3.6 Architectural Coating - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.1516 0.0754 1.3422 4.4500e0030.6610 2.0900e0030.6631 0.1758 1.9300e0030.1777 0.0000 441.7714 441.7714 7.9600e0039.8500e003444.9070 Total 0.1516 0.0754 1.3422 4.4500e0030.6610 2.0900e0030.6631 0.1758 1.9300e0030.1777 0.0000 441.7714 441.7714 7.9600e0039.8500e003444.9070 Mitigated Construction Off-Site
3.6 Architectural Coating - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Archit. Coating 1.6342 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 6.1500e0030.0403 0.0845 1.4000e0049.5000e0049.5000e0049.5000e0049.5000e0040.0000 12.0003 12.0003 4.9000e0040.0000 12.0124 Total 1.6404 0.0403 0.0845 1.4000e0049.5000e0049.5000e0049.5000e0049.5000e0040.0000 12.0003 12.0003 4.9000e0040.0000 12.0124 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 54 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0516 0.0259 0.4688 1.5700e0030.2371 7.1000e0040.2379 0.0631 6.5000e0040.0637 0.0000 156.5807 156.5807 2.6800e0033.4600e003157.6792 Total 0.0516 0.0259 0.4688 1.5700e0030.2371 7.1000e0040.2379 0.0631 6.5000e0040.0637 0.0000 156.5807 156.5807 2.6800e0033.4600e003157.6792 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Archit. Coating 1.6342 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 1.4000e0036.0500e0030.0861 1.4000e0041.9000e0041.9000e0041.9000e0041.9000e0040.0000 12.0003 12.0003 4.9000e0040.0000 12.0124 Total 1.6356 6.0500e0030.0861 1.4000e0041.9000e0041.9000e0041.9000e0041.9000e0040.0000 12.0003 12.0003 4.9000e0040.0000 12.0124 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 55 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0516 0.0259 0.4688 1.5700e0030.2371 7.1000e0040.2379 0.0631 6.5000e0040.0637 0.0000 156.5807 156.5807 2.6800e0033.4600e003157.6792 Total 0.0516 0.0259 0.4688 1.5700e0030.2371 7.1000e0040.2379 0.0631 6.5000e0040.0637 0.0000 156.5807 156.5807 2.6800e0033.4600e003157.6792 Mitigated Construction Off-Site
4.0 Operational Detail - Mobile
4.1 Mitigation Measures Mobile
CalEEMod Version: CalEEMod.2020.4.0 Page 56 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 4.5910 4.0495 32.2909 0.0502 6.2289 0.0364 6.2653 1.6640 0.0339 1.6979 0.0000 4,983.701 3 4,983.701
3 0.4610 0.3149 5,089.075
8 Unmitigated 4.5910 4.0495 32.2909 0.0502 6.2289 0.0364 6.2653 1.6640 0.0339 1.6979 0.0000 4,983.701 3 4,983.701
3 0.4610 0.3149 5,089.075
8 4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Convenience Market with Gas Pumps 2,031.00 2,031.00 2031.00 1,305,797 1,305,797 Fast Food Restaurant with Drive Thru 3,487.96 3,487.96 3487.96 2,271,855 2,271,855 Hotel 878.40 878.40 878.40 662,880 662,880
Industrial Park 12,822.04 12,822.04 12822.04 12,588,435 12,588,435 Parking Lot 0.00 0.00 0.00
Total 19,219.40 19,219.40 19,219.40 16,828,967 16,828,967 Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Convenience Market with Gas
Pumps
3.31 1.66 2.15 0.80 80.20 19.00 100 0 0
Fast Food Restaurant with Drive
Thru
3.31 1.66 2.15 2.20 78.80 19.00 100 0 0
Hotel 3.31 1.66 2.15 19.40 61.60 19.00 100 0 0
Industrial Park 3.31 1.66 2.15 59.00 28.00 13.00 100 0 0 Parking Lot 10.00 5.00 6.50 0.00 0.00 0.00 0 0 0
4.4 Fleet Mix
CalEEMod Version: CalEEMod.2020.4.0 Page 57 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Convenience Market with Gas
Pumps
0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428 Fast Food Restaurant with Drive
Thru
0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428 Hotel 0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428 Industrial Park 0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428 Parking Lot 0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428
5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Electricity
Mitigated
0.0000 0.0000 0.0000 0.0000 0.0000 15,238.47
04 15,238.47
04 1.4047 0.1703 15,324.33
00 Electricity
Unmitigated
0.0000 0.0000 0.0000 0.0000 0.0000 15,238.47
04 15,238.47
04 1.4047 0.1703 15,324.33
00 NaturalGas
Mitigated
0.4939 4.4900 3.7716 0.0269 0.3412 0.3412 0.3412 0.3412 0.0000 4,887.952 2 4,887.952
2 0.0937 0.0896 4,916.998
8 NaturalGas
Unmitigated
0.4939 4.4900 3.7716 0.0269 0.3412 0.3412 0.3412 0.3412 0.0000 4,887.952 2 4,887.952
2 0.0937 0.0896 4,916.998
8 5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2020.4.0 Page 58 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Convenience
Market with Gas
Pumps
43497 2.3000e0042.1300e0031.7900e0031.0000e0051.6000e0041.6000e0041.6000e0041.6000e0040.0000 2.3212 2.3212 4.0000e0054.0000e0052.3350 Fast Food
Restaurant with
Drive Thru
2.95774e
+006
0.0160 0.1450 0.1218 8.7000e0040.0110 0.0110 0.0110 0.0110 0.0000 157.8361 157.8361 3.0300e0032.8900e003158.7741 Hotel 2.80682e
+006
0.0151 0.1376 0.1156 8.3000e0040.0105 0.0105 0.0105 0.0105 0.0000 149.7824 149.7824 2.8700e0032.7500e003150.6725 Industrial Park 8.57887e
+007
0.4626 4.2053 3.5325 0.0252 0.3196 0.3196 0.3196 0.3196 0.0000 4,578.012 5 4,578.012
5 0.0878 0.0839 4,605.217
3 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.4939 4.4900 3.7716 0.0269 0.3413 0.3413 0.3413 0.3413 0.0000 4,887.952 2 4,887.952
2 0.0937 0.0896 4,916.998
8 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 59 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr tons/yr MT/yr
Convenience
Market with Gas
Pumps
43497 2.3000e0042.1300e0031.7900e0031.0000e0051.6000e0041.6000e0041.6000e0041.6000e0040.0000 2.3212 2.3212 4.0000e0054.0000e0052.3350 Fast Food
Restaurant with
Drive Thru
2.95774e
+006
0.0160 0.1450 0.1218 8.7000e0040.0110 0.0110 0.0110 0.0110 0.0000 157.8361 157.8361 3.0300e0032.8900e003158.7741 Hotel 2.80682e
+006
0.0151 0.1376 0.1156 8.3000e0040.0105 0.0105 0.0105 0.0105 0.0000 149.7824 149.7824 2.8700e0032.7500e003150.6725 Industrial Park 8.57887e
+007
0.4626 4.2053 3.5325 0.0252 0.3196 0.3196 0.3196 0.3196 0.0000 4,578.012 5 4,578.012
5 0.0878 0.0839 4,605.217
3 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.4939 4.4900 3.7716 0.0269 0.3413 0.3413 0.3413 0.3413 0.0000 4,887.952 2 4,887.952
2 0.0937 0.0896 4,916.998
8 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 60 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
Convenience
Market with Gas
Pumps
90882 14.7572 1.3600e0031.6000e00414.8403
Fast Food
Restaurant with
Drive Thru
680859 110.5558 0.0102 1.2400e003111.1788
Hotel 691428 112.2720 0.0104 1.2500e003112.9046
Industrial Park 9.18693e
+007
14,917.45
61 1.3752 0.1667 15,001.50
70 Parking Lot 513800 83.4293 7.6900e0039.3000e00483.8994 Total 15,238.47
04 1.4047 0.1703 15,324.33
00 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 61 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.1 Mitigation Measures Area
6.0 Area Detail
5.3 Energy by Land Use - Electricity
Electricity
Use
Total CO2 CH4 N2O CO2e
Land Use kWh/yr MT/yr
Convenience
Market with Gas
Pumps
90882 14.7572 1.3600e0031.6000e00414.8403
Fast Food
Restaurant with
Drive Thru
680859 110.5558 0.0102 1.2400e003111.1788
Hotel 691428 112.2720 0.0104 1.2500e003112.9046
Industrial Park 9.18693e
+007
14,917.45
61 1.3752 0.1667 15,001.50
70 Parking Lot 513800 83.4293 7.6900e0039.3000e00483.8994 Total 15,238.47
04 1.4047 0.1703 15,324.33
00 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 62 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category tons/yr MT/yr
Mitigated 29.4325 1.1900e0030.1326 1.0000e0054.7000e0044.7000e0044.7000e0044.7000e0040.0000 0.2590 0.2590 6.7000e0040.0000 0.2758 Unmitigated 29.4325 1.1900e0030.1326 1.0000e0054.7000e0044.7000e0044.7000e0044.7000e0040.0000 0.2590 0.2590 6.7000e0040.0000 0.2758
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating
3.1293 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer
Products
26.2910 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.0121 1.1900e0030.1326 1.0000e0054.7000e0044.7000e0044.7000e0044.7000e0040.0000 0.2590 0.2590 6.7000e0040.0000 0.2758 Total 29.4325 1.1900e0030.1326 1.0000e0054.7000e0044.7000e0044.7000e0044.7000e0040.0000 0.2590 0.2590 6.7000e0040.0000 0.2758 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 63 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Apply Water Conservation Strategy
7.1 Mitigation Measures Water
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory tons/yr MT/yr
Architectural
Coating
3.1293 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer
Products
26.2910 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 0.0121 1.1900e0030.1326 1.0000e0054.7000e0044.7000e0044.7000e0044.7000e0040.0000 0.2590 0.2590 6.7000e0040.0000 0.2758 Total 29.4325 1.1900e0030.1326 1.0000e0054.7000e0044.7000e0044.7000e0044.7000e0040.0000 0.2590 0.2590 6.7000e0040.0000 0.2758 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 64 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Total CO2 CH4 N2O CO2e
Category MT/yr
Mitigated 1,787.416
0 1.9861 1.1963 2,193.563
2 Unmitigated 1,787.506
5 1.9861 1.1963 2,193.654
1 7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
Convenience
Market with Gas
Pumps
0.209144 /
0.128185
0.3161 2.8000e0041.6000e0040.3717
Fast Food
Restaurant with
Drive Thru
5.06901 /
0.323554
6.0784 6.5700e0033.9500e0037.4191
Hotel 3.09475 /
0.343861
3.7942 4.0200e0032.4100e0034.6132
Industrial Park 1528.4 / 0 1,777.317
8 1.9752 1.1898 2,181.250
1 Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000
Total 1,787.506
4 1.9861 1.1963 2,193.654
1 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 65 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
7.2 Water by Land Use
Indoor/Out
door Use
Total CO2 CH4 N2O CO2e
Land Use Mgal MT/yr
Convenience
Market with Gas
Pumps
0.209144 /
0.102548
0.3015 2.8000e0041.6000e0040.3571
Fast Food
Restaurant with
Drive Thru
5.06901 /
0.258843
6.0417 6.5600e0033.9500e0037.3822
Hotel 3.09475 /
0.275089
3.7551 4.0100e0032.4100e0034.5739
Industrial Park 1528.4 / 0 1,777.317
8 1.9752 1.1898 2,181.250
1 Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000
Total 1,787.416
0 1.9861 1.1963 2,193.563
2 Mitigated
8.1 Mitigation Measures Waste
8.0 Waste Detail
CalEEMod Version: CalEEMod.2020.4.0 Page 66 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Total CO2 CH4 N2O CO2e
MT/yr
Mitigated 1,716.227
7 101.4262 0.0000 4,251.881
5 Unmitigated 1,716.227
7 101.4262 0.0000 4,251.881
5 Category/Year
8.2 Waste by Land Use
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
Fast Food
Restaurant with
Drive Thru
192.37 39.0494 2.3078 0.0000 96.7432
Hotel 66.8 13.5598 0.8014 0.0000 33.5938
Industrial Park 8195.53 1,663.618
5 98.3170 0.0000 4,121.544
5 Parking Lot 0 0.0000 0.0000 0.0000 0.0000
Total 1,716.227
7 101.4262 0.0000 4,251.881
5 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 67 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
8.2 Waste by Land Use
Waste
Disposed
Total CO2 CH4 N2O CO2e
Land Use tons MT/yr
Fast Food
Restaurant with
Drive Thru
192.37 39.0494 2.3078 0.0000 96.7432
Hotel 66.8 13.5598 0.8014 0.0000 33.5938
Industrial Park 8195.53 1,663.618
5 98.3170 0.0000 4,121.544
5 Parking Lot 0 0.0000 0.0000 0.0000 0.0000
Total 1,716.227
7 101.4262 0.0000 4,251.881
5 Mitigated
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type Forklifts 121 12.00 300 89 0.20 Diesel
CalEEMod Version: CalEEMod.2020.4.0 Page 68 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
11.0 Vegetation
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Equipment Type tons/yr MT/yr
Forklifts 2.4188 13.2905 32.4699 0.0513 0.1795 0.1795 0.1795 0.1795 0.0000 4,406.403 4 4,406.403
4 0.1938 0.0000 4,411.249
4 Total 2.4188 13.2905 32.4699 0.0513 0.1795 0.1795 0.1795 0.1795 0.0000 4,406.403 4 4,406.403
4 0.1938 0.0000 4,411.249
4 UnMitigated/Mitigated
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2020.4.0 Page 69 of 69 Date: 2/15/2024 8:23 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Annual EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation Sacramento Metropolitan AQMD Air District, Summer
Project Characteristics -
Land Use - Square footage and lot acreages adjusted per site plan.
Construction Phase - Phase timing adjusted per applicant-provided questionnaire.
Grading - Based on applicant provided AQ questionnaire.
Vehicle Trips - Based on project-specific information provided by DKS.
Water Mitigation - Compliant with MWELO.
Operational Off-Road Equipment - Based on applicant provided AQ questionnaire.
Construction Off-road Equipment Mitigation - Required with implementation of MM 4.3-1 of EIR.
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Industrial Park 6,609.30 1000sqft 318.60 6,609,300.00 0 Parking Lot 3,670.00 Space 33.03 1,468,000.00 0
Fast Food Restaurant with Drive Thru 16.70 1000sqft 6.40 16,700.00 0 Hotel 122.00 Room 4.00 73,400.00 0
Convenience Market with Gas Pumps 20.00 Pump 3.00 8,100.00 0
1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
6 Wind Speed (m/s) 3.5 Precipitation Freq (Days) 58
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company Sacramento Municipal Utility District
Operational Year 2033
CO2 Intensity
(lb/MWhr)
357.98 CH4 Intensity 0.033
(lb/MWhr)
N2O Intensity 0.004
(lb/MWhr)
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Table Name Column Name Default Value New Value
tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstructionPhase NumDays 440.00 1,800.00
CalEEMod Version: CalEEMod.2020.4.0 Page 2 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied tblConstructionPhase NumDays 6,200.00 1,800.00
tblConstructionPhase NumDays 620.00 540.00
tblConstructionPhase NumDays 440.00 90.00
tblConstructionPhase NumDays 240.00 90.00
tblGrading MaterialImported 0.00 304,000.00
tblLandUse LandUseSquareFeet 177,144.00 73,400.00
tblLandUse LandUseSquareFeet 2,823.50 8,100.00
tblLandUse LotAcreage 151.73 318.60
tblLandUse LotAcreage 0.38 6.40
tblLandUse LotAcreage 4.07 4.00
tblLandUse LotAcreage 0.06 3.00
tblOperationalOffRoadEquipment OperDaysPerYear 260.00 300.00 tblOperationalOffRoadEquipment OperHoursPerDay 8.00 12.00 tblOperationalOffRoadEquipment OperOffRoadEquipmentNumber 0.00 121.00 tblVehicleTrips CC_TL 5.00 1.66
tblVehicleTrips CC_TL 5.00 1.66
tblVehicleTrips CC_TL 5.00 1.66
tblVehicleTrips CC_TL 5.00 1.66
tblVehicleTrips CNW_TL 6.50 2.15
tblVehicleTrips CNW_TL 6.50 2.15
tblVehicleTrips CNW_TL 6.50 2.15
tblVehicleTrips CNW_TL 6.50 2.15
tblVehicleTrips CW_TL 10.00 3.31
tblVehicleTrips CW_TL 10.00 3.31
tblVehicleTrips CW_TL 10.00 3.31
tblVehicleTrips CW_TL 10.00 3.31
tblVehicleTrips DV_TP 21.00 0.00
tblVehicleTrips DV_TP 21.00 0.00
tblVehicleTrips DV_TP 38.00 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 3 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.0 Emissions Summary
tblVehicleTrips DV_TP 19.00 0.00
tblVehicleTrips PB_TP 65.00 0.00
tblVehicleTrips PB_TP 50.00 0.00
tblVehicleTrips PB_TP 4.00 0.00
tblVehicleTrips PB_TP 2.00 0.00
tblVehicleTrips PR_TP 14.00 100.00
tblVehicleTrips PR_TP 29.00 100.00
tblVehicleTrips PR_TP 58.00 100.00
tblVehicleTrips PR_TP 79.00 100.00
tblVehicleTrips ST_TR 322.50 101.55
tblVehicleTrips ST_TR 616.12 208.86
tblVehicleTrips ST_TR 8.19 7.20
tblVehicleTrips ST_TR 2.54 1.94
tblVehicleTrips SU_TR 322.50 101.55
tblVehicleTrips SU_TR 472.58 208.86
tblVehicleTrips SU_TR 5.95 7.20
tblVehicleTrips SU_TR 1.24 1.94
tblVehicleTrips WD_TR 322.50 101.55
tblVehicleTrips WD_TR 470.95 208.86
tblVehicleTrips WD_TR 8.36 7.20
tblVehicleTrips WD_TR 3.37 1.94
CalEEMod Version: CalEEMod.2020.4.0 Page 4 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2023 2.7201 27.5533 18.7349 0.0393 19.7939 1.2667 21.0607 10.1388 1.1654 11.3042 0.0000 3,815.413 9 3,815.413
9 1.1961 3.1500e0033,846.253
1 2024 3.4677 42.7160 30.4696 0.1067 19.7939 1.4167 21.0240 10.1388 1.3063 11.2704 0.0000 10,874.09 47 10,874.09
47 2.1351 0.7526 11,151.73
76 2025 3.1428 38.0013 29.0525 0.1057 10.6987 1.2106 11.9093 4.0476 1.1167 5.1642 0.0000 10,770.17 65 10,770.17
65 2.1313 0.7367 11,043.00
70 2026 49.3820 76.8174 127.2961 0.5292 39.4114 1.2086 40.4571 10.6362 1.1148 11.6252 0.0000 55,846.18 88 55,846.18
88 2.1276 4.3946 57,201.90
30 2027 48.6885 75.2903 122.0568 0.5162 39.4106 1.0305 40.4412 10.6359 0.9748 11.6107 0.0000 54,677.99 01 54,677.99
01 1.7780 4.2898 56,000.79
46 2028 48.0588 74.0217 117.7096 0.5043 39.4099 1.0158 40.4257 10.6357 0.9610 11.5967 0.0000 53,609.41 71 53,609.41
71 1.7221 4.1939 54,902.24
66 2029 47.4457 72.8700 113.9636 0.4935 39.4093 1.0016 40.4109 10.6354 0.9477 11.5832 0.0000 52,630.59 12 52,630.59
12 1.6725 4.1061 53,896.00
47 2030 46.7591 67.0102 110.8812 0.4876 39.4087 0.5773 39.9860 10.6352 0.5556 11.1908 0.0000 52,092.03 12 52,092.03
12 1.1407 4.0271 53,320.61
09 2031 46.1993 66.1193 108.1754 0.4789 39.4082 0.5647 39.9730 10.6350 0.5438 11.1789 0.0000 51,308.75 79 51,308.75
79 1.1009 3.9574 52,515.59
46 2032 45.6826 65.3627 105.8845 0.4712 39.4079 0.5536 39.9614 10.6349 0.5334 11.1683 0.0000 50,621.41 19 50,621.41
19 1.0660 3.8972 51,809.43
38 2033 45.2376 64.7315 103.9491 0.4645 39.4075 0.5437 39.9512 10.6348 0.5241 11.1589 0.0000 50,016.68 04 50,016.68
04 1.0359 3.8449 51,188.37
31 Maximum 49.3820 76.8174 127.2961 0.5292 39.4114 1.4167 40.4571 10.6362 1.3063 11.6252 0.0000 55,846.18 88 55,846.18
88 2.1351 4.3946 57,201.90
30 Unmitigated Construction
CalEEMod Version: CalEEMod.2020.4.0 Page 5 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2023 0.5262 2.0466 21.3595 0.0393 19.7939 0.0628 19.8567 10.1388 0.0627 10.2015 0.0000 3,815.413 9 3,815.413
9 1.1961 3.1500e0033,846.253
1 2024 1.0111 13.6391 35.7459 0.1067 19.7939 0.1829 19.8567 10.1388 0.1793 10.2015 0.0000 10,874.09 47 10,874.09
47 2.1351 0.7526 11,151.73
76 2025 1.0031 13.3584 35.7205 0.1057 10.6987 0.1813 10.8799 4.0476 0.1778 4.2253 0.0000 10,770.17 65 10,770.17
65 2.1313 0.7367 11,043.00
70 2026 48.2013 65.5657 128.6950 0.5292 39.4114 0.5114 39.9227 10.6362 0.4861 11.1222 0.0000 55,846.18 88 55,846.18
88 2.1276 4.3946 57,201.90
30 2027 47.5078 64.0386 123.4557 0.5162 39.4106 0.4962 39.9068 10.6359 0.4718 11.1077 0.0000 54,677.99 01 54,677.99
01 1.7780 4.2898 56,000.79
46 2028 46.8781 62.7700 119.1084 0.5043 39.4099 0.4815 39.8914 10.6357 0.4580 11.0937 0.0000 53,609.41 71 53,609.41
71 1.7221 4.1939 54,902.24
66 2029 46.2649 61.6183 115.3625 0.4935 39.4093 0.4673 39.8766 10.6354 0.4447 11.0801 0.0000 52,630.59 12 52,630.59
12 1.6725 4.1061 53,896.00
47 2030 45.6768 60.5828 112.2192 0.4876 39.4087 0.4536 39.8623 10.6352 0.4319 11.0671 0.0000 52,092.03 12 52,092.03
12 1.1407 4.0271 53,320.61
09 2031 45.1170 59.6919 109.5133 0.4789 39.4082 0.4410 39.8493 10.6350 0.4201 11.0552 0.0000 51,308.75 79 51,308.75
79 1.1009 3.9574 52,515.59
46 2032 44.6002 58.9353 107.2225 0.4712 39.4079 0.4299 39.8377 10.6349 0.4097 11.0446 0.0000 50,621.41 19 50,621.41
19 1.0660 3.8972 51,809.43
38 2033 44.1553 58.3040 105.2870 0.4645 39.4075 0.4200 39.8275 10.6348 0.4004 11.0352 0.0000 50,016.68 04 50,016.68
04 1.0359 3.8449 51,188.37
31 Maximum 48.2013 65.5657 128.6950 0.5292 39.4114 0.5114 39.9227 10.6362 0.4861 11.1222 0.0000 55,846.18 88 55,846.18
88 2.1351 4.3946 57,201.90
30 Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
4.10 22.36 -2.58 0.00 0.00 60.27 1.61 0.00 59.54 4.73 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 6 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 161.3046 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Energy 2.7063 24.6029 20.6665 0.1476 1.8698 1.8698 1.8698 1.8698 29,523.53 39 29,523.53
39 0.5659 0.5413 29,698.97
75 Mobile 34.3497 20.7155 177.2324 0.2954 35.4391 0.2000 35.6391 9.4406 0.1864 9.6270 32,315.16 44 32,315.16
44 2.5706 1.8327 32,925.56
73 Offroad 16.1253 88.6036 216.4662 0.3419 1.1966 1.1966 1.1966 1.1966 0.0000 32,381.56 02 32,381.56
02 1.4245 32,417.17
25 Total 214.4858 133.9316 415.4255 0.7849 35.4391 3.2702 38.7092 9.4406 3.2566 12.6972 0.0000 94,222.54 29 94,222.54
29 4.5668 2.3739 95,044.14
90 Unmitigated Operational
CalEEMod Version: CalEEMod.2020.4.0 Page 7 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 161.3046 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Energy 2.7063 24.6029 20.6665 0.1476 1.8698 1.8698 1.8698 1.8698 29,523.53 39 29,523.53
39 0.5659 0.5413 29,698.97
75 Mobile 34.3497 20.7155 177.2324 0.2954 35.4391 0.2000 35.6391 9.4406 0.1864 9.6270 32,315.16 44 32,315.16
44 2.5706 1.8327 32,925.56
73 Offroad 16.1253 88.6036 216.4662 0.3419 1.1966 1.1966 1.1966 1.1966 0.0000 32,381.56 02 32,381.56
02 1.4245 32,417.17
25 Total 214.4858 133.9316 415.4255 0.7849 35.4391 3.2702 38.7092 9.4406 3.2566 12.6972 0.0000 94,222.54 29 94,222.54
29 4.5668 2.3739 95,044.14
90 Mitigated Operational
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Site Preparation Site Preparation 9/1/2023 1/4/2024 5 90 2 Grading Grading 1/5/2024 1/29/2026 5 540
3 Paving Paving 1/30/2026 6/4/2026 5 90
4 Building Construction Building Construction 6/5/2026 4/28/2033 5 1800 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 8 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied 5 Architectural Coating Architectural Coating 6/19/2026 5/12/2033 5 1800 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Rubber Tired Dozers 3 8.00 247 0.40
Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 2 8.00 158 0.38
Grading Graders 1 8.00 187 0.41
Grading Rubber Tired Dozers 1 8.00 247 0.40
Grading Scrapers 2 8.00 367 0.48
Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37
Paving Pavers 2 8.00 130 0.42
Paving Paving Equipment 2 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 10,061,250; Non-Residential Outdoor: 3,353,750; Striped Parking Area:
88,080 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 135
Acres of Grading (Grading Phase): 1620
Acres of Paving: 33.03
CalEEMod Version: CalEEMod.2020.4.0 Page 9 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 19.6570 0.0000 19.6570 10.1025 0.0000 10.1025 0.0000 0.0000 Off-Road 2.6595 27.5242 18.2443 0.0381 1.2660 1.2660 1.1647 1.1647 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Total 2.6595 27.5242 18.2443 0.0381 19.6570 1.2660 20.9230 10.1025 1.1647 11.2672 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Unmitigated Construction On-Site
3.1 Mitigation Measures Construction
Use Cleaner Engines for Construction Equipment
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Site Preparation 7 18.00 0.00 0.00 10.00 6.50 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 38,000.00 10.00 6.50 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 10.00 6.50 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 3,433.00 1,340.00 0.00 10.00 6.50 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 687.00 0.00 0.00 10.00 6.50 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2020.4.0 Page 10 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0607 0.0291 0.4906 1.2500e0030.1369 7.1000e0040.1376 0.0363 6.5000e0040.0370 128.1058 128.1058 3.5200e0033.1500e003129.1312 Total 0.0607 0.0291 0.4906 1.2500e0030.1369 7.1000e0040.1376 0.0363 6.5000e0040.0370 128.1058 128.1058 3.5200e0033.1500e003129.1312 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 19.6570 0.0000 19.6570 10.1025 0.0000 10.1025 0.0000 0.0000 Off-Road 0.4656 2.0175 20.8690 0.0381 0.0621 0.0621 0.0621 0.0621 0.0000 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Total 0.4656 2.0175 20.8690 0.0381 19.6570 0.0621 19.7191 10.1025 0.0621 10.1645 0.0000 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 11 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0607 0.0291 0.4906 1.2500e0030.1369 7.1000e0040.1376 0.0363 6.5000e0040.0370 128.1058 128.1058 3.5200e0033.1500e003129.1312 Total 0.0607 0.0291 0.4906 1.2500e0030.1369 7.1000e0040.1376 0.0363 6.5000e0040.0370 128.1058 128.1058 3.5200e0033.1500e003129.1312 Mitigated Construction Off-Site
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 19.6570 0.0000 19.6570 10.1025 0.0000 10.1025 0.0000 0.0000 Off-Road 2.6609 27.1760 18.3356 0.0381 1.2294 1.2294 1.1310 1.1310 3,688.010 0 3,688.010
0 1.1928 3,717.829
4 Total 2.6609 27.1760 18.3356 0.0381 19.6570 1.2294 20.8864 10.1025 1.1310 11.2335 3,688.010 0 3,688.010
0 1.1928 3,717.829
4 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 12 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0567 0.0260 0.4554 1.2100e0030.1369 6.7000e0040.1376 0.0363 6.2000e0040.0369 124.8755 124.8755 3.1800e0032.9300e003125.8270 Total 0.0567 0.0260 0.4554 1.2100e0030.1369 6.7000e0040.1376 0.0363 6.2000e0040.0369 124.8755 124.8755 3.1800e0032.9300e003125.8270 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 19.6570 0.0000 19.6570 10.1025 0.0000 10.1025 0.0000 0.0000 Off-Road 0.4656 2.0175 20.8690 0.0381 0.0621 0.0621 0.0621 0.0621 0.0000 3,688.010 0 3,688.010
0 1.1928 3,717.829
4 Total 0.4656 2.0175 20.8690 0.0381 19.6570 0.0621 19.7191 10.1025 0.0621 10.1645 0.0000 3,688.010 0 3,688.010
0 1.1928 3,717.829
4 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 13 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0567 0.0260 0.4554 1.2100e0030.1369 6.7000e0040.1376 0.0363 6.2000e0040.0369 124.8755 124.8755 3.1800e0032.9300e003125.8270 Total 0.0567 0.0260 0.4554 1.2100e0030.1369 6.7000e0040.1376 0.0363 6.2000e0040.0369 124.8755 124.8755 3.1800e0032.9300e003125.8270 Mitigated Construction Off-Site
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 9.3200 0.0000 9.3200 3.6714 0.0000 3.6714 0.0000 0.0000 Off-Road 3.2181 32.3770 27.7228 0.0621 1.3354 1.3354 1.2286 1.2286 6,009.748 7 6,009.748
7 1.9437 6,058.340
5 Total 3.2181 32.3770 27.7228 0.0621 9.3200 1.3354 10.6554 3.6714 1.2286 4.9000 6,009.748 7 6,009.748
7 1.9437 6,058.340
5 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 14 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.1866 10.3102 2.2408 0.0433 1.2268 0.0806 1.3074 0.3359 0.0771 0.4130 4,725.595 4 4,725.595
4 0.1879 0.7493 4,953.589
2 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0630 0.0289 0.5060 1.3500e0030.1521 7.5000e0040.1529 0.0404 6.9000e0040.0410 138.7506 138.7506 3.5300e0033.2500e003139.8078 Total 0.2496 10.3390 2.7468 0.0446 1.3790 0.0813 1.4603 0.3763 0.0778 0.4540 4,864.346 0 4,864.346
0 0.1914 0.7526 5,093.397
0 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 9.3200 0.0000 9.3200 3.6714 0.0000 3.6714 0.0000 0.0000 Off-Road 0.7616 3.3000 32.9991 0.0621 0.1015 0.1015 0.1015 0.1015 0.0000 6,009.748 7 6,009.748
7 1.9437 6,058.340
5 Total 0.7616 3.3000 32.9991 0.0621 9.3200 0.1015 9.4216 3.6714 0.1015 3.7729 0.0000 6,009.748 7 6,009.748
7 1.9437 6,058.340
5 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 15 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.1866 10.3102 2.2408 0.0433 1.2268 0.0806 1.3074 0.3359 0.0771 0.4130 4,725.595 4 4,725.595
4 0.1879 0.7493 4,953.589
2 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0630 0.0289 0.5060 1.3500e0030.1521 7.5000e0040.1529 0.0404 6.9000e0040.0410 138.7506 138.7506 3.5300e0033.2500e003139.8078 Total 0.2496 10.3390 2.7468 0.0446 1.3790 0.0813 1.4603 0.3763 0.0778 0.4540 4,864.346 0 4,864.346
0 0.1914 0.7526 5,093.397
0 Mitigated Construction Off-Site
3.3 Grading - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 9.3200 0.0000 9.3200 3.6714 0.0000 3.6714 0.0000 0.0000 Off-Road 2.9012 27.9429 26.3311 0.0621 1.1309 1.1309 1.0404 1.0404 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Total 2.9012 27.9429 26.3311 0.0621 9.3200 1.1309 10.4509 3.6714 1.0404 4.7118 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 16 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.1824 10.0325 2.2491 0.0424 1.2265 0.0790 1.3055 0.3358 0.0756 0.4114 4,626.531 2 4,626.531
2 0.1849 0.7337 4,849.795
6 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0591 0.0259 0.4723 1.3000e0030.1521 7.1000e0040.1529 0.0404 6.6000e0040.0410 135.3639 135.3639 3.1900e0033.0400e003136.3499 Total 0.2415 10.0584 2.7214 0.0437 1.3787 0.0797 1.4584 0.3762 0.0762 0.4524 4,761.895 1 4,761.895
1 0.1881 0.7367 4,986.145
5 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 9.3200 0.0000 9.3200 3.6714 0.0000 3.6714 0.0000 0.0000 Off-Road 0.7616 3.3000 32.9991 0.0621 0.1015 0.1015 0.1015 0.1015 0.0000 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Total 0.7616 3.3000 32.9991 0.0621 9.3200 0.1015 9.4216 3.6714 0.1015 3.7729 0.0000 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 17 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.1824 10.0325 2.2491 0.0424 1.2265 0.0790 1.3055 0.3358 0.0756 0.4114 4,626.531 2 4,626.531
2 0.1849 0.7337 4,849.795
6 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0591 0.0259 0.4723 1.3000e0030.1521 7.1000e0040.1529 0.0404 6.6000e0040.0410 135.3639 135.3639 3.1900e0033.0400e003136.3499 Total 0.2415 10.0584 2.7214 0.0437 1.3787 0.0797 1.4584 0.3762 0.0762 0.4524 4,761.895 1 4,761.895
1 0.1881 0.7367 4,986.145
5 Mitigated Construction Off-Site
3.3 Grading - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 9.3200 0.0000 9.3200 3.6714 0.0000 3.6714 0.0000 0.0000 Off-Road 2.9012 27.9429 26.3311 0.0621 1.1309 1.1309 1.0404 1.0404 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Total 2.9012 27.9429 26.3311 0.0621 9.3200 1.1309 10.4509 3.6714 1.0404 4.7118 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 18 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.1780 9.7592 2.2524 0.0414 1.2263 0.0771 1.3033 0.3357 0.0737 0.4095 4,529.067 2 4,529.067
2 0.1815 0.7183 4,747.656
8 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0557 0.0235 0.4441 1.2600e0030.1521 6.8000e0040.1528 0.0404 6.3000e0040.0410 132.1259 132.1259 2.9100e0032.8700e003133.0526 Total 0.2337 9.7826 2.6965 0.0427 1.3784 0.0777 1.4562 0.3761 0.0744 0.4504 4,661.193 0 4,661.193
0 0.1844 0.7212 4,880.709
4 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 9.3200 0.0000 9.3200 3.6714 0.0000 3.6714 0.0000 0.0000 Off-Road 0.7616 3.3000 32.9991 0.0621 0.1015 0.1015 0.1015 0.1015 0.0000 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Total 0.7616 3.3000 32.9991 0.0621 9.3200 0.1015 9.4216 3.6714 0.1015 3.7729 0.0000 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 19 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.1780 9.7592 2.2524 0.0414 1.2263 0.0771 1.3033 0.3357 0.0737 0.4095 4,529.067 2 4,529.067
2 0.1815 0.7183 4,747.656
8 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0557 0.0235 0.4441 1.2600e0030.1521 6.8000e0040.1528 0.0404 6.3000e0040.0410 132.1259 132.1259 2.9100e0032.8700e003133.0526 Total 0.2337 9.7826 2.6965 0.0427 1.3784 0.0777 1.4562 0.3761 0.0744 0.4504 4,661.193 0 4,661.193
0 0.1844 0.7212 4,880.709
4 Mitigated Construction Off-Site
3.4 Paving - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Paving 0.9615 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.8767 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 20 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.4 Paving - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0418 0.0176 0.3331 9.4000e0040.1141 5.1000e0040.1146 0.0303 4.7000e0040.0307 99.0944 99.0944 2.1800e0032.1500e00399.7895 Total 0.0418 0.0176 0.3331 9.4000e0040.1141 5.1000e0040.1146 0.0303 4.7000e0040.0307 99.0944 99.0944 2.1800e0032.1500e00399.7895 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.2805 1.2154 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Paving 0.9615 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.2420 1.2154 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 21 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.4 Paving - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0418 0.0176 0.3331 9.4000e0040.1141 5.1000e0040.1146 0.0303 4.7000e0040.0307 99.0944 99.0944 2.1800e0032.1500e00399.7895 Total 0.0418 0.0176 0.3331 9.4000e0040.1141 5.1000e0040.1146 0.0303 4.7000e0040.0307 99.0944 99.0944 2.1800e0032.1500e00399.7895 Mitigated Construction Off-Site
3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 22 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.5959 58.3650 17.9107 0.2402 8.0706 0.3264 8.3969 2.3227 0.3122 2.6349 25,790.33 74 25,790.33
74 0.6300 3.8042 26,939.73
67 Worker 9.5636 4.0307 76.2356 0.2159 26.1148 0.1168 26.2317 6.9272 0.1076 7.0348 22,679.40 54 22,679.40
54 0.4991 0.4919 22,838.47
95 Total 11.1595 62.3956 94.1463 0.4561 34.1854 0.4432 34.6286 9.2499 0.4198 9.6697 48,469.74 28 48,469.74
28 1.1290 4.2961 49,778.21
62 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 23 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.5959 58.3650 17.9107 0.2402 8.0706 0.3264 8.3969 2.3227 0.3122 2.6349 25,790.33 74 25,790.33
74 0.6300 3.8042 26,939.73
67 Worker 9.5636 4.0307 76.2356 0.2159 26.1148 0.1168 26.2317 6.9272 0.1076 7.0348 22,679.40 54 22,679.40
54 0.4991 0.4919 22,838.47
95 Total 11.1595 62.3956 94.1463 0.4561 34.1854 0.4432 34.6286 9.2499 0.4198 9.6697 48,469.74 28 48,469.74
28 1.1290 4.2961 49,778.21
62 Mitigated Construction Off-Site
3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 24 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.5447 57.2539 17.6041 0.2350 8.0698 0.3189 8.3887 2.3225 0.3051 2.6275 25,236.37 42 25,236.37
42 0.6139 3.7296 26,363.15
31 Worker 9.0285 3.6840 72.1254 0.2094 26.1148 0.1105 26.2253 6.9272 0.1017 7.0289 22,167.59 22 22,167.59
22 0.4564 0.4667 22,318.09
26 Total 10.5731 60.9379 89.7295 0.4444 34.1846 0.4294 34.6140 9.2496 0.4067 9.6564 47,403.96 64 47,403.96
64 1.0703 4.1964 48,681.24
57 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 25 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.5447 57.2539 17.6041 0.2350 8.0698 0.3189 8.3887 2.3225 0.3051 2.6275 25,236.37 42 25,236.37
42 0.6139 3.7296 26,363.15
31 Worker 9.0285 3.6840 72.1254 0.2094 26.1148 0.1105 26.2253 6.9272 0.1017 7.0289 22,167.59 22 22,167.59
22 0.4564 0.4667 22,318.09
26 Total 10.5731 60.9379 89.7295 0.4444 34.1846 0.4294 34.6140 9.2496 0.4067 9.6564 47,403.96 64 47,403.96
64 1.0703 4.1964 48,681.24
57 Mitigated Construction Off-Site
3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 26 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.4996 56.3283 17.3594 0.2301 8.0691 0.3123 8.3814 2.3222 0.2987 2.6209 24,717.25 59 24,717.25
59 0.6019 3.6588 25,822.63
67 Worker 8.5413 3.3982 68.7070 0.2036 26.1148 0.1037 26.2185 6.9272 0.0955 7.0227 21,709.75 77 21,709.75
77 0.4199 0.4458 21,853.11
14 Total 10.0409 59.7265 86.0664 0.4337 34.1839 0.4160 34.5999 9.2494 0.3942 9.6436 46,427.01 36 46,427.01
36 1.0217 4.1047 47,675.74
81 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 27 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.4996 56.3283 17.3594 0.2301 8.0691 0.3123 8.3814 2.3222 0.2987 2.6209 24,717.25 59 24,717.25
59 0.6019 3.6588 25,822.63
67 Worker 8.5413 3.3982 68.7070 0.2036 26.1148 0.1037 26.2185 6.9272 0.0955 7.0227 21,709.75 77 21,709.75
77 0.4199 0.4458 21,853.11
14 Total 10.0409 59.7265 86.0664 0.4337 34.1839 0.4160 34.5999 9.2494 0.3942 9.6436 46,427.01 36 46,427.01
36 1.0217 4.1047 47,675.74
81 Mitigated Construction Off-Site
3.5 Building Construction - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 28 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.4578 55.4668 17.1474 0.2255 8.0685 0.3059 8.3744 2.3220 0.2926 2.6146 24,231.45 78 24,231.45
78 0.5909 3.5921 25,316.67
79 Worker 8.0652 3.1564 65.7623 0.1983 26.1148 0.0972 26.2120 6.9272 0.0895 7.0167 21,298.94 11 21,298.94
11 0.3877 0.4282 21,436.24
93 Total 9.5230 58.6232 82.9097 0.4238 34.1833 0.4031 34.5864 9.2492 0.3821 9.6312 45,530.39 89 45,530.39
89 0.9786 4.0204 46,752.92
72 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 29 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.4578 55.4668 17.1474 0.2255 8.0685 0.3059 8.3744 2.3220 0.2926 2.6146 24,231.45 78 24,231.45
78 0.5909 3.5921 25,316.67
79 Worker 8.0652 3.1564 65.7623 0.1983 26.1148 0.0972 26.2120 6.9272 0.0895 7.0167 21,298.94 11 21,298.94
11 0.3877 0.4282 21,436.24
93 Total 9.5230 58.6232 82.9097 0.4238 34.1833 0.4031 34.5864 9.2492 0.3821 9.6312 45,530.39 89 45,530.39
89 0.9786 4.0204 46,752.92
72 Mitigated Construction Off-Site
3.5 Building Construction - 2030
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 30 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2030
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.4201 54.6752 16.9805 0.2213 8.0679 0.2996 8.3675 2.3218 0.2866 2.6084 23,785.17 43 23,785.17
43 0.5818 3.5307 24,851.87
29 Worker 7.6065 2.9532 63.2822 0.1936 26.1148 0.0910 26.2058 6.9272 0.0838 7.0110 20,937.85 21 20,937.85
21 0.3593 0.4136 21,070.08
11 Total 9.0266 57.6284 80.2627 0.4150 34.1827 0.3906 34.5733 9.2490 0.3703 9.6193 44,723.02 64 44,723.02
64 0.9411 3.9443 45,921.95
40 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 31 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2030
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.4201 54.6752 16.9805 0.2213 8.0679 0.2996 8.3675 2.3218 0.2866 2.6084 23,785.17 43 23,785.17
43 0.5818 3.5307 24,851.87
29 Worker 7.6065 2.9532 63.2822 0.1936 26.1148 0.0910 26.2058 6.9272 0.0838 7.0110 20,937.85 21 20,937.85
21 0.3593 0.4136 21,070.08
11 Total 9.0266 57.6284 80.2627 0.4150 34.1827 0.3906 34.5733 9.2490 0.3703 9.6193 44,723.02 64 44,723.02
64 0.9411 3.9443 45,921.95
40 Mitigated Construction Off-Site
3.5 Building Construction - 2031
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 32 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2031
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3881 53.9935 16.8655 0.2176 8.0674 0.2940 8.3615 2.3216 0.2813 2.6029 23,386.41 17 23,386.41
17 0.5723 3.4759 24,436.54
56 Worker 7.1668 2.7788 61.1234 0.1895 26.1148 0.0852 26.2000 6.9272 0.0784 7.0056 20,617.45 76 20,617.45
76 0.3341 0.4012 20,745.37
18 Total 8.5548 56.7723 77.9889 0.4071 34.1822 0.3792 34.5615 9.2488 0.3597 9.6085 44,003.86 93 44,003.86
93 0.9064 3.8772 45,181.91
74 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 33 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2031
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3881 53.9935 16.8655 0.2176 8.0674 0.2940 8.3615 2.3216 0.2813 2.6029 23,386.41 17 23,386.41
17 0.5723 3.4759 24,436.54
56 Worker 7.1668 2.7788 61.1234 0.1895 26.1148 0.0852 26.2000 6.9272 0.0784 7.0056 20,617.45 76 20,617.45
76 0.3341 0.4012 20,745.37
18 Total 8.5548 56.7723 77.9889 0.4071 34.1822 0.3792 34.5615 9.2488 0.3597 9.6085 44,003.86 93 44,003.86
93 0.9064 3.8772 45,181.91
74 Mitigated Construction Off-Site
3.5 Building Construction - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 34 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3610 53.4089 16.7924 0.2143 8.0670 0.2893 8.3563 2.3215 0.2767 2.5982 23,035.77 79 23,035.77
79 0.5642 3.4279 24,071.38
03 Worker 6.7587 2.6355 59.2754 0.1858 26.1148 0.0799 26.1947 6.9272 0.0735 7.0007 20,336.89 14 20,336.89
14 0.3119 0.3911 20,461.23
65 Total 8.1198 56.0444 76.0678 0.4001 34.1819 0.3691 34.5510 9.2487 0.3502 9.5989 43,372.66 92 43,372.66
92 0.8760 3.8190 44,532.61
68 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 35 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3610 53.4089 16.7924 0.2143 8.0670 0.2893 8.3563 2.3215 0.2767 2.5982 23,035.77 79 23,035.77
79 0.5642 3.4279 24,071.38
03 Worker 6.7587 2.6355 59.2754 0.1858 26.1148 0.0799 26.1947 6.9272 0.0735 7.0007 20,336.89 14 20,336.89
14 0.3119 0.3911 20,461.23
65 Total 8.1198 56.0444 76.0678 0.4001 34.1819 0.3691 34.5510 9.2487 0.3502 9.5989 43,372.66 92 43,372.66
92 0.8760 3.8190 44,532.61
68 Mitigated Construction Off-Site
3.5 Building Construction - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 36 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3384 52.9155 16.7441 0.2115 8.0667 0.2852 8.3519 2.3213 0.2728 2.5942 22,725.65 01 22,725.65
01 0.5572 3.3854 23,748.41
99 Worker 6.4068 2.5206 57.7029 0.1826 26.1148 0.0750 26.1898 6.9272 0.0690 6.9962 20,091.41 21 20,091.41
21 0.2926 0.3829 20,212.84
37 Total 7.7452 55.4361 74.4470 0.3940 34.1815 0.3602 34.5417 9.2485 0.3419 9.5904 42,817.06 22 42,817.06
22 0.8498 3.7683 43,961.26
35 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 37 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3384 52.9155 16.7441 0.2115 8.0667 0.2852 8.3519 2.3213 0.2728 2.5942 22,725.65 01 22,725.65
01 0.5572 3.3854 23,748.41
99 Worker 6.4068 2.5206 57.7029 0.1826 26.1148 0.0750 26.1898 6.9272 0.0690 6.9962 20,091.41 21 20,091.41
21 0.2926 0.3829 20,212.84
37 Total 7.7452 55.4361 74.4470 0.3940 34.1815 0.3602 34.5417 9.2485 0.3419 9.5904 42,817.06 22 42,817.06
22 0.8498 3.7683 43,961.26
35 Mitigated Construction Off-Site
3.6 Architectural Coating - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 34.9413 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 38 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.9138 0.8066 15.2560 0.0432 5.2260 0.0234 5.2494 1.3863 0.0215 1.4078 4,538.523 6 4,538.523
6 0.0999 0.0985 4,570.356
9 Total 1.9138 0.8066 15.2560 0.0432 5.2260 0.0234 5.2494 1.3863 0.0215 1.4078 4,538.523 6 4,538.523
6 0.0999 0.0985 4,570.356
9 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 39 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.9138 0.8066 15.2560 0.0432 5.2260 0.0234 5.2494 1.3863 0.0215 1.4078 4,538.523 6 4,538.523
6 0.0999 0.0985 4,570.356
9 Total 1.9138 0.8066 15.2560 0.0432 5.2260 0.0234 5.2494 1.3863 0.0215 1.4078 4,538.523 6 4,538.523
6 0.0999 0.0985 4,570.356
9 Mitigated Construction Off-Site
3.6 Architectural Coating - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 34.9413 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 40 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.8067 0.7372 14.4335 0.0419 5.2260 0.0221 5.2481 1.3863 0.0204 1.4066 4,436.101 3 4,436.101
3 0.0913 0.0934 4,466.219
0 Total 1.8067 0.7372 14.4335 0.0419 5.2260 0.0221 5.2481 1.3863 0.0204 1.4066 4,436.101 3 4,436.101
3 0.0913 0.0934 4,466.219
0 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 41 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.8067 0.7372 14.4335 0.0419 5.2260 0.0221 5.2481 1.3863 0.0204 1.4066 4,436.101 3 4,436.101
3 0.0913 0.0934 4,466.219
0 Total 1.8067 0.7372 14.4335 0.0419 5.2260 0.0221 5.2481 1.3863 0.0204 1.4066 4,436.101 3 4,436.101
3 0.0913 0.0934 4,466.219
0 Mitigated Construction Off-Site
3.6 Architectural Coating - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 34.9413 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 42 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.7093 0.6800 13.7494 0.0407 5.2260 0.0208 5.2468 1.3863 0.0191 1.4054 4,344.481 1 4,344.481
1 0.0840 0.0892 4,373.168
5 Total 1.7093 0.6800 13.7494 0.0407 5.2260 0.0208 5.2468 1.3863 0.0191 1.4054 4,344.481 1 4,344.481
1 0.0840 0.0892 4,373.168
5 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 43 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.7093 0.6800 13.7494 0.0407 5.2260 0.0208 5.2468 1.3863 0.0191 1.4054 4,344.481 1 4,344.481
1 0.0840 0.0892 4,373.168
5 Total 1.7093 0.6800 13.7494 0.0407 5.2260 0.0208 5.2468 1.3863 0.0191 1.4054 4,344.481 1 4,344.481
1 0.0840 0.0892 4,373.168
5 Mitigated Construction Off-Site
3.6 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 34.9413 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 44 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.6140 0.6316 13.1601 0.0397 5.2260 0.0195 5.2455 1.3863 0.0179 1.4042 4,262.269 9 4,262.269
9 0.0776 0.0857 4,289.747
5 Total 1.6140 0.6316 13.1601 0.0397 5.2260 0.0195 5.2455 1.3863 0.0179 1.4042 4,262.269 9 4,262.269
9 0.0776 0.0857 4,289.747
5 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 45 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.6140 0.6316 13.1601 0.0397 5.2260 0.0195 5.2455 1.3863 0.0179 1.4042 4,262.269 9 4,262.269
9 0.0776 0.0857 4,289.747
5 Total 1.6140 0.6316 13.1601 0.0397 5.2260 0.0195 5.2455 1.3863 0.0179 1.4042 4,262.269 9 4,262.269
9 0.0776 0.0857 4,289.747
5 Mitigated Construction Off-Site
3.6 Architectural Coating - 2030
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1308 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Total 34.9012 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 46 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2030
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5222 0.5910 12.6638 0.0388 5.2260 0.0182 5.2442 1.3863 0.0168 1.4030 4,190.010 0 4,190.010
0 0.0719 0.0828 4,216.471
2 Total 1.5222 0.5910 12.6638 0.0388 5.2260 0.0182 5.2442 1.3863 0.0168 1.4030 4,190.010 0 4,190.010
0 0.0719 0.0828 4,216.471
2 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 47 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2030
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5222 0.5910 12.6638 0.0388 5.2260 0.0182 5.2442 1.3863 0.0168 1.4030 4,190.010 0 4,190.010
0 0.0719 0.0828 4,216.471
2 Total 1.5222 0.5910 12.6638 0.0388 5.2260 0.0182 5.2442 1.3863 0.0168 1.4030 4,190.010 0 4,190.010
0 0.0719 0.0828 4,216.471
2 Mitigated Construction Off-Site
3.6 Architectural Coating - 2031
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1308 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Total 34.9012 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 48 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2031
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.4342 0.5561 12.2318 0.0379 5.2260 0.0171 5.2431 1.3863 0.0157 1.4019 4,125.893 8 4,125.893
8 0.0669 0.0803 4,151.491
5 Total 1.4342 0.5561 12.2318 0.0379 5.2260 0.0171 5.2431 1.3863 0.0157 1.4019 4,125.893 8 4,125.893
8 0.0669 0.0803 4,151.491
5 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 49 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2031
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.4342 0.5561 12.2318 0.0379 5.2260 0.0171 5.2431 1.3863 0.0157 1.4019 4,125.893 8 4,125.893
8 0.0669 0.0803 4,151.491
5 Total 1.4342 0.5561 12.2318 0.0379 5.2260 0.0171 5.2431 1.3863 0.0157 1.4019 4,125.893 8 4,125.893
8 0.0669 0.0803 4,151.491
5 Mitigated Construction Off-Site
3.6 Architectural Coating - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1308 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Total 34.9012 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 50 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.3525 0.5274 11.8620 0.0372 5.2260 0.0160 5.2420 1.3863 0.0147 1.4010 4,069.747 9 4,069.747
9 0.0624 0.0783 4,094.631
4 Total 1.3525 0.5274 11.8620 0.0372 5.2260 0.0160 5.2420 1.3863 0.0147 1.4010 4,069.747 9 4,069.747
9 0.0624 0.0783 4,094.631
4 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 51 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.3525 0.5274 11.8620 0.0372 5.2260 0.0160 5.2420 1.3863 0.0147 1.4010 4,069.747 9 4,069.747
9 0.0624 0.0783 4,094.631
4 Total 1.3525 0.5274 11.8620 0.0372 5.2260 0.0160 5.2420 1.3863 0.0147 1.4010 4,069.747 9 4,069.747
9 0.0624 0.0783 4,094.631
4 Mitigated Construction Off-Site
3.6 Architectural Coating - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1308 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Total 34.9012 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 52 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2821 0.5044 11.5473 0.0365 5.2260 0.0150 5.2410 1.3863 0.0138 1.4001 4,020.623 4 4,020.623
4 0.0586 0.0766 4,044.923
9 Total 1.2821 0.5044 11.5473 0.0365 5.2260 0.0150 5.2410 1.3863 0.0138 1.4001 4,020.623 4 4,020.623
4 0.0586 0.0766 4,044.923
9 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 53 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2821 0.5044 11.5473 0.0365 5.2260 0.0150 5.2410 1.3863 0.0138 1.4001 4,020.623 4 4,020.623
4 0.0586 0.0766 4,044.923
9 Total 1.2821 0.5044 11.5473 0.0365 5.2260 0.0150 5.2410 1.3863 0.0138 1.4001 4,020.623 4 4,020.623
4 0.0586 0.0766 4,044.923
9 Mitigated Construction Off-Site
4.0 Operational Detail - Mobile
4.1 Mitigation Measures Mobile
CalEEMod Version: CalEEMod.2020.4.0 Page 54 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 34.3497 20.7155 177.2324 0.2954 35.4391 0.2000 35.6391 9.4406 0.1864 9.6270 32,315.16 44 32,315.16
44 2.5706 1.8327 32,925.56
73 Unmitigated 34.3497 20.7155 177.2324 0.2954 35.4391 0.2000 35.6391 9.4406 0.1864 9.6270 32,315.16 44 32,315.16
44 2.5706 1.8327 32,925.56
73 4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Convenience Market with Gas Pumps 2,031.00 2,031.00 2031.00 1,305,797 1,305,797 Fast Food Restaurant with Drive Thru 3,487.96 3,487.96 3487.96 2,271,855 2,271,855 Hotel 878.40 878.40 878.40 662,880 662,880
Industrial Park 12,822.04 12,822.04 12822.04 12,588,435 12,588,435 Parking Lot 0.00 0.00 0.00
Total 19,219.40 19,219.40 19,219.40 16,828,967 16,828,967 Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Convenience Market with Gas
Pumps
3.31 1.66 2.15 0.80 80.20 19.00 100 0 0
Fast Food Restaurant with Drive
Thru
3.31 1.66 2.15 2.20 78.80 19.00 100 0 0
Hotel 3.31 1.66 2.15 19.40 61.60 19.00 100 0 0
Industrial Park 3.31 1.66 2.15 59.00 28.00 13.00 100 0 0 Parking Lot 10.00 5.00 6.50 0.00 0.00 0.00 0 0 0
4.4 Fleet Mix
CalEEMod Version: CalEEMod.2020.4.0 Page 55 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Convenience Market with Gas
Pumps
0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428 Fast Food Restaurant with Drive
Thru
0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428 Hotel 0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428 Industrial Park 0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428 Parking Lot 0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428
5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
NaturalGas
Mitigated
2.7063 24.6029 20.6665 0.1476 1.8698 1.8698 1.8698 1.8698 29,523.53 39 29,523.53
39 0.5659 0.5413 29,698.97
75 NaturalGas
Unmitigated
2.7063 24.6029 20.6665 0.1476 1.8698 1.8698 1.8698 1.8698 29,523.53 39 29,523.53
39 0.5659 0.5413 29,698.97
75 5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2020.4.0 Page 56 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Convenience
Market with Gas
Pumps
119.17 1.2900e0030.0117 9.8100e0037.0000e0058.9000e0048.9000e0048.9000e0048.9000e00414.0200 14.0200 2.7000e0042.6000e00414.1033 Fast Food
Restaurant with
Drive Thru
8103.39 0.0874 0.7945 0.6673 4.7700e0030.0604 0.0604 0.0604 0.0604 953.3399 953.3399 0.0183 0.0175 959.0051 Hotel 7689.91 0.0829 0.7539 0.6333 4.5200e0030.0573 0.0573 0.0573 0.0573 904.6949 904.6949 0.0173 0.0166 910.0711 Industrial Park 235038 2.5347 23.0429 19.3560 0.1383 1.7513 1.7513 1.7513 1.7513 27,651.47 91 27,651.47
91 0.5300 0.5069 27,815.79
80 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.7063 24.6029 20.6665 0.1476 1.8698 1.8698 1.8698 1.8698 29,523.53 39 29,523.53
39 0.5659 0.5413 29,698.97
75 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 57 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.1 Mitigation Measures Area
6.0 Area Detail
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Convenience
Market with Gas
Pumps
0.11917 1.2900e0030.0117 9.8100e0037.0000e0058.9000e0048.9000e0048.9000e0048.9000e00414.0200 14.0200 2.7000e0042.6000e00414.1033 Fast Food
Restaurant with
Drive Thru
8.10339 0.0874 0.7945 0.6673 4.7700e0030.0604 0.0604 0.0604 0.0604 953.3399 953.3399 0.0183 0.0175 959.0051 Hotel 7.68991 0.0829 0.7539 0.6333 4.5200e0030.0573 0.0573 0.0573 0.0573 904.6949 904.6949 0.0173 0.0166 910.0711 Industrial Park 235.038 2.5347 23.0429 19.3560 0.1383 1.7513 1.7513 1.7513 1.7513 27,651.47 91 27,651.47
91 0.5300 0.5069 27,815.79
80 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.7063 24.6029 20.6665 0.1476 1.8698 1.8698 1.8698 1.8698 29,523.53 39 29,523.53
39 0.5659 0.5413 29,698.97
75 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 58 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 161.3046 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Unmitigated 161.3046 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating
17.1471 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
144.0605 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 0.0970 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Total 161.3046 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 59 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Apply Water Conservation Strategy
7.1 Mitigation Measures Water
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating
17.1471 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
144.0605 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 0.0970 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Total 161.3046 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Mitigated
8.1 Mitigation Measures Waste
8.0 Waste Detail
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type Forklifts 121 12.00 300 89 0.20 Diesel
CalEEMod Version: CalEEMod.2020.4.0 Page 60 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
11.0 Vegetation
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Equipment Type lb/day lb/day
Forklifts 16.1253 88.6036 216.4662 0.3419 1.1966 1.1966 1.1966 1.1966 0.0000 32,381.56 02 32,381.56
02 1.4245 32,417.17
25 Total 16.1253 88.6036 216.4662 0.3419 1.1966 1.1966 1.1966 1.1966 0.0000 32,381.56 02 32,381.56
02 1.4245 32,417.17
25 UnMitigated/Mitigated
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2020.4.0 Page 61 of 61 Date: 2/15/2024 8:24 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Summer EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation Sacramento Metropolitan AQMD Air District, Winter
Project Characteristics -
Land Use - Square footage and lot acreages adjusted per site plan.
Construction Phase - Phase timing adjusted per applicant-provided questionnaire.
Grading - Based on applicant provided AQ questionnaire.
Vehicle Trips - Based on project-specific information provided by DKS.
Water Mitigation - Compliant with MWELO.
Operational Off-Road Equipment - Based on applicant provided AQ questionnaire.
Construction Off-road Equipment Mitigation - Required with implementation of MM 4.3-1 of EIR.
1.1 Land Usage
Land Uses Size Metric Lot Acreage Floor Surface Area Population Industrial Park 6,609.30 1000sqft 318.60 6,609,300.00 0 Parking Lot 3,670.00 Space 33.03 1,468,000.00 0
Fast Food Restaurant with Drive Thru 16.70 1000sqft 6.40 16,700.00 0 Hotel 122.00 Room 4.00 73,400.00 0
Convenience Market with Gas Pumps 20.00 Pump 3.00 8,100.00 0
1.2 Other Project Characteristics
Urbanization
Climate Zone
Urban
6 Wind Speed (m/s) 3.5 Precipitation Freq (Days) 58
1.3 User Entered Comments & Non-Default Data
1.0 Project Characteristics
Utility Company Sacramento Municipal Utility District
Operational Year 2033
CO2 Intensity
(lb/MWhr)
357.98 CH4 Intensity 0.033
(lb/MWhr)
N2O Intensity 0.004
(lb/MWhr)
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Table Name Column Name Default Value New Value
tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstEquipMitigation Tier No Change Tier 4 Final
tblConstructionPhase NumDays 440.00 1,800.00
CalEEMod Version: CalEEMod.2020.4.0 Page 2 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied tblConstructionPhase NumDays 6,200.00 1,800.00
tblConstructionPhase NumDays 620.00 540.00
tblConstructionPhase NumDays 440.00 90.00
tblConstructionPhase NumDays 240.00 90.00
tblGrading MaterialImported 0.00 304,000.00
tblLandUse LandUseSquareFeet 177,144.00 73,400.00
tblLandUse LandUseSquareFeet 2,823.50 8,100.00
tblLandUse LotAcreage 151.73 318.60
tblLandUse LotAcreage 0.38 6.40
tblLandUse LotAcreage 4.07 4.00
tblLandUse LotAcreage 0.06 3.00
tblOperationalOffRoadEquipment OperDaysPerYear 260.00 300.00 tblOperationalOffRoadEquipment OperHoursPerDay 8.00 12.00 tblOperationalOffRoadEquipment OperOffRoadEquipmentNumber 0.00 121.00 tblVehicleTrips CC_TL 5.00 1.66
tblVehicleTrips CC_TL 5.00 1.66
tblVehicleTrips CC_TL 5.00 1.66
tblVehicleTrips CC_TL 5.00 1.66
tblVehicleTrips CNW_TL 6.50 2.15
tblVehicleTrips CNW_TL 6.50 2.15
tblVehicleTrips CNW_TL 6.50 2.15
tblVehicleTrips CNW_TL 6.50 2.15
tblVehicleTrips CW_TL 10.00 3.31
tblVehicleTrips CW_TL 10.00 3.31
tblVehicleTrips CW_TL 10.00 3.31
tblVehicleTrips CW_TL 10.00 3.31
tblVehicleTrips DV_TP 21.00 0.00
tblVehicleTrips DV_TP 21.00 0.00
tblVehicleTrips DV_TP 38.00 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 3 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.0 Emissions Summary
tblVehicleTrips DV_TP 19.00 0.00
tblVehicleTrips PB_TP 65.00 0.00
tblVehicleTrips PB_TP 50.00 0.00
tblVehicleTrips PB_TP 4.00 0.00
tblVehicleTrips PB_TP 2.00 0.00
tblVehicleTrips PR_TP 14.00 100.00
tblVehicleTrips PR_TP 29.00 100.00
tblVehicleTrips PR_TP 58.00 100.00
tblVehicleTrips PR_TP 79.00 100.00
tblVehicleTrips ST_TR 322.50 101.55
tblVehicleTrips ST_TR 616.12 208.86
tblVehicleTrips ST_TR 8.19 7.20
tblVehicleTrips ST_TR 2.54 1.94
tblVehicleTrips SU_TR 322.50 101.55
tblVehicleTrips SU_TR 472.58 208.86
tblVehicleTrips SU_TR 5.95 7.20
tblVehicleTrips SU_TR 1.24 1.94
tblVehicleTrips WD_TR 322.50 101.55
tblVehicleTrips WD_TR 470.95 208.86
tblVehicleTrips WD_TR 8.36 7.20
tblVehicleTrips WD_TR 3.37 1.94
CalEEMod Version: CalEEMod.2020.4.0 Page 4 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2023 2.7132 27.5599 18.6716 0.0392 19.7939 1.2667 21.0607 10.1388 1.1654 11.3042 0.0000 3,801.262 2 3,801.262
2 1.1966 3.6100e0033,832.252
4 2024 3.4515 43.5621 30.4463 0.1066 19.7939 1.4170 21.0240 10.1388 1.3066 11.2704 0.0000 10,861.71 38 10,861.71
38 2.1352 0.7535 11,139.64
80 2025 3.1271 38.8259 29.0339 0.1056 10.6987 1.2109 11.9095 4.0476 1.1169 5.1645 0.0000 10,758.33 17 10,758.33
17 2.1314 0.7377 11,031.44
87 2026 48.0611 82.3251 117.2129 0.5011 39.4114 1.2089 40.4599 10.6362 1.1150 11.6280 0.0000 52,887.32 69 52,887.32
69 2.1276 4.4891 54,273.65
45 2027 47.4499 80.6348 112.7006 0.4890 39.4106 1.0332 40.4438 10.6359 0.9773 11.6132 0.0000 51,792.25 74 51,792.25
74 1.8694 4.3795 53,144.09
23 2028 46.8892 79.2328 108.9336 0.4779 39.4099 1.0182 40.4281 10.6357 0.9633 11.5989 0.0000 50,788.00 11 50,788.00
11 1.8078 4.2797 52,108.53
80 2029 46.3448 77.9635 105.6540 0.4677 39.4093 1.0037 40.4130 10.6354 0.9498 11.5852 0.0000 49,865.87 83 49,865.87
83 1.7528 4.1885 51,157.87
92 2030 45.7296 72.0019 102.9636 0.4625 39.4087 0.5792 39.9879 10.6352 0.5574 11.1926 0.0000 49,376.55 63 49,376.55
63 1.2160 4.1068 50,630.78
71 2031 45.2355 71.0251 100.5847 0.4544 39.4082 0.5664 39.9747 10.6350 0.5454 11.1805 0.0000 48,636.33 58 48,636.33
58 1.1717 4.0349 49,868.03
30 2032 44.7853 70.1991 98.5628 0.4472 39.4079 0.5551 39.9630 10.6349 0.5348 11.1697 0.0000 47,986.29 32 47,986.29
32 1.1327 3.9729 49,198.52
73 2033 44.3973 69.5120 96.8444 0.4408 39.4075 0.5451 39.9526 10.6348 0.5255 11.1603 0.0000 47,413.95 35 47,413.95
35 1.0989 3.9192 48,609.33
42 Maximum 48.0611 82.3251 117.2129 0.5011 39.4114 1.4170 40.4599 10.6362 1.3066 11.6280 0.0000 52,887.32 69 52,887.32
69 2.1352 4.4891 54,273.65
45 Unmitigated Construction
CalEEMod Version: CalEEMod.2020.4.0 Page 5 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.1 Overall Construction (Maximum Daily Emission)
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Year lb/day lb/day
2023 0.5193 2.0533 21.2962 0.0392 19.7939 0.0628 19.8567 10.1388 0.0627 10.2015 0.0000 3,801.262 2 3,801.262
2 1.1966 3.6100e0033,832.252
4 2024 0.9950 14.4852 35.7226 0.1066 19.7939 0.1831 19.8567 10.1388 0.1796 10.2015 0.0000 10,861.71 38 10,861.71
38 2.1352 0.7535 11,139.64
80 2025 0.9874 14.1831 35.7019 0.1056 10.6987 0.1815 10.8802 4.0476 0.1780 4.2256 0.0000 10,758.33 17 10,758.33
17 2.1314 0.7377 11,031.44
87 2026 46.8804 71.0734 118.6117 0.5011 39.4114 0.5143 39.9256 10.6362 0.4888 11.1250 0.0000 52,887.32 69 52,887.32
69 2.1276 4.4891 54,273.65
45 2027 46.2691 69.3831 114.0994 0.4890 39.4106 0.4988 39.9094 10.6359 0.4743 11.1102 0.0000 51,792.25 74 51,792.25
74 1.8694 4.3795 53,144.09
23 2028 45.7085 67.9811 110.3324 0.4779 39.4099 0.4839 39.8938 10.6357 0.4603 11.0959 0.0000 50,788.00 11 50,788.00
11 1.8078 4.2797 52,108.53
80 2029 45.1641 66.7118 107.0528 0.4677 39.4093 0.4694 39.8787 10.6354 0.4467 11.0822 0.0000 49,865.87 83 49,865.87
83 1.7528 4.1885 51,157.87
92 2030 44.6473 65.5744 104.3015 0.4625 39.4087 0.4555 39.8642 10.6352 0.4337 11.0689 0.0000 49,376.55 63 49,376.55
63 1.2160 4.1068 50,630.78
71 2031 44.1532 64.5977 101.9227 0.4544 39.4082 0.4427 39.8510 10.6350 0.4217 11.0568 0.0000 48,636.33 58 48,636.33
58 1.1717 4.0349 49,868.03
30 2032 43.7030 63.7716 99.9007 0.4472 39.4079 0.4314 39.8393 10.6349 0.4111 11.0460 0.0000 47,986.29 32 47,986.29
32 1.1327 3.9729 49,198.52
73 2033 43.3150 63.0845 98.1824 0.4408 39.4075 0.4214 39.8289 10.6348 0.4018 11.0366 0.0000 47,413.95 35 47,413.95
35 1.0989 3.9192 48,609.33
42 Maximum 46.8804 71.0734 118.6117 0.5011 39.4114 0.5143 39.9256 10.6362 0.4888 11.1250 0.0000 52,887.32 69 52,887.32
69 2.1352 4.4891 54,273.65
45 Mitigated Construction
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
4.19 21.03 -2.77 0.00 0.00 60.16 1.61 0.00 59.43 4.73 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 6 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 161.3046 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Energy 2.7063 24.6029 20.6665 0.1476 1.8698 1.8698 1.8698 1.8698 29,523.53 39 29,523.53
39 0.5659 0.5413 29,698.97
75 Mobile 23.0128 23.7934 198.9401 0.2717 35.4391 0.2004 35.6395 9.4406 0.1868 9.6274 29,704.71 64 29,704.71
64 3.0767 2.0145 30,381.94
06 Offroad 16.1253 88.6036 216.4662 0.3419 1.1966 1.1966 1.1966 1.1966 0.0000 32,381.56 02 32,381.56
02 1.4245 32,417.17
25 Total 203.1489 137.0095 437.1332 0.7613 35.4391 3.2706 38.7097 9.4406 3.2570 12.6976 0.0000 91,612.09 49 91,612.09
49 5.0730 2.5557 92,500.52
23 Unmitigated Operational
CalEEMod Version: CalEEMod.2020.4.0 Page 7 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
2.2 Overall Operational
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Area 161.3046 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Energy 2.7063 24.6029 20.6665 0.1476 1.8698 1.8698 1.8698 1.8698 29,523.53 39 29,523.53
39 0.5659 0.5413 29,698.97
75 Mobile 23.0128 23.7934 198.9401 0.2717 35.4391 0.2004 35.6395 9.4406 0.1868 9.6274 29,704.71 64 29,704.71
64 3.0767 2.0145 30,381.94
06 Offroad 16.1253 88.6036 216.4662 0.3419 1.1966 1.1966 1.1966 1.1966 0.0000 32,381.56 02 32,381.56
02 1.4245 32,417.17
25 Total 203.1489 137.0095 437.1332 0.7613 35.4391 3.2706 38.7097 9.4406 3.2570 12.6976 0.0000 91,612.09 49 91,612.09
49 5.0730 2.5557 92,500.52
23 Mitigated Operational
3.0 Construction Detail
Construction Phase
Phase
Number
Phase Name Phase Type Start Date End Date Num Days
Week
Num Days Phase Description
1 Site Preparation Site Preparation 9/1/2023 1/4/2024 5 90 2 Grading Grading 1/5/2024 1/29/2026 5 540
3 Paving Paving 1/30/2026 6/4/2026 5 90
4 Building Construction Building Construction 6/5/2026 4/28/2033 5 1800 ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e
Percent
Reduction
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2020.4.0 Page 8 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied 5 Architectural Coating Architectural Coating 6/19/2026 5/12/2033 5 1800 OffRoad Equipment
Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Site Preparation Rubber Tired Dozers 3 8.00 247 0.40
Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Grading Excavators 2 8.00 158 0.38
Grading Graders 1 8.00 187 0.41
Grading Rubber Tired Dozers 1 8.00 247 0.40
Grading Scrapers 2 8.00 367 0.48
Grading Tractors/Loaders/Backhoes 2 8.00 97 0.37
Paving Pavers 2 8.00 130 0.42
Paving Paving Equipment 2 8.00 132 0.36
Paving Rollers 2 8.00 80 0.38
Building Construction Cranes 1 7.00 231 0.29
Building Construction Forklifts 3 8.00 89 0.20
Building Construction Generator Sets 1 8.00 84 0.74
Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Building Construction Welders 1 8.00 46 0.45
Architectural Coating Air Compressors 1 6.00 78 0.48
Trips and VMT
Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 10,061,250; Non-Residential Outdoor: 3,353,750; Striped Parking Area:
88,080 (Architectural Coating – sqft)
Acres of Grading (Site Preparation Phase): 135
Acres of Grading (Grading Phase): 1620
Acres of Paving: 33.03
CalEEMod Version: CalEEMod.2020.4.0 Page 9 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 19.6570 0.0000 19.6570 10.1025 0.0000 10.1025 0.0000 0.0000 Off-Road 2.6595 27.5242 18.2443 0.0381 1.2660 1.2660 1.1647 1.1647 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Total 2.6595 27.5242 18.2443 0.0381 19.6570 1.2660 20.9230 10.1025 1.1647 11.2672 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Unmitigated Construction On-Site
3.1 Mitigation Measures Construction
Use Cleaner Engines for Construction Equipment
Phase Name Offroad Equipment
Count
Worker Trip
Number
Vendor Trip
Number
Hauling Trip
Number
Worker Trip
Length
Vendor Trip
Length
Hauling Trip
Length
Worker Vehicle
Class
Vendor
Vehicle Class
Hauling
Vehicle Class
Site Preparation 7 18.00 0.00 0.00 10.00 6.50 20.00 LD_Mix HDT_Mix HHDT Grading 8 20.00 0.00 38,000.00 10.00 6.50 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 10.00 6.50 20.00 LD_Mix HDT_Mix HHDT Building Construction 9 3,433.00 1,340.00 0.00 10.00 6.50 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 1 687.00 0.00 0.00 10.00 6.50 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2020.4.0 Page 10 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0537 0.0358 0.4272 1.1100e0030.1369 7.1000e0040.1376 0.0363 6.5000e0040.0370 113.9541 113.9541 4.0500e0033.6100e003115.1305 Total 0.0537 0.0358 0.4272 1.1100e0030.1369 7.1000e0040.1376 0.0363 6.5000e0040.0370 113.9541 113.9541 4.0500e0033.6100e003115.1305 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 19.6570 0.0000 19.6570 10.1025 0.0000 10.1025 0.0000 0.0000 Off-Road 0.4656 2.0175 20.8690 0.0381 0.0621 0.0621 0.0621 0.0621 0.0000 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Total 0.4656 2.0175 20.8690 0.0381 19.6570 0.0621 19.7191 10.1025 0.0621 10.1645 0.0000 3,687.308 1 3,687.308
1 1.1926 3,717.121
9 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 11 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2023
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0537 0.0358 0.4272 1.1100e0030.1369 7.1000e0040.1376 0.0363 6.5000e0040.0370 113.9541 113.9541 4.0500e0033.6100e003115.1305 Total 0.0537 0.0358 0.4272 1.1100e0030.1369 7.1000e0040.1376 0.0363 6.5000e0040.0370 113.9541 113.9541 4.0500e0033.6100e003115.1305 Mitigated Construction Off-Site
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 19.6570 0.0000 19.6570 10.1025 0.0000 10.1025 0.0000 0.0000 Off-Road 2.6609 27.1760 18.3356 0.0381 1.2294 1.2294 1.1310 1.1310 3,688.010 0 3,688.010
0 1.1928 3,717.829
4 Total 2.6609 27.1760 18.3356 0.0381 19.6570 1.2294 20.8864 10.1025 1.1310 11.2335 3,688.010 0 3,688.010
0 1.1928 3,717.829
4 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 12 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0503 0.0318 0.3985 1.0800e0030.1369 6.7000e0040.1376 0.0363 6.2000e0040.0369 111.1171 111.1171 3.6800e0033.3500e003112.2087 Total 0.0503 0.0318 0.3985 1.0800e0030.1369 6.7000e0040.1376 0.0363 6.2000e0040.0369 111.1171 111.1171 3.6800e0033.3500e003112.2087 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 19.6570 0.0000 19.6570 10.1025 0.0000 10.1025 0.0000 0.0000 Off-Road 0.4656 2.0175 20.8690 0.0381 0.0621 0.0621 0.0621 0.0621 0.0000 3,688.010 0 3,688.010
0 1.1928 3,717.829
4 Total 0.4656 2.0175 20.8690 0.0381 19.6570 0.0621 19.7191 10.1025 0.0621 10.1645 0.0000 3,688.010 0 3,688.010
0 1.1928 3,717.829
4 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 13 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.2 Site Preparation - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0503 0.0318 0.3985 1.0800e0030.1369 6.7000e0040.1376 0.0363 6.2000e0040.0369 111.1171 111.1171 3.6800e0033.3500e003112.2087 Total 0.0503 0.0318 0.3985 1.0800e0030.1369 6.7000e0040.1376 0.0363 6.2000e0040.0369 111.1171 111.1171 3.6800e0033.3500e003112.2087 Mitigated Construction Off-Site
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 9.3200 0.0000 9.3200 3.6714 0.0000 3.6714 0.0000 0.0000 Off-Road 3.2181 32.3770 27.7228 0.0621 1.3354 1.3354 1.2286 1.2286 6,009.748 7 6,009.748
7 1.9437 6,058.340
5 Total 3.2181 32.3770 27.7228 0.0621 9.3200 1.3354 10.6554 3.6714 1.2286 4.9000 6,009.748 7 6,009.748
7 1.9437 6,058.340
5 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 14 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.1775 11.1498 2.2807 0.0433 1.2268 0.0809 1.3077 0.3359 0.0774 0.4133 4,728.501 7 4,728.501
7 0.1874 0.7498 4,956.631
1 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0559 0.0354 0.4428 1.2000e0030.1521 7.5000e0040.1529 0.0404 6.9000e0040.0410 123.4634 123.4634 4.0900e0033.7300e003124.6763 Total 0.2334 11.1852 2.7235 0.0445 1.3790 0.0816 1.4606 0.3763 0.0780 0.4543 4,851.965 1 4,851.965
1 0.1915 0.7535 5,081.307
4 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 9.3200 0.0000 9.3200 3.6714 0.0000 3.6714 0.0000 0.0000 Off-Road 0.7616 3.3000 32.9991 0.0621 0.1015 0.1015 0.1015 0.1015 0.0000 6,009.748 7 6,009.748
7 1.9437 6,058.340
5 Total 0.7616 3.3000 32.9991 0.0621 9.3200 0.1015 9.4216 3.6714 0.1015 3.7729 0.0000 6,009.748 7 6,009.748
7 1.9437 6,058.340
5 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 15 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2024
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.1775 11.1498 2.2807 0.0433 1.2268 0.0809 1.3077 0.3359 0.0774 0.4133 4,728.501 7 4,728.501
7 0.1874 0.7498 4,956.631
1 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0559 0.0354 0.4428 1.2000e0030.1521 7.5000e0040.1529 0.0404 6.9000e0040.0410 123.4634 123.4634 4.0900e0033.7300e003124.6763 Total 0.2334 11.1852 2.7235 0.0445 1.3790 0.0816 1.4606 0.3763 0.0780 0.4543 4,851.965 1 4,851.965
1 0.1915 0.7535 5,081.307
4 Mitigated Construction Off-Site
3.3 Grading - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 9.3200 0.0000 9.3200 3.6714 0.0000 3.6714 0.0000 0.0000 Off-Road 2.9012 27.9429 26.3311 0.0621 1.1309 1.1309 1.0404 1.0404 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Total 2.9012 27.9429 26.3311 0.0621 9.3200 1.1309 10.4509 3.6714 1.0404 4.7118 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 16 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.1733 10.8513 2.2879 0.0424 1.2265 0.0793 1.3058 0.3358 0.0758 0.4116 4,629.565 4 4,629.565
4 0.1844 0.7342 4,852.971
3 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0525 0.0317 0.4149 1.1600e0030.1521 7.1000e0040.1529 0.0404 6.6000e0040.0410 120.4848 120.4848 3.7200e0033.4800e003121.6159 Total 0.2258 10.8830 2.7028 0.0435 1.3787 0.0800 1.4586 0.3762 0.0765 0.4527 4,750.050 2 4,750.050
2 0.1882 0.7377 4,974.587
2 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 9.3200 0.0000 9.3200 3.6714 0.0000 3.6714 0.0000 0.0000 Off-Road 0.7616 3.3000 32.9991 0.0621 0.1015 0.1015 0.1015 0.1015 0.0000 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Total 0.7616 3.3000 32.9991 0.0621 9.3200 0.1015 9.4216 3.6714 0.1015 3.7729 0.0000 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 17 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2025
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.1733 10.8513 2.2879 0.0424 1.2265 0.0793 1.3058 0.3358 0.0758 0.4116 4,629.565 4 4,629.565
4 0.1844 0.7342 4,852.971
3 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0525 0.0317 0.4149 1.1600e0030.1521 7.1000e0040.1529 0.0404 6.6000e0040.0410 120.4848 120.4848 3.7200e0033.4800e003121.6159 Total 0.2258 10.8830 2.7028 0.0435 1.3787 0.0800 1.4586 0.3762 0.0765 0.4527 4,750.050 2 4,750.050
2 0.1882 0.7377 4,974.587
2 Mitigated Construction Off-Site
3.3 Grading - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 9.3200 0.0000 9.3200 3.6714 0.0000 3.6714 0.0000 0.0000 Off-Road 2.9012 27.9429 26.3311 0.0621 1.1309 1.1309 1.0404 1.0404 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Total 2.9012 27.9429 26.3311 0.0621 9.3200 1.1309 10.4509 3.6714 1.0404 4.7118 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 18 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.1688 10.5572 2.2903 0.0415 1.2263 0.0773 1.3036 0.3357 0.0740 0.4097 4,532.211 4 4,532.211
4 0.1810 0.7188 4,750.947
2 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0496 0.0288 0.3912 1.1200e0030.1521 6.8000e0040.1528 0.0404 6.3000e0040.0410 117.6293 117.6293 3.4000e0033.2800e003118.6922 Total 0.2184 10.5860 2.6815 0.0426 1.3784 0.0780 1.4564 0.3761 0.0746 0.4507 4,649.840 7 4,649.840
7 0.1844 0.7221 4,869.639
4 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Fugitive Dust 9.3200 0.0000 9.3200 3.6714 0.0000 3.6714 0.0000 0.0000 Off-Road 0.7616 3.3000 32.9991 0.0621 0.1015 0.1015 0.1015 0.1015 0.0000 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Total 0.7616 3.3000 32.9991 0.0621 9.3200 0.1015 9.4216 3.6714 0.1015 3.7729 0.0000 6,008.281 4 6,008.281
4 1.9432 6,056.861
4 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 19 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.3 Grading - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.1688 10.5572 2.2903 0.0415 1.2263 0.0773 1.3036 0.3357 0.0740 0.4097 4,532.211 4 4,532.211
4 0.1810 0.7188 4,750.947
2 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0496 0.0288 0.3912 1.1200e0030.1521 6.8000e0040.1528 0.0404 6.3000e0040.0410 117.6293 117.6293 3.4000e0033.2800e003118.6922 Total 0.2184 10.5860 2.6815 0.0426 1.3784 0.0780 1.4564 0.3761 0.0746 0.4507 4,649.840 7 4,649.840
7 0.1844 0.7221 4,869.639
4 Mitigated Construction Off-Site
3.4 Paving - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Paving 0.9615 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.8767 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 20 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.4 Paving - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0372 0.0216 0.2934 8.4000e0040.1141 5.1000e0040.1146 0.0303 4.7000e0040.0307 88.2220 88.2220 2.5500e0032.4600e00389.0192 Total 0.0372 0.0216 0.2934 8.4000e0040.1141 5.1000e0040.1146 0.0303 4.7000e0040.0307 88.2220 88.2220 2.5500e0032.4600e00389.0192 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.2805 1.2154 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Paving 0.9615 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.2420 1.2154 17.2957 0.0228 0.0374 0.0374 0.0374 0.0374 0.0000 2,206.745 2 2,206.745
2 0.7137 2,224.587
8 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 21 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.4 Paving - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0372 0.0216 0.2934 8.4000e0040.1141 5.1000e0040.1146 0.0303 4.7000e0040.0307 88.2220 88.2220 2.5500e0032.4600e00389.0192 Total 0.0372 0.0216 0.2934 8.4000e0040.1141 5.1000e0040.1146 0.0303 4.7000e0040.0307 88.2220 88.2220 2.5500e0032.4600e00389.0192 Mitigated Construction Off-Site
3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 22 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.5343 62.7843 18.7260 0.2404 8.0706 0.3293 8.3998 2.3227 0.3150 2.6377 25,817.76 73 25,817.76
73 0.6269 3.8131 26,969.73
24 Worker 8.5143 4.9376 67.1543 0.1922 26.1148 0.1168 26.2317 6.9272 0.1076 7.0348 20,191.07 05 20,191.07
05 0.5831 0.5633 20,373.51
53 Total 10.0486 67.7219 85.8804 0.4327 34.1854 0.4461 34.6315 9.2499 0.4225 9.6725 46,008.83 78 46,008.83
78 1.2100 4.3764 47,343.24
77 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 23 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.5343 62.7843 18.7260 0.2404 8.0706 0.3293 8.3998 2.3227 0.3150 2.6377 25,817.76 73 25,817.76
73 0.6269 3.8131 26,969.73
24 Worker 8.5143 4.9376 67.1543 0.1922 26.1148 0.1168 26.2317 6.9272 0.1076 7.0348 20,191.07 05 20,191.07
05 0.5831 0.5633 20,373.51
53 Total 10.0486 67.7219 85.8804 0.4327 34.1854 0.4461 34.6315 9.2499 0.4225 9.6725 46,008.83 78 46,008.83
78 1.2100 4.3764 47,343.24
77 Mitigated Construction Off-Site
3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 24 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.4818 61.6061 18.3956 0.2352 8.0698 0.3215 8.3913 2.3225 0.3075 2.6300 25,265.69 58 25,265.69
58 0.6107 3.7384 26,394.99
99 Worker 8.0487 4.5108 63.6698 0.1865 26.1148 0.1105 26.2253 6.9272 0.1017 7.0289 19,738.61 61 19,738.61
61 0.5353 0.5342 19,911.20
21 Total 9.5305 66.1169 82.0654 0.4217 34.1846 0.4320 34.6166 9.2496 0.4092 9.6589 45,004.31 19 45,004.31
19 1.1460 4.2726 46,306.20
20 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 25 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.4818 61.6061 18.3956 0.2352 8.0698 0.3215 8.3913 2.3225 0.3075 2.6300 25,265.69 58 25,265.69
58 0.6107 3.7384 26,394.99
99 Worker 8.0487 4.5108 63.6698 0.1865 26.1148 0.1105 26.2253 6.9272 0.1017 7.0289 19,738.61 61 19,738.61
61 0.5353 0.5342 19,911.20
21 Total 9.5305 66.1169 82.0654 0.4217 34.1846 0.4320 34.6166 9.2496 0.4092 9.6589 45,004.31 19 45,004.31
19 1.1460 4.2726 46,306.20
20 Mitigated Construction Off-Site
3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 26 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.4354 60.6264 18.1277 0.2304 8.0691 0.3146 8.3837 2.3222 0.3009 2.6232 24,748.13 39 24,748.13
39 0.5986 3.6675 25,856.00
91 Worker 7.6202 4.1589 60.7542 0.1813 26.1148 0.1037 26.2185 6.9272 0.0955 7.0227 19,333.07 69 19,333.07
69 0.4940 0.5101 19,497.43
94 Total 9.0556 64.7853 78.8819 0.4117 34.1839 0.4183 34.6023 9.2494 0.3964 9.6458 44,081.21 07 44,081.21
07 1.0926 4.1776 45,353.44
84 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 27 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.4354 60.6264 18.1277 0.2304 8.0691 0.3146 8.3837 2.3222 0.3009 2.6232 24,748.13 39 24,748.13
39 0.5986 3.6675 25,856.00
91 Worker 7.6202 4.1589 60.7542 0.1813 26.1148 0.1037 26.2185 6.9272 0.0955 7.0227 19,333.07 69 19,333.07
69 0.4940 0.5101 19,497.43
94 Total 9.0556 64.7853 78.8819 0.4117 34.1839 0.4183 34.6023 9.2494 0.3964 9.6458 44,081.21 07 44,081.21
07 1.0926 4.1776 45,353.44
84 Mitigated Construction Off-Site
3.5 Building Construction - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 1.3674 12.4697 16.0847 0.0270 0.5276 0.5276 0.4963 0.4963 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 28 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3922 59.7148 17.8937 0.2258 8.0685 0.3080 8.3765 2.3220 0.2946 2.6166 24,263.72 55 24,263.72
55 0.5876 3.6007 25,351.41
93 Worker 7.2025 3.8609 58.2164 0.1766 26.1148 0.0972 26.2120 6.9272 0.0895 7.0167 18,968.35 02 18,968.35
02 0.4574 0.4898 19,125.75
13 Total 8.5948 63.5757 76.1101 0.4024 34.1833 0.4052 34.5885 9.2492 0.3841 9.6333 43,232.07 57 43,232.07
57 1.0450 4.0905 44,477.17
06 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Total 0.3278 2.2347 17.4603 0.0270 0.0408 0.0408 0.0408 0.0408 0.0000 2,556.474 4 2,556.474
4 0.6010 2,571.498
1 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 29 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3922 59.7148 17.8937 0.2258 8.0685 0.3080 8.3765 2.3220 0.2946 2.6166 24,263.72 55 24,263.72
55 0.5876 3.6007 25,351.41
93 Worker 7.2025 3.8609 58.2164 0.1766 26.1148 0.0972 26.2120 6.9272 0.0895 7.0167 18,968.35 02 18,968.35
02 0.4574 0.4898 19,125.75
13 Total 8.5948 63.5757 76.1101 0.4024 34.1833 0.4052 34.5885 9.2492 0.3841 9.6333 43,232.07 57 43,232.07
57 1.0450 4.0905 44,477.17
06 Mitigated Construction Off-Site
3.5 Building Construction - 2030
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 30 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2030
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3530 58.8780 17.7059 0.2217 8.0679 0.3015 8.3694 2.3218 0.2884 2.6102 23,818.79 48 23,818.79
48 0.5784 3.5393 24,887.95
98 Worker 6.8046 3.6105 56.0803 0.1725 26.1148 0.0910 26.2058 6.9272 0.0838 7.0110 18,647.16 17 18,647.16
17 0.4249 0.4729 18,798.70
94 Total 8.1576 62.4884 73.7862 0.3941 34.1827 0.3925 34.5752 9.2490 0.3722 9.6211 42,465.95 64 42,465.95
64 1.0034 4.0122 43,686.66
92 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 31 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2030
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3530 58.8780 17.7059 0.2217 8.0679 0.3015 8.3694 2.3218 0.2884 2.6102 23,818.79 48 23,818.79
48 0.5784 3.5393 24,887.95
98 Worker 6.8046 3.6105 56.0803 0.1725 26.1148 0.0910 26.2058 6.9272 0.0838 7.0110 18,647.16 17 18,647.16
17 0.4249 0.4729 18,798.70
94 Total 8.1576 62.4884 73.7862 0.3941 34.1827 0.3925 34.5752 9.2490 0.3722 9.6211 42,465.95 64 42,465.95
64 1.0034 4.0122 43,686.66
92 Mitigated Construction Off-Site
3.5 Building Construction - 2031
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 32 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2031
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3196 58.1594 17.5731 0.2179 8.0674 0.2957 8.3631 2.3216 0.2829 2.6045 23,421.27 53 23,421.27
53 0.5689 3.4845 24,473.87
81 Worker 6.4207 3.3954 54.2088 0.1687 26.1148 0.0852 26.2000 6.9272 0.0784 7.0056 18,361.60 52 18,361.60
52 0.3960 0.4586 18,508.17
72 Total 7.7403 61.5547 71.7819 0.3867 34.1822 0.3809 34.5632 9.2488 0.3613 9.6101 41,782.88 05 41,782.88
05 0.9648 3.9431 42,982.05
54 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 33 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2031
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.3196 58.1594 17.5731 0.2179 8.0674 0.2957 8.3631 2.3216 0.2829 2.6045 23,421.27 53 23,421.27
53 0.5689 3.4845 24,473.87
81 Worker 6.4207 3.3954 54.2088 0.1687 26.1148 0.0852 26.2000 6.9272 0.0784 7.0056 18,361.60 52 18,361.60
52 0.3960 0.4586 18,508.17
72 Total 7.7403 61.5547 71.7819 0.3867 34.1822 0.3809 34.5632 9.2488 0.3613 9.6101 41,782.88 05 41,782.88
05 0.9648 3.9431 42,982.05
54 Mitigated Construction Off-Site
3.5 Building Construction - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 34 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2911 57.5453 17.4856 0.2147 8.0670 0.2908 8.3579 2.3215 0.2782 2.5996 23,071.76 28 23,071.76
28 0.5606 3.4365 24,109.84
26 Worker 6.0693 3.2187 52.5970 0.1655 26.1148 0.0799 26.1947 6.9272 0.0735 7.0007 18,111.18 78 18,111.18
78 0.3703 0.4470 18,253.64
35 Total 7.3604 60.7640 70.0825 0.3801 34.1819 0.3707 34.5525 9.2487 0.3517 9.6003 41,182.95 06 41,182.95
06 0.9309 3.8834 42,363.48
61 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 35 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2911 57.5453 17.4856 0.2147 8.0670 0.2908 8.3579 2.3215 0.2782 2.5996 23,071.76 28 23,071.76
28 0.5606 3.4365 24,109.84
26 Worker 6.0693 3.2187 52.5970 0.1655 26.1148 0.0799 26.1947 6.9272 0.0735 7.0007 18,111.18 78 18,111.18
78 0.3703 0.4470 18,253.64
35 Total 7.3604 60.7640 70.0825 0.3801 34.1819 0.3707 34.5525 9.2487 0.3517 9.6003 41,182.95 06 41,182.95
06 0.9309 3.8834 42,363.48
61 Mitigated Construction Off-Site
3.5 Building Construction - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 1.3091 7.9346 16.1570 0.0310 0.1481 0.1481 0.1481 0.1481 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 36 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2672 57.0280 17.4252 0.2118 8.0667 0.2867 8.3533 2.3213 0.2742 2.5955 22,762.64 02 22,762.64
02 0.5536 3.3940 23,787.89
84 Worker 5.7660 3.0772 51.2154 0.1626 26.1148 0.0750 26.1898 6.9272 0.0690 6.9962 17,891.86 16 17,891.86
16 0.3480 0.4376 18,030.95
77 Total 7.0332 60.1053 68.6407 0.3744 34.1815 0.3617 34.5432 9.2485 0.3432 9.5918 40,654.50 17 40,654.50
17 0.9016 3.8316 41,818.85
61 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Off-Road 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Total 0.3278 2.2347 17.4603 0.0310 0.0408 0.0408 0.0408 0.0408 0.0000 2,897.546 8 2,897.546
8 0.1162 2,900.452
9 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 37 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.5 Building Construction - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 1.2672 57.0280 17.4252 0.2118 8.0667 0.2867 8.3533 2.3213 0.2742 2.5955 22,762.64 02 22,762.64
02 0.5536 3.3940 23,787.89
84 Worker 5.7660 3.0772 51.2154 0.1626 26.1148 0.0750 26.1898 6.9272 0.0690 6.9962 17,891.86 16 17,891.86
16 0.3480 0.4376 18,030.95
77 Total 7.0332 60.1053 68.6407 0.3744 34.1815 0.3617 34.5432 9.2485 0.3432 9.5918 40,654.50 17 40,654.50
17 0.9016 3.8316 41,818.85
61 Mitigated Construction Off-Site
3.6 Architectural Coating - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 34.9413 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 38 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.7038 0.9881 13.4387 0.0385 5.2260 0.0234 5.2494 1.3863 0.0215 1.4078 4,040.566 7 4,040.566
7 0.1167 0.1127 4,077.076
9 Total 1.7038 0.9881 13.4387 0.0385 5.2260 0.0234 5.2494 1.3863 0.0215 1.4078 4,040.566 7 4,040.566
7 0.1167 0.1127 4,077.076
9 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 39 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2026
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.7038 0.9881 13.4387 0.0385 5.2260 0.0234 5.2494 1.3863 0.0215 1.4078 4,040.566 7 4,040.566
7 0.1167 0.1127 4,077.076
9 Total 1.7038 0.9881 13.4387 0.0385 5.2260 0.0234 5.2494 1.3863 0.0215 1.4078 4,040.566 7 4,040.566
7 0.1167 0.1127 4,077.076
9 Mitigated Construction Off-Site
3.6 Architectural Coating - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 34.9413 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 40 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.6107 0.9027 12.7414 0.0373 5.2260 0.0221 5.2481 1.3863 0.0204 1.4066 3,950.023 1 3,950.023
1 0.1071 0.1069 3,984.560
4 Total 1.6107 0.9027 12.7414 0.0373 5.2260 0.0221 5.2481 1.3863 0.0204 1.4066 3,950.023 1 3,950.023
1 0.1071 0.1069 3,984.560
4 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 41 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2027
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.6107 0.9027 12.7414 0.0373 5.2260 0.0221 5.2481 1.3863 0.0204 1.4066 3,950.023 1 3,950.023
1 0.1071 0.1069 3,984.560
4 Total 1.6107 0.9027 12.7414 0.0373 5.2260 0.0221 5.2481 1.3863 0.0204 1.4066 3,950.023 1 3,950.023
1 0.1071 0.1069 3,984.560
4 Mitigated Construction Off-Site
3.6 Architectural Coating - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 34.9413 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 42 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5249 0.8323 12.1579 0.0363 5.2260 0.0208 5.2468 1.3863 0.0191 1.4054 3,868.868 0 3,868.868
0 0.0989 0.1021 3,901.759
6 Total 1.5249 0.8323 12.1579 0.0363 5.2260 0.0208 5.2468 1.3863 0.0191 1.4054 3,868.868 0 3,868.868
0 0.0989 0.1021 3,901.759
6 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 43 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2028
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5249 0.8323 12.1579 0.0363 5.2260 0.0208 5.2468 1.3863 0.0191 1.4054 3,868.868 0 3,868.868
0 0.0989 0.1021 3,901.759
6 Total 1.5249 0.8323 12.1579 0.0363 5.2260 0.0208 5.2468 1.3863 0.0191 1.4054 3,868.868 0 3,868.868
0 0.0989 0.1021 3,901.759
6 Mitigated Construction Off-Site
3.6 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1709 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Total 34.9413 1.1455 1.8091 2.9700e0030.0515 0.0515 0.0515 0.0515 281.4481 281.4481 0.0154 281.8319 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 44 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.4413 0.7726 11.6501 0.0353 5.2260 0.0195 5.2455 1.3863 0.0179 1.4042 3,795.880 2 3,795.880
2 0.0915 0.0980 3,827.378
7 Total 1.4413 0.7726 11.6501 0.0353 5.2260 0.0195 5.2455 1.3863 0.0179 1.4042 3,795.880 2 3,795.880
2 0.0915 0.0980 3,827.378
7 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0154 281.8319 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 45 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2029
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.4413 0.7726 11.6501 0.0353 5.2260 0.0195 5.2455 1.3863 0.0179 1.4042 3,795.880 2 3,795.880
2 0.0915 0.0980 3,827.378
7 Total 1.4413 0.7726 11.6501 0.0353 5.2260 0.0195 5.2455 1.3863 0.0179 1.4042 3,795.880 2 3,795.880
2 0.0915 0.0980 3,827.378
7 Mitigated Construction Off-Site
3.6 Architectural Coating - 2030
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1308 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Total 34.9012 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 46 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2030
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.3617 0.7225 11.2226 0.0345 5.2260 0.0182 5.2442 1.3863 0.0168 1.4030 3,731.605 0 3,731.605
0 0.0850 0.0946 3,761.932
2 Total 1.3617 0.7225 11.2226 0.0345 5.2260 0.0182 5.2442 1.3863 0.0168 1.4030 3,731.605 0 3,731.605
0 0.0850 0.0946 3,761.932
2 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 47 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2030
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.3617 0.7225 11.2226 0.0345 5.2260 0.0182 5.2442 1.3863 0.0168 1.4030 3,731.605 0 3,731.605
0 0.0850 0.0946 3,761.932
2 Total 1.3617 0.7225 11.2226 0.0345 5.2260 0.0182 5.2442 1.3863 0.0168 1.4030 3,731.605 0 3,731.605
0 0.0850 0.0946 3,761.932
2 Mitigated Construction Off-Site
3.6 Architectural Coating - 2031
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1308 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Total 34.9012 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 48 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2031
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2849 0.6795 10.8481 0.0338 5.2260 0.0171 5.2431 1.3863 0.0157 1.4019 3,674.460 5 3,674.460
5 0.0792 0.0918 3,703.792
0 Total 1.2849 0.6795 10.8481 0.0338 5.2260 0.0171 5.2431 1.3863 0.0157 1.4019 3,674.460 5 3,674.460
5 0.0792 0.0918 3,703.792
0 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 49 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2031
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2849 0.6795 10.8481 0.0338 5.2260 0.0171 5.2431 1.3863 0.0157 1.4019 3,674.460 5 3,674.460
5 0.0792 0.0918 3,703.792
0 Total 1.2849 0.6795 10.8481 0.0338 5.2260 0.0171 5.2431 1.3863 0.0157 1.4019 3,674.460 5 3,674.460
5 0.0792 0.0918 3,703.792
0 Mitigated Construction Off-Site
3.6 Architectural Coating - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1308 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Total 34.9012 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 50 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2146 0.6441 10.5255 0.0331 5.2260 0.0160 5.2420 1.3863 0.0147 1.4010 3,624.347 8 3,624.347
8 0.0741 0.0895 3,652.855
5 Total 1.2146 0.6441 10.5255 0.0331 5.2260 0.0160 5.2420 1.3863 0.0147 1.4010 3,624.347 8 3,624.347
8 0.0741 0.0895 3,652.855
5 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 51 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2032
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.2146 0.6441 10.5255 0.0331 5.2260 0.0160 5.2420 1.3863 0.0147 1.4010 3,624.347 8 3,624.347
8 0.0741 0.0895 3,652.855
5 Total 1.2146 0.6441 10.5255 0.0331 5.2260 0.0160 5.2420 1.3863 0.0147 1.4010 3,624.347 8 3,624.347
8 0.0741 0.0895 3,652.855
5 Mitigated Construction Off-Site
3.6 Architectural Coating - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.1308 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Total 34.9012 0.8563 1.7977 2.9700e0030.0203 0.0203 0.0203 0.0203 281.4481 281.4481 0.0114 281.7328 Unmitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 52 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.1539 0.6158 10.2491 0.0325 5.2260 0.0150 5.2410 1.3863 0.0138 1.4001 3,580.457 0 3,580.457
0 0.0696 0.0876 3,608.292
4 Total 1.1539 0.6158 10.2491 0.0325 5.2260 0.0150 5.2410 1.3863 0.0138 1.4001 3,580.457 0 3,580.457
0 0.0696 0.0876 3,608.292
4 Unmitigated Construction Off-Site
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Archit. Coating 34.7704 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0297 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Total 34.8001 0.1288 1.8324 2.9700e0033.9600e0033.9600e0033.9600e0033.9600e0030.0000 281.4481 281.4481 0.0114 281.7328 Mitigated Construction On-Site
CalEEMod Version: CalEEMod.2020.4.0 Page 53 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
3.6 Architectural Coating - 2033
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.1539 0.6158 10.2491 0.0325 5.2260 0.0150 5.2410 1.3863 0.0138 1.4001 3,580.457 0 3,580.457
0 0.0696 0.0876 3,608.292
4 Total 1.1539 0.6158 10.2491 0.0325 5.2260 0.0150 5.2410 1.3863 0.0138 1.4001 3,580.457 0 3,580.457
0 0.0696 0.0876 3,608.292
4 Mitigated Construction Off-Site
4.0 Operational Detail - Mobile
4.1 Mitigation Measures Mobile
CalEEMod Version: CalEEMod.2020.4.0 Page 54 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 23.0128 23.7934 198.9401 0.2717 35.4391 0.2004 35.6395 9.4406 0.1868 9.6274 29,704.71 64 29,704.71
64 3.0767 2.0145 30,381.94
06 Unmitigated 23.0128 23.7934 198.9401 0.2717 35.4391 0.2004 35.6395 9.4406 0.1868 9.6274 29,704.71 64 29,704.71
64 3.0767 2.0145 30,381.94
06 4.2 Trip Summary Information
4.3 Trip Type Information
Average Daily Trip Rate Unmitigated Mitigated
Land Use Weekday Saturday Sunday Annual VMT Annual VMT
Convenience Market with Gas Pumps 2,031.00 2,031.00 2031.00 1,305,797 1,305,797 Fast Food Restaurant with Drive Thru 3,487.96 3,487.96 3487.96 2,271,855 2,271,855 Hotel 878.40 878.40 878.40 662,880 662,880
Industrial Park 12,822.04 12,822.04 12822.04 12,588,435 12,588,435 Parking Lot 0.00 0.00 0.00
Total 19,219.40 19,219.40 19,219.40 16,828,967 16,828,967 Miles Trip % Trip Purpose %
Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Convenience Market with Gas
Pumps
3.31 1.66 2.15 0.80 80.20 19.00 100 0 0
Fast Food Restaurant with Drive
Thru
3.31 1.66 2.15 2.20 78.80 19.00 100 0 0
Hotel 3.31 1.66 2.15 19.40 61.60 19.00 100 0 0
Industrial Park 3.31 1.66 2.15 59.00 28.00 13.00 100 0 0 Parking Lot 10.00 5.00 6.50 0.00 0.00 0.00 0 0 0
4.4 Fleet Mix
CalEEMod Version: CalEEMod.2020.4.0 Page 55 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Convenience Market with Gas
Pumps
0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428 Fast Food Restaurant with Drive
Thru
0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428 Hotel 0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428 Industrial Park 0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428 Parking Lot 0.567036 0.055979 0.181238 0.119180 0.019685 0.005252 0.013298 0.009451 0.000749 0.000688 0.024235 0.000780 0.002428
5.0 Energy Detail
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
NaturalGas
Mitigated
2.7063 24.6029 20.6665 0.1476 1.8698 1.8698 1.8698 1.8698 29,523.53 39 29,523.53
39 0.5659 0.5413 29,698.97
75 NaturalGas
Unmitigated
2.7063 24.6029 20.6665 0.1476 1.8698 1.8698 1.8698 1.8698 29,523.53 39 29,523.53
39 0.5659 0.5413 29,698.97
75 5.1 Mitigation Measures Energy
Historical Energy Use: N
CalEEMod Version: CalEEMod.2020.4.0 Page 56 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Convenience
Market with Gas
Pumps
119.17 1.2900e0030.0117 9.8100e0037.0000e0058.9000e0048.9000e0048.9000e0048.9000e00414.0200 14.0200 2.7000e0042.6000e00414.1033 Fast Food
Restaurant with
Drive Thru
8103.39 0.0874 0.7945 0.6673 4.7700e0030.0604 0.0604 0.0604 0.0604 953.3399 953.3399 0.0183 0.0175 959.0051 Hotel 7689.91 0.0829 0.7539 0.6333 4.5200e0030.0573 0.0573 0.0573 0.0573 904.6949 904.6949 0.0173 0.0166 910.0711 Industrial Park 235038 2.5347 23.0429 19.3560 0.1383 1.7513 1.7513 1.7513 1.7513 27,651.47 91 27,651.47
91 0.5300 0.5069 27,815.79
80 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.7063 24.6029 20.6665 0.1476 1.8698 1.8698 1.8698 1.8698 29,523.53 39 29,523.53
39 0.5659 0.5413 29,698.97
75 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 57 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
6.1 Mitigation Measures Area
6.0 Area Detail
5.2 Energy by Land Use - NaturalGas
NaturalGa
s Use
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Land Use kBTU/yr lb/day lb/day
Convenience
Market with Gas
Pumps
0.11917 1.2900e0030.0117 9.8100e0037.0000e0058.9000e0048.9000e0048.9000e0048.9000e00414.0200 14.0200 2.7000e0042.6000e00414.1033 Fast Food
Restaurant with
Drive Thru
8.10339 0.0874 0.7945 0.6673 4.7700e0030.0604 0.0604 0.0604 0.0604 953.3399 953.3399 0.0183 0.0175 959.0051 Hotel 7.68991 0.0829 0.7539 0.6333 4.5200e0030.0573 0.0573 0.0573 0.0573 904.6949 904.6949 0.0173 0.0166 910.0711 Industrial Park 235.038 2.5347 23.0429 19.3560 0.1383 1.7513 1.7513 1.7513 1.7513 27,651.47 91 27,651.47
91 0.5300 0.5069 27,815.79
80 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.7063 24.6029 20.6665 0.1476 1.8698 1.8698 1.8698 1.8698 29,523.53 39 29,523.53
39 0.5659 0.5413 29,698.97
75 Mitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 58 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Category lb/day lb/day
Mitigated 161.3046 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Unmitigated 161.3046 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating
17.1471 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
144.0605 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 0.0970 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Total 161.3046 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Unmitigated
CalEEMod Version: CalEEMod.2020.4.0 Page 59 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Apply Water Conservation Strategy
7.1 Mitigation Measures Water
7.0 Water Detail
6.2 Area by SubCategory
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
SubCategory lb/day lb/day
Architectural
Coating
17.1471 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Consumer
Products
144.0605 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000
Landscaping 0.0970 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Total 161.3046 9.5500e0031.0604 8.0000e0053.7600e0033.7600e0033.7600e0033.7600e0032.2844 2.2844 5.8900e0032.4317 Mitigated
8.1 Mitigation Measures Waste
8.0 Waste Detail
9.0 Operational Offroad
Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type Forklifts 121 12.00 300 89 0.20 Diesel
CalEEMod Version: CalEEMod.2020.4.0 Page 60 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied
11.0 Vegetation
ROG NOx CO SO2 Fugitive
PM10
Exhaust
PM10
PM10
Total
Fugitive
PM2.5
Exhaust
PM2.5
PM2.5
Total
Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e
Equipment Type lb/day lb/day
Forklifts 16.1253 88.6036 216.4662 0.3419 1.1966 1.1966 1.1966 1.1966 0.0000 32,381.56 02 32,381.56
02 1.4245 32,417.17
25 Total 16.1253 88.6036 216.4662 0.3419 1.1966 1.1966 1.1966 1.1966 0.0000 32,381.56 02 32,381.56
02 1.4245 32,417.17
25 UnMitigated/Mitigated
10.0 Stationary Equipment
Fire Pumps and Emergency Generators
Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers
Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment
Equipment Type Number
CalEEMod Version: CalEEMod.2020.4.0 Page 61 of 61 Date: 2/15/2024 8:25 AM Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation - Sacramento Metropolitan AQMD Air District, Winter EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Sacramento Metropolitan AQMD Air District, Mitigation Report Construction Mitigation Summary
Phase ROG NOx CO SO2
Exhaust
PM10
Exhaust
PM2.5 Bio- CO2
NBioCO2 Total CO2 CH4 N2O CO2e
Percent Reduction
Architectural Coating 0.00 0.52 0.00 0.00 0.58 0.60 0.00 0.00 0.00 0.00 0.00 0.00 Building Construction 0.11 0.11 -0.01 0.00 0.41 0.41 0.00 0.00 0.00 0.00 0.00 0.00 Grading 0.70 0.66 -0.20 0.00 0.86 0.85 0.00 0.00 0.00 0.00 0.00 0.00 Paving 0.33 0.86 -0.18 0.00 0.91 0.90 0.00 0.00 0.00 0.00 0.00 0.00 Site Preparation 0.81 0.93 -0.14 0.00 0.95 0.95 0.00 0.00 0.00 0.00 0.00 0.00 OFFROAD Equipment Mitigation
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 11 Date: 2/15/2024 8:26 AM EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation Equipment Type Fuel Type Tier Number Mitigated Total Number of Equipment DPF Oxidation Catalyst Air Compressors Diesel Tier 4 Final 1 1 No Change 0.00
Cranes Diesel Tier 4 Final 1 1 No Change 0.00
Excavators Diesel Tier 4 Final 2 2 No Change 0.00
Forklifts Diesel Tier 4 Final 3 3 No Change 0.00
Generator Sets Diesel Tier 4 Final 1 1 No Change 0.00
Graders Diesel Tier 4 Final 1 1 No Change 0.00
Pavers Diesel Tier 4 Final 2 2 No Change 0.00
Paving Equipment Diesel Tier 4 Final 2 2 No Change 0.00 Rollers Diesel Tier 4 Final 2 2 No Change 0.00
Rubber Tired Dozers Diesel Tier 4 Final 4 4 No Change 0.00 Scrapers Diesel Tier 4 Final 2 2 No Change 0.00
Tractors/Loaders/Backhoes Diesel Tier 4 Final 9 9 No Change 0.00 Welders Diesel Tier 4 Final 1 1 No Change 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 2 of 11 Date: 2/15/2024 8:26 AM EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation Equipment Type ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Unmitigated tons/yr Unmitigated mt/yr
Air Compressors 1.36160E-001 9.03990E-001 1.62322E+000 2.67000E-003 3.26600E-002 3.26600E-002 0.00000E+000 2.29793E+002 2.29793E+002 1.09600E-002 0.00000E+000 2.30067E+002 Cranes 2.28050E-001 1.62734E+000 1.22267E+000 5.05000E-003 6.56800E-002 6.12800E-002 0.00000E+000 4.38028E+002 4.38028E+002 7.50000E-002 0.00000E+000 4.39903E+002 Excavators 9.36300E-002 7.06440E-001 1.76152E+000 2.79000E-003 3.47200E-002 3.19400E-002 0.00000E+000 2.45088E+002 2.45088E+002 7.92700E-002 0.00000E+000 2.47070E+002 Forklifts 2.37150E-001 1.77992E+000 3.13782E+000 4.59000E-003 6.98400E-002 6.49400E-002 0.00000E+000 3.98470E+002 3.98470E+002 6.99900E-002 0.00000E+000 4.00220E+002 Generator Sets 2.08840E-001 1.89897E+000 3.28308E+000 5.92000E-003 6.06200E-002 6.06200E-002 0.00000E+000 5.08687E+002 5.08687E+002 1.66400E-002 0.00000E+000 5.09103E+002 Graders 8.96100E-002 1.02348E+000 4.38450E-001 1.79000E-003 3.30700E-002 3.04300E-002 0.00000E+000 1.56852E+002 1.56852E+002 5.07300E-002 0.00000E+000 1.58120E+002 Pavers 1.56400E-002 1.42480E-001 2.60620E-001 4.20000E-004 6.67000E-003 6.14000E-003 0.00000E+000 3.71487E+001 3.71487E+001 1.20100E-002 0.00000E+000 3.74490E+001 Paving Equipment 1.32100E-002 1.13820E-001 2.29180E-001 3.70000E-004 5.63000E-003 5.18000E-003 0.00000E+000 3.21947E+001 3.21947E+001 1.04100E-002 0.00000E+000 3.24550E+001 Rollers 1.23300E-002 1.29870E-001 1.66200E-001 2.40000E-004 6.53000E-003 6.01000E-003 0.00000E+000 2.07433E+001 2.07433E+001 6.71000E-003 0.00000E+000 2.09110E+001 Rubber Tired
Dozers
2.73530E-001 2.81663E+000 1.24609E+000 3.46000E-003 1.25670E-001 1.15610E-001 0.00000E+000 3.03841E+002 3.03841E+002 9.82700E-002 0.00000E+000 3.06297E+002 Scrapers 3.85550E-001 3.78205E+000 3.05681E+000 8.19000E-003 1.49190E-001 1.37260E-001 0.00000E+000 7.19438E+002 7.19438E+002 2.32680E-001 0.00000E+000 7.25255E+002 Tractors/Loaders/
Backhoes
4.59350E-001 3.83014E+000 7.00646E+000 1.03900E-002 1.33780E-001 1.24810E-001 0.00000E+000 9.04129E+002 9.04129E+002 1.87870E-001 0.00000E+000 9.08825E+002 Welders 1.73560E-001 1.14399E+000 1.46477E+000 2.30000E-003 2.61800E-002 2.61800E-002 0.00000E+000 1.69399E+002 1.69399E+002 1.40800E-002 0.00000E+000 1.69751E+002 CalEEMod Version: CalEEMod.2020.4.0 Page 3 of 11 Date: 2/15/2024 8:26 AM EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation Equipment Type ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Mitigated tons/yr Mitigated mt/yr
Air Compressors 2.67400E-002 1.15890E-001 1.64917E+000 2.67000E-003 3.57000E-003 3.57000E-003 0.00000E+000 2.29793E+002 2.29793E+002 1.09600E-002 0.00000E+000 2.30066E+002 Cranes 5.58300E-002 2.41910E-001 2.04695E+000 5.05000E-003 7.44000E-003 7.44000E-003 0.00000E+000 4.38027E+002 4.38027E+002 7.50000E-002 0.00000E+000 4.39902E+002 Excavators 3.43100E-002 1.48670E-001 2.11573E+000 2.79000E-003 4.57000E-003 4.57000E-003 0.00000E+000 2.45088E+002 2.45088E+002 7.92700E-002 0.00000E+000 2.47070E+002 Forklifts 5.08600E-002 2.20380E-001 3.13624E+000 4.59000E-003 6.78000E-003 6.78000E-003 0.00000E+000 3.98470E+002 3.98470E+002 6.99900E-002 0.00000E+000 4.00219E+002 Generator Sets 5.92000E-002 2.56540E-001 3.65072E+000 5.92000E-003 7.89000E-003 7.89000E-003 0.00000E+000 5.08686E+002 5.08686E+002 1.66400E-002 0.00000E+000 5.09102E+002 Graders 2.19100E-002 9.49300E-002 8.03220E-001 1.79000E-003 2.92000E-003 2.92000E-003 0.00000E+000 1.56851E+002 1.56851E+002 5.07300E-002 0.00000E+000 1.58120E+002 Pavers 5.20000E-003 2.25300E-002 3.20670E-001 4.20000E-004 6.90000E-004 6.90000E-004 0.00000E+000 3.71486E+001 3.71486E+001 1.20100E-002 0.00000E+000 3.74490E+001 Paving Equipment 4.53000E-003 1.96100E-002 2.79090E-001 3.70000E-004 6.00000E-004 6.00000E-004 0.00000E+000 3.21947E+001 3.21947E+001 1.04100E-002 0.00000E+000 3.24550E+001 Rollers 2.90000E-003 1.25500E-002 1.78540E-001 2.40000E-004 3.90000E-004 3.90000E-004 0.00000E+000 2.07433E+001 2.07433E+001 6.71000E-003 0.00000E+000 2.09110E+001 Rubber Tired Dozers 4.23400E-002 1.83490E-001 1.55260E+000 3.46000E-003 5.65000E-003 5.65000E-003 0.00000E+000 3.03840E+002 3.03840E+002 9.82700E-002 0.00000E+000 3.06297E+002 Scrapers 1.00660E-001 4.36210E-001 3.69103E+000 8.19000E-003 1.34200E-002 1.34200E-002 0.00000E+000 7.19437E+002 7.19437E+002 2.32680E-001 0.00000E+000 7.25254E+002 Tractors/Loaders/Ba
ckhoes
1.17070E-001 5.07310E-001 7.21941E+000 1.03900E-002 1.56100E-002 1.56100E-002 0.00000E+000 9.04127E+002 9.04127E+002 1.87870E-001 0.00000E+000 9.08824E+002 Welders 3.94300E-002 9.03590E-001 1.34716E+000 2.30000E-003 2.63000E-003 2.63000E-003 0.00000E+000 1.69398E+002 1.69398E+002 1.40800E-002 0.00000E+000 1.69750E+002 CalEEMod Version: CalEEMod.2020.4.0 Page 4 of 11 Date: 2/15/2024 8:26 AM EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation Equipment Type ROG NOx CO SO2 Exhaust PM10 Exhaust PM2.5 Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Percent Reduction
Air Compressors 8.03613E-001 8.71802E-001 -1.59867E-002 0.00000E+000 8.90692E-001 8.90692E-001 0.00000E+000 1.21849E-006 1.21849E-006 0.00000E+000 0.00000E+000 1.17357E-006 Cranes 7.55185E-001 8.51346E-001 -6.74164E-001 0.00000E+000 8.86724E-001 8.78590E-001 0.00000E+000 1.18714E-006 1.18714E-006 0.00000E+000 0.00000E+000 1.18208E-006 Excavators 6.33558E-001 7.89550E-001 -2.01082E-001 0.00000E+000 8.68376E-001 8.56919E-001 0.00000E+000 1.18325E-006 1.18325E-006 0.00000E+000 0.00000E+000 1.17376E-006 Forklifts 7.85537E-001 8.76185E-001 5.03534E-004 0.00000E+000 9.02921E-001 8.95596E-001 0.00000E+000 1.20461E-006 1.20461E-006 0.00000E+000 0.00000E+000 1.19934E-006 Generator Sets 7.16529E-001 8.64906E-001 -1.11980E-001 0.00000E+000 8.69845E-001 8.69845E-001 0.00000E+000 1.19917E-006 1.19917E-006 0.00000E+000 0.00000E+000 1.17854E-006 Graders 7.55496E-001 9.07248E-001 -8.31953E-001 0.00000E+000 9.11702E-001 9.04042E-001 0.00000E+000 1.21134E-006 1.21134E-006 0.00000E+000 0.00000E+000 1.20162E-006 Pavers 6.67519E-001 8.41873E-001 -2.30412E-001 0.00000E+000 8.96552E-001 8.87622E-001 0.00000E+000 1.07675E-006 1.07675E-006 0.00000E+000 0.00000E+000 1.06812E-006 Paving Equipment 6.57078E-001 8.27710E-001 -2.17776E-001 0.00000E+000 8.93428E-001 8.84170E-001 0.00000E+000 9.31831E-007 9.31831E-007 0.00000E+000 0.00000E+000 1.23248E-006 Rollers 7.64801E-001 9.03365E-001 -7.42479E-002 0.00000E+000 9.40276E-001 9.35108E-001 0.00000E+000 9.64167E-007 9.64167E-007 0.00000E+000 0.00000E+000 9.56433E-007 Rubber Tired Dozers 8.45209E-001 9.34855E-001 -2.45977E-001 0.00000E+000 9.55041E-001 9.51129E-001 0.00000E+000 1.18483E-006 1.18483E-006 0.00000E+000 0.00000E+000 1.20798E-006 Scrapers 7.38918E-001 8.84663E-001 -2.07478E-001 0.00000E+000 9.10048E-001 9.02229E-001 0.00000E+000 1.18148E-006 1.18148E-006 0.00000E+000 0.00000E+000 1.18579E-006 Tractors/Loaders/Ba
ckhoes
7.45140E-001 8.67548E-001 -3.03934E-002 0.00000E+000 8.83316E-001 8.74930E-001 0.00000E+000 1.18346E-006 1.18346E-006 0.00000E+000 0.00000E+000 1.18835E-006 Welders 7.72816E-001 2.10142E-001 8.02925E-002 0.00000E+000 8.99542E-001 8.99542E-001 0.00000E+000 1.23968E-006 1.23968E-006 0.00000E+000 0.00000E+000 1.17820E-006 Fugitive Dust Mitigation
No Soil Stabilizer for unpaved
Roads
PM10 Reduction 0.00 PM2.5 Reduction 0.00
Yes/No Mitigation Measure Mitigation Input Mitigation Input Mitigation Input CalEEMod Version: CalEEMod.2020.4.0 Page 5 of 11 Date: 2/15/2024 8:26 AM EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation No Replace Ground Cover of Area
Disturbed
PM10 Reduction 0.00 PM2.5 Reduction 0.00
No Water Exposed Area PM10 Reduction 0.00 PM2.5 Reduction 0.00 Frequency (per day)
No Unpaved Road Mitigation Moisture Content
%
0.00 Vehicle Speed
(mph)
0.00 No Clean Paved Road % PM Reduction 0.00
Operational Percent Reduction Summary
Unmitigated Mitigated Percent Reduction
Phase Source PM10 PM2.5 PM10 PM2.5 PM10 PM2.5
Architectural Coating Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Architectural Coating Roads 4.54 1.21 4.54 1.21 0.00 0.00 Building Construction Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00 Building Construction Roads 29.75 8.07 29.75 8.07 0.00 0.00 Grading Fugitive Dust 4.30 1.19 4.30 1.19 0.00 0.00
Grading Roads 0.36 0.10 0.36 0.10 0.00 0.00
Paving Fugitive Dust 0.00 0.00 0.00 0.00 0.00 0.00
Paving Roads 0.00 0.00 0.00 0.00 0.00 0.00
Site Preparation Fugitive Dust 0.96 0.46 0.96 0.46 0.00 0.00 Site Preparation Roads 0.01 0.00 0.01 0.00 0.00 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 6 of 11 Date: 2/15/2024 8:26 AM EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation Category ROG NOx CO SO2
Exhaust
PM10
Exhaust
PM2.5 Bio- CO2
NBioCO2 Total CO2 CH4 N2O CO2e
Percent Reduction
Architectural Coating 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Consumer Products 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hearth 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Landscaping 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Mobile 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Natural Gas 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Water Indoor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 Water Outdoor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Operational Mobile Mitigation
Mitigation
Selected
No
No
No
No
No
No
Category
Land Use
Land Use
Land Use
Land Use
Land Use
Land Use
Land Use
% Reduction
0.00 0.00
0.00 0.25
0.00 0.00
0.03 Input Value 1
0.20 Measure Input Value 2 Input Value 3
Increase Diversity
Land Use SubTotal
Integrate Below Market Rate Housing
Increase Transit Accessibility
Improve Destination Accessibility
Improve Walkability Design
Increase Density
Project Setting:
CalEEMod Version: CalEEMod.2020.4.0 Page 7 of 11 Date: 2/15/2024 8:26 AM EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation No
No
No Neighborhood Enhancements
Neighborhood Enhancements
Neighborhood Enhancements
Implement NEV Network 0.00
Provide Traffic Calming Measures
Improve Pedestrian Network
No
No
No
No
No
No
Parking Policy Pricing
Transit Improvements
Transit Improvements
Transit Improvements
Transit Improvements
Parking Policy Pricing
Parking Policy Pricing
Parking Policy Pricing
Neighborhood Enhancements 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Limit Parking Supply 0.00
Land Use and Site Enhancement Subtotal
Transit Improvements Subtotal
Increase Transit Frequency
Expand Transit Network
Provide BRT System
Parking Policy Pricing Subtotal
On-street Market Pricing
Unbundle Parking Costs
Neighborhood Enhancements Subtotal
No
No
No
No
No
No
No
Commute
Commute
Commute
Commute
Commute
Commute
Commute
0.00 0.00
0.00 2.00
Transit Subsidy
Employee Vanpool/Shuttle
Market Commute Trip Reduction Option
Encourage Telecommuting and Alternative
Work Schedules
Workplace Parking Charge
Implement Employee Parking "Cash Out"
Implement Trip Reduction Program
CalEEMod Version: CalEEMod.2020.4.0 Page 8 of 11 Date: 2/15/2024 8:26 AM EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation No
No School Trip
Commute
Commute
0.00 0.00
Implement School Bus Program
Commute Subtotal
Provide Ride Sharing Program
Total VMT Reduction 0.00
Area Mitigation
Measure Implemented
No
No
No
No
No
No
No
No
No
No
Mitigation Measure
No Hearth
% Electric Chainsaw
% Electric Leafblower
% Electric Lawnmower
Use Low VOC Paint (Non-residential Exterior)
Use Low VOC Paint (Non-residential Interior)
Use Low VOC Paint (Residential Exterior)
Use Low VOC Paint (Residential Interior)
Use Low VOC Cleaning Supplies
Only Natural Gas Hearth
Input Value
100.00
100.00
100.00
100.00
Energy Mitigation Measures
Measure Implemented
No
Mitigation Measure
Exceed Title 24
Input Value 1 Input Value 2
No Use Low VOC Paint (Parking) 100.00
CalEEMod Version: CalEEMod.2020.4.0 Page 9 of 11 Date: 2/15/2024 8:26 AM EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation Solid Waste Mitigation
No
No Install High Efficiency Lighting
On-site Renewable
Appliance Type Land Use Subtype % Improvement
ClothWasher 30.00
DishWasher 15.00
Fan 50.00
Refrigerator 15.00
Water Mitigation Measures
Measure Implemented
No
No
Yes
Mitigation Measure
Use Reclaimed Water
Use Grey Water
Apply Water Conservation on Strategy
Input Value 1
0.00 0.00
0.00 20.00
0.00 Input Value 2
No
No
No
No
Install low-flow bathroom faucet
Install low-flow Toilet
Install low-flow Shower
Install low-flow Kitchen faucet
32.00 18.00
20.00 20.00
No
No
No
Turf Reduction
Water Efficient Landscape
Use Water Efficient Irrigation Systems
0.00 6.10
0.00 0.00
CalEEMod Version: CalEEMod.2020.4.0 Page 10 of 11 Date: 2/15/2024 8:26 AM EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation Mitigation Measures
Institute Recycling and Composting Services
Percent Reduction in Waste Disposed
Input Value
CalEEMod Version: CalEEMod.2020.4.0 Page 11 of 11 Date: 2/15/2024 8:26 AM EMFAC Off-Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied Airport South Industrial Project - Full Buildout of Annexation Area_Tier 4 Mitigation Source: EMFAC2021 (v1.0.2) Emission Rates
Region Type: CountyRegion: SacramentoCalendar Year: 2029Season: AnnualVehicle Classification: EMFAC2007 CategoriesUnits: miles/day for CVMT and EVMT, trips/day for Trips, g/mile for RUNEX, PMBW and PMTW, g/trip for STREX, HOTSOAK and RUNLOSS, g/vehicle/day for IDLEX and DIURN. PHEV calculated based on total VMT.Region Calendar Year Vehicle Category Model Year Speed Fuel Population Total VMT CVMT EVMT Trips NOx_RUNEX PM2.5_RUNEX PM10_RUNEX CO2_RUNEX Sacramento 2029 HHDT Aggregate Aggregate Diesel 10083.56489 944669.6263 944669.6263 0 113359.2238 2.380079274 0.027007233 0.028228381 1546.813686 HHDT Total KSF Trip Rate Total Daily Trips Avg VMT/Trip Total VMT Full Buildout 6,609.30 0.387181699 2,559.00 44.8 114,643.20Proposed Project 5,204.50 0.387181699 2,015.09 44.8 90,275.90HHDT Nox (lbs/day) PM2.5 (lbs/day) PM10 (lbs/day) PM2.5 (tons/yr) PM10 (tons/yr) MTCO2e/yr Full Buildout 601.5536089 6.825948469 7.134587763 0.853243559 0.89182347 48,833.40 Proposed Project 473.6940005 5.375100057 5.618138383 0.671887507 0.702267298 38,453.91 Nox (lbs/day) PM2.5 (lbs/day) PM10 (lbs/day) PM2.5 (tons/yr) PM10 (tons/yr) MTCO2e/yr* ROG (lbs/day) CalEEMod 154.64 12.54 27.38 2.07 4.66 3,153.88 172.37
HHDT Emissions 473.69 5.38 5.62 0.67 0.70 38,453.91 N/ATotal 628.33 17.91 32.99 2.74 5.36 41,607.79 172.37 Nox (lbs/day) PM2.5 (lbs/day) PM10 (lbs/day) PM2.5 (tons/yr) PM10 (tons/yr) MTCO2e/yr* ROG (lbs/day) CalEEMod 137.01 12.70 38.71 2.22 6.79 5,089.08 214.49
HHDT Emissions 601.55 6.83 7.13 0.85 0.89 48,833.40 N/ATotal 738.56 19.52 45.84 3.07 7.68 53,922.48 214.49 * MTCO2e/yr is mobile emissions only. See CalEEMod for other emissions sources and total annual emissions.
VMT per Employee Employees per ksf Total KSF Total VMT (daily) Annual VMT
22.12 0.57208238 1,404.80 17,776.99 6,488,600.82
VMT per Employee Employees per ksf Total KSF Total VMT (daily) Annual VMT
22.12 0.57208238 6,609.30 83,637.14 30,527,555.11
Full buildout VMT Future Industrial VMT Project-Specific VMT Porportion of VMT 16,817,740 3,574,593.55 13,243,146.45 21.255%
Full Buildout Emissions
Proposed Project Emissions
Road Construction Emissions Model, Version 8.1.0 2/20/2024 Road Construction Emissions Model Version 9.0.0
Data Entry Worksheet
Optional data input sections have a blue background. Only areas with a yellow or blue background can be modified. Program defaults have a white background.
The user is required to enter information in cells D10 through D24, E28 through G35, and D38 through D41 for all project types.
Please use "Clear Data Input & User Overrides" button first before changing the Project Type or begin a new project.
Input Type
Project Name ASIP - Off-Site Pipeline
Construction Start Year 2023 Enter a Year between 2014 and 2040 (inclusive)
Project Type 1) New Road Construction : Project to build a roadway from bare ground, which generally requires more site preparation than widening an existing roadway 2) Road Widening : Project to add a new lane to an existing roadway 3) Bridge/Overpass Construction : Project to build an elevated roadway, which generally requires some different equipment than a new roadway, such as a crane 4) Other Linear Project Type: Non-roadway project such as a pipeline, transmission line, or levee construction Project Construction Time 1.00 month
Working Days per Month 22.00 days (assume 22 if unknown) Predominant Soil/Site Type: Enter 1, 2, or 3 1) Sand Gravel : Use for quaternary deposits (Delta/West County) 2) Weathered Rock-Earth : Use for Laguna formation (Jackson Highway area) or the Ione formation (Scott Road, Rancho Murieta) 3) Blasted Rock : Use for Salt Springs Slate or Copper Hill Volcanics (Folsom South of Highway 50, Rancho Murieta) Project Length 2.32 miles
Total Project Area 1.69 acres
Maximum Area Disturbed/Day 1.69 acres
Water Trucks Used? 2 1. Yes
2. No
Material Hauling Quantity Input
Material Type Phase Haul Truck Capacity (yd3
) (assume 20 if
unknown) Import Volume (yd3
/day) Export Volume (yd3
/day)
Grubbing/Land Clearing 20.00 0.00 0.00
Grading/Excavation 20.00 0.00 0.00
Drainage/Utilities/Sub-Grade 20.00 0.00 330.07
Paving 20.00 0.00 0.00
Grubbing/Land Clearing 20.00 0.00 0.00
Grading/Excavation 20.00 0.00 0.00
Drainage/Utilities/Sub-Grade 20.00 0.00 0.00
Paving 20.00 0.00 0.00
Mitigation Options
On-road Fleet Emissions Mitigation Select "2010 and Newer On-road Vehicles Fleet" option when the on-road heavy-duty truck fleet for the project will be limited to vehicles of model year 2010 or newer Off-road Equipment Emissions Mitigation
Select "Tier 4 Equipment" option if some or all off-road equipment used for the project meets CARB Tier 4 Standard Will all off-road equipment be tier 4?
The remaining sections of this sheet contain areas that require modification when 'Other Project Type' is selected. 2010 and Newer On-road Vehicles Fleet
Select "20% NOx and 45% Exhaust PM reduction" option if the project will be required to use a lower emitting off-road construction fleet. The SMAQMD Construction Mitigation Calculator can be used to confirm compliance with this mitigation measure (http://www.airquality.org/Businesses/CEQA-Land-Use-Planning/Mitigation).
For 4: Other Linear Project Type, please provide project specific offroad equipment population and vehicle trip data Please note that the soil type instructions provided in cells E18 to E20 are specific to Sacramento County. Maps available from the California Geologic Survey (see weblink below) can be used to determine soil type outside Sacramento County.
http://www.conservation.ca.gov/cgs/information/geologic_mapping/P ages/googlemaps.aspx#regionalseries
4 Note: Required data input sections have a yellow background.
Soil
Asphalt
No Mitigation
Tier 4 equipment for limited equipment types
(for project within "Sacramento County", follow soil type selection instructions in cells E18 to E20 otherwise see instructions provided in cells J18 to J22)
1 To begin a new project, click this button to
clear data previously entered. This button
will only work if you opted not to disable
macros when loading this spreadsheet.
Data Entry Worksheet 1
Road Construction Emissions Model, Version 8.1.0 2/20/2024 Note: The program's estimates of construction period phase length can be overridden in cells D50 through D53, and F50 through F53.
Program Program
User Override of Calculated User Override of Default
Construction Periods Construction Months Months Phase Starting Date Phase Starting Date Grubbing/Land Clearing 0.00 0.10 1/1/2023
Grading/Excavation 0.00 0.40 1/1/2023
Drainage/Utilities/Sub-Grade 1.00 0.35 1/1/2023
Paving 0.00 0.15 2/1/2023
Totals (Months)
Note: Soil Hauling emission default values can be overridden in cells D61 through D64, and F61 through F64.
Soil Hauling Emissions User Override of Program Estimate of User Override of Truck Default Values Calculated User Input Miles/Round Trip Miles/Round Trip Round Trips/Day Round Trips/Day Daily VMT Miles/round trip: Grubbing/Land Clearing 15.00 0.00 0 0.00 Miles/round trip: Grading/Excavation 15.00 0.00 0 0.00
Miles/round trip: Drainage/Utilities/Sub-Grade 15.00 0.00 17 255.00 Miles/round trip: Paving 15.00 0.00 0 0.00
2010+ Model Year Mitigation Option Emission Rates ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Grubbing/Land Clearing (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/mile) 0.03 0.40 2.98 0.11 0.05 0.02 1,714.99 0.00 0.27 1,795.36 Paving (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grubbing/Land Clearing (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/trip) 0.00 0.00 4.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Paving (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling Emissions ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Pounds per day - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Drainage/Utilities/Sub-Grade 0.02 0.23 1.84 0.06 0.03 0.01 964.13 0.00 0.15 1,009.31 Tons per const. Period - Drainage/Utilities/Sub-Grade 0.00 0.00 0.02 0.00 0.00 0.00 10.61 0.00 0.00 11.10 Pounds per day - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total tons per construction project 0.00 0.00 0.02 0.00 0.00 0.00 10.61 0.00 0.00 11.10 Note: Asphalt Hauling emission default values can be overridden in cells D91 through D94, and F91 through F94.
Asphalt Hauling Emissions User Override of Program Estimate of User Override of Truck Default Values Calculated User Input Miles/Round Trip Miles/Round Trip Round Trips/Day Round Trips/Day Daily VMT Miles/round trip: Grubbing/Land Clearing 15.00 0.00 0 0.00 Miles/round trip: Grading/Excavation 15.00 0.00 0 0.00
Miles/round trip: Drainage/Utilities/Sub-Grade 15.00 0.00 0 0.00 Miles/round trip: Paving 15.00 0.00 0 0.00
2010+ Model Year Mitigation Option Emission Rates ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Grubbing/Land Clearing (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/mile) 0.03 0.40 2.98 0.11 0.05 0.02 1,714.99 0.00 0.27 1,795.36 Paving (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grubbing/Land Clearing (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/trip) 0.00 0.00 4.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Paving (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Emissions ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e
Pounds per day - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Drainage/Utilities/Sub-Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Drainage/Utilities/Sub-Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total tons per construction project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Note: Worker commute default values can be overridden in cells D121 through D126.
Worker Commute Emissions User Override of Worker
User Input Commute Default Values Default Values
Miles/ one-way trip 0 Calculated Calculated
One-way trips/day 0 Daily Trips Daily VMT
No. of employees: Grubbing/Land Clearing 0 0 0.00
No. of employees: Grading/Excavation 0 0 0.00
No. of employees: Drainage/Utilities/Sub-Grade 0 0 0.00 No. of employees: Paving 0 0 0.00
Emission Rates ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Grubbing/Land Clearing (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/mile) 0.02 0.91 0.07 0.05 0.02 0.00 317.66 0.00 0.01 319.68 Paving (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grubbing/Land Clearing (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/trip) 1.04 2.75 0.29 0.00 0.00 0.00 68.26 0.07 0.03 79.50 Paving (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Emissions ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e
Pounds per day - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 Data Entry Worksheet 2
Road Construction Emissions Model, Version 8.1.0 2/20/2024 Pounds per day - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Drainage/Utilities/Sub-Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Drainage/Utilities/Sub-Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total tons per construction project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Note: Water Truck default values can be overridden in cells D153 through D156, I153 through I156, and F153 through F156.
Water Truck Emissions User Override of Program Estimate of User Override of Truck Default Values Calculated User Override of Default Values Calculated User Input Default # Water Trucks Number of Water Trucks Round Trips/Vehicle/Day Round Trips/Vehicle/Day Trips/day Miles/Round Trip Miles/Round Trip Daily VMT Grubbing/Land Clearing - Exhaust 0 0 0 0.00 0.00
Grading/Excavation - Exhaust 0 0 0 0.00 0.00
Drainage/Utilities/Subgrade 0 0 0 0.00 0.00
Paving 0 0 0 0.00 0.00
2010+ Model Year Mitigation Option Emission Rates ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Grubbing/Land Clearing (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/mile) 0.03 0.40 2.98 0.11 0.05 0.02 1,714.99 0.00 0.27 1,795.36 Paving (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grubbing/Land Clearing (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/trip) 0.00 0.00 4.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Paving (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Emissions ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e
Pounds per day - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Drainage/Utilities/Sub-Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Drainage/Utilities/Sub-Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total tons per construction project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Note: Fugitive dust default values can be overridden in cells D183 through D185.
User Override of Max Default PM10 PM10 PM2.5 PM2.5
Acreage Disturbed/Day Maximum Acreage/Day pounds/day tons/per period pounds/day tons/per period Fugitive Dust - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 Fugitive Dust - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 Fugitive Dust - Drainage/Utilities/Subgrade 1.69 33.80 0.37 7.03 0.08 Fugitive Dust
Data Entry Worksheet 3
Road Construction Emissions Model, Version 8.1.0 2/20/2024 Values in cells D195 through D228, D246 through D279, D297 through D330, and D348 through D381 are required when 'Other Project Type' is selected.
Off-Road Equipment Emissions
Default
Grubbing/Land Clearing Number of Vehicles Override of Current ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Override of Default Number of Vehicles Program-estimate Default Equipment Tier (applicable only
when "Tier 4 Mitigation" Option Selected) Equipment Tier Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day Model Default Tier Model Default Tier Aerial Lifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Air Compressors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Bore/Drill Rigs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Cement and Mortar Mixers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Concrete/Industrial Saws 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Cranes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Crawler Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Crushing/Proc. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Excavators 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Generator Sets 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Graders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Off-Highway Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Off-Highway Trucks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Other Construction Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Other General Industrial Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Other Material Handling Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Pavers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Paving Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Plate Compactors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Pressure Washers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Pumps 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Rollers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Rough Terrain Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Rubber Tired Dozers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Rubber Tired Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Scrapers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Signal Boards 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Skid Steer Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Surfacing Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Sweepers/Scrubbers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Tractors/Loaders/Backhoes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Trenchers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Welders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User-Defined Off-road Equipment If non-default vehicles are used, please provide information in 'Non-default Off-road Equipment' tab ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Grubbing/Land Clearing pounds per day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grubbing/Land Clearing tons per phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Default
Grading/Excavation Number of Vehicles Override of Current ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Override of Default Number of Vehicles Program-estimate Default Equipment Tier (applicable only
when "Tier 4 Mitigation" Option Selected) Equipment Tier Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day Model Default Tier Model Default Tier Aerial Lifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Air Compressors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Bore/Drill Rigs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Cement and Mortar Mixers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Concrete/Industrial Saws 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Cranes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Crawler Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Crushing/Proc. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Excavators 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Generator Sets 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Graders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Off-Highway Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Off-Highway Trucks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Other Construction Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Other General Industrial Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Other Material Handling Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Pavers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Paving Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Plate Compactors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Pressure Washers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Pumps 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Rollers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Rough Terrain Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Rubber Tired Dozers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Rubber Tired Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Scrapers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Signal Boards 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Skid Steer Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Surfacing Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Sweepers/Scrubbers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Tractors/Loaders/Backhoes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Trenchers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Welders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User-Defined Off-road Equipment If non-default vehicles are used, please provide information in 'Non-default Off-road Equipment' tab ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day Mitigation Option
Mitigation Option
0.00 0.00
N/A
0.00 0.00
N/A
N/A
0.00 N/A
0.00 Number of Vehicles
Number of Vehicles
0.00 N/A
N/A
N/A
Equipment Tier
Equipment Tier
Data Entry Worksheet 4
Road Construction Emissions Model, Version 8.1.0 2/20/2024 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Grading/Excavation pounds per day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation tons per phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Default
Drainage/Utilities/Subgrade Number of Vehicles Override of Current ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Override of Default Number of Vehicles Program-estimate Default Equipment Tier (applicable only
when "Tier 4 Mitigation" Option Selected) Equipment Tier pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day Model Default Tier Model Default Tier Aerial Lifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.00 0 Model Default Tier Model Default Tier Air Compressors 0.26 2.41 1.74 0.09 0.09 0.00 375.26 0.02 0.00 376.67 Model Default Tier Model Default Tier Bore/Drill Rigs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Cement and Mortar Mixers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.00 Model Default Tier Model Default Tier Concrete/Industrial Saws 0.33 3.66 2.58 0.13 0.13 0.01 592.67 0.03 0.00 594.72 Model Default Tier Model Default Tier Cranes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Crawler Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Crushing/Proc. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Excavators 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.00 0 Model Default Tier Model Default Tier Generator Sets 0.31 3.67 2.72 0.13 0.13 0.01 623.04 0.03 0.00 625.12 0 Model Default Tier Model Default Tier Graders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Off-Highway Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Off-Highway Trucks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Other Construction Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Other General Industrial Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Other Material Handling Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Pavers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.00 Model Default Tier Model Default Tier Paving Equipment 0.17 2.56 1.60 0.08 0.07 0.00 394.47 0.13 0.00 398.72 0 Model Default Tier Model Default Tier Plate Compactors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Pressure Washers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Pumps 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Rollers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Rough Terrain Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Rubber Tired Dozers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Rubber Tired Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Scrapers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.00 0 Model Default Tier Model Default Tier Signal Boards 0.17 0.90 1.08 0.04 0.04 0.00 147.94 0.02 0.00 148.69 Model Default Tier Model Default Tier Skid Steer Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Surfacing Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Sweepers/Scrubbers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.00 0 Tier 4 Model Default Tier Tractors/Loaders/Backhoes 0.30 4.46 3.07 0.15 0.14 0.01 603.15 0.20 0.01 609.64
1.00 Tier 4 Model Default Tier Trenchers 0.35 2.59 3.23 0.22 0.21 0.00 327.20 0.11 0.00 330.72 Model Default Tier Model Default Tier Welders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User-Defined Off-road Equipment If non-default vehicles are used, please provide information in 'Non-default Off-road Equipment' tab ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Drainage/Utilities/Sub-Grade pounds per day 1.89 20.26 16.02 0.85 0.81 0.03 3,063.73 0.52 0.03 3,084.29 Drainage/Utilities/Sub-Grade tons per phase 0.02 0.22 0.18 0.01 0.01 0.00 33.70 0.01 0.00 33.93 Default
Paving Number of Vehicles Override of Current ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Override of Default Number of Vehicles Program-estimate Default Equipment Tier (applicable only
when "Tier 4 Mitigation" Option Selected) Equipment Tier Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day Model Default Tier Model Default Tier Aerial Lifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Air Compressors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Bore/Drill Rigs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Cement and Mortar Mixers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Concrete/Industrial Saws 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Cranes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Crawler Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Crushing/Proc. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Excavators 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Generator Sets 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Graders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Off-Highway Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Off-Highway Trucks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Other Construction Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Other General Industrial Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Other Material Handling Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Pavers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Paving Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Plate Compactors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Pressure Washers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Pumps 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Rollers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Rough Terrain Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Rubber Tired Dozers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Rubber Tired Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Scrapers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Signal Boards 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Skid Steer Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Surfacing Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Mitigation Option
Mitigation Option
0.00 N/A
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Number of Vehicles
N/A
N/A
N/A
N/A
0.00 0.00
0.00 0.00
0.00 N/A
N/A
N/A
Equipment Tier
N/A
N/A
N/A
N/A
N/A
N/A
Data Entry Worksheet 5
Road Construction Emissions Model, Version 8.1.0 2/20/2024 Model Default Tier Model Default Tier Sweepers/Scrubbers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Model Default Tier Tractors/Loaders/Backhoes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Trenchers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Model Default Tier Welders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User-Defined Off-road Equipment If non-default vehicles are used, please provide information in 'Non-default Off-road Equipment' tab ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Paving pounds per day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Paving tons per phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Emissions all Phases (tons per construction period) => 0.02 0.22 0.18 0.01 0.01 0.00 33.70 0.01 0.00 33.93
0.00 0.00
Number of Vehicles
0.00 0.00
0.00 0.00
0.00 N/A
N/A
N/A
Equipment Tier
N/A
N/A
N/A
N/A
Data Entry Worksheet 6
Road Construction Emissions Model, Version 8.1.0 2/20/2024 Equipment default values for horsepower and hours/day can be overridden in cells D403 through D436 and F403 through F436.
User Override of Default Values User Override of Default Values Equipment Horsepower Horsepower Hours/day Hours/day
Aerial Lifts 63 8
Air Compressors 78 8
Bore/Drill Rigs 221 8
Cement and Mortar Mixers 9 8
Concrete/Industrial Saws 81 8
Cranes 231 8
Crawler Tractors 212 8
Crushing/Proc. Equipment 85 8
Excavators 158 8
Forklifts 89 8
Generator Sets 84 8
Graders 187 8
Off-Highway Tractors 124 8
Off-Highway Trucks 402 8
Other Construction Equipment 172 8
Other General Industrial Equipment 88 8
Other Material Handling Equipment 168 8
Pavers 130 8
Paving Equipment 132 8
Plate Compactors 8 8
Pressure Washers 13 8
Pumps 84 8
Rollers 80 8
Rough Terrain Forklifts 100 8
Rubber Tired Dozers 247 8
Rubber Tired Loaders 203 8
Scrapers 367 8
Signal Boards 6 8
Skid Steer Loaders 65 8
Surfacing Equipment 263 8
Sweepers/Scrubbers 64 8
Tractors/Loaders/Backhoes 97 8
Trenchers 78 8
Welders 46 8
END OF DATA ENTRY SHEET
Data Entry Worksheet 7
The maximum pounds per day in row 11 is summed over overlapping phases, but the maximum tons per phase in row 34 is not summed over overlapping phases.
Road Construction Emissions Model, Version 9.0.0
Daily Emission Estimates for -> Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Project Phases (Pounds) ROG (lbs/day) CO (lbs/day) NOx (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) SOx (lbs/day) CO2 (lbs/day) CH4 (lbs/day) N2O (lbs/day) CO2e (lbs/day) Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Drainage/Utilities/Sub-Grade 1.90 20.48 17.87 34.71 0.91 33.80 7.87 0.84 7.03 0.04 4,027.86 0.52 0.18 4,093.60 Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Maximum (pounds/day) 1.90 20.48 17.87 34.71 0.91 33.80 7.87 0.84 7.03 0.04 4,027.86 0.52 0.18 4,093.60 Total (tons/construction project) 0.02 0.23 0.20 0.38 0.01 0.37 0.09 0.01 0.08 0.00 44.31 0.01 0.00 45.03 Notes: Project Start Year -> 2023
Project Length (months) -> 1
Total Project Area (acres) -> 2
Maximum Area Disturbed/Day (acres) -> 2
Water Truck Used? -> No
Phase Soil Asphalt Soil Hauling Asphalt Hauling Worker Commute Water Truck Grubbing/Land Clearing 0 0 0 0 0 0
Grading/Excavation 0 0 0 0 0 0
Drainage/Utilities/Sub-Grade 330 0 255 0 0 0
Paving 0 0 0 0 0 0
CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N2O, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs.
Total Emission Estimates by Phase for -> Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Project Phases
(Tons for all except CO2e. Metric tonnes for CO2e) ROG (tons/phase) CO (tons/phase) NOx (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) SOx (tons/phase) CO2 (tons/phase) CH4 (tons/phase) N2O (tons/phase) CO2e (MT/phase) Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Drainage/Utilities/Sub-Grade 0.02 0.23 0.20 0.38 0.01 0.37 0.09 0.01 0.08 0.00 44.31 0.01 0.00 40.85 Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Maximum (tons/phase) 0.02 0.23 0.20 0.38 0.01 0.37 0.09 0.01 0.08 0.00 44.31 0.01 0.00 40.85 Total (tons/construction project) 0.02 0.23 0.20 0.38 0.01 0.37 0.09 0.01 0.08 0.00 44.31 0.01 0.00 40.85 CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N2O, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs.
The CO2e emissions are reported as metric tons per phase.
Daily VMT (miles/day)
Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K.
ASIP - Off-Site Pipeline
PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified.
ASIP - Off-Site Pipeline
PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified.
Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K.
Total Material Imported/Exported
Volume (yd3/day)
Road Construction Emissions Model, Version 8.1.0 2/20/2024 Road Construction Emissions Model Version 9.0.0
Data Entry Worksheet
Optional data input sections have a blue background. Only areas with a yellow or blue background can be modified. Program defaults have a white background.
The user is required to enter information in cells D10 through D24, E28 through G35, and D38 through D41 for all project types.
Please use "Clear Data Input & User Overrides" button first before changing the Project Type or begin a new project.
Input Type
Project Name ASIP - Off-Site Pipeline (Mitigated)
Construction Start Year 2023 Enter a Year between 2014 and 2040 (inclusive)
Project Type 1) New Road Construction : Project to build a roadway from bare ground, which generally requires more site preparation than widening an existing roadway 2) Road Widening : Project to add a new lane to an existing roadway 3) Bridge/Overpass Construction : Project to build an elevated roadway, which generally requires some different equipment than a new roadway, such as a crane 4) Other Linear Project Type: Non-roadway project such as a pipeline, transmission line, or levee construction Project Construction Time 1.00 month
Working Days per Month 22.00 days (assume 22 if unknown) Predominant Soil/Site Type: Enter 1, 2, or 3 1) Sand Gravel : Use for quaternary deposits (Delta/West County) 2) Weathered Rock-Earth : Use for Laguna formation (Jackson Highway area) or the Ione formation (Scott Road, Rancho Murieta) 3) Blasted Rock : Use for Salt Springs Slate or Copper Hill Volcanics (Folsom South of Highway 50, Rancho Murieta) Project Length 2.32 miles
Total Project Area 1.69 acres
Maximum Area Disturbed/Day 1.69 acres
Water Trucks Used? 2 1. Yes
2. No
Material Hauling Quantity Input
Material Type Phase Haul Truck Capacity (yd3
) (assume 20 if
unknown) Import Volume (yd3
/day) Export Volume (yd3
/day)
Grubbing/Land Clearing 20.00 0.00 0.00
Grading/Excavation 20.00 0.00 0.00
Drainage/Utilities/Sub-Grade 20.00 0.00 330.07
Paving 20.00 0.00 0.00
Grubbing/Land Clearing 20.00 0.00 0.00
Grading/Excavation 20.00 0.00 0.00
Drainage/Utilities/Sub-Grade 20.00 0.00 0.00
Paving 20.00 0.00 0.00
Mitigation Options
On-road Fleet Emissions Mitigation Select "2010 and Newer On-road Vehicles Fleet" option when the on-road heavy-duty truck fleet for the project will be limited to vehicles of model year 2010 or newer Off-road Equipment Emissions Mitigation
Select "Tier 4 Equipment" option if some or all off-road equipment used for the project meets CARB Tier 4 Standard Will all off-road equipment be tier 4?
The remaining sections of this sheet contain areas that require modification when 'Other Project Type' is selected. 2010 and Newer On-road Vehicles Fleet
Select "20% NOx and 45% Exhaust PM reduction" option if the project will be required to use a lower emitting off-road construction fleet. The SMAQMD Construction Mitigation Calculator can be used to confirm compliance with this mitigation measure (http://www.airquality.org/Businesses/CEQA-Land-Use-Planning/Mitigation).
For 4: Other Linear Project Type, please provide project specific offroad equipment population and vehicle trip data Please note that the soil type instructions provided in cells E18 to E20 are specific to Sacramento County. Maps available from the California Geologic Survey (see weblink below) can be used to determine soil type outside Sacramento County.
http://www.conservation.ca.gov/cgs/information/geologic_mapping/P ages/googlemaps.aspx#regionalseries
4 Note: Required data input sections have a yellow background.
Soil
Asphalt
Tier 4 Equipment
All Tier 4 Equipment
(for project within "Sacramento County", follow soil type selection instructions in cells E18 to E20 otherwise see instructions provided in cells J18 to J22)
1 To begin a new project, click this button to
clear data previously entered. This button
will only work if you opted not to disable
macros when loading this spreadsheet.
Data Entry Worksheet 1
Road Construction Emissions Model, Version 8.1.0 2/20/2024 Note: The program's estimates of construction period phase length can be overridden in cells D50 through D53, and F50 through F53.
Program Program
User Override of Calculated User Override of Default
Construction Periods Construction Months Months Phase Starting Date Phase Starting Date Grubbing/Land Clearing 0.00 0.10 1/1/2023
Grading/Excavation 0.00 0.40 1/1/2023
Drainage/Utilities/Sub-Grade 1.00 0.35 1/1/2023
Paving 0.00 0.15 2/1/2023
Totals (Months)
Note: Soil Hauling emission default values can be overridden in cells D61 through D64, and F61 through F64.
Soil Hauling Emissions User Override of Program Estimate of User Override of Truck Default Values Calculated User Input Miles/Round Trip Miles/Round Trip Round Trips/Day Round Trips/Day Daily VMT Miles/round trip: Grubbing/Land Clearing 15.00 0.00 0 0.00 Miles/round trip: Grading/Excavation 15.00 0.00 0 0.00
Miles/round trip: Drainage/Utilities/Sub-Grade 15.00 0.00 17 255.00 Miles/round trip: Paving 15.00 0.00 0 0.00
2010+ Model Year Mitigation Option Emission Rates ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Grubbing/Land Clearing (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/mile) 0.03 0.40 2.98 0.11 0.05 0.02 1,714.99 0.00 0.27 1,795.36 Paving (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grubbing/Land Clearing (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/trip) 0.00 0.00 4.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Paving (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hauling Emissions ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Pounds per day - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Drainage/Utilities/Sub-Grade 0.02 0.23 1.84 0.06 0.03 0.01 964.13 0.00 0.15 1,009.31 Tons per const. Period - Drainage/Utilities/Sub-Grade 0.00 0.00 0.02 0.00 0.00 0.00 10.61 0.00 0.00 11.10 Pounds per day - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total tons per construction project 0.00 0.00 0.02 0.00 0.00 0.00 10.61 0.00 0.00 11.10 Note: Asphalt Hauling emission default values can be overridden in cells D91 through D94, and F91 through F94.
Asphalt Hauling Emissions User Override of Program Estimate of User Override of Truck Default Values Calculated User Input Miles/Round Trip Miles/Round Trip Round Trips/Day Round Trips/Day Daily VMT Miles/round trip: Grubbing/Land Clearing 15.00 0.00 0 0.00 Miles/round trip: Grading/Excavation 15.00 0.00 0 0.00
Miles/round trip: Drainage/Utilities/Sub-Grade 15.00 0.00 0 0.00 Miles/round trip: Paving 15.00 0.00 0 0.00
2010+ Model Year Mitigation Option Emission Rates ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Grubbing/Land Clearing (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/mile) 0.03 0.40 2.98 0.11 0.05 0.02 1,714.99 0.00 0.27 1,795.36 Paving (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grubbing/Land Clearing (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/trip) 0.00 0.00 4.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Paving (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Emissions ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e
Pounds per day - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Drainage/Utilities/Sub-Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Drainage/Utilities/Sub-Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total tons per construction project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Note: Worker commute default values can be overridden in cells D121 through D126.
Worker Commute Emissions User Override of Worker
User Input Commute Default Values Default Values
Miles/ one-way trip 0 Calculated Calculated
One-way trips/day 0 Daily Trips Daily VMT
No. of employees: Grubbing/Land Clearing 0 0 0.00
No. of employees: Grading/Excavation 0 0 0.00
No. of employees: Drainage/Utilities/Sub-Grade 0 0 0.00 No. of employees: Paving 0 0 0.00
Emission Rates ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Grubbing/Land Clearing (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/mile) 0.02 0.91 0.07 0.05 0.02 0.00 317.66 0.00 0.01 319.68 Paving (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grubbing/Land Clearing (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/trip) 1.04 2.75 0.29 0.00 0.00 0.00 68.26 0.07 0.03 79.50 Paving (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Emissions ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e
Pounds per day - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 Data Entry Worksheet 2
Road Construction Emissions Model, Version 8.1.0 2/20/2024 Pounds per day - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Drainage/Utilities/Sub-Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Drainage/Utilities/Sub-Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total tons per construction project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Note: Water Truck default values can be overridden in cells D153 through D156, I153 through I156, and F153 through F156.
Water Truck Emissions User Override of Program Estimate of User Override of Truck Default Values Calculated User Override of Default Values Calculated User Input Default # Water Trucks Number of Water Trucks Round Trips/Vehicle/Day Round Trips/Vehicle/Day Trips/day Miles/Round Trip Miles/Round Trip Daily VMT Grubbing/Land Clearing - Exhaust 0 0 0 0.00 0.00
Grading/Excavation - Exhaust 0 0 0 0.00 0.00
Drainage/Utilities/Subgrade 0 0 0 0.00 0.00
Paving 0 0 0 0.00 0.00
2010+ Model Year Mitigation Option Emission Rates ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Grubbing/Land Clearing (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/mile) 0.03 0.40 2.98 0.11 0.05 0.02 1,714.99 0.00 0.27 1,795.36 Paving (grams/mile) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grubbing/Land Clearing (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Draining/Utilities/Sub-Grade (grams/trip) 0.00 0.00 4.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Paving (grams/trip) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Emissions ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e
Pounds per day - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Drainage/Utilities/Sub-Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Drainage/Utilities/Sub-Grade 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pounds per day - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Tons per const. Period - Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total tons per construction project 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Note: Fugitive dust default values can be overridden in cells D183 through D185.
User Override of Max Default PM10 PM10 PM2.5 PM2.5
Acreage Disturbed/Day Maximum Acreage/Day pounds/day tons/per period pounds/day tons/per period Fugitive Dust - Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 Fugitive Dust - Grading/Excavation 0.00 0.00 0.00 0.00 0.00 Fugitive Dust - Drainage/Utilities/Subgrade 1.69 33.80 0.37 7.03 0.08 Fugitive Dust
Data Entry Worksheet 3
Road Construction Emissions Model, Version 8.1.0 2/20/2024 Values in cells D195 through D228, D246 through D279, D297 through D330, and D348 through D381 are required when 'Other Project Type' is selected.
Off-Road Equipment Emissions
Default
Grubbing/Land Clearing Number of Vehicles Override of Default ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Override of Default Number of Vehicles Program-estimate Default Equipment Tier (applicable only
when "Tier 4 Mitigation" Option Selected) Equipment Tier Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day Model Default Tier Tier 4 Aerial Lifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Air Compressors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Bore/Drill Rigs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Cement and Mortar Mixers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Concrete/Industrial Saws 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Cranes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Crawler Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Crushing/Proc. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Excavators 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Generator Sets 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Graders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Off-Highway Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Off-Highway Trucks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Other Construction Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Other General Industrial Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Other Material Handling Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Pavers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Paving Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Plate Compactors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Pressure Washers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Pumps 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Rollers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Rough Terrain Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Rubber Tired Dozers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Rubber Tired Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Scrapers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Signal Boards 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Skid Steer Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Surfacing Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Sweepers/Scrubbers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Tractors/Loaders/Backhoes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Trenchers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Welders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User-Defined Off-road Equipment If non-default vehicles are used, please provide information in 'Non-default Off-road Equipment' tab ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Grubbing/Land Clearing pounds per day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grubbing/Land Clearing tons per phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Default
Grading/Excavation Number of Vehicles Override of Default ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Override of Default Number of Vehicles Program-estimate Default Equipment Tier (applicable only
when "Tier 4 Mitigation" Option Selected) Equipment Tier Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day Model Default Tier Tier 4 Aerial Lifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Air Compressors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Bore/Drill Rigs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Cement and Mortar Mixers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Concrete/Industrial Saws 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Cranes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Crawler Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Crushing/Proc. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Excavators 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Generator Sets 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Graders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Off-Highway Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Off-Highway Trucks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Other Construction Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Other General Industrial Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Other Material Handling Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Pavers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Paving Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Plate Compactors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Pressure Washers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Pumps 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Rollers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Rough Terrain Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Rubber Tired Dozers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Rubber Tired Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Scrapers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Signal Boards 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Skid Steer Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Surfacing Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Sweepers/Scrubbers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Tractors/Loaders/Backhoes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Trenchers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Welders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User-Defined Off-road Equipment If non-default vehicles are used, please provide information in 'Non-default Off-road Equipment' tab ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day Mitigation Option
Mitigation Option
0.00 0.00
N/A
0.00 0.00
N/A
N/A
0.00 N/A
0.00 Number of Vehicles
Number of Vehicles
0.00 N/A
N/A
N/A
Equipment Tier
Equipment Tier
Data Entry Worksheet 4
Road Construction Emissions Model, Version 8.1.0 2/20/2024 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Grading/Excavation pounds per day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation tons per phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Default
Drainage/Utilities/Subgrade Number of Vehicles Override of Default ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Override of Default Number of Vehicles Program-estimate Default Equipment Tier (applicable only
when "Tier 4 Mitigation" Option Selected) Equipment Tier pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day Model Default Tier Tier 4 Aerial Lifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.00 0 Model Default Tier Tier 4 Air Compressors 0.10 2.44 0.20 0.01 0.01 0.00 375.26 0.02 0.00 376.67 Model Default Tier Tier 4 Bore/Drill Rigs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Cement and Mortar Mixers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.00 Model Default Tier Tier 4 Concrete/Industrial Saws 0.16 3.86 0.31 0.02 0.01 0.01 592.67 0.03 0.00 594.72 Model Default Tier Tier 4 Cranes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Crawler Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Crushing/Proc. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Excavators 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.00 0 Model Default Tier Tier 4 Generator Sets 0.16 4.06 0.33 0.02 0.02 0.01 623.04 0.03 0.00 625.12 0 Model Default Tier Tier 4 Graders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Off-Highway Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Off-Highway Trucks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Other Construction Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Other General Industrial Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Other Material Handling Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Pavers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.00 Model Default Tier Tier 4 Paving Equipment 0.13 3.10 0.25 0.01 0.01 0.00 394.47 0.13 0.00 398.72 0 Model Default Tier Tier 4 Plate Compactors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Pressure Washers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Pumps 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Rollers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Rough Terrain Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Rubber Tired Dozers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Rubber Tired Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Scrapers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.00 0 Model Default Tier Tier 4 Signal Boards 0.08 1.56 1.38 0.08 0.07 0.00 147.94 0.02 0.00 148.69 Model Default Tier Tier 4 Skid Steer Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Surfacing Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Sweepers/Scrubbers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.00 0 Tier 4 Tier 4 Tractors/Loaders/Backhoes 0.19 4.68 0.38 0.02 0.02 0.01 603.15 0.20 0.01 609.64
1.00 Tier 4 Tier 4 Trenchers 0.10 2.55 0.21 0.01 0.01 0.00 327.20 0.11 0.00 330.72 Model Default Tier Tier 4 Welders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User-Defined Off-road Equipment If non-default vehicles are used, please provide information in 'Non-default Off-road Equipment' tab ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Drainage/Utilities/Sub-Grade pounds per day 0.92 22.25 3.06 0.16 0.15 0.03 3,063.73 0.52 0.03 3,084.29 Drainage/Utilities/Sub-Grade tons per phase 0.01 0.24 0.03 0.00 0.00 0.00 33.70 0.01 0.00 33.93 Default
Paving Number of Vehicles Override of Default ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Override of Default Number of Vehicles Program-estimate Default Equipment Tier (applicable only
when "Tier 4 Mitigation" Option Selected) Equipment Tier Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day Model Default Tier Tier 4 Aerial Lifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Air Compressors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Bore/Drill Rigs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Cement and Mortar Mixers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Concrete/Industrial Saws 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Cranes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Crawler Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Crushing/Proc. Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Excavators 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Generator Sets 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Graders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Off-Highway Tractors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Off-Highway Trucks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Other Construction Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Other General Industrial Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Other Material Handling Equipm 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Pavers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Paving Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Plate Compactors 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Pressure Washers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Pumps 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Rollers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Rough Terrain Forklifts 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Rubber Tired Dozers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Rubber Tired Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Scrapers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Signal Boards 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Skid Steer Loaders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Surfacing Equipment 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Mitigation Option
Mitigation Option
0.00 N/A
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Number of Vehicles
N/A
N/A
N/A
N/A
0.00 0.00
0.00 0.00
0.00 N/A
N/A
N/A
Equipment Tier
N/A
N/A
N/A
N/A
N/A
N/A
Data Entry Worksheet 5
Road Construction Emissions Model, Version 8.1.0 2/20/2024 Model Default Tier Tier 4 Sweepers/Scrubbers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Model Default Tier Tier 4 Tractors/Loaders/Backhoes 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Trenchers 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Model Default Tier Tier 4 Welders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 User-Defined Off-road Equipment If non-default vehicles are used, please provide information in 'Non-default Off-road Equipment' tab ROG CO NOx PM10 PM2.5 SOx CO2 CH4 N2O CO2e Type pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day pounds/day 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Paving pounds per day 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Paving tons per phase 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Emissions all Phases (tons per construction period) => 0.01 0.24 0.03 0.00 0.00 0.00 33.70 0.01 0.00 33.93
0.00 0.00
Number of Vehicles
0.00 0.00
0.00 0.00
0.00 N/A
N/A
N/A
Equipment Tier
N/A
N/A
N/A
N/A
Data Entry Worksheet 6
Road Construction Emissions Model, Version 8.1.0 2/20/2024 Equipment default values for horsepower and hours/day can be overridden in cells D403 through D436 and F403 through F436.
User Override of Default Values User Override of Default Values Equipment Horsepower Horsepower Hours/day Hours/day
Aerial Lifts 63 8
Air Compressors 78 8
Bore/Drill Rigs 221 8
Cement and Mortar Mixers 9 8
Concrete/Industrial Saws 81 8
Cranes 231 8
Crawler Tractors 212 8
Crushing/Proc. Equipment 85 8
Excavators 158 8
Forklifts 89 8
Generator Sets 84 8
Graders 187 8
Off-Highway Tractors 124 8
Off-Highway Trucks 402 8
Other Construction Equipment 172 8
Other General Industrial Equipment 88 8
Other Material Handling Equipment 168 8
Pavers 130 8
Paving Equipment 132 8
Plate Compactors 8 8
Pressure Washers 13 8
Pumps 84 8
Rollers 80 8
Rough Terrain Forklifts 100 8
Rubber Tired Dozers 247 8
Rubber Tired Loaders 203 8
Scrapers 367 8
Signal Boards 6 8
Skid Steer Loaders 65 8
Surfacing Equipment 263 8
Sweepers/Scrubbers 64 8
Tractors/Loaders/Backhoes 97 8
Trenchers 78 8
Welders 46 8
END OF DATA ENTRY SHEET
Data Entry Worksheet 7
The maximum pounds per day in row 11 is summed over overlapping phases, but the maximum tons per phase in row 34 is not summed over overlapping phases.
Road Construction Emissions Model, Version 9.0.0
Daily Emission Estimates for -> Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Project Phases (Pounds) ROG (lbs/day) CO (lbs/day) NOx (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) SOx (lbs/day) CO2 (lbs/day) CH4 (lbs/day) N2O (lbs/day) CO2e (lbs/day) Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Drainage/Utilities/Sub-Grade 0.93 22.48 4.91 34.02 0.22 33.80 7.21 0.18 7.03 0.04 4,027.86 0.52 0.18 4,093.60 Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Maximum (pounds/day) 0.93 22.48 4.91 34.02 0.22 33.80 7.21 0.18 7.03 0.04 4,027.86 0.52 0.18 4,093.60 Total (tons/construction project) 0.01 0.25 0.05 0.37 0.00 0.37 0.08 0.00 0.08 0.00 44.31 0.01 0.00 45.03 Notes: Project Start Year -> 2023
Project Length (months) -> 1
Total Project Area (acres) -> 2
Maximum Area Disturbed/Day (acres) -> 2
Water Truck Used? -> No
Phase Soil Asphalt Soil Hauling Asphalt Hauling Worker Commute Water Truck Grubbing/Land Clearing 0 0 0 0 0 0
Grading/Excavation 0 0 0 0 0 0
Drainage/Utilities/Sub-Grade 330 0 255 0 0 0
Paving 0 0 0 0 0 0
CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N2O, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs.
Total Emission Estimates by Phase for -> Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Project Phases
(Tons for all except CO2e. Metric tonnes for CO2e) ROG (tons/phase) CO (tons/phase) NOx (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) SOx (tons/phase) CO2 (tons/phase) CH4 (tons/phase) N2O (tons/phase) CO2e (MT/phase) Grubbing/Land Clearing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Grading/Excavation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Drainage/Utilities/Sub-Grade 0.01 0.25 0.05 0.37 0.00 0.37 0.08 0.00 0.08 0.00 44.31 0.01 0.00 40.85 Paving 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Maximum (tons/phase) 0.01 0.25 0.05 0.37 0.00 0.37 0.08 0.00 0.08 0.00 44.31 0.01 0.00 40.85 Total (tons/construction project) 0.01 0.25 0.05 0.37 0.00 0.37 0.08 0.00 0.08 0.00 44.31 0.01 0.00 40.85 CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N2O, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs.
The CO2e emissions are reported as metric tons per phase.
Daily VMT (miles/day)
Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K.
ASIP - Off-Site Pipeline (Mitigated)
PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified.
ASIP - Off-Site Pipeline (Mitigated)
PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified.
Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K.
Total Material Imported/Exported
Volume (yd3/day)
AERMOD Model Options
Model Options
Pathway Keyword Description Value
CO TITLEONE Project title 1 Airport South Industrial Project CO TITLETWO Project title 2
CO MODELOPT Model options DFAULT,CONC,NODRYDPLT,NOWETDPLT CO AVERTIME Averaging times 1,ANNUAL
CO URBANOPT Urban options
CO POLLUTID Pollutant ID PM25 H1H
CO HALFLIFE Half life
CO DCAYCOEF Decay coefficient
CO FLAGPOLE Flagpole receptor heights 1.8
CO RUNORNOT Run or Not RUN
CO EVENTFIL Event file F
CO SAVEFILE Save file F
CO INITFILE Initialization file
CO MULTYEAR Multiple year option N/A
CO DEBUGOPT Debug options N/A
CO ERRORFIL Error file F
SO ELEVUNIT Elevation units METERS
SO EMISUNIT Emission units N/A
RE ELEVUNIT Elevation units METERS
ME SURFFILE Surface met file I:\Projects\Reference Material\Air Quality Assessment\_HRA Guidance_2023 \Meteorological Data for AERMOD\Sac International Airport.SFC ME PROFFILE Profile met file I:\Projects\Reference Material\Air Quality Assessment\_HRA Guidance_2023 \Meteorological Data for AERMOD\Sac International Airport.PFL ME SURFDATA Surf met data info. 93225 2014
ME UAIRDATA U-Air met data info. 23230 2014
ME SITEDATA On-site met data info.
ME PROFBASE Elev. above MSL 8.2
ME STARTEND Start-end met dates
ME WDROTATE Wind dir. rot. adjust.
ME WINDCATS Wind speed cat. max.
ME SCIMBYHR SCIM sample params
EV DAYTABLE Print summary opt. N/A
OU EVENTOUT Output info. level N/A
Report for "ASIP.ami" Page 1 of 5
file:///C:/ProgramData/BREEZE/Aermod/20230511132219/ReportsTemp.htm 5/12/2023 Source Parameter Tables
OU DAYTABLE Print summary opt.
All Sources
Source ID /
Pollutant ID Source Type Description UTM Elev. Emiss. Rate Emiss. Units Release
Height
East (m) North (m) (m) (m)
LUN1H01R POINT V1 624356.6 4280909.1 0 2.68225E-05 (g/s) 3.84048 LUN1H01S POINT HL1 624356.6 4280909.8 0 2.68225E-05 (g/s) 0.18288 LUN1H01T POINT HH1 624358.3 4280909.8 0 2.68225E-05 (g/s) 3.84048 LUN1H01U POINT V2 624380.8 4280497.5 0 3.64222E-05 (g/s) 3.84048 LUN1H01V POINT HL2 624383.7 4280500.4 0 3.64222E-05 (g/s) 0.18288 LUN1H01W POINT HH2 624380.8 4280500.4 0 3.64222E-05 (g/s) 3.84048 LUN1H01X POINT V3 625169.3 4280921.1 0 2.11757E-05 (g/s) 3.84048 LUN1H01Y POINT HL3 625169.3 4280921.1 0 2.11757E-05 (g/s) 0.18288 LUN1H020 POINT HH3 625169.3 4280923.2 0 2.11757E-05 (g/s) 3.84048 LUN1H021 POINT V4 625296.3 4280517.5 0 3.64222E-05 (g/s) 3.84048 LUN1H022 POINT HL4 625293.2 4280520.6 0 3.64222E-05 (g/s) 0.18288 LUN1H023 POINT HH4 625293.2 4280520.6 0 3.64222E-05 (g/s) 3.84048 LUN1H024 POINT V5 626021 4280895.4 0 0.0000213169 (g/s) 3.84048 LUN1H025 POINT HL5 626017.9 4280898.5 0 0.0000213169 (g/s) 0.18288 LUN1H026 POINT HH5 626017.9 4280901.6 0 0.0000213169 (g/s) 3.84048 LUN1H002 VOLUME 626109.4 4280840.8 0 1.404589E-05 (g/s) 2.3 LUN1H003 VOLUME 626057.4 4280840.5 0 1.404589E-05 (g/s) 2.3 LUN1H004 VOLUME 626005.4 4280840.2 0 1.404589E-05 (g/s) 2.3 LUN1H005 VOLUME 625953.4 4280839.9 0 1.404589E-05 (g/s) 2.3 LUN1H006 VOLUME 625901.4 4280839.6 0 1.404589E-05 (g/s) 2.3 LUN1H007 VOLUME 625849.4 4280839.3 0 1.404589E-05 (g/s) 2.3 LUN1H008 VOLUME 625797.4 4280839.1 0 1.404589E-05 (g/s) 2.3 LUN1H009 VOLUME 625745.4 4280838.8 0 1.404589E-05 (g/s) 2.3 LUN1H00A VOLUME 625693.4 4280838.5 0 1.404589E-05 (g/s) 2.3 LUN1H00B VOLUME 625641.4 4280838.2 0 1.404589E-05 (g/s) 2.3 LUN1H00C VOLUME 625589.4 4280837.9 0 1.404589E-05 (g/s) 2.3 LUN1H00D VOLUME 625537.4 4280837.6 0 1.404589E-05 (g/s) 2.3 LUN1H00E VOLUME 625485.4 4280837.4 0 1.404589E-05 (g/s) 2.3 LUN1H00H VOLUME 625431.9 4280833.8 0 5.063473E-05 (g/s) 2.3 LUN1H00I VOLUME 625379.9 4280834.5 0 5.063473E-05 (g/s) 2.3 LUN1H00J VOLUME 625327.9 4280835.2 0 5.063473E-05 (g/s) 2.3 LUN1H00K VOLUME 625275.9 4280836.0 0 5.063473E-05 (g/s) 2.3 LUN1H00L VOLUME 625223.9 4280836.7 0 5.063473E-05 (g/s) 2.3 LUN1H00M VOLUME 625171.9 4280837.4 0 5.063473E-05 (g/s) 2.3 Report for "ASIP.ami" Page 2 of 5
file:///C:/ProgramData/BREEZE/Aermod/20230511132219/ReportsTemp.htm 5/12/2023 LUN1H00N VOLUME 625119.9 4280838.1 0 5.063473E-05 (g/s) 2.3 LUN1H00O VOLUME 625067.9 4280838.9 0 5.063473E-05 (g/s) 2.3 LUN1H00P VOLUME 625015.9 4280839.6 0 5.063473E-05 (g/s) 2.3 LUN1H00Q VOLUME 624963.9 4280840.3 0 5.063473E-05 (g/s) 2.3 LUN1H00R VOLUME 624912.0 4280841.1 0 5.063473E-05 (g/s) 2.3 LUN1H00S VOLUME 624860.0 4280841.8 0 5.063473E-05 (g/s) 2.3 LUN1H00T VOLUME 624808.0 4280842.5 0 5.063473E-05 (g/s) 2.3 LUN1H00U VOLUME 624756.0 4280843.2 0 5.063473E-05 (g/s) 2.3 LUN1H00V VOLUME 624704.0 4280844.0 0 5.063473E-05 (g/s) 2.3 LUN1H00W VOLUME 624652.0 4280844.7 0 5.063473E-05 (g/s) 2.3 LUN1H00Z VOLUME 624614.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H010 VOLUME 624562.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H011 VOLUME 624510.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H012 VOLUME 624458.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H013 VOLUME 624406.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H014 VOLUME 624354.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H015 VOLUME 624302.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H016 VOLUME 624250.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H017 VOLUME 624198.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H018 VOLUME 624146.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H019 VOLUME 624094.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H01A VOLUME 624042.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H01B VOLUME 623990.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H01C VOLUME 623938.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H01D VOLUME 623886.4 4280844.7 0 4.224243E-05 (g/s) 2.3 LUN1H01G VOLUME 624662.7 4281390.2 0 0.0001034244 (g/s) 2.3 LUN1H01H VOLUME 624661.6 4281338.2 0 0.0001034244 (g/s) 2.3 LUN1H01I VOLUME 624660.6 4281286.2 0 0.0001034244 (g/s) 2.3 LUN1H01J VOLUME 624659.5 4281234.2 0 0.0001034244 (g/s) 2.3 LUN1H01K VOLUME 624658.4 4281182.2 0 0.0001034244 (g/s) 2.3 LUN1H01L VOLUME 624657.4 4281130.3 0 0.0001034244 (g/s) 2.3 LUN1H01M VOLUME 624656.3 4281078.3 0 0.0001034244 (g/s) 2.3 LUN1H01N VOLUME 624655.3 4281026.3 0 0.0001034244 (g/s) 2.3 LUN1H01O VOLUME 624654.2 4280974.3 0 0.0001034244 (g/s) 2.3 LUN1H01P VOLUME 624653.1 4280922.3 0 0.0001034244 (g/s) 2.3 LUN1H01Q VOLUME 624652.1 4280870.3 0 0.0001034244 (g/s) 2.3 Point Sources
Source ID /
Pollutant ID Description UTM Elev. Emiss. Rate Stack
Height
Stack
Temp
Stack
Velocity
Stack
Diameter
East (m) North (m) (m) (g/s) (m) (K) (m/s) (m)
LUN1H01R V1 624356.6 4280909.1 0 2.68225E-05 3.84048 366 51.71 0.1 LUN1H01S HL1 624356.6 4280909.8 0 2.68225E-05 0.18288 366 0.001 0.1 LUN1H01T HH1 624358.3 4280909.8 0 2.68225E-05 3.84048 366 0.001 0.1 LUN1H01U V2 624380.8 4280497.5 0 3.64222E-05 3.84048 366 51.71 0.1 Report for "ASIP.ami" Page 3 of 5
file:///C:/ProgramData/BREEZE/Aermod/20230511132219/ReportsTemp.htm 5/12/2023 LUN1H01V HL2 624383.7 4280500.4 0 3.64222E-05 0.18288 366 0.001 0.1 LUN1H01W HH2 624380.8 4280500.4 0 3.64222E-05 3.84048 366 0.001 0.1 LUN1H01X V3 625169.3 4280921.1 0 2.11757E-05 3.84048 366 51.71 0.1 LUN1H01Y HL3 625169.3 4280921.1 0 2.11757E-05 0.18288 366 0.001 0.1 LUN1H020 HH3 625169.3 4280923.2 0 2.11757E-05 3.84048 366 0.001 0.1 LUN1H021 V4 625296.3 4280517.5 0 3.64222E-05 3.84048 366 51.71 0.1 LUN1H022 HL4 625293.2 4280520.6 0 3.64222E-05 0.18288 366 0.001 0.1 LUN1H023 HH4 625293.2 4280520.6 0 3.64222E-05 3.84048 366 0.001 0.1 LUN1H024 V5 626021 4280895.4 0 0.0000213169 3.84048 366 51.71 0.1 LUN1H025 HL5 626017.9 4280898.5 0 0.0000213169 0.18288 366 0.001 0.1 LUN1H026 HH5 626017.9 4280901.6 0 0.0000213169 3.84048 366 0.001 0.1 Volume Sources
Source ID /
Pollutant ID Description UTM Elev. Emiss. Rate Release
Height
Init. Lat.
Dim.
Init. Vert.
Dim.
East (m) North (m) (m) (g/s) (m) (m) (m)
LUN1H002 626109.4 4280840.8 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H003 626057.4 4280840.5 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H004 626005.4 4280840.2 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H005 625953.4 4280839.9 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H006 625901.4 4280839.6 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H007 625849.4 4280839.3 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H008 625797.4 4280839.1 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H009 625745.4 4280838.8 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H00A 625693.4 4280838.5 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H00B 625641.4 4280838.2 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H00C 625589.4 4280837.9 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H00D 625537.4 4280837.6 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H00E 625485.4 4280837.4 0 1.404589E-05 2.3 24.18605 2.139535 LUN1H00H 625431.9 4280833.8 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00I 625379.9 4280834.5 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00J 625327.9 4280835.2 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00K 625275.9 4280836.0 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00L 625223.9 4280836.7 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00M 625171.9 4280837.4 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00N 625119.9 4280838.1 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00O 625067.9 4280838.9 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00P 625015.9 4280839.6 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00Q 624963.9 4280840.3 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00R 624912.0 4280841.1 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00S 624860.0 4280841.8 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00T 624808.0 4280842.5 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00U 624756.0 4280843.2 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00V 624704.0 4280844.0 0 5.063473E-05 2.3 24.18605 2.139535 LUN1H00W 624652.0 4280844.7 0 5.063473E-05 2.3 24.18605 2.139535 Report for "ASIP.ami" Page 4 of 5
file:///C:/ProgramData/BREEZE/Aermod/20230511132219/ReportsTemp.htm 5/12/2023 LUN1H00Z 624614.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H010 624562.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H011 624510.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H012 624458.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H013 624406.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H014 624354.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H015 624302.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H016 624250.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H017 624198.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H018 624146.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H019 624094.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H01A 624042.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H01B 623990.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H01C 623938.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H01D 623886.4 4280844.7 0 4.224243E-05 2.3 24.18605 2.139535 LUN1H01G 624662.7 4281390.2 0 0.0001034244 2.3 24.18605 2.139535 LUN1H01H 624661.6 4281338.2 0 0.0001034244 2.3 24.18605 2.139535 LUN1H01I 624660.6 4281286.2 0 0.0001034244 2.3 24.18605 2.139535 LUN1H01J 624659.5 4281234.2 0 0.0001034244 2.3 24.18605 2.139535 LUN1H01K 624658.4 4281182.2 0 0.0001034244 2.3 24.18605 2.139535 LUN1H01L 624657.4 4281130.3 0 0.0001034244 2.3 24.18605 2.139535 LUN1H01M 624656.3 4281078.3 0 0.0001034244 2.3 24.18605 2.139535 LUN1H01N 624655.3 4281026.3 0 0.0001034244 2.3 24.18605 2.139535 LUN1H01O 624654.2 4280974.3 0 0.0001034244 2.3 24.18605 2.139535 LUN1H01P 624653.1 4280922.3 0 0.0001034244 2.3 24.18605 2.139535 LUN1H01Q 624652.1 4280870.3 0 0.0001034244 2.3 24.18605 2.139535 Report for "ASIP.ami" Page 5 of 5
file:///C:/ProgramData/BREEZE/Aermod/20230511132219/ReportsTemp.htm 5/12/2023 BREEZE AERMOD Model Results
Max. Annual ( 4 YEARS) Results of Pollutant: PM25 (ug/m**3) Group ID High Avg. Conc. UTM Elev. Hill Ht. Flag Ht. Rec. Type Grid ID East (m) North (m) (m) (m) (m)
ALL 1ST 0.01101 624559.90 4281781.00 0.00 0.00 1.80 DC
2ND 0.01011 624409.90 4281781.00 0.00 0.00 1.80 DC
3RD 0.00952 624709.90 4281781.00 0.00 0.00 1.80 DC
4TH 0.00826 624259.90 4281781.00 0.00 0.00 1.80 DC
5TH 0.00751 624859.90 4281781.00 0.00 0.00 1.80 DC
6TH 0.00667 624109.90 4281781.00 0.00 0.00 1.80 DC
7TH 0.00589 625009.90 4281781.00 0.00 0.00 1.80 DC
8TH 0.00547 623959.90 4281781.00 0.00 0.00 1.80 DC
9TH 0.00515 626200.20 4280760.20 0.00 0.00 1.80 DC
10TH 0.00515 626200.20 4280755.20 0.00 0.00 1.80 DC
Highest Results of Pollutant: PM25
Avg.
Per.
Grp
ID High Type Val Units
Date UTM Elev. Hill
Ht.
Flag
Ht. Rec.
Type
Grid
ID YYMMDDHH East (m) North
(m) (m) (m) (m)
1-HR ALL 1ST Avg.
Conc. 0.40444 ug/m**3 15010423 626198.70 4280894.40 0.00 0.00 1.80 DC Summary of Total Messages
# Message Type
0 Fatal Error Message(s)
11 Warning Message(s)
996 Informational Message(s)
43680 Hours Were Processed
452 Calm Hours Identified
544 Missing Hours Identified ( 1.25 Percent)
Error & Warning Messages
Msg. Type Pathway Ref. # Description
WARNING CO W276 Special proc for 1h-NO2/SO2 24hPM25 NAAQS disabled PM25 H1H WARNING CO W363 Multiyr 24h/Ann PM25 processing not applicable for PM25 H1H WARNING SO W320 Input Parameter May Be Out-of-Range for Parameter VS WARNING SO W320 Input Parameter May Be Out-of-Range for Parameter VS Report for "ASIP.ami" Page 1 of 2
file:///C:/ProgramData/BREEZE/Aermod/20230511132219/ReportsTemp.htm 5/12/2023 www.breeze-software.com
WARNING SO W320 Input Parameter May Be Out-of-Range for Parameter VS WARNING SO W320 Input Parameter May Be Out-of-Range for Parameter VS WARNING SO W320 Input Parameter May Be Out-of-Range for Parameter VS WARNING ME W186 THRESH_1MIN 1-min ASOS wind speed threshold used 0.50 Report for "ASIP.ami" Page 2 of 2
file:///C:/ProgramData/BREEZE/Aermod/20230511132219/ReportsTemp.htm 5/12/2023 *HARP - HRACalc v21081 5/12/2023 8:16:41 AM - Cancer Risk - Input File: C:\Users\jfahrney\Desktop\HARP\ASIP_HRAInput.hra INDEX GRP1 GRP2 POLID POLABBREV CONC RISK_SUM SCENARIO DETAILS INH_RISK SOIL_RISK DERMAL_RISK MMILK_RISK WATER_RISK FISH_RISK CROP_RISK BEEF_RISK DAIRY_RISK PIG_RISK CHICKEN_RISK EGG_RISK 1ST_DRIVER 2ND_DRIVER PASTURE_CONC FISH_CONC WATER_CONC 1 9901 DieselExhPM 0.01101 9.53E-06 30YrCancerHighEnd_Inh_FAH16to70 * 9.53E-06 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 NA NA 0.00E+00 0.00E+00 0.00E+00 *HARP - HRACalc v21081 5/12/2023 8:16:41 AM - Chronic Risk - Input File: C:\Users\jfahrney\Desktop\HARP\ASIP_HRAInput.hra INDEX GRP1 GRP2 POLID POLABBREV CONC SCENARIO CV CNS IMMUN KIDNEY GILV REPRO/DEVEL RESP SKIN EYE BONE/TEETH ENDO BLOOD ODOR GENERAL DETAILS INH_CONC SOIL_DOSE DERMAL_DOSE MMILK_DOSE WATER_DOSE FISH_DOSE CROP_DOSE BEEF_DOSE DAIRY_DOSE PIG_DOSE CHICKEN_DOSE EGG_DOSE 1ST_DRIVER 2ND_DRIVER 3RD_DRIVER PASTURE_CONC FISH_CONC WATER_CONC 1 9901 DieselExhPM 0.01101 NonCancerChronicHighEnd_Inh 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 2.20E-03 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 * 1.10E-02 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 INHALATION NA NA 0.00E+00 0.00E+00 0.00E+00 *HARP - HRACalc v21081 5/12/2023 8:16:41 AM - Acute Risk - Input File: C:\Users\jfahrney\Desktop\HARP\ASIP_HRAInput.hra INDEX GRP1 GRP2 POLID POLABBREV CONC SCENARIO CV CNS IMMUN KIDNEY GILV REPRO/DEVEL RESP SKIN EYE BONE/TEETH ENDO BLOOD ODOR GENERAL 1 9901 DieselExhPM 0.40444 NonCancerAcute 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 0.00E+00 Strategic Area Location III. Downtown Sacramento
NOx Emissions 656
ROG Emissions 214.49
PM25 Emissions 19.52
Incidences Across the Reduced
Sacramento 4-km Modeling
Domain Resulting from Project
Emissions (per year)2,5
Incidences Across the 5-
Air-District Region
Resulting from Project
Emissions (per year)2
Percent of Background
Health Incidences
Across the 5-Air-District
Region3
Total Number of Health
Incidences Across the 5-AirDistrict Region (per year)4 (Mean) (Mean)
Respiratory
Emergency Room Visits, Asthma 0 - 99 2.5 2.3 0.012% 18419 Hospital Admissions, Asthma 0 - 64 0.16 0.15 0.0079% 1846 Hospital Admissions, All Respiratory 65 - 99 0.89 0.77 0.0039% 19644 Cardiovascular
Hospital Admissions, All Cardiovascular (less
Myocardial Infarctions) 65 - 99 0.45 0.40 0.0017% 24037 Acute Myocardial Infarction, Nonfatal 18 - 24 0.00023 0.00020 0.0054% 4 Acute Myocardial Infarction, Nonfatal 25 - 44 0.019 0.018 0.0057% 308 Acute Myocardial Infarction, Nonfatal 45 - 54 0.044 0.040 0.0054% 741 Acute Myocardial Infarction, Nonfatal 55 - 64 0.074 0.068 0.0055% 1239 Acute Myocardial Infarction, Nonfatal 65 - 99 0.29 0.26 0.0051% 5052 Mortality
Mortality, All Cause 30 - 99 6.3 5.6 0.013% 44766
Incidences Across the Reduced
Sacramento 4-km Modeling
Domain Resulting from Project
Emissions (per year)2,5
Incidences Across the 5-
Air-District Region
Resulting from Project
Emissions (per year)2
Percent of Background
Health Incidences
Across the 5-Air-District
Region3
Total Number of Health
Incidences Across the 5-AirDistrict Region (per year)4 (Mean) (Mean)
Respiratory
Hospital Admissions, All Respiratory 65 - 99 0.51 0.39 0.0020% 19644 Emergency Room Visits, Asthma 0 - 17 2.6 2.1 0.036% 5859 Emergency Room Visits, Asthma 18 - 99 4.1 3.4 0.027% 12560 Mortality
Mortality, Non-Accidental 0 - 99 0.32 0.26 0.00084% 30386 Sac Metro Air District Strategic Area Project Health Effects Tool, version 2, published September 2020 PM2.5 Health Endpoint Age Range1
Strategic Area Project Health Effects Tool
<-- Step 1: Input the area
<-- Step 2: Input NOx emissions in lbs./day
<-- Step 3: Input ROG emissions in lbs./day
<-- Step 4: Input PM2.5 emissions in lbs./day
4. The total number of health incidences across the 5-Air-District Region is calculated based on the modeling data. The information is presented to assist in providing overall health context.
5. The technical specifications and map for the Reduced Sacramento 4-km Modeling Domain are included in Appendix A, Table A-1 and Appendix B, Figure B-2 of the Guidance to Address the Friant Ranch Ruling for CEQA Projects in the Sac Metro Air District.
Ozone Health Endpoint Age Range1
1. Affected age ranges are shown. Other age ranges are available, but the endpoints and age ranges shown here are the ones used by the USEPA in their health assessments. The age ranges are consistent with the epidemiological study that is the basis of the health function.
2. Health effects are shown in terms of incidences of each health endpoint and how it compares to the base (2035 base year health effect incidences, or “background health incidence”) values.
Health effects are shown for the Reduced Sacramento 4-km Modeling Domain and the 5-Air-District Region.
3. The percent of background health incidence uses the mean incidence. The background health incidence is an estimate of the average number of people that are affected by the health endpoint in a given population over a given period of time. In this case, the background incidence rates cover the 5-Air-District Region (estimated 2035 population of 3,271,451 persons). Health incidence rates and other health data are typically collected by the government as well as the World Health Organization. The background incidence rates used here are obtained from BenMAP.
APPENDIX D