Item 05 2024-01652 Execution of Utility Relocation Agreement with Sacramento Suburban Water District for the Auburn Boulevard Bridge Replacement Project (T15145300)

Sacramento City Council
October 29, 2024

Document
Item 05 2024-01652 Execution of Utility Relocation Agreement with Sacramento Suburban Water District for the Auburn Boulevard Bridge Replacement Project (T15145300)
Meeting
October 29, 2024
Body
Sacramento City Council
Pages
3
Original file
8.3 MB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

City of Sacramento
City Council - 5PM Report
915 I Street Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2024-01652 10/29/2024 Consent Item 5.

Execution of Utility Relocation Agreement with Sacramento Suburban Water District for the Auburn Boulevard Bridge Replacement Project (T15145300) File ID: 2024-01652
Location: Auburn Boulevard at Arcade Creek between Winding Way and the Interstate 80 Ramp intersections, District 2, Represented by Councilmember Thao Recommendation: Adopt a Resolution authorizing the City Manager or the City Manager’s designee to execute a Utility Agreement with Sacramento Suburban Water District (SSWD) for the Auburn Boulevard Bridge Replacement Project (T15145300); and 2) upon execution of the agreement authorize the City Manager or the City Manager’s designee to increase the revenue and expenditure budget in the Auburn Boulevard Bridge Agreement by $955,000 (CIP Reimbursable Fund, Fund 3702).

Contact: Nick Ahantab, Assistant Engineer, (916) 808-1196, [email protected]; Judith -Matsui Drury, Supervising Engineer, (916) 808-7610, [email protected]; Ofelia Avalos, Engineering Services Manager, (916) 808-5054, [email protected]; Department of Public Works
Presenter: None
Attachments:
1-Description/Analysis
2-Resolution
3-Utility Relocation Agreement - Sacramento Suburban Water District Description/Analysis
Issue Detail: The Auburn Boulevard Bridge Replacement Project will replace the existing structurally deficient and functionally obsolete bridge over Arcade Creek. The new bridge will be widened to accommodate standard bike lanes, lane widths, and sidewalks as well as an additional left turn lane at the Winding Way intersection.

The project is funded primarily through the federal Highway Bridge Program (HBP) with matching local funds. During the engineering design process, an existing waterline owned by the Sacramento Suburban Water District (SSWD) was identified on Auburn Boulevard which requires relocation to

Page 1 of 3 ends

File ID: 2024-01652 10/29/2024 Consent Item 5.
construct the proposed bridge. In addition to the waterline relocation, SSWD requested that the project include upsizing of their existing water line within the project limits. To proceed with the construction of Auburn Boulevard Bridge Replacement and fund the water line improvements, the City must execute a Utility Agreement with the SSWD to formalize cost liability for the proposed water line improvements. The City will perform the work with the project and SSWD will reimburse the City via this agreement.

Policy Considerations: The actions requested herein are necessary for the construction of the Auburn Boulevard Bridge Replacement project, which is consistent with the City’s goals of improving and expanding public safety, and enhancing livability, as identified in the General Plan:

PFS-3.1 - Provision of Adequate Utilities: The City shall continue to provide reliable water, wastewater, and stormwater drainage utility services.

PFS-3.3 - Development Impacts: The City shall ensure that public utility facilities are designed to be safe and compatible with adjacent uses.

Per City Code 3.04.010(B), all contracts involving income or expenditure of $250,000 or more require approval of the City Council, for signature of the City Manager.

Economic Impacts: None.

Environmental Considerations:

California Environmental Quality Act (CEQA): The Community Development Department, Environmental Planning Services Division has reviewed the Auburn Boulevard at Arcade Creek Bridge Project, which is a project subject to the California Environmental Quality Act (CEQA). In compliance with the CEQA, the City prepared an Initial Study. On December 8, 2020, the City Council adopted the Mitigated Negative Declaration (MND) and adopted the Mitigation Monitoring Plan (MMP), (Resolution No. 2020-0394). None of the circumstances identified in CEQA Guidelines Section 15162 are present that would require supplemental or subsequent review and no re-circulation is required. The adopted MND evaluated the environmental effects associated with the replacement of the Auburn Bridge. No further environmental review is required for the subsequent action of the previously approved project.

National Environmental Policy Act (NEPA): Caltrans issued a Categorical Exclusion (CE) for the Auburn Boulevard Bridge Replacement Project on January 20, 2021, confirming conformance with the National Environmental Policy Act (NEPA).

Sustainability: This project is consistent with the General Plan goals of balancing community, social, environmental, and economic goals when modifying streets, roads, bridges, and other public rights- of-way and also by enhancing pedestrian facilities to encourage bicycle and pedestrian trips with increased connectivity along Auburn Boulevard to the trails along

Page 2 of 3 ends

File ID: 2024-01652 10/29/2024 Consent Item 5.

Arcade Creek.

Commission/Committee Action: None.

Rationale for Recommendation: The Auburn Boulevard Bridge Replacement Project requires the relocation of an existing waterline owned by SSWD to accommodate changes in the bridge structure.

Relocation and related improvements of the waterline require approval by the City Council to execute a Utility Agreement with the SSWD prior to authorization of federal construction funds. City Council approval is required to execute the Utility Agreement.

Financial Considerations: Per the Utility Agreement, SSWD will reimburse the City an estimated $955,000 to fund the engineering and construction costs associated with the waterline relocation agreement. Upon execution of the agreement, the revenue and expenditure budgets of the Auburn Boulevard Bridge Replacement Project (T15145300) will be increased by $955,000 (CIP Reimbursable Fund, Fund 3702).

Local Business Enterprise (LBE): Not applicable.

Page 3 of 3 ends

Resolution 2024-XXXX September 26, 2024 Page 1 of 2
RESOLUTION 2024-

Adopted by the Sacramento City Council

October 29, 2024

Budgetary Adjustments and Execution of Utility Relocation Agreement with Sacramento Suburban Water District for the Auburn Boulevard Bridge Replacement Project (T15145300)

BACKGROUND

A. The Auburn Boulevard Bridge Replacement Project will replace the existing structurally deficient and functionally obsolete bridge over Arcade Creek. The new bridge will be widened to accommodate standard bike lanes, lane widths, and sidewalks as well as an additional left turn lane at the Winding Way intersection.

B. The project is funded primarily through the federal Highway Bridge Program (HBP) with matching local funds. During the engineering design process, an existing waterline owned by the Sacramento Suburban Water District (SSWD) was identified on Auburn Boulevard which requires relocation to construct the proposed bridge. In addition to the waterline relocation, SSWD requested that the project include upsizing of their existing water line within the project limits. To proceed with the construction of Auburn Boulevard Bridge Replacement and fund the water line improvements, the City must execute a Utility Agreement with the SSWD to formalize cost liability for the proposed water line improvements. The City will perform the work with the project and SSWD will reimburse the City via this agreement.

BASED ON THE FACTS SET FORTH IN THE BACKGROUND, THE CITY COUNCIL RESOLVES AS FOLLOWS:

SECTION 1.

The City Manager or the City Manager’s designee is authorized to execute a Utility Agreement with Sacramento Suburban Water District (SSWD) for the Auburn Boulevard Bridge Replacement Project (T15145300);

SECTION 2.

Resolution 2024-XXXX September 26, 2024 Page 2 of 2

The City Manager or the City Manager’s designee is authorized to increase the revenue and expenditure budget of the Auburn Boulevard Bridge Replacement Project (T15145300) by $955,000 (CIP Reimbursable Fund, Fund 3702).