City of Sacramento
City Council - 5PM Report
915 I Street Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2024-01723 10/29/2024 Consent Item 13.
Execute Consultant Services Agreement for the Vision Zero Action Plan Update (S15184100) File ID: 2024-01723
Location: Citywide
Recommendation: Pass a Motion authorizing the City Manager or the City Manager’s designee to execute a Professional Services Agreement with Fehr and Peers for the Vision Zero Action Plan Update for an amount not to exceed $495,615.
Contact: Jennifer Donlon Wyant, Transportation Planning Manager, (916) 808-5913, [email protected]; David Edrosolan, City Traffic Engineer, (916) 808-5974, [email protected]; Department of Public Works Presenter: None
Attachments:
1-Description/Analysis
2-Professional Services Agreement with Fehr and Peers
Description/Analysis
Issue Detail: In 2017, City Council adopted the goal to eliminate traffic fatalities by 2027 (Resolution 2017-0032) and then in 2018 City Council adopted the Vision Zero Action Plan (Resolution 2018- 0342). The objective of this Vision Zero Action Plan Update is to build from the 2018 Action Plan and provide a framework for the near-term and to the future. This Action Plan update will include updated data and ensure the City is eligible for competitive grant funding. The updated plan will identify “safety corridors” as defined by the State of California and include all the features defined by the Safe Streets and Roads for All (SS4A) discretionary program.
City Council approval is required to execute a Professional Services Agreement with Fehr and Peers to assist in plan preparation.
Policy Considerations: The recommendations in this report are in accordance with the following specific policies from the Sacramento 2040 General Plan:
File ID: 2024-01723 10/29/2024 Consent Item 13.
M-1: An equitable, sustainable multimodal system that provides a range of viable and healthy travel choices for users of all ages, backgrounds, and abilities.
M-1.2 User Prioritization. The City shall prioritize mobility, comfort, health, safety, and convenience for those walking, followed by those bicycling and riding transit, ahead of design and operations for those driving.
M-1.9 Equitable Processes and Outcomes. The City shall ensure that the transportation system is planned and implemented with an equitable process to achieve equitable outcomes and investments so that all neighborhoods one day will have similar levels of transportation infrastructure such as sidewalks, marked low stress crossings, and bikeways.
M-4.1 Application of Safety. The City shall design, plan, and operate streets using complete streets principles to ensure the safety and mobility of all users.
M-4.2 Safer Driving Speeds. The City shall work to maximize the safety of the transportation network by designing streets for lower driving speeds and enforcing speed limits in an unbiased manner as well as promoting safer driving behavior.
M-4.3 Vision Zero. The City shall utilize a data driven, “vision zero” approach to eliminate all traffic fatalities and severe injuries by 2027, while increasing safety, health, and equitable mobility for all.
M-4.4 Collaborative Safety Solutions. The City shall collaborate with educational institutions, senior living facilities, community organizations, and other interested parties when developing and implementing programs and improvements that increase safety and encourage the use of active transportation and transit modes.
Economic Impacts: None.
Environmental Considerations:
California Environmental Quality Act (CEQA): The award of a professional services agreement for the preparation of a complete streets plan is exempt from the requirements of CEQA pursuant to CEQA Guidelines Section 15262, Feasibility and Planning Studies. Section 15262 exempts projects involving only feasibility or planning studies for possible future actions, which have not been approved, adopted, or funded. It is anticipated that future projects identified in this study will be subject to environmental evaluation under CEQA and possibly National Environmental Policy Act (NEPA) requirements.
Sustainability: This plan will ensure the City is eligible for more funding sources, allowing the City to
File ID: 2024-01723 10/29/2024 Consent Item 13.
pursue additional funding to plan for multimodal improvements furthers the City’s commitment to sustainability. The Vision Zero Action Plan Update will focus on safety, mobility for all modes of transportation, and by doing so identify ways to remove barriers to walking, bicycling and transit use.
Commission/Committee Action: None.
Rationale for Recommendation: Traffic safety is a critical issue. Given the limited funding available, it is important to have a plan that includes updated data and to maximize the City’s eligibility for certain federal competitive grant funding. The City allocated funding and issued a Request for Proposals in April 2024.
The Request for Proposals (RFP) for professional services was advertised for the project per City guidelines. Three proposals were received by the close of the submittal period. All submittals were scored by an unbiased selection committee and three consultant teams were interviewed by a panel of City employees. Fehr and Peers was selected as the preferred consultant team. City Council approval is necessary to execute the agreement. Section 3.56.090 of the City Code requires the approval of city council for a contract that is more than $250,000.
Financial Considerations: The Vision Zero Action Plan Update is expected to cost approximately $700,000 for staff and consultant efforts. There is sufficient funding in Vision Zero Safety Program (S15184100) to execute the agreement with Fehr and Peers for an amount not to exceed $495,615 and cover remaining program costs.
There are no General Funds planned or allocated for this project.
Local Business Enterprise (LBE): Fehr and Peers is a Local Business Enterprise (LBE).
Background: On April 23, 2024, City staff released a Request for Proposals (RFP) for professional services to support the Vision Zero Action Plan Update.
A pre-proposal meeting was held on May 1, 2024, and proposals were due May 17, 2024. Three proposals were received, and all were interviewed the week of July 15, 2024. Fehr and Peers was chosen as the preferred firm. Scope negotiations began on August 6, 2024, and concluded with the mutual satisfaction of both parties. The professional services to be performed by Fehr and Peers. Will include the following:
· Data Collection and Analysis
· Develop Countermeasures
· Listening and Engagement
· Prioritization of actions (such as policies)
· Draft and Final Plan
Form Approved by City Attorney 9-1-2020 Page 1
CONTRACT #: CONTRACT NAME: Vision Zero Action Plan UpdateCONTRACT PROJECT #: S15184123 DEPARTMENT: Public WorksDIVISION: TransportationCITY OF SACRAMENTOPROFESSIONAL SERVICES AGREEMENT FOR ARCHITECTS, LANDSCAPE ARCHITECTS, ENGINEERS, AND LAND SURVEYORS THIS CONTRACTis made at Sacramento, California, by and between the CITY OF SACRAMENTO, a charter city and municipal corporation (“CITY”), andFehr & Peers555 Capitol Mall, #510, Sacramento, CA 95814 Phone: 415.255.5963 / E-mail: [email protected](“CONTRACTOR”), as of the Effective Date, as defined below.The City and Contractor agree as follows: 1.Effective Date. This Contract shall be effective beginning October 29, 2024. 2. Contract Documents. All exhibits and documents attached or referred to in this Contract are incorporated as if set forth herein, Including Exhibit A (titled “Scope of Services”) and Exhibit B (titled “Payment”). If there is a conflict between the terms and conditions of any document prepared or provided by the Contractor and made a part of this Contract and the other terms or conditions of the Contract, the other terms and conditions of the Contract control. 3. Services. Subject to the terms and conditions set forth in this Contract, CONTRACTOR shall provide to CITY the services described in Exhibit A (“Services”). CONTRACTOR will not be compensated for services outside the scope of Exhibit A (“Additional Services”) unless, before providing Additional Services: (a) CONTRACTOR notifies CITY and CITY agrees that the Additional Services are outside the scope of Exhibit A; (b) CONTRACTOR estimates the additional compensation required for these Additional Services; and (c) CITY, after notice, approves in writing a Supplemental Contract specifying the Additional Services and the amount of additional compensation to be paid Contractor. CITY will have no obligations whatsoever under this Contract or any Supplemental Contract, unless and until this Contract or any Supplemental Contract is approved by the City as required by the Sacramento City Code. As used in this Contract, the term “Services” includes both Services and Additional Services as applicable.
Form Approved by City Attorney 9-1-2020 Page 2
4.Payment.CITY shall pay CONTRACTOR at the times and in the manner set forth in Exhibit B. CONTRACTOR shall submit all invoices to CITY in the manner specified in Exhibit B.5.Facilities and Equipment. Except as set forth below, CONTRACTOR shall, at its sole cost and expense, furnish all facilities and equipment required for CONTRACTOR to perform this Contract. CITY shall furnish to CONTRACTOR only the facilities and equipment listed below, if any. 6.Insurance. Contractor shall, at its sole cost and expense, maintain the insurance coverage described in the attached Exhibit C. 7. General Conditions. Contractor shall comply with the terms and conditions set forth in the attached Exhibit D. 8. Additional Requirements for Surveying, Material Testing, and Inspection Services. If this Contract includes any land surveying, material testing, or inspection services provided for a City construction project, during the design, pre-construction, construction, or post-construction phases of the project, the Contractor and any subcontractor or subconsultant performing any such services shall comply with the provisions specified in Exhibit E. 9. Non-Discrimination in Employee Benefits. This Contract may be subject to Sacramento CityCode chapter 3.54, Non- Discrimination in Employee Benefits by City Contractors. A summary of the requirements, entitled "Requirements of the Non-Discrimination in Employee Benefits Code (Equal Benefits Ordinance),” can be viewed at: https://www.cityofsacramento.org/Finance/Procurement/Contract-Ordinances. Contractor acknowledges and represents that Contractor has read and understands the requirements and shall fully comply with all applicable requirements of Sacramento City Code chapter 3.54. If requested by City, Contractor shall promptly provide any documents and information required by City to verify Contractor's compliance. Contractor's violation of Sacramento City Code chapter 3.54 constitutes a material breach of this Contract, for which the City may terminate the Contract and pursue all available legal and equitable remedies. 10. Considering Criminal Conviction Information in the Employment Application Process. This Contract may be subject to the requirements of Sacramento City Code chapter 3.62, Procedures for Considering Criminal Conviction Information in the Employment Application Process. A summary of the requirements, entitled “Ban-The-Box Requirements,” can be viewed at: https://www.cityofsacramento.org/Finance/Procurement/Contract-Ordinances. The Ban-The-Box Requirements are applicable to certain contracts with the City in an amount of $250,000 or more (either initial value or total value after amendment) or if the total value of all Contractor's contracts with the City is $250,000 or more over a 12-month period.
Form Approved by City Attorney 9-1-2020 Page 3
Contractor acknowledges and represents that Contractor has read and understands these requirements and shall fully comply with all applicable requirements of Sacramento City Codechapter 3.62. If requested by City, Contractor shall promptly provide any documents and information required by City to verify Contractor's compliance. Contractor shall require applicable subcontractors to fully comply with all applicable requirements of Sacramento City Code chapter 3.62 and include these requirements in all subcontracts covered by Sacramento City Code chapter 3.62. Contractor's violation of Sacramento City Code chapter 3.62 constitutes a material breach of this Contract, for which the City may terminate the Contract and pursue all available legal and equitable remedies. 11. Local Business Enterprise Program. The Local Business Enterprise Program Participation Requirements ("LBE Participation Requirements") may be applicable to this Contract. A summary of the requirements, entitled "LBE Participation Requirements," can be viewed at: https://www.cityofsacramento.org/Finance/Procurement/Contract-Ordinances. Contractor acknowledges and represents that Contractor has read and understands these requirements and shall fully comply with all applicable requirements of Sacramento City Codechapter 3.60. If requested by City, Contractor shall promptly provide any documents andinformation required by City to verify Contractor's compliance. Contractor shall require applicable subcontractors to fully comply with all applicable requirements of Sacramento City Code chapter 3.60 and include these requirements in all subcontracts covered by Sacramento City Code chapter 3.60. Contractor's violation of Sacramento City Code chapter 3.60 constitutes a material breach of this Contract, for which the City may terminate the Contract and pursue all available legal and equitable remedies.12.Authority. The person signing this Contract for CONTRACTOR represents and warrants that heor she has read, understands, and agrees to all the Contract terms and is fully authorized to sign this Contract on behalf of the CONTRACTOR and to bind the CONTRACTOR to the performance of the Contract’s obligations.[Signature Pages Follow Exhibits] Form Approved by City Attorney 9-1-2020 Exhibit A - Page 1 EXHIBIT ASCOPE OF SERVICES 1. Representatives. The CITY Representative for this Agreement is: Jennifer Donlon Wyant / Project Manager 915 I Street, Sacramento, CA 95814 Phone: 916.808.5913 / E-mail: [email protected] The CONTRACTOR Representative for this Agreement is:Erin Ferguson / Project Manager555 Capitol Mall, #510, Sacramento, CA 95814 Phone: 415.255.5963 / E-mail: [email protected] otherwise provided in this Contract, all Contractor questions and correspondencepertaining to this Contract must be addressed to the City Representative. All City questions and correspondence must be addressed to the Contractor Representative. 2. Scope of Services. Contractor shall provide Services to City as set forth in Attachment 1 to this Exhibit A. 3. Time of Performance. The Services described in this Contract shall be provided for through December 31, 2027. Contractor shall provide the Services in accordance with any schedule in Attachment 1 to this Exhibit A. Contractor shall immediately notify the City if Contractor is unable to make delivery of Goods or perform Services in compliance with this Contract. 4. Conflict of Interest Requirements. The individual(s) who will provide Services pursuant to this Contract are “Consultants” within the meaning of the Political Reform Act and the City’s Conflict of Interest Code: ____ yes __X__ no [check one] Contractor shall cause the following to occur within 30 days after execution of this Contract: (A) Identify the individuals who will provide Services or perform Work under this Contract as "Consultants"; and (B) Cause these individuals to file with the City Representative the "assuming office" statements of economic interests required by the City's Conflict of Interest Code.Thereafter, throughout the term of the Contract, Contractor shall cause these individuals to file with the City Representative annual statements of economic interests and "leaving office" statements of economic interests, as required by the City's Conflict of Interest Code. The City may withhold all or a portion of any payment due under this Contract or impose fines on the individuals until all required statements are filed.
City of Sacramento Vision Zero Action Plan UpdateScope of Services For memorandums, presentations, and other related deliverables - accessible electronic copy of the be prepared, including the use of alt-text. comprehension level of preferably Flesch- Hmong, Chinese, and Spanish. Task 1.Project Management-Vision Zero Action Plan development. Task 1.1 Budget and Schedule Management- --ls for the meeting. Task 1.3 Biweekly one-hour meetings --hour confe - TASK 1 DELIVERABLES • • • Schedule updates • - • Task 2 Data Collection and Analysis Purpose: Establish a baseline road safety performance across the updated high database inclusive of crash data, characteristics, land use data, and socio-demographic data. Task 2.1 Current Practices and Progress document progress made from the Vision Zero Action Plan and the second guidelines, and/or standards to identify Tracking & Sharing Progressrategy and means for the City to could be refreshed periodically to provide regular updates to the community. Benchmarking Assessment & Recommendations Sacramento. the Safe System approach. It includes federal and state policies that have been either recently established and/or updated. For and is and/or standards related to transportation planning, funding, and design. As part of conducting the assessment and related recommendations. Task 2.2 Review Existing Collision Data existing collision data as as supplement that socio- potential innovative data sources.
Collision Database Development ten -l cross-reference these data sources to prepare a comprehensive collision dataset of Killed and Contextual Database Development tion Priorities Plan process, that attributes include intersection controls, intersection density, density of controlled intersections, crossing types, croare, and community centers. in the database, for example recent speed survey data. geographies – income communities – and assess to prices, etc. Innovative Data Sources Innovative data sources provide additional options for developing a deeper understanding of contextual factors. provides includes a set aside to all Task 2.3 Data Analysis and Findings the databases developed above, Fehr & Peers prepare crash and identify an patterns in the collision data by mode, severity, and crash type over time, focused on the most -demographic data capture the most cote burden of through charts, tables, maps and graphics to communicate the outcome visually and in a manner es. High Injury Network (Safety Corridors)the federal, y input. Task 2 Deliverables • • • • • • • • Task 3 Develop Countermeasures Purpose: Identify engineering and non- – Task 3.1 Engineering Countermeasure Toolkit practice and most current street design standards in comparison to the engineering countermeasures to identify Task 3.2 Non-Engineering CountermeasuresIdentify opportunities for non- infrastructure countermeasures, including policies, process, and programmatic changes that support safety education, encouragement, enforcement, evaluation. -infrastructure countermeasures related to policies, process, and n best practice information from - People” pillars of the Safe System Approach, such as collision rapid response protocols, AV discrete infrastructure countermeasure. TASK 3 DELIVERABLES • • Task 4 Listening and Engagement (Internal and External) -Action Plan they are excited to see implemented. Internal Engagement Task 4.1 Technical Advisory Committee (Internal)thatmeetup to eight times divisions: • Operations • • Funding & • from the City • • connected to Climate, Forestry, and other similar programs • Other meetings as needed agendas, materials, and summaries after assume the meetings place in-person. can accommodate virtual meetings as that is preferred. up to four led by matter experts practices in the industry. – • Workshop 1: Safe System Approach – • Workshop 2: – and/or Peter Koonce • Workshop 3: – • Workshop 4: Implementation – and/or Peter Koonce -serve as a foundation for the concepts and best practice before launching into the discussions -most appropriate format. External EngagementTask 4.2 Vision Zero TaskforceVision Zero Action Plan, and based on commusers throughout the City of Sacramento. -if that is preferred. or made available - Task 4.3 Neighborhood Conversationscommunity champions and residents for 5 highest athered from these . Youth Community- Neighborhood Association members Existing coalitions and committees Task 4.4 Community Engagement Plansengagement plan that describes engagement goals, identify target audiences, engagement methods, and an engagement schedule. City implementation. a Comprehensive Community engagement communications plan that provides a be posted, and engagement opportunities across social media platforms, through blog posts, and Force and City are briefed about invited to attend community meetings. . Task 4.5 Develop Engagement Materialsraphics for distribution on City and and provide materials and media accounts. Engagement Hmong, Chinese, Spanish and English appropriate. Engagement throughout all engagement and the City communication needs and establish branding guidelines and templates that present a consistent as printed and electronic elements that may be shared digitally and distributed through social -including public-engagement engagement events. media graphics. Engagement os, build the social media channeengagement to community members and Task 4.6 Engagement Activities • • • Community events and locations • • Round 1 Engagement engagement relatively light focused on introducing include branding, and a brief online survey. Round 2 Engagement engagement phase of the planniserved by a combination of both a broad reach and opportunities for focused conversations. engagement up to t pop-ins at community eventsvirtual activities in Round 3 Engagement engagement community membersengagement their chance to see the near- engagement online communication sharing the public draft action plan, pop--person community meeting, and -versed in using innovative online tools to gather d technical team least one month prior to each event. Task 4 Deliverables • Agendas and notes from every meeting • Agendas and notes from every meeting • Community Engagement Plans • Final Community Engagement Plans • Branding Guide • • Content • Social • Language • Pop Ins at Community Events • In Person • Online Surveys/Interactive Activities • Online Plan Site Task 5 Prioritization Purpose: Create priorities and aligned actions based on the technical analysis in 2, countermeasure developed in is a necessary activity to be consistent criteria for a Comprehensive Safety encourage the City to include it as part of its core scope for . -means for activities. implementation of the update Vision Zero Action Plan. Task 5 Deliverables: • • 2Actions Task 6 Draft and Final Action Plan Task 6.1 Administrative Draft Action Plan Task 6.2 Public Draft Action Planpublic-facing executive summaries provided in English, Hmong, Chinese, and Spanish, Task 6.3 Final Draft Action Plan Task 6.4 Final Action Plan for Adoption at City Council. Additionally, . Task 6 Deliverables • • • Public-facing Executive Summary provided in English, Hmong, Chinese, and Spanish • • • spreadsheet tool and/or reporting template Form Approved by City Attorney 9-1-2020 Exhibit B - Page 1 EXHIBIT BPAYMENT 1. CONTRACTOR’s Compensation. The total of all fees paid to the CONTRACTOR for the provision of Services as set forth in Exhibit A, including any authorized reimbursable expenses, shall not exceed the total sum of $ 495,615.23. The payments specified in this Exhibit B shall be the only payments made to Contractor unless the City approves a Supplemental Contract. 2. Billable Rates. Contractor shall be paid for the performance of Services on an hourly rate, daily rate, flat fee, lump sum, or other basis, as set forth in Exhibit A or Attachment 1 to this Exhibit B and any applicable special provisions included in the request for bids or proposals. If there is a conflict between Exhibit A or Exhibit B and the Special Provisions, Exhibit A or Exhibit B controls. 3. CONTRACTOR’s Reimbursable Expenses. “Reimbursable Expenses” are limited to actual expenditures of CONTRACTOR for expenses that are necessary for the proper satisfaction of the Contract and are only payable if specifically authorized in advance in writing by the City. No charges or markup will be allowed unless specified in the Contract, including charges for traveland transportation. 4. Payments to CONTRACTOR. Contractor is responsible for supplying all documentation necessary to verify invoices to the City’s satisfaction. A. Payments to CONTRACTOR shall be made within a reasonable time after receipt of CONTRACTOR’s invoice, in proportion to services performed or as otherwise specified in Attachment 1 to Exhibit B. CONTRACTOR may request payment on a monthly basis. CONTRACTOR shall be responsible for the cost of supplying all documentation necessary to verify the monthly billings to the satisfaction of CITY. B. Invoices must be submitted to either of the addresses specified below. (1) Email. Submit email invoices and any attachments to: (2) Postal Mail. If emailing is not an option, mail to: A/P Processing Center City of Sacramento 915 I Street, Floor 4 Sacramento, CA 95814-2608C. All invoices submitted by CONTRACTOR must contain the following information: (1) Job/Project Name (2) CITY’s current Purchase Order Number(3) CONTRACTOR’s Invoice Number (4) Date of Invoice Issuance (5) Work Order Number (if applicable) (6) CITY representative identified on the Purchase Order (7) CONTRACTOR’s remit address Form Approved by City Attorney 9-1-2020 Exhibit B - Page 2 (8) Description of services billed under Invoice(9) Amount of Invoice (itemize all authorized Reimbursable Expenses)(10) Total Billed to Date under Contract (if applicable)D. Items must be separated into Services and Reimbursable Expenses. Invoices that do not conform to the format outlined above will be returned to CONTRACTOR for correction. CITY is not responsible for delays in payment to CONTRACTOR resulting from CONTRACTOR’s failure to comply with the invoice format described above. 5. Additional Services. Additional Services shall be provided only when a Supplemental Contract authorizing the Additional Services is approved in writing by the City in accordance with the City’s contract amendment procedures. The City reserves the right to perform any Additional Services with its own staff or to retain other contractors to perform the Additional Services. 6. Accounting Records of CONTRACTOR. During performance of this Contract and for a period of three years after completion of performance, CONTRACTOR shall maintain all accounting and financial records related to this Contract, in accordance with generally accepted accounting practices, including records of Contractor’s costs for performance under this Contract and records of Contractor’s Reimbursable Expenses. Contractor shall keep and make records available for inspection and audit by representatives of the CITY upon reasonable written notice. 7. Tax Payments.CONTRACTOR shall pay, when and as due, any and all taxes incurred as a result of CONTRACTOR’s compensation hereunder, including estimated taxes, and shall provide CITY with proof of the payment upon request. CONTRACTOR hereby agrees to indemnify CITY for any claims, losses, costs, fees, liabilities, damages or injuries suffered by CITY arising out of CONTRACTOR’s breach of this section. 1Last Updated7/24/14
ATTACHMENT 1 TO EXHIBIT B I. COMPENSATION AND PAYMENT A. CONSULTANT shall be reimbursed for services at the specific rate of compensation in the approved 10-H Form(s). Unless specifically identified as some other method, the specified rates shall include direct/base hourly rate, fringe benefits, overhead, and profit. B. CONSULTANT shall be reimbursed for Other Direct Costs (ODC), at rates as identified on the approved 10-H Form(s) with receipts for actual costs. Please refer to 10-H instructions for guidelines on reimbursable costs. C. If applicable, CONSULTANT shall pay prevailing wages to those workers employed on public works contracts performing applicable duties as required by the State Labor Code and City Code 3.60.180. CONSULTANT shall be responsible for any future adjustments to prevailing wage rates including, but not limited to, base hourly rates and employer payments as determined by the Department of Industrial Relations. Based on prevailing adjustments, CONSULTANT may request an adjustment in the rate(s) in the 10-H form. These adjusted rates will not go into effect until the approval date by the City of the Supplemental Agreement. CONSULTANT is responsible for paying the appropriate rate, including escalations that take place during the term of the Agreement. A mistake, inadvertence, or neglect by CONSULTANT in failing to pay the correct rates of prevailing wage will be remedied solely by CONSULTANT and will not, under any circumstances, be considered as the basis of a claim against CITY on this Agreement. D. Unless specifically stated, the contract shall be a not-to-exceed by task, Other Direct Cost (ODC) line item, and total budget as included in the Cost Proposal. Written approval by CITY Project Manager is required for reallocation of budget between tasks, between ODC line items, or between tasks and ODCs. All reallocation requests must include an updated task, budget, and billing summary or revised Cost Proposal. If the reallocation will directly or indirectly require an increase in the total contract amount, it will require a Supplemental Agreement to be approved by the CITY as described in Section F. E. Written approval by CITY Project Manager is required for any staff substitutions or additions of staff under classifications included in the 10-H Form(s):
2Last Updated7/24/14
1.Updated 10-H Form(s) for CONSULTANT and/or SUBCONSULTANT shall be included, where applicable. 2.Any addition or substitution shall be paid at the same or lower rate of the previously approved or similar classification. 3.If a substitution involves Key Staff, CONSULTANT shall request and justify the need for substitution and obtain written approval from CITY Project Manager. The justification shall include a resume of the proposed new Key Staff. If the staff addition or substitution will include a new classification, any rate increase, or will directly or indirectly require an increase in total contract amount, it will require a Supplemental Agreement to be approved by the CITY as described in Section F. No work shall commence until agreement is executed. Any work not in compliance with the above, and performed prior to the date of approval by the City, shall not be reimbursed. F. Supplemental Agreements are required for any changes to the scope and terms of the agreement, including but not limited to the following: 1. Increasing the Agreement not-to-exceed amount. a. Any increase to the not-to-exceed amount shall include a cost proposal documenting the increase. 2. Adding task(s) within the advertised scope. 3.Adding new classifications or adjusting rates:a. Updated 10-H Form(s) for CONSULTANT and all SUBCONSULTANT shall be included. b. CONSULTANT may request cost of living increases in base salary of staff after the contract has been in effect for one year. The maximum increase, if approved, shall be the annual Cost of Living Adjustment (COLA) increase as calculated and used by the Social Security Administration. Any approved increase shall not go into effect until a Supplemental Agreement is executed. 4. Adding SUBCONSULTANTS. 5. Adding new Other Direct Cost (ODC) items not included in 10-H Form. 3Last Updated7/24/14
6. Reallocations (between tasks and/or Other Direct Costs) 7. Extending the sunset date of the Agreement. No work shall commence until the Supplemental Agreement is executed. Any work not in compliance with the above, and performed prior to the date of the execution of the Supplemental Agreement by the City, shall not be reimbursed. G. Monthly Invoices 1. Invoices shall be made in arrears based on services provided at specific hourly rates and other direct cost(s) incurred per the approved 10-H Form(s). 2. CONSULTANT AND SUBCONSULTANT invoices shall be submitted using the City- template and include the following: a. Task, Budget, and Billing Summary. b. A copy of all invoices/receipts for Other Direct Costs and appropriate back up documentation, at rates consistent with the approved 10-H Form(s). c. A copy of SUBCONSULTANT invoices using the City template. d. CONSULTANT Project Manager’s signature certifying that all charges have been reviewed and are in compliance with the contract terms. e. If applicable, payroll documentation for staff invoicing under unnamed classifications listed on 10-H Form. 3. For non-federally funded projects, CONSULTANT shall meet the 5% Local Business Enterprise (LBE) participation requirement, unless an LBE waiver has been obtained by CITY Project Manager prior to the agreement being executed. CONSULTANT will track LBE utilization, including for all SUBCONSULTANTs, and include the percentage achieved with each invoice. The 5% requirement only applies to those agreements awarded for a not-to-exceed amount over $250,000. 4. For federally funded projects in compliance with 49 CFR 26.37, a Disadvantaged Business Enterprises Utilization Report (Form ADM-3069) is required, as specified in this Agreement. 5. CONSULTANT may include SUBCONSULTANT costs that are treated by the CONSULTANT as accrued due to such costs having been billed by the SUBCONSULTANT to CONSULTANT and recognized by CONSULTANT and CITY as valid, undisputed, due and payable. 4Last Updated7/24/14
6. CONSULTANT shall not add a mark-up to SUBCONSULTANT for professional services or other direct costs included in the approved 10-H form(s). 7. Invoices for approved monthly services shall be submitted by CONSULTANT and received by CITY Project Manager within 45 calendar days of the completion of the approved monthly services specified in the Task, Budget, and Billing Summary. II. COST PRINCIPLES A. All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files. B. For federally funded projects, all costs must be in accordance with the cost principles of Title 48 Code of Federal Regulations (CFR), Part 31, Contract Cost Principles and Procedures (48 CFR 31 et seq.). C. For federally funded projects, CONSULTANT agrees to comply with federal procedures in accordance with Title 49 CFR, Part 18, Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments (49 CFR 18). D. Any costs for which payment had been made to CONSULTANT that are determined by subsequent audit to be unallowable under 48 CFR 31 or 49 CFR 18 are subject to repayment by CONSULTANT to CITY. III. CONFLICT OF INTERESTA. CONSULTANT shall disclose any financial, business, or other relationship with CITY that may have an impact upon the outcome of this contract, or any ensuing CITY construction project. CONSULTANT shall list current clients who may have a financial interest in the outcome of this contract, or any ensuing CITY construction project, which will follow. B. CONSULTANT certifies that it does not now have, nor shall it acquire in the future, any financial or business interest that would conflict with the performance of services under this contract. C. Any subcontract entered into as a result of this contract, shall contain all of the provisions of this Article III. 5Last Updated7/24/14
D. CONSULTANT certifies that neither CONSULTANT, nor any firm affiliated with CONSULTANT will bid on any construction contract, or on any contract to provide construction inspection for any construction project resulting from this contract. An affiliated firm is one, which is subject to the control of the same persons through joint-ownership, or otherwise. E. Except for SUBCONSULTANTS whose services are limited to providing surveying or materials testing information, no SUBCONSULTANT who has provided design services in connection with this contract shall be eligible to bid on any construction contract, or on any contract to provide construction inspection for any construction project resulting from this contract. IV. PROVISIONS FOR REBATES, KICKBACKS OR OTHER UNLAWFUL CONSIDERATION CONSULTANT warrants that this contract was not obtained or secured through rebates kickbacks or other unlawful consideration, either promised or paid to any CITY employee. In the event of breach or violation of this warranty, CITY shall have the right in its discretion: to terminate the contract without liability; to pay only for the value of the work actually performed; or to deduct from the contract price; or otherwise recover the full amount of such rebate, kickback or other unlawful consideration. V. PROHIBITION OF EXPENDING CITY STATE OR FEDERAL FUNDS FOR LOBBYING A. CONSULTANT certifies to the best of his or her knowledge and belief that: 1.No state, federal or CITY appropriated funds have been paid, or will be paid by-or-on behalf of CONSULTANT to any person for influencing or attempting to influence an officer or employee of any state or federal agency; a Member of the State Legislature or United States Congress; an officer or employee of the Legislature or Congress; or any employee of a Member of the Legislature or Congress, in connection with the awarding of any state or federal contract; the making of any state or federal grant; the making of any state or federal loan; the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any state or federal contract, grant, loan, or cooperative agreement. 2. If any funds other than federal appropriated funds have been paid, or will be paid to any person for influencing or attempting to influence an officer or employee of any federal agency; a Member of Congress; an officer or employee of Congress, or an employee of a Member of Congress; in 6Last Updated7/24/14
connection with this federal contract, grant, loan, or cooperative agreement; CONSULTANT shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying”, in accordance with its instructions. B. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, US. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. C. CONSULTANT also agrees by signing this document that he or she shall require that the language of this certification be included in all lower-tier subcontracts, which exceed $100,000, and that all such sub recipients shall certify and disclose accordingly. VI. AUDIT REVIEW PROCEDURES A. Any dispute concerning a question of fact arising under an interim or post audit of this contract that is not disposed of by agreement, shall be reviewed by CITY’S Chief Financial Officer. B. Not later than 30 days after issuance of the final audit report, CONSULTANT may request a review by CITY’S Chief Financial Officer of unresolved audit issues. The request for review will be submitted in writing. C. Neither the pendency of a dispute nor its consideration by CITY will excuse CONSULTANT from full and timely performance, in accordance with the terms of this contract. D. CONSULTANT and SUBCONSULTANTS’ contracts, including cost proposals and indirect cost rates (ICR), are subject to audits or reviews such as, but not limited to, a Contract Audit, an Incurred Cost Audit, an ICR Audit, or a certified public accountant (CPA) ICR Audit Workpaper Review. If selected for audit or review, the contract, cost proposal and ICR and related workpapers, if applicable, will be reviewed to verify compliance with 48 CFR, Part 31 and other related laws and regulations. In the instances of a CPA ICR Audit Workpaper Review it is CONSULTANT’s responsibility to ensure federal, state, or local government officials are allowed full access to the CPA’s workpapers. The contract, cost proposal, and ICR shall be adjusted by CONSULTANT and approved by CITY contract manager to conform to the audit or review recommendations. CONSULTANT agrees that individual terms of costs identified in the audit report shall be incorporated into 7Last Updated7/24/14
the contract by this reference if directed by CITY at its sole discretion. Refusal by CONSULTANT to incorporate audit or review recommendations, or to ensure that the Federal, State, or local governments have access to CPA workpapers, will be considered a breach of contract terms and cause for termination of the contract and disallowance of prior reimbursed costs. VII. SUBCONSULTING A. CONSULTANT shall perform the work contemplated with resources available within its own organization; and no portion of the work pertinent to this contract shall be subcontracted without written authorization by CITY’S Contract Administrator, except that, which is expressly identified in the approved Cost Proposal. B. Any subcontract entered into as a result of this contract, shall contain all the provisions stipulated in this contract to be applicable to SUBCONSULTANTS. C. Any substitution of SUBCONSULTANTS must be approved in writing by CITY’s Contract Administrator prior to the start of work by the SUBCONSULTANT. VIII. RETENTION OF RECORDS/AUDIT A. For the purpose of determining compliance with Public Contract Code 10115, et seq. and Title 21, California Code of Regulations, Chapter 21, Section 2500 et seq., when applicable and other matters connected with the performance of the contract pursuant to Government Code 8546.7; CONSULTANT, SUBCONSULTANTS, and CITY shall maintain and make available for inspection all books, documents, papers, accounting records, and other evidence pertaining to the performance of the contract, including but not limited to, the costs of administering the contract. All parties shall make such materials available at their respective offices at all reasonable times during the contract period and for three years from the date of final payment under the contract. The state, State Auditor, CITY, FHWA, or any duly authorized representative of the Federal Government shall have access to any books, records, and documents of CONSULTANTS that are pertinent to the contract for audit, examinations, excerpts, and transactions, and copies thereof shall be furnished if requested. All subcontracts shall contain this provision. *All referenced forms and sample templates will be provided by CITY.
10-H FORM INSTRUCTIONS 1. Supplement#: Enterin appropriate Supplement # orfill in Original, if itisto establish the agreement. 2. CONSULTANT Name: Enter CONSULTANT name as it appears on the W-9, and should match remit information on invoices.3. Date*: Date CONSULTANT is filling out the 10-H Form (*This is not the effective date of contract execution for invoicing purposes).4. Project Name: Enter project name.5. Project #: Enter CITY project number.6. The CONSULTANT and SUBCONSULTANT(s) shall submit, for the most recent completed fiscal year, an Indirect Cost Rate (ICR)that has been approved by Caltrans with a Cognizant Letter of Approval if available ORan ICR that is Federal Acquisition Regulations (FAR) compliant. For contracts $3.5 million or greater, a CPA audited ICR shall be used.a. Fringe Benefit %: Enter in the Fringe Benefit Rate per CONSULTANT’S audited rateb. Overhead %: Enter in the FAR compliant Overhead Rate.7. Profit: Enter profit,max is 10%8. Classification: Enter classification that shall match invoiced classification for payment approval.9. Name: List all Professional and Supervisory staff by Name. For staff not listed by name, a current payroll document identifying actual hourly rate shall be provided with every invoice for which they bill time. For greater flexibility, besides naming all individuals working on the project, it may be helpful to also enter in a classification without a name (non-key staff only), and a rate not to exceed similar classifications. 10. Key Staff: Denote Key Staff with an X in the Key Staff Column. Final determination of Key Staff to be approved by CITY Project Manager. (Examples of key staff may include a named Project Manager, a specific Principal Engineer, a specific Structural Engineer 11. Prevailing Wage: Denote staff subject to Prevailing Wage with an X in the Prevailing Wage Column. 12. Overtime: Overtime may be paid to classifications where it is required by their union contracts (Prevailing Wage classifications). Overtime will not be charged unless prior written approval is received by CITY Project Manager. CITY shall pay the CONSULTANT at the approved overtime rates noted within the 10-H Form (overtime columns can be unhidden for entry where appropriate). CONSULTANT shall pay prevailing wage employees per prevailing wage guidelines. For more information on applicable prevailing wages, please visit the following website: https://www.dir.ca.gov/OPRL/PWD/. 13. Actual Base Hourly Rate Paid to Employee for Reference Only: Enter in the actual hourly rate of the employee per the date noted in number 3. Actual Base Hourly Rate should not include fringe, in-lieu of fringe, or overhead. Hourly rates for new employees added to the project, after the execution of original 10-H shall not exceed (or shall be in line with) the rates of similar personnel with similar experience listed on this 10-H Form.14. Actual Fully Loaded Hourly Rate for Reference Only: Rate is for reference purposes during negotiations. This field is auto- calculated. [Actual Base Hourly Rate Paid to Employee + (Actual Base Hourly Rate Paid to Employee x Combined %)] = AA x Profit % = BA + B = Actual Fully Loaded Hourly Rate 15. Approved Flat Hourly Billing Rate: Approved Flat Hourly Billing Rate shall generally equal the Actual Fully Loaded Hourly Rateexcept where Actual Fully Loaded Hourly Rate exceeds reasonable market costs for such work as determined by CITY. TheApproved Flat Hourly Billing Rate may differ from the Actual Fully Loaded Rate if CITY Project Manager assigns a fair andreasonable flat hourly billing rate for select employees. The Approved Flat Hourly Billing Rate shall be all-inclusive, including all mark-ups, fringe, overhead and profit.16. Other Direct Costs (ODC's): Enter in a description of the ODC's to be reimbursed. No mark-up shall be applied to ODC's.See Guidelines below. GUIDELINES – OTHER DIRECTCOSTS Other Direct Costs (ODCs) may only include those items not covered in indirect costs and must list specific items at cost. All ODCs need to be itemized in the 10-H form and be compliant with Federal Acquisition Regulation (FAR). Receipts or other appropriate documentation must be provided for reimbursement of ODC items and no mark-up is permitted. Ineligible ODCs Use of in house equipment (e.g., computers, phones, printers), office supplies, copies, and other items generally associatedwith doing business should not be included in ODCs. Food items and travel to and from the employees’ home to the office are not allowable ODCs.
TravelMileage from an employee’s home to the office is not reimbursable. Mileage from the office to the work site or off-site meetings may be allowable if approved by the City’s Project Manager and only if the consultant is traveling from out of the area. If required for the project, all hotel costs and air fare must be within Caltrans rate (i.e., at lowest available airfare, reasonable hotel rate for area). All travel must be pre-approved by the City’s Project Manager. Estimating ODCsAny ODCs need to be itemized with a not-to exceed total for each item. If an ODC item is not listed, it will not be reimbursable under the contract. Please consider the total costs for each individual item to determine if it warrants individual tracking and invoicing or whether it should more efficiently be absorbed within overhead costs. Potential ODCs. (These are examples only; they may not be appropriate in each individual case): DescriptionRate Printing/Reproduction (outside vendor only) AtCostPermits/FeesAt CostLab Analyses/Test (list specifics) Per TestCostEquipment (list specifics) At cost/ lease rate Field Equipment/Supplies (outside vendor)*** At cost Shipping/Postage At cost *Units: Include if here is a relevant per-unit cost (e.g., $40 per traffic count location) FEHR & PEERS AIM CONSULTING Peter Koonce Civic Thread TOTALCost TotalTask 1: Project ManagementTask 1.1 Budget and Schedule Management $ 12,783.73 Task 1.2 Kick off Meeting $ 3,094.43 Task 1.3 Biweekley one-hour meetings $ 29,754.94 Task 1 Subtotal $ 38,749.66 $ 4,776.72 $ - $ 2,106.72 $ 45,633.10 Task 2: Data Collection and AnalysisTask 2.1 Current Practices and Progress $ 18,928.88 Task 2.2 Review Existing Collision Data $ 16,424.30 Task 2.3 Data Analysis and Findings $ 16,424.30 Task 2 Subtotal $ 51,777.49 $ - $ - $ - $ 51,777.49 Task 3: Develop CountermeasuresTask 3.1 Engineering Countermeasure Toolkit $ 11,431.48 Task 3.2 Non-Engineering Countermeasures $ 12,643.29 Task 3 Subtotal $ 24,074.77 $ - $ - $ - $ 24,074.77 Task 4: Listening and EngagementTask 4.1 Technical Advisorty Committee (Internal) $ 55,477.79 $ - $ 13,500.00 $ 68,977.79 Task 4.2 Vision Zero Task Force $ 15,456.13 $ - $ - $ 15,456.13 Task 4.3 Neighborhood Conversations $ 4,312.32 $ - $ - $ 27,239.07 Task 4.4 Community Engagement Plans $ 4,312.32 $ 5,831.28 $ - $ 10,143.60 Task 4.5 Develop Engagment Materials $ 10,423.76 $ 16,535.11 $ - $ 26,958.87 Task 4.6 Engagment Activities $ 18,371.01 $ 55,621.23 $ - $ 73,992.24 Task 4 Subtotal $ 108,353.31 $ 77,987.63 $ 13,500.00 $ 22,926.75 $ 222,767.69 Task 5: PrioritizationTask 5.1 Define Prioritization Approach $ 10,537.84 $ - $ - $ - $ 10,537.84 Task 5.2 Identify and Prioritize Actions $ 11,053.74 $ - $ - $ - $ 11,053.74 Task 5 Subtotal $ 21,591.58 $ - $ - $ - $ 21,591.58 Task 6: Draft and Final Action PlanTask 6.1 Administrative Draft Action Plan $ 41,071.17 $ - $ - $ - $ 41,071.17 Task 6.2 Public Draft Action Plan $ 28,289.10 $ - $ - $ - $ 28,289.10 Task 6.3 Final Draft Action Plan $ 12,505.19 $ - $ - $ - $ 12,505.19 Task 6.4 Final Action Plan for Adoption at City Council $ 17,444.37 $ - $ - $ - $ 17,444.37 Collateral for Grant Applications $ 15,094.23 $ - $ - $ - $ 15,094.23 Task 6 Subtotal $ 114,404.07 $ - $ - $ - $ 114,404.07 Total - Labor $ 358,950.89 $ 82,764.35 $ 13,500.00 $ 25,033.47 $ 480,248.70 Other Direct CostsTraffic Counts $ 1,000.00 $ 1,000.00 Big Data $ 5,000.00 $ 5,000.00 Mileage/Parking $ - Workshop Supplies $ 800.00 $ 800.00 Printed Materials $ - $ 1,500.00 $ 1,500.00 Notifications $ 600.00 $ 600.00 P. Koonce Travel $ 1,500.00 $ 1,500.00 Stipends and Incentives $ 2,800.00 $ 2,800.00 Printing $ 1,291.53 $ 1,291.53 Language Services $ 600.00 $ 600.00 Venue $ 275.00 $ 275.00 ODC Subtotal $ 6,000.00 $ 2,900.00 $ 1,500.00 $ 4,966.53 $ 15,366.53 Grand Total $ 364,950.89 $ 85,664.35 $ 15,000.00 $ 30,000.00 $ 495,615.23 Vision Zero Action Plan UpdateOVERALL COST PROPOSAL - COST PLUS FIXED FEE
Staff Name and or ClassificationPeter Koonce HoursSubtotal Total Cost Actual Base Hourly Rate $ 225.00 Task 1: Project ManagementTask 1.1 Budget and Schedule ManagementHours0 $ - Task 1.2 Kick off Meeting0 $ - Task 1.3 Biweekley one-hour meetings0 $ - Task 1 Subtotal00 $ - Task 2: Data Collection and AnalysisHoursTask 2.1 Current Practices and Progress0 $ - Task 2.2 Review Existing Collision Data0 $ - Task 2.3 Data Analysis and Findings0 $ - Task 2.4 Vision Zero Safety Dashboard (Optional) 0 $ - Task 2 Subtotal00 $ - Task 3: Develop CountermeasuresHoursTask 3.1 Engineering Countermeasure Toolkit 0 $ - Task 3.2 Non-Engineering Countermeasures0 $ - Task 3 Subtotal00 $ - Task 4: Listening and EngagementHoursTask 4.1 Technical Advisory Committee (Internal) 60 60 $ 13,500.00 Task 4.2 Vision Zero Task Force0 $ - Task 4.3 Neighborhood Conversations0 $ - Task 4.4 Community Engagement Plans0 $ - Task 4.5 Develop Engagment Materials0 $ - Task 4.6 Engagment Activities0 $ - Task 4 Subtotal6060 $ 13,500.00 Task 5: PrioritizationHoursTask 5.1 Define Prioritization Approach0 $ - Task 5.2 Identify and Prioritize Actions0 $ - Task 5 Subtotal00 $ - Task 6: Draft and Final Action PlanHoursTask 6.1 Administrative Draft Action Plan0 $ - Task 6.2 Public Draft Action Plan0 $ - Task 6.3 Final Draft Action Plan0 $ - Task 6.4 Final Action Plan for Adoption at City Council 0 $ - Collateral for Grant Applications0 $ - Task 5 Subtotal00 $ - Total6060 $ 13,500.00 Travel up to two trips1500ODC Subtotal00 $ 1,500.00 Grand Total $ 15,000.00 Vision Zero Plan Action Plan UpdatePeter Koonce
Check one: PrimePrimeCONSULTANT Name:Fehr & PeersDate:XSubProject Name:2nd Tier SubProject #:Fringe Benefit % + *Overhead %Combined %62.39% 121.13% 0.00% 183.52%Fixed Fee (Profit) %:10.00%Key StaffPrevailing Wage Classification NameActual Base Hourly Rate Paid to Employee For Reference Only (Does not Include any Fringe, OH, or G&A)Actual Fully Loaded Hourly Rate For Reference Only (Includes Fringe, OH, G&A & Fixed Fee)XPrincipal Erin Ferguson $93.75 $292.38XPrincipal Adrian Engel $79.09 $246.66XPrincipal Meghan Mitman $114.42#$356.84Principal Nicole Waldheim $86.54 $269.89Associate Danny Murphy $65.38 $203.90Senior Engineer/Planner David Manciati $54.81 $170.94Senior Engineer/Planner Yoyo Zeng $53.37 $166.45Senior Engineer/Planner Sonia Anthoine $41.35 $128.96Associate Cullen McCormick $64.90 $202.40Engineer/Planner Raina Joby$36.06 $112.46Principal $86.54 $269.89Engineer/Planner Jonathan Murillo $33.65 $104.94Engineer/PlannerPa Nhia Yang $33.65 $104.94Engineer/Planner Sree Gudimella $36.06 $112.46Engineer/Planner Rebecca Lillis $37.50 $116.95Engineer/Planner Brian Situ $37.50 $116.95Engineer/Planner Mary Ramones $37.50 $116.95Engineer/Planner Jose Garcia $37.50 $116.95Senior Engineering Technician William Edmondson $52.88 $164.92TechnicianTim Wilbur $31.25 $97.46Technician Marty Delgado $31.25 $97.46Intern $31.50 $98.24Senior Project Coordinator JoLynn Souto $49.28 $153.69Senior Project Coordinator Lacy Delgado $35.82 $111.71Senior Project Accountant Laura Murphy $36.06 $112.46Senior Project Accountant Kayleigh Pastorius $50.48 $157.43Project Coordinator Gizelle Halvorson $27.40 $85.45$0.00$0.00TOTAL BUDGET AMOUNTS30,000.00$ 85,664.35$ 15,000.00$ 130,664.35$ Description RateTotalTravel At Cost 1,000.00$ Big Data 5,000.00$ TOTAL 6,000.00$ GRAND TOTAL: 495,615.23$ By signing here, you agree to the terms above, and attest that all information is accurate and true.Adrian Engel1. List all Professional and Supervisory staff by Classification and Name. For staff not listed by name but by classification only, a current payroll document identifying their actual base hourly rate shall be provided with every invoice where an unlisted staff bills time. The approved flat hourly billing rates for all employees will be calculated and reimbursed based on their actual base hourly rates per the date noted above unless CITY Project Manager assigns a fair and reasonable flat hourly billing rate for selected employees. For staff not listed by name but by classification only, the reimbursement will not exceed the approved flat hourly billing rate for that classification. Approved flat hourly billing rates for new employees hired after the date of this cost proposal will not exceed (or shall be in line with) the rates of similar personnel with similar experience listed on this cost proposal. The approved flat hourly billing rate shall be all-inclusive, including all mark-ups, fringe, and overhead expenses and profit.2. Key Staff shall be determined by CITY Project Manager. (i.e., named Project Manager, a specific Principal Engineer, a specific Structural Engineer, etc. Note Key staff with an "X" in the Key Staff column.3. The employees' actual base hourly rates used to negotiate the flat hourly billing rates in this 10-H Form are the rates that were effective per the date noted above. Addition of new staff, new classifications, or addition of a SUBCONTRACTOR not previously listed on the approved 10-H Form(s) shall require written approval from the CITY. No work shall commence until the approval is provided by the CITY. New staff shall be paid at the same or lower approved flat hourly billing rate of the previously approved or similar classification. In addition, if the substitution involves Key Staff, CONTRACTOR must request and justify the need for the substitution and obtain approval from CITY Project Manager. Substituted Key Staff shall be as qualified as the original. 4. Approved flat hourly billing rates include all standard equipment including laptop, camera, cell phone, truck, standard personal safety equipment. CITY Project Manager shall approve any other direct costs.5. Note employees/classifications that are subject to prevailing wage requirements with an "X" in the Prevailing Wage column. Prevailing Wage specified is based on current Department of Industrial Relations (DIR) determination. CONTRACTOR shall be responsible for any future adjustments to the prevailing wage, including but not limited to, base hourly rates and employer payments as determined by the DIR. CONTRACTOR is responsible for paying the appropriate rate, including escalations that take place during the term of the Agreement. CONTRACTOR shall be reimbursed at the above listed approved flat hourly billing rates.6. Overtime may be reimbursed to classifications where it is required by their union contracts (Prevailing Wage classifications). Overtime will not be charged unless prior written approval is received by CITY Project Manager. CITY shall pay CONTRACTOR at the approved overtime rates noted above. CONTRACTOR shall pay prevailing wage employees per prevailing wage guidelines. 7. Local transportation costs resulting from commuting to and from the employee's residence to the office or job site are not reimbursable.8. The Project will not reimburse CONTRACTOR for costs to relocate its staff to the geographic area of the contract. The Project will not reimburse CONTRACTOR for any per diem.9. ODC items are to be in compliance with Code of Federal Regulations, Title 48 Part 31 [Federal Acquisition Regulations (FAR) cost principles] and the firm's company-wide allocation policies and charging practices with all clients including federal government, state government, local agencies and private clients. Other Direct Costs (ODC) Items and RatesCONTRACTOR/SUBCONTRACTOR'S AUTHORIZED PERSON SIGNATURE A x Profit % = B A + B = Actual Fully Loaded Hourly Rate[Actual Base Hourly Rate Paid to Employee + (Actual Base Hourly Rate Paid to Employee x Combined %)] = A SUB CONSULTANTS GRAND TOTAL:
Original9/23/2024
Estimated ODC Budgets Shall Be
+ Gen & Admin %SUB CONSULTANTSSUB CONSULTANT NAMECivic ThreadAIM CONSULTINGPeter Koonce CITY OF SACRAMENTO 10-H FORMVision Zero Action Plan UpdateS15184123Approved with Supplement # (type Original if it is the Original):COST PLUS FIXED FEE Version: JANUARY 4, 2022
AIM ConsultingDate:XProject Name:Project #:Fringe Benefit % + *Overhead %=Combined %17.10% 110.94% 128.04%Profit %:10.00%Key StaffPrevailing Wage Classification NameActual Base Hourly Rate Paid to Employee For Reference Only (Does not Include any Fringe or OH)Actual Fully Loaded Hourly Rate For Reference Only (Includes Fringe, OH & Profit)Approved Flat Hourly Billing RateOutreach Oversight Gladys Cornell $95.00 $238.30 $238.30XSenior Project Manager Katie DeMaio $68.06 $170.72 $170.72Senior Project Coordinator TBD $46.24 $115.99#$115.99Project Coordinator I TBD $39.01 $97.85 $97.85XGraphic Design Darlene Tran $75.00 $188.13 $188.13Description RateTotalWorkshop Supplies at cost 800.00$ Printed Materials at cost 1,500.00$ Notifications at cost 600.00$ -$ -$ TOTAL 2,900.00$ A x Profit % = B A + B = Actual Fully Loaded Hourly RateCITY OF SACRAMENTO 10-H FORMApproved with Supplement # (type Original if it is the Original):Original CONTRACTOR Name:9/20/2024Vision Zero Action Plan UpdateS15184123[Actual Base Hourly Rate Paid to Employee + (Actual Base Hourly Rate Paid to Employee x Combined %)] = A By signing here, you agree to the terms above, and attest that all information is accurate and true.CONTRACTOR/SUBCONTRACTOR'S AUTHORIZED PERSON SIGNATUREKatie DeMaioOther Direct Costs (ODC) Items and RatesEstimated ODC Budgets Shall Be Included in Cost Proposal.1. List all Professional and Supervisory staff by Classification and Name. For staff not listed by name but by classification only, a current payroll document identifying their actual base hourly rate shall be provided with every invoice where an unlisted staff bills time. The approved flat hourly billing rates for all employees will be calculated and reimbursed based on their actual base hourly rates per the date noted above unless CITY Project Manager assigns a fair and reasonable flat hourly billing rate for selected employees. For staff not listed by name but by classification only, the reimbursement will not exceed the approved flat hourly billing rate for that classification. Approved flat hourly billing rates for new employees hired after the date of this cost proposal will not exceed (or shall be in line with) the rates of similar personnel with similar experience listed on this cost proposal. The approved flat hourly billing rate shall be all-inclusive, including all mark-ups, fringe, and overhead expenses and profit.2. Key Staff shall be determined by CITY Project Manager. (i.e., named Project Manager, a specific Principal Engineer, a specific Structural Engineer, etc. Note Key staff with an "X" in the Key Staff column.3. The employees' actual base hourly rates used to negotiate the flat hourly billing rates in this 10-H Form are the rates that were effective per the date noted above. Addition of new staff, new classifications, or addition of a SUBCONTRACTOR not previously listed on the approved 10-H Form(s) shall require written approval from the CITY. No work shall commence until the approval is provided by the CITY. New staff shall be paid at the same or lower approved flat hourly billing rate of the previously approved or similar classification. In addition, if the substitution involves Key Staff, CONTRACTOR must request and justify the need for the substitution and obtain approval from CITY Project Manager. Substituted Key Staff shall be as qualified as the original. 4. Approved flat hourly billing rates include all standard equipment including laptop, camera, cell phone, truck, standard personal safety equipment. CITY Project Manager shall approve any other direct costs.5. Note employees/classifications that are subject to prevailing wage requirements with an "X" in the Prevailing Wage column. Prevailing Wage specified is based on current Department of Industrial Relations (DIR) determination. CONTRACTOR shall be responsible for any future adjustments to the prevailing wage, including but not limited to, base hourly rates and employer payments as determined by the DIR. CONTRACTOR is responsible for paying the appropriate rate, including escalations that take place during the term of the Agreement. CONTRACTOR shall be reimbursed at the above listed approved flat hourly billing rates.6. Overtime may be reimbursed to classifications where it is required by their union contracts (Prevailing Wage classifications). Overtime will not be charged unless prior written approval is received by CITY Project Manager. CITY shall pay CONTRACTOR at the approved overtime rates noted above. CONTRACTOR shall pay prevailing wage employees per prevailing wage guidelines. 7. Local transportation costs resulting from commuting to and from the employee's residence to the office or job site are not reimbursable.8. The Project will not reimburse CONTRACTOR for costs to relocate its staff to the geographic area of the contract. The Project will not reimburse CONTRACTOR for any per diem.9. ODC items are to be in compliance with Code of Federal Regulations, Title 48 Part 31 [Federal Acquisition Regulations (FAR) cost principles] and the firm's company-wide allocation policies and charging practices with all clients including federal government, state government, local agencies and private clients.
Version: MARCH 29, 2021Page3 of 9
Civic Thread Date:XProject Name:Project #:Fringe Benefit % + *Overhead %=Combined %0.00% 110.00% 110.00%Profit %:10.00%Key StaffPrevailing Wage Classification NameActual Base Hourly Rate Paid to Employee For Reference Only (Does not Include any Fringe or OH)Actual Fully Loaded Hourly Rate For Reference Only (Includes Fringe, OH & Profit)Approved Flat Hourly Billing Rate*Executive Director Kiara Reed $66.00 210% 110% $152.46 $152.46*Project Manager Pristina Zhang $38.00 210% 110% $87.78 $87.78Project Coordinator Aika Miranda $35.00 210% 110% $80.85 $80.85$0.00 210% 110% $0.00 $0.00$0.00 210% 110% $0.00 $0.00Description RateTotalStipends and Incentives 2,800.00$ Printing 1,291.53$ Language Services 600.00$ Venue 275.00$ -$ -$ -$ TOTAL 4,966.53$ A x Profit % = B A + B = Actual Fully Loaded Hourly RateCITY OF SACRAMENTO 10-H FORMApproved with Supplement # (type Original if it is the Original):OriginalCONTRACTOR Name:9/23/2024Vision Zero UpdateS15184123[Actual Base Hourly Rate Paid to Employee + (Actual Base Hourly Rate Paid to Employee x Combined %)] = A By signing here, you agree to the terms above, and attest that all information is accurate and true.CONTRACTOR/SUBCONTRACTOR'S AUTHORIZED PERSON SIGNATUREKiara A. ReedOther Direct Costs (ODC) Items and RatesEstimated ODC Budgets Shall Be Included in Cost Proposal.1. List all Professional and Supervisory staff by Classification and Name. For staff not listed by name but by classification only, a current payroll document identifying their actual base hourly rate shall be provided with every invoice where an unlisted staff bills time. The approved flat hourly billing rates for all employees will be calculated and reimbursed based on their actual base hourly rates per the date noted above unless CITY Project Manager assigns a fair and reasonable flat hourly billing rate for selected employees. For staff not listed by name but by classification only, the reimbursement will not exceed the approved flat hourly billing rate for that classification. Approved flat hourly billing rates for new employees hired after the date of this cost proposal will not exceed (or shall be in line with) the rates of similar personnel with similar experience listed on this cost proposal. The approved flat hourly billing rate shall be all-inclusive, including all mark-ups, fringe, and overhead expenses and profit.2. Key Staff shall be determined by CITY Project Manager. (i.e., named Project Manager, a specific Principal Engineer, a specific Structural Engineer, etc. Note Key staff with an "X" in the Key Staff column.3. The employees' actual base hourly rates used to negotiate the flat hourly billing rates in this 10-H Form are the rates that were effective per the date noted above. Addition of new staff, new classifications, or addition of a SUBCONTRACTOR not previously listed on the approved 10-H Form(s) shall require written approval from the CITY. No work shall commence until the approval is provided by the CITY. New staff shall be paid at the same or lower approved flat hourly billing rate of the previously approved or similar classification. In addition, if the substitution involves Key Staff, CONTRACTOR must request and justify the need for the substitution and obtain approval from CITY Project Manager. Substituted Key Staff shall be as qualified as the original. 4. Approved flat hourly billing rates include all standard equipment including laptop, camera, cell phone, truck, standard personal safety equipment. CITY Project Manager shall approve any other direct costs.5. Note employees/classifications that are subject to prevailing wage requirements with an "X" in the Prevailing Wage column. Prevailing Wage specified is based on current Department of Industrial Relations (DIR) determination. CONTRACTOR shall be responsible for any future adjustments to the prevailing wage, including but not limited to, base hourly rates and employer payments as determined by the DIR. CONTRACTOR is responsible for paying the appropriate rate, including escalations that take place during the term of the Agreement. CONTRACTOR shall be reimbursed at the above listed approved flat hourly billing rates.6. Overtime may be reimbursed to classifications where it is required by their union contracts (Prevailing Wage classifications). Overtime will not be charged unless prior written approval is received by CITY Project Manager. CITY shall pay CONTRACTOR at the approved overtime rates noted above. CONTRACTOR shall pay prevailing wage employees per prevailing wage guidelines. 7. Local transportation costs resulting from commuting to and from the employee's residence to the office or job site are not reimbursable.8. The Project will not reimburse CONTRACTOR for costs to relocate its staff to the geographic area of the contract. The Project will not reimburse CONTRACTOR for any per diem.9. ODC items are to be in compliance with Code of Federal Regulations, Title 48 Part 31 [Federal Acquisition Regulations (FAR) cost principles] and the firm's company-wide allocation policies and charging practices with all clients including federal government, state government, local agencies and private clients.
Peter KoonceDate:XProject Name:Project #:Fringe Benefit % + *Overhead %=Combined %0.00% 0.00% 0.00%Profit %:0.00%Key StaffPrevailing Wage Classification NameActual Base Hourly Rate Paid to Employee For Reference Only (Does not Include any Fringe or OH)Actual Fully Loaded Hourly Rate For Reference Only (Includes Fringe, OH & Profit)Approved Flat Hourly Billing Rate*Principal Peter Koonce $225.00 100% 100% $225.00 $225.00$0.00 100% 100% $0.00 $0.00$0.00 100% 100% $0.00#$0.00100% 100% $0.00 $0.00Description RateTotalTravel up to two trips 1,500.00$ -$ -$ -$ TOTAL 1,500.00$ A x Profit % = B A + B = Actual Fully Loaded Hourly RateCITY OF SACRAMENTO 10-H FORMApproved with Supplement # (type Original if it is the Original):OriginalCONTRACTOR Name:9/23/2024Vision Zero UpdateS15184123[Actual Base Hourly Rate Paid to Employee + (Actual Base Hourly Rate Paid to Employee x Combined %)] = A By signing here, you agree to the terms above, and attest that all information is accurate and true.CONTRACTOR/SUBCONTRACTOR'S AUTHORIZED PERSON SIGNATUREPeter KoonceOther Direct Costs (ODC) Items and RatesEstimated ODC Budgets Shall Be Included in Cost Proposal.1. List all Professional and Supervisory staff by Classification and Name. For staff not listed by name but by classification only, a current payroll document identifying their actual base hourly rate shall be provided with every invoice where an unlisted staff bills time. The approved flat hourly billing rates for all employees will be calculated and reimbursed based on their actual base hourly rates per the date noted above unless CITY Project Manager assigns a fair and reasonable flat hourly billing rate for selected employees. For staff not listed by name but by classification only, the reimbursement will not exceed the approved flat hourly billing rate for that classification. Approved flat hourly billing rates for new employees hired after the date of this cost proposal will not exceed (or shall be in line with) the rates of similar personnel with similar experience listed on this cost proposal. The approved flat hourly billing rate shall be all-inclusive, including all mark-ups, fringe, and overhead expenses and profit.2. Key Staff shall be determined by CITY Project Manager. (i.e., named Project Manager, a specific Principal Engineer, a specific Structural Engineer, etc. Note Key staff with an "X" in the Key Staff column.3. The employees' actual base hourly rates used to negotiate the flat hourly billing rates in this 10-H Form are the rates that were effective per the date noted above. Addition of new staff, new classifications, or addition of a SUBCONTRACTOR not previously listed on the approved 10-H Form(s) shall require written approval from the CITY. No work shall commence until the approval is provided by the CITY. New staff shall be paid at the same or lower approved flat hourly billing rate of the previously approved or similar classification. In addition, if the substitution involves Key Staff, CONTRACTOR must request and justify the need for the substitution and obtain approval from CITY Project Manager. Substituted Key Staff shall be as qualified as the original. 4. Approved flat hourly billing rates include all standard equipment including laptop, camera, cell phone, truck, standard personal safety equipment. CITY Project Manager shall approve any other direct costs.5. Note employees/classifications that are subject to prevailing wage requirements with an "X" in the Prevailing Wage column. Prevailing Wage specified is based on current Department of Industrial Relations (DIR) determination. CONTRACTOR shall be responsible for any future adjustments to the prevailing wage, including but not limited to, base hourly rates and employer payments as determined by the DIR. CONTRACTOR is responsible for paying the appropriate rate, including escalations that take place during the term of the Agreement. CONTRACTOR shall be reimbursed at the above listed approved flat hourly billing rates.6. Overtime may be reimbursed to classifications where it is required by their union contracts (Prevailing Wage classifications). Overtime will not be charged unless prior written approval is received by CITY Project Manager. CITY shall pay CONTRACTOR at the approved overtime rates noted above. CONTRACTOR shall pay prevailing wage employees per prevailing wage guidelines. 7. Local transportation costs resulting from commuting to and from the employee's residence to the office or job site are not reimbursable.8. The Project will not reimburse CONTRACTOR for costs to relocate its staff to the geographic area of the contract. The Project will not reimburse CONTRACTOR for any per diem.9. ODC items are to be in compliance with Code of Federal Regulations, Title 48 Part 31 [Federal Acquisition Regulations (FAR) cost principles] and the firm's company-wide allocation policies and charging practices with all clients including federal government, state government, local agencies and private clients.
Form Approved by City Attorney 9-1-2020 Exhibit C - Page 1 EXHIBIT CINSURANCE 1. Insurance Requirements. During the entire term of this Contract, Contractor shall maintainthe insurance coverage described in the Insurance Terms below. Full compensation for all premiums that Contractor is required to pay for the insurance coverage described herein shall be included in the compensation specified under this Contract. No additional compensation will be provided for Contractor's insurance premiums. Any available insurance proceeds in excess of the specified minimum limits and coverages shall be available to the City. Contractor's liability to the City is not in any way limited to or affected by the amount of insurance coverage required or carried by the Contractor in connection with this Contract. 2. General Liability Minimum Scope and Limits of Insurance Coverage. Commercial General Liability Insurance is required providing coverage at least as broad as ISO CGL Form 00 01 on an occurrence basis for bodily injury, including death, of one or more persons, property damage, and personal injury, arising out of activities performed by or on behalf of the Contractor and subcontractors, products and completed operations of Contractor and subcontractors, and premises owned, leased, or used by Contractor and subcontractors, with limits of not less than one million dollars ($1,000,000) per occurrence. The policy shall provide contractual liability and products and completed operations coverage for the term of the policy. The City, its officials, employees and volunteers shall be covered by policy terms or endorsement as additional insureds as respects general liability arising out of: activitiesperformed by or on behalf of Contractor and subcontractors; products and completedoperations of Contractor and subcontractors; and premises owned, leased, or used by Contractor and subcontractors. 3. Automobile Liability Minimum Scope and Limits of Insurance Coverage. (Check the applicable provision.) _X_ Automobile Liability Insurance is required providing coverage at least as broad as ISOForm CA 00 01 for bodily injury, including death, of one or more persons, property damage and personal injury, with limits of not less than one million dollars ($1,000,000) per occurrence. The policy shall provide coverage for owned, non-owned and/or hired autos as appropriate to the operations of the Contractor. The City, its officials, employees and volunteers shall be covered by policy terms or endorsement as additional insureds as respects auto liability. ___ No automobile liability insurance is required, and by signing this Contract, Contractor certifies as follows: “Contractor certifies that a motor vehicle will not be used in the performance of any work or services under this agreement. If, however, Contractor does transport items under this Contract, or this Contract is amended to require any employees of Contractor to use a Form Approved by City Attorney 9-1-2020 Exhibit C - Page 2 vehicle to perform services under the Contract, Contractor understands that it must maintain and provide evidence of Automobile Liability Insurance providing coverage at least as broad as ISO Form CA 00 01 for bodily injury, including death, of one or more persons, property damage and personal injury, with limits of not less than one million dollars ($1,000,000) per occurrence. The policy shall provide coverage for owned, non-owned and/or hired autos as appropriate to the operations of the Contractor.” 4. Excess Insurance. The minimum limits of insurance required above may be satisfied by acombination of primary and umbrella or excess insurance coverage, provided that any umbrella or excess insurance contains, or is endorsed to contain, a provision that it will apply on a primarybasis for the benefit of the City, and any insurance or self-insurance maintained by City, its officials, employees, or volunteers will be in excess of Contractor's umbrella or excess coverageand will not contribute to it. 5. Workers’ Compensation Minimum Scope and Limits of Insurance Coverage.(Check the applicable provision.) _X_ Workers’ Compensation Insurance is required with statutory limits and Employers'Liability Insurance with limits of not less than one million dollars ($1,000,000). The Workers' Compensation policy shall include a waiver of subrogation in favor of the City. ___ No work or services will be performed on or at CITY facilities or CITY Property, therefore a Workers’ Compensation waiver of subrogation in favor of the CITY is not required. ___ No Workers’ Compensation insurance is required, and by signing this Contract, Contractor certifies as follows: “Contractor certifies that its business has no employees, and that it does not employ anyone, and is therefore exempt from the legal requirements to provide Workers' Compensation insurance. If, however, Contractor hires any employee during the term of this Contract, Contractor understands that Workers’ Compensation with statutory limits and Employer’s Liability Insurance with a limit of not less than one million dollars ($1,000,000) is required. The Workers’ Compensation policy will include a waiver of subrogation in favor of the City.” 6. Professional Liability Minimum Scope and Limits of Insurance Coverage. Professional Liability Insurance providing coverage on a claims-made basis for errors and omissions, or malpractice with limits of not less than one million dollars ($1,000,000): Is __X___ Is not _____ [check one] required for this Agreement. If required, such coverage must be continued for at least 1 (one) year(s) following the completion of all Services under this Contract. The retroactive date must be prior to the date this Contract is approved or any Services are performed.
Form Approved by City Attorney 9-1-2020 Exhibit C - Page 3
7. Other Insurance Provisions.The policies must contain, or be endorsed to contain, the following provisions:A. Contractor's insurance coverage, including excess insurance, shall be primaryinsurance as respects the City, its officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officials, employees or volunteers will be in excess of Contractor's insurance and will not contribute with it. B. Any failure to comply with reporting provisions of the policies will not affect coverage provided to the City, its officials, employees or volunteers. C. Coverage shall state that Contractor's insurance applies separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. D. Contractor shall provide the City with 30 days written notice of cancellation or material change in the policy language or terms. 8. Acceptability of Insurance. Insurance must be placed with insurers with a Bests' rating of not less than A:VI. Self-insured retentions, policy terms or other variations that do not comply with the requirements of this Exhibit C must be declared to and approved by the City in writing before execution of this Contract. 9. Verification of Coverage. A. Contractor shall furnish City with certificates and required endorsements evidencing the insurance required. Certificates of insurance must be signed by an authorized representative of the insurance carrier. Copies of policies shall be delivered to the City Representative on demand. B. Contractor shall send all insurance certificates and endorsements, including policyrenewals, during the term of this Contract directly to: City of Sacramentoc/o Exigis LLCPO Box 947Murrieta, CA 92564C. Certificate Holder must be listed as:City of Sacramentoc/o Exigis LLCPO Box 947Murrieta, CA 92564D. The City may withdraw its offer of Contract or cancel this Contract if the certificates ofinsurance and endorsements required have not been provided before execution of this Contract. The City may withhold payments to Contractor and/or cancel the Contract if theinsurance is canceled or Contractor otherwise ceases to be insured as required herein.
Form Approved by City Attorney 9-1-2020 Exhibit C - Page 4
10. Subcontractor Insurance Coverage. Contractor shall require and verify that all subcontractorsmaintain insurance coverage that meets the minimum scope and limits of insurance coveragespecified in this Exhibit C.
Form Approved by City Attorney 9-1-2020 Exhibit D - Page 1 EXHIBIT DGENERAL CONDITIONS1. Independent Contractor. A. It is understood and agreed that CONTRACTOR (including CONTRACTOR’s employees) is an independent contractor and that no relationship of employer-employee exists between the parties hereto for any purpose whatsoever. Neither CONTRACTOR nor CONTRACTOR’s assigned personnel will be entitled to any benefits payable to CITYemployees. CITY is not required to make any deductions or withholdings from the compensation payable to CONTRACTOR under the provisions of this Contract, and CONTRACTOR will be issued a Form 1099 for its services hereunder. As an independent contractor, CONTRACTOR hereby agrees to indemnify and hold CITY harmless from any and all claims that may be made against CITY based upon any contention by any of CONTRACTOR’s employees or by any third party, including any state or federal agency, that an employer-employee relationship or a substitute therefor exists for any purpose whatsoever by reason of this Contract or by reason of the nature and/or performance under this Contract. B. It is further understood and agreed by the parties that CONTRACTOR, in the performance of its obligations, is subject to the City’s control and direction as to the designation of tasks to be performed and the results to be accomplished under this Contract, but not as to the means, methods, or sequence used by CONTRACTOR for accomplishing the results. To the extent that CONTRACTOR obtains permission to, and does, use CITY facilities, space, equipment or support services in the performance of this Contract, this use will be at the CONTRACTOR’s sole discretion based on the CONTRACTOR’s determination that the use will promote CONTRACTOR’s efficiency and effectiveness. Except as may be specifically provided elsewhere in this Contract, the CITY does not require that CONTRACTOR use CITY facilities, equipment or support services or work in CITY locations in the performance of this Contract. As used in this Contract, "sole discretion" or "sole judgment" means that the party authorized to exercise its discretion or judgment may do so based on an unfettered assessment of its own interests, without considering how its decision affects the other party, and unconstrained by the implied covenant of good faith and fair dealing. C. If, in the performance of this Contract, any third persons are employed by CONTRACTOR, such persons will be entirely and exclusively under the direction, supervision, and control of CONTRACTOR. Except as otherwise provided in this Contract, all terms of employment, including hours, wages, working conditions, discipline, hiring, and discharging, or any other terms of employment or requirements of law, shall be determined by CONTRACTOR. It is further understood and agreed that CONTRACTOR will issue W-2 or 1099 Forms for income and employment tax purposes for all CONTRACTOR’s assigned personnel and subcontractors. D. The provisions of this section will survive any expiration or termination of this Contract. Nothing in this Contract creates an exclusive relationship between CITY and CONTRACTOR. CONTRACTOR may represent, perform services for, or be employed by Form Approved by City Attorney 9-1-2020 Exhibit D - Page 2 any additional persons or companies so long as CONTRACTOR does not violate the provisions of Section 5, below.2. Licenses; Permits, Etc. CONTRACTOR represents and warrants that CONTRACTOR has, and shall maintain at all times during the term of this Contract at its sole cost and expense, all licenses, permits, qualifications, and approvals of any nature that are legally required for CONTRACTOR to practice its profession or fulfill the terms of this Contract, including a City Business Operations Tax Certificate and any required certification issued by the California Secretary of State. 3. Time. Time is off the essence in the performance of this Contract. CONTRACTOR shall devote the necessary time and effort to its performance under this Contract. Neither party will be considered in default of this Contract, to the extent that party’s performance is prevented or delayed by any cause, present or future, that is beyond the reasonable control of that party. 4. CONTRACTOR Not Agent. Except as CITY may specify in writing, CONTRACTOR and CONTRACTOR’s personnel have no authority, express or implied, to act on behalf of CITY in any capacity whatsoever as an agent. CONTRACTOR and CONTRACTOR’s personnel shall have no authority, express or implied, to bind CITY to any obligations whatsoever. 5. Conflicts of Interest. CONTRACTOR covenants that neither it, nor any officer or principal of its firm, has or will acquire any interest, directly or indirectly, that would conflict in any manner with the CITY’s interests or that would in any way hinder CONTRACTOR’s performance under this Contract. CONTRACTOR further covenants that in the performance of this Contract, no person having any such interest will be employed by it as an officer, employee, agent or subcontractor, without the City’s written consent. CONTRACTOR agrees to avoid conflicts of interest or the appearance of any conflicts of interest with the City’s interests during the performance of this Contract. If CONTRACTOR is or employs a former officer or employee of the CITY, CONTRACTOR and any former City officer or employee shall comply with the provisions of Sacramento City Code Section 2.16.090 pertaining to appearances before the City Council or any CITY department, board, commission, or committee. 6. Hazardous Substances. "Hazardous Substances" means any substance, material, waste, or other pollutant or contaminant that is or becomes designated, classified, or regulated as hazardous or toxic under any law, regulation, rule, order, decree, or other governmental requirement now in effect or later enacted. If Contractor is shipping Hazardous Substances, Contractor must supply a Safety Data Sheet ("SDS") with the first shipment of Hazardous Substances to each City location receiving the Hazardous Substances. If the content of an SDS is revised, Contractor must provide a revised SDS to each City location receiving Hazardous Substances. 7. Confidentiality of CITY Information. During performance of this Contract, CONTRACTOR may gain access to and use CITY information regarding inventions, machinery, products, prices, apparatus, costs, discounts, future plans, business affairs, governmental affairs, processes, trade secrets, technical matters, systems, facilities, customer lists, product design, copyright, data, and other vital information (hereafter collectively referred to as “City Information”) that are valuable, special and unique assets of the CITY.
Form Approved by City Attorney 9-1-2020 Exhibit D - Page 3 CONTRACTOR agrees to protect all City Information and treat it as strictly confidential, and further agrees that CONTRACTOR shall not at any time, either directly or indirectly, divulge, disclose or communicate in any manner any City Information to any third party without the City’s prior written consent. In addition, CONTRACTOR must comply with all CITY policies governing the use of the CITY network and technology systems, as set forth in applicable provisions of the City of Sacramento Administrative Policy Instructions # 30. A violation by CONTRACTOR of this section is a material violation of this Contract and shall justify legal and equitable relief. 8. CONTRACTOR Information. A. CITY shall have full ownership and control, including ownership of any copyrights, of all information prepared, produced, or provided by CONTRACTOR under this Contract. In this Contract, the term “information” means and includes: any and all work product, submittals, reports, plans, specifications, and other deliverables consisting of documents, writings, handwritings, typewriting, printing, photostatting, photographing, computer models, and any other computerized data and every other means of recording any form of information, communications, or representation, including letters, works, pictures, drawings, sounds, or symbols, or any combination thereof. CONTRACTOR shall not be responsible for any unauthorized modification or use of such information for other than its intended purpose by CITY. B. CONTRACTOR shall fully defend, indemnify and hold harmless CITY, its officers and employees, and each of them, from and against any and all claims, actions, lawsuits or other proceedings alleging that all or any part of the information prepared, produced, or provided by CONTRACTOR under this Contract infringes upon any third party’s trademark, trade name, copyright, patent or other intellectual property rights. CITY shall make reasonable efforts to notify CONTRACTOR not later than ten days after CITY is served with any such claim, action, lawsuit or other proceeding. However, City’s failure to provide notice within the ten-day period does not relieve CONTRACTOR of its obligations hereunder, which survive any termination or expiration of this Contract. C. All proprietary and other information received from CONTRACTOR by CITY, whether received in connection with CONTRACTOR’s proposal to CITY or in connection with Contractor’s performance, will be disclosed upon receipt of a request for disclosure, in accordance with the California Public Records Act; provided, however, that, if any information is set apart and clearly marked “trade secret” when it is provided to CITY, CITY shall give notice to CONTRACTOR of any request for the disclosure of such information. The CONTRACTOR will then have five days from the date it receives notice to petition the court for a protective order to prevent the disclosure of the information. The CONTRACTOR shall have sole responsibility for defense of the actual “trade secret” designation of such information. D. The parties understand and agree that any failure by CONTRACTOR to respond to the notice provided by CITY and seek a protective order, in accordance with the provisions of subsection C, above, constitutes a complete waiver by CONTRACTOR of any rights regarding the information designated “trade secret” by CONTRACTOR, and the Form Approved by City Attorney 9-1-2020 Exhibit D - Page 4 information will be disclosed by CITY in accordance with the Public Records Act.9. Notification of Material Changes in Business. Contractor agrees that if it experiences anymaterial changes in its business, including a reorganization, refinancing, restructuring, leveraged buyout, bankruptcy, name change, or loss of key personnel, it will immediately notify the City of the changes. Contractor also agrees to immediately notify the City of any condition that may jeopardize the scheduled delivery or fulfillment of Contractor's obligations to the City under this Contract. 10. Standard of Performance. CONTRACTOR shall perform in the manner and according to the standards currently observed by a competent practitioner of CONTRACTOR’s profession in California and in compliance with all requirements of this Contract. All products that CONTRACTOR delivers to CITY under this Contract must be prepared in a professional manner and conform to the standards of quality normally observed by a person currently practicing in CONTRACTOR’s profession. CONTRACTOR shall assign only competent personnel to perform on its behalf under this Contract. CONTRACTOR must notify the CITY in writing of any changes in CONTRACTOR’s staff assigned to perform under this Contract, before any performance by the new staff member. If the CITY, in its sole discretion, determines that any person assigned by the Contractor to perform under this Contract is not performing in accordance with the standards required herein, City shall provide notice to Contractor. CONTRACTOR shall immediately remove the assigned person upon receipt of the notice. 11. Performance or Different Terms and Conditions. The City's subsequent performance will not be construed as either acceptance of additional or different terms and conditions or a counteroffer by the Contractor, nor will the City's subsequent performance be viewed as acceptance of any provision of the Uniform Commercial Code, as adopted by any State, that is contrary to the terms and conditions contained herein. Contractor's performance shall conform to the applicable requirements of the Sacramento City Charter, Sacramento City Code, and all applicable State and Federal laws, and all the requirements of this Contract. The California Commercial Code will apply except as otherwise provided in the Contract. 12. Emergency/Declared Disaster Requirements. If an emergency is declared by the City Manager,or if any portion of the City is declared a disaster area by the county, state or federal government, this Contract may be subjected to increased usage. The Contractor shall serve the City during adeclared emergency or disaster, subject to the same terms and conditions that apply during non-emergency / non-disaster conditions. The pricing set forth in this Contract will apply, without mark-up, regardless of the circumstances. If the Contractor is unable to fulfill the terms of the Contract because of a disruption in its chain of supply or service, then the Contractor shall provide proof of the disruption. Acceptable forms of proof will include a letter or notice from theContractor's source stating the reason for the disruption 13. Term; Suspension; Termination. A. This Contract is effective on the Effective Date and continues in effect until both parties have fully performed their respective obligations under this Contract, unless sooner terminated as provided herein.
Form Approved by City Attorney 9-1-2020 Exhibit D - Page 5 B. CITY shall have the right at any time to suspend CONTRACTOR’s performance hereunder, in whole or in part, by giving a written notice of suspension to CONTRACTOR. Upon receipt of such notice, CONTRACTOR shall immediately suspend its activities under this Contract, as specified in the notice. C. The CITY shall have the right to terminate this Contract at any time by giving a written notice of termination to CONTRACTOR. Upon receipt of such notice, CONTRACTOR shall immediately cease performance under this Contract as specified in the notice. If the CITY terminates this Contract: (1) CONTRACTOR shall, not later than five days after receipt of the notice, deliver allinformation prepared under this Contract to the City. (2) The CITY shall pay CONTRACTOR the reasonable value of Goods or Services provided by CONTRACTOR before termination; provided, however, CITY shall not in any manner be liable for lost profits that might have been made by CONTRACTOR had the Contract not been terminated or had CONTRACTOR completed performance required by this Contract. CONTRACTOR shall furnish to the CITY any financial information requested by the City to determine the reasonable value of the Goods or Services provided by CONTRACTOR. The foregoing is cumulative and does not affect any right or remedy that CITY may have in law or equity. 14. Default by Contractor. In case of default by the Contractor, the City reserves the right to procurethe Goods or Services from other sources and deduct from any monies due, or that maythereafter become due to the Contractor, the difference between the price named in thisContract and the actual cost to the City to procure from an alternate source. Prices paid by the City will be considered the prevailing market price at the time such purchase is made. 15. Indemnity. A. Indemnity:Contractor shall defend, hold harmless, and indemnify City, its officers, and employees, and each and every one of them, to the fullest extent permitted under law, from and against all actions, damages, costs, liabilities, claims, demands, losses, judgments, penalties, and expenses of every type and description, whether arising on or off the site of the work or services performed under this Contract, including any fees and costs reasonably incurred by City’s staff attorneys or outside attorneys and any fees and expenses incurred in enforcing this provision (hereafter collectively referred to as “Claims”), including Claims for personal injury or death, damage to personal, real, or intellectual property, damage to the environment, contractual or other economic damages, or regulatory penalties, that arise out of, pertain to, or relate to any negligent act or omission, recklessness, or willful misconduct related in any way to the performance of or failure to perform this Contract by Contractor, any subcontractor (including lower-tier subcontractors) or agent of Contractor, their respective officers and employees, and anyone else for whose acts of omissions any of them may be liable, whether or not the Claims are litigated, settled, or reduced to judgment; provided that the foregoing indemnity does not apply to liability for damages for death or bodily injury Form Approved by City Attorney 9-1-2020 Exhibit D - Page 6 to persons, injury to property, or other loss, damage, or expense, to the extent arising from the active negligence or willful misconduct of, or defects in design furnished by, City, its agents, servants, or independent contractors who are directly responsible to City, except when such agents, servants, or independent contractors are under the supervision and control of Contractor or any subcontractor (including lower-tier subcontractors) or agent of Contractor. While Contractor’s defense costs ordinarily cannot exceed Contractor’s proportionate percentage of fault, if one or more defendants is unable to pay its share of defense costs due to bankruptcy or dissolution, the Contractor shall meet and confer with the City and other parties regarding the unpaid defense costs. B. Insurance Policies; Intellectual Property Claims:The existence or acceptance by City of any of the insurance policies or coverages described in this Contract will not affect or limit any of City’s rights under this Section, nor will the limits of any insurance limit the liability of Contractor hereunder. This Section will not apply to any intellectual property claims, actions, lawsuits or other proceedings subject to the provisions of the Contractor Information Section, above. C. Survival. The provisions of this section will survive any expiration or termination of this Contract. 16. Funding Availability.A. This Contract is subject to the budget and fiscal provisions of the Charter and the Sacramento City Code. B. The City’s payment obligation under this Contract will not exceed the amount of funds appropriated and approved for this Contract by the Sacramento City Council. C. This Section shall govern over any other contrary provision of the Contract.17. Equal Employment Opportunity. During the performance of this Contract, CONTRACTOR, for itself, its assignees and successors in interest, agrees as follows: A. Compliance With Regulations: CONTRACTOR shall comply with all state, local, and federal anti-discrimination laws and regulations, including the Executive Order 11246 entitled “Equal Opportunity in Federal Employment”, as amended by Executive Order 11375, 12086, and 13672, and as supplemented in Department of Labor regulations (41 CFR Chapter 60), referred to collectively as the “Regulations.” B. Nondiscrimination: CONTRACTOR, with regards to the work performed by it after award and before completion of the work under this Contract, shall not discriminate on the ground of race, color, religion, sex, national origin, age, marital status, physical handicap or sexual orientation in selection and retention of subcontractors, including procurement of materials and leases of equipment. CONTRACTOR shall not participate either directly or indirectly in discrimination prohibited by the Regulations. C. Solicitations for Subcontractors, Including Procurement of Materials and Equipment: In Form Approved by City Attorney 9-1-2020 Exhibit D - Page 7 all solicitations either by competitive bidding or negotiations made by CONTRACTOR for work to be performed under any subcontract, including all procurement of materials or equipment, each potential subcontractor or supplier shall be notified by CONTRACTOR of CONTRACTOR’s obligation under this Contract and the Regulations relative to nondiscrimination on the ground of race, color, religion, sex, national origin, age, marital status, physical handicap or sexual orientation. D. Information and Reports: CONTRACTOR shall provide all information and reports required by the Regulations, or by any orders or instructions issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information and its facilities as may be determined by the CITY to be pertinent to ascertain compliance with the Regulations, orders and instructions. Where any information required of CONTRACTOR is in the exclusive possession of another who fails or refuses to furnish this information, CONTRACTOR shall so certify to the CITY, and shall set forth what efforts it has made to obtain the information. E. Sanctions for Noncompliance: In the event of noncompliance by CONTRACTOR with the nondiscrimination provisions of this Contract, the CITY shall impose any sanctions it determines are appropriate including: (1) Withholding of payments to CONTRACTOR under this Contract until CONTRACTOR complies; (2) Cancellation, termination, or suspension of this Contract, in whole or in part.F. Incorporation of Provisions: CONTRACTOR shall include the provisions of subsections A through E, above, in every subcontract, including procurement of materials and leases of equipment, unless exempted by the Regulations, or by any order or instructions issued pursuant thereto. The City may direct CONTRACTOR to take specific actions to enforce these provisions, including sanctions for noncompliance; provided, however, that ifCONTRACTOR becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, CONTRACTOR may request that the CITY join such litigation to protect the City’s interests. 18. Entire Agreement. This Contract, including all Exhibits and documents referenced herein, contains the entire agreement between the parties and supersedes whatever oral or written understanding they may have had before the execution of this Contract. No alteration to the terms of this Contract shall be valid unless approved in writing by CONTRACTOR, and by CITY, in accordance with applicable provisions of the Sacramento City Code. 19. Modification of Contract. The Contractor shall take no direction from any City employee that changes the executed terms and conditions of the Contract, including Exhibit A, or any change that impacts the cost, price, or schedule, before receiving a written, signed modification to the Contract. 20. Severability.If a court with jurisdiction rules that any portion of this Contract or its application to any person or circumstance is invalid or unenforceable, the remainder of this Contract will not be affected thereby and will remain valid and enforceable as written, to the greatest extent permitted by law.
Form Approved by City Attorney 9-1-2020 Exhibit D - Page 8
21. Waiver.Neither the CITY’s acceptance of, or payment for, any Goods or Services, nor any waiver by either party of any default, breach or condition precedent, will be construed as a waiver of any provision of this Contract, nor as a waiver of any other default, breach or condition precedent or any other right hereunder. No waiver will be effective unless it is in writing and signed by the waiving party. 22. Governing Law. This Contract shall be governed, construed and enforced in accordance with the laws of the State of California, except that the rule of interpretation in California Civil Code section 1654 will not apply. Venue of any litigation arising out of this Contract will lie exclusively in the state trial court or Federal District Court located in Sacramento County in the State of California, and the parties consent to jurisdiction over their persons and over the subject matter of any such litigation in such courts, and consent to service of process issued by such courts. 23. Assignment Prohibited. The expertise and experience of CONTRACTOR are material considerations for this Contract. CITY has a strong interest in the qualifications and capability of the persons and entities that will fulfill the obligations imposed on CONTRACTOR under this Agreement. In recognition of this interest, CONTRACTOR shall not assign any right or obligation pursuant to this Contract without the written consent of the CITY. Any attempted or purported assignment without CITY’s written consent shall be void and of no effect. 24. Binding Effect. This Contract is binding on the heirs, executors, administrators, successors and assigns of the parties, subject to the provisions of Section 23, above. 25. Compliance with Laws. The Contractor shall be responsible for strict compliance with all applicable laws, regulations, court orders and other legal requirements applicable to the work to be accomplished under the Contract, including the California Occupational Safety and Health Act and all applicable safety orders issued by the Division of Occupational Safety and Health, Department of Industrial Relations, State of California, and all applicable requirements of Underwriters Laboratories and the Federal Communication Commission. 26. Debarment Certification A. Pursuant to 2 CFR, Part 200, and applicable Executive Orders, the City is restricted in its ability to contract with certain parties that are debarred, suspended, or otherwise excluded or ineligible for participating in Federal assistance programs or activities. By signing this Agreement, CONTRACTOR warrants and certifies under penalty of perjury under the laws of the State of California that Contractor, including any owner, partner, director, officer, or principal of the CONTRACTOR, or any person in a position with management responsibility or responsibility for the administration of federal funds: (1) Is not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any federal or state department/agency; (2) Has not within a three-year period preceding this certification been convicted of or had a civil judgment rendered against it for: commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public transaction or contract (federal, state, or local); violation of federal or state antitrust statutes; or Form Approved by City Attorney 9-1-2020 Exhibit D - Page 9 commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, receiving stolen property, or other criminal felony;(3) Is not presently indicted for or otherwise criminally or civilly charged by a governmental entity (federal, state, or local) with commission of any of the offenses enumerated in paragraph (b) above; or(4) Has not, within a three-year period preceding this certification, had one or more public contracts (federal, state, or local) or transactions terminated for cause or default.(5) Has not been notified, within a three-year period preceding this certification, been notified of any delinquent Federal taxes in an amount that exceeds $3,500 for which the liability remains unsatisfied. Federal taxes are considered delinquent if the tax liability has been finally determined and the taxpayer is delinquent in making payment, as defined in Section 52.209-5 of the Federal Acquisition Regulations. B. CONTRACTOR further warrants and certifies that it shall not knowingly enter into any transaction with any subcontractor, material supplier, or vendor who is debarred, suspended, declared ineligible, or voluntarily excluded from covered transactions by any federal or state department/agency. Any exceptions to the warranties and certifications in this Section must be disclosed to the City. C. Exceptions will not necessarily result in denial of recommendation for award, but will be considered in determining Contractor’s responsibility. Disclosures must indicate to whom exceptions apply, the initiating agency, and dates of action. D. City will review the Federal Government’s System for Award Management Exclusions maintained by the General Services Administration for eligibility, prior to the execution of this Agreement. The CONTRACTOR shall provide immediate written notice to the City if, at any time prior to execution, the CONTRACTOR learns this certification is erroneous or has become erroneous by reason of changed circumstances. If it is later determined that the Contractor’s warranties and certification in this Section were erroneous, the City may terminate this Agreement for default.
Form Approved by City Attorney 9-1-2020 Exhibit E - Page 1 EXHIBIT EADDITIONAL REQUIREMENTS FOR SURVEYING, MATERIAL TESTING, AND INSPECTION SERVICES The Services provided under this Contract include land surveying, material testing, or inspection services provided for a City construction project during the design, pre-construction, construction, or post-construction phases of the project. Therefore, the services include “Public Work” under the California Labor Code and is subject to the following requirements: A. Payment of Prevailing Wages: Contractor and any subcontractor(s) performing any Public Work shall comply with the provisions of Sacramento City Code section 3.60.180 and applicable provisions of the California Labor Code, which require, among other things, that CONTRACTOR and all subcontractors pay not less than the prevailing rate of wages, as determined by the Director of the California Department of Industrial Relations (“DIR”) in accordance with California Labor Code section 1773. CONTRACTOR and every subcontractor shall maintain payroll records and submit certified payrolls and other labor compliance documentation electronically when and as required by CITY. In addition, Labor Code Section 1771.4 requires the CONTRACTOR and any subcontractor performing any Public Work to furnish electronic payroll records directly to the Labor Commissioner. Contractor shall include these requirements in every subcontract. This Agreement is subject to compliance monitoring and enforcement by the DIR, as specified in California Labor Code section 1771.4. The Contractor and any subcontractor will be subject to withholding and penalties for violation of prevailing wage requirements in accordance with applicable law, including Labor Code Sections 1726, 1741, 1771.5, and 1775, and City Code Section 3.60.180. Questions regarding the City’s Labor Compliance Program should be directed to the City Representative. B. DIR Registration: California Labor Code Section 1725.5 requires the CONTRACTOR and all subcontractors performing Public Works services to be currently registered with the DIR, as specified in California Labor Code Section 1725.5. California Labor Code Section 1771.1 provides that a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal (subject to the requirements of Section 4104 of the California Public Contract Code), or engage in the performance of any contract for Public Work, unless currently registered and qualified to perform Public Work in accordance with California Labor Code Section 1725.5. Further information can be found on DIR’s website at http://www.dir.ca.gov/Public-Works/Contractors.html. The above summary is provided solely for informational purposes and does not in any way affect the CONTRACTOR’s and subcontractors’ obligation to comply in all respects with all other applicable laws and regulations. The CONTRACTOR shall disseminate these provisions to all subcontractors. Before the performance of work by Contractor or any subcontractor(s) under this Contract, Contractor shall furnish Contractor’s and any subcontractors’ current DIR
Form Approved by City Attorney 9-1-2020 Exhibit E - Page 2 registration number(s). The Contractor’s current DIR registration number and the current DIR registration number of all subcontractors will be listed on the Subcontractor and LBE Participation Verification Form, incorporated herein.To be completed by the City Representative if this Agreement is for the performance of any Public Work:Contractor DIR registration #: NOT APPLICABLE TO THIS AGREEMENTC. Workers’ Compensation Certification. In accordance with California Labor Code Section 1861, by signing this Contract, Contractor acknowledges and represents that Contractor is aware of the provisions of section 3700 of the California Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and that Contractor will comply with the provisions of the Labor Code before commencing performance under this Contract.D. Apprentices. If this Contract is for the performance of any Public Work, and the amount of the Contract is $30,000 or more, the Contractor and any subcontractors performing any Public Work under this Contract must comply with and be subject to enforcement under, the provisions of Sacramento City Code Section 3.60.190, Section 1777.5 et seq. of the California Labor Code, and implementing regulations set forth in Title 8 of the California Code of Regulations, governing the employment of apprentices. The Contractor and any subcontractors performing Public Work will be subject to penalties for apprenticeship violations in accordance with Labor Code Section 1777.7.E. Working Hours. If this Contract is for the performance of any Public Work, Contractor and any subcontractors performing any Public Work under this Contract must comply with and be subject to enforcement under, the provisions of Sacramento City Code Section 3.60.180 and California Labor Code Section 1810 et seq., governing the working hours of employees performing Public Work.F. Failure to Comply with Labor Compliance. If all applicable labor compliance requirements are not met, the City will have the right to withhold or reject a payment request and/or invoice, in whole or in part, without in any way relieving Contractor or its subcontractors of any obligations under this Contract. G. Subcontractors. The Contractor shall include these provisions A through F in every subcontract or sub-agreement for any subcontractors performing work under this Contract.
PSA Signature Page – Approved by CAO 11-1-2019
Executed as of the day and year first above stated.CITY OF SACRAMENTOA Municipal Corporation By: _____Print name: Title:For: Howard Chan, City Manager ATTEST: ______City ClerkAPPROVED AS TO FORM: ______City Attorney AttachmentsExhibit A Scope of WorkExhibit B PaymentExhibit C Insurance Exhibit D General ConditionsExhibit E Additional Requirements for Surveying, Material Testing, and Inspection Services PSA Signature Page – Approved by CAO 11-1-2019
CONTRACTOR:______________________________________ NAME OF FIRM______________________________________ Federal I.D. No.______________________________________ State I.D. No.______________________________________ City of Sacramento Business Op. Tax Cert. No.TYPE OF BUSINESS ENTITY (check one): _____ Individual/Sole Proprietor_____ Partnership_____ Corporation (may require 2 signatures)_____ Limited Liability Company_____ Other (please specify: ______________)______________________________________ Signature of Authorized Person______________________________________ Print Name and Title______________________________________ Additional Signature (if required)______________________________________ Print Name and Title Fehr & Peers68-0065540XN/AN/A
139007