications.

B. Commercially available asphalt concrete approved within the last two years for City of Sacramento projects will be considered suitable for work on this project and will not require development of a new job mix formula, provided that the aggregate and aspha lt gradations are as specified herein, and the resultant mix has between four (4) and seven (7) percent voids and a stabilometer value of at least 37 when measured in accordance with California Test Method 366.

2.03 STRIPING PAINT
A. Striping paint shall be specifically formulated for use as a traffic lane marking paint to be applied on and compatible with asphalt concrete . Unless otherwise approved, comply with Federal Standard TT-P-115.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 82 of 157 ends

PART 3 - EXECUTION

3.01 GENERAL
A. Conform to the aforementioned Standard Specification requirements for furnishing, placing, compacting, and finishing aggregate base and asphalt concrete. Skin patching shall not be used to obtain the specified finish surface tolerance.

B. Installation of striping paint shall comply with the paint manufacturer’s instructions. ** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 83 of 157 ends

DIVISION 3 – CONCRETE
SECTION 03100

CONCRETE FRAMEWORK
PART 1 - GENERAL

1.01 DESCRIPTION
A. Work included:

1. Forms shall be designed, constructed, and maintained so as to insure that after removal of forms, the formed concrete will have true surfaces free of offset, waviness or bulges, and will conform accurately to the indicated shapes, dimensions, lines, elevat ions, and positions.

2. Provide form accessories and openings in forms as required for placement of equipment and materials. Remove forms after concrete has cured.

B. Related Work

1. Section 01330, “Submittals”

2. Section 03150, “Concrete Accessories”

3. Section 03200, “Concrete Reinforcement”

4. Section 03300, “Cast-in-place Concrete”

1.02 REFERENCES
A. The publications referred to hereinafter form a part of this specification to the extent referenced.

The publications are referred to in the text by the basic designation only. Unless otherwise indicated, the latest edition of referenced publications in effect at the time of the bid shall govern.

In case of conflict between the requirements of this Section and those of the listed documents, the requirements of this Section shall prevail.

American Concrete Institute (ACI)
ACI 301 Specifications for Structural Concrete for Buildings ACI 347 Recommended Practice for Concrete Formwork
ACI P4 Publication 4, Formwork for Concrete

City of Sacramento (CSSS)
CSSS 20-4 Forms for Structures
CSSS 20-5 Removal of Forms

U.S. Department of Commerce, National Bureau of Standards Publications PS1 Construction and Industrial Plywood

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 84 of 157 ends

National Forest Products Association (NFPA)
National Design Specification for stress grade lumber and its fastening

West Coast Lumber Inspection Bureau (WCLB)
Std. No. 16 Standard Grading and Dressing Rules for Douglas Fir, Western Hemlock, Western Red Cedar, White Fir, and Sitka Spruce Lumber.

Western Wood Products Association (WWPA):

Western Lumber Grading Rules

1.03 SUBMITTALS
A. Submit for approval in accordance with Section 01330, “Submittals”.

B. Shop Drawings

1. Formwork
a. Before starting concrete work, submit drawings of all formwork showing form plywood patterns, formwork, ties, vertical limits of concrete placements, horizontal lifts, and construction joints.

2. Shoring
a. If shoring the excavation is required due to proximity of the proposed facility to the Sacramento River levee and residential improvements, or for any other reason, submit drawings and structural calculations showing members, connections, and anchorage of the proposed shoring system. Calculations and drawings shall be stamped by a Civil Engineer currently licensed in the State of California.

PART 2 - PRODUCTS

2.01 FORM MATERIALS
A. Plywood - PS 1, B -B Plyform Cla ss 1, EXT -APA, edge-sealed, 5/8-inch thick when studs are spaced 12-inches on center and 3/4-inch thick when studs are spaced 16-inches on center.

B. Wood strips for forming reveals, chamfers and quirks: Any close grain hardwood or softwood, free of knots.

C. Framing Lumber - Douglas Fir "Standard" grade, sized to uniform width and depth D. Sheathing - Douglas Fir "Construction" grade boards and sheathing, 10-inch maximum width

2.02 FORM ACCESSORIES
A. Form Ties

1. Ties shall be adjustable type, arranged to leave no metal within 1" of surface. They shall have no lugs, cones, or other devices that will leave holes larger than 1" diameter in exposed concrete surfaces. Spreaders shall be either type designed for use w ith approved clamps of separate metal spreaders. Do not use wood spreaders or wire ties.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 85 of 157 ends

B. Form Coatings

1. Burke Concrete Accessories, Inc.'s "Burke Release", Nox -Crete, or approved equal.

Apply per manufacturer's printed instructions.

PART 3 - EXECUTION

3.01 GENERAL
A. Provisions for work of other Sections

1. Provide openings for mechanical and electrical work and work of other Sections. Place items to be incorporated in concrete and support on formwork. Seal forms around openings to prevent concrete seepage.

B. Design and erection of formwork, shoring and falsework

1. The design and engineering of all formwork, falsework and shoring, as well as its construction and protection, is the Contractor's responsibility. Conform to ACI 347 unless otherwise directed or approved.

C. Exposed-to-view concrete

1. Deflection of facing materials between studs, as well as deflection of studs and walers, shall be limited to 3/64 of an inch or 0.004 times the span length, whichever is the larger, at the midpoint between supports.

3.02 CONSTRUCTION TOLERANCES
A. Construct forms to provide concrete conforming to dimensions shown, and to tolerance limits listed in ACI 301 "Specifications for Structural Concrete for Buildings".

3.03 INSTALLATION
A. Installation shall conform to ACI 301, 347, P4 and CSSS 20-3. Design forms for easy removal.

Do not pry against face of concrete. Use wooden wedges only. In order that reused forms will not contain patches resulting from alterations, forms for concrete exposed-to-view shall be reused only on identical sections.

Forms will not be used if there is any evidence of surface wear or tear which would impair the quality of the exposed -to-view concrete. Forms shall be thoroughly cleaned and re -lubricated before reuses. Formwork for exposed -to-view concrete shall be observed continuously while concrete is being placed to see that there are no changes of elevation, plumbness, or camber.

If, during construction, any weakness develops and the fals ework shows any undue settlement or distortion, the work shall be stopped, the affected construction removed, if permanently damaged, and the falsework strengthened.

3.04 CONSTRUCTION AND SURFACE FINISH
A. Forms shall be substantial, true to line and level, sufficiently tight to prevent leakage and shall conform to indicated dimensions. Locate form ties for exposed concrete in straight horizontal and vertical lines and as indicated on Drawings and specified herein. Provide cleanout holes at bottom of forms. Remove debris before concrete is placed. Construct forms for exposed surfaces so that joints in forms are either horizontal or vertical and are located to the pattern indicated.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 86 of 157 ends

External corners on all concrete shall be formed with chamfer strips in corners of forms to form bevel at external angles. All form joints in forms for exposed -to-view concrete shall be sealed with specified form tape to prevent leakage. Camber soffits t o accommodate anticipated deflections caused by wet concrete and construction loads. Provide positive means of adjustment for shores and struts. Take up settlement as concrete is placed.

3.05 REMOVAL AND REUSE
A. Removal of forms shall conform to CSSS 20-4 and as specified herein. Remove forms, shoring and bracing carefully to avoid damage to fresh concrete, but not bef ore concrete is capable of self-support and support of construction loads. Do not pull tie rods until concrete is hard enough to permit withdrawal without damage to concrete. Pull ties that are entirely withdrawn from wall toward inside face. When forms are removed during specified curing period, cure the concrete as specified in Section 03300, “Cast-in-Place Concrete”.

Regardless of strengths attained by concrete, leave forms in place for following periods when supporting:

1. Vertical Surfaces - Three (3) days minimum

2. Slabs - Seven (7) days minimum

3. Beams and Girders - Fifteen (15) days minimum, but do not remove vertical support until concrete has reached its 28-day strength
B. Before reuse of plywood forms, thoroughly clean, sand, and recoat them with form coating. Do not reuse plywood that has torn grain, patches, worn edges, damaged phenolic resin covered surfaces, or other defects which would impair texture of finished surface. Other wood forms shall be prepared for reuse by thorough cleaning and recoat with form coating. Repair damaged forms and replace loose or damaged boards.

3.06 SHORING
A. Live loading of new construction while reshoring is under way is not permitted. Do not over stress new construction by over tightening reshores. Leave reshores in place until concrete has reached its specified 28-day strength. Reshore floors that suppor t shores under wet concrete, or leave original shores in place. Reshores shall have at least half the capacity of the shores above and be distributed in approximately the same pattern. Leave these reshores in place until freshly placed concrete has reached seventy-five percent (75%) of its specified 28-day strength.

3.07 MATERIAL APPLICATION
A. Concrete exposed-to-view in completed structures

1. Use specified "B-B" or better plyform plywood or phenolic resin covered form board.

B. Concealed concrete

1. Forms for concrete surfaces not visible in completed structure: Plywood, lumber or steel is acceptable. Footings may be poured directly against earth banks where soil conditions are such that vertical banks will remain stable during placing operations. Earth forms at walls are not permitted.
** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 87 of 157 ends

SECTION 03150

CONCRETE ACCESSORIES
PART 1 - GENERAL

1.01 SUMMARY
A. Section includes:

1. Waterstops

2. Preformed expansion joint material

1.02 REFERENCES
A. The publications referred to hereinafter form a part of this specification to the extent referenced.

The publications are referred to in the text by the basic designation only. Unless otherwise indicated, the latest edition of referenced publications in effect at the time of the bid shall govern.

In case of conflict between the requirements of this Section and those of the listed documents, the requirements of this Section shall prevail.

American Society of Testing Materials (ASTM)
ASTM D570 Test Method for Water Absorption of Plastics
ASTM D624 Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers
ASTM D638 Test Method for Tensile Properties of Plastics ASTM D746 Test Method for Brittleness Temperature of Plastics and Elastomers by Impact
ASTM D747 Test Method for Apparent Bending Modulus of Plastics by Means of a Cantilever Beam
ASTM D792 Test Methods for Density and Specific Gravity (Relative Density) of Plastics by Displacement
ASTM D2240 Test Method for Rubber Property - Durometer Hardness U. S. Army Corps of Engineers (U.S.ACOE)
CRD-C-572 Polyvinylchloride Waterstop

1.03 SUBMITTALS
A. Product Data

1. Submit data of complete physical properties for polyvinyl chloride waterstops.

2. Preformed Expansion Joint Material - Submit sufficient information on each type of material for review to determine conformance of material to requirements specified.

B. Samples - Submit samples of polyvinyl chloride waterstop.

C. Laboratory Test Reports - Submit reports indicating that average properties of polyvinyl chloride

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 88 of 157 ends

waterstops material and finish conform to requirements specified in this Section.

D. Quality Control Submittals

1. Certificates of Compliance - Submit written certificates that polyvinyl chloride waterstops supplied on this project meet or exceed physical property requirements of current U.S.ACOE CRD-C-572.

2. Manufacturer's Instructions - Submit instructions for materials specified in this Section that are specified to be installed with such instructions.

1.04 QUALITY ASSURANCE
A. Mock-ups

1. Welding Demonstration
a. Demonstrate ability to weld acceptable joints in polyvinyl chloride waterstop before installing waterstop in forms.
b. Quality of welded joints will be subject to acceptance of the Engineer.

PART 2 - PRODUCTS

3.01 MATERIALS
A. Waterstops

1. Material and Type
a. Provide polyvinyl chloride waterstops. Ribbed type waterstops will not be allowed.

2. Manufacturers (one of the following, or approved equal) a. Vinylex Corporation.
b. Greenstreak Plastic Product Division of Western Textile Products Company.

3. Polyvinyl Chloride Waterstops
a. Unless otherwise specified or indicated on the Drawings, provide following types:
i. Six inch (6") flat dumbbell type in construction and contraction joints ii. Nine inch (9") wide dumbbell with one inch (1") diameter hollow center bulb in expansion joints
b. Provide polyvinyl chloride waterstop complying with following requirements:

Physical Characteristics Test Method Required Results
Specific Gravity ASTM D792 Not less than 1.3
Hardness ASTM D2240 70 to 90 Type A Shore durometer
Tensile Strength ASTM D638 Not less than 2,000-pounds per square inch
Ultimate Elongation ASTM D638 Not less than 350-percent Alkali Extraction CRD-C-572 7-day weight change between minus

0.1-percent and plus 0.25-percent

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 89 of 157 ends

Low Temperature Brittle Point ASTM D746 Not more than minus 35-degrees Fahrenheit
Water Absorption ASTM D570 Not more than 0.15 percent after 24- hours
Accelerated Extraction Tensile CRD-C-572 Not less than 2,000-pounds per square inch
Stiffness in Flexure ASTM D747 Not less than 750-pounds per square inch
Tear Resistance ASTM D624 300-pounds per inch

Weight/Size Requirements
6-inch Waterstops Weigh not less than 130-pounds per 100-linear feet 9-inch Waterstops Weigh not less than 220-pounds per 100-linear feet Thickness 3/8-inch
Center Bulb 1/2-inch nominal outside diameter

Allowable Tolerances
Width Plus or minus 3/16-inch
Thickness Plus or minus 1/32-inch
B. Pre-Formed Expansion Joint Material

1. Material - Use synthetic sponge rubber or bituminous fiber types as specified in this Section.

2. Use specific type in any application as indicated on the Drawings.

3. Thicknesses and dimensions of materials shall be as indicated on the Drawings or as required according to the way joint material is used.

4. Sponge Rubber Type shall be from o ne of the following manufacturers, or approved equal:
a. Tammstech, Inc., Cementone
b. Burke Concrete Accessories Inc., Neoprene Sponge Rubber Expansion Joint

5. Bituminous Fiber Type shall be from one of the following manufacturers, or approved equal:
a. Tammstech, Inc., Hornboard/fiber
b. Burke Concrete Accessories Inc., Fiber Expansion Joint

3.02 MANUFACTURED UNITS
A. Polyvinyl Chloride Waterstops: Provide waterstops manufactured from virgin polyvinyl chloride plastic compound that does not contain any scrap or reclaimed material.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 90 of 157 ends

PART 3 - EXECUTION

3.03 INSTALLATION
A. Waterstops

1. Install waterstops in concrete joints where indicated on the Drawings.

2. Carry waterstops in walls into lower slabs and join to waterstops in slabs with appropriate types of fittings.

3. In water-bearing structures, provide all joints with waterstops, whether indicated on the Drawings or not.

4. Provide waterstops that are continuous.

5. Set waterstops accurately to position and line as indicated on the Drawings.

6. Hold and securely fix edges in position at in tervals of not more than twenty -four inches (24") so that they do not move during placing of concrete.

7. Do not drive nails, screws, or other fasteners through waterstops in vicinity of construction joints.

8. Use wires at not more than twenty -four inches (24") on centers near outer bulbs to tie waterstops into position.

9. Special clips may be used in lieu of wires, at Contractor's option.

10. Terminate waterstops three-inches (3") from top of finished surfaces of walls and slabs unless otherwise specified or indicated on the Drawings.

11. Polyvinyl Chloride Waterstops
a. Install waterstops so that joints are watertight.
b. For joints such as unions, crosses, ells, and tees, field weld with thermostatically controlled equipment recommended by waterstop manufacturer. c. Split type waterstop will not be permitted except where specifically indicated on the Drawings.

B. Joints

1. Construct expansion, contraction, and construction joints as indicated on the Drawings.

2. Preformed Expansion Joint Material: Fasten expansion joint strips to concrete, masonry, or forms with adhesive. No nailing will be permitted, nor shall expansion joint strips be placed without fastening.
** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 91 of 157 ends

SECTION 03300

CAST-IN-PLACE CONCRETE
PART 1 - GENERAL

1.01 DESCRIPTION
A. Scope of Work

1. Unless otherwise directed, provide concrete as specified herein.

B. Related Work

1. Section 01330, “Submittals”

2. Section 03100, “Concrete Formwork”

3. Section 03200, “Concrete Reinforcement”

1.02 REFERENCES
A. The publications referred to hereinafter form a part of this specification to the extent referenced.

The publications are referred to in the text by the basic designation only. Unless otherwise indicated, the latest edition of referenced publications in effect at the time of the bid shall govern.

In case of conflict between the requirements of this Section and those of the listed documents, the requirements of this Section shall prevail.

American Concrete Institute (ACI) Standard
ACI SP-15 Field Reference Manual: Standard Specifications for Structural Concrete with Selected ACI and ASTM references
ACI 211 Recommended Practice for Selecting Proportions for Concrete ACI 301 Structural Concrete for Buildings
ACI 302 Guide for Concrete Floor and Slab Construction
ACI 304 Recommended Practice for Measuring, Mixing and Placing Concrete ACI 305 Hot Weather Concreting
ACI 306 Cold Weather Concreting
ACI 309 Consolidation of Concrete
ACI 318 Building Code Requirement for Reinforced Concrete, with Commentary

American Society for Testing and Materials (ASTM)
ASTM C31 Method of Making and Curing Concrete Test Specimens ASTM C33 Concrete Aggregates
ASTM C39 Compressive Strength of Cylindrical Concrete Specimens ASTM C94 Ready Mixed Concrete

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 92 of 157 ends

ASTM C143 Slump of Portland Cement Concrete
ASTM C150 Portland Cement
ASTM C171 Sheet Materials for Curing Concrete
ASTM C172 Method of Sampling Freshly Mixed Concrete
ASTM C192 Making and Curing Concrete Test Specimens in the Laboratory ASTM C227 Test for Potential Alkali Reactivity of Cement-Aggregate Combinations ASTM C231 Air Content of Freshly Mixed Concrete by the Pressure Method ASTM C260 Air Entraining Admixture for Concrete
ASTM C289 Test of Potential Reactivity of Aggregates
ASTM C295 Petrographic Examination of Aggregates
ASTM C309 Liquid Membrane Forming Compounds for Curing Concrete ASTM D98 Calcium Chloride
ASTM D1785 Poly (Vinyl Chloride) PVC Plastic Pipe, Schedules 40, 80 and 120

City of Sacramento (CSSS)
Section 10 Construction Materials
Section 20 Concrete in Structures

1.03 CONDITIONS
A. Notes pertaining to concrete on the Plan sheets are a part of these Specifications.

B. Testing shall comply with the General and Special Conditions.

1.04 SUBMITTALS
A. Manufacturer’s Data

1. Proposed mix designs, including admixtures

2. Curing Material
B. Certificates:

1. Submit Certificate of Compliance that concrete meets the specified requirements.

2. Delivery tickets for all concrete delivered to the project site.

PART 2 - PRODUCTS

2.01 MATERIALS
A. Portland Cement - ASTM C150, Type II or Type III.

1. Concrete - Standard gray cement (use same brand for surfaces not to be painted) B. Water - Clean and free of substances injurious to concrete

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 93 of 157 ends

C. Aggregate

1. Do not use aggregates that are alkali reactive when tested by ASTM C227, C289, or C295.

2. Unless otherwise noted, maximum coarse aggregate size shall be 1-1/2-inches for walls and slabs greater than or equal to 12 -inches thick, and 1 -inch for walls and slabs less than 12-inches thick.

3. Provide hard, washed, fine and coarse aggregates conforming to ASTM C33, including requirements for sampling and testing, except that loss after 500 revolutions in Los Angeles machine shall not exceed forty percent (40%). Limit material finer than No. 200 sieve to a maximum of three percent (3%) of the fine aggregate.

D. Non-Shrink Grout - Master Builders premixed "Embeco", Burke's "Metallic Grouting Compound"; Sonneborn-Desoto "Ferrolith-G", or approved equal
E. Curing materials

1. Liquid Curing Compound - ASTM C309, Type 1 (Clear) containing a fugitive dye

2. Sheet Material - Double-layered, reinforced, stain proof, waterproofed Kraft paper, ASTM C171, regular type
F. Admixtures

1. General
a. Provide only as indicated below. Submit manufacturer's data for admixtures, and use only those approved by Engineer. Use shall be in accordance with the manufacturer’s recommendations.

2. Water Reducing - "Plastocrete", Sika Chemical Corporation; "WRDA with Hycol", W.R.

Grace, or approved equal. Conform to ASTM C49A, Type A (use in all mixes)

3. Retarding - "Plastiment", Sika Chemical Corporation, or approved equal (u se for hot weather concreting only)
G. Concrete Overlay Bonding Materials - Burke Acrylic Bondcrete or approved equal

2.02 DESIGN OF MIXES
A. General

1. The Contractor shall be responsible to design concrete mixtures resulting in the required 28-day compressive strength and other required characteristics. An approved laboratory shall design all mixes. Comply with ACI 211 "Recommended Practice for Selecti ng Proportions for Concrete" and ACI 304 "Recommended Practice for Measuring, Mixing and Placing Concrete" to produce plastic, workable mixture suitable for concrete work indicated, which will develop required compressive strengths, as indicated.

B. Mix for conduit encasement

1. Concrete mix shall be Class D and contain a minimum of five (5) sacks (470 pounds) of Portland cement per cubic yard. The maximum water/cement ratio shall be 0.50. The Contractor shall add red oxide, in the amount of 5-lbs per cubic yard, to all concrete used for conduit encasement.

C. Mix for antenna foundations, generator pads, building foundations and housekeeping pads, retaining walls, and footings

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 94 of 157 ends

1. Concrete mix shall be Class B and contain a minimum of six (6) sacks (564 pounds) of Portland cement per cubic yard. The compressive strength at 28 days shall be 4,000 psi.

The maximum water/cement ratio shall be 0.50.

D. The maximum slump for concrete shall be 4-inches. A tolerance of one-inch above the maximum slump will be allowed, provided that the average of all batches is less than the specified maximum slump. Batches of concrete with slumps in excess of those specified will be rejected if their frequency of occurrence is excessive or the Contractor fails to take corrective action to reduce their occurrence. No water shall be added to the approved mix after batching except as approved by the Engineer.

E. Batching and mixing

1. Use transit -mixed concrete from approved batch plant. Batching, mixing, and transportation of concrete shall conform to ASTM C94.

PART 3 - EXECUTION

3.01 PREPARATION
A. Embedded Items

1. Includes installation of work built into concrete such as waterstop sleeves, anchor bolts, wood nailers, reglets, frames and sleeves for piping, conduit and fittings specified under other divisions. Provide facilities and supervision required for installation of inserts specified under other Sections, and perform cutting and reinforcing of forms required to accommodate them. Do not place any concrete until all inserted items are installed in their proper locations, secured against displacement, cleaned, inspected and approved.

Furnish ties and supports necessary to keep embedded items in place when concrete is placed.

B. Clean Up

1. Remove excess water from forms before concrete is deposited. Remove hardened concrete, debris, and foreign materials from interior of forms and from surfaces of mixing and conveying equipment.

C. Wetting

1. Prior to placing concrete, wet wood forms sufficiently to tighten up cracks. Wet all other materials sufficiently to reduce suction and maintain concrete workability.

D. Earth or Gravel Subgrade

1. Lightly dampen subgrade no more than 24-hours in advance of concrete placement, but do not muddy. Reroll where necessary for smoothness and remove loose earth material.

E. Screeds (Flatwork)

1. Set screeds at walls and at maximum of 8 -foot horizontal distance between adjacent screeds.

F. Weather

1. Do not place concrete during rainy weather unless approved measures are taken to prevent damage to concrete. Cure concrete placed during periods of dry winds, low humidity, high temperatures and other conditions causing rapid drying, initially with a fine

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 95 of 157 ends

fog spray of water applied immediately after finishing and maintained until final curing operations are begun. Comply with the following:
a. Hot weather: ACI 305
b. Cold weather: ACI 306
G. Pumping Concrete

1. Maintain close observation of ambient temperature both at pump location and at discharge end. Allow for wide variance of temperature change.

3.02 FLATNESS TOLERANCE FOR FLOOR SLABS
A. Slabs (Flatwork) Interior and Exterior

1. Finish slabs monolithically. Uniformly slope floor slabs to provide positive draining of indicated areas. Special care shall be taken so that a smooth, even joint is obtained between successive pours.

2. Finished surfaces shall be true plane surfaces with no deviat ion in excess of 1/8-inch in 10-feet when tested with a straight edge.

3. Replace or repair any slab which fails to meet this standard. If slabs fail to drain as indicated, remove drains and faulty floor section and refinish topping so that it drains according to the Drawings. No deviations will be allowed.

3.03 PLACING
A. Formed Concrete

1. Place concrete after subgrade, forms, and reinforcement has been approved. Limit free vertical drop in concrete walls or columns to three (3) feet. In other concrete, limit the drop to five (5) feet. Deposit concrete in horizontal layers not more than 18-inches deep and continue pouring until section is completed. Control rate of pouring and depth of layers so that each layer will be covered within one hour after it is poured. Pour columns to top and allow to settle two (2) hours before additional conc rete is placed. Place concrete continuously between pour joints.

B. Grouting

1. Grout mix shall be regular concrete mix with one-half the large aggregate omitted. Use to cover the following before additional concrete is placed:
a. Flat form surfaces next to congested steel
b. Construction joints
c. Top of column and wall footings
d. On surfaces where concrete has set
C. Vibration and Tamping

1. As concrete is placed in forms, work concrete around reinforcing steel, built-in items and into corners and angles. Extra care shall be given to work architectural concrete around inserts, reveals, quirks, corners and plastic cones of ties to preclude roc k pockets, air pockets, and other defects, and to produce sharp corners, edges and smooth surfaces.

Provide mechanical vibrators operated by experienced employees for agitating concrete in forms. Vibrate thoroughly within five (5) minutes after layer is placed. Carry vibration

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 96 of 157 ends

well into previous layer. Vibrators shall not be used to transport concrete inside forms.

Internal vibrators shall maintain a speed of not less than 7,000 impulses per minute when submerged in concrete. Supplement vibration by suitable methods to elimin ate voids along forms for full depth of layer as directed. Do not allow vibrators to strike overlaid plywood surfaces. Do not use vibrators to work concrete along forms. Keep at least one spare vibrator on job at all times while concrete is being placed . Comply with ACI Committee 309 consolidation of Concrete, Committee Report.

D. Stoppage

1. Upon completion of a pour and after concrete has partially hardened, wash scum or laitance off surface with stiff brush and stream of water. When work is resumed, brush clean with wire brushes or sandblast, then place fresh concrete.

E. Pumped Concrete

1. Do not place concrete by pumping without prior written approval of the Engineer.

2. Do not use aluminum or aluminum lined pipe . Prevent concrete from contacting aluminum fittings.

3. Do not add more water to mix unless approved by the Engineer. Check that the mix design entered on delivery ticket complies with that ordered.

4. Use only piston type pumps. Insure they are reversible. Make a standby pump available of no less capacity than that in use for operation at the job within one hour's notice.

3.04 CONSTRUCTION JOINTS
A. The location and design of joints not shown or specified are subject to approval of the Engineer prior to placement of concrete.

B. Horizontal Joints

1. Where joints occur in exposed concrete, set smooth painted wood strips in form to provide a straight and level joint in which upper pour laps lower pour. Place concrete level with, but not above top of pour joint strip as shown on Drawings. Allow 24 -hours before concrete is placed over horizontal joints. Remove loose material and laitance. Clean by sandblasting, or wire brushing. Allow enough time between placing of adjacent pour sections to provide for initial shrinkage. Horizontal joints will no t be allowed in beams, girders and slabs unless otherwise indicated.

C. Vertical joints

1. Vertical joints not shown on the Drawings shall be so made and located as to least impair the strength of the structure and shall be approved by the Engineer prior to placement of concrete.

3.05 REPAIRS AND PATCHING
A. Patch defective areas immediately following form removal. Remove honeycombed and other defective concrete to sound concrete, but not less than 1 -inch deep. Make the walls of the cut area perpendicular to the surface. Do not feather out the edges. Dampen the patch area and the adjacent area six (6) inches around the patch area.

B. For exposed concrete prepare a patching mortar of one part Portland cement adjusted to match the color of the surrounding concrete and 2 -1/2 parts sand with the least water required to produce a workable mass. Rework this mortar until it is the stiffest consistency that will permit

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 97 of 157 ends

placing. Brush the patch area with a bond of neat cement and water paste and apply patching mortar when the water sheen is off the bond. Strike off the mortar slightly higher than the surrounding surface, let set for one hour and finish flush with the surrounding surface. Tie holes shall be cleaned, dampened and filled solid with the above specified patching mortar.

3.06 FINISHING FORMED SURFACES
A. Finish formed surfaces by removing any and all fins. The tolerances of finished formed surfaces shall conform to ACI 301.

3.07 FLATWORK
A. Place floor slabs on grade in alternate strips. Place each unit against construction joint forms with formed control joints perpendicular to the poured strips. Pour slabs-on-grade against a moist subgrade. Wet the subgrade the day before placing concrete. Moisten subgrade just ahead of concrete as it is placed. Do not place concrete in standing water. Provide new, clean cut, sharp- edged wood headers at construction joints of suspended slabs. Deposit concrete evenly, consolidated with mechanical vibra tors, particularly at side forms, and screed to indicated elevations and contours. Maintain full indicated thickness of slab over all parts of cambered support. Concrete shall be compacted with a grid tamper to eliminate voids and pockets and to produce a uniformly dense slab. Where ground slabs are left to receive deferred finishes, provide protection against contamination from time of placing concrete until time of placing finish.

Remove contamination mechanically leaving a clean surface.

B. Joint location and detail shall be as indicated. Tooling is required at control and pour joints.

1. Control Joints
a. After concrete surface is screeded, cut concrete with a cutting bar, or other approved tool, approximately 1/4" thick x 2" deep. Form straight clean lines. After slot is formed in stiff concrete, insert 1/8" thick x 1-1/2" strip of tempered hardboard or plastic joint form zip strip. Butt strips neatly to line and flush with concrete surface. Finish slab flush with top of hardboard strips without tooling.

2. Construction Joints
a. Form construction joints with 2 -inch nominal dressed lumber, or approved steel forms. Provide enough stakes to prevent sagging and misalignment under construction loads. Leave forms in place as long as possible and remove without chipping the edge of the slab. Protect the slab edge until the adjacent slab is placed.

3. Expansion Joints
a. Provide sponge neoprene joint filler where shown on the Drawings. Place filler to provide space for sealant as indicated. Seal joints with specified sealant per manufacturer's printed instructions. Thickness of filler material is indicated.

C. Slab Finishing

1. Contractor shall apply a medium broom finish just after final troweling to all flat slabs not specified to receive another finish.

2. Where wood float finish is indicated, screed slabs to elevations indicated. Compact with motor driven disk type compactor float and bull float to smooth, even surface. Perform final finishing with wood hand floats to give finished surface uniform, slight ly roughened texture.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 98 of 157 ends

3. Where steel trowel finish is indicated, tamp fresh concrete with a grid tamper enough to raise a thin bed of mortar to surface. Before finishing, remove any excess water. Level and compact with motor drive disk type compactor float. Immediately after fl oating, the surface shall be further leveled and compacted with a motor driven rotary trowel with flat- pitched blades. Final troweling shall be done with steel hand trowel after surfaces have become hard enough to produce a hard, dense, smooth, burnished surface.

3.08 CURING AND PROTECTING
A. Do not use any curing method which will be incompatible with the specified applied finishes.

B. Initial Curing

1. Begin initial curing with water immediately after the final finishing operation. Keep the concrete continuously wet at least overnight. Use one of the final curing methods.

C. Final Curing

1. Water or Paper Curing (mandatory for bridge slabs) - Where water curing is used, keep surfaces continuously wet for seven (7) days. Where paper curing is used, keep the paper in place without torn areas for at least ten (10) days. Seal all joints in paper with a suitable waterproof cement or tape.

2. Mandatory Hot/Dry Weather Curing - Use water curing for the first 24 -hours of the required curing period.

3. Optional Curing - Surfaces not specified to receive a mandatory curing method may be cured by water, membrane, or paper curing. Use clear curing compound for all membrane curing and paper curing. Water and paper curing to be as specified above.

D. Formed Surfaces

1. Wood forms left in place during the final curing period shall be kept tight, wetting if necessary. If forms are removed during the curing period, one of the specified curing methods, as approved by Inspector, shall be applied immediately and continued for the remainder of the curing period.

3.09 MISCELLANEOUS
A. Grouting and Drypacking

1. Grout - One (1) part cement, two (2) parts sand , and sufficient water that the grout will just flow under its own weight. Water reducing and workable agent may be added at the Contractor's option.

2. Drypack - One (1) part cement, two (2) parts sand, with just enough water to bind the materials together.

3. Installation - Dampen surfaces before grouting and slush with neat cement. Force grout into place and rod so as to fill all voids and provide uniform bearing under plates. Provide smooth finish on exposed surfaces and damp cure for at least three (3) days.

B. Non-shrink grout

1. Mix and place under structural steel base plates in accordance with manufacturer's printed instructions.

C. Concrete Overlay Bonding

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 99 of 157 ends

1. The surface of the existing concrete is to be roughened by sandblasting to remove loose material, rust and oils. Sufficient cement matrix should be removed to expose surface aggregates and to form a roughened surface for bonding. Clean with a high pressu re water jet and allow to surface dry. Immediately apply an acrylic bonding agent such as Burke Acrylic B ondcrete at the rate of 200 -square feet per gallon and follow with placement of the concrete overlay after a minimum of one hour and after the film is dry to the touch. Install bonding agent in strict accord with manufacturer's instructions.

3.10 QUALITY CONTROL
A. The Engineer shall be responsible for the routine quality control testing of concrete mixes.

B. Slump Test

1. Slump test shall be performed at the job site by the Engineer in accordance with ASTM Test Method C 143.

C. Compressive Strength Tests

1. Each day concrete is poured, the Engineer shall mold four concrete test cylinders in accordance with ASTM C31. City shall pay for the service of an independent testing company to cure and test the concrete cylinders in accordance with ASTM C39 and C172 unless samples fail to meet requirements, in which case Contractor shall pay for retesting done to the same requirements. Cylinders shall be tested at 7 days, 14 days, 21 days, and 28 days.

D. The Contractor shall assist the Engineer in obtaining samples of fresh concrete.

E. Methods of sampling and testing concrete mixtures shall include but not be limited to the following:

American Society of Testing Materials (ASTM)
Composite Samples ASTM C172.

Specimen Preparation ASTM C31.

Compressive Strength ASTM C39.

Air Content ASTM C173 or C231.

Slump ASTM C143.

Unit Weight ASTM C138
F. Evaluation and acceptance of concrete and concrete structures shall be in accordance with Chapters 17 and 18 of ACI 301.
** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 100 of 157 ends

DIVISION 4 – MASONRY (Not Used)

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 101 of 157 ends

DIVISION 5 – METALS (Not Used)

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 102 of 157 ends

DIVISION 6 – WOOD AND PLASTIC (Not Used)

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 103 of 157 ends

DIVISION 7 – THERMAL AND MOISTURE PROTECTION (Not Used)

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 104 of 157 ends

DIVISION 8 – DOORS AND WINDOWS (Not Used)

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 105 of 157 ends

DIVISION 9 – FINISHES (Not Used)

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 106 of 157 ends

DIVISION 10 – SPECIALTIES (Not Used)

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 107 of 157 ends

DIVISION 11 – EQUIPMENT (Not Used)

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 108 of 157 ends

DIVISION 12 – FURNISHINGS (Not Used)

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 109 of 157 ends

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 110 of 157 ends

DIVISION 13 – SPECIAL CONSTRUCTION (Not Used)

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 111 of 157 ends

DIVISION 14 – CONVEYANCE SYSTEMS (Not Used)

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 112 of 157 ends

DIVISION 15 – MECHANICAL
SECTION 15055

PIPING MATERIALS AND COMPONENTS
PART 1 - GENERAL

1.01 Summary
A. This section specifies the general requirements for piping materials and components and their installation and testing and shall be used in conjunction with the Contract Drawings.

1.02 References
A. This section references the following documents. They are a part of this section insofar as specified and modified herein. In case of conflict between the requirements of this section and the listed documents, the requirements of this section shall prevail.

Reference Title
ANSI A13.1 Scheme for the Identification of Piping Systems AWWA C651 Standard for Disinfecting Water Mains

PART 2 - PRODUCTS

2.01 Piping
A. Material

1. Unless otherwise specified, piping materials, including pipe, gaskets, fittings, connection and joint assemblies, lining and coating, shall be selected from those listed on this Section. Piping materials shall conform to detailed specifications for each type of pipe and piping appurtenance specified in Division 15.

B. Flange Assemblies

1. Flat faced flanges shall not be bolted to raised face flanges.

2. Gaskets for flat faced flanges shall be the full-face type.

3. Gaskets for raised faced flanges shall match the raised face type.

4. Utilize only flat faced flanges when using flanges to mate dissimilar piping materials.

C. Tracer Wire

1. Tracer wire shall be #10 with direct bury jacket solid strand copper wire and included for piping as indicated herein.

D. Warning Tape

1. Tracer tape shall be 12 inches wide and included for piping as indicated herein. Tracer tape shall be made of inert plastic material suitable for direct burial and capable of stretching to twice its original length.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 113 of 157 ends

2. Tracer tape shall be blue for potable water, purple for recycled water, and green for all other lines. A warning message shall be printed on the tape. a. For Potable Water the message shall read “CAUTION: BURIED WATER PIPE BELOW.” Letters shall be with black and the message shall be printed at maximum intervals of 2 feet.

PART 3 - EXECUTION

3.01 Installation
A. General:

1. Only proper implements, tools, and facilities as recommended by the pipe manufacturer's standard printed installation instructions shall be used.

2. The interior of all pipes shall be cleaned of all foreign matter before installing.

3. Under no circumstances shall pipe or accessories be dropped or dumped into the trench.

4. Lay pipe with label facing up.

5. While pipe laying is NOT in progress, the open ends of the installed pipe shall be closed to prevent trench water from entering into the interior of the pipe. a. Adequate backfill shall be deposited on pipe to prevent floating of pipe. b. Any pipe that has floated shall be removed from the trench, cleaned, and re-laid in an acceptable manner.
c. The use of burlap, wood, or other similar temporary plugs will not be permitted.
d. Cable, rope, or other devices used for lowering fittings into trench shall be attached around the exterior of fitting for handling. Under no circumstances shall the cable, rope or other device be attached through the fitting's interior for handling.

B. Anchorage

1. All bends, plugs, joints, caps and tees in pressure piping systems shall be anchored by means of restrained joints unless otherwise specified or shown.

C. Pipe Flexibility

1. Unless otherwise specified or shown, wherever piping 6 inches in diameter and larger passes from concrete to earth, 2 sleeve type flexible pipe couplings or flexible joints shall be provided with the first joint between 2 feet and 3 feet from the face of the structure.
a. The spacing between the two couplings shall be between 2 and 3 feet. b. A single sleeve type flexible pipe coupling can be utilized if the concrete wall penetration employs a flexible pipe seal. c. Where installed on pressure pipe, flexible couplings shall be restrained.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 114 of 157 ends

3.02 Cleaning and Flushing
A. General:

1. Piping systems shall be flushed and cleaned prior to testing. The Contractor may, in order to facilitate the cleaning of sections of buried or exposed piping between isolating valves, clean and test the system as specified in this section, prior to connec tion to the valving. Use of this procedure, however, will not waive the requirement for a full test of the completed system.

2. Unless specified otherwise, piping 24 inches in diameter and smaller shall first be cleaned by pulling a tightly fitting cleaning ball or swab through the system.

B. Liquid Systems:

1. After completion of cleaning, piping systems 12” and less shall be flushed with clean water for a minimum period of 15 minutes at the flow rate required to produce a minimum velocity of 6 feet per second.
a. Contractor is responsible for all temporary piping and facilities required.
b. Contractor shall comply with all State and Local regulations and requirements for disposal of flushing water.

2. Potable water piping systems shall be flushed and disinfected in accordance with AWWA C651. Post disinfection testing shall be done and paid for by the Contractor.
** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 115 of 157 ends

SECTION 15060

PIPE AND PIPE FITTINGS

PART 1 - GENERAL

1.01 Summary
A. Section includes:

1. All piping not covered in specific sections of the specifications.

2. Provide piping complete with all fittings, gaskets, jointing materials, supports, saddles, anchors, and necessary appurtenances.

3. Miscellaneous accessories and items.

1.02 References
A. Referenced standards:

1. ANSI/AWWA C600: Standard for Installation of Ductile-Iron Water Mains and Their Appurtenances.

2. ANSI/AWWA C602: Standard for Cement-Mortar Lining of Water Pipelines 4 inches and Larger - in Place.

3. ANSI/AWWA C651: Standard for Disinfecting Water Mains.

4. ASTM A307: Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi tensile strength.

5. ASTM D297: Standard Test Methods for Rubber Products - Chemical Analysis.

6. ASTM D395: Standard Test Methods for Rubber Property - Compression Set.

7. ASTM D412: Standard Test Methods for Rubber Properties in Tension.

8. ASTM D2240: Standard Test Methods for Rubber Properties - Durometer Hardness.

9. ASTM D1330: Rubber Flange Gaskets Grade I.

10. ANSI/AWWA C900: Standard for Polyvinyl Chloride (PVC) Pressure Pipe, 4 inches through 12 inches for Water Distribution.

11. ANSI/AWWA C907: Standard for Polyvinyl Chloride (PVC) Pressure Fittings for Water - 4 inches through 8 inches.

12. AWWA M23: PVC Pipe Design and Installation Manual.

13. ASTM D2241 -88: Standard Specifications for Polyvinyl Chloride (PVC) Pressure Rated Pipe (SDR Series).

B. Requirements of regulatory agencies:

1. In accordance with all municipal codes and ordinances, laws and regulations of the State.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 116 of 157 ends

2. In case of apparent conflict, State and local requirements govern over these specifications.

3. In absence of State and local regulations, National Plumbing Code applies.

PART 2 - SUBMITTALS

2.01 Product Data and Shop Drawings:

A. Sufficient data to verify compliance with the specifications.

B. Shop Drawing showing dimensions, sizes, location.

C. Detailed Shop Drawings for all pipe 4-inch size and larger.

D. Product Data: Describe materials, pipe, fittings, and gaskets.

E. Manufacturer’s published installation instructions.

F. Solvent Cement:

1. Product Data.

2. Copies of solvent cement manufacturer’s report and certification in accordance with ASTM D 2564 for PVC piping, and ASTM F 493 for CPVC piping.

2.02 Delivery, Storage, and Handling
A. Packing and shipping:

1. To ensure undamaged condition.

2. Use wide bearing area slings and wide padded skids.

3. Do not use bare cables, chains, hooks, metal bars, or narrow skids.

4. Support on padded saddles not less than 12 inches wide.

5. Laterally support ends of pipe, fittings, and specials to maintain shape.

6. Separate materials so they do not bear against each other.

7. Securely fasten load to prevent movement in transit.

B. Acceptance at site:

1. Reject products with dents, kinks, abrupt changes of curvature or other injuries.

2. Reject any products dropped from truck or crane.

3. Replace or recondition at Contractor’s expense rejected items.

4. Reconditioning subject to Engineer’s acceptance.

5. Replace coatings as originally specified on reconditioned pipe.

PART 3 - PRODUCTS

3.01 Manufacturers
A. Acceptable manufacturers are shown under Section 2.02, Materials, for the various types of pipe, and pipe fittings.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 117 of 157 ends

3.02 Materials
A. Polyvinyl chloride (PVC) pipe:

1. Water service:
a. Pipe: ASTM D1785, Schedule 80, PVC 1120, with NSF seal. i. Pipe and Fittings: Extruded from Type I, Grade 1, Class 12454 B material in accordance with ASTM D 1784.
b. Fittings: Ductile Iron
i. Acceptable manufacturers:
ii. Celanese.
iii. Chemtrol.
iv. Harvel Plastics.
v. Certainteed Pipe.
vi. M&T Plastics.
vii. Or approved equal.
c. Flanges: Diameter and drilling per ANSI B16.5, 150 lb. d. Unions:
i. Unions 2 1/2 Inches and Smaller: Socket end screwed. ii. Unions 3 inches and larger: Socket flanges with 1/8 inch full face soft gasket compatible with chemical service. For general usage (non-chemical), use neoprene gaskets.

2. Flange bolts and nuts: ASTM A307, Grade B, galvanized unless specified otherwise, install such that after installation bolts will project 1/8 -inch to 3/8- inch beyond outer face of nut.

3. Flanged bolts and nuts shall be Type 316 stainless steel for the following conditions:
a. Submerged in water or wastewater.
b. In an enclosed space above wastewater.
c. Buried.
d. Locations subject to seasonal or occasional flooding. e. Inside hydraulic structures below the top of the structure. f. Inside buried vaults, manholes, and structures that do not drain through a gravity sewer or to a sump with a pump.
g. Chemical handling areas.
h. Inside trenches, containment walls, and curbed areas.

4. Flange gaskets: Full face, 1/8-inch thick, neoprene or plasticized PVC.

5. Expansion joints: Belmont “Style 3915,” Resistoflex “Style R6905,” molded expansion joint, or approved equal.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 118 of 157 ends

a. Schedule Type: Mark pipe and fittings in accordance with ASTM D1785.

B. Pipe accessories:

1. Watertight and dust -tight pipe sleeves: O -Z Electrical Manufacturing Company, Incorporated; Thru-wall and Floor Seals, or approved equal.

2. Modular, rubber, sealing elements: Thunder Line Corporation, “Link Seal,” or approved equal.

3. Thread tape: Teflon; John Crane “Thread Tape,” Garlock Plasti -Thread,” Hoke “EZ Seal,” or approved equal.

4. Protective coatings:
a. Tape wrap: FS HH -T-30 Coal Tar Base; Protecto Wrap “200,” Tapecoat “CT,” or approved equal.
b. Coal tar coating: MIL-C-18480; Kop Coat “Bitumastic No. 50,” Tnemec “46H-413 Tneme-Tar,” or approved equal.

PART 4 - EXECUTION

4.01 Installation
A. General:

1. Install where indicated on Drawings.

2. Provide unions where required for equipment removal, indicated on the Drawing or specified.

3. Do not install piping to obstruct openings and passageways.

4. Cut pipe to measurement taken at the site, not from the Drawings.

B. Joints:

1. Make pipe joints carefully and neatly.

2. Threaded:
a. ANSI B2.1, NPT fully and cleanly cut with sharp dies. b. No more than three (3) threads exposed after installation. c. Ream pipe ends after threading to remove burrs.
d. Apply thread tape to joints in all plastic and stainless steel piping. e. Apply thread tape or joint compound to joints in other piping.

3. Compression:
a. Cut pipe ends squarely, remove burrs.
b. Scratches or grooves in tubing are not allowed.

4. Flared:
a. Cut tubing ends squarely; remove burrs.
b. Scratches or grooves in flared ends are not allowed.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 119 of 157 ends

5. Soldered and brazed:
a. Solder or braze lines smaller than two (2) inches where solder fittings are specified, except for aluminum pipe or fittings.
b. Thoroughly clean joint surfaces with flint paper and coat with thin film of flux.
c. Install tubing to full depth of socket.
d. Do not overheat metal or flux.
e. Uniformly heat joint to melt filler metal on contact. f. Remove surplus filler metal and flux while joint is still hot.

6. Bell and spigot:
a. Install as recommended by manufacturer.
b. 12 inches and smaller outlets, where minimum line is at least twice the diameter of the branch; tee or a tapping saddle is acceptable. c. Mark the centerline of each flange and mechanical joint piece on ductile iron pipe.
d. Finish machine pipe ends and flange faces flat and perpendicular to pipe centerline in a single operation on ductile iron pipe.

7. Flanged: Tighten bolts sufficiently to slightly compress gasket in accordance with manufacturer’s instructions, but not so tight as to distort flanges.

8. Welded: ANSI B31.1 and per “Code for Pressure Piping.” C. Protective coating:

1. Install polyethylene encasement on ductile iron pipe.

D. Pipe supports:

1. Provide adequate pipe supports for all piping.

2. Utilize pipe supports as shown on the pipe support details.

3. Provide pipe supports at locations shown on the plans, as well as additional supports required to meet these maximum spacings:
a. Maximum pipe support for PVC pipe:

Pipe Size Maximum Spacing
1” or less 4’-0”
1-1/4” - 2” 6’-0”
2-1/2” - 3” 7’-0”
3-1/2” & larger 8’-0”
b. Maximum pipe support for miscellaneous metallic piping:

Pipe Size Maximum Spacing
1” or less 5’-0”
1” & larger 7’-0”
E. Hydrostatic testing (pressure pipe):

1. Hydrostatically pressure test pipe per ANSI/AWWA C600, Section 4.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 120 of 157 ends

2. Pressure and leakage test:
a. Test restrictions:
i. Test pressure shall not be less than 1.5 times the working pressure at the highest point along the test section.
ii. Test pressure shall not exceed pipe or thrust -restraint design pressures.
iii. The hydrostatic test shall be of at least 2-hour duration. iv. Test pressure shall not vary by more than +5 psi for the duration of the test.
v. Valves shall not be operated in either direction at differential pressure exceeding the rated valve working pressure.
vi. Valves can then be opened enough to equalize the trapped pressure with the line pressure, or fully opened if desired. vii. Provide an independent valve to reduce the line pressure to the rated valve pressure on completion of the test.
viii. Test pressure shall not exceed the rated pressure of the valves when the pressure boundary of the test section includes closed resilient-seated gate valves or butterfly valves.
b. Pressurization:
i. All newly laid pipe or any valved section thereof shall be subjected to a hydrostatic pressure of at least 1.5 times the working pressure at the point of testing.
ii. Each valved section of pipe shall be slowly filled with water, and the specified test pressure, based on the elevation of the lowest point of the line or section under test and corrected to the elevation of the test gauge.
iii. Test pressure shall be applied by means of a pump connected to the pipe in a manner satisfactory to the Owner.
iv. Valves shall not be operated in either the opening or closing direction at differential pressures above the rated pressure. v. Allow the system to stabilize at the test pressure before conducting the leakage test.
c. Air removal:
i. Before applying the specified test pressure, air shall be expelled completely from the pipe, valves, and hydrants. ii. If permanent air vents are not located at all high points, the Contractor shall install corporation cocks at such points so that the air can be expelled as the line is filled with water. iii. After all the air has been expelled, the corporation cocks shall be closed and the test pressure applied.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 121 of 157 ends

iv. At the conclusion of the pressure test, the corporation cocks shall be removed and plugged or left in place at the discretion of the Owner.
d. Examination:
i. Any exposed pipe, fittings, valves, hydrants, and joints shall be examined carefully during the test.
ii. Any damaged or defective pipe, fittings, valves, hydrants, or joints that are discovered following the pressure test shall be repaired or replaced with sound material, and the test shall be repeated until it is satisfactory to the Owner.
e. Leakage defined:
i. Leakage shall be defined as the quantity of water that must be supplied into the newly laid pipe or any valved section thereof to maintain pressure within 5 psi of the specified test pressure after the pipe has been filled with water and the air has been expelled for the specified 2-hour test duration.
ii. Leakage shall not be measured by a drop in pressure in a test section over a period of time.
f. Allowable leakage: None
g. Acceptance of installation:
i. Acceptance shall be determined on the basis of allowable leakage.
ii. If any test of laid pipe discloses leakage greater than that specified in (f), the Contractor shall, at his own expense, locate and make approved repairs as necessary until the leakage is within the specified allowance.

4.02 Field Quality Control
A. Test each line at the Contractor’s expense in the presence and to the satisfaction of Engineer.

B. Provide all testing equipment, materials, tools, appliances and devices, and labor.

C. Leaks:

1. Make all joints and seams watertight and free of leaks.

2. Inspect all exposed shop- and field-welded seams.

3. Mark leaks clearly.

4. Repair all visible leaks on exposed piping.

5. Do not remove marks until leak is corrected.

6. Repair welded joints by chipping out defective parts and re-welding.

7. Do not hammer welds.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 122 of 157 ends

8. Repair at Contractor’s expense leaks discovered within one (1) year after final acceptance by Owner.

4.03 Cleaning
A. General:

1. The inside of all pipe, valves, and fittings shall be smooth, clean, and free from blisters, loose mill scale, sand, and dirt when erected.

2. Flush all lines prior to placing into service or prior to tie-in.

** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 123 of 157 ends

SECTION 15064

PVC PIPE
PART 1 - GENERAL

1.01 Summary
A. This section specifies polyvinylchloride (PVC) for pressurized and non -pressurized systems.

1.02 References
A. This section contains references to some or all of the following documents, most recent edition. They are a part of this section as specified and modified. In case of conflict between the requirements of this section and those of the listed documents, the requirements of this section shall prevail.

Reference Title
ANSI/AWWA C900 Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4-in Through 12-in for Water Distribution
ANSI/AWWA C905 Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 14-in Through 48-in for Water Distribution
ASTM D1784 Standard Specification for Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds ASTM D1785 Standard Specification for Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80 and 120
ASTM D2241 Standard Specification for Poly (Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)
ASTM D2321 Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications
ASTM D2464 Standard Specification for Threaded Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
ASTM D2665 Standard Specification for Poly (Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings
ASTM D2466 Standard Specification for Poly (Vinyl Chloride) (PVC) Plastic Pipe Fitting, Schedule 40
ASTM D2467 Standard Specification for Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
ASTM D2564 Standard Specification for Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Piping Systems
ASTM D2665 Standard Specification for Poly (Vinyl Chloride) (PVC) Plastic Drain, Waste and Vent Pipe Fittings
ASTM D2774 Standard Practice for Underground Installation of Thermoplastic Pressure Piping
ASTM D2855 Standard Practice for Making Solvent-Cemented Joints with Poly (Vinyl Chloride) (PVC) Pipe and Fittings
ASTM D3034 Standard Specification for Type PSM Poly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings
ASTM D3139 Standard Specification for Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals
ASTM F402 Standard Practice for Safe Handling of Solvent Cements, Primers and Cleaners Used for Joining Thermoplastic Pipe and Fittings

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 124 of 157 ends

ASTM F477 Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
ASTM F679 Standard Specification for Poly (Vinyl Chloride) (PVC) Large-Diameter Plastic Gravity Sewer Pipe and Fittings
AWWA M23 Manual of Water Supply Practices PVC Pipe – Design and Installation

1.03 Submittals
A. The Contractor shall provide submittals as required hereunder.

1. Alignment/ Layout drawings

2. Manufacturer's certificates shall be provided with each delivery. This certifies that each pipe section complies with this specification.

3. Manufacturers’ Affidavits of compliance with applicable references

4. Descriptive literature showing pipe dimensions, joints, couplings and other details for each size of pipe indicated.

1.04 Quality Assurance
A. The pipe, joints and fittings shall be tested in accordance with the requirements of this specification and as specified in the reference standards. The Contractor shall submit the test results to the Owner’s Representative.

B. Additional sampling may be requested of any material for testing by the Owner at the Owner’s expense. The additional samples shall be furnished by the Contractor at no additional cost to the Owner.

1.05 Delivery, Storage and Handling
A. Delivery

1. Pipe shipment should be carefully inspected by the Contractor upon arrival for defects or damage during delivery.

2. The Manufacturer shall mark the nominal pipe diameter, pressure class, manufacturer’s name, date of extrusion, ASTM designation and PVC Cell Classification on the pipe.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 125 of 157 ends

B. Storage

1. Pipe shall be stored in such a way as to prevent sagging, compression or bending.

2. Pipe shall be protected from direct sunlight by covering with an opaque material while permitting air circulation.

3. Gaskets should be stored in a cool, dark place out of direct sunlight.

C. Handling

1. Handling of the PVC pipe shall be done in accordance with manufacturer’s instructions to ensure that the pipe is not damaged in any manner during storage, transit, loading, unloading, and installation.

2. Any length of pipe having a gouge, scratch, or other permanent indentation more than 10 percent of the wall thickness in depth shall be rejected.

3. Defective, damaged or rejected pipe shall be immediately removed from the working area and replaced by the contractor at no additional cost to the owner.

1.06 Warranty
A. The pipe shall be warranted to be free of defects in material for a period of one year from substantial completion.

PART 2 - PRODUCTS

2.01 Material
A. Pipe Color shall be based on application as follows:

1. Blue: potable water

PART 3 - EXECUTION

3.01 General
A. All installation, jointing, tests for defects and leakage shall be performed in the presence of the Owner’s Representative and shall be subject to his approval before acceptance.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 126 of 157 ends

B. All material found to have defects will be rejected and the Contractor shall promptly remove such defective materials from the work site.

C. Installation shall conform to the requirements of the following standard practices, instructions furnished by the pipe manufacturer, and to the supplementary requirements or modifications specified in this section. Wherever the provisions of this Section and the aforementioned requirements are in conflict, the more stringent provision shall apply.

1. AWWA Manual M23: C900/C905 PVC Pressure Pipe

2. ASTM D2321: SDR 26
B. Unless otherwise specified, paint PVC piping exposed to direct sunlight as specified in Section 09900 – Protective Coatings.

3.02 Trenching and Backfill
A. Trench excavation and backfill shall conform to the requirements of Section 02315 – Earthwork.

B. Bedding:

1. There shall be a minimum 6 inches of Aggregate Base bedding

2. Bedding shall be checked for firmness and uniformity of surface immediately before placing each section of pipe in final position for jointing.

3. Select backfill shall be Aggregate Base to 12 inches above the pipe.

4. Backfill shall be native material or type “C” backfill.

3.03 Installation
A. General:

1. Pipe and fittings shall be of the sizes indicated.

2. Proper implements, tools, and facilities as recommended by the pipe manufacturer's standard printed installation instructions shall be provided and used by the Contractor for safe and efficient execution of the Work.

3. The interior of the pipe shall be cleaned of all foreign matter before installing.

4. The pipe and accessories shall be inspected for defects prior to lowering into the trench. Any defective, damaged or unsound pipe shall be repaired or replaced.

5. All pipe, fittings, valves, and accessories shall be carefully lowered into the trench by means of derrick, ropes, or other suitable equipment in such a manner as to prevent damage to pipe and fittings.

6. Under no circumstances shall pipe or accessories be dropped or dumped into the trench.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 127 of 157 ends

7. While laying pipe is NOT in progress, the open ends of the installed pipe shall be closed to prevent trench water from entering into the interior of the pipe.

Adequate backfill shall be deposited on pipe to prevent floating of pipe. Any pipe that has floated shall be removed from the trench, cleaned, and re-laid in an acceptable manner. The use of burlap, wood, or other similar temporary plugs will not be permitted.

8. No pipe shall be laid when, in the opinion of the Owner’s Representative, the trench conditions or the weather are unsuitable for such work.

B. Field Cutting Pipe

1. Cutting and machining of the pipe shall be accomplished in accordance with the pipe manufacturer's standard procedures for this operation.

2. Pipe shall NOT be cut with a cold chisel, standard iron pipe cutter, wedge type roll cutter or any other method that may fracture the pipe or will produce ragged, uneven edges.

3. Pipe shall be square cut with fine tooth saw or other cutter or knife designed for use with plastic pipe.

4. After cutting, the end of the pipe shall be beveled using a beveling tool, portable type sander or abrasive disc. Remove burrs by smoothing edges with a knife, file, or sandpaper.

C. Field Joining Pipe Joints and Fittings:

1. Pipe shall be jointed in compliance with manufacturer's printed instructions.

2. All pressure pipe shall be suitably restrained by use of thrust blocks or other means as approved by the Engineer.

3. Solvent Weld Joint Type Pipe
a. Test fit dry pipe and fittings before applying cement. Pipe should enter socket without forcing at least one -third but not more than two -thirds the depth of socket. Fittings that are looser or tighter shall not be used. b. Thoroughly clean and dry the pipe end and socket of fittings prior to application of solvent.
c. Before applying cement, apply primer evenly to outside surface and end of pipe and inside surface of socket.
d. Apply cement evenly to outside surface and end of pipe and inside surface of socket. Avoid excess application of cement but insure complete coverage of all bonding surfaces.
e. Mark depth of socket on pipe to guide application of cement and insure full insertion of pipe.
f. Insert pipe in socket, twisting pipe or fitting approximately 1/2 turn as pipe is being seated in socket. Make sure pipe is fully seated providing a bond between end of pipe and shoulder of socket.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 128 of 157 ends

g. Immediately wipe excess cement from pipe leaving no more than a 1/8 inch fillet at fitting end. Hold assembled joint in place for approximately 15 seconds and allow to set for 30 minutes before moving. Avoid rough handling for 48 hours. Longer periods may be required in cold or wet weather.

D. Mechanical Joints

1. Cut off and remove bevel end of pipe before installing in mechanical joint.

E. Bends, Tees, and Reducers

1. Ductile-iron and/or PVC fittings shall be installed utilizing standard installation procedures.

2. Cable, rope, or other devices used for lowering fittings into trench shall be attached around the exterior of fitting for handling. Under no circumstances shall the cable, rope or other device be attached through the fitting's interior for handling.

3.04 Compaction of Pipe Bedding and Backfill
A. Compaction of pipe bedding and backfill material shall conform to the requirements of Section 02315 – Earthwork.

** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 129 of 157 ends

SECTION 15066

FUSIBLE POLYVINYL CHLORIDE PIPE FOR INSTALLATION BY PIPE BURSTING PART 1 – GENERAL

1.01 DESCRIPTION
A. Scope of Work

1. This section specifies fusible polyvinyl chloride (PVC) pipe, including standards for dimensionality, testing, quality, acceptable fusion practice, safe handling, storage and installation of the pipe by pipe bursting.

B. Pipe Description

1. Pipe Supplier shall furnish fusible polyvinyl chloride (PVC) pipe conforming to all identified standards and meeting all testing and material properties called out in this specification.

2. Pipe shall conform to the following table of nominal size(s), dimensions, and pressure designation(s):

Pipe Description
& Reference Standard
Nominal Diameter (in.) &
Convention (e.g., CIOD,
IPS, or other)
Dimension
Ratio (DR)
Pressure
Class or
Rating (psi)
Required
Inside
Diameter (in.)

1.02 QUALITY ASSURANCE
A. References:

1. This section contains references to the following documents. They are a part of this section as specified and modified. In the event of a conflict between the requirements of this section and those of the listed documents, the requirements of this section shall prevail.

2. Unless otherwise specified, references to documents shall mean the documents in effect at the time of design.

B. Manufacturer Requirements

1. All piping shall be made from PVC compound conforming to cell classification 12454 per ASTM D1784.

C. Fusion Technician Requirement

1. Fusion Technician shall be fully qualified by the pipe supplier to install fusible polyvinyl chloride (PVC) pipe of the type(s) and size(s) being used. Qualification shall be current as of the actual date of fusion performance on the project.

D. Specified Fusion Process and Pipe Suppliers

1. The pipe fusion joining process shall be that of Underground Solutions, Inc., Poway,

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 130 of 157 ends

CA, Patent No. 6,982,051.

2. The pipe manufacturers shall be fully experienced, reputable, and qualified in the manufacture of fusible polyvinyl chloride (PVC) products for Underground Solutions, Inc., Poway, CA, (858) 679-9551. Fusible polyvinyl chloride (PVC) pipe marking shall include either Fusible PVC®, Fusible C-900®, or FPVC®.

E. Warranty

1. The pipe shall be warranted for one year per the pipe supplier’s standard terms.

2. In addition to the standard pipe warranty, the fusion services shall be warranted for one year per the fusion service provider’s standard terms.

F. Pre-Construction Submittals

1. The following product data is required from the pipe supplier and fusion provider:
a. Pipe Size
b. Dimensions
c. Pressure Class or Pressure Rating per applicable standard d. Color
e. Recommended Minimum Bending Radius
f. Recommended Maximum Safe Pull Force
g. Fusion technician qualification indicating conformance with this specification.

2. The following work plan and information is required from the contractor and/or pipe bursting subcontractor. This work plan and information shall also be supplied to the pipe supplier, upon request:
a. Pipe bursting equipment information and certification indicating the applicability of equipment, operator, and methods commensurate with the size and scope of the project, including any proposed lubricants to be used in the operation. b. Contingency plan, that considers the following:
i. Unforeseen obstructions that stop or delay the operation ii. Unforeseen deflections that would over bend the fusible polyvinyl chloride (PVC) pipe
iii. Excessive surface heaving or subsidence,
iv. Damage to existing utility installations and
v. Required spot repairs of the existing line.

3. Shop drawings shall include, for each pipe bursting operation, all excavation locations, adjacent utilities, excavation dimensions, flow bypass and traffic control schematics.

4. Work schedule identifying construction sequencing, daily work hours and working dates for each installation.

G. Post-Construction Submittals

1. The contractor and fusion provider shall present the following information to the owner or pipe supplier upon request:

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 131 of 157 ends

a. The joint fusion datalogger reports.
b. Fusion joint documentation containing the following information:
i. Pipe size (Diameter) and Thickness
ii. Fusion Machine Make, Model and Serial Number
iii. Fusion Technician Identification and Qualification Level iv. Job Identification (Name, Location and/or Project Number) v. Fusion Joint Number
vi. Fusion, Heating, and Drag Pressure Settings
vii. Heat Plate Temperature
viii. Time Stamp
ix. Fusion Heating Time and Cool Down Time
x. Ambient Temperature and Weather Conditions
PART 2 – PRODUCTS

2.01 FUSIBLE POLYVINYL CHLORIDE (PVC) PIPE
A. Fusible polyvinyl chloride (PVC) pipe shall conform to AWWA C900, ASTM D2241, ASTM D1785, ASTM D3034 (non-pressure), or ASTM D679 (non-pressure), as specified in the project contract documents. Pipe QA/QC testing shall be in accordance with the test methods provided or referenced in the specified pipe standard.

B. Fusible polyvinylchloride (PVC) pipe shall be extruded with plain ends. The ends shall be square to the pipe and free of any bevel or chamfer. There shall be no bell or gasket of any kind incorporated into the pipe unless specified for connections with appurtenances or for connections at the pipe burst termination locations.

C. Fusible polyvinylchloride (PVC) pipe shall be manufactured in a standard 40’ or 45’ nominal length, or specified custom lengths.

D. Marking on the pipe exterior shall include:

1. Pipe size (nominal diameter)

2. PVC

3. Dimension Ratio (DR) or Standard Dimension Ratio (SDR) or Schedule (SCH)

4. Pressure Class (PC) or Pressure Rating (PR) for pressure pipe applications

5. Pipe stiffness (PS) may be required for non-pressure pipe applications

6. AWWA or ASTM standard designation

7. NSF-61-G mark verifying suitability, when required for potable water applications

8. Extrusion production-record code

9. Trademark or trade name

10. Cell Classification 12454 or PVC material designation code 1120

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 132 of 157 ends

11. If color coding is required, the pipe exterior shall be the required color or include exterior stripes of the required color.

2.02 FUSION JOINT ASSEMBLY
A. Unless otherwise specified, fusible polyvinyl chloride (PVC) pipe shall be assembled via thermal butt-fusion in the field. The Contractor shall follow the pipe supplier’s written guidelines and comply with Sections 1.02 C and 1.02 D1 of this specification.

2.03 DUCTILE IRON MECHANICAL AND FLANGED FITTINGS
A. Acceptable fittings for use with fusible polyvinyl chloride (PVC) pipe shall include standard ductile iron fittings conforming to AWWA/ANSI C110/A21.10, or AWWA/ANSI C153/A21.53 and AWWA/ANSI C111/A21.11.

B. Connections to fusible polyvinyl chloride (PVC) pipe may be made using a restrained or non- restrained retainer gland product for PVC pipe, as well as for MJ or flanged fittings C. Ductile iron fittings and glands must be installed per the manufacturer’s guidelines.

2.04 PVC GASKETED, PUSH-ON FITTINGS
A. PVC pressure fittings for use with fusible polyvinyl chloride pipe shall conform to AWWA C900 or C907. PVC non-pressure fittings for use with fusible polyvinyl chloride (PVC) pipe shall conform to ASTM D3034, F679 or F1336.

B. PVC fittings for joining fusible polyvinyl chloride (PVC) pipe to other sections of fused or gasket-joint PVC pipe shall include gasketed, push-on type couplings and fittings, including bends, tees, and couplings as shown in the drawings.

C. Bends, tees and other PVC fittings shall be restrained with the use of thrust blocking or other restraint products as indicated in the project contract documents.

D. PVC gasketed, push-on fittings and mechanical restraints, if used, must be installed per the manufacturer’s guidelines.

2.05 FUSIBLE POLYVINYL CHLORIDE PIPE SWEEPS OR BENDS
A. Fusible polyvinyl chloride (PVC) pipe sweeps or bends shall conform to the same sizing convention, diameter, dimensional tolerances, and pressure class of the pipe being joined using the sweep or bend.

B. Fusible polyvinyl chloride (PVC) pipe sweeps or bends shall be manufactured from the same fusible polyvinyl chloride pipe being used for the installation, and shall have at least 2 feet of straight section on either end of the sweep or bend to allow for fusion of the sweep to the pipe installation.

C. Standard fusible polyvinyl chloride pipe sweep or bend angles shall not be greater than 22.5 degrees and shall only be allowed for nominal diameters ranging from 4-inch through 16-inch.

2.06 SLEEVE-TYPE COUPLINGS
A. Sleeve-type, mechanical couplings shall be manufactured for use with PVC pipe and may be restrained or unrestrained as indicated in the project contract documents.

B. Sleeve-type couplings shall be rated at the same, or greater, pressure as the pipe.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 133 of 157 ends

2.07 EXPANSION AND FLEXIBLE COUPLINGS
A. Only expansion-type mechanical couplings manufactured for use with PVC pipe shall be permitted and may be restrained or unrestrained as indicated in the project contract documents.

B. Expansion-type mechanical couplings shall be rated at the same, or greater, pressure as the pipe.

2.08 CONNECTION HARDWARE
A. Unless otherwise specified, bolts and nuts for buried service shall be made of non-corrosive, high-strength, low-alloy steel having the characteristics specified in ANSI/AWWA C111/A21.11, regardless of any other protective coating.

2.09 PIPE BURSTING SYSTEM EQUIPMENT
A. General

1. The pipe bursting system shall be designed and manufactured to force its way through the existing line. As the bursting unit progresses, the existing pipe is split or fractured and pushed out into the surrounding soil. The bursting system shall generate enough force to break open and push the existing pipeline out of the alignment so insertion of the fusible polyvinyl chloride (PVC) pipe will be unobstructed.

B. Pipe Bursting Systems

1. Only Use Static Pipe Bursting
a. Fusible polyvinyl chloride (PVC) pipe burst installations shall only be conducted using static (hydraulic) pipe bursting system. Static pipe bursting systems are those in which a force is applied, using steel pulling rod assemblies, to a blunt- nosed head or tapered head (expander) that is pulled through the existing pipeline. The expander head transfers the pulling force into a radial force (hoop stress) that breaks open the existing pipe as it is pulled through. External blades or cutting wheel assemblies can be mounted on the expander head to enable bursting of fracture resistant pipes. When specified, additional expansion is accomplished by placing a larger expansion head behind the lead expansion head to fully accommodate the replacement pipe diameter. Under no circumstances shall the pipe pull head, which is attached directly to the fusible polyvinyl chloride (PVC) pipe, be used to expand or otherwise increase the diameter of the host pipe, or fragmented host pipe.

2. Pneumatic / Percussive Bursting Systems Are Strictly Prohibited. a. Pneumatic/percussive bursting systems shall not be permitted for pipe burst installations of fusible polyvinyl chloride (PVC) pipe. Pneumatic pipe bursting systems are those in which percussive force is applied by a pneumatically driven reciprocating hammer that fractures the existing pipe.

3. Bursting Lubricants
a. Pipe bursting lubricants shall be used at the request of the pipe bursting contractor and at the discretion of the Owner and Engineer. Lubricants shall be compatible for long term use with PVC pipe.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 134 of 157 ends

2.10 PIPE PULL HEAD
A. Pipe pull heads shall be utilized that employ a positive through-bolt design that provides a smooth exterior wall circumference.

B. Pipe pull heads shall be specifically designed for use with fusible polyvinyl chloride (PVC) pipe and shall be as recommended by the pipe supplier.

2.11 PIPE ROLLERS
A. Pipe rollers, if required, shall be of sufficient size to fully support the weight of the pipe during handling and pullback operations.

B. To assure adequate support and resist excessive sagging of the pipe, the quantity and spacing of pipe rollers shall be per the pipe supplier’s guidelines.

PART 3 –EXECUTION

3.01 DELIVERY AND OFF-LOADING
A. All pipe shall be bundled or packaged in such a manner as to provide adequate protection of the ends during transportation to the site. Any pipe damaged in shipment shall be replaced as directed by the owner or engineer.

B. Each pipe shipment should be inspected prior to unloading to see if the load has shifted or otherwise been damaged. Notify owner or engineer immediately if more than immaterial damage is found. Each pipe shipment should be checked for quantity and proper pipe size, color, and type.

C. Pipe should be loaded, off-loaded, and otherwise handled in accordance with AWWA M23, and all the pipe supplier’s guidelines shall be followed.

D. Off-loading devices such as chains, wire rope, chokers, or other pipe handling implements that may scratch, nick, cut, or gouge the pipe are strictly prohibited.

E. During removal and handling, be sure that the pipe does not strike anything. Significant impact could cause damage, particularly during cold weather.

F. If appropriate unloading equipment is not available, pipe may be unloaded by removing individual pieces. Care should be taken to ensure that pipe is not dropped or damaged. Pipe should be carefully lowered, not dropped, from trucks.

3.02 PIPE STORAGE AND HANDLING
A. Any length of pipe showing a crack or which has received a blow that may have caused an incident fracture, even though no such fracture can be seen, shall be marked as rejected and removed at once from the work. Damaged areas, or possible areas of damage may be removed by cutting out and removing the suspected incident fracture area. Limits of the acceptable length of pipe shall be determined by the owner or engineer.

B. Any damage, scratch or gouge that is deeper than 10% of the wall thickness shall be significant and is basis for rejection unless determined acceptable by the owner or engineer. Significantly damaged pipe sections shall be rejected or cut out. Cutting shall be performed according to the pipe supplier’s recommendations. Pipe rejoining shall be per the construction documents and the pipe supplier’s guidelines.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 135 of 157 ends

C. Pipe lengths should be stored and placed on level ground. Pipe should be stored at the job site in the unit packaging provided by the manufacturer. Caution shall be exercised to avoid compression, damage, or deformation to the ends of the pipe. The interior of the pipe, as well as all end surfaces, should be kept free from dirt and foreign matter.

D. Pipe shall be handled and supported with the use of woven fiber pipe slings or approved equal.

Care shall be exercised when handling the pipe to not cut, gouge, scratch or otherwise abrade the piping in any way.

E. If pipe is to be stored for a period in excess of 1 year, the pipe should be shaded or otherwise shielded from direct sunlight. If pipe is shielded with a cover, adequate air circulation above and around the pipe shall be provided to prevent excess heat from accumulating.

F. Pipe shall be stored and stacked per the pipe supplier’s guidelines.

G. The fusible polyvinyl chloride (PVC) pipe shall be handled with care to minimize the possibility of it being cut, kinked, gouged, or otherwise damaged. The use of cables or hooks in direct contact with the pipe shall not be permitted.

3.03 FUSION PROCESS
A. General Requirements

1. Fusible polyvinyl chloride (PVC) pipe shall be handled in a safe and non-destructive manner before, during, and after the fusion process and in accordance with this specification and pipe supplier’s guidelines.

2. Fusible polyvinylchloride pipe will be fused by qualified fusion technicians, as documented by the pipe supplier.

3. Each fusion joint shall be recorded and logged by an electronic monitoring device (data logger) properly connected to the fusion machine.

4. Only appropriately sized and outfitted fusion machines that have been approved by the pipe supplier shall be used for the fusion process. Fusion machines must incorporate the following elements:
a. Heat Plate - Heat plates shall be in good condition with no deep gouges or scratches. Plates shall be clean and free of any debris or contamination.

Heater controls shall function properly. The cord and plug shall be in good condition. The appropriately sized heat plate shall be capable of maintaining a uniform and consistent heat profile and temperature for the size of pipe being fused, per the pipe supplier’s guidelines.
b. Carriage – The carriage shall travel smoothly with no binding at less than 50 psi.

Jaws shall be in good condition with proper inserts for the pipe size being fused.

Insert pins shall be installed with no interference to carriage travel. c. Fusion Machine Overview - The entire fusion machine shall be examined for defects, missing parts, or potential safety issues. All issues shall be rectified prior to use.
d. Data Logging Device – An approved datalogging device with the current version of the pipe supplier’s recommended and compatible software shall be used. The operations and maintenance manual shall be kept with the datalogging device at all times. If fusing for extended periods of time, an independent 110V power source shall be available to extend battery life.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 136 of 157 ends

5. Other equipment specifically required for the fusion process shall include the following:
a. Pipe rollers shall be used to adequately support the pipe on both sides of the machine
b. A weather protection canopy or like protection that allows full machine motion of the heat plate, fusion assembly and carriage shall be provided for fusion in inclement, extreme temperatures, and /or windy weather conditions, per the pipe supplier’s recommendations. When the pipe temperature is below 40°F, the pipe supplier’s cold weather operating procedures shall be followed. c. An infrared (IR) pyrometer with an accuracy of ±1% or better, shall be used to check pipe and heat plate temperatures.
d. The fusion machine operations and maintenance manual shall always be kept with the fusion machine.
e. Facing blades specifically designed for use on fusible polyvinyl chloride (PVC) pipe shall be used.

B. Fusion Joint Report Requirements

1. Each fusion joint shall be recorded and logged by an electronic monitoring device (data logger) connected to the fusion machine. The fusion data logging and joint report shall be generated by software developed specifically for the butt-fusion of fusible polyvinyl chloride pipe. The software shall register and/or record the parameters required by the pipe supplier and these specifications. Pertinent data not logged by the data logger shall be logged manually and be included in the Fusion Technician’s report.

BURSTING OPERATIONS AND PIPE INSTALLATION
A. Location and Protection of Underground Utilities

1. Correct location of all underground utilities that could be impacted by the pipe bursting and polyvinyl chloride (PVC) pipe installation shall be the responsibility of the Contractor.

2. Utility location and notification services shall be contacted by the Contractor prior to the start of construction.

3. All existing lines and underground utilities shall be positively identified, including exposing those facilities that are located within an envelope of possible impact during the bursting operation, as determined for the project specific site conditions. It is the Contractor and pipe burst system operator’s responsibility to determine the safe offset distance from existing utilities. This determination shall include, but is not limited to, soil conditions and layering, utility type and material, pipe bursting technique and equipment, and foreign subsurface objects/materials.

B. Access Pits

1. Access pit excavations shall be performed at all points where the fusible polyvinyl chloride (PVC) pipe will be inserted into the existing pipeline. When possible, access pit excavations shall coincide with host pipe lateral connection points or other appurtenance installations.

2. Access pit length shall be such that the minimum bending radius for the fusible polyvinyl chloride (PVC) pipe, per the pipe supplier, is maintained. Sheeting, shoring and bracing requirements shall be in accordance with these specifications and applicable

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 137 of 157 ends

jurisdictional standards.

C. Pipe Bursting Operation

1. The fusible polyvinyl chloride (PVC) pipe may be continuously or partially supported on rollers or other Owner and Engineer approved friction reducing devices during joining and insertion. The pipe shall not be over-stressed or critically abraded prior to or during installation.

2. The new fusible polyvinyl chloride (PVC) pipe shall follow behind the bursting head in accordance with the pipe supplier’s recommended procedures. The bursting equipment shall be specifically designed and manufactured for the type of insertion process being used.

3. Immediately following the completion of a pipe bursting installation, if practicable, the pipe should be pushed back into the alignment, at the pulling head, until a small amount of movement is detected at the insertion pit side of the installation.

3.04 INSTALLATION ACCEPTANCE AND CLEANUP
A. The first several feet of fusible polyvinyl chloride (PVC) pipe that is pulled into the receiving pit behind the pull head shall be inspected for damage. Depending on the degree of gouging, abrading or damage witnessed; the pipe may be accepted, de-rated, reinstalled, or abandoned as unusable per the contract documents.

B. Following the installation, the project site shall be returned to a condition resembling or better than the pre-construction condition of the site per applicable jurisdictional standards.

C. The Contractor shall verify that all utilities, structures, and sub-surface features within the possible impact envelope of the bursting operation, as determined for the project specific site conditions, are sound.

3.05 PREPARATIONS PRIOR TO MAKING CONNECTIONS INTO EXISTING PIPING

SYSTEMS
A. Approximate locations for existing piping systems are shown in the construction documents.

Prior to making connections into existing piping systems, the contractor shall:

1. Field verify location, size, piping material, and utility/purpose of the existing pipe.

2. Obtain all required fittings, which may include saddles, sleeve type couplings, flanges, tees, or others as shown in the construction documents.

3. Field verify that all temporary pumps and/or pipes have been installed and are operational in accordance with established connection plans.

B. Unless otherwise approved, the new fusible polyvinyl chloride (PVC) pipeline shall be completely assembled and successfully tested prior to making connections into existing pipe systems.

3.06 PIPE SYSTEM CONNECTIONS
A. Pipe connections shall be installed per applicable standards and regulations, as well as per the connection manufacturer’s guidelines and as indicated in the construction documents. Pipe connections to structures shall be installed per applicable standards and regulations, as well as per the connection manufacturer’s guidelines.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 138 of 157 ends

3.07 TAPPING FOR POTABLE AND NON-POTABLE WATER APPLICATIONS A. Tapping shall be performed using standard tapping saddles designed for use on PVC piping in accordance with AWWA C605. Tapping shall be performed only with use of tapping saddles or sleeves. DIRECT TAPPING SHALL NOT BE PERMITTED. Tapping shall be performed in accordance with the applicable sections for Saddle Tapping per UNI-PUB-8-20 and UGSI Product & Installation Guide for Tapping.

B. All connections requiring a larger diameter than that recommended by the pipe supplier, shall be made with a pipe connection as specified and indicated on the project contract drawings.

C. Equipment used for tapping shall be made specifically for tapping PVC pipe. Tapping bits shall be slotted “shell” style cutters, specifically made for PVC pipe. ‘Hole saws’ made for cutting wood, steel, ductile iron, or other materials are strictly prohibited.

D. Manually operated or power operated drilling machines may be used.

E. Taps may be performed while the PVC pipeline is filled with water and under pressure (‘wet’ tap), or when the pipeline is not filled with water and not under pressure (‘dry’ tap).

3.08 HYDROSTATIC TESTING AND LEAKAGE TESTING FOR FUSIBLE POLYVINYL

CHLORIDE (PVC) PRESSURE PIPING
A. Prior to pressure testing the following preparations shall be completed:

1. All air must be vented from the pipeline prior to pressurization. This may be accomplished with the use of the air relief valves or corporation stop valves, vent piping in the testing hardware or end caps, or any other method which adequately allows air to escape the pipeline at all high points. Venting may also be accomplished by ‘flushing’ the pipeline in accordance with the parameters and procedures as described in AWWA C605.

2. The pipeline must be fully restrained prior to pressurization. This includes complete installation of approved mechanical restraints per the restraint manufacturer’s guidelines, whether permanent or temporary to the final installation. This also includes the installation and curing of any and all required thrust blocking. All appurtenances included in the pressure test, including valves, blow-offs, and air-relief valves shall be checked for proper installation and restraint prior to beginning the test.

3. Temporary pipeline alignments that are being tested, such as those that are partially installed in their permanent location shall be configured to minimize the amount of potentially trapped air in the pipeline.

B. Hydrostatic pressure and leakage testing shall be conducted according to and comply with AWWA C605, unless otherwise required in the project contract documents.

C. Leakage testing shall comply with all applicable local, State and national codes, statutes, standards, regulations, and laws.

3.09 LEAKAGE TESTING FOR FUSIBLE POLYVINYL CHLORIDE (PVC) NON-

PRESSURE PIPING
A. Gravity sanitary sewer lines, that contain mechanical joints in addition to fused PVC joints, may need to be tested for infiltration/exfiltration leakage by means of appropriate water or low- pressure air testing methods. If tested, the leakage outward or inward (exfiltration or infiltration) shall not exceed 25 gallons per inch of pipe diameter per mile per day for any section of the system. Water exfiltration or infiltration test shall be performed with a minimum positive head of

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 139 of 157 ends

two feet. The air test, when used, shall be conducted in accordance with either ASTM F1417 or UNI-B-6.

3.10 DISINFECTION OF POTABLE WATER PIPING
A. Chlorine granules shall not be used or present near the pipe ends while the pipe sections are being joined.

B. After installation and successfully passing all required testing, the fusible polyvinyl chloride (PVC) pipeline shall be disinfected prior to being put into service. Unless otherwise directed by the owner or engineer, the pipeline will be disinfected per AWWA C651.

3.11 INTERMEDIATE TESTING
Short lengths or segments of the pipe may be tested separately in accordance with standard testing procedures and safety practices, as approved by the owner and engineer.

**END OF SECTION**

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 140 of 157 ends

SECTION 15100

VALVES & MISCELLANEOUS COMPONENTS
PART 1 - GENERAL

1.01 Summary
A. This Section includes valves and miscellaneous components.

B. All components which contact the water shall be ANSI/NSF -61 certified by an approved ANSI/NSF tester for use in drinking water systems.

1.02 Submittals
A. Annotated Product Bulletins for all valves, miscellaneous components, and accessories utilized.

B. Installation, operating and maintenance manuals for all valves, miscellaneous components, and accessories utilized.

1.03 Delivery, Storage, and Handling
A. All valves and miscellaneous items shall be packed, shipped, stored and handled in accordance with manufacturer recommendations.

1.04 Manual Operators
A. All valves, except check valves and air/vacuum valves, shall be provided with manual operators unless otherwise specified.

1. The operator shall be either levers or handwheels opened in the counterclockwise direction, unless otherwise indicated.

2. Each valve body shall have cast thereon the word OPEN and an arrow indicating the direction to open.

3. Valves mounted higher than 6 feet above floor or operating level shall have chain operators.

4. Unless otherwise indicated, valves of sizes 4-inch and larger shall have gear assisted operators.

1.05 Buried Valves
A. Where buried, valves shall have extensions with square nuts.

1. Extended wrench nuts shall be provided so that the nut shall be within 40 inches of the cover.

2. Wrench nuts shall comply with Section 19 of AWWA C500.

3. A minimum of one operating key per every ten valves, but no less than two keys, shall be provided.

4. Provide valve boxes for all buried valves.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 141 of 157 ends

1.06 Warranty
A. Provide manufacturer’s written warranty, issued in the Owner’s name, to cover the equipment supplied against defects in workmanship and material for a period of one (1) year from the date of acceptance under normal use and service. Warranty shall include all materials and labor required.

PART 2 - PRODUCTS

2.01 Miscellaneous Valves and Components
A. Air Valves – See Specification 15110
B. Gate Valves 4” to 12”

1. Flanged Ductile Iron Body

2. Resilient Seat

3. Non-rising stem

4. Fusion epoxy lined and coated per AWWA C515

5. Manually operated

6. ANSI/NSF-61 certified by an approved ANSI/NSF tester for use in drinking water systems

7. Acceptable Manufacturers:
a. Mueller: A2360
b. AFC: AFC2500
c. Clow: F6100
C. PVC Sample Line Tubing

1. Tubing to be compatible with chlorine gas dissolved in water.

2. Provide clear nylon reinforced PVC tubing with fittings and appurtenances as shown on Drawings.

3. Tubing shall be manufactured with working temperatures from 5 to 180°F.

4. Design tubing with a minimum safety factor of 4 to 1 ratio of burst pressure to working pressure at maximum temperature. Provide tubing with working pressure of 75 PSI at 180°F.

5. Ensure that tubing is self-extinguishing and fire resistant.

6. Fittings: Install tubing with nylon fittings and connectors. Use barbed type adapters with stainless steel clamps. Provide fittings capable of withstanding temperatures from 0°F to 200°F. Ensure fittings have the same pressure and temperature rating as the tubing.

D. Valve Boxes:

1. Provide 9” inside diameter precast, traffic rated, type G5 valve boxes with bolt down cast iron covers by Christy Concrete Products, Jensen Precast, or approved equal

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 142 of 157 ends

2. Valve boxes outside of street or traffic locations shall be installed with a 12 - inch wide by 6-inch deep concrete collar with a #4 rebar reinforcing ring.

3. All valve box lids shall be marked Sewer, Reclaimed Water or Potable Water to match service.

4. Operator nut shall be within 30-inches of final surface grade.

5. All gate valves shall be centered in a one -piece riser stock with the use of a riser aligner or approved equal.

PART 3 - EXECUTION

3.01 Installation
A. General:

1. Valves shall be installed in accordance with the manufacturer's instructions.

2. Above ground valves shall be independently supported to prevent stress on pipe.

B. Access:

1. Valves shall be installed to provide easy access for operation, removal and maintenance and to prevent interferences between the valve operators and structural members or other obstructions.

** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 143 of 157 ends

SECTION 15110

AIR AND VACUUM VALVE ASSEMBLIES

PART 1 - GENERAL

1.01 Scope
A. This specification governs materials and installation for air release, air and vacuum, or combination air-vacuum and air release valve assemblies. The type of air valve to be installed shall be as indicated on the plans and in accordance with Standards.

Valve assemblies include all items from the main pipeline to the valve vent as shown on the Design Drawings.

1.02 Submittals
A. Prior to the purchase of valves to be used in the City system, the following items shall be submitted and approved:

B. Manufacturer's catalog data showing valve type and size to be used, valve dimensions, pressure rating and materials of construction.

C. Manufacturer's catalog data showing above ground enclosure to be used, and materials for anchoring enclosure.

PART 2 - MATERIALS

2.01 Valves
A. Acceptable manufacturers

1. Air Release Valves
a. APCO 200A
b. or approved equal

2. Combination Air Valves
a. APCO 143C or 145C, depending on size
b. Or approved equal
B. Valve bodies shall be of high strength ductile iron. The float, seal, and all moving parts shall be constructed of 316 stainless steel. Seat washers and gaskets shall be of Buna-N, Nitrile Rubber.

C. Valve operating pressures are 40 to 80 psi unless otherwise shown.

D. Valves shall be designed to perform the following functions:

1. Air Release Valves - Air release valves shall be designed to:
a. Release small amounts of air that can accumulate at high points in systems once they are filled and under pressure
b. Expel large amounts of air from the system when it is being filled.

2. Vacuum Breaker Valves - Vacuum valves shall be designed to:
a. Remain closed when the system is in operation and under pressure

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 144 of 157 ends

b. Open to allow air to enter when the line begins to drain and the internal pressure reverts to atmosphere.

3. Combination Valves - These valves combine the features of air release and vacuum valves.

2.02 Appurtenances
A. Air and Vacuum valve assembly include ARV line materials and fittings include pipe, service saddles, fittings, enclosure, corporation stops, ARV or CAV. Materials shall comply with the City Standards.

1. Pipe material between the mainline and the ARV shall be threaded brass.

2. Valves shall be in accordance with the size and type as specified on the plans.

B. Valve vent pipe shall include stainless mesh air vent cap screen

1. Christy’s FPT - #10 or approved equal
PART 3 - EXECUTION

3.01 Installation
A. Threaded joints shall be cleaned by wire brushing or swabbing. Teflon joint compound or Teflon tape shall be applied to pipe threads before installing threaded valves.

Joints shall be watertight.

B. Joint Isolation

1. Dielectric connections with PVC tape wrap shall be provided at all connections between steel or iron and brass or bronze.

2. Copper, brass, and other nonferrous metal pipe shall be isolated from steel or cast iron by insulated couplings or unions
C. The Contractor shall also isolate nonferrous pipe from steel supports and pipe straps by means of insulating sleeves or tape wrapping around the pipe.

3.02 ARV Piping
A. The piping and fittings shall be stored in a way that prevents damage to the pipe and the coating due to crushing or piercing, excessive heat, harmful chemicals, or exposure for prolonged periods.

B. Material shall be stored and installed in accordance with manufactures recommendation.

3.03 Testing
A. Air valve assemblies shall be tested at the same time that the connecting pipelines are pressure tested.

** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 145 of 157 ends

SECTION 4 – ITEMS OF THE PROPOSAL
The items described below correspond to the items on the bid schedule. It is understood that the Contractor shall furnish all labor, equipment, material, tools, parts and other items necessary to complete the work as described in the Plans and these Special Provisions.

ITEM 1: Pre-Mobilization Site Video
A. Description
This item shall include the creation of a video that documents above ground site conditions before the Contractor mobilizes. See Section 2.1 , “ Pre-Mobilization Site Video ”, of the Technical Specifications.

B. Measurement and Payment
Pre-Mobilization Site Video shall be measured and paid on a lump sum basis. Measurement shall be based on the percentage of work completed as determined by the City. Payment shall include full compensation for furnishing all supervision, labor, materials, tools and equipment necessary to complete this item, including transportation.

ITEM 2: Mobilization, Site Setup, Demobilization, and Site Cleanup A. Description
This item shall include the mobilization, demobilization, establishment of storage and staging areas, all materials, tools, equipment, labor, supervision and other items necessary to facilitate mobilization to the site and demobilization from the site. Other aspects of this item include:1) preparation of the site for performance of the project work, 2) providing site security, 3) providing a portable toilet and sanitation facilities, 4) per diem, and 5) other costs that may not be shown as line items on the bid schedule. See Section 2.2, “Mobilization, Site Setup, Demobilization, and Site Clean-up”, of the Technical Specifications.

B. Measurement and Payment
Mobilization, Demobilization and Site Setup shall be measured and paid on a lump sum basis.

The value of this item shall not exceed five percent of the total value bid for the project.

Measurement shall be based on the percentage of work completed as determined by the City. Payment shall include full compensation for furnishing all supervision, labor, materials, tools and equipment necessary to complete this item, including transportation.

ITEM 3: Traffic Control
A. Description
This item shall include traffic control measures which encompasses all furnished labor, materials, equipment, tools, and services necessary to provide access to the motoring and pedestrian public; and adequately safeguard the workers and public from construction hazards. See Section 1.29 “Maintenance of Traffic, Public Safety, and Convenience” and Section 01550 Traffic Control of the Technical Specifications.

B. Measurement and Payment

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 146 of 157 ends

Traffic control shall be measured and paid on a lump sum basis. Payment shall include full compensation for furnishing all supervision, labor, materials, tools and equipment necessary to complete this item, including transportation.

ITEM 4: Sheeting, Shoring, and Bracing
A. Description
This item shall consist of furnishing and installing all trench shoring, sheeting, and bracing associated with this project in accordance with the requirements of the City Standard Specifications and Section 02250.
.

B. Measurement and Payment
Payment for trench shoring, sheeting, and bracing shall be at the contract lump sum price bid for furnishing and installing trench sheeting, shoring, and bracing and shall include full compensation for furnishing all labor, materials, tools and equipment, and for performing all work necessary to complete this item in place.

ITEM 5: Stormwater Protection
A. Description
This item shall include all labor, materials, tools, equipment, parts, and other items necessary to provide and implement appropriate erosion control and stormwater pollution prevention best management practices (BMPs) at all well sites. BMPs for stormwater pollution prevention include but are not limited to providing methods of material handling and spill prevention, waste disposal, drain inlet protection measures, and final stabilization at well sites. Contractor shall prevent sediment and construction debris from entering the stormwater conveyance system in accordance with Chapter 13.16 of the Sacramento City Code and Section 16-3 of the Standard Specifications.

B. Measurement and Payment
Stormwater protection shall be measured and paid on a lump sum per well site basis.

Measurement shall be based on the amount of work completed as determined by the City.

Payment shall include full compensation for furnishing all materials, tools, equipment, labor, parts and other items necessary for stormwater pollution prevention in accordance with the Plans, Standard Specifications, and these Special Provisions.

ITEM 6: 8-Inch Water Main to Furnish and Install by Open Cut Construction A. Description
This item shall consist of furnishing and placing water main pipe, fire hydrant leads, elbows and fittings at the locations, to the alignments and to the details shown on the Plans.

This item shall also include furnishing and installing elbows to change the horizontal and vertical alignment of the proposed water main to avoid conflicts with existing underground utilities or to maintain proper depth of bury through vertical curves.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 147 of 157 ends

The water main pipe material shall be polyvinyl chloride (PVC) C900 in conformance with CSSS Section 10-26 and per Plans. Materials and placement shall meet the applicable requirements of Sections 10, 27, and 38 of the City Standard Specifications and Section 15060 and Section 15064 of the Technical Specifications.

All pipes shall be installed per State Water Resources Control Board requirements, specified elsewhere in these Special Provisions.

Surface restoration associated with this item shall be performed as specified elsewhere in these Special Provisions and paid for under this item. The Contractor shall restore surfaces in kind unless otherwise specified on the Plans or in these Special Provisions. Pavement cutting and restoration shall conform to the provisions of the City Standard Specifications and these Special Provisions. Striping and speed bump replacement, concrete, landscaping, asphaltic concrete, or any other material replacement encountered, shall be included in this item.

B. Measurement and Payment
Payment shall be at the contract unit price bid per linear foot of water main furnished and installed and shall include full compensation for furnishing all labor, materials, tools and equipment, and for performing all work necessary to complete this item in place.

ITEM 7: Replace 6-Inch Water Main with 8-Inch Water Main by Pipe Bursting Construction Description
This item shall consist of pipe bursting water main pipe, at the locations, to the alignments and to the details shown on the Plans. The water pipe material shall be fusible polyvinyl chloride (FPVC) and shall meet the applicable requirements of Section 15066 of the Technical Specifications.

Surface restoration associated with this item shall be performed as specified elsewhere in these Special Provisions and paid for under this item. The Contractor shall restore surfaces in kind unless otherwise specified on the Plans or in these Special Provisions. Pavement cutting and restoration shall conform to the provisions of the City Standard Specifications and these Special Provisions. Striping and speed bump replacement, concrete, landscaping, asphaltic concrete, or any other material replacement encountered, shall be included in this item.

A. Measurement and Payment
Payment shall be at the contract unit price bid per linear foot of water main furnished and installed and shall include full compensation for furnishing all labor, materials, tools and equipment, and for performing all work necessary to complete this item in place.

ITEM 8: Abandon 6-Inch Water Main and Remove Existing Valves, Tees, and Saddles A. Description

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 148 of 157 ends

This item shall consist of disconnecting existing taps and removing or abandoning existing valves, tees, saddles and water mains in place as indicated on the Plans or as directed by the Engineer in accordance with these Special Provisions.

At locations where a water main will be abandoned, the main shall be exposed a minimum of one working day prior to completing the work for Engineer’s final approval of cut location. All abandoned connections shall be removed such that no protrusions remain on the live main, and any sections removed from the live main shall be repaired. The method for a main to be abandoned shall be one of the following, depending on the material of the water main:

• Asbestos-cement, ductile iron, PVC, and cast iron pipe shall be plugged with two (2) feet of concrete.
• Steel pipe shall be abandoned by either welding 1/4 -inch thick steel plate on cut ends or plugging with two (2) feet of concrete.
• In the event that valve shutdown does not effect a positive shutdown, use of a restrained MJ cap to abandon pipe, rather than welding or plugging with concrete, will be subject to Engineer approval and shall continue to be paid under this item.

At locations where permanent caps will be installed on existing water mains, which are to remain live, the water main shall be exposed a minimum of one working day prior to capping for Engineer’s final approval of cut location. The method of capping the mains depends on the type of existing pipe:

• Asbestos-cement pipe shall be transition flex coupling, 3’ PVC pipe, and an MJ cap with a thrust block.
• Cast iron, ductile iron, and PVC pipe shall be capped by installing an MJ cap and a thrust block.
• Steel pipe shall be capped by welding on a ¼-inch thick steel plate and exposed metal shall be coated with epoxy.

Contractor shall coordinate timing and location of new connections and abandonments, to minimize the number of water main shutdowns necessary within the project.

Cut pipe, valves, tees, fittings and appurtenances to be removed as indicated on the Plans or as directed by the Engineer shall become the property of the Contractor and shall be disposed of at the Contractor's expense.

Removal of existing valves shall include removing all appurtenances associated with the valve including, but not limited to, risers, valve boxes and lids.

B. Measurement and Payment
Payment shall be at the contract unit price bid per linear foot of water main abandoned in place shall include full compensation for furnishing all labor, materials, tools and equipment, and for performing all work necessary to complete this item in place.

ITEM 9: Construct 8-Inch Gate Valves
A. Description
This item shall consist of furnishing and installing gate valves, including gate valve boxes

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 149 of 157 ends

and standpipes, at the locations indicated on the Plans and in conformance with the applicable requirements of Sections 10, 27, and 38 of the City Standard Specifications and these Special Provisions. This item shall include furnishing and installing gate valves on fire service transfers and standard hydrant leads.

Surface restoration associated with this item shall be performed as specified elsewhere in these Special Provisions and paid for under this item.

B. Measurement and Payment
Payment shall be at the contract unit price bid for each gate valve furnished and installed and shall include full compensation for furnishing all labor, materials, tools and equipment, and for performing all work necessary to complete this item in place.

ITEM 10: Construct 2-Inch ARV
A. Description
This item shall consist of furnishing and installing a two inch (2”) ARV at the locationsL indicated on the Plans or determined by the Engineer and shall be installed in accordance with Sections 10, 27, and 38 of the City Standard Specifications and as detailed in the Plans.

Surface restoration associated with this item shall be performed as specified elsewhere in these Special Provisions and paid for under this item.

B. Measurement and Payment
Payment shall be at the contract unit price for each 2-inch ARV furnished and installed and shall include full compensation for furnishing all labor, materials, tools and equipment, and for performing all work necessary to complete this item in place.

ITEM 11: Construct 4-Inch Blow-Off
A. Description
This item shall consist of furnishing and installing a four inch (4”) blow-off at the locations indicated on the Plans or determined by the Engineer and shall be installed in accordance with Standard Drawing W-301 and Sections 10, 27, and 38 of the City Standard Specifications and as detailed in the Plans.

Surface restoration associated with this item shall be performed as specified elsewhere in these Special Provisions and paid for under this item.

B. Measurement and Payment
Payment shall be at the contract unit price for each 4-inch blow-off valve furnished and installed and shall include full compensation for furnishing all labor, materials, tools and equipment, and for performing all work necessary to complete this item in place.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 150 of 157 ends

ITEM 12: Construct Fire Hydrant and Assembly
A. Description
This item shall consist of furnishing and installing a standard fire hydrant at the locations indicated on the Plans. The standard fire hydrant shall be installed in accordance with Standard Drawing W-201 and Sections 10, 27, and 38 of the City Standard Specifications.

The Contractor shall work with the City Engineer in finding a suitable location to install a fire hydrant. In addition, the Contractor shall place a blue stake at the proposed location. Door hangers, as shown in Appendix B, shall be placed on the homeowner’s door explaining the fire hydrant location and allowing the homeowner to call the Contractor with any issues regarding the proposed location. This work shall be done at least one week prior to installing the tee and gate valve on the new water main.

Surface restoration associated with this item shall be performed as specified elsewhere in these Special Provisions and paid for under this item.
6-inch standard fire hydrants, leads and valves shall be placed off 6-inch diameter water mains. 8-inch standard fire hydrants, leads and valves shall be placed off 8-inch and larger diameter water mains. The fire hydrant lead and valve shall be installed and paid for under separate items.

B. Measurement and Payment
Payment shall be at the contract unit price bid for each standard fire hydrant furnished and installed and shall include full compensation for furnishing all labor, materials, tools and equipment, and for performing all work necessary to complete this item in place.

ITEM 13: Construct Tie-In Connections
A. Description
This item shall consist of connecting the new water main to the existing water distribution main at the locations indicated, to the details shown on the Plans and in accordance with Section 27-14 of the City Standard Specifications.

Connections made between different phases of the work outlined in these contract specifications shall not be considered an “existing connection”.

The Contractor shall expose tie-in locations to locate existing water mains prior to installing new water main to determine elevation and to confirm material type, to minimize the use of fittings to connect to existing main.

The Contractor shall furnish and install fittings, restraints and pipe necessary to connect mains. When cutting into an existing main, up to 15 feet of new pipe may be required for each tie-in. The Contractor shall use 45 degree (maximum) elbows to match existing pipe elevations, which shall be installed in accordance with Standard Drawing W-103 of the City Standard Specifications.

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 151 of 157 ends

Surface restoration associated with this item shall be performed as specified elsewhere in these Special Provisions and paid for under this item.

B. Measurement and Payment
Payment shall be at the contract unit price bid for each connection to the existing water distribution system and shall include full compensation for furnishing all labor, materials, tools and equipment, and for performing all work necessary to complete this item in place.

ITEM 14: Highlining Services
A. Description
This item shall consist of requirements for implementing an above ground temporary potable water supply system (TPWSS) including, but not limited to, mains, service connections, and associated appurtenances prior to disconnecting service of an existing water main for the purpose of replacing the main in the same location. Services shall be installed per City Standard Specifications and shall meet the applicable requirements of Section 02072 of the Technical Specifications.

B. Measurement and Payment
Payment for these items shall be at the contract lump sum price bid and shall include full compensation for furnishing all labor, materials, tools, equipment, and for performing all work necessary to complete this item in place.

ITEM 15: Potholing
A. Description
This item shall consist of potholing at the locations directed by the Engineer. This item includes but is not limited to: traffic control, pavement sawcutting, removal and disposal of pavement materials, excavation, backfill, compaction and temporary or permanent pavement repair.

The quantity of potholes shown on the Proposal is for bidding purposes only. The unit price indicated will not be adjusted because the actual quantity varies from the quantity shown on the Proposal.

The Contractor is required to expose each utility crossing (including services) and water main tie-in locations per USA guidelines; the costs for these excavations shall be included in the price to furnish and install the new water main, services, or retrofits, and are not included in this bid item

B. Measurement and Payment
Payment shall be at the contract unit price bid per each pothole and shall include full compensation for furnishing all labor, materials, tools, equipment, and for performing all work necessary to complete this item in place.

** End of Section **

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 152 of 157 ends

ATTACHMENT B
Project Task Completion Form

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 153 of 157 ends

Item Task Completion Date

A Pre-Mobilization Site Video
B Mobilization/Demobilization
C Traffic Control
D Sheeting, Shoring, and Bracing
E Stormwater Protection
F 8-Inch Water Main (WM) Install by Open Cut
G 8-Inch WM Install by Pipe Bursting
H Abandon 6-Inch WM
I Construct 8-Inch Gate Valves
J Construct 2-Inch ARV
K Construct 4-Inch Blow-Off
L Construct Fire Hydrant and Assembly
M Construct Tie-In Connections
N Highlining Services
O Potholing
P
Q
R
S
T
U
V
W

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 154 of 157 ends

ATTACHMENT C
Daily Field Log

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 155 of 157 ends

Daily Field Log
Well: Owner: Page:

Date: Day: M T W Th F
Operator:

Activity Start
Time
End
Time
Materials
Used Visual
Appearance
Pre-Mobilization Site Video
Mobilization/Demobilization
Traffic Control
Sheeting, Shoring, and
Bracing
Stormwater Protection
8-Inch Water Main (WM)
Install by Open Cut
8-Inch WM Install by Pipe
Bursting
Abandon 6-Inch WM
Construct 8-Inch Gate Valves
Construct 2-Inch ARV
Construct 4-Inch Blow-Off
Construct Fire Hydrant and
Assembly
Construct Tie-In Connections
Highlining Services
Potholing
Other
Owner Representative Date Contractor Representative Date

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 156 of 157 ends

ATTACHMENT D
Neighborhood Notification Letter

LAVENDER HEIGHTS WATER MAIN REPLACEMENT

Page 157 of 157 ends

Dear Resident,
The City of Sacramento, Department of Utilities, awarded a construction contract to our firm, (Contractor) to perform a water rehabilitation project in your neighborhood.

During the course of the project, temporary sidewalk and street detours adjacent to the water pipe alignment may occur. In addition, on-street parking may be temporarily unavailable to accommodate traffic and construction work. Our work hours are typically between 7 AM to 6 PM.

General public and construction crew safety is of primary concern to us and we remind you to observe the construction signs. We realize this project may be a temporary inconvenience and we shall strive to minimize the impacts to the residents.

If you have any questions or problems, please contact any one of the project representatives listed below:

Contractor Superintendent: Name, Phone Number
City Inspector: Name, Phone Number
City Project Manager: Name, Phone Number
Construction work is scheduled to begin in your neighborhood on ___________________. The anticipated project completion date is ___________________.

Thank you for your cooperation on this important project.

Sincerely,
Contractor Representative
cc: Project Manager, Utilities
Jessica Hess, Utilities
City Council Member’s Assistant

811

811

EXISTINGPROPOSED

DETAIL DESIGNATIONS
CONTRACTOR:INSTALL DATE:TRANSMISSION MAIN MATERIAL:PIPE MFG:WATER SERVICES LOCATIONS SUBMITTEDINFORMATION ACCEPTED BY (CITY):GATE VALVE MFG:CONSTRUCTION INFORMATIONNOTE: CONTRACTOR TO FILL OUT AFTER PROJECT COMPLETION.DISTRIBUTION MAIN MATERIAL:PIPE MFG:BUTTERFLY VALVE MFG:HYDRANT LEAD MATERIAL:PIPE MFG:HYDRANT MFG:AIR & VACUUM RELEASE VALVE MFG:WATER SERVICE MATERIAL:

CONTRACTOR:INSTALL DATE:TRANSMISSION MAIN MATERIAL:PIPE MFG:WATER SERVICES LOCATIONS SUBMITTEDINFORMATION ACCEPTED BY (CITY):GATE VALVE MFG:CONSTRUCTION INFORMATIONNOTE: CONTRACTOR TO FILL OUT AFTER PROJECT COMPLETION.DISTRIBUTION MAIN MATERIAL:PIPE MFG:BUTTERFLY VALVE MFG:HYDRANT LEAD MATERIAL:PIPE MFG:HYDRANT MFG:AIR & VACUUM RELEASE VALVE MFG:WATER SERVICE MATERIAL:

BELLBELLBELL

BELLBELL
UNKN
SMUD

BELLSMUD
CONTRACTOR:INSTALL DATE:TRANSMISSION MAIN MATERIAL:PIPE MFG:WATER SERVICES LOCATIONS SUBMITTEDINFORMATION ACCEPTED BY (CITY):GATE VALVE MFG:CONSTRUCTION INFORMATIONNOTE: CONTRACTOR TO FILL OUT AFTER PROJECT COMPLETION.DISTRIBUTION MAIN MATERIAL:PIPE MFG:BUTTERFLY VALVE MFG:HYDRANT LEAD MATERIAL:PIPE MFG:HYDRANT MFG:AIR & VACUUM RELEASE VALVE MFG:WATER SERVICE MATERIAL:

TRUNC DOME334319.36
TRUNC DOME349819.65

UNKNUNKNUNKN
TRUNC DOME329119.47
TRUNC DOME334319.36TRUNC DOME334519.42
TRUNC DOME342119.51TRUNC DOME347719.62TRUNC DOME349819.65

BELLBELL
BELL
BELL

BELLBELL BELLBELLBELL
SMUD

SMUDSMUD
CONTRACTOR:INSTALL DATE:TRANSMISSION MAIN MATERIAL:PIPE MFG:WATER SERVICES LOCATIONS SUBMITTEDINFORMATION ACCEPTED BY (CITY):GATE VALVE MFG:CONSTRUCTION INFORMATIONNOTE: CONTRACTOR TO FILL OUT AFTER PROJECT COMPLETION.DISTRIBUTION MAIN MATERIAL:PIPE MFG:BUTTERFLY VALVE MFG:HYDRANT LEAD MATERIAL:PIPE MFG:HYDRANT MFG:AIR & VACUUM RELEASE VALVE MFG:WATER SERVICE MATERIAL:

BELL BELLBELL
BELL
TRUNC DOME455818.11
CONTRACTOR:INSTALL DATE:TRANSMISSION MAIN MATERIAL:PIPE MFG:WATER SERVICES LOCATIONS SUBMITTEDINFORMATION ACCEPTED BY (CITY):GATE VALVE MFG:CONSTRUCTION INFORMATIONNOTE: CONTRACTOR TO FILL OUT AFTER PROJECT COMPLETION.DISTRIBUTION MAIN MATERIAL:PIPE MFG:BUTTERFLY VALVE MFG:HYDRANT LEAD MATERIAL:PIPE MFG:HYDRANT MFG:AIR & VACUUM RELEASE VALVE MFG:WATER SERVICE MATERIAL:

TRUNC DOME395219.234022
TRUNC DOME4225
CONTRACTOR:INSTALL DATE:TRANSMISSION MAIN MATERIAL:PIPE MFG:WATER SERVICES LOCATIONS SUBMITTEDINFORMATION ACCEPTED BY (CITY):GATE VALVE MFG:CONSTRUCTION INFORMATIONNOTE: CONTRACTOR TO FILL OUT AFTER PROJECT COMPLETION.DISTRIBUTION MAIN MATERIAL:PIPE MFG:BUTTERFLY VALVE MFG:HYDRANT LEAD MATERIAL:PIPE MFG:HYDRANT MFG:AIR & VACUUM RELEASE VALVE MFG:WATER SERVICE MATERIAL:

THRUST BLOCKING FOR WATER MAINSCHANGES IN MAIN ELEVATION && DRAIN UTILITY CROSSINGBACKFILL & REPAIR AT SEWER"CUT-IN" INSTALLATIONSWATER MAIN

WATER MAINSRAISING AND LOWERINGTAP EXCAVATION REQUIREMENTS

13-i 7/24/18
SECTION 13

WATER SYSTEMS

TABLE OF CONTENTS

13.1 PURPOSE AND DEFINITIONS ................................ ................................ ...................... 1

13.1.1 Purpose ................................ ................................ ................................ .................... 1

13.1.2 DOU Water System ................................ ................................ ................................ .. 1

13.1.3 Definitions ................................ ................................ ................................ ................ 1

13.2 GENERAL REQUIREMENTS ................................ ................................ ......................... 6

13.2.1 Authority and Responsibility ................................ ................................ ..................... 6

13.2.2 Disclaimer, Acceptance and Variances................................ ................................ ..... 6

13.2.3 Water Studies ................................ ................................ ................................ ........... 6

13.2.4 Placement of Mains in Streets ................................ ................................ .................. 7

13.2.5 Horizontal and Vertical Separation of Mains ................................ ............................. 7

13.2.6 Depth of Cover Over Mains ................................ ................................ ...................... 7

13.2.7 Raising or Lowering Mains to Resolve Grade Conflicts ................................ ............ 8

13.2.8 Tie-In Connections ................................ ................................ ................................ ... 8

13.3 WATER DISTRIBUTION SYSTEMS ................................ ................................ ............. 10

13.3.1 Residential Mains ................................ ................................ ................................ ... 10

13.3.2 Commercial Mains ................................ ................................ ................................ .. 10

13.3.3 Dead End Mains ................................ ................................ ................................ ..... 10

13.3.4 Dual Mains ................................ ................................ ................................ ............. 10

13.3.5 Water Services ................................ ................................ ................................ ....... 11

13.3.6 Gate Valves ................................ ................................ ................................ ............ 13

13.3.7 Fire Hydrants ................................ ................................ ................................ .......... 13

13.3.8 Blow-Offs ................................ ................................ ................................ ................ 14

13.3.9 Air Release Valves ................................ ................................ ................................ . 14

13.3.10 Water Sample Stations ................................ ................................ ......................... 14

13.3.11 Levees ................................ ................................ ................................ .................. 14

13.4 WATER TRANSMISSION SYSTEMS ................................ ................................ ........... 15

13.4.1 Butterfly Valves ................................ ................................ ................................ ...... 15

13.4.2 Blow-Offs ................................ ................................ ................................ ................ 15

13.4.3 Insulated Joints ................................ ................................ ................................ ...... 15

13-ii 7/24/18

13.4.4 Access Manholes ................................ ................................ ................................ ... 15

13.4.5 Air Release Valves ................................ ................................ ................................ . 15

13.4.6 Cathodic Protection ................................ ................................ ................................ 15

13.4.7 Fire Hydrants ................................ ................................ ................................ .......... 16

13.4.8 Water Services ................................ ................................ ................................ ....... 16

13.5 PLAN PREPARATION AND REVIEW ................................ ................................ ........... 17

13.5.1 Separate Water Plans ................................ ................................ ............................ 17

13.5.2 Development Water Plan Review ................................ ................................ ........... 17 Plate 13-1 DISTRIBUTION MAIN PLACEMENT ................................ ................................ ....... 19 Plate 13-2 DISTRIBUTION APPURTENANCE PLACEMENT ................................ .................. 20 Plate 13-3 WATER PURVEYOR MAP ................................ ................................ ...................... 21

TABLES AND FIGURES
Table 13-1 Depth of Cover Over Mains ................................ ................................ ..................... 8

13-1 7/24/18
SECTION 13

WATER SYSTEMS

13.1 PURPOSE AND DEFINITIONS

13.1.1 Purpose
This Section provides minimum design standards and guidelines for the planning and design of public Water Systems within the City Service Area . This Section generally covers the size, layout, and placement of Mains as well as appurtenant gate valves, Fire Hydrants, Blow-Offs and Services. These standards and guidelines may be amended periodically. It is the Designer’s responsibility to check the City of Sacramento Department of Utilities (DOU) website or ask DOU representatives for amendments and to use t he latest version of this Section. It is expected that all applicable Sections of this Manual will be reviewed and utilized as determined to be appropriate by the Project owner and Designer.

Compliance with these standards does not relieve a Designer fro m the additional responsibility to apply conservative and sound professional judgment when designing public owned and maintained facilities. Designers are expected to consider related issues, such as environmental impacts, maintenance of pedestrian and ve hicular traffic patterns, constructability, safety, system maintenance and sustainability principles. Designer shall submit a Variance for all proposed deviations from requirements contained herein. All Variances shall be reviewed and accepted by DOU prior to DOU review of affected portions of Plans or studies (Refer to Section

9.2.4).

13.1.2 DOU Water System
The Department of Utilities is responsible for operating and maintaining the public Water System within the City Service Area (roughly 95% of the geograph ical area of the City together with limited areas outside of the City limits).

The DOU Water System is fed by the Sacramento River and Fairbairn Water Treatment Plants, along with several potable groundwater wells. Refer to Plate 13-3 WATER PURVEYOR MAP.

13.1.3 Definitions
Whenever the following terms or titles are used, the intent and meaning shall be as defined below. Words defined below are shown capitalized throughout this Section. Proper nouns are also capitalized, but not defined below. Refer to Plate 9-2 for utility abbreviations.

100 Year Event: Refer to Section 9.1.3

Backflow Prevention Assembly : An assembled system of gate valves, check valves and reduced pressure principle assemblies used to prevent the reversal of the flow of water from the Customer back into the Water System. Reference should be made to the DOU Cross

13-2 7/24/18
Connection Control Policy for the particular type of backflow assembly to be used where such assemblies are required.

Blow-Off: A device placed at the Dead End of a Main to provide a means of flushing the Main pipe to remove accumulated sediment or stagnant water from the pipe . Blow-Offs are also placed at low points and minimum intervals along the profile of Transmission Mains to facilitate de-watering.

City: Refer to Section 9.1.3. Same as defined in City Code Chapter 13.04.030

City Code: Refer to Section 9.1.3

City Service Area: Refer to Section 9.1.3 and Plate 13-3

Commercial: Refer to Section 9.1.3

Customer: Refer to Section 9.1.3. Same as defined in City Code Chapter 13.04.030

Cut-In: A means of making a direct connection of a new Main or Service 4-inch and larger to an existing Main that involves the cutting and removal of a short length of pipe from the existing Main. A fitting is connected to the cut end(s) of the existing Main. The Cut-In type of Tie-In connection requires the existing Main to temporarily be taken out of service.

Dead End Main: A length of Distribution Main with only one Tie-In connection to other Mains in the Water System . The Dead End of the Main is the unconnected terminus of the Dead End Main.

Department of Utilities (DOU): Refer to Section 9.1.3. Same as “Department” defined in City Code Chapter 13.04.030

Designer: Refer to Section 9.1.3

Director: Refer to Section 9.1.3. Same as defined in City Code Chapter 13.04.030

Distribution Main: Mains 12-inches in diameter or smaller. Distribution Mains may be tapped for the installation of Services. Same as defined in City Code Chapter 13.04.030

Division of Drinking Water (DDW): California Environmental Protection Agency, State Water Resources Control Board, Division of Drinking Water

13-3 7/24/18
Domestic Service: A metered Service that is not solely used for fire suppression or irrigation.

Domestic Services may require the installation of a Backflow Prevention Assembly . Same as defined in City Code Chapter 13.04.030

Easement: Refer to Section 9.1.3

Fire Hydrant : A publicly owned and maintained appurtenance used to supply water for firefighting, as specified in DWG NO. W-201 and Section 10 of t he Standard Specifications.

Same as “Public fire hydrant” defined in City Code Chapter 13.04.030

Fire Service : A Service installed for the sole purpose of connection to an On-Site fire suppression system required for certain types of building occupancies. Such fire suppression systems may include wet or dry standpipes, automatic fire sprinkler lines and private fire hydrants located On-Site. Fire Services are not metered but may require the installation of a Backflow Prevention Assembly. Same as defined in City Code Chapter 13.04.030

Hot-Tap: A method of making a direct connection of a new Main or Service to an existing Main while the existing Main is kept in service and under pressure

Hydraulic Grade Line (HGL): Refer to Section 9.1.3

Irrigation Service: A metered Service installed for the sole purpose of supplying water to a landscape irrigation system. All dedicated Irrigation Services require the installation of a Backflow Prevention Assembly. Same as defined in City Code Chapter 13.04.030

Main: Pipe owned by the City and maintained by the DOU placed for the purpose of conveying and distributing potable water to the public. Mains include Distribution and Transmission Mains, and must be located within public streets or alleys. Same as “Public water main” defined in City Code Chapter 13.04.030

Major Water Improvement: Scope of improvement or extension to the Water System such that the work must be shown on a separately prepared Water Plan. Such improvements include any of the following:

1. Main extensions 100 feet or more in length,

2. Replacement and/or abandonment of an existing Main,

3. Public Mains located on private property.

Manhole: Refer to Section 9.1.3

Minor Water Improvement : All Water System improvements that are not Major Water Improvements

13-4 7/24/18
On-Site: Refer to Section 9.1.3

Plans: Refer to Section 9.1.3

Point of Service : The location where the DOU terminates maintenance responsibility of Services. The Point of Service is at or near the Right-of-Way line. For existing public Mains located in Easements, the Point of Service is located at the Service connection to the Main .

Same as defined in City Code Chapter 13.04.030

Project: Refer to Section 9.1.3

Residential: Areas that are predom inantly zoned for single family residences. Residential areas may include duplexes, community parks, and other facilities complimentary or appurtenant to the residential use. Multi-family developments are considered Commercial.

Right-of-Way (ROW): Refer to Section 9.1.3

Round Corner: Refer to Section 9.1.3

Service: Publicly maintained portion of water p ipe and appurtenances connected to a Distribution Main for the purpose of supplying water to individual lots or parcels of land.

Services provide water for domestic, fire, and/or landscape irrigation purposes to Residential and Commercial consumers. Services range in size from 1-inch through 12-inches in diameter, and extend from the Main to the Point of Service. Same as “Water service” defined in City Code Chapter 13.04.030

Shared Service: Privately maintained portion of water pipe and appurtenances that connects to one or more public Services to serve more than one parcel. Shared Services may require maintenance agreements, easements and other provisions to ensure private maintenance.

Standard Specifications : Refer to Section 9.1.3 . Same as defined in City Code Chapter

13.04.030

Subgrade: Refer to Section 9.1.3

Tap: See “Hot-Tap”, “Cut-In” and Plate 13-2 DISTRIBUTION APPURTENANCE PLACEMENT.

Same as “Service connection” or “water service connection” defined in City Code Chapter

13.04.030

Tie-In: The juncture or point of connection of one Main to another Main

Transmission Main: Water Mains larger than 12 -inches in diameter that are used to convey large volumes of water from treatment plants, where the water is produced, to selected points

13-5 7/24/18
throughout the Water System as well as to (and fro m) storage reservoirs to meet fluctuating daily and seasonal demands. Same as defined in City Code Chapter 13.04.030

Water Plan: A separately prepared engineered Plan, drawn to scale, showing the layout and details of Water System improvements to be constructed for any given private development or public improvement Project. Separate Water Plan s are required for all Major W ater System Improvements.

Water System: The complete collection of interconnected elements maintained by the City that store, convey and distribute drinking water to the public for a variety of consumptive uses. The elements making up the Water System include a network of public Distribution Mains and appurtenances (such as meters, Fire Hydrant s and Services), storage reservoirs, treatment plants, wells and Transmission Mains and appurtenances. Same as “City water distribution system” or “Water distribution facilities”, City Code Chapter 13.04.030

13-6 7/24/18

13.2 GENERAL REQUIREMENTS

13.2.1 Authority and Responsibility
The Director is given the authority and responsibility to produce and distribute a safe supply of drinking water to the public. The Designer is responsible for adherence to the design standards contained herein.

All improvements to the City Water System shall be designed to meet the applicable and current requirements of the following standards:

1. The Standard Specifications,

2. Title Chapter 13.04 of the Sacramento City Code,

3. Applicable provisions of the Uniform Plumbing Code,

4. Cross Connection Control Policy of the City of Sacramento Department of Utilities,

5. Requirements of the California Environmental Protection Agency, State Water Resources Control Board, Division of Drinking Water (DDW) relating to domestic water supply, particularly the applicable provisio ns of California Statutes Related to Drinking Water contained in Title 17 and 22, California Code of Regulations, and Guidance Memo 2003-02,

6. American Water Works Association design standards,

7. NSF/ANSI Standard 61.

Conflicts between the various standards shall be identified by the Designer, and corresponding resolutions shall be accepted by the Director prior to implementation.

13.2.2 Disclaimer, Acceptance and Variances
Refer to Section s 9.2.2 for disclaimer, 13.5, 9.2.3 and Plate 9 -4 for acceptance and 9.2. 4 for variances.

13.2.3 Water Studies
As defined by conditions of approval or when otherwise required by DOU, Designer shall prepare and submit a water study for improvements to the Water System. The water study shall be performed as defined in the City Water Study Manual by a licensed engineer utilizing boundary conditions provided by DOU . The study shall demonstrate that the existing or proposed Water System is capable of meeting the needs of the Project while meeting design criteria presented herein.

When a water study is required, a current (less than one year old) water supply test for the Main serving the Project shall be required. Water System improvements shall be designed in the form of a n interconnected grid to allow the water pressure throughout the system to be equalized under varying rates and locations of maximum demand.

Water System improvements shall also be designed to satisfy the following conditions:

13-7 7/24/18

1. At maximum day peak hour demand, the operating or static pressure at all Service connections shall be at least 30 pounds per square inch,

2. At maximum day demand with fire flow at the point of connection , the residual pressure shall not be less than 20 pounds per square inch,

3. At average day demand (without fire flow), the minimum flow velocity shall not be less than 0.10 feet per second , unless the Main is in a dead -end street without Services that is planned to be extended in the future.

13.2.4 Placement of Mains in Streets
Mains shall be placed under the asphalt-paved portion of public streets north or west of the street centerline. Mains shall not be placed under medians, curb, gutter, sidewalk, or concrete paved streets or alleys.

Within Residential streets (as defined by Plate 15 -2), Mains shall not be placed within 4-feet of the lip of gutter. For streets wider than a Residential Street, the Mains shall be placed no closer than 7-feet from the curb and gutter. The 4 and 7-foot dimensio ns are measured from the nearest edge of the Main to the nearest lip of gutter or edge of island curb (Refer to Plate 13-1 DISTRIBUTION MAIN PLACEMENT).

13.2.5 Horizontal and Vertical Separation of Mains
Mains shall be placed to conform to Section 64572 (a) (5), Article 4, Chapter 16, Division 4, Title 22 of the California Code of Regulations and California Department of health Services Guidance Memo 2003-02, revised October 16, 2003. Refer to:
http://www.dot.ca.gov/hq/esc/Structure_Design/wwe/documents/ca_health_serv_dept_re_pipe_ separation.pdf.

Additionally, Mains shall be placed a minimum of:

1. Five-feet horizontally from electrical, gas, or utilities with impressed cathodic protection systems measured from the edge of Main to edge of pipe or edge of trench when encased,

2. Two-feet horizontally from edge of Main to other underground dry utilities such as communications or cable TV, measured from their respective edge of pipe,

3. One-foot vertically from all dry utility crossings.

13.2.6 Depth of Cover Over Mains
Mains shall meet the depth of cover requirements specified below.

13-8 7/24/18
Table 13-1 Depth of Cover Over Mains
Application
Inches To
Pavement
Surface
Inches To
Road
Subgrade Notes
Typical
Condition
Minimum 36 18 Applies to all Mains placed except
where conflicting with a gravity pipeline Maximum 48
Using Ductile
Iron Pipe
Minimum 24 12 Applies where raising or lowering Main
to avoid conflict with gravity pipeline Maximum 60

Any other depth of cover proposed shall require a Variance submittal that adequately addresses the need to reduce or increase the cover requirements and the additional methods proposed for protecting the pipeline and workers during construction, operation, repair and replacement.

13.2.7 Raising or Lowering Mains to Resolve Grade Conflicts Grade conflicts between existing water Mains and new or replacement storm drain and sanitary sewer lines are often encountered during construction.

These problems shall be resolved during design of sewer and drainage improvements .

Advance potholing of existin g Mains at locations of potential conflicts during early stages of design will provide the Design er the information needed to avoid a conflict with Mains when possible, and to efficiently plan for relocation of the Main when unavoidable.

In the field, th e work of raising or lowering the existing water Main at the location of the grade conflict requires the isolation, shutdown, and de -watering of a section of the Main. This is followed by the cutting and removal of a length of the existing Main and replac ing it with a connected assembly of short lengths of pipe and elbows. All raised and lowered water pipes shall be disinfected and pressure tested. All work to raise and lower Mains shall meet DDW requirements and pipe shall be ductile iron fabricated in the field.

All Mains shall be raised when the depth of cover and separation requirements can be maintained.

Plans shall refer Contractor to DWG. NO. W-106 of the Standard Specifications entitled "Raising and Lowering Existing Water Mains" when such conflicts are suspected to occur.

13.2.8 Tie-In Connections
For newly constructed Water System and/or private water improvements , Tie-In connections (whether Hot-Tap or Cut-In) shall be made only after the improvements have been satisfactorily disinfected and pressure tested.

The type of Tie-In connection to be used shall be determined by the DOU during Plan review.

13-9 7/24/18
Tie-In connections shall be installed as follows:

1. All Hot-Taps on existing Mains shall be made by City crews after payment of required fees to City . Customer shall provide all applicable surface cutting, excavation, spoil removal, backfill, traffic control and surface restoration,

2. The use of 4-inch Hot-Taps on 4-inch diameter Mains is not permitted,

3. When a connection to a steel Distribution Main is required, t he steel Main shall be replaced in both directions with an accepted material up to the nearest valves.

All Water Plans shall indicate the type of Main Tie-In connection (Hot-Tap or Cut-In) to be used and whether the Tie-In connection is to be made by City crews or by the contractor. Tie-ins for Services shall conform to the requirements listed in Section 13.3.5.

13-10 7/24/18

13.3 WATER DISTRIBUTION SYSTEMS

13.3.1 Residential Mains
Residential Water Systems shall utilize Mains sized as follows:

1. Twelve-inch diameter Mains shall be placed on approximately one-square-mile grids,

2. Four-inch diameter Mains shall be placed for Dead End Mains less than 250-feet long in cul-de-sacs serving no Fire Hydrant and no more than:
a. Five single family, or
b. Four duplexes (8 residential units).

3. Six-inch diameter Mains shall be placed when serving no more than:
a. Fifteen single family units,
b. Ten duplexes (20 residential units), or
c. One Fire Hydrant.

4. Eight-inch diameter Mains shall be used in all other cases.

13.3.2 Commercial Mains
Commercial Water Systems shall utilize Mains sized as follows:

1. Twelve-inch Mains at grid intervals of one-half-mile,

2. Eight-inch diameter Mains within the remainder.

Water Systems that serve both Residential and Commercial properties shall comply with Commercial Water System requirements.

13.3.3 Dead End Mains
All Distribution Mains shall have a minimum of 2-points of connection, except Dead End Mains, which may be allowed for cul-de-sacs and dead end streets as defined below.

The maximum length for Dead End Mains shall be:

1. Four-inch diameter Main: 250-feet. Four-inch Dead End Mains are not allowed in Commercial areas.

2. Six and 8-inch diameter Main: 500-feet. Six-inch Dead End Mains are not allowed in Commercial areas.

3. Twelve-inch diameter Main: 1000-feet. Twelve-inch Dead End Mains are not allowed in Residential areas, unless the dead end street is planned to be extended in the future.

13.3.4 Dual Mains
Dual Distribution Mains (one water pipeline along each side of the street) are required for all streets constructed with either:

1. A raised center median separating opposing lanes of traffic, or

2. A Right-of-Way width of 100 feet or more where Services or Fire H ydrants are need ed on both sides of the street.

Refer to Plate 13-1 DISTRIBUTION MAIN PLACEMENT.

13-11 7/24/18

13.3.5 Water Services
All Services shall be connected directly to Distribution Main s and shall be installed at right angles to the Distribution Main, in accordance with City Code and the City Tap Policy. Tapping a Fire Hydrant branch lead or another Service for the installation of Services shall not be permitted.

Services are available in 1 -inch, 1 -½-inch, 2 -inch, 4-inch, 6-inch, 8-inch, 10 -inch and 12-inch nominal diameters. Meter boxes shall be installed over meter s for all Services 2 -inches in diameter and smaller. Refer to Standard Specification DWG NO. W-402 & W-507. Services 4- inches in diameter and larger will require a valve box (Refer to Standard Specification DWG NO.

W-303) over the gate valve at the connection of the Service to the water Main. Meter boxes shall be installed over meters, unless meter is installed on RP . Refer to Standard Specification DWG NO. W-515 & W-608.

Refer to Plate 13-1 DISTRIBUTION MAIN PLACEMENT for typical valve and point of service locations.

Service Hot-Taps:

1. For Services 4 -inch and larger, City shall provide the tapping sleeve, gate valve, standpipe and valve box. Customer shall provide and install all required pipe and fittings to complete Service installation,

2. For Services 2-inch and smaller, City shall provide and install saddle, corporation stop, pipe material from the Main to the meter, and metered valve at the Point of Service.

Service connections to the Main shall also conform to the Tie -In requirements listed in Section

13.2.8. Refer to Plate 13-2 DISTRIBUTION APPURTENANCE PLACEMENT.

13.3.5.1 Backflow Prevention
The installation of Backflow Prevention Assemblies shall be required per the Cross Connection Control Policy , which includes a complete list of conditions requiring Backflow Prevention Assemblies as well as the particular type of assemblies to be used.

Refer to Section 38 of the Standard Specifications for Backflow Prevention Assembly details.

13.3.5.2 Domestic Service
Services for single -family residences and duplexes shall be designed in accordance with City Code Section 13.04 and Standard Specifications DWG. No. W -401. Services for corner Residential lots are to be placed at the lot frontage with the greater set back distance.

For Commercial developments, the size and location of Domestic Services is determined by the Designer and indicated on the Plans.

13-12 7/24/18
The installation of future water Services is not allowed unless the following additional items are submitted and approved by DOU:

1. Size and location of Services, meters and Backflow Prevention Assemblies,

2. Anticipated driveway and building locations,

3. Potential conflicts with other improvements, such as water quality facilities.

Future Services 2-inches in diameter and smaller shall include installation of an idler and meter box and shall be capped at the Point of Service. Four-inch and larger future Services require a 2-inch diameter Blow-Off to be installed as part of the Service installation per Standard Specifications DWG NO. W-301.

All future Service construction shall be performed at the Customer’s risk and may require abandonment or relocation at Customer cost.

13.3.5.3 Fire Service
Fire Services for private development Projects as well as their size and location shall be determined by the Designer and must be approved by the City Fire Marshall . Fire Services are not metered. Backflow prevention requirements shall be per the City Cross Connection Control Policy.

Commercial developments shall not have interconnected Domestic and Fire Services, unless pre-existing, or a Shared Service is approved by DOU.

13.3.5.4 Irrigation Service
Irrigation Services shall be metered , require backflow prevention per City Cross Connection Control Policy and shall meet the requirements of City Code.

To avoid the cutting of new pavement , future Irrigation Services may be authorized in accordance with Section 13.3.5.2. Irrigation water may be provi ded from a Domestic Service, except where disallowed by California State regulations.

13.3.5.5 Meters
All Services except for dedicated Fire Services shall be metered. Water meters shall be provided by the City for a fee.

13.3.5.6 Temporary Construction Service
Temporary underground water Services are required at sites where construction activities will extend over a time -period in excess of 60 days. Examples include the site of a multi -story building or at a site involving extensive earthwork and requiring a wa ter truck fill station. All temporary Services used as a source of water for construction shall be equipped with meters as well as with reduced pressure principle Backflow Prevention Assemblies per the City Temporary

13-13 7/24/18
Water Use Policy . Temporary construct ion Services will be installed by City crews upon payment of fees at the DOU offices.

13.3.6 Gate Valves
Gate valves shall be placed such that:

1. The requirements illustrated on Standard Specifications DWG NO. W303 are met,

2. No more than three -valves need to be closed to shut down and isolate any section of Main,

3. The number of gate valves at each tee or cross is one less than the number of inlet/outlet openings of the fitting (tees will require two gate valves and crosses will require three valves), except:
a. Only one gate valve (located on the Fire Hydrant lead) is required at a tee placed for a Fire Hydrant.

4. Gate valves are no more than 1200-feet apart for Mains 8 -inches in diameter and smaller,

5. Gate valves are no more than 1500-feet apart for Mains 12-inches in diameter,

6. A maximum of 40-parcels may be affected by a Main shutdown,

7. Gate valves are bolted to a fitting,

8. Gate valve is placed on each side of all casings and Distribution Main crossings of bridges, drainage channels, irrigation canals, railroads, etc.

Gate valves shall be the same size as the Main, Service or Fire Hydrant Lead. Refer to Plate 13-2 DISTRIBUTION APPURTENANCE PLACEMENT.

13.3.7 Fire Hydrants
Fire Hydrants shall be placed:

1. Per t he requirements illustrated on Plate 13 -2 DISTRIBUTION APPURTENANCE PLACEMENT and Standard Specifications DWG. NO. W-201,

2. At a maximum spacing of 500-feet in Residential and 300-feet in Commercial areas,

3. At a minimum spacing of 150-feet. Hydrants required with less separation shall be private hydrants,

4. In Minor1 Streets by measuring along the centerline, and placing Hydrants on either side of the road,

5. In Major2 streets by measuring along and placing Hydrants on both sides of the road,

6. Outside of Round Corners at street intersections,

7. On property lines between adjacent lots if placed between street intersections . The spacing of Fire Hydrants shall take precedence over the placement of Fire Hydrants at street intersections,

8. On 6-inch diameter or larger Distribution Mains,

1 Minor streets have less than 4 lanes and no median as illustrated in Plates 15-2 thru 15-5 2 Major streets include 4 or more lanes, medians or as otherwise illustrated in Plates 15 -6 thru 15-8

13-14 7/24/18

9. In cul-de-sacs in both Residential and Commercial areas. Fire Hydrants shall be placed at the beginning of the reverse curve transition to the bulb of the cul -de-sac, u nless otherwise required by the Fire Marshall,

10. A minimum of 3-feet from any fence, bush, power pole, wall, traffic signal standard, or other obstruction, to allow access for operation and maintenance,

11. Such that they do not cross retaining walls or pedestrian curb ramps.

13.3.8 Blow-Offs
Blow-Offs shall be installed at the Dead End of all Distribution Mains as shown on Plate 13-2 DISTRIBUTION APPURTENANCE PLACEMENT:

1. Six inches and smaller Mains may use a 2 -inch diameter Blow -Off per Standard Specifications DWG NO. W -301. A Fire Hydrant may be placed in lieu of a Blow -Off where space allows.

2. Eight inches and larger Mains shall use a Fire Hydrant for a Blow-Off.

3. When Fire Hydrants are used as Blow -Offs in cul -de-sacs, Main size shall be reduced after last Fire Hydrant as necessary to meet demand and water quality requirements, and shall be extended into cul-de-sac bulb to serve remaining properties.

13.3.9 Air Release Valves
Air release valves shall be installed on Distribution Mains at the high point where crossing a bridge, and as otherwise directed by DOU.

13.3.10 Water Sample Stations
Where developments include 50 Residential units or more, or the installation of more than 1000- feet of Main, water sample station s shall be required. Location and number of sample stations shall be determined by DOU during Plan review.

13.3.11 Levees
Public Distribution Mains and Services shall not be placed within or crossing levees.

13-15 7/24/18

13.4 WATER TRANSMISSION SYSTEMS

13.4.1 Butterfly Valves
Butterfly valves shall be used to isolate Transmission Mains:

1. Per Standard Specifications DWG. NO. W-801,

2. At a maximum spacing of 2000-feet,

3. At any connection, if required by DOU.

At least one Blow-Off and one Air Release Valve shall be placed between Butterfly Valves.

13.4.2 Blow-Offs
Blow-Offs shall be placed:

1. Per Standard Specifications DWG. NO. W-804 and W-805,

2. At all low points,

3. When required by Section 13.4.1.

13.4.3 Insulated Joints
To effectively isolate metallic piping between dissimilar metals, insulated joints shall be placed:

1. Per the Standard Specifications DWG. NO. W-801, W-902 and W-905,

2. At each change in Main material,

3. At each butterfly valve,

4. At all appurtenance connections,

5. At all Main connections,

6. Where required to isolate cathodically protected systems, as determined by the City.

13.4.4 Access Manholes
Access Manholes shall be placed between butterfly valves per Standard Specification DWG.

NO W-702.

13.4.5 Air Release Valves
Air Release valves shall be placed:

1. Per Standard Specifications DWG. NO. W-802 and W-803,

2. At all high points,

3. With the vent above the 100 Year Event HGL,

4. When required by Section 13.4.1.

13.4.6 Cathodic Protection
Test Stations shall be installed as follows:

1. Corrosion monitoring test station: at a maximum spacing of every 1000-ft,

2. Insulated joint test station: at all locations where an insulated joint is required (see

13.4.3, “Insulated Joints”),

3. Anode test station: at all locations where a sacrificial anode is installed,

13-16 7/24/18

4. Foreign pipe test station: at all locations where a metallic Main crosses a cathodically protected utility pipe,

5. Casing test station: at both ends of a metallic casing.

A soils report shall be submitted to the City to confirm the corrosivity of the soils at the depth of the Main. A soil sample shall be collected for every 1000 -feet of new Main installed within the alignment of the new Main. The sample(s) shall be tested for (at a minimum) Redox, pH, sulfate, resist ivity (100% saturation) and chloride. Based on the results of the samples, additional sampling and tests may be required by the City.

Cathodic protection shall be installed where adverse environments (including but not limited to soils conditions, foreign pipelines or stray current) are considered corrosive, highly corrosive, or extremely corrosive to buried metallic infrastructure. Design and testing of the cathodic protection system shall be:

1. Conducted by a registered Corrosion Engineer with the State of California, or a NACE certified Corrosion Specialist,

2. Reviewed and accepted by the DOU before Plan approval and notice of completion,

3. Planned for a minimum 30-year life expectancy.

The cathodic protection system shall be retested by the Corrosion Speci alist or Corrosion Engineer 1-year after initial activation to confirm the system is functioning per design. A system is considered “cathodically protected” when it meets the minimum NACE standards for cathodic protection of buried metallic infrastructure.

13.4.7 Fire Hydrants
A Fire Hydrant shall be placed between all butterfly valves, and shall not be considered when evaluating Fire Hydrant spacing requirements.

13.4.8 Water Services
The installation of a Service Tap of any size on a Transmission Main is not permitted.

13-17 7/24/18

13.5 PLAN PREPARATION AND REVIEW

13.5.1 Separate Water Plans
All Major Water Improvements shall be shown on a separate Water Plan.

Major Water Improvements shall also be shown screened and without notes on Plan sheets for other improvements, including sanitary sewers, storm drains and streets.

Minor Water Improvements may be solely depicted on Plans showing other improvements.

13.5.2 Development Water Plan Review
Plans that include the construction of Major as well as Minor Water Improvements shall be submitted to Public Works Development Engineering Section for routing, review and comment.

Copies of special provisions prepared for Projects involving the construction of water improvements shall also be submitted for review, if applicable.

A 51 series file number will be assigned by DOU and placed on the Water Plan sheets for all Projects involving the construction of Distribution Main s. A 60 series file number will be assigned by DOU and placed on the Water Plan sheets for all Projects involving the construction of Transmission Mains.

The DOU will review the Water Plans for compatibility with the Water System. The Water Plans will also be reviewed to determine the type of Tie-In connections to be made to the existing system and whether the Tie-In connections are to be made by City crews or by a contractor.

The Water Plan shall show the following at a minimum:

1. Street alignments, Right-of-Way width and names,

2. Configuration of the lots and lot numbers,

3. Scale (consistent with Engineer’s scale), stationing and a north arrow,

4. Proposed Main size, location and material,

5. Gate valves, Services, Fire Hydrants and all other water appurtenances,

6. Water title block with approved signature line3,

7. Construction Information Block1,

8. City standard General Water Notes1,

9. Detail sheets as required.

Plans for On-Site privately owned and maintained common interest development water systems shall meet the requirements listed herein. The Shared Service shall be denoted as “Private”.

3 See http://portal.cityofsacramento.org/Utilities/Resources/Specs-and-Drawings

13-18 7/24/18

APPENDIX

13-19 7/24/18
Plate 13-1 DISTRIBUTION MAIN PLACEMENT

13-20 7/24/18
Plate 13-2 DISTRIBUTION APPURTENANCE PLACEMENT

13-21 7/24/18
Plate 13-3 WATER PURVEYOR MAP

City of Sacramento – RFP
Bid # P24141322041
Lavender Heights WM
Replacement Project

APPENDIX N

MEMORANDUM OF UNDERSTANDING

BETWEEN

SACRAMENTO AREA COUNCIL OF GOVERNMENTS
And the

CITY OF SACRAMENTO
FOR THE GREEN MEANS GO PROGRAM:

Lavender Heights Water Infrastructure Expansion Project Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 MEMORANDUM OF UNDERSTANDING BETWEEN SACRAMENTO AREA COUNCIL OF GOVERNMENTS And the CITY OF SACRAMENTO FOR THE GREEN MEANS GO PROGRAM: Lavender Heights Water Infrastructure Expansion Project This Memorandum of Understanding (“MOU” or “Agreement”) is made effective ____________, 2023 (the “Effective Date”), by and between the Sacramento Area Council of Governments (“SACOG”) and the CITY OF SACRAMENTO (“Local Agency”). RECITALS: WHEREAS, SACOG, as a council of governments and Metropolitan Planning Organization, provides and/or facilitates member services on behalf of the six counties and 22 cities in the greater Sacramento region; andWHEREAS, SACOG is the recipient of funds from the State of California Housing and Community Development Department in connection with the Green Means Go funding program; and WHEREAS, Local Agency is a member of SACOG and is the recipient of ONE MILLION EIGHTY-THREE THOUSAND DOLLARS ($1,083,000.00)of SACOG Green Means Go funds (the “Funds”) that will be used to pay for the LAVENDER HEIGHTS WATER INFRASTRUCTURE EXPANSION PROJECT as more particularly described in Exhibit “A” attached hereto and incorporated herein (the “Project”); andWHEREAS,the Funds will be used to pay for the LAVENDER HEIGHTS WATER INFRASTRUCTURE EXPANSION PROJECT as more particularly described in Exhibit “A” attached hereto and incorporated herein (the “Project”). NOW, THEREFORE, SACOG and Local Agency agree as follows: 1. Recitals: the recitals above are hereby incorporated in this Agreement.2. Compliance with Laws and Funding Agreement: Local Agency will comply with allapplicable Federal, State, and local laws, codes, ordinances, regulations, orders, circulars,and directives, including, without limitation, all Federal regulatory requirements associatedwith the funding provided to Local Agency hereunder. Further, Local Agency will requirethe appropriate debarment certification form from all Local Agency contractors and LocalAgency certifies that it will not knowingly enter into any transaction with a contractor,1 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 subcontractor, material supplier, or vendor who is debarred, suspended, declared ineligible, or voluntarily excluded from covered transactions by any Federal or State agency. Local Agency acknowledges that the Funds are being provided to SACOG via an agreement between SACOG and the Department of Housing and Community Development (“HCD”), a copy of which is attached hereto and incorporated herein as Exhibit “B” (the “Funding Agreement”). Local Agency agrees to comply with all applicable terms, conditions, and requirements of the Funding Agreement, as such terms relate to recipients or sub-recipients of funds under the Funding Agreement. In the event of any inconsistency or conflict between this MOU and the Funding Agreement, the terms of the Funding Agreement shall prevail. 3. Funding Amount: The amount to be paid to Local Agency for administration by Local Agency in accordance with Exhibit A will not exceed ONE MILLION EIGHTY-THREE THOUSAND DOLLARS ($1,083,000.00)unless agreed to in advance by the parties pursuant to a written amendment signed by SACOG’s Executive Director or Deputy Executive Director. In no instance will SACOG be liable for any payments or costs for work in excess of this amount, nor for any unauthorized or ineligible costs. 4. Term: The term of this Agreement shall be from the Effective Date until JUNE 30, 2026,unless agreed to in advance by written amendment signed by SACOG’s Executive Director or Deputy Executive Director. 5. Independent Contractor: The Local Agency, and the agents and employees of the Local Agency, in the performance of this Agreement, will act as and be independent contractors and not officers or employees or agents of SACOG. Local Agency, its officers, employees, agents, and subcontractors, if any, will have no power to bind or commit SACOG to any decision or course of action, and will not represent to any person or business that they have such power. Local Agency has and will retain the right to exercise full control of the supervision of the work and over the employment, direction, compensation and discharge of all persons assisting Local Agency in the performance of work funded by this Agreement. Local Agency will be solely responsible for all matters relating to the payment of its employees and contractors including, but not limited to, compliance with all laws, statutes, and regulations governing such matters. 6. Accounting Records: a. Local Agency, its staff, contractors and subcontractors shall establish and maintain an accounting system and reports that properly accumulate incurred project costs by line. The accounting system shall conform to Generally Accepted Accounting Principles (GAAP), enable the determination of incurred costs at interim points of completion, and provide support for reimbursement payment voucher or invoices. 2 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 b. Local Agency shall establish a separate ledger account for receipts and expenditure of the Funds and maintain expenditure details in accordance with the scope of work, project timeline and budget. c. Local Agency shall maintain documentation of its normal procurement policy and competitive bid process (including the use of sole source purchasing), and financial records of expenditures incurred during the course of the project in accordance with GAAP. d. Local Agency agrees that SACOG and the State of California or their designated representative shall have the right to review and to copy any records and supporting documentation pertaining to the performance of this Agreement. 7. Reporting and Payment: a. On a quarterly basis, Local Agency will provide SACOG with both a written report on the progress made on the Scope of Work (Exhibit “A”) and an invoice for reimbursement. Invoices for contractual work completed through June 30 of a fiscal year must be submitted by July 30. Local Agency shall submit written invoices by e-mail in to SACOG. Local Agency’s written progress report shall be completed as required by SACOG, and shall be for the periods ending March, June, September and December. Local Agency shall provide any and all information requested by SACOG and necessary for SACOG to submit an annual progress report to the State of California Housing and Community Development Department in April of each year of this Agreement. b. Payments to Local Agency hereunder will be made in arrears. Local Agency will submit a detailed and properly documented invoice on its letterhead for reimbursement which invoice will include the following: (i) a description of the work performed, (ii) a detailed accounting of costs incurred, and (iii) evidence that Local Agency has alreadyincurred costs for the Project. Attached as Exhibit “C” is SACOG’s matrix of required supporting documentation for Local Agency invoices. Invoices for expenditures incurred prior to January 1, 2021 will not be reimbursed. c. The Local Agency shall not be entitled to reimbursement of indirect costs unless a copy of an applicable, approved indirect cost plan has been received by SACOG prior to submittal of the first invoice from the Local Agency. Indirect cost rates shall be submitted annually in accordance with SACOG requirements. d. Local Agency will be notified within ten (10) business days following receipt of its invoice by SACOG of any circumstances or data identified by SACOG in Local Agency’s invoice that would cause withholding of approval and subsequent payment. Local Agency’s invoice will include documentation of reimbursable expenses and billed items sufficient for SACOG, in its opinion, to substantiate billings. SACOG reserves the right to withhold payment of disputed amounts. Local Agency’s failure to comply with any of 3 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 the reporting requirements in this Agreement may impact Local Agency’s ability to receive future Green Means Go funds. 8. Audit, Retention and Inspection of Records: a. SACOG or its designee, including but not limited to any State or Federal agency, will have the right to review, obtain, copy, and audit all books, records, computer records, accounts, documentation and any other materials (collectively “Records”) pertaining to performance of this Agreement, including any Records in the possession of any contractors or subcontractors. Such Records shall include all records of employment, employment advertisements, employment application forms, and other pertinent employment data, as well as any records pertaining to compliance with Public Contract Code Sections 10115, et seq.and Title 21, California Code of Regulations, Chapter 21, Section 2500, et seq. (when applicable) and other matters connected with the performance of the contract pursuant to Government Code Section 8546.7. b. Local Agency agrees to provide SACOG or its designee, the State, the California State Auditor or any duly authorized representative of the State or Federal government, with any relevant information requested and will permit SACOG or its designees access to its premises, upon reasonable notice, during normal business hours, for the purpose of interviewing employees and inspecting and copying such Records for the purpose of determining compliance with any applicable Federal and State laws and regulations. Local Agency further agrees to maintain such Records for a period of three (3) years after final payment under the Agreement or three (3) years from the conclusion or resolution of any and all audits or litigation relevant to this Agreement and any amendments, whichever is later. If any litigation, claim, negotiation, audit, monitoring, inspection or other action has been started before the expiration of the three (3) years after final payment under this Agreement, all records must be retained by Local Agency, its contractors and subcontractors until completion of the action and resolution of all issues which arise from it. Records related to any and all audits or litigation relevant to this Agreement shall be retained for five (5) years after the conclusion or resolution of the matter. SACOG shall have the right to audit Local Agency records and interview employees. c. If so directed by SACOG upon expiration of this Agreement, the Local Agency will cause all Records relevant to the Scope of Work to be delivered to SACOG as depository. d. In addition to any other remedies available to SACOG in law or equity for breach of this Agreement, SACOG, may at its discretion, exercise a variety of remedies, including, but not limited to, requiring repayment of the Funds disbursed and expended under this Agreement. 4 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 9. Third Party Contracts: a. All procurements related to the expenditure of the Funds must be conducted using a fair and competitive procurement process. Local Agency may use its own procurement procedures as long as the procedures comply with all City/County laws, rules and ordinances governing procurement, and all applicable provisions of California law. b. Any contract entered into as a result of this Agreement shall contain all the provisions stipulated in this Agreement and shall be applicable to Local Agency’s contractors and subcontractors. Copies of all agreements with contractors and subcontractors shall be submitted to SACOG’s project manager. c. Local Agency shall be responsible for monitoring and enforcement of all agreements with contractors and subcontractors to ensure compliance with the terms of this Agreement. 10. Termination: a. Either party may terminate this Agreement for any reason, with or without cause, at any time, by giving the other party fifteen (15) days written notice. The notice will be deemed served and effective for all purposes on the date it is deposited in the U.S. mail, certified, return receipt requested, addressed to the other party at the address indicated in Section 17 below. b. If either party issues a notice of termination, SACOG will reimburse Local Agency for work actually performed up to the effective date of the notice of termination, subject to the limitations in Section 6 and less any compensation to SACOG for damages suffered as a result of Local Agency’s failure to comply with the terms of this Agreement. c. Local Agency will have the right to terminate this Agreement in the event SACOG is unable to make required payments, including, without limitation, a failure of the State to appropriate funds. In such event, Local Agency will provide SACOG with seven (7) days written notice of termination. The notice will be deemed served and effective on the date it is deposited in the U.S. mail, certified, return receipt requested, addressed to SACOG at the address indicated in Section 17. SACOG will make payment to Local Agency through the date of termination, subject to the provisions of Section 6 above. 11. Indemnity: Local Agency specifically agrees to indemnify, defend, and hold harmless SACOG, its directors, officers, members, agents, and employees (collectively the “Indemnitees”) from and against any and all actions, claims, demands, losses, costs, expenses, including reasonable attorneys’ fees and costs, damages, and liabilities (collectively “Losses”) arising out of or in any way connected with the performance of 5 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 this Agreement. Local Agency shall pay all costs and expenses that may be incurred by SACOG in enforcing this indemnity, including reasonable attorneys’ fees. The provisions of this Section shall survive the expiration, termination, or assignment of this Agreement. 12. Assignment: The parties understand that SACOG entered into this Agreement based on the Project proposed by Local Agency. Therefore, without the prior express written consent of SACOG, this Agreement is not assignable by the Local Agency either in whole or in part. 13. [Reserved] 14. Time: Time is of the essence in this Agreement and will follow the timeline set forth in the scope of work (Exhibit “A”), unless modified pursuant to Section 15. 15. Amendments: No alteration or variation of the terms of this Agreement will be valid unless made in writing and signed by the parties hereto, and no oral understanding or agreement not incorporated herein, will be binding on any of the parties hereto. 16. Contractors and Subcontractors: Local Agency will be fully responsible for all work performed by its contractors and subcontractors. a. SACOG reserves the right to review and approve, which approval shall not be unreasonably withheld, any contract or agreement to be funded in whole or in part using funds provided under this Agreement. b. Any contract or subcontract to be funded in whole or in part using funds provided under this Agreement will require the contractor and its subcontractors, if any, to: (1) Comply with applicable State and Federal law requirements that pertain to, among other things, labor standards, Non-Discrimination, the Americans with Disabilities Act, Equal Employment Opportunity, the Drug-Free Workplace Act. (2) Maintain at least the minimum State-required Workers’ Compensation Insurance for those employees who will perform the work or any part of it. (3) Maintain unemployment insurance and disability insurance as required by law, along with liability insurance in an amount that is reasonable to compensate any person, firm, or corporation who may be injured or damaged by the Local Agency or any subcontractor in performing work associated with this Agreement or any part of it. (4) Retain all books, records, accounts, documentation, and all other materials relevant to this Agreement for a period of three (3) years from the date of termination of this Agreement, or three (3) years from the conclusion or 6 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 resolution of any and all audits or litigation relevant to this Agreement and any amendments, whichever is later. (5) Permit SACOG and/or its representatives, upon reasonable notice, unrestricted access to any or all books, records, accounts, documentation, and all other materials relevant to this Agreement for the purpose of monitoring, auditing, or otherwise examining said materials. 17. Project Managers: SACOG’s Project Manager for this Agreement isGreg Chew, unless SACOG otherwise informs Local Agency. With the exception of notice of termination sent by certified mail pursuant to Section 10 above, any notice, report, or other communication required by this Agreement will be mailed by first-class mail to the SACOG Project Manager at the following address: Greg Chew, Senior Planner Sacramento Area Council of Governments 1415 L Street, Suite 300 Sacramento, CA 95814 Telephone: 916-798-0464 Email: [email protected] Local Agency’s Project Manager for this Agreement is Alaina Jordan (Primary Contact), Tyler Stratton, and Colleen Karbowski. No substitution of Local Agency’s Project Manager is permitted without prior written agreement by SACOG, which agreement will not be unreasonably withheld. With the exception of notice of termination sent by certified mail pursuant to Section 10 above, any notice, report, or other communication to Local Agency required by this Agreement will be mailed by first-class mail to: Alaina Jordan, Administrative Analyst (Primary Contact) City of Sacramento Department of Utilities 1395 35th Avenue, Sacramento CA 95822 Telephone: (916) 808-5801 Email: [email protected] Tyler Stratton, Program Specialist Telephone: (916) 808-1284 Email: [email protected] Colleen Karbowski, Senior Engineer Telephone: (916) 808-1474 Email: [email protected] 18. Successors: This Agreement will be binding on the parties hereto, their assigns, successors, administrators, executors, and other representatives. 7 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 19. Waivers: No waiver of any breach of this Agreement will be held to be a waiver of any prior or subsequent breach. The failure of SACOG to enforce at any time the provisions of this Agreement or to require at any time performance by the Local Agency of these provisions, will in no way be construed to be a waiver of such provisions nor to affect the validity of this Agreement or the right of SACOG to enforce these provisions. 20. Litigation: Local Agency will notify SACOG immediately of any claim or action undertaken by it or against it that affects or may affect this Agreement or SACOG, and will take such action with respect to the claim or action as is consistent with the terms of this Agreement and the interests of SACOG. 21. Non-Liability of SACOG: SACOG shall not be liable to Local Agency or any third party for any claim for loss of profits or consequential damages. Further, SACOG shall not be liable to Local Agency or any third party for any loss, cost, claim or damage, either direct or consequential, allegedly arising from a delay in performance or failure to perform under this Agreement. 22. Amendments Required by State Agencies: If any State agency having jurisdiction, requires a change to the terms of this Agreement, the parties will amend this Agreement as necessary, or will terminate it immediately. 23. Counterparts and Electronic Signatures: This MOU may be signed in one or more counterparts, each of which will constitute an original and all of which taken together shall constitute one and the same instrument. Documents executed, scanned, and transmitted electronically and electronic signatures shall be deemed original signatures for purposes of this MOU and all matters related thereto, with such scanned and electronic signatures having the same legal effect as original signatures. 24. Authority: The persons signing on behalf of the parties to this MOU each warrant they have the legal authority to execute this MOU. 25. Entire Agreement: This MOU embodies the entire agreement of the parties in relation to the matters contained herein, and no other understanding, whether verbal, written, or otherwise, exists among the parties. 26. Americans with Disabilities Act (ADA) of 1990; Accessibility: By signing this Agreement, Local Agency assures SACOG that it complies with the Americans with Disabilities Act (ADA) of 1990 (42 U.S.C. § 12101, et seq.), which prohibits discrimination on the basis of disability, as well as all applicable regulations and guidelines issued pursuant to the ADA including, but not limited to, those found within the Code of Federal Regulations, Title 49, parts 27, 37, and 38. Local Agency also agrees that it will award no construction contract unless its plans and specifications for such facilities conform to the provisions of California Government Code Sections 4450 and 4454, if applicable. 8 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 27. Compliance with Non-discrimination and Equal Employment Opportunity Laws: It is SACOG’s policy to comply with State and Federal laws and regulations including Title VI of the Civil Rights Act of 1964, Americans with Disabilities Act of 1990 (ADA) and other Federal discrimination laws and regulations, (including 49 CFR Part 21 through Appendix C, 23 CFR part 200, 23 CFR part 230, 49 U.S.C. 5332, 42 U.S.C. 12101, et seq., and the Title VI Assurance executed by California under 23 U.S.C. 324 and 29 U.S.C. 794), as well as the Unruh Civil Rights Act of 1959, the California Fair Employment and Housing Act (Government Code Section 12990, et seq.), and other California State discrimination laws and regulations. SACOG does not discriminate against any employee or applicant for employment because of race, religion (including religious dress and grooming practices) color, national origin, (includes use and possession of a driver’s license issued to persons unable to prove their presence in the United States is authorized under federal law), ancestry, disability, (including physical and mental, including HIV and AIDS) medical condition, (including genetic characteristics, cancer or a record or history of cancer), military or veteran status, marital status, sex/gender (includes pregnancy, childbirth, breastfeeding, and/or related medical conditions), age (40 and above), gender identity, gender expression, or sexual orientation pursuant to Sections 12940 et seq. of the Government Code. SACOG prohibits discrimination by its employees, Local Agencys, contractors and consultants. Local Agency hereby certifies, under penalty of perjury under the laws of California, that it complies with, and that Local Agency will require that its contractors and subcontractors comply with, the following non-discrimination and equal opportunity laws. Any failure by Local Agency to comply with these provisions shall constitute a material breach of this Agreement, which may result in the termination of this Agreement or such other remedy as SACOG may deem appropriate. a. Local Agency and its contractors and subcontractors shall comply with all provisions prohibiting discrimination on the basis of race, color, or national origin of Title VI of the Civil Rights Act of 1964, as amended, 42 U.S.C. §§ 2000d, et seq., with U.S. D.O.T. regulations, “Nondiscrimination in Federally-Assisted Programs of the Department of Transportation – Effectuation of Title VI of the Civil Rights Act”, 49 C.F.R. Part 21, and with any applicable implementing Federal directives that may be issued. Title VI provides that the recipients of federal assistance will implement and maintain a policy of nondiscrimination in which no person shall, on the basis of race, color, ancestry, national origin, religion, religious creed, sex, age, or disability, be excluded from participation in, denied the benefits of, or subject to discrimination under any program or activity by the recipients of federal assistance or their assignees and successors in interest. b. Local Agency and its contractors and subcontractors shall comply with all applicable equal employment opportunity (EEO) provisions of 42 U.S.C. § 2000e, implementing Federal regulations, and any applicable implementing Federal directives that may be issued. Local Agency and its contractors and subcontractors 9 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 shall ensure that applicants and employees are treated fairly without regard to their race, color, creed, sex, disability, age, or national origin. c. Local Agency and its contractors and subcontractors will act in accordance with Title VI and will not unlawfully discriminate, harass, or allow harassment, against any employee or applicant for employment because of sex, sexual orientation, race, color, ancestry, religion, religious creed, national origin, physical disability (including HIV and AIDS), mental disability, medical condition, age or marital status. Local Agency and its contractors and subcontractors will further ensure that the evaluation and treatment of their employees and applicants for employment are free from such discrimination and harassment, including the improper denial of family and medical care leave and pregnancy disability leave. Local Agency and its contractors and subcontractors will comply with all applicable Federal and State employment laws and regulations including, without limitation, the provisions of the California Fair Employment and Housing Act (Government Code § 12900, et seq.) and the applicable regulations promulgated thereunder (California Code of Regulations, Title 2, § 7285.0, et seq.), as well as Title 2, California Code of Regulations, Section 8103. The applicable regulations of the Fair Employment and Housing Commission implementing Government Code §§ 12990 (a-f), set forth in Chapter 5 of Division 4 of Title 2 of the California Code of Regulations, are incorporated into this Agreement by reference and made a part hereof as if set forth in full. Local Agency and its contractors and subcontractors will give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement. d. Local Agency and its subcontractors shall also comply with the Older Americans Act, as amended (42 U.S.C. 6101), prohibiting discrimination on the basis of age, Section 324 of Title 23 U.S.C., prohibiting discrimination based on gender, and Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794) and 49 CFR part 27 regarding discrimination against individuals with disabilities. e. Local Agency, with regard to the work performed by it during the Agreement, shall act in accordance with Title VI. Specifically, Local Agency shall not discriminate on the basis of race, color, ancestry, national origin, religion, religious creed, sex, age, or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. f. Local Agency and its contractors will include the provisions of this Section 27 in all contracts to perform work funded under this Agreement. Local Agency shall take such action with respect to any such contract as SACOG may direct as a means of enforcing such provisions, including sanctions for noncompliance. g. Sanctions for Noncompliance: In the event of the Local Agency's noncompliance with the nondiscrimination provisions of this Agreement, SACOG shall impose such contract sanctions as it or the State may determine to be appropriate, including, but not limited to: 10 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 i. Withholding of payments to the Local Agency under this Agreementuntil the Local Agency complies, and/or ii. Cancellation, termination or suspension of the Agreement, in whole or in part.28. Drug-Free Certification: By signing this Agreement, Local Agency hereby certifies under penalty of perjury under the laws of the State of California that Local Agency will comply with the requirements of the Drug-Free Workplace Act of 1990 (Government Code § 8350, et seq.) and will provide a drug-free workplace by taking the following actions: a. Publish a statement notifying employees that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited, and specifying actions to be taken against employees for violations. b. Establish a Drug-Free Awareness Program to inform employees about: (1) The dangers of drug abuse in the workplace; (2) The person’s or the organization’s policy of maintaining a drug-free workplace; (3) Any available counseling, rehabilitation, and employee assistance programs; and (4) Penalties that may be imposed upon employees for drug abuse violations. c. Every employee of Local Agency who works under this Agreement will: (1) Receive a copy of Local Agency’s Drug-Free Workplace Policy Statement; and (2) Agree to abide by the terms of Local Agency’s Statement as a condition of employment on this Agreement. 29. Union Organizing: By signing this Agreement, Local Agency hereby acknowledges the applicability of Government Code § 16645 through § 16649 to this Agreement, excluding § 16645.2 and § 16645.7. a. Local Agency will not assist, promote, or deter union organizing by employees performing work on this Agreement if such assistance, promotion, or deterrence contains a threat of reprisal or force, or a promise of benefit. b. Local Agency will not meet with employees or supervisors on SACOG or State property if the purpose of the meeting is to assist, promote, or deter union organizing, unless the property is equally available to the general public for meetings.11 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 30. Prohibition of Expending State or Federal Funds for Lobbying: a. Local Agency certifies, to the best of his or her knowledge or belief, that: (1) No State or Federal appropriated funds have been paid or will be paid, by or on behalf of the Local Agency, to any person for influencing or attempting to influence an officer or employee of any State or Federal agency, a Member of the State Legislature or United States Congress, an officer or employee of the Legislature or Congress, or any employee of a Member of the Legislature or Congress in connection with the awarding of any State or Federal contract, the making of any State or Federal grant, the making of any State or Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any State or Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federally appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or any employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative Agreement, the Local Agency will complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions. b. This certification is a material representation of fact upon which reliance was placed when this Agreement was entered into. Submission of this certification is a prerequisite for making or entering into this Agreement imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification will be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. c. Local Agency also agrees by signing this Agreement that he or she will require that the language of this certification be included in all lower tier contracts and subcontracts. 31. Prevailing Wage and Labor Requirements. a. Should Local Agency award any construction contracts utilizing Federal funds under this Agreement, Local Agency agrees to comply with all applicable statutes, rules and regulations promulgated by the Federal government including, but not limited to, (i) prevailing wage requirements of the Davis Bacon Act (40 U.S.C. §276a, et seq.) and related regulations (29 CFR Part 5); (ii) anti-kick back and payroll records requirements of the Copeland “Anti-Kickback” Act (40 U.S.C. §276c and 18 U.S.C. §874) and related regulations (29 CFR Part 3); and (iii) workweek computation and overtime requirements of the Contract Work Hours and 12 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 Safety Standards Act (40 U.S.C. §327-333) and related regulations (29 CFR Part 5). b. Should Local Agency award any “public work” contract, as defined by California Labor Code Section 1720, utilizing State funds under this Agreement, Local Agency agrees to comply with all pertinent California statutes, rules, and regulations including, but not limited to, prevailing wage provisions of Labor Code Section 1771. Nothing in this section is intended to preclude any exemptions within Labor Code Section 1720 that may apply to Local Agency. If required by Civil Code sections 9550 et seq., any contractor or subcontractor shall be required to provide and maintain bonds to secure the payment of prevailing wages to workers. c. Any contract or subcontract entered into as a result of this Agreement will contain all of the provisions of this section. 32. Economic Sanctions: Pursuant to California State Executive Order N-6-22 (Order) imposing economic sanctions against Russia and declaring support of Ukraine, SACOG shall terminate any contract with any individual or entity that is in violation of the Order or that is subject to economic sanctions therein and shall not enter a contract with any such individual or entity while the Order is in effect. [Signatures on Next Page] 13 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 IN WITNESS WHEREOF, THE PARTIES HAVE ENTERED INTO THIS MEMORANDUM OF UNDERSTANDING AS OF THE DATE FIRST ABOVE WRITTEN:SACRAMENTO AREA COUNCILOF GOVERNMENTS By:______________________________ JAMES CORLESSExecutive Director APPROVED AS TO FORM:__________________________________ Sloan Sakai Yeung & Wong LLP Legal Counsel to SACOG JURISDICTIONBy:______________________________ RYAN MOOREAssistant City ManagerBy:______________________________ MICHAEL VOSSSenior Deputy City AttorneyLIST OF EXHIBITS:Exhibit “A”: Scope of Work Exhibit “B”: Standard Agreement between State and SACOG regarding REAP 2 Grants Exhibit “C”: Required Supporting Documentation for Grant Recipients 14

Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 EXHIBIT “A” Project Description Jurisdiction: ___City of Sacramento_________________________________________________ Project Title: ___Lavender Heights Water Infrastructure Expansion Project _________________ Project Location: _20th Street to 23rd Street from Improv Alley to Kayak Alley_______________ Project Housing Nexus: Check all that apply._____Reduce Time __X__Impact on housing supply and/or affordability _____Reduce Development Costs _____Increase approval certainty and/or streamlines entitlements __X___Infrastructure Capacity _____Other: ____________ Project Location Type: Check all that apply. ___x__Green Zone _____Community wide _____Civic Lab Corridor _____Other: _______________ Project Goal Statement: Describe the impact of your project on the acceleration of housing production. The goal of this project is to expand water infrastructure in the project area to increase capacity sufficient to serve future multi-family residential units and increase fire safety. Project Description: The proposed GMG Project would expand water infrastructure in a portion of the “Central City Corridors” Green Zone, generally comprised of 20thStreet to 23rdStreet from Improv Alley to Kayak Alley, to increasing capacity sufficient to serve thousands of multi-family residential units and improve fire safety. The existing 6” water infrastructure is inadequate to accommodate meaningful residential densification. As such, the proposed corridor-wide project would be a catalyst for considerable residential infill development in an area currently undersupplied in housing choice and opportunity. The project proposes to construct approximately 450 linear feet of 8-inch diameter water main between Jazz Alley and Improv Alley on 20th Street, 850 linear feet of 8-inch diameter water main between Kayak Alley and Improv Alley on 21st Street, and 850 linear feet of 8-inch diameter water main between Kayak Alley and Improv Alley on 22ndStreet. DOU reserves the right to revise the proposed water main improvements based system analysis and demands. Implementation: Summarize plans for adoption or implementation or next steps. If the project is one component of a larger effort, such as a study that will support fee reductions, please specify how this project fits into the larger housing effort. 15 Contract No.: 230058Funding Source: State REAP 2 Project Billing Code: SAC229 The anticipated timing of known residential projects will likely mitigate the risk of funding shortfall related to the water infrastructure expansion project because if there is any funding gap, the delta will be borne by any immediately benefitting project applicant(s). The City understands, however, that it is infeasible for any one infill residential project to pay for the entirety of the water infrastructure expansion and that the feasibility of infill residential development may continue to be a challenge even with the success of this water infrastructure project. 16 Contract No.: 230058 Funding Source: State REAP 2 Project Billing Code: SAC229

SCOPE OF WORK Project Tasks, Deliverables, Timeline and Budget Grant Project Name: LAVENDER HEIGHTS WATER INFRASTRUCTURE EXPANSION PROJECT Task # Detailed Description of Tasks / Milestones Task Timeline (in months and year)Deliverable(s) including delivery date Total Budget Green Means Go Funds Other Funds (include source)1 Project Management & Administration On-going (Through duration of project, 2 years & 1 month)1. Invoices & associated backup documentation $15,000$15,000 - 2 Reporting (SACOG) On-going (Through duration of project, 2 years & 1 month) 1. Progress report and invoicing (quarterly) 2. Summary of potential housing units impacted by project (final deliverable upon project completion)$15,000$15,000 - 3Perform Topographic Survey Topographic survey of streets and alleyways. 3 months1.Topographic Survey –11/1/2023 $50,000$50,000-17 Contract No.: 230058 Funding Source: State REAP 2 Project Billing Code: SAC229

4 Design Develop PS&E documents for the construction of approximately 450 linear feet of 8-inch diameter water main between Jazz Alley and Improv Alley on 20th Street, 850 linear feet of 8-inch diameter water main between Kayak Alley and Improv Alley on 21st Street, and 850 linear feet of 8-inch diameter water main between Kayak Alley and Improv Alley on 22nd Street. Water main shall be C900 PVC pipe. All fittings/appurtenances shall be constructed per City Specifications. Design shall include alignment alternative analysis, potholing, permitting, and public outreach. 8 months 1. Construction Plans, Specifications, and Engineer’s Construction Cost Estimate – 4/1/2024 $125,000 $125,000 -5 Bid and Award 5 months 2. Execute Contract –9/1/2024 a. Bid Documents b. Proof of Advertisementc. Notice of Awardd. Notice to Proceed $10,000$10,000 - 6 ConstructionConstruct water main improvements per Contract Documents. Includes materials and labor. 9 months1.Construct Improvements –6/1/2025$829,500$829,50018 Contract No.: 230058 Funding Source: State REAP 2 Project Billing Code: SAC229

6.1Construction Management & Inspection Costs shall include inspection, construction management, and administration costs. $38,500$38,500 TOTALS $1,083,000 $1,083,000 19 Contract No.: 230058 Funding Source: State REAP 2 Project Billing Code: SAC229 20 21
22 23
24 25
26 27
28 29
30 31
32 33
Contract No.: 230058 Funding Source: State REAP 2 Project Billing Code: SAC229

EXHIBIT “C”

34 811

PIPE SCHEDULE

811

EXISTINGPROPOSED

DETAIL DESIGNATIONS
CONTRACTOR:INSTALL DATE:TRANSMISSION MAIN MATERIAL:PIPE MFG:WATER SERVICES LOCATIONS SUBMITTEDINFORMATION ACCEPTED BY (CITY):GATE VALVE MFG:CONSTRUCTION INFORMATIONNOTE: CONTRACTOR TO FILL OUT AFTER PROJECT COMPLETION.DISTRIBUTION MAIN MATERIAL:PIPE MFG:BUTTERFLY VALVE MFG:HYDRANT LEAD MATERIAL:PIPE MFG:HYDRANT MFG:AIR & VACUUM RELEASE VALVE MFG:WATER SERVICE MATERIAL:

CONTRACTOR:INSTALL DATE:TRANSMISSION MAIN MATERIAL:PIPE MFG:WATER SERVICES LOCATIONS SUBMITTEDINFORMATION ACCEPTED BY (CITY):GATE VALVE MFG:CONSTRUCTION INFORMATIONNOTE: CONTRACTOR TO FILL OUT AFTER PROJECT COMPLETION.DISTRIBUTION MAIN MATERIAL:PIPE MFG:BUTTERFLY VALVE MFG:HYDRANT LEAD MATERIAL:PIPE MFG:HYDRANT MFG:AIR & VACUUM RELEASE VALVE MFG:WATER SERVICE MATERIAL:

BELL
BELL
BELL

BELLBELL
UNKN
SMUD
BELL
BELL
BELL

BELLBELL
UNKN
SMUD
BELL
SMUD
BELL
SMUD
CONTRACTOR:INSTALL DATE:TRANSMISSION MAIN MATERIAL:PIPE MFG:WATER SERVICES LOCATIONS SUBMITTEDINFORMATION ACCEPTED BY (CITY):GATE VALVE MFG:CONSTRUCTION INFORMATIONNOTE: CONTRACTOR TO FILL OUT AFTER PROJECT COMPLETION.DISTRIBUTION MAIN MATERIAL:PIPE MFG:BUTTERFLY VALVE MFG:HYDRANT LEAD MATERIAL:PIPE MFG:HYDRANT MFG:AIR & VACUUM RELEASE VALVE MFG:WATER SERVICE MATERIAL:

UNKNUNKNUNKNUNKNUNKNUNKN
TRUNC DOME334319.36TRUNC DOME349819.65
BELL

BELLBELLBELL

BELLBELL

BELLBELLBELL
SMUD

SMUDSMUD
BELL

BELLBELLBELL

BELLBELL

BELLBELLBELL
SMUD

SMUDSMUD
TRUNC DOME329119.47
TRUNC DOME334319.36TRUNC DOME334519.42
TRUNC DOME342119.51
TRUNC DOME347719.62TRUNC DOME349819.65
CONTRACTOR:INSTALL DATE:TRANSMISSION MAIN MATERIAL:PIPE MFG:WATER SERVICES LOCATIONS SUBMITTEDINFORMATION ACCEPTED BY (CITY):GATE VALVE MFG:CONSTRUCTION INFORMATIONNOTE: CONTRACTOR TO FILL OUT AFTER PROJECT COMPLETION.DISTRIBUTION MAIN MATERIAL:PIPE MFG:BUTTERFLY VALVE MFG:HYDRANT LEAD MATERIAL:PIPE MFG:HYDRANT MFG:AIR & VACUUM RELEASE VALVE MFG:WATER SERVICE MATERIAL:

BELL

BELLBELLBELL
BELL

BELLBELLBELL
TRUNC DOME455818.11
CONTRACTOR:INSTALL DATE:TRANSMISSION MAIN MATERIAL:PIPE MFG:WATER SERVICES LOCATIONS SUBMITTEDINFORMATION ACCEPTED BY (CITY):GATE VALVE MFG:CONSTRUCTION INFORMATIONNOTE: CONTRACTOR TO FILL OUT AFTER PROJECT COMPLETION.DISTRIBUTION MAIN MATERIAL:PIPE MFG:BUTTERFLY VALVE MFG:HYDRANT LEAD MATERIAL:PIPE MFG:HYDRANT MFG:AIR & VACUUM RELEASE VALVE MFG:WATER SERVICE MATERIAL:

TRUNC DOME395219.23
TRUNC DOME4022TRUNC DOME4225
CONTRACTOR:INSTALL DATE:TRANSMISSION MAIN MATERIAL:PIPE MFG:WATER SERVICES LOCATIONS SUBMITTEDINFORMATION ACCEPTED BY (CITY):GATE VALVE MFG:CONSTRUCTION INFORMATIONNOTE: CONTRACTOR TO FILL OUT AFTER PROJECT COMPLETION.DISTRIBUTION MAIN MATERIAL:PIPE MFG:BUTTERFLY VALVE MFG:HYDRANT LEAD MATERIAL:PIPE MFG:HYDRANT MFG:AIR & VACUUM RELEASE VALVE MFG:WATER SERVICE MATERIAL: