City of Sacramento
City Council - 2PM Report
915 I Street Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2025-00441 2/18/2025 Consent Item 3.
Park Impact Fee (PIF) Annual Report for Fiscal Year (FY) 2023/24 File ID: 2025-00441
Location: Citywide
Recommendation: Receive and file the Park Impact Fee Report for Fiscal Year (FY) 2023/24.
Contact: Sadie Sanchez, Senior Administrative Officer, (916) 808-8040, [email protected]; Jason Wiesemann, Park Planning, Design and Development Manager, (916) 808-7634, [email protected]; Department of Youth, Parks, & Community Enrichment
Presenter: None
Attachments:
1-Description/Analysis
2-PIF Annual Report for FY 2023/24
Description/Analysis
Issue Detail: PIF is established under Sacramento City Code Sections 18.56.210-250. Per the Mitigation Fee Act, Government Code Section 66006 and City Code Section 18.56.150, an annual report for this impact fee is required to be prepared and presented to the City Council. The report is to include information on the amount of the fees collected, expenditures and the remaining balance.
The City of Sacramento PIF Report for FY2023/24 is attached.
Policy Considerations: Providing parks and recreation facilities is consistent with the City’s strategic plan to enhance liveability in Sacramento’s neighborhoods by expanding park and recreation facilities throughout the City.
Economic Impacts: Not applicable.
Environmental Considerations: This report concerns administrative activities that do not constitute a "project" as defined by the California Enviornmental Quality Act Guidelines Section 15378(b)(2) (Title 14 Cal. Code Reg. § 15000 et seq.).
File ID: 2025-00441 2/18/2025 Consent Item 3.
Sustainability: Projects utilizing PIF funds are reviewed for consistency with the goals, policies, and targets of the City’s Sustainability Plan, the Department of Youth, Parks, & Community Enrichment’s Parks Plan and Strategic Plan, and the Parks Plan 2040. Development of parks utilizing PIF funds advance these plans by reducing air pollution, reducing water consumption, and expanding recreation opportunities. Park renovations and improvements utilizing PIF funds are also consistent with sustainable design and development standards.
Commission/Committee Action: Not Applicable.
Rationale for Recommendation: This is an annual impact fee report to City Council in compliance with the Mitigation Fee Act and the City Code.
Financial Considerations: The report provides a comprehensive accounting of the revenues, expenditures, and budgets of the PIF program for FY2023/24.
Local Business Enterprise (LBE): Not Applicable.
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
City of Sacramento
Park Impact Fee Report
Fiscal Year
2023 - 2024
Presented to City Council: February 18, 2025
TABLE OF CONTENTS
Executive Summary .........................................................................................................................1 Annual Report Requirements ...........................................................................................................3
Park Impact Fee Report Requirements:
Balance Sheet as of June 30, 2024 .............................................................................................4 Statement of Revenues, Expenditures, and
Changes in Fund Balance .......................................................................................................5 Park Impact Fee Refunds ...........................................................................................................6 Park Impact Fee Structure ..........................................................................................................7 Proposed Capital Improvement Program ...................................................................................8 Capital Improvement Project Report .........................................................................................9 Notes to the Park Impact Fee Report .......................................................................................16 Supplementary Information:
Community Plan Area Reports:
City Council Districts ...........................................................................................................17 Council District Citywide Map .............................................................................................18 PIF Incentive Zone Map .......................................................................................................19 Park Impact Fee Report by Council District ............................................................................20 Council District 1 .........................................................................................................21 Council District 2 .........................................................................................................22 Council District 3 .........................................................................................................23 Council District 4 .........................................................................................................24 Council District 5 .........................................................................................................25 Council District 6 .........................................................................................................26 Council District 7 .........................................................................................................27 Council District 8 .........................................................................................................28 Citywide Component .............................................................................................................29 Administrative Component ...................................................................................................30
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
1 EXECUTIVE SUMMARY
The Park Impact Fee Report (Report) is a requirement under California Government Code 66006. The Report requirements are located on page 3. Supplemental reports have been included to detail revenues collected and expenditures made in each of the City’s eight council districts. All financial information is shown for the fiscal year ended June 30, 20 24. As of October 20 th, 2013 revenues collect ed and expenditures made are recorded and shown by Council District rather than by the City’s ten Community Plan Areas. (Note: With adoption of the City’s 2030 General Plan on March 3, 2009, Resolution 2009 - 131, the number of Community Plan Areas was reduced from eleven to ten, effective April 3, 2009).
The fees are assessed upon landowners developing new property and for certain renovations and modifications to existing buildings for any residential or nonresidential use. These fees are used to provide all or a portion of the funds necessary to design, construct, and install neighborhood and community park facilities. It is the intent and purpose of the City to allow development within the City on the condition that the owners of property under development pay the costs of such park development and the costs shall not become a responsibility of the City’s general fund.
The Park Impact Fees collected from inception to October 20, 2013 are presented below by Community Plan Area:
Community Plan Area Revenue & Interest %
1-Central City $4,436,651 6.1
2-Land Park 433,802 .6
3-Pocket 2,193,551 3.0
4-South Area 9,553,723 13.1
5-Fruitridge/Broadway 2,648,822 3.6
6-East Sacramento 870,368 1.2
7-Arden/Arcade 304,496 .4
8-North Sacramento 3,894,345 5.3
9-South Natomas 4,531,649 6.2
10-North Natomas 40,321,829 55.4
11-Airport/Meadowview * 1,781,464 2.4
- Administrative 1,837,890 2.5
Total by Plan Area (Inception thru 10/20/13) $72,808,590 100.0 *Note: As of 4/3/09, Plan Area 11 merged with Plan Area 4.
The Park Impact Fees collected from October 21, 2013 to June 30, 2024 are presented below by Council District:
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
2 Council District
Revenue &
Interest %
Council District 1 $34,197,982 38.8
Council District 2 3,579,087 4.1
Council District 3 10,188,854 11.6
Council District 4 12,797,679 14.5
Council District 5 2,910,518 3.3
Council District 6 3,079,450 3.5
Council District 7 1,642,626 1.9
Council District 8
Citywide
4,514,202
10,431,568
5.1 11.8
- Administrative 4,799,255 5.4
Total by Council District (10/21/2013 to
06/30/24)
$88,141,221 100.0
Park Impact Fees collected are accounted for by Council Districts.
Revenue &
Interest %
Total by Plan Area thru 10/20/13 $72,808,590 45.2
Total by Council District (10/21/13-06/30/24) 88,141,221 54.8 Total Collected $159,218,897 100.0
With adoption of Resolution 2022-0386, on December 6, 2022, a transfer of year-end resources included in fund balance in General Fund/Measure U Fund was approved to offset the revenue losses resulting from the Reduced Residential Development Impact Fees fo r Affordable Dwelling Units Program (commonly referred to as the “Zero -Dollar Impact Fee Program” ). In the fiscal year ending June 30, 2024, approximately $1.7 million has been transferred to the Park Impact Fee Fund as part of this resolution.
These funds are shown as permit fees collected and have been allocated to each Council District, based on the area where the applicable permits under the program were applied.
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
3 ANNUAL REPORT REQUIREMENTS
An annual report for the Park Impact Fee is required under the Mitigation Fee Act. The park fee revenues and expenditures are accounted for in Fund 3204, the Park Impact Fee Fund, but are allocated for projects based on the location of the development projects for which the fee was paid . The information required is presented below and includes the referenced attachments:
A1. A brief description of the fee. – See Page 1 for the Executive Summary and description of the fee and Note One on Page 15 for additional explanation.
A2. The amount of the fee. – see Page 7 for the fee structure for the year ended June 30, 2024.
A3. The beginning and ending balances of the fund. - See Page 4 for the Balance Sheet at June 30, 2024.
A4. The amount of revenue collected from the fee and the interest earned on the revenue – See Page 5 for the Statement of Revenues, Expenditures, and Changes in Fund Balance for the fiscal year ended June 30, 2024.
A5. Identification of each component of the infrastructure on which revenues from the fee were expended and the amount of the expenditures for each component, including the total percentage of cost of the component that was funded with the fee revenues. - See Pages 9-15 for the capital improvement project report.
A6. For each incomplete component of the infrastructure for which the city determines that sufficient funds have been collected to complete the financing of the component, identification of an approximate date by which construction of the component will commence. – See Page 8 for a list projects presented in the 2024 Capital Improvement Program utilizing the fee.
A7. The amount of refunds made in accordance with section 15.56.140 and any appropriations made in accordance with subsection 15.56.140.C.2.b. – See Page 6 for detail on refunds made. Any appropriations made are included in the capital improvement project report.
A8. The amount of the automatic annual adjustment made pursuant to Sacramento City Code section
18.56.120, including the basis of the calculation. – See Page 7 for the adjusted fee schedule as of July 1, 2023.
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
4 CITY OF SACRAMENTO
PARK IMPACT FEE FUND
BALANCE SHEET
FOR THE FISCAL YEAR ENDING JUNE 30, 2024
(in thousands)
Assets: 2024
Cash and investments $ 37.332
Receivables (net of allowances for uncollectibles)
Accounts 7,696
Interest 172
Total assets $ 45,200
Liabilities and fund balance:
Liabilities:
Accounts payable
Unearned revenue
1,391
278
Deferred inflow 1,441
Total liabilities
3,110
Fund balances:
Restricted:
For capital projects
Other programs
42,080
10 Total fund balances 42,090
Total liabilities and fund balances: $ 45,200
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
5 CITY OF SACRAMENTO
PARK IMPACT FEE FUND
SCHEDULE OF REVENUES, EXPENDITURES
AND CHANGES IN FUND BALANCES
FOR THE FISCAL YEAR ENDING JUNE 30, 2024
(in thousands)
2024
Revenues:
Charges for services 474$
Interest, rents and concessions 1,731
Community service fees 5,559
Total revenues 7,764
Expenditures:
Current:
Parks and recreation 470
Capital outlay 3,742
Debt service:
Principal 384
Interest and other charges -
Total expenditures 4,596
Excess (deficiency) of revenues over
(under) expenditure 3,168
Other financing sources (uses):
Transfers in 1,070
Issuance of long-term debt 395
Total other financing sources (uses) 1,465
Excess (deficiency) of revenues and other
financing sources over (under) expenditures
and other financing uses 4,633
Fund balances, beginning of year 37,457
Fund balances, end of year 42,090$
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
6 CITY OF SACRAMENTO
PARK IMPACT FEE REFUNDS
2024
Refunds 368,399$
FOR THE FISCAL YEAR ENDED JUNE 30, 2024
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
7 CITY OF SACRAMENTO
PARK IMPACT FEE FUND
PARK IMPACT FEE STRUCTURE
FOR THE FISCAL YEAR ENDED JUNE 30, 2024
Note: A map of the PIF Rate Housing Incentive and Central City Incentive Zones is presented on Page 18.
On July 1 of each fiscal year fees are adjusted by a factor equal to the percentage increase of the Construction Cost Index for San Francisco during the twelve months ended on the preceding March 1 of the prior fiscal year, as published by Engineering News Record/McGraw-Hill Construction Weekly (Automatic Annual Adjustment). In no event shall the adjustment reduce the fees below the fees established for the previous year. The fees may also be revised periodically by Council.
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
8 CITY OF SACRAMENTO
PARK IMPACT FEE FUND
PARK IMPACT FEE 2024-2029 PROPOSED CAPITAL
IMPROVEMENT PROGRAM
CIP Number Project Name PIF Funding Project Start Date L19109400 BLACKBIRD PARK RESTROOM $600,000 7/1/2024
L19109500 BERTHA HENSCHEL PARK $750,000 7/1/2024
L19140700 NORTH NATOMAS REGIONAL PARK BALLFIELD $2,000,000 7/1/2024
L19143200 NORTHGATE PARK RESTROOM REPLACEMENT $600,000 7/1/2024
L19148400 TANZANITE FUTSOL COURT LIGHTING $75,000 7/1/2024
L19300000 CITYWIDE PARK IMPROVEMENT $750,000 7/1/2024
L19920000 ART IN PUBLIC PLACES PROGRAM $95,500 N/A
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
9 City of Sacramento 'C' Status = COMPLETED/CLOSED
Park Development Impact Fees 'A' Status = ACTIVE
Capital Improvement Project Report
ACTIVITY AS OF JUNE 30, 2024
CIP# ST
A
T
U
S
PROJECT NAME ESTIMATED
PROJECT COSTS
APPROPRI-
ATIONS TO DATE
EXPENDED TO
DATE (CAPITAL
OUTLAY)
COMMIT-MENTS
(ENCUM-
BRANCES)
REMAINING
BUDGET
(DESIGNATED FOR
CAPITAL
PROJECTS)
TOTAL PROJECT
COST BY ALL
FUNDING
SOURCES
% OF TOTAL
PROJECT COSTS
FUNDED BY
PARK
DEVELOPMENT
IMPACT FEE
B15000100 C BOYS AND GIRLS CLUB $ 370,615 $ 370,615 370,615$ -$ 870,615$ 42.6% B18217000 C K STREET STREETSCAPE 400,000 400,000 400,000 - 400,000 100.0% B18430000 C DOCKS PROMENADE CONSTRUCTION 500,000 500,000 499,999 - 4,950,111 10.1% C13000600 C HAGGINWOOD REHABILITATION 63,317 63,317 63,317 - 3,417,994 1.9% C15000100 C MANGAN PARK REMEDIATION 90,000 90,000 90,000 - 982,847 9.2% G22146900 C FLORIN - MEADOWVIEW TOD 50,000 50,000 50,000 - 350,000 14.3% K15125102 C CERVANTES PARK IMPROVEMENTS 277,580 277,580 277,580 - 411,200 67.5% L13000103 C OAK PARK CC PH II B 80,614 80,614 80,614 - 1,175,381 6.9% L13000200 C COLONIAL PARK CLUB HOUSE 16,550 16,550 16,550 - 10,821,323 0.2% L19000001 C WITTER RANCH PK PICNIC AREA 6,500 6,500 6,500 - 6,946 93.6% L19000201 C CD3 - SISTER CITIES TREE GROVE 5,000 5,000 5,000 - 5,000 100.0% L19000303 C GRANT PARK RESTROOM DEMO 15,759 15,759 15,758 74,071 21.3% L19000305 C ROOSEVELT PARK RESTROOM RENOVATION 175,000 457,620 457,620 - - 477,090 95.9% L19000306 C FREMONT PARK UTILITY BUILDING 212,000 219,361 219,361 - - 474,177 46.3% L19000307 C BROOKS TRUITT DOG PARK SHADE STRUCTURE 35,000 35,000 35,000 35,000 100.0% L19000400 C CD5 PARK PROJECTS 544 544 543 29,387 1.9% L19000401 C CD5 - MCCLATC HY BASKETBALL SAFETY 924 924 923 25,872 3.6% L19000701 C CD 8 - SHASTA PK REPAIRS 2,500 2,500 2,500 - 2,500 100.0% L19001200 C SAC NORTHERN PARKWAY BIKE TRAIL 170,930 170,930 170,930 1,973,870 8.7% L19001500 C DISTRICT 4 PARK STUDY 21,084 21,084 21,084 - 21,084 100.0% L19002000 C NSA PA 1 30,000 30,000 30,000 - 195,006 15.4% L19002100 C NSA PA 2 30,000 30,000 30,000 - 157,353 19.1% L19002200 C NSA PA 3 30,000 30,000 30,000 - 150,000 20.0% L19002300 C NSA PA 4 30,000 30,000 30,000 - 150,882 19.9% L19003000 C SPORTS COURT REHAB 2,000 2,000 2,000 - 315,108 0.6% L19003100 C CURTIS PARK TENNIS CT 10,281 10,281 10,281 - 91,900 11.2% L19004700 C RIVER OTTER PK BASKETBALL COURT 42,706 42,706 42,706 142,706 29.9% L19005000 C BILL CONLIN YOUTH SPT PH3 48,961 48,961 48,961 - 731,057 6.7% L19005102 C CONLIN PK-PARKING LOT GATES 101,250 101,250 101,250 - 101,250 100.0% L19005103 C CONLIN SPORTS COMPLEX PLYGD 278,475 278,475 278,475 322,391 86.4% L19005104 C CONLIN PARK PAVING REPAIRS 14,388 14,388 14,388 - 14,388 100.0% L19005105 C CONLIN DOG PARK SHADE STRUCTURE 25,146 25,146 25,146 - 25,146 100.0% L19005200 C RIVER OAKS (COVE) PARK DEVELOPMENT 114,731 114,114 114,114 - 114,731 99.5% L19007000 C CENTRAL IRRIGATION INFRA 34,160 34,160 34,160 - 60,988 56.0% L19007100 C SYCAMORE PARK IMPROVEMENTS 65,000 64,377 64,377 - 65,000 99.0% L19007101 C SYCAMORE PK -PICKLE BALL COURT 4,000 3,883 3,883 - 4,000 97.1% L19007200 C SYCAMORE PARK TENNIS COURTS 352,200 352,200 352,200 - 352,200 100.0% L19009101 C EVENTIDE NEIGHBORHOOD PARK 54,754 54,754 54,754 54,754 100.0% L19009104 C NORTHLAKE PH 2 IMPROVEMENTS 109,303 109,303 106,596 L19011800 C BROOKS TRUITT PARK 392,000 392,609 392,609 - 1,134,400 34.6% L19011900 C 19TH & Q ST PK COMMUNITY GARDEN 60,000 46,000 46,000 - 196,000 23.5% L19012100 C 19TH AND Q STREET MASTER PLAN 50,113 50,113 50,113 - 50,113 100.0% L19012300 C TRIANGLE PARK RENOVATION 22,540 21,458 21,458 - 135,694 15.8% L19012400 C LAWRENCE TEMPLE, COLONIAL PKS 2,985 2,888 2,888 - 25,480 11.3% L19012401 C LAWRENCE PARK RENOVATION 13,150 11,265 11,265 - 81,748 13.8% L19012900 C LAND PARK PONDS 35,624 35,624 35,624 - 796,876 4.5% L19013000 C PA1 PARK SIGN REPLACEMENT 3,623 3,623 3,623 - 45,000 8.1% L19013100 C PA8 PARK SIGN REPLACEMENT 3,434 3,434 3,434 - 62,733 5.5% L19013600 C ROOSEVELT PARK FACE LIFT 3,700 1,856 1,856 - 55,264 3.4% L19013901 C DISTRICT 7 POCKET CANAL PILOT 14,000 14,219 14,219 - 14,219 100.0% L19014100 C NORTH LAGUNA POND RENOVATION 410,420 410,420 410,420 - 480,878 85.3% L19015000 C ADA TRANSACTION PLAN DEV 30,000 30,000 30,000 - 85,583 35.1% L19017501 C TOWNSHIP 9-DPW INSPECTION 20,144 996 996 - 10,105 9.9% L19018500 C PARKEBRIDGE PARK - 111 111 - 19,759 0.6% L19019000 C MCKINLEY VILLAGE PARKS 63,035 63,035 63,035 100,635 62.6% L19019001 C MCKINLEY VILLAGE POST PARK 680,741 680,741 680,741 680,741 100.0% L19019100 C R BURNETT MILLER PARK & ES5 PK 42,436 42,436 42,436 42,436 100.0% L19100100 C 24TH ST BYPASS 521,512 521,512 521,512 - 625,030 83.4% L19100109 C 24TH ST PK - APP 32,974 32,974 32,974 - 32,974 100.0% L19100200 C 24TH ST BYPASS PH2 DES & CON 53,000 53,000 52,609 - 102,194 51.9% L19101000 C VALLEY HI PARK IMPROVEMENTS 30,000 31,500 31,492 - 237,059 13.3% L19101200 C MULTI-WATER SITE IMPROVEMENTS 3,029 3,028 3,028 - 403,026 0.8% L19101500 C AIRPORT PK LITTLE LEAGUE RR 213,231 213,231 213,231 213,231 100.0% L19102000 C AIRFIELD PARK DEV (TK) 10,466 10,466 10,466 - 10,466 100.0% L19102009 C AIRFIELD PARK - APP 3,935 3,935 3,935 - 3,935 100.0% L19102100 C AIRFIELD PARK PHASE 1 1,985,000 1,982,244 1,982,244 - - 2,010,000 98.6% L19103100 C AIRPORT LITTLE LEAGUE PK LOT 256,000 256,000 256,000 450,393 56.8% L19103300 C 4TH AVE PARK PLAYGROUND 5,212 5,212 5,212 - 266,992 2.0% L19104000 C ALDER PARK 11C 525,474 525,474 525,474 - 525,474 100.0% L19104500 C ALI YOUSSEFI SQ/ST ROSE OF LIMA 65,498 65,498 65,498 96,498 67.9% L19105000 C ARMY DEPOT SPORTS FIELD 90,000 90,000 90,000 - 115,000 78.3% L19106000 C BAER (MAX) PK IMPROVEMENTS 590,044 590,044 590,044 - 804,396 73.4% L19106500 C ANTHONY PARK FUTSOL & MINOR IMP 183,459 183,459 183,697 183,459 100.0% L19107100 C BANNON CREEK PLYGRD RENOVATION 137,200 142,430 142,430 - 142,430 100.0%
PARK DEVELOPMENT IMPACT FEE
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
10 City of Sacramento 'C' Status = COMPLETED/CLOSED
Park Development Impact Fees 'A' Status = ACTIVE
Capital Improvement Project Report
ACTIVITY AS OF JUNE 30, 2024
CIP# ST
A
T
U
S
PROJECT NAME ESTIMATED
PROJECT COSTS
APPROPRI-
ATIONS TO DATE
EXPENDED TO
DATE (CAPITAL
OUTLAY)
COMMIT-MENTS
(ENCUM-
BRANCES)
REMAINING
BUDGET
(DESIGNATED FOR
CAPITAL
PROJECTS)
TOTAL PROJECT
COST BY ALL
FUNDING
SOURCES
% OF TOTAL
PROJECT COSTS
FUNDED BY
PARK
DEVELOPMENT
IMPACT FEE
L19108000 C BARANDAS PARK DEV 191,841 191,841 191,841 - 209,406 91.6% L19108200 C BARANDAS PARK PH 2 852,638 852,638 852,638 967,056 88.2% L19108300 C DISTRICT 2 PLAYGROUND, SPORTS COURT 209,452 152,224 152,224 - - 378,031 40.3% L19108400 C DISTRICT 5 PLAYGROUND, SPORTS COURT 18,759 18,759 18,759 18,759 100.0% L19108500 C CABRILLO AND KEMBLE PARKS PLAYGROUND 457,465 466,722 466,722 - 466,722 100.0% L19109000 C BELLE COOLEDGE PICNIC 45,387 45,387 45,387 - 157,508 28.8% L19109100 C BELLE COLLEDGE IMP 39,232 38,716 38,716 - 39,538 97.9% L19109101 C B COOLEDGE DOG PARK FOUNTAIN 693 693 693 - 18,458 3.8% L19109200 C BLACKBIRD PARK PHASE 1 4,499,592 4,499,592 4,499,592 - 4,499,592 100.0% L19109300 C BELLE COOLEDGE STAGE/AMPITHEATRE 97,735 97,735 97,735 112,735 86.7% L19111000 C BURBERRY COMM PARK 9A 60 60 60 - 139,778 0.0% L19111001 C BURBERRY PARK PH2 653,700 653,700 653,700 - 1,249,500 52.3% L19111009 C BURBERRY COMM PARK - APP 31,216 31,216 31,216 - 31,216 100.0% L19111100 C JOHNSTON PARK PLAYGROUND RENO 200,000 230,646 230,646 - 231,810 99.5% L19111200 C PLAZA CERVANTES IMPROVEMENTS 1,000 1,000 1,000 - 1,000 100.0% L19111500 C COLONIAL PARK PLAYGROUND RENOVATION 182,730 179,468 179,468 - 238,880 75.1% L19111600 C COLONIAL PARK SHADE STRUCTURE 35,000 25,950 25,950 - 47,000 55.2% L19112000 C CHARLIE JENSEN PARK 194,953 194,953 194,953 - 338,633 57.6% L19112100 C CHARLIE JENSEN PK IMPROVEMENT 87,785 87,785 87,785 - 87,785 100.0% L19112200 C JENSEN PK CPTED IMPROVEMENT 15,052 15,052 15,052 - 15,052 100.0% L19113000 C DEL PASO DISCGOLF 55,000 55,000 55,000 - 154,098 35.7% L19114000 C NUEVO PARK PLAYGROUND 221,833 221,833 221,833 - 349,738 63.4% L19114100 C DEL PASO MULTI-USE TRI IMP 80,798 80,798 80,789 338,993 23.8% L19114200 C DISTRICT 2 SMALL PARK PROJECTS 20,951 20,951 21,002 20,951 100.0% L19115000 C WINNERS CIRCLE PARK 311,340 311,340 311,340 - 1,062,871 29.3% L19114000 C DEL PASO NUEVO PLAYGROUND 221,833 221,833 221,833 - 349,738 63.4% L19114100 C DEL PASO MULTI-USE TRI IMP 80,789 80,789 80,789 338,993 23.8% L19115009 C DIXIEANNE TOT LOT DEV 15,500 15,500 15,500 - 30,000 51.7% L19116000 C EGRET PARK PH2 2,958 2,958 2,958 - 514,618 0.6% L19116100 C EGRET PARK MP REVISION 161 161 161 - 161 100.0% L19116200 C EGRET PARK RENOVATION 50,795 50,795 50,795 250,795 20.3% L19116800 C EAST LAWN CHILDRENS PARK IMP 154,403 154,403 154,403 238,984 64.6% L19117000 C FISHERMAN'S LAKE PARK DEV (TK) 1,679,356 1,679,356 1,679,356 - 2,966,456 56.6% L19117009 C FISHERMAN'S LAKE PARK - APP 37,200 37,200 37,200 - 37,200 100.0% L19118000 C FRANKLIN BOYCE PK MP 6,072 6,072 6,072 - 16,072 37.8% L19118100 C FRANKLIN BOYCE PARK 1,201,420 1,172,422 1,172,422 - 1,674,773 70.0% L19118101 C FRANKLIN BLVD FRONT IMP PH 1 140,000 135,229 135,229 - 970,348 13.9% L19118102 C FRANKLIN BLVD FRONT IMP PH 2 10,000 10,000 10,000 - 30,874 32.4% L19118300 C FREEPORT PARK PLAYGROUND RENOVATIONS 106,956 106,956 106,956 106,956 100.0% L19118200 C FRANKLIN BOYCE PARK PH 2 33,700 4,928 4,928 - 764,163 0.6% L19119000 C FREMONT PARK IMPROVEMENT 133,946 133,946 133,946 - 398,965 33.6% L19119009 C FREMONT PARK - APP 19,569 19,569 19,569 - 30,569 64.0% L19119200 C FREMONT PARK IMPROVEMENTS 196,000 190,559 190,559 - 193,197 98.6% L19120000 C GARCIA BEND IMPR 337,668 337,668 337,668 - 566,000 59.7% L19121000 C RIVER BIRCH PARK 994,199 110,061 110,061 - 110,062 100.0% L19123000 C HERITAGE PARKS 7A,9B & 9D (TK) 2,009,151 2,009,151 2,009,151 - 2,023,151 99.3% L19123009 C HERITAGE PARKS 7A,9B & 9D 35,000 35,000 35,000 - 35,000 100.0% L19124000 C JACINTO CREEK PARK DEV 868,925 868,925 868,925 - 1,138,925 76.3% L19124009 C JACINTO CREEK PARK - APP 26,075 26,075 26,075 - 46,075 56.6% L19124500 C JACINTO CREEK DOG PARK RENOVATION 51,661 51,661 51,660 51,661 100.0% L19125000 C JEFFERSON PK PLAYGROUND IMPR 81,968 81,968 81,968 - 518,324 15.8% L19125100 C JEFFERSON PARK MP & DEV 611,941 611,941 611,941 - 694,128 88.2% L19125200 C JEFFERSON PARK SITE IMPROVEMENTS 102,039 102,039 102,038 102,039 100.0% L19126000 C JOHNSTON PARK IMPROVEMENTS 28,000 28,000 28,000 - 109,275 25.6% L19126500 C RICHARDSON VILLAGE PLAYGROUND 200,000 200,000 200,000 - 200,000 100.0% L19127009 C KOKOMO PARK 46,600 46,600 46,600 - 46,600 100.0% L19129000 C LAWRENCE PARK IMPR 116,245 116,245 116,245 - 150,000 77.5% L19129100 C LAWRENCE PK PLAYGROUND RENO 123,005 120,711 120,711 - 123,005 98.1% L19130009 C LINDEN PARK 4B 30,364 30,364 30,364 - 30,364 100.0% L19131000 C MACKEY PARK DEV 184,208 184,208 184,208 - 486,321 37.9% L19132000 C MAGNOLIA PARK 1,217,796 1,217,796 1,217,796 - 2,172,280 56.1% L19132009 C MAGNOLIA PARK - APP 13,000 13,000 13,000 - 30,000 43.3% L19133000 C GOLDEN POPPY 782,240 782,240 782,240 - 869,660 89.9% L19135000 C MARSHALL PARK MASTER PLAN 21,510 21,510 21,440 - 405,000 5.3% L19135500 C MARSHALL PARK PLAYGROUND FENCE 20,000 17,598 17,598 - 17,598 100.0% L19136000 C MCCLATCHY PARK RENOVATION 488,867 488,867 488,867 - 1,211,314 40.4% L19136001 C MCCLATCHY PARK RENOVATION PH2 172,715 172,715 172,715 - 253,777 68.1% L19136002 C MCCLATCHY PK FM MKT PH2 353,774 355,618 355,618 - 408,904 87.0% L19136003 C MCCLATCHY PK DISC GOLF 30,000 18,894 18,894 - 30,000 63.0% L19136005 C MCCLATCHY PK MRKT-CM & LABOR COMP 5,870 5,870 5,870 - 5,870 100.0% L19136007 C MCCLATCHY PK RESTROOM DESIGN 50,000 50,000 50,000 - 50,000 100.0% L19136100 C MCCLATCHY PARK RESTROOM 63,795 60,429 60,429 - 327,694 18.4% L19136101 C MCCLATCHY PARK SECURITY 35,000 31,654 31,654 - 43,584 72.6% L19136200 C MCCLATCHY PARK BALLFIELDS 41,400 41,400 41,400 1,040,959 4.0% L19136500 C MCCLATCHY PK REDEV PROJECT 170,000 163,956 163,956 - 2,960,000 5.5% L19137000 C MCKINLEY PARK IMPRV PH2 41,905 41,905 41,905 - 610,846 6.9% L19137001 C MCKINLEY PK ROSE ARBORS 149,095 149,095 149,095 - 193,222 77.2% L19137100 C MCKINLEY PARK REHABILIATION 300,000 300,000 300,000 305,269 98.3% L19137102 C MCKINLEY PARK BALL WALL 38,313 38,313 38,313 - 38,313 100.0% L19137100 C MCKINLEY PARK REHABILIATION 300,000 300,000 300,000 - 305,269 98.3%
PARK DEVELOPMENT IMPACT FEE
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
11 City of Sacramento 'C' Status = COMPLETED/CLOSED
Park Development Impact Fees 'A' Status = ACTIVE
Capital Improvement Project Report
ACTIVITY AS OF JUNE 30, 2024
CIP# ST
A
T
U
S
PROJECT NAME ESTIMATED
PROJECT COSTS
APPROPRI-
ATIONS TO DATE
EXPENDED TO
DATE (CAPITAL
OUTLAY)
COMMIT-MENTS
(ENCUM-
BRANCES)
REMAINING
BUDGET
(DESIGNATED FOR
CAPITAL
PROJECTS)
TOTAL PROJECT
COST BY ALL
FUNDING
SOURCES
% OF TOTAL
PROJECT COSTS
FUNDED BY
PARK
DEVELOPMENT
IMPACT FEE
L19137101 C MCKINLEY PARK IMP-TENNIS COURT 17,322 17,322 17,322 - 241,467 7.2% L19137300 C MCKINLEY PARK ROSE GARDEN REHAB 184,394 184,394 184,394 - 312,079 59.1% L19137400 C MCKINLEY PK PLAYGROUND REBUILD 232,000 242,000 242,000 - 775,426 31.2% L19137500 C MCKINLEY PARK PLAYGROUND RESTROOM 110,000 114,180 114,180 - 264,853 43.1% L19137501 C MCKINLEY PARK HISTORICAL RESTROOM 15,000 10,370 10,011 10,370 100.0% L19137600 C MCKINLEY PARK SHADE CANOPY 132,300 115,294 115,294 - 132,300 87.1% L19137700 C MCKINLEY PARK POND RENOVATION 59,714 55,668 55,668 - 562,955 9.9% L19137710 C MCKINLEY PARk POND LANDSCAPE 164,046 164,046 163,775 - 204,684 80.1% L19137800 C MCKINLEY PARK TRASH ENCLOSURES 30,889 30,889 30,847 36,920 83.7% L19137900 C MCKINLEY PARK RR GRINDER PUMP 67,165 67,165 67,165 104,341 64.4% L19138000 C MEADOWS PARK (TK) 27,111 27,111 27,111 - 27,111 100.0% L19138100 C MEADOWS COMMUNITY PARK PH 1 1,100,000 2,487,737 2,487,737 - - 3,015,749 82.5% L19138500 C MESA GRANDE PARK RENOVATION 60,000 62,220 62,220 264,242 23.5% L19139000 C MUIR CHILDREN'S PARK 35,780 35,780 35,780 - 704,102 5.1% L19140000 C NN REGIONAL PARK 206,828 206,828 206,828 - 3,565,430 5.8% L19140009 C NN REGIONAL PARK - APP 38,700 38,700 38,700 - 38,700 100.0% L19140100 C N. NATOMAS REG PARK DEV 3,920,000 3,949,465 3,949,465 - 5,372,472 73.5% L19140200 C NN REG PK FARMERS MARKET & PARKING 649,880 651,226 651,226 - - 1,631,464 39.9% L19140201 C NNRP - BALL FIELDS & STAGE 2,050,000 1,981,500 1,981,011 - 2,050,000 96.7% L19140203 C NN REG PK CON&REST 849,236 849,236 849,236 849,236 100.0% L19140218 C NN REG FIELD PKNG LOT LIGHTING 330,040 310,714 310,714 - - 339,259 91.6% L19140300 C NNRP - INFRASTRUCTURE MAPPING 40,000 27,033 27,033 - 123,493 21.9% L19140301 C NNRP TREELINE 68,500 68,500 68,181 - 140,500 48.8% L19140401 C NORTH NATOMAS MP ENVIRONMENTAL 67,650 67,650 67,628 72,650 93.1% L19140500 C NNRP - DOG PARK RELOCATION 900,000 1,002,736 1,002,736 - - 1,315,421 76.2% L19140600 C N NATOMAS COMMUNITY PARK LANDSCAPE 200,000 114,538 114,538 - 179,681 63.7% L19141100 C NINOS PARK IMPROVEMENTS 31,252 31,252 31,252 - 50,000 62.5% L19141200 C NINOS PARKWAY PH2 17,556 17,556 17,555 - 17,556 100.0% L19141201 C NINOS PARKWAY COM GARDEN SHED 5,000 5,000 5,168 - 5,168 96.8% L19141300 C NINOS PKWY COMMUNITY GARDEN 65,000 65,000 65,000 - 241,355 26.9% L19142001 C N. LAGUNA SIGN & FENCE 42,000 42,000 42,000 - 42,000 100.0% L19143000 C NORTHGATE PARK IMPROVEMENT 51,180 51,180 51,180 - 109,648 46.7% L19143100 C NORTHGATE PARK IMPROVE PH 2 459,077 345,352 345,352 - 819,295 42.2% L19143101 C NORTHGATE PK-FIELD RENOVATIONS 46,694 14,761 14,761 - 46,694 31.6% L19143102 C NORTHGATE PK-CM & LABOR COMPL 8,820 3,400 3,400 - 8,820 38.5% L19143103 C NORTHGATE PK=DPW INSPECTIONS 11,466 5,946 5,946 - 11,466 51.9% L19144500 C OAK PARK RESTROOM 60,000 6,950 6,950 - 6,950 100.0% L19144700 C OAK PARK PLAYGROUND IMPROVEMENT 130,000 61,200 61,200 - - 311,200 19.7% L19145000 C ORCHARD PARK 168,002 168,002 168,002 - 1,123,086 15.0% L19145009 C ORCHARD PARK - APP 33,924 33,924 33,924 - 35,744 94.9% L19145100 C OLYMPIAN PARK DEVELOPMENT 1,017,795 1,018,634 1,018,634 - 1,018,634 100.0% L19145101 C OLYMPIAN PARK DEVELOPMENT STAFF TIME 164,000 162,956 162,956 - - 162,956 100.0% L19145200 C OFFICER TARA O'SULLIVAN MEMORIAL 20,000 14,475 14,475 - - 20,000 72.4% L19146000 C PANNELL MEADOWVIEW SOCCER 24,656 24,656 24,656 - 24,656 100.0% L19146100 C PANNELL MV COMM CTR PK LAN CO 192,080 143,553 143,552 - 151,700 94.6% L19146101 C PANNELL MEADOWVIEW CC BB COURT 39,649 29,335 29,335 - 216,188 13.6% L19146200 C PANNELL MV COMM CTR SITE IMP 50,000 61,319 61,319 - 61,319 100.0% L19146210 C PANNELL CENTER LANDSCAPE IMPRO 101,772 101,772 101,772 - 101,772 100.0% L19146300 C PANNELL POOL CON/RESTROOM RENO 76,500 76,500 76,238 76,500 100.0% L19147100 C MEADOWVIEW RESTROOM RENOVATION 41,163 41,163 41,163 - 470,303 8.8% L19147100 C WOODLAKE PARK PLAYGROUND RENO 128,368 128,368 128,390 342,026 37.5% L19148000 C PEREGRINE PARK 1,573,146 1,573,146 1,573,146 1,578,328 99.7% L19148001 C PEREGRINE PARK BIKE TRAIL 80,000 80,000 80,000 - 100,844 79.3% L19148009 C PEREGRINE PARK - APP 40,713 40,713 40,713 - 40,713 100.0% L19148100 C PEREGRINE PK RENOVATION 256,760 236,936 236,936 - 256,760 92.3% L19149000 C PHILLIPS PARK MASTER PLAN 164 164 164 - 164 100.0% L19149800 C PORTUGUESE COMMUNITY PARK PLAYGROUND 133,000 131,027 131,026 133,000 98.5% L19150000 C REDDING AVENUE PARK 80,562 80,562 80,562 - 80,562 100.0% L19150100 C MAE FONG PARK 58,467 57,694 57,694 - 499,867 11.5% L19150101 C MAE FONG PK IMP 112,035 112,035 112,307 - 118,000 94.9% L19150300 C MAE FONG PHASE 2 634,111 634,111 634,111 634,111 100.0% L19151100 C REDTAIL HAWK PARK 134,000 132,281 132,281 - 132,281 100.0% L19152000 C REGENCY COMM PARK 962,252 962,252 962,252 - 1,714,407 56.1% L19152009 C REGENCY COMM PARK - APP 53,831 53,831 53,831 - 53,831 100.0% L19152100 C REGENCY PARK IMPROVEMENT 9,800 6,901 6,901 - 9,800 70.4% L19152200 C REGENCY PARK BALLFIELD 275,000 229,624 229,623 - 229,623 100.0% L19153000 C REICHMUTH PARK IMP 424,481 424,481 424,481 - 424,481 100.0% L19153001 C REICHMUTH PK-CELL TOWER INSTALL 3,408 3,408 3,408 3,408 100.0% L19153009 C REICHMUTH PARK - APP 28,500 28,500 28,500 - 38,500 74.0% L19153100 C REICHMUTH PARK IMP PH2 210,700 38,403 38,403 - 41,198 93.2% L19153101 C REICHMUTH PK PLAYGROUND RENOVATION 306,815 306,815 306,815 - 377,620 81.2% L19153102 C DISC GOLF - REICHMUTH PARK 49,000 17,382 17,381 - 49,000 35.5% L19154000 C RICHFIELD PARK 535,305 535,305 535,305 - 538,508 99.4% L19154100 C RICHFIELD PARK PLAYGROUND 657,000 657,000 657,000 - 891,600 73.7% L19154101 C LEVAR BURTON PARK SIGN 12,306 12,306 12,306 - 12,306 100.0% L19154200 C JOHNSON PARK IMPROVEMENTS 200,000 198,788 198,788 - 198,788 100.0% L19154300 C RICHFIELD PK SHADE STRUCTURE 138,515 136,988 136,988 - - 136,988 100.0% L19155000 C ROBLA COMM PARK PH2 331,952 331,952 331,952 - 601,487 55.2% L19155100 C ROBLA PARK PH3 127,902 127,902 127,902 - 357,272 35.8% L19155110 C ROBLA COMMUNITY PARK 121,000 93,213 93,213 - - 321,000 29.0% L19155400 C ROOSEVELT PARK FITNESS COURT 220,000 160,937 160,937 - 235,937 68.2%
PARK DEVELOPMENT IMPACT FEE
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
12 City of Sacramento 'C' Status = COMPLETED/CLOSED
Park Development Impact Fees 'A' Status = ACTIVE
Capital Improvement Project Report
ACTIVITY AS OF JUNE 30, 2024
CIP# ST
A
T
U
S
PROJECT NAME ESTIMATED
PROJECT COSTS
APPROPRI-
ATIONS TO DATE
EXPENDED TO
DATE (CAPITAL
OUTLAY)
COMMIT-MENTS
(ENCUM-
BRANCES)
REMAINING
BUDGET
(DESIGNATED FOR
CAPITAL
PROJECTS)
TOTAL PROJECT
COST BY ALL
FUNDING
SOURCES
% OF TOTAL
PROJECT COSTS
FUNDED BY
PARK
DEVELOPMENT
IMPACT FEE
L19155500 C ROOSEVELT PARK BASBALL LIGHT 52,500 52,500 52,500 - 752,500 7.0% L19156000 C SOUTH NATOMAS COMM PARK PH1 22,000 22,000 22,000 - 1,988,278 1.1% L19156100 C SOUTH NATOMAS ROSE GARDEN 39,500 39,500 39,500 - 339,433 11.6% L19156301 C S NATOMAS PK IMP/NINOS PK PH 2 64,231 64,231 64,231 - 191,336 33.6% L19156500 C S NATOMAS GARDEN SECURITY CAMERA 5,778 5,778 5,778 - 15,778 36.6% L19156601 C S NATOMAS PARK RESTROOM SCREEN 11,089 11,089 11,089 - 11,089 100.0% L19158000 C SHADE CANOPIES CD2 907 907 907 - 244,848 0.4% L19159100 C SHASTA PARK MASTER PLAN 297,265 297,265 297,265 - 3,249,434 9.1% L19159109 C SHASTA COMM PARK - APP 60,000 60,000 60,000 - 60,000 100.0% L19159200 C SHASTA COMM PARK PH2 2,333,981 2,333,981 2,333,981 - 2,787,341 83.7% L19159300 C SHASTA PARK LANDSCAPING 71,540 925 925 - 925 100.0% L19159500 C SHASTA COMMUNITY PARK PLAYGROUND 227,361 203,318 203,318 - 203,318 100.0% L19161000 C SIM PK LIFE TRAIL WELLNESS 7,000 7,000 7,000 - 31,099 22.5% L19161500 C SOJOURNER TRUTH COMM GARDEN 205,000 205,000 205,134 205,000 100.0% L19162000 C SOUTHSIDE PARK PLAYGROUND 47,281 47,281 47,281 - 1,540,652 3.1% L19162101 C SOUTHSIDE PARK LAKE PHII 113,260 113,260 113,260 - 638,723 17.7% L19162102 C SOUTHSIDE PARK LIGHTING 83,740 83,740 83,740 - 250,000 33.5% L19162103 C SOUTHSIDE PARK LAKE IMP PH3 186,218 186,218 186,218 - 339,496 54.9% L19162104 C SOUTHSIDE PARK GROUP PICNIC AREA 163,645 163,645 163,645 - 289,512 56.5% L19162105 C SOUTHSIDE PK PH3-DOT INSPEC 9,257 9,257 9,257 - 9,257 100.0% L19162106 C SOUTHSIDE PK PH3-CM & LABOR COMP 4,525 4,525 4,525 - 4,525 100.0% L19162200 C SOUTHSIDE PK RENOVATION PROGRAM 41,619 41,619 41,619 - 48,275 86.2% L19162300 C SOUTHSIDE PK PLAY SURFACE REHAB 812 812 812 - 30,912 2.6% L19162600 C SOUTHSIDE PARK RR AND PLAYGROUND 790,873 790,873 790,873 - 825,374 95.8% L19163000 C SPARROW PARK 1C 434,924 434,924 434,924 - 434,924 100.0% L19164000 C STEVE JONES PARK 207,836 175,017 175,017 - 496,836 35.2% L19164001 C STEVE JONES PARK IMP PHASE 2 240,332 240,332 240,332 - 357,332 67.3% L19165200 C SUNDANCE PARK SHADE STRUCTURE 84,000 84,000 84,000 - 84,000 100.0% L19167400 C STANFORD PARK RESTROOM REPLACEMENT 430,000 430,000 430,000 - 430,000 100.0% L19167900 C SUTTER PARK DEVELOPMENT 116,766 116,766 116,766 116,766 100.0% L19168000 C SWAINSON HAWK PARK (TK) 2,512,011 2,512,011 2,512,011 - 2,678,439 93.8% L19168009 C SWAINSON HAWK PARK - APP 40,500 40,500 40,500 - 40,500 100.0% L19168200 C TAHOE PK RESTROOM/UTILITY BLD 229,000 199,000 199,000 - - 199,000 100.0% L19168300 C TAHOE PK JOG/WALK TRAIL RENOVATION 60,000 1,457 1,457 - 60,000 2.4% L19168500 C SWAINSON'S HAWK PARK PH2 250,000 250,000 250,000 - - 250,000 100.0% L19169000 C TANZANITE COMM PARK 2,022,306 2,022,306 2,022,306 - 2,679,462 75.5% L19169009 C TANZANITE COMM PARK 41,719 41,719 41,719 - 41,719 100.0% L19169100 C TANZANITE COMM PARK IMP 342,692 342,692 342,692 358,092 95.7% L19169200 C TANZANITE PARK FUTSOL COURT 815,000 815,000 815,000 - - 815,000 100.0% L19169500 C MIRASOL VILLAGE PARK & GARDEN 20,000 20,000 20,000 - - 79,558 25.1% L19170000 C UNIVERSITY PARK IMPROVEMENT 15,757 15,757 15,757 - 213,975 7.4% L19170100 C UNIVERSITY DOG PARK 108,400 108,400 108,400 226,143 47.9% L19171000 C VALLEY HI PARK IMP 139,685 139,685 139,685 - 553,324 25.2% L19171001 C VALLEY HI PARK COMM GARDEN 16,479 16,479 16,479 - 23,420 70.4% L19171200 C VALLEY HI PARK PLAYGROUND REPLACEMENT 70,575 110,575 110,575 - 209,575 52.8% L19172000 C FIVE STAR PARK 395,937 395,937 395,937 - 546,000 72.5% L19173000 C WARREN (EARL) PK IMPROVEMENTS 113,615 113,615 113,615 - 699,833 16.2% L19174000 C WEST HAMPTON PARK (TK) 1,353,556 1,353,556 1,353,556 - 1,353,556 100.0% L19174009 C WEST HAMPTON PARK - APP 32,600 32,600 32,600 - 32,600 100.0% L19174100 C WESTHAMPTON PK RENOVATION 192,080 192,080 191,989 - 192,080 100.0% L19175000 C WESTLAKE PARK 313,585 313,585 313,585 - 1,068,779 29.3% L19175009 C WESTLAKE PARK - APP 29,900 29,900 29,900 - 39,900 74.9% L19176000 C WILLOW RANCHO PK IMPR 31,019 31,019 31,019 - 1,138,555 2.7% L19177000 C WITTER RANCH PARK PH2 290,752 290,752 290,752 - 418,226 69.5% L19177009 C WITTER RANCH PARK - APP 31,500 31,500 31,500 - 31,500 100.0% L19178000 C WOODBINE PARK IMPROV 107,014 107,014 107,014 - 164,157 65.2% L19178100 C WOODBINE PARK PLAYGROUND RENOVATION 300,000 292,394 292,394 - 367,394 79.6% L19179000 C ARGONUT PARK MP 11,000 11,000 10,902 - 35,000 31.4% L19179100 C ARGONAUT SKATE PLAZA 19,600 19,600 19,600 19,600 100.0% L19179500 C WINN PARK IMPROVEMENTS 228,749 228,749 228,749 326,699 70.0% L19180000 C S NATOMAS SPORTS COMPLEX MP 100,000 100,000 100,000 - 108,819 91.9% L19181001 C HOPKINS PARK IMPROVEMENTS 351,820 351,820 351,820 - 351,820 100.0% L19182000 C LEWIS PARK PICNIC IMPROVEMENT 135,226 135,226 135,226 - 150,000 90.2% L19182100 C LEWIS PARK ENHANCEMENT 49,000 49,000 48,975 - 49,000 100.0% L19182200 C LEWIS PARK TENNIS COURT RENOVATION 180,000 177,510 177,510 - 282,510 62.8% L19183000 C SIERRA 2 PARK FENCE IMPROVEMENTS 31,914 31,914 31,893 - 31,914 100.0% L19183100 C SIERRA 2 PARK COURT REHAB 15,081 15,081 15,081 - 15,081 100.0% L19184001 C VALLEY OAK PARK DEV PH1 2,684,511 8,288 8,288 - 2,684,511 0.3% L19184002 C VALLEY OAK PARK PHASE 2 320,452 320,452 320,452 L19186100 C OKI PARK RESTROOM RENOVATION 150,000 158,966 158,966 - - 208,996 76.1% L19186000 C OKI PARK OPEN SPACE - MP 44,150 41,108 41,108 - 50,000 82.2% L19186200 C OKI PARK OPEN SPACE IMPROVEMENTS 50,000 49,959 49,959 49,959 100.0% L19186300 C OKI PARK PLAYGROUND 263,000 263,000 263,000 - 263,000 100.0% L19187000 C WILD ROSE PARK DEVELOPMENT MP 42,707 42,707 42,707 - 42,707 100.0% L19187001 C WILD ROSE PARK DEVELOPMENT 3,155,705 3,081,965 3,081,965 - 3,081,956 100.0% L19187002 C WILD ROSE PARK-SURVEY 11,500 11,500 11,500 11,500 100.0% L19188000 C EAST PORTAL PARK JOGGING TRAIL 24,000 24,000 24,000 - 24,000 100.0% L19189000 C PARK SIGNAGE 20,000 20,000 20,000 - 20,000 100.0% L19190000 C ROBERTSON PARK IMPROVEMENTS 57 57 57 - 312,500 0.0% L19192001 C CD6 PARK IMPROVEMENTS 5,850 5,850 5,850 - 5,850 100.0%
PARK DEVELOPMENT IMPACT FEE
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
13 City of Sacramento 'C' Status = COMPLETED/CLOSED
Park Development Impact Fees 'A' Status = ACTIVE
Capital Improvement Project Report
ACTIVITY AS OF JUNE 30, 2024
CIP# ST
A
T
U
S
PROJECT NAME ESTIMATED
PROJECT COSTS
APPROPRI-
ATIONS TO DATE
EXPENDED TO
DATE (CAPITAL
OUTLAY)
COMMIT-MENTS
(ENCUM-
BRANCES)
REMAINING
BUDGET
(DESIGNATED FOR
CAPITAL
PROJECTS)
TOTAL PROJECT
COST BY ALL
FUNDING
SOURCES
% OF TOTAL
PROJECT COSTS
FUNDED BY
PARK
DEVELOPMENT
IMPACT FEE
L19192101 C TAHOE PARK POOL RESTROOM 58,543 58,543 58,543 462,042 12.7% L19192105 C TAHOE TALLAC PARK IMPROVEMENTS 10,709 10,709 10,709 - 300,024 3.6% L19193001 C HAMPTON STATION PARK (TK) 822,789 742,006 742,006 - 742,006 100.0% L19193009 C HAMPTON STATION PARK - APP 23,972 23,972 23,972 - 30,600 78.3% L19194000 C QUAIL PARK 552,602 552,602 552,602 - 621,236 89.0% L19195300 C HAGGINWOOD PK RESTROOM IMPROVEMENTS 270,375 270,375 270,375 - 270,375 100.0% L19196000 C MAMA MARKS PARK 17,300 17,300 17,300 - 50,000 34.6% L19196100 C MAMA MARKS PARK RESTROOM 40,000 12,903 12,903 - 200,740 6.4% L19197000 C NORTH POINTE PARK 4,668 4,668 4,668 - 30,000 15.6% L19199000 C ZAPATA PARK COMM GARDEN EXP 27,590 27,590 27,590 - 78,692 35.1% L19201100 C NATOMAS OAKS PARK IMPROVEMENTS 107,000 110,446 110,446 - 110,446 100.0% L19201000 C NATOMAS OAKS PARK INTERPRETIVE 11,408 11,408 11,408 - 11,408 100.0% L19202001 C CAMELLIA PARK COMM GARDEN 137,200 137,200 137,200 - 137,200 100.0% L19202100 C CAMELLIA PARK 21,235 21,235 21,235 - 106,249 20.0% L19202101 C CAMELLIA PARK PH2 6,860 2,200 2,200 - 131,850 1.7% L19207000 C CESAR CHAVEZ MP/IMP 32,583 32,583 32,583 - 45,784 71.2% L19207001 C CESAR CHAVEZ IMPRV 65,917 65,917 65,917 - 216,127 30.5% L19207100 C CESAR CHAVEZ PLAZA PARK IMPROVEMENTS 223,000 223,516 223,516 - 751,990 29.7% L19207102 C CESAR CHAVEZ PLAYGROUND 11,425 11,425 11,425 11,425 100.0% L19207200 C CESAR CHAVEZ RESTROOM 70,000 70,000 70,000 - - 432,787 16.2% L19208100 C WOOD PARK PLAYGROUND RENO 180,047 180,047 180,047 320,846 56.1% L19209000 C REDBUD PARK REHAP/DEV 254,007 254,007 254,007 - 254,007 100.0% L19210000 C GLENN HALL PARK CPTED 63,179 63,179 63,179 - 210,179 30.1% L19210001 C GLENN HALL PARK - RESTROOMS 62,856 62,856 62,856 - 62,856 100.0% L19210002 C GLENN HALL PK-DESIGN & INSTALL 1,713 1,713 1,713 - 1,713 100.0% L19210003 C GLENN HALL PARK - ADA PRKG STALL 8,091 8,091 8,091 - 8,091 100.0% L19211000 C GLENN HALL PARK IMPROVEMENTS 125,000 175,000 175,000 - 175,000 100.0% L19210100 C MANGAN PARK MASTER PLAN AMENDMENT 50,000 40,862 40,862 - 40,862 100.0% L19210200 C MANGAN PARK IMPROVEMENTS 220,350 220,350 220,350 - 750,350 29.4% L19220000 C GLENBROOK/RIVER ACCESS/OKI IMP 42,100 36,037 36,037 - 58,730 61.4% L19220002 C GLENBROOK RIVER ACCESS GARDEN 59,900 30,662 30,662 - 50,870 60.3% L19220004 C GLENBROOK PK REST-CM & LABOR 1,870 1,870 1,870 - 1,870 100.0% L19240000 C N NATOMAS COMM PK CONCES STN 234,416 195,575 195,575 - 245,000 79.8% L19240001 C N NATOMAS COMM PK-CM & LABOR COMP 10,584 11,084 11,084 - 11,084 100.0% L19261000 C TEMPLE AVENUE PARK PLAYGROUND 251,889 251,889 251,889 251,889 100.0% L19280000 C SOJOURNER TRUTH MASTER PLAN AMENDMENT 30,000 5,382 5,382 - 5,382 100.0% L19702000 C PLAYGROUND REHAB/REPAIR 3,741 3,741 3,741 - 528,094 0.7% L19703003 C IRRIGATION SYSTEM - HENSHEL 16,815 16,815 16,815 - 16,960 99.1% L19703004 C IRRIGATION SYSTEM - NUNN 17,355 17,355 17,355 - 17,356 100.0% L19703005 C IRRIGATION SYSTEM - CONLIN 14,358 14,358 14,358 - 14,359 100.0% L19703500 C HAGGINWOOD PK PLAYGROUND REPLACEMENT 10,000 10,000 10,000 - 147,000 6.8% L19706028 C MU DEL PASO PARKING/PICNIC 105,000 105,000 105,000 - 446,357 23.5% L19706030 C MU FORT NATOMAS SHADE STRUCTURE 175,000 175,000 175,000 - 350,392 49.9% L19801100 C ARTIVIO GUERRO PARK 157,147 157,147 157,147 2,927,898 5.4% L19801101 C PARK SITE FB2-SURVEY 5,214 5,214 5,214 - 5,214 100.0% L19801103 C PARK SITE FB2-REAL ESTATE 3,000 2,730 2,730 - 3,000 91.0% L19807000 C PARK SAFETY ASSESSMENTS PROJ 42,448 42,448 42,448 - 50,000 84.9% L19807100 C HAGGINWOOD PARK SAFETY IMP 247,500 247,500 247,500 - 341,083 72.6% L19807400 C MCCLATCHY PARK SAFETY IMP 75,349 75,349 75,349 - 85,800 87.8% L19807500 C NINOS PARK SAFETY IMP 49,300 30,769 30,769 - 49,300 62.4% L19807600 C STRAWBERRY MANOR PARK MP 50,000 47,373 47,373 - 50,000 94.7% L19807700 C BILL BEAN JR. PARK SAFETY IMP 10,451 10,451 10,451 - 94,700 11.0% L19808100 C GARDENLAND PARK MP 31,034 31,034 31,034 - 35,000 88.7% L19808300 C STRAWBERRY MANOR PK SAFETY IMP 667,629 667,629 667,629 - 718,037 93.0% L19808500 C CHORLEY PARK MP 24,000 24,000 24,000 - 24,000 100.0% L19808700 C BILL BEAN JR PK SFTY TIER II 15,552 15,552 15,552 - 15,552 100.0% L19809001 C GARDENLAND PK-DOT INSPECTIONS 5,796 2,252 2,252 - 5,796 38.9% L19809003 C GARDENLAND PK RESTROOMS CONS 131,575 113,143 113,143 - 131,575 86.0% L19809004 C GARDENLAND PARK PH 2 IMPR 154,235 68,867 68,867 - 76,765 89.7% L19809006 C GARDENLAND PARK GATE REPAIR 37,000 35,694 35,694 37,000 96.5% L19809200 C CHORLEY PARK PSIP TIER III 70,677 70,677 70,547 - 164,240 43.0% L19809201 C CHORLEY PK-DOT ASP/CONC 26,932 26,932 26,932 - 26,932 100.0% L19809202 C CHORLEY PK PSIP-DOT/BACCHINI 13,340 13,340 13,340 - 13,340 100.0% L19809203 C CHORLEY PK PSI-CM & LABOR COMP 6,800 6,800 6,800 - 6,800 100.0% L19809300 C MLK JR. PARK PSIP TIER III 400,000 400,000 400,000 - 539,576 74.1% L19911000 C ROBERT T. MATSUI WATERFRONT 15,000 15,000 15,000 868,517 1.7% L19911500 C LAWRENCE PARK IMPROVEMENTS 1,679 1,679 1,679 1,679 100.0% L19921004 C PA10 - APP; NNRP 162,500 162,500 162,500 152,500 106.6% L1L2 C N NATOMAS PARK 3C 377,388 377,388 377,388 - 377,388 100.0% L1L3 C SYCAMORE PARK 9C 122,540 122,540 122,540 - 122,540 100.0% L1L4 C REDTAIL HAWK PARK 583,251 583,251 583,251 - 583,251 100.0% L1L6 C KOKOMO PARK 767,975 767,975 767,975 - 767,975 100.0% L1L8 C REGENCY PARK 11A 1,382,833 1,382,833 1,382,833 - 1,382,833 100.0% L1L9 C SHRA DEL PASO NUEVO CREDIT 809,553 809,553 809,553 - 809,553 100.0% LG61 C BARANDAS PARK 77,855 77,855 77,855 - 1,149,091 6.8% LG62 C BARANDAS PARK APP 22,300 22,300 22,300 - 22,300 100.0% LK61 C GRANITE PARK PLANNING 17,684 17,684 17,684 - 17,684 100.0% LK71 C ORCHARD PARK 115,091 115,091 115,091 - 1,031,672 11.2% LM56 C TRIANGLE PARK 20,694 20,694 20,694 - 299,694 6.9% LM57 C TRIANGLE PARK 3,399 3,399 3,399 - 28,399 12.0% LN63 C ROBLA PARK PH2 331,952 331,952 331,952 - 601,487 55.2% LN67 C P&R MASTER PLAN 100,000 100,000 100,000 - 250,000 40.0% LN91 C ROBERTSON WADING POOL 36,000 36,000 36,000 - 302,836 11.9% LQ43 C GARDENLAND PARK 45,246 45,246 45,246 - 275,246 16.4% LR16 C JACINTO CREEK PARK DEV 294,807 294,807 294,807 - 299,114 98.6% LS02 C STRAUCH PARK DEVELOPMENT 9,000 9,000 9,000 - 9,000 100.0% LS07 C TAHOE PARK IMPROVEMENTS 61,000 61,000 61,000 - 121,000 50.4% LS21 C FRTRDGE MANOR/PETER BURNETT 185,000 185,000 185,000 - 488,062 37.9% LS53 C SOUTHSIDE PARK LAKE IMP 26,000 26,000 26,000 - 50,480 51.5%
PARK DEVELOPMENT IMPACT FEE
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
14 City of Sacramento 'C' Status = COMPLETED/CLOSED
Park Development Impact Fees 'A' Status = ACTIVE
Capital Improvement Project Report
ACTIVITY AS OF JUNE 30, 2024
CIP# ST
A
T
U
S
PROJECT NAME ESTIMATED
PROJECT COSTS
APPROPRI-
ATIONS TO DATE
EXPENDED TO
DATE (CAPITAL
OUTLAY)
COMMIT-MENTS
(ENCUM-
BRANCES)
REMAINING
BUDGET
(DESIGNATED FOR
CAPITAL
PROJECTS)
TOTAL PROJECT
COST BY ALL
FUNDING
SOURCES
% OF TOTAL
PROJECT COSTS
FUNDED BY
PARK
DEVELOPMENT
IMPACT FEE
LS54 C SOUTHSIDE PK PAR COURSE 61,646 61,646 61,646 - 61,646 100.0% LS57 C GLENBROOK PARK ACCESS 40,000 40,000 40,000 - 85,661 46.7% LS58 C GLENBROOK PARK OPEN SPACE MP 35,506 35,506 35,506 - 82,923 42.8% LS81 C EGRET PARK 546,893 546,893 546,893 - 617,443 88.6% LS86 C TANZANITE COMM PARK 656,963 656,963 656,963 - 673,974 97.5% LS91 C N NATOMAS NEIGHBRHD PK 2,450 2,450 2,450 - 6,781 36.1% LS96 C SYCAMORE PARK 9C 542,617 542,617 542,617 - 551,473 98.4% LT01 C N NATOMAS COMMUNITY PARK 631,029 631,029 631,029 - 1,092,914 57.7% LT02 C N NATOMAS COMMUNITY PARK 376,323 376,323 376,323 - 1,696,825 22.2% LT03 C N NATOMAS COMMUNITY PARK 53,787 53,787 53,787 - 54,100 99.4% LT06 C N NATOMAS NEIGHBRHD PK 13D 12,246 12,246 12,246 - 12,246 100.0% LT16 C BURBERRY COMMINITY PARK 1,355,782 1,355,782 1,355,782 - 1,355,782 100.0% LT21 C NORTHBOROUGH PARK 10A 557,953 557,953 557,953 - 557,953 100.0% LT26 C COTTONWOOD PARK 786,200 786,200 786,200 - 813,700 96.6% LT31 C KING'S FLD LITTLE 12,961 12,961 12,961 - 12,961 100.0% LT36 C BILLY BEAN MEMORIAL PARK 24,000 24,000 24,000 - 768,000 3.1% LT56 C COLONIAL PARK CLUB HOUSE 16,550 16,550 16,550 - 276,335 6.0% LT87 C MCKINLEY PARK IMPROVEMENT 41,905 41,905 41,905 - 610,846 6.9% LT92 C GLENN HALL POOL FENCE 30,494 30,494 30,494 - 50,539 60.3% LT96 C EAST PORTAL PARK 1,344 1,344 1,344 - 79,894 1.7% LU21 C FLORIN RES PARK 10,000 10,000 10,000 - 88,550 11.3% LU36 C JACINTO CREEK PARK DEV 4,017 4,017 4,017 - 39,285 10.2% LU37 C JACINTO CREEK PARK DEV 931,932 931,932 931,932 - 1,021,739 91.2% LU61 C SUNDANCE PARK 2E 338,137 338,137 338,137 - 397,370 85.1% LU66 C RIVER VIEW PARK 3C 28,118 28,118 28,118 - 31,500 89.3% LU67 C RIVER VIEW PARK 3C 53,552 53,552 53,552 - 53,552 100.0% LU71 C HERON PARK 10B 411,951 411,951 411,951 - 411,951 100.0% LU76 C REDBUD PARK 10C 199,751 199,751 199,751 - 199,754 100.0% LU81 C BLUE OAK PARK 10D 121,650 121,650 121,650 - 121,650 100.0% LU97 C DIXIEANNE TOT LOT DEV 43,367 43,367 43,367 - 211,059 20.5% LV27 C 24TH ST PK - APP 32,974 32,974 32,974 - 32,974 100.0% LV61 C REDTAIL HAWK PARK 125,208 125,208 125,208 - 125,208 100.0% LV66 C SAN JUAN RESERVOIR PARK 82,246 82,246 82,246 - 467,041 17.6% LV76 C REGENCY COMM PARK 173,867 173,867 173,867 - 173,867 100.0% LV91 C GRANITE PARK PHASE II 8,298 8,298 8,298 - 229,046 3.6% LW11 C SHOREBIRD PARK 306,000 306,000 306,000 - 444,000 68.9% LW12 C RIVER OTTER PARK 234,000 234,000 234,000 - 364,073 64.3% LW16 C WOODLAKE PARK 36,867 36,867 36,867 - 36,867 100.0% LW31 C Z'BERG PARK GAZEBO 35,000 35,000 35,000 - 100,000 35.0% LW46 C KOKOMO PARK 211,848 211,848 211,848 - 211,848 100.0% LW51 C KENWOOD OAKS PARK 56,664 56,664 56,664 - 514,551 11.0% LW56 C HUMMINGBIRD PARK 769,290 769,290 769,290 - 769,290 100.0% LW57 C HUMMINGBIRD PARK 30,075 30,075 30,075 - 30,075 100.0% LW61 C LINDEN PARK 4B 706,661 706,661 706,661 - 706,661 100.0% LW66 C CA LILAC PARK 12C 628,816 628,816 628,816 - 765,259 82.2% LW96 C TAHOE TALLAC PARK IMPROVEMENTS 34,336 34,336 34,336 - 254,515 13.5% LX31 C UNIVERSITY PARK IMPROVEMENT 15,757 15,757 15,757 - 238,572 6.6% LX71 C LEWIS PARK TENNIS CT REHAB 50,000 50,000 50,000 - 61,800 80.9% T15029030 C WEST PEDESTRIAN TUNNEL 300,016 300,016 300,016 - 872,359 34.4% W14004100 C FRWY LAND PH1 231,070 231,070 231,070 - 2,467,148 9.4% L19000300 A CD 4 PARK PROJECTS 61,731 61,731 60,960 96 675 78,853 78.3% L19000308 A Oneil Street Soccer 30,000 30,000 28,168 - 1,832 30,000 100.0% L19000309 A Fremont Park Restroom Improvem 450,000 450,000 55,021 16,097 378,882 450,000 100.0% L19003504 A RENFREE/DEL PASO REG REPAIRS 4,287 4,287 - - 4,287 35,287 12.1% L19005100 A CONLIN COMPLEX IMPR WT 338,303 338,303 323,617 - 14,686 1,037,824 32.6% L19009100 A Greenbriar Phase 1 Park Develo 320,623 320,623 50,622 - 270,001 80,623 397.7% L19009103 A Greenbriar Phase 2 27,336 27,336 27,336 - - 27,336 100.0% L19009104 A NORTHLAKE PH 2 IMPROVEMENTS 109,303 109,303 106,596 109,303 100.0% L19013900 A CD7 PARK SIGNS AND MINOR IMPR 34,781 34,781 34,765 - 16 371,153 9.4% L19017100 A TOWNSHIP 9 PARK 116,321 116,321 116,320 - 1 116,321 100.0% L19017102 A Vine Park 52,763 52,763 39,604 - 13,159 5,326 990.7% L19102110 A Airfield Park Phase 2 1,337,894 1,337,894 954,336 16,518 367,040 1,337,894 100.0% L19108600 A District 5 Minor Pk Renovation 48,600 48,600 37,597 - 11,003 48,600 100.0% L19109210 A Blackbird Park Phase 2 957,408 957,408 364,666 10 592,732 957,408 100.0% L19112400 A Crocker Village Park Developme 750,974 750,974 62,918 6,520 681,536 750,974 100.0% L19112500 A CW Parks Master Plan Update Pr 595,000 595,000 591,515 2,676 809 595,000 100.0% L19120200 A Garcia Bend Pk RR/Fish Station 350,000 350,000 349,257 274 469 350,000 100.0% L19138110 A Meadows Park Phase 2 762,263 762,263 757,585 4,678 - 830,921 91.7% L19138120 A Meadows Park Phase 3 1,200,000 1,200,000 112,037 30,541 1,057,422 1,200,000 100.0% L19140400 A North Natomas Master Plan Amen 73,350 73,350 73,349 - 1 526,209 13.9% L19140415 A NNCCAC CONSTRUCTION 71,936 71,936 71,936 - - 40,116,583 0.2% L19144100 A Oakbrook Park Improvements 600,000 600,000 22,766 - 577,234 600,000 100.0% L19145500 A O'Neil Park Restroom Replaceme 15,000 15,000 3,564 - 11,436 545,000 2.8% L19146500 A Fong Ranch Park Development 1,843,213 1,843,213 1,840,994 2,219 - 1,909,713 96.5% L19146700 A Panhandle 105 Park Development 20,000 20,000 1,457 - 18,543 20,000 100.0% L19147200 A Woodlake Park Walkway Improve 30,000 30,000 29,521 - 479 120,000 25.0% L19152400 A REGENCY PARK PLAYGROUND RENOVA 425,462 425,462 420,530 - 4,932 459,767 92.5% L19156600 A S NATOMAS COMM PK IMPROVEMENTS 348,537 348,537 348,537 - - 526,442 66.2% L19156700 A S. Natomas Pk Security Camera 28,444 28,444 26,901 - 1,543 28,444 100.0% L19162500 A Southside Park Improvments 457,544 457,544 236,058 138,793 82,693 824,850 55.5%
PARK DEVELOPMENT IMPACT FEE
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
15 City of Sacramento 'C' Status = COMPLETED/CLOSED
Park Development Impact Fees 'A' Status = ACTIVE
Capital Improvement Project Report
ACTIVITY AS OF JUNE 30, 2024
CIP# ST
A
T
U
S
PROJECT NAME ESTIMATED
PROJECT COSTS
APPROPRI-
ATIONS TO DATE
EXPENDED TO
DATE (CAPITAL
OUTLAY)
COMMIT-MENTS
(ENCUM-
BRANCES)
REMAINING
BUDGET
(DESIGNATED FOR
CAPITAL
PROJECTS)
TOTAL PROJECT
COST BY ALL
FUNDING
SOURCES
% OF TOTAL
PROJECT COSTS
FUNDED BY
PARK
DEVELOPMENT
IMPACT FEE
L19169300 A Tyre Nichols Skate Park Imp 20,000 20,000 3,092 1,825 15,083 20,000 100.0% L19175300 A Westshore Park 2,564,484 2,564,484 1,050,285 1,328,127 186,072 2,564,484 100.0% L19175301 A Westshore Park Survey 10,516 10,516 9,007 - 1,509 10,516 100.0% L19188100 A East Portal Park Restroom Reno 485,000 485,000 146,992 306,743 31,265 485,000 100.0% L19190200 A Robertson Park Master Plan Ame 24,877 24,877 24,751 - 126 822,977 3.0% L19192100 A Parks, Parkways, & Open Spaces 829 829 - - 829 24,877 3.3% L19196200 A Mama Marks Park Improvements 235,000 235,000 233,483 1,516 1 1,369,504 17.2% L19208200 A Wood Park Community Garden 32,453 32,453 6,903 - 25,550 643,304 5.0% L19300001 A N. Natomas Aqua Ctr Proj Const 250,000 250,000 3,045 - 246,955 250,000 100.0% L19300002 A Renfree Field Phase 1 Design 500,000 500,000 145,593 55,875 298,532 3,751,550 13.3% L19300003 A D5 Mangan Clubhouse 500,000 500,000 - - 500,000 500,000 100.0% L19300004 A D7 Land Park 500,000 500,000 - - 500,000 619,070 80.8% L19300005 A Granite Regional Park Improvem 225,000 225,000 108,225 25,270 91,505 225,000 100.0% L19300006 A D8 Pannell CC Imp 250,000 250,000 147,742 - 102,258 250,000 100.0% L19300007 A D1-NNRP Great Meadow 250,000 250,000 36,566 - 213,434 250,000 100.0% L19300009 A Granite Disc Golf 25,000 25,000 - - 25,000 25,000 100.0% L19301000 A Land Park Dog Park Project 200,000 200,000 6,055 39,025 154,920 200,000 100.0% L19703100 A PARK MAINTENANCE IRRI SYS 4727 1,259 1,259 378 - 881 2,502,274 0.1% L19706074 A MU Land Park Restroom Replace 300,000 300,000 - - 300,000 300,000 100.0% L19706509 A Citywide Pool Repair-Clunie 709,700 709,700 661,572 10,433 37,695 1,149,700 61.7% L19706512 A Southside Park Pool Repairs 200,000 200,000 174,252 25,748 - 827,400 24.2% L19707000 A Z'berg Park Sign and Minor Imp 12,000 12,000 10,053 - 1,947 12,000 100.0% L19804100 A RCIF LONG-TERM CIP 173,622 173,622 157,722 - 15,900 203,909 85.1% L19804200 A Independence Field Dugout Shad 86,514 86,514 86,513 - 1 86,514 100.0% L19809000 A GARDENLAND PARK PSIP TIER III 156,869 156,869 34,359 - 122,510 248,394 63.2% L19809007 A Gardenland Park Ph3 188,539 188,539 186,466 - 2,073 239,058 78.9% L19911200 A ROBERT T. MATSUI WATERFRONT 99,000 99,000 98,483 517 1,210,381 8.2% L19911201 A Matsui Hanami Line 126,000 126,000 20,451 35,516 70,033 3,885,238 3.2% L19911300 A D5 CDBG Mangan & Chorley Pk Im 471 471 471 - - 471 100.0% L19911301 A Chorley Park Improvements 14,529 14,529 7,875 - 6,654 264,529 5.5% L19911400 A D6 CDBG Median, Nunn, Camelia 8,446 8,446 8,601 - (155) 8,446 100.0% L19911401 A Camellia Park Improvements 16,277 16,277 9,377 - 6,900 166,277 9.8% L19911402 A Nunn Park Improvements 17,755 17,755 7,048 - 10,707 305,097 5.8% L19911702 A SLP-Conc/Rest/Multi bldg 50,000 50,000 - - 50,000 2,850,000 1.8% L19911900 A McClatchy Pk-Baseball Imp 4,100 4,100 3,115 908 77 275,000 0.0% L19912000 A Airport Pk-Baseball Imp 1,400 1,400 1,364 - 36 333,538 0.4% L19912200 A North Pointe Park Improvements 25,000 25,000 - - 25,000 325,000 7.7% L19912600 A Crocker Park Imp 100,000 100,000 - - 100,000 2,100,000 4.8% L19920100 A PA1 - ART IN PUBLIC PLACES 129,323 129,323 22,000 - 107,323 188,124 68.7% L19920200 A PA2 - ART IN PUBLIC PLACES 36,875 36,875 - - 36,875 43,023 85.7% L19920300 A PA3 - ART IN PUBLIC PLACES 29,250 29,250 4,146 - 25,104 33,350 87.7% L19920400 A PA4 - ART IN PUBLIC PLACES 33,691 33,691 27,070 - 6,621 33,696 100.0% L19920403 A PA4 - APP Pannell Kinetic Art 51,275 51,275 49,841 - 1,434 141,278 36.3% L19920500 A PA5 - ART IN PUBLIC PLACES 50,134 50,134 - - 50,134 55,653 90.1% L19920600 A PA6 - ART IN PUBLIC PLACES 89,609 89,609 - - 89,609 115,594 77.5% L19920700 A PA7 - ART IN PUBLIC PLACES 2,420 2,420 - - 2,420 2,420 100.0% L19920800 A PA8 - ART IN PUBLIC PLACES 39,420 39,420 - - 39,420 72,260 54.6% L19920900 A PA9 - ART IN PUBLIC PLACES 70,913 70,913 2,408 - 68,505 86,305 82.2% L19921000 A PA10 - ART IN PUBLIC PLACES 379,194 379,194 3,100 - 376,094 449,865 84.3% 124,582,035$ 121,230,256$ 111,134,935$ 2,049,408$ 8,038,765$ 283,439,107$
PARK DEVELOPMENT IMPACT FEE
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
16 Note 1: Park Impact Fee Overview
On August 17, 1999, the City of Sacramento (City) Council adopted an ordinance for a park development impact fee based on the Mitigation Fee Act set forth in California Government Code Section 66000, et. seq. The impact fee was revised based on a new ordinance was adopted on February 14, 2017, removing Chapter 18.44 and adding Article II to Chapter 18.56 of the Sacramento City Code . This fee is assessed upon the owners of new residential and nonresidential property located within the City in order to provide all or a portion of the funds which will be necessary to design, construct, and install park facilities required to meet the needs of and address the impacts caused by new development.
It is the intent and purpose of the ordinance that the landowners undertaking the new development pay the costs of the park facilities so that the costs shall not become the responsibility of the City’s general fund.
The fees collected are necessary to provid e neighborhood and community parks , and regional parks and citywide park amenities required to meet the needs of and address the impacts caused by the additional persons residing or employed on the property as a result of the development. By law, the fund s may not be used to subsidize existing deficiencies in park acreage.
Note 2: Developer Constructed Parks
In order to facilitate developer-constructed parks, the City has established policies and guidelines for the construction of the City parks by developers. Developer-constructed parks or ‘turnkey’ parks require the developer to enter into a Credit / Reimbursement Agreement with the City whereby the developer receives PIF credits equal to the estimated park development costs. The advancement of PIF credits are secured through an irrevocable letter of credit, a performance bond or cash, and the credits can be applied to building permits that are issued during the park construction. Upon completion of the park, the City and developer reconcile costs and upon acceptance of the park, the letter of credit, bond or cash security can be released.
Note 3: Fund Balance
The fund balance on the balance sheet has been segregated by reservations and designations. Reserved for encumbrances is the amount that has been set aside to pay for contractual agreements entered into by the City for the capital improvement projects. U nreserved-designated is the amount that has been appropriated (budgeted) for capital projects but has not been encumbered. The Unappropriated fund balance is the amount available for programming. The balance represents unaudited actuals.
Note 4: Administrative Costs
An allocation of 5% of t he park impact fee revenues are set-aside for the cost of administering the fee program.
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
17 Council District Council Member
1 Lisa Kaplan
2 Roger Dickinson
3 Karina Talamantes
4 Phil Pluckebaum
5 Caity Maple
6 Eric Guerra
7 Rick Jennings, II
8 Mai Vang
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
18 CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
19 CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
20 Park Impact Fee Report by Council District
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
21 COUNCIL DISTRICT 1
2024
Revenues
Commercial fees 563,848$
Residential fees 1,842,130
Zero-dollar fee reallocation 337,114
Total Fees 2,743,092
Interest/Change in FMV of Investments 645,853
Total Available for Programming 3,388,944
Expenditures
Capital outlay 1,957,037
Total Expenditures 1,957,037
Excess of Revenues Over Expenditures 1,431,907
Beginning Fund Balance, July 1 14,272,898
Ending Fund Balance, June 30 15,704,805
Reserved for encumbrances 1,526,484
Designated for capital projects 2,965,877
Undesignated Fund Balance, June 30 11,212,444$
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
FOR THE FISCAL YEAR ENDED JUNE 30, 2024
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
22 COUNCIL DISTRICT 2
2024
Revenues
Commercial fees 371,230$
Residential fees 99,004
Total Fees 470,234
Interest/Change in FMV of investments 66,127
Total Available for Programming 536,361
Expenditures
Capital outlay 54,337
Total Expenditures 54,337
Excess of Revenues Over Expenditures 482,024
Beginning Fund Balance, July 1 1,125,946
Ending Fund Balance, June 30 1,607,970
Reserved for encumbrances 1,516
Designated for capital projects 29,194
Undesignated Fund Balance, June 30 1,577,260$
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
FOR THE FISCAL YEAR ENDED JUNE 30, 2024
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
23 COUNCIL DISTRICT 3
2024
Revenues
Commercial fees 190,731$
Residential fees 119,500
Total Fees 310,230
Interest/Change in FMV of investments 197,738
Total Available for Programming 507,968
Expenditures
Capital outlay 1,169,559
Total Expenditures 1,169,559
Excess of Revenues Over Expenditures (661,591)
Beginning Fund Balance, July 1 5,469,862
Ending Fund Balance, June 30 4,808,271
Reserved for encumbrances 356,498
Designated for capital projects 866,371
Undesignated Fund Balance, June 30 3,585,402$
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
FOR THE FISCAL YEAR ENDED JUNE 30, 2024
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
24 COUNCIL DISTRICT 4
2024
Revenues
Commercial fees 92,024$
Residential fees (refunds) 76,632
Zero-dollar fees reallocation 27,963
Total Fees 196,619
Interest/Change in FMV of investments 190,249
Total Available for Programming 386,867
Expenditures
Capital outlay 286,369
Total Expenditures 286,369
Excess of Revenues Over Expenditures 100,498
Beginning Fund Balance, July 1 4,525,660
Ending Fund Balance, June 30 4,626,158
Reserved for encumbrances 217,635
Designated for capital projects 748,159
Undesignated Fund Balance, June 30 3,660,364$
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
FOR THE FISCAL YEAR ENDED JUNE 30, 2024
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
25 COUNCIL DISTRICT 5
2024
Revenues
Commercial fees 450,074$
Residential fees 58,032
Zero-dollar fees reallocation 7,392
Total Fees 515,498
Interest/Change In FMV of investments 64,502
Total Available for Programming 580,000
Expenditures
Capital outlay 96,232
Total Expenditures 96,232
Excess of Revenues Over Expenditures 483,768
Beginning Fund Balance, July 1 1,084,696
Ending Fund Balance, June 30 1,568,464
Reserved for encumbrances 7,427
Designated for capital projects 897,407
Undesignated Fund Balance, June 30 663,630$
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
FOR THE FISCAL YEAR ENDED JUNE 30, 2024
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
26 COUNCIL DISTRICT 6
2024
Revenues
Commercial fees 5,602$
Residential fees 36,680
Zero-dollar fees reallocation 292,679
Total Fees 334,961
Interest/Change in FMV of investments 36,787
Total Available for Programming 371,747
Expenditures
Capital outlay 33,982
Total Expenditures 33,982
Excess of Revenues Over Expenditures 337,765
Beginning Fund Balance, July 1 556,759
Ending Fund Balance, June 30 894,524
Reserved for encumbrances -
Designated for capital projects 44,722
Undesignated Fund Balance, June 30 849,802$
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
FOR THE FISCAL YEAR ENDED JUNE 30, 2024
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
27 COUNCIL DISTRICT 7
2024
Revenues
Commercial fees 3,064$
Residential fees 137,684
Total Fees 140,747
Interest/Change in FMV investments 23,052
Total Available for Programming 163,799
Expenditures
Capital outlay 15,662
Total Expenditures 15,662
Excess of Revenues Over Expenditures 148,137
Beginning Fund Balance, July 1 412,397
Ending Fund Balance, June 30 560,534
Reserved for encumbrances 274
Designated for capital projects 338,040
Undesignated Fund Balance, June 30 222,220$
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
FOR THE FISCAL YEAR ENDED JUNE 30, 2024
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
28 COUNCIL DISTRICT 8
2024
Revenues
Commercial fees 1,976$
Residential fees 451,737
Total Fees 453,713
Interest/Change in FMV of investments 51,424
Total Available for Programming 505,138
Expenditures
Capital outlay 66,525
Total Expenditures 66,525
Excess of Revenues Over Expenditures 438,613
Beginning Fund Balance, July 1 811,846
Ending Fund Balance, June 30 1,250,459
Reserved for encumbrances -
Designated for capital projects 134,402
Undesignated Fund Balance, June 30 1,116,057$
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
FOR THE FISCAL YEAR ENDED JUNE 30, 2024
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
29 CITYWIDE COMPONENT
2024
Revenues
Commerical fees 894,137$
Residential Fees 1,042,144
Zero-dollar fee reallocation 351,111
Total Fees 2,287,393
Interest/Change in FMV of investments 345,889
Total Available for Programming 2,633,282
Expenditures
Capital Outlay 430,100
Excess of Collected Over Expended 2,203,182
Beginning Fund Balance, July 1 6,207,596
Ending Fund Balance, June 30 8,410,778$
Reserved for encumbrances 110,317
Designated for capital projects 1,903,709
Undesignated Fund Balance, June 30 6,396,752$
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
FOR THE FISCAL YEAR ENDED JUNE 30, 2024
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
30 ADMINISTRATIVE COMPONENT BY COUNCIL DISTRICT
2024
Revenues
Park development impact fee 392,236$
Interest/Change in FMV of investments 109,295
Total Available for Programming 501,531
Expenditures
Administrative costs 833,377
Excess of Collected Over Expended (331,846)
Beginning Fund Balance, July 1 2,989,496
Ending Fund Balance, June 30 2,657,650$
Reserved for encumbrances -
Undesignated Fund Balance, June 30 2,657,650$
CITY OF SACRAMENTO
PARK IMPACT FEE REPORT
FOR THE FISCAL YEAR ENDED JUNE 30, 2024