City of Sacramento
City Council - 5PM Report
915 I Street Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2025-00727 3/25/2025 Discussion Item 20.
Budgetary Adjustments for Old Sac Revitalization and Improvement Project (C15002100) [Published for 10-Day Review 03/14/2025]
File ID: 2025-00727
Location: 1110 Front Street, District 4
Recommendation: Adopt a Resolution: 1) authorizing the Interim City Manager or designee to execute Contract Supplement No. 1 to City Agreement No. 2023-0918 with Triamid Construction of Central California, Inc. increasing the not-to-exceed amount by $2,893,424 for a new total not-to exceed amount of $3,073,352; and increasing the Interim City Manager’s change order authority to six percent ($187,757) of the new not-to-exceed amount of $3,073,352 for the construction phase of the Deck Repair Project; and 2) authorizing the Interim City Manager to execute all necessary budget adjustments to the Deck Repair Project at 1110 Front Street (B18119000).
Contact: Kevin Love, Program Manager, (916) 808-5592, [email protected]; James Christensen, Facilities Manager, (916) 808-5863, [email protected]; Department of Public Works
Presenter: James Christensen, Facilities Manager, (916) 808-5863, [email protected]; Department of Public Works Attachments:
1-Description/Analysis
2-Contract Supplement- Triamid Construction of Central California, Inc. 3-Resolution
Description/Analysis
Issue Detail: The outdoor dining deck overlooking the Sacramento River, located at 1110 Front Street in Old Sacramento (formerly leased to the Rio City Café), was deemed unsafe and in need of replacement. A local Engineering firm, Lionakis, was retained to evaluate the deck in 2019. Based on the results of their study, they recommended a complete deck replacement using wood timber and structural steel. In August of 2022, the City Council approved Motion No. 2022-0288 suspending competitive bidding to allow the use of a design-assist approach to construction based on the complexity of removing and replacing the deck located over the Sacramento River.
File ID: 2025-00727 3/25/2025 Discussion Item 20.
A Request for Qualifications, Q22014541002, was issued on September 14, 2022, soliciting Design Assist Contractors for the demolition and construction of a new deck. Only one contractor, Traimid Construction of Central California, Inc. (Triamid), submitted a proposal. After reviewing the proposal, and an interview, they were chosen as the Design Assist Contractor. Lionakis in collaboration with Triamid have completed the design and are prepared to enter the construction phase. Because the work must be completed over the Sacramento River, the allowable construction window is from May 1 to October 31 of each calendar year. Staff is targeting May of 2025 to begin work and complete it by the end of October 2025.
Policy Considerations: The recommendations in this report are in accordance with the provisions of City Code Chapter 3.56.090 requiring City Council approval for agreements equal to or greater than $250,000.
Sacramento City Code Section 4.04.020 and the City Council Rules of Procedure (Chapter 7, Section E.2.d) require that unless waived by 2/3 vote of the City Council, all contracts and labor agreements great than $1,000,000 shall be made available to the public at least ten (10) days prior to Council action. This item was published for 10-day review on March 14, 2025, in compliance with the City Code.
Economic Impacts: The recommended contract is expected to create 21.41 jobs (13.60 direct jobs and 7.81 jobs through indirect and induced activities) and create $2,825,492 in total economic output ($1,811,214 of direct output and another $1,014,278 of output in indirect and induced activities).
The indicated economic impacts are estimates calculated using a calculation tool developed by the Center for Strategic Economic Research (CSER). CSER utilized the IMPLAN input-output model (2009 coefficients) to quantify the economic impacts of a hypothetical $1 million of spending in various construction categories within the City of Sacramento in an average one-year period. Actual impact could differ significantly from the estimates and neither the City of Sacramento nor CSER shall be held responsible for consequences resulting from such differences.
Environmental Considerations: California Environmental Quality Act (CEQA): The action is exempt from review under the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines section 15301. Required maintenance and rehabilitation of existing serviceable deck and structure and part of existing building with no expansion of existing use.
Sustainability: Not applicable
Commission/Committee Action: Not applicable
Rationale for Recommendation: Lionakis in collaboration with Triamid have completed the design for a new deck. Triamid has developed a Guaranteed Maximum Price (GMP) based on the final deck
File ID: 2025-00727 3/25/2025 Discussion Item 20.
design. Staff recommend accepting the GMP and executing Contract Supplement No. 1 to City Agreement No. 2023-0918 with Triamid in the not-to-exceed amount by $2,893,424 for a new total not-to-exceed amount of $3,073,352; and increasing the City Manager’s change order authority to six percent ($184,401) of the new not-to-exceed amount of $3,073,352 for the construction of the deck.
Financial Considerations: The costs for reconstruction of the new deck are estimated at $3,073,352 in contract costs. In addition, the City may incur construction management and other administrative costs as the project progresses.
The City has been awarded approximately $4.6 million in grant funds from the State of California for Riverfront safety and pedestrian improvements. These funds will be allocated to the Old Sac Revitalization and Improvement Project (C15002100) to restore the deck, and these improvements will create a safer environment for the community.
Local Business Enterprise (LBE): Trimid Construction of Central California, Inc. is an LBE.
CONTRACT SUPPLEMENT
Project Title: Rio City Café Deck Rebuild Date: 07/20/2023 Purchase Order #:73679
Contract Supplement No.: 1
The City of Sacramento ("City") and Triamid Construction of Central California ("Contractor"), as parties to that certain Design-Assist Contract designated as Contract Number 2023-0918, including any and all prior contract supplements modifying said contract (the contract and contract supplements are hereafter collectively referred to as the "Contract"), hereby supplement and modify the Contract as follows:
1. The Contract is amended as follows:
A. Guaranteed Maximum Price (GMP). The City hereby accepts the GMP Proposal as revised as of February 26, 2025 (incorporated herein by reference) pursuant to Sections 6 of the Contract. The GMP Proposal includes the GMP amount, Schedule of Values, Allowances, General Conditions, and Assumptions that are outlined in Attachment 1, which is attached hereto and incorporated herein.
B. Construction Phase Scope of Work. Section 3 (B) of the Contract is amended to reflect that the Construction Phase work shall be completed in accordance with the following construction documents:
(1) Drawings: 100% DD, Dated January 26, 2024, prepared by Lionakis. (2) Specifications: 100% DD set Dated January 26, 2024, prepared by Lionakis. (3) Structural Calculations: Dated January 26, 2024, prepared by Lionakis (4) Proposal Schedule dated February 25, 2025, prepared by Triamid.
C. Time of Performance. Section 4(A)(2) of the Contract is amended to reflect that the Construction Phase shall be completed between May 1, 2025 and October 31, 2025. Prepar ation for construction, including shop drawings and pre-ordering of material shall begi n within fifteen (15) working days after City’s issuance of the Notice to Proceed. Post construction activities may continue after the October 31, 2025 construction completion date. Thus, the “Completion Date – Construction Phase” referenced in Section 4(A)(2) will be October 31, 2025.
D. Contract Amount. Section 5(B)(2) is amended to reflect that the GMP will not exceed $3,129,757.00.
E. Change Orders. Any Change Orders requested by Contractor or any of its subcontractors shall be initiated using the EZ-PCO form included in the specifications: “Contract Modification Procedures” 012600.
F. Bonds. Contractor shall provide the bonds require d under Section 6(4)(B) and Section 24 of the Contract to City within 14 calendar days following City Council approval of this contract supplement.
G. Insurance. Contractor shall provide insurance doc umentation demonstrating its satisfaction of all insurance requirements specified in Section 23 of the Contract to City within 14 calendar days following City Council approval of this contract supplement.
H. Contract Documents. To be clear, all documents attach ed to this contract supplement or incorporated by reference into this contract supplement shall be co nsidered part of the “Contract Documents” defined in Section 2 of the Contract.
2. In consideration of the additional and/or revised work described in section 1, above, the amount specified in Section 6 for performance of the Construction The maximum not-to-exceed amount of the Contract is increased by $2,949,829.00. The Contract’s maximum not- to-exceed amount is thus amended as follows:
Contract's original not-to-exceed amount: $ 179,928.00 Net change by previous contract supplements: $ 0.00 Not-to-exceed amount prior to this contract supplement: $ 179,928.00 Increase by this contract supplement: $2,949,829.00 New not-to exceed amount including all contract supplements: $3,129,757.00
3. Contractor understands and agrees that the new not-t o-exceed amount specified in section 2, above, shall constitute full compensation for the additional and/or re vised work specified in section 1, above, and shall fully compensate Contractor for any and all direct and indirect costs that may be incurred by Contractor in connection with such additional a nd/or revised work, including costs associated with any changes and/or delays in work schedules or work by Contractor and costs associated with the completion of the plans, specifications, cost estimate, bid documents, permitting and preparation of the GMP and as defined in the daily communications and meetings.
4. Contractor warrants and represents that the person or persons executing this contract supplement on behalf of Contractor has or have been duly authorized by Contractor to sign this contract supplement and bind Contractor to the terms hereof.
5. Except as specifically revised herein, all terms and conditions of the Contr act shall remain in full force and effect, and Contractor shall perform all of the servi ces, duties, obligations, and conditions required under the Contract, as supplemented and modified by this contract supplement. In the event of any conflict between terms of the Contract and terms of this contract supplement (including attachments), the terms of this contract supplement shall prevail.
6. Capitalized terms used in this contract supplement but not otherwise defined herein shall have the meanings ascribed to such terms in the Contract.
Approval Recommended By: A pproved As To Form By:
Project Manager City Attorney
Approved By:
Contractor
Attested To By:
Approved By:
City Clerk
City of Sacramento
Attachment 1
GUARANTEED MAXIMUM PRICE AND FEE
1. Guaranteed Maximum Price. The Guaranteed Maximum Price as of the date of execution of the Contract is ($ 3,129,757.00). The GMP is comprised of the following.
Professional Services: $ 179,928.00
Construction: $ 2,588,705.00
Bonds: $ 25,887.00
Insurance: $ 38,831.00
General Contractor Fee: $ 166,971.00
Construction Contingency1: $ 129,435.00
Design and Construction Project Sub Total: $ 3,129,757.00
Notes:
1. Contingency funds are ow ned and controlled by the City of Sacramento. Only the City has the authority to allocate use of contingency funds (Contract Section 6. (A) (2)).
Schedule of Values
Client: City of Sacramento
Description: Replace Existing Exterior Deck
Location: 1110 Front Street
Date:
Code Description
2025
Proposal
Direct Construction Costs
01-00-00 General Conditions $46,500
01-00-00 On Site Supervsion & PM $284,600
01-00-00 Scaffolding First Four Months of Project $376,100 02-21-00 Demolition $91,000
02-21-00 Rebuild Office $11,000
04-00-00 Concrete $5,000
06-06-00 Wood Framing Labor and Materials $381,000
07-00-00 Repace Rotted Siding and Office $12,000
08-00-00 Sheetmetal & Flashings $5,000
08-00-00 Testing Piers $48,900
08-00-00 Steel Guard Rail $65,075
05-00-00 Barge Crane Mobilization $220,099
08-00-00 Steel and Galvanizing (Subject to Price Increase) $155,566 22-00-00 Crane, Barges, & Tugboat $177,500
23-00-00
Fabrication, Trucking, Erection Labor $491,703
08-00-00 Roof $149,500
09-00-00 Painting Canopy and Touch Up Building $20,000
11-00-00 Fire Protection $15,190
11-00-00 HVAC $14,972
26-00-00 Electrical $12,000
11-00-00 Fire Alarm $6,000
Project Sub Total $2,588,705
Net Costs Subtotal $2,588,705
Liability Insurance $38,831
Bond $25,887
Contingency 5% $129,435
Contractors Fee 6% $166,971
Total Estimate $2,949,829
February 26, 2025
City of Sacramento Rio City Café Deck Replacement Project
GMP Qualifications
Description: Replace Existing Wood Deck at 1110 Front Street
Scope of Work:
Install and maintain scaffolding underneath the entire wood deck May Through August 2025. Demo existing gas, electrical, fire sprinklers, and plumbing in deck area under the canopy. Page AD121 Remove HVAC Condensers from roof of offi ce and store offsite or inside restaurant. Demo existing wood deck, including canopy, office above existing decking, wood floor, and wood framing Page SD111, SD132, AD111, AD121, AD1332
Off haul deck debris, recycle all materials possible. Scan the ends of the concrete Girders to lo cate existing rebar for anchor locations. Use tugboat to locate barge crane, and material barge where the Hornblower is currently located. Perform Dynamic load test for (2) two existing steel piers with barge crane onsite Page SD111. Coordinate testing with the City of Sacramento Special Inspector.
Install new wide flange steel framing Page S111.
Install new 4”X 8” Redwood decking Page S111.
Install new wood canopy over large dining area Page S132. Install new powder coated steel guardrail and Pressure Treated 6x16 base rail around exterior edge of new deck page S-111.
Paint underside of wood canopy and touch up building where siding is replaced. Install Tremco 60 mil TPA roof over canopy with gutters and downspout page A551, A552. Install new fire sprinklers, and electrical to meet minimum code requirements under the new canopy. Build new wall and parapet for the remaining o ffice area at the edge of the new deck. Remove and replace first two courses of building siding and flashing above new decking.
Clarifications:
Updated proposal is based on 100% CD drawings dated 01/26/2-24, provided on to Triamid on 02/07/2025, 49 pages.
The Hornblower will have to be relocated while the barge crane is needed onsite. The floating dock in front of the deck area and ramp/s tairs north and south of the deck will be closed to pedestrians during construction hours while the barge crane is in operation. Fencing and signage will direct pedestrians around the work area. The dock will be open to pedestrians during off hours. Triamid plans to use a portion of the closed restaurant as a temporary office during construction. The deck area will be completed with minimum MEP and finishes to meet code. Lionakis will update the drawings to reflect the final requirements.
Existing gas piping and heaters will not be re-installed under the new canopy as shown on page P111. Vertical and horizontal parts of the canopy, and building siding that was replaced will be painted, the deck surface and steel below will not be painted per Note on page A311. The office extension over the wood deck will be demolished and not be rebuilt, minimal shoring will be used to support the remaining office. Condensers on the demoed part of the office roof will be removed. A wall at the edge of the deck will be built to close in the remaining office. If required the Condensers removed from the office roof can be relocated on the new deck. The condensers are old, the GC will not be responsible if the units do not function after relocating. Main pages to be revised A111, S111, P111, EL111
City of Sacramento Rio City Café Deck Replacement Project
A crane may be required to be located on the boardwalk east of the restaurant building to load canopy materials on the new deck. This will be for a limited time and duration to be determined and coordinated with the city.
Prevailing Wage included in this proposal.
This project is subject to the City’s Work force Training Agreement (CWTA). Includes installing ConHart Redwood de cking, Cedar is similar in price. Steel detailing is expected to ta ke 6 weeks, fabrication & Galvanizing will take 5 weeks, and steel erection will take 5 weeks.
Steel and metal pricing is fluctuating every day du e to the current steel/metals conditions in US based on Federal directives and Tariffs. As of this date suppliers/mills are only holding a quoted price for 24 hours without full payment. The fabricator has several steel suppliers and mills they draw from and shop for the most favorable pricing. These market conditions could affect the final price of steel.
Excludes:
Off hours premium time work. Any and all work not identified above. E xcludes all building permits, Special Inspections, and hot work permits unless specifically noted above. Insulation above new canopy framing, added fire protection and bird deterrent measures under the new wood deck, new gas piping and heaters, new electrical and fire alarm except what is needed to meet code requirements, new plumbing, new casework and equipment, rebuilding the office over the wood deck.
1110 Front Street Deck Subcontractor List
1. S weetwater Construction Inc. – provide, fabricate and install all structural steel, including perimeter guardrail, provide barge crane.
2. Skyline Scaold Inc. - scaolding under the deck.
3. Lawson Mechanical – remove existing condensing units on the roof of the oice to be demolished.
4. Marquee Fire Protection – demo existing fire sprinkler system under the deck canopy, install new fire sprinkler system.
5. Tecta America Sacramento Inc. – provide and install Tremco roof, metal gutters and downspouts.
6. Shane Brown Electric - provide new electrical services.
7. Triamid Construction – demo the canopy and deck, install new wood decking and canopy.
ID Task
Mode
Task Name Duration Start Finish Predecessors Resource Names 1 Rio City Café Deck Rebuild 162 days Thu 2/13/25 Fri 9/26/25 2 Pre Con Tasks 73 days Thu 2/27/25 Mon 6/9/25
3 Submit GMP to City 20 days Thu 2/27/25 Wed 3/26/25 GMP 4 City Approved Triamid GMP 1 day Thu 3/27/25 Thu 3/27/25 3 Approved GMP 5 Notice To Proceed From City 1 day Thu 3/27/25 Thu 3/27/25 4SS NTP 6 Order Wood 1 day Fri 3/28/25 Fri 3/28/25 5
7 Steel Detail and Shop Drawings 31 days Fri 3/28/25 Fri 5/9/25 4 Shop Drawings 8 Provide submittals to Engineer and
City
15 days Fri 3/28/25 Thu 4/17/25 Provide Submittals
9 Connect with affected business in the
area
20 days Tue 4/1/25 Mon 4/28/25 Connect with Local
Business
10 Pre Constrcution Meeting 1 day Mon 4/21/25 Mon 4/21/25 Pre-Con Meeting 11 Fabricate and Galvanize Steel 21 days Mon 5/12/25 Mon 6/9/25 7 Order Steel 12 Mobilization 15 days Thu 5/1/25 Wed 5/21/25
13 Scaffolding Installed 15 days Thu 5/1/25 Wed 5/21/25 Scaffolding Installed 14 Temporary Fencing 1 day Thu 5/1/25 Thu 5/1/25 13SS Temp fencing 15 Demo Deck 32 days Tue 5/13/25 Wed 6/25/25
16 Demo Electrical and Plumbing 5 days Tue 5/13/25 Mon 5/19/25 13FS-7 days Demo Electric and Plumbing 17 Demo Fire Sprinklers 3 days Tue 5/20/25 Thu 5/22/25 16 Demo Fire Sprinklers 18 Demo Wood Canopy Structure 7 days Mon 5/26/25 Tue 6/3/25 17FS+1 day Demo Canopy 19 Remove Canopy Posts 1 day Thu 6/5/25 Thu 6/5/25 18FS+1 day Remove Canopy Posts 20 Install Shoring in Office 3 days Fri 6/6/25 Tue 6/10/25 19 Demo Office 21 Demo Deck Service Area Cabinetry 1 day Fri 6/6/25 Fri 6/6/25 19 Demo Cabinetry 22 Remove all Wood Curbs and
Guardrails
2 days Fri 6/6/25 Mon 6/9/25 19 Remove Curbs and
Guardrails
23 Demo Decking 7 days Tue 6/10/25 Wed 6/18/25 22 Demo Decking 24 Demo Floor Joists and Glulams 4 days Thu 6/19/25 Tue 6/24/25 23 Demo Floor Joists and Glulams 25 Complete Demolition 1 day Wed 6/25/25 Wed 6/25/25 24 Complete Demolition 26 Construcion Phase 71 days Fri 6/20/25 Fri 9/26/25
27 Receive and Shake Out Wood Deck
Framing Material
9 days Thu 6/26/25 Tue 7/8/25 25 Receive Wood
Material
28 Load Test Two Existing Steel Piles 2 days Fri 6/20/25 Mon 6/23/25 24SS+1 day Load Test Steel Piles
29 Hang Steel Girders and Joists 15 days Tue 6/24/25 Mon 7/14/25 28 Hang Girders and Joists 30 Install Steel Cross Bracing at Floor
Joists
15 days Tue 6/24/25 Mon 7/14/25 29SS Install Steel Cross Bracing
GMP
Approved GMP
NTP
Shop Drawings
Provide Submittals
Connect with Local Business
Pre-Con Meeting
Order Steel
Scaffolding Installed
Temp fencing
Demo Electric and Plumbing
Demo Fire Sprinklers
Demo Canopy
Remove Canopy Posts
Demo Office
Demo Cabinetry
Remove Curbs and Guardrails
Demo Decking
Demo Floor Joists and Glulams
Complete Demolition
Receive Wood Material
Load Test Steel Piles
Hang Girders and Joists
Install Steel Cross Bracing
Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 2, 2025 Qtr 3, 2025 Qtr 4, 2025
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
1110 Front Street Deck Schedule 2.25.2025
Project: Triamid Construction S
Date: Tue 2/25/25
ID Task
Mode
Task Name Duration Start Finish Predecessors Resource Names 31 Install Wood Blocking to Steel Joists
for Flooring
10 days Thu 7/10/25 Wed 7/23/25 29FS-3 days Install Wood Blocking
32 Install 4X8 Wood Decking 15 days Thu 7/24/25 Wed 8/13/25 31 Install Wood Decking 33 Frame Office 3 days Wed 7/30/25 Fri 8/1/25 32SS+4 days Frame Office 34 Drywall, Tape, texture and Paint
Office
4 days Mon 8/4/25 Thu 8/7/25 33 Drywall and Paint
office
35 Install Deck Canopy Frame 15 days Thu 8/14/25 Wed 9/3/25 32 Install Roof Frame 36 Install Perimiter Wood Curb and
Guardrail
12 days Tue 8/19/25 Wed 9/3/25 35SS+3 days Install Wood Curb and Guardrail
37 Install Fire Sprinkler System 4 days Thu 9/4/25 Tue 9/9/25 35 Install Fire Sprinkler 38 Install Canopy Roof, Patch Office Roof 3 days Thu 9/4/25 Mon 9/8/25 35 Install Canopy 39 Minimal Electrical to Meet Code
Requirements
4 days Tue 9/9/25 Fri 9/12/25 38 Complete Electrical
40 Final Inspection and Punch List 10 days Mon 9/15/25 Fri 9/26/25 39 Final Inspections and Punch List
Install Wood Blocking
Install Wood Decking
Frame Office
Drywall and Paint office
Install Roof Frame
Install Wood Curb and Guardrail
Install Fire Sprinkler
Install Canopy
Complete Electrical
Final Inspections and Punch List
Feb Mar Apr May Jun Jul Aug Sep Oct
Qtr 2, 2025 Qtr 3, 2025 Qtr 4, 2025
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
1110 Front Street Deck Schedule 2.25.2025
Project: Triamid Construction S
Date: Tue 2/25/25
PROJECT MANUAL FOR
CITY OF SACRAMENTO
RIO CITY CAFE DECK REPAIR
LIONAKIS NO. 019124.02
100% Design Development Specifications
January 26, 2024
Lionakis No. 019124.02 00 01 10
January 26, 2024 Table of Contents
Line3xx Page 1
PROJECT MANUAL
FOR
CITY OF SACRAMENTO
RIO CITY CAFE DECK REPAIR
TABLE OF CONTENTS
DIVISION NO. SECTION TITLE PAGES INCLUSIVE
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
To be provided by Owner
SPECIFICATIONS
DIVISION 01 GENERAL REQUIREMENTS
Section 01 73 29 Cutting and Patching ................................ ................................ .... 1 – 5 Additional Division 01 Sections to be provided by Owner DIVISION 02 EXISTING CONDITIONS
Section 02 41 00 Demolition ................................ ................................ .................... 1 – 2 DIVISION 03 CONCRETE
Section 03 20 00 Concrete Reinforcing ................................ ................................ .... 1 – 6 Section 03 30 00 Cast-in-Place Concrete ................................ .............................. 1 – 21 DIVISION 04 NOT USED
DIVISION 05 METALS
Section 05 12 00 Structural Steel Framing ................................ ............................... 1 – 9 Section 05 31 00 Steel Decking ................................ ................................ ............... 1 – 5 Section 05 50 00 Metal Fabrications ................................ ................................ ........ 1 – 6 DIVISION 06 WOODS, PLASTICS, AND COMPOSITES
Section 06 10 00 Rough Carpentry ................................ ................................ .......... 1 – 7 Section 06 17 53 Shop-Fabricated Wood Trusses ................................ ................... 1 – 3 DIVISION 07 THERMAL AND MOISTURE PROTECTION
Section 07 13 26 Self-Adhering Sheet Waterproofing ................................ .............. 1 – 5 Section 07 21 00 Thermal Insulation ................................ ................................ ........ 1 – 3 Section 07 25 00 Weather Barriers ................................ ................................ .......... 1 – 5 Section 07 54 23 Thermoplastic-Polyolefin Roofing ................................ ............... 1 – 11 Section 07 62 00 Sheet Metal Flashing and Trim ................................ ..................... 1 – 6 Section 07 92 00 Joint Sealants ................................ ................................ ............. 1 – 12 Section 07 95 00 Expansion Control ................................ ................................ ........ 1 – 3 DIVISION 08 NOT USED
DIVISION 09 FINISHES
Section 09 29 00 Gypsum Board ................................ ................................ ............. 1 – 6 Section 09 30 00 Tiling ................................ ................................ ............................ 1 – 7 Section 09 91 00 Painting ................................ ................................ ........................ 1 – 9 DIVISIONS 10 – 20 NOT USED
00 01 10 Lionakis No. 019124.02
Table of Contents January 26, 2024
DIVISION 21 FIRE PROTECTION
Section 21 05 00 Common Work Results for Fire Suppression ................................ .... 1 - Section 21 13 00 Fire-Suppression Sprinkler Systems ................................ ............. 1 – 7 DIVISION 22 PLUMBING
Section 22 05 10 Plumbing General Provisions ................................ ..................... 1 – 18 Section 22 05 16 Expansion Fittings and Loops for Plumbing Piping ....................... 1 – 4 Section 22 05 23 General-Duty Valves for Plumbing Piping ................................ ... 1 – 10 Section 22 05 29 Hangers and Supports for Plumbing Piping and Equipment ....... 1 – 10 Section 22 05 53 Identification for Plumbing Piping and Equipment ......................... 1 – 3 Section 22 07 19 Plumbing Piping Insulation ................................ ........................... 1 – 7 Section 22 08 00 Plumbing Commissioning Requirements ................................ ...... 1 – 3 Section 22 10 05 Plumbing Piping ................................ ................................ ........... 1 – 9 Section 22 10 06 Plumbing Piping Specialties ................................ ......................... 1 – 4 Section 22 40 00 Plumbing Fixtures ................................ ................................ ......... 1 – 4 DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING
Section 23 05 10 Mechanical General Provisions ................................ .................. 1 – 18 Section 23 05 29 Hangers and Supports for HVAC Piping and Equipment ............ 1 – 11 Section 23 05 53 Identification for HVAC Piping and Equipment .............................. 1 – 4 Section 23 83 00 Radiant Heating and Cooling Units ................................ ............... 1 – 2 DIVISIONS 10 – 20 NOT USED
DIVISION 26 ELECTRICAL
Section 26 05 00 Common Work Results for Electrical ................................ .......... 1 – 19 Section 26 05 19 Low-Voltage Electrical Power Conductors and Cables ............... 1 – 23 DIVISION 26 ELECTRICAL (CONTINUED)
Section 26 05 26 Grounding and Bonding for Electrical Systems ........................... 1 – 22 Section 26 05 29 Hangers and Supports for Electrical Systems ............................. 1 – 14 Section 26 05 33.13 Conduit for Electrical Systems ................................ .................... 1 – 28 Section 26 05 33.16 Boxes for Electrical Systems ................................ ...................... 1 – 17 Section 26 05 53 Identification for Electrical Systems ................................ ............ 1 – 19 Section 26 05 83 Wiring Connections ................................ ................................ ...... 1 – 4 Section 26 08 00 Electrical Commissioning Requirements................................ ....... 1 – 6 Section 26 09 23 Lighting Control Devices ................................ ............................. 1 – 32 Section 26 24 16 Panelboards ................................ ................................ ............... 1 – 17 Section 26 27 26 Wiring Devices ................................ ................................ ........... 1 – 24 Section 26 28 13 Fuses ................................ ................................ ........................... 1 – 7 Section 26 51 00 Interior Lighting................................ ................................ ........... 1 – 19 Section 26 56 00 Exterior Lighting ................................ ................................ ........ 1 – 14 DIVISIONS 27 – 49 NOT USED
END OF TABLE OF CONTENTS
Lionakis No. 019124.02 01 73 29
January 26, 2024 Cutting and Patching
SECTION 01 73 29
CUTTING AND PATCHING
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Procedural requirements and limitations for cutting and patching work.
B. Patching of existing materials and construction disturbed by Work under this Contract, including repair of damage to existing materials and construction caused by:
1. Installation of new products, materials, and equipment or systems.
2. Relocation or reinstallation of existing products, materials, and equipment or systems.
C. Removal, patching, and restoration work at new roofing system, when required.
D. Removal, patching, and restoration work at existing roofing system.
1.2 RELATED SECTIONS
A. Section 01 33 00 – Submittal Procedures.
B. Section 01 35 16 – Alteration Project Procedures: Cutting and patching for alterations work.
C. Section 01 60 00 – Product Requirements: Product options and substitutions.
D. Divisions 02 through 49 Sections for specific requirements and limitations applicable to cutting and patching individual parts of the Work, including the following:
1. Cutting and patching incidental to work of the individual Section.
2. Advance notification to other Sections of openings required in work of those Sections.
3. Limitations on cutting structural members.
1.3 SUBMITTALS
A. Submit written request in advance of cutting or patching which affects:
1. Integrity of moisture-resistant, water-resistant, and exposed to weather elements.
2. Utility services and mechanical/electrical systems.
3. Operational elements.
4. Visual qualities of sight exposed elements.
5. Existing structural elements.
6. Efficiency, maintenance, or safety of element.
7. Work of Owner or separate contractor.
B. Include in request:
1. Identification of Project.
2. Location and description of affected Work.
3. Necessity for cutting or patching.
01 73 29 Lionakis No. 019124.02
Cutting and Patching January 26, 2024
4. Description of proposed Work and products to be used.
5. Alternatives to cutting and patching.
6. List of services and systems that will be temporarily out of service and length of disruption.
7. List of services and systems that will be relocated.
8. Reinforcement to structural elements, with details and engineering calculations showing integration of reinforcement with original structure.
9. Effect on work of Owner or separate contractor.
10. Written permission of affected separate contractor.
11. Date and time the work will be executed.
C. Architect’s and Owner’s Approval: Obtain approval of cutting and patching submittals before commencing cutting and patching work. Approval does not waive the right to require removal and replacement of unsatisfactory work.
1.4 DEFINITIONS
A. Cutting: Removal of in-place construction for installation or performance of other Work.
B. Patching: Repair work required for restoration of damaged surfaces to original condition after installation of other Work.
1.5 QUALITY ASSURANCE
A. Structural Elements: Do not cut and patch structural elements in a manner that could change their load-carrying capacity or load-deflection ratio.
B. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or results in increased maintenance or decreased operational life or safety.
C. Cutting and Patching Conference: Before proceeding, meet at Project site with parties involved in cutting and patching work, including mechanical and electrical trades. Review areas of potential inte rference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.
1.6 WARRANTY
A. Existing Applicable Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during cutting and patching operations, by appropriate methods and with suitable materials so that existing applicable warranties are not voided.
PART 2 PRODUCTS
2.1 MATERIALS
A. Primary Products: Those required for original installation.
B. Product Substitution: For any proposed change in materials, submit request for substitution as specified in Section 01 60 00.
PART 3 EXECUTION
Lionakis No. 019124.02 01 73 29
January 26, 2024 Cutting and Patching
3.1 EXAMINATION
A. Examine existing conditions prior to commencing Work, including elements subject to damage or movement during cutting and patching.
B. After uncovering existing work, assess conditions affecting performance of Work.
C. Beginning of cutting or patching means acceptance of existing conditions.
D. Identify hazardous substances or conditions exposed during the Work to Architect for decision or remedy.
3.2 PREPARATION
A. Provide temporary supports to ensure structural integrity of the Work. Provide devices and methods to protect other portions of Project from damage.
B. Provide protection from elements for areas which may be exposed by uncovering Work.
3.3 CUTTING
A. Execute cutting and fitting to complete the Work.
B. Uncover in-place Work to reinstall improperly sequenced Work.
C. Remove and replace defective or non-conforming Work.
D. Obtain material samples of installed Work for testing, when requested.
E. Provide openings in the Work for penetration of mechanical and electrical work.
F. Employ experienced installer to perform cutting of moisture-resistant, water -resistant, exposed to weather elements, and surfaces exposed to view.
G. Cut rigid materials in straight, true and parallel or perpendicular lines.
H. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as p ossible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
I. Cut masonry and concrete materials using masonry saw or core drill.
J. Pneumatic tools are not allowed without prior approval from Architect and Owner.
K. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed.
Cap, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.
3.4 PATCHING
A. Execute patching to complement adjacent Work.
B. Fit products together to integrate with other Work.
C. Execute Work by appropriate methods to avoid damage to other Work and to provide surfaces suitable for patching and finishing.
01 73 29 Lionakis No. 019124.02
Cutting and Patching January 26, 2024
D. Employ experienced installer to perform patching of moisture -resistant, water -resistant, exposed to weather elements, and surfaces exposed to view.
E. Restore Work with new materials and products in accordance with requirements of the Contract Documents.
F. Fit Work tight to pipes, sleeves, ducts, conduit and other penetrations through surfaces.
G. Maintain integrity of wall, ceiling, or floor construction; completely seal voids.
H. At penetrations of fire rated walls, partitions, ceiling or floor construction, completely seal voids with fire rated material to full thickness of the penetrated element. Firestopping shall meet or exceed the fire rating of the assembly in which it is installed.
I. Fire rated assemblies disturbed or damaged during con struction shall be repaired to pre - construction condition using like materials.
J. Refinish surfaces to match adjacent finish in all respects (type, texture, thickness, color, etc.).
For continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.
K. Removal, Patching, and Restoration Work at New Roofing System: Work under this Project may require removal, patching, and restoration work at completed roofing system. Roof patching and restoration work shall be compatible with and identical to the original roofing system. Provide roof patching and restoration work in accordance with roofing manufacturer’s written instructions, or applicable NRCA procedures and details, whichever is more stringent.
1. Roofing Warranties: Contractor shall ensure that applicable warranties on the roofing system remain intact after completion of patching and restoration work.
2. Prior to commencement of roof p atching work, submit materials/product data and procedures proposed for roof patching and restoration work for Architect’s review.
3. Submit documentation under provisions of Section 01 33 00.
4. Provide documentary evidence that roofing warranties are not voided due to roof patching and restoration work completed under this Project.
L. Removal, Patching, and Restoration Work at Existing Roofing : Work under this Project requires removal, patching, and/or restoration work at existing roofing system. Roofing system for patching and restoration work shall be compatible with and identical to the existing roofing system. Provide roof patching and restoration work in accordance with roofing manufacturer’s written instructions, or applicable NRCA procedures and details, whichever is more stringent.
1. Existing Roofing Warranties: Contractor shall ensure that applicable warranties on the existing roofing system remain intact after completion of roof patching and restoration work.
2. Prior to commencement of roof patching and restoration work, submit materials/product data and procedures proposed for roof patching and restoration work for Architect’s review.
3. Submit documentation under provisions of Section 01 33 00.
4. Provide documentary evidence that existing roofing warranties are not voided due to roof patching and restoration work completed under this Project.
3.5 CLEANING
Lionakis No. 019124.02 01 73 29
January 26, 2024 Cutting and Patching
A. Clean areas and spaces where cutting and patching are performed. Completely remove paint, mortar, oils, putty, and similar materials.
END OF SECTION
Lionakis No. 019124.02 02 41 00
January 26, 2024 Demolition
Line3xx Page 1
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Removal of designated construction.
B. Identification of utilities.
C. Demolition requirements.
1.2 RELATED SECTIONS
A. Division 01 Sections, as applicable.
1.3 PROJECT RECORD DOCUMENTS
A. Submit under provisions of Division 01.
B. Accurately record actual locations of capped utilities and subsurface obstructions.
1.4 REGULATORY REQUIREMENTS
A. Perform work of this Section under provisions of CBC Chapter 33, CFC Chapter 33, and NFPA 241 for demolition work, safety of structure, dust control and safety of occupants.
B. Obtain required permits from authorities.
C. Do not close or obstruct egress width to exits.
D. Do not disable or disrupt building fire or life safety systems without three -day prior written notice to Owner.
E. Conform to procedures applicable when discovering hazardous or contaminated materials.
1.5 SCHEDULING
A. Schedule work under the provisions of Division 01.
B. Describe demolition removal procedures and schedule.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 PREPARATION
A. Provide, erect and maintain temporary barriers as required. 02 41 00 Lionakis No. 019124.02
Demolition January 26, 2024
B. Erect and maintain temporary partitions to prevent spread of dust, odors and noise to adjoining facilities.
C. Protect existing materials and finishes that are not scheduled or otherwise required to be demolished.
D. Mark location of utilities.
3.2 DEMOLITION REQUIREMENTS
A. Conduct demolition to minimize interference with adjacent and occupied buildings.
B. Maintain protected egress and access to the Work.
3.3 DEMOLITION
A. Refer to Drawings for specific items to be demolished.
B. Disconnect, remove, cap, and identify designated utilities within demolition areas.
C. Demolish in an orderly and careful manner. Protect existing supporting structural members and materials.
D. Except where noted otherwise, remove demolishe d materials from site. Do not bury or burn materials on site.
E. Remove demolished materials from site as Work progresses. Upon completion of Work, leave areas in clean condition.
F. Remove temporary Work.
END OF SECTION
Lionakis No. 019124.02 03 20 00
January 26, 2024 Concrete Reinforcing
Line3xx Page 1
SECTION 03 20 00
CONCRETE REINFORCING
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Steel reinforcement and accessories for concrete.
1.2 RELATED SECTIONS
A. Section 03 30 00 – Cast-In-Place Concrete.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. ACI SPEC-117 – Specifications for Tolerances for Concrete Construction and Materials.
2. ACI SPEC-301 – Specifications for Structural Concrete.
3. ACI CODE-318 – Building Code Requirements for Structural Concrete and Commentary.
4. ACI MNL-66 – ACI Detailing Manual.
5. ASTM A615/A615M – Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement.
6. ASTM A706/A706M – Standard Specification for Low -Alloy Steel Deformed and Plain Bars for Concrete Reinforcement.
7. ASTM A1064/A1064M – Standard Specification for Carb on-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete.
8. AWS D1.4 – Structural Welding Code – Reinforcing Steel.
9. CRSI Manual of Standard Practice.
10. Wire Reinforcement Institute (WRI) Manual of Standard Practice.
1.4 SUBMITTALS
A. General: Submit in accordance with Division 01.
B. Product Data: Submit manufacturer’s descriptive literature , installation instructions, and product specification for the following products:
1. Mechanical splicing devices.
2. Bar supports.
03 20 00 Lionakis No. 019124.02
Concrete Reinforcing January 26, 2024
C. Placement Drawings:
1. Prepare in accordance with ACI MNL-66.
2. Indicate bar sizes, spacing, locations, and quantities of steel reinforcement and wire fabric, bending and cutting schedules, and supporting and spacing devices.
3. If fusion welding is used, i dentify which mem bers will utilize fusion welding process for preassembly, including details indicating the size/location of stirrups and holding wires, and welding requirements.
4. Identify placement drawings with reference to sheet and detail numbers from the Contract Documents.
5. Do not use scaled dimensions from Drawings to determine lengths of steel reinforcement.
6. Submit one cop y of reproducible placement drawings in addition to those required by Division 01.
7. Contractor shall be responsible for correctness and completeness of steel reinforcing requirements.
8. Begin fabrication only when placement drawings have been accepted.
D. Quality Assurance/Control Submittals:
1. If fusion welding is used, s ubmit complete shop welding program outlining the type of fusion welding machine to be used and periodic inspection of the in-plant welding.
2. Submit certified copies of mill test reports of reinforcing materials analysis to Owner’s testing agency.
1.5 QUALITY ASSURANCE
A. Perform work in accordance with CRSI Manual of Standard Practice; ACI SPEC-301; and 2022 California Building Code ( CBC) Chapter 17 “Special Inspections and Tests ”, and Chapter 19 “Concrete”, and as follows:
1. Steel Reinforcement, Tests and Materials : CBC Section 1903 “Specifications for Tests and Materials”.
2. Reinforcing Bar Welding Testing: Per Section 1705, Table 1705.3 “Required Special Inspections and Tests of Concrete Construction”.
B. Fusion welded reinforcing steel shall have one tensile test taken from on e specimen sampled per 2.5 tons or fraction thereof for each size of reinforcing steel fusion welded. No bend test is necessary. The specimen shall have a holding wire attached to it that need not be removed. The elongation requirements shall comply with t he ASTM of reinforcing steel specified. Test results shall be submitted to the Engineer of Record and the Authority Having Jurisdiction. Testing and inspection costs for fusion welding shall be paid for by the Contractor.
C. Pre-Installation Meetings:
1. Conduct pre-installation meeting in accordance with Division 01.
2. Convene pre-installation meeting prior to commencing Work of this Section.
3. Coordinate Work in this Section with Work in related Sections.
Lionakis No. 019124.02 03 20 00
January 26, 2024 Concrete Reinforcing
Line3xx Page 3
1.6 DELIVERY, STORAGE, AND HANDLING
A. Comply with requirements of Division 01.
B. Deliver steel reinforcement in bundles marked with identification tags.
C. Handle and store materials to p revent damage and contamination, excessive rusting or coating with grease, oil, or other objectionable materials.
D. Store steel reinforcement, fabricated assemblies, and accessories off the ground on platforms, skids, or other supports.
E. Deliver and store welding electrodes in accordance with AWS D1.4.
PART 2 PRODUCTS
2.1 STEEL REINFORCEMENT
A. Reinforcing Steel: ASTM A615/A615M, Grade 60, low-alloy deformed steel bars.
B. Reinforcing Steel Indicated to be Welded : ASTM A706/A706M, Grade 60, low -alloy deformed steel bars.
C. Tie Wire: Black annealed steel wire; No. 16 gauge.
D. Welded Wire Fabric: ASTM A1064/1064M; 65 ksi minimum yield strength; fabricated from as-drawn steel wire into flat sheets (rolled fabric not permitted).
1. Size: As indicated on Drawings.
2.2 ACCESSORIES
A. Bar Supports (Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire fabric in place): Provide in accordance with CRSI Manual of Standard Practice from steel wire, plastic, or precast concrete or fiber -reinforced concrete of equal to or greater compressive strength than surrounding concrete. Provide as follows:
1. Footings: Precast concrete blocks with tie wires.
2. Slab on gr ound: Precast concrete blocks, plastic coated steel fabricated with bearing plates, or specifically designed wire-fabric supports fabricated of plastic.
3. Where legs of wire bar supports contact forms: CRSI Class 1 plastic -protected or CRSI Class 2 stainless steel bar supports.
4. Where support is no closer to concrete surface than 1/2 inch: CRSI Class 3 wire supports.
5. Supports placed against g round: Precast concrete blocks not less than 4 inch square with embedded wire.
B. Welding Materials For Reinforcing Steel:
1. Weld Filler Material: AWS D1.4; low hydrogen, 80 ksi tensile strength.
03 20 00 Lionakis No. 019124.02
Concrete Reinforcing January 26, 2024
C. Mechanical Splices: Splicing devices capable of developing 125 percent of the specified yield strength of the bar in compression and tension.
1. Metal Sleeve with Cast Filler Metal:
a. Acceptable Product: Cadweld Rebar by Erico International Corporation, Solon, OH; 800-248-2677; www.erico.com, or accepted equal.
2. Mechanical Threaded Connections: Provide threaded mechanical connections using a metal coupling sleeve with internal threads.
a. Acceptable Product: Lenton Couplers by Erico International Co rporation DB-SAE Dowel Bar Splicers by Dayton Concrete Accessories , Miamisburg, OH ; 800-745- 3700, www.daytonconcreteacc.com, or accepted equal.
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine job site conditions and verify field dimensions.
B. Report unacceptable conditions to Architect. Begin installation only when unacceptable conditions have been corrected.
3.2 PREPARATION
A. Clean steel reinforcement of rust and mill scale, earth, moisture, and other foreign materials before fabrication or placement.
3.3 STEEL REINFORCEMENT FABRICATION
A. Fabricate to shapes , dimensions, and tolerances in accordance with accepted placement drawings conforming to CRSI Manual of Standard Practice, ACI MNL-66, ACI CODE-318, ACI SPEC-117, and CBC Chapter 19.
B. Standard Hooks and Bends: Conform to ACI CODE-318.
C. Bending: Cold bend steel reinforcement in the field or at the mill. Heating for bending is not permitted unless otherwise specifically allowed by Architect.
D. Reinforcement must not be straighten ed or re -bent without approval of Structural Engineer of Record (SEOR).
E. Weld steel reinforcement in accordance with AWS D1.4.
3.4 PLACEMENT
A. Place steel reinforcement in accordance with accepted placement drawings in conformance with tolerances specified in ACI SPEC-117.
B. Install steel reinforcement in largest practical lengths. Accurately position, support, and secure reinforcement against displacement. Locate support reinforcement with bar supports to maintain minimum concrete cover.
C. Secure reinforcement agains t displacement within tolerances permitted in ACI CODE-318.
Point wire tie ends away from forms.
Lionakis No. 019124.02 03 20 00
January 26, 2024 Concrete Reinforcing
Line3xx Page 5
D. Concrete Cover: Refer to Drawings. Cover tolerances shall comply with ACI SPEC-117.
E. Laps: Refer to Drawings.
1. Offset laps in adjacent bars.
F. Splices:
1. Splice reinforcing as shown.
2. Tie lap splices securely to prevent displacement during concrete placement.
3. Install mechanical splice in accordance with manufacturer’s written instructions.
4. Locate splices only where shown and accepted by Architect.
G. Welding:
1. Welding is not permitted unless specifically detailed on Drawings or accepted by Architect.
2. Employ shielded metal-arc method. Comply with AWS D1.4.
3. Welding is not permitted on bars where the carbon content is not known or is determined to exceed 0.75 percent.
4. Welding is not permitted within two bar diameters of any bent portion of a bar which has been bent cold.
5. Welding of crossing bars is not permitted.
H. Maintain minimum clear distance between parallel bars at not less than 1-1/2 times nominal bar diameter, 1-1/2 times maximum size of coarse aggregate, or 1-1/2 inch.
I. Dowels: Place where indicated on Drawings. Grease loose end to prevent concrete from bonding to dowel. Sleeves may be used when accepted by Architect.
J. Welded Wire Reinforcement: Install in longes t practical lengths on bar supports to minimize sagging. Lap edges and ends of adjoining sheets at least one mesh spacing. Offset laps to avoid continuous laps in either direction. Tie lap joints at 12 inches on center.
K. Field Adjustments: Move steel reinforcement as necessary to avoid interference with other reinforcing steel or other embedded items within accepted tolerances.
1. Sleeves and embedded items: Do not cut bars to clear sleeves or slot s through slabs or walls. Wrap bars around these openings.
2. Openings: Compensate for steel reinforcement terminated at openings in slabs by placing one half of steel reinforcement terminated on each side of openings for the full span length.
3. Steel reinforcement moved to avoid interference with other reinforcements , conduits, or embedded items, including additional steel reinforcement to meet structural requirements are subject to inspection and approval before concrete placement.
3.5 FIELD QUALITY CONTROL
A. General: Comply with requirements of Division 01.
03 20 00 Lionakis No. 019124.02
Concrete Reinforcing January 26, 2024
B. Testing Servi ce: Owner will select and pay for independent testing agency, which will perform the following:
1. Inspect shop and field welding per AWS D1.4, including checking materials, equipment, procedures, and welder qualifications.
2. Inspector shall employ non-destructive testing or any other aid to visual inspection deemed necessary to assure adequacy of weld.
3.6 PROTECTION
A. Protect steel reinforcement from damage and displacement.
B. Protect for potential rust staining of adjacent surfaces. Wrap steel reinforceme nt with impervious tape or other methods as accepted by Architect. Remove protective cover and clean reinforcement before concrete placement.
C. Install safety caps on all exposed ends of vertical steel reinforcement that pose a danger to life safety.
END OF SECTION
Lionakis No. 019124.02 03 30 00
January 26, 2024 Cast-In-Place Concrete
Line3xx Page 1
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Cast-in-place concrete.
B. Concrete admixtures.
C. Curing and surface slab treatment.
D. Grouting, bonding, and patching materials.
1.2 RELATED SECTIONS
A. Section 03 20 00 – Concrete Reinforcing.
B. Section 05 31 00 – Steel Decking.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. ACI publications PRC-221, PRC-302.1, PRC-302.2, PRC-304, PRC-305, PRC-306, and PRC-309 contain recommended practices for concrete work. Submit any proposed deviations from these recommendations to Architect for review prior to commencing concrete work.
D. Referenced Standards:
1. ACI SPEC-117 – Specification for Tolerances for Concrete Constructi on and Materials.
2. ACI PRC-221 – Guide for Use of Normal Weight and Heavyweight Aggregates in Concrete.
3. ACI SPEC-301 – Specifications for Concrete Construction.
4. ACI PRC-302.1 – Guide for Concrete Floor and Slab Construction.
5. ACI PRC-302.2 – Guide for Concre te Slab s that Receive Moisture -Sensitive Flooring Materials.
6. ACI PRC-304 – Guide for Measuring, Mixing, Transporting, and Placing Concrete.
7. ACI PRC-305 – Guide to Hot Weather Concreting.
8. ACI SPEC-305.1 – Standard Specification for Hot Weather Concreting.
9. ACI PRC-306 – Guide to Cold Weather Concreting.
03 30 00 Lionakis No. 019124.02
Cast-In-Place Concrete January 26, 2024
10. ACI SPEC-306.1 – Standard Specification for Cold Weather Concreting.
11. ACI PRC-309 – Guide for Consolidation of Concrete.
12. ACI CODE-318 – Building Code Requirements for Structural Concrete.
13. ACI SP-15 – Field Reference Manual: Specifications for Structural Concrete ACI 301-10 with Selected ACI and ASTM References.
14. ASTM C31/C31M – Standard Practice for Making and Curing Concrete Test Specimens in the Field.
15. ASTM C33/C33M – Standard Specification for Concrete Aggregates.
16. ASTM C39/C39M – Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens.
17. ASTM C94/C94M – Standard Specification for Ready Mixed Concrete.
18. ASTM C109/C109M – Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or [50-mm] Cube Specimens).
19. ASTM C114 – Standard Test Methods for Chemical Analysis of Hydraulic Cement.
20. ASTM C138/C138M – Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete.
21. ASTM C143/C143M – Standard Test Method for Slump of Hydraulic Cement Concrete.
22. ASTM C150/C150M – Standard Specification for Portland Cement.
23. ASTM C157/C157M – Standard Test Method for Length Change of Ha rdened Hydraulic-Cement, Mortar and Concrete.
24. ASTM C171 – Standard Specification for Sheet Materials for Curing Concrete.
25. ASTM C172/C172M – Standard Practice for Sampling Freshly Mixed Concrete.
26. ASTM C309 – Standard Specification for Liquid Membrane Forming Compounds for Curing Concrete.
27. ASTM C348 – Standard Test Method for Flexural Strength of Hydraulic - Cement Mortars.
28. ASTM C494/C494M – Standard Specification for Chemical Admixtures for Concrete.
29. ASTM C618 – Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete.
30. ASTM C881/C881M – Standard Specification for Epoxy Resin Base Bonding Systems for Concrete.
31. ASTM C928/C928M – Standard Specification f or Packaged, Dry, Rapid Hardening Cementitious Materials for Concrete Repairs.
32. ASTM C939/C939M – Standard Test Method for Flow of Grout for Preplaced Aggregate Concrete (Flow Cone Method).
33. ASTM C989/C989M – Standard Specification for Slag Cement for Use in Concrete and Mortars.
34. ASTM C1059/C1059M – Standard Specification for Latex Agents for Bonding Fresh to Hardened Concrete.
Lionakis No. 019124.02 03 30 00
January 26, 2024 Cast-In-Place Concrete
Line3xx Page 3
35. ASTM C1064/C1064M – Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete.
36. ASTM C1077 – Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation.
37. ASTM C1107/C1107M – Standard Specification for Packaged Dry, Hydraulic -Cement Grout (Nonshrink).
38. ASTM C1315 – Standard Specification for Liquid Membrane -Forming Compounds Having Special Properties for Curing and Sealing Concrete.
39. ASTM C1602/C1602M – Standard Specification for Mixing Water Used in the Production of Hydraulic Cement Concrete.
40. ASTM D4397 – Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications.
41. ASTM E303 – Standard Test Method for Measuring Surface Frictional Properties Using the British Pendulum Tester.
42. ASTM E329 – Standard Specification for Agencies Engaged in Construction Inspection and/or Testing.
43. ASTM E1155/E1155M – Standard Test Method for Determining FF Floor Flatness and FL Floor Levelness Numbers.
44. ISO/IEC/EN 17025 – General Requirements for the Competence of Testing and Calibration Laboratories (formerly ISO/IEC Guide 25-1990 and ASTM E548).
45. NRMCA – Quality Control Checklist – Section 2.
46. NRMCA – Plant Certification Checklist – Section 3.
1.4 SUBMITTALS
A. General: Submit in accordance with Division 01.
B. Product Data: Submit manufacturer’s descriptive literature and product specification for each product. Include manufacturer’s written instructions and installation procedures.
C. Drawings: Submit concrete pouring plan showing proposed locations of construction and control joints for review by Architect prior to concrete placement.
D. Samples: Submit product samples when requested by Architect or testing laboratory.
E. Quality Assurance/Control Submittals:
1. Certificates:
a. Manufacturer’s Certification of Compliance that materials (cement itious materials , aggregates, and admixtures) conform to specifications.
2. Reference Documents: Maintain one copy of ACI SP-15 on site.
3. Concrete mixture proportions and characteristics for each class/type of concrete used.
03 30 00 Lionakis No. 019124.02
Cast-In-Place Concrete January 26, 2024
4. Concrete mixture proportion data for each class/type of concrete used:
a. Calculation of required average compressive strength and supporting test records. b. Documentation indicating proposed mixture proportions will produce an average compressive strength greater than the required average compressive strength, including field strength test records or trial mixtures. c. Provide documentation in accordance with Concrete Mix Design Submittal Checklist located at the end of this Section.
5. Test Reports.
6. Batch Ticket: Furnish accepted batch tickets at the time of delivery fo r each concrete load. Indicate on each ticket equipment used for measuring and quantities, by weight, of cement, sand, each class of aggregate, admixtures, and amount of water in the aggregate, water added at the batching plant, and any water withheld at the batch plant.
In addition, include mix number, total yield in cubic yards, date, and time of day (dispatch time, plant departure time, site arrival time, unloading start and end time).
7. Concrete Placement Record: Keep a record on site including time and date of concrete placing for each portion of the structure for the duration of t he project. Record additional information not included in batch ticket such as admixtures added at the job site. Make records available to Architect for review. Submit record to Architect at project completion.
8. Protection of Slabs and Foundations: Submit p lans for protection of slabs and foundations, including the following, if applicable:
a. Cold Weather Concreting: Comply with submittal requirements of ACI SPEC-306.1. b. Hot Weather Concreting: Comply with submittal requirements of ACI SPEC-305.1.
F. Closeout Submittals:
1. Concrete placement record.
2. Show location of embedded utilities in record drawings.
1.5 QUALITY ASSURANCE
A. Qualifications:
1. Concrete Supplier: Firm specializing in products specified in this Section with a minimum five years documented experience; successfully suppl ying similar materials (design, content, and performance) as specified in this Section.
2. Concrete Batch Plant: Complies with requirements of ASTM C94 , Sections 9 and 10, and is currently c ertified per NRMCA Plant Certification Checklist - Section 3 or other certification acceptable to Architect.
3. Contractor’s Design Laboratory: Under the direction of civil engineer lice nsed by the State of California; conforming to ASTM E329 and ASTM C1077.
4. Independent Testing Laboratory: Conforming to ASTM E329 , ASTM C1077 , and ISO/IEC/EN 17025, acceptable to Architect.
B. Regulatory Requirements: Conform to requirements of 2022 California Building Code (CBC), Chapter 19, “Concrete”, Chapter 17 “Special Inspections and Tests”, and as follows:
1. Materials:
a. Cementitious Materials: CBC Chapter 19, Section 1903 “Specifications for Tests and Materials”.
Lionakis No. 019124.02 03 30 00
January 26, 2024 Cast-In-Place Concrete
Line3xx Page 5
2. Inspection: CBC Chapter 17, Section 170 5 “Required Special Inspections and Tests ” Article 1705.3 “Concrete Construction”, as applicable.
C. Drying Shrinkage Test: Perform per ASTM C157/C157M modified as follows:
1. Prepare 4 inch x 4 inch x 11 inch prisms with an effective gage length of 10 inches fabricated, cured, dried, and measured per ASTM C157/C157M except tha t specimens shall be removed from molds at an age of 23 hours +/ - 1 hour after trial batching , and shall be placed immediately in water at 73 degrees F +/ - 3 degrees for at least thirty minutes, and shall be measured within thirty minutes thereafter to determine original length and then submerged in saturated lime water at 73 degrees F +/- 3 degrees.
2. Measurement to determine expansion expressed as a percentage of original length shall be made at seven days. This length at seven days shall be the base length for drying shrinkage calculations. Specimens shall then be stored immediately in a humidity control room, maintained at 73 degrees F +/ - three degrees F and fifty percent +/- four percent relative humidity for the remainder of the test.
3. Measurements to determine shrinkage expressed as a percentage of base length shall be made and reported separately for 7, 14, and 21 days of drying after 7 days of moist curing.
D. Quality Control: Comply with NRMCA Quality Control Checklist – Section 2.
E. Materials Quality Assurance: Obtain cement and aggregates from same source for the duration of the work unless specifically accepted by Architect.
F. Pre-Installation Meetings:
1. Conduct pre-installation (pre-pour) meeting in accordance with Division 01.
2. Convene pre-installation (pre-pour) meeting one week prior to commencing work of this Section attended by concrete supplier.
3. Meeting minutes shall be taken and distributed to meeting attendees within three days of meeting.
4. Coordinate work in this Section with work in related Sections.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Comply with requirements of Division 01.
B. Deliver products in manufacturer's original containers, dry and undamaged, with seals and labels intact.
C. Store cement and other cementitious materials in weathertight buildings, bins, or silos which exclude moisture and contaminants and keep building materials completely separated.
D. Arrange and use aggregate stockpiles in a manner to avoid excessive segregation and to prevent contamination with other materials or with other sizes of aggregates. Do not store aggregates directly on ground unless a sacrificial layer is left undisturbed.
E. Refer to manufacturers’ product data sheets for recommended shelf life and storage conditions for admixtures.
F. Clearly and accurately label materials after containers have been opened. 03 30 00 Lionakis No. 019124.02
Cast-In-Place Concrete January 26, 2024
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturers:
1. Master Builders Solutions, Cleveland, OH; 800-228-3318 or 800-433-9517, www.master- builders-solutions.com.
2. Grace Construction Products – W. R. Grace & Co., Cambridge, MA ; 877 -423-6491, www.na.graceconstruction.com.
3. Sika Corporation, Lyndhurst, NJ; 800-933-7452, www.usa.sika.com.
4. Stego Industries, LLC, San Clemente, CA; 877-464-7834, www.stegoindustries.com.
5. The Euclid Chemical Co., Cleveland, OH; 800-321-7628, www.euclidchemical.com.
6. US Mix Products Co., Denver, CO; 800-397-9903, www.usspec.com.
7. W. R. Meadows, Inc., Hampshire, IL; 800-342-5976, www.wrmeadows.com.
B. Substitutions: Manufacturers and products are listed in this Section to establish minimum requirements as to quality and performance. Comply with requirements of Division 01 for substitutions.
2.2 CONCRETE MATERIALS
A. Cementitious Materials:
1. Cement: ASTM C150, Type II, low alkali (equivalent alkalis (Na2O + 0.658K2O) no more than 0.6 percent per ASTM C114), gray.
2. Supplementary Cementitious Materials (SCM):
a. Fly Ash: ASTM C618, Class F. Class C is not permitted. b. Slag Cement: ASTM C989, Grade 100 or Grade 120.
c. Silica Fume: ASTM C1240.
1) MasterLife SF 100 by Master Builders Solutions.
d. Metakaolin: ASTM C618, Class N.
1) MasterLife MK 828 by Master Builders Solutions.
B. Aggregates: Aggregates used in concrete shall have a combined aggregate distribution similar to the aggregates used in the concrete represented by field test data or used in trial mixtures. Fine and coarse aggregates: ASTM C33. Low -shrinkage producing coarse aggregates per ACI PRC-221; and uniformly graded as follows (see following page):
Lionakis No. 019124.02 03 30 00
January 26, 2024 Cast-In-Place Concrete
Line3xx Page 7
Sieve Number or
Size in Inches
Percent Retained by Weight
1-1/2 inch Max. 1 inch Max. 3/4 inch Max.
2 inch 0-5 – –
1-1/2 inch 0-8 0-5 –
1 inch 8-18 0-8 0-5
3/4 inch 8-18 8-18 0-8
1/2 inch 8-18 8-18 8-18
3/8 inch 8-18 8-18 8-18
No. 4 8-18 8-18 8-18
No. 8 8-18 8-18 8-18
No. 16 8-18 8-18 8-18
No. 30 8-18 8-18 8-18
No. 50 0-18 0-18 0-18
No. 100 0-8 0-8 0-8
No. 200 0-8 0-8 0-8
1. Maximum N ominal Size of C oarse Aggregate: CBC Section 1903 “Specifications for Tests and Materials”, and as follows:
a. 1/5 the narrowest dimension between sides of forms,
b. 1/3 depth of slab, or
c. 3/4 the minimum clear spacing between individual reinforcing bars.
2. Aggregate sources shall not contain any alkali-silica reactive material in accordance with ASTM C33, Appendix XI.
C. Water: Potable and complying with ASTM C1602/C1602M.
2.3 ADMIXTURES
A. General:
1. Manufacturer certified to contain no intentionally added chlorides.
2. Compatible with other admixtures and cementitious materials in the concrete mix.
3. Obtain Architect’s written a cceptance prior to use of admixtures. Use admixtures according to manufacturer's written instructions.
B. Water Reducing Admixtures:
1. Normal Range: ASTM C494/C494M, Type A.
a. Acceptable Products:
1) MasterPozzolith Series by Master Builders Solutions. 2) Eucon Series by The Euclid Chemical Co.
3) WRDA 64 by Grace Construction Products.
4) Plastocrete 161 by Sika Corp.
5) Or accepted equal.
03 30 00 Lionakis No. 019124.02
Cast-In-Place Concrete January 26, 2024
2. Mid-Range Water-Reducing: ASTM C494/C494M, Type A or Type F. a. Acceptable Products:
1) MasterPolyheed Series by Master Builders Solutions.
2) Eucon Series by The Euclid Chemical Co.
3) Duracem 55 by Grace Construction Products.
4) Or accepted equal.
3. High Range Water-Reducing: ASTM C494/C494M, Type F or G. a. Acceptable Products:
1) MasterRheobuild 1000 or MasterGlenium Series by Master Builders Solutions. 2) Eucon Series or Plastol Series by The Euclid Chemical Co. 3) Duracem 100 by Grace Construction Products.
4) Sikament 10 ESL by Sika Corp.
5) Or accepted equal.
C. Shrinkage Reducing Admixtures: Reduces dry shrinkage up to 80 percent at 28 days, and up to 50 percent at one year and beyond as tested per ASTM C157/C157M.
1. Acceptable Products:
a. MasterLife SRA Series or MasterLife CRA 007 by Master Builders Solutions. b. Eclipse Floor and Eclipse Plus by Grace Construction Products. c. Eucon SRA Series or Conex by The Euclid Chemical Co. d. Or accepted equal.
D. Retarding Admixtures: ASTM C494/C494M, Type B or Type D.
1. Acceptable Products:
a. MasterSet R Series or MasterSet DELVO Series by Master Builders Solutions. b. Eucon Retarder Series, Eucon DS, or Eucon Stasis by The Euclid Chemical Co. c. Or accepted equal.
E. Accelerating Admixtures: ASTM C494/C494M, Type C or Type E.
1. Acceptable Products:
a. MasterSet AC 534 or MasterSet FP 20 by Master Builders Solutions. b. Accelguard Series by The Euclid Chemical Co.
c. Or accepted equal.
F. Workability-Retaining Admixtures: Shall retain concrete workability without affecting time of setting or early-age strength development. ASTMC494/C494M, Type S.
1. Acceptable Products:
a. MasterSure Z 60 by Master Builders Solutions.
b. Plastol AMP Series by The Euclid Chemical Co.
c. Or accepted equal.
Lionakis No. 019124.02 03 30 00
January 26, 2024 Cast-In-Place Concrete
Line3xx Page 9
G. Permeability-Reducing Admixtures: ASTM C494/C 494M, Type S.
1. Shall be a Portland cement -based crystalline capillary waterproofing admixture that reacts in concrete to form insoluble crystalline hydration products in the capillary pores of concrete.
2. Shall show a reduction in permeability of concrete compared to an identical conc rete mixture without the admixture, when tested in accordance with CRD -C48 at a pressure of 200 psi.
3. Shall reduce or have no penetration of water compared to an identical concrete mixture without the admixture, when tested in accordance with DIN 1048 for a duration of 96 hours.
4. NSF-61 certified.
5. Acceptable Product:
a. MasterLife 300 Series by Master Builders Solutions.
2.4 CURING MATERIALS AND SLAB TREATMENT
A. General:
1. Comply with regulations of the California Air Resources Board and the local Air Pollution Control/Air Quality Management District.
a. VOC Limit: 350 g/L.
2. Verify compatibility with subsequent adhesives and coatings before application; furnish Manufacturer’s certificate of compatibility. Coordinate with related Sections.
B. Curing and Sealing Compound: Select as appropriate for compatibility of subsequent adhesives and coatings.
1. Acrylic emulsion blend; meets or exceed ASTM C309, Type 1, Class B. a. Acceptable Products:
1) MasterKure CC 160WB by Master Builders Solutions.
2) Diamond Clear VOX by The Euclid Chemical Co.
3) Vocomp 20 by W. R. Meadows, Inc.
4) US SPEC Hydrasheen 15% by US Mix Products Co.
5) Or accepted equal.
C. Waterproof Sheet Materials for Curing: ASTM C171 and as follows:
1. Curing paper consisting of two sheets of kraft paper adhered together with a bituminous material with embedded cords or strands of fiber running in both directions not more than 1-1/4 inches apart.
a. Tensile strength in machine direction: Thirty foot-pounds per inch of width minimum. b. Tensile strength in cross direction: Fifteen foot-pounds per inch of width minimum.
2. Polyethylene Film: ASTM D4397; minimum six mil thickness.
3. White burlap -polyethylene sheeti ng: C onsisting of burlap weighing not less than nine ounces per square yard extrusion coated on one side with at least four mil white opaque polyethylene sheet.
03 30 00 Lionakis No. 019124.02
Cast-In-Place Concrete January 26, 2024
D. Evaporation Retarder: Water-based polymer concentrate, readily dilutable in water.
1. Acceptable Products:
a. MasterKure ER50 by Master Builders Solutions.
b. Eucobar by The Euclid Chemical Co.
c. US SPEC Monofilm ER by US Mix Products Co.
d. Or accepted equal.
E. Surface Retarder : Water soluble liqu id, formulated to retard wet surface of mortar in concrete.
1. Acceptable Products:
a. MasterFinish EA by Master Builders Solutions.
b. Sure Etch Series by The Euclid Chemical Co.
c. Rugasol-S by Sika Corp.
d. Or accepted equal.
2.5 GROUTING, BONDING, AND PATCHING MATERIALS
A. Grout:
1. Non-shrink Grout: ASTM C1107, non -metallic aggregate grout; 7000 psi minimum 28- day compressive strength at fluid water ratio per ASTM C939. a. Acceptable Products:
1) MasterFlow 928 by Master Builders Solutions.
2) NS Grout, Hi-Flow Grout, or Euco Pre-Cast Grout by The Euclid Chemical Co. 3) US SPEC MP Grout by US Mix Products Co.
4) Or accepted equal.
2. Non-shrink Drypack Grout: Non-shrink, natural aggregates, 7000 psi minimum 28-day compressive strength.
a. Acceptable Products:
1) MasterFlow 100 by Master Builders Solutions.
2) Dry Pack Grout by The Euclid Chemical Co.
3) Sealtight Pac-it by W.R. Meadows, Inc.
4) Or accepted equal.
B. Bonding Materials:
1. Bonding Agent/Admixture:
a. Interior or exterior applications: Acrylic or SBR , latex cement bonding agent/admixture; non-re-emulsifiable; meets or exceeds ASTM C1059, Type II. 1) Acceptable Products:
a) Akkro-7T, Flex-Con, or SBR Latex by The Euclid Chemical Co. b) US SPEC Acrylcoat by US Mix Products Co.
c) Sealtight Acry-Lok by W. R. Meadows, Inc.
d) Or accepted equal.
Lionakis No. 019124.02 03 30 00
January 26, 2024 Cast-In-Place Concrete
Line3xx Page 11
b. Interior applications or exterior applications not subject to constant water immersions: Ethyl-vinyl acetate (EVA ) copolymer liquid bonding agent and admixture; re-emulsifies once and will not re-wet; meets or exceeds ASTM C1059. 1) Acceptable Products:
a) Tammsweld by The Euclid Chemical Co.
b) US SPEC Multicoat by US Mix Products Co.
c) Or accepted equal.
2. Structural Bonding Ep oxy Adhesive: Two component, 100 percent solids, 100 percent reactive; meets or exceeds ASTM C881/C881M, Type II, Grade 2, Class B or C as appropriate.
a. Acceptable Products:
1) MasterEmaco ADH 1090RS, MasterEmaco ADH 1420, or MasterEmaco ADH 327RS by Master Builders Solutions.
2) Dural 452 MV by The Euclid Chemical Co.
3) Sealtight Rezi-Weld 1000 by W. R. Meadows, Inc.
4) Or accepted equal.
C. Self-Leveling Underlayment: Portland cement base d, self -leveling 1 inch thick to featheredge. Fast setting – minimum compressive strength 2200 psi after one day; minimum 4000 psi compressive strength at 28 days per ASTM C109.
1. Acceptable Products:
a. K-15 Self-Leveling Underlayment Concrete by ARDEX Engineered Cements. b. MasterTop 110 SL by Master Builders Solutions.
c. Flo-Top or EucoFloor SL 160 by The Euclid Chemical Co. d. US SPEC Self-Leveling Underlayment by US Mix Products Co. e. Or accepted equal.
D. Repair Mortar: Exceeds ASTM C928, R1 and R2; rapid settin g – minimum 1300 psi at three hours; 5500 psi at seven days per ASTM C109.
1. Acceptable Products:
a. MasterEmaco T 415/430 or MasterEmaco T 1060/1061 Repair Mortars by Master Builders Solutions.
b. Euco-Speed, Versaspeed, or Speedcrete 2028 by The Euclid Chemical Co. c. US SPEC Transpatch by US Mix Products Co.
d. Or accepted equal.
E. Repair Mortar (for patching over steel): Liquid polymer modified, containing an integral corrosion inhibitor, exceeds C928, R2; rapid setting – minimum compressive strength 1500 psi at one day; 3500 psi at seven days; 5000 psi at 28 days per ASTM C109.
1. Acceptable Products:
a. MasterEmaco N 420CI or MasterEmaco T 310CI by Master Builders Solutions. b. Concrete-Top Supreme by The Euclid Chemical Co.
c. US SPEC H2 by US Mix Products Co.
03 30 00 Lionakis No. 019124.02
Cast-In-Place Concrete January 26, 2024
d. Sikatop 122 Plus by Sika Corp.
e. Or accepted equal.
F. Epoxy Joint Filler: Two component, 100 percent solids, semi -rigid epoxy; hardness:
minimum 75 Shore A per ASTM D2240.
1. Acceptable Products:
a. MasterSeal CR 190 by Master Builders Solutions.
b. Euco 700 by The Euclid Chemical Co.
c. Sikadur 51 NS by Sika Corp.
d. Or accepted equal.
G. Polyurea Joint Filler: Two component, 100 percent solids, UV resistant, semi -rigid polyuria; hardness: minimum 80 Shore A per ASTM D2240. Color as selected by Architect from manufacturer’s full range of standard colors.
1. Acceptable Products:
a. Euco QWIKjoint UVR by The Euclid Chemical Co.
b. MasterSeal CR 100 by Master Builders Solutions.
c. Or accepted equal.
2.6 CONCRETE MIX
A. General:
1. Proportion concrete design mixes per ACI SPEC-301 Section 4.2.3 and ACI CODE-318 Section 26.4.3.
2. Proportion c oncrete design mixes per ACI , prepared and tested by an independent testing laboratory acceptable to Architect prior to design mix approval. For each mix design, prepare and perform tests as follows:
a. Drying shrinkage test per modified ASTM C157/C157M as specified in this Section; provide at least three test specimens. Drying shrinkage test not required for below grade concrete.
3. Proportioning without field experience or trial mixtures may be pe rmitted with written approval from Architect, where concrete manufacturer can establish the uniformity of its production for concrete of similar type and strength based on recent test data in accordance with ACI CODE-318, Chapter 26, Article 26.4.4 “Documentation of Concrete Mixture Characteristics”.
4. Proportion concrete design mix to attain compressive strength as specified below and as needed, with early strength to meet Contractor’s work program.
B. Mix Designs: Refer to Structural Drawings for mix design requirements.
1. Maximum Water Content: 300 pounds per cubic yard.
2. Water- Cementitious Materials Ratio: Refer to Drawings.
3. Maximum Drying Shrinkage: 0.048 percent as tested per modified ASTM C157/C15 7M as specified in this Section after 7 days moist curing plus 21 days drying. This requirement does not apply to below grade concrete.
Lionakis No. 019124.02 03 30 00
January 26, 2024 Cast-In-Place Concrete
Line3xx Page 13
C. Admixtures:
1. Use specified admixtures as acceptable to Architect. Verify compatibility of concrete admixtures when using multiple admixtures.
2.7 CONCRETE MIXING
A. Concrete shall be mixed per ACI PRC-304.
2.8 SOURCE QUALITY CONTROL
A. Owner shall employ a testing laboratory accepted by Architect to perform the following:
1. Review mix designs and certificates of compliance for materials Contractor proposes to use.
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine and verify the following prior to concrete placement.
1. Forms are erected, adequately braced, sealed, lubricated (if required), and bulkhead provided where placing is to stop.
2. Thoroughly water soak wood forms other than plywood at least twelve hours before concrete placement.
3. Steel reinforcement are accurately positioned, securely tied and braced. Verify concrete cover requirements.
4. Coordination with related work is completed.
5. Anchors and embedded items are in position, securely held and braced.
6. Construction joints and previously placed concrete are prepared as specified.
7. Compliance with cold-weather or hot-weather requirements.
8. Compliance with cleaning and preparation requirements.
B. Report unacceptable conditions to Architect. Begin instal lation only when unacceptable conditions have been corrected.
C. Concrete formwork, reinforcement, inserts, and embedded items are subject to Architect’s acceptance. Notify Architect at least 48 hours prior to concrete placement.
3.2 PREPARATION
A. Refer to Section 03 20 00 for reinforcing steel preparation.
3.3 PLACING CONCRETE
A. Place concrete in accordance with ACI SPEC-301 and as specified in this Section.
1. Concrete construction tolerances shall be per ACI SPEC-301.
03 30 00 Lionakis No. 019124.02
Cast-In-Place Concrete January 26, 2024
B. Add no water during delivery and at the project site unless spe cifically accepted by Architect. If water is withheld at batch plant, indicate in delivery ticket the design water for accepted mix, moisture content of aggregates, and free water added at batch plant. If total water added at plant is less than design water to attain slump of accepted mix design, water may be added to concrete at job site, not to exceed the design water content , subject to the limitations specified in ASTM C94/C94M. If additional slump is required, use water reducing admixture.
C. Discharge mixed concrete within 1 -1/2 hours after the introduction of mixing water to the cement and aggregates. Reduce this time to 45 minutes when the concrete temperature exceeds 85 degrees F , unless appropriate measures as specified in ACI SPEC-305.1 are taken to maintain slump and temperature of concrete . Slump and concrete temperature can be maintained within limits longer with the use of retarding admixtures or hydration -control admixtures.
D. Place concrete within fifteen minutes after it ha s been discharged from the mixer. Handle concrete from mixer to forms in a continuous manner.
E. Deposit concrete as close as possible to its final position in the forms, with no vertical drop greater than five feet except where suitable equipment is provided to prevent segregation and where specifically authorized.
F. Deposit concrete continuously or in layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If concrete cannot be pla ced continuously, provide construction joints as specified. Deposit concrete to avoid segregation.
G. Deposit concrete in forms in horizontal layers no deeper than 24 inches and in a manner to avoid inclined construction joints. Place each layer while precedi ng layer is still plastic to avoid cold joints.
H. Pumping concrete, when specifically accepted, may be conveyed by positive displacement pump such as pi ston or squeeze pressure type; pneumatic placing equipment is not permitted. Use rigid steel pipe or heavy -duty flexible hose with an inside diameter at least three times the nominal maximum -size coarse aggregate, but not less than 4 inches.
Aluminum pipe is not allowed.
I. Provide adequate scaffolding, ramps and walkways in a manner so that personnel and equipment are not supported by in-place reinforcement.
J. Consolidation: Consolidate placed concrete with mechanical vi brating equipment per ACI SPEC-301.
1. Consolidate each layer of concrete immediately after placing using internal vibrators, except for slabs 4 inches thick or less.
2. Insert and withdraw vibrators vertically at uniformly spaced location no farther than the visible effectiveness of the vibrator. Hold vibrator stationary and slowly withd raw vertically while operating.
3. Do not use vibrators to transport concrete inside forms.
4. Place vibrator to rapidly penetrate placed layer and at least 6 inches into preceding layer. Do not insert vibrators into lower layers that have begun to lose plasticity. Limit vibration duration to time necessary to consolidate co ncrete and complete embedment of reinforcement and other embedded items without causing mix to segregate.
Lionakis No. 019124.02 03 30 00
January 26, 2024 Cast-In-Place Concrete
Line3xx Page 15
K. Concrete Floors and Slabs : Deposit and consolidate concrete for floors and slabs in a continuous operation within limits of construction joints until placement of a panel or section is complete.
1. Consolidate concrete during placement so concrete is thoroughly worked around reinforcement and other embedded items and into corners.
2. Maintain reinforcement in position on chairs during concrete placement.
3. Screed slab surfaces with a straightedge and strike off to correct elevations.
4. Slope exterior surfaces for drainage as directed, unless otherwise shown.
L. Hot Weather Concreting: Place concrete according to ACI SPEC-305.1 and as follows:
1. Cool components before mixing to maintain concrete temperature below 85 degrees F at time of placement. Chilled mixing water or chopped ice may be used to control temperature. Calculate and include water equivalent of ice in designed water cement ratio.
2. Cover steel reinforcement with water-soaked burlap so steel temperature will not exceed ambient air temperature immediately before embedding in concrete.
3. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade moisture uniform without standing water, soft spots, or dry areas.
4. Protect concrete from surface drying; moisture loss from concrete in plastic state shall be maintained below 0.1 pounds per square foot per hour. Methods may include, but are not limited to: evaporation retardant, sun shades, wind breaks, and fog misting.
M. Cold Weather Concreting: Place concrete according to ACI SPEC-306.1 and as follows:
1. Protect concrete work from physical damage or reduced strength as a result of frost, freezing, or low temperatures.
2. When ambient temperature is expected to fall below 40 degrees F, uniformly heat water and aggregates before mixing to obtain a concrete mixture temperatur e of not less than 50 degrees F and not more than 75 degrees F.
3. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade.
4. Do not incorporate calcium chloride, salt or other materials containing antifreeze agents into the concrete mix.
5. Upon Architect’s written a cceptance and subject to prior approval of mix desi gn, accelerating admixtures, containing no calcium chloride, as specified in this Section may be used.
3.4 JOINTS
A. General: Construct joints true to line with faces perpendicular to surface plane of concrete, unless otherwise indicated on Drawings.
B. Construction Joints: Locate and install joints as indicated on Drawings or as accepted by Architect, and in a manner that strength and appearance of concrete are not impaired.
1. Comply with ACI CODE-318.
2. Place joints perpendicular to main reinforcement. Continue reinforcement across construction joints unless otherwise indicated.
03 30 00 Lionakis No. 019124.02
Cast-In-Place Concrete January 26, 2024
3. Expose concrete aggregates, a minimum of 1/4 inch depth, creating a rough surface using a surface retardant. Within 24 hours after placing concrete, remove retarded surface mortar using either high pressure water jetting or stiff brushing or a combination of both to expose coarse aggregate. A rough surface of exposed aggregate may also be produced by sandblasting followed by high pressure water jetting.
4. Where new concrete joins existin g concrete (concrete more than sixty days old), clean and roughen existing concrete to expose coarse aggregate. Coat with epoxy bonding compound prior to placing new concrete.
3.5 FORMED SURFACES FINISHING
A. Leave texture imparted on formed concrete surface, unless otherwise specified, except that defective surfaces shall be repaired. Repair defective concrete as specified in this Section.
B. Maintain uniform color of the concrete, unless painting of surfaces is required, by using only one mixture without changes in material or proportions for any structure or portion of structure exposed to public view.
3.6 CONCRETE FLOORS AND SLABS FINISHING
A. Comply with ACI PRC-302.2 and as specified in this Section. Comply with flatness and levelness tolerance requirements of this Section.
B. Trowel Finish:
1. After floating is complete and after surface moisture has disappeared, apply trowel finish using a power -driven trowel or hand trowel if ar ea is small or inaccessible to power - driven trowel.
2. Steel trowel to a smooth, even, dense finish, free of blemishes including trowel marks.
3. Apply final steel troweling by hand.
C. Broom Finish:
1. After floating, lightly trowel surface and then carefully score b y pulling a broom across the surface. Use appropriate type of broom to achieve texture specified.
2. Broom as indicated or as directed by Architect. Where not specifically indicated, broom transverse to traffic or at right angles to the slope of the slab.
3. Adding water to facilitate brooming is not permitted.
4. Exterior ramps, walks, and slabs: Apply a slip-resistant finish as follows:
a. Where slope is six percent or greater: Heavy broom finish with at least 0.8 coefficient of friction per ASTM E303.
b. Where slope is less than six percent: Medium broom finish with a minimum 0.6 coefficient of friction per ASTM E303.
D. Floor and Slab Flatness and Levelness Tolerance: Determine flatness and levelness of floor slabs using the F -Number System in accordance with ASTM E1155 using the inch -pound system of units. Calculate F-Numbers as follows:
1. Definitions:
a. Face Flatness Number (F F): The maximum slab curvature allowed over 24 inches computed on the basis of successive 12 inch elevation differentials.
Lionakis No. 019124.02 03 30 00
January 26, 2024 Cast-In-Place Concrete
Line3xx Page 17
b. Face Levelness Number (FL): The relative conformity of the slab surface to a horizontal plane as measured over a ten foot distance.
2. These floor flatness and floor levelness tolerances apply to concrete slabs-on-ground. At raised slabs, only the floor flatness tolerance applies.
3. Sampling Requirements: As described in ACI SPEC-117.
4. Calculations:
FF =
4.57 Maximum difference in elevation (in decimals of inches) between successive 12 inch elevation differences.
FL =
12.5 Maximum difference in elevation (in decimals of inches) between two points 10 feet apart.
5. Tolerances, unless noted otherwise:
a. Trowel finish surfaces on ground: FF 25; FL 20 (overall tolerance values). b. Float finish surfaces on ground: FF 20; FL 17 (overall tolerance values). c. Float finish surfaces at roof: FF 20; FL 17 (overall tolerance values). d. Trowel finish surfaces for concrete fill over steel deck and elevated structural concrete slabs: FF 25.
1) Depressions in floors between high spots shall not be greater than 5/16 inch below a 10 foot long straight edge.
2) Top of concrete surface elevation shall not vary by more than ±3/4 inch from the average elevation.
e. Minimum local tolerance (1/2 bay or as designated by Architect): 2/3 of specified tolerance values.
6. Refer to Article 3.9 of this Section for remedial work required for out -of-tolerance concrete.
3.7 CURING AND PROTECTION
A. Protect freshly placed concrete from premature drying, rapid temperature change, mechanical injury , and injury f rom flowing water for a curing period not less than seven days. Comply with ACI SPEC-306.1 for cold -weather protection and ACI SPEC-305.1 for hot-weather protection during curing.
B. Curing Methods:
1. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer’s written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and re pair damage during curing period.
a. If curing compound is applied using a hand held, pump -up sprayer, it shall be back - rolled using a short nap roller.
03 30 00 Lionakis No. 019124.02
Cast-In-Place Concrete January 26, 2024
2. Moist Curing: Keep surfaces in a moist condition for not less than seven days using water saturated abso rptive cover (burlap -polyethylene sheeting) kept wet continuously.
Cover concrete completely in widest practicable width, with sides and ends lapped at least 12 inches , and sealed with waterproof tape or adhesive . Immediately repair and maintain rips and tears and keep traffic away from surface during curing period.
3. Ponding or Immersion: Continuously immerse concrete throughout the curing period in water not more than twenty degrees below the temperature of the concrete.
C. Concrete in Forms: Keep forms and ex posed concrete surfaces covered and continuously moist. Provide soaker hoses at top of walls or other accepted means of keeping concrete and forms wet while forms remain in place. If forms are removed before end of curing period, continue curing by methods described in this Section.
D. Floors and Slabs:
1. Evaporation Retarder: Apply evaporation retarder to floors and slabs if hot, dry, or windy conditions cause moisture loss of 0.1 pounds per square foot per hour before and during finishing operations. Apply according to manufacturer’s written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.
2. Cure by application of curing and sealing compound or by moist curing.
3. Begin curing as soon as free water has disapp eared f rom the concrete surface after placing and final finishing.
E. Protection:
1. Protect concrete surfaces from damage by tools, equipment, materi als, and construction activity.
2. Traffic, shoring, or loading will not be permitted on concrete surface until it has sufficiently hardened to prevent injury to finish and strength.
3. Protect all flat work and other surfaces as required with full board of plywood coverings as necessary.
3.8 REMOVAL OF FORMS
A. Formwork for sides of curbs and similar parts of the Work that does not support weight of concrete may be removed after cumulativel y curing at not less than 50 degrees F for 48 hours after placing concrete provided concrete is hard enough not to be damaged by form - removal operations and provided curing and protection operations are maintained.
3.9 CONCRETE REPAIRS
A. General: Comply with ACI SPEC-301 as follows:
1. Completed concrete work shall conform to applicable requirements of this Section and Contract Documents.
2. Concrete work that fails to meet one or more requirements of the Contract Documents but subsequently is repaired to bring the concrete into compliance will be acceptable.
3. Concrete work that fails to meet one or more requirements of the Contract Documents and cannot be brought into compliance with the Contract Documents is subject to rejection.
Lionakis No. 019124.02 03 30 00
January 26, 2024 Cast-In-Place Concrete
Line3xx Page 19
4. Repair rejected concrete work by removing and replacing or by additional construction to strengthen or otherwise satisfy project requirements as directed by Architect. To bring rejected Work into compliance, use repair methods that meet applicable requirements for function, durability, dimensional tolerances, and appearance as determined by Architect.
5. Submit proposed repair methods, materials, and modifications needed to repair concrete work to meet the requirements of the Contract Documents.
6. Contractor shall be responsible to bring concrete work into compliance with requirements of Contract Documents.
B. Defective Concrete: Repair and patch defective concrete work and concrete not conforming to required lines, details, and elevations. Use materials and methods specified in this Section as accepted by Architect. Serious defects, defects affecting structural strength, or unsatisfactory patching may be cause for complete removal and replacement of concrete.
C. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycombs, rock pockets, fins and other projections on the surface stains and other discolorations that cannot be removed by cleaning.
1. Immediately after form removal, cut out honeycomb, rock pockets, and voids more than 1/2 inch in any direction in solid concrete. Make edges of cuts perpendicular to concrete surface. Clean, dampen with water, and brush -coat holes and voids with bonding agent.
Fill and compact with drypack grout before bonding agent has dried.
2. Repair defects on surfaces exp osed to view by blending white P ortland cement and standard Portland cement so that, when dry, repair mortar will match surrounding color.
Patch a te st area at inconspicuous location to verify mixture and color match before proceeding with patching. Compact mortar in place and strike off slightly higher than surrounding surface.
3. Repair defects on concealed, formed surfaces that affect concrete’s durabi lity and structural performance as determined by Architect.
D. Repairing Unformed Surfaces: Test unformed surfaces, such as floors and slabs, for finish and verify tolerances specified for each surface. Correct low and high areas. Test surfaces sloped to drain for trueness of slope and smoothness.
1. Repair defective finished surfaces including spalls, popouts, honeycombs, rock pockets, crazing and cracks in excess of 0.01 inch wide or that penetrate to reinforcement or completely through unreinforced section reg ardless of width, and other objectionable conditions.
2. After concrete has cured fourteen days, correct high spots by grinding.
3. Correct localized low areas during or immediately after completing surface finishing operations by cutting out low areas and replacing with patching mortar. Finish areas to blend into adjacent concrete.
4. Repair defective areas, except random cracks and single holes 1 inch or less in diameter, by cutting out and replacing with fresh concrete. Remove defective areas with clean, square cuts and expose steel reinforcement with at least 3/4 inch clearance all around. Dampen concrete surface in contact with patching concrete and apply bonding agent. Mix patching concrete of same materials and mix as original concrete. Place , compact, and finish to blend with adjacent finished concrete.
03 30 00 Lionakis No. 019124.02
Cast-In-Place Concrete January 26, 2024
5. Repair random cracks and single holes 1 inch or less in diameter with drypack grout.
Groove top of cracks and cut out holes to sound concrete and clean off dust, dirt, and loose particles. Dampen cleaned concrete surfaces and apply bonding agent. Place drypack grout before bonding agent has dried. Compact and finish grouted areas to match adjacent concrete.
E. Moist cure patches and repairs for at least 72 hours.
F. Perform concrete structural repairs subject to Architect’s acceptance.
3.10 FIELD QUALITY CONTROL
A. General: Comply with requirements of Division 01.
B. Testing Service: Owner will select and pay for independent testing agency.
C. Strength Test Specimen Cylinders: Conduct sampling, curing, and testing per ASTM C172, ASTM C31/C31M, and ASTM C39/C39M. Contractor shall provide molds required for strength test cylinders. Test samples shall be taken at the point of concrete placement.
1. Frequency: Samples for strength tests of each class of concrete placed each day shall be taken not less than once a day, nor less than once for each 150 cubic yards of concrete, nor less than once for each 5000 square feet of surface area for slabs or walls.
2. A strength test shall be the average of the strengths of at least two 6 inch by 12 inch cylinders or at least three 4 inch by 8 inch cylinders made from the same sample of concrete and tested at the test age designated for the determination of concrete compressive strength.
3. Cylinder Label and Records: Mark and date each test cylinder . Maintain records of test specimen cylinders and send copies to Contractor, Architect, and Owner. Record the following information:
a. Cylinder identification mark.
b. Date made.
c. Concrete supplier.
d. Slump/slump flow.
e. Specified concrete design strength.
f. Pour location and type of structural member.
g. Compressive strength test date and age.
h. Admixtures added to concrete mix.
4. Compressive Strength Tests: Test laboratory cured specimens at the following ages and report compressive strengths as follows:
a. 7 days where early compressive strength is required. b. 28 days.
c. 56 days when concrete with SCM is used.
d. Hold specimens for one strength test in reserve.
5. Test Reports: Furnish copies of test reports directly from testing agency to Contractor, Architect, Project inspector, and Owner.
Lionakis No. 019124.02 03 30 00
January 26, 2024 Cast-In-Place Concrete
Line3xx Page 21
D. Slump Test: ASTM C143/C143M. Conduct slump testing when test cylinders are made and additionally for every 15 0 cubic yards of concrete. Perform additional tests when concrete consistency appears to change. Slump not meeting slump indicated in accepted mix design (± one inch) will be rejected. Contractor shall provide slump cones.
E. Density: ASTM C138/C138M. Conduct density testing when test cylinders are made.
F. Concrete Temperature: ASTM C1064/C1064M. Check concrete temperature when test cylinders are made and every hour when ambient temperature is below 40 degrees F or above 90 degrees F.
G. In the event the cylinders tested do not meet the required concrete design strength, conduct core tests and additional tests or inspections as required by Architect to ascertain strength of placed concrete. Costs for additional tests and inspections shall be borne by Contractor.
H. Floor Flatness/Levelness: Provide verification of Floor and Slab Flatness and Levelness as indicated in Article 3.6.E of this Section. Furnish copies of report directly from testing agency to Contractor, Architect, Project Inspector, and Owner.
END OF SECTION
Concrete Mixture Design Submittal Checklist
Specify Use: All mix designs must clearly note the concrete type or use. (i.e. footings, slab on grade, site concrete)
Mix Design: Provide concrete mixture designs with proportions and characteristics including all admixtures.
Gradation: Provide combined aggregate gradation by weight for all course and fine aggregates.
Weight: Provide dry unit weight of mix. Normal weight concrete shall be limited to 145 PCF.
Material Certificates: Provide supplier’s certification that materials conform to specifications. This includes aggregates, admixtures, and cementitious materials such as cement, fly ash, silica fume, slag cement, and metakaolin.
Product Data: Provide product literature for each product and admixture used. Include manufacturer’s specification, written instructions, and installation procedures.
Required SCM: Mix design must contain the percentage of supplementary cementitious materials noted in mix design table of the specifications.
Admixtures: Where multiple admixtures are used, provide a letter from all manufacturers indicating there are no compatibility problems or adverse effects resulting from combination of products.
Shrinkage: Provide shrinkage test per modified ASTM C157/C157M at 21 days.
Shrinkage test must be for the same mix specified or a similar mix with the same water cement ratio and aggregate source. (Exception: shrinkage testing is not required for below grade concrete)
Testing / Proportion Method: Concrete must be proportioned per the requirements of ACI SPEC-301-20. Indicated method used and provide complete test data and documentation for the chosen proportion method.
Lionakis No. 019124.02 05 12 00
January 26, 2024 Structural Steel Framing
Line3xx Page 1
SECTION 05 12 00
STRUCTURAL STEEL FRAMING
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Structural steel framing and support members.
B. Base plates.
C. Grouting under base plates.
1.2 RELATED SECTIONS
A. Section 03 20 00 – Concrete Reinforcing.
B. Section 03 30 00 – Cast-In-Place Concrete.
C. Section 05 31 00 – Steel Decking.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. AISC 303-16 – Code of Standard Practice for Steel Buildings and Bridges.
2. ANSI B18.22.1 – Plain Washers.
3. ANSI B18.23.1 – Beveled Washers.
4. ASTM A6/A6M – Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling.
5. ASTM A36/A36M – Standard Specification for Carbon Structural Steel.
6. ASTM A53/A53M – Standard Specification for Pipe, Steel, Black and Hot -Dipped, Zinc-Coated, Welded and Seamless.
7. ASTM A108 – Standard Specification for S teel Bar, Carbon and Alloy, Cold - Finished.
8. ASTM A123/A123M – Standard Specification for Zinc (Hot -Dip Galvanized) Coatings on Iron and Steel Products.
9. ASTM A307 – Standard Specification for Carbon Steel Bolts and Studs, 60,000 PSI Tensile Strength.
10. ASTM A500 – Standard Specification for Cold -Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes.
11. ASTM A563 – Standard Specification for Carbon and Alloy Steel Nuts. 05 12 00 Lionakis No. 019124.02
Structural Steel Framing January 26, 2024
12. ASTM A572/A572M – Standard Specification for High-Strength Low -Alloy Columbium - Vanadium Structural Steel.
13. ASTM A780/A780M – Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings.
14. ASTM A992 – Standard Specification for Structural Steel Shapes.
15. ASTM F436 – Standard Specification for Hardened Steel Washers.
16. ASTM F844 – Standard Specification for Washers, Steel, Plain (Flat), Unhardened for General Use.
17. ASTM F959 – Standard Specification for Compressible -Washer-Type Direct Tension Indicators for Use with Structural Fasteners.
18. ASTM F1554 – Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength.
19. ASTM F3125 - Standard Specification for High Strength Structural Bolts and Assemblies, Steel and Alloy Steel, Heat -Treated, 120/150 ksi Minimum Tensile Strength.
20. AWS A2.4 – Standard Symbols for Welding, Brazing, and Nondestructive Examination.
21. AWS D1.1 – Structural Welding Code – Steel.
22. AWS D1.4 – Structural Welding Code – Reinforcing Steel.
23. AWS D1.8 – Structural Welding Code – Seismic Supplement.
24. AWS D2.0 – Specifications for Welded Highway and Railway Bridges.
25. RCSC – Specification for Structural Joints Using High Strength Bolts.
26. SSPC – Steel Structures Painting Manual, Volumes 1 and 2.
1.4 SUBMITTALS
A. Submit under provisions of Division 01.
B. Shop Drawings:
1. Pages of electronic submittals shall be labeled and bookmarked. Bookmark naming shall match the naming of corresponding shop drawing sheets.
2. Indicate profiles, sizes, spacing, and locations of structural members, attachments, fasteners, and required connections, including connections not detailed on Drawings.
3. Indicate welded connections with AWS A2.4 welding symbols. Indicate net weld lengths.
4. Clearly distinguish between shop and field bolts and welds.
C. Manufacturer's Mill Certificate: Submit Manufacturer's Certificates under provisions of Division 01, certifying that steel, fasteners and welding electrodes meet or exceed specified requirements.
D. Mill Test Reports: Submit Manufacturer's Reports under provisions of Division 01, indicating structural strength, destructive and non-destructive test analysis and ladle analysis.
E. Submit product data for type of metal primer proposed for use.
Lionakis No. 019124.02 05 12 00
January 26, 2024 Structural Steel Framing
Line3xx Page 3
F. Welders' Certificates: Submit certificates under provisions of Division 01, certifying welders employed on the Work, verifying AWS qualifications within the previous twelve months.
1. Welders who have not performed welding for period of three or more months shall be requalified.
2. Welders whose work fails to pass inspection shall be requalified before performing further welding.
3. Contractor shall pay costs of certifying qualifications.
G. Welding Procedures: Submit proposed Welding Procedure Specifications (WPS). Where WPS is not prequalified by AWS D1.1, submit supporting Performance Qualification Records (PQR).
H. Qualification Data: For qualified Fabricator and Installer.
1.5 DEFINITIONS
A. Structural Steel: Elements of structural -steel frame, as classified by AISC 303, Code of Standard Practice for Steel Buildings and Bridges.
B. Seismic-Force-Resisting System: Elements of structural -steel frame designated as " SFRS" or along grid lines designated as " SFRS" on Drawings, including columns, beams, and braces and their connection.
C. Heavy Sections: Rolled and built-up sections as follows:
1. Shapes included in ASTM A6/A6M with flanges thicker than 1-1/2 inches.
2. Welded built-up members with plates thicker than 2 inches.
3. Column base plates thicker than 2 inches.
D. Protected Zone: Structural members or portions of structural members indicated as "Protected Zone" on Drawings. Connections of structural and nonstructural elements to protected zones are limited.
E. Demand Critical Welds: Those welds, the failure of which would result in significant degradation of the strength and stiffness of the Seismic -Force-Resisting System and which are indicated as "Demand Critical" on Drawings.
1.6 QUALITY ASSURANCE
A. Fabricate structural steel membe rs in accordance with the AISC Specification for Structural Steel Buildings, Code of Standard Practice for Steel Buildings and Bridges and Quality Criteria and Inspection Standards.
B. Fabricator Qualifications: Company specializing in performing the work of this Section with sufficient documented experience.
C. Installer (Erector) Qualifications: Company specializing in performing the work of this Section.
1.7 REGULATORY REQUIREMENTS
A. Conform to 2022 California Building Code (CBC), Chapter 16 “Structural Design” , Chapter 22 “Steel", and Chapter 17 “Special Inspections and Tests”. 05 12 00 Lionakis No. 019124.02
Structural Steel Framing January 26, 2024
B. Materials:
1. Material identification per CBC Chapter 22, Section 2202.1.
2. Protection of structural steel per CBC Chapter 22, Section 2203.1.
1.8 FIELD MEASUREMENTS
A. Verify that field measurements are as shown on shop drawings.
B. Coordinate fabrication and delivery of structural steel items with concrete work and with all other trades to permit such items to be built into the structure without delay.
1.9 DELIVERY, STORAGE AND HANDLING
A. Delivery of Materials to be Installed Under Other Sections: Anchor bolts and other anchorage devices which are embedded in cast -in-place concrete construction shall be delivered to the project site in time to be installed before start of cast -in-place concrete operations.
B. Storage of Materials:
1. Structural steel members to be stored at the Project site shall be placed above ground , on platforms, skids or other supports.
2. Steel shall be protected from corrosion.
3. Other materials shall be stored in a watertight, dry place until ready for installation in the Work.
4. Packaged materials shall be stored in their original package or container.
5. Do not store materials on the structure in a manner that m ight cause distortion or damage to members of supporting structures. Repair or replace damaged materials or structure as directed by Architect.
PART 2 PRODUCTS
2.1 MATERIALS
A. Structural Steel Members:
1. ASTM A992 Grade 50 for wide flange and WT shapes.
2. ASTM A36/A36M or A572 Grade 50 for plates, as noted on Drawings.
3. ASTM A36/A36M for channels, angles and all other shapes.
B. HSS:
1. Tubing: ASTM A500, Grade C.
2. Round: ASTM A500, Grade C.
C. Pipe: ASTM A53/A53M, Type E or S, Grade B.
D. Bolts and Nuts: ASTM A307, Grade A, with ASTM A5 63, Grade A, hex nuts ; ASTM F3125, Grade A325N, Type 1, with ASTM A563, Grade C, heavy hex nuts ; anchor bolts, ASTM F1554, grade as indicated on Drawings.
Lionakis No. 019124.02 05 12 00
January 26, 2024 Structural Steel Framing
Line3xx Page 5
E. High-Strength Bolts, Nuts, and Washers: ASTM F3125, Type 1, heavy hex steel structural bolts; ASTM A563 heavy hex carbon-steel nuts.
F. High-Strength Bolts, Nuts, and Washers: ASTM F3125, Type 1, heavy hex steel structural bolts or tension -control, bolt-nut-washer assemblies with splined ends; ASTM A563 heavy hex carbon-steel nuts; and ASTM F436 hardened carbon-steel washers, plain.
G. Tension-Control, High-Strength Bolt-Nut-Washer Assemblies: ASTM F3125, Type 1, heavy hex head or round head steel structural bolts with splined ends; ASTM A563 heavy hex carbon-steel nuts; and ASTM F436 hardened carbon-steel washers.
H. Welding Materials:
1. Typical Weld Locations: AWS D1.1; type required for materials being welded.
2. SFRS and Demand Critical Welds: AWS D1.8; filler metal shall be classified as low hydrogen and shall have a minimum Charpy V-notch toughness of twenty foot-pounds at minus 50 degrees F for SFRS welds and forty foot -pounds at 20 degrees F for Demand Critical Welds as determined by AWS classification or manufacturer certification.
Demand critical weld material shall also meet heat input testing requirements of AWS D1.8, Clause 6.3.
I. Circular washers for common bolts: ASTM F844, Type A, and ANSI B18.22.1.
J. Beveled washers for common bolts: ANSI B18.23.1.
K. Washers for high strength bolts: Direct te nsion indicator. ASTM F959 hardened circular, beveled and clipped, ASTM F436.
L. Post-Installed Concrete Anchors: ICC approved, as indicated and manufactured by Hilti or accepted equal.
M. Eye Bolts and Nuts: ASTM A108, Grade 1030, cold-finished carbon steel.
N. Sleeve Nuts: ASTM A108, Grade 1018, cold-finished carbon steel.
O. Welded Headed Stud Anchors: ASTM A108. Welding, testing and inspection shall be in accordance with AWS D1.1.
P. Steel Shop and Touch-Up Primer: TNEMEC Series 115 Uni-Bond DF or accepted equal.
Q. Shop and Touch -Up Zinc Rich Primer for Galvanized Surfaces: ZRC Galvilite Galvanizing Repair Compound as manufactured by ZRC Worldwide Company, Phone: (800) 831 -3275, or accepted equal.
R. Weld filler material: All weld filler material shall have a minim um tensile strength of 70 KSI per AWS D1.1, latest edition approved by code enforcement agency.
S. Reinforcing Steel: Refer to Section 03 20 00.
2.2 FABRICATION
A. General: Fabricate items of structural steel in accordance with AISC specifications and as indicated on Drawings. Fabrication tolerances shall be reduced as required for acceptance of subsequent work. Properly mark and match -mark all materials for field assembly.
Fabricate for delivery sequence which will expedite erection and minimize field handling. 05 12 00 Lionakis No. 019124.02
Structural Steel Framing January 26, 2024
1. Welded splicing of structural members may be done only upon written acceptance by Architect, unless otherwise indicated on Drawings. Splicing shall be thoroughly examined by a nondestructive means at Contractor's expense. Inspection shall be made by a recognized and approved testing laboratory; procedure, technique and standards of acceptance shall conform to Appendix E of AWS Standard D2.0-69. Correct faulty welds and re-examine in a manner specified for original welds.
B. Welded Construction:
1. Weld in accordance with AISC using manual shielded arc method or flux cored arc method in accordance with AWS D1.1 and AWS D1.8. Groove welds shall be complete joint penetration welds, unless specifically designated otherwise on Drawings.
2. Remove back-up plates for complete joint penetration welds when specifically requested by testing laboratory to perform non-destructive testing. Remove at no cost to Owner.
3. Weld reinforcing steel in accordance with AWS D1.4 and using prequalified procedures.
C. Connections:
1. Weld or bolt shop connections as indicated.
2. Bolt field connections except where welded or other connections are indicated. Provide unfinished threaded fasteners only where noted on Drawings and for temporary bracing to facilitate erections.
D. Holes for Other Work: Provide holes required for securing other work to structural steel framing, and for the passage of work through steel framing members as indicated. Provide threaded nuts welded to framing, and other specialty items as sh own to receive other work.
Cut, drill or punch holes perpendicular to metal surfaces. Thermally cut holes are only permitted at anchor rod holes.
2.3 FINISHES
A. Prepare structural component surfaces in accordance with SSPC SP -2 at concealed locations and SSPC SP-6 at exposed locations. Provide Class “A” (clean mill scale) contact surfaces per RCSC 2016 at high-strength bolted connections.
B. Do not prime surfaces in direct contact with concrete, where field welding is required, or contact surfaces of steel -to-steel connections. Provide Class “A” or better contact surfaces at steel connections per RCSC Specification for Structural Joints Using High Strength Bolts, latest edition.
C. All exposed interior steel shall be primed with shop primer unless otherwise noted.
1. Primer shall be applied in one coat, to meet or exceed the minimum mil thickness required by the primer manufacturer.
D. All un-exposed, concealed, or enclosed interior or exterior steel requires no finish.
E. All exposed exterior steel shall be galvanized unless otherwise noted.
1. Galvanize in accordance with ASTM A123/A123M, designated steel items. Provide minimum 1.25 ounce per square foot galvanized coating.
2. At galvanized members, touch-up all welds with zinc-rich primer.
Lionakis No. 019124.02 05 12 00
January 26, 2024 Structural Steel Framing
Line3xx Page 7
F. Column Bases: Column bases and base plates shall be finished in accordance with the following requirements:
1. Steel bearing plates 2 inches or less in thickness are permitted without milling provided a smooth and notch -free contact bearing surface is obtained. Steel bearing plates over 2 inches but not over 4 inches in thickness are permitted to be straightened by pressing or, if presses are not available, by milling for bearing surfaces , except a s stipulated in subparagraphs (2) and (3) below, to obtain a smooth and notch -free contact bearing surface. Steel bearing plates over 4 inches in thickness shall be milled for bearing surfaces, except as stipulated in subparagraphs (2) and (3) below.
2. Bottom surfaces of bearing plates and column bases that are grouted to ensure full bearing contact on foundations need not be milled.
3. Top surfaces of bearing plates need not be milled when complete -joint-penetration groove welds are provided between the column and the bearing plate.
2.4 TESTING AND INSPECTION
A. General: Owner will engage and pay a testing agency to perform the following services:
1. Review manufacturer's certificates and check heat numbers and that the steel is properly identified in accordance with CBC Section 220 2 “Identification of Steel for Structural Purposes”.
2. Testing of unidentified materials or as directed by Owner.
3. Provide inspection per CBC Sections 1705.2 and 1705.13.
4. Provide testing per CBC Section 1705.14.
5. In the event an examination discloses faulty welds and additional tests are required to fully examine the welds, the cost of the additional tests shall be paid for by Owner and back-charged to Contractor.
6. All defective welds shall be repaired and tested at no expense to Owner.
7. Perform any physical tests of structural steel as required by Architect. Perform ultrasonic tests on members as determined by Architect to determine if delamination defects in steel members are evident.
8. High-strength bolting testing and inspection shall conform to the following requirements:
a. Perform pre-installation verification of pretensioned bolts per RCSC Section 7.1 for the selected pretensioning method.
b. Inspect bolted joints per RCSC Section 9 and CBC Section 1705.2.1. c. All fasteners failing to meet the specified tension shall be examined to determine the cause of failure and re-tested.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify that field conditions are acceptable and are ready to receive work.
B. Beginning of installation means erector accepts existing conditions.
C. Bolts shall be clean and free of grease, oil and all other deleterious substances. 05 12 00 Lionakis No. 019124.02
Structural Steel Framing January 26, 2024
3.2 ERECTION
A. Allow for erection loads and for sufficient temporary bracing to maintain structure safe, plumb and in true alignment until completion of erection and installation of permanent bracing.
B. Field weld components indicated on shop drawings.
C. Do not field cut or alter structural members without acceptance of Architect.
D. After erection, prime welds, abrasions and surfaces not shop primed, except surfaces to be in contact with concrete.
E. Setting Base Plates:
1. Clean concrete bearing surfaces and roughen to improve bond. Clean the bottom surface of base plates.
2. Set loose and attached base plates for structural members on adjusting nuts at anchor bolts. All anchor bolts shall have double nuts for adjusting.
3. Tighten anchor bolts after the supported members have been positioned and plumbed.
Do not remove adjusting nuts.
4. Place non-shrink grout solidly between surfaces as shown to ensure that no voids remain. Finish expose d surfaces, protect installed materials and allow non-shrink grout to cure.
F. Structural steel work shall be set accurately at established lines and levels. Steel shall be plumb and level before final bolting or welding is commenced and after complete erecti on.
All cutting, notching, coping, etc., required for proper assembly and fitting of parts and members, shall be done by the steel fabricator. Such workmanship shall be equal in quality to shop work.
1. Coordinate the erection of structural steel with other trades and locate temporary guys, braces, falsework and cribbing as may be necessary for erection so as not to interfere with the progress of other work.
2. Rolled sections, except for minor details, shall not be heated except for welding operations.
3. Upon acceptance by Architect, gas cutting may be permitted if the metal being cut is not highly stressed during the operation. Stresses shall not be transmitted through a flame cut surface unless such surfaces are cut by a mechanically guided torch. The radi us of re-entrant flame cut fillets shall be as large as possible, but not less than 1 inch . To determine the net area of members so cut, 1/8 inch shall be deducted from the flame cut edges not made by a mechanically guided torch. Gas cuts shall be smooth a nd regular.
Holes for bolts shall not be cut with a torch.
4. All contact surfaces shall be cleaned before assembly.
5. Provide setting diagrams and templates as required. Placement of beam connectors shall be the responsibility of structural steel fabricator.
6. Splice members only where indicated.
G. Connections shall be as specified hereinbefore under "Fabrication." In addition, bolted connections shall conform to the following requirements:
1. Beveled washers shall be used under all bolt heads and nuts where they rest on beveled surfaces.
Lionakis No. 019124.02 05 12 00
January 26, 2024 Structural Steel Framing
Line3xx Page 9
2. Connectors shall have hexagon heads and nuts.
3. Nuts shall be drawn up tight. Check threads of unfinished bolts with chisel or approved self-locking nuts.
4. Bolts that have been completely tightened shall be marked with identifying symbol.
5. High-strength bolted construction: Install high-strength threaded fasteners in accordance with RCSC Specification for Structural Joints Using High-Strength Bolts. All high strength bolts shall be pretensioned, unless specifically noted otherwise. Pretensioning shall be by one of the methods permitted in RCSC Section 8.2.
H. Framing sha ll be carried up true and plumb. T emporary bracing shall be introduced wherever necessary to take care of all loads to which structure may be subjected, inclu ding erection equipment and its operation. Such bracing shall be left in place as long as may be required for safety. It shall finally be removed by Contractor as part of his equipment. As erection progresses, the work shall be securely connected to take c are of all dead load, lateral loads and erection stresses. No final bolting or welding shall be done until the structure has been properly aligned.
3.3 ERECTION TOLERANCES
A. Level and plumb steel within the tolerances defined in the AISC Code of Standard Practic e, latest edition. Erection tolerances shall be reduced as required for acceptance of subsequent work.
3.4 REPAIRS AND PROTECTION
A. Repair damaged galvanized coatings on galvanized items with galvanized repair paint as specified or according to ASTM A780, and manufacturer's written instructions.
B. Touchup Painting: After installation, promptly clean, prepare, and prime or re -prime field connections, rust spots, abraded surfaces of prime -painted joists and accessories , and abutting structural steel.
1. Clean and prepare surfaces by SSPC-SP 2 hand-tool cleaning or SSPC-SP 3 power-tool cleaning.
2. Apply a compatible primer of same type as shop primer used on adjacent surfaces.
3.5 CLEAN-UP
A. Upon completion of the work of this S ection, remove all surplus material s, rubbish and debris from premises.
END OF SECTION
Lionakis No. 019124.02 05 31 00
January 26, 2024 Steel Decking
Line3xx Page 1
SECTION 05 31 00
STEEL DECKING
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Steel decking and accessories:
B. Framing for openings up to and including 24 inches.
1.2 RELATED SECTIONS
A. Section 03 30 00 – Cast-In-Place Concrete.
B. Section 05 12 00 – Structural Steel Framing.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. AISI S100 – North American Specification for the Design of Cold-Formed Steel Structural Steel Members.
2. ASTM A653/A653M – Standard Specification for Steel Sheet, Zinc -Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.
3. ASTM E329 – Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection.
4. AWS D1.1 – Structural Welding Code – Steel.
5. AWS D1.3 – Standard Welding Code – Sheet Steel.
1.4 SUBMITTALS
A. Submit under provisions of Division 01.
B. Shop Drawings: Indicate decking pla n, dimensions, sizes, support locations, projections, openings and reinforcement, pertinent anchoring details and accessories. Coordinate with other trades in accurately locating and detailing openings and penetrations.
C. Product Data: Provide deck profile c haracteristics and dimensions, structural properties, finishes and accessories.
D. Manufacturer's Installation Instructions: Indicate specific installation sequence and special instructions.
05 31 00 Lionakis No. 019124.02
Steel Decking January 26, 2024
E. Certificates:
1. The manufacturer's certification and fire test reports to document that deck assemblies comply with requirements of this Section.
2. Furnish certification by approved testing agency for each welder employed.
1.5 PERFORMANCE REQUIREMENTS
A. Steel decking and section properties shall comply with AISI S100.
B. Profile and design of deck units and accessories shall conform to the details shown on Drawings. Units shall be one piece, unless indicated otherwise.
C. Steel decking and its installation shal l meet the requirements of 2022 California Building Code (CBC).
1.6 FIELD MEASUREMENTS
A. Verify that field measurements are as shown on shop drawings.
1.7 TESTS AND INSPECTIONS
A. Furnish test specimens of materials when they are requested. Welded decking in place is subject to inspection and testing per CBC Chapter 17 “Special Inspections and Tests” , Section 1705 “Required Special Inspections and Tests”.
1. Expense of removing and replacing any portion of decking for testing purposes will be borne by Owner if installation is found to be satisfactory. All portions of the work found to be defective and not in conformity with contract requirements shall be removed and replaced at no cost to Owner.
1.8 QUALITY ASSURANCE
A. Testing Agency Qualifications: An independent agency qualifie d according to ASTM E329 for testing indicated.
B. Welding: Qualify procedures and personnel according to AWS D1.3.
C. Installer: Company specializing in performing work of this Section.
1.9 DELIVERY, STORAGE AND HANDLING
A. Deliver products to site under provisions of Division 01.
B. Store and protect products under provisions of Division 01.
C. Store decking on dry wood sleepers; slope for positive drainage. Work showing creases, burrs in cells, deformation, weathering, or other defects affecting its use or appearance in exposed locations will not be accepted.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturer:
1. Basis-of-Design: ASC Steel Deck , West Sacramento, CA; 916 -372-6851, www.ascsd.com; per evaluation agency reports as follows:
Lionakis No. 019124.02 05 31 00
January 26, 2024 Steel Decking
Line3xx Page 3
a. IAPMO Evaluation Report No. ER-0161 for bare steel deck. b. IAPMO Evaluation Report No. ER-0329 for concrete-filled steel deck.
B. Substitutions: Under provisions of Division 01 with valid Evaluation Agency Report.
1. Substitution requests for steel decking shall c onsider the vertical and lateral load capacities of final system, including attachments. Provide a comparison summary of proposed and specified deck systems showing that the proposed system has equal or greater vertical and lateral load capacit ies for all conditions shown on Drawings.
Systems with lower load capacities will not be acceptable.
2. Substitution requests will require review by the Structural Engineer of Record and Authority Having Jurisdiction (AHJ). Cost for such reviews shall be borne by Contractor.
3. Do not submit shop drawings with substituted decking manufacturer until decking manufacturer has been accepted via substitution request process.
2.2 MATERIALS
A. Sheet Steel for Bare Deck : ASTM A653/A653M, SS designation, Grade 40 (minimum yield 38 KSI); zinc coated conforming to ASTM A653/A653M, G 185, unless noted otherwise .
Refer to Drawings for types and sizes of steel decking.
B. Sheet Steel for Composite Deck: ASTM A653/A653M, SS designati on, Grade 40 for 3 inch Type “W” and “WF” deck profiles (minimum yield 40 KSI); zinc coated conforming to ASTM A653/A653M, G185, unless noted otherwise. Refer to Drawings for types and sizes of steel decking.
C. Welding Materials: Conform to AWS D1.1 and D1.3, with a minimum 60 KSI filler metal yield strength.
D. Shop and Touch -Up Zinc Rich Primer for Galvanized Surfaces: ZRC Galvilite Galvanizing Repair Compound as manufactured by ZRC Worldwide Company, Marshfield, MA; 800-831- 3275, www.zrcworldwide.com, or accepted equal.
E. Steel Decking and Design: Steel decking shall be metallic coated with interlocking side lap.
Deck types and minimum structural properties shall be as indicated on Drawings. Submit Evaluation Agency Reports that demonstrate compliance with design requirements.
2.3 FABRICATION
A. Fabrication: All steel decking units shall be roll-formed to assure uniformity and strength.
B. Allowable Tolerances: Maximum variation in unit alignment 1/4 inch in 40 feet (1/1920).
C. Workmanship: All work shall be neat, trim, true to line and upon completion shall present a true finished surface of specified deck profile, free of dents, deformations, creases, weld spatter or other noti ceable defects. Steel deck permanently exposed to view shall be manufactured, handled, and transported for “exposed” installation.
D. Reinforcement: Provide reinforcement for openings, cutouts and free edges of decking as required for strength and stiffness. Provide reinforcement where a cell is cut parallel to rib as necessary to make a tight fit along the cut cell . Such reinforcement shall be in addition to structural supports shown on Drawings and specified in Section 05 12 00. 05 31 00 Lionakis No. 019124.02
Steel Decking January 26, 2024
E. Miscellaneous Work: Provide all other transition pieces, reinforcement , and miscellaneous decking items as detailed and required to provide a complete installation.
F. Where steel decking is scheduled to receive a paint finish , it shall be provided free of lubricants, oils, passivators, and other substances which would impair the adhesion of the paint system.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify that field conditions are acceptable and are ready to receive work. Check supporting members for correct layout and alignment. Should layout and alignmen t be such as to prevent proper bearing of the deck units on supporting members, the deck installer shall bring it to the attention of structural steel installer in writing , with a copy to Architect, for corrective measures and action. Steel decking units s hall not be placed until necessary corrections are made.
B. Beginning of installation means installer accepts existing conditions.
3.2 INSTALLATION
A. Erect steel decking in accordance with Evaluation Agency Report, manufacturer's instructions and final shop drawings.
B. Placing and Fastening Deck Units: Place decking in a permanent position with all panels aligned end-to-end so that the fluted portions of the panels align accurately. Panels shall be placed on supporting framework and adjusted in final position b efore being permanently fastened. Ends shall be over structural supports with positive, complete bearing over full width of panels. Installation shall be accomplished without deformation of units. Decking layout shall be as indicated on Drawings.
1. Carefully check control points, as indicated, for layout of deck flutes. Where required, deck module shall be adjusted to conform to layout indicated.
2. Fasten deck units to structure and to each other as indicated.
3. At galvanized steel decks, deslag, clean, and touch-up all welds with zinc -rich primer, including those at the underside of deck.
a. Exception: Do not touch-up welds on top of deck which will be covered with concrete.
4. Complete installation shall conform to manufacturer's specifications and as detailed.
C. Openings Through Decking: Steel decking fabricator shall cut and reinforce all openings in the metal deck, including framed openings indicated on Drawings. Small miscellaneous openings shall be field-cut by the trade requiring the opening.
1. All cutting of exposed edges shall be square, trim and equal to factory cutting.
2. Steel deck panels and accessories shall be cut and neatly fit around openings and other work projecting through the deck.
3. Openings shall be reinforced as indicated or required to provide a rigid installation.
D. Steel decking installation shall proceed in accordance with current Cal/OSHA and OSHA regulations including guidelines with respect to fall protection.
E. Steel decking shall be spread for safety and working platforms.
Lionakis No. 019124.02 05 31 00
January 26, 2024 Steel Decking
Line3xx Page 5
F. All steel decking sheets shall be wind tacked and loose bundles of deck shall be wired at the end of each shift.
G. Concrete Filled Deck Installation:
1. Provide deck accessories required to contain concrete during concrete placement.
2. Concrete fill thicknesses over steel deck indicated on the construction docu ments are minimum thicknesses. Provide additional concrete fill as required to compensate for framing or deck deflections during placement in order to maintain specified surface tolerances and minimum thicknesses.
3. Place concrete in a manner to avoid excessive deflections or ponding.
4. Place concrete fill on adjacent spans before placement on cantilever conditions.
5. Provide shoring where indicated on Drawings and where deck span exceeds manufacturer’s listed maximum unshored span. Do not r emove forms until concrete fill has reached its minimum compressive strength.
3.3 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports.
B. Field welds will be subject to inspection.
C. Remove and replace work that does not comply with specified requirements.
1. Additional inspecti on, at Contractor's expense, will be performed to determine compliance of corrected work with specified requirements.
3.4 PROTECTION
A. Do not use steel decking for storage or working platforms until it has been permanently fastened. Storage loads must be supported on wood blocking in the flutes of the deck.
1. Any damaged deck unit shall be repaired or replaced as directed by Arch itect and at no cost to Owner.
B. Assure that construction loads do not exceed the carrying capacity of the deck.
3.5 CLEAN-UP
A. Upon completion of the work of this S ection, remove all surplus materials, rubbish and debris from premises.
END OF SECTION
Lionakis No. 019124.02 05 50 00
January 26, 2024 Metal Fabrications
Line3xx Page 1
SECTION 05 50 00
METAL FABRICATIONS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Metal fabrications as follows:
1. Railing assemblies.
2. Downspouts.
3. Miscellaneous metal fabrications.
1.2 RELATED SECTIONS
A. Section 06 10 00 – Rough Carpentry.
B. Section 09 91 00 – Painting.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. ASTM A36/A36M – Standard Specification for Carbon Structural Steel.
2. ASTM A53/A53M – Standard Specification for Pipe, Steel, Black and Hot - Dipped, Zinc-Coated, Welded and Seamless.
3. ASTM A123/A123M – Standard Specification for Zinc (Hot -Dip Galvanized) Coatings on Iron and Steel Products.
4. ASTM A307 – Standard Specification for Carbon Steel Bolts and Studs, 60,000 PSI Tensile Strength.
5. ASTM A500 – Standard Specification for Cold -Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and
Shapes.
6. ASTM D1187 – Standard Specification for Asphalt -Base Emulsions for Use as Protective Coatings for Metal.
7. ASTM E488 – Standard Test Methods for Strength of Anchors in Concrete and Masonry Elements.
8. AWS A2.4 – Standard Symbols for Welding, Brazing , Nondestructive Examination.
9. AWS D1.1 – Structural Welding Code – Steel.
10. AWS D1.3 – Structural Welding Code – Sheet Steel.
05 50 00 Lionakis No. 019124.02
Metal Fabrications January 26, 2024
11. SSPC SP-2 – Hand Tool Cleaning.
12. SSPC SP-6 – Commercial Blast Cleaning.
1.4 SUBMITTALS
A. Submit under provisions of Division 01.
B. Shop Drawings: For each item specified, i ndicate profiles, sizes, connection attachments, reinforcing, anchorage, size and type of fasteners and accessories. Include erection drawings, elevations and details where applicable.
C. Product Data: Submit product data for eac h manufactured product specified by name and model number in this Section with the product and selected attributes clearly identified.
D. Indicate welded connections using standard AWS A2. 4 welding symbols. Indicate net weld lengths.
1.5 QUALITY ASSURANCE
A. Welding: Qualify procedures and personnel according to the following:
1. AWS D1.1, "Structural Welding Code – Steel.”
2. AWS D1.3, "Structural Welding Code – Sheet Steel.”
B. Conform to 2022 California Building Code (CBC), Chapter 17 “Special Inspections and Tests” and Chapter 22 “Steel”.
1. Materials:
a. Material Identification per CBC Chapter 22, Section 2202 “Identification of Steel for Structural Purposes”.
2. Inspection and Tests:
a. Welding Inspection per CBC Chapter 17, Section 1705, Paragraph 1705.2 “Steel Construction”.
b. Non-Destructive Weld Testing per CBC Chapter 17, Section 1705, Paragraph 1705.13.1 “Structural Steel”.
C. Painting: Refer to Section 09 91 00 for field painting.
1. Do not paint galvanized surfaces that are indicated to remain galvanized.
1.6 QUALIFICATIONS
A. Welders' Certificates: Submit certificates under provisions of Division 01, certifying welders employed on the Work, verifying AWS qualification within the previous twelve months.
1.7 FIELD MEASUREMENTS
A. Verify that field measurements are as indicated on shop drawings.
Lionakis No. 019124.02 05 50 00
January 26, 2024 Metal Fabrications
Line3xx Page 3
PART 2 PRODUCTS
2.1 MATERIALS
A. Steel: Unless otherwise noted, provide steel materials as follows:
1. Steel Plates, Shapes, and Bars: ASTM A36/A36M.
2. Pipe: ASTM A53/A53M, Type E or S, Grade B.
3. HSS:
a. Tubing: ASTM A500, Grade C.
b. Round: ASTM A500, Grade C.
4. Bolts, Nuts and Washers: ASTM A307.
B. Anchorage:
1. Cast-in-Place Anchors in Concrete: Anchors capable of sustaining, without failure, a load equal to four times the loa d imposed, as determined by testing according to ASTM E488, conducted by a qualified independent testing agency.
2. Expansion Anchors: Anchor bolt and sleeve assembly with capability to sustain, without failure, a load equal to six times the load imposed when installed in unit masonry and four times the load imposed when installed in concrete, as determined by testing according to ASTM E488, conducted by a qualified independent testing agency.
C. Welding Materials:
1. Steel: AWS D1.1; type as required for materials being welded.
2. Sheet Steel: AWS D1.3; type as required for materials being welded.
D. Weld filler material: All weld filler material shall have a minimum tensile strength of 70 ksi per AWS D1.1, latest edition approved by code enforcement agency.
E. Steel Shop and Touch-Up Primer: TNEMEC Series 115 Uni-Bond DF or accepted equal.
F. Shop and Touch -Up Zinc Rich Primer for Galvanized Surfaces: ZRC Galvilite Galvanizing Repair Compound as manufactured by ZRC Worldwide Company, Phone: (800) 831 -3275, or accepted equal.
G. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D1187.
2.2 RAILING ASSEMBLIES
A. Steel Railing Assemblies: Fabricated from steel pipe, steel plates and sections; sizes and configurations as shown on Drawings. At exterior locations , hot-dip galvanize all components in accordance with ASTM A123/A123M, minimum 1.25 ounces per square foot.
1. Steel Tubing: HSS, ASTM A500, Grade C. Refer to Drawings for configuration and sizes.
2. Vertical Pickets: Steel bars, ASTM A36/A36M. Refer to Drawings for configuration and sizes.
05 50 00 Lionakis No. 019124.02
Metal Fabrications January 26, 2024
3. Galvanize exterior handrail and guardrail assemblies after fabrication. After assembly has been galvanized, fill vent and drain holes that will be exposed in the finished Work, unless indicated to remain as weep holes, by plugging with zinc solder and filing off smooth.
4. Finish: Field painted with exterior industrial paint system in accordance with Section 09 91 00; color as selected by Architect.
B. Fabrication:
1. Handrail gripping surfaces and any surfaces adjacent to them shall be free of sharp or abrasive elements and shall have rounded edges.
2. Handrails shall not rotate in their fittings.
2.3 DOWNSPOUTS
A. Downspouts and Support Brackets:
1. Pipe: ASTM A53 /A53M, Schedule 40, round, galvanized, size as indicated on Drawings.
2. Support Brackets: Steel plates, sections, and sheets: galvanized; size and thickness as shown on Drawings.
3. Finish: Site paint finish under provisions of Section 09 91 00. Color as selected by Architect.
2.4 MISCELLANEOUS METAL FABRICATIONS
A. Provide miscellaneous metal fabrications as required to complete work under other Sections, but not specified in those Sections.
B. Miscellaneous metal work, including, but not limited to, the following items:
1. Steel Framing and Supports For:
a. Mechanical and electrical equipment.
2. Loose bearing and leveling plates.
3. Steel weld plates and angles for casting into concrete not specified in other Sections.
2.5 SHOP FABRICATION
A. Fit and shop assemble in largest practical sections, for delivery to site.
1. Disassemble units only as necessary for shipping and handling limitations. Use connections that maintain structural value of joined pieces. Clearly mark units for reassembly and coordinated installation.
B. Fabricate items with joints tightly fitted and secured.
C. Grind exposed joints flush and smooth with adjacent finish surface. Make exposed joints butt tight, flush, and hairline. Ease exposed edges to small uniform radius.
D. Cut, drill, and punch metals cleanly and accurately. De-burr rough edges and holes.
E. Form exposed work true to line and level with accurate angles and surfaces and straight edges.
Lionakis No. 019124.02 05 50 00
January 26, 2024 Metal Fabrications
Line3xx Page 5
F. Exposed Mechanical Fastenings: Flush countersunk screws or bolts; unobtrusively located; consistent with design of component, except where specifically noted otherwise.
G. Supply components required for anchorage of fabrications. Fabricate anchors and related components of sam e material and finish as fabrication except where specifically noted otherwise.
H. Miter and weld members, welds ground smooth.
I. Provide for anchorage of type indicated; coordinate with supporting structure. Space anchoring devices to secure metal fabrications rigidly in place and to support indicated loads.
2.6 FINISHES
A. Prepare structural component surfaces in accordance with SSPC SP -2 at concealed locations and SSPC SP-6 at exposed locations.
B. Do not prime surfaces in direct contact with concrete, where field weld ing is required, or contact surfaces of steel-to-steel connections.
C. Shop prime all exposed interior steel with shop primer unless otherwise noted. Apply primer in one coat, to meet or exceed the minimum mil thickness required by the primer manufacturer.
D. All unexposed, concealed, or enclosed interior or exterior steel requires no finish.
E. All exposed exterior steel shall be galvanized after fabrication unless otherwise noted.
1. Galvanizing shall be in accordance with ASTM A123/A123M, on designated steel items.
Provide minimum 1.25 ounces per square foot galvanized coating.
2. At galvanized members, touch-up all welds with zinc-rich primer.
F. Painting shall conform to applicable requirements of Section 09 91 00.
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine job site conditions and verify field dimensions.
B. Verify structure or substrate is plumb, level, and ready to receive work.
C. Verify that appropriate backing, blocking, or structural reinforcing is provided at walls.
D. Report unacceptable conditions to Architect. Begin installation only when unacceptable conditions have been corrected.
3.2 PREPARATION
A. Clean and strip primed steel items to bare metal where site welding is required.
B. Supply items required to be cast into concrete with setting templates, to appropriate Sections.
05 50 00 Lionakis No. 019124.02
Metal Fabrications January 26, 2024
3.3 INSTALLATION
A. Install items plumb and level, accurately fitted, free from distortion or defects.
B. Install manufactured items in accordance with manufacturer’s printed instructions.
C. Allow for erection loads and for sufficient temporary bracing to maintain tru e alignment until completion of erection and installation of permanent attachments.
D. Field weld components indicated on shop drawings.
E. Perform field welding in accordance with AWS D1.1 for steel and AWS D1.3 for sheet steel.
F. Obtain Architect’s acceptance prior to site cutting or making adjustments not scheduled.
G. After erection, prime welds, abrasions and surfaces not shop primed, except surfaces to be in contact with concrete.
3.4 CLEANING
A. Inspect components after completing installation. Remove dirt and debris. Repair damaged finishes to match original finish or replace component.
END OF SECTION
Lionakis No. 019124.02 06 10 00
January 26, 2024 Rough Carpentry
Line3xx Page 1
SECTION 06 10 00
ROUGH CARPENTRY
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Description of requirements for materials, fabrications and installation of rough carpentry and associated items (except that which is specified elsewhere) indicated on Drawings and necessary to complete the work. Items include, but are not necessarily limited to, the following:
1. Wood framing.
2. Wood decking.
3. Plywood, general use.
4. Blocking, backing, stripping, furring, and nailers.
5. Rough hardware.
6. Preservative treatment.
1.2 RELATED SECTIONS
A. Section 03 30 00 – Cast-In-Place Concrete.
B. Section 05 12 00 – Structural Steel Framing.
C. Section 06 17 53 – Shop-Fabricated Wood Trusses.
D. Section 09 91 00 – Painting.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent ref erenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. ALSC – American Lumber Standard Committee: Softwood Lumber Standards.
2. ANSI/ASME B18.2.1. – Square and Hex Bolts and Screws Inch Series.
3. ASTM A123/A123M – Standard Specification for Zinc (Hot -Dip Galvanized) Coatings on Iron and Steel Products.
4. ASTM A307 – Standard Specification for Carbon Steel Bolts and Studs, 60,000 PSI Tensile Strength.
5. AWPA U1 – Use Category System: User Specification for Treated Wood.
6. The Engineered Wood Association (APA); Plywood Specifications and Grades. 06 10 00 Lionakis No. 019124.02
Rough Carpentry January 26, 2024
7. International Code Council (ICC) Evaluation Report/Evaluation Service Report (ER/ESR).
8. National Design Specification (NDS).
9. NIST DOC PS-1-09 – Structural Plywood.
10. NIST DOC PS-2-10 – Performance Standard for Wood-based Structural-use Panels.
11. NIST DOC PS-20 – American Softwood Lumber Standard.
1.4 SUBMITTALS
A. Submit all products and materials proposed for use under provisions of Division 01.
B. Preservative Treatment Certification, Pressure Treated Wood:
1. Submit certification by treating plant stating the chemicals and process used, net amount of preservative treatment product retained, and conformance with applicable standards.
1.5 QUALITY ASSURANCE
A. Coordinate work with other trades to ensure proper placement of materials, anchors, etc., as well as providing for openings and anchors for the installation of surface mounted items and equipment.
B. Qualifications of Workmen: Provide skilled workmen and supervisors who shall be present at all times during execution of this portion of the work and who shall be thoroughly familiar with the type of construction involved and the materials and techniques specified.
C. Rejection: In the acceptance or rejection of rough car pentry, no allowance will be made for lack of skill on the part of the workmen.
D. Requirements of Regulatory Agencies:
1. State of California, California Code of Regulations, Title 24, Part 2, Chapter 23 requirements apply.
a. Grading and preservative treatment of lumber and p lywood shall conform to CBC Section 2303, Minimum Standards and Quality.
1.6 DELIVERY, STORAGE AND HANDLING
A. Protection:
1. After delivery, store all materials in such a manner as to ensure proper ventilation and drainage and to protect against damage and the weather.
2. Keep all material clearly identified with all grade marks legible; keep all damaged material clearly identified as damaged, and separately store to prevent its inadvertent use. Do not allow installation of damaged or otherwise non-complying material.
3. Use all means necessary to protect the installed work and materials of all other trades.
B. Replacements: In the event of damage, immediately make necessary repairs and replacements as acceptable to Architect and at no cost to Owner.
1.7 JOB AND ENVIRONMENTAL CONDITIONS
A. Environmental Requirements: Maintain uniform moisture content of lumber at 19 percent or less at time of installation.
Lionakis No. 019124.02 06 10 00
January 26, 2024 Rough Carpentry
Line3xx Page 3
B. Sequencing: Coordinate details with other work supporting, adjoining , or fastening to rough carpentry work.
PART 2 PRODUCTS
2.1 MATERIALS
A. Wood:
1. Lumber shall be identified by the grade mark of an approved lumber grading or inspection agency in conformance with NIST DOC PS-20.
2. Lumber sizes, species, and grades shall be as noted on Drawings.
B. Wood Sheathing:
1. General Use: NIST DOC PS-1, Exposure 1. Thickness and type shall be as indicated on Drawings.
2. Plywood back boards for electrical, telephone, and similar types of wall mounted equipment shall be provided as indicated and as required by design conditions. Unless otherwise specified, plywood shall be 3/4 inch thick, fire -retardant treated, exterior A -C plywood with “A” face exposed.
3. Structural Panels for Structural Usage: As indicated on Drawings.
C. Plates, Blocking, Cast-in-Nailers at Concrete Curbs, or Sills on Concrete: Douglas Fir No. 1 pressure-treated.
D. Preservative Treatment:
1. Furnish pressure treated wood in accordance with AWPA Standard U1.
2. All preservative treatment products shall be waterborne , alkali -based type, acceptable for use in California and meeting the minimum requirements of AWPA Use Categories noted. Type SBX/DOT preservative is only permitted when material is protected from exposure to any water during construction.
a. Use Category 2 (Interior, Damp ) shall apply to wood sills supported on concrete more than 6 inches above finish grade.
b. Use Category 3B (Above Ground, Exposed) shall apply to wood used in exterior construction and not in contact with the ground.
c. Use Category 4A (Ground Contact, General Use) for wood supported by concrete within 6 inches of finished grade, wood in contact with the ground or fresh water, or wood in direct contact with any older construction with evidence of decay.
3. Type of fasteners used with pressure treated wood shall be in accordance with CBC Section 2304.10.6.1.
E. Rough Hardware Fastenings and Connections: All types including bolts, lag screws, nails, spikes, screws, washers, framing devices and other rough hardware, or kinds that may be purchased and that require no furth er fabrication, shall be furnished and installed for all finish and rough carpentry. All exterior hardware shall be hot -dipped galvanized per ASTM A123/123M Standards.
1. Nails: Common wire nails or spikes and box nails, as indicated on Drawings ; “sinkers” are not permitted.
06 10 00 Lionakis No. 019124.02
Rough Carpentry January 26, 2024
2. Bolts: ASTM A307, Grade A, hexagonal heads, unless noted otherwise. Upset threads are not permitted.
3. Washers: Washers for bearing against wood shall be provided under all bolt heads and nuts. Washers shall be as indicated on Drawings.
4. Power Actuated Fasteners: Refer to Drawings. All fasteners shall have ICC approval.
5. Post-Installed Anchors: Refer to Drawings. All anchors shall have ICC approval.
6. Fabricated Sheet Metal Timber Framing Connectors: All framing connectors shall have ICC approval. Connector t ypes shall be as indicated on Drawings. Provide t imber framing connectors by Simpson Co. or accepted equal. Framing connectors shall be stamped with manufacturer's logo, and model designation.
7. Nailing Schedule: Except as otherwise indicated on Drawings or specified, nailing shall conform to 2022 CBC, Table 2304.10.2, Fastening Schedule.
8. Lag Screws: Conform to ANSI/ASME B.18.2.1. Dimensions and installation shall conform to requirements described in the National Design Specification (NDS), 2018 edition.
2.2 FABRICATION
A. Lumber:
1. Air- or kiln-dry to maximum 19 percent moisture content, at the time of installation.
2. Furnish S4S unless otherwise noted.
3. Size to conform to rules of governing standard. Sizes shown are nominal unless otherwise noted.
2.3 SOURCE QUALITY CONTROL
A. Grade Mark each piece of lumber. Marking must be done by recognized agency.
B. Plywood: Each panel shall be legibly identified as to type, grade and specie by APA grade. If plies are spliced, the slope of the scarf shall not be steeper than 1:8. White pockets will not be permitted in face plies.
C. Each piece of preservative treated lumber shall bear AWPA quality stamp by an ALSC approved inspection agency indicating compliance with the AWPA standards.
PART 3 EXECUTION
3.1 SURFACE CONDITIONS
A. Inspection:
1. Prior to execution of work under this Section, carefully inspect the installed work of other trades and verify that such work is complete to the point where work of this Section may properly proceed.
2. Verify that rough carpentry may be performed in strict accordance with the original design and all pertinent codes and regulations.
B. Selection of Lumber Pieces: Carefully select all members. Select individual piece s so that knot and obvious defects will not interfere with placing bolts or proper nailing or making proper connections. Cut out and discard all defects which will render a piece unable to serve its intended function.
Lionakis No. 019124.02 06 10 00
January 26, 2024 Rough Carpentry
Line3xx Page 5
C. Lumber may be rejected by Architect, w hether or not it has been installed, for excessive warp, twist, bow, crook, mildew, fungus or mold, as well as for improper cutting and fitting.
No load carrying member shall fall below grade.
D. Shimming: Do not shim any framing component.
3.2 FASTENING
A. Nailing: Except as otherwise specified, all nailing shall be as scheduled on Drawings:
1. Nails or Spikes shall be common wire unless noted otherwise. Penetration of nails or spikes shall be one-half the length of the nail or spike into the piece receiving the point. However, to connect pieces 2 inches in thickness, 16d nails shall be used unless noted otherwise. a. Bore holes for nails wherever necessary to prevent splitting. Hole size shall not exceed 75 percent of nail diameter.
b. Use finish or casing nails for finish work.
c. Use of nailing guns is limited by CBC requirements and subject to approval by Architect. Submit nailing gun and nail data for review.
B. Bolts: Bolts shall be of sizes indicated. Drive fit with washers under head and nuts. Lag screws shall be scr ewed (not driven) into place with holes bored the same depth and diameter as shank. For threaded portion, holes shall be no larger than root diameter.
Retighten all bolts and screws before closing in.
C. Framing Devices: As specified under Products, sizes as indicated. Use half -length nails where required.
3.3 FRAMING AND ROUGH CARPENTRY
A. Sills: Shall be in long lengths of sizes shown, fastened with anchor bolts at exterior walls and with fasteners at non-structural interior walls as indicated on Drawings. Place malleable iron or steel plate washers (but not cut washers) under nuts bearing on wood.
B. Studs, Posts and Columns: Shall be full length. Corners shall be as detailed. Partitions or walls containing plumbing, heating or other piping shall be so formed as to gi ve proper clearance for materials. Cut members as required to provide full bearing at ends. Connect to structure as indicated.
C. Plates: Shall be in long lengths and spliced as shown.
D. Fire Blocking: Shall be same thickness and width of studs or joists unless shown otherwise.
Blocking shall not be spaced over 8 feet – 0 inches on center. Install fire blocking in accordance with CBC, Title 24, Part 2, Section 718, Concealed Spaces.
E. Joists and Beams: Shall be in long lengths and spliced over bearings unless shown otherwise. Install with crown side up. Beams or headers indicated to be built up of two or more joists shall be fabricated on the job using full length members. Clinch nails protruding through members.
1. Provide double joists and headers at all openings through floors and roofs unless otherwise shown on Drawings.
2. Provide typical headers at all openings through walls where one or more studs are required to be cut. For penetration through walls narrower than stud spacing, provide solid backing on all sides for fastening finish materials. 06 10 00 Lionakis No. 019124.02
Rough Carpentry January 26, 2024
F. Plywood, General Use: Install to pattern indicated and provide blocking at joints where noted on Drawings. Center all joints over bearing supports. Nail to framing as indicated.
G. Wood Furring, Stripping and Grounds: Install as shown or required to provide nailing of materials or passage of pipes, conduits, etc., not otherwise accommodated.
H. Bridging: Space not over 8 feet-0 inches on center for spans over 16 feet-0 inches. Spans over 8 feet-0 inches and under 16 feet-0 inches shall have bridging placed at midspan.
Bridging shall be two 2 x 3s or solid blocking as indicated. Joists 8 inches or less in depth shall not require bridging unless specifically indicated.
I. Backing/Blocking: Shall be provided for all wall and ceil ing finishes and for the supporting and anchorage of products, fixtures and equipment for all trades. Coordinate size, type , and location of backing and supports with manufacturer or supplier of items requiring backing/blocking.
1. Install blocking for fastening surface applied items.
2. Install blocking at plywood joints unless otherwise noted on Drawings.
J. Framing members shall not be notched or bored unless specifically detailed on Drawings.
3.4 ROUGH HARDWARE
A. Rough hardware indicated or required but not specified elsewhere, shall be furnished and installed hereunder, including metal fittings, screws, bolts, and other fastening devices; size and configuration as applicable.
3.5 MISCELLANEOUS CARPENTRY WORK
A. Miscellaneous Carpentry Work not included under other Sections shall be furnished and installed hereunder as indicated. Carefully locate and securely anchor such items to structure.
B. Drypack: Drypack shall consist of one part high early strength Portland cement to not more than three parts of sand by volume. Add only a minimum amount of water to hold the mixture in shape while packing and to provide hydration. Solidly ram drypack into place to provide uniform bearing and cure with moist sacks or cloths for a period of at least three days.
C. Plywood back boards for electrical, telephone, and similar types of wall mounted equipment shall be provided as indicated and as required by design conditions. Plywood back boards may be installed either horizontally or vertically.
D. Shoring and Bracing: Shore or brace for temporary support of all work as required during the construction period except any shoring and bracing specified and included under other Sections of these specifications.
E. Temporary Enclosures: Provide and maintain all barricades and enclosures required to protect the work in progress.
F. Protect all work in progress and all work installed, as well as the work of all other trades. Any work damaged as a re sult of the work under this Section shall be corrected to its original condition or replaced if directed by Architect and at no cost to Owner.
Lionakis No. 019124.02 06 10 00
January 26, 2024 Rough Carpentry
Line3xx Page 7
G. Protection Devices: Pedestrian walkways, barricades, lights, shoring , and other protective structures and devices necessary for protection of pedestrians shall conform to requirements of 2022 CBC, Title 24, Section 3306, Protection of Pedestrians, and to the requirements of the Department of Public Works, City of Sacramento.
H. Wall Flashing: Install where shown on Drawings and per manufacturer’s recommended installation procedures.
3.6 FRAMING TOLERANCES
A. Maximum variation from true flatness: 1/4 inch in 10 feet in any direction.
3.7 CLEAN-UP
A. Upon completion of the work of this Section, remove all surplus materials, rubbish and debris from the premises.
END OF SECTION
Lionakis No. 019124.02 06 17 53
January 26, 2024 Shop-Fabricated Wood Trusses
Line3xx Page 1
SECTION 06 17 53
SHOP-FABRICATED WOOD TRUSSES
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Shop fabricated wood trusses for structural framing.
B. Bridging, bracing, and anchorage.
1.2 RELATED SECTIONS
A. Section 06 10 00 – Rough Carpentry.
B. Section 09 91 00 – Painting.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. ALSC – Softwood Lumber Standards.
2. ASTM A653/A653M – Standard Specification for Steel Sheet, Zinc -Coated (Galvanized) or Zinc-Iron Alloy-coated (Galvannealed) by the Hot Dip Process.
3. BCSI-1 – Bracing Wood Trusses.
4. BCSI-1 – Handling and Erecting Wood Trusses.
5. TPI 1 – Metal Plate Connected Parallel Chord Wood Trusses.
6. TPI 1 – Metal Plate Connected Wood Trusses.
1.4 SYSTEM DESCRIPTION
A. Design Loads: Refer to Structural Drawings.
1.5 SUBMITTALS FOR REVIEW
A. Submit under provisions of Division 01.
B. Truss Submittal Package: Provide a complete submittal package per CBC Section 2303.4.3.
Truss design drawings shall bear the seal and signature of the truss designer in accordance with CBC Section 2303.4.1.4.1.
C. Design Calculations : Submit design calculations for each truss configuration and loading configuration. Design calculations shall bear the seal and signature of the truss designer.
06 17 53 Lionakis No. 019124.02
Shop-Fabricated Wood Trusses January 26, 2024
1.6 QUALITY ASSURANCE
A. Perform Work in accordance with the following agencies:
1. Lumber Grading Agency: Certified by ALSC.
B. Truss Design, Fabrication, and Installation: In accordance with BCSI-1 and TPI 1.
C. Maintain one copy of each document on site.
D. Manufacturer: Company specializing in manufacturing the Products specified in this section.
E. Design trusses under direct supervision of a Professional Structural Engineer experienced in design of this Work and licensed in the State of California.
F. State of California, California Code of Regulations, CBC Part 2, 2022 Edition, Chapter 23.
1. Lumber Grading as per CBC Section 2303.
2. Metal Plate Connected Trusses as per CBC Section 2303.4.6.
3. Truss Quality Assurance as per CBC Section 2303.4.7.
1.7 REGULATORY REQUIREMENTS
A. Conform to 2022 CBC for loads and other governing load criteria.
1.8 DELIVERY, STORAGE, AND PROTECTION
A. Transport, handle, store, and protect products under provisions of Division 01.
B. Handle and erect trusses in accordance with BCSI-1.
C. Store truss depth in vertical position resting on intermittent bearing pads.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Truss manufacturer shall be a company specializing in manufacturing the products specified in this Section.
2.2 MATERIALS
A. Lumber Grading Rules: AFPA, WCLIB and WWPA.
B. Wood Members: Single or multiple top and bottom chord, 19 percent maximum and 11 percent minimum moisture content.
C. Steel Plate Connectors: ASTM A653/A653 steel, Grade B, hot dip galvanized; die stamped with integral teeth.
D. Truss Bridging: Type, size and spacing recommended by truss manufacturer.
2.3 ACCESSORIES
A. Wood Blocking, Plating, Support Members and Framing for Openings: In accordance with Section 06 10 00.
Lionakis No. 019124.02 06 17 53
January 26, 2024 Shop-Fabricated Wood Trusses
Line3xx Page 3
B. Fasteners and Anchors: Hot dipped galvanized steel.
C. Bearing Plates: Electro-galvanized.
2.4 FABRICATION
A. Fabricate trusses to achieve structural requirements specified.
B. Brace wood trusses for support in accordance with BCSI-1.
C. Provide bottom and top chord extensions as indicated.
D. Fabricate to achieve minimum end bearing of 2-3/4 inches.
E. Frame special sized openings in web framing as shown to accommodate ducts.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify that supports and openings are ready to receive trusses.
3.2 PREPARATION
A. Coordinate placement of bearing items.
3.3 ERECTION
A. Install trusses in accordance with manufacturer's instructions and BCSI-1.
B. Set members level and plumb, in correct position.
C. Make provisions for erection loads, and for sufficient temporary bracing to maintain structure plumb, and in true alignment until completion of erection and installation of permanent bracing.
D. Do not field cut or alter structural members without acceptance of Architect.
E. Place headers and supports to frame openings.
F. Frame openings between trusses with lumber in accordance with Section 06 10 00.
G. Coordinate placement of sheathing with work of this Section.
H. After erection, touch-up damaged surfaces with primer consistent with shop coat.
3.4 ERECTION TOLERANCES
A. Framing Members: 1/2 inch maximum from true position.
END OF SECTION
Lionakis No. 019124.02 07 13 26
January 26, 2024 Self-Adhering Sheet Waterproofing
Line3xx Page 1
SECTION 07 13 26
SELF-ADHERING SHEET WATERPROOFING
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Self-adhesive elastomeric sheet membrane waterproofing for:
1. Installation as air/water barrier/flashing at wall areas.
B. Drainage composite and protection board.
C. Accessories.
1.2 RELATED SECTIONS
A. Section 03 30 00 – Cast-In-Place Concrete.
B. Section 06 10 00 – Rough Carpentry.
C. Section 07 62 00 – Sheet Metal Flashing and Trim.
D. Section 07 92 00 – Joint Sealants.
1.3 REFERENCES
A. The publications listed below form a part of th is Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards , manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. ASTM D412 – Test Methods for Vulcanized Rubber and Thermoplastic Rubbers and Thermoplastic Elastomers-Tension.
2. ASTM D1970 – Standard Specification for Self -Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection.
3. ASTM D3767 – Standard Practice for Rubber-Measurement of Dimensions.
4. ASTM E96 – Standard Test Methods for Water Vapor Transmission of Materials.
5. ASTM D6135 – Standard Practice for Application of Self -Adhering Modified Bituminous Waterproofing.
6. ASTM G90 – Standard Practice for Performing Accelerated Outdoor Weathering of Nonmetallic Materials using Concentrated Natural Sunlight - EMMAqua test.
1.4 SUBMITTALS
A. Submit under provisions of Division 01.
07 13 26 Lionakis No. 019124.02
Self-Adhering Sheet Waterproofing January 26, 2024
B. Product Data: Submit product data for each product specified in this Section with the product and selected attributes clearly identified.
C. Manufacturer's Instructions: Furnish manufacturer's printed instructions for the installation of membranes, including procedures and materials for splicing and bonding.
1.5 QUALITY ASSURANCE
A. Applicator Qualifications: Application s hall be done only by an application firm normally engaged in this business and approved by the material manufacturers. All work shall be performed by qualified applicators working under an experienced supervisor.
B. Manufacturer's Representation During Instal lation: A qualified representative of the membrane manufacturer shall be present periodically during the work on the waterproof membrane system to assure compliance with the specifications and recommendations of the manufacturer.
1.6 DELIVERY, STORAGE AND HANDLING
A. Materials shall be delivered to the job site in original unbroken packages bearing the manufacturer's label. Material shall be stored above the ground in a dry location. Containers shall be stored in such a manner as to prevent damage.
B. Cover materials and store in dry condition between temperatures of 40 degrees F and 90 degrees F. Install within one year of date of manufacture. Do not store at elevated temperatures which will reduce the shelf life of the product.
1.7 JOB AND ENVIRONMENTAL CONDITIONS
A. Job C onditions: The Membrane Waterproofing Contractor shall acquaint himself with all conditions, general construction methods, and sequence to be employed. No extras will be permitted for his failure to do so.
B. Environmental Conditions:
1. Temperature: Surface temperature shall not be higher than 90 degrees F and no lower than 40 degrees F during application of membrane.
2. Weather: Do not apply during periods of precipitation or when rain is expected for period of application, and for at least three hours following application.
3. Ventilation: Provide positive ventilation to all areas not subject to natural ventilation during application and curing periods.
1.8 WARRANTY
A. Membrane waterproofing shall be warrantied for two years from the date of filing Notice of Completion against all defects in materials. Warranty shall also cover damage due to leaks, defective materials, and installation.
B. Installer: Two year installer workmanship warranty.
Lionakis No. 019124.02 07 13 26
January 26, 2024 Self-Adhering Sheet Waterproofing
Line3xx Page 3
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Basis-of-Design: GCP Applied Technologies, Products:
1. Walls: Grace Ice and Water Shield HT.
2. Primer: Perm-A-Barrier Primer Plus.
B. Epro.
C. Carlisle.
D. W. R. Meadows.
E. Henry Company.
F. Substitutions: Under provisions of Division 01.
2.2 MATERIALS – WALL AREAS
A. Elastic Sheet Membrane Waterproofing:
1. Material: Cold applied, self -adhering membrane composed of a rubberized asphalt adhesive and interwound with a disposable release sheet. Provide an embossed, slip resistant surface on the high-performance film with UV barrier properties.
2. Membrane Thickness: 40 mils per ASTM D3767 Method A.
3. Membrane Tensile Strength: MD 33 lbf/in, CD 31 lbf/inch per ASTM D412 Die C Modified.
4. Membrane Elongation: 250 percent per ASTM D412 Die C Modified.
5. Low Temperature Flexibility: Unaffected at -20 degrees F per ASTM D1970.
6. Maximum Permeance: 0.05 perms per ASTM E96.
7. Maximum Material Weight Installed: 0.22 pounds per square foot per ASTM D461.
8. Service Temperature: 240 degrees F per ASTM D1204
9. Adhesive: Rubberized asphalt adhesive containing post -consumer recycled content, contains no calcium carbonate, sand or fly ash.
10. Exposure: Can be left exposed for a maximum of 120 days from date of installation per ASTM G90 – EMMAqua test.
B. Primer: VOC compliant, low odor, water -based primer provided by sheet waterproofing manufacturer, which imparts a high tack finish on the treated substrate.
C. Sealant: Type specified in Section 07 92 00.
07 13 26 Lionakis No. 019124.02
Self-Adhering Sheet Waterproofing January 26, 2024
PART 3 EXECUTION
3.1 INSPECTION
A. Examine surfaces to receive membrane waterproofing to assure that they are smooth, dry , and free of foreign material, moisture and unevenness which would prevent the execution and quality of application of the membrane waterproofing as specified.
B. Do not proceed with application of waterproofing systems until defects are corrected.
3.2 PREPARATION OF SURFACES - GENERAL
A. Surfaces shall be dry, clean, smooth , and free from projections or holes that may cause puncture of membrane. Substrate shall be absolutely surface dry for proper adhesion of membrane. Minimum curing time for concrete shall be seven days prior to membrane installation.
B. Cleaning: Clean surface s to remove all curing compounds, loose dirt, moisture, grease, dust, and other foreign material. Sweep or vacuum surface clean prior to membrane installation.
3.3 APPLICATION OF PRIMER
A. Apply primer over substrate per manufacturer’s recommendations.
B. Allow primer to fully dry prior to start of membrane installation.
3.4 APPLICATION OF MEMBRANE AT WALL AREAS
A. Install membrane per ASTM D6135 and manufacturer’s recommendations.
1. Schedule installation such that membrane is covered by finish materials within 120 days after installation.
2. Do not install membrane on wet or frozen substrates.
3. Install when surface temperature of substrate is a minimum of 40 degrees F and rising.
4. Remove dust, dirt, loose materials, and protrusions from substrate surface.
5. Install membrane on clean , dry, continuous s ubstrate. Fill voids and damaged or unsupported areas prior to installation.
6. Install membrane such that all laps shed water. Work from the low point to the high point at all times.
7. Side laps shall be minimum 4 inches and end laps shall be minimum 8 inches.
8. Flash penetrations and repair damage using manufacturer’s recommended methods.
9. Seal all reversed laps and exposed or cut membrane edges with continuous bead of compatible silicone weather barrier sealant.
3.5 CLEAN-UP
A. At the completion of the work of this Section, all surfaces and areas adjoining the membrane shall be left in a clean condition. All cartons, pails and equipment shall be removed from the premises.
Lionakis No. 019124.02 07 13 26
January 26, 2024 Self-Adhering Sheet Waterproofing
Line3xx Page 5
B. Clean any stains on materials that would be exposed in the completed work.
END OF SECTION
Lionakis No. 019124.02 07 21 00
January 26, 2024 Thermal Insulation
Line3xx Page 1
SECTION 07 21 00
THERMAL INSULATION
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Thermal insulation in exterior wall construction.
1.2 RELATED SECTIONS
A. Section 06 10 00 – Rough Carpentry.
B. Section 09 29 00 – Gypsum Board.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. ASTM C665 – Standard Specification for Miner al-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing.
2. ASTM E84 – Standard Test Method for Surface Burning Characteristics of Building Materials.
3. UL 723 – Test for Surface Burning Characteristics of Building Materials.
1.4 SUBMITTALS
A. Submit under provisions of Division 01.
B. Product Data: Provide data on product characteristics, performance criteria, and limitations.
C. Manufacturer's Certificate: Certify that products meet or exceed California Quality Standards.
1.5 SYSTEM DESCRIPTION
A. Materials of this Section: Provide continuity of thermal barrier at building enclosure elements.
1.6 COORDINATION
A. Coordinate work with other trades under provisions of Division 01.
07 21 00 Lionakis No. 019124.02
Thermal Insulation January 26, 2024
PART 2 PRODUCTS
2.1 GLASS FIBER BATT INSULATION
A. Acceptable Manufacturers:
1. Knauf Insulation, Shelbyville, IN; 317-398-4434, www.knaufusa.com. Product: EcoBatt.
2. Owens-Corning, Toledo, OH; 800-438-7465, www.owenscorning.com.
3. Certainteed Corp., Insulation Group, Valley Forge, PA; 800 -233-8990, www.certainteed.com.
4. Johns Manville, Denver, CO; 800-654-3103, www.specJM.com.
5. Substitutions: Under provisions of Division 01.
B. Batt Insulation: Preformed glass fiber batt in accordance with 20 22 CBC Section 7 20, California Referenced Standards Code Chapter 12-13, ASTM E84, and UL 723, conforming to the following:
1. Facings:
a. Faced on one side with foil reinforced kraft (FSK) face at exposed locations (facing not covered by finish materials) ; Type III, Class A per ASTM C665; flame spread 25 and smoke developed 50 per ASTM E84.
b. Kraft facing at locations where insulation will be covered by finish materials ; Type II, Class C per ASTM C665. In concealed locations, facings shall be installed behind and in substantial contact with the unexposed surface of the wall finish.
2. Thermal Resistance Value: Minimum R-19.
3. Provide formaldehyde-free thermal insulation products.
4. Recycled Content: Minimum twenty percent post-consumer.
C. Accessories:
1. Staples: Steel wire; galvanized; type and size to suit application.
2. Tape: Polyester self-adhering type, mesh reinforced, 2 inches wide.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify existing site conditions.
B. Verify that substrate, adjacent materials, and insulation are dry and ready to receive insulation.
3.2 INSTALLATION – BATT INSULATION
A. Install insulation in accordance with insulation manufacturer's instructions and with the flame spread rating and smoke density requirements of CBC Section 720, ASTM E84 , and UL 723.
B. Install in exterior walls, full width, depth, and height of cavity , without gaps or voids. Do not compress insulation.
C. Trim insulation neatly to fit spaces. Insulate miscellaneous gaps and voids.
Lionakis No. 019124.02 07 21 00
January 26, 2024 Thermal Insulation
Line3xx Page 3
D. Fit insulation tight in spaces and tight to exterior side of mechanical and electrical services within the plane of insulation.
E. Install with factory applied vapor retarder membrane facing interior side of building spaces.
Lap ends and side flanges of membrane over framing members.
F. Securely fasten and anchor insulation in place to prevent displacement or sagging of material in all areas.
1. At wood stud walls, staple facing flanges in place at maximum 6 inches on center.
G. Tape seal butt ends, lapped flanges, and tears or cuts in membrane.
END OF SECTION
Lionakis No. 019124.02 07 25 00
January 26, 2024 Weather Barriers
Line3xx Page 1
SECTION 07 25 00
WEATHER BARRIERS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Weather barrier membrane.
B. Seam tape.
C. Flexible flashings.
D. Fasteners.
E. Accessories.
1.2 RELATED SECTIONS
A. Section 06 10 00 – Rough Carpentry.
B. Section 07 62 00 – Sheet Metal Flashing and Trim.
1.3 REFERENCES
A. The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. ASTM C920 – Standard Specification for Elastomeric Joint Sealants.
2. ASTM C1193 – Standard Guide for Use of Joint Sealants.
3. ASTM D882 – Test Method for Tensile Properties of Thin Plastic Sheeting.
4. ASTM D1117 – Standard Guide for Evaluating Non-Woven Fabrics.
5. ASTM E84 – Test Method for Surface Burning Characteristics of Building Materials.
6. ASTM E96 – Test Method for Water Vapor Transmission of Materials.
7. ASTM E1677 – Specification for Air Retarder Material or System for Framed Building Walls.
8. ASTM E2178 – Test Method for Air Permeance of Building Materials.
9. ASTM E2357 – Test Method for Determining Air Leakage of Air Barrier Assemblies.
10. AATCC Test Method 127 – Water Resistance: Hydrostatic Pressure Test.
11. TAPPI Test Method T-410 – Grams of Paper and Paperboard (Weight per Unit Area).
12. TAPPI Test Method T-460 – Air Resistance of Paper (Gurley Hill Method). 07 25 00 Lionakis No. 019124.02
Weather Barriers January 26, 2024
1.4 SUBMITTALS
A. Submit under provisions of Division 01.
B. Product Data: Submit product data for each product specified in this Section with the prod- uct and selected attributes clearly identified.
C. Quality Assurance Submittals:
1. Design Data, Test Reports: Provide manufacturer test reports indicating product compliance with indicated requirements.
2. Manufacturer Instructions: Provide manufacturer’s written installation instructions and details.
3. Manufacturer’s Field Service Reports: Provide site reports from authorized field service representative, indicating observation of weather barrier assembly installation.
D. Closeout Submittals:
1. Weather Barrier Warranty: Manufacturer’ s executed warranty form with authorized signatures and endorsements indicating date of Substantial Completion.
1.5 QUALITY ASSURANCE
A. Qualifications:
1. Installer shall have experience with installation of specified w eather barrier and flexible flashing assemblies under similar conditions.
2. Installation shall be in accordance with weather barrier manufacturer’s installation guidelines and recommendations.
B. Single Source Responsibility: Provide building wrap, flashings, and accessory materials from a single manufactu rer to ensure system compatibility and quality, and to comply with manufacturer’s warranty requirements.
C. Pre-installation Meeting:
1. Conduct pre-installation meeting in accordance with provisions of Division 01.
2. Hold a pre-installation conference, two weeks prior to start of weather barrier installation.
Attendees shall include Contractor, Architect, installer, Owner’s Representative, and weather barrier manufacturer’s designated representative.
3. Review all related project requirements and submittals, status o f substrate work and preparation, areas of potential conflict and interface, availability of weather barrier assembly materials and components, installer’s training requirements, equipment, facilities, and scaffolding, and coordinate methods, procedures an d sequencing requirements for full and proper installation, integration, and protection.
1.6 DELIVERY, STORAGE AND HANDLING
A. Deliver, store, and handle products and materials under provisions of Division 01.
B. Deliver weather barrier materials and components in manufacturer’s original, unopened, undamaged containers with identification labels intact.
C. Store weather barrier materials as recommended by weather barrier manufacturer.
Lionakis No. 019124.02 07 25 00
January 26, 2024 Weather Barriers
Line3xx Page 3
1.7 SCHEDULING
A. Review requirements for sequencing of installation of weathe r barrier assembly with installation of flashings to provide a weather-tight barrier assembly.
B. Schedule installation of weather barrier materials and exterior cladding within nine months of weather barrier assembly installation.
1.8 WARRANTY
A. Product and Labor Warranty: Weather barrier manufacturer shall warranty weather barrier assemblies for a period of ten years from date of Project Completion.
1. Weather barrier manufacturer ’s approval for warranty is required prior to assembly installation.
PART 2 PRODUCTS
2.1 MANUFACTURER
A. Basis-of-Design: DuPont Building Innovations , Wilmington, DE; (800) 448-9835, http://construction.tyvek.com. Products:
1. DuPont Tyvek CommercialWrap D.
2. DuPont FlexWrap NF.
3. DuPont StraightFlash.
B. Substitutions: Under provisions of Division 01.
2.2 MATERIALS
A. Building Wrap: High-performance, flash spun -bonded olefin, non -woven, non -perforated weather barrier and related assembly components.
B. Performance Characteristics:
1. Air Penetration Resistance: <0.04 cfm/ft2 at 1.57 psf, when tested in accordance with ASTM E2357. Type 1 per ASTM E1677.
2. Water Vapor Permeance: 30 perms, when tested in accordance with ASTM E96, Procedure A.
3. Water Penetration Resistance: Hydrostatic head resistance greater than 7.7 feet when tested in accordance with AATCC Test Method 127.
4. Basis Weight: Minimum 2. 4 ounces per square yard , when teste d in accordance with TAPPI Test Method T-410.
5. Air Penetration Resistance: >750 seconds/100cc, when tested in accordance with TAPPI Test Method T-460.
6. Breaking Strength: Minimum 33/41 lbs/in., when tested in accordance with ASTM D882.
7. Tear Resistance: 6/9 pounds, when tested in accordance with ASTM D1117.
8. Surface Burning Characteristics: Class A, when tested in accordance with ASTM E84.
Flame Spread: 15, Smoke Developed: 25.
07 25 00 Lionakis No. 019124.02
Weather Barriers January 26, 2024
2.3 FLEXIBLE FLASHINGS
A. Flexible membrane flashing materials for openings and penetrations.
B. Straight flashing membrane materials for sealing penetrations.
2.4 ACCESSORIES
A. Seam Tape: DuPont Tyvek Tape , three inches wide, as manufactured by DuPont Building Innovations.
B. Fasteners: Tyvek Wrap Cap Screws, as manufactured by DuPont Building Innovations.
1. 1-5/8 inch corrosion resistant screws with 2-inch diameter high density polyethylene cap washers with UV inhibitors.
C. Sealants:
1. Provide sealants that comply with ASTM C920, Type S, Grade NS, Class 25 minimum, silicone sealant to maintain watertight conditions. All sealants shall be California VOC compliant.
2. Acceptable Products:
a. Dow Corning Dowsil 758.
b. GE SCS2000 Silpruf.
c. Tremco Spectrem 1.
d. Other sealants recommended by the weather barrier manufacturer.
D. Adhesives:
1. Provide adhesive recommended by weather barrier manufacturer. All adhesives shall be California VOC compliant.
E. Primers for Flashings:
1. Provide flashing manufacturer synthetic rubber-based, spray applied primer to assist in adhesion between substrate and flashing. All primers shall be California VOC compliant.
2. Acceptable Products:
a. DuPont Adhesive Primer.
b. Other primers recommended by the flashing manufacturer.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify substrate and surface conditions are in accordance with weather barrier manufacturer recommended tolerances prior to installation of weather barrier and accessories.
3.2 INSTALLATION - WEATHER BARRIER
A. Install weather barrier over exterior face of exterior wall substrate in accordance with manufacturer recommendations and as indicated on Drawings.
B. Install weather barrier prior to installation of exterior cladding materials.
Lionakis No. 019124.02 07 25 00
January 26, 2024 Weather Barriers
Line3xx Page 5
C. Start weather barrier installation at a building corner, leaving 6 inches to 12 inches of weather barrier extended beyond corner to over lap.
D. Install weather barrier in a horizontal manner starting at the lower portion of the wall surface with subsequent layers installed in a shingling manner to overlap lower layers. Maintain weather barrier plumb and level.
E. Sill Plate Interface: Extend lower edge of weather barrier over sill plate interface a minimum of 1 inch. Secure to foundation with elastomeric sealant as recommended by weather barrier manufacturer.
F. Overlap weather barrier:
1. Exterior Corners: Minimum 12 inches.
2. Seams: Minimum 6 inches.
G. Weather Barrier Attachment:
1. Attach weather barrier to wood studs through exterior sheathing. Secure using weather barrier manufacturer recommend fasteners, space 6 inches to 18 inches vertically on center along stud line, and 24 inches on center, maximum horizontally.
3.3 SEAMING
A. Seal seams of weather barrier with seam tape at all vertical an d horizontal overlapping seams.
B. Seal any tears or cuts as recommended by weather barrier manufacturer.
3.4 FLEXIBLE FLASHINGS
A. Install flexible flashings per manufacturer’s recommendations.
3.5 FIELD QUALITY CONTROL
A. Notify manufacturer’s designated representative to obtain required periodic observations of weather barrier assembly installation.
3.6 PROTECTION
A. Protect installed weather barrier from damage.
B. Weather barrier shall be covered with ex terior cladding materials prior to manufacturer’s recommended maximum exposure time.
END OF SECTION
Lionakis No. 019124.02 07 54 23
January 26, 2024 Thermoplastic-Polyolefin Roofing
Line3xx Page 1
SECTION 07 54 23
THERMOPLASTIC-POLYOLEFIN ROOFING
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Adhered thermoplastic polyolefin (TPO) roofing membrane system.
B. Gypsum roof cover board.
C. Roofing accessories.
D. Existing roofing demolition.
1.2 RELATED SECTIONS
A. Section 02 41 00 – Demolition: Roofing Demolition.
B. Section 06 10 00 – Rough Carpentry.
C. Section 07 62 00 – Sheet Metal Flashing and Trim.
D. Section 07 95 00 – Expansion Control.
E. Divisions 21-23 – Mechanical.
F. Divisions 26-28 – Electrical.
1.3 REFERENCES
A. The publications listed be low form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest editi on of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards and Manuals:
1. ASTM C1177/C1177M – Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing.
2. ASTM C1371 – Standard Test Method for Determination of Emittance of Materials Near Room Temperature Using Portable
Emissometers.
3. ASTM C1549 – Standard Test Method for Determination of Solar Reflectance Near Ambien t Temperature Using a Portable Solar
Reflectometer.
4. ASTM D471 – Standard Test Method for Rubber Property – Effects of Liquids.
5. ASTM D751 – Standard Test Methods for Coated Fabrics. 07 54 23 Lionakis No. 019124.02
Thermoplastic-Polyolefin Roofing January 26, 2024
6. ASTM D1204 – Standard Test Method for Linear Dimensional Changes of Non-Rigid Thermoplastic Sheathing or Film at Elevated
Temperature.
7. ASTM D5884 – Standard Test Method for Determining Tearing Strength of Internally Reinforced Geomembranes.
8. ASTM D6878 – Standard Specification for Thermoplastic Polyolefin Based Sheet Roofing.
9. ASTM E84 – Standard Test Method for Surface Burning Characteristics of Building Materials.
10. ASTM E96 – Standard Test Method for Water Vapor Transmission of Materials.
11. ASTM E108 – Standard Test Methods for Fire Tests of Roof Coverings.
12. ASTM E408 – Standard Test Method for Tota l Normal Emittance of Surfaces Using Inspection-Meter Techniques.
13. ASTM E1980 – Standard Practice for Calculating Solar Reflectance Index of Horizontal and Low-Sloped Opaque Surfaces.
14. Factory Mutual Global (FMG) Approval Guide.
15. NRCA – National Roofing Contractors Association.
16. UL 790 – Standard Test Methods for Fire Tests of Roof Coverings.
1.4 SUBMITTALS
A. General: Submit in accordance with Division 01.
B. Product Data:
1. Submit manufacturer’s descriptive literature, product specification, and installation instructions for each product.
2. Material Safety and Data Sheet (MSDS) for each product.
C. Shop Drawings:
1. Single-Ply Roofing Membrane Setting Plan: Include layout of membrane, location of flashings and accessories.
a. For mechanically fastened single-ply membrane system, indicate membrane fastener type, size, and spacing to meet CBC and ASCE 7 wind uplift requirements at the location of the work.
2. Detail Drawings: Include joint or termination detail conditions, such as junction at de ck and wall, curb flashing, roof drain, pre -molded pipe flashing, field fabricated pipe flashing, field fabricated hot pipe flashing, parapet flashing, inside corner and outside corner flashing, and sealant pockets.
D. Samples:
1. Expansion joints.
E. Quality Assurance Submittals:
1. ICC ES Report.
2. Manufacturer’s Field Reports: Submit under provisions of Division 01.
Lionakis No. 019124.02 07 54 23
January 26, 2024 Thermoplastic-Polyolefin Roofing
Line3xx Page 3
3. Manufacturer Certifications.
4. Installer Certifications.
F. Closeout Submittals:
1. Warranty certificate.
2. Maintenance instructions.
1.5 QUALITY ASSURANCE
A. Single Source Responsibility: Provide cover board, membrane, and accessory materials from a single manufacturer to ensure system compatibility and quality, and to comply with manufacturer’s warranty requirements.
B. Qualifications:
1. Manufacturer Qualifications:
a. Firm specializing in roofing systems specified in this Section with a minimum ten years documented experience.
b. Furnish qualification documentation including a complete list of all projects (minimum of ten) within a 100 -mile radius from project site, wit h the same climate zone, using the same roofing system, and single -ply membrane formulation/ingredients. Include information on project location, size (square feet), date of installation, and contact information.
c. Private-labeled single-ply membrane products are not acceptable.
2. Installer Qualifications:
a. Firm specializing and certified by roofing system manufacturer. Submit manufacturer’s certification at time of bid.
b. Minimum of three years’ experience in single-ply roofing installation. c. State Contractor’s License: Class C-39.
C. Regulatory Requirements:
1. Conform to the 20 22 CBC, Section 1505 for roof assembly fire classification requirements.
2. Roof Assembly Fire Hazard Classification: UL Class A per ASTM E108 or UL 790.
3. All roof surfaces shall have positive roof drainage per definition in CBC Section 1502 and shall meet or exceed the minimum slope of 1/4 inch per foot as described in CBC Section 1507.12.1. Refer to Drawings for roof slopes and drainage patterns.
4. Thermoplastic single-ply roof covering shall comply with ASTM D6878 per CBC Section 1507.12.2.
5. Wind Uplift: Per CBC Section 1609.5.2, roof coverings shall be designed to withstand the wind pressures at the location of this Project, determined in accordance with ASCE 7. a. Per CBC Section 1504.4, the wind load on the roof covering shall be permitted to be determined using allowable stress design.
07 54 23 Lionakis No. 019124.02
Thermoplastic-Polyolefin Roofing January 26, 2024
D. Certifications:
1. Manufacturer Certification: Certify that the specified or proposed roofing system including type of deck, gypsum roof cover board, membrane type, adherence of components, perimeter attachment details, and all system component details are acceptable to meet warranty requirements and , when installed as per FM G Approval Guide, it will meet or exceed Factory Mutual System Approval and UL Classification Requirements as per UL RMSD.
2. Manufacturer’s Acceptance of Roofing Installer: Certify that the roofing installer’s qualifications have been reviewed, meet requirements of this Section, and is accepted by the roofing manufacturer.
E. Pre-Installation Meetings:
1. Conduct pre-installation meeting in accordance with Division 01.
2. Convene pre-installation meeting at the site at least one week prior to commencing work on this Section.
a. Attendees:
1) Owner’s representative, preferably including Owner’s Facilities Manager and Maintenance Foreman.
2) Architect.
3) Contractor.
4) Roofing installer.
5) Related trades sub-contractors.
6) Manufacturer Technical Representative/Inspector.
b. Agenda:
1) Review roof design (roof substrate, roofing system, flashings, gutters, etc.), shop drawings, and submittals.
2) Review manufacturer’s installation and technical information and provisions of this Section.
3) Review substrate requirements including substrate preparation and procedures for inspection and handover to roofing installer.
4) Review and coordinate schedule and site conditions related to project and work of this Section.
5) Conduct a roofing substrate walk-through.
3. Contractor shall give a minimum one-week notice to pre-installation meeting participants.
F. Coordination: Coordinate the work in this Section with work in relate d Sections particularly roof substrate work. Convene a coordination meeting at least one week before roof substrate work with roof system manufacturer’s representative attending and in accordance with Division 01.
Lionakis No. 019124.02 07 54 23
January 26, 2024 Thermoplastic-Polyolefin Roofing
Line3xx Page 5
1.6 SUSTAINABLE BUILDING DESIGN REQUIREMENTS
A. Provide highly reflective Energy Star compliant roofing system with emissivity of at least 0.9 when tested in accordance with ASTM E408 for a minimum of 75 percent of the roof surface.
1. Thermal Emissivity shall be measured in accordance with ASTM C1371.
2. Solar Reflectivity shall be measured in accordance with ASTM C1549.
3. Solar Reflectance Index shall be measured in accordance with ASTM E1980.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Comply with requirements of Division 01.
B. Deliver products in manufacturer's original containers, dry and undamaged, with seals and labels intact.
C. Store products in weather protected environment, clear of ground and moisture.
D. Store roofing membrane in the original undisturbed plastic wrap.
E. Store adhesives, sealants, and other curable materials in cool and dry location with temperatures between 60 degrees F and 90 degrees F. Do not store adhesive containers with opened lids due to the loss of solvent which occur from flash off.
1.8 PROJECT/SITE CONDITIONS
A. Do not apply roofing system during inclement weather.
B. Do not apply roofing system to damp or frozen substrate.
C. Take precautions to prevent wind blow -off or wind damage during the course of the roofing application.
D. Substrates to receive roofing system shall be thoroughly dr y. Provide drying equipment should moisture occur.
1.9 WARRANTY
A. Comply with provisions of Division 01.
B. Warranty installed membrane roofing system including labor and materials for loss of water- tightness caused by defective materials (including accessories) or workmanship, with no dollar limit, for twenty years. Effective warranty start date shall be at the time of final acceptance by Owner.
C. Warranty shall provide for the removal, replacement, repair, and making good without cost to Owner, of defects due to defective materials or workmanship.
D. Repairs under warranty shall be made within three days after receiving notice of need for repairs from Owner, weather permitting.
07 54 23 Lionakis No. 019124.02
Thermoplastic-Polyolefin Roofing January 26, 2024
PART 2 PRODUCTS
2.1 MANUFACTURERS AND PRODUCTS
A. Acceptable Manufacturers and Products:
1. TPO Roofing Membrane System:
a. Carlisle Syntec Inc. Product: Sure-Weld 60.
1) Flexible FAST adhesive for use on gypsum cover board. 2) CAV-GRIP III Low-VOC Adhesive/Primer for use on roofing membrane. b. Tremco. Product: TremPly TPO - 60 mil.
c. GAF Materials Corp. Product: EverGuard TPO 60.
d. Johns Manville. Product: JM TPO Roofing Membrane - 60 mil.
2. Gypsum Cover Board: Provided by roof system manufacturer.
B. Substitutions: Under provisions of Division 01.
2.2 TPO ROOFING MEMBRANE
A. Ultraviolet resistant thermoplastic polyolefin membrane reinforced with polyester fabric.
B. Properties:
1. Thickness (ASTM D751): 60 mils nominal.
2. Thickness over skrim: 15 mils nominal.
3. Tolerance on nominal thickness: ± 10 percent.
4. Minimum breaking strength (ASTM D751): 320 lbf/in.
5. Elongation at break of fabric (ASTM D751): 28 percent.
6. Tearing strength (ASTM D5884): 86 lbf.
7. Dimensional stability (ASTM D1204): ± 1 percent.
8. Water absorption (ASTM D471): ± 1 percent.
9. Colors:
a. White.
1) Initial Solar Reflectance: 0.79.
2) Initial Thermal Emittance: 0.90.
3) Solar Reflectance Index: 99.
2.3 GYPSUM ROOF COVER BOARD
A. Glass mat-faced, noncombustible, moisture-resistant treated gypsum core panel specifically designed for roofing applications, 1/4 inch thick, square edges , factory primed, conforming to ASTM C1177.
1. Where membrane is attached to gypsum roof cover board with adhesive (such as at vertical surfaces), cover board shall be factory primed and 5/8 inch thick. Do not use products intended for use as exterior wall sheathing.
Lionakis No. 019124.02 07 54 23
January 26, 2024 Thermoplastic-Polyolefin Roofing
Line3xx Page 7
2.4 ACCESSORIES
A. Non-Reinforced or Reinforced TPO Flashing, Pipe Boot and Flashings, Clamping Rings:
Use roofing membrane provided and recommended by manufacturer.
B. Flashing Metal: 0.023 inch thi ck galvanized steel laminated to 0.020 inch thick roofing membrane in white color used for flashing and edge metal detailing as furnished by the membrane manufacturer.
C. Membrane Bonding Adhesive: Low-VOC, methylene chloride -free aerosol contact adhesive/primer meeting California Air Resources Board or local Air Pollution Control/Air Quality Management District regulations.
D. Adhesive for Gypsum Roof Cover Board Attachment for Adhered Single -Ply Roofing System: Two-component, low-rise adhesive approved by roofi ng system manufacturer and cover board manufacturers.
E. Termination Bar: Extruded aluminum bar 0.08 inch thick by 1 inch wide.
F. Membrane Cleaning Solution: Manufacturer approved or recommended.
G. Air and Vapor Barrier: Roofing manufacturer’s 40 mil composite ai r and vapor barrier consisting of 35 mils of self -adhering rubberized asphalt laminated to a 5 mil polyolefin film with a siliconized one piece release liner. Permeability: 0.05 perms per ASTM D1970.
1. Primer: Type as manufactured and recommended by roofing manufacturer, appropriate to substrate.
H. Sealants: Solvent -based ethylene propylene seam caulk approved by roofing system manufacturer.
I. All-Purpose Sealant: Single component, high -solids content, and gun grade, approved by membrane manufacturer.
J. Expansion Joints: Refer to Section 07 95 00.
PART 3 EXECUTION
3.1 EXAMINATION
A. Report unacceptable conditions to Architect. Begin installation only when unacceptable conditions have been corrected and only when substrate is inspected and accepted by roofing installer and roofing system manufacturer.
B. Verify that surfaces and site conditions are ready to receive work.
C. Verify that deck is structurally sound to secure adhered single ply roofing system. Inspect roof deck for corrosion, rotting, warping, etc. Repair or replace defective roof deck prior to installing the roofing system.
D. Verify that deck surfaces are dry to the touch and free of snow or ice.
E. Verify that deck is clean and smooth, free of noticeable high spots or depressions, and ha s a positive slope to gutters.
07 54 23 Lionakis No. 019124.02
Thermoplastic-Polyolefin Roofing January 26, 2024
F. Verify that roof openings, curbs, pipes, sleeves, ducts , vents, etc. through roof are solidly set. Verify and ensure that all roof drain lines are clear.
3.2 PREPARATION - GENERAL
A. Protection: Protect roofing surface and adjacent work against damage to roofing work.
B. Review Material Safety Data Sheet and safety regulations recommended by OSHA.
C. Preparation Of Substrate:
1. General: To prevent delays or interruptions, coordinate with other work to ensure that components to be incorporated into the roofing system are available as the work progresses. Examine substrates to which the roofing materials are to be applied to ensure that their condition is satisfactory for the roofing systems application. Do not permit voids greater than 1/4 inch width in the substrate. Substrates for roofing materials shall be dry and free of oil, dirt, grease, sharp edges and debris. Inspect substrates and correct defects before application of roofing membrane.
2. Determine the condition of the structur al substrate. Areas with deteriorated or damaged decking or other materials shall have those affected materials removed and replaced.
3. Provide temporary water cut-offs at the end of each day. Maintain watertight condition of roof to prevent water intrusion . Install only that amount of roofing and flashing that can be made watertight with new materials in a one -day period or prior to the onset of inclement weather. Remove cut-off before resuming roofing.
4. Cover decking with cover board, applied in accordance w ith manufacturer’s instructions and as required resulting in a UL Class A roof system.
3.3 AIR AND VAPOR BARRIER INSTALLATION
A. Prepare surfaces and install primer and air and vapor barrier per manufacturer’s recommendations.
1. Surfaces shall be clean, dry, smooth, and free of voids, spalled areas, sharp protrusions, loose aggregate, laitance, and curing and form release compounds.
B. Install air and vapor barrier over entire roof area and at all roof penetrations and deck to wall intersections.
3.4 GYPSUM ROOF COVER BOARD INSTALLATION
A. Place cover board over clean plywood sheathing.
B. Apply adhesive for adhered single -ply roofing system according to adhesive manufacturer’s instructions.
3.5 ROOFING MEMBRANE PLACEMENT, ATTACHMENT, AND HOT AIR WELDING A. General: Install membrane in accordance with manufacturer’s instructions.
B. Sweep substrate of all loose debris before laying membrane.
Lionakis No. 019124.02 07 54 23
January 26, 2024 Thermoplastic-Polyolefin Roofing
Line3xx Page 9
C. Adhered Single-Ply Roofing System:
1. Apply adhesive per manufacturer’s foam adhesive bead spacing requirements within the field, at perimeters, and at corners to meet wind uplift and warranty requirements.
2. Position membrane over the substrate.
3. Fold membrane sheet back so half the underside is exposed.
4. Stir bonding adhesive thoroughly scraping the sides and the bot tom of the can (5 minutes minimum). Bonding surfaces must be dry and clean.
5. Apply bonding adhesive to the exposed underside of the membrane and the corresponding substrate area. Do not apply adhesive along the splice edge of the membrane to be hot air welded over adjoining sheet.
6. Apply adhesive evenly, without puddles using a plastic core medium nap roller to achieve continuous coating of both surfaces at a coverage rate recommended by adhesive manufacturer.
7. Due to solvent flash -off, condensation may form on freshly applied bonding adhesive when the ambient temperature is near the dew point. If condensation develops, possible surface contamination may occur and the application of bonding adhesive must be discontinued. Allow the surface to dry and apply a thin freshener coat to the previously coated surface when conditions allow for continuing.
8. Allow adhesive to dry until it is tacky but will not string or stick to a dry finger touch.
9. Roll the coated membrane into the coated substrate while avoiding wrinkles.
10. Brush down the bonded section of the membrane sheet immediately after rolling the membrane into the adhesive with a soft bristle push broom to achieve maximum contact.
11. Fold back the unbonded half of the sheet in the same manner, over lapping edges a minimum of 2 inches to provide for a minimum of 1-1/2 inch hot air weld.
12. Install adjoining membrane sheets in the same manner, overlapping a minimum of 2 inches to provide a minimum of 1-1/2 inch hot air weld.
13. Protect completed sections of the roof so bonding adhesive will not discolor the membrane surface. Do not place bonding adhesive containers or their lids directly on the surface of the membrane.
14. Install additional membrane securement at the perimeter of each roof level, roof section, curb, interior wall, etc. at any inside angle change where slope exceeds 2 inch es in one horizontal foot. Use manufacturer approved fasteners and standard seam fastening plates installed horizontally or vertically at the base of the walls, curbs, etc., spac ed a minimum of 12 inch es on center and flashed as recommended by roofing system manufacturer.
D. Adhered Single-Ply Roofing System at Vertical Surfaces:
1. Apply the applicable bonding adhesive to the exposed underside of the membrane and the corresponding vert ical substrate area at the published application rate on the applicable Product Data Sheet.
2. Allow adhesive to dry until tacky and install coated membrane into coated vertical substrate and avoid wrinkling.
3. Brush down the bonded section of membrane immediat ely with a soft bristle push broom.
07 54 23 Lionakis No. 019124.02
Thermoplastic-Polyolefin Roofing January 26, 2024
4. Install adjoining membrane sheets in the same manner, overlapping edges a minimum of 2 inches to provide for a minimum 1 -1/2 inch hot air weld. All splices be shingled to avoid bucking of water.
5. Hot air weld the membran e sheets a minimum of 1 -1/2 inches with an automatic hot air welding machine.
E. Welding of Laps:
1. General:
a. Roofing membrane connection shall be hot air welded only. b. Surfaces to be welded shall be clean and dry.
2. Hot Air Welding:
a. Hot air weld the membrane sheets with an automatic hot air welding machine. Follow hot air welding machine manufacturer’s instructions for use. b. Where use of automatic hot air welding machines is not practical, use a hand -held hot air welding machine. Preheat the nozzle tip and apply ove r the overlap area until the material reaches required temperature, immediately follow with a hand roller to press the heated membrane surfaces together with slow, even movements. Keep the roller within one inch of the nozzle tip. Seam strength may be test ed when cool. For best results, test seams 8 hours after hot air welding.
3. Quality Control of Seams: After seaming, check welded seams for continuity and integrity. Repair openings or “fishmouths” with a hand -held hot air tool fitted with a narrow nozzle tip and with a roller.
4. Membrane lap edges that have been exposed to the elements for approximately seven days or longer must be prepared with manufacturer -approved membrane cleaner.
Prepare the surface where the cleaner has been applied as per manufacturer’s instructions prior to hot air welding.
3.6 MEMBRANE FLASHING
A. Flash all vertical surfaces with reinforced membrane. Use non-reinforced membrane only at inside and outside corners, field fabricated pipe seals, scuppers, and sealant pockets where the use of pre molded accessories are not practical. Terminate the flashing in accordance with manufacturer-approved detail.
B. Use bonding adhesive on vertical surfaces more than 12 inches high such as walls, curbs, and pipes. Bonding adhesive is not required for vertical surfaces terminated under a metal counter flashing less than 12 inches high. Bonding adhesive may be eliminated for flashing heights 18 inches or less when a coping or termination bar is used for vertical terminations.
3.7 OTHER RELATED WORK
A. Counterflashing, and Other Metal Work: Refer to Section 07 62 00. Fasten flashing to prevent metal from pulling free or buckling. Seal to prevent moisture from entering the roofing system or building.
B. Expansion Joints: Refer to Section 07 95 00.
3.8 FIELD QUALITY CONTROL
A. General: Comply with requirements of Division 01.
Lionakis No. 019124.02 07 54 23
January 26, 2024 Thermoplastic-Polyolefin Roofing
Line3xx Page 11
B. The manufacturer’s representative shall observe, conduct tests, and prepare test reports in accordance with the provisions of this Section at predetermined periods before, during, and after installation of the work – specifically at critical periods identified by roofing system manufacturer to ensure a completely warranted system.
C. The manufacturer’s representative and the testing agency shall conduct final roof inspection on completion of the work in this Section and submit report to Architect and Owner. Notify Architect and Owner 48 hours in advance of date and time of inspection.
3.9 CLEANING
A. Clean roof surfaces as recommended by manufacturer. Do not use materials or methods which may damage surface or surrounding construction.
B. Where traffic must continue over finished roof membrane, protect surfaces.
END OF SECTION
Lionakis No. 019124.02 07 62 00
January 26, 2024 Sheet Metal Flashing and Trim
Line3xx Page 1
SECTION 07 62 00
SHEET METAL FLASHING AND TRIM
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Exterior wall flashings.
B. Roof flashings.
C. Gutters.
D. Rain water leaders.
E. Pre-manufactured roof penetration flashings.
F. Reglets.
1.2 RELATED SECTIONS
A. Section 07 54 23 – Thermoplastic-Polyolefin Roofing.
B. Section 07 92 00 – Joint Sealants.
C. Section 09 91 00 – Painting.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic desi gnation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated oth erwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. AAMA 2605 – Voluntary Specifications, Performance Requirements, and Test Procedures for Superior Performing Organic Coatings on
Aluminum Extrusions and Panels.
2. ANSI/SPRI/FM4435/ES-1 – Wind Design Standard for Edge Systems Used with Low Slope Roofing Systems.
3. ASTM A653/A653M – Standard Specification for Steel Sheet, Zinc Coated, (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.
4. ASTM A666 – Standard Specification for Annealed or Cold -Worked Austenitic Stainless Steel Sheet, Strip, Plate, and Flat Bar.
5. ASTM B32 – Standard Specification for Solder Metal.
6. ASTM B209 – Standard Specification for Aluminum and Aluminum -Alloy Sheet and Plate.
07 62 00 Lionakis No. 019124.02
Sheet Metal Flashing and Trim January 26, 2024
7. ASTM B370 – Standard Specification for Copper Sheet and Strip for Building Construction.
8. ASTM D1187 – Standard Specification for Asphalt -Base Emulsions for Use as Protective Coatings for Metal.
9. ASTM D4586 – Standard Specification for Asphalt Roof Cement, Asbestos Free.
10. CDA Copper in Architecture – Handbook.
11. NRCA Roofing Manual.
12. SMACNA Architectural Sheet Metal Manual.
1.4 SUBMITTALS
A. Submit shop drawings and product data under provisions of Division 01.
B. Describe material profile, jointing pattern, jointing details, fastenin g methods and installation details.
1.5 QUALITY ASSURANCE
A. Applicator: Company specializing in sheet metal flashing work with sufficient documented experience.
1.6 SYSTEM DESCRIPTION
A. Work of this Section is to physically protect roofing and exterior from damage tha t would permit water leakage to building interior.
1.7 PERFORMANCE
A. General: Sheet metal flashing and trim assemblies shall withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Completed sheet metal flashing and trim shall not rattle, leak, or loosen, and shall remain watertight.
B. Sheet Metal Standard for Flashing and Trim: Comply with NRCA's "The NRCA Roofing Manual" and SMACNA's "Architectural Sheet Metal Manual" requirements for dimensions and profiles shown unless more stringent requirements are indicated.
C. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes to prevent buckli ng, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.
1. Temperature Change: 120 degrees F, ambient; 180 degrees F, material surfaces.
1.8 DELIVERY, STORAGE AND HANDLING
A. Store products under provisions of Division 01.
B. Stack preformed material to prevent twisting, bending or abrasion, and to provide ventilation.
C. Prevent contact with materials during storage that may cause discoloration, staining or damage.
Lionakis No. 019124.02 07 62 00
January 26, 2024 Sheet Metal Flashing and Trim
Line3xx Page 3
PART 2 PRODUCTS
2.1 SHEET MATERIALS
A. Galvanized Steel: ASTM A653/A653M, G90 zinc coating; 24 gauge core steel unless noted otherwise on Drawings.
B. Aluminum: ASTM B209, 0.032 inch thickness with mill finish, unless noted otherwise on Drawings.
C. Copper Sheet: ASTM B370, temper H00-1/8 hard (cold rolled), except where temper 060 is required for forming, 20 ounces per square foot.
D. Stainless Steel: ASTM A666, Type 304, soft temper, 28 gauge, smooth No. 4 finish
2.2 ACCESSORIES
A. Fasteners: Galvanized steel or stainless steel with soft neoprene washers. Finish exposed fasteners same as flashing metal.
B. Bituminous Coating: Cold-applied asphalt emulsion complying with ASTM D1187.
C. Touch-up Paint: "Galvalloy" or "Galvweldalloy."
D. Sealant: Type specified in Section 07 92 00.
E. Bedding Compound: Rubber-asphalt type.
F. Asphalt Roofing Cement: ASTM D4586, asbestos free, of consistency required for application.
G. Solder:
1. Galvanized Steel: ASTM B 32, Grade Sn50, 50 percent tin and 50 percent lead with maximum lead content of 0.2 percent.
2. Copper: ASTM B32; 50 -50 Tin-Lead type or lead -free alternative of similar or greater strength.
H. Flux: Type as recommended by sheet metal manufacturer.
1. Copper: Harris Stay-Clean Liquid Flux or muriatic acid neutralized with zinc.
I. Strainers: Provide and install strainers at downspout openings in gutters per SMACNA manual.
2.3 PREMANUFACTURED ROOF PENETRATION FLASHINGS
A. At single ply membrane roofing:
1. Products as manufactured by Portals Plus or accepted equal. a. Pipe Portal Systems Pipe Boots: Compression molded EPDM rubber caps mechanically sealed to substrate using two beads formed into the collar of the cover mated with double grooves molded into the inside of the cap. Provide manufacturer’s standard adapter rings as required for a watertight installation. Size and type: As required for size and number of pipes to be flashed.
07 62 00 Lionakis No. 019124.02
Sheet Metal Flashing and Trim January 26, 2024
1) Provide s tainless steel clamps for final securement of pipe boots around penetrations.
2.4 REGLETS
A. Manufacturers:
1. Fry. Products:
a. Plaster Flashing System: Fry Reglet Model “STX” Springlok Stucco Reglet and Counter Flashing. Material shall be 0.025 inch thick aluminum with mill finish. b. Masonry Flashing System: Fry Reglet Model “MA” Springlok Masonry Regle t and Counter Flashing with 1 -1/2 inch top flange . Material shall be 0.025 inch thick aluminum with gray polyester coating.
c. Surface Mounted Flashing System: Fry Reglet Model “SM” Surface Mounted Reglet and Counter Flashing. Material shall be 0.025 inch thick aluminum with mill finish.
2. MM Systems.
3. Superior.
B. Substitutions: Under provisions of Division 01.
2.5 FABRICATION
A. Form sections true to shape, accurate in size, square, and free from distortion or defects.
B. Fabricate cleats and starter strips of same material as sheet, interlockable with sheet.
C. Form pieces in longest practical lengths.
D. Hem exposed edges on underside 1/2 inch; miter and seam corners.
E. Form material with flat lock seam.
F. Solder and seal non-moving metal joints watertight. After soldering, remove flux. Wipe and wash solder joints clean.
G. Fabricate one piece corners with minimum 18 inch long legs; seam for rigidity, solder joint watertight.
H. Fabricate vertical faces with bottom edge formed outward 1/4 inch and hemmed to form drip.
I. Expansion-contraction of sheet metal runs: Provide flat, 4 inch lap joints, sealed watertight with sealant, at maximum of 40 foot intervals.
2.6 FINISHES
A. Back-paint concealed metal surfaces with bituminous paint to a minimum dry film thickness of 15 mils.
B. Site paint finish under provisions of Section 09 91 00.
C. Pre-Finished Galvanized Steel: Shop pre-coated with PVDF coating.
1. PVDF (Polyvinylidene Fluoride) Coating: Superior Performance Organic Finish, AAMA 2605, multiple coat, thermally cured fluoropolymer paint finish system.
2. Colors: As selected by Architect.
Lionakis No. 019124.02 07 62 00
January 26, 2024 Sheet Metal Flashing and Trim
Line3xx Page 5
PART 3 EXECUTION
3.1 INSPECTION
A. Verify shapes and dimensions of surfaces to be covered.
B. Verify substrates are clean, dry, smooth and free of defects to the extent needed for sheet metal work.
C. Beginning of installation means acceptance of existing conditions.
3.2 PREPARATION
A. Field measure site conditions prior to fabricating work.
B. Install starter and edge strips, and cleats before starting installation.
C. Install reglets true to lines and levels. Seal top of surface mounted reglets with sealant.
D. Insert flashings into reglets to form tight fit. Secure in place with plastic wedges at maximum 12 inches on center. Seal flashings into reglets with sealant.
E. Secure flashings in place using concealed fasteners. Use exposed fasteners only in locations acceptable to Architect.
F. Lock and seal all joints.
G. Apply plastic cement compound between metal flashings and felt flashings.
H. Apply bituminous coating between dissimilar metals.
I. Fit flashings tight in place. Make corners square, surfaces true and straight in planes, and lines accurate to profiles.
J. Solder non-moving metal joints watertight for full metal surface contact. After soldering, wash metal clean with neutralizing solution and rinse with water.
K. Seal metal joints watertight.
L. Single-Ply Roofing:
1. Do not use petroleum-based products in conjunction with single-ply roofing.
2. All sealants used in conjunction with single -ply roofing shall be approved by roof membrane manufacturer.
3.3 INSTALLATION
A. Fabricate and install items in conforma nce with drawing details and SMACNA and NRCA manuals.
1. Install premanufactured items in accordance with manufacturer’s recommendations.
B. Ensure that items are installed in true and accurate alignment with other items and related work; that joints are accurately fitted; that exposed surfaces are free from dents; that corners are reinforced; that seams are watertight.
07 62 00 Lionakis No. 019124.02
Sheet Metal Flashing and Trim January 26, 2024
C. All work shall be left free of passivators, oil, grease, or acid residue, ready to receive paint finish.
D. Wherever possible, all fasteners shall b e concealed. All exposed fasteners shall have neoprene gaskets and be capped with a bead of sealant.
E. Install counter-flashings in reglets with continuous bead of sealant.
3.4 TOUCH-UP
A. Where galvanized finish is damaged by fabrication or installation, repair with specified touch-up material, applying in accordance with manufacturer's printed instructions.
END OF SECTION
Lionakis No. 019124.02 07 92 00
January 26, 2024 Joint Sealants
Line3xx Page 1
SECTION 07 92 00
JOINT SEALANTS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Sealants.
B. Sealant accessories.
1.2 RELATED SECTIONS
A. Section 03 30 00 – Cast-In-Place Concrete.
B. Section 07 13 26 – Self-Adhering Sheet Waterproofing.
C. Section 07 62 00 – Sheet Metal Flashing and Trim.
D. Section 07 84 00 – Firestopping.
E. Section 09 29 00 – Gypsum Board.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. ASTM C510 – Standard Test Method for Staining and Color Change of Single or Multicomponent Joint Sealants.
2. ASTM C719 – Standard Test Method for Adhesion and Cohesion of Elastomeric Joint Sealants Under Cyclic Movement (Hockman Cycle).
3. ASTM C794 – Standard Test Method for Adhesion in Peel of Elastomeric Joint Sealants.
4. ASTM C834 – Standard Specification for Latex Sealants.
5. ASTM C881 – Standard Specification for Epoxy Resin Base Bonding Systems for Concrete.
6. ASTM C919 – Standard Practice for Use of Sealants in Acoustical Applications.
7. ASTM C920 – Standard Specification for Elastomeric Joint Sealants.
8. ASTM C1087 – Standard Test Method for Determining Compatibility of Liquid Applied Sealants with Accessories Used in Structural Glazing Systems.
9. ASTM C1193 – Standard Guide for Use of Joint Sealants.
10. ASTM C1248 – Standard Test Method for Staining of Porous Substrate by Joint Sealants.
07 92 00 Lionakis No. 019124.02
Joint Sealants January 26, 2024
11. ASTM C1311 – Standard Specification for Solvent Release Sealants.
12. ASTM C1521 – Standard Practice for Evaluating Adhesion of Installed Weatherproofing Sealant Joints.
13. ASTM D2203 – Standard Test Method for Staining from Sealants.
1.4 SUBMITTALS
A. General: Submit in accordance with Division 01.
B. Product Data: Submit manufacturer’s descriptive literature and product specification for each product, including primers and sealing compounds.
1. Provide manufacturer’s literature with selected colors clearly indicated.
C. Quality Assurance/Control Submittals:
1. Product validation/assurance submittals.
2. Manufacturer’s laboratory adhesion and stain testing results.
3. Joint sealants field adhesion to joint substrates test results.
4. Installer qualifications.
5. Written certification from the subcontractor that joints are of the proper size and design, that the materials supplied are compatible with adjacent materials and backing, that the materials will properly perform to provide permanent watertight, airtight or vapor tight seals (as applicable), and that materials supplied meet specified perf ormance requirements.
D. Sample Manufacturer’s Warranty.
E. Closeout Submittals: Cleaning and maintenance data.
1.5 DEFINITIONS
A. Sealant Types:
1. S: Single component sealant, cures by moisture reaction.
2. M: Multiple component sealant; cures by chemical reaction.
B. Sealant Grades:
1. NS: Non-sag or gunnable sealant that permits application in joints on vertical surfaces without sagging or slumping.
2. P: Pourable sealant that has sufficient flow to form a smooth, level surface when applied in a horizontal joint.
3. SL: Self-leveling sealant that has sufficient flow to form a smooth, level surface when applied in a horizontal joint.
C. Sealant Classes:
1. 12.5: A sealant that when tested for adhesion and cohesion under cyclic movement shall withstand an increase and decrease of at le ast 12.5 percent of the joint width as measured at the time of application.
Lionakis No. 019124.02 07 92 00
January 26, 2024 Joint Sealants
Line3xx Page 3
2. 25: A sealant that when tested for adhesion and cohesion under cyclic movement shall withstand an increase and decrease of at least 25 percent of the joint width as measured at the time of application.
3. 35: A sealant that when tested for adhesion and cohesion under cyclic movement shall withstand an increase and decrease of at least 35 percent of the joint width as measured at the time of application.
4. 50: A sealant that when tested for adhesion and cohesion under cyclic movement shall withstand an increase and decrease of at least 50 percent of the joint width as measured at the time of application.
5. 100/50: A sealant that when tested for adhesion and cohesion under cycl ic movement shall withstand an increase of at least 100 percent and a decrease of at least 50 percent of the joint width as measured at the time of application.
D. Sealant Uses:
1. A: Sealant acceptable for use on an aluminum substrate.
2. G: Sealant acceptable for use on a glass substrate.
3. I: Sealant designed for use in joints which are submerged continuously in a liquid. a. Immersion rated sealant applications require primer.
4. M: Sealant acceptable for use on a mortar substrate.
5. NT: Sealant designed for use in joints in non-traffic areas.
6. T: Sealant designed for use in joints in pedestrian and vehicular traffic areas such as walkways, plazas, decks, and parking garages.
7. O: Sealant acceptable for use on substrates other than those listed above including, but not limited to, color anodized aluminum, metals other than aluminum, painted surfaces, brick, stone, tile, and wood.
E. Miscellaneous:
1. FC: Fast cure sealants; provides lesser cure times than corresponding standard cure sealants.
1.6 SUSTAINABLE DESIGN REQUIREMENTS
A. Meet VOC requirements of South Coast Air Quality Management District (SCAQMD) Rule 1168. Information is available at www.aqmd.gov. VOC limit expressed in grams per liter as follows:
Sealant VOC Limit
Architectural 250
Single Ply Roof Material Installation/Repair 450
Nonmembrane Roof Installation/Repair 300
Other 420
Sealant Primer VOC Limit
Architectural – Nonporous 250
Architectural – Porous 775
Other 750
07 92 00 Lionakis No. 019124.02
Joint Sealants January 26, 2024
B. Provide sealants with no carcinogen or reproductive toxicant components at more than one percent of total mass of product as defined in the following lists:
1. California OEHHA, Safe Drinking Water and Toxic Enforcement Act of 1986 (Proposition 65). Information is available at www.oehha.ca.gov/prop65.html.
2. California Air Resources Board (CARB), list of Toxic Air Contaminants (California Air Toxics). Information is available at www.arb.ca.gov/toxics.
1.7 QUALITY ASSURANCE
A. Qualifications:
1. Manufacturer Qualifications: Firm specializing in manufacturing products specified in this Section.
2. Applicator Qualifications: Firm specializing in installing work specified in this Section with experience on at least five projects of similar nature in past three years.
B. Product Validation/Assurance: Provide products with current SWRI Validation or provide independent third -party laboratory test results showing product meets performance requirements in accordance with ASTM C920 and as specified in this Section.
C. Compatibility: Materials forming joints and adjacent materials shall not adversely affect sealant materials or sealant color per ASTM C1087.
D. Staining: Sealants shall not stain joint substrates per ASTM C510, ASTM C1248, and ASTM D2203.
E. Manufacturer Adhesion , Cohesion, and Stain Testing: Provide manufacturer’s laboratory adhesion and cohesion testing per ASTM C719 and ASTM C794, and stain testing per ASTM C510 , using specimens of actual substrates to ensure sealant compatibility with substrate before product acceptance.
F. Joint Sealants Field Test for Adhesion and Cohesion to Joint Substrates: Perform field tests for each elastomeric joint sealant in accordance with ASTM C1521, with the manufacturer’s representative present prior to installation as follows:
1. Install joint sealants in five foot joint lengths. Allow sealant to fully cure before testing.
2. Make a knife cut of the sealant across the joint and along each side of the joint approximately 3 inches long.
3. Place a mark on the sealant tab, 1 inch from the adhered joint to the tab’s free end.
4. Grasp a 2 inch piece of sealant firmly just beyond the 1 inch mark and pull at a 90 degree angle.
5. Record whether or not sealant in joint maintained adhesion to substrate.
6. Record percentage length of sealant elongation.
7. Sealant product acceptance shall be based on pass/fail adhesion performance.
G. Coordination and Pre-Installation Meetings:
1. Conduct pre-installation meeting in accordance with provisions of Division 01.
2. Convene pre-installation meeting prior to commencing work of this Section.
3. Take minutes of meeting. Distribute to all attendees and concerned parties within five days.
4. Coordinate work in this Section with work in related Sections.
Lionakis No. 019124.02 07 92 00
January 26, 2024 Joint Sealants
Line3xx Page 5
1.8 DELIVERY, STORAGE, AND HANDLING
A. Comply with requirements of Division 01.
B. Deliver materials in the unopened, original containers or unopened packages with manufacturer’s name, labels, product identification, color, expiration period, curing time and mixing instructions for multi-component materials.
C. Storage and Protection: Store materials in a dry secure location with ambient temperature range of 60 degrees F to 80 degrees F.
D. Carefully handle and store to prevent inclusion of foreign materials.
1.9 PROJECT/SITE CONDITIONS
A. Environmental Limitations:
1. Do not proceed with installation of primers and joint sealants under the following conditions:
a. When ambient and substrate temperature conditions are less than 40 de grees F, or as otherwise recommended by manufacturer.
b. When joint substrates are wet.
B. Joint-Width Conditions:
1. Do not proceed with installation of joint sealants until contaminants capable of interfering with adhesion are removed from joint substrates.
1.10 SEQUENCING
A. Apply waterproofing, water repellents, and preservative finishes after sealant s have fully cured.
1.11 WARRANTY
A. Comply with provisions of Division 01.
B. Provide manufacturer’s warranty against material defects, air and water tightness, loss of adhesion, cohesion, and staining as follows:
1. Silicone sealants – Twenty years.
2. Urethane sealants – Five years.
3. Other sealants – Two years.
C. Provide installer’s two year workmanship warranty.
1.12 MAINTENANCE DATA
A. Submit in accordance with Division 01.
B. Provide cleaning and maintenance information , recommended inspection intervals, and instructions for repairing and replacing failed sealant joints.
07 92 00 Lionakis No. 019124.02
Joint Sealants January 26, 2024
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturers:
1. BASF Corporation – Building Systems, Shakopee, MN; 800 -433-9517 www.buildingsystems.basf.com.
2. GCP Applied Technologies, Cambridge, MA; 617-876-1400, www.gcpat.com.
3. Pecora Corporation, Harleysville, PA; 800-523-6688, www.pecora.com.
4. Sika Corporation, Lyndhurst, NJ; 800-933-7452, www.usa.sika.com.
5. Specified Technologies Inc. (STI), Somerville, NJ; 800-992-1180, www.stifirestop.com.
6. The Dow Chemical Company, Midland, MI; 800-331-6451, www.consumer.dow.com.
7. The Euclid Chemical Company, Cleveland, OH; 800 -321-7628, www.euclidchemical.com.
8. Tremco Sealant Weatherproofing Division of RPM International, Inc., Beachwood, OH; 800-321-7906, www.tremcosealants.com.
9. USG – United States Gypsum Co., Chicago, IL; 800-874-4968, www.usg.com.
B. Substitutions: Under provisions of Division 01.
2.2 SEALANTS
A. General:
1. Provide sealants that have been tested and f ound suitable for the substrates to which they will be applied.
2. Color: As selected by Architect from manufacturer’s full range of colors.
B. Exterior Sealants:
1. Exterior Perimeter Sealant: Polyurethane sealant ; ASTM C920; Type M; Grade NS; Class 50; uses: A, I, M, NT, O, T.
a. Products:
1) Tremco Dymeric 240FC.
2) BASF MasterSeal NP2.
3) Sika Sikaflex-2c NS.
4) or accepted equal.
b. Use at:
1) Exterior vertical joints bordered on one or both sides by concrete, metal, and/or window perimeters, threshold bedding, and/or sheet metal flashing lap joints. 2) Porous materials such as concrete or fiber cement siding. 3) Non-porous materials such as painted metal, anodized or mill finish aluminum.
2. Exterior Perimeter Sealant : Medium modulus moisture curing, non -staining, non - bleeding silicone sealant; ASTM C920; Type S; Grade NS; Class 50/50; uses: A, G, M, NT, O.
Lionakis No. 019124.02 07 92 00
January 26, 2024 Joint Sealants
Line3xx Page 7
a. Products:
1) The Dow Chemical Company Dowsil 795 Silicone Building Sealant. 2) Tremco Spectrem 2.
3) Sika Sikasil WS-295.
4) or accepted equal.
b. Use at:
1) Exterior vertical joints bordered on one or both sides by concrete, metal, and/or window perimeters, threshold bedding, and/or sheet metal flashing lap joints. 2) Porous materials such as concrete or fiber cement siding. 3) Non-porous materials such as painted metal, anodized or mill finish aluminum.
3. Silicone Weather Barrier Sealant: High performance, moisture curing, gun grade silicone sealant; ASTM C920; Type S; Grade NS; Class 25; use: A, I, M, NT, O, T. a. Products:
1) The Dow Chemical Company Dowsil 758.
2) GCP Applied Technologies Perm-A-Barrier S100.
3) Tremco Spectrem 1.
4) or accepted equal.
b. Use for be dding metal panel roof clips, sheet metal flashing and trim over self - adhering sheet waterproofing, and sealing reverse laps and exposed or cut self - adhering sheet waterproofing membrane edges not exposed to UV.
4. Traffic Sealant: Self leveling, chemical curing, non -staining, non-bleeding polyurethane sealant; ASTM C920; Type M; Grade NS or Grade P; Class 25; uses: M, O, T. a. Products:
1) Pecora Corp. Urexpan NR-200.
2) BASF MasterSeal SL 2.
3) Sika Sikaflex-2c SL.
4) or accepted equal.
b. Use at:
1) Exterior horizontal traffic expansion joints in concrete with slopes less than five percent.
2) Interior horizontal traffic joints in low -slope concrete with slopes less than five percent.
5. Traffic Sealant : Slope grade chemical curing, non -staining, non-bleeding polyurethane sealant; ASTM C920; Type M; Grade P; Class 25; use: T.
a. Products:
1) Pecora Corp. DynaTrol II-SG.
2) BASF MasterSeal SL 2 Slope Grade.
3) Sika Sikaflex 2c NS TG.
4) or accepted equal.
07 92 00 Lionakis No. 019124.02
Joint Sealants January 26, 2024
b. Use at:
1) Exterior horizontal traffic expansion joints in concrete with slopes between five percent and ten percent.
2) Interior horizontal traffic joints in concrete with slopes between five percent and ten percent.
6. Metal Lap and Bedding Sealant (non-soldered flashings): Non-drying, non-skinning, non- curing flexible butyl rubber sealant; ASTM C1311; Type S; Grade NS; Class 10; uses: G, M, O.
a. Products:
1) Tremco TREMpro JS773 Butyl Sealant.
2) Pecora Corp. BA-98 Butyl Rubber Sealant.
3) or accepted equal.
b. Use for b edding thresholds, glazing secondary seals, and sheet metal flashing and trim not exposed to ultraviolet (UV) light.
7. Metal Lap and Bedding Sealant (non-soldered flashings): High performance, moisture curing, gun grade polyurethane sealant; ASTM C920; Type S; Grade NS; Class 25; use:
A, I, M, NT, O, T.
a. Products:
1) Tremco Vulkem 116.
2) BASF MasterSeal TX1.
3) Sika Sikaflex Textured Sealant.
4) or accepted equal.
b. Use for be dding thresholds, glazing secondary seals, and sheet metal flashing and trim exposed to ultraviolet (UV) light.
C. Interior Sealants:
1. Interior Sealant : Nonoxidizing, skinnable, paintable, gunnable , non -staining, non - bleeding acrylic latex sealant; ASTM C834; Type S; Grade NS; Class 12.5; use: O. a. Products:
1) Tremco Tremflex 834.
2) Pecora Corp. AC-20 + Silicone.
3) or accepted equal.
b. Use at interior trim and finish joints expecting minimal movement.
2. Interior Sealant: Low modulus, moisture curing, non-staining, non-bleeding polyurethane sealant; ASTM C920; Type S; Grade NS; Class 35; uses: A, M, NT, O. a. Products:
1) Tremco Dymonic FC.
2) Euclid Chemical Company Eucolastic 1NS.
3) Sika Sikaflex 1a.
4) or accepted equal.
b. Use at interior vertical expansion, control, and air seal joints.
Lionakis No. 019124.02 07 92 00
January 26, 2024 Joint Sealants
Line3xx Page 9
3. Sanitary Sealant: Mildew resistant with fungicide , acetoxy curing, non -staining, non - bleeding silicone sealant; ASTM C920; Type S; Grade NS; Class 25; uses: A, G, NT, O. a. Products:
1) Tremco Tremsil 200 Sanitary.
2) The Dow Chemical Company Dowsil 785 Mildew Resistant. 3) Pecora 898NST.
4) Sika Sikasil-N Plus US.
5) or accepted equal.
b. Use at interior joints with nonporous substrates around quarry tile, sinks and plumbing fixtures.
4. Acoustical Sealant: Non-skinning, non-hardening synthetic rubber sealant; ASTM C919; Type S; Grade NS; use: O.
a. Products:
1) Tremco Acoustical Sealant.
2) Pecora BA-98.
3) or accepted equal.
b. Use at concealed joints and penetrations in interior acoustical walls.
5. Acoustical Sealant: Nonoxidizing, skinnable, paintable, gunnable , non -staining, non - bleeding acrylic latex sealant; ASTM C834 and C919; Type S; Grade NS; Class 12.5; use: O.
a. Products:
1) Tremco Tremflex 834.
2) Pecora Corp. AC-20 FTR.
3) USG Sheetrock Brand Acoustical Sealant.
4) STI LC or SpecSeal Smoke “N” Sound Sealant.
5) Hilti CS-S SA Light.
6) or accepted equal.
b. Use at exposed joints and penetrations in interior acoustical walls.
2.3 ACCESSORIES
A. Joint Cleaner: Non -corrosive and non -staining type as recommended by sealant manufacturer; compatible with joint forming materials.
B. Primers: Non -staining, quick -drying type and consistency recommended by the sealant manufacturer for the particular application.
C. Joint Backing: Non -adhering backing to sealant; n on-staining, compatible with sealant and primer such as round, closed cell or bi-cell polyethylene foam rod; oversized 25 percent to 50 percent larger than joint width. Materials impregnated with oil, bitumen or similar materials are not permitted.
D. Bond Breakers: Type and consistency recommended by the sealant manufacturer to suit the particular application.
07 92 00 Lionakis No. 019124.02
Joint Sealants January 26, 2024
E. Bond Breaker Tape: Self-adhesive, pressure sensitive polyethylene tape.
F. Masking Tape: Non -staining, non -absorbent tape compatible with joint sealants and adjacent joint surfaces.
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine job site conditions; v erify s ubstrate, surfaces, and joint openings are ready to receive work and field measurements are as shown on drawings, as specified in this Section, and as recommended by manufacturer.
B. Report unacceptable conditions to Architect. Begin installation only when unacceptable conditions have been corrected.
3.2 PREPARATION
A. Clean, prepare, and prime joints in accordance with ASTM C1193 and manufacturer’s written instructions.
B. Remove loose materials and foreign matter that might impair sealant adhesion. Clean porous materials such as concrete by grinding, sand or water blast cleaning, mechanical abrading, acid washing or a combination of these methods as required to provide a cl ean, sound base surface for sealant adhesion.
1. Remove laitance by acid washing, grinding or mechanical abrading.
2. Remove form oils, release agents, chemical retardants, by sand or water blast cleaning.
3. Blow from joints with oil -free compressed air loose part icles resulting from grinding, abrading, or blast cleaning prior to sealant application.
C. Mechanically or chemically clean nonporous surfaces such as metal. Remove temporary protective coatings on metallic surfaces using solvents that leave no residue as recommended by metal surface manufacturer. When masking tape or strippable films are used, remove the tape or film, and clean any residual adhesive. Apply and wipe-dry cleaning solvents using clean, lint -free cloths or paper towels, do not allow solvent to a ir dry without wiping.
D. Protect elements surrounding the work of this Section from damage or disfiguration. Apply masking tape to adjacent surfaces to prevent damage to finishes from sealant installation.
3.3 APPLICATION
A. Apply sealant s in accordance with ASTM C 1193, manufacturer’s written instructions, and accepted shop drawings.
B. Apply acoustical sealants in accordance with ASTM C919, manufacturer’s written instructions, except where more stringent requirements are specified herein, and accepted shop drawings.
C. Apply sealant where indicated on the Drawings and at all exterior joints and openings in the building envelope that are observable sources of air or water infiltration.
Lionakis No. 019124.02 07 92 00
January 26, 2024 Joint Sealants
Line3xx Page 11
D. Measure joint dimensions and size materials to a chieve required width -to-depth ratios.
Acceptable joint width-to-depth ratios:
Material Joint Width Joint Depth
Minimum Maximum
Metal or other nonporous
surfaces.
1/4 inch (minimum) 1/4 inch 1/4 inch
Over 1/4 inch 1/2 of width 1/2 inch
Wood, concrete, or other
porous surfaces.
1/4 inch (minimum) 1/4 inch 1/4 inch
Over 1/4 inch 1/2 of width 1/2 inch
Over 1/2 to 2 inches 1/2 inch 1/2 inch
Over 2 inches As recommended by sealant
manufacturer.
E. Install joint backing to achieve desired joint width -to-depth ratio. Roll the material into the joint to avoid lengthwise stretching. Do not twist or braid rod stock.
F. Install bond breaker where joint backing is not used to prevent three-sided adhesion.
G. Apply primer where required and where recommended by sealant manufacturer for sealant adhesion.
H. Install sealants within recommended application temperature ranges. Consult manufacturer when sealant cannot be applied within these temperature ranges.
I. Install sealants immediately after joint preparation.
J. Install sealants free of air pockets, foreign embedded matter, ridges, and sags.
K. Produce uniform, cross sectional shapes and depths relative to joint width that allow optimum sealant movement capability.
L. Tool joints concave. Use dry tooling method.
M. Cure sealants in compliance with their manufacturer’s instructions to obtain high early bond strength, internal cohesive strength, and durability. Do not disturb seals until completely cured.
3.4 CLEANING AND REPAIRING
A. Immediately clean work under provisions of Division 01.
B. Clean adjacent soiled surfaces. Use a cleaning agent as recommended in writing by the sealant manufacturer. Remove any masking tape immediately after tooling joints, leaving finished work in neat and clean condition.
C. Repair or replace defaced or disfigured caused by work of this Section.
3.5 PROTECTION OF FINISHED WORK
A. Protect finished installation under provisions of Division 01.
B. Protect sealant until cured.
07 92 00 Lionakis No. 019124.02
Joint Sealants January 26, 2024
C. Do not paint sealants until sealant is fully cured.
D. Do not paint silicone sealant.
E. Protect joint sealants from contact with contaminating substances and from damage. Cut out, remove, and replace contaminated or damaged sealants, immediately, so that they are without contamination or damage at time of Project Completion.
END OF SECTION
Lionakis No. 019124.02 07 95 00
January 26, 2024 Expansion Control
Line3xx Page 1
SECTION 07 95 00
EXPANSION CONTROL
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Non-rated expansion joint assemblies for roof surfaces.
1.2 RELATED SECTIONS
A. Section 06 10 00 – Rough Carpentry.
B. Section07 54 23 – Thermoplastic-Polyolefin Roofing.
C. Section 07 92 00 – Joint Sealants.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. ASTM D1187 – Standard S pecification for Asphalt -Base Emulsions for Use as Protective Coatings for Metal.
2. ASTM D4637 – Standard Specification for EPDM Sheet Used In Single -Ply Roof Membrane.
1.4 SUBMITTALS
A. Submit under provisions of Division 01.
B. Shop Drawings: Provide line diagrams s howing entire route of each joint system, plans, elevations, sections, details, joints, splices, locations of joints and splices, and transition attachments.
1. Provide isometric drawings depicting how components interconnect to achieve and continuity and watertightness of joint covers and fillers.
C. Product Data: Submit product data for each product specified in this Section with the product and selected attributes clearly identified.
D. Manufacturer's Installation Instructions: Indicate rough-in sizes. Provide templates for cast-in or placed frames or anchors, and indicate tolerances for item placement.
1.5 QUALITY ASSURANCE
A. Manufacturer: Sufficient experience specializing in the manufacturing of expansion joint assemblies utilizing membrane seals.
07 95 00 Lionakis No. 019124.02
Expansion Control January 26, 2024
B. Application: Factory approved, trained, and certified in the proper installation of the specified expansion control system.
1.6 FIELD MEASUREMENTS
A. Verify that field measurements are as instructed by the manufacturer.
1.7 DELIVERY, STORAGE AND HANDLING
A. Deliver prod ucts in each manufacturer’s original, intact, labeled containers, pallets or bundles and store under shelter in a dry location with temperatures above 40 degrees F until installed. Store off the ground, protect from freezing, direct sun exposure in elevate d temperatures and construction activities.
1.8 WARRANTY
A. The expansion system shall be warranted for a period of three years for normal usage under specified movements and design conditions.
B. The three year warranty shall warrant and provide at no charge, all m aterials and labor needed to properly repair or replace defective or damaged product within the term of the provided warranty.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Balco, Inc. Product: Model #BRBS-3.5-7SE-R2W roof-to-wall bellows.
B. MM Systems Corporation.
C. Watson Bowman Acme.
D. InPro Corporation.
E. Substitutions: Under provisions of Division 01.
2.2 MATERIALS
A. Roof Bellows: 14 inch wide white 60 mil EPDM cover with closed cell support foam and
0.018 inch stainless steel flanges.
1. Provide manufacturer’s prefabricated end caps.
B. Threaded Fasteners: Stainless steel.
C. Provide 45 mil flexible EPDM Class I (per ASTM D4637) water barriers with drainage fittings and tubing at exterior joints for a waterproof installation.
D. Bituminous Coating: Cold-applied asphalt emulsion complying with ASTM D1187.
2.3 FABRICATION
A. Joint Covers: Designed to permit 50 percent joint movement with full recovery; refer to Drawings for type and locations.
B. Back paint components in contact with cementitious materials with bituminous coating.
Lionakis No. 019124.02 07 95 00
January 26, 2024 Expansion Control
Line3xx Page 3
C. Shop-assemble components and pa ckage with anchors and fittings. At metal components, provide factory welded transitions and corners.
D. Provide joint components in single length wherever practical. Minimize site splicing.
E. Only straight, butt splice connections shall be allowed on the jobsite following manufacturer’s written instructions utilizing specialty heat fusing equipment or the manufacturer’s specialty splicing adhesive. All factory and field fused connections shall incorporate bonding of the complete seal profile. This includes fusing of all internal and external web configurations. All corner connections shall be factory fabricated.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify existing conditions prior to installation.
B. Verify that joint preparation and affected dimensions are acceptable.
3.2 PREPARATION
A. Provide anchoring devices for installation and embedment.
B. Provide templates and rough-in measurements.
3.3 INSTALLATION
A. Install components and accessories in accordance with manufacturer's instructions.
B. Align work plumb and level, flush with adjacent surfaces.
C. Rigidly anchor components to substrate to prevent misalignment.
D. Make allowances for change in joint size due to difference between installation and building operating temperatures.
E. Cover and protect expansion joint cover assemblies from construction traffic.
F. Roof Joint Covers: Attach to curbs and substrates at 24 inches on center maximum.
G. Remove excess and misplaced sealants as work progresses.
H. Remove protective film or coverings from expansion joint covers upon completion of adjacent construction.
3.4 ADJUSTING AND PROTECTION
A. Adjust joint seal to freely accommodate joint movement.
B. Protect installation from damage by work of other Sections.
END OF SECTION
Lionakis No. 019124.02 09 29 00
January 26, 2024 Gypsum Board
Line3xx Page 1
SECTION 09 29 00
GYPSUM BOARD
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Gypsum board:
1. Type X gypsum board.
2. Moisture resistant gypsum board.
B. Accessories.
1.2 RELATED SECTIONS
A. Section 06 10 00 – Rough Carpentry.
B. Section 07 21 00 – Thermal Insulation.
C. Section 07 92 00 – Joint Sealants.
D. Section 09 91 00 – Painting.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards:
1. ASTM B117 – Standard Practice for Operating Salt Spray (Fog) Apparatus.
2. ASTM C473 – Standard Test Method for Physical Testing of Gypsum Panel Products.
3. ASTM C475/C475M – Standard Specification for Joint Compound and Joint Tape for Finishing Gypsum Board.
4. ASTM C840 – Standard Specification for Application and Finishing of Gypsum Board.
5. ASTM C954 – Standard Specification for Steel Drill Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Steel Studs From 0.03 3 in. (0.84 mm) to 0.112 in. (2.84 mm) in Thickness.
6. ASTM C1002 – Standard Specification for Steel Self -Piercing Tapping Screws for the Application of Gypsum Panel Products or Metal Plaster Bases to Wood Studs or Steel Studs.
7. ASTM C1047 – Standard Specification for Accessories for Gypsum Wallboard and Gypsum Veneer Base.
09 29 00 Lionakis No. 019124.02
Gypsum Board January 26, 2024
8. ASTM C1396/C1396M – Standard Specification for Gypsum Board.
9. ASTM D3273 – Standard Test Method for Resistance to Growth of Mold on the Surface of Interior Coatings in an Environmental Chamber.
10. GA-214 – Recommended Levels of Gypsum Board Finish.
11. GA-216 – Application and Finishing of Gypsum Board.
1.4 SUBMITTALS
A. Submit under provisions of Division 01.
B. Product Data: Submit product data for each product specified in this Section with the product and selected attributes clearly identified.
1.5 QUALITY ASSURANCE
A. Qualifications:
1. Manufacturer Qualifications: Firm specializing in manufacturing products specified in this Section with a minimum five years’ experience.
2. Installer Qualifications: Firm specializing in installing work specified in this Section acceptable to manufacturer with experience on at least five projects of similar nature in past three years.
B. Regulatory Requirements: Comply with requirements of CBC Chapter 25.
C. Coordinate work in this Section with work in related Sections.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Comply with requirements of Division 01.
B. Deliver products in manufacturer's original containers, dry and undamaged, with seals and labels intact.
C. Storage and Pro tection: Store m aterials in a dry secure place; neatly stacked to prevent sagging or damage to edges, ends, and surfaces. Protect from weather, surface contaminants, corrosion, construction traffic, and other potential damage.
1.7 ENVIRONMENTAL REQUIREMENTS
A. Interior Environmental Requirements:
1. Maintain room temperature at not less than 40 degrees F during application of gypsum board. Maintain room temperature at not less than 50 degrees F for joint treatment, texturing, and decoration for 48 hours prior to and continuously thereafter until completely dry.
2. Provide adequate ventilation during installation and curing period.
3. Prevent exposure to excessive or continuous moisture before, during, and continuously after installation. Eliminate sources of moisture immediately.
4. Protect gypsum board from direct exposure to rain, snow, sunlight, or excessive weather conditions.
Lionakis No. 019124.02 09 29 00
January 26, 2024 Gypsum Board
Line3xx Page 3
PART 2 PRODUCTS
2.1 SUSTAINABLE BUILDING DESIGN REQUIREMENTS
A. Provide sealants that meet VOC requirements of South Coast Air Quality Management District (SCAQMD) Rule 1168. Information is available at www.aqmd.gov.
B. Provide adhesive materials that meet VOC requirements of South Coast Air Quality Management District (SCAQMD) Rule No. 1168.
2.2 MANUFACTURERS
A. Acceptable Manufacturers:
1. USG – United States Gypsum Company, Chicago, IL; 312-606-4000, www.usg.com.
2. National Gypsum Co., Charlotte, NC; 704-365-7300, www.nationalgypsum.com.
3. GP-Gypsum – Georgia-Pacific Corp., Atlanta, GA; 404-652-4000, www.gp.com.
4. CertainTeed Corporation, Malvern, PA; 800-233-8990, www.certainteed.com.
5. PABCO Gypsum, Newark, CA; 510-792-9555, www.pabcogypsum.paccoast.com.
B. Substitutions: Under provisions of Division 01.
2.3 GYPSUM BOARD
A. Type X Gypsum Board: ASTM C1396/1396M; 5/8-inch thick; 2.2 pounds per square foot; fire resistant core; maximum permissible length; ends square cut, tapered edges.
1. Acceptable Products:
a. Sheetrock Brand Firecode X manufactured by USG,
b. Gold Bond Brand XP Fire-Shield Gypsum Board manufactured by National Gypsum, c. ToughRock Fireguard manufactured by G-P Gypsum,
d. CertainTeed Type X manufactured by CertainTeed Corporation, e. FLAME CURB Type X Gypsum Board manufactured by PABCO Gypsum, f. or accepted equal.
B. Moisture Resistant Gypsum Board: ASTM C1396/C1396M; 5/8 inch thick Type X, moisture and mold resistant core, encased in moisture resistant paper facers; maximum permissible length; ends square cut, tapered edges.
1. Average water absorption after two-hour immersion per ASTM C473: 5 percent or less.
2. Mold and mildew resistance per ASTM D3273: Minimum average score 8.
3. Acceptable Products:
a. Sheetrock Brand Mold Tough Gypsum Panels manufactured by USG, b. Gold Bond Brand XP Gypsum Board manufactured by National Gypsum, c. ToughRock Mold Guard manufactured by G-P Gypsum,
d. M2Tech Type X manufactured by CertainTeed Corporation, e. MOLD CURB PLUS Type X Mold and Water Resistant Gypsum Board manufactured by PABCO Gypsum,
f. or accepted equal.
09 29 00 Lionakis No. 019124.02
Gypsum Board January 26, 2024
2.4 ACCESSORIES
A. Corner Bead, Edge Trim, and Decorative Dividers: ASTM C1047; zinc-coated sheet steel.
Acceptable product: 103 Deluxe Corner Bead manufactured by Clark Dietrich, or accepted equal.
B. Control Joints: ASTM C1047; roll -formed zinc joint with removable protected opening.
Acceptable product: Zinc Control Joint No. 093 manufactured by Clark Dietrich, or accepted equal.
C. Screws: ASTM C1002 Type W or Type A; bugle head; provide sufficient length to provide a minimum 3/4 inch penetration into wood framing members.
D. Jointing Tape: ASTM C475/C475M; 2 inch wide heavy duty paper joint tape.
E. Joint Compound: ASTM C475/C475M.
F. Primer-Surfacer (used in lieu of skim coat in a Level 5 finish): High-build interior coating finish applied with an airless sprayer. Products: Sheetrock Brand Primer -Surfacer Tuff -Hide manufactured by USG, ProForm Brand Surfacer/Primer manu factured by National Gypsum, or accepted equal. Note: Walls applied with primer-surfacer do not require drywall paint primer prior to application of finish coats.
G. Acoustical Sealant: Refer to Section 07 92 00.
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine job site conditions and verify field dimensions.
B. Verify framing for acceptable placement, spacing, and tolerance (alignment and plumb).
C. Verify that framing and furring are securely attached.
D. Verify that all blocking, headers, and supports are in place to support pl umbing fixtures, casework, shelves, and similar items.
E. Verify that insulation is secured.
F. Report unacceptable conditions to the Architect. Begin installation only when unacceptable conditions have been corrected.
3.2 SEALANTS
A. Apply acoustical sealant at partitions per sealant manufacturer’s instructions. Refer to Section 07 92 00.
3.3 GYPSUM BOARD INSTALLATION
A. Install gypsum board to framing and furring members in accordance with manufacturer’s recommendations, GA-216 or ASTM C840, and as specified in this Section.
Lionakis No. 019124.02 09 29 00
January 26, 2024 Gypsum Board
Line3xx Page 5
B. Install gypsum board with separate panels in moderate contact, do not force in place. Stagger end joints of adjoining panels. Neatly fit abutting end and edge joints.
1. Where two layers of gypsum board are installed, stagger all joints in top layer over joints in first layer.
C. Install gypsum board in most economical direction, using maximum practical lengths , with edges occurring over firm bearing. Install 1/4 inch (nominal) above rough floor or curb . Cut out gypsum board as required to make neat close joints around openings.
D. In vertical applications, provide lengths required to reach full height of vertical surfaces in one continuous piece.
E. Where gypsum board is carried full height to structure above, provide for deflection of structure by undercutting board 3/8 inch (nominal) and sealing top edge of board to substrate with a continuous bead of sealant to form an elastic closure.
F. Use screws to fasten gypsum board to framing.
G. Treat cut edges and holes in moisture resistant gypsum board per manufacturer’s recommendations.
H. Place corner beads at all exterior corners. Use longest practical length. Place edge trims where gypsum board abuts dissimilar materials.
I. Control Joints: Install control joints where indicated on the Drawings. Where not specifically indicated, install consistent with lines of building s paces as directed by Architect; and as a minimum, install as follows:
1. Where a partition, wall, or ceiling traverses a construction joint (expansion, seismic, or building control element) in the base building structure.
2. Where a wall or partition runs in an uninterrupted straight plane exceeding 30 linear feet.
3. In interior ceilings without perimeter relief so that linear dimensions between control joints do not exceed 30 feet and total area between control joints does not exceed 900 square feet.
4. Where ceiling framing members change direction.
5. Where a partition transitions from floor-supported framing to overhead hung framing.
J. Attach metal corner beads, edge trim, decorative dividers, and control joints to the supporting construction at 9 inches on center maximum spacing using same fasteners used to attach gypsum board panels.
3.4 JOINT TREATMENT AND FINISH TEXTURE
A. Finish gypsum board surfaces in accordance with ASTM C840, GA-214, and GA-216.
B. Remove dirt, oil, and other materials that may cause lack of bond from all surfaces to receive joint compound.
C. Set mechanical fasteners below the plane of the board.
D. Tape, fill, and sand all joints, edges and corners to produce smooth surface ready to receive finishes. Fill all dents, gouges, recesses, or other depressions with joint compound to produce a monolithic surface.
09 29 00 Lionakis No. 019124.02
Gypsum Board January 26, 2024
E. Feather coats onto adjoining surfaces so that camber is maximum 1/32-inch.
F. Spray apply texture where indicated on Drawings.
G. Levels of Finish: Finish gypsum board surfaces in accordance with GA-214 as follows:
Area Finish
Plenum areas above ceilings. Level 1 finish, no texture.
Light texture (medium orange-peel). Level 4 finish.
Smooth finish; satin/eggshell paint
finish.
Level 4 finish.
Level 5 finish where critical (severe) lighting
condition occurs (refer to GA-214 for description
of critical lighting).
Smooth finish; semi-gloss paint finish. Level 5 finish.
3.5 TOLERANCES
A. Maximum variation from true flatness: 1/4 inch in 10 feet in any direction.
3.6 CLEANING AND PROTECTION
A. Cleaning and Repair: Clean surfaces that have been spotted or soiled during wallboard application.
B. Defective Work: Remove and replace defective work that cannot be satisfactorily repaired, at the direction of the Architect, with no additional cost to the Owner.
C. Protection: Protect installed work against damage from other construction work.
D. Upon completion of the work under this Section, remove all surplus material, rubbish and debris from the premises and leave floors broom clean.
END OF SECTION
Lionakis No. 019124.02 09 30 00
January 26, 2024 Tiling
Line3xx Page 1
SECTION 09 30 00
TILING
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Ceramic tile.
B. Setting materials including adhesives and mortar.
C. Tile grout.
D. Sealants.
E. Waterproofing membranes:
F. Accessories.
1.2 RELATED SECTIONS
A. Section 03 30 00 – Cast-In-Place Concrete.
B. Section 07 92 00 – Joint Sealants.
C. Section 09 29 00 – Gypsum Board.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards and Manuals:
1. ANSI A108.5 – Installation of Ceramic Tile with Dry-Set Portland Cement Mortar or Latex-Portland Cement Mortar.
2. ANSI A108.6 – Installation of Ceramic Tile with Chemical Resistant, Water Cleanable Tile-Setting and Grouting Epoxy.
3. ANSI A108.10 – Installation of Grout in Tilework.
4. ANSI A108.13 – Installation of Load Bearing, Bonded, Waterproof Membranes for Thin-Set Ceramic Tile and Dimension Stone.
5. ANSI A118.3 – Chemical Resistant, Water Cleanable Tile -Setting and Grouting Epoxy and Water Cleanable Tile Setting Epoxy Adhesive.
6. ANSI A118.4 – Latex-Portland Cement Mortar.
7. ANSI A118.10 – Load Bearing, Bonded, Waterproof Membranes for Thin -Set Ceramic Tile and Dimension Stone Installations.
8. ANSI A137.1 – Ceramic Tile.
09 30 00 Lionakis No. 019124.02
Tiling January 26, 2024
9. ASTM C373 – Standard Test Method for Water Absorption, Bulk Density, Apparent Porosity, and Apparent Specific Gravity of Fired Whiteware Products.
10. ASTM C648 – Standard Test Method for Breaking Strength of Ceramic Tile.
11. ASTM C920 – Standard Specification for Elastomeric Joint Sealants.
12. ASTM C1027 – Standard Test Method for Determining Visible Abrasion Resistance of Glazed Ceramic Tile.
13. MIA Design Manual.
14. TCNA Handbook for Ceramic, Glass, and Stone Tile Installation by Tile Council of North America, Inc.
1.4 SUBMITTALS
A. General: Submit in accordance with Division 01.
B. Product Data: Submit product data for each product specified in this Section with the product and selected attributes clearly identified.
C. Submit instructions for installing membranes, adhesives, and grouts.
D. Samples: Submit two samples of each type and color of ceramic tile and trim.
E. Closeout Submittals: Cleaning and maintenance data.
1.5 QUALITY ASSURANCE
A. Qualifications:
1. Manufacturer Qualifications: Firm specializing in manufacturing products specified in this Section with a minimum ten years’ experience.
2. Installer Qualifications: Firm specializing in installing work specified in this Section acceptable to manufacturer with experience on at least five projects of similar nature in past three years.
B. Single Sou rce Responsibility: Provide setting, grouting, membrane, and sealant products from a single manufacturer to ensure system compatibility and quality , and to comply with manufacturer’s warranty requirements.
C. Perform work in accordance with TCNA Handbook for Ceramic Tile Installation and ANSI A108 Series. Provide a copy of TCNA Handbook for Ceramic Tile Installation and ANSI A108 Series at the job site.
D. Pre-Installation Meetings:
1. Conduct pre-installation meeting in accordance with Division 01.
2. Convene pre-installation meeting prior to commencing work of this Section.
3. Coordinate work in this Section with work in related Sections.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Comply with requirements of Division 01.
Lionakis No. 019124.02 09 30 00
January 26, 2024 Tiling
Line3xx Page 3
B. Deliver products in manufacturer's original containers, dry and undamaged, with seals and labels intact.
C. Storage and Protection: Store materials in a dry secure place. Protect from weather, surface contaminants, corrosion, construction traffic, and other potential damage. Protect adhesives from freezing or overheating in accordance with manufacturer's instructions.
1.7 ENVIRONMENTAL REQUIREMENTS
A. Perform ceramic tile work when the ambient temperature is at least 50 degrees F and rising.
Maintain temperature above 50 degrees F while the work is being p erformed for at least seven days after completion of the work.
B. Do not install adhesives in a closed, unventilated environment.
1.8 WARRANTY
A. Comply with provisions of Division 01.
B. Provide manufacturer’s standard performance warranties that extend beyond a one-year period.
1.9 MAINTENANCE
A. Extra Materials: Provide five percent extra of the total square footage of each type and color of tile installed. Comply with provisions of Division 01.
B. Operation and Maintenance Data: Submit cleaning and maintenance data in accordance with Division 01.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturers - Tile:
1. Daltile Corp., Dallas, TX; (800) 933-8453, www.daltile.com.
2. American Olean Tile Co., Dallas, TX; (888) 268-8453, www.aotile.com.
3. Crossville Inc., Crossville, TN; (931) 484-2110, www.crossvilleinc.com.
4. Interceramic, Garland, TX; (800) 688-5671, www.interceramic.com.
5. Emser Tile, Los Angeles, CA; (323) 650-2000, www.emser.com.
B. Acceptable Manufacturers - Setting Materials:
1. Custom Building Products, Seal Beach, CA; (209) 518 -1153, www.custombuildingproducts.com.
2. Laticrete International, Inc., Bethany, CT; (800) 243-4788, www.laticrete.com.
3. Mapei Corp., Deerfield Beach, FL; (800) 426-2734, www.mapei.com.
C. Acceptable Manufacturers - Grout:
1. Custom Building Products.
2. Laticrete International, Inc.
3. Mapei Corp.
09 30 00 Lionakis No. 019124.02
Tiling January 26, 2024
D. Acceptable Manufacturers - Sealants:
1. Custom Building Products.
2. Laticrete International, Inc.
3. Mapei Corp.
4. Color Caulk, Inc.
E. Acceptable Manufacturers - Waterproofing Membranes:
1. Custom Building Products.
2. Laticrete International, Inc.
3. Mapei Corp.
F. Acceptable Manufacturers - Accessories:
1. Schlüter-Systems L.P., Plattsburgh, NY; (800) 472-4588, www.schluter.com.
2. Custom Building Products, Seal Beach, CA; (209) 518 -1153, www.custombuildingproducts.com.
G. Substitutions: Under provisions of Division 01.
2.2 CERAMIC TILE
A. General: ANSI A137.1, Standard Grade. Packaging shall be grade sealed. Seals shall be marked to correspond with the marks on the signed master grade certificate.
B. Properties:
1. Impact resistant with a minimum breaking strength of 90 pounds for wall tiles and 250 pounds for floor tiles in accordance with ASTM C648.
2. Water absorption shall be 0.50 percent maximum in accordance with ASTM C373.
3. Tile flooring shall be stable, firm, and slip resistant per CBC Section 11B -302.1. Floor tiles shall have a minimum dynamic coefficient of friction of 0.42 wet in accordance with the DCOF AcuTest.
4. Floor tiles shall be minimum Class IV – Heavy Traffic durability when tested in accordance with ASTM C1027 for abrasion resistance as related to foot traffic.
C. Products:
1. Quarry Tile:
a. Match existing quarry tile in all respects.
D. Special Shapes (trimmers, angles, bases, caps, stops, and returns): Same nominal size as field tile; rounded concave and convex surfaces; same properties as field tile (moisture absorption, surface finish, and color). Provide radius at all outside vertical and horizontal corner tile. Provide base at wall tile.
E. Wall Base: Unless otherwise indicated, quarry tile wall base shall be 6 inches high with 3/8 inch minimum cove radius.
Lionakis No. 019124.02 09 30 00
January 26, 2024 Tiling
Line3xx Page 5
2.3 SETTING MATERIALS
A. Latex Portland Cement Mortar: Prepackaged, one -part, high performance, latex polymer modified dry-set, thin-set mortar. Meets or exceeds ANSI A118.4.
1. Products:
a. Custom Building Products MegaLite Crack Prevention Mortar. b. Laticrete 254 Platinum Multipurpose Thin-Set Mortar. c. Mapei Keraflex Super.
d. Or accepted equal.
2.4 GROUTING MATERIALS
A. Epoxy Grout: 100 percent solids epoxy grout; stainless, non -sagging, water cleanable; conforming to ANSI A118.3.
1. Products:
a. Custom Building Products CEGLite Commercial Epoxy Grout. b. Laticrete Spectralock Pro Premium.
c. Mapei Kerapoxy CQ.
d. Or accepted equal.
2. Colors as selected by Architect.
2.5 SEALANTS
A. Latex siliconized sealant, non-sanded, in conformance with ASTM C920, Type S, Grade NS, Class 25, Uses NT, M and G. Color to match grout color.
1. Products:
a. Custom Building Products 100% Silicone Commercial Caulk. b. Laticrete Latasil.
c. Mapei Mapesil T Plus 100% Silicone Caulk.
d. Color Caulk, Inc. Latex Siliconized Sealant.
e. Or accepted equal.
2.6 MEMBRANES
A. Waterproofing Membrane: Trowel applied, liquid, load bearing; bonded; conforming to ANSI A118.10.
1. Products:
a. Custom Building Products Custom 9240 Waterproofing and Crack Prevention Membrane. Self-curing liquid elastomeric membrane with reinforcing fabric. b. Laticrete 9235 Waterproofing Membrane with Microban. Self -curing liquid elastomeric membrane with reinforcing fabric forming a flexible, seamless waterproof membrane bonded to the substrate. Contains an antimicrobial protection to inhibit growth of mold and mildew.
c. Mapei Mapelastic Aqua Defense , premixed, flexible, thin, ultra fast -drying waterproofing membrane.
d. Or accepted equal.
09 30 00 Lionakis No. 019124.02
Tiling January 26, 2024
2.7 ACCESSORIES
A. Expansion Joints: DILEX-AKWS surface joint profile with aluminum anchoring legs and 1/4 inch wide PVC movement zone manufactured by Schlüter-Systems L.P., Custom Building Products, or accepted equal. PVC color as selected by Architect from manufacturer’s full range of standard colors.
PART 3 EXECUTION
3.1 EXAMINATION
A. Examine job site conditions and verify field dimensions. Verify substrate is plumb, level, true to line and square.
B. Substrate surface conditions shall conform to the requirements of ANSI A108 for the type of substrate specified and for workmanship.
C. Maximum surface variation of substrate shall not exceed maximum limits as specified in specific TCNA Methods or as follows, whichever is more stringent.
Type Walls Floors
Latex Portland Cement Mortar Not applicable 1/8 inch in 10 feet D. Tile work shall not be started until roughing in for mechanical and electrical work has been completed and tested.
E. Report unacceptable conditions to Architect. Begin installation only when unacceptable conditions have been corrected.
3.2 INSTALLATION
A. General:
1. Install in accordance with TCNA Handbook for Ceramic Tile Installation and ANSI A108.
2. Install waterproofing membrane per manufacturer’s recommendations.
3. Do not interrupt tile pattern through openings.
4. In areas requiring floor and wall tiles, floor tile installation shall not begin until after wall tiles have been installed.
5. Cut and fit tile tight to penetrations through tile. Form corners and bases neatly. Align floor, base and wall joints.
6. Place tile joints uniform in width, subject to variance in tolerance allowed in tile size. Make joints watertight, without voids, cracks, excess mortar, or excess grout.
7. Provide grout joint spacing in accordance with tile manufacturer’s recommendations.
8. Install movement joints where indicated on Drawings and as specified in this Section.
9. Install accessories per manufacturer’s recommendations and as detailed on Drawings.
10. Sound tile after setting. Replace hollow sounding units.
11. Allow tile to set prior to grouting: Minimum of 48 hours for thin-set methods.
Lionakis No. 019124.02 09 30 00
January 26, 2024 Tiling
Line3xx Page 7
B. Installation Methods – Interior Floors:
Method Substrate/Application Setting Material
TCNA Method F122A;
ANSI A108.5, A108.6,
and A108.13.
Raised concrete slab;
waterproof membrane; t hin set
application; epoxy grout.
Latex Portland cement
mortar.
3.3 JOINTS
A. Joint Widths at Floors: Install tile on floors in the joint widths recom mended by the tile manufacturer.
B. Expansion Joints:
1. Provide expansion joints at locations shown on the Drawings or where Drawings do not indicate location, provide in the following locations as a minimum requirement:
a. Provide and install expansion joints per TCNA EJ171. b. At control joints and expansion joints in substrate material, c. Where substrate material changes to separate different materials, d. Over construction joints,
e. Where tile abuts restraining surfaces, such as perimeter walls, curbs, and columns and at intervals of 24 to 36 feet each way in interior floor areas.
3.4 INSTALLATION - GROUT
A. Epoxy Grout: Install in accordance with manufacturer’s printed instructions and ANSI A108.6.
1. Before grouting, ensure all tiles are firmly in place. Clean tile surfaces; remove paper and glue from face of mounted tiles. Remove spacers, strings, ropes, and pegs.
2. Clean open tile joints. Remove excess setting materials present in the open grout joints.
3. Mix grout in accordance with manufacturer’s instructions.
4. Apply grout firmly into open joints using a hard rubber float.
5. Remove all excess epoxy grout from the tile surface with a rubber squeegee or rubber trowel before it loses plasticity and begins to set.
6. Immediately perform final clean up in accordance with manufacturer’s instructions.
3.5 CLEANING AND PROTECTING
A. Clean as recommended by manufacturer. Do not use materials or methods which may damage finish surface or surrounding construction.
B. Provide protective covering as recommended by tile manufacturer and as required to ensure installed tile finish will not be damaged by work of other trades. Protect installed tile finish surfaces from damage until Project Completion.
END OF SECTION
Lionakis No. 019124.02 09 91 00
January 26, 2024 Painting
Line3xx Page 1
SECTION 09 91 00
PAINTING
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Surface preparation.
B. Painting schedules, including painting of e xposed surfaces, interior and exterior, except as otherwise specified or indicated.
1.2 RELATED SECTIONS
A. Section 05 12 00 – Structural Steel Framing.
B. Section 05 50 00 – Metal Fabrications.
C. Section 06 10 00 – Rough Carpentry.
D. Section 06 17 53 – Shop-Fabricated Wood Trusses.
E. Section 07 62 00 – Sheet Metal Flashing and Trim.
F. Section 09 29 00 – Gypsum Board.
G. Divisions 21 – 23 – Mechanical.
H. Divisions 26 – 28 – Electrical.
1.3 REFERENCES
A. The publications listed below form a part of this Section to the extent referenced. The publications are referred to in the text by the basic designation only. Refer to Division 01 for definitions, acronyms, and abbreviations.
B. Standards, manuals, and codes refer to the latest edition of such standards, manuals, and codes in effect as of the date of issue of this Project Manual, unless indicated otherwise in CBC Chapter 35 and CFC Chapter 80.
C. Referenced Standards, Manuals and Codes:
1. ASTM D523 – Standard Test Method for Specular Gloss.
2. The Master Painters Institute, MPI Gloss and Sheen Levels.
3. The Master Painters Institute, MPI Maintenance Repainting Manual.
1.4 SUBMITTALS
A. Submit product data under provisions of Division 01.
B. Provide product data on all painting products and accessories.
C. Submit four brush-out samples 8 inches by 10 inches in size illustrating color and gloss level selected for each surface finishing product scheduled.
09 91 00 Lionakis No. 019124.02