Cities Index.
2025-01456 Appeal Crocker Village Residential Development (P24-028) [Noticed 08.01.2025; Published 08.01.2025]

Sacramento City Council
September 9, 2025

Document
2025-01456 Appeal Crocker Village Residential Development (P24-028) [Noticed 08.01.2025; Published 08.01.2025]
Meeting
September 9, 2025
Body
Sacramento City Council
Pages
12
Original file
75.0 MB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

City of Sacramento
City Council - 5PM Report
915 I Street Sacramento, CA 95814
www.cityofsacramento.org
File ID: 2025-01456 9/9/2025
Appeal: Crocker Village Residential Development (P24-028) [Noticed 08/01/2025; Published 08/01/2025]
File ID: 2025-01456
Location: 2325 10th Avenue and 2341 Omaha Beach Avenue, APN(s): 013-0010-046-0000 & 013- 0490-110-0000, District 7
Recommendation: Conduct a public hearing and upon conclusion, adopt: 1) a Resolution finding the proposal for the 2.40-acre Flex Parcel project is consistent with the Environmental Impact Report for Curtis Park Village Project (State Clearing House # 2004082020); 2) a Resolution approving the Tentative Subdivision Map to subdivide the 2.49-acre Flex Parcel into 31 residential parcels and three common parcels, the Conditional Use Permit to develop single-unit dwellings within the Shopping Center (SC-PUD) Zone and Curtis Park Village Planned Unit Development, and Site Plan and Design Review to construct 31 single-unit dwellings on the ±2.49-acre Flex Parcel site located in the Shopping Center (SC-PUD) Zone and Curtis Park Village Planned Unit Development; and: 3) a Resolution denying an amendment the Curtis Park Village Planned Unit Development Schematic Plan and Guidelines to permit single-unit dwelling development on the Multi-Family Housing designated site, a Tentative Subdivision Map to subdivide the 2.37-acre Multi Parcel into 30 residential parcels for single-unit development and five common parcels, and Site Plan and Design Review for construction of 30 single-unit dwellings on a ±2.37-acre parcel within the Multi Parcel site located in the Multi-Unit Dwelling (R-4A-PUD) Zone and Curtis Park Village Planned Unit Development.

Contact: Danny Abbes, Associate Planner, (916) 808-5873, [email protected]; Marcus Adams, Senior Planner, (916) 808-5044, [email protected]; Department of Community Development
Presenter: Danny Abbes, Associate Planner, (916) 808-5873, [email protected], Department of Community Development
Applicant: Paul Petrovich, 3680 Crocker Drive Suite 160, Sacramento, CA 95818 Property Owner: Paul Petrovich, 3680 Crocker Drive Suite 160, Sacramento, CA 95818 Attachments:

Page 1 of 10 ends

File ID: 2025-01456 9/9/2025
1-Description/Analysis
2-Background
3-Resolution: Finding Project Consistent with Curtis Park Village Project (P04-109) Environmental Impact Report and Mitigation Monitoring Plan
3A-Exhibit A City Council Resolutions: 2010-174 and 2010-572 3B-Exhibit B Mitigation Monitoring Program
4-Resolution: Approval of Flex-Parcel Entitlements
5-Resolution: Denial of Multi-Parcel Entitlements
6-Applicant Narrative and Proposed Resolution Amending the Curtis Park Village PUD Schematic Plan and Guidelines
7-Proposed Project Plans
8A-Public Comments
8B-Public Comments
8C-Public Comments
9-Original, Current, and Proposed Curtis Park Village PUD Schematic Plan land uses 10-Mitigation Monitoring Plan
11-Applicant Appeal Letter
12-Staff Response to Appeal Letter
13-Applicant Letter Claiming Housing Accountability Act Violation 14-California Housing and Community Development Letter Stating City Accordance with Housing Accountability Act
Description/Analysis
Issue Detail: The applicant is proposing to develop two vacant parcels (“Flex Parcel” and “Multi Parcel”) totaling 4.86 acres with a combined total of 61 single-unit dwellings within the Curtis Park Village Planned Unit Development (PUD). The required entitlements for the proposed development of the Flex Parcel site include a Conditional Use Permit to construct single-unit dwellings within the Shopping Center (SC-PUD) zone, a Tentative Subdivision Map to create 31 residential parcels, and Site Plan and Design Review to review the subdivision layout, housing design, and improvements.

The required entitlements for the proposed development of the Multi Parcel site include a Resolution amending the PUD Schematic Plan and Guidelines to permit single-unit dwelling development within the Multi-Family Housing designation, a Tentative Subdivision Map to create 30 residential parcels, and Site Plan and Design Review to review the subdivision layout, housing design, and improvements.

Staff recommends that the City Council approve entitlements associated with the “Flex Zone” property (2325 10th Avenue) and deny the requested entitlements associated with the “Multi Parcel” (2341 Omaha Beach Avenue).

In addition, since filing the appeal, the applicant has submitted a revised proposal for the Multi Site.

The revised proposal adds two junior accessory dwelling units to each single unit homes. Staff has

Page 2 of 10 ends

File ID: 2025-01456 9/9/2025
reviewed the revised proposal and the revised proposal does not meet the PUD. Accordingly, the recommendation to deny remains unchanged.

Public/Neighborhood Outreach and Comments: As part of the application review process, the proposal was routed to community organizations including Civic Thread, Sacramento Area Bicycle Advocates, Preservation Sacramento, Sacramento Metropolitan Air Quality Management District, Sacramento Housing Alliance, Environmental Council of Sacramento, and the Sierra Curtis Neighborhood Association.

Notification of this hearing was also sent to property owners and occupants within a 500-foot radius of the site, and the site was posted with contact information for project questions, as well as the date, time, and participation details for the project hearing.

Staff received responses from community groups and individuals that opposed single-unit dwelling development on the Multi Parcel, that opposed single-unit dwelling on both the Multi Parcel and the Flex Parcel, and that supported single-unit dwelling development on both the Multi Parcel and Flex Parcel. Some comment letters refer to a 100-foot-tall building to be constructed on the Multi Parcel site. There is no proposal by staff or anyone else to construct such a building. Staff does not propose development projects. All response letters and public e-comments can be found within Attachment 8 of this report.

Policy Considerations: The General Plan designation for the Flex Parcel site (2325 10th Avenue) is Residential Mixed Use (RMU). The RMU designation is intended to foster vibrant, walkable areas with a high-intensity mix of residential, commercial, office, and public uses, where daily errands can be accomplished on foot, by bicycle, or by transit.

The General Plan designation for the Multi Parcel site (2341 Omaha Beach Avenue) is Neighborhood (N). The N designation applies throughout Sacramento’s established residential neighborhoods and in newly annexed areas in the north of the city where primarily residential development is planned.

The N designation is intended to maintain and enhance livability and sense of place. The N designation is primarily comprised of residential uses, with some complementary neighborhoodserving commercial and public uses.

The following General Plan goal and policies support the development of residential units on both the Flex Zone site and the Multi Parcel site:

Goal LUP-1: A compact urban footprint and sustainable development pattern with infrastructure that supports efficient delivery of public services while protecting surrounding open space lands.

Policy LUP-1.1: Compact Urban Footprint. The City shall promote a land and resourceefficient development pattern and the placement of infrastructure to support efficient delivery of

Page 3 of 10 ends

File ID: 2025-01456 9/9/2025
public services and conserve open space, reduce vehicle miles traveled, and improve air quality.

Policy LUP-1.8: Jobs-Housing Balance. The City shall encourage a balance between job type, the workforce, and housing development to reduce the negative impacts of long commutes and provide a range of employment opportunities for all city residents.

Staff Response: This urban infill development project makes efficient use of city land and infrastructure by utilizing existing street and utility networks, and by being positioned within walking distance to supportive commercial services, retail uses, and employment opportunities.

While residential construction on both the Flex Parcel and the Multi Parcel are consistent with General Plan Policies LUD-1.1 and LU-1.8, the project proposes single-unit homes, which are inconsistent with the Curtis Park Village Planned Unit Development Schematic Plan and Guidelines.

As a result, the project requests an amendment of the PUD to allow the development of single-unit dwellings in the Multi-Family Housing schematic plan designation. This amendment is inconsistent with the following 2040 General Plan policies:

Policy LUP-2.4 Development Intensity Linked to Transit. The City shall plan for higher development intensities around current and planned transit to optimize public investments and support an accessible, convenient network.

Staff Response: The “Multi Parcel” site is within an approximately 0.3-mile walking distance (1,730 feet) of a current light rail transit station. The request to decrease development intensity by redesignating the site from “multi-family” to “single-family” is inconsistent with 2040 General Plan LUP-2.4.

On September 28, 2010, Sacramento City Council approved the Curtis Park Village Planned Unit Development (PUD) Schematic Plan and Development Guidelines. The Curtis Park Village Schematic Plan was established to ensure development would be in conformance with the land uses, density, architectural guidelines, and development goals and purpose of the PUD.

The PUD clearly distinguishes between the commercial land uses (generally in the southern portion of the project), single family housing (in the northern portion of the project), and multi-family, in the center. The multi-family site, identified as 2341 Omaha Beach Avenue, is designated on the PUD Schematic Plan as Multi-Family. The Schematic Plan multi-family designation was recommended and adopted by the City Council with the expectation that the site’s higher development intensity would take advantage of proximity to the adjacent public transit investment.

Policy LUP-4.1 Transit-Supportive Development. The City shall encourage increased residential and commercial development intensity within ½-mile of existing high-frequency bus

Page 4 of 10 ends

File ID: 2025-01456 9/9/2025
stops and existing and planned light rail stations, bus rapid transit stations, and commuter rail stations to support more frequent, reliable transit service and vibrant, walkable neighborhoods.

Staff Response: The subject site’s location, approximately 0.3-mile (1,730 foot) walking distance from the City College light rail station, is intended to support urban infill “smart growth” planning principles.

The placement of an intended multi-family residential development at the 2341 Omaha Beach Avenue site (Multi Parcel) was instrumental in the project securing transit-oriented development infrastructure funding, including the pedestrian/bike bridge connecting Crocker Village to the City College light rail station.

The importance of the anticipated synergy between a multi-family project at the subject site, as designated by the Schematic Plan, and adjacent public transit and retail/commercial goods and services, is evident in the language of the PUD’s four primary goals established by the PUD in 2010 and as they still read today:

1. “Create a visually interesting, pedestrian friendly mixed-use neighborhood that promotes smart growth principles.”

2. “Provide a vibrant and successful neighborhood retail center.”

3. “Provide various housing choices including single-family and cluster, affordable senior, and market-rate multi-family residences.”

4. “Maximize opportunities for efficient transit provided by the public transportation and roadway corridors serving the site of the PUD.”
Abandoning market rate multi-family development at the Multi Parcel site, in favor of more singlefamily development, is inconsistent with the PUD and 2040 General Plan vision, goals, and polices.

Policy LUP-5.3 Mixed-Use Neighborhood Centers. The City shall promote the development of strategically located mixed-use neighborhood centers that accommodate local-serving commercial, employment, entertainment, and cultural uses; provide diverse housing opportunities; are within walking distance of surrounding residents; and are efficiently served by transit.

Staff Response: The Multi Parcel site is strategically located within ¼ mile of “local-serving commercial, employment, entertainment,” and less than a ½ mile from transit. The Multi Parcel site is specifically distinguished from the single-family designated neighborhoods, not only by its location, but also by its purpose and attributes, as described on page 13 of the PUD Guidelines (emphasis added):

Page 5 of 10 ends

File ID: 2025-01456 9/9/2025
“Market-Rate Multi-Family Housing:

A. Provides additional pedestrian links through Curtis Park Village B. Acts as a buffer between Curtis Park Village single family residential and Curtis Park Village commercial areas
C. Provides an alternative type of housing for the neighborhood D. Neighborhood Park will provide shared recreational, open space, and tot lot facilities E. Provide parking per city code
F. Achieve variety in exterior architectural forms through the use of various building materials and colors
G. Shared common open space may be substituted for private patios and balconies” The PUD Guidelines make clear that the Schematic Plan’s multi-family designation intended the Multi Parcel site be developed with a housing product that not only distinguishes it from the PUD’s singlefamily product physically and aesthetically but also functionally due to its strategic location.

Replicating the adjacent single-family detached housing type would result in an inconsistency with the PUD’s vision and purpose for the site.

Policy LUP-6.2 Range of Residential Development Intensities. The City shall allow for a range of residential development intensities throughout the community to cultivate a mix of housing types at varying sales price points and rental rates, provide options for residents of all income levels, and protect existing residents from displacement.

Staff Response: Within the Curtis Park Village PUD Guidelines, one of the goals and objectives of the PUD is to create housing choices. The Guidelines describe the Multi Family Housing Area as an area that allows “for the development of apartments and condominium multi-family housing.” Taken in context with the dominant single-family detached housing type and one senior affordable apartment project, the purpose for the multi-family designated site is to diversify the PUD housing mix to include residences for those with incomes that would otherwise leave them unable to live in the community.

Such individuals could include City College staff, students, Crocker Village commercial/retail employees, and adjacent neighborhood young adults, looking to start living on their own, but within short distance of family and friends. Failure to provide the expected multi-family housing would be inconsistent with the Curtis Park Village Vision, as described on page 4 of the PUD:

Page 6 of 10 ends

File ID: 2025-01456 9/9/2025
“The vision for Curtis Park Village is of a vibrant mixed-use neighborhood developed at a pedestrian scale. Uses of the site include: detached brownstones, cluster-housing (cottages), single-family detached homes, affordable seniors and market-rate multi-family housing, a community shopping and retail/commercial development area, and a neighborhood park.

These elements will combine into a truly vibrant mixed-use neighborhood. Curtis Park Village incorporates values of new urbanism and smart growth, including walkable neighborhoods with tree-lined streets, pedestrian-scaled architecture, and effective connections to surrounding communities.” (Emphasis added.)
The site within the PUD identified for market-rate multi-family housing is the Multi Parcel site at 2341 Omaha Beach Avenue. If this site is not developed as market-rate multi-family housing, the PUD area will be built out without meeting the PUD requirement for this housing type.

Policy LUP-6.6 New Growth Neighborhoods. The City shall ensure that new residential growth areas include neighborhoods with a mix of residential types, sizes, and densities, such as single-, duplex-, and multi-unit dwellings.

Staff Response: As a relatively “new growth neighborhood” nearing its complete build-out, Curtis Park Village is a treasured community asset which receives local and regional praise for its “smart growth” attributes, walkability to shopping and commercial services, and easy access to transit. The 2341 Omaha Beach Avenue multi-family designated site is a key component of completing the vision for a “vibrant mixed-use neighborhood,” helping establish an inclusive, diverse community.

Replacing the market rate multi-family designation with a detached, single-unit housing type would be an inconsistent action, contrary to the Curtis Park Village PUD, the City’s 2040 General Plan, State housing goals, and fundamental “smart growth” Planning principles.

Greater Land Park Community Plan
The project site is within the boundaries of the Greater Land Park Community Plan. This plan contains identified community issues and opportunities, associated with General Plan policies, expected to be considered and addressed with future area development. Staff finds the requested amendment to the Curtis Park Village Planned Unit Development Schematic Plan and Guidelines to develop single-unit dwellings in the Multi-Family Housing designation to be inconsistent with the following community issues/opportunities identified within the Greater Land Park Community Plan:

Community Issue/Opportunity - Housing: Approximately 83 percent of the housing stock in Greater Land Park is single-unit residential, and average housing sales prices are higher than in most other areas. Residents expressed interest in seeing a wider variety of housing types in Greater Land Park, particularly smaller homes that can be affordable by design and allow younger Sacramentans to stay in the area. Many

Page 7 of 10 ends

File ID: 2025-01456 9/9/2025
community members wanted to see higher density housing allowed near transit routes and walkable neighborhood centers, including additional student housing in the Carleton Tract neighborhood, close to Sacramento City College. Addressing homelessness is another priority for Greater Land Park community members; some residents advocated for more shelter and permanent housing options and additional support services for people experiencing homelessness. (Greater Land Park Community Plan 11-LP-4.) Staff Response: The proposal to allow more single-unit residential development at a site designated for multi-unit development worsens the identified community issue of housing type imbalance and housing cost and opposes the opportunity for smaller units that can be affordable by design and allow younger Sacramentans to stay in the area. It also foregoes planned opportunity for higher density housing near transit.

Community Issue/Opportunity - Infill Development: Infill development along Greater Land Park’s corridors - including Freeport Boulevard, Franklin Boulevard, Sutterville Road, and some areas south of Broadway - could connect existing local businesses and enhance Greater Land Park’s sense of community. Capitalizing on proximity to light rail and to Downtown with greater development intensity along corridors would support the City’s goals to reduce GHG emissions by encouraging walking, bicycling, and transit use. Infill redevelopment could also open up new opportunities for living in Greater Land Park and further support the vitality of local businesses. Many residents see the Tower District and Broadway corridor as the creative “fringe” of the Central City and would like to see it enhanced as a multicultural live/work arts destination.

Staff response: The Multi Parcel site, designated by the Curtis Park Village PUD as a more intense Multi-Family Housing development site, is situated along the Blue Line light rail corridor. A decision to allow less intense single-unit development instead of higher intensity multi-unit development would not capitalize on proximity to light rail and to Downtown and would fail to best support the City’s goals to reduce GHG emissions by encouraging walking, bicycling, and transit use.

Environmental Considerations: On April 1, 2010, the City Council certified an Environmental Impact Report (EIR) (Resolution 2010-174) and on September 28, 2010, adopted Findings of Fact and Statement of Overriding Considerations and a Mitigation Monitoring Plan (Resolution 2010-572) for the Curtis Park Village Project (P04-109) (Original Project).

Staff’s recommended project decision consists of approving 31 housing units on the 2.3-acre Flex Parcel site and the analysis of impacts and mitigation in the EIR is adequate for the scope of this development. CEQA Guidelines provides that a lead agency shall not prepare a subsequent or supplemental EIR unless one or more of the conditions set forth in CEQA Guidelines Section 15162 is present. Following staff review, it was determined that the project did not result in any of the circumstances identified in CEQA Guidelines Section 15162. No further environmental review is

Page 8 of 10 ends

File ID: 2025-01456 9/9/2025
required.

The EIR can be found at:
https://www.cityofsacramento.gov/community-development/planning/environmental/impact-reports 200-Year Flood Protection: State Law (SB 5) and Planning and Development Code chapter 17.810 require that the City must make specific findings prior to approving certain entitlements for projects within a flood hazard zone. The purpose is to ensure that new development will have protection from a 200-year flood event or will achieve that protection by 2025. The project site is within a flood hazard zone and is an area covered by SAFCA’s Improvements to the State Plan of Flood Control System, and specific findings related to the level of protection have been incorporated as part of this project.

Even though the project site is within a flood hazard zone, the local flood management agency, SAFCA, has made adequate progress on the construction of a flood protection system that will ensure protection from a 200-year flood event or will achieve that protection by 2025. This is based on the SAFCA Urban level of flood protection plan, adequate progress baseline report, and adequate progress toward an urban level of flood protection engineer’s report that were accepted by City Council Resolution No. 2016-0226 on June 21, 2016 and the SAFCA 2024 Adequate Progress Annual Report accepted by City Council Resolution No. 2024-0311 on October 22, 2024.

Economic Impacts: Not applicable.

Sustainability: The 2040 General Plan was designed to promote sustainable land use by prioritizing infill development and higher-density development within convenient walking distance of public transit. Multi-unit dwellings located within proximity of a light rail station will help to improve transit ridership and encourage alternative modes of transportation.

Commission/Committee Action: On June 24, 2024, the Planning and Design Commission conducted a public hearing and approved entitlements associated with the Flex Parcel site to construct 31 single-unit dwellings in the Shopping Center (SC-PUD) zone and denied entitlements associated with the Multi Parcel site to construct 30 single-unit dwellings within the Multi-Unit Dwelling (R-4A-PUD) zone and Curtis Park Village Planned Unit Development Multi-Family Housing designation.

Rationale for Recommendation: Staff recommends that the City Council approve entitlements associated with the “Flex Zone” property (2325 10th Avenue), subject to the conditions of approval within Attachment 4.

Staff recommends that the City Council deny entitlements associated with the “Multi Parcel” site (2341 Omaha Beach Avenue). Staff finds the proposal to construct single-unit dwellings on the MultiFamily Housing site to be inconsistent with the Curtis Park Village PUD Schematic Plan and Guidelines, City of Sacramento 2040 General Plan land use policies, and the Greater Land Park Community Plan.

Page 9 of 10 ends

File ID: 2025-01456 9/9/2025
Financial Considerations: Not applicable.

Local Business Enterprise (LBE): Not applicable.

Page 10 of 10 ends

Background Information and Entitlement History
The Curtis Park Village Planned Unit Development (PUD), adopted in 2010 by City Council, is a 72-acre area south of Sacramento’s Central City. It is surrounded to the north and east by residential neighborhoods, to the south by light industrial development across Sutterville Road, and to the west by Sacramento City College, rail tracks, and the City College light rail station. Most of the PUD is now developed and includes thousands of square feet of commercial development and hundreds of housing units.

The two subject parcels (the 2.49-acre “Flex Parcel” and the 2.37-acre “Multi Parcel”) are the only significantly sized remaining undeveloped residential parcels within the PUD boundaries. According to available permit records and historic aerial imagery, the parcels have remained vacant since at least the 1990’s after the former Western Pacific/Southern Pacific Railroad companies ceased their operations in the vicinity.

Figure 1: Aerial view of subject site and surroundings (Google) Background: Flex Parcel Site / Flex Zone PUD Designation On September 28, 2010, City Council approved the establishment of the Curtis Park Village PUD. Originally, two parcels totaling ±5 acres were designated as “Flex Zone” property within the PUD between Omaha Beach Avenue, Crocker Drive, 10th Avenue, and the railroad tracks. The Flex Zone was initially created, “…in recognition that development in this area is not expected to occur for a number of years and market conditions will likely change during this period of time.” Per City Council Resolution 2010-176, plans for the Flex Zone site could consist of residential, commercial, office, or public use, and required City Council approval to assign a land use to the Schematic Plan. (P04-109)
On June 11, 2013, the ±2.23-acre western Flex Zone parcel was approved for a 91-unit affordable senior apartment complex by City Council Resolution 2013-0195. The apartment project completed construction in 2016. (P13-023) In late 2016, an application was submitted to develop the eastern Flex Zone parcel (2325 10th Avenue) with a ±40,000 square foot retail building (DR16-329). This application was withdrawn.

On June 20, 2023, Sacramento City Council adopted a Resolution (2023-0218) to designate the eastern Flex Parcel site for residential use. (P22-025) Background: Multi Parcel Site / Multi-Family Housing PUD Designation The Multi Parcel is a vacant ±2.37-acre site designated by the Curtis Park Village PUD for up to 131 units of multi-family/high-density housing. The applicant is proposing to amend the PUD Schematic Plan and Guidelines to develop the parcel with 31 singleunit dwellings.

The originally approved Curtis Park Village PUD document for the entire 72-acre area anticipated 527 total dwelling units including 248 “multi-family residences” and 90 “senior multi-family residences.” Section 2.5 of the PUD further states “multi-family residential uses shall consist of affordable senior housing and market rate multi-family housing,” distinguishing that there are two types of multi-family development required within the PUD’s Multi-Family designation.

On January 28, 2016, the Planning and Design Commission approved a PUD Amendment and entitlement package (project P15-027) that reduced the anticipated number of the PUD’s multi-unit dwellings by 113 units and increased the anticipated number of the PUD’s single-unit dwellings by 96 units. It also increased the allowed height of buildings within the Multi-Family designation from 45 feet to 55 feet to “allow for a higher density housing project of up to four stories over podium parking.” (PUD Guidelines section 2.1.3.A – Concept and Land Use; Multi-Family Housing Area) Attachment 9 shows the originally approved PUD Schematic Plan land uses, the 2016 amended PUD Schematic Plan, and the currently proposed PUD Schematic Plan amendment, and demonstrates the change (reduction) in land dedicated to the MultiFamily Housing designation.

Affordable Housing within the Curtis Park Village PUD
Construction of the 91-unit affordable senior apartment complex on the western Flex Zone parcel satisfied the Inclusionary Housing Plan requirement for the Curtis Park Village Planned Unit Development for up to 527 residential units (including the 91 senior units). The existing number of units plus the current proposed number of units within the PUD boundaries would be less than 450.

Table 1: Project Information
Entitlement Review
Tentative Subdivision Map- Flex Parcel
The applicant is proposing to subdivide the existing ±2.49-acre Flex Parcel into 31 residential parcels and three common parcels. The three common parcels provide access as alleys and a street through the site. The common parcels, lighting, and landscaping would be maintained by a Homeowners Association.

The residential parcels are generally between 31 and 37 feet wide and between 64 and 79 feet wide, and range in size from ±2,000 to ±3,140 square feet. Neither the Shopping Center (SC) Zone nor the Curtis Park Village PUD establish lot size, lot width, or lot depth development standards for the creation of new parcels; therefore, the proposed subdivision of the site does not require any deviations from development standards.

Each residential lot would contain one residence each.

Project Area: Total site: ±4.86-acres
Flex Parcel: ±2.49-acres
Multi Parcel: ±2.37-acres
Existing Use: Vacant
Zoning: Flex Parcel: Shopping Center (SC-PUD)
Multi Parcel: Multi-Unit Dwelling (R-4A-PUD)
Proposed Use: Flex Parcel: 31 single-unit dwellings
Multi Parcel: 30 single-unit dwellings
General Plan Designation: Flex Parcel: Residential Mixed Use Multi Parcel: Neighborhood
Minimum Density: Flex Parcel: 15 dwelling units per acre Multi Parcel: 3 dwelling units per acre
Conditional Use Permit (CUP)- Flex Parcel
The Flex Parcel is zoned SC-PUD. Multi-unit dwelling residential development is permitted “by right” without the need of a CUP in the SC zone. Single-unit dwelling residential development within the Shopping Center (SC) zone however requires Planning and Design Commission approval of a Conditional Use Permit. The CUP process is designed to evaluate a project’s potential impact on a site and the surrounding area.

In 2023, City Council adopted a Resolution to designate the subject Flex Parcel site for residential use. The associated staff report supported a residential designation for the parcel:
“Staff believes residential is an optimal use of the site since the area already includes plentiful restaurant, retail and commercial service uses, and since future residential site development will provide a quality living environment in walking distance to Sacramento City College, Curtis Park, the City College light rail transit station, and shopping and service needs. Furthermore, residential development will enhance the vitality of local commercial space.” Staff maintain the perspective that residential development is an optimal use of the site, find the current Flex site proposal to be consistent with the PUD Schematic Plan and Guidelines, and therefore support the CUP for single-unit dwelling development on the Flex Site.

Since its establishment in 2010, the Curtis Park Village PUD Guidelines and Schematic Plan have contemplated the provision of market-rate, multi-family residences in the neighborhood and have reserved a specific location to provide high density housing, creating an alternative dwelling type for the neighborhood.

Site Plan and Design Review- Flex Parcel
Access and Circulation
The Flex Parcel has existing off-site infrastructure improvements including a 6-foot-wide separated sidewalk along Crocker Drive, 6-foot-wide sidewalks along 10th and Omaha Beach Avenues, and an alley between the site and senior apartments site to the west.

Private “Street B”, directly across from Ronald Reagan Way, and Alley G which is accessible from both 10th Avenue and Omaha Beach Avenue, provide vehicle access and circulation to and through the site. Landscaped pedestrian sidewalk systems (“paseos”) are provided between interior homes that face each other and not the street.

Applicable Development Standards
There are no deviations from applicable development standards. The General Plan designation of Residential Mixed Use requires a minimum of 15 dwelling units per net acre. The net acreage of the site is 2.11 acres which requires a minimum of 31 units.

The proposed lots can accommodate residential development and are consistent with existing area development. City departments and utility agencies reviewed and conditioned the project to ensure safety and functionality.

Building Design
Each house is two stories with 3 or 4 bedrooms and 2.5 bathrooms. The ground floor contains a two-car garage, kitchen, dining, and living space. The bedrooms are generally located on the second floor. The houses range in size from 1,620 square feet to 2,071 square feet.

Figure 2: Proposed Elevations
Consistency with Applicable Design Guidelines
Staff finds the Flex Zone site and building design to be generally consistent with the principles of the Curtis Park Village PUD and the city’s Single-Unit Dwelling Design Guidelines. The proposed designs:
 reflect the scale of existing area homes
 are located toward the front of lots with minimal setbacks  provide an entry facing the street or easily identifiable from the street  minimize the appearance garages by locating them at the side or rear of homes  minimize the appearance of mass in two-story homes with an articulated façade PUD Schematic Plan and Guidelines Amendment- Multi Parcel The applicant is proposing to amend the Curtis Park Village PUD Schematic Plan and Guidelines to permit single-unit dwelling development within the Multi-Family Housing designation.

Planned Unit Development Schematic Plans and Guidelines are zoning instruments intended to implement a vision for a specific geographic area. They consider and guide a layout and development plan for areas comprised of a collection of individual parcels.

Based on a broader vision, the PUD designates land uses and development standards that sometimes differ from and supersede the allowed uses and standards of the individual underlying zones.

City Code Section 17.452.040.B.2.d. states, “Property within a planned unit development may be used only for the uses that are permitted in the underlying zone in which it is located and that are authorized by the schematic plan and development guidelines adopted for the property.” The Curtis Park Village PUD Guidelines specify that the use of the subject R-4A zoned parcel shall consist of affordable senior housing and market rate multi-family housing (Section 2.5, page 12). The Curtis Park Village Schematic Plan establishes that the land use allowed on the 2341 Omaha Beach Avenue site is “Multi-Family Housing,” consistent with the property’s R-4A zoning. The proposed single-unit development does not comply with these standards.

The stated vision and goals and objectives within the Curtis Park Village PUD include market-rate multi-family housing as a component in creating a “truly vibrant mixed-use neighborhood,” and a highlighted housing type in providing housing choice and an alternative type of housing for the neighborhood. The Multi Parcel site located at 2341 Omaha Beach Avenue was specifically selected as a location for the provision of MultiFamily Housing within the PUD.

The vision, goals, and objectives of the Curtis Park Village PUD, including the importance of various housing type options and that multi-family housing helps create vibrant neighborhoods, are consistent with general plan land use policies that promote a mix of residential housing types, sizes, and densities, and at varying sales price points and rental rates. Staff finds the proposed amendment to divest from the provision of market-rate multi-family housing within the PUD area inconsistent with City of Sacramento 2040 General Plan land use policies related to diversity in housing opportunities and increased residential development intensity near transit.

Staff does not agree with the applicant’s assertion within the narrative of this current proposed amendment that there are any omissions needing to be rectified related to any prior Curtis Park Village PUD Amendment. The 131-unit number (taken from the Schematic Plan map) refers to potential density of the Multi Parcel site only and does not refer to an expected cumulative density involving the Flex Parcels.

Staff recommends denial of the request to amend the Curtis Park Village PUD Schematic Plan and Guidelines and the associated Multi Parcel Tentative Subdivision Map and Site Plan and Design Review entitlements to allow single-unit dwelling development within the Multi-Family Housing designation.

Tentative Subdivision Map- Multi Parcel
The applicant proposes to subdivide the 2.37-acre Multi Parcel into 30 residential parcels and five common parcels. The five common parcels provide access as alleys and a street through the site. The common parcels, lighting, and landscaping would be maintained by a Homeowners Association.

The residential parcels are generally between 35 and 41 feet wide and between 65 and 70 feet wide, and range in size from ±2,275 to ±2,905 square feet.

Staff finds that the subdivision of property to accommodate single-unit development is inconsistent with the PUD Schematic Plan and Title 17, Planning and Development Code requirements (City Code Section 17.452.040.B.2.d.) Site Plan and Design Review- Multi Parcel
Access and Circulation
The Multi Parcel has existing off-site 6-foot-wide sidewalk infrastructure improvements along Veterans First and Omaha Beach Avenues. Private “Street A,” which runs between Bronze Star Way and Omaha Beach Avenue, and four interior alleys provide vehicle access and circulation to and through the site. Paseos are provided between interior homes that face each other and not the street.

Applicable Development Standards
The General Plan designation of Neighborhood requires a minimum of 3 dwelling units per net acre. The net acreage of the site is 2.01 acres which requires a minimum of 6 units. There are no deviations from applicable development standards.

Building Design
The Multi Parcel site has the same housing designs as the Flex Parcel site.

Rev. 061609 Page 1 of 3
RESOLUTION NO. 2025-
Adopted by the Sacramento City Council
September 9, 2025

CONSIDERING THE CERTIFIED ENVIRONMENTAL IMPACT REPORT, THE

FINDINGS OF FACT AND STATEMENT OF OVERRIDING CONSIDERATIONS

AND MITIGATION MONITORING PROGRAM FOR THE CROCKER VILLAGE

RESIDENTIAL PROJECT
(P24-028)

BACKGROUND
On June 24, 2024, the Planning and Design Commission conducted a public hearing and approved entitlements associated with the Flex Parcel site to construct 31 single-unit dwellings in the Shopping Center (SC-PUD) zone and denied entitlements associated with the Multi Parcel site to construct 30 singleunit dwellings within the Multi-Unit Dwelling (R-4A-PUD) zone and Curtis Park Village Planned Unit Development Multi-Family Housing designation.

On September 9, 2025, the City Council conducted a public hearing, for which notice was given pursuant Sacramento City Code, and received and considered evidence concerning the Crocker Village Residential project (P24-028).

BASED ON THE FACTS SET FORTH IN THE BACKGROUND, THE CITY COUNCIL RESOLVES AS FOLLOWS:

Section 1. The City Council finds as follows:

A. On April 1, 2010 pursuant to the California Environmental Quality Act (Public Resources Code §21000 et seq. (“CEQA”), the CEQA Guidelines (14 California Code of Regulations §15000 et seq.), and the City of Sacramento environmental guidelines, the City Council certified an environmental impact report (EIR) and, on September 28, 2010, having reviewed and considered the information contained in the EIR, adopted findings of fact and findings of overriding consideration, adopted a mitigation monitoring program, and approved the Curtis Park Village (P04-109) project (Project). (City Council Resolutions No. 2010-174, 2010-572)
B. Staff’s recommended project decision for the Crocker Village Residential Development (P24-028) (Current Project) consists of constructing 31 housing units on the 2.3-acre “Flex Parcel” within the SC-PUD zones and Curtis Park Village Planned Unit Development (PUD). The request requires approval of the following entitlements: a Conditional Use Permit to develop single-unit dwellings within the SC Zone, a Tentative Subdivision Map to create 31 Rev. 061609 Page 2 of 3
residential lots, and Site Plan and Design Review for construction of 31 housing units and associated site improvements.

C. Staff determined that the proposed changes to the original Project did not require the preparation of a subsequent EIR, and that the original EIR is adequate for purposes of environmental review.

Section 2. The City Council has reviewed and considered the information contained in the previously certified EIR for the Project, the previously adopted findings of fact and findings of overriding consideration, and all oral and documentary evidence received during the hearing on the Project Modification.

The City Council finds that the previously certified EIR constitutes an adequate, accurate, objective, and complete review of the proposed Project Modification and finds that none of the circumstances in CEQA Guidelines Section 15162 are present and that additional environmental review is required based on the reasons set forth below:

A. No substantial changes are proposed by the Project Modification that will require major revisions of the previously certified EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; B. No substantial changes have occurred with respect to the circumstances under which the Project Modification will be undertaken which will require major revisions to the previously certified EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;
C. No new information of substantial importance has been found that shows any of the following:

1. The Project Modification will have one or more significant effects not discussed in the previously certified EIR;

2. Significant effects previously examined will be substantially more severe than shown in the previously certified EIR;

3. Mitigation measures previously found to be infeasible would in fact be feasible and would substantially reduce one or more significant effects of the Project Modification; or

4. Mitigation measures which are considerably different from those analyzed in the previously certified EIR would substantially reduce one or more significant effects on the environment.

Rev. 061609 Page 3 of 3
Section 3. The mitigation monitoring program for the Project remains in effect and will be applied to the Project Modification. The mitigation monitoring program meets the requirements of CEQA section 21081.6 and CEQA Guidelines section 15091.

Section 4. Upon approval of the Project Modification, the City Manager shall file or cause to be filed a Notice of Determination with the Sacramento County Clerk and, if the project requires a discretionary approval from any state agency, with the State Office of Planning and Research, pursuant to section 21152(a) of the Public Resources Code and the State EIR Guidelines adopted pursuant thereto.

Section 5. Pursuant to Guidelines section 15091(e), the documents and other materials that constitute the record of proceedings upon which the City Council has based its decision are located in and may be obtained from, the Office of the City Clerk at 915 I Street, Sacramento, California. The City Clerk is the custodian of records for all matters before the City Council.

Table of Contents:

Exhibit A: City Council Resolutions: 2010-174 and 2010-572 Exhibit B: Mitigation Monitoring Program
RESOLUTION NO. 2010-174
Adopted by the Sacramento City Council
April 1, 2010

CERTIFYING THE ENVIRONMENTAL IMPACT REPORT
FOR THE CURTIS PARK VILLAGE PROJECT ( P04-109)

BACKGROUND
A. On February 25, 2010, the City Planning Commission conducted a public hearing on, and forwarded to the City Council a recommendation to approve with conditions the Curtis Park Village Project.

B. On April 1, 2010, the City Council conducted a public hearing, for which notice was given pursuant Sacramento City Code Section 17.200.010 (C)(2)(a, b, and c) (publication, posting, and mail (500 feet) and received and considered evidence concerning the Curtis Park Village Project.

BASED ON THE FACTS SET FORTH IN THE BACKGROUND, THE CITY COUNCIL RESOLVES AS FOLLOWS:

Section 1. The City Council finds that the Environmental Impact Report for Curtis Park Village Project (herein EIR) which consists of the Draft EIR and the Final EIR (Response to Comments) (collectively the "EIR") has been completed in accordance with the requirements of the California Environmental Quality Act (CEQA), the State CEQA Guidelines and the Sacramento Local Environmental Procedures.

Section 2. The City Council certifies that the EIR was prepared, published, circulated and reviewed in accordance with the requirements of CEQA, the State CEQA Guidelines and the Sacramento Local Environmental Procedures, and constitutes an adequate, accurate, objective and complete Final Environmental Impact Report in full compliance with the requirements of CEQA, the State CEQA Guidelines and the Sacramento Local Environmental Procedures.

Section 3. The City Council certifies that the EIR has been presented to it, that the City Council has reviewed the EIR and has considered the information contained in the EIR prior to acting on the proposed Project, and that the EIR reflects the City Council's independent judgment and analysis.

Resolution 2010-174 April 1, 2010 1
Adopted by the City of Sacramento City Council on April 1, 2010 by the following vote:

Ayes: Councilmembers Cohn, Fong, Hammond, McCarty, Pannell, Sheedy, Tretheway, Waters, and Mayor Johnson.

Noes: None.

Abstain: None.

Absent: None.

Attest:

Resolution 2010-174 April 1, 2010 2
RESOLUTION NO. 2010-572
Adopted by the Sacramento City Council
September 28, 2010.

ADOPTING THE'FINDINGS OF FACT, STATEMENT OF OVERRIDING

CONSIDERATIONS, AND THE MITIGATION MONITORING PROGRAM FOR THE CURTIS PARK=VILLAGE PROJECT- (P04-109) - - °

BACKGROUND
On February 25, 2010, the City Planning Commission conducted a public hearing on, and forwarded to the City Council a.recommend ation to approve with conditions the Curtis Park Village Project
B. On April 1, 2010 the City Council conducted _a public hearing, for which notice was given pursuant Sacramento City Code Section 17.200.010 (C)(2)(a, b, and c) (publication, posting, and mail (500 feet)) and received and considered evidence concerning the Curtis Park Village Project. The City Council certified the environmental impact report (EIR) for the project, entitled Curtis Park Village Project (State Clearinghouse Number 2004-082020). The EIR addressed the potential , . , .
environmental impacts associated with construction and operation of the Curtis Park Village project and proposed update to the previously-app roved- Remedial` Action Plan (RAP) (1995) for the remediation of the contamination on the project site.

C. Pursuant to California Environmental Quality Act Guidelines Section 15096, the - -=--=Department°of Toxic^Substances°controt°(DTSC) could^use°therenvironmental°impact report for the Curtis Park Village project in its capacity as Responsible Agency to review the potential environmental impacts of the proposed u,pdate to the-1995 RAP= D. Subsequent to the certification of the EIR, DTSC began the process associated with an Explanation of Significant Differences (ESD), concerning the 1995 RAP. DTSC conducted a public meeting on September 15, 2010 to discuss the proposed changes to the 1995 RAP.

The ESD would supplement the 1995 RAP administrative record with the proposed changes to the 1995 RAP to assure that any negative impacts to the environment are minimized. The DTSC would file a Notice of Determination (NOD) in compliance with CEQA for the ESD when approved.

If the ESD is approved by the DTSC, the update to the RAP, as analyzed in the Curtis Park Village environmental impact, report would not be necessary.

E. These Findings of Fact and the Mitigation Monitoring Plan do not address any impacts or mitigation associated with the update to the 1995 RAP.

Resolution 2010-572 September.28, 2010 1
F. On September 28, 2010 the City Council conducted a public hearing, for which notice was given pursuant Sacramento City Code Section 17.200.010 (C)(2)(a, b, and c) (publication, posting, and mail (500 feet)) and received and considered evidence concerning the Curtis Park Village Project.

BASED ON THE FACTS SET FORTH IN THE BACKGROUND, THE CITY COUNCIL RESOLVES AS FOLLOWS:

Section 1. Pursuant, to CEQA Guidelines Sections 15091 and 15093, and in support of its approval of the Project, the City Council adopts the attached Findings of Fact and Statement of Overriding =Considerations in support-of approval of the = Project-as set forth-in the-attached Exhibit-A---of-this- Resolution. °- _ Section ,2. Pursuant to CEQA section 21081.6 and CEQA Guidelines section 15091, and in support of its approval of the Project, the City Council adopts the Mitigation Monitoring Program to require all reasonably feasible mitigation measures be implemented by means of Project conditions, agreements, or other measures, as set forth in the.Mitigation Monitoring Program as set forth in Exhibit B of this Resolution.

Section 3. The City Council directs that, upon approval of the Project, the City's Community Development Department shall file a notice of determination with the County Clerk of Sacramento County and, if the Project -requires a discretionary approval from any state agency, with the State Office of Planning and Research, pursuant to the provisions of CEQA section 21152.

Section 4. Pursuant to Guidelines Section 15091(e), the documents and other materials that constitute the record of proceedings upon which the City Council has based its decision are located in and may be obtained from, the Office of the City Clerk -at 9`151 Street; Sacramento; Califo^nia^-TheCit^Clerk is y the cusfodian of ^ T^ records for all " " -
Table of Contents:

Exhibit A - CEQA Findings- of Fact and Statement of Overriding Considerations for the Curtis Park Village Project.

Exhibit B.- Mitigation Monitoring Plan
Resolution 2010-572 September 28, 2010
Adopted by the City of Sacramento City Council. on September 28, 2010 by the following vote:

Ayes: Councilmembers Cohn, Fong, Hammond, McCarty, Pannell, Sheedy, Tretheway, Waters, and Mayor Johnson.

Noes: None.

Abstain: None.
-Absent: -- _ - None.-
Attest:

Shirley Conc6lino, City Clerk
Resolution 2010-572 September 28, 2010
Exhibit A - CEQA Findings of Fact and Statement of Overriding ' Considerations for the Curtis Park Village Project
Description of the Proiect
The proposed project would covert the existing 72-acre project site into a mixed-use, urban infill development. Curtis Park Village, as proposed, would be one of Sacramento City's largest infill projects. The intent of the project is to create a neighborhood consisting of singlefamily home sites, multi-family and senior multi-family residential complexes, a neighborhood park-area, and neighborhood-serving-retail and commercial development areas: The° proposed project includes-approximately 260,000 square--feet-of commercial=retail; 189 single-family home sites, an 90-unit senior multi-family housing complex, a 117-unit multifamily residential housing complex, a 131 -unit multi-family residential housing complex, and an 8.7=acre (6.8 net acres) park.

The proposed project site is currently contaminated with hazardous wastes from the railyard era and remediation of the site is continuing to occur, pursuant to a Remedial Action Plan (RAP) approved by the DTSC in 1995. Senate Bill 120 (1998), adopted for the Curtis Park Village project site, states that DTSC cannot make a determination that the remediation of the site is complete until the City has completed its land use planning process and the remediation necessary to allow the approved land use plan is complete. The DTSC determination that the remediation is complete includes such actions as issuing a certification, a no further action letter, or a closure letter.

Findings Required Under CEQA

1. Procedural Findings
The City°Cbuncif of the Gifyof Sacramento finds as foAows - ^ Based onthe iitial_tudy conducted _foraCurtis Park=V_illge Project,aS.C.H ;#:2004A82020 (herein after the Project), the City of Sacramento's Community Development Department determined, on substantial evidence, that the Project may have a significant. effect on.the environment and prepared an environmental impact report ("EIR") on the Project. The EIR was prepared, noticed, published, circulated, reviewed, and completed in full compliance with the California Environmental Quality Act. (Public Resources Code §21000 et seq. ("CEQA"), the CEQA Guidelines ( 14 California Code of Regulations §15000 et seq.), and the City of Sacramento environmental guidelines, as follows:
. a. A Notice of Preparation of the Draft EIR was filed with the Office of Planning and Research and each responsible and trustee agency August 4, 2004 and was circulated for public comments from August 4, 2004 through September 3, 2004. A revised Notice of Preparation was filed on May 12, 2008 for a 30-day comment period, due to changes to the project description; a second revised NOP was released on November 12, 2008 for a 30-day comment period due to additional project description changes. b. A Notice of Completion (NOC) and copies of the Draft EIR were distributed to the Office of Planning and Research on April 1, 2009, to those public agencies that have Resolution 2010-572 September 28, 2010 4
jurisdiction by law with respect to the Project, or which exercise authority over resources that may be affected by the Project, and to other interested parties and agencies as required by law. The comments of such persons and agencies were sought. c. An official 45-day public comment period for the Draft EIR was established by the Office of Planning and Research. The public comment period began on April 1, 2009 and ended on May 15, 2009..
d. A Notice of Availability (NOA) of the Draft EIR was mailed to all interested groups, organizations, and individuals who had previously requested notice in writing on April. . 112009.- The NOA-stated-that -the City-of Sacramento had'cornpleted the Draft -E1Rand-that .^ copies were available at the-City-of Sacramento,- Development-Services Department; New ''°i City Hall, 915,1 Street, Third Floor, Sacramento, California 95814. The letter also indicated that the official 45-day public review period for the' Draft EIR would end on May 15, 2009. e. A public notice was placed in the Daily Recorder on April 1, 2009 which stated that the Draft EIR was available for public review and comment. f., A public notice was posted in the office of the Sacramento County Clerk on April 1, 2009. .
g. Following closure of the public comment period, all comments received on the Draft EIR during the comment period, the City's written responses to the significant environmental points raised in those comments, and additional information added by the City, were added to the Draft EIR to produce the Final EIR.
h. On April 1, 2010, the City Council certified the environmental impact report for the Project, entitled, Curtis Park Village Project (State Clearinghouse Number 2004-082020).

The Findings of Fact, Statement of Considerations, and Mitigation Monitoring Plan were not ^ . ^ ^ ^_ ^_^ _^ f^adoptedTat that-time beeause entitlements orthe project were not approved. 2 Record of_ProceedingPL
The following information is incorporated by reference and made part of the record supporting these findings:
a. The Draft and Final EIR and all documents relied upon or incorporated.by reference;
b. The City of Sacramento 2030 General Plan adopted March 3, 2009, and all updates;
c. The Master Environmental Impact Report for the City of Sacramento 2030 General Plan certified on March 3, 2009, and all updates; d. Findings of Fact and Statement of Overriding Considerations for the Adoption of . the Sacramento 2030 General Plan adopted March 3, 2009, and all updates; e. Zoning Ordinance of the City of Sacramento;
Resolution 2010-572 September 28, 2010 5
f. Blueprint Preferred Scenario for 2050, Sacramento Area Council of Governments, December 2004;
Land Park Community Plan;
h. Curtis Park Village PUD Guidelines and PUD Schematic Plan; L Applications materials, including application information; =The Mitigation Monitoring=Program for the: Project; and' All records of decision, staff reports, memoranda, maps, exhibits, letters, synopses of meetings*, and other documents approved, reviewed, relied upon, or prepared by any City commissions, boards, officials, consultants, or staff relating to the Project.

3. Findings
CEQA requires that the lead agency adopt mitigation measures or alternatives, where feasible, to substantially lessen or avoid significant environment impacts that would otherwise occur. Mitigation measures or alternatives are not required, however, where such changes are infeasible or where the responsibility for the project lies with some other agency. (CEQA Guidelines, § 15091, sub. (a), (b).)
With respect to a project for which significant impacts are not avoided or substantially lessened, a public agency, after adopting proper findings, may nevertheless approve the project if the agency first adopts a statement of overriding considerations setting forth the specific reasons why the agency found that the project's "benefits" rendered "acceptable" its ^-. - ^_ ^ = -^-- "unavoidable adverse environmental effects."-(CEQA_Guidein_es §§ 1509 -3, 15-043, sub. (b); see also Pub. Resources Code, § 21081, sub. (b))
In seeking to effectuate the substantive policy of CEQA to substantially lessen or avoid significant environmental effects to the extent feasible, an-agency, in adopting findings, need not necessarily address the feasibility of both mitigation measures and ^environmentally superior alternatives when contemplating approval of a proposed project with significant impacts. Where a significant impact can be mitigated to an "acceptable" level solely by the adoption of feasible mitigation measures, the agency, in drafting its findings, has no obligation to consider the feasibility of any environmentally superior alternative that could also substantially lessen or avoid that same impact - even if the alternative would render the impact less severe than would the proposed project as mitigated. (Laurel Hills Homeowners Association v. City Council (1978) 83 Cal.App.3d 515, 521; see also Kings County Farm Bureau v. City of Hanford (1990) 221 Cal.App.3d 692, 730-731; and Laurel Heights Improvement Association v. Regents of the University of California ("Laurel Heights P) (1988) 47 Cal.3d 376, 400-403.)
In these Findings, the City first addresses, the extent to which each significant environmental effect can be substantially lessened or avoided through the adoption of feasible mitigation measures. Only after determining that, even with the adoption of all feasible mitigation Resolution 2010-572 September 28, 2010 6
measures, an effect is significant and unavoidable does the City address the extent to which alternatives described in the EIR are (i) environmentally superior with respect to that effect and (ii) "feasible" within the meaning of CEQA.

In cases in which a project's significant effects cannot be mitigated or avoided, an agency, after adopting proper findings, may nevertheless approve the project if it first adopts a, statement of overriding considerations setting forth the specific reasons why the agency found that the "benefits of the project outweigh the significant effects on the environment." (Public Resources Code, Section 21081, sub. (b); see also, CEQA Guidelines, Sections 15093, 15043, sub.(b).) In the Statement of Overriding Considerations found at the end of = these Findings,-the City identifies the specific economic, social:, and-other considerations that;- in its judgment;-outweigh the°significant-environmental°effects that, the- Project wilFcause-'---- The California Supreme Court has stated that "[t]he wisdom of approving ... any development project, a delicate task which requires a balancing of interests, is necessarily left to the sound discretion of the local officials and their constituents who are responsible for such decisions. .The law as we interpret and apply it simply requires that those decisions be informed, and therefore balanced.". (Goleta ll (1990) 52 Cal.3d 553.at 576.) In support of its approval of the Project, the City Council makes the following findings for each of the significant environmental effects and alternatives of the Project identified in the EIR pursuant to Section 21080 of CEQA and section 15091 of the CEQA Guidelines:

Resolution 2010-572 September 28, 2010
A. Significant or Potentially Significant Impacts Mitigated to a Less Than Significant Level.

The following significant and potentially significant environmental impacts of the Project, including cumulative impacts, are being mitigated to a less than significant level-and are set out below. Pursuant to Section 21081(a)(1) of CEQA and Section 15091(a)(1) of the CEQA Guidelines, as to each such impact, the City Council, based on the evidence in the record before it, finds that changes or alterations incorporated into the Project by means of conditions or otherwise, mitigate, avoid or substantially lessen to a level of insignificance these significant or potentially-significant -environmental impacts of the Project. The basis for ° =-the finding for each identified-: impact is set forth-below.

Transportation and Circulation

5.2-1 Impacts to study intersections under baseline plus project conditions. The proposed Project and all access scenarios would increase traffic volumes at the following study intersections such that the levels of service are lower than required by the City's 2030 General Plan: Freeport Blvd/2nd Avenue; Sutterville Road/Road A; Sutterville/SR 99 Southbound Ramps; Road A/Area 3. Without mitigation, this is a significant impact.

Mitigation Measure (from MMP): The following mitigation measures have been adopted to address this impact:

5.2-1(a) At the Freeport Boulevard / 2"d Avenue intersection, provide protected leftturn phasing for the northbound and southbound approaches.

5.2-1(b) At the Sutterville Road l Road A intersection, provide overlap signal phasing to allow the southbound Road A right turning traffic to proceed on a green ^ -^ ^^ ^ ^ arrow simultaneously with theeastbound left turniiig movement ^
, and prohibit
_
U-turns for the eastbound left turning movement; add a southbound left-right lane _to pro_vide one leftwturn^lane,-one-left:r.ig%t:lane,°and_one-right_tur:nelane, _ and provide a dedicated right turn lane for the westbound Sutterville Road approach to the intersection.

5.2-1(c). Modify the southbound approach to the Sutterville Road /SR99 SB Ramps intersection to provide a left-turn lane, a combination left-through-lane, and two right-turn lanes. This change would bring the right-turning movements under.signal control. This mitigation measure is required at five percent of development based on trip generation. The design of the mitigation is subject to the approval of the City Transportation Department and Caltrans.

5.2-1(d) At the Road A /Area.3 intersection, provide separate right-turn and left-turn lanes on the eastbound approach:

Finding: The project is required to provide roadway and signal timing improvements that would reduce the impacts by improving the circulation in the area.

Resolution 2010-572 September 28, 2010
With implementation of the mitigation measures, this impact is reduced to a less than significant level. .

5.2-7 Impacts to on-site traffic circulation and safety under baseline plus project conditions.

The site plan submitted by the project applicant shows horizontal roadway curves at some locations that do not meet the City's centerline radius standards. In addition, the site plan shows angled parking stalls that require automobiles to back into pedestrian crosswalks. Without mitigation, this is a significant impact.

Mitigation Measure (from MMP): The following mitigation measures have been adopted to address this- impact:- _ = -

5.2-7(a) The design plans for the project shall be consistent with City standards. Any deviations are subject to the approval of the City Department of Transportation, Traffic Engineering Division. The horizontal curvatures shall be realigned or design. elements such as "knuckles" shall be installed in compliance with City standards.

5.2-7(b) The site design shall be modified to reduce the potential for vehicles leaving parking stalls to back across pedestrian crosswalks. This change may require the elimination of some angle parking spaces.

Finding: The project site design, including potential circulation is required to conform to City standards. In addition, the, site designs will be modified to reduce the potential of vehicles backing across pedestrian crosswalks. According .to the traffic report, after implementation of the site design, the project impact to onsite traffic and safety under baseline plus project conditions would be less than significant.
- R^_;
i
_ --^---_ced-^a_. /ess
^ -._
than
-_^
-1Nifhfimplementation of the`mitigatori measures ,`this iii^p --ac tisredu to significant level. .

5.2-9 Traffic impacts during construction. Construction activities, including the import of clean fill material, would result in disruptions to the circulation system in and around the project area, including temporary street and sidewalk closures. Heavy equipment would need to access the project site. Without mitigation, this is a significant impact.

Mitigation Measure (from MMP): The following mitigation measures have been adopted to address this impact:

5.2-9(a) Before issuance of grading permits for the project site, the project applicant shall prepare a detailed Traffic Management Plan that will be subject to review and approval by the City Department of Transportation, Regional Transit, and local emergency service providers, including the City of Sacramento fire and police departments. The plan shall ensure maintenance of acceptable operating conditions on local roadways and transit routes. At a minimum, the plan shall include:

Resolution 2010-572 September 28, 2010 9
• The number of truck trips, time, and day of street closures; • Time of day of arrival and departure of trucks;
• Limitations on the size and type of trucks and provision of a staging area with a limitation on the number of trucks that can be waiting; • Provision of a truck circulation pattern;
• Provision of a driveway access plan to maintain safe vehicular, pedestrian, and bicycle movements (e.g., steel plates, minimum distances of open trenches,. and private vehicle pick up and drop off Finding:
areas);
• Safe and efficient access routes
-
_for emergency vehicles;
Proper advance warning and posted signage concerning street closures;
- - - - -
Efficient and convenient transit routes:

Manual traffic control when necessary-
• Provisions for pedestrian safety; and
• Provisions for temporary bus stops, if necessary.

A copy of the construction traffic management plan shall be submitted to local emergency response agencies and these agencies shall be notified at least 14 days before the commencement of construction that would partially or fully obstruct roadways.
- essAhan=signi icant
The project applicant is required to submit a.Traffic Management Plan that would' ensure acceptable operating conditions- on local roadways and transit routes. The Traffic Management Plan would be subject to review and approval by the City Department of Transportation, Regional Transit, and local emergency service providers, including the City-of Sacramento Fire and Police Departments to ensure the traffic related impacts during-construction would be .With implementation of the mitigation measures, this impact is reduced to a less than - =-^--=- significant 1eveL^ ^`g p

5.2-10,Cumulative traffic impacts to study intersections. The project would cause traffic operations at eight on- and off-site intersections- to drop from acceptable levels, of service to non-acceptable levels or would increase the delay at intersections operating at LOS C, without the project, by five>seconds or more. Without mitigation, this is a significant impact.

Mitigation Measure (from MMP): The following mitigation measures have been adopted to address this impact:

5.2-10(a) 24r" Street / 2nd A venue - The project applicant shall pay a fair share contribution to install a traffic signal at this intersection.

5.2- 1 D(b) 24th Street / Portola Way - The project applicant shall pay a fair share contribution to install a traffic signal at this intersection.

Resolution 2010-572 September 28, 2010 10

5.2-10(c) Sutterville Road /Freeport Boulevard (north) - the applicant shall pay a fair share contribution to provide protected-permitted left turn phasing and install proper signage for southbound Freeport8oulevard.

5.2=10(d) Sutterville Road / City College Drive - The applicant shall pay a fair share contribution to provide overlap signal phasing to allow the northbound right turn traffic on City College Drive to proceed on a green arrow simultaneously with the westbound left turning movement, and prohibit U-turns for the westbound Sutterville Road approach to the intersection. -5:2=10(e)=Sutterville Road! Road A - apply Mitigation-Measure 5:2=1(b) which°w'ould provide overlap- signalphasing to allow- the-southboundRoad A-Right = turning traffic to proceed on a green arrow simultaneously with the eastbound /eft turning movement, and prohibit U-turns for the eastbound left turning movement; provide one left-turn lane, one left-right lane, and one right-turn lane on the southbound approach; provide a dedicated right turn lane for the westbound Sutterville Road approach to the intersection; provide an actuated exclusive pedestrian phase to serve pedestrians crossing Sutterville Road; and optimize signal timing.

5.2-10(g) Sutterville Road /Franklin Boulevard -The project applicant shall pay a fair share contribution to add an eastbound right-turn lane that would mitigate the Saturday peak hour impact of the Proposed Project and Access Scenario 2 and Access Scenario 3 to a less than significant level. For a.m. and p.m. peak hour impacts, the cycle length would increase to 110 seconds.

5.2-10(h) Sutterville Road / SR 99 Northbound Ramps - The project applicant shall pay a fair share contribution to modify signal timing to provide split phase for AH appr ^ ^ :
oadhe_-sanal-
-re=trips - theeas --- ^tboun-- d
_
l
^^ ^, _ ^.^
e on
^
e
,
/e _t urn__ _
,
_^^ - - ^ e anes to provid ftone left-through, and one through lane. Construct two receiving lanes on the -- -- wY_on carr►p for__-the: fur.ning=mo.v_ementefromeeastbou.nd=_12th_A,v_enue-to_t.he:- --^ - -
-
..
northbound SR 99 ramp.

5.2-10(i) Road A /Area 1- The project applicant shall pay a fair share contribution to modify the signal phasing to provide overlaps for the eastbound right-turn movement; provide protected-permitted phasing for the northbound left-turn movement; prohibit U-turn movement at this intersection; and increase the cycle length to 95 seconds.

Find.ing: The project applicant is required pay fair share contributions to intersection improvements at the affected intersections According to the traffic report, after implementation of the intersection improvements, the affected intersections would operate at acceptable levels.

With implementation of the mitigation measures, this impact is reduced to a less than significant level.

Air Quality
Resolution 2010-572. September 28, 2010 11
Mitigation Measure (from MMP): The following mitigation measures have been adopted to address this impact:
53-2 Impacts related to exhaust emissions and fugitive particulate matter emissions from project-associated construction activities. The California Air Resources Boardidentified particulate matter from diesel-fueled engines as a toxic air contaminant.

Because health risks associated with particulate matter are a function of concentration and duration of exposure, it was determined that emissions from diesel-powered construction equipment would not affect any specific receptor for any length of time.

However; controlled emissions from-diesel-powered-vehicles-and-equipment-and -dustgenerated during site grading would exceed 80 pounds per day and,-thereby, result in local exceedances of the particular matter air quality, standards. Without mitigation, this is a. significant impact.

Mitigation Measure (from MMP): The following mitigation measures have been adopted to address this. impact: .

5.3-2(a) The project applicant shall ensure that emissions from all off-road diesel powered equipment used on the project site do not exceed 40 percent opacity for more than three minutes in any one hour. Any equipment found to exceed 40 percent opacity (or Ringe/mann 2. 0) shall be repaired immediately, and SMAQMD shall be notified within 48 hours of identification of non-compliant equipment. A visual survey of all in-operation equipment shall be made at least weekly, and a monthly summary of the visual survey results shall be submitted throughout the duration of the project, except that the monthly summary shall not be required for any 30-day period in which no construction 'activity occurs. The monthly summary shall include the ^
^- - _ ^ ^
quantity and_type of vehiclessurveyedas we11as fhe dates of eachsurvey.

The SMAQMD and/or other officials may conduct periodic site inspections to _ _
^_^ ,deter:m, ►ne_compliance._Nothing rn.tfiis sect^on: s.hall supercede__other_ __ _ _-_- SMAQMD or state rules or regulations.

5.3-2(b) Prior to the approval of any grading permit, the project proponent shall submit a dust-control plan, approved by the SMAQMD, to the City of Sacramento Community Development Department. The dust-control plan shall stipulate grading schedules associated with the project phase, as well as the dust-control measures to be implemented. Grading of proposed project phases shall be scheduled so that the total area of disturbance would not exceed 15 acres on any given day. The dust control plan shall be incorporated into all construction contracts issued as part of the proposed project development. The dust-control plan shall, at a minimum, incorporate the following measures:
• Apply water, chemical stabilizer/suppressant, or vegetative cover to disturbed areas, including storage piles that are not being actively Resolution 2010-572 September 28, 2010 12
used for construction purposes, as well as any portions of the construction site that remain inactive for longer than 3 months; • Water exposed surfaces sufficient to control fugitive dust emissions during demolition, clearing, grading, earth-moving, or excavation operations. Actively disturbed areas should be kept moist at all times; • Cover all vehicles hauling dirt; sand, soil or other loose material or maintain at least two feet of freeboard in accordance with the requirements of California Vehicle Code Section 23114;
• Limit or expeditiously remove the accumulation of project-generated mud or dirt from adjacent public streets at least once every 24 hours °`- -`- when construction operations are occurring; ar► d -- ,- •" "Limitonsite vehicle speeds"on unpaved sun`aces to 15 mph; or less:

Finding: The SMAQMD's Guide to Air Quality Assessment recommends measures to reduce the amount of particulate matter generated during grading. The project applicant is required to ensure that all off-road diesel powered equipment does not exceed 40 percent opacity for more than three minutes. In addition the applicant shall submit a dust-control plan to the City of Sacramento Community Development Department. Measures within the dust-control plan would reduce fugitive particulate matter emissions to a less than significant level.

With implementation of the mitigation measure, this impact is reduced to a less than significant level.

5.3-3 Impacts related to a temporary increase in Nitrogen oxides (NOx) emissions. NOx are ozone precursors and could contribute to the creation of smog. Constructiongenerated emissions of NOx are short-term and temporary, lasting only as,long as construction occurs. However, it was determined that the vehicles. and equipment associated with construction of the project would result in NOx emission he standard. Without mitigation, this is a significant impact. -Mitigation-Measure^(from-MM P)-The^following-mitigation=measures-have--been-adopted-to^- address this impact:

5.3-3(a) Prior to issuance of a grading permit, the, applicant shall submit a SMAQMDapproved plan, which demonstrates that the heavy-duty (>50 horsepower) off-road vehicles to be used during construction of the project (including owned, leased, and subcontracted vehicles) will achieve a project-wide average of 20 percent NOx reduction and 45 percent particulate matter reduction, based on the most recent CARB fleet average at the time of construction. In addition, the applicant shall submit to SMAQMD a comprehensive inventory of all off-road construction equipment (>50 horsepower) that will be used an aggregate of 40 or more hours during any portion of the construction project. The inventory shall include the horsepower rating, engine production year, and project hours of use or fuel throughput for each piece of equipment. The inventory shall be updated and submitted monthly throughout the. duration of 'the project. Inventory shall not be required for any 30-day period in which construction activities do not Resolution 2010-572 September 28, 2010 . 13,
occur. At least 48 hours prior to the use of subject heavy-duty off-road equipment, the applicant shall provide SMAQMD with the anticipated construction timeline, including the start date and the name and phone number of the project manager and on-site foreman.

5.3-3(b) Prior to issuance of a grading permit, the applicant shall provide a construction mitigation fee to the SMAQMD sufficient to offset project emissions of NOx above 85 pounds per day. The amount of the fee shall be based on updated construction scheduling and equipment lists, and shall be calculated using the SMAQMD method of estimating excess emissions. The current price of NOX construction `offsets -calculated-by SIVIAQMD is $16, 000 per ton.

Finding: The project applicant is required to submit a plan and inventory which demonstrates that the heavy duty off-road vehicles used during ^construction will achieve project-wide emission reduction, based on the most recent CARB fleet average. In addition, the applicant is required to pay a construction mitigation fee to the SMAQMD sufficient-to offset project emissions of NOx above 85 pounds per day. A reduction of construction vehicle emissions and payment of mitigation fees would reduce the impact related to a temporary increase in NOx emissions to a less than significant level.

With implementation of the mitigation measures, this impact is reduced to a less than significant level.

Noise

5.4-2 Construction noise impacts to surrounding existing uses. Although construction activities are exempted from the noise standards in the City Code, construction of the _- _ ^ s ^ -- -^- = - --^----: _ F ^^ project could expose nearby noise=sensitive ^eceptors to higfi levels of noise during the day. Without mitigation, this is a significant impact.

Mitigation Measure (from MMP): The following mitigation measure has been adopted to address this impact:

5.4-2 Construction activities shall be limited to the hours set forth below, unless an exception is granted by the Community Development Department.

Monday through Saturday
7-00 a. m. to 6:00 p.m.

Sunday
9:00 a. m. to 6:00 p.m.

These restricted hours shall be included on all grading and construction plans submitted for the review and approval of the Community Development Department prior to issuance of grading and construction permits.

Resolution 2010-572 September 28, 201-0. 14
Finding: Construction activities are exempt from noise standards and would be limited to the hours set by the mitigation. Construction related noise would not occur during prohibited hours and a less than significant impact would occur.

With implementation of the mitigation measures, this impact is reduced to a less than significant level.

5.4-7 Railroad noise levels at exterior noise spaces of proposed project residences. The residential development that lies approximately 100. feet from the Union Pacific Railroad tracks could be exposed to exterior noise that exceeds the City's standards.

Without mitigation-; this is°a significant impact:

Mitigation Measure (from MMP): The following mitigation 'measure has been adopted to address this impact:

5.4-7 Prior to the issuance of building permits, a noise barrier shall be shown on the plans along the western boundary of the project site, from the northern boundary of the CPV site to the southern end of any parcel with residences for the review and approval of the City Engirieer. A barrier 10 feet in height (relative to-nearest outdoor activity elevations) would intercept line of sight to railroad pass-bys, thereby reducing future UPRR noise levels to 70 dB Ldn or less at the nearest outdoor activity areas proposed adjacent to the tracks.

Barriers can take the form of earthen berms, solid walls; or a combination of the two. Appropriate materials for noise walls include precast concrete or masonry block. Other materials may be acceptable provide they have a surface density of approximately four pounds per square foot.

Finding: The project includes construction of a noise barrier 10 feet in height along the _-- : -- -_.m^^ ^ - -- - vireste^n boundaryto the southern end of any parcel with residences._According to the Noise Report, construction of the noise barrier would reduce railroad - -
. , _
- .noiseeleuels-atexter.ior noise-le-velseto-a_less.
..thansignificant_leuel.=_ --^ -- --- -
With implementation of the mitigation measures, this impact is reduced to a less than significant level.

5.4-8 Railroad noise levels rat interior spaces. of proposed residences on the. project site. The residential development that lies approximately 100 feet from the Union Pacific Railroad tracks could be exposed to interior noise that exceeds the City's standards.

Without mitigation, this is a significant impact.

Mitigation Measure (from MMP): The following mitigation measures have been adopted to address this impact:

5.4-8(a) Prior to the issuance of building permits, all residential lots and residential buildings located within the 70 dB Ldn contour shall include noise insulation features such as the following:

Resolution-2010-572 September 28, 2010 15
• Sound-rated windows, and doors with STC rating of 35; and • Stucco exterior siding:

5.4-8(b) Prior to sale of any residential lots, statements shall be included in the title for all properties within the 65 dB Ldn.contour that informs the buyer of elevated noise levels during train passages, and that train passages routinely occur during nighttime hours.

Finding: , All residential lots within the 70 dB Ldn contour shall include insulation features.

In addition, the buyer of a residence within the 65 dB Ldn contour shall be _. informed' of elevated noise-levels during train passages The Noise=Repo determined that with insulation and notification the impact related to railroadnoise levels at interior spaces of proposed residences would be less than significant level.

With implementation of the mitigation measures, this impact is reduced to a less than significant level.

5.4-9 Noise-producing commercial uses proposed within the project site. If unshielded nighttime truck circulation or unloading occurs within the commercial areas of the project site, the noise generated by these activities could result in noise above City standards. Without mitigation, this is a significant impact.

Mitigation Measure (from MMP): The following mitigation measures have been adopted to address this impact:

5.4-9(a) Unshielded (i.e. unloading activities. which are visible from any residential window) nighttime truck unloading shall be prohibited within 200 feet of any residential unit.
5:4-9(b) Prior to _ issuance of a building permit, the site plans shall indicate that a .._ . . , __ vparapetwallshall-be-constr:ucted=along=the-edge=ofthe^roofs.ofthecommercial buildings of sufficient height to intercept line of sight from rooftop mechanical equipment at the nearest residences to reduce noise levels at those nearby residences.

Finding: Unshielded nighttime truck unloading shall be prohibited within 200 feet of any = residential unit. In addition, a parapet wall would be constructed along the edge of the roofs of commercial buildings to intercept the line of sight from rooftop mechanical equipment at the nearest residences. The Noise Report determined that with restricted nighttime unloading and parapet walls, the noise producing commercial uses within the project site would be less than significant level.

With implementation of the mitigation measures, this impact is reduced to a less than significant level.

5.4-10 Park generated noise at residential uses proposed within the project site. There would be residences constructed on the project site that would be located approximately 200 Resolution 2010-572 September 28, 2010 16
feet from the center a soccer field. The resulting noise could exceed the City's standards. Without mitigation, this is a significant impact.

Mitigation Measure (from MMP): The following mitigation measure has been adopted to address this impact:

5.4-10 Park activities shall be restricted to daytime hours, with exceptions allowed on a case-by-case basis subject to the approval of the Director of the Parks and Recreation.

Finding: Park-activities would be restricted°to daytime hours. Therefore; park-generated- - - noise would not impact residentiaF uses°during-evening hours and -a-less than` =` residential significant impact would occur.

With implementation of the mitigation measures, this impact is reduced to a less than significant level.

Biological. Resources

5.5-2 Impacts to burrowing owl. If the project.site remains undisturbed for some time after the completion of the remediation activities and prior to initiation of grading for the project, burrowing owls could potentially forage or nest on the. Curtis Park Village site.

Without mitigation, this is a significant impact. .

Mitigation Measure (from MMP); The following mitigation measure has been adopted to address this impact:

5.5-2 Prior to any ground disturbance associated with grading or construction, the applicant shall initiate a burrowing owl consultation with the California ^-- - _ a ll imple
_^,
m
^
ent
.^
fo llo
_^
w
_
in=
g
- =- $
rtmen
^--
t
-
ofFish and
^--
GaDepaTnel nd sh (CDFG)a th`e
mitigation measures or equivalents, based on the results of the consultation.

The developer shall arrange for burrowing owl surveys to be performed consistent with the CDFG's 1995 Staff Report on Burrowing Owl and the California Burrowing Owl Consortium's (CBOC) Survey Protocol (1997) not less than 30 days prior to ground disturbance for each phase of project grading. If burrowing owls are not detected, further mitigation is not necessary. However, if burrowing owls are detected the following steps shall be taken:

If site disturbance commences during the nesting season (between February 1 and August 31) and burrowing owls are detected, a fenced buffer shall be erected on the project site by the developer not less than 250 feet between the nest burrow(s) and construction activities. The 250-foot buffer shall be observed and the fence left intact until a qualified raptor biologist determines that the young are foraging independently, the nest has failed, or the owls are not using any burrows within the buffer.

If ground disturbance associated with grading.or construction commences Resolution 2010-572 September 28, 2010 17
outside' of the nesting season, and burrowing owl(s) are present on-site or within 160 feet of site disturbance, passive relocation consistent with.the CDFG Staff Report (1995) and the CBOC Survey Protocol (1997) shall be performed. At least one or more weeks will be necessary to accomplish this and allow the owls to acclimate to off-site burrows: The pre-construction surveys shall be repeated if more than 30 days elapse between the last survey and the start of construction activities.

Finding: Prior to any ground disturbance for the Curtis Park Village project, the applicant shall initiate a burrowing owl consultation with the CDFG: With Implementation of -burrowing owl surveys and-appropriate mitigation as-recommended irr:
consultation with-CDFG; the impact to burrowing°owls would°be lessthan ' significant.

With implementation of the mitigation measure, this impact is reduced to a less than significant level.

5.5-3 Impacts to nesting Swainson's hawks. : Due to the previous industrial activities on the project site and the current remediation activities, the site is not considered as foraging habitat for Swainson's hawks: If the project site remains undisturbed for some time after the completion of the remediation activities and priorto initiation of grading for the project, Swainson's hawk could potentially nest on the Curtis Park Village site. Without mitigation, this is a significant impact.

Mitigation Measure (from MMP): The following mitigation measure has been adopted to address this impact:

5.5-73 If site disturbance associated with grading or construction activities is proposed by the developer during breeding season (February to August), a ; pre=construction survey for Swainson s hawk nests-sha
^
ll be conducted-_
within 30 days prior to site disturbance%onstruction activities by a qualified bioLog►st in_order_to identify active_n.estsin®the-pr_oje.ctesiteev.icinity. The results of the survey shall be submitted to CDFG and the Community Development Department. If active nests are not found during the preconstruction survey, further mitigation is not required. If active nests are found, pursuant to consultation with CDFG, a fenced buffer shall be erected by the developer on the project site not less than one-quarter mile (approximately 1,300 feet) around the active nest. Site disturbance associated with grading or construction activities that may cause nest abandonment or forced fledging shall not be initiated within this buffer zone between March 1 and September 1. Any trees containing nests that must be removed as a result of project implementation shall be removed during the non-breeding season (September to January).

Finding: Prior to site disturbance, during the Swainson's hawk breeding season, a preconstruction survey shall be conducted within 30 days prior to site disturbance/construction activities. With implementation of appropriate mitigation as recommend by CDFG, the impact to Swainson's Hawk would-be less than significant.

Resolution 2010-572 September 28, 2010 18
With implementation of the mitigation measures, this impact is reduced to a less than significant level

5.5-4 Impacts to raptors and migratory birds. Suitable habitat for raptors, such as whiletailed kites, as well as migratory ground, tree, or shrub nesting avian species is present within, and adjacent to, the project site. Disruption of this habitat would be a significant impact. Without mitigation, this is a significant impact.

Mitigation Measure (from MMP): The following mitigation measures have been adopted to --address this impact:° -. - -.- . =

5.5-4(a) Prior to any grading or construction activities during the nesting season (February 1 to August 15), a preconstruction survey shall be conducted by a qualified wildlife biologist within 15 days of the start of project-related activities. If nests of migratory birds are detected on site, or within 75 feet (for migratory passerine birds) or 250 feet (for birds of prey) of the site, the developer shall consult with the CDFG to determine the size of a suitable buffer in which new site grading or construction disturbance is not permitted until August 15, or the qualified biologist determines that the young are foraging independently, or the nest has been abandoned.

I

5.5.4(b) Prior to any grading or construction activities from March 15 to May 15 The buffer area shall be avoided to prevent disturbance to the nest(s) until it -is..no lo :nger acti:ve .T_ .hemsize-of t.heebufferrar_ea_ma.y___-be=adjusted.if aequalifiedbiologist and CDFG determine it would not be likely to have adverse effects on the. purple martins. No project activity shall commence within the buffer area until a qualified biologist confirms that the nest(s) is no longer active. within 100 feet of the overcrossing of the railroad tracks on Sutterville Road,.. adjacent to the project site, a preconstruction survey shall be conducted by a qualified biologist within 15 days of the start of project-related activities. If active nests are present in the overcrossing, no construction shall be conducted within 100 feet of the edge of the purple martin colony (as demarcated by the active nest hole closest to the construction activity) at the ^---^-^ -- _ _ ;-beginning ofthe purp/e man breeding seasonfrom March 15 to-May_ 15 Finding:. Prior to-and grading or construction activities during the nesting season, a preconstruction survey would be conducted within 15 days prior to site disturbance/construction activities. With implementation of appropriate mitigation as recommend by CDFG, the impact to migratory birds would be less than significant.

With implementation of the mitigation measures, this impact is reduced to a less than significant level.

B. Significant or Potentially Significant Impacts for which Mitigation Measures Found To Be Infeasible.

Mitigation measures to mitigate, avoid, or substantially lessen the following significant and Resolution 2010-572 September 28, 2010 19
potentially significant environmental impacts of the Project have been identified. However, pursuant to section 21081(a)(3) of the Public Resources Code and section 15091(a)(3) of the CEQA Guidelines, as to each such impact and mitigation measure, the City Council, based on the evidence in'the record before it, specifically finds that the mitigation measures are infeasible. The impact and mitigation measures and the facts supporting the finding of infeasibility of the mitigation measure is set forth below. Notwithstanding the disclosure of this impact and the finding of infeasibility, the City Council elects to approve the Project due to the overriding considerations set forth below in Section F, the statement of overriding considerations.
5:2=10 Cumulative traffic-impacts to study intersections: Theproject would cause traffic operations at-the intersection of Sutterville Road, and Curtis Drive West-to dropfromacceptable levels of service (LOS C for evening and LOS A on Saturdays) to nonacceptable levels (LOS F and D, respectively). Without mitigation, this is a significant impact. .

Finding: Adding a southbound right turn lane to the intersection would mitigate the impact but was not considered to be feasible because of the need for demolishing several existing buildings to provide additional right-of-way.

The cumulative impact for the Proposed Project and all access scenarios would remain significant and unavoidable.

C. _Significant and Unavoidable- Impacts.

The following significant and potentially significant environmental impacts of the Project, including cumulative impacts, are unavoidable and cannot be mitigated in a manner that would substantially lessen the significant impact. Notwithstanding disclosure of these impacts, the City Council elects to approve the Project due to overriding considerations as set _ - --- - ---_=- T,^ forth below in Section F, the^statement of overriding considerations.

5.2-2 Impacts to study roadway segments under baseline plus project conditions. The traffic generated by the project would result in significant traffic impacts at the Sutterville overcrossing roadway segment and on Sutterville Road between East Curtis Drive and West Curtis Drive. Without mitigation, this is a. significant impact:

Mitigation Measure (from MMP): The following mitigation measure has been identified to reduce this impact to the extent feasible:

5.2-2 The project developer shall work with the Regional. Transit District to provide bus service or provide private shuttle service from 6:00 to 9:00 a.m. and from 4:00 to 7:00 p.m. between the commercial areas of the project site and the City College light rail station. As an alternative, the project developer shall coordinate with the City to reserve the required right of way needed to construct a pedestrian and bicycle bridge to provide access to the City College Station.

Resolution 2010-572 September 28, 2010 20
Finding: The bus service and private shuttle mitigation measure, or the pedestrian and bicycle bridge mitigation measure, is proposed to help reduce the impact on roadway segments, but would not reduce the impact to a less than significant level. To reduce the impact to less than significant would require widening Sutterville Road. Widening of Sutterville Road would impact existing development on both sides of Sutterville Road and would be against the City of Sacramento Smart Growth policy. The Sutterville Road widening mitigation is not considered to be feasible.

For these reasons, the impact' remains significant and una.voidable.

5.2-3= Impacts-to°freewayramps under baseline-plus project conditions: Trafficgenerated-by the project would result in traffic queues at the traffic signal at the 12th Avenue offramp to exceed the right turn storage capacity of the ramp. Without mitigation, this is a significant impact.

Mitigation Measure (from MMP): The following mitigation measure has been adopted to address this impact to the extent feasible:
5:2-3 Implementation of Mitigation Measure 5.2-1(c) would reduce the traffic queue at the southbound 12th Avenue off-ramp for baseline conditions for the Proposed Project and all access scenarios.

Finding: Implementation of Mitigation Measure 5.2-3 would reduc6the traffic queue at. the southbound 12th Avenue off-ramp for baseline conditions for the Proposed Project and all access scenarios. However, the reduction would not be sufficient to fully mitigate the project impacts and no other feasible mitigation measure was identified.
- ` For fhese reasons, the impact remains significant and unavoidable. - - - - . _ - ^ - _
:®5 2 1:1_Cumulative-irripactswto.study-r.oadway-segments .-T-_h-e.project._would^add-tr.a .ffic-to__-- _ .- roadway segments in 2027 that would result in significant cumulative conditions. The effected road segments are on Sutterville railroad overcrossing, Sutterville Road, 14" Street, Freeport Boulevard, and Road A. Without mitigation, this is a significant .impact.

Finding: No mitigation was identified to reduce the significant impact for cumulative conditions on roadway segments to less than significant. To reduce the impact to less than significant for the Proposed Project and all access scenarios, Sutterville Road, 24th Street and Freeport Boulevard would need to be widened.

No-roadway widening is considered to be feasible.

While widening the on-site roadway of Road A would reduce the impact to less than significant for the Proposed Project and Access Scenarios '2 and 3, secondary impacts might arise as a result of the widening. A widened roadway would attract incremental traffic and contribute to higher speeds. Additional traffic, higher speeds, and the added roadway width would make the roadway less friendly to pedestrians and bicycles. Because Road A is located in a Resolution 2010-572 September 28, 2010 21
commercial area where high pedestrian traffic is anticipated, a safe pedestrianfriendly street is desirable.

Mitigation Measure 5.2-2, which requires the developer to work with Regional Transit to provide or a bicycle or pedestrian connection between the commercial areas of the project site and the City College light rail station, would reduce the impact on roadway segments. However, the reduction would not be sufficient to fully mitigate the project impacts and no other feasible mitigation measure was identified.
--For reasons; the impact-remains-significant and unavoidable:

5.2-12 Cumulative impacts to freeway ramps. In 2027, the project would add traffic to 12tn Avenue off-ramp and State Highway 99 that would result in significant cumulative conditions in 2027. The southbound 12 th Avenue off-ramp would operate below standard during the p.m. and Saturday peak hours without the project. In addition, the traffic queue for the right turn movement at the northbound 12th Avenue off ramp would exceed the storage capacity of the ramp. The project would add traffic to the ramps and thereby exacerbate the conditions. Without mitigation, this is a significant impact.

Finding: No feasible mitigation measure was identified that would reduce the 2027 cumulative impacts on the freeway ramps. . Widening the freeway would reduce the impacts, but is not considered feasible.

For these reasons, the impact remains significant and unavoidable.

Air Quality
`5.3-5 Impacts related to long-term increases of criteria air pollutants. The project would result in the development of corrimercial and office uses that would generate emissions of ozonea-precursor pollutants (i.e., reactive organic compounds and ._nitrous_oxide.s),^Thesepolluntants-ar.e.anticipated-to-exceed.thethresholds Without_- mitigation, this is a significant impact.

Mitigation. Measure (from MMP): The following mitigation measures have been adopted . to address this impact to the extent feasible:

5.3-5(a) Prior to the issuance of any grading permit, the project applicant shall coordinate with the SMAQMD and the City of Sacramento Development Services Department to develop a project Air Quality Mitigation Plan (AQMP). In accordance with SMAQMD recommendations, the AQMP shall achieve a minimum overall reduction of 15 percent in the project's anticipated operational emissions. SMAQMD-recommended measures and corresponding emissions-reduction benefits are identified in SMAQMD's Guidance for Land Use Emission Reductions, which can be found in Appendix E of the SMAQMD document. The AQMP shall be reviewed and endorsed by SMAQMD staff prior to project implementation. Available measures to be included in, the AQMP include, but are not limited to, the following:

Resolution 2010-572 September 28, 2010 22
• Prohibit the installation of wood-burning fireplaces and stoves; • Provide onsite bicycle storage and showers for employees that bike to work sufficient to meet peak season maximum demand;
•. Provide preferential parking (e.g:, near building entrance, sheltered area; etc.) for carpool and vanpool vehicles;
• Provide transit enhancing infrastructure that includes: transit shelters, •
parking; or, use an open-grid pavement system (less than 50 percent impervious) for a minimum -of 50z percent of the parking-lot area. • Incorporate landscaping and sun screens to reduce energy use.

Deciduous trees should be utilized for building shading to increase solar heating during the winter months. Install sun-shading devices (e.g., screens) or recessed windows on newly proposed buildings; • Install efficient lighting and lighting control systems; • Install energy-efficient heating and cooling systems, appliances and equipment;
• Install light colored "cool" roofs and pavements (i.e., high reflectance, high emittance roof surfaces, or exceptionally high reflectance and low emittance surfaces) and strategically placed shade trees to the extent practical;
• Limit hours of operation of outdoor fighting-to- the extent practical; and • Provide shade (within 5 years) and/or use light-colored/high-albedo materials (reflectance of at least 0.3) and/or open grid pavement for at least 30 percent of the site's non-roof impervious surfaces, including parking lots, walkways, plazas, etc.; or, place a minimum of --50 percent--of--parking-spaces-underground-or-covered-by°structured--= benches, etc.; street lighting; route signs and displays; and/or bus turnouts/bulbs;
Incorporate onsite transit facility improvements (e.g., pedestrian shelters, route information, benches, lighting) to coincide with existing or plann_
ed transit service;

5.3-5(b) Documentation confirming implementation of the Air Quality Mitigation Plan shall be provided to the SMAQMD and City prior to issuance of occupancy permits.

Finding: The proposed project would have a minimum of 15 percent reduction of ROG and NOx emissions due to the implementation of the mitigation measure requiring an Air Quality Management Plan (AQMP) for the project, which requires a project to achieve a minimum overall reduction in operational emissions of 15 percent. However, the mitigation measure would not reduce the project's emissions of ROG and NOX to levels below the thresholds of significance for ozone precursors.

For these reasons, the impact remains significant and unavoidable.

5.3-8 Cumulative contribution to regional air quality conditions. Because the Sacramento Valley Air Basin is considered to be in non-attainment for ozone precursor pollutants Resolution 2010-572 September 28, 2010 23
and PM10 and the project's long-term generation;of these pollutants would exceed the thresholds, the cumulative impacts would be considered significant. Without mitigation, this is a significant impact.

Mitigation Measure (from MMP): The following mitigation measurehas been adopted to address this impact to the extent feasible:

5.3-8. Implement Mitigation Measures 5.3-2(a) and (b) and 5.3-4(a) and (b).

Finding: Implementation of Mitigation Measure 5.4-2(a) and (b) and Mitigation Measure -°` 5.3=5(a) and (b-) would reduce-short=term and long=terni increases `in-emissions .
--attributable to the-proposed project-by a minimum of 15° percent.-However--asnoted in Impact 5.3-5, long-term operational increases in emissions would still be anticipated to exceed SMAQMD's significance threshold.

For these reasons, the impact remains significant and unavoidable.

D. Findings Related to the Relationship Between Local Short-term Uses of the Environment and Maintenance and Enhancement of Long-term Productivity.

Based on the EIR and the entire record before the City Council; the City Council makes the following findings with respect to the project's balancing of local short.term uses of the environment and the maintenance of long term productivity:
• As the project is implemented, certain impacts would occur on a short-term level: Such .short-term impacts are discussed above. Where feasible, measures have been incorporated in the project to mitigate these potential impacts. • The _project would result in the long-term commitment of resources to develop and = -__ _---=_.-_^^__----- T operate the project including water, natural gas, fossil fuels, and electricity. The longterm implementation of the project would provide economic benefits to the City. The =--.project=would^be-developed=within-an-existing-urban-area and-not-contribute.to-urban= - -- -_ sprawl. Notwithstanding the foregoing, some long-term impacts would result.

Although there are short-term and long-term adverse impacts from the project, the short-term and long-term benefits of the project justify implementation.

E. Project's Contribution of Greenhouse Gas Emissions
The City of Sacramento has adopted a proactive and comprehensive approach to climate change issues, including adoption of the 2030 General Plan to encourage a pattern of urban development that avoids dispersed residential and employment centers that by their design encourage motor vehicle trips, one of the largest contributors to greenhouse gas emissions.

Likewise, the 2030 General Plan calls for strengthening the City's efforts to promote building standards to reduce the carbon footprint of buildings, another of the major contributors.. The Curtis Park Village project is consistent with this approach and implements the City's plan to reduce greenhouse gas emissions.

Resolution 2010-572 September 28, 2010' 24
The 2030 General Plan and the Master Environmental Impact Report The City Council approved the 2030 General Plan on March 3, 2009. As part of its action, the City Council certified the Master Environmental Impact Report (Master EIR) that evaluated .the environmental effects of development that is reasonably anticipated under the 2030 General Plan. The Master EIR includes extensive discussion of the potential effects of greenhouse gas emissions. The Master EIR discussions regarding climate change are incorporated here by reference. See, for example:

Draft EIR: 6.1 Air Quality (Page 6.1-1)
= finalEtR: City Climate-Change master=Response (Page 4-1) ° - Errata No.-2:-CIimate Change (Page-12)-
The impact of greenhouse gas emissions from human activities, specifically with regard to global climate change, has been acknowledged by the City of Sacramento and others as.an inherently cumulative effect. Global climate change occurs, by definition, on a global basis.

Greenhouse gases remain in the atmosphere for extended periods, and combine with GHG emissions from other areas of the globe, thus creating an inherently cumulative impact.

The 2030 General Plan and Master EIR recognized these unique aspects of the problem.

The Master EIR acknowledges that the greenhouse gas emissions resulting from development that would be consistent with the 2030 General Plan would be cumulatively considerable, and significant and unavoidable. See Errata 2, February 23, 2009. . . _ ., , _ . - - .

In addition, at City Council direction staff reviewed the various policies and implementation programs in the 2030 General Plan that could mitigate greenhouse gas emissions, and determined that a number of these policies could be revised. A list of such policies, and the changes that were made to respond to the continuing discussion of climate change, were included as part of the Mitigation Monitoring Plan that implemented mitigation identified in the ^^^_^ - -__ ^ T---= _-T_.^- --- ----------- Master Ell R- T --- .. The_effects-of the32030JGeneralPlan promotesdenser urba=development withmtthe&urrenf__ City territorial limits to.accommodate population growth, which will reduce growth pressures and sprawl in outlying areas. While total greenhouse gas emissions within the General Plan policy area may increase over time due to growth in population in the region, this increase is less than what.would have occurred if the 2030 General Plan were not adopted and development of more land in outlying areas- had been permitted under the 1988 General Plan. Adoption of the 2030 General Plan put these key strategies in place immediately and has begun to shape development as well as the activities of day-to-day living and move the City and the region toward a more sustainable future.

Because the actual effectiveness of all the feasible policies and programs included in the 2030 General Plan that avoid, minimize, or reduce greenhouse gas could not be quantified, the impact was identified in-the Master EIR as a significant and unavoidable cumulative impact.

General Plan Consistency of the Curtis Park Village Project The 2030 General Plan identifies a mix of Traditional Neighborhood Low Density (TNLD), Resolution 2010-572 September 28, 2010 25
Traditional Neighborhood Medium Density (TNMD) and Traditional Center (TC) on the Curtis Park Village site. These designations include detached and attached single-family homes, multifamily dwellings, commercial or mixed use development and compatible public and . quasi-public uses. The Land Use and Urban Form Diagram in the 2030 General Plan designates TNLD for the northern portion of the site, TNMD for the central portion and TC in .the southern portion. Each of the three designations permit residential and commercial development. The development program analyzed in the Master EIR for the Curtis Park Village site included a mix of 549 attached and detached dwelling, units and 200;000 square feet of commercial development.
_=The proposed=Curtis Park-Village:-project development program-and mix--of uses:-is generally consistent with the -development -program^anticipated-by=the 2030 General-Plan-and theMaster EIR. The Curtis Park Village project proposes a mix of TNLD, TNMD, Traditional Neighborhood High Density, and TC development. The-proposal locates lower density single family homes to the north, higher density attached homes and apartments in the central area and commercial uses to the south. The proposed 527 dwelling units fall within the range anticipated by the General Plan (549). The 259,000,square feet of commercial space appears to be about 30% greater than was studied in the Master EIR. However, the commercial floor area ratio. (FAR) of 0:37 is well within the range of 0.3-2.0 FAR permitted in TC. As a result, the land uses and their associated density and intensity are consistent with the 2030 General Plan.

In addition to determining consistency with the Land' Use and Urban Form Diagram, goals and policies of the General Plan's ten elements are relevant.

Land Use and Urban Design Element:

LU 5 Traditional Center Urban Form Guidelines (2030 General Plan, page 2-68) ^ -- ^ _ . ^ --_ ^ ^, - .& -
1Nhile the guideliries are not goals or olicies, and are not`mandatory or`binding onthe --- applicant, they do express the City's desired urban form vision. For Traditional Centers, the guidelines-callvfor:

1. small, rectangular blocks;

2. small, narrow lots providing a fine-grained development pattern;

3. building heights ranging from one to four stories;

4. lot coverage not exceeding 80 percent;

5. buildings sited at or near the sidewalk and typically abutting one another with limited side yard setbacks;

6. building entrances set at the sidewalk;

7. rear alleys and secondary streets providing service access to reduce the need for driveways and curb cuts on the primary street;

8. parking provided on-street as well as in...lots at the side or rear of structures;

9. transparent building frontages with pedestrian-scaled articulation and, detailing;

10. moderately wide side sidewalks;

11. public streetscapes serving as the center's primary open space, complemented by outdoor seating, plazas, courtyards, and sidewalk dining areas.

These guidelines provide the staff and applicant with guidance regarding project design, and Resolution 2010-572 September 28, 2010 26
support the City's identified goal of encouraging development by providing specific and enforceable standards for development.

LU 5 Traditional Centers Goals and Policies
Policy LU 5.3.1 Development Standards. The City shall continue to support development and operation of centers in traditional neighborhoods by providing flexibility in development standards, consistent with public health and safety, in response to constraints inherent in retrofitting older structures and in creating infill development in established neighborhoods. -Mobility Element: - - =
The following goals and policies are relevant to the,design of the Curtis Park Village project.

They primarily relate to the design of public and private streets and the desired relationships among buildings, streets and parking facilities.

Policy M 1.3.1 Grid Network. The City shall require all new residential, commercial, or mixed-use development that proposes or is required to construct or extend streets to develop a transportation network that provides for a well-connected, walkable .community, preferably as a grid or modified grid.

Policy M 1.3.2 Private Complete Streets. The City shall require large private developments (e.g., office parks, apartment complexes, retail centers) to provide internal complete streets-that connect to the existing roadway system.

Policy M 2.1.3 Streetscape Design. The City shall. require that pedestrian-oriented streets be designed to provide a pleasant environment for walking including shade trees; plantings; well-designed benches, trash receptacles, news racks, and other furniture; pedestrian-scaled lighting fixtures; wayfinding signage; integrated transit ^__^Polic_y_Me2._1_ 4^Cohesive Network_ The,Cithall develop a cohesive_pedestnan y^s _ network of public sidewalks and street crossings that makes walking a convenient and safe way to travel. _
Policy M 2.1.5 Continuous Network. The City shall provide a continuous pedestrian network in existing and new neighborhoods that facilitates convenient pedestrian travel free of major impediments and obstacles.

Policy M 2.1.6 Building Design. The City shall ensure that new buildings are designed to engage the street and encourage walking through design features such as placing the building with entrances facing the street and providing connections to sidewalks.

Policy M 2.1.7 Parking Facility Design. The City shall ensure that new automobile parking facilities are designed to facilitate safe and convenient pedestrian access, including clearly defined corridors and walkways connecting parking areas with buildings.

Policy M 2.1.8 Housing and Destination Connections. The City shall require new Resolution 2010-572 September 28, 2010 27
subdivisions and large-scale developments to include safe pedestrian walkways that provide direct links between streets and major destinations such as transit stops and stations, schools, parks, and shopping centers.

Policy M 3.1.12 Direct Access to Stations. The City shall ensure that projects located in the Central City and within '/z mile walking distance of existing and planned` light rail stations provide direct pedestrian and bicycle access to the station area, to the extent feasible.

Goal M 4.3 Neighborhood Traffic. Enhance the quality of life within existing neighborhoods through the-use-of neighborhood -traffic management-techniques-, while - °recognizing-the-City's°desire to provide a=grid-systern-that-creates a2high-level=of connectivity.

Policy M 4.3.1 Neighborhood Traffic Management. The City shall continue wherever possible to design streets and approve development applications in such as manner as to reduce high traffic flows and parking problems within residential neighborhoods.

M 5.1.8 Connections between New Development and Bikeways. The City shall ensure that new commercial and residential development projects provide frequent and direct connections to the nearest bikeways.

Buildings constructed as part of the project would be required to comply with current California buildi.ng codes that enforce energy efficiency.

The City of Sacramento has adopted an approach that seeks to implement community development principles that encourage pedestrian-friendly, multi-use development that reduces vehicle miles travelled. The various goals and policies applicable to the project through the 2030 General Plan provides just such a framework, and are effective tools to ^^ _ _.^ mitigate climate ^cha^nge through-reductin of greenhouse gas emissions. These goals and^- policies have accurately been described in the Master.ElR as mitigation for such effects.

The City has acknowledged that the sum of greenhouse gas emissions that could be generated by development under the 2030 General Plan would be cumulatively considerable, and has identified the goals and policies under the 2030 General Plan as the primary vehicle to mitigating such impacts. This programmatic approach achieves reductions in the two main emitting categories: motor vehicle emissions and energy used in buildings. By adopting measures that are applicable community-wide, the City has implemented a reduction strategy that is fair and can be implemented with confidence that emission reductions will actually occur.

The City has identified greenhouse gas reductions goals as stated in AB 32 and other State guidance as relevant to the impact analysis. This is consistent with guidance provided by the Sacramento Metropolitan Air Quality Management District (SMAQMD). In its CEQA Guide, December 2009, the District suggests that local agencies properly consider adopting a threshold that considers whether an individual project's GHG emissions would substantially hinder the State's ability to attain the goals identified in AB 32. (CEQA Guide, page 6-11) Conclusion
.Resolution 2010-572 September 28, 2010 28
The Master EIR concluded that greenhouse gas emissions that could be emitted by development that is consistent with the 2030 General Plan would be cumulatively considerable and unavoidable (Errata No. 2, Page 12). The Master EIR includes a full analysis of greenhouse gas emissions and climate change, and adequately addresses these issues.

The project is consistent with the City's goals and policies as set forth in the 2030 General Plan and Master EIR relating to reduction of greenhouse gas emissions. The project would not impede the City's efforts to comply with AB32 requirements. The project would not have `any°significant additional environmental effects relating togreenhouse gas°emissions-or-. --_ ^climate°change:

F. Project Alternatives.

The City Council has considered the Project alternatives presented and analyzed in . the final EIR and presented during the comment period and public hearing process. Some of these alternatives have the potential to avoid or reduce certain significant or potentially significant environmental impacts, as set forth below. The City Council finds, based on specific economic, legal, social, technological, or other considerations, that these alternatives are infeasible. Each alternative and the facts supporting the finding of infeasibility of each alternative are set forth below.

AlIalternatives to the project assume that the site is fully remediated to DTSC standards. The site is currently undergoing remediation under the auspices of DTSC.

Resolution 2010-572 September 28, 2010, 29
Alternatives Considered and Dismissed from Further Consideration Off-Site Alternative
Section 15126.6(f)(2)(B) of the CEQA Guidelines states, "If the lead agency concludes that no feasible alternative locations exist, it must disclose the reasons for this conclusion, and should include the reason in the EIR." A feasible alternative location for the proposed project that would result in substantially reduced impacts does not exist.

The CEQA Guidelines (Section 15126.6[b]) requires that only locations that would avoid or ` substantially lessen.any of the significant effects of the project need be considered for- _ inclusion-in-#he-EIR. The Off-Site Alternative°would^involve=the^construction-of-the=proposed project on an alternative location. The Off-Site Alternative would have the same type and intensity of uses as the proposed project. However; the Applicant does not own an alternative location in which to construct the proposed project. Furthermore, although other vacant properties are located in the City of Sacramento, infill parcels of substantial size like the project site are limited. It should also be noted that,, by definition, CEQA states that an alternative should avoid or substantially lessen one or more of the environmental effects of the project. Alternative locations within the City would generally contain similar characteristics as the project site, and the development of greenfield sites located outside the City would likely result in greater impacts than the proposed project. Therefore, development of the project on an alternative location would be expected to result in at least the same level of impacts as the proposed project. As a result, an environmentally feasible off-site location that would meet the requirements of CEQA, as well as meet the basic objectives of the proposed project, does not exist.

Village Green Alternative
The Village Green Alternative was proposed during community consultation.

The stated purpose of the Alternative. is to create a more human scale environment with activities:centered ona ^illage_g`reen as-a means-of reducing the emphasis_on the automobile and the visual impacts of parking lots. Overall, the Village Green Alternative would result in the construction of 126,000 square feet of commercial space and 602 residential units:. By comparison, the proposed project includes approximately 260,000 square feet of commercial uses and 470 residential.units.

As shown in Table 5.2-10 in the Transportation and Circulation chapter of this Draft EIR, the mix of commercial uses included in the proposed project would result in traffic throughout the day, whereas residential traffic typically is concentrated at the peak morning and evening commute hours. Therefore, the substantial number of additional residential units included in the Village Green Alternative would result in greater impacts to traffic. .In addition, due to the increased population associated with the additional residential units, this Alternative would increase the demand for police and fire protection services, as well as park and school facilities, beyond what is anticipated for the proposed project.

With respect to the other alternatives included in this DEIR, the Village Green Alternative uses are substantially similar to Reduced Commercial Alternative A, though Reduced Commercial Alternative A would have slightly more commercial space and fewer residential Resolution 2010-572 . September 28, 2010 30
units. In addition, Reduced Commercial Alternative B would contain less commercial space than the Village Green Alternative, and has fewer residential units. The Multi-Family Alternative assesses a similar number of residential units, 545 versus 602 for the Village Green Alternative, while including a larger commercial area. In addition, the Village Green Alternative would require additional park space based on an increase in the number of units:

The alternatives included in the analysis below include a range of commercial square footages with the lowest total being lower than the Village Green Alternative. None of the alternatives would include as many residential units as the Village Green Alternative:

Therefore, the Village Green Alternative would not reduce impacts to a greater extent than the alternatives included in the analysis, and may increase impacts as a result of the high number of residential units included in the Alternative:= Furthermore, the-Village Green - -Alternative=is°not anticipated to reduce;any°environmental--impac-ts that=would result-from -- implementation of the proposed project. Therefore, because the Village Green Alternative.. would increase some environmental impacts and would not reduce any impacts, the Alternative is dismissed from further consideration.

Existing Zoning Alternative
Under the Existing Zoning Alternative, the project site would be built out pursuant to the existing zoning designation for the site. The site is currently zoned Heavy Industrial (M-2), which allows for the "manufacture or treatment of goods from raw materials." The Existing Zoning Alternative is not a feasible alternative for the project because the existing M-2 zoning for the project site is not consistent with the General Plan land use designations (Traditional .Neighborhood., Low Density, Traditional Neighborhood High Density, and Traditional Center) for the site and buildout of the project site with industrial uses would not meet any of the proposed project's objectives.

Summary of Alternatives Considered
No-Project/No Buifd Alternative
• ^Sectio.n 1_51:26..6 :(e.).(.1s)_of thesStateCEQA Guidelines requires-that a «noproject-alternative„ _ ^.
be evaluated in comparison to the proposed project. The No Project/No Build Alterative is defined in this section as the continuation of the existing condition of the project site. The No Project/No Build Alternative would allow the project site to continue in the existing undeveloped vacant state and would meet only one of the project objectives.

The, remediation of the site to DTSC standards will be completed with or without the development of the Curtis Park Village project. It should be noted that although remediation of the site would continue until complete, DTSC cannot not issue a No Further Action letter certifying the site as clean until the City has approved a land use plan, pursuant to SB 120.

Facts in Support of Finding of Infeasibility"
DTSC can not issue a No Further Action letter certifying the site as clean until the City has approved a land use plan. In addition the No Project/No Build Alternative would not meet any of the project objectives.

Reduced Commercial Alternative A
Resolution 2010-572 September 28, 2010 31
The Reduced Commercial Alternative A would include a reduction in the commercial land'use area from approximately 260,000 square feet to 100,000 square feet. The other 160,000 square feet would instead be developed as an additional 74 single-family residential lots for a total of 252 single-family residential units on the project site, as opposed to 178 single-family units under the proposed project. In addition, the Alternative would include 310 multi-family residential units, which would.be 18 more than included. in the proposed project.

Facts in Support of Finding of Infeasibility
--The°Reduced Commercial Alternative Awould=develop -additional residential-units- that -would generate additional demand-for-public-services and utilities, as well as impact-the jobs/housing'balance. In addition, the Reduced Commercial Alternative A would not meet Objective 4, as the project would have limited neighborhood serving commercial and retail uses, and entertainment opportunities.

Reduced Commercial Alternative B
The Reduced Commercial Alternative B would include a reduction of square footage in the commercial land use area from the proposed plan of 260,000 square feet to 100,000 square feet. In addition, the Reduced Commercial Alternative B would result in the development of 112 more single-family residential units and 18 more multi-family residential units than the proposed project. The reduction in square footage in the commercial land-use area from the Facts in Support of Finding of Infeasibility
The Multi-Family Alternative would develop additional residential units that would generate additional demand for public services and utilities, as well as impact the jobs/housing balance. The Multi-Family Alternative would not meet Objective 4, as the project would include limited neigfiborhood^serving commercial and ^tail uses; and entertainment_- opportunities.

F. Statement of Overridin
g
Considerations:

Pursuant to CEQA Guidelines Section 15092, the City Council finds that in approving the Project it has eliminated or substantially lessened all significant and potentially significant effects of the Project on the environment where feasible, as shown in Sections 5.0 through

5.6. The City Council further finds that it has balanced the economic, legal, 'social, technological, and other benefits of the Project against the remaining unavoidable environmental risks in determining whether to approve the Project and has determined that those benefits outweigh the unavoidable environmental risks and that those risks are acceptable. The City Council makes this statement of overriding considerations in accordance with section 15093 of the Guidelines in support of approval-of the Project.

The project would provide a range of residential uses and retail services that would serve the Curtis Park Village neighborhood. The project would construct approximately 259,000 square feet of retail uses, including a two-story building with 38,000 square feet per floor for athletic club and recreation/entertainment uses. The project would generate sales tax revenue for the City, which can be used to support City services and programs.

Resolution 2010-572 September 28, 2010 32
The project site is a former industrial railroad site and a superfund site: The project site is currently undergoing remediation by DTSC as an action separate from the Curtis Park Village project.

The project provides,a range of residential uses, including single-family, multi-family, and senior housing, near the Sacramento light rail stations.

The City Council has considered these benefits and considerations and has considered the potentially significant unavoidable environmental effects of the project. The City Council has determined that the economic; -legal, social; technological and other--benefits=of the Project- - outweigh-the identified impacts. The City Council has determined that the-project benefits setforth above override the significant and unavoidable environmental costs associated with the project.

The City Council adopts the mitigation measures in the final Mitigation Monitoring and Reporting Program, incorporated, by reference into these Findings, and finds that any residual or remaining effects on the environment resulting from the project, identified as significant and unavoidable in the Findings of Fact, are acceptable due to the benefits set forth in this Statement of Overriding Considerations. The City Council makes this statement of overriding considerations in accordance with Section 15093 of the CEQA Guidelines in supporting approval of the project.

I
Resolution 2010-572 September 28, 2010 33
CtlRts PtiRtiVrLL,ri6E
S^F?TEMBER .2O J 0
MITIGATION:MONITORINGPLAN'
Curtis Park Village
Im ^ct P^ n^ Im
:^iumber lm act Miti gation Nleasure ^1 encv Schedule iun Si toft

5.2 Transportation andCikculation
, -__.. .J^ '._. :...:_ .- _:-. .. . . .r .
..
^. ..'
5:24 Impacts to study 5.2-1(a) ! 9 t: the , Fr,eeport' Boulevard: 7 2`° .Avenue Department of Implemerit -iritersections:under
baselineplus project?
intersection, provide protected left-turn:
pliusing- for the northbound ; and;
Transportation
.
improvements
prior to the that
conditions. southbound approaches. . . building permit

5.27(b) At, -the- Sutterville. . Road Road A Department;of S2iow lintersection, provide 'overlap signal, Transportation improvementson, phasing- to allow the :southbound Road A, improvement Plans right turning traffic to-proceed on a green: and construct prior ,ar,row simultaneously with the eastbound= to-thefixst buil ing Yeft'turning movement,andpr.oliibit U-turns, 'd permit
for the eastbound left :turning:movement,•
^add a southbound left-right lane to provide
one le^l-turn lane,. , one .left-right . lane,,.and;
6e right; turn lane, and provide a;
Idedicated right, turn lane for-(he westbowad;
n '
Suttervtlle Road- approach to. the,. -
iVntersection. -
,
....
1 '5. 24 (c) fodify the -southbound- approach to the D partment of Improvements Sutterville Road 1 . SR99 SB Ran ips e
'TransportatYOn shall be ,
^iintersection to provide, a lefl-turn; lane,, :a, constauctedakfive neombination; leftthrough. lane, and two percent.o£;
:p4 right-turn lanes. This change would bring, development_liased. the , right-turning movements under signal on trip generation control: -This mitigation measure, is;
Er,equired at fve.percent of development
^fbased on trip, generation. The design of the
Pitigation is subject to ;the approval of the. ^ pp ;,City Transportation Department and CHAPTER 4 - MITIGATION MONITORING.PLAN
4-3
CUR,T,ISPAR,KfVILL.AGE
SEPTcMHEr? 2010
MITIGATION;IVIONITORING PLAN'
Cu rtis Park Village
impact Vlonitoring Implementatioii
Number, . . Impact Mitigation Nieasure: P: ency - Schedule Sign-off Caltrans

5.2-1 O ;LAtthe lload 9/Area 3 intersectiora prov-'ide De p 'artment of, Show } separate, right- turn and,;left-turn lanes . on. Transportation improvements.on the•eastbound crpproach. impro;yements'
plans and.consh•uct
prior to the first
building permitin
Area 3
;5.2-2: Impacts to study, 52 The project developer ,shall -work- with the° Regional Prior to occupancy roadway segments. 'Regional Transit District to provide bus: Transit Di"strict. under baseline plus service or provide p!-irate shuttle service' and/or prqjec.t conditions. from. 6: 00-to. 9:.00, a.m. andfronr 4 00 'to: City 7:00 p.m. "between the commercial areas-of Departmentof the project site ,and the City College light Transportation'. rail, station., As amalternative,,t%zeprojectr °
developer shall coordinate with the City to
reserve:the,required,ri$
ht ofwayneeded-to
..
construct a pedestrian and bicycle bridge
. .
to provide access to. the City College
. . . Station.

5.2=3 Impacts to fieeway 5;2-3 ImplenrentMitigntrqnMeasure:5.2=1(c): See 5:7-1(c) See 52-1(c) ramp under baseline
plus project conditions.
`5:24 Impacts to on-site'traffic 5.2-7(a)- The .design plans for t&. projectshall be DeparEment:of Prior to'•approval . circulation-and safety consistent ivith, Ciry,' standards. Any Transportation of improvement under baselineiplus deviations are subject to. the approval of plans u project condition. . .,,the City De artment of Transportation, P ,.

Traffic, Engineering Division.. The
horizontal cur,vatures.sliall be realigned or
design elements such as "knuckles" shall
CHAPTER,4 -.-.MITIGP.TON MONITORING PLAN
4-4
CURTiS PARK VtL.1.,AGE'
. :SEPTclv18E'R 20-10
MIT,IGATION• MOMTORING PLA N
Curtis Park Village;
Irnpact: ° Vinnifurin^ Iin^ilcm^rrt:"iion
umber. Impact litigation \leasurc 1 cuc tiehedulc Si u u1'f be installed in compliance with City
standards.
51-7(b)' The site design ,shall•:be modified to reduce Department of Prtor;to approval the potential for vehicles leaving parking, Transportation of improvement stalls to back-across pedestrian. crosswalks: plans
This change may require the elimination Pof
'some an le parkink spaces:
5:29 Impacts during •5 2-9(a) Before issuance of grading permits for, tlie, Department-of Pn'or,ao-:issuance;of construction. project site,. the project applicant sl:all Transportation gradingpernuts prepare a detailed TrajTic Management
plan +that. will, ,be' subject to, review and, Regional approval by the` City Department- of Transit; -
Transportation, Regional Transit, and local
emergency service providers, including the City of'
City ' of Sacramento, fire. ands Police, Sacramento:
'
departments. The plan shall 'ensure Fire:and+Police •
maintenance of acceptable operating Departments
conditions on local roadways and :transit
^ routes. At a minimum, the plan, shall., ;
include:
,I• ,
•, The- number .of truck 'trips, time,. and,
day ofstreeGclosures;
^'w • Time of day, of arrival.and,departure._of
trucks;
f • "Limitations on the size and;.ope of
trucks and provision, of:a staging area
with a lirnitation, on the nwnberr.of
trucks: that;can be waiting;
Provision ;of a: rtruck circulation
CHAPTER 4 - MITIGATION MONITORINGPLAN
4-5
11 'CURT1S,FA,1?K VILLAGE

MITIGATION'MONITORINGPLAN'
Curtis Park Village,
Im pact . . " :
'Monitorm; ImplementaTion:

Vu ►ubui- ^Im act miti ation_Measure^ Aeucv: Schedule Si n-oft' pattern,
• Provision of `a d.r.,iveivay access plan..to
maintain scfe vehicular„ pedestrian,
and' :bicycle movements (e:g., `steel;
plates, 'minimum distances of opem
trenches, and private vehicle pick up:
and drop offareas);
•. Safe and efficient access routes for
emergency vehicles;
g •; Efficientand'convenienttransitroutes;
• Manual`traffi c,control wlsen necessary;,
-
• Proper advance warning-:and posted
sigizage concerning street closur,es;,
• Provisionsfor pedestr,ian•sa e, c(rrd` f t1 .
'
Provisions for "temporary, bus • stops, f
necessary.

A copy of the construction traffic:
management plan shall be submitted to City of At'1casY 14-days local emergency response agencies and
these agencies .rhall be notifred at least 14
Sacramento
Fire:and Police
prior to,
commencement of
days before ,the commencement of Departments construction that construction thut would. partially. or fully would;parliallyor ' obstruct roadwqys. fully ob9truct
roadwa^ s

5.2-10 Cumulative impacts to 1 5.2-1 0('d) 24t Street / 2nd Avenue - The, project Department.of Prior;toissuance of study:intersections. applicant shall pay a fair share Transportation building•,permits contribzltion to install a traffic signal at this'
intersection. Department of Prior t0ssuafice of
y 5.2- 1,0(b) 24th Street .y Portola, iflay- - The p"roject; j{ applicant .. shall; pav a fair share• - •
if CHAPTER 4 - MITIGATION MONITORING PLAN
4-6
C URTlS- PARK. VILLA GE
Sc PTEM3ER:G (7 l O
6 ° 4;7
♦
MITIGATION MOIVITORII\_G PLAN
Curtis Park Village
Impact^ ^ Monitoring Implementation
tiuui6er Impact lliti aliun 1lcisure Agency Schedule Si ii-off.` contribution to install.u, raffia.signal at this,. .
intersection..

5.240(c) Su'tterville Road. / Freeport Boulevard. Department of .

Prior to,'issuance.of
(north) - the applicant shall pay a fair Transportation `building permits shqre contribution to provide, protected=
permitted left turn phasing and install
proper si8na%e .f
or-,southliound Fr.ee ort . ^'-.,
Boulevard.'
2-1,0(d) .SuttervilleRoad'/'City College Drive- Tlie,
=, applicant. shall pay. . a fair share
contribution to: provide overlap sigtzal,
{ phasing to allow the northbound right 'turn.
traffic on City College Drive to proceecl=on. Department;of. Prior to,issuance of agreen, arrow" simultaneo¢isly with tl1e^ Transportation buildingpermits westbound: left turning movement, and,
prohibit U-turns for the westbound
Sutterville Road approach .tor the; i 4
intersection. . .

5.210(e) Sutterville Roa'd. % Road' A - apply
tMhtigation,Measure^ 5.2-1(b). which would,
^! provide overl'ap, signal phasing to allowthe: -
southbound'RoadA Right turning traffic to
proceed on a green arrow,siniultaneously
with the eastbound.left. turning movement;
and prohibit U-turns for the. eastbound. left
turning, movement; provide one left-turn,
'lane, one left-right lane ,-aild:one-right-turn
lane on the southbozind;approach•,provide.
a Wedicateds right. turn, lane, for the
CNAPTER,4 -'MITIGATION MONITORING PLAN
!, CURTi-9, PARK, VILLAGE
;SEpTEN1BER20 10•

MITIGATION G'PLAN
s Park Vill age
fill Pad ' ' ^4nn"itlorin^^ Implen^entatiun '
Ju>,ubcr I► u acl Mitig ation Ylcasurc 1 e►► cv Schedulc 5► „off. .►uestbound Sutterville Road.appr.oach to the,
intersection; .provide an actuated axclusive,
pedestrian phase to serve pedestrians;
crossing Sutterville Road,- and optimize;
signal timing...
(
'
. .

5.2-10(g) Sutterville Road /'Franklin Boulevard -The Department of Priortolissuance of project applicant shall pay a fair share Transportation building permits contribution to add an eustbound,right-turn*
lane :`thatwould rnitigate :the Saturday, peak,
liour: For a.m: and pom; peak hour
impacts, the, cycle length .would^increase;;to.

S.2-1-0 (li) Sutterville Road /^ SR 99 -.Northbound Department of, Prior-toisspance,of {E _Ramps - The project appCr'cant shall pay, cr, Transportation 'building'permits fair share, contribution to Modify signal
4 timing to provide split: phase for all
approaches and re-stripe the-eastbound,
lanes' to provide: one left- turn, one left- , ^^,
through; and, one ;tlzrougl:, lane., Construct
.
two, receiving lanes on the,on-rdmp for the,
turning movement from eastbound 12`"`
11 Avenue-to the northbound SR 99 ramp.

5.21.0(rj: Road.A /Arecr 1' - The project applicant Department_of Pnorto,issuance"of jl shall; pay a fair share contribution, to. Transportation -building permits modify the, signal' _ phasi3Tg1 to provide.
overlaps for the eastbound" right-turn
N tl movement, provide protected-permided
CHAPTER-4 - MITIGATION MONITORING PLAN
4 -8
Impact
Nuniber
s5:3-2•
Impact
Impacts related'to: J;
exhaust emissions and
fugitive particulate f
mattevemissions from
project-associated 4
construction:activitie'zp!
1VIITIGATION• R4ONITORI NG. ._.. ... _ . ., . __ . ,_. PLAN Curtis Park Villag&
Miiigatiun Yleusurc
phasing for the northbound lejt-turn:
movement,-, pr,ohibit U-turn movement at
this intersection; and. increase, ^the^ ,cycle.
'length to 95 seconds.
5:3 Aic;Qualitv

5.3-2(a)' The project uppli;:ant:shall: ensure 'thaY
ernrssioszs,fronr all off=road diesel powered:
equipment used, on the. project site: do not
exceed 40, percent opacity for more -thafis
three minutes. in any one hour: Any,
equipment found to exceed. 40: percent:
opacity (or, Ringelmann 2.0) shirll be;
repairedc immediately, and StVIfIQh2D' shall.
be notified within 48'hours of identfcation•
:of non-compliant equipment. A' i.visual
survey - of, crll in-operation eguipment: shall,
'be-made at least weekly, and- a monthly.
"summary of the visual -survey results shall
be:subnaitted throughout the:duration:of the,
° project, except, that the, monthly. summary:
shall not be7eqCtiredfor any 30-day periotl
in which no construction activity occurs:

The monthly summary shall include, the:
quantity and type of vehicles surveyed as,
well as the 'dates of each survey. The.
aIAQMD, and/or other officials may
conduct periodic site inspections to
determine^ compliance. Nothing, in this :
section shall supercede other ;SlG1AQMD or
state rules or regulations..
'Ivloiiitorina
Attenc^N
Community:

Development
Departinent'
If CHAPTER .4 -'MITIGATION 'MONITORING PLAN
.(:^URTiS ,PARK^O2Lt1Gc
SERTEwBER201 0
Iniplenientation
Schedule .. sigiIJoff ,
.Prior to and during
construction
4-9
;CURT/SPARK V/LLLA GE
SEPTEMBER 20 I'0
MITIGATION MONITORING PLAN' ... .

Curtis Park Village
lInpact Aniforiul; In jilcmcnlaliou
Number Im-'act Mitigation Measur,e Ap'CLICN : Schedule Sign-00

5.= 2(b) jf Prior. to. 'the approval; of any grading Priorrto approval permit, the,project proponent shall submit of grading permit a -dust-control plan, approved by the,
1^ Si1IAQN4D, to the City of Sacramento
J1 Communi.ty Development Department. The,
dust-control
p
lan shall stipulate grading. p ^ . schedules associated: with the r,oject phase, as^well as-the-dust-control measures
to be implemented Gradmg of proposed,
project.phases:shall• be scheduled so that
the total area_ ,of disturbance would., not
exce.ed;15 acres on any given day. The dust
^" {I control plan shall 4e: incorporatei! rnto cilh
construction contracts. issued.as par.t of 'the,
proposed project 'development., The dust=
control plan shall, at 'a minimum,
incorporate the follotiuing measures: °
• Apply water, chemical stabilizerl
suppressant, ^or vegetative, ;crn7er to
disturbedareas, including storage pilestliat are not being, actively used for construction purposes, as u;ell: as any
portions of the construction site, that.
remain inactive, for longer than 3
months;
^ Water- exposed surf_ _aces. s icient to,
control fugitive dust.emissions during; ;.
demolition,, clearing, grading,, eartli-
'i moving, or excavation operations> ir
Actively disturbed-areas should'be, kept
moist at all times;
CHAPTER;4 - N1ITIGP.TIONNONITORING„PLQN

4.-10
I!
MITIGATION MONITORING. PLAN
Curtis'Park Village;
III pa c1 - ^4,infl^^rino
r
nIplcnwrrt,rtion^
Numlxr Impact IvSitiatiull lleasur k euc% Schedule Si inMoff Cover , all, vehicles hauling dirt, sand
soil or other, loose.material or maintain
at, .least, two, feet of freebour"d in
accordance with the requirements' 9f
California, .,vehicle Code Section;
231.14;
• Limit• or, expeditiously remove the';
accumulation of project-generated mud.
or dirt fr.•om, adjacent_public'streets,at:
least once, every, 24 hours when,
coaastruction operations, are-occurring; , •
and
• Limit, onsite vehicle speeds on^unpaved ,
surfaces to 15m mph, or. less.

5.3 3 Impacts related to.a'f:, ' S 3'-`3(a): Prior to Issuance. of a. grading permit; . the SMAQNID' ' Prior to,issuance of temporary increase tn, applicant shall' subriiit a SMAQMD- grading pennit NOX.emissions. approved plan, which:demonstrates that the; heavy-cluty (>50 horseprnver) off=road
vehicles to be used during, construction of
the project (tncluding owned, leased, and
subcontracted vehicles) will; achieve a:
!
project-tivide: average of 20 percent tVOX,
^ ^C reduction and 45 percent particulate matter
reduction, based on ,the most recent, CARB.
fleetaverage;at-the time of construction. 1m -
addition, .the applicant shall submit: to'
SMAQMD a comprehensive inventory.qfall1 -
ofJ-road construction equipment (>50 '
horsepower) ',thatmills be used an aggregate: -
of 40 or more hours during any portion of
the construction project. 'The inventor]
CHAPTER;4- ;MITIGP.TICIN;Ml7NlTORIhfG;PLAh7
4-11
,CUR.TIS }?AR?f VtLLAGF
SEPTENePR 2010
MITIGATION:MONITORING'PLAN
Curtis Park Village
Im ^ct Monitorin{^
I .,.
mplementation
Vumbcr Impact Yliti gatiai `rlcasurc ^ cnr^ Schcr,lulv Sian-61T shall include tlae;horseP.ower rating, en ine;
production year, and project.hours of use
or fuel throughput, for each piecei of
equipment; The --inventory shall.be updated
and submitted monthly thr,oughout the
duration of the project. Inventory shqll°not
be requiredfor any, 30Ldayperiod in which
construction. ^ctivities do not occur, At,
least 48 hours prior to the: use of subject
heavy-duty 'off-road eduipment the
'
applicant. shall `.provide SMAQILID with!, the,
^. anticipated construction timeline, including
the start date and the name and' p'hone'
foreman, "number of the project manager and on-site.

5. 3 3(bPrior to issuance of a grading permit,, the: SM?,Q1vID, Prior tolissuance^af 41 applicant shrill' provide g' construction,, grailing:peimit mitigation fee,to:.the SAl12QMD?suftient,to: Coirununity ojf°set project emissions of NO'X, above 85 Development pounds per day. The amount of .the fee Department'
shall° be. based on. updated' construction;
'schedu7ing; and equipment lists, and shall, .
be calculated'^using the SAMQMD` inethod,,
of estimating excess emissions. The current
price ofNOX construction offsets calculated.

I! ; baL4 MD is $16,000 per ton. '
,5.3-5' Impacts related to long- 5. 37 ("a) Prior, to the issuance of anv grading permit, ,SMAQMR Prior to issuance•of term increases of f the project, applicant shall; coordinate with: grading permit criteria-air pollutants. .. i the SMt1QMD and the City. of Sacramento Community Community Development Department to.
i '
Developinent
develop a pro e,ct Air udli ^y Mitigatibn; Department
P 4-12
CURTIS PARK ViLLAGE
SERTEMSER'20 10
IVIITIGATION.IVIONITORING PLAN'
Curtis Park Village
^Imliart ^L;nitnrin^ Implementation
Plan (AQt14P)., In accordance. with'.

SA^1^4QMD recommendations, the AQttIP- di
i4 shall qchieie a mmimum.overa overall reduction
of i5 percent in .the projects: anticipated:
operational emissions. S1LI4 QIiIDrecommended.n7easures and-co rresponding; emissions-reduction benefjts are identified
in ;SM4QMD's Guidance for Land Use'
Emission Reductions,; which can be found
in Appendix E of the Stl%IAQMD•document
The,AQ11fP- shall be reviewed and endorsed
by &MAQMD staff prior to. project;
implementation. Available measures'.to. be
included in! the:AQMP include,. but are not'
limited to,ttlte follrnving:
e
• 'Prohibit, the installation 'of. .wood4 burnmg.fir.eplaces and stoves' i[ • Provide onsite bicycle- ;storage; :and;
11 showers for employees that bike to
-work sufficient-to meet,peak- season
maximum demand;
-•: Provide preferential parking (e.g., -near
building entrance, shelterect-area;,etc),
for carpool andvanpool vehicles;
• Provide. transit enhancing
infrastructure that includes: transit
'shelters, benches; etc street lighting,-
route signs and displays; and/dr bus.
':turnouts/bulbs
A Incorporate onsite, transit facility
CHAPTER 4 - MITIGATION MONITORING PLAN
4-- U3
CURT/S PARK'V/i_L.AGE
SEPTEMBER 201'0

MITIGATION MONITORINQ'PLAN
Curtis Park Village
Ini r.i.^t Nlrinitricin^ Im{►lementatio'n
Number Impact Yfiti utiun lleasurv ^ euc^ Schedule Si off improvements ("e.g., pedestrian shelters,
route information, benches, lighting) to
coincide with: existing or planned
transit service;
• Incorporate landscaping and sun
i; 'screens to reduce energy use.

Deciduous trees should be utilized for
building shading to increase solar
heating during the winter months.

Install sun-shading devices (e.g.,
screens) or recessed windows on newly
proposed buildings;
• Install' efficient lighting and lighting
control systems;
4! Install energy-efficient heating and,
cooling systems; appliances and
equipment,-
Install. light colored "cool" roofs and
pavements (i.e., high reflectance, high,
emittance roof . surfaces, or
exceptionally high reflectance-and laww, emittance surfaces): and strategically' placed shade trees to the extent
practical;
• Limit .hours of operation of outdoor
lighting to the extentpractical; and
^ • Provide shade (within 5 years) and/or
use light-colorecUhigh-al bedo materials
(reflectance, of at least 0.3) and%r open
grid pavement for at least 30 percent 6f
_
the site's non-roof impervious. surfaces, occupancy permit Community
CHAPTER.4 - MITIGATION MONITORING PLAN

4.-1 1,4
CUr?TiS PARK VIL.LAGE-
.5'EP-TEMBER-.2U10

MITIGATION MONITORING PLAN
Cur,tis.Park Village.
^
%)i,iromw fill ^)Iefli0iit:t'► III ^^
Vumbcr ^Im act F - ^Iiti : ,itinn ^tcasurc 1 ouc^ Schc^iule ^ Sr u off;. ^! including parking lots, lwalkwnvs, Development
plazas, etc. .^ cr,°place'a min"imum.oj50. Department^
percent ofparking'spaces underground
or covered.'by structured parking; or,
I'w y use-an opengrid.Pavement system.(less,
'than SO percent impervious) for
minimum of 50 percent of, the parking,
lot area.

5.3-.5(b Documentation con trmin im lementcrtion: f g p oftheAtrQuqlitylLfitigationPlan shall,be^,
provided tothe:Sh%If2QMD.and Cityprior-sto
J4 issucmce^o 'occ anc Lpermits.
5:3 8 nibutio` n,
u 5
.3 S Impl'emwat tllitigation Measures. 5.3.2(a) See 5:3'-2:(a) See 5'r3-2(a);and t^
q.-_
h,' ional air and (b) and 5. 3 ,- ,4(.)a a..nd'(b)• and b° t ) ^b) . ry condgions.
_54Noise ' and- Vibration

5.42 Co tructiom noise 5 4 2 Construction activities shall be limuted •tg l
Community Prior'to, issuance of
unp acts to surroundm the hours set forth; below, un ess: arz t Development grading.and ,existing - uses. exception is granted' by the- Community, Department building permits Development :Department:
• Mon day:throughSaturday
7:00, a.m. to-6:00p.m.
!! • Sunday
9:001a.m: to6:QOp.m.

These restricted hours shall be included.on
al all grading and construction plans=
submitted for- the review and approval ..of
the Community Development Department ,
CHAPTER 4 -MITIGATION MONITORING'PLAN
4- 1'5
.CURTiS PARK VILLAGE
MITIGATION "y10NITORING PLAN !
Curtis Park Village.
impact 7Roiiitur.iny ]inplemenfatimn
.Number Impact Jliti atiun "Wcasure Acucv Schedule Si^lir6ff prior to issuance of grading and
construction permits..
'5.4-7 Railroad noise level's at 5.4 7 Prior to the,,-. issuance of building permits, a. .City Engineer, Prior;to;the exterior. noise s aces of" noise barrier shall be shown ;oz, the plans issuanceof proposed;project along tltewestern'.boundary of'the.project building permits residences. site, from the northern boundary -of the.

CPU site to ;the southern end of any parcek
with residences for,the review andvpproval,
of - the Citl'..Engineer. A barrier 10 feet in
height (relative .t,? nearest outdoor activ
elevations) would intercept. line of sight to
railroad pass-bys; hereby reducing future
N UPRF^ noise^l'evels`to 70 dB Ldn or•less^at
the nearest outdoor-activity areas proposed
adjacent to the tr.ack:s.

Barriers can: take the form. of earthen.
berms, solid w'qlls, or acombination' of the:
two-Appropriate materials-for 'noise ,walls.
include precast concrete or:mcisonry,'block.

Other materials naay:be acceptable,provide: .
they have ,a^: surface deiasity of
approximately four unds° er s are foot.
5:48 Railroad noise,levels at, :5.9-.8(Prior to. the issuance' of building permits, Community Prior:to^dssuance:of igteriorspaces; of allresidentiallots and residential buildings Development building permits proposed, residences on Tocated.tivithrn the 70 dB.Ldn contour shall: Department the project site. +t include noise, insulation features such as. the following:
'f • ^Sound-r.ated, w,indowsand:doors iv7th
'," STC rating of 35; and
GHAPTER,4 - MITIGATIOtwI'MONITORING.,PL'AN
4:-16
G1JRT1S FARK•1/ILLAG'E
5EPTEh96ER'2010!
MITIG ATION;MONITORING PL'A N
,^• Curtis Park Village
Impact :Vloliiioring, IIII pl'DmcnYafion .::

Number Impact 1liti at+uli Measure A enc Schodulc
r^ •, Stucco exterior siding: ll Community Trio, Vsale,of

5.4-8(0)1^ Prior to sale of any residential lots; Development residential lots statements shall be included in.the title for Department all properties, withm_ the ,63 dB Ldn conto;{rthat informs the. buyer o, f`el'evated noise:
levels duringatrain passages, and. that train: , .. ;
passages routirrely occur duriiag• nighttirne,
, hours..
5:49: Noise-producmg ^G '',3..4 9 a( );, Unshielded (ie. unloading uctiyities 1vhich, Community Frior'to,issuance of commercial uses. 4 are visible from),any residential window). Development building permit proposed:withinthe nighttime truck unlocrding shall, be Departcnent anddurmgpr.oject proJect,site. prohibited wrthin,200 feet of any-residentiaL operations. unit:

5.4-9^) { Prior to issuance; o a buildin f g Permit the Community Prior;to;iissuance of ^ site plans shall P
t ^ a
Development burIding'permit
shall, be^ ns ruc d alorzg the edge the Department
roo s o the commercial buildings of
{ sufficient height 16 intercept line.' of sight;
from, rooftop ,mechanical. equipment at-'the
nearest residences, noise levels•`at
tl:osenearb residences.
5:410 Park,generated noise at T 5.4-10 j, Park activities shall be restricted to Parks and During.project:
residential uses daytime hours, with, exceptions allowed on Recreation operations proposed .within the a case-by-case basis - subject to the Department, project site. approval of the Director of the Parks and, YM Recreation.

5.5,Biolo6ical Resources.
5:5-2` Impacts to burrow ing ,
• 5.3-2 E Prior to any ground disturbance^associated: GDFG Prior;to any ground I owl. with grqdtng or constniction, the app] icant disturbance il
fI CHAPTER 4- MITIGATION MONITORING:PLAN
{ 4-17

CURTIS-RARK VILLAGE
S$PT.EMBSRGUj^^G>

MITIGATION-MONITORING PLAN
Curtis Park Village
Impact. iVloniforing I►npCementat'ion
Nun► ber ' .
.Impact AIiti ation Measure _A enc _ .. Schedule Si nmuff shall: initiate, a'burrowing..owl,col7sizltatioii, associated with with,the,C'alifor.niaDepartment ofFish and grading;or
Game- (CDFG)'J.and.shall implement the construction
following mitigation measures or
eduivalents; based on,- the results of the
consultation.

The developer"shall arrange for burroWiiag,
owl.surveys to beperformedconsistentwith:
the CDFG 's 1995 Staff Report; on:

Burr,owing, Owl and the California
Burrowing Owl Consorhum:'s. (C,BOG)
Survey Protocol (1997) not less than, 30.
days prior to ground disturbance for each
phase ;of profect,grading..lf buzrox>ing. owls:
are+ not detected, fiarther- mitigation "is not.
necessary However; if burrowing owls are;
detected thefollowmg steps shallbe taken;,
+^ If 'site disturbance, commences durtngfthe;
nesting season r(between; February I^ and,
August 31)= and, burrowing owls are^
detected . .a fenced buffer ,shall be ecected.
on the project site by the developer not less,
than 2S0 feet between the nest burrow(s)
and construction. activities: The 250-foot
buffer shall be observed and, the , fence-left
intact until a quad jred raptor biologist
determines that' the young are, foraging;
independently, the nest has fail'ed,,or, the.
owls are not using. anyburrows^ witliin; the.
4 buffer.

GHAPTER;4-,MIT.IGATION;MONITORIASG:,PLAN
.
{
4-A8
{
A

CUR TIS PARK VILLAGE
SEPTEMBER 20 10

MITIGATION MOIVITORING PLAN
Curtis Park Village,
-----
Imosnt^^ ^ Moiiitr±rin<^ Implcmcnt^i'tio ^it
_
^ i
tiuui•bcr Impact litigation Measure A eucN Schedule Si il-uI'f If' ground distur•bance• associated; -with:
grading or.construction commences,outside.
of thanesting seccson, and bur,rowingowl(s)
are'present on-site orwithin 160 feetof site
disturbance; pdssive,;relocation cozsistent. ,-
with 'the,CDFG Staff Report ()993) and the=
CBQC Survey. Protocol, (1,99Z); slralli be;
peiftmed.'At-least one or-more-weeks. will,
be necessary=to"'accomplish. this. and..allow
the •owls •to acclimate .to.off'site burrows.

The pre-construction surveys; shall: . be:
repeated, if' more than, 30 days elapse^
behveen, the. last survey and the, start of
l
construction 'act ivities.
6:5=3; ImpactstoSwainson's; 5.5-3 Ifsite;disturbance,associated'withgrading ;CDFG 'Pre-construction hawk nesting and orconstr'uction activities-is.prop,osed4by the sutveyprior`to-site' foraging`habitat: developer during breeding season Commumty disturbanceior (February to August), a pre construction Development construction survey, for Swanzson shawk nests shall: be Department
conducted' witli'in 30 - days prior to site:
disturbance%onstruction .activities by a
gun(ified biologist in order fo identify .
active nests •in, the project site vicinity. TJie.
results of :the survey shall be submitted to
CDFG and the Community Development
Departnsent. If active nests are not^found
during the pre-construction survey, further '
+I mitigation is not required. If active nests
are found,`pursuant to consu7tation with
CDFG,. a fe.nced' buffierahall . beerected., by
t the. developer on the project ' site not less
CHAPTER,4• - MIT,IGATIONMONITORING;P.LAN
4- 19.

C UR,TIS PA'RK VILLA GE
SEPTEMr3c. R•20 10

MITIGATION MONITORING PLAN
Curtis Park Village
Iinpact iVloit`itocing" Implementation
Num bcr Impact . Miti ation„hieasur•e Agency Schedule .'. : Sign-off 'than one-quarter, mile (approximately
1,300 feet) around.. the -active nest. ,Site:
disturbance associated` with grading or
construction: activities that may, cause nest
abandonment or. forced fedging shall not,
be initiated w,,,ithin this bufJer.zone between;
March "1 and September .1. Any trees
c'ontairaing nests`,that'must be removed as'.a.
result f project emplementation; shall be
removed during-the non=breeding season
.. (September toJaiuiary .
5:54 Impacts lo raptors-.and 5.5-4(4 Prior to any grading or. constructian Community Pre-construction Ytugratory'bzrds: activities during the nesting season Development survey prior to -(Februar'y .1 to August 15), a Department grading:orpreconstruction;csurvey-sliall be conducted construction by a qualified wildlife .biologist within 1 S' CDI°G- activities days of the start, of-' proj ect r',elatecl
activities. If nests of migratory brr'ds; are, .
detected' on 'site, or. within- -7,5feet (for
mrgratoty passerme birds) or 250 feet (for,
l
birds of prey) of the site, the,developershall consult with ,the CDFG to determine the size of a suitable :buffer in whrch'newvl
site grading or construction disturbdnce; rs
not permitted until, August• 15, or thequalified biologist determines -that the. young. -are foraging independently,-or the.
nest has.'been, abandoned.

5.54(G) Prior to any ^grading or,r construction,
activitiesfrom March ) 5'toaLicry 15 within
I00: eet o the overcrossin of the rdilroad
CHAPTER,4 -, MITIGATIOb!_MONITORING:PL''AN
,4,-•2,0
•
J!
G U R,TfS: PA fi' K`Vr L LA GE
,SEPTEA-1BER 2010
1VI. .. _.. . . . . ITIGATION-MONITORING PLAN'. . . . . ,.. ,,. .._ . •Curtis Park Village;
IMP,-act Vfonitorina Implenientation
Number . Ini aci 1Vliti ation,iVleasure- _ A" enc^ 5chcdule- Si n uFl' tracks; on Sutterville Road, adjacent to the, ,f ^G
project-site; a preconstruction survey shall
be conducted„by a gualifi,ed,biologist within

15. ^days of'the, start' of project-related,
activities. If active :nests are, pres•ent.in; the, _.- .. ,. overcrossirag, no, construction shall be
conducted within,;-100 feet of tlie:edge of the
purple martin eolony (as demarcated;by the:
active=nest hole closest to. the construction.
activity)' at the begrnnit^g of tlze° purple.
martin breedingseason from 'March 1S to,
:May13.The. buffer ..area shall be-avordedto:
prevent disturbance to the nest(s) untrl:it is
no lolger active. The size.-9f the"buffer,-.cirea;
may. be adjusted^if.a qualifedbiologrst: ands
CDFG determine it would not, be, likely ;to;
have^adverse.e^fects,on.'the purple martins. ^ No projecractrv{ty shall. commence ivitlain. ! the _bisjfer area until; a:qualfecd: biologist,
con firms thatxhe nest s) is no longer active:

CHAPTER 4 -- MITIGATION MomtbRIhlG PLAN
4-21
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 1

4.0 INTRODUCTION
Section 15097 of the California Environmental Quality Act (CEQA) requires all State and local agencies to establish monitoring or reporting programs for projects approved by a public agency whenever approval involves the adoption of either a “mitigated negative declaration” or specified environmental findings related to environmental impact reports.

The following is the Mitigation Monitoring Plan (MMP) for the Curtis Park Village project. The project as approved includes mitigation measures. The intent of the MMP is to prescribe and enforce a means for properly and successfully implementing the mitigation measures as identified within the Environmental Impact Report for this project. Unless otherwise noted, the cost of implementing the mitigation measures as prescribed by this MMP shall be funded by the applicant.

4.1 COMPLIANCE CHECKLIST
The MMP contained herein is intended to satisfy the requirements of CEQA as they relate to the Environmental Impact Report for the Curtis Park Village project prepared by the City of Sacramento. This MMP is intended to be used by City staff and mitigation monitoring personnel to ensure compliance with mitigation measures during project implementation. Mitigation measures identified in this MMP were developed in the Environmental Impact Report prepared for the proposed project.

The Curtis Park Village project Environmental Impact Report presents a detailed set of mitigation measures that will be implemented throughout the lifetime of the project. Mitigation is defined by CEQA as a measure which:
• Avoids the impact altogether by not taking a certain action or parts of an action; • Minimizes impacts by limiting the degree or magnitude of the action and its implementation;
• Rectifies the impact by repairing, rehabilitating, or restoring the impacted environment;
• Reduces or eliminates the impact over time by preservation and maintenance operations during the life of the project; or
• Compensates for the impact by replacing or providing substitute resources or environments.

The intent of the MMP is to ensure the effective implementation and enforcement of adopted mitigation measures and permit conditions. The MMP will provide for monitoring of 4 MITIGATION MONITORING PLAN
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 2
construction activities as necessary and in-the-field identification and resolution of environmental concerns.

Monitoring and documenting the implementation of mitigation measures will be coordinated by the City of Sacramento. The table attached to this report identifies the mitigation measure, the monitoring action for the mitigation measure, the responsible party for the monitoring action, and timing of the monitoring action. The applicant will be responsible for fully understanding and effectively implementing the mitigation measures contained within the MMP. The City of Sacramento will be responsible for ensuring compliance.

During construction of the project, the City will assign an inspector who will be responsible for field monitoring of mitigation measure compliance. The inspector will report to the City Community Development Department and will be thoroughly familiar with permit conditions and the MMP. In addition, the inspector will be familiar with construction contract requirements, construction schedules, standard construction practices, and mitigation techniques. In order to track the status of mitigation measure implementation, field-monitoring activities will be documented on compliance monitoring report worksheets. The time commitment of the inspector will vary depending on the intensity and location of construction. Aided by the attached table, the inspector will be responsible for the following activities:
• On-site, day-to-day monitoring of construction activities; • Reviewing construction plans and equipment staging/access plans to ensure conformance with adopted mitigation measures;
• Ensuring contractor knowledge of and compliance with the MMP; • Verifying the accuracy and adequacy of contract wording; • Having the authority to require correction of activities that violate mitigation measures, securing compliance with the MMP;
• Acting in the role of contact for property owners or any other affected persons who wish to register observations of violations of project permit conditions or mitigation.

Upon receiving any complaints, the inspector shall immediately contact the construction representative. The inspector shall be responsible for verifying any such observations and for developing any necessary corrective actions in consultation with the construction representative and the City of Sacramento; • Obtaining assistance as necessary from technical experts in order to develop sitespecific procedures for implementing the mitigation measures; and • Maintaining a log of all significant interactions, violations of permit conditions or mitigation measures, and necessary corrective measures.

4.2 MITIGATION MONITORING PLAN
The following table indicates the mitigation measure number, the impact the measure is designed to address, the measure text, the monitoring agency, implementation schedule, and an area for sign-off indicating compliance.

Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 3

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off

5.2 Transportation and Circulation

5.2-1 Impacts to study
intersections under
baseline plus project
conditions.

5.2-1(a) At the Freeport Boulevard / 2nd Avenue
intersection, provide protected left-turn
phasing for the northbound and
southbound approaches. This mitigation
measure would reduce the impact of the
Proposed Project and Access Scenarios 2
and 3 to a less than significant level.

5.2-1(b) At the Sutterville Road / Road A
intersection, provide overlap signal
phasing to allow the southbound Road A
right turning traffic to proceed on a green
arrow simultaneously with the eastbound
left turning movement, and prohibit U-turns
for the eastbound left turning movement;
add a southbound left-right lane to provide
one left-turn lane, one left-right lane, and
one right turn lane, and provide a
dedicated right turn lane for the westbound
Sutterville Road approach to the
intersection. This mitigation measure
would reduce the impact of the Proposed
Project and Access Scenarios 2 and 3 to a
less than significant level.

5.2-1(c) Modify the southbound approach to the
Sutterville Road / SR99 SB Ramps
intersection to provide a left-turn lane, a
combination left-through lane, and two
right-turn lanes. This change would bring
Department of
Transportation
Department of
Transportation
Department of
Transportation
Implement
improvements
prior to the first
building permit
Show
improvements on
improvement plans
and construct prior
to the first building
permit
Improvements
shall be
constructed at five
percent of
development based
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 4

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
the right-turning movements under signal
control. This mitigation measure is
required at five percent of development
based on trip generation. The design of the
mitigation is subject to the approval of the
City Transportation Department and
Caltrans. This mitigation measure would
reduce the impact of the Proposed Project
and all access scenarios to a less than
significant level during the p.m. and
Saturday peak hours.

5.2-1(d) At the Road A / Area 3 intersection, provide
separate right-turn and left-turn lanes on
the eastbound approach. This mitigation
measure would reduce the impact of the
Proposed Project and Access Scenarios 2
and 3 to a less than significant level.

Department of
Transportation
on trip generation
Show
improvements on
improvements
plans and
constructed prior to
the first building
permit in Area 3

5.2-2 Impacts to study
roadway segments
under baseline plus
project conditions.

5.2-2 The project developer shall work with the
Regional Transit District to provide bus
service or provide private shuttle service
from 6:00 to 9:00 a.m. and from 4:00 to
7:00 p.m. between the commercial areas of
the project site and the City College light
rail station. As an alternative, the project
developer shall coordinate with the City to
reserve the required right of way needed to
construct a pedestrian and bicycle bridge
to provide access to the City College
Station.

Regional
Transit District
Department of
Transportation
Prior to occupancy
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 5

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off

5.2-3 Impacts to freeway
ramp under baseline
plus project conditions.

5.2-3 Implementation of Mitigation Measure 5.2-
1(c) would reduce the traffic queue at the
southbound 12th Avenue off-ramp for
baseline conditions for the Proposed
Project and all access scenarios. However,
the reduction would not be sufficient to
fully mitigate the project impacts and no
other feasible mitigation measure was
identified. Therefore, the impact shall
remain significant and unavoidable.

See 5.2-1(c) See 5.2-1(c)

5.2-7 Impacts to on-site traffic
circulation and safety
under baseline plus
project conditions.

5.2-7(a) The design plans for the project shall be
consistent with City standards. Any
deviations are subject to the approval of
the City Department of Transportation,
Traffic Engineering Division. The
horizontal curvatures shall be realigned or
design elements such as “knuckles” shall
be installed in compliance with City
standards.

5.2-7(b) The site design shall be modified to reduce
the potential for vehicles leaving parking
stalls to back across pedestrian crosswalks.

This change may require the elimination of
some angle parking spaces.

Department of
Transportation
Department of
Transportation
Prior to approval
of improvement
plans
Prior to approval
of improvement
plans

5.2-9 Impacts during
construction.

5.2-9(a) Before issuance of grading permits for the
project site, the project applicant shall
prepare a detailed Traffic Management
Plan that will be subject to review and
approval by the City Department of
Transportation, Regional Transit, and local
emergency service providers, including the
Department of
Transportation
Regional
Transit
City of
Prior to issuance of
grading permits
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 6

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
City of Sacramento fire and police
departments. The plan shall ensure
maintenance of acceptable operating
conditions on local roadways and transit
routes. At a minimum, the plan shall
include:
• The number of truck trips, time, and
day of street closures;
• Time of day of arrival and departure of
trucks;
• Limitations on the size and type of
trucks and provision of a staging area
with a limitation on the number of
trucks that can be waiting;
• Provision of a truck circulation
pattern;
• Provision of a driveway access plan to
maintain safe vehicular, pedestrian,
and bicycle movements (e.g., steel
plates, minimum distances of open
trenches, and private vehicle pick up
and drop off areas);
• Safe and efficient access routes for
emergency vehicles;
• Efficient and convenient transit routes;
• Manual traffic control when necessary;
• Proper advance warning and posted
signage concerning street closures;
• Provisions for pedestrian safety; and
• Provisions for temporary bus stops, if
Sacramento
Fire and Police
Departments
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 7

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
necessary.

A copy of the construction traffic
management plan shall be submitted to
local emergency response agencies and
these agencies shall be notified at least 14
days before the commencement of
construction that would partially or fully
obstruct roadways.

5.2-10 Cumulative impacts to
study intersections.

5.2-10(a) 24th Street / 2nd Avenue – The project
applicant shall pay a fair share
contribution to install a traffic signal at this
intersection. This mitigation measure
would reduce the impact of the Proposed
Project and all access scenarios to a less
than significant level.

5.2-10(b) 24th Street / Portola Way – The project
applicant shall pay a fair share
contribution to install a traffic signal at this
intersection. This mitigation measure
would reduce the impact of the Proposed
Project and all access scenarios to a less
than significant level.

5.2-10(c) Sutterville Road / Freeport Boulevard
(north) – the applicant shall pay a fair
share contribution to provide protectedpermitted left turn phasing and install proper signage for southbound Freeport
Boulevard. This mitigation measure would
reduce the impact of the Proposed Project,
Department of
Transportation
Department of
Transportation
Department of
Transportation
Prior to issuance of
building permits
Prior to issuance of
building permits
Prior to issuance of
building permits
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 8

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
Access Scenario 2 and Access Scenario 3 to
a less than significant level.

5.2-10(d) Sutterville Road / City College Drive – The
applicant shall pay a fair share
contribution to provide overlap signal
phasing to allow the northbound right turn
traffic on City College Drive to proceed on
a green arrow simultaneously with the
westbound left turning movement, and
prohibit U-turns for the westbound
Sutterville Road approach to the
intersection. This mitigation measure
would reduce the impact of the Proposed
Project and Access Scenario 2 and 3 to a
less than significant level.

5.2-10(e) Sutterville Road / Road A – apply
Mitigation Measure 5.2-1(b) which would
provide overlap signal phasing to allow the
southbound Road A Right turning traffic to
proceed on a green arrow simultaneously
with the eastbound left turning movement,
and prohibit U-turns for the eastbound left
turning movement; provide one left-turn
lane, one left-right lane, and one right-turn
lane on the southbound approach; provide
a dedicated right turn lane for the
westbound Sutterville Road approach to the
intersection; provide an actuated exclusive
pedestrian phase to serve pedestrians
crossing Sutterville Road; and optimize
Department of
Transportation
Department of
Transportation
Prior to issuance of
building permits
Prior to issuance of
the first building
permit
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 9

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
signal timing. This mitigation measure
would reduce the impact of the Proposed
Project and Access Scenarios 2 and 3 to a
less than significant level.

5.2-10(f) Sutterville Road / Curtis Drive West - No
feasible mitigation measure was identified
for the Sutterville Road / Curtis Drive West
intersection. Adding a southbound right
turn lane to the intersection would mitigate
the impact but was not considered to be
feasible because of the need for
demolishing several existing buildings to
provide additional right-of-way. The
cumulative impact for the Proposed Project
and all access scenarios would remain
significant and unavoidable.

5.2-10(g) Sutterville Road / Franklin Boulevard –The
project applicant shall pay a fair share
contribution to add an eastbound right-turn
lane that would mitigate the Saturday peak
hour impact of the Proposed Project and
Access Scenario 2 and Access Scenario 3 to
a less than significant level. For a.m. and
p.m. peak hour impacts, the cycle length
would increase to 110 seconds. These
mitigation measures would reduce the
impact of the Proposed Project and Access
Scenario 2 and Access Scenario 3 to a less
than significant level.

Department of
Transportation
Department of
Transportation
Prior to issuance of
building permits
Prior to issuance of
building permits
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 10

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off

5.2-10(h) Sutterville Road / SR 99 Northbound
Ramps – The project applicant shall pay a
fair share contribution to modify signal
timing to provide split phase for all
approaches and re-stripe the eastbound
lanes to provide one left-turn, one leftthrough, and one through lane. Construct two receiving lanes on the on-ramp for the
turning movement from eastbound 12th
Avenue to the northbound SR 99 ramp. This
mitigation measure would reduce the
impact of the Proposed Project and Access
Scenario 2 and 3 to a less than significant
level.

5.2-10(i) Road A / Area 1 – The project applicant
shall pay a fair share contribution to
modify the signal phasing to provide
overlaps for the eastbound right-turn
movement; provide protected-permitted
phasing for the northbound left-turn
movement; prohibit U-turn movement at
this intersection; and increase the cycle
length to 95 seconds. This mitigation
measure would reduce the impact of the
Proposed Project and Access Scenario 2
and 3 to a less than significant level.

Department of
Transportation
Department of
Transportation
Prior to issuance of
building permits
Prior to issuance of
building permits

5.3 Air Quality
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 11

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off

5.3-2 Impacts related to
exhaust emissions and
fugitive particulate
matter emissions from
project-associated
construction activities.

5.3-2(a) The project applicant shall ensure that
emissions from all off-road diesel powered
equipment used on the project site do not
exceed 40 percent opacity for more than
three minutes in any one hour. Any
equipment found to exceed 40 percent
opacity (or Ringelmann 2.0) shall be
repaired immediately, and SMAQMD shall
be notified within 48 hours of identification
of non-compliant equipment. A visual
survey of all in-operation equipment shall
be made at least weekly, and a monthly
summary of the visual survey results shall
be submitted throughout the duration of the
project, except that the monthly summary
shall not be required for any 30-day period
in which no construction activity occurs.

The monthly summary shall include the
quantity and type of vehicles surveyed as
well as the dates of each survey. The
SMAQMD and/or other officials may
conduct periodic site inspections to
determine compliance. Nothing in this
section shall supercede other SMAQMD or
state rules or regulations.

5.3-2(b) Prior to the approval of any grading
permit, the project proponent shall submit
a dust-control plan to the City of
Sacramento Community Development
Department. The dust-control plan shall
stipulate grading schedules associated with
SMAQMD
Community
Development
Department
Prior to and during
construction
Prior to approval
of grading permit
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 12

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
the project phase, as well as the dustcontrol measures to be implemented.

Grading of proposed project phases shall
be scheduled so that the total area of
disturbance would not exceed 15 acres on
any given day. The dust control plan shall
be incorporated into all construction
contracts issued as part of the proposed
project development. The dust-control plan
shall, at a minimum, incorporate the
following measures:
• Apply water, chemical stabilizer/
suppressant, or vegetative cover to
disturbed areas, including storage piles
that are not being actively used for
construction purposes, as well as any
portions of the construction site that
remain inactive for longer than 3
months;
• Water exposed surfaces sufficient to
control fugitive dust emissions during
demolition, clearing, grading, earthmoving, or excavation operations.

Actively disturbed areas should be kept
moist at all times;
• Cover all vehicles hauling dirt, sand,
soil or other loose material or maintain
at least two feet of freeboard in
accordance with the requirements of
California Vehicle Code Section
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 13

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
23114;
• Limit or expeditiously remove the
accumulation of project-generated mud
or dirt from adjacent public streets at
least once every 24 hours when
construction operations are occurring;
and
• Limit onsite vehicle speeds on unpaved
surfaces to 15 mph, or less.

5.3-3 Impacts related to a
temporary increase in
NOX emissions.

5.3-3(a) Prior to issuance of a grading permit, the
applicant shall submit a SMAQMDapproved plan, which demonstrates that the heavy-duty (>50 horsepower) off-road
vehicles to be used during construction of
the project (including owned, leased, and
subcontracted vehicles) will achieve a
project-wide average of 20 percent NOX
reduction and 45 percent particulate matter
reduction, based on the most recent CARB
fleet average at the time of construction. In
addition, the applicant shall submit to
SMAQMD a comprehensive inventory of all
off-road construction equipment (>50
horsepower) that will be used an aggregate
of 40 or more hours during any portion of
the construction project. The inventory
shall include the horsepower rating, engine
production year, and project hours of use
or fuel throughput for each piece of
equipment. The inventory shall be updated
and submitted monthly throughout the
SMAQMD
Community
Development
Department
Prior to issuance of
grading permit
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 14

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
duration of the project. Inventory shall not
be required for any 30-day period in which
construction activities do not occur. At
least 48 hours prior to the use of subject
heavy-duty off-road equipment, the
applicant shall provide SMAQMD with the
anticipated construction timeline, including
the start date and the name and phone
number of the project manager and on-site
foreman.

5.3-3(b) Prior to issuance of a grading permit, the
applicant shall provide a construction
mitigation fee to the SMAQMD sufficient to
offset project emissions of NOX above 85
pounds per day. The amount of the fee
shall be based on updated construction
scheduling and equipment lists, and shall
be calculated using the SMAQMD method
of estimating excess emissions. The current
price of NOX construction offsets calculated
by SMAQMD is $16,000 per ton.

SMAQMD
Community
Development
Department
Prior to issuance of
grading permit

5.3-5 Impacts related to longterm increases of
criteria air pollutants.

5.3-5(a) Prior to the issuance of any grading permit,
the project applicant shall coordinate with
the SMAQMD and the City of Sacramento
Community Development Department to
develop a project Air Quality Mitigation
Plan (AQMP). In accordance with
SMAQMD recommendations, the AQMP
shall achieve a minimum overall reduction
of 15 percent in the project’s anticipated
operational emissions. SMAQMDSMAQMD
Community
Development
Department
Prior to issuance of
grading permit
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 15

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
recommended measures and corresponding
emissions-reduction benefits are identified
in SMAQMD’s Guidance for Land Use
Emission Reductions, which can be found
in Appendix E of the SMAQMD document.

The AQMP shall be reviewed and endorsed
by SMAQMD staff prior to project
implementation. Available measures to be
included in the AQMP include, but are not
limited to, the following:
• Prohibit the installation of woodburning fireplaces and stoves; • Provide onsite bicycle storage and
showers for employees that bike to
work sufficient to meet peak season
maximum demand;
• Provide preferential parking (e.g., near
building entrance, sheltered area, etc.)
for carpool and vanpool vehicles;
• Provide transit enhancing
infrastructure that includes: transit
shelters, benches, etc.; street lighting;
route signs and displays; and/or bus
turnouts/bulbs;
• Incorporate onsite transit facility
improvements (e.g., pedestrian shelters,
route information, benches, lighting) to
coincide with existing or planned
transit service;
• Incorporate landscaping and sun
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 16

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
screens to reduce energy use.

Deciduous trees should be utilized for
building shading to increase solar
heating during the winter months.

Install sun-shading devices (e.g.,
screens) or recessed windows on newly
proposed buildings;
• Install efficient lighting and lighting
control systems;
• Install energy-efficient heating and
cooling systems, appliances and
equipment;
• Install light colored “cool” roofs and
pavements (i.e., high reflectance, high
emittance roof surfaces, or
exceptionally high reflectance and low
emittance surfaces) and strategically
placed shade trees to the extent
practical;
• Limit hours of operation of outdoor
lighting to the extent practical; and
• Provide shade (within 5 years) and/or
use light-colored/high-albedo materials
(reflectance of at least 0.3) and/or open
grid pavement for at least 30 percent of
the site's non-roof impervious surfaces,
including parking lots, walkways,
plazas, etc.; or, place a minimum of 50
percent of parking spaces underground
or covered by structured parking; or,
use an open-grid pavement system (less
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 17

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
than 50 percent impervious) for a
minimum of 50 percent of the parking
lot area.

5.3-5(b) Documentation confirming implementation
of the Air Quality Mitigation Plan shall be
provided to the SMAQMD and City prior to
issuance of occupancy permits.

SMAQMD
Community
Development
Department
Prior to issuance of
occupancy permit

5.3-8 Cumulative contribution
to regional air quality
conditions.

5.3-8 Implement Mitigation Measures 5.3-2(a)
and (b) and 5.3-4(a) and (b).

See 5.3-2 (a)
and (b) and

5.3-4 (a) and
(b)
See 5.3-2(a) and
(b) and 5.3-4 (a)
and (b)

5.4 Noise and Vibration

5.4-2 Construction noise
impacts to surrounding
existing uses.

5.4-2 Construction activities shall be limited to
the hours set forth below, unless an
exception is granted by the Community
Development Department:
• Monday through Saturday
7:00 a.m. to 6:00 p.m.
• Sunday
9:00 a.m. to 6:00 p.m.

These restricted hours shall be included on
all grading and construction plans
submitted for the review and approval of
the Community Development Department
prior to issuance of grading and
construction permits.

Community
Development
Department
Prior to issuance of
grading and
building permits
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 18

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off

5.4-7 Railroad noise levels at
exterior noise spaces of
proposed project
residences.

5.4-7 Prior to the issuance of building permits, a
noise barrier shall be shown on the plans
along the western boundary of the project
site, from the northern boundary of the
CPV site to the southern end of the Multifamily parcel,any parcel with residences for the review and approval of the City
Engineer. A barrier 10 feet in height
(relative to nearest outdoor activity
elevations) would intercept line of sight to
railroad pass-bys, thereby reducing future
UPRR noise levels to 70 dB Ldn or less at
the nearest outdoor activity areas proposed
adjacent to the tracks.

Barriers can take the form of earthen
berms, solid walls, or a combination of the
two. Appropriate materials for noise walls
include precast concrete or masonry block.

Other materials may be acceptable provide
they have a surface density of
approximately four pounds per square foot.

City Engineer Prior to the
issuance of
building permits

5.4-8 Railroad noise levels at
interior spaces of
proposed residences on
the project site.

5.4-8(a) Prior to the issuance of building permits,
all residential lots and residential buildings
located within the 70 dB Ldn contour shall
include noise insulation features such as
the following:
• Sound-rated windows and doors with
STC rating of 35; and
• Stucco exterior siding.

City Building
Department
Prior to issuance of
building permits
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 19

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off

5.4-8(b) Prior to sale of any residential lots,
statements shall be included in the title for
all properties within the 65 dB Ldn contour
that informs the buyer of elevated noise
levels during train passages, and that train
passages routinely occur during nighttime
hours.

Community
Development
Department
Prior to sale of
residential lots

5.4-9 Noise-producing
commercial uses
proposed within the
project site.

5.4-9(a) Unshielded (i.e. unloading activities which
are visible from any residential window)
nighttime truck unloading shall be
prohibited within 200 feet of any residential
unit.

5.4-9(b) Prior to issuance of a building permit, the
site plans shall indicate that a parapet wall
shall be constructed along the edge of the
roofs of the commercial buildings of
sufficient height to intercept line of sight
from rooftop mechanical equipment at the
nearest residences to reduce noise levels at
those nearby residences.

Community
Development
Department
Community
Development
Department
Prior to issuance of
building permit
and during project
operations
Prior to issuance of
building permit

5.4-10 Park generated noise at
residential uses
proposed within the
project site.

5.4-10 Park activities shall be restricted to
daytime hours, with exceptions allowed on
a case-by-case basis subject to the
approval of the Director of the Parks and
Recreation.

Parks and
Recreation
Department
During project
operations

5.5 Biological Resources
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 20

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off

5.5-2 Impacts to burrowing
owl.

5.5-2 Prior to any ground disturbance associated
with grading or construction, the applicant
shall initiate a burrowing owl consultation
with the California Department of Fish and
Game (CDFG) and shall implement the
following mitigation measures or
equivalents, based on the results of the
consultation.

The developer shall arrange for burrowing
owl surveys to be performed consistent with
the CDFG’s 1995 Staff Report on
Burrowing Owl and the California
Burrowing Owl Consortium’s (CBOC)
Survey Protocol (1997) not less than 30
days prior to ground disturbance for each
phase of project grading. If burrowing owls
are not detected, further mitigation is not
necessary. However, if burrowing owls are
detected the following steps shall be taken:

If site disturbance commences during the
nesting season (between February 1 and
August 31) and burrowing owls are
detected, a fenced buffer shall be erected
on the project site by the developer not less
than 250 feet between the nest burrow(s)
and construction activities. The 250-foot
buffer shall be observed and the fence left
intact until a qualified raptor biologist
determines that the young are foraging
independently, the nest has failed, or the
CDFG Prior to any ground
disturbance
associated with
grading or
construction
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 21

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
owls are not using any burrows within the
buffer.

If ground disturbance associated with
grading or construction commences outside
of the nesting season, and burrowing owl(s)
are present on-site or within 160 feet of site
disturbance, passive relocation consistent
with the CDFG Staff Report (1995) and the
CBOC Survey Protocol (1997) shall be
performed. At least one or more weeks will
be necessary to accomplish this and allow
the owls to acclimate to off-site burrows.

The pre-construction surveys shall be
repeated if more than 30 days elapse
between the last survey and the start of
construction activities.

5.5-3 Impacts to Swainson’s
hawk nesting and
foraging habitat.

5.5-3 If site disturbance associated with grading
or construction activities is proposed by the
developer during breeding season
(February to August), a pre-construction
survey for Swainson’s hawk nests shall be
conducted within 30 days prior to site
disturbance/construction activities by a
qualified biologist in order to identify
active nests in the project site vicinity. The
results of the survey shall be submitted to
CDFG and the Community Development
Department. If active nests are not found
during the pre-construction survey, further
mitigation is not required. If active nests
are found, pursuant to consultation with
CDFG
Community
Development
Department
Pre-construction
survey prior to site
disturbance or
construction
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 22

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
CDFG, a fenced buffer shall be erected by
the developer on the project site not less
than one-quarter mile (approximately
1,300 feet) around the active nest. Site
disturbance associated with grading or
construction activities that may cause nest
abandonment or forced fledging shall not
be initiated within this buffer zone between
March 1 and September 1. Any trees
containing nests that must be removed as a
result of project implementation shall be
removed during the non-breeding season
(September to January).

5.5-4 Impacts to raptors and
migratory birds.

5.5-4(a) Prior to any grading or construction
activities during the nesting season
(February 1 to August 15), a
preconstruction survey shall be conducted
by a qualified wildlife biologist within 15
days of the start of project-related
activities. If nests of migratory birds are
detected on site, or within 75 feet (for
migratory passerine birds) or 250 feet (for
birds of prey) of the site, the developer
shall consult with the CDFG to determine
the size of a suitable buffer in which new
site grading or construction disturbance is
not permitted until August 15, or the
qualified biologist determines that the
young are foraging independently, or the
nest has been abandoned.

5.5.4(b) Prior to any grading or construction
Community
Development
Department
CDFG
Pre-construction
survey prior to
grading or
construction
activities
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 23

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
activities from March 15 to May 15 within
100 feet of the overcrossing of the railroad
tracks on Sutterville Road, adjacent to the
project site, a preconstruction survey shall
be conducted by a qualified biologist within
15 days of the start of project-related
activities. If active nests are present in the
overcrossing, no construction shall be
conducted within 100 feet of the edge of the
purple martin colony (as demarcated by the
active nest hole closest to the construction
activity) at the beginning of the purple
martin breeding season from March 15 to
May 15. The buffer area shall be avoided to
prevent disturbance to the nest(s) until it is
no longer active. The size of the buffer area
may be adjusted if a qualified biologist and
CEFG determine it would not be likely to
have adverse effects on the purple martins.

No project activity shall commence within
the buffer area until a qualified biologist
confirms that the nest(s) is no longer active.

5.6 Cultural Resources

5.6-1 Impacts related to the
update of the Remedial
Action Plan.

5.6-1(a) In the event that any prehistoric subsurface
archeological features or deposits,
including locally darkened soil
(“midden”), that could conceal cultural
deposits, animal bone, obsidian and/or
mortars are discovered during earthmoving activities, all work within 100 feet Community
Development
Department
During
construction
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 24

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
of the resource shall be halted, and the City
shall consult with a qualified archeologist,
representatives of the City and a qualified
archeologist shall coordinate to determine
the appropriate course of action. All
significant cultural materials recovered
shall be subject to scientific analysis and
professional museum curation.

5.6-1(b) If a Native American site is discovered, the
evaluation process shall include
consultation with the appropriate Native
American representatives.

If a Native American archeologist,
ethnographic, or spiritual resources are
discovered, all identification and treatment
shall be conducted by qualified
archeologists, who are certified by the
Society of Professional Archeologists
(SOPA) and/or meet the federal standards
as stated in the Code of Federal
Regulations (36 CFR 61), and Native
American representatives, who are
approved by the local Native American
community as scholars of the cultural
traditions.

In the event that no such Native American
is available, persons who represent tribal
governments and/or organizations in the
locale in which resources could be affected
Community
Development
Department
During
construction
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 25

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
shall be consulted. If historic archeological
sites are involved, all identified treatment is
to be carried out qualified historical
archeologists, who shall meet either
Register of Professional Archeologists
(RPA), or 36 CFR 61 requirements.

5.6-1(c) If a human bone or bone of unknown origin
is found during earth-moving activities, all
work shall stop within 100 feet of the find,
and the County Coroner shall be contacted
immediately. If the remains are determined
to be Native American, the Coroner shall
notify the Native American Heritage
Commission, who shall notify the person
most likely believed to be a descendant. The
most likely descendant shall work with the
contractor to develop a program for reinternment of the human remains and any associated artifacts. No additional work is
to take place within the immediate vicinity
of the find until the identified appropriate
actions have taken place.

County
Coroner
Native
American
Heritage
Commission
During
construction

5.7 Geology and Soils

5.7-1 Impacts related to the
update of the Remedial
Action Plan.

5.7-1(a) At least 72 hours prior to the placement of
imported fill, the applicant shall have the
potential fill inspected by a qualified
geotechnical consultant to ensure that all
fill being used for fills less than five feet
below design grade have a plasticity index
of less than or equal to 12, and that all
City Engineer At least 72 hours
prior to the
placement of
imported fill
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 26

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
soils are clean and free of deleterious
materials, organic materials, and shall not
contain particles greater than six inches in
size. The results of the geotechnical
analysis shall be submitted to the City
Engineer prior to placement of fill.

5.7-1(b) Prior to placement of imported fill, the
applicant shall have the excavation surface
inspected by a qualified geotechnical
consultant to ensure the stability of the
excavation bottom. Should the site be found
to be unstable or contain loose or
deleterious materials, the applicant shall
perform required mitigation as identified
by the geotechnical consultants and
approved by the City Engineer. Mitigation
for unstable fill could include, but is not
limited to the following:
• Restrict fill activities to occur when the
excavation bottom is dry and stable
during warm weather; or
• Require that the placement of geotextile
fabric be placed prior to granular
import fill. The geotextile fabric would
be required to be Mirafi 600X or
equivalent. Granular fill would consist
of well-graded crushed materials, such
as Class 2 aggregate base of Caltrans
Standard Specifications, but may also
consist of other granular imported
materials. Uniform crushed rock may
City Engineer Prior to placement
of imported fill
Curtis Park Village
September 2010
Chapter 4 – Mitigation Monitoring Plan
4 - 27

MITIGATION MONITORING PLAN
Curtis Park Village
Impact
Number Impact Mitigation Measure
Monitoring
Agency
Implementation
Schedule Sign-off
be used as a stabilizing layer provided
that the crushed rock is completely
wrapped in the geotextile fabric.

RESOLUTION NO. 2025-
Adopted by the Sacramento City Council
September 9, 2025
Adopting Findings of Fact and Conditions of Approval to Project entitlements related to the Flex Parcel site (2325 10th Avenue) for the Crocker Village Residential Development Project. (P24-028) (APN: 013-0010-046-0000) Background
A. On June 24, 2025, the City Planning and Design Commission conducted a public hearing on, and approved Project entitlements related to the Flex Parcel site for the Crocker Village Residential Project.

B. On September 9, 2025, the City Council conducted a public hearing, for which notice was given under Sacramento City Code Section 17.812.010(2)(b).

Based on the facts set forth in the Background, the City Council resolves as follows:

Section 1. Based on the verbal and documentary evidence received at the hearing on the Cotton Lanes Apartment Project (Project), the City Council approves the Project entitlements related to the Flex Parcel site based on the findings of fact and subject to the conditions of approval as set forth below.

Section 2. The City Council approves the Project entitlements related to the Flex Parcel site based on the following findings of fact:

A. Tentative Subdivision Map to subdivide the 2.49-acre Flex Parcel into 31 residential parcels and three common parcels is approved based on the following findings of fact:

1. None of the conditions described in Government Code section 66474 exist with respect to the proposed subdivision as follows:
a. The proposed map is consistent with the General Plan, all applicable community and specific plans, Title 17 of the City Code, and all other applicable provisions of the City Code.
b. The design and improvement of the proposed subdivision is consistent with the General Plan, and all applicable community and specific plans, Title 17 of the City Code, and all other applicable provisions of the City Code. c. The site is physically suitable for the type of development. d. The site is physically suitable for the proposed density of development. e. The design of the subdivision and the proposed improvements are not likely to cause substantial environmental damage or substantially and avoidable injure fish or wildlife or their habitat.
f. The design of the subdivision and the type of improvements are not likely to cause serious public health problems.
g. The design of the subdivision and the type of improvements will not conflict with easements, acquired by the public at large, for access through or use of, property within the proposed subdivision.

2. The proposed subdivision, together with the provisions for its design and improvement, is consistent with the General Plan, all applicable community and specific plans, Title 17 of the City Code, and all other applicable provisions of the City Code (Gov. Code §66473.5).

3. The discharge of waste from the proposed subdivision into the existing community sewer system will not result in a violation of the applicable waste discharge requirements prescribed by the California Regional Water Quality Board, Central Valley Region, in that existing treatment plants have a design capacity adequate to service the proposed subdivision (Gov. Code §66474.6).

4. The design of the proposed subdivision provides, to the extent feasible, for future passive or natural heating and cooling opportunities (Gov. Code §66473.1).

5. The City has considered the effect of the approval of this tentative subdivision map on the housing needs of the region and has balanced these needs against the public service needs of its residents and available fiscal and environmental resources (Gov. Code §66412.3).

B. Conditional Use Permit to develop single-unit dwellings within the Shopping Center (SC-PUD) Zone and Curtis Park Village Planned Unit Development is approved based on the following findings of fact:

1. The proposed use and its operating characteristics are consistent with the general plan, Curtis Park Village Planned Unit Development, and Greater Land Park Community plan, in that: 1) the Residential Mixed-Use general plan designation allows for residential use where daily errands can be accomplished on foot, by bicycle, or by transit, and 2) the Planned Unit Development Schematic Plan and Guidelines allow for single-unit dwelling development at the site. There is no applicable transit village plan.

2. The proposed use and its operating characteristics are consistent with the applicable standards, requirements, and regulations of the zoning district in which it is located, in that the proposed residential development, as conditioned, meets applicable development standards and is not in conflict with any nearby Shopping Center zone uses.

3. The proposed use is situated on a parcel that is physically suitable in terms of location, size, topography, and access, and that is adequately served by public services and utilities, in that the site has been reviewed and conditioned to ensure adequate access and provision of City services.

4. The proposed use and its operating characteristics are not detrimental to the public health, safety, convenience, or welfare of persons residing, working, visiting, or recreating in the surrounding neighborhood and will not result in the creation of a nuisance, in that single unit dwellings on this Shopping Center zoned site are compatible with adjacent residential and commercial uses.

C. Site Plan and Design Review to construct 31 single-unit dwellings on a ±2.49- acre parcel within the Flex Parcel site located in the Shopping Center (SC-PUD) Zone and Curtis Park Village Planned Unit Development is approved based on the following findings of fact:

1. The design, layout, and physical characteristics of the proposed development are consistent with the general plan designation of Residential Mixed Use which allows for residential development near commercial uses where daily errands can be accomplished on foot, by bicycle, or by transit. Single-unit dwelling development is also an allowed use within the Curtis Park Village PUD Schematic Plan and Guidelines with the provision of a CUP. There is no applicable transit village plan.

2. The design, layout, and physical characteristics of proposed development are consistent with applicable design guidelines and with applicable development standards. City departments and utility agencies reviewed and conditioned the project to ensure safety and functionality.

3. All streets and other public access ways and facilities, parking facilities, and utility infrastructure are adequate to serve the proposed development and comply with applicable design guidelines and development standards. City Public Works and Utilities departments reviewed and conditioned the project for adequacy and service.

4. The design, layout, and physical characteristics of the proposed development are visually and functionally compatible with the surrounding neighborhood, in that the orientation, articulation, and massing of the proposed houses are similar to that of existing neighborhood houses.

5. The design, layout, and physical characteristics of the proposed development ensure energy consumption is minimized and use of renewable energy sources is encouraged, in that the site is located within an urban environment and will utilize existing road and utility infrastructure.

6. The design, layout, and physical characteristics of the proposed development are not detrimental to the public health, safety, convenience, or welfare of persons residing, working, visiting, or recreating in the surrounding neighborhood and will not result in the creation of a nuisance, in that the proposed architecture and layout blends with the existing area.

D. 200-Year Flood Protection

1. The project site is within an area for which the local flood-management agency has made adequate progress (as defined in California Government Code section 65007) on the construction of a flood-protection system that, for the area intended to be protected by the system, will result in flood protection equal to or greater than the urban level of flood protection in urban areas for property located within a flood-hazard zone, as demonstrated by the SAFCA Urban Level of Flood Protection Plan and Adequate Progress Baseline Report and the SAFCA Adequate Progress Toward an Urban Level of Flood Protection Engineer’s Report, each accepted by the City Council on June 21, 2016 (Resolution No. 2016-0226), and the SAFCA 2024 Adequate Progress Annual Report accepted by the City Council on October 22, 2024 (Resolution No. 2024- 0311).

CONDITIONS OF APPROVAL
B. The Tentative Subdivision Map to subdivide the 2.49-acre Flex Parcel into 31 residential parcels and three common parcels is approved subject to the following conditions:

Public Works
B1. Pursuant to City Code Section 17.500.190, indicate easements on the Final Map to allow for the placement of centralized mail delivery units. The specific locations for such easements shall be subject to review and approval of the Department of Public Works after consultation with the U.S. Postal Service.

B2. Private reciprocal ingress, egress, and maneuvering easements are required for future development of the area covered by this Tentative Map. The applicant shall enter into and record an Agreement For Conveyance of Easements with the City stating that a private reciprocal ingress/egress, and maneuvering easement shall be conveyed to and reserved from all appropriate parcels, at no cost, at the time of sale or other conveyance of either parcel.

B3. Comply with requirements included in the Mitigation Monitoring Plan developed by, and kept on file in, the Planning Division Office for project (P04-109). (City Council Resolutions 2010-174 and 2010-572)
B4. Meet all conditions of the existing PUD (P04-109) unless the condition is superseded by a Tentative Map condition.

B5. Show all continuing and proposed/required easements on the Final Map.

B6. Multiple Final Maps may be recorded. Prior to recording any Final Maps all infrastructure/improvements necessary for the respective Final Map must be in place to the satisfaction of the Departments of Utilities, and Public Works.

B7. Construct standard subdivision improvements as noted in these conditions pursuant to section 17.504.050 of the City Code. All improvements shall be designed and constructed to the satisfaction of the Department of Public Works.

The City shall determine improvements required for each phase prior to recording each phase. Any public improvement not specifically noted in these conditions or on the Tentative Map shall be designed and constructed to City standards. This shall include the repair or replacement/reconstruction of any existing deteriorated curb, gutter and sidewalk abutting the subject property per City standards to the satisfaction of the Department of Public Works.

B8. The tentative subdivision map allows for two subdivision modifications and are as follows:
a. Non-standard street section with 41-foot right of way and attached sidewalks (Street A and B).

B9. All right-of-way and street improvement transitions that result from changing the right-of-way of any street shall be located, designed and constructed to the satisfaction of the Department of Public Works. The center lines of such streets shall be aligned.

B10. The applicant shall provide a signing and striping improvement plan if new signage or striping is proposed; or if existing signing and/or striping is removed or relocated.

The plans shall be to the satisfaction of the Department of Public Works.

B11. The applicant shall repair or replace/reconstruct any deteriorated portion of the alley adjacent to the subject property per City standards to the satisfaction of the Department of Public Works.

B12. With the proposed development along the alley, the applicant shall install alley name signs at both alley entrances when required by either the Building, Police and/or Fire Departments. In the event the alley name signs are required, the applicant shall coordinate with the Department of Public Works on the location of the alley name signs at alley entrances. The installation of the alley name signs shall be to the satisfaction of the Department of Public Works.

B13. The design and placement of walls, fences, signs and Landscaping near intersections and driveways shall allow stopping sight distance per Caltrans standards and comply with City Code Section 12.28.010 (25' sight triangle). Walls shall be set back 3' behind the sight line needed for stopping sight distance to allow sufficient room for pilasters. Landscaping in the area required for adequate stopping sight distance shall be limited to 3.5' in height. The area of exclusion shall be determined by the Department of Public Works.

B14. Design private streets to meet City standards regarding structural section. Private streets shall be inspected to the satisfaction of the Department of Public Works.

B15. Provide a standard driveway at the entrance to the private street B/Lot C.

B16. The applicant shall satisfy all the conditions of approval of the requested abandonment.

B17. Form a Homeowner's Association (HOA) or annex to an existing HOA with CC&R's that shall be recorded assuring maintenance of all private streets, common lights, common landscaping and any common areas, etc.

SMUD
B18. SMUD has existing underground 21kV facilities along the east side of the MultiParcel and along the north and west sides of the flex parcel that will need to remain.

The Applicant shall be responsible for maintaining all CalOSHA and State of California Public Utilities Commission General Order No. 128 safety clearances during construction and upon building completion. If the required clearances cannot be maintained, the Applicant shall be responsible for the cost of relocation.

B19. Structural setbacks less than 14-feet shall require the Applicant to conduct a preengineering meeting with all utilities to ensure property clearances are maintained.

B20. Any necessary future SMUD facilities located on the Applicant’s property shall require a dedicated SMUD easement. This will be determined prior to SMUD performing work on the Applicant’s property.

B21. In the event the Applicant requires the relocation or removal of existing SMUD facilities on or adjacent to the subject property, the Applicant shall coordinate with SMUD. The Applicant shall be responsible for the cost of relocation or removal.

B22. SMUD reserves the right to use any portion of its easements on or adjacent to the subject property that it reasonably needs and shall not be responsible for any damages to the developed property within said easement that unreasonably interferes with those needs.

B23. The Applicant shall not place any building foundations within 5-feet of any SMUD trench to maintain adequate trench integrity. The Applicant shall verify specific clearance requirements for other utilities (e.g., Gas, Telephone, etc.) B24. In the event the City requires an Irrevocable Offer of Dedication (IOD) for future roadway improvements, the Applicant shall dedicate a 12.5-foot public utility easement (PUE) for overhead and/or underground facilities and appurtenances adjacent to the City’s IOD.

B25. The Applicant shall comply with SMUD siting requirements (e.g., panel size/location, clearances from SMUD equipment, transformer location, service conductors). Information regarding SMUD siting requirements can be found at:
https://www.smud.org/en/Business-Solutions-and-Rebates/Design-andConstruction-Services.

B26. The Applicant shall provide separate SMUD service points to each parcel to the satisfaction of SMUD.

B27. The Applicant shall locate, verify, and provide a drawing to SMUD identifying all electrical utility infrastructure for the existing structures. If necessary, any existing onsite electrical infrastructure that serves existing structures shall be relocated to the satisfaction of SMUD.

B28. The Applicant shall dedicate a 12.5-foot public utility easement for overhead and/or underground facilities and appurtenances adjacent to all public street rights-ofways.

B29. The Applicant shall dedicate any private drive, ingress and egress easement, (and 10-feet adjacent thereto) as a public utility easement for (overhead and) underground facilities and appurtenances. All access roads shall meet minimum SMUD requirements for access roads.

B30. The Applicant shall dedicate and provide all-weather vehicular access for service vehicles that are up to 26,000 pounds. At a minimum: (a) the drivable surface shall be 20-feet wide; and (b) all SMUD underground equipment and appurtenances shall be within 15-feet from the drivable surface.

Sacramento Area Sewer District
B31. Before the ISSUANCE OF A BUILDING PERMIT: The owner must contact SacSewer Development Services at [email protected] or by phone at (916) 876-6100 to determine if SacSewer impact fees are due. Fees must be paid before the issuance of building permits.

Department of Utilities (DOU)
B32. The applicant shall comply with the conditions of the Tentative Map (P15-027 & Z18-221) as applicable unless otherwise approved by the Department of Utilities (DOU).

B33. A note stating the following shall be placed on the Final Map: “Where necessary private reciprocal easement for ingress/egress, utilities, drainage, water and sanitary sewer facilities, and surface storm drainage, shall be granted and reserved, as necessary and at no cost, at or before the time of sale or conveyance of any parcel shown in this map.”
B34. Easements for water meters and access easements over private streets, and all private alleys shall be dedicated to the City and shall include language assuring unrestricted access at all times for DOU personnel and maintenance vehicles.

Youth, Parks, and Community Enrichment
B35. Payment of In-lieu Park Fee: Pursuant to Sacramento City Code Chapter 17.512 (Parkland Dedication) the applicant shall pay to City an in-lieu park fee in the amount determined under SCC §§17.512.030 and 17.512.040 equal to the value of land prescribed for dedication under 17.512.020 and not satisfied by dedication. (See Advisory Note)
B36. Maintenance District: Unless already completed, the applicant shall initiate and complete the formation of a parks maintenance district (assessment or Mello-Roos special tax district) or annex the project into an existing parks maintenance district.

The applicant shall pay all city fees for formation of or annexation to a parks maintenance district. (Contact Infrastructure Finance, Brent Mueller, (916)808- 5715, [email protected]).

Advisory Notes:

The following advisory notes are informational in nature and are not a requirement of this Tentative Map:

B37. If unusual amounts of bone, stone, or artifacts are uncovered, work, in the area within the distance required by federal and state regulations, will cease immediately and a qualified archaeologist shall be consulted to develop, if necessary, further mitigation measures to reduce any archaeological impact to a less than significant effect before construction resumes. A note shall be placed on the final improvement plans referencing this condition.

B38. House plans shall comply with City Code Chapter 17.508 Driveways which includes:

17.508.040.J All driveways shall be at least 5-ft away from the property line.

17.508.050.A Residential driveways shall have a width of at least 10-ft and a depth of at least 20-ft measured from the right-of-way line.

17.508.070.D.3 Garages off alleys shall be set back at least 4-feet away from the alley right-of-way.

B39. The City of Sacramento (City) is responsible for providing local sewer service to the proposed project site via its local sanitary sewer collection system. SacSewer is responsible for conveying sewage from the City collection system to the EchoWater Resource Recovery Facility for treatment, resource recovery, and disposal.

B40. As per City Code, the applicant will be responsible to meet his/her obligations regarding:
a. Title 17, 17.512 Park Dedication / In Lieu (Quimby) Fees, due prior to recordation of the final map. The Quimby fee due for this project is estimated at $79,515. This is based on the creation 31 housing units on ±2.34 vacant acres within SC-PUD zone, at a level of service ratio of 3.5 acres/1000 residents, with an average land value of $225,000 per acre for the Land Park Community Plan Area, plus an additional 20% for off-site park infrastructure improvements. The approval of P15-027, allowing for the creation of 199 single family and 131 multi-family residential units, required the dedication at a level of service of 5 acres/1000 residents resulting in 4.08 acres. The new residential map in the SC-PUD zone is not factored in with the previous dedication and is in addition to the previously approved units; therefore, new residential maps created after the dedication of the park lot, is calculated at the 3.5 acres/1000 residents level of service ratio. Any change in these factors will change the amount of the Quimby fee due. The final fee is calculated using factors at the time of finalizing conditions on the final map.

The Department of Public Works is the lead for resolving the conditions on the map, including the invoicing and payment of the in-lieu fee. b. Title 18, 18.56 Park Development Impact Fee, due at the time of issuance of building permit. The Park Development Impact Fee is estimated at $215,357.

The Park Development Impact Fee due for this project is based on the Remainder Zone Rate of $6,947 for units over 2,000 square feet. Any change in these factors will change the amount of the PIF due. The fee is calculated using factors at the time that the project is submitted for building permit. c. Community Facilities District 2002-02, Neighborhood Park Maintenance CFD Annexation.

C. The Conditional Use Permit to develop single-unit dwellings within the Shopping Center (SC-PUD) Zone and Curtis Park Village Planned Unit Development is approved subject to the following conditions:

C1. Any modification to the project shall be subject to review and approval by Planning staff prior to the issuance of building permits. Any significant modification to the project may require additional planning entitlements.

C2. Comply with requirements included in the Mitigation Monitoring Plan developed by, and kept on file in, the Planning Division Office for project (P04-109). (City Council Resolutions 2010-174 and 2010-572)
D. The Site Plan and Design Review to construct 31 single-unit dwellings on a ±2.49- acre parcel within the Flex Parcel site located in the Shopping Center (SC-PUD) Zone and Curtis Park Village Planned Unit Development is approved subject to the following conditions:

Planning
D1. Provide the following building materials and architectural elements on the houses as indicated per approved plans:
a. Painted stucco;
b. Composite roofing;
c. Stucco trim;
d. Decorative front entry doors;
e. Stone veneer;
f. Brick veneer;
g. Brick trim;
h. Decorative shutters;
i. Standing seam metal roofing at awnings;
j. Decorative vents;
k. Decorative corbels;
l. Composite lap siding;
m. Composite panels
D2. The first submittal of each master plan type to obtain a Building Permit shall be identified as a Model for inspection purposes. Inspections: In addition to an 89 Planning Final (to be scheduled prior to a 29 Bldg Final), each model will receive an auto-scheduled 94 Planning-Foundation In-Progress and 95 Planning-Frame In-Progress inspection during construction. The Model home inspection process shall serve as the benchmark for all other production home construction.

D3. All residential mechanical equipment must be ground-mounted and cannot be placed within the front or street-side yards. The equipment shall be screened from any street view using fencing, landscaping, or an architecturally integrated screen wall.Construct landscape improvements including all required irrigation, ground coverings, shrubs, and trees as shown on the final approved landscape plan exhibit.

D4. Any new or relocated electrical service panels shall not be placed on any street facing elevation and must be screened from street view when located on the interior side yard of the structure.

D5. Comply with requirements included in the Mitigation Monitoring Plan developed by, and kept on file in, the Planning Division Office for project (P04-109). (City Council Resolutions 2010-174 and 2010-572)
Public Works
D6. Construct standard public improvements as noted in these conditions pursuant to Title 17 of the City Code. Improvements shall be designed to City Standards and assured as set forth in Section 17.502.130 of the City Code. All improvements shall be designed and constructed to the satisfaction of the Department of Public Works. Any public improvement not specifically noted in these conditions shall be designed and constructed to City Standards. This shall include the repair or replacement/reconstruction of any existing deteriorated curb, gutter and sidewalk abutting the subject property per City standards to the satisfaction of the Department of Public Works.

D7. The applicant shall repair or replace/reconstruct any deteriorated portion of the alley adjacent to the subject property per City standards to the satisfaction of the Department of Public Works.

D8. With the proposed development along the alley, the applicant shall install alley name signs at both alley entrances when required by either the Building, Police and/or Fire Departments. In the event the alley name signs are required, the applicant shall coordinate with the Department of Public Works on the location of the alley name signs at alley entrances. The installation of the alley name signs shall be to the satisfaction of the Department of Public Works.

D9. Design private streets to meet City standards regarding structural section. Private streets shall be inspected to the satisfaction of the Department of Public Works.

D10. The applicant shall provide a signing and striping improvement plan if new signage or striping is proposed; or if existing signing and/or striping is removed or relocated.

The plans shall be to the satisfaction of the Department of Public Works.

D11. All new and existing driveways shall be designed and constructed to City Standards to the satisfaction of the Department of Public Works. Provide a standard driveway at the entrance to any private street.

D12. The site plan shall conform to A.D.A. requirements in all respects. This shall include the replacement of any curb ramp abutting the property that does not meet current A.D.A. standards.

D13. The applicant shall record the Final Map, which creates the lot pattern shown on the proposed site plan prior to obtaining any Building Permits.

D14. The design of walls, fences and signage near intersections and driveways shall allow stopping sight distance per Caltrans standards and comply with City Code Section 12.28.010 (25' sight triangle). Walls shall be set back 3' behind the sight line needed for stopping sight distance to allow sufficient room for pilasters.

Landscaping in the area required for adequate stopping sight distance shall be limited to 3.5' in height at maturity. The area of exclusion shall be determined by the Department of Public Works.

SMUD
D15. SMUD has existing underground 21kV facilities along the east side of the MultiParcel and along the north and west sides of the flex parcel that will need to remain. The Applicant shall be responsible for maintaining all CalOSHA and State of California Public Utilities Commission General Order No. 128 safety clearances during construction and upon building completion. If the required clearances cannot be maintained, the Applicant shall be responsible for the cost of relocation.

D16. Structural setbacks less than 14-feet shall require the Applicant to conduct a preengineering meeting with all utilities to ensure property clearances are maintained.

D17. Any necessary future SMUD facilities located on the Applicant’s property shall require a dedicated SMUD easement. This will be determined prior to SMUD performing work on the Applicant’s property.

D18. In the event the Applicant requires the relocation or removal of existing SMUD facilities on or adjacent to the subject property, the Applicant shall coordinate with SMUD. The Applicant shall be responsible for the cost of relocation or removal.

D19. SMUD reserves the right to use any portion of its easements on or adjacent to the subject property that it reasonably needs and shall not be responsible for any damages to the developed property within said easement that unreasonably interferes with those needs.

D20. The Applicant shall not place any building foundations within 5-feet of any SMUD trench to maintain adequate trench integrity. The Applicant shall verify specific clearance requirements for other utilities (e.g., Gas, Telephone, etc.).

D21. In the event the City requires an Irrevocable Offer of Dedication (IOD) for future roadway improvements, the Applicant shall dedicate a 12.5-foot public utility easement (PUE) for overhead and/or underground facilities and appurtenances adjacent to the City’s IOD.

D22. The Applicant shall comply with SMUD siting requirements (e.g., panel size/location, clearances from SMUD equipment, transformer location, service conductors). Information regarding SMUD siting requirements can be found at:
https://www.smud.org/en/Business-Solutions-and-Rebates/Design-andConstruction-Services.

D23. The Applicant shall provide separate SMUD service points to each parcel to the satisfaction of SMUD.

D24. The Applicant shall locate, verify, and provide a drawing to SMUD identifying all electrical utility infrastructure for the existing structures. If necessary, any existing onsite electrical infrastructure that serves existing structures shall be relocated to the satisfaction of SMUD.

D25. The Applicant shall dedicate a 12.5-foot public utility easement for overhead and/or underground facilities and appurtenances adjacent to all public street rights-ofways.

D26. The Applicant shall dedicate any private drive, ingress and egress easement, (and 10-feet adjacent thereto) as a public utility easement for (overhead and) underground facilities and appurtenances. All access roads shall meet minimum SMUD requirements for access roads.

D27. The Applicant shall dedicate and provide all-weather vehicular access for service vehicles that are up to 26,000 pounds. At a minimum: (a) the drivable surface shall be 20-feet wide; and (b) all SMUD underground equipment and appurtenances shall be within 15-feet from the drivable surface.

Department of Utilities (DOU)
D28. The applicant shall participate in the Curtis Park Village Finance District Plan and pay all required fees, including all DOU development impact fees.

D29. The applicant shall comply with the conditions of the Tentative Map (P15-027 & Z18-221) as applicable unless otherwise approved by the Department of Utilities (DOU).

D30. Improvement plans and project specific studies shall be consistent with, the approved Curtis Park Village Water, Sewer, and Drainage Master Plans. Any deviations from the approved studies will require an addendum.

D31. The project shall be consistent with the approved Curtis Park Village Water Master Plan, including addendums. Concurrent with the submittal of improvement plans, prepare a project specific water study for review and approval by the DOU. The water system shall be designed to satisfy the more critical of the two following conditions (1) at maximum day peak hour demand, the operating or static pressure at all service connections shall be at least 30 pounds per square inch, (2) At maximum day demand with fire flow at the point of connection, the residual pressure shall not be less than 20 pounds per square inch (3) At average day demand (without fire flow), the minimum flow velocity shall not be less than 0.10 feet per second, unless the main is in a dead-end street without Services that is planned to be extended in the future. See Section 13 of the City of Sacramento Design and Procedures Manual. The water study shall determine if the existing and proposed water distribution system is adequate to supply fire flow demands for the project.

D32. Per City Code Section, 13.04.070, multiple water services to a single lot or parcel may be allowed if approved by DOU Development Review and Operations and Maintenance staff. Any new water services (other than fire) shall be metered and include a backflow device (commercial only). Excess services shall be abandoned to the satisfaction of the DOU.

D33. Easements for water meters and access easements over private streets, and all private alleys shall be dedicated to the City and shall include language assuring unrestricted access at all times for DOU personnel and maintenance vehicles.

D34. The project is served by the Combined Sewer System (CSS). Therefore, the developer/property owner will be required to pay the Combined Sewer System Development Fee prior to the issuance of building permit. Note: This development is part of a larger project, Curtis Park Village, that was granted 25 ESDs at the lower rate. The Curtis Park Village development has exhausted these credits; therefore, this project will be charged at the higher rate.

D35. The project shall be consistent with the approved Curtis Park Village Sewer Master Plan, including addendums. The applicant shall prepare a project specific sewer study meeting the criteria specified in the current Design and Procedures Manual, for review and approval by the DOU. Failure to submit the sewer study may delay review and approval. All additional sewer flows shall be mitigated. Any deviations from the approved study will require an addendum to the approved sewer study.

D36. Public water, sewer or drainage mains are not allowed in alleys, private drives or private streets unless otherwise approved by the DOU.

D37. The onsite water, sewer, and storm drain systems shall be private systems maintained by the owner(s), homeowner association (HOA) or other approved entity. Private common water, sewer, and drainage maintenance agreements are required for any proposed common water, sewer, and drainage facilities within the proposed private access road. In addition, prior to the initiation of any water, sanitary sewer, or storm drainage services to the project, C.C. & R.s approved by the City shall be recorded that authorize and require the association to: (1) operate, maintain, and repair the onsite sanitary sewer, water, and storm drainage facilities within the project; and (2) obtain and pay for water, sewer or drainage service on behalf of all owners within the project in accordance with all applicable provisions of Title 13 of the Sacramento City Code. The CC&Rs must provide that the City-approved provisions regarding water, sewer and surface and subsurface storm drainage facilities may not be revised without City consent.

D38. Onsite sewer and drainage facilities shall be separated systems.

D39. The drainage study shall be consistent with the approved Curtis Park Village Drainage Master Plan, including addendums. The applicant shall prepare a project specific drainage study meeting the criteria specified in the current Design and Procedures Manual, for review and approval by the DOU. Failure to submit the drainage study may delay review and approval. If the proposed development exceeds the imperviousness that was specified in the accepted drainage master plan, then the applicant shall provide drainage mitigation and an addendum for the additional impervious area. An agreement may be required for detention and Low Impact Development (LID) features.

D40. Per City Code, the applicant may not develop the project in any way that obstructs, impedes, or interferes with the natural flow of existing off-site drainage that crosses the property. The project shall construct the required public and/or private infrastructure to handle off-site runoff to the satisfaction of the DOU. If private infrastructure is constructed to handle off-site runoff, the applicant shall dedicate the required private easements, and/or, at the discretion of the DOU, the applicant shall enter into and record an Agreement for Maintenance of Drainage with the City, in a form acceptable to the City Attorney.

D41. Finished floor elevations shall be a minimum of 1-foot above the 100-year HGL or 1.5-foot above the overland flow release elevation, whichever is higher or as approved by the DOU.

D42. A grading plan showing existing and proposed elevations is required. Adjacent off-site topography shall also be shown to the extent necessary to determine impacts to existing surface drainage paths. No grading shall occur until the grading plan has been reviewed and approved by the DOU.

D43. This project will disturb more than one (1) acre of land; therefore, the project is required to comply with the State’s “Construction General Permit”. To comply with the State Permit, the applicant must file a Notice of Intent (NOI) through the State’s Storm Water Multiple Application and Report Tracking System (SMARTS). A valid WDID number must be obtained and provided to the DOU prior to the issuance of any grading permits.

D44. The applicant must comply with the City of Sacramento's Grading, Erosion and Sediment Control Ordinance. This ordinance requires the applicant to show erosion and sediment control methods on the construction drawings. These plans shall also show the methods to control urban runoff pollution from the project site during construction.

Police Department
Lighting:

D45. Exterior lighting shall be white light using LED lamps with full cutoff fixtures to limit glare and light trespass. Color temperature shall be between 2700K and 4100K with a color rendering index of 80 or higher and a light loss factor of .95 or better. When choosing lamps, the applicant shall look for efficiency of 110 lumens per watt or better. All existing exterior fixtures shall be replaced with fixtures that meet this requirement.

D46. Light poles, if applicable, shall be no higher than 16’.

D47. Exterior lighting shall be designed in coordination with the landscaping plan to minimize interference between the light standards and required illumination and the landscape trees and required shading.

D48. Exterior lighting shall be shielded or otherwise designed to avoid spill-over illumination to adjacent streets and properties.

Landscaping:

D49. All mature landscaping shall follow the two-foot, six-foot rule. All landscaping shall be ground cover, two feet or less and lower tree canopies of mature trees shall be above six feet. This increases natural surveillance, eliminates hiding areas within the landscape, and provides for tenants and users a safer environment.

D50. Tree canopies shall not interfere with or block lighting. This creates shadows and areas of concealment. The landscaping plan shall allow for proper illumination and visibility regarding lighting and surveillance cameras through the maturity of trees and shrubs.

During Construction:

D51. The applicant shall enclose the entire perimeter of the project with a chain link fence with necessary construction gates to be locked after normal construction hours.

D52. The location shall be monitored by security after normal construction hours during all phases of construction. This can be done via remote camera monitoring.

D53. Adequate security lighting shall be provided to illuminate vulnerable equipment and materials. Lighting shall be white light with full cut off fixtures.

Urban Forestry
D54. The following Tree Preservation Measures shall be included on all future plans in the General Notes, Grading Plans, Utility Plans, Demolition Plan, Landscape Plan, offsite plans, and any additional plans sheets if trees will be impacted by work proposed on each sheet. This does not replace any request for a Project Arborist’s tree protection plan.

Required Tree Preservation Measures for City and Private Protected Trees 1) This project shall contract with a Project Arborist experienced with tree protection and construction that is required to:
a. Attend preconstruction meetings to approve of and inform contractors of all tree protection measures.
b. Visit the site before and after demolition, grading, and landscaping as well as at least twice each month during construction to ensure that tree protection measures are implemented and maintained.
c. Be responsible for correcting any site conditions that may negatively impact the trees and revisit the site to ensure that corrective action was properly implemented.
d. The Project Arborist shall report in writing to Urban Forestry all violations and tree protection failures along with corrective action taken and expected outcomes.
2) All concrete sidewalks and driveways shall be retained throughout construction to protect the roots and soil from the impacts of construction activities.
a. Existing driveways shall be used as the sole access to the site. Where there are no existing driveways, access shall be limited to a one or two locations outside the dripline of protected trees that have protection from soil compaction with the use of one or more of the following: A 6-inch layer of hardwood chips covered by ¾-inch plywood or trench plates, geotextile fabric covered by a 6-inch layer of hardwood chips or an alternative that is approved by the City Arborist.
3) Right-of-way planters and City trees shall be separated from the construction site with a six-foot high chain link fence that shall remain throughout the duration of the project to protect trees and to prevent construction traffic from compacting the soil in the planters.
4) Construction trailers and port-a-potties shall be placed on existing hardscape or bridged over the tree protection zone or planter so as not to compact soil. 5) Any Regulated Work within the dripline or Tree Protection Zone of a protected tree shall be separately permitted prior to the start of construction and supervised by a Certified Arborist. Submit a tree permit application and a tree protection plan created by a Certified Arborist to
[email protected] and refer to the planning project number or off-site project number.
6) All excavation, grading, or trenching within the dripline of a protected tree for the purpose of utility installation, constructing foundations, footings, sidewalks, curbs, gutters, or any other reason shall employ one of the following methods: Hydro-excavation, pneumatic excavation or hand digging and shall be directly supervised by a Certified Arborist. 7) There shall be no excavation deeper than the existing excavation for sidewalks within the dripline of protected trees.
8) There shall be no grade changes within the dripline of protected trees. All grade changes shall be accommodated onsite.
9) There shall be no soil compaction within the dripline of protected trees. 10)There shall be no non-native soil, non-organic matter or structural soil added to the right-of-way planter.
11)The following is a list of activities that require a tree permit if they are to occur or be used within the right-of-way planter and/or within the tree protection zone of protected trees: any regulated work as defined in SCC 12.56, including excavation, grade changes, trenching, root or canopy pruning, or boring.
12)The following is a list of activities that are prohibited within the right-of-way planter and/or tree protection zone of protected trees: pedestrian and equipment traffic that could compact the soil or physically damage roots, parking vehicles, equipment and/or port-a-potties, storing of soil, construction materials, petroleum products, water or building refuse, disposing of wash water, paint, cement, fuel or other potentially damaging liquids, and any other activities that may have negative impacts on the trees and soil. 13)All trees shall be watered regularly according to the recommendation of the Project Arborist.
14)The applicant shall be financially responsible for any damage to City trees associated with the project. Accidental or negligent actions that damage City trees may result in a penalty. The monetary value of any such damages will be appraised by the City Urban Forester or his authorized representative and shall be expressed as the monetary equivalent of all labor and materials required to bring the tree in question to a state of comparable utility with regards to its condition and function prior to the beginning of the project.

Sacramento Area Sewer District
D55. Before the ISSUANCE OF A BUILDING PERMIT: The owner must contact SacSewer Development Services at [email protected] or by phone at (916) 876-6100 to determine if SacSewer impact fees are due. Fees must be paid before the issuance of building permits.

Youth, Parks, and Community Enrichment
D56. Payment of In-lieu Park Fee: Pursuant to Sacramento City Code Chapter 17.512 (Parkland Dedication) the applicant shall pay to City an in-lieu park fee in the amount determined under SCC §§17.512.030 and 17.512.040 equal to the value of land prescribed for dedication under 17.512.020 and not satisfied by dedication. (See Advisory Note)
D57. Maintenance District: Unless already completed, the applicant shall initiate and complete the formation of a parks maintenance district (assessment or MelloRoos special tax district) or annex the project into an existing parks maintenance district. The applicant shall pay all city fees for formation of or annexation to a parks maintenance district. (Contact Infrastructure Finance, Brent Mueller, (916)808-5715, [email protected] ).

Advisory Comments:

Department of Utilities (DOU)
D58. The proposed project is located in a Zone X on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps (FIRMs). Accordingly, the project site lies in an area with no requirements to elevate or flood proof.

D59. Water meter boxes located in driveways shall be traffic rated per the requirements of the City Standard Specifications.

D60. Common private water systems shall have backflow devices installed at the point of service as follow; a single check valve shall be installed for residential subdivisions, common private sewer systems shall have manholes installed at the point of service, and common private drainage systems shall have manholes installed at the point of service.

D61. All groundwater discharges to the Combined or Separated Sewer and/or drainage systems must be regulated and monitored by the DOU (City Council Resolution #92-439). Groundwater discharges to the City's sewer system are defined as follows; 1) Construction dewatering discharges, 2) Treated or untreated contaminated groundwater cleanup discharges, 3) Uncontaminated groundwater discharges, and 4) Discharges associated with soil remediation projects.

D62. The applicant is responsible for obtaining all necessary permits, easements, and approvals from federal, state, and applicable local agencies (i.e., California Department of Transportation (Caltrans), Union Pacific Railroad (UPRR), etc.) for the construction of this project.

D63. On October 24, 2023, and November 14, 2023, City Council adopted Resolutions 2023-0338 and 2023-0368, respectively, to adjust the Water System, Sewer, and Combined Sewer Development Fees, as well as, establish the Storm Drainage Development Fee to align with updated Nexus Studies. These resolutions provide for an effective date for the new Utility Development Fees as of January 22, 2024.

D64. This development project is part of a larger development, Curtis Park Village.

Projects with submitted grading permit applications or subdivision improvement plan applications that have been accepted for processing by the City and have paid application fees prior to January 22, 2024, or grading permit applications or subdivision improvement plans approved prior to January 22, 2024, are not subject to the adjusted fee amounts for five years after January 22, 2024.

Police Department
D65. City of Sacramento permits must be obtained for private patrol, alarms, and camera systems.

Sacramento Area Sewer District
D66. The City of Sacramento (City) is responsible for providing local sewer service to the proposed project site via its local sanitary sewer collection system. SacSewer is responsible for conveying sewage from the City collection system to the EchoWater Resource Recovery Facility for treatment, resource recovery, and disposal.

Youth, Parks, and Community Enrichment
D67. As per City Code, the applicant will be responsible to meet his/her obligations regarding:
a. Title 17, 17.512 Park Dedication / In Lieu (Quimby) Fees, due prior to recordation of the final map. The Quimby fee due for this project is estimated at $79,515. This is based on the creation 31 housing units on ±2.34 vacant acres within SC-PUD zone, at a level of service ratio of 3.5 acres/1000 residents, with an average land value of $225,000 per acre for the Land Park Community Plan Area, plus an additional 20% for off-site park infrastructure improvements. The approval of P15-027, allowing for the creation of 199 single family and 131 multi-family residential units, required the dedication at a level of service of 5 acres/1000 residents resulting in 4.08 acres. The new residential map in the SC-PUD zone is not factored in with the previous dedication and is in addition to the previously approved units; therefore, new residential maps created after the dedication of the park lot, is calculated at the 3.5 acres/1000 residents level of service ratio. Any change in these factors will change the amount of the Quimby fee due. The final fee is calculated using factors at the time of finalizing conditions on the final map.

The Department of Public Works is the lead for resolving the conditions on the map, including the invoicing and payment of the in-lieu fee. b. Title 18, 18.56 Park Development Impact Fee, due at the time of issuance of building permit. The Park Development Impact Fee is estimated at $215,357.

The Park Development Impact Fee due for this project is based on the Remainder Zone Rate of $6,947 for units over 2,000 square feet. Any change in these factors will change the amount of the PIF due. The fee is calculated using factors at the time that the project is submitted for building permit. c. Community Facilities District 2002-02, Neighborhood Park Maintenance CFD Annexation.

RESOLUTION NO. 2025-
Adopted by the Sacramento City Council
September 9, 2025
Denying project entitlements related to the Multi Parcel site (2341 Omaha Beach Avenue) based on Findings of Fact for the Crocker Village Residential Development Project (P24-028) (APN: 013-0490-110-0000)
Background
A. On June 24, 2025, the City Planning and Design Commission conducted a public hearing on and denied project entitlements related to the Multi Parcel site for the Crocker Village Residential Project.

B. On September 9, 2025, the City Council conducted a public hearing, for which notice was given under Sacramento City Code Section 17.812.010(2)(b).

Based on the facts set forth in the Background, the City Council resolves as follows:

Section 1. Based on the verbal and documentary evidence received at the hearing on the Crocker Village Residential Project (Project), the City Council denies project entitlements related to the Multi Parcel site based on the findings of fact as set forth below.

Section 2. The City Council denies the Project entitlements related to the Multi Parcel site based on the following findings of fact:

A. Resolution Amending the Curtis Park Village Planned Unit Development Schematic Plan and Guidelines to permit single-unit dwelling development within the Multi-Family Housing designation (P24-028) is denied based on the following finding of fact:

1. The proposed amendment is inconsistent with several land use policies within the City of Sacramento 2040 General Plan, including LUP-2.4, LUP-4.1, LUP5.3, LUP-6.2, and LUP-6.6. Amending the Planned Unit Development to eliminate the planned provision of market-rate multi-family housing near transit diminishes the prospect of diverse housing opportunities and a mix of residential types within the neighborhood that would provide options for residents of all income levels and protect existing residents from displacement. Furthermore, a decreased, lower development intensity near transit would neither optimize public investments nor support an accessible, convenient transit network.

The proposed amendment is also inconsistent with supporting identified community issues/opportunities within the Greater Land Park Community Plan that seek to address housing type imbalance, housing cost, and promoting higher housing density near transit.

2. The proposed amendment to allow single unit dwellings instead of multi-unit dwellings on the Multi Parcel site does not promote the public health, safety, convenience, and welfare of the neighborhood, in that it does not capitalize on proximity to light rail with greater development intensity at a site that is specifically designated by the Planned Unit Development for higher intensity multi-family housing. An allowed decrease in development intensity at this location near transit does not support the City’s goals to reduce GHG emissions by encouraging walking, bicycling, and transit use.

B. Tentative Subdivision Map to subdivide the 2.37-acre Multi Parcel into 30 residential parcels and five common parcels is denied based on the following finding of fact:

1. The proposed map is inconsistent with the General Plan, the Curtis Park Village Planned Unit Development, and the Greater Land Park Community Plan. The Curtis Park Village PUD designates the site for Multi Family Housing development. The proposed subdivision map to accommodate single-unit development is therefore inconsistent with the PUD Schematic Plan designation.

General Plan land use policies (ie. LUP-2.4, LUP-4.1, LUP-5.3, LUP-6.2, and LUP-6.6) and specified community issues and opportunities within the Greater Land Park Community Plan (ie. Housing and Infill Development) support the existing PUD Multi Family housing designation and Guidelines in that they encourage a mix of housing types and greater housing intensity near transit.

2. The design and improvement of the proposed subdivision is inconsistent with the General Plan, the Curtis Park Village Planned Unit Development, and the Greater Land Park Community Plan. The Curtis Park Village PUD designates the site for Multi Family Housing development. The proposed design and improvement of the subdivision map to accommodate single-unit development is therefore inconsistent with the PUD Schematic Plan designation. General Plan land use policies (ie. LUP-2.4, LUP-4.1, LUP-5.3, LUP-6.2, and LUP-6.6) and specified community issues and opportunities within the Greater Land Park Community Plan (ie. Housing and Infill Development) support the existing PUD Multi Family housing designation and Guidelines in that they encourage a mix of housing types and greater housing intensity near transit.

C. Site Plan and Design Review of the proposed “Multi Parcel” Tentative Subdivision Map and to construct 30 single-unit dwellings on a ±2.37-acre parcel within the “Multi Parcel” site located in the Multi-Unit Dwelling (R-4A-PUD) Zone and Curtis Park Village Planned Unit Development is denied based on the following findings of fact:

1. The design, layout, and physical characteristics of the proposed development are inconsistent with the 2040 General Plan, the Curtis Park Village Planned Unit Development Schematic Plan and Guidelines, and the Greater Land Park Community Plan, in that single-unit development is inconsistent with the Curtis Park Village PUD Schematic Plan and 2040 General Plan goals and policies that support higher density housing near transit and a mix of housing types within neighborhoods. The proposal eliminates the long-planned provision of marketrate multi-family housing which was intended to support housing choice within the neighborhood and support the nearby transit infrastructure investments.

Attachment 3: Applicant Narrative and Proposed Resolution Amending the Curtis Park Village PUD Schematic Plan and Guidelines One of the core objectives of the Curtis Park Village Planned Unit Development (PUD) Guidelines is to ensure a variety of housing types. These range from:
- Front-loaded single-family homes with densities of approximately five (5) units per acre (primarily north of the park and detention basin), - Detached alley-loaded single-family homes at roughly seven (7) units per acre (located both north and south of the park),
- High-density alley-loaded single-family “court” homes of approximately fifteen (15) dwelling units per acre, and
- High-density multi-family housing.

Per a prior PUD Amendment promulgated in 2013 at the City’s request, a four-story 90-unit affordable high density multi-family housing facility planned for the Multi-Family Housing parcel was relocated to the Flex Zone (with underlying SC zoning) to reduce impacts on adjacent single-family homes. The original PUD Guidelines never required or anticipated two (2) large, multi-story, high-density structures on both the Flex Zone and the MultiFamily parcel simultaneously. This Amendment is intended to restore the PUD’s original vision while providing more dwelling units in the vicinity of the pedestrian bridge to the Sacramento City Light Rail Station than was ever originally envisioned for these PUD Guidelines.

By updating this 15-year-old PUD to reflect current conditions and rectify omissions from the 2013 Amendment, this amendment both reaffirms the PUD’s intent and yields a greater number of dwelling units near the pedestrian bridge, consistent with the City’s General Plan goals. This approach is superior to the prior concept, which requires a massive, multistory apartment building towering over existing single-family homes on three sides, creating a disproportionately large structure in a suburban context.

Specifically, the total number of units per the requested PUD Amendment will exceed the one hundred thirty-one (131) units called for in the original PUD Guidelines, as follows:
ninety (90) units in the Existing Flex Zone Parcel 1 (via the affordable senior multifamily housing facility), plus thirty-one (31) units approved by the City for the Existing Flex Zone Parcel 2, plus an additional thirty (30) units proposed per this PUD Amendment in the MultiFamily Housing parcel, for a for a total of one hundred fifty-one (151) units.

When combined with the existing seventy-seven (77) alley-loaded Court Homes, the result is two hundred sixty-eight (268) total dwelling units, equating to approximately thirty (30) dwelling units per acre on the approximate nine (9) acres nearest the pedestrian bridge to the Sacramento City College Light Rail Station.

This configuration far surpasses the prior requirement of a stand-alone multi-family parcel containing one hundred thirty (130) units and remains in keeping with the goals of the City’s General Plan. The higher-density Court Homes (i) better integrate with the existing suburban fabric than a single, potentially 100-foot tall, multi-story structure would, thereby preserving neighborhood character while still achieving robust density near transit and (ii) re-establishes the original intent of the PUD while exceeding its original number of dwelling units.

Proposed Amendment: Section 2.1(3) shall be deleted and replaced in its entirety with the following:

Section 2.1(3) Flex Zone Housing Area: The area along the western property line of Curtis Park Village south and west of the Court single-family home area and on the north edge of the commercial area Flex Zone that contains the affordable senior housing project shall be designed as follows:

Court Homes: Traditional Neighborhood High, R-4A PUD Zone A. Court home sites occur on smaller lots of approximately 37’ x 75’ (or otherwise achieve a density of approximately 15 du/ac) served by motor courts along the west side of Crocker Drive. The Court Homes should be integrated into the existing Curtis Park neighborhood fabric by means of architectural character, continuity, mass, scale, details and rhythm.

B. Design guidelines applicable to the Court housing sites are found in Appendix A: Curtis Park Village Single Family Design Home Guidelines. Project review for the Court Homes, an alternative ownership housing type, shall be in accordance with Sacramento City Code Sections

TSD ENGINEERING, INC
785 Orchard Dr, Suite 110
Folsom, CA 95630Phone: (916) 608-0707 Fax: (916) 608-0701 expect more. MULTI PARCEL 15 DU/AC 2.0 AC. (NET) 30 DU STREET B STREET A NS W E scale: 1"=200' EXISTING PUD PROPOSED PUD FLEX PARCEL 15 DU/AC 2.1 AC. (NET) 31 DU C4.0 APPLICATION FOR TENTATIVE SUBDIVISION MAP CROCKER VILLAGE 3 MULTI PARCEL & FLEX PARCEL PUD SCHEMATIC PLAN-AMENDMENT EXHIBIT CITY OF SACRAMENTO, CA & COURT LOTS & COURT LOTS PARK & DETENTION BASIN 6.6 AC. (NET) SINGLE-FAMILY HOUSING 7DU/AC 13.2 AC. (NET) 91 DU PARK & DETENTION BASIN 6.6 AC. (NET) SINGLE-FAMILY HOUSING 7DU/AC 13.2 AC. (NET) 91 DU N
S
E
W
scale: 1"=200'

INDEX OF DRAWINGS
OWNER
PDC CONSTRUCTION COMPANY INC. (MULTI PARCEL)
CROCKER VILLAGE 70A LLC. (FLEX PARCEL)
3680 CROCKER VILLAGE DRIVE, SUITE 160
SACRAMENTO, CA 95818
ATTN: PAUL PETROVICH
PHONE: (916) 834-4600
EMAIL: [email protected]

APPLICANT

PETROVICH DEVELOPMENT COMPANY, LLC
3680 CROCKER DRIVE, SUITE 160
SACRAMENTO, CA 95818
PHONE: (916) 834-4600
EMAIL:[email protected]

PLANNER/ENGINEER

TSD ENGINEERING, INC
785 ORCHARD DRIVE, SUITE 110
FOLSOM, CA 95630
ATTN: CHRIS SCHULZE
PHONE: (916) 608-0707 x 108
EMAIL: [email protected]

OWNER/APPLICANT/CONSULTANT

CONTACT INFORMATION
NORTH
N.T.S.

VICINITY MAP CURTIS PARK

WILLIAM LAND PARK
5 50
99 FLEX
PARCEL
MULTI
PARCEL
BENCHMARK NO 317-E2J:

PROJECT IS LOCATED WITHIN FLOOD ZONE DESIGNATED AS "X" PER THE FEDERAL EMERGENCY MANAGEMENT AGENCY FLOOD INSURANCE RATE MAP, MAP NO. 06067C0190H, DATED AUGUST 16, 2012.

FLOOD ZONE

CITY OF SACRAMENTO BENCHMARK
(NGVD29 ELEVATION=23.196)

RAMSET NAIL IN TRAFFIC SIGNAL/ STREET LIGHT BASE SW CORNER CROCKER DR AND 10TH AVE.

APPLICATION FOR TENTATIVE SUBDIVISION MAP
CROCKER VILLAGE 3

MULTI PARCEL & FLEX PARCEL

COVER SHEET

CITY OF SACRAMENTO, CA
MULTI PARCEL (P04-109 & P15-027)
1) TENTATIVE SUBDIVISION MAP
2) PUD SCHEMATIC PLAN AMENDMENT
3) SITE PLAN & DESIGN REVIEW
FLEX PARCEL (P04-109, P15-027, & P22-025)
1) TENTATIVE SUBDIVISION MAP
2) CONDITIONAL USE PERMIT
3) SITE PLAN & DESIGN REVIEW

LIST OF ENTITLEMENTS
CROCKER VILLAGE 3

MULTI PARCEL
APN: 013-0490-110
CROCKER VILLAGE 3

FLEX PARCEL
APN: 013-0010-046

CONTEXT SITE PLAN
CROCKER DRIVE SUTTERVILLE ROAD 10TH AVE OMAHA BEACH AVE VETERANS FIRST AVE BRONZE STAR WAY

GIOVANNI STREET

DONNER WAY
5TH AVE

REPRESENTATIVE PERSPECTIVE STREET VIEW - COURT HOMES REPRESENTATIVE PERSPECTIVE ALLEY VIEW - COURT HOMES REPRESENTATIVE PERSPECTIVE PASEO VIEW - COURT HOMES

CROCKER DRIVE

RONALD REAGAN WY
10TH AVE BRONZE STAR WAY
TSD ENGINEERING, INC.
785 Orchard Dr, Suite 110
Folsom, CA 95630
Phone: (916) 608-0707 Fax: (916) 608-0701
expect more.

C1.0

THE BASIS OF BEARINGS FOR THIS SURVEY IS IDENTICAL WITH THE SOUTHERLY BOUNDARY OF "CROCKER VILLAGE 1", FILED IN BOOK 415 OF MAPS, AT PAGE 3, SACRAMENTO COUNTY RECORDS, THE BEARING OF WHICH IS GIVEN AS S76°04'53"W.

BASIS OF BEARING
STOP

STOP COMPACT COMPACT COMPACT COMPACT COMPACT

CLEAN AIR

VANPOOL/EV

CLEAN AIR

VANPOOL/EV

T STOP STOP
TSD ENGINEERING, INC.
785 Orchard Dr, Suite 110
Folsom, CA 95630
Phone: (916) 608-0707 Fax: (916) 608-0701
expect more.

N
S
E
W
scale: 1"=40'

ALLEY G
LEGEND

DESCRIPTION EXISTING

STORM DRAIN LINE

STORM DRAIN MANHOLE

STORM DRAIN INLET

MULTI PARCEL
APN: 013-0490-110
PARCEL 201
FINAL MAP BK420 PG07

FLEX PARCEL
APN: 013-0010-046
PARCEL 2
PARCEL MAP BK222 PG0007
C2.0 10TH AVENUE (PUBLIC R/W) OMAHA BEACH AVE (PUBLIC R/W)

CROCKER DRIVE
(PUBLIC R/W)
RONALD REAGAN LN.
(PUBLIC R/W) VETERANS FIRST AVE (PUBLIC R/W)

BRONZE STAR WAY
(PUBLIC R/W)

GIONVANNI STREET
(PUBLIC R/W)

APPLICATION FOR TENTATIVE SUBDIVISION MAP
CROCKER VILLAGE 3

MULTI PARCEL & FLEX PARCEL

EXISTING CONDITIONS PLAN

CITY OF SACRAMENTO, CA

SEWER LINE

SEWER MANHOLE

WATER MAIN (PUBLIC )

FIRE HYDRANT (PUBLIC )

DOMESTIC WATER SERVICE
BENCHMARK NO 317-E2J:

PROJECT IS LOCATED WITHIN FLOOD ZONE DESIGNATED AS
"X" PER THE FEDERAL EMERGENCY MANAGEMENT AGENCY
FLOOD INSURANCE RATE MAP, MAP NO. 06067C0190H, DATED
AUGUST 16, 2012.

FLOOD ZONE

CITY OF SACRAMENTO BENCHMARK
(NGVD29 ELEVATION=23.196)

RAMSET NAIL IN TRAFFIC SIGNAL/ STREET LIGHT BASE SW
CORNER CROCKER DR AND 10TH AVE.

THE BASIS OF BEARINGS FOR THIS SURVEY IS IDENTICAL
WITH THE SOUTHERLY BOUNDARY OF "CROCKER VILLAGE
1", FILED IN BOOK 415 OF MAPS, AT PAGE 3, SACRAMENTO

COUNTY RECORDS, THE BEARING OF WHICH IS GIVEN AS
S76°04'53"W.

BASIS OF BEARING

STOP STOP

COMPACT COMPACT COMPACT COMPACT COMPACT CLEAN AIR VANPOOL/EV CLEAN AIR VANPOOL/EV T STOP
STOP S13°55'07"E 382.05'
S79°38'23"W 33.46' S76°03'38"W 234.58' N13°55'34"W 426.87' Δ=106°11'58" L=90.21' R=48.67' Δ=16°07'17" L=8.91' R=31.67' N76°04'53"E 193.60'
N76°03'38"E 277.25' S13°56'35"E 294.29'
S76°03'38"W 294.38' 80.06'

40.58' 70.04'35.00' 70.03'

41.50' 70.02'

41.50' 35.00' 35.59' 5.03' 10.00' 10.00' 75.00'

40.62' 65.00'

35.59' 35.00' 65.00'

41.50' 20.00' 65.00'

35.00'

41.50' 65.00' 20.00'

41.50' 35.00' 35.61' 10.00' 10.00' 5.00' 75.00' 65.00' 65.00' 65.00' 65.00'

41.50' 35.00' 35.61'

40.62' 65.00' 75.00'35.00' 41.50' 76.33' 76.33' 73.81' 121.81' L=68.38' R=48.67' L=21.84' R=48.67' L=8.91' R=31.50' 4.59'

41.50'

41.00'

41.00' 70.00' 20.00'

41.50' 69.99'

41.50' 35.00' 69.97'

35.00' 82.05'

33.46'

30.00' 10.00' 10.00' 5.00' 75.00'

35.00' 65.00' 65.00' 65.00'

41.50' 35.00'

35.00' 41.50' 30.00' 65.00' 65.00' 65.00' 75.00' 75.00'

30.00' 35.00' 41.50'

41.50' 35.00' 30.00' 10.00' 10.00' 5.00' 65.00' 65.00' 20.00' 65.00'

41.50' 35.00' 35.00' 76.33'

41.50' 35.00' 30.01' 5.16' 75.00' S13°55'07"E 382.05'
S79°38'23"W 33.46' S76°03'38"W 234.58' N13°55'34"W 426.87' Δ=106°11'58" L=90.21' R=48.67' Δ=16°07'17" L=8.91' R=31.67' N76°04'53"E 193.60' S88°59'27"E 5.16' N13°56'22"W 330.69' 67.00' 67.00' 67.00' 67.00' 67.00' 67.00' 67.00' 67.00' 61.50'

32.50' 35.00' 31.00' 35.00' 35.00' 31.00' 35.00' 46.88'

46.88' 35.00' 31.00' 35.00' 35.00' 31.00' 35.00' 32.50' 10.00'

15.50' 10.00'

29.00' 31.00' 37.50' 71.65' 71.65' 81.65'

44.50' 31.00' 37.50' 65.00' 65.00' 75.00'

37.50' 71.65' 65.00'

31.00' 30.24' 10.00'

15.50' 10.00'

28.99' 31.00' 37.50' 20.00' 76.15'

24.49' 86.15' 86.15'

40.64'

41.00' 79.00' 36.50' 31.00' 31.00'

79.00'

79.00' 64.37'

64.37'

64.37'

64.37'

64.37'

64.37'

64.37'

64.26' 75.86' 41.00' 34.29' 35.00'

78.80'

79.00'

79.00'

79.00'

31.00' 36.50' 31.00' 31.00' 34.29' 35.00' 31.00' 44.00' 20.01' 36.50' 31.00' 31.00' 34.29' 35.00' 31.00' 44.01'

13.00' N80°09'38"E 12.53'
N76°03'38"E 277.25' Δ=89°59'47" L=31.41' R=20.00' S13°56'35"E 294.29' Δ=90°00'13" L=24.35' R=15.50' S76°03'38"W 294.38' 76.33' 76.33' 21.97' L=9.03' R=204.50' L=15.12' R=204.50' L=29.00' R=245.50' L=24.15' R=204.50' L=29.00' R=245.50' 33.12' 0.11' TSD ENGINEERING, INC. 785 Orchard Dr, Suite 110
Folsom, CA 95630Phone: (916) 608-0707 Fax: (916) 608-0701 expect more. APPLICATION FOR TENTATIVE SUBDIVISION MAP CROCKER VILLAGE 3 MULTI PARCEL & FLEX PARCEL TENTATIVE SUBDIVISION MAP CITY OF SACRAMENTO, CA NS E W scale: 1"=40' NORTH N.T.S. VICINITY MAP

CURTIS PARK
WILLIAM LAND PARK 5 50 99 FLEX PARCEL MULTI PARCEL CROCKER DRIVE (PUBLIC R/W) 10TH AVENUE
(PUBLIC R/W) RONALD REAGAN LN. (PUBLIC R/W)

OMAHA BEACH AVE
(PUBLIC R/W)

VETERANS FIRST AVE
(PUBLIC R/W) STREET A - PRIVATE (LOT E)
ALLEY A (LOT G) MULTI PARCEL FLEX PARCEL *“ ”

ALLEY B (LOT I)

ALLEY D (LOT F)

ALLEY C (LOT H) STREET B PRIVATE

ALLEY E (LOT A) (LOT C)
ALLEY F (LOT D) ALLEY G (LOT B) PROJECT NOTES CROCKER VILLAGE 3 - MULTI PARCEL - COURT LOT APN:013-0490-110 EXISTING: PROPOSED: CROCKER VILLAGE PUD: MULTI FAMILY SINGLE FAMILY COTTAGE INFILL/ COURT LOT ZONING: R-4A-PUD R-4A-PUD GENERAL PLAN: TRADITIONAL TRADITIONAL NEIGHBORHOOD NEIGHBORHOOD HIGH DENSITY HIGH DENSITY CROCKER VILLAGE 3 - FLEX PARCEL - COURT LOT APN:013-0010-046 EXISTING: PROPOSED: CROCKER VILLAGE PUD: FLEX ZONE SINGLE FAMILY RESIDENTIAL COTTAGE INFILL (P22-025) COURT LOT ZONING: SC PUD SC PUD GENERAL PLAN: TRADITIONAL CENTER TRADITIONAL CENTER OWNER: CROCKER VILLAGE 70A LLC. (MULTI PARCEL) PDC CONSTRUCTION COMPANY INC. (FLEX PARCEL) PAUL PETROVICH 3680 CROCKER VILLAGE DRIVE, SUITE 160 SACRAMENTO, CA 95818 PHONE:(916) 834-4600 [email protected] APPLICANT: PETROVICH DEVELOPMENT COMPANY, LLC PAUL PETROVICH 3680 CROCKER DRIVE, SUITE 160 SACRAMENTO, CA 95818 PHONE:834-4600 [email protected] PREPARED BY: TSD ENGINEERING, INC. CHRIS SCHULZE 785 ORCHARD DRIVE, SUITE 110 FOLSOM, CA 95630 PHONE: (916) 608-0707 x 108 [email protected] FIRE DISTRICT: ELECTRICITY: CITY OF SACRAMENTO SMUD POLICE DISTRICT: GAS: City OF SACRAMENTO PGE SCHOOL DISTRICT: TELEPHONE: SACRAMENTO CITY UNIFIED SCHOOL DISTRICT AT&T PARK DISTRICT: CABLE CITY OF SACRAMENTO COMCAST WATER DISTRICT: CITY OF SACRAMENTO WATER FLOOD ZONE RESIDENTIAL SINGLE DWELLING - COURT LOT 35x65 LOT TYPICAL 31x65 LOT TYPICAL BRONZE STAR WAY (PUBLIC R/W) GIOVANNI STREET (PUBLIC R/W) C3.0 SIDE PASEO /PUBLIC STREET FRONTAGE REAR ALLEY/PRIVATE STREET FRONT ENGINEERS NOTE 11/19/2024 1. THIS IS AN APPLICATION FOR A ENTITLEMENT DEVELOPMENT PERMIT OF TENTATIVE SUBDIVISION MAP. 2. LOT DIMENSIONS AND ACREAGES ARE APPROXIMATE. ACTUAL LOT DIMENSIONS WILL BE ESTABLISHED WITH THE FINAL MAPS SUBJECT TO THE APPROVAL OF THE CITY OF SACRAMENTO. 3. PURSUANT TO GOVERNMENT CODE SECTION 66456.1, THE SUBDIVIDER MAY FILE MULTIPLE FINAL MAPS BASED UPON THIS TENTATIVE SUBDIVISION MAP. THE FILING OF A FINAL MAP ON A PORTION OF THIS TENTATIVE MAP SHALL NOT INVALIDATE ANY PART OF THIS TENTATIVE MAP. 4. LOT NUMBERING IS FOR IDENTIFICATION PURPOSES ONLY AND DOES NOT INDICATE PHASING OR ORDER OF DEVELOPMENT. ULTIMATE DEVELOPMENT PHASING SHALL BE ORDERLY AND WILL BE DETERMINED AT FINAL MAP AND/OR IMPROVEMENT PLAN STAGE. 5. EASEMENTS TO ACCOMMODATE NEW PUBLIC UTILITY IMPROVEMENTS, ACCESS REQUIRED FOR PARCEL DEVELOPMENT, OR OTHER SIMILAR MAPPING REQUIREMENTS NEEDED TO ACCOMPLISH THE FINAL DESIGN MAY BE ADDED PRIOR TO EACH FINAL MAP BASED ON THIS TENTATIVE PARCEL MAP. 6. HOME OWNER ASSOCIATION SHALL OWN AND MAINTAIN THE FOLLOWING: * PRIVATE STREETS * PRIVATE ALLEYS 7. HOME OWNER ASSOCIATION SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF COMMON LANDSCAPE AREAS AS SHOWN ON SHEET A0. 8. TENTATIVE SUBDIVISION MAP SPECIFICALLY IDENTIFIES AND REQUESTS THE APPROVAL TO ABANDON THE EMERGENCY VEHICLE ACCESS EASEMENT EVAE AS SHOWN ON LOT 201 OF THE CROCKER VILLAGE 2 FINAL SUBDIVISION MAP BOOK 420 PAGE 7. PRELIMINARY PROPOSED LOT AREA SCHEDULE PROJECT SUBDIVISION LOT SUMMARY SUBDIVISION MODIFICATION STREET & ALLEY TYPICAL SECTIONS PRIVATE STREET SECTIONS TO INCLUDE WIDTH, IMPROVEMENTS, AND PUE DEDICATIONS ARE DESIGNED PER CROCKER VILLAGE TENTATIVE MAP P15-027/ROD 020316 AND CONSISTENT WITH CROCKER VILLAGE 2 FINAL SUBDIVISION MAP; BK 420 PG 07 AND IMPROVEMENT PLANS; RPC17-0005. PRIVATE ALLEY SECTIONS TO INCLUDE WIDTH, IMPROVEMENTS, AND PUE DEDICATIONS ARE DESIGNED PER CROCKER VILLAGE TENTATIVE MAP P15-027/ROD 020316 AND CONSISTENT WITH CROCKER VILLAGE 2 FINAL SUBDIVISION MAP; BK 420 PG 07 AND IMPROVEMENT PLANS; RPC17-0005. LEGEND 1. RESIDENTIAL PRIVATE STREET STANDARDS (PLATE 15-2) TO BE MODIFIED WITH ATTACHED 4-FOOT SIDEWALK AND STREET RIGHT OF WAY OF 41-FOOT. REQUESTED MODIFICATION IS CONSISTENT WITH CROCKER VILLAGE TENTATIVE MAP P15-027/ROD 020316 AND CONSISTENT WITH CROCKER VILLA GE 2 FINAL SUBDIVISION MAP; BK 420 PG 07 AND IMPROVEMENT PLANS; RPC17-0005. MODIFICATION IS ALSO REQUESTED AS AN PROJECT IS INFILL AND REDUCED RIGHT OF WAY IS REQUESTED TO MEET RESIDENTIAL HOUSING DENSITY. 2. PRIVATE STREET A AND BRONZE STAR WAY 120 FOOT MINIMUM SEPARATION OF 120 FEET (CITY STD 15.7.4). VETERANS FIRST IS THE AVE IS THE THROUGH STREET. AS PROPOSED PRIVATE STREET AND BRONZE STAR WAY ARE OFFSET BY 114 FEET (CENTERLINE TO CENTERLINE). MODIFICATION IS REQUESTED AS BRONZE STAR WAY AND VETERANS FIRST AVENUE IS A STREET ELBOW. NUMBER OF LOTS: 61 TOTAL RESIDENTIAL LOTS SUBTOTAL 31'x65': 18 SUBTOTAL RESIDENTIAL LOTS SUBTOTAL 35'x65': 43 SUBTOTAL RESIDENTIAL LOTS 7 ALLEY LOTS 2 PRIVATE STREET LOTS 70 TOTAL LOTS TENTATIVE SUBDIVISION MAP NOTES DENSITY CALCULATIONS COURT LOTS HAVE BEEN DESIGNED FOR LOT SIZE, SETBACKS, ORIENTATION, AND COVERAGE CONSISTENT WITH THE CROCKER VILLAGE TENTATIVE MAP P15-027/ROD 020316 AND APPENDIX A - DESIGN GUIDELINES.

SIDE PASEO /PUBLIC STREET FRONTAGE REAR
SIDE

SIDE ALLEY/PRIVATE STREET FRONT

TSD ENGINEERING, INC
785 Orchard Dr, Suite 110
Folsom, CA 95630Phone: (916) 608-0707 Fax: (916) 608-0701 expect more. MULTI PARCEL 15 DU/AC 2.0 AC. (NET) 30 DU STREET B STREET A NS W E scale: 1"=200' EXISTING PUD PROPOSED PUD FLEX PARCEL 15 DU/AC 2.1 AC. (NET) 31 DU C4.0 APPLICATION FOR TENTATIVE SUBDIVISION MAP CROCKER VILLAGE 3 MULTI PARCEL & FLEX PARCEL PUD SCHEMATIC PLAN-AMENDMENT EXHIBIT CITY OF SACRAMENTO, CA & COURT LOTS & COURT LOTS PARK & DETENTION BASIN 6.6 AC. (NET) SINGLE-FAMILY HOUSING 7DU/AC 13.2 AC. (NET) 91 DU PARK & DETENTION BASIN 6.6 AC. (NET) SINGLE-FAMILY HOUSING 7DU/AC 13.2 AC. (NET) 91 DU ALLEY
ALLEY
PLAN 1
INLINE
PLAN 4
CORNER
PLAN 3
CORNER
PLAN 1
INLINE
PLAN 3
CORNER
PLAN 2
CORNER
S13°55'07"E 382.05'
S79°38'23"W 33.46' S76°03'38"W 234.58'
N13°55'34"W 426.87'
Δ=106°11'58"
L=90.21'
R=48.67'
Δ=16°07'17"
L=8.91'
R=31.67' N76°04'53"E 193.60' S79°38'23"W 33.46' N76°03'38"E 277.25' S13°56'35"E 294.29' S76°03'38"W 294.38'
CONCEPT PASEO PLAN LOT FIT PLAN SCHEDULE - PLAN 1 / PLAN 2 / PLAN 3 / PLAN 4 OMAHA BEACH AVE (PUBLIC R/W) VETERANS FIRST AVE (PUBLIC R/W)

STREET A - PRIVATE
(LOT E) ALLEY A (LOT G)

MULTI PARCELALLEY B (LOT I) ALLEY D (LOT F) ALLEY C (LOT H)

CROCKER DRIVE
(PUBLIC R/W) 10TH AVENUE (PUBLIC R/W)

STREET B

PRIVATE ALLEY E (LOT A)
(LOT C) ALLEY F (LOT D)

ALLEY G (LOT B) VETERANS FIRST AVE (PUBLIC R/W)
LOT FIT - 21'x65'
HOUSE PLAN 1, ONLY.

LOT FIT - 25'x65'
HOUSE PLAN 1, 2, 3, OR 4

FLEXPARCEL
TSD ENGINEERING, INC.
785 Orchard Dr, Suite 110
Folsom, CA 95630
Phone: (916) 608-0707 Fax: (916) 608-0701
expect more.

A0
SCHEDULE NOTES:

1. HOUSE PLAN 1 CAN FIT ON ALL PROPOSED LOTS.

2. SCHEDULE IS FOR HOUSE PLAN DISTRIBUTION AND

ACTUAL COLOR AND HOUSE STYLE SHALL BE PERFECTED
AT TIME OF BUILDING PERMIT. THE DESIGN INTENT

SHALL PROVIDE A MIX OF HOUSE STYLE AND COLOR

PROVIDING A NON-REPETITIVE DISTRIBUTION OF
HOUSES. PRIVATE STREET PRIVATE STREET
LEGEND

LANDSCAPE AREA OWNED AND MAINTAINED BY HOA

LANDSCAPE AREA OWNED AND MAINTAINED

BY LOT OWNER

PRIVATE PATIO AREA OWNED AND MAINTAINED

BY LOT OWNER

A2

A8 35"x65'

A14 35"x65'

A19 35"x65'

From: Ralph Propper
To: Daniel Abbes
Cc: Alexandra Reagan; Susan Herre; Rachel Iskow; Bruce Pierini; agrosen8; Hal Thomas; Creswell Cathy; Jonathan Cook; Connor Finney; [email protected]
Subject: Project File No. P24-028; Crocker Village Residential Development request Date: Friday, November 1, 2024 3:01:22 PM
Danny Abbes,
The Environmental Council of Sacramento (ECOS) opposes the request by Crocker Village Residential Development to construct 61 housing units on ±4.86 vacant acres within the R-4A-PUD and SC-PUD zones and Curtis Park Village Planned Unit Development (PUD), located at 2325 10th Avenue.

This acreage has a Multi-Family Housing designation, which is appropriate considering its proximity to Sacramento Regional Transit’s light rail station at City College. SACOG supported funding for the bike/pedestrian bridge from this development to the light rail station based on the understanding that this would be a transit-oriented development.

ECOS is opposed to a PUD Schematic Plan Amendment to develop single-unit dwellings instead.

We have two crises that must be addressed: our severe shortage of affordable housing, and climate change. In Sacramento, the largest source of greenhouse gas emissions is from cars. Multi-Family Housing near a light-rail station addresses both these crises, and therefore this designation must be preserved.

Ralph Propper, Chair, ECOS Climate Change Committee
PO Box 1708| Sacramento CA 95812-1708
Phone: 916.455.4900
SHA
Board of Directors
Cathy Creswell
President
Jennifer Fleming
Vice President
Valerie Feldman
Secretary
Rachel Smith
Treasurer
Nur Kausar
At Large
LaShawnda Barker
At Large
Stephan Daues
Stephan Daues Consulting
Tamie A. Dramer
Organize Sacramento
Gabriela Herrera
SACOG
Richard Ciraulo
Mercy Housing
Nicole Restmeyer
At Large
April Ludwig
At Large
Gianna Marasovich
At Large
November 1, 2024
Daniel Abbes
City of Sacramento
Project Planner
300 Richards Blvd.

Sacramento, CA 95811
RE: Crocker Village Schematic Plan Amendment and Conditional Use Permit
Dear Mr. Abbes,
The Sacramento Housing Alliance is writing to oppose the requested schematic plan amendment to allow single family homes on a site zoned for multi-family high density development in Crocker Village and a conditional use permit to allow single family homes on a site SC zoned site in Crocker Village.

For over 35 years the Sacramento Housing Alliance has advocated for the development of safe, accessible, and affordable homes for low-income individuals and families, and those who are experiencing homelessness.

We also advocate for land use policies that advance meeting the community’s affordable housing needs as identified in their housing elements.

The proposal violates the obligation to act consistently with the City’s duty to affirmatively further fair housing, it undermines the City’s Housing Element program to increase the number of multi-family sites in high resource areas and is inconsistent with the commitment the City made to obtain its Prohousing Designation.
1 Crocker Village is in a high resource area, indicated by its proximity to multiple high performing schools, some of the City’s best amenities, and thriving commercial districts.

The development of one of the few Crocker Village sites identified for multi-family housing is more crucial now than ever before because of the City’s growing need for affordable housing. This is increasingly possible, as the City has more developers with expertise and experience in developing affordable homes than at any previous time. This area is primed to compete for affordable housing funding sources because of its proximity to transit, commercial amenities, and high performing schools.

Affirmatively Furthering Fair Housing
Affirmatively furthering fair housing (AFFH) means removing barriers to desegregation, addressing barriers that limit access to opportunity and housing choice, and limit investment in lower resource areas. The California Government Code section 8899.50(b) requires all public agencies, including local cities, to act consistently with their duty to affirmatively further fair housing in all of their housing and community development activities, including approving discretionary land use actions such as reviewing conditional use permit requests to allow single family homes where multi- unit dwellings are currently the only residential use permitted by right (City Code 17.216.510).

The law not only requires the City of Sacramento to affirmatively take steps to decrease segregation, but also to act consistently with its duty when engaged in all housing and land use activities. Taking action to decrease housing opportunities for lower income households in a high resource area is inconsistent with the City’s duty to affirmatively further fair housing.
2 Housing Element Program H12: Rezone Additional Affordable Housing Sites in High Resource Areas
In order to meet the requirements of Housing Element law, the City included Program H12 in its most recent Housing Element revision. The Program requires the City to identify additional sites where high density housing can be developed in high resource areas. This commitment is a result of the City’s recognition that additional multi-family sites are needed in high resource areas to fulfill specific AFFH requirements included in Housing Element law, in addition to the broad requirements contained in Government Code section 8899.50. If the City reduces the density required on an existing multi-family site in a high resource area, it adds to the number of sites the City will have to find and rezone in other high resource areas in order to remain compliant with its Housing Element obligations. Reducing higher density multifamily sites in the Crocker Village area also significantly reduces opportunities for lower income families and BIPOC individuals and families to live in a thriving high opportunity area.

As the planning department can attest, finding additional vacant parcels to zone for high density residential uses is an enormous undertaking, and one that is not just fueled by effort, the City cannot just create vacant parcels in high resource areas. There is a limited supply of vacant land within the City. Reducing the density on the site identified in the planning application will potentially prevent the City from complying with its housing element to rezone more sites in higher resource areas.1 1 The existing affordable development in Crocker Village is a terrific example of the City’s previous inclusionary zoning ordinance and a result of prior Housing Element programs, that focused on construction of affordable housing rather than collecting fees. 3 Prohousing Designation
The Sacramento Housing Alliance shares the pride the City feels regarding being the first city in California to achieve the Prohousing Designation. However, this designation is not deserved if a city decreases the number of sites to accommodate high density housing instead of increasing that crucial supply. The City only permits multi-unit dwellings in the SC zone as one crucial method to increase the potential for multifamily housing in the City. Allowing single family development on this site is inconsistent with the City’s Prohousing Designation.

We appreciate the City considering our comments as they prepare to review this planning application and are happy to answer any questions about our concerns.

In community,
Jonathan Cook
Executive Director
Cathy Creswell
Board President
4 777 12th Street, Ste. 300 • Sacramento, CA 95814
Tel: 279-207-1122 • Toll Free: 800-880-9025
AirQuality.org
November 1, 2024
Danny Abbes, Associate Planner
City of Sacramento Community Development Department
300 Richards Boulevard, 3rd Floor, Sacramento, CA 95811

Subject: Crocker Village Residential Development (P24-028) Dear Danny Abbes:

Thank you for providing the Sacramento Metropolitan Air Quality Management District (Sac Metro Air District) with the opportunity to review the Crocker Village Residential Development project, a request to construct 61 housing units on ±4.86 vacant acres within the Curtis Park Village Planned Unit Development (PUD) area. We offer the comments below to benefit air quality and public health, and to reduce greenhouse gases.

Curtis Park Village CEQA Mitigation
Because this project is within the Curtis Park Village PUD area, it is subject to the Air Quality Management Plan (AQMP) and Mitigation and Monitoring Plan (MMP) that resulted from the California Environmental Quality Act (CEQA) review for the Curtis Park Village PUD. The AQMP includes measures to mitigate emissions of pollutants regulated by the Clean Air Act (“criteria pollutants”) resulting from project operations (“operational emissions”). The MMP includes measures from the AQMP and measures to mitigate criteria pollutant emissions resulting from project construction, among other measures. Following are comments on the project’s consistency with the AQMP Measure 18 on residential density.

Residential Density
AQMP Measure 18 calls for a residential density of at least 11 dwelling units per net acre for the entire Curtis Park Village project, and provides 3.5 mitigation credit points for this. The originally approved PUD provided for 470 dwelling units, as discussed in AQMP Measure 18 text. Given the portion of land that is allocated to park space and a detention basin for the overall Curtis Park Village PUD area (park space is called for in AQMP Measure 23), the project site may be the last area available for residential development. Based on the currently proposed project’s density, the overall Curtis Park Village development will not reach the 470 dwelling unit provision or a residential density of 11 dwelling units per acre.

If Curtis Park Village overall provides less than the 11 dwelling units per acre, mitigation credit awarded to the Curtis Park Village project overall could be reduced by approximately 1.28 points, pursuant to Sac Metro Air District Recommended Guidance for Land Use Emission Reductions v2.4 (Guidance v2.4). 15% Air Quality Mitigation
To be consistent with the City General Plan at the time of Curtis Park Village’s approval, in addition to the current City General Plan (see Policy ERC-4.7 in the current 2040 General Plan and Policy ER 6.1.3 in