ED 3.2.c - Create Gateway Signage, Banners, and Murals.
ED 3.1.a – Develop District Identity Theme.
YAP 4.4.b – Brand Alisal as an Arts and Cultural Hub.
ED 1.2.c – Promote Art in Privately-Owned Spaces.
YAP 4.2.d – Identify and Develop a Variety of Art Spaces for Training, Display, and Performance.
YAP 4.4.a – Promote Alisal’s Public Art Installations.
Goals
Appearance
AVP SHORT TERM PROJECT BUDGET ALLOCATION
AVP Action ItemBudget Allocation
Creating District Identity
YAP 4.2.a – Commission Culturally-Relevant Art in Public Spaces.
Project Name
$700,000.00
•Public Art (murals, gateway elements, and
features)
•Wayfinding signs and banners
Tree Trimming & Tree Planting TI 3.3.a – Plant Street Trees.$75 000 00 Total:
Total:
Total:
Total:
Total:
$250,000.00
Trash/Recycle Receptacles
Cleanliness
ED 1.1.c – Increase Number of Organized Community Clean-Ups.
TI 1.3.a – Prioritize Protected or Separated bikeways, Paths Shared with Pedestrians, and Buffered Bike Lanes.
•Enhance intersection and crosswalk visibility
•Install permanent crosswalk striping
enhancements using thermoplastic paint
HS 3.1.d – Launch an “I Heart Salinas” Campaign.
$50,000.00
TI 1.4.a – Design Street Improvements to Encourage Safe Vehicle Speeds and Calm Traffic.
TI 1.1.e – Provide More Frequent Signalized Crossings and Evaluate Midblock Crossings in High Demand Locations.
TI 2.1.f – Implement Complete Streets Improvements.
YAP 5.4.c – Organize Community Beautification Events and Ongoing Volunteer Stewardship.
•Leverage “Amor Salinas” volunteer efforts
General Landscaping/Sidewalk
Cleanliness
•Ongoing landscape and sidewalk maintenance
(volunteer/contract)
$300,000.00
YAP 6.3.a – Improve Park Maintenance.
ED 1.1.a – Expand Trash Pick-up and Street Sweeping Schedules. •Installation along E. Alisal corridor and at
parks
ED 1.4.a – Build Corridor Maintenance Capacity of Community and Business Organizations
TI 3.3 – Increase Street Tree Coverage Throughout The Alisal.
HS 1.1.a – Complete a Lighting Needs Survey.
HS 2.1.d – Construct Exercise Equipment in Public Parks.
YAP 6.2.b – Install Park Fitness Equipment and Amenities. $550,000.00
YAP 6.1.g – Improve Park Playgrounds.
Conduct Lighting needs assessment
(Corridor & Parks)
•Hire/enter into contract with consultant for
lighting assessment (could be volunteer based
effort)
Park Improvements
TI 1.2.b – Complete Sidewalk Network and Keep Sidewalks in Good Repair.
TI 3.2.b – Incorporate Green Infrastructure Into Pedestrian Improvements. $250,000.00
$50,000.00
$775,000.00
HS 1.1.b – Remove “Dark Spots.”
HS 1.1.c – Install Light Poles.
HS 1.1.d – Improve Park Lighting.
Parks & Open Space $550,000.00
•Leverage current/proposed facility/park
improvements at:
-Cesar Chavez Park
-Gabilan Park
-Closter park
•Develop properties to improve trails,
equipment, and amenities
•Enhance open spaces
•Façade improvement loans/grants
•Social media and online presence support
grants
•Business plan support
$100,000.00
ED 1.1.d – Establish a Youth Works Ambassador Program.
Safety/Infrastructure
$75,000.00
$565,000.00
$350,000.00
$775,000.00
•Undertake engagement to build consensus for
corridor plan that services all users
•Based on community vision, complete
technical studies and develop plan for design
and construction (improvements)
Crosswalk visual enhancement
markings - Safe to School
demonstration pop-up
Funding for planning and corridor
assessment for road/street
infrastructure improvements
Leverage Amor Salinas in the "Alisal"
& other clean-ups
•Create a Youth Works Ambassador summer
program
•Pair youth with small business for online,
marketing and business plan support
ED 1.3.b – Identify Blighted Properties to Benefit From Façade Program.
ED 2.2.c – Activate Existing Loan Programs and Identify Funding Gaps. Establish a Microloan Program.
TI 1.1.a – Reduce Crossing Distances.
TI 1.1.b – Improve Pedestrian Visibility at Intersections. $15,000.00
$675,000.00
$3,015,000.00Grand Total:
Youth Ambassador Program
Economic Development
Micro-Grants & Loans ED 1.3.a – Establish a Façade Improvement Program.