Cities Index.
Agenda Packet

Salinas City Council
September 6, 2022

Document
Agenda Packet
Meeting
September 6, 2022
Body
Salinas City Council
Pages
6
Original file
116.6 MB
Text extracted from the city's file for reading and search. Open the original on salinas.legistar.com. That file is the official record.

BASIC FREEWAY SEGMENTS WORKSHEET
General Information Site Information
Analyst KC Highway/Direction of Travel US 101 NB
Agency or Company Fehr & Peers From/To Boronda to Russell Date Performed July 2010 Jurisdiction Salinas
Analysis Time Period PM Peak Hour Analysis Year Cumulative Scenario Project Description Cumulative With Project Conditions
 Oper.(LOS)  Des.(N)  Planning Data
Flow Inputs
Volume, V 4967 veh/h Peak-Hour Factor, PHF 0.91
AADT veh/day %Trucks and Buses, PT5
Peak-Hr Prop. of AADT, K %RVs, PR0
Peak-Hr Direction Prop, D General Terrain: Level
DDHV = AADT x K x D veh/h Grade % Length mi
Driver type adjustment 1.00 Up/Down %
Calculate Flow Adjustments
fp

1.00 ER1.2
ET

1.5 fHV = 1/[1+PT
(ET - 1) + PR(ER - 1)] 0.976
Speed Inputs Calc Speed Adj and FFS
Lane Width 12.0 ft
Rt-Shoulder Lat. Clearance 6.0 ft
Interchange Density 1.12 I/mi
Number of Lanes, N 2
FFS (measured) mi/h
Base free-flow Speed, BFFS 70.0 mi/h
fLW 0.0 mi/h
fLC 0.0 mi/h
fID 3.1 mi/h
fN

4.5 mi/h
FFS 62.4 mi/h
LOS and Performance Measures Design (N)
Operational (LOS)
vp = (V or DDHV) / (PHF x N x fHV x
f
p
)
2797 pc/h/ln
S mi/h
D = vp / S pc/mi/ln
LOS F
Design (N)
Design LOS
vp = (V or DDHV) / (PHF x N x fHV x
f
p
)
pc/h
S mi/h
D = vp / S pc/mi/ln
Required Number of Lanes, N
Glossary Factor Location
N - Number of lanes S - Speed
V - Hourly volume D - Density
vp - Flow rate FFS - Free-flow speed
LOS - Level of service BFFS - Base free-flow speed
DDHV - Directional design hour volume
ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4
ET
- Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5
f
p
- Page 23-12 fN
- Exhibit 23-6
LOS, S, FFS, vp
- Exhibits 23-2, 23-3 fID - Exhibit 23-7
Copyright © 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 7/17/2010 10:24 PM BASIC FREEWAY WORKSHEET Page 1 of 1
file://C:\Documents and Settings\sshark\Local Settings\Temp\f2k4AE.tmp 7/17/2010

BASIC FREEWAY SEGMENTS WORKSHEET
General Information Site Information
Analyst KC Highway/Direction of Travel US 101 NB
Agency or Company Fehr & Peers From/To Laurel to Boronda Date Performed July 2010 Jurisdiction Salinas
Analysis Time Period PM Peak Hour Analysis Year Cumulative Scenario Project Description Cumulative With Project Conditions
 Oper.(LOS)  Des.(N)  Planning Data
Flow Inputs
Volume, V 5232 veh/h Peak-Hour Factor, PHF 0.91
AADT veh/day %Trucks and Buses, PT5
Peak-Hr Prop. of AADT, K %RVs, PR0
Peak-Hr Direction Prop, D General Terrain: Level
DDHV = AADT x K x D veh/h Grade % Length mi
Driver type adjustment 1.00 Up/Down %
Calculate Flow Adjustments
fp

1.00 ER1.2
ET

1.5 fHV = 1/[1+PT
(ET - 1) + PR(ER - 1)] 0.976
Speed Inputs Calc Speed Adj and FFS
Lane Width 12.0 ft
Rt-Shoulder Lat. Clearance 6.0 ft
Interchange Density 1.12 I/mi
Number of Lanes, N 2
FFS (measured) mi/h
Base free-flow Speed, BFFS 70.0 mi/h
fLW 0.0 mi/h
fLC 0.0 mi/h
fID 3.1 mi/h
fN

4.5 mi/h
FFS 62.4 mi/h
LOS and Performance Measures Design (N)
Operational (LOS)
vp = (V or DDHV) / (PHF x N x fHV x
f
p
)
2947 pc/h/ln
S mi/h
D = vp / S pc/mi/ln
LOS F
Design (N)
Design LOS
vp = (V or DDHV) / (PHF x N x fHV x
f
p
)
pc/h
S mi/h
D = vp / S pc/mi/ln
Required Number of Lanes, N
Glossary Factor Location
N - Number of lanes S - Speed
V - Hourly volume D - Density
vp - Flow rate FFS - Free-flow speed
LOS - Level of service BFFS - Base free-flow speed
DDHV - Directional design hour volume
ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4
ET
- Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5
f
p
- Page 23-12 fN
- Exhibit 23-6
LOS, S, FFS, vp
- Exhibits 23-2, 23-3 fID - Exhibit 23-7
Copyright © 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 7/17/2010 10:24 PM BASIC FREEWAY WORKSHEET Page 1 of 1
file://C:\Documents and Settings\sshark\Local Settings\Temp\f2k4B4.tmp 7/17/2010

BASIC FREEWAY SEGMENTS WORKSHEET
General Information Site Information
Analyst KC Highway/Direction of Travel US 101 SB
Agency or Company Fehr & Peers From/To Boronda to Laurel Date Performed July 2010 Jurisdiction Salinas
Analysis Time Period PM Peak Hour Analysis Year Cumulative Scenario Project Description Cumulative With Project Conditions
 Oper.(LOS)  Des.(N)  Planning Data
Flow Inputs
Volume, V 5010 veh/h Peak-Hour Factor, PHF 0.96
AADT veh/day %Trucks and Buses, PT7
Peak-Hr Prop. of AADT, K %RVs, PR0
Peak-Hr Direction Prop, D General Terrain: Level
DDHV = AADT x K x D veh/h Grade % Length mi
Driver type adjustment 1.00 Up/Down %
Calculate Flow Adjustments
fp

1.00 ER1.2
ET

1.5 fHV = 1/[1+PT
(ET - 1) + PR(ER - 1)] 0.966
Speed Inputs Calc Speed Adj and FFS
Lane Width 12.0 ft
Rt-Shoulder Lat. Clearance 6.0 ft
Interchange Density 1.12 I/mi
Number of Lanes, N 2
FFS (measured) mi/h
Base free-flow Speed, BFFS 70.0 mi/h
fLW 0.0 mi/h
fLC 0.0 mi/h
fID 3.1 mi/h
fN

4.5 mi/h
FFS 62.4 mi/h
LOS and Performance Measures Design (N)
Operational (LOS)
vp = (V or DDHV) / (PHF x N x fHV x
f
p
)
2701 pc/h/ln
S mi/h
D = vp / S pc/mi/ln
LOS F
Design (N)
Design LOS
vp = (V or DDHV) / (PHF x N x fHV x
f
p
)
pc/h
S mi/h
D = vp / S pc/mi/ln
Required Number of Lanes, N
Glossary Factor Location
N - Number of lanes S - Speed
V - Hourly volume D - Density
vp - Flow rate FFS - Free-flow speed
LOS - Level of service BFFS - Base free-flow speed
DDHV - Directional design hour volume
ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4
ET
- Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5
f
p
- Page 23-12 fN
- Exhibit 23-6
LOS, S, FFS, vp
- Exhibits 23-2, 23-3 fID - Exhibit 23-7
Copyright © 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 7/17/2010 10:25 PM BASIC FREEWAY WORKSHEET Page 1 of 1
file://C:\Documents and Settings\sshark\Local Settings\Temp\f2k4BA.tmp 7/17/2010

BASIC FREEWAY SEGMENTS WORKSHEET
General Information Site Information
Analyst KC Highway/Direction of Travel US 101 SB
Agency or Company Fehr & Peers From/To Russell to Boronda Date Performed July 2010 Jurisdiction Salinas
Analysis Time Period PM Peak Hour Analysis Year Cumulative Scenario Project Description
 Oper.(LOS)  Des.(N)  Planning Data
Flow Inputs
Volume, V 5149 veh/h Peak-Hour Factor, PHF 0.96
AADT veh/day %Trucks and Buses, PT7
Peak-Hr Prop. of AADT, K %RVs, PR0
Peak-Hr Direction Prop, D General Terrain: Level
DDHV = AADT x K x D veh/h Grade % Length mi
Driver type adjustment 1.00 Up/Down %
Calculate Flow Adjustments
fp

1.00 ER1.2
ET

1.5 fHV = 1/[1+PT
(ET - 1) + PR(ER - 1)] 0.966
Speed Inputs Calc Speed Adj and FFS
Lane Width 12.0 ft
Rt-Shoulder Lat. Clearance 6.0 ft
Interchange Density 1.12 I/mi
Number of Lanes, N 2
FFS (measured) mi/h
Base free-flow Speed, BFFS 70.0 mi/h
fLW 0.0 mi/h
fLC 0.0 mi/h
fID 3.1 mi/h
fN

4.5 mi/h
FFS 62.4 mi/h
LOS and Performance Measures Design (N)
Operational (LOS)
vp = (V or DDHV) / (PHF x N x fHV x
f
p
)
2776 pc/h/ln
S mi/h
D = vp / S pc/mi/ln
LOS F
Design (N)
Design LOS
vp = (V or DDHV) / (PHF x N x fHV x
f
p
)
pc/h
S mi/h
D = vp / S pc/mi/ln
Required Number of Lanes, N
Glossary Factor Location
N - Number of lanes S - Speed
V - Hourly volume D - Density
vp - Flow rate FFS - Free-flow speed
LOS - Level of service BFFS - Base free-flow speed
DDHV - Directional design hour volume
ER - Exhibits23-8, 23-10 fLW - Exhibit 23-4
ET
- Exhibits 23-8, 23-10, 23-11 fLC - Exhibit 23-5
f
p
- Page 23-12 fN
- Exhibit 23-6
LOS, S, FFS, vp
- Exhibits 23-2, 23-3 fID - Exhibit 23-7
Copyright © 2007 University of Florida, All Rights Reserved HCS+TM Version 5.3 Generated: 7/17/2010 10:25 PM BASIC FREEWAY WORKSHEET Page 1 of 1
file://C:\Documents and Settings\sshark\Local Settings\Temp\f2k4C0.tmp 7/17/2010

APPENDIX D:

PEAK-HOUR SIGNAL WARRANTS
Project - Int 4. San Juan Grade_Northridge_PM
 






No of lanes
Major Street 2
Minor Street 1
Major Street
(Sum of both
approaches)
Minor street
(High volume
approach)
5:00 PM 1,169 226
 

Time
Vehicles Per Hour
Peak Hour
0 100
200
300
400
500
300 400 500 600 700 800 900 1000 1100 1200 1300

MINOR STREET - HIGHER VOLUME APPROACH
(VPH)

MAJOR STREET - TOTAL OF BOTH APPROACHES (VPH)
FIGURE 4C-4. PEAK HOUR VOLUME WARRANT
(Community less than 10,000 or above 40 mph on major street) Peak Hour
The peak hour volume warrant is satisfied when the plotted point representing the vehicles per hour on the major street (total of both approaches) and the corresponding vehicles per hour of the higher volume minor street approach (one direction only) for one hour (any four consecutive 15-minute periods) of an average day falls above the curve in Figure 4-5 for the existing combination of approach lanes.

When the 85-percentile speed of the major street traffic exceeds 40 mile per hour or when the intersection lies within a built-up area of an isolated community having a population less than 10,000, the peak hour volume requirement is satisfied when the plotted point referred to above falls above the curve in Figure 4-6 for the existing combination of approach lanes. 2 OR MORE LANES & 2 OR MORE LANES
2 OR MORE LANES & 1 LANE
1 LANE & 1 LANE
*100
*75
*Note: 100 vph applies as the lower threshold volume for a minor street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one or lane.

WARRANT 3B (RURAL)
Project - Int 4. San Juan Grade_Northridge_SAT
 






No of lanes
Major Street 2
Minor Street 1
Major Street
(Sum of both
approaches)
Minor street
(High volume
approach)
12:00 PM 1,022 286
 

Time
Vehicles Per Hour
Peak Hour
0 100
200
300
400
500
300 400 500 600 700 800 900 1000 1100 1200 1300

MINOR STREET - HIGHER VOLUME APPROACH
(VPH)

MAJOR STREET - TOTAL OF BOTH APPROACHES (VPH)
FIGURE 4C-4. PEAK HOUR VOLUME WARRANT
(Community less than 10,000 or above 40 mph on major street) Peak Hour
The peak hour volume warrant is satisfied when the plotted point representing the vehicles per hour on the major street (total of both approaches) and the corresponding vehicles per hour of the higher volume minor street approach (one direction only) for one hour (any four consecutive 15-minute periods) of an average day falls above the curve in Figure 4-5 for the existing combination of approach lanes.

When the 85-percentile speed of the major street traffic exceeds 40 mile per hour or when the intersection lies within a built-up area of an isolated community having a population less than 10,000, the peak hour volume requirement is satisfied when the plotted point referred to above falls above the curve in Figure 4-6 for the existing combination of approach lanes. 2 OR MORE LANES & 2 OR MORE LANES
2 OR MORE LANES & 1 LANE
1 LANE & 1 LANE
*100
*75
*Note: 100 vph applies as the lower threshold volume for a minor street approach with two or more lanes and 75 vph applies as the lower threshold volume for a minor street approach with one or lane.

WARRANT 3B (RURAL)

APPENDIX E:

INTERSECTION QUEUE REPORTS
Queuing and Blocking Report
PM Cum With Prj Conditions 







Intersection: 1: Russell Road & Van Buren Ave.
     
 





    

!"#""$
% &' '  (' & &' )
*

#""$
% ' + )& + ()  (
+&,#""$
% )( ( ') &)  & &&
-



$
% .. )& .( ((
/


0- $1%
#""
02$,%



2

$
% & & &


0- $1%   
#""
02$,%   
Intersection: 2: Russell Road & San Juan Grade Rd.
  

   





  / 

!"#""$
% & ) & )( )& )+ '
*

#""$
% )& ' . ( & ( .&
+&,#""$
% +& .) ) + .  '
-



$
% )& & (.)
/


0- $1%
#""
02$,%



2

$
% & ( & &&


0- $1%   &
#""
02$,% (  +
Intersection: 3: Van Buren Ave. & San Juan Grade Rd.
 
 





  

!"#""$
% ' )( &
*

#""$
% .' +( 
+&,#""$
% +& & .
-



$
% )(( '') &
/


0- $1%
#""
02$,%



2

$
%


0- $1%
#""
02$,%
Queuing and Blocking Report
PM Cum With Prj Conditions 







Intersection: 4: Northridge Wy. & San Juan Grade Rd.
   


   





    

!"#""$
% & + )' . +& ) . ( .+
*

#""$
% . )   ) (( .  
+&,#""$
% . (+ ) ) &' ' +.  '
-



$
% .)) )(' )(' ( ( ( (
/


0- $1%    
#""
02$,% & '  



2

$
%  


0- $1% ) )  
#""
02$,%    &
Intersection: 5: Mobile Home Drwy. & San Juan Grade Rd.   


  





    

!"#""$
% )( . ) )' .' '+ 
*

#""$
% ) + .    
+&,#""$
% ' ))  ' + & '
-



$
%   )) )) ( (
/


0- $1%
#""
02$,%



2

$
% (


0- $1% 
#""
02$,% 
Intersection: 6: Boronda Rd. & SB 101 Off-Ramp
          





   

!"#""$
% .& )&& .'( ++ ' &  )+. &) )
*

#""$
% &+ &  .& . & & + ) &)
+&,#""$
% . && )' ' + ) () )& . (
-



$
% '& '& '&& '&& '&& (&
/


0- $1%  
#""
02$,%  



2

$
% )& & && .


0- $1%       
#""
02$,%      + 
Queuing and Blocking Report
PM Cum With Prj Conditions 






)
Intersection: 7: Boronda Rd. & NB 101 On-Ramp
        








    

!"#""$
% )) ' ''& & (. & )' & ++ '' +'
*

#""$
% ) )+) &( ( ) ( '  + ( )
+&,#""$
% &+ + +). + ' ( '  (& & '
-



$
% '&& '&& '&& + + + &'
/


0- $1%   &   
#""
02$,%   )   



2

$
% & & )& )&


0- $1% )&   
#""
02$,% +  ( 
Intersection: 8: Boronda Rd. & N. Main Street
            ).





  

!"#""$
% )) ' & .. ). ' ).+ (& ( (( & ('
*

#""$
% () ' & +( ' (  & &&& &(' ++ &
+&,#""$
% . .( (' . &( ( ' ). .( (& ( )
-



$
% &' &' &' &' &' &' &'' &'' &'' +
/


0- $1%  + (    . + 
#""
02$,% (  + (+ (+ ) & ' +



2

$
% )& &


0- $1%  . (. 
#""
02$,%   + 
Intersection: 8: Boronda Rd. & N. Main Street
 ). ).




    





  

!"#""$
% +' )&) &+( (+ ((. .( . & .. & &
*

#""$
% (' ' .(. .(. () '  & & + .(
+&,#""$
% .( ' ( (+ (+) ). ) ' .) .+ ()
-



$
% + + ) ) . .
/


0- $1%
#""
02$,%



2

$
% (& (& & & &


0- $1%  .    )  )(
#""
02$,% ) (   & ). & &)
Queuing and Blocking Report
PM Cum With Prj Conditions 






.

Intersection: 9: Boronda Rd. & San Juan Grade Rd.
     ). ). ).     





 

!"#""$
% ). ). ' '(. )(& )(& ))+ )& .+ .. &( +.
*

#""$
% ) ( &.. & & . ' () '  + .+
+&,#""$
%  )+ +&+ +(& )&) )+ ) ( ' ' ' &&
-



$
% + + &'' &'' &'' )) )) ))
/


0- $1% +    
#""
02$,% (.    



2

$
% + + ) )


0- $1%  )  
#""
02$,%  +(  
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
 




     





   

!"#""$
% & .) (' ) & ( '(  )) .. &
*

#""$
% +' ) +'  . )( . &+  ' '
+&,#""$
% & ' & .  '  .   .&
-



$
% ))( ))( )) ))
/


0- $1% . 
#""
02$,% ' )



2

$
% & )& )& & & & 


0- $1%    .   ' &
#""
02$,%    & .   (
Intersection: 10: Boronda Rd. & Shopping Center Drwy.
       






  

!"#""$
% ' . ) ) ') )+ )' (.
*

#""$
% + .. & ( )   (&
+&,#""$
% & + )  .. +  )&
-



$
% &) &) &) )( )( )( )''
/


0- $1%   )
#""
02$,% ( . &+



2

$
% 


0- $1% &
#""
02$,% +
Queuing and Blocking Report
PM Cum With Prj Conditions 






&
Intersection: 11: Boronda Rd. & Project Drwy
      

  





    

!"#""$
% && )( .) . &( (.  . . )
*

#""$
% ( ' ( )' ' )& .  & 
+&,#""$
% ) .) .&& + & &+. ) ) ' &&
-



$
% )( )( ..) ..) )& (&
/


0- $1%  ' 
#""
02$,% ) & 



2

$
% .  & &


0- $1%  &  &  . 
#""
02$,% .  (   + '
Intersection: 12: Boronda Rd. & McKinnon St.
        

  





    

!"#""$
% .' .&' &. )& & )( (  & ).+ ) &.
*

#""$
% + '(  +. (+ ) )&  )&   
+&,#""$
% )& ) )++ . + & )'  + .( ( )
-



$
% ..) ..) +. +. ()+ (.
/


0- $1%
#""
02$,%



2

$
% . ) )& & & )&


0- $1%     
#""
02$,%  +   (
Intersection: 16: Boronda Rd. &
         






  

!"#""$
% &.  (. '( ( &. & . ) '
*

#""$
% ( . '  ) & +   &
+&,#""$
% )& ' . (  & ) ) + (&
-



$
% + + + + &' &' &' .
/


0- $1%         
#""
02$,%  . .  )   ' &



2

$
% & &


0- $1%    
#""
02$,%  & ) )
Queuing and Blocking Report
PM Cum With Prj Conditions 






(
Intersection: 17: Boronda Rd. & Project Drwy
       





  

!"#""$
% & '( +& ' . . +&
*

#""$
%       .)
+&,#""$
% . .. & & '  '
-



$
% )) )) )) &) &) &) '(
/


0- $1%   
#""
02$,%   



2

$
%


0- $1%
#""
02$,%
Intersection: 32: Project Drwy & San Juan Grade Rd.


  





 

!"#""$
% ) ' .. .&
*

#""$
% )& ) ) 
+&,#""$
%   + .
-



$
% ( ( '')
/


0- $1%  
#""
02$,%  



2

$
% 


0- $1%  
#""
02$,%  
Network Summary

3
-3#""
024'.

Queuing and Blocking Report
SAT Cumulative With Project Conditions 







Intersection: 1: Russell Road & Van Buren Ave.
     
 





    

!"#""$
% & ' ' ' ( ' (
)

#""$
% ( *+   ,( * +'
&,-#""$
% '* & ,+ , * ,* ',
.



$
% ** +, *' ''
/


0. $1%
#""
02$-%



2

$
% , , ,


0. $1%   
#""
02$-%   
Intersection: 2: Russell Road & San Juan Grade Rd.
  

   





  / 

!"#""$
% +'  *  + ' (
)

#""$
% '' + ,, '  , ++
&,-#""$
%  '' &( , , + ',
.



$
% +, , '*+
/


0. $1%
#""
02$-%



2

$
% , ' , ,,


0. $1%  
#""
02$-%  +
Intersection: 3: Van Buren Ave. & San Juan Grade Rd.
 






 

!"#""$
%  +&
)

#""$
% ,' '(
&,-#""$
%  &
.



$
% +'' ((+
/


0. $1%
#""
02$-%



2

$
%


0. $1%
#""
02$-%
Queuing and Blocking Report
SAT Cumulative With Project Conditions 







Intersection: 4: Northridge Wy. & San Juan Grade Rd.
   


   





    

!"#""$
% & ( * * &+ + * '+ '
)

#""$
% ** ' + , + ' ,  &
&,-#""$
% *  +& & , & '  &
.



$
% *++ +'( +'( ' ' ' '
/


0. $1%    
#""
02$-% ,   



2

$
%  


0. $1% * +  
#""
02$-%  & , (
Intersection: 5: Mobile Home Drwy. & San Juan Grade Rd.  


  





   

!"#""$
% +(   , ( *
)

#""$
% *   +  &
&,-#""$
% * (  &  '
.



$
%  + + ' '
/


0. $1% 
#""
02$-% 



2

$
% '


0. $1% 
#""
02$-% 
Intersection: 6: Boronda Rd. & SB 101 Off-Ramp
          





   

!"#""$
% ,& ,( +* &( +' +* ++ (, +, '
)

#""$
% & , **  ' (  '+ ( ',
&,-#""$
% *,  *( '(  + * '' ( &
.



$
% (, (, (,, (,, (,, ',
/


0. $1%
#""
02$-%



2

$
% +, , ,, *


0. $1%   + 
#""
02$-% + ' * 
Queuing and Blocking Report
SAT Cumulative With Project Conditions 






+
Intersection: 7: Boronda Rd. & NB 101 On-Ramp
        








    

!"#""$
% ',' + ( , * +** +' , ,& + &
)

#""$
% * +,( *+ ,& ( '  +( ' * ,
&,-#""$
% ,++ ''* ( &, (& '+ ' ,, + &( *
.



$
% (,, (,, (,, & & & ,(
/


0. $1%    
#""
02$-%   * +



2

$
% , , +, +,


0. $1% +&   
#""
02$-% ,,  * 
Intersection: 8: Boronda Rd. & N. Main Street
            +*





  

!"#""$
%  + ** +& + + +*& ', ',, '' , *
)

#""$
% *' ''  , * '* *( *(( , ,+* (* +&
&,-#""$
%  ** , ,& * '+ &(  ' * &( '
.



$
% ,( ,( ,( ,( ,( ,( ,( ,( ,( &
/


0. $1% *  ++ '   &  ,
#""
02$-% *, ' ' (* ('  *+ ,& '&



2

$
% +, ,


0. $1%  ++ ,* 
#""
02$-%  +( ( '
Intersection: 8: Boronda Rd. & N. Main Street
 +* +*




    





  

!"#""$
% *( ,, *, *+( &( +* , , '+ '(& ,
)

#""$
% , ' +, +, ' , +& ' + +(' *'
&,-#""$
%  ,* ** *+ ,  , & ,'* ',+ ',
.



$
% & & + + * *
/


0. $1%
#""
02$-%



2

$
% ', ', , , ,


0. $1%   + +' & *+
#""
02$-%    *& (& '
Queuing and Blocking Report
SAT Cumulative With Project Conditions 






*
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
     +* +* +*     





 

!"#""$
% + +* (+* (+( * * + & & ,* (* +(
)

#""$
% (*  ,+' ,,, +' ' & (,  *' ,& &
&,-#""$
% &' +** (& ((' +& *++ + ,,  * ,' &
.



$
% & & ,( ,( ,( ++ ++ ++
/


0. $1% + *   
#""
02$-% + (   *



2

$
% & & + +


0. $1%  , *  
#""
02$-% ' * (,  *
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
 




     





   

!"#""$
% ,, & +' & ( & ('  + +' ,
)

#""$
% (*  & +  + *' '+ ', *& &'
&,-#""$
%  * &&  &   ( ++  ,*
.



$
% ++' ++' + +
/


0. $1%  +
#""
02$-% +* *



2

$
% , +, +, , , , 


0. $1%    ' *  ' 
#""
02$-%    &   * 
Intersection: 10: Boronda Rd. & Shopping Center Drwy.
       






  

!"#""$
%  , & * +' &, ' *'
)

#""$
% ' , +& ( +, * * (+
&,-#""$
% * ( , + (, , , (
.



$
% ,+ ,+ ,+ +' +' +' +((
/


0. $1%  * (   
#""
02$-%  ' ++   



2

$
% 


0. $1% 
#""
02$-% *+
Queuing and Blocking Report
SAT Cumulative With Project Conditions 






,
Intersection: 11: Boronda Rd. & Project Drwy
      

  





    

!"#""$
% '* +(* +&* &* ( &** + * * '&
)

#""$
%   ,* + *'* ,   ,( 
&,-#""$
% * *' *, ,* (+ &** , + & (
.



$
% +' +' **+ **+ +, ',
/


0. $1%  * 
#""
02$-% ' ' 



2

$
% *  , ,


0. $1%   + + '
#""
02$-%   + * *
Intersection: 12: Boronda Rd. & McKinnon St.
        

 





    

!"#""$
% + ,* ,, +, + & ++  , ++ +
)

#""$
% * * '+  &+ *& ,(  ,+ &' +
&,-#""$
%  *' *&& (+ '* '+ ( ( * &' ,
.



$
% **+ **+ &* &* '+& '*
/


0. $1%
#""
02$-%



2

$
% * + +, , ,


0. $1%  '    ,
#""
02$-%  *    +
Intersection: 16: Boronda Rd. &
         






  

!"#""$
% ( * ( +,( +'* ,   (* &
)

#""$
%  '   ( *& ' &* (& (
&,-#""$
% , + *, ' +  & (( ' ((
.



$
% & & & & ,( ,( ,( *
/


0. $1%        
#""
02$-%       ' +



2

$
% , ,


0. $1%   
#""
02$-%  & '
Queuing and Blocking Report
SAT Cumulative With Project Conditions 






'
Intersection: 17: Boronda Rd. & Project Drwy
     





  

!"#""$
% + , &+ ,( *'
)

#""$
%  + (  ,
&,-#""$
%  , *( + 
.



$
% ++ ++ ++ ,+ ('
/


0. $1% 
#""
02$-% 



2

$
%


0. $1%
#""
02$-%
Intersection: 32: Project Drwy & San Juan Grade Rd.


  





 

!"#""$
% &&   
)

#""$
% ,   
&,-#""$
% ' * ' (
.



$
% ' ' ((+
/


0. $1%
#""
02$-%



2

$
% 


0. $1%
#""
02$-%
Network Summary

3
.3#""
024',+

APPENDIX F:

MITIGATED INTERSECTION LEVEL OF SERVICE CALCULATIONS
HCM Signalized Intersection Capacity Analysis Project_PM Mitigation 9: Boronda Rd. & San Juan Grade Rd. 
 




 






!
 "#$ "#% "#
&#$ &#% &#
'#$ '#% '#
#$ #% #

$( )
*+)
,!

- ./ 0
/ 0
/
/ . . 0 0
0 /
1+2+3,!

+- . . . . . . . . . . . . %+$
,-
4
4
4
4
4
4
4
4
4
4
4
$5+42 4. 4. 4 4. 4 4 4. 4 4 4. 4 2
67
68 4 4 4 4 4. 4 4 4. 4 4 4. 2+
67
68 4 4 4 4 4 4 4 4 4 4 4 2 4 4.. 4 4 40 4 4 40 4 4 40 2+
 4. 4 4. 4 4 4. 4 4 4. 4 4 42+3,
- / /./  0   . .  .  2+

 4. 4 4. 4 4 4. 4 4 4. 4 4 42+3,

- / /./  0   . .  . 

8

)(7
92 4./ 4./ 4./ 4./ 4./ 4./ 4./ 4./ 4./ 4./ 4./ 4./ :42+3,!

-  0/
0 ..
0    0 / . 

%;

),!

-  /    .      .
$<)
2+3,!

-  .0  ..
0 0   / / .

(+4
4,=
-    
(+4#8,=
-    
%)%













  /  0   




 0 

:)<7<,- 4 4
4 4 4 4
4 4 04 /40 /40
"((!<7 ,- 4 4
4 4 4 4
4 4 04 /40 /40
:) 
 4 4 4 4 4 4 4
4
40 4/ 4/
+%
,-
4
4
4
4
4
4
4
4
4
4
4
*
+">,- 4 4 4 4 4 4 4 4 4 4 4 $<

,!

- /0  .  /
 0 0   0/ 
/
!

 4. 4 4 4/ 4
4. 4 4

!


4 4 4/
!
 4 40 4 4/ 4 4
4/ 4
4.0 4 4
5(
?+7 /4
4 /
4 .4 
4 //4
.4. 
4 /4 4 4

 2 4 4 4 4 4 4 4 4 4 4 4 1
+?+7 /4
4/ 04 4 4 4/ 4 4 //4 4 4
?+,- /04 04 /40 .4 

4. /4 /4. 
40 04 4 4
$!+(! ? ? 2   ? ? ? 2  
:


?+,- /4
/4 /4/ /4
:


$; ? ? ? ?
1)


9:! +?+ /4 9$!+(! ?
9*+)

 4
:)+$ 
,- /4 )
(+
,- 04
1
5+@ 04.A 15$!+(! "
:+
,
- 
+$<)

HCM Signalized Intersection Capacity Analysis Project_SAT Mitigation 9: Boronda Rd. & San Juan Grade Rd. 








 
 !
"#
 $%& $% $% '%& '% '% (%& (% (%
%&
%
%
& )!* 
+,*
-#
. 


/  0 


  / 1
0 
/1
2 ,3,4-#
,. 0 0 0 0 0 0 0 0 0 0 0 0  ,&
-.
5
5
5
5
5
5
5
5
5
5
5
& 6,53  50 50
5 50 5 5 50
5 5 50
5
3 78 79 5 5 5 5 50 5 5 50 5 5 50 3, 78 79 5 5 5 5 5 5 5 5 5 5 5 3 5 500 5 5 51
5 5 51
5 5 51

3, 50
5 50
5 5 50
5 5 50
5 5

53,4- . / / 
1


 
0 
0  
0 

3,
 50
5 50
5 5 50
5 5 50
5 5

53,4- 
. / / 
1


 
0 
0  
0 

 9

*) 8:3 50/ 50/ 50/ 50/ 50/ 50/ 50/ 50/ 50/ 50/ 50/ 50/ 53,4-#
. 
0 
// 1/  0 1 0 0 1 
/
;*-#
. 
   1      

& <* 3,4-#
.  

 // 1/ / 0 1 / 0 1
0 ),55-=
.    
),5%9-=
.    
*
   
 
 


  /  1
 



 1 

* <8<-. /5 
51 5 51 51 51 /51 /51 15/ 5/ 5/
$))#<8!-. /5 
51 5 51 51 51 /51 /51 15/ 5/ 5/
* !  5
51 5 5
5
5 5
5
50 5 5
,  
-.
5
5
5
5
5
5
5
5
5
5
5
+
,$>-. 5 5 5 5 5 5 5 5 5 5 5 & <  -#
.

01   1/ 0

  / 0
//
#  5 5 5/ 5
5 5 5 5

# 
5 5 5/
#  5 51 5
5
 5 5
0 5/ 5
50 5 5
6)
?,
8 15
5
/5 50 5
05

5/ /5 5
5
051
!3  5 5 5 5 5 5 5 5 5 5 5 2
 ,?,
8 /5 /5 5
5 5 5
5
5 
5 5 5
?,
-. /51 
5 
/5
50 5 /5 5 /5/
5 5 5
&#,)
# ? ? 3   ? ?  $  
  
?,
-. 15

5 50 /5
  
&;
? $ ? ?
2
*



:"# !,?,
/
5/ :"&#,)
# ?
:"+,*
 
  51
* 
,&!
-. 0
5
*
),
-. /5
2 
6,@  150A 26&#,)
# $
 ,
-
. 

 ,& <*
HCM Signalized Intersection Capacity Analysis Cum With Prj_PM Mitiigation 8: Boronda Rd. & N. Main Street 






 




!

"
 #$% #$& #$
$% $& $
'$% '$& '$
$% $& $

% (! 
)*
+" , - . - . - -.  .. - -/ 00 .-/
1 *2*3+"  *, 0 0 0 0 0 0 0 0 0 0 0 0 & *%
+, -4 -4- -4- -4 40 40 -4
-4- -4- -4 -4- .4
% 5*42
 40 40 4 4 40 4 40 40 4 4 40 4 2 67 68 4 4 40
4 4 40
4 4 40
4 4 400
2* 67 68 4 4 4 4 4 4 4 4 4 4 4 4 2 4 4 4/ 4 4 4/ 4 4 4/ 4 4 4/ 2*

 40 4 4 40 4 4 40 4 4 40 4 4  42*3+ , .-.. / 
 / 
.-.. ..0   ..0 
.
2*

 40 4 4 40 4 4 40 4 4 40 4 4  42*3+ 
, .-.. / 
 / 
.-.. ..0   ..0 
.

8 (
7
92 40- 40- 40- 40- 40- 40- 40- 40- 40- 40- 40- 40- :42*3+" , -- .- -/- 
  
. ..   ./ .

&;


+" ,      0   -.  

% < 2*3+" , -- .- 0 
 0. 
. ..   ./ .
-
(*4
4+=,    
(*4$8+=,    
&&










>"



   - . /   




  - / 

:
 <7<+, /4
4
4
40 ./4 ./4 .4/ 4 4 .4 04. -4/
#((
"<7!+, 04
4

4
40 ./4 ./4 .
4/ 4 4 .
4 4/ 4/
:
 !
 4 4-. 4-. 4 4 4 4 4 4 4 4- 4. *  
&
+, 4 40 40 4 40 40 4
40 40 4 40 4
)
*#?+, 4/ -4/ -4/ 4/ 4. 4. 4/ 4. 4. 4/ 4. 4/ % <  +" ,  

 0 .. -
/. 
 --
0 -0
"

 4. 4
4.
4
4 4 40 40
4-
"


4 4
4 4
"

 4
. 4
 4- 4/ 4/ 4. 4/ 4
 4. 4. 4
 4

5(
@* 7 4
.4 /4

4/ -04/ -4 4 /4. 4 --4- /4. .04

!2
 4 4 400 4 4 4 4 4 4 4 4 4 1

 *@* 7 4- 4 4/ 4 .4/ 4 04- 40 4 4 40 4. @* +, -4 .40 04. 40 .4
-4
4
4 4 --4

4 -4
%"*("
@   # @ @ # # @ @ # @
: 
@* +, .

4. .4
4/ -04-
: 
%; @ @ # @
1



9
:" !*@*  -4- 9
%"*("
@
9
)*

  4
:
 
*%!+, --4 
(*
+, 40
1

5*A  /4B 15%"*("
#
: *
+
, 


*% <
HCM Signalized Intersection Capacity Analysis Cum With Prj_SAT Mitigation 8: Boronda Rd. & N. Main Street 
 



 




!

"#
$
% 
 &'( &' &'# '( ' '# )'( )' )'#
'(
'
'#
(

*$

+ ,- . . / 0 


 01 ./
/ .
.
/ .

234,- 1 1 1 1 1 1 1 1 1 1 1 1 (  , - /5 /5/ /5/ /5
51 51 /5
/5/ /5/ /5 /5/ .5
(
653
 51 51 5 5 51 5 51 51
5 5 51
5
37879 5 5 51
5 5 51
5 5 51
5 5 510
37879 5 5 5 5 5 5 5 5 5 5 5 5 3 5 5 50
5 5 50
5 5 50
5 5 50

3
 51
5 5 51
5 5 51
5 5 51
5 5

534,- ./..
0

 
0

/ ./.. .
.1 

 .
.1 

0 3  51
5 5 51
5 5 51
5 5 51
5 5

534, - ./..
0

 
0

/ ./.. .
.1 

 .
.1 

0 9"*
8:3 51/ 51/ 51/ 51/ 51/ 51/ 51/ 51/ 51/ 51/ 51/ 51/

534,- .. 0 //0 
. 
 0
 .
/
 // . .

#;##

,-   .  
/   /1  

(
<34,- .. 0 .

. 
0  .
/ 0 // . .

*5 5,=-    

*5'9 ,=-    

!         >

   / . 0
 

   / 0 

<
8<, - /5/
/51
/51 /5 //5
//5
/5. 5 5 /.5
5 /
5 &**
<
8$, - 
5/

5/

5/ 
5 //5
//5
/.5. 5 5 //5
.5
/15

$# 5
5.
5.
5 51 51 50 5
5
51 5
5.


 , -
5
51 51
5
51 51
5 51
51 5
51 5
+
&?

, - 50 /50 /50 50 5. 5. 50 5. 5. 50 5. 50
(
<,-

1 0/

  /
 /.
1 .




.
/1

 # 5
5
5
5/
5
5 50
5
5
 # 5
5 5 5

# 5
1 5 5/. 5/ 50
5/ 51 5 5/ 50 5 5

6 * @!8
5
/5/ .5

05 5
/50
/5.
.5/
5 /.5.
50 /
5
$ 
3
 5 5 511 5 5 5 5 5 5 5 5 5 2  
@!8 5 5/ 5 /5 /5 5 5
.51 5 5 .5 5
@!, -
5
/.51 .05/ 05

5 /.5

50 5.
5. /.5/

5 /51
(*

 & @ @ 3 & @ & & & @ & @


@!, - /
5 50

50 5/


(;
@ & & &
2  


 !
:%
$
@!
/50 :%(*

 @
:%+ 
! 51

!
(
$, - 

51  *  , - /51
2  


!6A
0/5/B 26(*

 &

!  , 
- 


(
<
HCM Signalized Intersection Capacity Analysis Cum With Prj_PM Mitiigation 8: Boronda Rd. & N. Main Street 
 








 !

"#!
$!
! %&' %&( %& &' &( & )&' )&( )&
&'
&(
&
'"!*#"
+,
!-$
. / 0 / 0 / /0

00 /
/  0/
1!",2,3-$

,.             (",'
!-. /4 /4/ /4/ /4 4 /4
/4/ /4/ /4 /4/ 04

'"!5,42"
 4
4 4 4 4 4
4 4 4 4 4
2
67
!68! 4 4 4
4 4 4 4 4
4 4 4
2,
67
!68! 4 4 4 4 4 4 4 4 4 4 4 2 4 4 4 4 4 4 4 4 4 4 4 2,!
! 4 4 4 4 4 4 4 4 4 4 4

"42,3-
. 0/00   

 /
 0/00 00 


 00 

2,!
! 4 4 4 4 4 4 4 4 4 4 4

"42,3-
!
. 0/00   

 /
 0/00 00 


 00 

!"8*"
792 4/ 4/ 4/ 4/ 4/ 4/ 4/ 4/ 4/ 4/ 4/ 4/ :42,3-$
. // 0/ // 



0 00  
0 0

(;  !
-$
.   0      /0  

'"!<
2,3-$
. // 0/ 
 
/ 

0 00

0 0
/
*,4!4-=.    
*,4&8!-=.    
((

!  !
  !


>$
!
!"!
/ 0    

!
!"! / 

:
"!<!!7<-. 
4
4
4
4 /4 0
4 4 4 04
40 /4/
%**!
$!<!!7#-. 
4
4

4
4 /4 0
4 4 4 0
4 4 /4/
:
"!# " 4 4/0 4/0 4 4 4 4 4 4 4/ 400 ,!""
!(
!-. 4 4 4 4 4 4
4 4 4 4 4
+!
,!%?!-. 4 /4 /4 4 40 4 40 40 4 40 4 '"!<
"
-$
.
0 
/ 
/0 
  0 // / 

$ " 40 4
40
4
4 4 4 4
40
$ "!
4
4 4
$
 " 4
 4
 4/ 4 4
4 4
 40 40 4
0 4

5*
@!,"
7 4
04 4

4/ /4/ 4/ 4 04/ //4 4 /4

#!2"
 4 4 4 4 4 4 4 4 4 4 4 1
!
!",@!,"
7 4
4
4 4
4 4
04 4 4 4 04
@!,"
-. 4 04 40
4 4
4
4 04/ /4
4 /
4
'!$!,*
!$
! %   % % % % @ @ % @
:

"
@!,"
-. 0
4 
4
4
4

:

"
';
@ % % @
1!!



"

9:$!"#!,@!,"
/4 9'!$!,*
!$
! @
9+,
!"
"

" 4
:
"!

,!'!#-. /
4

*,
!-. 
4
1!!
"
"

5,A" /4B 15'!$!,*
!$
! %
:",
!-
. 


",'"!<

HCM Signalized Intersection Capacity Analysis Cum With Prj_SAT Mitigation 8: Boronda Rd. & N. Main Street 








!
" # 


$%


&
'

  ()* () ()% )* ) )% +)* +) +)% )* ) )%
* 
,&

"
-

. / 0 0 1  


  01
1 0
0 1 0

2!3
4.  /             
*
"
."/ 15 151 151 15
5 15
151 151 15 151 05

* 653

5
5 5 5 5 5
5
5 5 5
5
3 78 !79" 5 5 5
5 5 5 5 5
5 5 5
3 78 !79" 5 5 5 5 5 5 5 5 5 5 5 3  5 5 5
5 5 5 5 5
5 5 5

3

! 5
5 5 5
5 5
5 5 5
5 5
!53
4.

/ 0100


 

 1

0100 0
0 



 0
0 

3

! 5
5 5 5
5 5
5 5 5
5 5
!53
4. 

/ 0100


 

 1

0100 0
0 



 0
0 

9$

,

8:3 51 51 51 51 51 51 51 51 51 51 51 51 !
53
4. / 00  11 
0 
 
 0
1 11 0

0

%;%%!
. /   0      1  

* <

 3
4. / 00  0

0  
 0
1  11 0

0

,5!"5.=
/    

,5)9".=
/    

#  

 



 

 




>



!""
1 0 
 



!"" 1 

!<
 8<."/ 51
15
15 15 15
150 5 5 105
5 15

(,,<
 8&."/ 51

51 51 
5 15
1050 5
5
115
05
1 5

!&%
51 50
50
5 50 5 5
5
5 5
5

 
."/
5
5
5
5
5
5 5
5
5
5
5
-(? "
."/ 5 15 15 5 50 5 50 50 5 50 5
* <
 . / 1
 1

 
 
1 
0 



0 1
1 "%


 5 5
5
5 5
5 5 5 5
"%


5
5 5
%
5
 5
 510 5
1 5 5 5
 51 5 5
 5

6 ,

@#8!
15 151 0
5 5

5
150
051

5 1050
5 15


&
""
3

5 5 5 5 5 5 5 5 5 5 5
2 
 @#8! 05 51 5 15
5 5
05 5 5 05
15
@#."/
5 105 051 5

5

5

50 50 1051

5 05
*
,
 ( @ @ 3 ( ( ( ( @ ( @


@#."/ 1
5 5

5

5 

*; @ ( ( (
2 
"



#
:'
&


@#

5 :'*
,
 (
:'-


 #

5
!#* &."/ 

5 

,
"
."/ 15
2 
"
 #6A

5B 26*
,
 (
 #""

!.
 / 


* <


HCM Signalized Intersection Capacity Analysis Cum With Prj_PM Mitiigation 9: Boronda Rd. & San Juan Grade Rd. 






 




!

"
 #$% #$& #$
$% $& $
'$% '$& '$
$% $& $

% (! 
)*
+" , -- -
. / / / 
.- 0. -.0 
- -
1 *2*3+"  *, 0 0 0 0 0 0 0 0 0 0 0 0 & *%
+,
4
4
4
4
4
4
4
4
4
4
4
% 5*42
 40 40 40 40 4 40 40 4 40 40 4 2 67 68 4 4 4 4 40 4 4 40 4 4 40 2* 67 68 4 4 4 4 4 4 4 4 4 4 4 2 4 400 4 4 4/ 4 4 4/ 4 4 4/ 2*

 40 4 40 4 4 40 4 4 40 4 4  42*3+ , -.-- -- -.-- / - -.-- --0 - -.-- --0 / 2*

 40 4 40 4 4 40 4 4 40 4 4  42*3+ 
, -.-- -- -.-- / - -.-- --0 - -.-- --0 /

8 (
7
92 40. 40. 40. 40. 40. 40. 40. 40. 40. 40. 40. 40. :42*3+" , --- 
/ 00 . -  .0  - / 
0 &;


+" ,  -       /   -
% < 2*3+" , --- /  00 .   .0 0 - /

(*4
4+=,    
(*4$8+=,    
&&












   . - /   



  / 

:
 <7<+, -4 .4- 4 -
4 -
4 -4- 4 4 4 -4 -4
#((
"<7!+, -4 .4- 4 -
4 -
4 -4- 4 4 4 -4 -4
:
 !
 4 4-
40 4-- 4-- 4 40 40 4. 4 4
*  
&
+,
4
4
4
4
4
4
4
4
4
4
4
)
*#>+, 4 -4 4 -4 -4 4 -4 -4 4 -4 -4 % <  +" , .-  -0 
 
.
 0 ./ .0 --
"


4
4-. 4
4 4/
4-
4 4/
"


4 4 4.
"

 40 40- 4
. 4.
4 4

4
/ 4 4
4- 4
5(
?* 7 .4- -.4 ./4/ 04 
4 .
4 .40 -
40 .40 -4 -
4

!2
 4 4 4 4 4 4 4 4 4 4 4 1

 *?* 7 /4 4- -4. 4 4 -4 40 4

4. 4- 4-
?* +, 40 .

4. 4- 04 
40 .04/ ..4/ -4 4- -4/ -

4. %"*("
# ? ?   ? ? ? ? ? ?
: 
?* +, ./4 -4 .4 .-4
: 
%; ?  ? ?
1



9
:" !*?*  .4. 9
%"*("
?
9
)*

  4/

:
 
*%!+, 4 
(*
+, .4
1

5*@  /-4A 15%"*("
#
: *
+
, 


*% <
HCM Signalized Intersection Capacity Analysis Cum With Prj_SAT Mitigation 9: Boronda Rd. & San Juan Grade Rd. 
 



 




!

"#
$
% 
 &'( &' &'# '( ' '# )'( )' )'#
'(
'
'#
(

*$

+ ,- .
. /
0  / 0.
 .. .
1 // .. /0 
/
234,- / / / / / / / / / / / / (  , -
5
5
5
5
5
5
5
5
5
5
5
(
653
 5/ 5/
5/ 5/ 5 5/ 5/
5 5/ 5/
5
37879 5 5 5 5 5/ 5 5 5/ 5 5 5/

37879 5 5 5 5 5 5 5 5 5 5 5 3 5 5// 5 5 50
5 5 50
5 5 50

3
 5/
5 5/
5 5 5/
5 5 5/
5 5

534,- .1.. .1/
.1..
0

. .1.. .
./ 
/ .1.. .
./ 


3  5/
5 5/
5 5 5/
5 5 5/
5 5

534, - .1.. .1/
.1..
0

. .1.. .
./ 
/ .1.. .
./ 


9"*
8:3 5/1 5/1 5/1 5/1 5/1 5/1 5/1 5/1 5/1 5/1 5/1 5/1

534,- .0
/ 
11 000  .
 .0 
./ . 

#;##

,-  1    1   0   0.
(
<34,- .0
/  11 000 . .
 .0 0 ./ . /.

*5 5,=-    

*5'9 ,=-    

!       

   1 . 0
 

   0 

<
8<, - 15 15. 5 .
5/ .
5/ 
5 /5 /5 
51 /5/ /5/
&**
<
8$, - 15 15. 5 .
5/ .
5/ 
5 /5 /5 
51 /5/ /5/

$# 5. 5.
5 5.. 5.. 51 5 5 5
50 50


 , -
5
5
5
5
5
5
5
5
5
5
5
+
&>

, - 5 .5 5 .5 .5 5 .5 .5 5 .5 .5
(
<,- 1.0 1 .. 
/
. 10
1 

/
. 1
 #
5
5. 5 5 5
5
5 5/
 # 5
5 5


# 500 50
5. 5
 51 5 5
. 5 50 5
 5.1
6 * ?!8 151 .5
105
/5 
50 1
51 151 .05 1
51 150 ./5

$ 
3
 5 5 5 5 5 5 5 5 5 5 5 2  
?!8 5/
5/ 5 5. 5 151 5 5
50 5
5
?!, -

5. .051

5 .5 
5/ 1/50 115
.05.
5 15
151
(*

 & ? &   ? ? ? ? ? ?


?!, - 1
51 .15 1
5/ 1
51 
(;
?  ? ?
2  


 !
:%
$
?! 15 :%(*

 ?
:%+ 
! 50.

!
(
$, - 5

 *  , - 15
2  


!6@
05A 26(*

 ?

!  , 
- 


(
<
HCM Signalized Intersection Capacity Analysis Cum With Prj_PM Mitiigation 12: Boronda Rd. & McKinnon St. 






 




!

"
 #$% #$& #$
$% $& $
'$% '$& '$
$% $& $

% (! 
)*
+" ,  - .
/ 0 0 . 
 / /0 -  /
1 *2*3+"  *, 0 0 0 0 0 0 0 0 0 0 0 0 & *%
+,
4
4
4
4
4
4 4 4 4 4
% 5*42
 4 40 4 4 40 4 4 4 4 4
2 67 68 4 4 40 4 4 40 4 40 4 40- 2* 67 68 4 4 4 4 4 4 4 4 400 4 2 4 4 4- 4 4 4- 4 4-
4 4-0
2*

 40 4 4 40 4 4 40 4 40 4
 42*3+ ,  ..0   ..0 .  - .  
2*

 40 4 4 40 4 4 4/ 4 4 4  42*3+ 
,  ..0   ..0 . .-
- .. 


8 (
7
92 40/ 40/ 40/ 40/ 40/ 40/ 40/ 40/ 40/ 40/ 40/ 40/ :42*3+" ,   .-  0-/ . 0 /  0  

&;


+" ,   0     .0    
% < 2*3+" ,   0  0-/  0   0 0  (*4
4+=,     
(*4$8+=,    
&&












    
- /



  
- /
:
 <7<+, 4 /04 /04 -4. 
4 
4 /4 /4 /4 /4
#((
"<7!+, 4 /04 /04 -4. 
4 
4 /4 /4 /4 /4
:
 !
 4 4/0 4/0 4- 4
4
4 4 4 4
*  
&
+,
4
4
4
4
4
4 4 4 4 4
)
*#>+, .4 .4 .4 .4 .4 .4 .4 .4 .4 .4 % <  +" ,  .0 .- / 00 -/
./ .- .
.0
"

 4
4.
4

4- 4 4
"


4. 4
4 4
"

 4.. 4
 4
4
0 4/0 4 4- 4/ 4. 4
5(
?* 7 /04 -4 /4- //4 .4 04
.4
-4- -4
-4

!2
 4 4 4 4 4 4 4 4 4 4
1

 *?* 7 04 4
4- 4 40 4 /4
4 4 4
?* +, -4 4 4
4 /4 04
4 -4- -4 -4

%"*("
#  $ # $ : ?   
: 
?* +, 04 -4 /
4 -4

: 
%; $ $ ? 
1



9
:" !*?*  4 9
%"*("

9
)*

  4
:
 
*%!+, 0040 
(*
+, /4
1

5*@  4/A 15%"*("

: *
+
, 


*% <
HCM Signalized Intersection Capacity Analysis Cum With Prj_SAT Mitigation 12: Boronda Rd. & McKinnon St. 
 



 




!

"#
$
% 
 &'( &' &'# '( ' '# )'( )' )'#
'(
'
'#
(

*$

+ ,- . . /  / / 0.     /
123,- 0 0 0 0 0 0 0 0 0 0 0 0 (  , -
4 4

4 4

4 4

4
4
4
(
542
 4 40
4 4 40
4 4 4 4
26768 4 4 40
4 4 40
4 40 409
26768 4 4 4 4 4 4 4 4 4 2 4 4 49
4 4 49
4 49
40
2
 40
4 4 40
4 4 40
4 4

423,-  /
/0 .09  /
/0 
  
/. 

/
2  40
4 4 40
4 4 4
4 4

423, -  /
/0 .09  /
/0 
 .

/. 

/
8"*
7:2 40. 40. 40. 40. 40. 40. 40. 40. 40. 40. 40. 40.

423,- . 0 .
0 / / //  9   /
#;##

,-   /     /    
(
<23,- . 0 
0 /  //
  / 

*4 4,=-     

*4'8 ,=-    

!      

 
 
9 .
   
9 .

<
7<, - 4 .049 .049 4
04 04
4. 4. 4.
&**
<
7$, - 4 .049 .049 4
04 04
4. 4. 4.

$# 4 4. 4. 4 4

4

4
4
4



 , -
4 4

4 4

4 4

4
4
4
+
&>

, - /4 /4 /4 /4 /4 /4 /4 /4 /4
(
<,-  

  9/ 09

9. /
 /0
.0
 # 4
4/
4 4/ 4 4
 # 49 4
4

# 4 4

4
4 4

4 49
4 4
5 * ?!7
4 4

4 .
4 .40 4 /4
04/ 04/
$ 
2
 4 4 4 4 4 4 4 4 4
1  
?!7 .40 4 4
4 4 4 949 4 4
?!, -

40 /4

4
4 
4 4

4 04/ 04/
(*

 &  ' & ' ' &  


?!, - 4. 4/

4 04/


(;
  ? 
1  


 !
:%
$
?! 
4 :%(*

 
:%+ 
! 4

!
(
$, - 
4
 *  , - 94
1  


!5@
/4/A 15(*

 ?

!  , 
- 


(
<

APPENDIX G:

APPROVED AND PENDING PROJECTS
Map # Development Description Size Unit
ApprovedRogge Road Residential Development  












 
!




!
 "#$ 






%
 



!
 &$$$  '

()  
*!
+
  ##$  


 
,-


 .
/ 0 &$$$ 1*2,-


 .
/ 0 #&$$$ 1*2,-


 .
/ 0 #&$$$ 1*2

2 3

4
 *5 



#" 
 6
!
 



$&$ 1*2
Pending

 %

 %
  '2
  4 2
 7


822 9$&$$$ 1*2



 $$&$$$ 1*2


$$
!
: 
 &$$$ 1*2
, *
'- ;

<%)822 #&# 1*2
'%* :
: 
&#9 1*2
" 
'%* :
: 
"&==# 1*2
 


6 &'*'
-<2&
!
5
 "&$"= 1*2
!!

:
822 &# 1*2
=&9 1*2

!!

<: 
 &9 1*2
!!

:
822 &#= 1*2
"&=" 1*2
,(
55 "  ,(
555 $#  ,(
53 9#  ,(
3 #$ 


APPENDIX H:

FAIR SHARE CALCULATIONS AT THE INTERSECTION OF

BORONDA ROAD AND MAIN STREET
Salinas (Cloverfield) Retail Center Fair-Share Contribution at Boronda Road and Main Street Study Int # Intersection Juristiction
Peak
Hour
Total Existing
Intersection
Volume
(VE)
Total
Cumulative
Intersection
Volume
(VT)
Project Trips
(VP)
Percent
Contribution
of Growth

VP/(VT-VE)
Percent
Contribution of
Total Traffic
(VP/VT)
Salinas (Cloverfield) Retail Center TIA
Recommended Mitigation
PM 4103 5233 455 40.27% 8.69%
SAT 3948 5359 603 42.74% 11.25%
Notes:
1 Other impacted intersection mitigated with payment of Traffic Impact Fees.

Cumulative-Level Impact Contributions
1) Add a third eastbound through, 2) Conversion of the
westbound through-right lane into an exclusive through
lane (SAT only), 3) A separate westbound right-turn lane (SAT only), and 4) southbound right-turn overlap phase.

Boronda Road and Main
Street 8 Salinas

APPENDIX I:

EAST BORONDA ROAD AND SAN JUAN GRADE ROAD

INTERSECTION ANALYSIS MEMORANDUM
160 West Santa Clara Street, Suite 675, San Jose CA 95113 (408) 278-1700 Fax (408) 278-1717 www.fehrandpeers.com

MEMORANDUM
Date: April 15, 2010
To: Rob Russell, City of Salinas
Tara Hullinger, City of Salinas
From: Daniel Rubins, P.E. and Kevin Chen
Subject: East Boronda Road and San Juan Grade Road Intersection Analysis SJ10-1154
Fehr & Peers was retained to evaluate the traffic operations at the East Boronda Road / San Juan Grade Road intersection. The analysis considered both the AM and PM peak hour conditions under Year 2030 Current General Plan Conditions. The study was completed to identify the appropriate geometric design for the westbound right turn-lane and to inform the site developer regarding project site driveway placement on East Boronda Road. For this study, Boronda Road is considered east-west, while San Juan Grade Road is considered north-south.

BACKGROUND
The proposed Salinas Retail Center located at the northeast corner of Boronda Road and San Juan Grade Road in Salinas, California is consistent with the current General Plan land use, but conflicts with the planned roadway improvements at San Juan Grade Road and Boronda Road.

Specifically the proposed site plan would only accommodate a westbound shared through-right lane. The City of Salinas Public Works Department has an active project (No. 9510) to construct double lefts on all approaches and maintain the sweeping westbound right-turn lane.

Three City of Traffic Improvement Program (TIP) projects planned at or near the East Boronda Road and San Juan Grade Road intersection include:

TIP Project 13: San Juan Grade Road (north/south roadway) widened to a 4-lane divided arterial with bicycle lanes between East Boronda Road and Rogge Road.

This roadway will serve an estimated 14,900 vehicles per day with construction of the future growth area north of East Boronda Road. The posted speed limit will be 35 to 40 mph.

TIP Project 20: East Boronda Road (east/west roadway) widened to a 6-lane divided arterial between San Juan Grade Road and Williams Road. This roadway will serve an estimated 57,200 daily vehicles with construction of the future growth area north of East Boronda Road. The posted speed limit will be 40 to 45 mph.

TIP Project 50: Turning movements at the East Boronda Road / San Juan Grade Road intersection includes two lefts, two or three through lanes, and separate right-turn lanes for all approaches. Bicycle lanes are planned on all four approaches.

Rob Russell and Tara Hullinger
April 15, 2010

Page 2 of 6 ends

GEOMETRIC ALTERNATIVES CONSIDERED
This study evaluated five geometric configurations which are shown on Figure 1 and summarized below:
• Intersection Configuration 1: Intersection turning movement configuration and design based on City Public Works Project 9510 with a sweeping westbound right-turn lane, and two eastbound through lanes (i.e., not widening East Boronda Road between Main Street and San Juan Grade Road).
• Intersection Configuration 2: Same as intersection configuration 1 except replaced sweeping westbound right turn lane with a separate westbound right-turn lane without a “pork-chop” pedestrian island (i.e., smaller corner curb-return). • Intersection Configuration 3: Same as intersection configuration 1 except replaced sweeping westbound right turn lane with a westbound shared through-right turn lane. • Intersection Configuration 4: Same as intersection configuration 2, except eastbound approach includes a third eastbound through lane, and the southbound approach includes a shared through-right lane, through lane and two left turn lanes. • Intersection Configuration 5: Same as intersection configuration 3, except eastbound approach includes a third eastbound through lane and the southbound approach includes a shared through right lane, through lane and two left turn lanes.

FORECAST METHOD
The AM and PM peak hour intersection turning movement forecasts were developed based on the guidelines published in National Cooperative Highway Research Program (NCHRP) Report 2551
, which were applied to refine the raw model forecasts. This method uses the difference between counts and model volumes and adjusts the existing volume to provide reasonable future forecasts. The Year 2030 Current General Plan Conditions for the five (5) intersection configurations described above are presented in Figure 1.

LEVEL OF SERVICE METHOD
The operations of roadway facilities are described with the term level of service (LOS). LOS is a qualitative description of traffic flow based on such factors as speed, travel time, delay, and freedom to maneuver. Six levels are defined from LOS A, with the least congested operating conditions, to LOS F, with the most congested operating conditions. LOS E represents “atcapacity” operations. Operations are designated as LOS F when volumes exceed capacity, resulting in stop-and-go conditions.

1 National Cooperative Highway Research Program (NCHRP). Report 255: Highway Traffic Data for Urbanized Area Project Planning and Design. Washington, D.C.: National Academy Press, 1982.

Rob Russell and Tara Hullinger
April 15, 2010

Page 3 of 6 ends

Signalized Intersections
The LOS method for signalized intersections approved by the City of Salinas analyzes intersection operations based on average control vehicular delay, as described in Chapter 16 of the 2000 Highway Capacity Manual (HCM) by the Transportation Research Board. Control delay includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. The average control delay for signalized intersections is calculated using Synchro analysis software and is correlated to a LOS designation as shown in Table 1.

The level of service standard (i.e., minimum acceptable operations) for signalized intersections in the City of Salinas is LOS D.

YEAR 2030 CURRENT GENERAL PLAN INTERSECTION LEVELS OF SERVICE Year 2030 Current General Plan intersection lane configurations, signal timings, and peak-hour turning movement traffic volumes were used to determine the levels of service. The results are presented in Table 2. The corresponding calculation sheets are attached.

The East Boronda Road intersection with San Juan Grade Road will operate at an unacceptable LOS F during the PM peak hour in Year 2030. The intersection LOS can be improved to “D” if East Boranda Road is widened to six (6) lanes through the San Juan Grade intersection.

TABLE 1

SIGNALIZED INTERSECTION LEVEL OF SERVICE DEFINITIONS

USING AVERAGE CONTROL VEHICULAR DELAY
Level of
Service Description
Average Control Delay
Per Vehicle (Seconds)
A Operations with very low delay occurring with favorable progression and/or short cycle lengths. ≤ 10.0
B Operations with low delay occurring with good progression and/ or short cycle lengths. > 10.0 and ≤ 20.0
C Operations with average delays resulting from fair progression and/ or longer cycle lengths. Individual cycle failures begin to appear. > 20.0 and ≤ 35.0 D
Operations with longer delays due to a combination of unfavorable progression, long cycle lengths, and high V/C ratios. Many vehicles stop and individual cycle failures are noticeable.
> 35.0 and ≤ 55.0
E Operations with high delay values indicating poor progression, long cycle lengths, and high V/C ratios. Individual cycle failures are frequent occurrences.
> 55.0 and ≤ 80.0
F Operations with delays unacceptable to most drivers occurring due to over-saturation, poor progression, or very long cycle lengths. > 80.0 Source: Highway Capacity Manual, Transportation Research Board, 2000.

Rob Russell and Tara Hullinger
April 15, 2010

Page 4 of 6 ends

TABLE 2
YEAR 2030 INTERSECTION LEVELS OF SERVICE
5-Lane E. Boronda Road2 6-Lane E. Boronda Road3
Intersection Configuration
Description
Peak
Hour1
Delay4
LOS5 Delay4 LOS5
Separate Right-Turn Lane with Large
Pedestrian “Pork Chop” Island
AM
PM

34.4 121.0
C
F

33.9 50.1
C
D
Separate Right-Turn Lane AM
PM

34.4 121.0
C
F

33.9 50.1
C
D
Shared Through-Right Turn Lane AM
PM

45.3 122.4
D
F

45.1 51.5
D
D
Notes:
1 AM = morning weekday peak-hour, PM = evening weekday peak-hour 2 East Boronda Road is a 5-lane divided arterial between Main Street and San Juan Grade Road 3 East Boronda Road is a 6-lane divided arterial between Main Street and San Juan Grade Road 4 Whole intersection weighted average control delay expressed in seconds per vehicle for signalized intersections using methodology described in the 2000 Highway Capacity Manual. LOS calculations conducted using the Synchro level of service analysis software package.
5 LOS = Level of service
Bold text indicates unacceptable operations by City of Salinas standards (LOS E or worse).

Source: Fehr & Peers, April 2010.

YEAR 2030 CURRENT GENERAL PLAN INTERSECTION STORAGE POCKET LENGHTS The Synchro files were converted to SimTraffic, a micro-simulation tool used to calculate vehicle storage requirements at intersections. Figure 1 shows the storage pocket estimates (calculated in feet) for the left and right turn lanes at the East Boronda Road / San Juan Grade Road intersection. The corresponding calculation sheets are attached.

Left turn storage pockets are typically sized to the greater of the maximum queue of the left turn movement or through movement queue. However, during the AM and PM peak hours, the leftturn lane will be blocked by the through vehicles (westbound in AM peak hour and eastbound in PM peak hour) with maximum queues greater than 600 feet in the AM peak hour westbound directions and greater than 1,000 feet in the PM peak hour eastbound direction. Using the typical approach would yield excessively long left-turn storage pockets. To avoid excessively long pocket lengths, the left turn storage pockets were estimated using the average queue distance (based on average of five (5) micro-simulation runs) plus the deceleration distance at 30 miles per hour (mph). In other words, on average vehicles will be able to decelerate from 30 mph and stop at the back of the average queue for the left turn movement within the length of the storage pocket. At 30 mph the Caltrans Highway Design Manual (HDM) specifies an approximate deceleration distance of 235 feet and the estimated average storage pocket length is approximately 100 to 200 feet under the five intersection configurations for the left turn approaches. Thus, the left turn storage pockets are estimated to be 350 to 400 feet.

The 250 foot right-turn lane storage pockets were sized for vehicles to merge across the bicycle lane and slow within the length of the storage pocket from 30 mile per hour (i.e., right-turn vehicles will begin to decelerate prior to the storage pocket). On East Boronda Road, the through movement queue will block the right-turn lane during the red phase, but maintain separation from Rob Russell and Tara Hullinger
April 15, 2010

Page 5 of 6 ends

the through vehicles as the right turn vehicles slow to make the right turn during the green phase.

The Salinas retail center driveway should be placed more than 400 feet east of the East Boronda Road and San Juan Grade Road intersection to accommodate the right turn lane storage distance and lane taper.

BICYCLE LANE TREATMENTS
Issues for pedestrians and bicyclist at intersections are typically focused on long crossing distances, turning conflicts, and high vehicle speeds. The widening of the East Boronda Road / San Juan Grade Road intersection can exacerbate these conditions. The California Manual of Uniform Traffic Control Devices (CAMUTCD) provides guidance on striping bicycle lanes at intersections. Figure 2 illustrates bicycle lane treatments that clarify right-of-way, manage vehicle turning speeds and minimize the crossing distance to the extent possible for the westbound approach. The advantages and disadvantages of each treatment are described in Table 3.

TABLE 3

BICYCLE LANE TREATMENTS WITH AND WITHOUT A RIGHT-TURN LANE (EAST BORONDA ROAD AND SAN JUAN GRADE ROAD INTERSECTION) Description Advantages Disadvantages
Sweeping RightTurn Lane with
Large Pedestrian
Island
• Right-turn lane vehicles do not conflict
with bicyclist at intersection.
• Shorter pedestrian crossing distance
of east leg than separate right-turn
lane at intersection.
• Vehicles enter San Juan Grade
Road at higher speeds.
• Pedestrians crossing of right-turn
lane is uncontrolled
Separate Right
Turn Lane
(Recommended)
• Guides bicyclist to correct position at
intersections with a separate rightturn lane.
• Encourages motorist maneuvering
into the dedicated right-turn lane to
look for and yield to bicyclists.
• Defines the transition point for both
bicyclist and motorists.
• Minimizes conflict between right-turn
vehicles and through movement
bicyclist.
• Right-turn lane vehicles do not conflict
with bicyclist at intersection.
• For long right-turn lanes, bicyclist
may be overtaken on both sides
by motorists.
• On high-speed facilities, a long
transition area is needed,
increasing the length of the
potential conflict area.

Shared ThroughRight Lane
• Encourages motorist maneuvering
into the shared lane to look for and
yield to bicyclist.
• Defines the transition point for both
bicyclist and motorists.
• Right turn vehicle speeds lower than
sweeping right turn.
• Shorter pedestrian crossing distance
of east leg than separate right-turn
lane at intersection.
• Right hooking conflict between
right-turn vehicles and through
movement bicyclist not
addressed.

Source: Fehr & Peers, April 2010.

Rob Russell and Tara Hullinger
April 15, 2010

Page 6 of 6 ends

CONCLUSION
The separate right-turn lane without a pedestrian pork-chop island and bicycle lane meets City of Salinas level of service standards in Year 2030 with Current General Plan Conditions. This separate right-turn lane with a bicycle lane clarifies right-of-way, manages vehicle turning speeds and minimizes the crossing distance to the extent possible for the westbound approach.

Attachments

HCM Signalized Intersection Capacity Analysis Configuration 1_AM 9: Boronda Rd. & San Juan Grade Rd. 









      


   



 !"


#
$
%"
&
'  () *  + *   , + ( 
-.
%
/%
0 &
%' ( ( ( ( ( ( ( ( ( ( ( ( 

%

#
 
&#' ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1


2 %1
/


1( 1() 1( 1( 1 1( 1() 1 1( 1() 1
/
34
.3 5# 1 1 1 1 1( 1 1 1(, 1 1 1(, /%34
.3 5# 1 1 1 1 1 1 1 1 1 1 1 /
 1 1 1 1 1+) 1 1 1+) 1 1 1+) /%
6  . 1() 1 1() 1 1 1() 1 1 1() 1 1 
.1
/%
0 &

' *** *) *** )+) ) *** *)*( )* *** *)*( ), /%
6
 . 1() 1 1() 1 1 1() 1 1 1() 1 1 
.1
/%
0 &
' *** *) *** )+) ) *** *)*( )* *** *)*( ), 6
5

"



4 67/ 1( 1( 1( 1( 1( 1( 1( 1( 1( 1( 1( 1(

8.91 /%
0 &
' ))  * , (, *( , + , (+  +
:
." 

&
'      ,+   ))   +


;

"
/%
0 &
' ))   , (, ) , + ( (+  ,(

%1
6.#1
&<

'    

%1
 5#
&<

'    
"

 6

 6

 6
 6

 6
 6

 6

6  .
6 ##   * + )   ,
6
 .
6 ## +  ,
8 "
.
;
4
;
&#' 1 )1* 1 (1 (1 1* 1( 1( 1, 1 1   
;
4
!
&#' 1 )1* 1 (1 (1 1* 1( 1( 1, 1 1 8 "
.
!



1( 1 1, 1) 1) 1 1* 1* 1 1+ 1+

%

 
 
&#' ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1
$
%
=#

&#' 1 *1 1 *1 *1 1 *1 *1 1 *1 *1


;



&
' * ,)( * ,* ,+) , )  *( , +
#



6  1 1* 1* 1*+ 1* 1) 1( 1,
#



6
 1 1 1



1+ 1,* 1+ 1+) 1 1 1*+ 1 1, 1* 1,
2


>%
4
. (1) 1 )1 1) (1 )1 *1+ 1+ 1+ *(1 1+ 6 !
##

/


1 1 1 1 1 1 1 1 1 1 1
-

%
>%
4
. 1 1+ 1, *1* 1 1, 1) 1 1+ 1* *1
>%

&#' ,1 1+ )1 *1+ (1 )1) 1 1( ))1, *(1 )1) %


  
>
 > > >  > >
8

>%

&#' *1( *1 )1+ 1+
8

:

> >
-
# 

"


7 
8

!



%
>%
 *1 7

%


 

7 
$
%"






1++
8 "
.

 %
!

&#'
1 "

%
#
 
&#' *1
-
# 




2 % ?

 +1@ -
2 %


  >
8
%# #
6

.
& ' )


%


;

"
Queuing and Blocking Report Configuration 1_AM
2030_Boronda/SJG_AM 





Intersection: 9: Boronda Rd. & San Juan Grade Rd.
            











 !  "
# $% & '$' '& ( ($ )& & %$ '%) && $)
*

+!  "
#  ( % )  ' $( ' '% % ' 
$),!  "
# () $ '% '%$ )$ % $& )% &' '' ) %(

-


"
# $ $ ( ( (
.


/- "0#  
!  +1
/2",#  


+
2
"
# & & & & ') ) )


+/- "0#  ( 
!  +1
/2",#  ' 
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
        









 !  "
#  ( &) &$ $ & ') '
*

+!  "
# $ & % $( $ ) &% $
$),!  "
# $)  )) )& %% $& & 

-


"
# '( '( $& $&
.


/- "0#
!  +1
/2",#


+
2
"
# ')   )


+/- "0# 
!  +1
/2",# 
HCM Signalized Intersection Capacity Analysis Configuration 2_AM 9: Boronda Rd. & San Juan Grade Rd. 









      


   



 !"


#
$
%"
&
'  () *  + *   , + ( 
-.
%
/%
0 &
%' ( ( ( ( ( ( ( ( ( ( ( ( 

%

#
 
&#' ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1


2 %1
/


1( 1() 1( 1( 1 1( 1() 1 1( 1() 1
/
34
.3 5# 1 1 1 1 1( 1 1 1(, 1 1 1(, /%34
.3 5# 1 1 1 1 1 1 1 1 1 1 1 /
 1 1 1 1 1+) 1 1 1+) 1 1 1+) /%
6  . 1() 1 1() 1 1 1() 1 1 1() 1 1 
.1
/%
0 &

' *** *) *** )+) ) *** *)*( )* *** *)*( ), /%
6
 . 1() 1 1() 1 1 1() 1 1 1() 1 1 
.1
/%
0 &
' *** *) *** )+) ) *** *)*( )* *** *)*( ), 6
5

"



4 67/ 1( 1( 1( 1( 1( 1( 1( 1( 1( 1( 1( 1(

8.91 /%
0 &
' ))  * , (, *( , + , (+  +
:
." 

&
'      ,+   ))   +


;

"
/%
0 &
' ))   , (, ) , + ( (+  ,(

%1
6.#1
&<

'    

%1
 5#
&<

'    
"

 6

 6

 6
 6

 6
 6

 6

6  .
6 ##   * + )   ,
6
 .
6 ## +  ,
8 "
.
;
4
;
&#' 1 )1* 1 (1 (1 1* 1( 1( 1, 1 1   
;
4
!
&#' 1 )1* 1 (1 (1 1* 1( 1( 1, 1 1 8 "
.
!



1( 1 1, 1) 1) 1 1* 1* 1 1+ 1+

%

 
 
&#' ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1
$
%
=#

&#' 1 *1 1 *1 *1 1 *1 *1 1 *1 *1


;



&
' * ,)( * ,* ,+) , )  *( , +
#



6  1 1* 1* 1*+ 1* 1) 1( 1,
#



6
 1 1 1



1+ 1,* 1+ 1+) 1 1 1*+ 1 1, 1* 1,
2


>%
4
. (1) 1 )1 1) (1 )1 *1+ 1+ 1+ *(1 1+ 6 !
##

/


1 1 1 1 1 1 1 1 1 1 1
-

%
>%
4
. 1 1+ 1, *1* 1 1, 1) 1 1+ 1* *1
>%

&#' ,1 1+ )1 *1+ (1 )1) 1 1( ))1, *(1 )1) %


  
>
 > > >  > >
8

>%

&#' *1( *1 )1+ 1+
8

:

> >
-
# 

"


7 
8

!



%
>%
 *1 7

%


 

7 
$
%"






1++
8 "
.

 %
!

&#'
1 "

%
#
 
&#' *1
-
# 




2 % ?

 +1@ -
2 %


  >
8
%# #
6

.
& ' )


%


;

"
Queuing and Blocking Report Configuration 2_AM
2030_Boronda/SJG_AM 





Intersection: 9: Boronda Rd. & San Juan Grade Rd.
            











 !  "
#  $ $% & %&  '' (& &( $&' &$ %)
*

+!  "
#  )   )  $ $((  $) ' 
)',!  "
# )$ & $$' $&$ (% % %% '( ( $&$ '% &(

-


"
# ) ) % % %
.


/- "0# 
!  +1
/2",# 


+
2
"
# ( ( ( ( $' ' '


+/- "0#  ) 
!  +1
/2",#  % 
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
        









 !  "
#  $ (   ) ( &
*

+!  "
# $ & ' ' ( '' () (
)',!  "
# %% % ' &$ )'  ' 

-


"
# $% $% )( )(
.


/- "0#
!  +1
/2",#


+
2
"
# $'   '


+/- "0# 
!  +1
/2",# 
HCM Signalized Intersection Capacity Analysis Configuration 3_AM 9: Boronda Rd. & San Juan Grade Rd. 









      


   



 !"


#
$
%"
&
'  () *  + *   , + ( 
-.
%
/%
0 &
%' ( ( ( ( ( ( ( ( ( ( ( ( 

%

#
 
&#' ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1


2 %1
/


1( 1() 1( 1( 1( 1() 1 1( 1() 1
/
34
.3 5# 1 1 1 1 1 1 1(, 1 1 1(, /%34
.3 5# 1 1 1 1 1 1 1 1 1 1 /
 1 1 1 1(+ 1 1 1+) 1 1 1+)
/%
6  . 1() 1 1() 1 1() 1 1 1() 1 1 
.1
/%
0 &

' *** *) *** ()+ *** *)*( )* *** *)*( ),
/%
6
 . 1() 1 1() 1 1() 1 1 1() 1 1 
.1
/%
0 &
' *** *) *** ()+ *** *)*( )* *** *)*( ),
6
5

"



4 67/ 1( 1( 1( 1( 1( 1( 1( 1( 1( 1( 1( 1(

8.91 /%
0 &
' ))  * , (, *( , + , (+  +
:
." 

&
'     ,    ))   +


;

"
/%
0 &
' ))   , (  , + ( (+  ,(

%1
6.#1
&<

'    

%1
 5#
&<

'    
"

 6

 6

 6

 6
 6

 6

6  .
6 ##   * + )   ,
6
 .
6 ##  ,
8 "
.
;
4
;
&#' 1 )1* 1 (1 1* 1( 1( 1, 1 1
  
;
4
!
&#' 1 )1* 1 (1 1* 1( 1( 1, 1 1
8 "
.
!



1( 1 1, 1) 1 1* 1* 1 1+ 1+

%

 
 
&#' ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1
$
%
=#

&#' 1 *1 1 *1 1 *1 *1 1 *1 *1


;



&
' * ,)( *  , )  *( , +
#



6  1 1* 1* 1) 1* 1) 1( 1,
#



6
 1 1



1+ 1,* 1+ 1 1 1*+ 1 1, 1* 1,
2


>%
4
. (1) 1 )1 *1+ )1 *1+ 1+ 1+ *(1 1+
6 !
##

/


1 1 1 1 1 1 1 1 1 1
-

%
>%
4
. 1 1+ 1, 1 1, 1) 1 1+ 1* *1
>%

&#' ,1 1+ )1 )1) )1) 1 1( ))1, *(1 )1)
%


  
> > > > >  > >
8

>%

&#' *1( )1 )1+ 1+
8

:
> > >
-
# 

"


7 
8

!



%
>%
 )1* 7

%


  >
7 
$
%"






1(+
8 "
.

 %
!

&#'
1 "

%
#
 
&#' *1
-
# 




2 % ?

 ++1*@ -
2 %


  
8
%# #
6

.
& ' )


%


;

"
Queuing and Blocking Report Configuration 3_AM
2030_Boronda/SJG_AM 





Intersection: 9: Boronda Rd. & San Juan Grade Rd.
            











 !  "
#   $%& % '' ( ' '% '&) () %( %
*

+!  "
# & ' %  $  &) &'$ &%  $ (
%),!  "
# && % $ $(' )%  $$ $% $ )) ' '%

-


"
# % % ' ' ' $'
.


/- "0# ) ( $
!  +1
/2",# ' '% $


+
2
"
# ( ( ( ( ) )


+/- "0#  $)
!  +1
/2",#  $)
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
       









 !  "
# $ ( %  ) & (
*

+!  "
# ( ( ( $ )$ & '$
%),!  "
#  ) & % %% % )

-


"
# $' %( %(
.


/- "0#
!  +1
/2",#


+
2
"
# $)   )


+/- "0# 
!  +1
/2",# 
HCM Signalized Intersection Capacity Analysis Configuration 4_AM 9: Boronda Rd. & San Juan Grade Rd. 









      


   



 !"


#
$
%"
&
'  () *  + *   , + ( 
-.
%
/%
0 &
%' ( ( ( ( ( ( ( ( ( ( ( ( 

%

#
 
&#' ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1


2 %1
/


1( 1( 1( 1( 1 1( 1() 1 1( 1()
/
34
.3 5# 1 1 1 1 1( 1 1 1(+ 1 1(+ /%34
.3 5# 1 1 1 1 1 1 1 1 1 1 /
 1 1 1 1 1+) 1 1 1+) 1 1(
/%
6  . 1() 1 1() 1 1 1() 1 1 1() 1 
.1
/%
0 &

' *** ))+ *** )+) ) *** *)*( )+ *** *)(
/%
6
 . 1() 1 1() 1 1 1() 1 1 1() 1 
.1
/%
0 &
' *** ))+ *** )+) ) *** *)*( )+ *** *)(
6
5

"



4 67/ 1( 1( 1( 1( 1( 1( 1( 1( 1( 1( 1( 1(

8.91 /%
0 &
' ))  * , (, *( , + , (+  +
:
." 

&
'      ,+   *  + 


;

"
/%
0 &
' ))   , (, ) , +  (+ * 

%1
6.#1
&<

'    

%1
 5#
&<

'    
"

 6

 6

 6
 6

 =
 6


6  .
6 ##   * + )  *  ,
6
 .
6 ## + 
8 "
.
;
4
;
&#' 1 )1* 1 (1 (1 1* )1 1* 1, 1
  
;
4
!
&#' 1 )1* 1 (1 (1 1* )1 1* 1, 1
8 "
.
!



1( 1 1, 1 1 1 1 1 1 1+

%

 
 
&#' ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1
$
%
>#

&#' 1 *1 1 *1 *1 1 *1 1 1 *1


;



&
' * *(  )( ,+ ) + *( *+( )+
#



6  1 1 1* 1*+ 1* 1) 1 1( 1
#



6
 1 1



1+ 1 1+ 1+) 1 1 1*+ 1 1 1,
2


?%
4
. (1, (1, )1 1, (1 )1 *1+ *,1* 1( 1
6 !
##

/


1 1 1 1 1 1 1 1 1 1
-

%
?%
4
. 1 1 1, *1* 1 1, 1) 1 1( 1
?%

&#' ,1 (1+ )1+ *1 (1 )1 1* *,1* ))1+ 1
%


    ?
 ? ? ?  ?
8

?%

&#' +1) *1* 1 +1
8

:

? ?
-
# 

"


7 
8

!



%
?%
 **1( 7

%


 

7 
$
%"






1+(
8 "
.

 %
!

&#'
1 "

%
#
 
&#' *1
-
# 




2 % @

 +*1A -
2 %


  
8
%# #
6

.
& ' )


%


;

"
Queuing and Blocking Report Configuration 4_AM
2030_Boronda/SJG_AM 





Intersection: 9: Boronda Rd. & San Juan Grade Rd.
            











 !  "
# $% &' ( %' ''  '% )% $ $$' ($% '
*

+!  "
# & )$  ) $' $  ())  %( (& &
&%,!  "
# '( &%  & ) )) ' %' )$ $' ($ ))

-


"
# % % % ' ' '
.


/- "0#   
!  +1
/2",#   (


+
2
"
# ) ) ) ) (% %


+/- "0#   ( 
!  +1
/2",#    
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
        










 !  "
#  ) ( $ ' )  &$
*

+!  "
# % % $ $ ' (' ') $
&%,!  "
# '% &%  %$ &  )$ $

-


"
# (& (& &)( &)(
.


/- "0#
!  +1
/2",#


+
2
"
# %  % %


+/- "0#
!  +1
/2",#
HCM Signalized Intersection Capacity Analysis Configuration 5_AM 9: Boronda Rd. & San Juan Grade Rd. 









      


   



 !"


#
$
%"
&
'  () *  + *   , + ( 
-.
%
/%
0 &
%' ( ( ( ( ( ( ( ( ( ( ( ( 

%

#
 
&#' ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1


2 %1
/


1( 1( 1( 1( 1( 1() 1 1( 1()
/
34
.3 5# 1 1 1 1 1 1 1(+ 1 1(+
/%34
.3 5# 1 1 1 1 1 1 1 1 1
/
 1 1 1 1(+ 1 1 1+) 1 1(
/%
6  . 1() 1 1() 1 1() 1 1 1() 1

.1
/%
0 &

' *** ))+ *** () *** *)*( )+ *** *)(
/%
6
 . 1() 1 1() 1 1() 1 1 1() 1

.1
/%
0 &
' *** ))+ *** () *** *)*( )+ *** *)(
6
5

"



4 67/ 1( 1( 1( 1( 1( 1( 1( 1( 1( 1( 1( 1(

8.91 /%
0 &
' ))  * , (, *( , + , (+  +
:
." 

&
'     ,    *  + 


;

"
/%
0 &
' ))   , (  , +  (+ * 

%1
6.#1
&<

'    

%1
 5#
&<

'    
"

 6

 6

 6

 =
 6


6  .
6 ##   * + )  *  ,
6
 .
6 ## 
8 "
.
;
4
;
&#' 1 )1* 1 (1 1* )1 1* 1, 1
  
;
4
!
&#' 1 )1* 1 (1 1* )1 1* 1, 1
8 "
.
!



1( 1 1, 1 1 1 1 1 1+

%

 
 
&#' ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1 ,1
$
%
>#

&#' 1 *1 1 *1 1 *1 1 1 *1


;



&
' * *(   ) + *( *+( )+
#



6  1 1 1* 1) 1* 1) 1 1( 1
#



6
 1



1+ 1 1+ 1 1 1*+ 1 1 1,
2


?%
4
. (1, (1, )1 *1( )1 *1+ *,1* 1( 1
6 !
##

/


1 1 1 1 1 1 1 1 1
-

%
?%
4
. 1 1 1, 1* 1, 1) 1 1( 1
?%

&#' ,1 (1+ )1+ )*1 )1 1* *,1* ))1+ 1
%


    ? ? ? ? ?  ?
8

?%

&#' +1) )*1 1 +1
8

:
? ? ?
-
# 

"


7 
8

!



%
?%
 )1 7

%


  ?
7 
$
%"






1(+
8 "
.

 %
!

&#'
1 "

%
#
 
&#' *1
-
# 




2 % @

 (1A -
2 %


  
8
%# #
6

.
& ' )


%


;

"
Queuing and Blocking Report Configuration 5_AM
2030_Boronda/SJG_AM 





Intersection: 9: Boronda Rd. & San Juan Grade Rd.
            











 !  "
# $% $% &' ( & ( %' () ($ (') ' $
*

+!  "
# ' %  ( ''  ' '( (& ( ' )
$),!  "
# '' () & & ' )( $' $' $'% $) )( (

-


"
# ) ) ) ( ( (
.


/- "0# ( ' &
!  +1
/2",# %  &'


+
2
"
# % % %) %) ) )


+/- "0#  &'
!  +1
/2",#  &'
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
       









 !  "
#  & % ('   &%
*

+!  "
# ) % ' ) & $ '
$),!  "
# ((  )& () $$ '' (

-


"
# &$ &$ $%& $%&
.


/- "0#
!  +1
/2",#


+
2
"
#  ) )


+/- "0#
!  +1
/2",#
HCM Signalized Intersection Capacity Analysis Configuration 1_PM 2030_Boronda/SJG_PM 









      


   



 !"


#
$
%"
&
' ( )  ( ((* + ,* ( ((   *
-.
%
/%
0 &
%' , , , , , , , , , , , , 

%

#
 
&#' +1 +1 +1 +1 +1 +1 +1 +1 +1 +1 +1


2 %1
/


1, 1,* 1, 1, 1 1, 1,* 1 1, 1,* 1
/
34
.3 5# 1 1 1 1 1, 1 1 1,+ 1 1 1,+ /%34
.3 5# 1 1 1 1 1 1 1 1 1 1 1 /
 1 1 1 1 1)* 1 1 1)* 1 1 1)* /%
6  . 1,* 1 1,* 1 1 1,* 1 1 1,* 1 1 
.1
/%
0 &

' ((( (* ((( *)* *(+ ((( (*(, *+ ((( (*(, * /%
6
 . 1,* 1 1,* 1 1 1,* 1 1 1,* 1 1 
.1
/%
0 &
' ((( (* ((( *)* *(+ ((( (*(, *+ ((( (*(, * 6
5

"



4 67/ 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1,

8.91 /%
0 &
' * +  *    (, (* ( ( ++
:
." 

&
'         *   +


;

"
/%
0 &
' * ,)  *  *(  (, + ( ( 

%1
6.#1
&<

'    

%1
 5#
&<

'    
"

 6

 6

 6
 6

 6
 6

 6

6  .
6 ##   ( ) *   +
6
 .
6 ## )  +
8 "
.
;
4
;
&#' 1+ ++1( 1 *+1, *+1, 1* (1+ (1+ )1 1 1   
;
4
!
&#' 1+ ++1( 1 *+1, *+1, 1* (1+ (1+ )1 1 1 8 "
.
!



1+ 1, 1, 1 1 1, 1) 1) 1+ 1* 1*

%

 
 
&#' +1 +1 +1 +1 +1 +1 +1 +1 +1 +1 +1
$
%
=#

&#' 1 (1 1 (1 (1 1 (1 (1 1 (1 (1


;



&
' **(  ( *) +* , +( +, * *( 
#



6  1( 1 1 1) 1+ 1 1+ 1+
#



6
 1 1( 1(



1)( 1 1, 1++ 1 1 1+( 1 1 1 1)
2


>%
4
. *1 ((1, *,1 (1) 1 *,1+ *1 *1+ +(1 *1+ ,1) 6 !
##

/


1 1 1 1 1 1 1 1 1 1 1
-

%
>%
4
. ,1 ,,1 1( 1 1 +1 1 1 (1* 1* 1
>%

&#' +(1) ((1 1 (1+ 1, +*1) *(1( +1) (+1* *1 *1 %


   / 

 >  / > >
8

>%

&#' +1, (*1+ +1( 1(
8

: / >  
-
# 

"


7 
8

!



%
>%
 1 7

%


  /
7 
$
%"






1
8 "
.

 %
!

&#'
(1 "

%
#
 
&#' 1
-
# 




2 % ?

 1,@ -
2 %


  7
8
%# #
6

.
& ' *


%


;

"
Queuing and Blocking Report Configuration 1_PM
2030_Boronda/SJG_PM 





Intersection: 9: Boronda Rd. & San Juan Grade Rd.
            











 !  "
# $ %$ $ $& ' &$ ('  %% &$ %$ )%
*

+!  "
# & ' $( $ '   (( $) ) )% '
'$,!  "
# ' %&& $% $& $) %' ($ ($$ (' )' ($ '

-


"
# &' &' &% &% &%
.


/- "0# % %
!  +1
/2",#  


+
2
"
# % %   ($ $ $


+/- "0#     
!  +1
/2",#  ))  ( 
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
        









 !  "
# ' (( (% % ) $ %( 
*

+!  "
# ( % (( (( $( %' & '
'$,!  "
#  $ ) $$ %$  () &)

-


"
# ((( ((( '%% '%%
.


/- "0#
!  +1
/2",#


+
2
"
# ($   $


+/- "0#     
!  +1
/2",#     
HCM Signalized Intersection Capacity Analysis Configuration 2_PM 9: Boronda Rd. & San Juan Grade Rd. 









      


   



 !"


#
$
%"
&
' ( )  ( ((* + ,* ( ((   *
-.
%
/%
0 &
%' , , , , , , , , , , , , 

%

#
 
&#' +1 +1 +1 +1 +1 +1 +1 +1 +1 +1 +1


2 %1
/


1, 1,* 1, 1, 1 1, 1,* 1 1, 1,* 1
/
34
.3 5# 1 1 1 1 1, 1 1 1,+ 1 1 1,+ /%34
.3 5# 1 1 1 1 1 1 1 1 1 1 1 /
 1 1 1 1 1)* 1 1 1)* 1 1 1)* /%
6  . 1,* 1 1,* 1 1 1,* 1 1 1,* 1 1 
.1
/%
0 &

' ((( (* ((( *)* *(+ ((( (*(, *+ ((( (*(, * /%
6
 . 1,* 1 1,* 1 1 1,* 1 1 1,* 1 1 
.1
/%
0 &
' ((( (* ((( *)* *(+ ((( (*(, *+ ((( (*(, * 6
5

"



4 67/ 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1,

8.91 /%
0 &
' * +  *    (, (* ( ( ++
:
." 

&
'         *   +


;

"
/%
0 &
' * ,)  *  *(  (, + ( ( 

%1
6.#1
&<

'    

%1
 5#
&<

'    
"

 6

 6

 6
 6

 6
 6

 6

6  .
6 ##   ( ) *   +
6
 .
6 ## )  +
8 "
.
;
4
;
&#' 1+ ++1( 1 *+1, *+1, 1* (1+ (1+ )1 1 1   
;
4
!
&#' 1+ ++1( 1 *+1, *+1, 1* (1+ (1+ )1 1 1 8 "
.
!



1+ 1, 1, 1 1 1, 1) 1) 1+ 1* 1*

%

 
 
&#' +1 +1 +1 +1 +1 +1 +1 +1 +1 +1 +1
$
%
=#

&#' 1 (1 1 (1 (1 1 (1 (1 1 (1 (1


;



&
' **(  ( *) +* , +( +, * *( 
#



6  1( 1 1 1) 1+ 1 1+ 1+
#



6
 1 1( 1(



1)( 1 1, 1++ 1 1 1+( 1 1 1 1)
2


>%
4
. *1 ((1, *,1 (1) 1 *,1+ *1 *1+ +(1 *1+ ,1) 6 !
##

/


1 1 1 1 1 1 1 1 1 1 1
-

%
>%
4
. ,1 ,,1 1( 1 1 +1 1 1 (1* 1* 1
>%

&#' +(1) ((1 1 (1+ 1, +*1) *(1( +1) (+1* *1 *1 %


   / 

 >  / > >
8

>%

&#' +1, (*1+ +1( 1(
8

: / >  
-
# 

"


7 
8

!



%
>%
 1 7

%


  /
7 
$
%"






1
8 "
.

 %
!

&#'
(1 "

%
#
 
&#' 1
-
# 




2 % ?

 1,@ -
2 %


  7
8
%# #
6

.
& ' *


%


;

"
Queuing and Blocking Report Configuration 2_PM
2030_Boronda/SJG_PM 





Intersection: 9: Boronda Rd. & San Juan Grade Rd.
            











 !  "
# $ $ %& % % ' '$ % % '(' $$ (
)

*!  "
#  ( % +( (  % %( (( & & +(
+%,!  "
# &% $%' %'( %% &(  '+ '(+ '++ ' '& %'

-


"
# &+ &+ &$ &$ &$
.


/- "0# $ %
!  *1
/2",#  


*
2
"
# $ $   '% % %


*/- "0#     
!  *1
/2",#  (+   
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
        









 !  "
# '$ $ (' ' ''&  %$ '%
)

*!  "
# '% $' $ +  (( & 
+%,!  "
#  '+ ' '% '$' $$ '$ +%

-


"
# ''' ''' +$$ +$$
.


/- "0#
!  *1
/2",#


*
2
"
# '%   %


*/- "0#     
!  *1
/2",#     
HCM Signalized Intersection Capacity Analysis Configuration 3_PM 2030_Boronda/SJG_PM 









      


   



 !"


#
$
%"
&
' ( )  ( ((* + ,* ( ((   *
-.
%
/%
0 &
%' , , , , , , , , , , , , 

%

#
 
&#' +1 +1 +1 +1 +1 +1 +1 +1 +1 +1


2 %1
/


1, 1,* 1, 1, 1, 1,* 1 1, 1,* 1
/
34
.3 5# 1 1 1 1 1 1 1,+ 1 1 1,+ /%34
.3 5# 1 1 1 1 1 1 1 1 1 1 /
 1 1 1 1,) 1 1 1)* 1 1 1)*
/%
6  . 1,* 1 1,* 1 1,* 1 1 1,* 1 1 
.1
/%
0 &

' ((( (* ((( ,( ((( (*(, *+ ((( (*(, *
/%
6
 . 1,* 1 1,* 1 1,* 1 1 1,* 1 1 
.1
/%
0 &
' ((( (* ((( ,( ((( (*(, *+ ((( (*(, *
6
5

"



4 67/ 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1,

8.91 /%
0 &
' * +  *    (, (* ( ( ++
:
." 

&
'     )    *   +


;

"
/%
0 &
' * ,)  * +,   (, + ( ( 

%1
6.#1
&<

'    

%1
 5#
&<

'    
"

 6

 6

 6

 6
 6

 6

6  .
6 ##   ( ) *   +
6
 .
6 ##  +
8 "
.
;
4
;
&#' 1+ ++1( 1 *+1, 1* (1+ (1+ )1 1 1
  
;
4
!
&#' 1+ ++1( 1 *+1, 1* (1+ (1+ )1 1 1
8 "
.
!



1+ 1, 1, 1 1, 1) 1) 1+ 1* 1*

%

 
 
&#' +1 +1 +1 +1 +1 +1 +1 +1 +1 +1
$
%
=#

&#' 1 (1 1 (1 1 (1 (1 1 (1 (1


;



&
' **(  ( ,* , +( +, * *( 
#



6  1( 1 1 1( 1+ 1 1+ 1+
#



6
 1( 1(



1)( 1 1, 1) 1 1+( 1 1 1 1)
2


>%
4
. *1 ((1, *,1 ((1 *,1+ *1 *1+ +(1 *1+ ,1)
6 !
##

/


1 1 1 1 1 1 1 1 1 1
-

%
>%
4
. ,1 ,,1 1( 1( +1 1 1 (1* 1* 1
>%

&#' +(1) ((1 1 (+1 +*1) *(1( +1) (+1* *1 *1 %


   /  >  >  / > >
8

>%

&#' +1, 1 +1( 1(
8

: / >  
-
# 

"


7 
8

!



%
>%
 1 7

%


  /
7 
$
%"






1
8 "
.

 %
!

&#'
(1 "

%
#
 
&#' 1
-
# 




2 % ?

 1,@ -
2 %


  7
8
%# #
6

.
& ' *


%


;

"
Queuing and Blocking Report Configuration 3_PM
2030_Boronda/SJG_PM 





Intersection: 9: Boronda Rd. & San Juan Grade Rd.
            











 !  "
# $% &' ' '% (%  '' '% '%& &' $ '&
)

*!  "
# + $ '+ ' $%  $ +'  %+ $( +$
$',!  "
# % &(( ' ' && % +% ' ''&  '% 

-


"
# %$ %$ %& %& %& +++
.


/- "0# & 
!  *1
/2",#  


*
2
"
# & &   ' '


*/- "0#    
!  *1
/2",#  ($  
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
       









 !  "
# &' '& ++ +$ +$ + '+
)

*!  "
# '  %& ' $& %& ('
$',!  "
# +%  +'$ +(' +( $( %

-


"
# +++ $&& $&&
.


/- "0#
!  *1
/2",#


*
2
"
# +'   '


*/- "0#  '
!  *1
/2",#  '
HCM Signalized Intersection Capacity Analysis Configuration 4_PM 9: Boronda Rd. & San Juan Grade Rd. 









      


   



 !"


#
$
%"
&
' ( )  ( ((* + ,* ( ((   *
-.
%
/%
0 &
%' , , , , , , , , , , , , 

%

#
 
&#' +1 +1 +1 +1 +1 +1 +1 +1 +1 +1


2 %1
/


1, 1, 1, 1, 1 1, 1,* 1 1, 1,*
/
34
.3 5# 1 1 1 1 1, 1 1 1,) 1 1,) /%34
.3 5# 1 1 1 1 1 1 1 1 1 1 /
 1 1 1 1 1)* 1 1 1)* 1 1,
/%
6  . 1,* 1 1,* 1 1 1,* 1 1 1,* 1 
.1
/%
0 &

' ((( **, ((( *)* *(+ ((( (*(, ** ((( (+)
/%
6
 . 1,* 1 1,* 1 1 1,* 1 1 1,* 1 
.1
/%
0 &
' ((( **, ((( *)* *(+ ((( (*(, ** ((( (+)
6
5

"



4 67/ 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1,

8.91 /%
0 &
' * +  *    (, (* ( ( ++
:
." 

&
'      (     +, 


;

"
/%
0 &
' * ,)  *  *  (, (* ( ( 

%1
6.#1
&<

'    

%1
 5#
&<

'    
"

 6

 6

 6
 6

 =
 6


6  .
6 ##   ( ) *  (  +
6
 .
6 ## ) 
8 "
.
;
4
;
&#' 1* ++1( 1 *1 *1 1* 1+ (1) )1 ,1
  
;
4
!
&#' 1* ++1( 1 *1 *1 1* 1+ (1) )1 ,1
8 "
.
!



1+ 1* 1, 1( 1( 1, 1 1+ 1+ 1

%

 
 
&#' +1 +1 +1 +1 +1 +1 +1 +1 +1 +1
$
%
>#

&#' 1 (1 1 (1 (1 1 (1 1 1 (1


;



&
' *** * (* ) +*) , + * + **
#



6  1( 1, 1 1) 1+ 1 1 1+ 1
#



6
 1 1+



1) 1,, 1) 1+* 1( 1 1++ 1 1( 1+)
2


?%
4
. *1 ((1 *,1 (1 1 *,1 *1+ *1 +1* *1
6 !
##

/


1 1 1 1 1 1 1 1 1 1
-

%
?%
4
. ,1 *1, 1* 1 1 *1+ 1+ *1 1, 1
?%

&#' +(1 ,1 +,1+ (1, 1 +1) *1 *1 (1 *)1(
%


   ? 

 ? ? / 
8

?%

&#' *1 (1) **1 )1
8

: ?
? /
-
# 

"


7 
8

!



%
?%
 *1 7

%


  ?
7 
$
%"






1,
8 "
.

 %
!

&#'
((1 "

%
#
 
&#' 1
-
# 




2 % @

 ,1A -
2 %


  /
8
%# #
6

.
& ' *


%


;

"
Queuing and Blocking Report Configuration 4_PM
2030_Boronda/SJG_PM 





Intersection: 9: Boronda Rd. & San Juan Grade Rd.
            











 !  "
# $ %& &' ( ($  ' $(( ) &' $' %
*

+!  "
# )' $$ %$ ) () '  & )& $  )
(&,!  "
# ) %' '' %'% %%& '( (& $%)   )' 

-


"
# & & & )% )% )%
.


/- "0# & $ 
!  +1
/2",#   


+
2
"
# % %   $& &


+/- "0#  )  $  
!  +1
/2",#    '  
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
        










 !  "
# )' $' & $$( %) ') '& $%
*

+!  "
# () $) % )'  &&  
(&,!  "
# &( % $& $% % '' % $)

-


"
# $$$ $$$ (%) (%)
.


/- "0#
!  +1
/2",#


+
2
"
# &  & &


+/- "0#   
!  +1
/2",#   
HCM Signalized Intersection Capacity Analysis Configuration 5_PM 9: Boronda Rd. & San Juan Grade Rd. 









      


   



 !"


#
$
%"
&
' ( )  ( ((* + ,* ( ((   *
-.
%
/%
0 &
%' , , , , , , , , , , , , 

%

#
 
&#' +1 +1 +1 +1 +1 +1 +1 +1 +1


2 %1
/


1, 1, 1, 1, 1, 1,* 1 1, 1,*
/
34
.3 5# 1 1 1 1 1 1 1,) 1 1,)
/%34
.3 5# 1 1 1 1 1 1 1 1 1
/
 1 1 1 1,) 1 1 1)* 1 1,
/%
6  . 1,* 1 1,* 1 1,* 1 1 1,* 1

.1
/%
0 &

' ((( **, ((( ,( ((( (*(, ** ((( (+)
/%
6
 . 1,* 1 1,* 1 1,* 1 1 1,* 1

.1
/%
0 &
' ((( **, ((( ,( ((( (*(, ** ((( (+)
6
5

"



4 67/ 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1, 1,

8.91 /%
0 &
' * +  *    (, (* ( ( ++
:
." 

&
'     )      +, 


;

"
/%
0 &
' * ,)  * +,   (, (* ( ( 

%1
6.#1
&<

'    

%1
 5#
&<

'    
"

 6

 6

 6

 =
 6


6  .
6 ##   ( ) *  (  +
6
 .
6 ## 
8 "
.
;
4
;
&#' 1* ++1( 1 *1 1* 1+ (1) )1 ,1
  
;
4
!
&#' 1* ++1( 1 *1 1* 1+ (1) )1 ,1
8 "
.
!



1+ 1* 1, 1( 1, 1 1+ 1+ 1

%

 
 
&#' +1 +1 +1 +1 +1 +1 +1 +1 +1
$
%
>#

&#' 1 (1 1 (1 1 (1 1 1 (1


;



&
' *** * (*  , + * + **
#



6  1( 1, 1 1( 1+ 1 1 1+ 1
#



6
 1+



1) 1,, 1) 1, 1 1++ 1 1( 1+)
2


?%
4
. *1 ((1 *,1 ((1 *,1 *1+ *1 +1* *1
6 !
##

/


1 1 1 1 1 1 1 1 1
-

%
?%
4
. ,1 *1, 1* 1 *1+ 1+ *1 1, 1
?%

&#' +(1 ,1 +,1+ (*1 +1) *1 *1 (1 *)1(
%


   ?  ?  ? ? / 
8

?%

&#' *1 (,1* **1 )1
8

: ? ? ? /
-
# 

"


7 
8

!



%
?%
 *1* 7

%


  ?
7 
$
%"






1,
8 "
.

 %
!

&#'
((1 "

%
#
 
&#' 1
-
# 




2 % @

 ,1A -
2 %


  /
8
%# #
6

.
& ' *


%


;

"
Queuing and Blocking Report Configuration 5_PM
2030_Boronda/SJG_PM 





Intersection: 9: Boronda Rd. & San Juan Grade Rd.
            











 !  "
# $ %& & && & ' $( &%( %%& )' &) '
*

+!  "
# ' $% $& ' )) & % $$% $ &$ ' ('
(&,!  "
# )& %' )$ %(& %' )$ '' &% % % $ &&

-


"
# & & & '% '% '%
.


/- "0# %  &  
!  +1
/2",#     


+
2
"
# % %   & &


+/- "0#  )  $
!  +1
/2",#  &  %
Intersection: 9: Boronda Rd. & San Juan Grade Rd.
       









 !  "
# $( ( $& $ $$$ $% 
*

+!  "
# $& & ' (&  ( ((
(&,!  "
# %  ( $$% $( () $

-


"
# $$$ $$$ (%' (%'
.


/- "0#
!  +1
/2",#


+
2
"
#  & &


+/- "0# 
!  +1
/2",# 

APPENDIX J:

EAST BORONDA ROAD AND SAN JUAN GRADE ROAD

CONCEPTUAL STRIPING PLANS

2060 ROCKROSE COURT, GILROY, CA 95020
T 408.201.2752 [email protected]

HARVEST MOON AGRICULTURAL EMPLOYEE

HOUSING PROJECT
(QUATTRIN RANCH)

TRAFFIC IMPACT ANALYSIS

DRAFT REPORT

MONTEREY COUNTY, CALIFORNIA
Prepared for
Tony Flores
Monterey, CA 93940
Prepared by
Keith Higgins, Traffic Engineer
Gilroy, CA 95020
February 28, 2020
Keith Higgins
Traffic Engineer
Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page i

TABLE OF CONTENTS
PREFACE.................................................................................................................................. 1 1 INTRODUCTION............................................................................................................ 1

1.1 Scope of Work .................................................................................................... 2

1.2 Study Network .................................................................................................... 2

1.3 Analysis Scenarios.............................................................................................. 2

1.4 Traffic Operation Evaluation Methodologies........................................................ 3

1.5 Level of Service Standards - Study Network ....................................................... 3

1.6 Significance Criteria............................................................................................ 4

1.6.1 Monterey County................................................................................................. 4

1.6.2 City of Salinas..................................................................................................... 4

1.6.3 Caltrans .............................................................................................................. 5

1.7 Impact Fees ........................................................................................................ 5

1.7.1 Transportation Agency for Monterey County ....................................................... 5

1.7.2 Monterey County Traffic Impact Fee ................................................................... 5

1.7.3 Salinas Traffic Improvement Program................................................................. 5

1.8 Unique Project Traffic Characteristics ................................................................. 6 2 EXISTING TRAFFIC CONDITIONS ............................................................................... 8

2.1 Existing Traffic Network ...................................................................................... 8

2.2 Existing Pedestrian Network ............................................................................... 9

2.3 Existing Bicycle Network..................................................................................... 9

2.4 Existing Transit Service......................................................................................10

2.5 Existing Conditions Traffic Circulation................................................................11

2.5.1 Intersection Operations......................................................................................11

2.5.2 Pedestrian Circulation........................................................................................12

2.5.3 Bicycle Circulation..............................................................................................12 3 EXISTING PLUS PROJECT CONDITIONS – AG HOUSING ........................................13

3.1 Ag Housing Project Description..........................................................................13

3.2 Project Trip Generation – Ag Housing With Casa Boronda Data........................13 Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page ii

3.3 Unique Project Trip Generation Characteristics .................................................14

3.4 Project Access Improvements............................................................................15

3.5 Existing Plus Project Condition Traffic Circulation – Ag Housing........................15

3.5.1 Intersection Operations......................................................................................15

3.5.2 Pedestrian Circulation........................................................................................16

3.5.3 Bicycle Circulation..............................................................................................16

3.5.4 Transit Circulation..............................................................................................17

3.6 Impact Fees .......................................................................................................17 4 EXISTING PLUS PROJECT CONDITIONS – APARTMENTS.......................................18

4.1 Project Alternative Description ...........................................................................18

4.2 Project Trip Generation – Apartments................................................................18

4.3 Project Trip Distribution and Assignment – Apartments......................................18

4.4 Project Access Improvements............................................................................18

4.5 Existing Plus Project Condition Traffic Circulation – Apartments........................19

4.5.1 Intersection Operations......................................................................................19

4.5.2 Pedestrian Circulation........................................................................................20

4.5.3 Bicycle Circulation..............................................................................................20

4.5.4 Transit Circulation..............................................................................................20

4.6 Impact Fees .......................................................................................................20 5 BACKGROUND CONDITIONS......................................................................................22

5.1 Derivation of Background Condition Traffic Volumes .........................................22

5.2 Background Traffic Conditions ...........................................................................22

5.2.1 Intersection Operations......................................................................................22

5.2.2 Pedestrian Circulation........................................................................................22

5.2.3 Bicycle Circulation..............................................................................................23

5.2.4 Transit Circulation..............................................................................................23 6 BACKGROUND PLUS PROJECT CONDITIONS – AG HOUSING ...............................24

6.1 Derivation of Background Plus Project – Ag Housing Condition Traffic Volumes24

6.2 Background Plus Project Traffic Conditions – Ag Housing .................................24

6.2.1 Intersection Operations......................................................................................24 Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page iii

6.2.2 Pedestrian Circulation........................................................................................26

6.2.3 Bicycle Circulation..............................................................................................26

6.2.4 Transit Circulation..............................................................................................26 7 BACKGROUND PLUS PROJECT CONDITIONS – APARTMENTS..............................27

7.1 Derivation of Background Plus Project Condition Traffic Volumes – Apartments27

7.2 Background Plus Project Traffic Conditions – Apartments .................................27

7.2.1 Intersection Operations......................................................................................27

7.2.2 Pedestrian Circulation........................................................................................29

7.2.3 Bicycle Circulation..............................................................................................30

7.2.4 Transit Circulation..............................................................................................30 8 CUMULATIVE WITHOUT PROJECT CONDITIONS .....................................................31

8.1 Derivation of Cumulative Without Project Condition Volumes ............................31

8.2 Network Modifications under Cumulative Conditions..........................................31

8.3 Cumulative Without Project Traffic Conditions ...................................................32

8.3.1 Intersection Operations......................................................................................32

8.3.2 Pedestrian Circulation........................................................................................33

8.3.3 Bicycle Circulation..............................................................................................33

8.3.4 Transit Circulation..............................................................................................33 9 CUMULATIVE PLUS PROJECT CONDITIONS – AG HOUSING..................................34

9.1 Derivation of Cumulative Plus Project Condition Traffic Volumes – Ag Housing.34

9.2 Cumulative Plus Project Traffic Conditions – Ag Housing ..................................34

9.2.1 Intersection Operations......................................................................................34

9.2.2 Pedestrian Circulation........................................................................................36

9.2.3 Bicycle Circulation..............................................................................................37

9.2.4 Transit Circulation..............................................................................................37 10 CUMULATIVE PLUS PROJECT CONDITIONS – APARTMENTS ................................38

10.1 Derivation of Cumulative Plus Project Condition Traffic Volumes – Apartments.38

10.2 Cumulative Plus Project Traffic Conditions – Apartments...................................38

10.2.1 Intersection Operations......................................................................................38

10.2.2 Pedestrian Circulation........................................................................................41 Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page iv

10.2.3 Bicycle Circulation..............................................................................................42

10.2.4 Transit Circulation..............................................................................................42 11 SITE ACCESS AND INTERNAL CIRCULATION...........................................................43

11.1 Vehicle Circulation .............................................................................................43

11.2 Pedestrian Circulation........................................................................................43

11.3 Bicycle Circulation..............................................................................................43 12 VEHICLE MILES TRAVELED........................................................................................44

12.1 Ag Housing VMT................................................................................................44

12.2 Apartment VMT..................................................................................................44 13 SUMMARY OF PROJECT RESPONSIBILITIES ...........................................................46 14 REFERENCES..............................................................................................................48

14.1 List of References..............................................................................................48

14.2 List of Contacts ..................................................................................................49 Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page v

LIST OF EXHIBITS

1. Project Location Map and Study Area

2. Project Site Plan

3. Existing Peak Hour Volumes – AM and PM Peak Hour Volumes 4A. Intersection Levels of Service
4B. Recommended Intersection Improvements

5. Project Trip Generation

6. Project Trip Distribution (Ag Employee Housing)

7. Project Trip Assignment – Ag Employee Housing – AM and PM Peak Hour Peak Hour Volumes

8. Existing Plus Project Conditions – Ag Employee Housing – AM and PM Peak Hour Peak Hour Volumes

9. Project Trip Distribution – (Apartments)

10. Project Trip Assignment – Apartments – AM and PM Peak Hour Peak Hour Volumes

11. Existing Plus Project Conditions – Apartments – AM and PM Peak Hour Peak Hour Volumes

12. Background Conditions – AM and PM Peak Hour Volumes

13. Background Plus Project Conditions – Ag Employee Housing – AM and PM Peak Hour Volumes

14. Background Plus Project Conditions – Apartments – AM and PM Peak Hour Volumes

15. Cumulative Without Project Conditions – AM and PM Peak Hour Volumes

16. Cumulative Plus Project Conditions – Ag Employee Housing – AM and PM Peak Hour Volumes

17. Cumulative Plus Project Conditions – Apartments – AM and PM Peak Hour Volumes 18A. Project Vehicle Miles Traveled Calculation (Ag Employee Housing) 18B. Project Vehicle Miles Traveled Calculation (Apartments) Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page vi

LIST OF APPENDICES
A. Level of Service Descriptions
B. Existing and Proposed Bicycle Facilities near Project Site C. Intersection Traffic Volume Counts
D. Volume Count Comparison
E. Intersection Level of Service Calculations – Existing Conditions F. Casa Boronda Driveway Counts
G. Intersection Level of Service Calculations – Existing Plus Project Ag Housing Conditions H. Intersection Level of Service Calculations – Existing Plus Project Apartments Conditions I. Background Growth Derivation
J. Intersection Level of Service Calculations – Background Conditions K. Intersection Level of Service Calculations – Background Plus Project Ag Housing Conditions
L. Intersection Level of Service Calculations – Background Plus Project Apartments Conditions
M. Intersection Level of Service Calculations – Cumulative Without Project Conditions N. Intersection Level of Service Calculations – Cumulative Plus Project Ag Housing Conditions
O. Intersection Level of Service Calculations – Cumulative Plus Project Apartments Conditions
P. Monterey County Regional Trip Length Calculation
Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 1

PREFACE
This report was originally completed November 11, 2019. There has since been a change in the California Environmental Quality Act (CEQA regarding determination of transportation impacts as well as a reduction in the size of the Project Apartment Alternative. These two changes are discussed below.

1. Change in California Environmental Quality Act (CEQA) Transportation Impact Criteria
In accordance with California Senate Bill 743, transportation impacts are now being determined by Vehicle Miles Traveled (VMT) rather than level of service (LOS). This change occurred subsequent to the preparation of this traffic study in November 2019. Section 12 of this study provides an analysis of VMT for CEQA purposes. The County of Monterey and City of Salinas have not adopted methodologies or thresholds of significance at this time. However, the determination of impacts can be made based on the estimates included herein.

Impacts identified in this report based on LOS are no longer CEQA impacts. However, analysis does identify locations where traffic operations will not conform to City of Salinas, County of Monterey or Caltrans policies. The need for project contribution toward improvements in traffic operations recommended in this report are therefore now determined by these agencies without needing to consider whether the improvements or lack thereof would result in full mitigation of anticipated impacts.

2. Change in Description of Project Apartment Alternative The following traffic study is based on a preliminary project description that included two project alternatives. The first was a 1,200-bed agricultural employee (H2A) housing facility. The second was 200 standard apartments. Subsequent to the preparation of the study, the apartment alternative was reduced to 150 standard apartments.

The analysis of the 1,200-bed H2A housing facility continues to reflect the current proposal. The analysis of the 200-unit apartment alternative overstates the trip generation and resulting impacts at the study intersections. The locations where the 200-unit Apartment alternative were expected to result in traffic operations below acceptable levels in County, City or Caltrans policies will not change for the 150-unit Apartment alternative. This is because the locations are already operating worse than acceptable levels or are expected to in the future without the project, the Apartment alternative would add traffic above the historic significance threshold and Transportation Demand Management (TDM) measures alone would not eliminate the impact. 1 INTRODUCTION
The proposed Quattrin Ranch project would be located in the Boronda Area of Monterey County, California. The project site covers approximately 7 acres on the west side of North Davis Road at West Rossi Street. The project has two possible alternatives:

1. 1,200 beds for agricultural employee housing; OR

2. 200 standard apartments.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 2
Both alternatives are analyzed in this report.

The locations of the Project site and study area are indicated in Exhibit 1. The project site plan is shown in Exhibit 2.

This report summarizes the analysis of potential traffic impacts associated with both alternatives of the proposed Project as well as cumulative impacts. Existing, Background and Cumulative conditions are also analyzed with and without the Project. Vehicular, pedestrian, bicycle and transit circulation are evaluated at the Project site and the immediate surrounding street network.

1.1 Scope of Work
This report addresses the following topics:

1. Existing vehicular, pedestrian and bicycle circulation on the surrounding street network.

2. Assessment of potential impacts to vehicular, pedestrian, bicycle and transit circulation due to the Project, and recommendations to minimize or alleviate those impacts.

3. Assessment of potential background and cumulative traffic impacts.

4. Site access and on-site circulation assessment.

5. Estimation of the project’s Vehicle Miles Traveled (VMT).

1.2 Study Network
The AM and PM peak periods were analyzed at the following six intersections, which includes the agency having jurisdiction. Their locations are indicated on Exhibit 1.

1. Intersection 1 – Adams Street / West Laurel Drive (City of Salinas)

2. Intersection 2 – US 101 Northbound Ramps / West Laurel Drive (Caltrans)

3. Intersection 3 – US 101 Southbound Offramp / West Laurel Drive (Caltrans)

4. Intersection 4 – North Davis Road / Calle Del Adobe – West Laurel Drive (City of Salinas)

5. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe (Monterey County)

6. Intersection 6 – North Davis Road / Post Drive – Commercial Driveway (City of Salinas)

7. Intersection 7 – North Davis Road / West Rossi Street (City of Salinas)

8. Intersection 8 – North Main Street (State Route 183) / Rossi Street (Caltrans)

9. Intersection 9 – Davis Road Southbound Ramps – Market Circle / West Market Street (State Route 183) (Caltrans)

10. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183) (Caltrans)

11. Intersection 11 – Davis Road / Blanco Road (Monterey County)

12. Intersection 12 – North Main Street / Alvin Drive (City of Salinas)

13. Intersection 13 – North Main Street / Laurel Drive (City of Salinas)

1.3 Analysis Scenarios
Traffic operations for the following analysis scenarios were analyzed:

1. Existing Conditions

2. Existing Plus Project Conditions (both project alternatives)

3. Background Conditions

4. Background Plus Project Conditions (both project alternatives)

5. Cumulative Without Project Conditions
Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 3

6. Cumulative Plus Project Conditions (both project alternatives) Improvements recommended to mitigate impacts for each development scenario are recommended where warranted.

1.4 Traffic Operation Evaluation Methodologies
Intersection traffic operations were evaluated based upon the level of service (LOS) concept. LOS is a qualitative description of an intersection’s operations, ranging from LOS A to LOS F. Level of Service “A” represents free flow uncongested traffic conditions. Level of Service “F” represents highly congested traffic conditions with unacceptable delay to vehicles at intersections. The intermediate levels of service represent incremental levels of congestion and delay between these two extremes. LOS descriptions for each type of existing traffic control at the study intersections (i.e., signal, all-way stop and one-/two-way stop) are included as Appendix A.

Intersection traffic operations were evaluated using the Synchro© traffic analysis software (Version 10) using both the 2010 and 2000 Highway Capacity Manual (HCM) methodologies. The average delay is then correlated to a level of service. For two-way stop-controlled intersections, only the vehicle delay for side street traffic is analyzed. LOS for each side street movement is based on the distribution of gaps in the major street traffic stream and driver judgment in selecting gaps. Improvements are warranted when a side street approach reaches LOS F for two-way stopcontrolled intersections. When using the HCM 2010 and 2000 methods for the analysis of signalized and all-way stop-controlled intersections, the overall intersection delay is used to determine LOS.

Intersections 1 and 2 (Adams Street / West Laurel Drive and US 101 Northbound Ramps / West Laurel Drive are operated by the same signal controller. The HCM 2010 cannot analyze intersections that share a controller. Hence, these two intersections are analyzed using the HCM 2000 methodologies. The remaining four study intersections are analyzed using the HCM 2010 methodologies.

Also, traffic signals at Intersections 12 and 13 North Main Street / Alvin Drive and North Main Street / Laurel Drive are coordinated using the InSync adaptive traffic control system. This system optimizes the signal phase lengths and their sequence and also coordinates traffic flow between adjacent InSync-controlled signals. Currently, there is no process to model InSync signal operations in computerized operations software; hence the HCM 2010 methodologies are used to assess operations at these intersections. This analysis therefore constitutes a conservative assessment of operations at these two intersections.

1.5 Level of Service Standards - Study Network
This study assesses operations at intersections under three different jurisdictions – City of Salinas, Monterey County and Caltrans. Both the City of Salinas and Monterey County have an overall level of service (LOS) standard of LOS D. The overall Caltrans level of service is the transition between LOS C and LOS D, abbreviated herein as LOS C-D.

As noted in Section 1.4, the Highway Capacity Manual does not provide overall levels of service for one-way stop-controlled intersections; rather, it only provides side-street operations for this Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 4
type of traffic control. Side-street operations represent delay for the entire stop-controlled approach, regardless of the number of lanes. For the purposes of this analysis, a standard of LOS E is applied to side-street operations at these intersections, given that intersection improvements such as signalization and channelization are generally not warranted until the side street LOS is F. Also, side street traffic volumes are typically much lower than volumes on the major street and only represent a small portion of the overall intersection operations.

1.6 Significance Criteria
According to the California Environmental Quality Act (CEQA) guidelines, a Project may have a significant effect on the environment if it would cause an increase in traffic that is substantial in relation to the existing traffic load and capacity of the street system. The following significance criteria have been used within this study:

1.6.1 Monterey County
For the purposes of this analysis, a significant impact would occur at any intersection under the jurisdiction of Monterey County in the following circumstances:

Signalized Intersection (Intersection 11):
• A significant impact would occur if an intersection operating at LOS A, B, C, or D preProject degrades to E or F with the addition of Project traffic. • For intersections already operating at unacceptable level E or F pre-Project, any increase (one vehicle) in traffic is considered significant.

One- or Two-Way Stop-Controlled Intersection (Intersection 5):
• A significant impact would occur if the side-street at an intersection operating at LOS A, B, C, D or E pre-Project degrades to LOS F with Project traffic; or • If any traffic signal warrant is met with the addition of Project traffic; or • For side-streets already operating at LOS F pre-Project, the addition of any Project traffic during the deficient peak hour would be considered significant, regardless of its effects on delay.

1.6.2 City of Salinas
For the purposes of this analysis, a significant impact would occur at any study intersection under the jurisdiction of the City of Salinas in the following circumstances:

Signalized Intersection (Intersections 1, 4, 6-7, 12-13):
• A significant impact would occur if an intersection operating at LOS A, B, C, or D preProject degrades to E or F with the addition of Project traffic. • For intersections already operating at unacceptable level E or F pre-Project, any increase (one vehicle) in traffic is considered significant.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 5

1.6.3 Caltrans
For the purposes of this analysis, a significant impact would occur at any intersection or roadway segment under the jurisdictions of Caltrans in the following circumstances:

Signalized Intersection (Intersections 2-3, 8-10):
• A significant impact would occur if an intersection operating at LOS A, B, or C pre-Project degrades to D, E or F with the addition of Project traffic; or • For intersections already operating at LOS D, E, or F pre-Project, a significant impact would occur if the project would cause overall delay to increase by at least 0.1 seconds.

1.7 Impact Fees

1.7.1 Transportation Agency for Monterey County
The Transportation Agency for Monterey County (TAMC) and its member jurisdictions have adopted a county-wide, regional development impact fee to cover the costs for studies and construction of many roadway improvements throughout Monterey County. This impact fee, which went into effect on August 27, 2008, is applied to new development within Monterey County.

The governing document for the fee is the Regional Impact Fee Nexus Study Update (March 26, 2008) prepared by Kimley-Horn Associates, Inc. The Regional Impact Fee Nexus Study Update was updated in October 2018 by Wood Rodgers.

TAMC, Monterey County and Caltrans have agreed that the payment of the TAMC fee satisfies the Project’s fair share contribution to cumulative impact mitigation throughout the regional highway system. This includes highways that will operate deficiently but no capital improvement Project is programmed to correct the deficiency. Projects partially funded by the TAMC fee in North Monterey County and the vicinity of Salinas include the following. Additional funding will be provided by Measure X, the Transportation Sales Tax measure. These local funding sources are anticipated to leverage State and federal funding sources to fully fund the improvements. Toll roads are also being considered as a funding source.

1. TAMC Improvement 2 – SR 156 Widening from US 101 to Castroville Boulevard

2. TAMC Improvement 4 - Davis Road North from Blanco Road to Market Street (SR183)

3. TAMC Improvement 5 – Davis Road South from Blanco Road to Reservation Road, including replacement of bridge over Salinas River

4. TAMC Improvement 10 – US 101 Widening from Airport Boulevard to Boronda Road

1.7.2 Monterey County Traffic Impact Fee
Monterey County is developing a traffic impact fee. It is expected to be adopted in late 2019. A list of improvements and the amount of the impact fee are not currently available. The fee is would not be applicable to the Project unless the fee program is adopted by Monterey County before the Project is approved. This fee is not able to be imposed at this time.

1.7.3 Salinas Traffic Improvement Program
The City of Salinas Traffic Improvement Program – 2010 Update, Wood Rodgers, March 2010, is the technical document used to establish the Salinas Traffic Fee Ordinance (TFO), which is the Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 6
primary funding source for transportation improvements to mitigate impacts of cumulative development as the City builds out its current General Plan. A traffic impact fee is assessed to new development within the City of Salinas to off-set its cumulative impacts on the circulation system that is under the City’s jurisdiction. As the project site is not located in the City of Salinas, the TFO fee would not be applicable to the Project.

Improvements with TFO funding included in the Traffic Improvement Program that are located in the vicinity of the Project site are listed below along with their individual Traffic Improvement Program project number. as follows.

1. TFO 26 – Western Bypass. This improvement will construct a new six-lane divided arterial between the Boronda Road / US 101 interchange and Blanco Road, mostly west of Boronda Road, Davis Road and the Boronda community.

2. TFO 27 – Alvin Drive Extension. This improvement will extend Alvin Drive westward over US 101 and to the Western Bypass as a four-lane arterial.

3. TFO 28A and 28B – Laurel / US 101 Widening (Davis to Adams) and Laurel Improvements (Adams to Main). These improvements will widen West Laurel Drive to six lanes between North Davis Road and Adams Street, and add left turn lanes in both directions between Adams Street and North Main Street.

4. TFO 29 – Rossi Street Extension. This improvement extends Rossi Street as a two-lane minor arterial west of North Davis Road to the Westside Bypass, thus creating a new access to the Boronda community near the project site.

5. TFO 31 – Main Street Widening (Expressway Type II). This improvement widens Main Street from a four to six-lane arterial between Casentini Street and Market Street.

6. TFO 73 – Davis Road / Blanco Road Intersection. This improvement widens the intersection to add the following lanes:
a. Second northbound Davis Road left turn lane;
b. Northbound Davis Road right turn lane;
c. Second southbound Davis Road through lane;
d. Eastbound Blanco Road right turn lane;
e. Second westbound Blanco Road left turn lane.

1.8 Unique Project Traffic Characteristics
The Quattrin H2A project will provide farmworker housing, which will assist in alleviating overcrowding in farmworker households. According to the “Farmworker Housing Study and Action Plan for Salinas Valley and Pajaro Valley,” California Institute for Rural Studies, June 2018, farmworker households have an occupancy rate of 7.00 persons per dwelling unit. These are scattered throughout the City of Salinas and surrounding communities. Farmworkers at these scattered locations must use private cars (many in carpools) to commute to and from work as well as shopping and personal trips.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 7
Residents of the Quattrin H2A housing project will be prohibited from having a car and will be transported to and from work and all other destinations by bus. Vehicle occupancy will increase from 2 to 3 persons per vehicle to over 20 persons per vehicle. There will be a corresponding reduction in traffic volumes on the street systems in Salinas and surrounding area. The project will thus have a positive city-wide impact on traffic congestion, which will likely more than offset any increase in traffic at nearby intersections. This is not possible to quantify but could easily be several times the increase anticipated in this study. This study does not provide any credit for this phenomenon, except for qualifying the determination of whether the project creates a significant impact at individual intersections.

The apartment alternative may have some similar traffic benefits. However, because the apartments will be available to the general public, they are analyzed as standard apartments. No credit is given in the analysis of determination of impact significance.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 8
2 EXISTING TRAFFIC CONDITIONS
This chapter evaluates Existing traffic conditions and includes a description of the Project setting.

2.1 Existing Traffic Network
The Project site is located on the west side of North Davis Road at West Rossi Street in unincorporated Monterey County. The project site is located adjacent to the City of Salinas, which lies just east of West Davis Road from the project site.

The key roadways in the vicinity of the proposed project include US 101, Davis Road, Laurel Drive, Main Street, Market Street, Blanco Road, Alvin Drive, Rossi Street, Calle Del Adobe, Post Drive, Adams Street and El Rancho Way. These facilities are described below, in alphabetical order:

Adams Street is a two-lane collector street providing access to neighborhoods north of West Laurel Drive and east of US 101. The posted speed limit is 35 miles per hour (mph).

Alvin Drive is a four-lane minor arterial street in northern Salinas, providing access to adjacent residential neighborhoods and schools. The posted speed limit is 35 mph.

Blanco Road is a two- to four-lane roadway in Monterey County and southern Salinas, connecting Marina and Salinas via Reservation Road. As such, it is a major commute corridor between the Monterey Peninsula and the Salinas Valley. The posted speed limit is 55 mph west of Davis Road and 50 mph east of Davis Road.

Calle Del Adobe provides the primary access to the Boronda area from North Davis Road. It is a two-lane east-west arterial that extends from the Davis Road/Laurel Drive intersection to Boronda Road. The posted speed limit is 45 mph between Boronda Road and Post Drive and 35 miles per hour between Post Drive and North Davis Road.

Davis Road extends along the easterly boundary of the Boronda area and generally represents the western limit line for the City of Salinas in the vicinity of the planning area. It extends from Reservation Road – near the unincorporated Toro Park neighborhood south of Salinas – to Boronda Road in northwestern Salinas. In the study area, Davis Road is a four-lane major arterial.

The posted speed limit in the study area is 35 mph north of Larkin Street, 45 miles per hour between Larkin Street and Blanco Road, and 55 mph south of Blanco Road.

El Rancho Way provides access to a residential neighborhood and a hotel. The posted speed limit is 25 mph.

Laurel Drive is a major four-lane east-west arterial in the city of Salinas. Laurel Drive extends easterly from North Davis Road and has an interchange with US 101. It continues east through most of the northerly portion of the City of Salinas and is one of the major east-west arterials serving the city of Salinas. The posted speed limit is 35 mph.

Main Street is a four- to six-lane north-south major arterial in southern, central and northern Salinas. It provides primary access to the Downtown from the north and south, as well as to northbound and southbound US 101 approximately one-half mile north of Rossi Street. In the study area, commercial and residential land uses line Main Street. Between US 101 and Market Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 9
Street, Main Street is also State Route 183. In the study area, the posted speed limit is 35 mph north of US 101 and 40 mph south of US 101.

Market Street is a four-lane east-west major arterial in the City of Salinas. the vicinity of the project site, connecting the Downtown with eastern and western Salinas. It provides direct access to commercial and industrial land uses along its frontage. West of Main Street, Market Street is also Sate Route 183, which continues west towards Castroville. The posted speed limit is 25 mph east of Main Street, 40 mph between Main Street and Davis Road, and 55 mph west of Davis Road.

Market Circle is a two-lane local street providing access to agricultural fields and rural residences. The presumed speed limit is 25 mph.

Rossi Street is a two-lane east-west minor arterial in western and central Salinas. It provides access to residential and commercial land uses. The posted speed limit is 40 mph west of North Main Street and 25 mph east of North Main Street.

Post Drive is a four-lane commercial collector street that runs in a quarter circle between North Davis Road and Calle Del Adobe. The presumed speed limit is 35 mph.

US 101 is a regional north-south facility through the city of Salinas. It is currently a four-lane roadway with interchanges in the city. The posted speed limit through the city is 65 mph. The nearest interchange access points to the project from US 101 are the Laurel Drive interchange and the partial Main Street interchange.

2.2 Existing Pedestrian Network
There are no sidewalks along the Project frontage of North Davis Road, although a sidewalk does exist on this side of North Davis Road just north of the project site. Sidewalks are present on the east frontage of North Davis Road. Both sidewalks are continuous to the north and east of the project site, including onto West Laurel Drive, Calle Del Adobe, Post Drive, Adam Street, West Rossi Street and West Market Street (State Route 183). These connections allow continuous travel for pedestrians to various commercial and industrial areas in western and downtown Salinas.

There are marked crosswalks present at all study intersections.

2.3 Existing Bicycle Network
There are four types of bicycle facilities defined by Caltrans. Each type is described below:

1. Bike path (Class I) – A separate right-of-way designed for the exclusive use of bicycle and pedestrian traffic with crossflow minimized.

2. Bike lane (Class II) – A striped lane for one-way bike travel on a street or highway, typically including signs placed along the street segment.

3. Bike route (Class III) – Provides a shared use with pedestrian or motor vehicle traffic.

Typically, these facilities are city streets with signage designating the segment for Bike Route without additional striping or facilities.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 10

4. Separated Bikeways (Class IV) – A bikeway for the exclusive use of bicycles and includes a separation between the bikeway and the through vehicular traffic. The separation may include, but is not limited to, grade separation, flexible posts, inflexible posts, inflexible barriers, or on-street parking.

A bicycle network map for Monterey County is included in Appendix B. This map is cited from Transportation Agency for Monterey County Bicycle and Pedestrian Master Plan, Alta Planning + Design, December 2011 (“TAMC Bicycle and Pedestrian Master Plan”).

Bicycle facilities are provided along the following roadways in the study network:
• Bike Path (Class I):
a. Rossi-Rico Parkway: between North Davis Road (north of West Rossi Street) and West Rossi Street (east of Sansome Street)
• Bike Lane (Class II):
a. North Davis Road: between Blanco Road and Post Drive and between West Laurel Drive and Boronda Road (both directions)
b. West Rossi Street: between North Davis Road and Sherwood Drive (both directions) c. Blanco Road: between Reservation Road in Marina and Luther Way in Salinas (both directions)
d. North Main Street: between Alvin Drive and San Juan Grade Road e. Alvin Drive: between North Main Street and Kip Drive

2.4 Existing Transit Service
Monterey-Salinas Transit (MST) provides fixed-route bus service in Monterey County and Peninsula cities. Thirteen MST bus lines provides service to the study area:
• Line 20 (Salinas – Monterey). This line provides weekday and weekend service roughly every 30 minutes between roughly 5:00 AM – 3:00 AM the following morning. • Line 21 (Pebble Beach – Salinas Express). This line provides via just six runs per day (three in each direction) on weekdays and weekends.
• Line 23 (Salinas – King City). This line provides weekday and weekend service roughly every two hours between roughly 4:00 AM – 10:30 PM.
• Line 25 (CSUMB – Salinas). This line provides weekday and weekend service every 60 minutes between roughly 6:30 AM – 10:30 PM.
• Line 28 (Watsonville – Salinas via Castroville). This line provides weekday and weekend service every two hours between roughly 6:30 AM – 10:00 PM. • Line 29 (Watsonville – Salinas via Prunedale). This line provides weekday and weekend service every two hours 90 minutes between roughly 6:00 AM – 8:00 PM. • Line 42 (Westridge – Alisal). This line provides only weekend service every 90 minutes between roughly 9:00 AM – 9:00 PM.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 11
• Line 44 (Northridge – Salinas). This line provides daily service every 75 minutes between roughly 6:30 AM – 6:30 PM.
• Line 46 (Salinas – Natividad). This line provides only weekday service every 60-120 minutes between roughly 7:00 AM – 6:00 PM.
• Line 61 (Salinas – VA-DOD Clinic). This line provides weekday and weekend service every 60 minutes between roughly 6:00 AM – 10:30 PM.
• Line 72 (Presidio – North Salinas). This line provides weekday service via just four runs (two AM runs and two PM runs).
• Line 86 (King City – San Jose/SJ Airport). This line provides just four weekday runs (two in each direction) and eight weekend runs (four in each direction). • Line 95 (Williams Ranch – Northridge). This line provides weekday and weekend service every two hours between roughly 7:00 AM – 5:00 PM.

The nearest bus stops to the Project site (served by Line 72 only) are located on West Rossi Street east of North Davis Road (both directions). These stops located at approximately a sixminute walk from the project site. Bus stops are also located on North Davis Road south of Post Drive (served by Lines 44 and 72), which are more than a 13-minute walk away from the project site. Additional bus stops are located even further away from the project site.

2.5 Existing Conditions Traffic Circulation

2.5.1 Intersection Operations
Traffic volumes counts at the study intersections were collected during the AM (7:00 – 9:00 AM) and PM (4:00 – 6:00) peak hours on Wednesday, May 22, 2019 (Intersections 1 through 6) and Tuesday, September 24, 2019 (Intersections 7 through 13). Traffic data was collected for cars, trucks, buses, bicyclists, and pedestrians. From these counts, the AM and PM peak hour volumes were derived. Exhibit 3 depicts the peak turning movement volumes for the study intersections under Existing Conditions. Appendix C contains the traffic count data collected at these study intersections.

Appendix D contains a comparison of the May 2019 and September 2019 volumes at Intersection 4 – North Davis Road / Calle Del Adobe – West Laurel Drive, where data was collected during both count periods in order to verify if there were significant variation in the volumes from the two count periods. The exhibit shows that the September 2019 volumes at this intersection were between approximately 3% - 7% higher than those collected in May 2019. After balancing of the volumes along the adjacent West Laurel Drive intersections, the difference lowers to between approximately 1 – 2%. Both sets of percentages are below the typical day-to-day volume variation of 10% experienced at intersections. Therefore, it is concluded that the September 2019 volumes do not significantly differ from the May 2019 volumes.

Existing intersection lane configurations, traffic controls and levels of service at the study intersections are summarized in Exhibit 4A. Recommended intersection improvements are summarized in Exhibit 4B. The LOS calculation sheets for Existing conditions can be found in Appendix E.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 12
Most of the study intersections currently operate at or better than their respective level of service standards. However, the following three intersections operate below their respective standards under Existing conditions:

1. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe – Side-Street LOS F (AM).

2. Intersection 8 – North Main Street (State Route 183) / Rossi Street – LOS D (AM and PM).

3. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183) – LOS D (PM)

2.5.2 Pedestrian Circulation
All study intersections nearest the project site have less than 10 pedestrians crossing each approach leg during the AM and PM peak hours. This low level of pedestrian activity also occurs at most of the study intersections. However, the three North Main Street intersections all have moderate to high levels of pedestrian crossings, averaging 66 AM and 57 PM pedestrian crossings between them.

2.5.3 Bicycle Circulation
There is little to no bicycle traffic at the study intersections. The highest amount of bicycle traffic was on Laurel Drive, which had one (AM) and two (PM) through bicyclists during the study peak periods.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 13
3 EXISTING PLUS PROJECT CONDITIONS – AG HOUSING

3.1 Ag Housing Project Description
This section of the report focuses on Existing Plus Project conditions with Project Alternative 1 – agricultural employee housing.

Project Alternative 1 would build six residential buildings providing a total of 1,200 beds for 1,200 employees without dependents. All employees housed on site would be H2A Visa workers, i.e., seasonal employees who are US residents or reside permanently outside of the United States.

None of the employees would have their own vehicles. Instead, the employees would be bussed or carpooled to agricultural fields throughout Monterey County. All outbound bus/vanpool trips would occur between 2:00 – 5:00 AM and all inbound bus/vanpool trips would occur between 12:00 – 4:00 PM.

Both buses and vans will be used for employee bussing and vanpools. The buses would be stored offsite and driven to and from the site each day, while the vans would be stored onsite.

During weekday evenings and weekends, bus service into Salinas would be provided to the employees, as necessary, to transport employees to shopping, recreation and religious services.

The Project would only be occupied eight-and-a-half months of the year, from mid-March through November.

All project access would be via a westerly extension of West Rossi Street. This extension would only provide access to the project site and the adjacent agricultural fields; the West Rossi Street extension would not be connected to other roadways in Salinas or Boronda by the project.

3.2 Project Trip Generation – Ag Housing With Casa Boronda Data Trip generation estimates are typically based on rates from Trip Generation Manual, 10th Edition, published by the Institute of Traffic Engineers in 2017 (Trip Generation Manual). However, this publication does not include trip rates for agricultural employee housing projects. Instead, as requested by Monterey County staff, the Project trip generation was derived using trip activity at an existing agricultural employee housing facility in Monterey County. Inbound and outbound traffic at the Casa Boronda agricultural housing facility on Madison Lane in the Boronda Area – just west of Salinas, was collected during the peak agricultural season on Tuesday, April 16, 2019 between 7:00 – 9:00 AM and 4:00 – 6:00 PM. The collected traffic data can be found in Appendix F. From this data, the AM and PM one-hour peak volumes were derived and converted into trips per employee using the roughly 600 employees that reside at that facility. The derived rates were used to estimate the AM and PM peak hour traffic generated by the proposed project.

The Casa Boronda project generates 4 AM peak hour trips and 43 PM peak hour trips. This is about two times the peak hour volume estimates of 2 AM peak hour trips and 22 PM peak hour trips based on operator forecasts at the time of preparation of the Casa Boronda Agricultural Employee Housing Project Traffic Impact Analysis, Keith Higgins Traffic Engineer, July 3, 2017.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 14
A comparison of the estimated trip generation in the traffic study to the actual driveway counts is provided in Exhibit 5.

Much of the increase appears to be associated with a higher number of bus trips than originally anticipated. During observations of driveway traffic at Casa Boronda in May 2018, it was noted that the buses routinely carried 20 or fewer workers, which was less than half of their capacity.

This appeared to result in two times as many buses entered and exited the site as were originally forecasted. They were often followed by pickup trucks that often left with the buses after the workers disembarked. Foremen were assumed to arrive at Casa Boronda in their own vehicles and ride the bus to the fields with the workers. Apparently, many foremen drive separate vehicles to the fields. The traffic count was conducted on a single random day. Farm operations may vary from day to day, resulting in fewer buses being needed with a corresponding reduction in project trips. However, this is the only actual count data available. Previous traffic studies of farmworker housing projects were based on estimates by the project applicant.

Traffic volumes during off-peak hours, except for the early morning project peak hour when workers are leaving for the fields, are expected to the same as estimated in the Casa Boronda traffic study. This is because project occupants are generally not allowed to have personal vehicles. Typical residential trips such as shopping, school and recreation will not occur. The PM peak hour would then represent about 25% of the daily total.

Exhibit 5 summarizes the Project trip generation for the ag employee housing alternative. The Project is estimated to generate 346 weekday daily trips, with 8 trips (6 in, 2 out) during the AM peak hour and 86 trips (44 in, 42 out) during the PM peak hour. This is the trip activity used to evaluated potential project traffic impacts on the surrounding street system.

3.3 Unique Project Trip Generation Characteristics
The Project will only be occupied eight-and-a-half months out of the year, which is typical of most H2A housing projects in the Salinas area. Therefore, the project trip generation estimate in the prior paragraph will only occur when the project is open. The project would generate zero trips when closed. As a result, a seasonally adjusted trip generation is also included on Exhibit 5, to account for the project only being open approximately 71% of the year. The seasonally adjusted project trip generation would be 245 daily trips, with 6 trips (4 in, 2 out) during the AM peak hour and 61 trips (31 in, 30 out) during the PM peak hour. This is a factor that should be considered in the determination of project H2A traffic impact significance determination.

The use of the Casa Boronda traffic counts to project the project trip activity is a conservative estimate of the ag employee housing trips, as nearly all of the project bussing and vanpooling is anticipated to occur outside of the AM and PM street peak hours. Specifically, the project applicant anticipates that all morning bussing and vanpools will occur between 2:00 – 5:00 AM and between 12:00 – 4:00 PM. Restricting the hours of the bussing and vanpools outside of the peak hours is a form of Transportation Demand Management (TDM), and is described as such in this analysis. As noted on Exhibit 6, the project trip generation with the bussing and vanpools could constitute only 20% of the Casa Boronda traffic counts. The effects of the TDM measures on the project impacts for the ag employee housing project are addressed at each intersection Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 15
with deficient operations for all Ag Employee Housing analysis scenarios in this report.

Operations with the TDM measures are also indicated on Exhibit 4A.

Exhibit 6 depicts the trip distribution for the Project. The trip distribution was combined with the Project trip generation to derive the Project trip assignment depicted in Exhibit 7.

3.4 Project Access Improvements
The project’s vehicular access is on an extension of West Rossi Street west of North Davis Road.

This will require modifications to the lane configuration and existing traffic signal at the North Davis Road / West Rossi Street intersection. The analysis for Existing Plus Project, Background Plus Project and Cumulative Plus Project all assume the following intersection modifications, all of which the project will be responsible for implementation:

1. Construct eastbound West Rossi Street as one left turn lane and one shared through-right turn lane.

2. Remove and reconstruct the existing median on West Rossi Street east of North Davis Road to remove one eastbound through lane leaving the intersection and add a new westbound through lane at the intersection. This improvement would also retain the existing dual westbound left turn lanes and single westbound right turn lane.

3. Add a northbound West Davis Road left turn lane.

4. Revise the existing signal infrastructure and signal phasing to reflect the above lane configuration modifications.

3.5 Existing Plus Project Condition Traffic Circulation – Ag Housing

3.5.1 Intersection Operations
The Project trip assignment for the ag employee housing alternative (Exhibit 7) was added to the existing traffic volumes in Exhibit 3 to create the Existing Plus Project – Ag Housing volumes depicted in Exhibit 8.

Existing Plus Project – Ag Housing condition intersection levels of service are summarized in Exhibit 4A. Recommended intersection improvements are summarized in Exhibit 4B. The LOS calculation sheets for Existing Plus Project – Ag Housing conditions can be found in Appendix G.

Most of the study intersections would operate at or better than their respective level of service standards under Existing Plus Project – Ag Housing conditions. However, the following three intersections would operate continue to operate below their standards:

1. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe – Side-Street LOS F (AM).

2. Intersection 8 – North Main Street (State Route 183) / Rossi Street – LOS D (AM and PM).

3. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183) – LOS D (PM)
Below is a discussion of the recommended improvements at the study intersections operating under deficient operations that would be needed to improve operations to acceptable or better level of service.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 16

1. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe:

The side-street levels of service under AM conditions would be LOS F, compared to LOS F without the Project. The project would not add any traffic to this intersection. Per the significance criteria in Section 1.6, the Project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

2. Intersection 8 – North Main Street (State Route 183) / Rossi Street:

The level of service under AM and PM conditions would be LOS D, compared to LOS D without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Boronda-based trip generation.

However, with the TDM measures, the Project would only add zero trips (AM) and two trips (PM) to this intersection. This is a de minimis increase in traffic. This also does not account for the reduction in City-wide traffic resulting from the project as discussed in Section 1.8 of this report. Therefore, the project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

3. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183):

The level of service under PM conditions would be LOS D, compared to LOS D without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Boronda-based trip generation.

However, with the TDM measures, the Project would only add one trip (AM) and one trip (PM) to this intersection. This is a de minimis increase in traffic. This also does not account for the reduction in City-wide traffic resulting from the project as discussed in Section 1.8 of this report. Therefore, the project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

3.5.2 Pedestrian Circulation
The Project is anticipated to generate a small to moderate amount of pedestrian traffic. This would include pedestrian trips to the existing commercial areas on North Davis Road and to Downtown Salinas. There are existing and continuous sidewalks between the project site and these locations, thus providing adequate capacity for the additional pedestrian traffic. Therefore, the Project would not represent a significant impact to pedestrian circulation.

3.5.3 Bicycle Circulation
The Project is anticipated to generate a small amount of bicycle traffic. The existing bike lanes and shoulders on the study street network will be adequate to accommodate this additional bicycle traffic. Therefore, the Project would not represent a significant impact to bicycle circulation.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 17

3.5.4 Transit Circulation
The Project is anticipated to generate little or no transit demand. Therefore, the Project would not represent a significant impact to transit service.

3.6 Impact Fees
The Project would be subject to the TAMC Regional Development Impact Fee and the Salinas Traffic Improvement Program fee. The Project may also be subject to a Monterey County transportation impact fee, if one is adopted prior to approval of the study Project by Monterey County.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 18
4 EXISTING PLUS PROJECT CONDITIONS – APARTMENTS

4.1 Project Alternative Description
This section of the report focuses on Existing Plus Project conditions with Project Alternative 2 – standard apartments. Although the initial project is anticipated to be the agricultural employee housing, the project may be converted into standard apartments in the future, hence its inclusion within this analysis.

The Project Alternative 2 would build the same six residential buildings as Project Alternative

1.However, the buildings would be modified to provide up to 200 standard apartment units.

The trip generation estimate for Project Alternative 2 is based on rates from Trip Generation Manual, 10th Edition, published by the Institute of Traffic Engineers in 2017 (Trip Generation Manual).

Project access for the apartment alternative would be the same as the H2A project alternative, with all project driveways located along a westerly extension of West Rossi Street. Under the Existing Plus Project scenario, this extension would only provide access to the project site and the adjacent agricultural fields; the West Rossi Street extension would not be connected to other roadways in Salinas or Boronda by the project.

4.2 Project Trip Generation – Apartments
Exhibit 5 provides the trip generation estimate for the apartment alternative. The Project is estimated to generate 1,464 weekday daily trips, with 92 trips (21 in, 71 out) during the AM peak hour and 112 trips (71 in, 41 out) during the PM peak hour. This is the trip activity used to evaluated potential project traffic impacts on the surrounding street system.

4.3 Project Trip Distribution and Assignment – Apartments Exhibit 9 depicts the trip distribution for the Project. The trip distribution was combined with the Project trip generation to derive the Project trip assignment depicted in Exhibit 10.

4.4 Project Access Improvements
As with the project’s ag employee housing alternative, vehicular access for the apartments alternative would be via an extension of West Rossi Street west of North Davis Road. This will require modifications to the lane configuration and existing traffic signal at the North Davis Road / West Rossi Street intersection. The analysis for Existing Plus Project, Background Plus Project and Cumulative Plus Project with the apartment alternative all assume the same North Davis Road / West Rossi Street intersection modifications as previously described under the ag employee housing alternative, all of which the project will be responsible for implementation.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 19

4.5 Existing Plus Project Condition Traffic Circulation – Apartments

4.5.1 Intersection Operations
The Project trip assignment for the apartments (Exhibit 10) was added to the existing traffic volumes in Exhibit 3 to estimate the Existing Plus Project – Apartment volumes depicted in Exhibit 11.

Existing Plus Project – Apartment condition intersection levels of service are summarized in Exhibit 4A. Recommended intersection improvements are summarized in Exhibit 4B. The LOS calculation sheets for Existing Plus Project – Apartment conditions can be found in Appendix H.

Most of the study intersections would operate at or better than their respective level of service standards under Existing Plus Project – Apartment conditions. However, the following three intersections would continue to operate below their standards:

1. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe – Side-Street LOS F (AM).

2. Intersection 8 – North Main Street (State Route 183) / Rossi Street – LOS D (AM and PM).

3. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183) – LOS D (PM)
Below is a discussion of the recommended improvements at the study intersections operating under deficient operations that would be needed to improve operations to acceptable or better level of service.

1. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe:

The side-street levels of service under AM conditions would be LOS F, compared to LOS F without the Project. The project would not add any traffic to this intersection. Per the significance criteria in Section 1.6, the Project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

2. Intersection 8 – North Main Street (State Route 183) / Rossi Street:

The level of service under AM and PM conditions would be LOS D, compared to LOS D without the Project. It would result in an increase of 0.9 seconds of delay in the AM peak hour and 0.4 seconds of delay in the PM peak hour. For intersections already operating at LOS D, E, or F pre-Project, a significant impact would occur if the project would cause overall delay to increase by at least 0.1 seconds. Per the significance criteria in Section

1.6, the Project would result in a significant impact at this intersection. However, if this intersection was under City of Salinas jurisdiction, the project would not have an insignificant impact. This is because the City of Salinas has a standard of LOS D. • Recommendation: Implement the following:

1. Add a third northbound and third southbound through lane on North Main Street.

This improvement is Salinas TFO Improvement 31.
• Operations after Implementation of Improvement: LOS C (AM and PM).

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 20
• Responsibility for Improvement: Payment of Salinas TFO would constitute the project’s responsibility towards improvement.

3. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183):

The level of service under PM conditions would be LOS D, compared to LOS D without the Project. It would result in an increase of 0.2 seconds of delay in the AM peak hour and 0.9 seconds of delay in the PM peak hour. For intersections already operating at LOS D, E, or F pre-Project, a significant impact would occur if the project would cause overall delay to increase by at least 0.1 seconds. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection. However, if this intersection was under City of Salinas jurisdiction, the project would not have an insignificant impact.

This is because the City of Salinas has a standard of LOS D. • Recommendation: Implement the following:

1. Add an eastbound right turn lane on West Market Street. • Operations after Implementation of Improvement: LOS B (AM) and LOS C (PM). • Responsibility for Improvement: The study project should implement this improvement.

4.5.2 Pedestrian Circulation
The Project is anticipated to generate a small to moderate amount of pedestrian traffic. This would include pedestrian trips to the existing Boronda Meadows Elementary School, commercial areas on North Davis Road and to Downtown Salinas. There are existing and continuous sidewalks between the project site and these locations, thus providing adequate capacity for the additional pedestrian traffic. Therefore, the Project would not represent a significant impact to pedestrian circulation.

4.5.3 Bicycle Circulation
The Project is anticipated to generate a small amount of bicycle traffic. The existing bike lanes and shoulders on the study street network will be adequate to accommodate this additional bicycle traffic. Therefore, the Project would not represent a significant impact to bicycle circulation.

4.5.4 Transit Circulation
The Project is anticipated to generate little or no transit demand. Therefore, the Project would not represent a significant impact to transit service.

4.6 Impact Fees
The Project would be subject to the TAMC Regional Development Impact Fee and the Salinas Traffic Improvement Program fee. The Project may also be subject to a Monterey County transportation impact fee, if one is adopted prior to approval of the study Project by Monterey County.

Note that the project’s fees applicable to the apartments would be different compared to the fees applicable for the ag employee housing.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 21
Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 22
5 BACKGROUND CONDITIONS
This section describes Background traffic conditions. It accounts for traffic growth on the study network over a five-year period but does not include trips from the Project.

5.1 Derivation of Background Condition Traffic Volumes
Weekday AM and PM peak hour traffic generated by projects approved for development but not yet constructed or occupied was estimated based on a growth rate of 2% per year for five years (i.e., 10% increase in traffic). This is consistent with a review of traffic volumes at the study intersections over the past five years, referenced from past traffic studies1 and data collected for this analysis. This review found traffic volume growth of approximately 2% per year at the study intersections which is summarized in Appendix I.

Exhibit 12 contains the Background AM and PM traffic volumes at the study intersections.

5.2 Background Traffic Conditions

5.2.1 Intersection Operations
Background intersection levels of service are summarized in Exhibit 4A. Recommended intersection improvements are summarized in Exhibit 4B. The LOS calculation sheets for Background traffic conditions can be found in Appendix J.

Most of the study intersections would operate at or better than their respective level of service standards under Background conditions. However, the following four intersections will operate below their respective standards:

1. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe – Side-Street LOS F (AM).

2. Intersection 6 – North Davis Road / Post Drive – Commercial Driveway – LOS E (AM and PM)

3. Intersection 8 – North Main Street (State Route 183) / Rossi Street – LOS E (AM) and LOS D (PM).

4. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183) – LOS D (PM)

5.2.2 Pedestrian Circulation
Pedestrian demand is not anticipated to increase significantly under Background conditions.

There are no planned pedestrian infrastructure improvements in the study area under Background conditions.
1 Traffic Studies:

1. Casa Boronda Agricultural Employee Housing Project, Keith Higgins Traffic Engineer, July 3, 2017.

Existing volumes from 2014.

2. The Draft West Area Specific Plan Transportation Impact Analysis, Fehr & Peers, June 2018.

Existing volumes from 2016.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 23

5.2.3 Bicycle Circulation
Bicycle traffic is not anticipated to increase significantly under Background conditions. There are no planned bicycle infrastructure improvements in the study area under Background conditions.

5.2.4 Transit Circulation
There are no planned transit circulation improvements in the study area under Background conditions.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 24
6 BACKGROUND PLUS PROJECT CONDITIONS – AG

HOUSING
This section describes the analysis results for Background Plus Project – Ag Housing traffic conditions, which combines Project Alternative 1 traffic with the Background volumes.

6.1 Derivation of Background Plus Project – Ag Housing Condition Traffic Volumes The Project trip assignment for the ag employee housing (Exhibit 7) was combined with the Background volumes (Exhibit 12) to estimate the Background Plus Project – Ag Housing intersection volumes depicted in Exhibit 13.

6.2 Background Plus Project Traffic Conditions – Ag Housing

6.2.1 Intersection Operations
Background Plus Project – Ag Housing intersection levels of service are summarized in Exhibit 4A. Recommended intersection improvements are summarized in Exhibit 4B. The LOS calculation sheets for Background Plus Project – Ag Housing traffic conditions can be found in Appendix K.

Most of the study intersections would operate at or better than their respective level of service standards under Background Plus Project – Ag Housing conditions. However, the following five intersections would operate below their standards:

1. Intersection 4 – North Davis Road / Calle Del Adobe – West Laurel Drive – LOS E (PM)

2. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe – Side-Street LOS F (AM).

3. Intersection 6 – North Davis Road / Post Drive – Commercial Driveway – LOS E (AM and PM)

4. Intersection 8 – North Main Street (State Route 183) / Rossi Street – LOS E (AM and PM).

5. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183) – LOS D (PM)
Below is a discussion of the recommended improvements at the study intersections operating under deficient operations that would be needed to improve operations to acceptable or better level of service.

1. Intersection 4 – North Davis Road / Calle Del Adobe – West Laurel Drive:

No change would occur in the Background LOS C at this intersection. However, the level of service under PM conditions would be LOS E, compared to LOS D without the Project due to an increase in delay of 1.7 seconds. LOS E is an unacceptable level of service.

Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Boronda-based trip generation. However, with the addition of the Project trips and the TDM measures described in Section 3.3, the intersection operations would remain at LOS D. Therefore, the project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 25

2. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe:

The side-street levels of service under AM conditions would be LOS F, compared to LOS F without the Project. The project would not add any traffic to this intersection. Per the significance criteria in Section 1.6, the Project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

3. Intersection 6 – North Davis Road / Post Drive – Commercial Driveway:

The level of service under AM and PM conditions would be LOS E, compared to LOS E without the Project. The H2A Project would result in an increase of 0.1 seconds of delay in the AM peak hour and 1.7 seconds of delay in the PM peak hour. For intersections already operating at LOS D, E, or F pre-Project, a significant impact would occur if the project would cause overall delay to increase by at least 0.1 seconds. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Boronda-based trip generation. However, with the TDM measures, the Project would only add zero trips (AM) and four trips (PM) to this intersection. This is a de minimis increase in traffic. Therefore, the project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

4. Intersection 8 – North Main Street (State Route 183) / Rossi Street:

The level of service under AM and PM conditions would be LOS E, compared to LOS E (AM) and LOS D (PM) without the Project. The H2A Project would result in an increase of 0.1 seconds of delay in the AM peak hour and 0.3 seconds of delay in the PM peak hour. For intersections already operating at LOS D, E, or F pre-Project, a significant impact would occur if the project would cause overall delay to increase by at least 0.1 seconds. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Boronda-based trip generation.

However, with the TDM measures, the Project would only add zero trips (AM) and two trips (PM) to this intersection. This is a de minimis increase in traffic. Therefore, the project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

5. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183):

The level of service under PM conditions would be LOS D, compared to LOS D without the Project. The level of service under PM conditions would be LOS D, compared to LOS D without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Boronda-based trip generation. However, with the TDM measures, the Project would only add one trip (AM) and one trip (PM) to this intersection. This is a de minimis increase in traffic. Therefore, the project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection. Also, if this intersection was Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 26
under City of Salinas jurisdiction, the project would not have an insignificant impact. This is because the City of Salinas has a standard of LOS D.

6.2.2 Pedestrian Circulation
Pedestrian demand is not anticipated to increase significantly under Background Plus Project conditions as compared to Background conditions. Therefore, the Project would not represent a significant impact to pedestrian circulation under Background Plus Project conditions.

6.2.3 Bicycle Circulation
Bicycle demand is not anticipated to increase significantly under Background Plus Project conditions as compared to Background conditions. Therefore, the Project would not represent a significant impact to bicycle circulation under Background Plus Project conditions.

6.2.4 Transit Circulation
Transit demand from the Project is not anticipated to increase significantly over Existing Plus Project conditions, due to the lack of bus stops near the Project site. As such, the Project would not represent a significant impact to transit circulation under Background Plus Project conditions.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 27
7 BACKGROUND PLUS PROJECT CONDITIONS –

APARTMENTS
This section describes the analysis results for Background Plus Project – Apartments traffic conditions, which combines Project Alternative 2 traffic with the Background volumes.

7.1 Derivation of Background Plus Project Condition Traffic Volumes – Apartments The Project trip assignment for the apartments (Exhibit 10) was combined with the Background volumes (Exhibit 12) to estimate the Background Plus Project – Apartments intersection volumes depicted in Exhibit 11.

7.2 Background Plus Project Traffic Conditions – Apartments

7.2.1 Intersection Operations
Background Plus Project – Apartments intersection levels of service are summarized in Exhibit 4A. Recommended intersection improvements are summarized in Exhibit 4B. The LOS calculation sheets for Background Plus Project – Apartments traffic conditions can be found in Appendix L.

Most of the study intersections would operate at or better than their respective level of service standards under Background Plus Project – Apartments conditions. However, the following five intersections would operate below their standards:

1. Intersection 4 – North Davis Road / Calle Del Adobe – West Laurel Drive – LOS E (PM)

2. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe – Side-Street LOS F (AM).

3. Intersection 6 – North Davis Road / Post Drive – Commercial Driveway – LOS E (AM and PM)

4. Intersection 8 – North Main Street (State Route 183) / Rossi Street – LOS E (AM and PM).

5. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183) – LOS D (PM)
Below is a discussion of the recommended improvements at the study intersections operating under deficient operations that would be needed to improve operations to acceptable or better level of service.

1. Intersection 4 – North Davis Road / Calle Del Adobe – West Laurel Drive:

The level of service under PM conditions would be LOS E, compared to LOS D without the Project due to an increase in delay of 3.8 seconds. LOS E is an unacceptable level of service. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection.
• Recommendation: Implement either of the following groups of improvements:

1. Add a third westbound left turn lane on West Laurel Drive and a third southbound receiving lane on North Davis Road leaving the intersection; OR Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 28

2. Implement the following improvements, both of which are incorporated into the recommendations at this intersection under Cumulative Plus Project – Apartments conditions:
a. Implement the Western Bypass. This roadway, proposed by the Salinas TFO, would be a new arterial roadway parallel to and west of North Davis Road. As shown under Cumulative Plus Project – Apartment conditions, the Western Bypass would divert traffic off of West Davis Road, reducing the total traffic through this intersection. This improvement is Salinas TFO Improvement 26. b. Optimize the signal timing at the North Davis Road / Calle Del Adobe – West Laurel Drive intersection.
• Operations after Implementation of Improvement options: LOS C (AM) and LOS D (PM) for both improvement options.
• Responsibility for Improvement: The project would be responsible for implementation of Improvement Option 1. Payment of Salinas TFO would constitute project’s responsibility towards Improvement Option 2.

2. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe:

The side-street levels of service under AM conditions would be LOS F, compared to LOS F without the Project. The project would not add any traffic to this intersection. Per the significance criteria in Section 1.6, the Project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

3. Intersection 6 – North Davis Road / Post Drive – Commercial Driveway:

The level of service under AM and PM conditions would be LOS E, compared to LOS E without the Project. The Project would result in an increase in delay of 0.7 seconds in the AM peak hour and 3.9 seconds in the PM peak hour. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection. • Recommendation: Implement either of the following groups of improvements:

1. Implement the following:
a. Restripe eastbound Post Drive as one left lane, one through lane and one right turn lane.
b. Convert the east/west left turn signal phasing on Post Drive – Commercial Driveway to permitted phasing (as opposed to the current split phasing); OR

2. Implement the Western Bypass. This roadway, proposed by the Salinas TFO, would be a new arterial roadway parallel to and west of North Davis Road. As shown under Cumulative Plus Project – Apartment conditions, the Western Bypass would divert traffic away from West Davis Road, reducing the total traffic through this intersection. This improvement is Salinas TFO Improvement 26. • Operations after Implementation of Improvement options: LOS C (AM and PM) for Improvement Option 1 or LOS D (AM and PM) for Improvement Option 2.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 29
• Responsibility for Improvement: The project would be responsible for implementation of Improvement Option 1. Payment of Salinas TFO would constitute the project’s responsibility towards Improvement Option 2.

4. Intersection 8 – North Main Street (State Route 183) / Rossi Street:

The level of service under AM and PM conditions would be LOS E, compared to LOS E (AM) and LOS D (PM) without the Project. The Project would result in an increase in delay of 1.2 seconds in the AM peak hour and 0.5 seconds in the PM peak hour. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection.
• Recommendation: Implement the following:

1. Add a third northbound and third southbound through lane on North Main Street.

This improvement is Salinas TFO Improvement 31. This is the same improvement as previously recommended under Existing Plus Project – Apartment conditions. • Operations after Implementation of Improvement: LOS D (AM and PM). • Responsibility for Improvement: Payment of Salinas TFO would constitute the project’s responsibility towards improvement.

5. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183):

The level of service under PM conditions would be LOS D, compared to LOS D without the Project. It would result in an increase of 0.1 seconds of delay in the AM peak hour and 1.4 seconds of delay in the PM peak hour. For intersections already operating at LOS D, E, or F pre-Project, a significant impact would occur if the project would cause overall delay to increase by at least 0.1 seconds. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection. However, if this intersection was under City of Salinas jurisdiction, the project would not have an insignificant impact.

This is because the City of Salinas has a standard of LOS D. • Recommendation: Implement the following:

1. Add an eastbound right turn lane on West Market Street. This is the same improvement as previously recommended under Existing Plus Project – Apartment conditions.
• Operations after Implementation of Improvement: LOS B (AM) and LOS C (PM). • Responsibility for Improvement: The study project should implement this improvement.

7.2.2 Pedestrian Circulation
Pedestrian demand is not anticipated to increase significantly under Background Plus Project conditions as compared to Background conditions. Therefore, the Project would not represent a significant impact to pedestrian circulation under Background Plus Project conditions.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 30

7.2.3 Bicycle Circulation
Bicycle demand is not anticipated to increase significantly under Background Plus Project conditions as compared to Background conditions. Therefore, the Project would not represent a significant impact to bicycle circulation under Background Plus Project conditions.

7.2.4 Transit Circulation
Transit demand from the Project is not anticipated to increase significantly over Existing Plus Project conditions, due to the lack of bus stops near the Project site. As such, the Project would not represent a significant impact to transit circulation under Background Plus Project conditions.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 31

8 CUMULATIVE WITHOUT PROJECT CONDITIONS
This section describes the analysis results under Cumulative Without Project traffic conditions, which forecasts traffic conditions at buildout of the City of Salinas and Monterey County General Plans. This scenario does not include trips from the study Project. This condition represents conditions in approximately the Year 2045.

8.1 Derivation of Cumulative Without Project Condition Volumes Traffic volumes under Cumulative Without Project conditions were estimated using volume forecasts from six prior traffic studies that analyzed the study network:

1. Casa Boronda Agricultural Employee Housing Project, Keith Higgins Traffic Engineer, July 3, 2017.

2. The Draft West Area Specific Plan Transportation Impact Analysis, Fehr & Peers, June 2018.

3. Rodeo Property Traffic Impact Analysis, Mott MacDonald, June 12, 2019.

4. El Rancho Toro Agricultural Employee Housing Project Traffic Impact Analysis, Keith Higgins Traffic Engineer, June 6, 2019.

5. City of Salinas General Plan Circulation Element and Environmental Impact Report Traffic Study, Higgins Associates, June 11, 2002.

6. 2007 Monterey County General Plan Draft Environmental Impact Report, ICF Jones & Stokes, September 2008.

8.2 Network Modifications under Cumulative Conditions
Cumulative Without Project and Cumulative Plus Project conditions include multiple street network modifications near the study network. These modifications will divert traffic away from the study network. All improvements are in the City of Salinas Traffic Fee Ordinance.

The network modifications are:

1. TFO 26 – Western Bypass. This improvement will construct a new six-lane divided arterial between the Boronda Road / US 101 interchange and Blanco Road, mostly west of Boronda Road, Davis Road and the Boronda community.

2. TFO 27 – Alvin Drive Extension. This improvement will extend Alvin Drive westward over US 101 and to the Western Bypass as a four-lane arterial.

3. TFO 29 – Rossi Street Extension. This improvement extends Rossi Street as a two-lane minor arterial west of North Davis Road to the Westside Bypass, thus creating a new access to the Boronda community near the project site.

Please see Section 1.7.3 for a more detailed description of these improvements.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 32
The analyzed traffic volumes for Cumulative Without Project and Cumulative Plus Project reflect the traffic diversions that would occur due to these network modifications.

With regards to the Western Bypass, its alignment between Blanco Road and West Market Street (State Route 183) is not defined. City staff has confirmed that there are no formal designs of the roadway south of West Market Street (State Route 183) beyond the conceptual alignment identified in the Salinas TFO, which indicates that it will run parallel to South Davis Road at approximately 800 feet to the west. This would mean that the Western Bypass would have an interchange or grade separation with SR 183 and an intersection with Blanco Road between South Davis Road and Hitchcock Road. Therefore, the traffic forecasts at the South Davis Road / Blanco Road intersection are taken from the traffic study for the West Area Specific Plan, whose cumulative traffic forecasts are consistent with the TFO alignment of the Western Bypass.

In addition, the improvements at the North Davis Road / West Rossi Street intersection previously discussed in Section 3.3 – as associated with the project’s westward extension of West Rossi Street – are also assumed in place under Cumulative Without Project conditions. This is due to the Rossi Street Extension (TFO 29).

8.3 Cumulative Without Project Traffic Conditions

8.3.1 Intersection Operations
Cumulative Without Project traffic volumes are depicted on Exhibit 15. Cumulative Without Project intersection levels of service are summarized in Exhibit 4A. Recommended intersection improvements are summarized in Exhibit 4B. The LOS calculation sheets for Cumulative Without Project traffic conditions can be found in Appendix M.

Some of the study intersections will operate at or better than their respective level of service standards. However, the following eight intersections operate below their respective standards under Cumulative Without Project conditions:

1. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe – Side-Street LOS F (PM).

2. Intersection 7 – North Davis Road / West Rossi Street – LOS F (PM).

3. Intersection 8 – North Main Street (State Route 183) / Rossi Street – LOS E (AM and PM).

4. Intersection 9 – Davis Road Southbound Ramps – Market Circle / West Market Street (State Route 183) – LOS D (PM).

5. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183) – LOS E (PM).

6. Intersection 11 – Davis Road / Blanco Road – LOS F (AM and PM).

7. Intersection 12 – North Main Street / Alvin Drive – LOS E (PM).

8. Intersection 13 – North Main Street / Laurel Drive – LOS F (PM).

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 33

8.3.2 Pedestrian Circulation
There are no planned pedestrian improvements in the study area under Cumulative Without Project conditions other than to construct sidewalks along future streets where appropriate and to close gaps in existing sidewalks.

8.3.3 Bicycle Circulation
The TAMC bike and ped plan proposes the following future bicycle improvements in the study area.
• Bike Lane (Class II):
a. Davis Road: between West Laurel Drive and Post Street and between Blanco Road and Reservation Road (both directions)
b. Calle Del Adobe: between North Davis Road and Boronda Road (both directions) c. West Rossi Street: between North Davis Road and Boronda Road (both directions) d. Alvin Drive: between North Main Street and North Davis Road and between Kip Drive and Natividad Road (both directions)
• Bike Path (Class III):
a. West Laurel Drive: between North Davis Road and Adams Street b. Adams Street: between West Laurel Drive and Tulane Street

8.3.4 Transit Circulation
There are no anticipated transit improvements in the study area.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 34
9 CUMULATIVE PLUS PROJECT CONDITIONS – AG

HOUSING
This section describes the analysis results under Cumulative Plus Project traffic conditions, which combines the Cumulative Without Project volumes with the Project Alternative 1 trips.

9.1 Derivation of Cumulative Plus Project Condition Traffic Volumes – Ag Housing The Project trip assignment for the ag employee housing (Exhibit 7) was added to the Cumulative Without Project volumes (Exhibit 15) to estimate Cumulative Plus Project – Ag Housing traffic volumes, which are depicted on Exhibit 16.

Note: The Rossi Street Extension is not anticipated to modify the project trip assignment.

9.2 Cumulative Plus Project Traffic Conditions – Ag Housing

9.2.1 Intersection Operations
Cumulative Plus Project – Ag Housing intersection levels of service are summarized in Exhibit 4A. Recommended intersection improvements are summarized in Exhibit 4B. The LOS calculation sheets for Cumulative Plus Project – Ag Housing traffic conditions can be found in Appendix N.

Most of the study intersections would operate at or better than their respective level of service standards under Cumulative Plus Project – Ag Housing conditions. However, the following eight intersections would operate below their standards. These are the same intersections that will be deficient without the Project.

1. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe – Side-Street LOS F (PM).

2. Intersection 7 – North Davis Road / West Rossi Street – LOS F (PM).

3. Intersection 8 – North Main Street (State Route 183) / Rossi Street – LOS E (AM and PM).

4. Intersection 9 – Davis Road Southbound Ramps – Market Circle / West Market Street (State Route 183) – LOS D (PM).

5. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183) – LOS E (PM).

6. Intersection 11 – Davis Road / Blanco Road – LOS F (AM and PM).

7. Intersection 12 – North Main Street / Alvin Drive – LOS E (PM).

8. Intersection 13 – North Main Street / Laurel Drive – LOS F (PM).

Below is a discussion of the recommended improvements at the study intersections operating under deficient operations that would be needed to improve operations to acceptable or better level of service.

1. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe:

The side-street levels of service under AM conditions would be LOS F, compared to LOS F without the Project. The project would not add any traffic to this intersection. Per the Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 35
significance criteria in Section 1.6, the Project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

2. Intersection 7 – North Davis Road / West Rossi Street:

The level of service under PM conditions would be LOS F, compared to LOS F without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Boronda-based trip generation. With the TDM measures, the Project would add two trips (AM) and twelve trips (PM) to this intersection. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection both with and without the TDM measures. • Recommendation: Implement the following:

1. Add a second eastbound left turn lane on West Rossi Street

2. Add an eastbound right turn lane on West Rossi Street

3. Add a southbound right turn lane on North Davis Road

4. Add a northbound right turn overlap signal phase on North Davis Road. • Operations after Implementation of Improvement: LOS C (AM) and LOS D (PM). • Responsibility for Improvement: The City of Salinas would be responsible for implementation of these improvements, in conjunction with the West Rossi Street extension to Boronda Road. The project would be responsible for preserving the necessary right-of-way for these improvements where implementation would occur along the project frontage.

3. Intersection 8 – North Main Street (State Route 183) / Rossi Street:

The level of service under AM and PM conditions would be LOS E, compared to LOS E (AM) and LOS D (PM) without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Borondabased trip generation. However, with the TDM measures, the Project would only add zero trips (AM) and two trips (PM) to this intersection. This is a de minimis increase in traffic.

Therefore, the project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

4. Intersection 9 – Davis Road Southbound Ramps – Market Circle / West Market Street (State Route 183):

The level of service under PM conditions would be LOS D, compared to LOS D without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Boronda-based trip generation.

However, with the TDM measures, the Project would only add one trip (AM) and two trips (PM) to this intersection. This is a de minimis increase in traffic. Therefore, the project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 36

5. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183):

The level of service under PM conditions would be LOS E, compared to LOS E without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Boronda-based trip generation.

However, with the TDM measures, the Project would only add one trip (AM) and one trip (PM) to this intersection. This is a de minimis increase in traffic. Therefore, the project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

Intersection 11 – Davis Road / Blanco Road:

The level of service under AM and PM conditions would be LOS F, compared to LOS F without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Boronda-based trip generation.

However, with the TDM measures, the Project would only add zero trips (AM) and four trips (PM) to this intersection. This is a de minimis increase in traffic. Therefore, the project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

6. Intersection 12 – North Main Street / Alvin Drive:

The level of service under PM conditions would be LOS E, compared to LOS E without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Boronda-based trip generation.

However, with the TDM measures, the Project would only add zero trips (AM) and two trips (PM) to this intersection. This is a de minimis increase in traffic. Therefore, the project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

7. Intersection 13 – North Main Street / Laurel Drive:

The level of service under PM conditions would be LOS F, compared to LOS F without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection with the Casa Boronda-based trip generation.

However, with the TDM measures, the Project would only add zero trips (AM) and two trips (PM) to this intersection. This is a de minimis increase in traffic. Therefore, the project would not result in a significant impact at this intersection. The H2A project could have a beneficial (mitigative) effect at this intersection. The project would not be responsible for any improvements at this intersection.

9.2.2 Pedestrian Circulation
Pedestrian activity is not anticipated to increase significantly under Cumulative Plus Project conditions as compared to Cumulative Without Project conditions. Therefore, the Project would not represent a significant impact to pedestrian circulation under Cumulative Plus Project conditions.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 37

9.2.3 Bicycle Circulation
Bicycle activity is not anticipated to increase significantly under Cumulative Plus Project conditions as compared to Cumulative Without Project conditions. Therefore, the Project would not represent a significant impact to bicycle circulation under Cumulative Plus Project conditions.

9.2.4 Transit Circulation
Transit demand from the Project is not anticipated to increase significantly under Cumulative Plus Project conditions. As such, the Project would not represent a significant cumulative impact to transit circulation.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 38
10 CUMULATIVE PLUS PROJECT CONDITIONS –

APARTMENTS
This section describes the analysis results under Cumulative Plus Project traffic conditions, which combines the Cumulative Without Project volumes with trips from the Project Alternative 2.

10.1 Derivation of Cumulative Plus Project Condition Traffic Volumes – Apartments The Project trip assignment for the apartments (Exhibit 10) was added to the Cumulative Without Project volumes (Exhibit 15) to create the Cumulative Plus Project – Apartments traffic volumes depicted on Exhibit 17.

Note: The Rossi Street Extension is not anticipated to modify the project trip assignment.

10.2 Cumulative Plus Project Traffic Conditions – Apartments

10.2.1 Intersection Operations
Cumulative Plus Project – Apartments intersection levels of service are summarized in Exhibit 4A. Recommended intersection improvements are summarized in Exhibit 4B. The LOS calculation sheets for Cumulative Plus Project – Apartments traffic conditions can be found in Appendix O.

Most of the study intersections would operate at or better than their respective level of service standards under Cumulative Plus Project – Apartments conditions. However, the following nine intersections would operate below their standards. These are the same as Cumulative Plus Project with the addition of Intersection 4 – North Davis Road / Called del Adobe – West Laurel Drive.

1. Intersection 4 – North Davis Road / Calle Del Adobe – West Laurel Drive – LOS E (PM)

2. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe – Side-Street LOS F (PM).

3. Intersection 7 – North Davis Road / West Rossi Street – LOS E (AM) and LOS F (PM)

4. Intersection 8 – North Main Street (State Route 183) / Rossi Street – LOS E (AM and PM).

5. Intersection 9 – Davis Road Southbound Ramps – Market Circle / West Market Street (State Route 183) – LOS D (PM).

6. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183) – LOS E (PM)

7. Intersection 11 – Davis Road / Blanco Road – LOS F (AM and PM).

8. Intersection 12 – North Main Street / Alvin Drive – LOS E (PM).

9. Intersection 13 – North Main Street / Laurel Drive – LOS F (PM).

Below is a discussion of the recommended improvements at the study intersections operating under deficient operations that would be needed to improve operations to acceptable or better level of service.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 39

1. Intersection 4 – North Davis Road / Calle Del Adobe – West Laurel Drive:

The level of service under PM conditions would be LOS E, compared to LOS D without the Project due to an increase in delay of 1.6 seconds. LOS E is an unacceptable level of service. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection.
• Recommendation: Implement the following:

1. Optimize the current intersection signal timing.
• Operations after Implementation of Improvement: LOS C (AM) and LOS D (PM). • Responsibility for Improvement: The City of Salinas would be responsible for implementation of this improvement, as part of its typical signal operations management.

2. Intersection 5 – Post Drive – El Rancho Way / Calle Del Adobe:

The side-street levels of service under AM conditions would be LOS F, compared to LOS F without the Project. The project would not add any traffic to this intersection. Per the significance criteria in Section 1.6, the Project would not result in a significant impact at this intersection. The project would not be responsible for any improvements at this intersection.

3. Intersection 7 – North Davis Road / West Rossi Street:

The level of service under would be LOS E (AM) and LOS F (PM), compared to LOS D (AM) and LOS F (PM) without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection. • Recommendation: Implement the following, which are the same improvements as previously recommended under Cumulative Plus Project – Ag Housing conditions:

1. Add a second eastbound left turn lane on West Rossi Street

2. Add an eastbound right turn lane on West Rossi Street

3. Add a southbound right turn lane on North Davis Road

4. Add a northbound right turn overlap signal phase on North Davis Road. • Operations after Implementation of Improvement: LOS C (AM) and LOS D (PM). • Responsibility for Improvement: The City of Salinas would be responsible for implementation of these improvements, in conjunction with the West Rossi Street extension to Boronda Road. The project would be responsible for preserving the necessary right-of-way for these improvements where implementation would occur on the project site or project frontage.

4. Intersection 8 – North Main Street (State Route 183) / Rossi Street:

The level of service under AM and PM conditions would be LOS E, compared to LOS E (AM) and LOS D (PM) without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 40
• Recommendation: Implement the following:

1. Add a third northbound and third southbound through lane on North Main Street.

This improvement is Salinas TFO Improvement 31. This is the same improvement as previously recommended under Existing Plus Project – Apartment conditions. • Operations after Implementation of Improvement: LOS D (AM and PM). • Responsibility for Improvement: Payment of Salinas TFO would constitute the project’s responsibility towards improvement.

8. Intersection 9 – Davis Road Southbound Ramps – Market Circle / West Market Street (State Route 183):

The level of service under PM conditions would be LOS D, compared to LOS D without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection.
• Recommendation: Implement the following:

1. Optimize the current intersection signal timing. This is the same improvement as previously recommended under Cumulative Plus Project – Ag Housing conditions. • Operations after Implementation of Improvement: LOS B (AM) and LOS C (PM). • Responsibility for Improvement: The City of Salinas would be responsible for implementation of this improvement, as part of its typical signal operations management.

5. Intersection 10 – Davis Road Northbound Ramps – Private Driveway / West Market Street (State Route 183):

The level of service under PM conditions would be LOS E, compared to LOS E without the Project. The Project would add 1.9 seconds of delay. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection. • Recommendation: Implement the following:

1. Add an eastbound right turn lane on West Market Street. This is the same improvement as previously recommended under Existing Plus Project – Apartment conditions.
• Operations after Implementation of Improvement: LOS B (AM) and LOS C (PM). • Responsibility for Improvement: The Project should implement this improvement.

6. Intersection 11 – Davis Road / Blanco Road:

The level of service under AM and PM conditions would be LOS F, compared to LOS F without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection.
• Recommendation: Implement the following, all of which are part of Salinas TFO Improvement 73 and are the same improvements as previously recommended under Cumulative Plus Project – Ag Housing conditions.:

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 41

1. Add a second northbound left turn lane and a northbound right turn lane on Davis Road

2. Add a second southbound through lane on Davis Road

3. Add an eastbound right turn lane on Blanco Road

4. Add a second westbound left turn lane on Blanco Road • Operations after Implementation of Improvement: LOS E (AM) and LOS F (PM). • Responsibility for Improvement: Payment of Salinas TFO would constitute project’s responsibility towards improvement.

7. Intersection 12 – North Main Street / Alvin Drive:

The level of service under PM conditions would be LOS E, compared to LOS E without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection.
• Recommendation: Implement the following:

1. Optimize the current intersection signal timing. This is the same improvement as previously recommended under Cumulative Plus Project – Ag Housing conditions. • Operations after Implementation of Improvement: LOS D (AM and PM). • Responsibility for Improvement: The City of Salinas would be responsible for implementation of this improvement, as part of its typical maintenance schedule for signal operations.

8. Intersection 13 – North Main Street / Laurel Drive:

The level of service under PM conditions would be LOS F, compared to LOS F without the Project. Per the significance criteria in Section 1.6, the Project would result in a significant impact at this intersection.
• Recommendation: Implement the following:

1. Optimize the current intersection signal timing. This is the same improvement as previously recommended under Cumulative Plus Project – Ag Housing conditions. • Operations after Implementation of Improvement: LOS D (AM) and LOS F (PM). LOS F would continue to be a deficient condition. Cumulative impacts with and without the Project will be significant and unavoidable.
• Responsibility for Improvement: The City of Salinas would be responsible for implementation of this improvement, as part of its typical maintenance schedule for signal operations.

10.2.2 Pedestrian Circulation
Pedestrian activity is not anticipated to increase significantly under Cumulative Plus Project conditions as compared to Cumulative Without Project conditions. Therefore, the Project would not represent a significant impact to pedestrian circulation under Cumulative Plus Project conditions.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 42

10.2.3 Bicycle Circulation
Bicycle activity is not anticipated to increase significantly under Cumulative Plus Project conditions as compared to Cumulative Without Project conditions. Therefore, the Project would not represent a significant impact to bicycle circulation under Cumulative Plus Project conditions.

10.2.4 Transit Circulation
Transit demand from the Project is not anticipated to increase significantly under Cumulative Plus Project conditions. As such, the Project would not represent a significant cumulative impact to transit circulation.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 43
11 SITE ACCESS AND INTERNAL CIRCULATION
This section summarizes the site access and internal circulation analysis, including Project driveway operations, based on the site plan included as Exhibit 2.

11.1 Vehicle Circulation
The onsite parking areas have direct access to the West Rossi Street extension. All project site traffic would travel on the Rossi Street Extension, which is the future west leg of the North Davis Road / West Rossi Street intersection. This intersection will operate acceptably through Background Plus Project conditions with the improvements previously described in Section 3.3 of this report. It will continue to operate acceptably through Cumulative Plus Project conditions with the following lane configuration..

1. NB Davis: 2 lefts, 2 throughs, 1 right with a right turn overlap

2. SB Davis: 1 left, 2 throughs, 1 right

3. EB Rossi: 2 lefts, 1 through, 1 right

4. WB Rossi: 2 lefts, 1 through, 1 right
The project driveways on the West Rossi Street extension will all operate acceptably through Background Plus Project conditions. This is primarily due to the low cross traffic on West Rossi Street without the full westward extension of this roadway to Boronda Road.

Under Cumulative Plus Project conditions, the two eastbound Rossi Street left turns at Davis Road will each require approximately 425 feet of storage length. The westbound left turn lane into the driveway serving the south half of the project should be a minimum of 100 feet in length.

There will also b a 90-foot bay taper in the median between the eastbound left turn lane at Davis Road and the westbound left turn lane serving the project driveway. A total clear distance of about 615 feet should therefore be provided between the project driveway and Davis Road.

Driveways between the westerly main driveways should ultimately be limited to right turns in and out.

The bus loading area should accommodate bus geometrics, such as wide bus turning movements, and have a pavement section that can accommodate regular bus travel.

11.2 Pedestrian Circulation
A meandering trail is proposed along the North Davis Road frontage of the project site. This trail would be located within a 50-foot setback of the street. It would also connect to the existing sidewalk on North Davis Road north of the project site. This trail will provide good connectivity for pedestrians between the project site and the surrounding area. It is assumed that driveways will be provided within the Project and along Rossi Street to connect with the trail along the west side of North Davis Road.

11.3 Bicycle Circulation
It is recommended that on-site bicycle racks or other storage facilities be provided, per City of Salinas standards.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 44
12 VEHICLE MILES TRAVELED
This section summarizes the calculation of the total vehicle miles traveled by Project traffic.

Vehicle Miles Traveled (VMT) represents the total number of miles traveled per weekday by all vehicles while traveling to and from a Project site. VMT has been quantified for both project alternatives.

12.1 Ag Housing VMT
Exhibit 18A summarizes the total Vehicle Miles Traveled (VMT) for the ag employee housing project alternative. This alternative would house up to 1,200 workers. These are to be comprised of H-2A Visa farmworkers. They will be transported to and from a variety of agricultural fields throughout the Salinas Valley by buses and vanpools. The buses will have a seating capacity of 32 people per bus and the vans will have a seating capacity of 15 people per van. This would result in approximately 33 round-trip bus trips and 8 round-trip van trips, or 82 trips per day when shuttling employees to and from the fields. Assuming an average of 15 miles each way, a total of about 1,230 vehicle-miles-travelled (VMT) will be generated per day.

The buses would be stored at a location 6 miles away from the project site, adding an additional 66 daily trips to and from the site. The vans would be stored on the project site and would not generate additional trips beyond employee transportation. The buses will generate an estimated 400 VMT per day between the storage yard and project site. The total VMT for the ag employee housing project alternative will be about 1,630 miles per day.

By comparison, if these workers traveled by car to and from home and the work location, they would generate a much higher VMT. Assuming two persons per vehicle, 600 cars must travel between home and work, which is a total of 18,000 VMT each day.

The agricultural season, as estimated by the project applicant, spans about eight-and-a-half months, with a six-day work week, or roughly 200 days. The proposed project will annually generate about 326,000 VMT per year compared to 3,600,000 VMT per year if the employees drove themselves. The proposed project will save 3,274,000 VMT annually, with corresponding reductions in congestion, emissions and fuel consumption. There will also be reduced congestion and a lower risk exposure for vehicle collisions.

12.2 Apartment VMT
Exhibit 18B summarizes the total Vehicle Miles Traveled (VMT) for the apartment project alternative. The VMT was calculated using the project trip generation and project trip distribution, as well as the approximate distances between the project site and the destinations of the residents traveling to and from the project site. These distances and the percentage of project trips traveling to/from those locations are also shown on Exhibit 18B.

Per the publication Technical Advisory on Evaluating Transportation Impacts in CEQA, State of California Governor’s Office of Planning and Research, December 2018, VMT for apartments is measured in VMT per resident. The project would have an estimated VMT of 16.5 miles per resident. The project average trip length would be approximately 8.4 miles, slightly lower than Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 45
the regional average of 8.9 miles, per 2017 California Emissions Estimator Model (CalEEMod) data. Quantification of the regional average trip length can be found in Appendix P.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 46
13 SUMMARY OF PROJECT RESPONSIBILITIES
The following is a summary of the Project responsibilities regarding traffic issues and impacts, based upon the recommendations discussed earlier in this report.

It is important to note that the H2A project will reduce trips by replacing existing private automobile trips with bus trips at a much higher vehicle occupancy. The H2A project will also operate only 8 and a half months per year. It will have virtually no impacts during winter months. The analysis does not give credit for these unique project characteristics. The analysis assumes much more conservative Project peak hour trip generation rates identical to the recently constructed Casa Boronda H2A project. The work schedule anticipated by Project representatives would result in almost no project trips generated during street peak hours. Even with the conservative assumptions the H2A project alternative would result in de minimus impacts.

The potential future conversion of the Project to standard apartments is assumed to result in standard apartment trip generation rates. Travel demand management strategies cannot be implemented for this Project alternative.

1. Pay the TAMC Regional Development Impact Fee and the City of Salinas Traffic Fee Ordinance fee. Monterey County and City of Salinas staff will quantify the applicable fees to the Project at the time of development. The fees applicable to each project alternative will vary; hence, conversion of ag employee housing to apartments will require payment of additional fees.

2. Pay the County of Monterey Traffic Impact Fee, if adopted prior to approval of the Project by Monterey County. Monterey County staff will quantify the applicable fee to the Project at the time of development. The Project will not be responsible for the payment of a fee if one is not in place at the time of Project approval.

3. Implement the following at the North Davis Road / Rossi Street intersection for both project alternatives. These are required to add the west leg of Rossi Street. i. Modify the existing northbound Davis Road median to provide a northbound left turn lane.
ii. Modify the east leg of Rossi Street to provide a westbound through lane. iii. Add west leg as a part of the Rossi Street extension that will include one eastbound left turn lane and a through/right lane.
iv. Modify the existing traffic signal.
v. Preserve right-of-way on project site and project frontage for future improvements at the North Davis Road / West Rossi Street intersection to be made by the City of Salinas as part of the West Rossi Street extension to Blanco Road. These include the following.

1. NB Davis: 2 lefts, 2 throughs, 1 right with a right turn overlap

2. SB Davis: 1 left, 2 throughs, 1 right

3. EB Rossi: 2 lefts, 1 through, 1 right

4. WB Rossi: 2 lefts, 1 through, 1 right
Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 47

4. Implement the following improvements with the conversion of the project site to standard apartments. These are not required for the H2A project alternative. a. Add an eastbound right turn lane on West Market Street (State Route 183) at the Davis Road northbound ramps.
b. Implement the following for the North Davis Road / Calle Del Adobe – West Laurel Drive intersection:
i. Pay the Salinas TFO AND optimize the signal timing at this intersection.

Payment of the TFO constitutes the project’s contribution towards the construction of the Western Bypass (TFO Project 26).
c. Implement the following for the North Davis Road / Post Drive – Commercial Driveway intersection:
i. Pay the Salinas TFO, which constitutes the project’s contribution towards the construction of the Western Bypass.

5. The bus loading area should accommodate bus geometrics, such as wide bus turning movements, and have a pavement section that can accommodate regular bus travel.

6. Provide sidewalks or walkways on the project site that connect the project buildings to West Rossi Street, the proposed trail that will extend from the existing sidewalk near Boronda Meadows Elementary School along the entire project frontage.

7. The site plan does not indicate locations for bicycle racks or other storage facilities. It is recommended that these facilities be provided, per City of Salinas standards.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 48
14 REFERENCES

14.1 List of References

1. 2010 Highway Capacity Manual, Transportation Research Board, 2010.

2. 2000 Highway Capacity Manual, Transportation Research Board, 2000.

3. City of Salinas General Plan, Cotton/Bridges/Associates, September 2002.

4. Guide for the Preparation of Traffic Impact Studies, Monterey County Resource Management Agency – Department of Public Works, March 2014

5. Guide for the Preparation of Traffic Impact Studies, California Department of Transportation (Caltrans), December 2002.

6. The Draft West Area Specific Plan Transportation Impact Analysis, Fehr & Peers, June 2018 (West Area Specific Plan TIA).

7. The Regional Impact Fee Program Nexus Study Update 2018, Wood Rodgers, October 2018.

8. The City of Salinas Traffic Improvement Program – 2010 Update, Wood Rodgers, March 2010

9. Casa Boronda Agricultural Employee Housing Project, Keith Higgins Traffic Engineer, July 3, 2017.

10. Highway Design Manual, 6
th Edition, California Department of Transportation (Caltrans), November 20, 2017.

11. Transportation Agency for Monterey County Bicycle and Pedestrian Master Plan, Alta Planning + Design, December 2011.

12. Monterey-Salinas Transit web site, http://www.mst.org. Accessed July 18, 2019.

13. Trip Generation Manual, 10th Edition, Institute of Transportation Engineers, 2017.

14. California Manual on Uniform Traffic Control Devices, California Department of Transportation (Caltrans), April 2017.

15. Rodeo Property Traffic Impact Analysis, Mott MacDonald, June 12, 2019.

16. El Rancho Toro Agricultural Employee Housing Project Traffic Impact Analysis, Keith Higgins Traffic Engineer, June 6, 2019.

17. City of Salinas General Plan Circulation Element and Environmental Impact Report Traffic Study, Higgins Associates, June 11, 2002.

18. 2007 Monterey County General Plan Draft Environmental Impact Report, ICF Jones & Stokes, September 2008.

19. Google Maps, http://www.google.com/maps. Accessed October 18, 2019.

Keith Higgins Traffic Engineer
Quattrin Ranch Traffic Impact Analysis
Quattrin Report-Draft Page 49

20. Technical Advisory on Evaluating Transportation Impacts in CEQA, State of California Governor’s Office of Planning and Research, December 2018

14.2 List of Contacts

1. Vic Montgomery and Tim Walters, RRM Design Group, San Luis Obispo, California.

2. Andrew Easterling, City of Salinas Traffic Engineer, Salinas, California.

Basemap Source: Google Maps, 2019.
7 10
13 9
6 5 4 3 2 1
8 Project
Site
N
Legend:

X Study Intersections
12 11
Keith Higgins
Traffic Engineer
Exhibit 1
Project Location Map
and Study Area
WEST
ROSSI
STREET NORTH DAVIS ROAD NORTH DAVIS ROAD CIVIL SITE PLAN HARVEST MOON AGRICULTURAL EMPLOYEE HOUSING PROJECT SALINAS, CALIFORNIA Sheet 1 of 1 Civil Engineering Land Surveying 6 Harris Court Monterey, California 831.649.5225 whitsonengineers.com 2 / 2 4 / 2 0 Project No.:3970.00 Exhibit 2
Project Site Plan
Keith Higgins
Traffic Engineer
432(309)
21(37)0(0)0(0)360(360)210(388)
17(30) 247(229) 256(137)
1008(878) 1193(958) 1220(1239)
0(0) 0(0) 0(0)
210(442) 0(0) 0(0)
804(1343) 867(1428) 946(1429)
0(0) 289(389) 325(472) 0(0) 0(0) 0(0) 283(418) 1(3) 147(357) 0(0)0(0)0(0)
29(31)178(529)0(1)60(52)19(40)120(210)
294(527) 39(71) 91(174)
441(348) 249(175) 9(11)
845(724) 168(118) 60(106)
29(28) 0(6) 34(90)
284(327) 233(233) 28(29)
9(7) 164(85) 310(211) 23(12) 280(497) 809(1045) 111(100) 22(49) 17(42) 164(203)
987(1290)
12(16)
0(0)206(144)224(157)135(177)0(1)7(5)
130(225) 97(236) 3(4)
0(0) 315(285) 344(375)
595(428) 142(130) 98(89)
0(0) 140(227) 0(0)
0(0) 322(340) 451(813)
0(0) 264(126) 142(145) 0(0) 918(1282) 486(678) 113(166) 591(1230) 56(131) 154(85)
0(2)
174(164)
282(491)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 1160(1012) 1145(791)

9. Davis Road Southbound Ramps - Market Circle /
West Market Street (State Route 183) 2(0)
39(29)953(932)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 0(0)
0(0)0(0)

5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 3
Existing Conditions
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)579(506)174(222)83(217)209(181)
3(0) 236(264) 257(234)
346(388) 553(677) 293(215)
164(363) 129(78) 289(215)
1(1) 501(467) 107(194)
554(715) 647(628) 383(215)
97(270) 29(11) 97(60) 99(80) 1(0) 106(67) 40(34) 258(284) 70(150) 32(107)
406(931)346(235)
158(202)192(297)0(0)206(144)19(40)120(210)
88(168) 130(225) 91(174)
547(494) 0(0) 9(11)
132(160) 595(428) 60(106)
175(216) 0(0) 34(90)
389(611) 0(0) 28(29)
95(81) 0(0) 310(211) 71(138) 488(880) 112(184) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
736(835)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 359(257) 538(1074) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 3
Existing Conditions
AM & PM Peak Hour Volumes
(Page 2 of 2)
Existing Existing
N-S E-W Lane Intersection LOS Peak
Street Street Jurisdiction Configuration Control Standard Hour 1 Adams W Laurel SB 1-L, 1-R AM 16.6 B 16.6 B 16.7 B 22.6 C 22.7 C 22.9 C 47.7 D 47.7 D 47.7 D Street Drive EB 1-L, 2-T PM 15.2 B 15.4 B 15.5 B 22.0 C 22.3 C 22.5 C 21.3 C 21.6 C 21.8 C WB 1-T, 1-T/R
2 US 101 W Laurel NB 1-L, 1-L/T, 1-R AM 13.9 B 13.9 B 14.0 B 18.0 B 17.9 B 18.0 B 28.4 C 28.4 C 28.6 C Northbound Drive EB 2-T PM 17.9 B 18.0 B 18.1 B 22.1 C 22.3 C 22.5 C 20.6 C 20.7 C 20.9 C Ramps WB 1-T, 1-T/R
3 US 101 W Laurel SB 2-L, 1-R AM 10.1 B 10.1 B 10.2 B 12.9 A 13.0 B 13.2 B 14.9 B 14.9 B 15.6 B Southbound Drive EB 2-T PM 10.9 B 11.1 B 11.3 B 14.2 B 14.6 B 14.9 B 15.0 B 15.4 B 15.7 B Offramp WB 2-T
4 N Davis Calle Del NB 1-L, 2-T, 2-R AM 25.0 C 25.0 C 25.1 C 28.3 C 28.3 C 28.6 C 26.6 C 26.6 C 26.8 C Road Adobe - SB 2-L, 1-T, 1-T/R PM 39.7 D 40.8 D 42.0 D 54.4 D 56.1 E 58.2 E 53.6 D 54.2 D 55.2 E W Laurel EB 1-L, 1-T, 1-T/RDrive WB 2-L, 2-T, 1-R AM 28.3 C PM 54.6 DAM 25.3 C 26.8 CPM 44.5 D 53.4 D
5 Post Calle Del NB 1-L, 1-T/R AM 77.1/74.7 F/F 77.1/74.7 F/F 77.1/74.7 F/F 176.5/148.6 F/F 176.5/148.6 F/F 176.5/148.6 F/F 28.8/46.7 D/E 28.8/46.7 D/E 28.8/46.7 D/E Drive - Adobe SB 1-L/T, 1-R PM 21.9/26.5 C/D 21.9/26.5 C/D 21.9/26.5 C/D 27.5/34.5 D/D 27.5/34.5 D/D 27.5/34.5 D/D 34.7/72.0 D/F 34.7/72.0 D/F 34.7/72.0 D/F El Rancho EB 1-L, 1-T, 1-R
Way WB 1-L, 1-T, 1-R AM
PM
6 N Davis Post NB 1-L, 2-T, 1-T/R AM 43.4 D 43.4 D 43.7 D 56.0 E 56.1 E 56.7 E 47.3 D 47.4 D 47.5 D Road Drive - SB 1-L, 2-T, 1-R PM 44.3 D 44.9 D 45.6 D 61.2 E 62.9 E 65.1 E 37.6 D 37.9 D 38.2 D Commercial EB 1-L, 1-L/T, 1-RDriveway WB 1-L/T, 1-R AM 56.0 E PM 61.4 E
AM 29.9 CPM 28.8 C
7 N Davis W Rossi NB 2-T, 1-R AM 17.7 B 29.8 C 30.7 C 22.9 C 37.2 D 38.0 D 52.2 D 52.8 D 59.0 E Road Street SB 1-L, 2-T PM 22.9 C 35.3 D 35.4 D 34.9 C 51.7 D 51.9 D 88.8 F 94.7 F 95.7 F WB 2-L, 1-R
AM 52.3 DPM 89.2 F
AM 30.6 C 32.3 CPM 38.2 D 40.2 D
8 N Main Rossi NB 1-L, 2-T, 1-R AM 44.0 D 44.0 D 44.9 D 58.9 E 59.0 E 60.1 E 66.0 E 66.1 E 67.4 E Street Street SB 1-L, 2-T, 1-R PM 41.7 D 41.8 D 42.1 D 54.8 D 55.1 E 55.3 E 70.3 E 71.3 E 71.6 E (State Route EB 2-L, 1-T, 1-R
183) WB 1-L, 1-T, 1-R AM 44.0 D 58.9 E 66.0 E
PM 41.8 D 54.9 D 70.5 E
AM 32.4 C 38.9 D 41.6 DPM 34.0 C 41.8 D 42.4 D
9 Davis W Market NB 1-L/T, 1-R AM 17.1 B 17.2 B 17.2 B 18.8 B 18.8 B 18.8 B 22.4 C 22.4 C 22.4 C Road Street SB 1-L/T/R PM 20.9 C 21.0 C 21.1 C 25.1 C 25.3 C 25.4 C 35.2 D 35.9 D 36.0 D Southbound (State Route EB 1-L, 1-T, 1-T/R
Ramps - 183) WB 1-L, 1-T, 1-T/R AM 22.4 C
Market PM 35.3 D
Circle AM 19.5 B
PM 23.3 C
With Improvement
Caltrans Signal C-D
With Improvement
Caltrans
City of
Salinas
With TDM Measures
With TDM MeasuresWith TDM Measures
With TDM Measures
With TDM Measures
LOS
City of
Salinas Signal D
With Improvement
Caltrans Signal C-D
City of
Salinas
C-D
Two-Way
Stop E/E
With Improvement
Signal D
With Improvement
With Improvement
D
SignalSignal
Delay
Monterey
County
C-D
Cumulative
Plus Project (Apt)
Conditions
Delay LOS
Cumulative
Without Project
Conditions
Delay LOS
Cumulative
Plus Project (Ag)
Conditions
Delay LOS
Background
Conditions
Background
Plus Project (Apt)
Conditions
Delay LOS Delay LOS
Background
Plus Project (Ag)
Conditions
Delay
Existing Plus
Project (Apt)
Conditions
LOS
Existing
Conditions
Signal
LOS
D
Delay
City of
Salinas
Caltrans
Existing Plus
Project (Ag)
Conditions
Delay LOS
Keith HigginsTraffic Engineer
Exhibit 4A
Intersection
Levels of Service
(Page 1 of 2)
Existing Existing
N-S E-W Lane Intersection LOS Peak
Street Street Jurisdiction Configuration Control Standard Hour 10 Davis W Market NB 1-L/T, 1-R AM 20.6 C 20.7 C 20.8 C 23.3 C 23.4 C 23.4 C 25.5 C 25.5 C 25.8 C Road Street SB 1-L/T/R PM 37.6 D 38.4 D 38.5 D 53.5 D 54.7 D 54.9 D 61.6 E 63.3 E 63.5 E Northbound (State Route EB 1-L, 1-T, 1-T/R
Ramps - 183) WB 1-L, 1-T, 1-T/R AM 20.7 C 23.4 C 25.5 C Private PM 37.7 D 53.6 D 61.8 E
Driveway AM 17.8 B 19.0 B 19.3 B
PM 24.7 C 27.8 C 26.3 C
11 Davis Blanco NB 1-L, 1-T, 1-T/R AM 32.5 C 32.5 C 33.0 C 37.2 D 37.2 D 37.3 D 357.2 F 357.2 F 356.8 F Road Road SB 1-L, 1-T, 1-R PM 37.8 D 38.5 D 38.6 D 46.7 D 47.8 D 47.9 D 239.8 F 240.1 F 240.2 F EB 2-L, 1-T, 1-T/R
WB 1-L, 2-T, 1-R AM 357.2 F
PM 239.8 F
WB AM 73.7 E
PM 111.9 F
12 N Main Alvin NB 1-L, 2-T, 1-T/R AM 35.3 D 35.3 D 35.6 D 43.2 D 43.2 D 43.5 D 35.8 D 35.8 D 36.1 D Street Drive SB 2-L, 3-T, 1-R PM 29.1 C 29.2 C 29.2 C 34.7 C 34.8 C 34.8 C 64.3 E 65.0 E 65.0 E EB 1-L, 2-T, 1-R
WB 1-L, 1-T, 1-R AM 35.8 D
PM 64.4 E
WB AM 35.5 D
PM 39.2 D
13 N Main Laurel NB 2-L, 2-T, 1-R AM 29.9 C 29.9 C 30.1 C 34.4 C 34.4 C 34.7 C 38.2 D 38.2 D 38.7 D Street Drive SB 2-L, 2-T, 1-T/R PM 37.5 D 37.6 D 37.8 D 45.7 D 45.9 D 46.1 D 259.3 F 259.6 F 260.3 F EB 1-L, 1-T, 1-T/R
WB 1-L, 1-T, 1-T/R AM 38.2 D
PM 259.5 F
WB AM 38.4 D
PM 185.0 F
Notes:

1. L, T, R = Left, Through, Right. 5. Analysis performed using 2010 and 2000 Highway Capacity Manual methodologies.2. NB, SB, EB, WB = Left, Through, Right, Northbound, Southbound, Eastbound, Westbound. 6. Level of service calculations can be found in Appendices E, G - H, and J - O.3. Overall Caltrans level of service standard is the transition between LOS C and LOS D, abbreviated as "LOS C-D". 7. LOS highlighted in red indicates intersection operating below level of service standard.

City of Salinas and Monterey County overall levels of service standard is LOS D. Side-street standard is assumed as LOS E. 8. LOS with a thick black border represents a significant impact. Resulting levels of service with

4. For signalized intersection analysis, delay is average overall delay in seconds per vehicle (sec/veh). For one- and two-way stop intersections, recommended improveme recommended improvements noted under "With Improvements". A list of applied improvements delays are side-street approach operations, also in seconds per vehicle (sec/veh). can be found on Exhibit 4B.

9. Transportation Demand Management (TDM) measures include bussing and vanpools for ag employees.

With ImprovementWith Improvement
With TDM Measures
With TDM Measures
With TDM Measures
With Improvement
City of
Salinas Signal D
With Improvement
City of
Salinas Signal D
Caltrans Signal C-D
Monterey
County Signal D
With TDM Measures
LOS Delay LOS Delay LOS Delay
Cumulative
Without Project
Conditions
Cumulative
Plus Project (Ag)
Conditions
Cumulative
Plus Project (Apts)
Conditions
Delay LOS Delay LOS Delay LOS Delay
Existing
Conditions
Existing Plus
Project (Ag)
Conditions
Existing Plus
Project (Apts)
Conditions
Background
Conditions
Background
Plus Project (Ag)
Conditions
Background
Plus Project (Apts)
Conditions
LOS Delay LOS Delay LOS
Keith HigginsTraffic Engineer
Exhibit 4A
Intersection
Levels of Service
(Page 2 of 2)
Existing
N-S E-W Intersection
Street Street Control
1 Adams W Laurel
Street Drive
2 US 101 W Laurel
Northbound Drive
Ramps
3 US 101 W Laurel
Southbound Drive
Offramp
4 N Davis Calle Del
Road Adobe -
W Laurel
Drive
5 Post Calle Del
Drive - Adobe
El Rancho
Way
6 N Davis Post
Road Drive -
Commercial
Driveway
7 N Davis W Rossi
Road Street
8 N Main Rossi
Street Street
(State Route
183)
9 Davis W Market
Road Street
Southbound (State Route
Ramps 183)
Existing
Plus Project (Apts)
Conditions
Background
Plus Project (Apts)
Conditions
Cumulative
Plus Project (Ag)
Conditions
None Required
None Required
None Required
None Required
None Required
None Required
None Required None Required
None Required None Required
None Required None Required
None Required None Required

1. Add 3rd WB L and
3rd Receiving Lane on
N Davis Leaving
Intersection;
OR
2a. Implement
Western Bypass (TFO 26)
2b. Optimize
Signal Timing
1a. Restripe EB as
1-L, 1-T, 1-R
1b. Convert EB/WB left
turn
signal phasing
to permitted phasing;
OR

2. Implement
Western Bypass
None Required
None Required
Optimize Signal Timing
Signal
None Required None Required None Required None Required None Required a. Add 2nd EB L
b. Add EB R
c. Add SB R
d. Add NB RTO Signal
Phase
Signal
None Required None Required
Add 3rd NB T,
3rd SB T
(TFO 31)
Signal
a. Add NB L
b. Add WB T
c. Add EB with 1-
L, 1-T/R
Same as Existing Plus
Project (Ag)
Same as Existing Plus
Project (Ag)
Add 3rd NB T,
3rd SB T
(TFO 31)
Add 3rd NB T,
3rd SB T
(TFO 31)
Same as Existing Plus
Project (Ag)
a. Add 2nd EB L
b. Add EB R
c. Add SB R
d. Add NB RTO Signal
Phase
None Required
Signal
Signal
Signal
None Required
None Required
None Required
Signal
Signal
None Required
None Required
Two-Way
Stop
None Required
None Required
None Required
None Required None Required
Background
Plus Project (Ag)
Conditions
None Required
None Required
None Required
None Required
Existing
Plus Project (Ag)
Conditions
Cumulative
Plus Project (Apts)
Conditions
None Required
None Required
Optimize Signal Timing
None Required
Keith Higgins
Traffic Engineer
Exhibit 4B
Recommended
Intersection Improvements
(Page 1 of 2)
This page intentionally blank
Existing
N-S E-W Intersection
Street Street Control
10 Davis W Market
Road Street
Northbound (State Route
Ramps 183)
11 S Davis Blanco
Road Road
12 N Main Alvin
Street Drive
13 N Main Laurel
Street Drive
Notes:

1. L, T, R = Left, Through, Right.2. NB, SB, EB, WB = Northbound, Southbound, Eastbound, Westbound.3. RTO = Right Turn Overlap Signal Phase Cumulative
Plus Project (Ag)
Conditions
Optimize Signal Timing
Signal
None Required None Required None Required None Required None Required a. Add 2nd NB L, NB R
b. Add 2nd SB T
c. Add EB R
d. Add 2nd WB L
(TFO 73)
Signal
None Required None Required Optimize Signal Timing
Siignal
None Required None Required None Required
None Required
None RequiredNone Required
None RequiredNone Required
Signal
None Required Add EB R Add EB R Add EB R None Required None Required Existing
Plus Project (Ag)
Conditions
Background
Plus Project (Apts)
Conditions
Cumulative
Plus Project (Apts)
Conditions
Existing
Plus Project (Apts)
Conditions
Background
Plus Project (Ag)
Conditions
Keith HigginsTraffic Engineer
Exhibit 4B
Recommended
Intersection Improvements
(Page 2 of 2)
A. Project Trip Rates
PEAK % PEAK %
DAILY HOUR OF % % HOUR OF % %

REFERENCE USE TRIPS TRIPS ADT IN OUT TRIPS ADT IN OUT
Casa Boronda Ag. Employee Housing
Driveway Count1 600 beds N.A. 4 3 1 43 22 21
Trip Rates (per employee):2 0.288 0.007 75% 25% 0.072 51% 49% B. Project Trip Generation
PEAK % PEAK %

DAILY HOUR OF TRIPS TRIPS HOUR OF TRIPS TRIPS

PROPOSED USE TRIPS TRIPS ADT IN OUT TRIPS ADT IN OUT
Agricultural Employee Housing 1,200 beds 346 8 2% 6 2 86 25% 44 42 Raw (Peak Hour) Total (used in analysis): 346 8 6 2 86 44 42 Annual Average Total: 245 6 4 2 61 31 30
With TDM Work Schedule:5 49 1 1 0 12 6 6
Notes:

1. AM and PM peak hour traffic at Casa Boronda was collected Tuesday, April 16, 2019. This data can be found in Appendix C.

2. Daily trip rate derived by assuming that PM peak rate is 25% of the daily trip rate.

3. Estimated trip generation for Casa Boronda project cited from Casa Boronda Agricultural Employee Housing Project Traffic Impact Analysis, Keith Higgins Traffic Engineer, July 3, 2017.

4. Seasonal adjustment reflects that project is open for just 8.5 months of the year (i.e., approximately 71% of a year).

5. Project Traffic Demand Management (TDM) program proposes use of employee buses and vans largely outside of AM and PM peak hours.

A. Project Trip Rates
DAILY PEAK % PEAK %
TRIP HOUR OF %% HOUR OF %%

TRIP GENERATION RATES RATE RATE ADT IN OUT RATE ADT IN OUT Multifamily Housing (Low-Rise) (per unit) 7.32 0.46 6% 23% 77% 0.56 8% 63% 37% B. Project Trip Generation
PEAK % PEAK %

DAILY HOUR OF TRIPS TRIPS HOUR OF TRIPS TRIPS

PROPOSED USE TRIPS TRIPS ADT IN OUT TRIPS ADT IN OUT
Apartments 200 units 1,464 92 6% 21 71 112 8% 71 41
Total:

Notes:

1. Trip generation rates published by Institute of Transportation Engineers (ITE), Trip Generation Manual, 10th Edition, 2017.

2. sq. ft. = square feet

PROJECT
SIZE
220

AM PEAK HOUR PM PEAK HOUR

AM PEAK HOUR PM PEAK HOUR
ITE

LAND USE
CODE

ALTERNATIVE PROPOSED PROJECT - APARTMENTS
Quatrrin Agricultural Employee Housing Trip Generation

AM PEAK HOUR PM PEAK HOUR

AM PEAK HOUR PM PEAK HOUR

PROPOSED PROJECT - AGRICULTURAL EMPLOYEE HOUSING
SIZE

PROJECT
SIZE

EXISTING
Keith Higgins
Traffic Engineer
Exhibit 5
Project Trip Generation
Basemap Source: Google Maps, 2019.
8 11
13 10
7 4 3 2 1
9 Project
Site
N 10%
15%
33%
10%
3%
2%
5 10%
5%
5%
8%
5% 12
15%
LEGEND
Study Intersection Number
Project Trip Distribution
Percentage
X%
X 35%
10%
15%
4% 3%
3% 6
4%
4%
Keith Higgins
Traffic Engineer
Exhibit 6
Project Trip Distribution
(Ag Employee Housing)
0(1)
0(0)0(0)0(0)1(5)0(0)
0(0) 0(0) 0(0)
0(4) 0(5) 0(7)
0(0) 0(0) 0(0)
0(1) 0(0) 0(0)
0(3) 0(4) 0(8)
0(0) 0(4) 0(2) 0(0) 0(0) 0(0) 0(2) 0(0) 0(0)
0(0)0(0)0(0)
0(0)0(0)0(0)0(0)0(0)0(0)
0(0) 0(0) 0(0)
0(0) 0(0) 0(0)
1(12) 0(0) 0(1)
0(0) 0(0) 0(0)
0(0) 0(0) 0(0)
0(0) 0(0) 0(0) 0(0) 0(1) 0(10) 0(0) 0(0) 0(0)
0(0)
0(11)
0(1)
1(14)0(0)0(0)0(0)0(0)0(0)
0(0) 0(0) 0(0)
1(7) 1(5) 0(0)
0(0) 0(0) 0(0)
0(12) 0(0) 0(0)
0(6) 0(4) 1(6)
2(24) 0(2) 0(0) 4(23) 0(0) 0(0) 0(2) 0(0) 0(0)
1(7)0(0)0(1)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 0(1)0(0)1(13)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
0(0)0(0)0(0)
W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 7
Project Trip Assignment
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
0(0)1(7)0(4)0(1)0(0)
0(0) 1(5) 0(0)
0(0) 0(0) 0(0)
0(1) 0(0) 0(1)
0(0) 1(6) 0(1)
0(1) 0(0) 0(0)
1(6) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 1(5) 0(0)
0(0)0(1)0(1)
0(2)0(0)0(0)206(144)19(40)120(210)
0(0) 130(225) 91(174)
0(2) 0(0) 9(11)
0(0) 595(428) 60(106)
0(1) 0(0) 34(90)
0(2) 0(0) 28(29)
0(0) 0(0) 310(211) 0(0) 0(0) 0(0) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 0(0) 0(4) 0(1)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
0(0)1160(1012)953(932)
S Davis Rd
Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 7
Project Trip Assignment
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 2 of 2)
432(310)
21(37)0(0)0(0)361(365)210(388)
17(30) 247(229) 256(137)
1008(882) 1193(963) 1220(1246)
0(0) 0(0) 0(0)
210(443) 0(0) 0(0)
804(1346) 867(1432) 946(1437)
0(0) 289(393) 325(474) 0(0) 0(0) 0(0) 283(420) 1(3) 147(357) 0(0)0(0)0(0)
29(31)178(529)0(1)60(52)19(40)120(210)
294(527) 39(71) 91(174)
441(348) 249(175) 9(11)
846(736) 168(118) 60(107)
29(28) 0(6) 34(90)
284(327) 233(233) 28(29)
9(7) 164(85) 310(211) 23(12) 280(498) 809(1055) 111(100) 22(49) 17(42) 164(203)
987(1301)
12(17)
1(14)206(144)224(157)135(177)0(1)7(5)
130(225) 97(236) 3(4)
1(7) 316(290) 344(375)
595(428) 142(130) 98(89)
0(12) 140(227) 0(0)
0(6) 322(344) 452(819)
2(24) 264(128) 142(145) 4(23) 918(1282) 486(678) 113(168) 591(1230) 56(131) 155(92)
0(2)
174(165)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 282(492)39(29)954(945)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
1160(1012)1145(791)2(0)
W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 8
Existing Plus Project Conditions
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)580(513)174(226)83(218)209(181)
3(0) 237(269) 257(234)
346(388) 553(677) 293(215)
164(364) 129(78) 289(216)
1(1) 502(473) 107(195)
554(716) 647(628) 383(215)
98(276) 29(11) 97(60) 99(80) 1(0) 106(67) 40(34) 259(289) 70(150) 32(107)
406(932)346(236)
158(204)192(297)0(0)206(144)19(40)120(210)
88(168) 130(225) 91(174)
547(496) 0(0) 9(11)
132(160) 595(428) 60(106)
175(217) 0(0) 34(90)
389(613) 0(0) 28(29)
95(81) 0(0) 310(211) 71(138) 488(880) 112(184) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 359(261) 538(1075)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
736(835)1160(1012)953(932)
S Davis Rd
Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 8
Existing Plus Project Conditions
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 2 of 2)
Basemap Source: Google Maps, 2019.
8 11
13 10
7 4 3 2 1
9 Project
Site
N 15%
15%
48%
10%
4%
2%
5 5%
5%
10%
10%
6% 12
10%
LEGEND
Study Intersection Number
Project Trip Distribution
Percentage
X%
X 25%
10%
10%
5% 5%
3% 6
5%
5%
Keith Higgins
Traffic Engineer
Exhibit 9
Project Trip Distribution
(Apartments)
0(3)
0(0)0(0)0(0)3(10)0(0)
0(0) 0(0) 0(0)
3(8) 3(11) 5(18)
0(0) 0(0) 0(0)
3(2) 0(0) 0(0)
8(5) 11(7) 21(13)
0(0) 10(6) 7(4) 0(0) 0(0) 0(0) 2(7) 0(0) 0(0)
0(0)0(0)0(0)
0(0)0(0)0(0)0(0)0(0)0(0)
0(0) 0(0) 0(0)
0(0) 0(0) 0(0)
8(28) 0(0) 1(2)
0(0) 0(0) 0(0)
0(0) 0(0) 0(0)
0(0) 0(0) 0(0) 0(0) 4(2) 28(17) 0(0) 0(0) 0(0)
0(0)
32(19)
2(1)
10(34)0(0)0(0)0(0)0(0)0(0)
0(0) 0(0) 0(0)
3(11) 2(7) 0(0)
0(0) 0(0) 0(0)
34(20) 0(0) 0(0)
11(6) 7(4) 2(7)
26(15) 4(2) 0(0) 8(26) 0(0) 0(0) 1(4) 0(0) 0(0)
7(4)0(0)1(1)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 1(4)0(0)9(32)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
0(0)0(0)0(0)
W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 10
Project Trip Assignment
Apartments
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
0(0)7(4)7(4)0(2)0(0)
0(0) 2(7) 0(0)
0(0) 0(0) 0(1)
1(1) 0(0) 1(2)
0(0) 2(7) 2(1)
1(1) 0(0) 1(1)
2(7) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 1(4) 0(0)
0(0)2(2)2(1)
2(4)0(0)0(0)206(144)19(40)120(210)
0(0) 130(225) 91(174)
1(4) 0(0) 9(11)
0(0) 595(428) 60(106)
4(3) 0(0) 34(90)
4(2) 0(0) 28(29)
0(0) 0(0) 310(211) 0(0) 0(0) 0(0) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 0(0) 4(2) 1(2)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
0(0)1160(1012)953(932)
S Davis Rd
Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 10
Project Trip Assignment
Apartments
AM & PM Peak Hour Volumes
(Page 2 of 2)
432(312)
21(37)0(0)0(0)363(370)210(388)
17(30) 247(229) 256(137)
1011(886) 1196(969) 1225(1257)
0(0) 0(0) 0(0)
213(444) 0(0) 0(0)
812(1348) 878(1435) 967(1442)
0(0) 299(395) 332(476) 0(0) 0(0) 0(0) 285(425) 1(3) 147(357) 0(0)0(0)0(0)
29(31)178(529)0(1)60(52)19(40)120(210)
294(527) 39(71) 91(174)
441(348) 249(175) 9(11)
853(752) 168(118) 61(108)
29(28) 0(6) 34(90)
284(327) 233(233) 28(29)
9(7) 164(85) 310(211) 23(12) 284(499) 837(1062) 111(100) 22(49) 17(42) 164(203)
1019(1309)
14(17)
10(34)206(144)224(157)135(177)0(1)7(5)
130(225) 97(236) 3(4)
3(11) 317(292) 344(375)
595(428) 142(130) 98(89)
34(20) 140(227) 0(0)
11(6) 329(344) 453(820)
26(15) 268(128) 142(145) 8(26) 918(1282) 486(678) 114(170) 591(1230) 56(131) 161(89)
0(2)
175(165)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 283(495)39(29)962(964)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
1160(1012)1145(791)2(0)
W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 11
Existing Plus Project Conditions
Apartments
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)586(510)181(226)83(219)209(181)
3(0) 238(271) 257(234)
346(388) 553(677) 293(216)
165(364) 129(78) 290(217)
1(1) 503(474) 109(195)
555(716) 647(628) 384(216)
99(277) 29(11) 97(60) 99(80) 1(0) 106(67) 40(34) 259(288) 70(150) 32(107)
408(933)348(236)
160(206)192(297)0(0)206(144)19(40)120(210)
88(168) 130(225) 91(174)
548(498) 0(0) 9(11)
132(160) 595(428) 60(106)
179(219) 0(0) 34(90)
393(613) 0(0) 28(29)
95(81) 0(0) 310(211) 71(138) 488(880) 112(184) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 363(259) 539(1076)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
736(835)1160(1012)953(932)
S Davis Rd
Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 11
Existing Plus Project Conditions
Apartments
AM & PM Peak Hour Volumes
(Page 2 of 2)
475(340)
23(41)0(0)0(0)396(396)231(427)
19(33) 272(252) 282(151)
1109(966) 1312(1054) 1342(1363)
0(0) 0(0) 0(0)
231(486) 0(0) 0(0)
884(1477) 954(1571) 1041(1572)
0(0) 318(428) 358(519) 0(0) 0(0) 0(0) 311(460) 1(3) 162(393) 0(0)0(0)0(0)
32(34)196(582)0(1)66(57)21(44)132(231)
323(580) 43(78) 100(191)
485(383) 274(193) 10(12)
930(796) 185(130) 66(117)
32(31) 0(7) 37(99)
312(360) 256(256) 31(32)
10(8) 180(94) 341(232) 25(13) 308(547) 890(1150) 122(110) 24(54) 19(46) 180(223)
1086(1419)
13(18)
0(0)227(158)246(173)149(195)0(1)7(5)
143(248) 107(260) 3(4)
0(0) 347(314) 378(413)
655(471) 156(143) 108(98)
0(0) 154(250) 0(0)
0(0) 354(374) 496(894)
0(0) 290(139) 156(160) 0(0) 1010(1410) 535(746) 124(183) 650(1353) 62(144) 169(94)
0(2)
191(180)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
1276(1113)1260(870)2(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 310(540)43(32)1048(1025)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0) W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 12
Background Conditions
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)637(557)191(244)91(239)230(199)
3(0) 260(290) 283(257)
381(427) 608(745) 322(237)
180(399) 142(86) 318(237)
1(1) 551(514) 118(213)
609(787) 712(691) 421(237)
107(297) 32(12) 107(66) 109(88) 1(0) 117(74) 44(37) 284(312) 77(165) 35(118)
447(1024)
381(259)
174(222)211(327)0(0)206(144)19(40)120(210)
97(185) 130(225) 91(174)
602(543) 0(0) 9(11)
145(176) 595(428) 60(106)
193(238) 0(0) 34(90)
428(672) 0(0) 28(29)
105(89) 0(0) 310(211) 78(152) 537(968) 123(202) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
810(919)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 395(283) 592(1181) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 12
Background Conditions
AM & PM Peak Hour Volumes
(Page 2 of 2)
475(341)
23(41)0(0)0(0)397(401)231(427)
19(33) 272(252) 282(151)
1109(970) 1312(1059) 1342(1370)
0(0) 0(0) 0(0)
231(487) 0(0) 0(0)
884(1480) 954(1575) 1041(1580)
0(0) 318(432) 358(521) 0(0) 0(0) 0(0) 311(462) 1(3) 162(393) 0(0)0(0)0(0)
32(34)196(582)0(1)66(57)21(44)132(231)
323(580) 43(78) 100(191)
485(383) 274(193) 10(12)
931(808) 185(130) 66(118)
32(31) 0(7) 37(99)
312(360) 256(256) 31(32)
10(8) 180(94) 341(232) 25(13) 308(548) 890(1160) 122(110) 24(54) 19(46) 180(223)
1086(1430)
13(19)
1(14)227(158)246(173)149(195)0(1)7(5)
143(248) 107(260) 3(4)
1(7) 348(319) 378(413)
655(471) 156(143) 108(98)
0(12) 154(250) 0(0)
0(6) 354(378) 497(900)
2(24) 290(141) 156(160) 4(23) 1010(1410) 535(746) 124(185) 650(1353) 62(144) 170(101)
0(2)
191(181)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
1276(1113)1260(870)2(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 310(541)43(32)1049(1038)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0) W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 13
Background Plus Project Conditions
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)638(564)191(248)91(240)230(199)
3(0) 261(295) 283(257)
381(427) 608(745) 322(237)
180(400) 142(86) 318(238)
1(1) 552(520) 118(214)
609(788) 712(691) 421(237)
108(303) 32(12) 107(66) 109(88) 1(0) 117(74) 44(37) 285(317) 77(165) 35(118)
447(1025)
381(260)
174(224)211(327)0(0)206(144)19(40)120(210)
97(185) 130(225) 91(174)
602(545) 0(0) 9(11)
145(176) 595(428) 60(106)
193(239) 0(0) 34(90)
428(674) 0(0) 28(29)
105(89) 0(0) 310(211) 78(152) 537(968) 123(202) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
810(919)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 395(287) 592(1182) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 13
Background Plus Project Conditions
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 2 of 2)
475(343)
23(41)0(0)0(0)399(406)231(427)
19(33) 272(252) 282(151)
1112(974) 1315(1065) 1347(1381)
0(0) 0(0) 0(0)
234(488) 0(0) 0(0)
892(1482) 965(1578) 1062(1585)
0(0) 328(434) 365(523) 0(0) 0(0) 0(0) 313(467) 1(3) 162(393) 0(0)0(0)0(0)
32(34)196(582)0(1)66(57)21(44)132(231)
323(580) 43(78) 100(191)
485(383) 274(193) 10(12)
938(824) 185(130) 67(119)
32(31) 0(7) 37(99)
312(360) 256(256) 31(32)
10(8) 180(94) 341(232) 25(13) 312(549) 918(1167) 122(110) 24(54) 19(46) 180(223)
1118(1438)
15(19)
10(34)227(158)246(173)149(195)0(1)7(5)
143(248) 107(260) 3(4)
3(11) 349(321) 378(413)
655(471) 156(143) 108(98)
34(20) 154(250) 0(0)
11(6) 361(378) 498(901)
26(15) 294(141) 156(160) 8(26) 1010(1410) 535(746) 125(187) 650(1353) 62(144) 176(98)
0(2)
192(181)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
1276(1113)1260(870)2(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 311(544)43(32)1057(1057)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0) W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 14
Background Plus Project Conditions
Apartments
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)644(561)198(248)91(241)230(199)
3(0) 262(297) 283(257)
381(427) 608(745) 322(238)
181(400) 142(86) 319(239)
1(1) 553(521) 120(214)
610(788) 712(691) 422(238)
109(304) 32(12) 107(66) 109(88) 1(0) 117(74) 44(37) 285(316) 77(165) 35(118)
449(1026)
383(260)
176(226)211(327)0(0)206(144)19(40)120(210)
97(185) 130(225) 91(174)
603(547) 0(0) 9(11)
145(176) 595(428) 60(106)
197(241) 0(0) 34(90)
432(674) 0(0) 28(29)
105(89) 0(0) 310(211) 78(152) 537(968) 123(202) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
810(919)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 399(285) 593(1183) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 14
Background Plus Project Conditions
Apartments
AM & PM Peak Hour Volumes
(Page 2 of 2)
600(290)
30(40)0(0)0(0)440(410)263(486)
20(30) 305(264) 328(147)
1138(986) 1433(1012) 1355(1435)
0(0) 0(0) 0(0)
210(480) 0(0) 0(0)
885(1430) 968(1542) 1045(1596)
0(0) 340(540) 310(480) 0(0) 0(0) 0(0) 250(570) 0(0) 127(369) 0(0)0(0)0(0)
20(40)170(660)0(1)66(57)48(38)132(231)
320(620) 43(78) 100(191)
480(550) 227(362) 10(12)
1015(675) 190(140) 66(117)
30(50) 0(7) 79(84)
220(400) 144(323) 31(32)
20(20) 73(48) 174(123) 20(30) 333(596) 965(1016) 65(64) 24(54) 20(50) 242(134)
839(1367)
13(18)
246(377)163(116)201(192)126(162)0(1)7(5)
228(211) 111(285) 3(4)
373(113) 391(372) 534(649)
412(419) 136(113) 88(83)
301(453) 164(334) 0(0)
292(109) 378(423) 673(1069)
139(197) 236(156) 128(141) 120(209) 540(790) 335(651) 161(252) 715(1349) 73(93) 139(79)
0(2)
157(153)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
675(644)1295(872)2(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 295(533)43(32)1110(914)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0) W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 15
Cumulative Without Project Conditions
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)760(579)210(280)140(236)216(195)
3(0) 250(320) 264(248)
536(662) 640(800) 310(190)
148(338) 290(350) 300(220)
1(1) 589(551) 146(234)
752(976) 620(640) 330(210)
84(251) 340(330) 140(60) 89(74) 1(0) 95(62) 590(300) 279(371) 250(730) 40(120)
620(1392)
320(250)
143(82)180(480)0(0)206(144)19(40)120(210)
100(620) 130(225) 91(174)
609(610) 0(0) 9(11)
160(620) 595(428) 60(106)
222(124) 0(0) 34(90)
518(800) 0(0) 28(29)
90(110) 0(0) 310(211) 80(160) 688(1078) 140(940) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
962(825)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 410(259) 745(1425) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 15
Cumulative Without Project Conditions
AM & PM Peak Hour Volumes
(Page 2 of 2)
600(291)
30(40)0(0)0(0)441(415)263(486)
20(30) 305(264) 328(147)
1138(990) 1433(1017) 1355(1442)
0(0) 0(0) 0(0)
210(481) 0(0) 0(0)
885(1433) 968(1546) 1045(1604)
0(0) 340(544) 310(482) 0(0) 0(0) 0(0) 250(572) 0(0) 127(369) 0(0)0(0)0(0)
20(40)170(660)0(1)66(57)48(38)132(231)
320(620) 43(78) 100(191)
480(550) 227(362) 10(12)
1016(687) 190(140) 66(118)
30(50) 0(7) 79(84)
220(400) 144(323) 31(32)
20(20) 73(48) 174(123) 20(30) 333(597) 965(1026) 65(64) 24(54) 20(50) 242(134)
839(1378)
13(19)
247(391)163(116)201(192)126(162)0(1)7(5)
228(211) 111(285) 3(4)
374(120) 392(377) 534(649)
412(419) 136(113) 88(83)
301(465) 164(334) 0(0)
292(115) 378(427) 674(1075)
141(221) 236(158) 128(141) 124(232) 540(790) 335(651) 161(254) 715(1349) 73(93) 140(86)
0(2)
157(154)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
675(644)1295(872)2(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 295(534)43(32)1111(927)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0) W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 16
Cumulative Plus Project Conditions
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)761(586)210(284)140(237)216(195)
3(0) 251(325) 264(248)
536(662) 640(800) 310(190)
148(339) 290(350) 300(221)
1(1) 590(557) 146(235)
752(977) 620(640) 330(210)
85(257) 340(330) 140(60) 89(74) 1(0) 95(62) 590(300) 280(376) 250(730) 40(120)
620(1393)
320(251)
143(84)180(480)0(0)206(144)19(40)120(210)
100(620) 130(225) 91(174)
609(612) 0(0) 9(11)
160(620) 595(428) 60(106)
222(125) 0(0) 34(90)
518(802) 0(0) 28(29)
90(110) 0(0) 310(211) 80(160) 688(1078) 140(940) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
962(825)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 410(263) 745(1426) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 16
Cumulative Plus Project Conditions
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 2 of 2)
600(293)
30(40)0(0)0(0)443(420)263(486)
20(30) 305(264) 328(147)
1141(994) 1436(1023) 1360(1453)
0(0) 0(0) 0(0)
213(482) 0(0) 0(0)
893(1435) 979(1549) 1066(1609)
0(0) 350(546) 317(484) 0(0) 0(0) 0(0) 252(577) 0(0) 127(369) 0(0)0(0)0(0)
20(40)170(660)0(1)66(57)48(38)132(231)
320(620) 43(78) 100(191)
480(550) 227(362) 10(12)
1023(703) 190(140) 67(119)
30(50) 0(7) 79(84)
220(400) 144(323) 31(32)
20(20) 73(48) 174(123) 20(30) 337(598) 993(1033) 65(64) 24(54) 20(50) 242(134)
871(1386)
15(19)
256(411)163(116)201(192)126(162)0(1)7(5)
228(211) 111(285) 3(4)
376(124) 393(379) 534(649)
412(419) 136(113) 88(83)
335(473) 164(334) 0(0)
303(115) 385(427) 675(1076)
165(212) 240(158) 128(141) 128(235) 540(790) 335(651) 162(256) 715(1349) 73(93) 146(83)
0(2)
158(154)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
675(644)1295(872)2(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 296(537)43(32)1119(946)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0) W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 17
Cumulative Plus Project Conditions
Apartments
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)767(583)217(284)140(238)216(195)
3(0) 252(327) 264(248)
536(662) 640(800) 310(191)
149(339) 290(350) 301(222)
1(1) 591(558) 148(235)
753(977) 620(640) 331(211)
86(258) 340(330) 140(60) 89(74) 1(0) 95(62) 590(300) 280(375) 250(730) 40(120)
622(1394)
322(251)
145(86)180(480)0(0)206(144)19(40)120(210)
100(620) 130(225) 91(174)
610(614) 0(0) 9(11)
160(620) 595(428) 60(106)
226(127) 0(0) 34(90)
522(802) 0(0) 28(29)
90(110) 0(0) 310(211) 80(160) 688(1078) 140(940) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
962(825)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 414(261) 746(1427) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 17
Cumulative Plus Project Conditions
Apartments
AM & PM Peak Hour Volumes
(Page 2 of 2)
Vehicle Trips - Ag Employee Housing Project Alternative Employee Shuttles
Bus 32 33 66 15 miles 990
Van 15 8 16 15 miles 240
Subtotal: 1,230
Shuttle Trips Between Project Site and Storage Area
Bus 33 66 6 miles 400
Van 8 0 0 miles 0
Subtotal: 400
Total VMT: 1,630 per day
326,000 per year
If all ag employees drove personal cars (assuming two person per vehicle):

Driving VMT: 18,000 per day
3,600,000 per year
Notes:

1. Number of buses and vans provided by project applicant.

2. Fields are assumed to be an average of 15 miles from the project site.

3. Per the project applicant, buses will be stored at a location 6 miles away and vans will be stored on the project site.

4. VMT per year estimated using 200 working days per year.

5. Estimate for driving employee comparision assumes two employees per vehicles, which is equivalent to 600 total vehicles per the project definition.

Total
VMT
Vehicle
Type
Seating
Capacity
Total
Vehicles
Total
Trips
Distance Traveled
per Trip
Total
Vehicles
Vehicle
Type
Total
Trips
Distance Traveled
per Trip
Total
VMT
Keith Higgins
Traffic Engineer
Exhibit 18A
Project Vehicle Miles Traveled
Calculation
(Ag Employee Housing)
Vehicle Miles Traveled - Apartments Project Alternative Salinas 57% 834 2.50 2,085
Marina 5% 73 9.00 657
Seaside 3% 44 15.00 660
Monterey 10% 146 18.00 2,628
Prunedale 7% 102 8.00 816
Castroville 5% 73 8.00 584
Watsonville 4% 59 19.00 1,121
Gonzales 1% 14 19.00 266
Soledad 1% 15 28.00 420
Greenfield 1% 15 37.00 555
San Benito County 3% 44 27.00 1,188
Santa Clara County 3% 44 30.00 1,320
Total: 100% 1,463 12,300
Project Average Trip Length 8.4
Regional Average Home-Based Trip Length 8.9
Project Percent of Regional Average Home-Based Trip Length 94% Apartment Occupants per Unit 3.73
Number of Apartments 200
Number of People Living in Apartments 746
Average Residential Vehicle-Miles Traveled (miles/resident): 16.5 Average AMBAG Region VMT per Capita 21.66
Project Percent of Regional VMT per Capita 76%
Notes:

1. Total daily net project residential trips cited from trip generation on Exhibit 5.

2. Apartment Occupants per Unit is average household size in Salinas in 2010 US Census, per the 2010 US Census (factfinder.census.gov).

Location
Percent of
Net Project
Traffic
Daily
Project
Traffic
Distance
from Project
(miles)
Vehicle
Miles
Traveled
Keith Higgins
Traffic Engineer
Exhibit 18B
Project Vehicle Miles Traveled
Calculation
(Apartments)
Basemap Source: Google Maps, 2019.
7 10
13 9
6 5 4 3 2 1
8 Project
Site
N
Legend:

X Study Intersections
12 11
Keith Higgins
Traffic Engineer
Exhibit 1
Project Location Map
and Study Area
Source: RRM Design Group, 10/29/19.

N
Keith Higgins
Traffic Engineer
Exhibit 2
Project SIte Plan
432(309)
21(37)0(0)0(0)360(360)210(388)
17(30) 247(229) 256(137)
1008(878) 1193(958) 1220(1239)
0(0) 0(0) 0(0)
210(442) 0(0) 0(0)
804(1343) 867(1428) 946(1429)
0(0) 289(389) 325(472) 0(0) 0(0) 0(0) 283(418) 1(3) 147(357) 0(0)0(0)0(0)
29(31)178(529)0(1)60(52)19(40)120(210)
294(527) 39(71) 91(174)
441(348) 249(175) 9(11)
845(724) 168(118) 60(106)
29(28) 0(6) 34(90)
284(327) 233(233) 28(29)
9(7) 164(85) 310(211) 23(12) 280(497) 809(1045) 111(100) 22(49) 17(42) 164(203)
987(1290)
12(16)
0(0)206(144)224(157)135(177)0(1)7(5)
130(225) 97(236) 3(4)
0(0) 315(285) 344(375)
595(428) 142(130) 98(89)
0(0) 140(227) 0(0)
0(0) 322(340) 451(813)
0(0) 264(126) 142(145) 0(0) 918(1282) 486(678) 113(166) 591(1230) 56(131) 154(85)
0(2)
174(164)
282(491)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 1160(1012) 1145(791)

9. Davis Road Southbound Ramps - Market Circle /
West Market Street (State Route 183) 2(0)
39(29)953(932)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 0(0)
0(0)0(0)

5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 3
Existing Conditions
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)579(506)174(222)83(217)209(181)
3(0) 236(264) 257(234)
346(388) 553(677) 293(215)
164(363) 129(78) 289(215)
1(1) 501(467) 107(194)
554(715) 647(628) 383(215)
97(270) 29(11) 97(60) 99(80) 1(0) 106(67) 40(34) 258(284) 70(150) 32(107)
406(931)346(235)
158(202)192(297)0(0)206(144)19(40)120(210)
88(168) 130(225) 91(174)
547(494) 0(0) 9(11)
132(160) 595(428) 60(106)
175(216) 0(0) 34(90)
389(611) 0(0) 28(29)
95(81) 0(0) 310(211) 71(138) 488(880) 112(184) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
736(835)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 359(257) 538(1074) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 3
Existing Conditions
AM & PM Peak Hour Volumes
(Page 2 of 2)
Existing Existing
N-S E-W Lane Intersection LOS Peak
Street Street Jurisdiction Configuration Control Standard Hour 1 Adams W Laurel SB 1-L, 1-R AM 16.6 B 16.6 B 16.7 B 22.6 C 22.7 C 22.9 C 47.7 D 47.7 D 47.7 D Street Drive EB 1-L, 2-T PM 15.2 B 15.4 B 15.5 B 22.0 C 22.3 C 22.5 C 21.3 C 21.6 C 21.8 C WB 1-T, 1-T/R
2 US 101 W Laurel NB 1-L, 1-L/T, 1-R AM 13.9 B 13.9 B 14.0 B 18.0 B 17.9 B 18.0 B 28.4 C 28.4 C 28.6 C Northbound Drive EB 2-T PM 17.9 B 18.0 B 18.1 B 22.1 C 22.3 C 22.5 C 20.6 C 20.7 C 20.9 C Ramps WB 1-T, 1-T/R
3 US 101 W Laurel SB 2-L, 1-R AM 10.1 B 10.1 B 10.2 B 12.9 A 13.0 B 13.2 B 14.9 B 14.9 B 15.6 B Southbound Drive EB 2-T PM 10.9 B 11.1 B 11.3 B 14.2 B 14.6 B 14.9 B 15.0 B 15.4 B 15.7 B Offramp WB 2-T
4 N Davis Calle Del NB 1-L, 2-T, 2-R AM 25.0 C 25.0 C 25.1 C 28.3 C 28.3 C 28.6 C 26.6 C 26.6 C 26.8 C Road Adobe - SB 2-L, 1-T, 1-T/R PM 39.7 D 40.8 D 42.0 D 54.4 D 56.1 E 58.2 E 53.6 D 54.2 D 55.2 E W Laurel EB 1-L, 1-T, 1-T/RDrive WB 2-L, 2-T, 1-R AM 28.3 C PM 54.6 DAM 25.3 C 26.8 CPM 44.5 D 53.4 D
5 Post Calle Del NB 1-L, 1-T/R AM 77.1/74.7 F/F 77.1/74.7 F/F 77.1/74.7 F/F 176.5/148.6 F/F 176.5/148.6 F/F 176.5/148.6 F/F 28.8/46.7 D/E 28.8/46.7 D/E 28.8/46.7 D/E Drive - Adobe SB 1-L/T, 1-R PM 21.9/26.5 C/D 21.9/26.5 C/D 21.9/26.5 C/D 27.5/34.5 D/D 27.5/34.5 D/D 27.5/34.5 D/D 34.7/72.0 D/F 34.7/72.0 D/F 34.7/72.0 D/F El Rancho EB 1-L, 1-T, 1-R
Way WB 1-L, 1-T, 1-R AM
PM
6 N Davis Post NB 1-L, 2-T, 1-T/R AM 43.4 D 43.4 D 43.7 D 56.0 E 56.1 E 56.7 E 47.3 D 47.4 D 47.5 D Road Drive - SB 1-L, 2-T, 1-R PM 44.3 D 44.9 D 45.6 D 61.2 E 62.9 E 65.1 E 37.6 D 37.9 D 38.2 D Commercial EB 1-L, 1-L/T, 1-RDriveway WB 1-L/T, 1-R AM 56.0 E PM 61.4 E
AM 29.9 CPM 28.8 C
7 N Davis W Rossi NB 2-T, 1-R AM 17.7 B 29.8 C 30.7 C 22.9 C 37.2 D 38.0 D 52.2 D 52.8 D 59.0 E Road Street SB 1-L, 2-T PM 22.9 C 35.3 D 35.4 D 34.9 C 51.7 D 51.9 D 88.8 F 94.7 F 95.7 F WB 2-L, 1-R
AM 52.3 DPM 89.2 F
AM 30.6 C 32.3 CPM 38.2 D 40.2 D
8 N Main Rossi NB 1-L, 2-T, 1-R AM 44.0 D 44.0 D 44.9 D 58.9 E 59.0 E 60.1 E 66.0 E 66.1 E 67.4 E Street Street SB 1-L, 2-T, 1-R PM 41.7 D 41.8 D 42.1 D 54.8 D 55.1 E 55.3 E 70.3 E 71.3 E 71.6 E (State Route EB 2-L, 1-T, 1-R
183) WB 1-L, 1-T, 1-R AM 44.0 D 58.9 E 66.0 E
PM 41.8 D 54.9 D 70.5 E
AM 32.4 C 38.9 D 41.6 DPM 34.0 C 41.8 D 42.4 D
9 Davis W Market NB 1-L/T, 1-R AM 17.1 B 17.2 B 17.2 B 18.8 B 18.8 B 18.8 B 22.4 C 22.4 C 22.4 C Road Street SB 1-L/T/R PM 20.9 C 21.0 C 21.1 C 25.1 C 25.3 C 25.4 C 35.2 D 35.9 D 36.0 D Southbound (State Route EB 1-L, 1-T, 1-T/R
Ramps - 183) WB 1-L, 1-T, 1-T/R AM 22.4 C
Market PM 35.3 D
Circle AM 19.5 B
PM 23.3 C
With Improvement
Caltrans Signal C-D
With Improvement
Caltrans
City of
Salinas
With TDM Measures
With TDM MeasuresWith TDM Measures
With TDM Measures
With TDM Measures
LOS
City of
Salinas Signal D
With Improvement
Caltrans Signal C-D
City of
Salinas
C-D
Two-Way
Stop E/E
With Improvement
Signal D
With Improvement
With Improvement
D
SignalSignal
Delay
Monterey
County
C-D
Cumulative
Plus Project (Apt)
Conditions
Delay LOS
Cumulative
Without Project
Conditions
Delay LOS
Cumulative
Plus Project (Ag)
Conditions
Delay LOS
Background
Conditions
Background
Plus Project (Apt)
Conditions
Delay LOS Delay LOS
Background
Plus Project (Ag)
Conditions
Delay
Existing Plus
Project (Apt)
Conditions
LOS
Existing
Conditions
Signal
LOS
D
Delay
City of
Salinas
Caltrans
Existing Plus
Project (Ag)
Conditions
Delay LOS
Keith HigginsTraffic Engineer
Exhibit 4A
Intersection
Levels of Service
(Page 1 of 2)
Existing Existing
N-S E-W Lane Intersection LOS Peak
Street Street Jurisdiction Configuration Control Standard Hour 10 Davis W Market NB 1-L/T, 1-R AM 20.6 C 20.7 C 20.8 C 23.3 C 23.4 C 23.4 C 25.5 C 25.5 C 25.8 C Road Street SB 1-L/T/R PM 37.6 D 38.4 D 38.5 D 53.5 D 54.7 D 54.9 D 61.6 E 63.3 E 63.5 E Northbound (State Route EB 1-L, 1-T, 1-T/R
Ramps - 183) WB 1-L, 1-T, 1-T/R AM 20.7 C 23.4 C 25.5 C Private PM 37.7 D 53.6 D 61.8 E
Driveway AM 17.8 B 19.0 B 19.3 B
PM 24.7 C 27.8 C 26.3 C
11 Davis Blanco NB 1-L, 1-T, 1-T/R AM 32.5 C 32.5 C 33.0 C 37.2 D 37.2 D 37.3 D 357.2 F 357.2 F 356.8 F Road Road SB 1-L, 1-T, 1-R PM 37.8 D 38.5 D 38.6 D 46.7 D 47.8 D 47.9 D 239.8 F 240.1 F 240.2 F EB 2-L, 1-T, 1-T/R
WB 1-L, 2-T, 1-R AM 357.2 F
PM 239.8 F
WB AM 73.7 E
PM 111.9 F
12 N Main Alvin NB 1-L, 2-T, 1-T/R AM 35.3 D 35.3 D 35.6 D 43.2 D 43.2 D 43.5 D 35.8 D 35.8 D 36.1 D Street Drive SB 2-L, 3-T, 1-R PM 29.1 C 29.2 C 29.2 C 34.7 C 34.8 C 34.8 C 64.3 E 65.0 E 65.0 E EB 1-L, 2-T, 1-R
WB 1-L, 1-T, 1-R AM 35.8 D
PM 64.4 E
WB AM 35.5 D
PM 39.2 D
13 N Main Laurel NB 2-L, 2-T, 1-R AM 29.9 C 29.9 C 30.1 C 34.4 C 34.4 C 34.7 C 38.2 D 38.2 D 38.7 D Street Drive SB 2-L, 2-T, 1-T/R PM 37.5 D 37.6 D 37.8 D 45.7 D 45.9 D 46.1 D 259.3 F 259.6 F 260.3 F EB 1-L, 1-T, 1-T/R
WB 1-L, 1-T, 1-T/R AM 38.2 D
PM 259.5 F
WB AM 38.4 D
PM 185.0 F
Notes:

1. L, T, R = Left, Through, Right. 5. Analysis performed using 2010 and 2000 Highway Capacity Manual methodologies.2. NB, SB, EB, WB = Left, Through, Right, Northbound, Southbound, Eastbound, Westbound. 6. Level of service calculations can be found in Appendices E, G - H, and J - O.3. Overall Caltrans level of service standard is the transition between LOS C and LOS D, abbreviated as "LOS C-D". 7. LOS highlighted in red indicates intersection operating below level of service standard.

City of Salinas and Monterey County overall levels of service standard is LOS D. Side-street standard is assumed as LOS E. 8. LOS with a thick black border represents a significant impact. Resulting levels of service with

4. For signalized intersection analysis, delay is average overall delay in seconds per vehicle (sec/veh). For one- and two-way stop intersections, recommended improveme recommended improvements noted under "With Improvements". A list of applied improvements delays are side-street approach operations, also in seconds per vehicle (sec/veh). can be found on Exhibit 4B.

9. Transportation Demand Management (TDM) measures include bussing and vanpools for ag employees.

With ImprovementWith Improvement
With TDM Measures
With TDM Measures
With TDM Measures
With Improvement
City of
Salinas Signal D
With Improvement
City of
Salinas Signal D
Caltrans Signal C-D
Monterey
County Signal D
With TDM Measures
LOS Delay LOS Delay LOS Delay
Cumulative
Without Project
Conditions
Cumulative
Plus Project (Ag)
Conditions
Cumulative
Plus Project (Apts)
Conditions
Delay LOS Delay LOS Delay LOS Delay
Existing
Conditions
Existing Plus
Project (Ag)
Conditions
Existing Plus
Project (Apts)
Conditions
Background
Conditions
Background
Plus Project (Ag)
Conditions
Background
Plus Project (Apts)
Conditions
LOS Delay LOS Delay LOS
Keith HigginsTraffic Engineer
Exhibit 4A
Intersection
Levels of Service
(Page 2 of 2)
Existing
N-S E-W Intersection
Street Street Control
1 Adams W Laurel
Street Drive
2 US 101 W Laurel
Northbound Drive
Ramps
3 US 101 W Laurel
Southbound Drive
Offramp
4 N Davis Calle Del
Road Adobe -
W Laurel
Drive
5 Post Calle Del
Drive - Adobe
El Rancho
Way
6 N Davis Post
Road Drive -
Commercial
Driveway
7 N Davis W Rossi
Road Street
8 N Main Rossi
Street Street
(State Route
183)
9 Davis W Market
Road Street
Southbound (State Route
Ramps 183)
Existing
Plus Project (Apts)
Conditions
Background
Plus Project (Apts)
Conditions
Cumulative
Plus Project (Ag)
Conditions
None Required
None Required
None Required
None Required
None Required
None Required
None Required None Required
None Required None Required
None Required None Required
None Required None Required

1. Add 3rd WB L and
3rd Receiving Lane on
N Davis Leaving
Intersection;
OR
2a. Implement
Western Bypass (TFO 26)
2b. Optimize
Signal Timing
1a. Restripe EB as
1-L, 1-T, 1-R
1b. Convert EB/WB left
turn
signal phasing
to permitted phasing;
OR

2. Implement
Western Bypass
None Required
None Required
Optimize Signal Timing
Signal
None Required None Required None Required None Required None Required a. Add 2nd EB L
b. Add EB R
c. Add SB R
d. Add NB RTO Signal
Phase
Signal
None Required None Required
Add 3rd NB T,
3rd SB T
(TFO 31)
Signal
a. Add NB L
b. Add WB T
c. Add EB with 1-
L, 1-T/R
Same as Existing Plus
Project (Ag)
Same as Existing Plus
Project (Ag)
Add 3rd NB T,
3rd SB T
(TFO 31)
Add 3rd NB T,
3rd SB T
(TFO 31)
Same as Existing Plus
Project (Ag)
a. Add 2nd EB L
b. Add EB R
c. Add SB R
d. Add NB RTO Signal
Phase
None Required
Signal
Signal
Signal
None Required
None Required
None Required
Signal
Signal
None Required
None Required
Two-Way
Stop
None Required
None Required
None Required
None Required None Required
Background
Plus Project (Ag)
Conditions
None Required
None Required
None Required
None Required
Existing
Plus Project (Ag)
Conditions
Cumulative
Plus Project (Apts)
Conditions
None Required
None Required
Optimize Signal Timing
None Required
Keith Higgins
Traffic Engineer
Exhibit 4B
Recommended
Intersection Improvements
(Page 1 of 2)
Existing
N-S E-W Intersection
Street Street Control
1 Adams W Laurel
Street Drive
2 US 101 W Laurel
Northbound Drive
Ramps
3 US 101 W Laurel
Southbound Drive
Offramp
4 N Davis Calle Del
Road Adobe -
W Laurel
Drive
5 Post Calle Del
Drive - Adobe
El Rancho
Way
6 N Davis Post
Road Drive -
Commercial
Driveway
7 N Davis W Rossi
Road Street
8 N Main Rossi
Street Street
(State Route
183)
9 Davis W Market
Road Street
Southbound (State Route
Ramps 183)
None Required None Required
Background
Plus Project (Ag)
Conditions
None Required
None Required
None Required
None Required
Existing
Plus Project (Ag)
Conditions
Cumulative
Plus Project (Apts)
Conditions
None Required
None Required
Optimize Signal Timing
None Required
None Required None Required
None Required
Signal
Signal
None Required
None Required
None Required
Signal
Signal
None Required
None Required
Two-Way
Stop
Signal
a. Add 2nd EB L
b. Add EB R
c. Add SB R
d. Add NB RTO Signal
Phase
Signal
None Required None Required
Add 3rd NB T,
3rd SB T
(TFO 31)
Signal
a. Add NB L
b. Add WB T
Same as Existing Plus
Project (Ag)
Same as Existing Plus
Project (Ag)
Add 3rd NB T,
3rd SB T
(TFO 31)
Add 3rd NB T,
3rd SB T
(TFO 31)
Same as Existing Plus
Project (Ag)
Same as Existing Plus Project
(Ag)
None Required
Optimize Signal Timing
Signal
None Required None Required None Required None Required None Required Existing
Plus Project (Apts)
Conditions
Background
Plus Project (Apts)
Conditions
Cumulative
Plus Project (Ag)
Conditions
None Required
None Required
None Required
None Required
None Required
None Required
None Required None Required
None Required None Required
None Required None Required
None Required None Required

1. Add 3rd WB L and
3rd Receiving Lane on
N Davis Leaving
Intersection;
OR
2a. Implement
Western Bypass
2b. Optimize
Signal Timing
1a. Restripe EB as
1-L, 1-T, 1-R
1b. Convert EB/WB left
turn
signal phasing
to permitted phasing;
OR

2. Implement
Western Bypass
None Required
None Required
Keith Higgins
Traffic Engineer
Exhibit 4B
Recommended
Intersection Improvements
(Page 1 of 2)
Existing
N-S E-W Intersection
Street Street Control
10 Davis W Market
Road Street
Northbound (State Route
Ramps 183)
11 S Davis Blanco
Road Road
12 N Main Alvin
Street Drive
13 N Main Laurel
Street Drive
Notes:

1. L, T, R = Left, Through, Right.2. NB, SB, EB, WB = Northbound, Southbound, Eastbound, Westbound.3. RTO = Right Turn Overlap Signal Phase Cumulative
Plus Project (Ag)
Conditions
Optimize Signal Timing
Signal
None Required None Required None Required None Required None Required a. Add 2nd NB L, NB R
b. Add 2nd SB T
c. Add EB R
d. Add 2nd WB L
(TFO 73)
Signal
None Required None Required Optimize Signal Timing
Siignal
None Required None Required None Required
None Required
None RequiredNone Required
None RequiredNone Required
Signal
None Required Add EB R Add EB R Add EB R None Required None Required Existing
Plus Project (Ag)
Conditions
Background
Plus Project (Apts)
Conditions
Cumulative
Plus Project (Apts)
Conditions
Existing
Plus Project (Apts)
Conditions
Background
Plus Project (Ag)
Conditions
Keith HigginsTraffic Engineer
Exhibit 4B
Recommended
Intersection Improvements
(Page 2 of 2)
A. Project Trip Rates
PEAK % PEAK %
DAILY HOUR OF % % HOUR OF % %

REFERENCE USE TRIPS TRIPS ADT IN OUT TRIPS ADT IN OUT
Casa Boronda Ag. Employee Housing
Driveway Count1 600 beds N.A. 4 3 1 43 22 21
Trip Rates (per employee):2 0.288 0.007 75% 25% 0.072 51% 49% B. Project Trip Generation
PEAK % PEAK %

DAILY HOUR OF TRIPS TRIPS HOUR OF TRIPS TRIPS

PROPOSED USE TRIPS TRIPS ADT IN OUT TRIPS ADT IN OUT
Agricultural Employee Housing 1,200 beds 346 8 2% 6 2 86 25% 44 42 Raw (Peak Hour) Total (used in analysis): 346 8 6 2 86 44 42 Annual Average Total: 245 6 4 2 61 31 30
With TDM Work Schedule:5 49 1 1 0 12 6 6
Notes:

1. AM and PM peak hour traffic at Casa Boronda was collected Tuesday, April 16, 2019. This data can be found in Appendix C.

2. Daily trip rate derived by assuming that PM peak rate is 25% of the daily trip rate.

3. Estimated trip generation for Casa Boronda project cited from Casa Boronda Agricultural Employee Housing Project Traffic Impact Analysis, Keith Higgins Traffic Engineer, July 3, 2017.

4. Seasonal adjustment reflects that project is open for just 8.5 months of the year (i.e., approximately 71% of a year).

5. Project Traffic Demand Management (TDM) program proposes use of employee buses and vans largely outside of AM and PM peak hours.

A. Project Trip Rates
DAILY PEAK % PEAK %
TRIP HOUR OF %% HOUR OF %%

TRIP GENERATION RATES RATE RATE ADT IN OUT RATE ADT IN OUT Multifamily Housing (Low-Rise) (per unit) 7.32 0.46 6% 23% 77% 0.56 8% 63% 37% B. Project Trip Generation
PEAK % PEAK %

DAILY HOUR OF TRIPS TRIPS HOUR OF TRIPS TRIPS

PROPOSED USE TRIPS TRIPS ADT IN OUT TRIPS ADT IN OUT
Apartments 200 units 1,464 92 6% 21 71 112 8% 71 41
Total:

Notes:

1. Trip generation rates published by Institute of Transportation Engineers (ITE), Trip Generation Manual, 10th Edition, 2017.

2. sq. ft. = square feet

PROJECT
SIZE
220

AM PEAK HOUR PM PEAK HOUR

AM PEAK HOUR PM PEAK HOUR
ITE

LAND USE
CODE

ALTERNATIVE PROPOSED PROJECT - APARTMENTS
Quatrrin Agricultural Employee Housing Trip Generation

AM PEAK HOUR PM PEAK HOUR

AM PEAK HOUR PM PEAK HOUR

PROPOSED PROJECT - AGRICULTURAL EMPLOYEE HOUSING
SIZE

PROJECT
SIZE

EXISTING
Keith Higgins
Traffic Engineer
Exhibit 5
Project Trip Generation
Basemap Source: Google Maps, 2019.
8 11
13 10
7 4 3 2 1
9 Project
Site
N 10%
15%
33%
10%
3%
2%
5 10%
5%
5%
8%
5% 12
15%
LEGEND
Study Intersection Number
Project Trip Distribution
Percentage
X%
X 35%
10%
15%
4% 3%
3% 6
4%
4%
Keith Higgins
Traffic Engineer
Exhibit 6
Project Trip Distribution
(Ag Employee Housing)
0(1)
0(0)0(0)0(0)1(5)0(0)
0(0) 0(0) 0(0)
0(4) 0(5) 0(7)
0(0) 0(0) 0(0)
0(1) 0(0) 0(0)
0(3) 0(4) 0(8)
0(0) 0(4) 0(2) 0(0) 0(0) 0(0) 0(2) 0(0) 0(0)
0(0)0(0)0(0)
0(0)0(0)0(0)0(0)0(0)0(0)
0(0) 0(0) 0(0)
0(0) 0(0) 0(0)
1(12) 0(0) 0(1)
0(0) 0(0) 0(0)
0(0) 0(0) 0(0)
0(0) 0(0) 0(0) 0(0) 0(1) 0(10) 0(0) 0(0) 0(0)
0(0)
0(11)
0(1)
1(14)0(0)0(0)0(0)0(0)0(0)
0(0) 0(0) 0(0)
1(7) 1(5) 0(0)
0(0) 0(0) 0(0)
0(12) 0(0) 0(0)
0(6) 0(4) 1(6)
2(24) 0(2) 0(0) 4(23) 0(0) 0(0) 0(2) 0(0) 0(0)
1(7)0(0)0(1)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 0(1)0(0)1(13)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
0(0)0(0)0(0)
W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 7
Project Trip Assignment
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
0(0)1(7)0(4)0(1)0(0)
0(0) 1(5) 0(0)
0(0) 0(0) 0(0)
0(1) 0(0) 0(1)
0(0) 1(6) 0(1)
0(1) 0(0) 0(0)
1(6) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 1(5) 0(0)
0(0)0(1)0(1)
0(2)0(0)0(0)206(144)19(40)120(210)
0(0) 130(225) 91(174)
0(2) 0(0) 9(11)
0(0) 595(428) 60(106)
0(1) 0(0) 34(90)
0(2) 0(0) 28(29)
0(0) 0(0) 310(211) 0(0) 0(0) 0(0) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 0(0) 0(4) 0(1)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
0(0)1160(1012)953(932)
S Davis Rd
Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 7
Project Trip Assignment
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 2 of 2)
432(310)
21(37)0(0)0(0)361(365)210(388)
17(30) 247(229) 256(137)
1008(882) 1193(963) 1220(1246)
0(0) 0(0) 0(0)
210(443) 0(0) 0(0)
804(1346) 867(1432) 946(1437)
0(0) 289(393) 325(474) 0(0) 0(0) 0(0) 283(420) 1(3) 147(357) 0(0)0(0)0(0)
29(31)178(529)0(1)60(52)19(40)120(210)
294(527) 39(71) 91(174)
441(348) 249(175) 9(11)
846(736) 168(118) 60(107)
29(28) 0(6) 34(90)
284(327) 233(233) 28(29)
9(7) 164(85) 310(211) 23(12) 280(498) 809(1055) 111(100) 22(49) 17(42) 164(203)
987(1301)
12(17)
1(14)206(144)224(157)135(177)0(1)7(5)
130(225) 97(236) 3(4)
1(7) 316(290) 344(375)
595(428) 142(130) 98(89)
0(12) 140(227) 0(0)
0(6) 322(344) 452(819)
2(24) 264(128) 142(145) 4(23) 918(1282) 486(678) 113(168) 591(1230) 56(131) 155(92)
0(2)
174(165)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 282(492)39(29)954(945)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
1160(1012)1145(791)2(0)
W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 8
Existing Plus Project Conditions
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)580(513)174(226)83(218)209(181)
3(0) 237(269) 257(234)
346(388) 553(677) 293(215)
164(364) 129(78) 289(216)
1(1) 502(473) 107(195)
554(716) 647(628) 383(215)
98(276) 29(11) 97(60) 99(80) 1(0) 106(67) 40(34) 259(289) 70(150) 32(107)
406(932)346(236)
158(204)192(297)0(0)206(144)19(40)120(210)
88(168) 130(225) 91(174)
547(496) 0(0) 9(11)
132(160) 595(428) 60(106)
175(217) 0(0) 34(90)
389(613) 0(0) 28(29)
95(81) 0(0) 310(211) 71(138) 488(880) 112(184) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 359(261) 538(1075)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
736(835)1160(1012)953(932)
S Davis Rd
Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 8
Existing Plus Project Conditions
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 2 of 2)
Basemap Source: Google Maps, 2019.
8 11
13 10
7 4 3 2 1
9 Project
Site
N 15%
15%
48%
10%
4%
2%
5 5%
5%
10%
10%
6% 12
10%
LEGEND
Study Intersection Number
Project Trip Distribution
Percentage
X%
X 25%
10%
10%
5% 5%
3% 6
5%
5%
Keith Higgins
Traffic Engineer
Exhibit 9
Project Trip Distribution
(Apartments)
0(3)
0(0)0(0)0(0)3(10)0(0)
0(0) 0(0) 0(0)
3(8) 3(11) 5(18)
0(0) 0(0) 0(0)
3(2) 0(0) 0(0)
8(5) 11(7) 21(13)
0(0) 10(6) 7(4) 0(0) 0(0) 0(0) 2(7) 0(0) 0(0)
0(0)0(0)0(0)
0(0)0(0)0(0)0(0)0(0)0(0)
0(0) 0(0) 0(0)
0(0) 0(0) 0(0)
8(28) 0(0) 1(2)
0(0) 0(0) 0(0)
0(0) 0(0) 0(0)
0(0) 0(0) 0(0) 0(0) 4(2) 28(17) 0(0) 0(0) 0(0)
0(0)
32(19)
2(1)
10(34)0(0)0(0)0(0)0(0)0(0)
0(0) 0(0) 0(0)
3(11) 2(7) 0(0)
0(0) 0(0) 0(0)
34(20) 0(0) 0(0)
11(6) 7(4) 2(7)
26(15) 4(2) 0(0) 8(26) 0(0) 0(0) 1(4) 0(0) 0(0)
7(4)0(0)1(1)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 1(4)0(0)9(32)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
0(0)0(0)0(0)
W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 10
Project Trip Assignment
Apartments
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
0(0)7(4)7(4)0(2)0(0)
0(0) 2(7) 0(0)
0(0) 0(0) 0(1)
1(1) 0(0) 1(2)
0(0) 2(7) 2(1)
1(1) 0(0) 1(1)
2(7) 0(0) 0(0) 0(0) 0(0) 0(0) 0(0) 1(4) 0(0)
0(0)2(2)2(1)
2(4)0(0)0(0)206(144)19(40)120(210)
0(0) 130(225) 91(174)
1(4) 0(0) 9(11)
0(0) 595(428) 60(106)
4(3) 0(0) 34(90)
4(2) 0(0) 28(29)
0(0) 0(0) 310(211) 0(0) 0(0) 0(0) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 0(0) 4(2) 1(2)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
0(0)1160(1012)953(932)
S Davis Rd
Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 10
Project Trip Assignment
Apartments
AM & PM Peak Hour Volumes
(Page 2 of 2)
432(312)
21(37)0(0)0(0)363(370)210(388)
17(30) 247(229) 256(137)
1011(886) 1196(969) 1225(1257)
0(0) 0(0) 0(0)
213(444) 0(0) 0(0)
812(1348) 878(1435) 967(1442)
0(0) 299(395) 332(476) 0(0) 0(0) 0(0) 285(425) 1(3) 147(357) 0(0)0(0)0(0)
29(31)178(529)0(1)60(52)19(40)120(210)
294(527) 39(71) 91(174)
441(348) 249(175) 9(11)
853(752) 168(118) 61(108)
29(28) 0(6) 34(90)
284(327) 233(233) 28(29)
9(7) 164(85) 310(211) 23(12) 284(499) 837(1062) 111(100) 22(49) 17(42) 164(203)
1019(1309)
14(17)
10(34)206(144)224(157)135(177)0(1)7(5)
130(225) 97(236) 3(4)
3(11) 317(292) 344(375)
595(428) 142(130) 98(89)
34(20) 140(227) 0(0)
11(6) 329(344) 453(820)
26(15) 268(128) 142(145) 8(26) 918(1282) 486(678) 114(170) 591(1230) 56(131) 161(89)
0(2)
175(165)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 283(495)39(29)962(964)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
1160(1012)1145(791)2(0)
W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 11
Existing Plus Project Conditions
Apartments
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)586(510)181(226)83(219)209(181)
3(0) 238(271) 257(234)
346(388) 553(677) 293(216)
165(364) 129(78) 290(217)
1(1) 503(474) 109(195)
555(716) 647(628) 384(216)
99(277) 29(11) 97(60) 99(80) 1(0) 106(67) 40(34) 259(288) 70(150) 32(107)
408(933)348(236)
160(206)192(297)0(0)206(144)19(40)120(210)
88(168) 130(225) 91(174)
548(498) 0(0) 9(11)
132(160) 595(428) 60(106)
179(219) 0(0) 34(90)
393(613) 0(0) 28(29)
95(81) 0(0) 310(211) 71(138) 488(880) 112(184) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 363(259) 539(1076)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
736(835)1160(1012)953(932)
S Davis Rd
Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 11
Existing Plus Project Conditions
Apartments
AM & PM Peak Hour Volumes
(Page 2 of 2)
475(340)
23(41)0(0)0(0)396(396)231(427)
19(33) 272(252) 282(151)
1109(966) 1312(1054) 1342(1363)
0(0) 0(0) 0(0)
231(486) 0(0) 0(0)
884(1477) 954(1571) 1041(1572)
0(0) 318(428) 358(519) 0(0) 0(0) 0(0) 311(460) 1(3) 162(393) 0(0)0(0)0(0)
32(34)196(582)0(1)66(57)21(44)132(231)
323(580) 43(78) 100(191)
485(383) 274(193) 10(12)
930(796) 185(130) 66(117)
32(31) 0(7) 37(99)
312(360) 256(256) 31(32)
10(8) 180(94) 341(232) 25(13) 308(547) 890(1150) 122(110) 24(54) 19(46) 180(223)
1086(1419)
13(18)
0(0)227(158)246(173)149(195)0(1)7(5)
143(248) 107(260) 3(4)
0(0) 347(314) 378(413)
655(471) 156(143) 108(98)
0(0) 154(250) 0(0)
0(0) 354(374) 496(894)
0(0) 290(139) 156(160) 0(0) 1010(1410) 535(746) 124(183) 650(1353) 62(144) 169(94)
0(2)
191(180)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
1276(1113)1260(870)2(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 310(540)43(32)1048(1025)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0) W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 12
Background Conditions
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)637(557)191(244)91(239)230(199)
3(0) 260(290) 283(257)
381(427) 608(745) 322(237)
180(399) 142(86) 318(237)
1(1) 551(514) 118(213)
609(787) 712(691) 421(237)
107(297) 32(12) 107(66) 109(88) 1(0) 117(74) 44(37) 284(312) 77(165) 35(118)
447(1024)
381(259)
174(222)211(327)0(0)206(144)19(40)120(210)
97(185) 130(225) 91(174)
602(543) 0(0) 9(11)
145(176) 595(428) 60(106)
193(238) 0(0) 34(90)
428(672) 0(0) 28(29)
105(89) 0(0) 310(211) 78(152) 537(968) 123(202) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
810(919)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 395(283) 592(1181) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit ?
Background Conditions
AM & PM Peak Hour Volumes
(Page 2 of 2)
475(341)
23(41)0(0)0(0)397(401)231(427)
19(33) 272(252) 282(151)
1109(970) 1312(1059) 1342(1370)
0(0) 0(0) 0(0)
231(487) 0(0) 0(0)
884(1480) 954(1575) 1041(1580)
0(0) 318(432) 358(521) 0(0) 0(0) 0(0) 311(462) 1(3) 162(393) 0(0)0(0)0(0)
32(34)196(582)0(1)66(57)21(44)132(231)
323(580) 43(78) 100(191)
485(383) 274(193) 10(12)
931(808) 185(130) 66(118)
32(31) 0(7) 37(99)
312(360) 256(256) 31(32)
10(8) 180(94) 341(232) 25(13) 308(548) 890(1160) 122(110) 24(54) 19(46) 180(223)
1086(1430)
13(19)
1(14)227(158)246(173)149(195)0(1)7(5)
143(248) 107(260) 3(4)
1(7) 348(319) 378(413)
655(471) 156(143) 108(98)
0(12) 154(250) 0(0)
0(6) 354(378) 497(900)
2(24) 290(141) 156(160) 4(23) 1010(1410) 535(746) 124(185) 650(1353) 62(144) 170(101)
0(2)
191(181)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
1276(1113)1260(870)2(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 310(541)43(32)1049(1038)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0) W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 13
Background Plus Project Conditions
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)638(564)191(248)91(240)230(199)
3(0) 261(295) 283(257)
381(427) 608(745) 322(237)
180(400) 142(86) 318(238)
1(1) 552(520) 118(214)
609(788) 712(691) 421(237)
108(303) 32(12) 107(66) 109(88) 1(0) 117(74) 44(37) 285(317) 77(165) 35(118)
447(1025)
381(260)
174(224)211(327)0(0)206(144)19(40)120(210)
97(185) 130(225) 91(174)
602(545) 0(0) 9(11)
145(176) 595(428) 60(106)
193(239) 0(0) 34(90)
428(674) 0(0) 28(29)
105(89) 0(0) 310(211) 78(152) 537(968) 123(202) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
810(919)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 395(287) 592(1182) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 13
Background Plus Project Conditions
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 2 of 2)
475(343)
23(41)0(0)0(0)399(406)231(427)
19(33) 272(252) 282(151)
1112(974) 1315(1065) 1347(1381)
0(0) 0(0) 0(0)
234(488) 0(0) 0(0)
892(1482) 965(1578) 1062(1585)
0(0) 328(434) 365(523) 0(0) 0(0) 0(0) 313(467) 1(3) 162(393) 0(0)0(0)0(0)
32(34)196(582)0(1)66(57)21(44)132(231)
323(580) 43(78) 100(191)
485(383) 274(193) 10(12)
938(824) 185(130) 67(119)
32(31) 0(7) 37(99)
312(360) 256(256) 31(32)
10(8) 180(94) 341(232) 25(13) 312(549) 918(1167) 122(110) 24(54) 19(46) 180(223)
1118(1438)
15(19)
10(34)227(158)246(173)149(195)0(1)7(5)
143(248) 107(260) 3(4)
3(11) 349(321) 378(413)
655(471) 156(143) 108(98)
34(20) 154(250) 0(0)
11(6) 361(378) 498(901)
26(15) 294(141) 156(160) 8(26) 1010(1410) 535(746) 125(187) 650(1353) 62(144) 176(98)
0(2)
192(181)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
1276(1113)1260(870)2(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 311(544)43(32)1057(1057)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0) W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 14
Background Plus Project Conditions
Apartments
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)644(561)198(248)91(241)230(199)
3(0) 262(297) 283(257)
381(427) 608(745) 322(238)
181(400) 142(86) 319(239)
1(1) 553(521) 120(214)
610(788) 712(691) 422(238)
109(304) 32(12) 107(66) 109(88) 1(0) 117(74) 44(37) 285(316) 77(165) 35(118)
449(1026)
383(260)
176(226)211(327)0(0)206(144)19(40)120(210)
97(185) 130(225) 91(174)
603(547) 0(0) 9(11)
145(176) 595(428) 60(106)
197(241) 0(0) 34(90)
432(674) 0(0) 28(29)
105(89) 0(0) 310(211) 78(152) 537(968) 123(202) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
810(919)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 399(285) 593(1183) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 14
Background Plus Project Conditions
Apartments
AM & PM Peak Hour Volumes
(Page 2 of 2)
600(290)
30(40)0(0)0(0)440(410)263(486)
20(30) 305(264) 328(147)
1138(986) 1433(1012) 1355(1435)
0(0) 0(0) 0(0)
210(480) 0(0) 0(0)
885(1430) 968(1542) 1045(1596)
0(0) 340(540) 310(480) 0(0) 0(0) 0(0) 250(570) 0(0) 127(369) 0(0)0(0)0(0)
20(40)170(660)0(1)66(57)48(38)132(231)
320(620) 43(78) 100(191)
480(550) 227(362) 10(12)
1015(675) 190(140) 66(117)
30(50) 0(7) 79(84)
220(400) 144(323) 31(32)
20(20) 73(48) 174(123) 20(30) 333(596) 965(1016) 65(64) 24(54) 20(50) 242(134)
839(1367)
13(18)
246(377)163(116)201(192)126(162)0(1)7(5)
228(211) 111(285) 3(4)
373(113) 391(372) 534(649)
412(419) 136(113) 88(83)
301(453) 164(334) 0(0)
292(109) 378(423) 673(1069)
139(197) 236(156) 128(141) 120(209) 540(790) 335(651) 161(252) 715(1349) 73(93) 139(79)
0(2)
157(153)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
675(644)1295(872)2(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 295(533)43(32)1110(914)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0) W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 15
Cumulative Without Project Conditions
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)760(579)210(280)140(236)216(195)
3(0) 250(320) 264(248)
536(662) 640(800) 310(190)
148(338) 290(350) 300(220)
1(1) 589(551) 146(234)
752(976) 620(640) 330(210)
84(251) 340(330) 140(60) 89(74) 1(0) 95(62) 590(300) 279(371) 250(730) 40(120)
620(1392)
320(250)
143(82)180(480)0(0)206(144)19(40)120(210)
100(620) 130(225) 91(174)
609(610) 0(0) 9(11)
160(620) 595(428) 60(106)
222(124) 0(0) 34(90)
518(800) 0(0) 28(29)
90(110) 0(0) 310(211) 80(160) 688(1078) 140(940) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
962(825)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 410(259) 745(1425) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 15
Cumulative Without Project Conditions
AM & PM Peak Hour Volumes
(Page 2 of 2)
600(291)
30(40)0(0)0(0)441(415)263(486)
20(30) 305(264) 328(147)
1138(990) 1433(1017) 1355(1442)
0(0) 0(0) 0(0)
210(481) 0(0) 0(0)
885(1433) 968(1546) 1045(1604)
0(0) 340(544) 310(482) 0(0) 0(0) 0(0) 250(572) 0(0) 127(369) 0(0)0(0)0(0)
20(40)170(660)0(1)66(57)48(38)132(231)
320(620) 43(78) 100(191)
480(550) 227(362) 10(12)
1016(687) 190(140) 66(118)
30(50) 0(7) 79(84)
220(400) 144(323) 31(32)
20(20) 73(48) 174(123) 20(30) 333(597) 965(1026) 65(64) 24(54) 20(50) 242(134)
839(1378)
13(19)
247(391)163(116)201(192)126(162)0(1)7(5)
228(211) 111(285) 3(4)
374(120) 392(377) 534(649)
412(419) 136(113) 88(83)
301(465) 164(334) 0(0)
292(115) 378(427) 674(1075)
141(221) 236(158) 128(141) 124(232) 540(790) 335(651) 161(254) 715(1349) 73(93) 140(86)
0(2)
157(154)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
675(644)1295(872)2(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 295(534)43(32)1111(927)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0) W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 16
Cumulative Plus Project Conditions
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)761(586)210(284)140(237)216(195)
3(0) 251(325) 264(248)
536(662) 640(800) 310(190)
148(339) 290(350) 300(221)
1(1) 590(557) 146(235)
752(977) 620(640) 330(210)
85(257) 340(330) 140(60) 89(74) 1(0) 95(62) 590(300) 280(376) 250(730) 40(120)
620(1393)
320(251)
143(84)180(480)0(0)206(144)19(40)120(210)
100(620) 130(225) 91(174)
609(612) 0(0) 9(11)
160(620) 595(428) 60(106)
222(125) 0(0) 34(90)
518(802) 0(0) 28(29)
90(110) 0(0) 310(211) 80(160) 688(1078) 140(940) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
962(825)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 410(263) 745(1426) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 16
Cumulative Plus Project Conditions
Ag Employee Housing
AM & PM Peak Hour Volumes
(Page 2 of 2)
600(293)
30(40)0(0)0(0)443(420)263(486)
20(30) 305(264) 328(147)
1141(994) 1436(1023) 1360(1453)
0(0) 0(0) 0(0)
213(482) 0(0) 0(0)
893(1435) 979(1549) 1066(1609)
0(0) 350(546) 317(484) 0(0) 0(0) 0(0) 252(577) 0(0) 127(369) 0(0)0(0)0(0)
20(40)170(660)0(1)66(57)48(38)132(231)
320(620) 43(78) 100(191)
480(550) 227(362) 10(12)
1023(703) 190(140) 67(119)
30(50) 0(7) 79(84)
220(400) 144(323) 31(32)
20(20) 73(48) 174(123) 20(30) 337(598) 993(1033) 65(64) 24(54) 20(50) 242(134)
871(1386)
15(19)
256(411)163(116)201(192)126(162)0(1)7(5)
228(211) 111(285) 3(4)
376(124) 393(379) 534(649)
412(419) 136(113) 88(83)
335(473) 164(334) 0(0)
303(115) 385(427) 675(1076)
165(212) 240(158) 128(141) 128(235) 540(790) 335(651) 162(256) 715(1349) 73(93) 146(83)
0(2)
158(154)

7. North Davis Road / West Rossi Street 8. North Main Street (State Route 183) / Rossi Street 9. Davis Road Southbound Ramps - Market Circle / West Market Street (State Route 183)
675(644)1295(872)2(0)

4. North Davis Road /
Calle Del Adobe - West Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road /Post Drive - Commercial Driveway 296(537)43(32)1119(946)

1. Adams Street / West Laurel Drive 2. US 101 Northbound Ramps / West Laurel Drive 3. US 101 Southbound Offramp / West Laurel Drive 0(0) 0(0) 0(0) W Market St
(State Route 183)
Market Cir
US 101 NorthboundRamps
E Rossi St
N Main St(State Route 183)
W Laurel Dr
N Davis Rd
W Laurel Dr
W Laurel Dr
Adams St
Calle Del Adobe
W Rossi St
US 101 SouthboundOfframp
W Laurel Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Rossi St
N Davis Rd
Davis RdSB Ramps
Keith Higgins
Traffic Engineer
Exhibit 17
Cumulative Plus Project Conditions
Apartments
AM & PM Peak Hour Volumes
(Page 1 of 2)
0(0)
1(0)767(583)217(284)140(238)216(195)
3(0) 252(327) 264(248)
536(662) 640(800) 310(191)
149(339) 290(350) 301(222)
1(1) 591(558) 148(235)
753(977) 620(640) 331(211)
86(258) 340(330) 140(60) 89(74) 1(0) 95(62) 590(300) 280(375) 250(730) 40(120)
622(1394)
322(251)
145(86)180(480)0(0)206(144)19(40)120(210)
100(620) 130(225) 91(174)
610(614) 0(0) 9(11)
160(620) 595(428) 60(106)
226(127) 0(0) 34(90)
522(802) 0(0) 28(29)
90(110) 0(0) 310(211) 80(160) 688(1078) 140(940) 0(0) 918(1282) 486(678) 164(203)
987(1290)
12(16)

13. North Main Street / Laurel Drive 5. Post Drive - El Rancho Way / Calle Del Adobe 6. North Davis Road / Post Drive - Commercial Driveway
962(825)1160(1012)953(932)

10. Davis Road Northbound Ramps - Private Driveway /
West Market Street (State Route 183) 11. Davis Road / Blanco Road 12. North Main Street / Alvin Drive 1(3) 414(261) 746(1427) S Davis Rd Blanco Rd
N Main St
E Laurel Dr
W Laurel Dr
N Main St
W Alvin Dr
Calle Del Adobe
Post Dr
El Rancho Wy
Commercial
Dwy
N Davis Rd
Post Dr
W Market St
(State Route 183)
Private Dwy
Davis RdNB Ramps
E Alvin Dr
Keith Higgins
Traffic Engineer
Exhibit 17
Cumulative Plus Project Conditions
Apartments
AM & PM Peak Hour Volumes
(Page 2 of 2)
Vehicle Trips - Ag Employee Housing Project Alternative Employee Shuttles
Bus 32 33 66 15 miles 990
Van 15 8 16 15 miles 240
Subtotal: 1,230
Shuttle Trips Between Project Site and Storage Area
Bus 33 66 6 miles 400
Van 8 0 0 miles 0
Subtotal: 400
Total VMT: 1,630 per day
326,000 per year
If all ag employees drove personal cars (assuming two person per vehicle):

Driving VMT: 18,000 per day
3,600,000 per year
Notes:

1. Number of buses and vans provided by project applicant.

2. Fields are assumed to be an average of 15 miles from the project site.

3. Per the project applicant, buses will be stored at a location 6 miles away and vans will be stored on the project site.

4. VMT per year estimated using 200 working days per year.

5. Estimate for driving employee comparision assumes two employees per vehicles, which is equivalent to 600 total vehicles per the project definition.

Total
VMT
Vehicle
Type
Seating
Capacity
Total
Vehicles
Total
Trips
Distance Traveled
per Trip
Total
Vehicles
Vehicle
Type
Total
Trips
Distance Traveled
per Trip
Total
VMT
Keith Higgins
Traffic Engineer
Exhibit 18A
Project Vehicle Miles Traveled
Calculation
(Ag Employee Housing)
Vehicle Miles Traveled - Apartments Project Alternative Salinas 57% 834 2.50 2,085
Marina 5% 73 9.00 657
Seaside 3% 44 15.00 660
Monterey 10% 146 18.00 2,628
Prunedale 7% 102 8.00 816
Castroville 5% 73 8.00 584
Watsonville 4% 59 19.00 1,121
Gonzales 1% 14 19.00 266
Soledad 1% 15 28.00 420
Greenfield 1% 15 37.00 555
San Benito County 3% 44 27.00 1,188
Santa Clara County 3% 44 30.00 1,320
Total: 100% 1,463 12,300
Project Average Trip Length 8.4
Regional Average Home-Based Trip Length 8.9
Project Percent of Regional Average Home-Based Trip Length 94% Apartment Occupants per Unit 3.73
Number of Apartments 200
Number of People Living in Apartments 746
Average Residential Vehicle-Miles Traveled (miles/resident): 16.5 Average AMBAG Region VMT per Capita 21.66
Project Percent of Regional VMT per Capita 76%
Notes:

1. Total daily net project residential trips cited from trip generation on Exhibit 5.

2. Apartment Occupants per Unit is average household size in Salinas in 2010 US Census, per the 2010 US Census (factfinder.census.gov).

Location
Percent of
Net Project
Traffic
Daily
Project
Traffic
Distance
from Project
(miles)
Vehicle
Miles
Traveled
Keith Higgins
Traffic Engineer
Exhibit 18B
Project Vehicle Miles Traveled
Calculation
(Apartments)
Appendix A
Level of Service
Descriptions

G-1.2 LOS 2000-2010 Sig Inter
APPENDIX A1

LEVEL OF SERVICE (LOS) DESCRIPTION

SIGNALIZED INTERSECTIONS
The capacity of an urban street is related primarily to the signal timing and the geometric characteristics of the facility as well as to the composition of traffic on the facility. Geometrics are a fixed characteristic of a facility. Thus, while traffic composition may vary somewhat over time, the capacity of a facility is generally a stable value that can be significantly improved only by initiating geometric improvements. A traffic signal essentially allocates time among conflicting traffic movements that seek to use the same space. The way in which time is allocated significantly affects the operation and the capacity of the intersection and its approaches.

The methodology for signalized intersection is designed to consider individual intersection approaches and individual lane groups within approaches. A lane group consists of one or more lanes on an intersection approach. The outputs from application of the method described in the HCM 2000 and 2010 are reported on the basis of each lane. For a given lane group at a signalized intersection, three indications are displayed: green, yellow and red. The red indication may include a short period during which all indications are red, referred to as an all-red interval and the yellow indication forms the change and clearance interval between two green phases.

The methodology for analyzing the capacity and level of service must consider a wide variety of prevailing conditions, including the amount and distribution of traffic movements, traffic composition, geometric characteristics, and details of intersection signalization. The methodology addresses the capacity, LOS, and other performance measures for lane groups and the intersection approaches and the LOS for the intersection as a whole.

Capacity is evaluated in terms of the ratio of demand flow rate to capacity (v/c ratio), whereas LOS is evaluated on the basis of control delay per vehicle (in seconds per vehicle). The methodology does not take into account the potential impact of downstream congestion on intersection operation, nor does the methodology detect and adjust for the impacts of turn-pocket overflows on through traffic and intersection operation.

LEVEL OF SERVICE (LOS) CRITERIA FOR SIGNALIZED INTERSECTIONS (Reference 2000 and 2010 Highway Capacity Manuals)
Level of Service Control Delay (seconds / vehicle)
A <10
B >10 - 20
>
C >20 - 35
D >35 - 55
E >55 - 80
F >80
G-2 Un Sig 2010 2-way Stop
APPENDIX A2

LEVEL OF SERVICE (LOS) DESCRIPTION

UNSIGNALIZED INTERSECTIONS WITH TWO-WAY STOP CONTROL (TWSC) TWSC intersections are widely used and stop signs are used to control vehicle movements at such intersections. At TWSC intersections, the stop-controlled approaches are referred to as the minor street approaches; they can be either public streets or private driveways. The intersection approaches that are not controlled by stop signs are referred to as the major street approaches.

A three-leg intersection is considered to be a standard type of TWSC intersection if the single minor street approach (i.e. the stem of the T configuration) is controlled by a stop sign. Three-leg intersections where two of the three approaches are controlled by stop signs are a special form of unsignalized intersection control.

At TWSC intersections, drivers on the controlled approaches are required to select gaps in the major street flow through which to execute crossing or turning maneuvers on the basis of judgment. In the presence of a queue, each driver on the controlled approach must use some time to move into the front-of-queue position and prepare to evaluate gaps in the major street flow. Capacity analysis at TWSC intersections depends on a clear description and understanding of the interaction of drivers on the minor or stop-controlled approach with drivers on the major street. Both gap acceptance and empirical models have been developed to describe this interaction.

Thus, the capacity of the controlled legs is based on three factors:
· the distribution of gaps in the major street traffic stream; · driver judgment in selecting gaps through which to execute the desired maneuvers; and · the follow-up time required by each driver in a queue.

The delay experienced by a motorist is made up of a number of factors that relate to control, geometrics, traffic and incidents. Total delay is the difference between the travel time actually experienced and the reference travel time that would result during base conditions, in the absence of incident, control, traffic or geometric delay. Average control delay for any particular minor movement is a function of the capacity of the approach and the degree of saturation and referred to as level of service.

LEVEL OF SERVICE (LOS) CRITERIA FOR TWSC INTERSECTIONS
(Reference 2010 Highway Capacity Manual)
Level of Service Control Delay (seconds / vehicle)
A 0 - 10
B >10 - 15
>
C >15 - 25
D >25 - 35
E >35 - 50
F >50
Appendix B
Existing and Proposed
Bicycle Facilities
near Project Site

Source: Transportation Agency for Monterey County Bicycle and Pedestrian Master Plan, Alta Planning + Design, December 2011.

Keith Higgins
Traffic Engineer
Appendix B
Appendix C
Intersection
Traffic Volume
Counts

www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
0 0
0 0
0 0
0 0
0 0 0 0 0 0 0 0 0
0 0
Peak Hr 18 14 0 1 33 0 0
Count Total 38 27 0 6 71 1 1 0 0 2 0 0
8:45 AM 4 7 0 1 12 1 1 0 0 2 0 0 0 0
0 0 0 0 0 0
0 8:30 AM 4 3 0 0 7 0 0 0
0 0 0 0 0 0
0 0
8:15 AM 4 2 0 0 6 0 0
0 0 0 0 0 0
0 0 0
8:00 AM 4 5 0 0 9 0
0 0 0 0 0 0
0 0 0
0 7:30 AM 4 2 0 1 7 0 0 0
0 0 0 0 0 0
2 9 0
EB WB NB SB Total East
7:45 AM 6 5 0 0 11
0 0 0
HV% - 0% 2% - - - - -
0 0
7:15 AM 6 2 0 2 10 0 0
0 0 0 0 0 0
West North South
7:00 AM 6 1 0
0 0 0 0 992 17 0 0 0 0 0 21 0
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
- 1% 0% - - 5% - 0% 1%
Peak
Hour
All 0 210 760
27 0 0 0 0 0
14 0 0 0 0 0 0 1 0 0 33 0
432 2,432 0
HV 0 0 18 0 0
Count Total 1 367 1,331 0 0 0 1,733 40 0 758 4,257 0
0 0 195 4 0 0 0 0 0 5 0 74 484 2,184
5 0 77 477 2,365
8:45 AM 1 38 167 0
1 0 0 0 0 0
568 2,432
8:30 AM 0 58 173 0 0 0 163
0 0 212 5 0 0 0 0 0 4 0 81
5 0 115 655 2,318
8:15 AM 0 63 203 0
6 0 0 0 0 0
665 2,073
8:00 AM 0 49 210 0 0 0 270
0 0 285 2 0 0 0 0 0 7 0 120
5 0 116 544 0
7:45 AM 0 63 188 0
4 0 0 0 0 0
454 0
7:30 AM 0 35 159 0 0 0 225
0 0 202 1 0 0 0 0 0 4 0 89
5 0 86 410 0
7:15 AM 0 37 121 0
7:00 AM 0 24 110 0 0 0 181 4 0 0 0 0 0
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
W Laurel Dr W Laurel Dr n/a Adams St
15-min
Total

UT LT TH RT
SB 0.2% 0.89
TOTAL 1.4% 0.91

UT LT TH RT UT LT TH RT
WB 1.4% 0.88
NB - -
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 1.9% 0.91
Date: 05-22-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
0 0
0 0
0 0
0 0
0 0
N
Adams St
W Laurel Dr
W Laurel Dr
Adams St
W Laurel Dr
TEV: 2,432
PHF: 0.91
432
21 453
227
0 17
992 1,009
781
0 760
210 970
1,424
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.

Peak Hour 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Count Total 0 1 0 0 0 1 0 0 0 0 0 0 2 0
0 0 0 0 0 2 2
0 0
8:45 AM 0 1 0 0 0 1 0
0 0 0 0 0 0
0 0 0
8:30 AM 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 8:00 AM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
7:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
7:30 AM 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
7:15 AM 0 0 0 0 0
0 0 0 0 0 0

TH RT LT TH RT
7:00 AM 0 0 0 0
Westbound Northbound Southbound

LT TH RT LT TH RT LT
33 0
Interval
Start
W Laurel Dr W Laurel Dr n/a Adams St
15-min
Total
Rolling
One Hour Eastbound
0 0 14 0 0 0 0 0 0 1 0 0
1 0 5 71 0
Peak Hour 0 0 18 0
Count Total 0 4 34 0 0 0 27 0 0 0 0 0 0
0 0 7 0 0 0 0 0 0 0 0 1 12 34
0 0 0 7 33
8:45 AM 0 1 3 0
0 0 0 0 0 0
6 33
8:30 AM 0 1 3 0 0 0 3
0 0 2 0 0 0 0 0 0 0 0 0
0 0 0 9 37
8:15 AM 0 0 4 0
0 0 0 0 0 0
11 37
8:00 AM 0 0 4 0 0 0 5
0 0 5 0 0 0 0 0 0 0 0 0
1 0 0 7 0
7:45 AM 0 0 6 0
0 0 0 0 0 0
10 0
7:30 AM 0 0 4 0 0 0 2
0 0 2 0 0 0 0 0 0 0 0 2
0 0 2 9 0
7:15 AM 0 1 5 0
0 0 0 0 0 0
TH RT
7:00 AM 0 1 5 0 0 0 1

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
W Laurel Dr W Laurel Dr n/a Adams St
15-min
Total
Rolling
One Hour Eastbound Westbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
0 0
0 0
0 0
0 0
0 0 0 1 0 0 0 0 0
0 0
Peak Hr 5 3 0 1 9 1 0
Count Total 11 13 0 2 26 1 0 0 0 1 0 0
5:45 PM 2 0 0 1 3 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 5:30 PM 0 1 0 0 1 0 0 0
0 0 1 0 0 0
0 0
5:15 PM 2 2 0 0 4 1 0
0 0 0 0 0 0
0 0 0
5:00 PM 1 0 0 0 1 0
0 0 0 0 0 0
0 0 0
0 4:30 PM 1 4 0 0 5 0 0 0
0 0 0 0 0 0
1 5 0
EB WB NB SB Total East
4:45 PM 1 1 0 0 2
0 0 0
HV% - 0% 0% - - - - -
0 0
4:15 PM 2 3 0 0 5 0 0
0 0 0 0 0 0
West North South
4:00 PM 2 2 0
0 0 0 0 849 30 0 0 0 0 0 37 0
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
- 0% 0% - - 0% - 0% 0%
Peak
Hour
All 0 442 1,329
47 0 0 0 0 0
3 0 0 0 0 0 0 0 0 1 9 0
309 2,996 0
HV 0 1 4 0 0
Count Total 0 838 2,561 0 0 0 1,696 70 0 589 5,801 0
0 0 201 12 0 0 0 0 0 8 0 87 737 2,996
11 0 75 755 2,983
5:45 PM 0 101 328 0
3 0 0 0 0 0
753 2,995
5:30 PM 0 106 332 0 0 0 228
0 0 207 6 0 0 0 0 0 9 0 70
9 0 77 751 2,915
5:15 PM 0 121 340 0
9 0 0 0 0 0
724 2,805
5:00 PM 0 114 329 0 0 0 213
0 0 204 6 0 0 0 0 0 11 0 71
6 0 63 767 0
4:45 PM 0 110 322 0
1 0 0 0 0 0
673 0
4:30 PM 0 108 352 0 0 0 237
0 0 199 5 0 0 0 0 0 7 0 73
9 0 73 641 0
4:15 PM 0 100 289 0
4:00 PM 0 78 269 0 0 0 207 5 0 0 0 0 0
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
W Laurel Dr W Laurel Dr n/a Adams St
15-min
Total

UT LT TH RT
SB 0.3% 0.91
TOTAL 0.3% 0.99

UT LT TH RT UT LT TH RT
WB 0.3% 0.95
NB - -
Peak Hour: 5:00 PM 6:00 PM
HV %: PHF
EB 0.3% 0.96
Date: 05-22-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
1 0
0 0
0 0
0 0
0 0
N
Adams St
W Laurel Dr
W Laurel Dr
Adams St
W Laurel Dr
TEV: 2,996
PHF: 0.99
309
37 346
472
0 30
849 879
1,366
0 1,329
442 1,771
1,158
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.

Peak Hour 0 1 0 0 0 0 0 0 0 0 0 0 1 0
Count Total 0 1 0 0 0 0 0 0 0 0 0 0 1 0
0 0 0 0 0 0 1
0 1
5:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 1 1
5:30 PM 0 0 0 0 0 0
5:15 PM 0 1 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 5:00 PM 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
4:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
4:30 PM 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
4:15 PM 0 0 0 0 0
0 0 0 0 0 0

TH RT LT TH RT
4:00 PM 0 0 0 0
Westbound Northbound Southbound

LT TH RT LT TH RT LT
9 0
Interval
Start
W Laurel Dr W Laurel Dr n/a Adams St
15-min
Total
Rolling
One Hour Eastbound
0 0 3 0 0 0 0 0 0 0 0 1
0 0 2 26 0
Peak Hour 0 1 4 0
Count Total 0 2 9 0 0 0 13 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 1 3 9
0 0 0 1 8
5:45 PM 0 0 2 0
0 0 0 0 0 0
4 12
5:30 PM 0 0 0 0 0 0 1
0 0 2 0 0 0 0 0 0 0 0 0
0 0 0 1 13
5:15 PM 0 1 1 0
0 0 0 0 0 0
2 17
5:00 PM 0 0 1 0 0 0 0
0 0 1 0 0 0 0 0 0 0 0 0
0 0 0 5 0
4:45 PM 0 0 1 0
0 0 0 0 0 0
5 0
4:30 PM 0 0 1 0 0 0 4
0 0 3 0 0 0 0 0 0 0 0 0
0 0 1 5 0
4:15 PM 0 1 1 0
0 0 0 0 0 0
TH RT
4:00 PM 0 0 2 0 0 0 2

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
W Laurel Dr W Laurel Dr n/a Adams St
15-min
Total
Rolling
One Hour Eastbound Westbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
1 1
4 2
2 2
1 3
16 0 0 0 0 0 3 7 10
6 10
Peak Hour 35 16 16 0 67 0 0
Count Total 68 35 28 0 131 1 0 0 0 1 0 0
8:45 AM 7 8 4 0 19 1 0 0 0 1 0 0 2 1
0 0 0 0 0 1
1 8:30 AM 12 4 3 0 19 0 0 0
0 0 0 0 0 1
2 0
8:15 AM 11 3 3 0 17 0 0
0 0 0 0 0 0
0 0 2
8:00 AM 7 6 6 0 19 0
0 0 0 0 0 0
0 0 4
1 7:30 AM 6 2 2 0 10 0 0 0
0 0 0 0 0 0
0 14 0
EB WB NB SB Total East
7:45 AM 11 5 5 0 21
0 0 0
HV% - - 2% 7% - - 5% 0%
1 0
7:15 AM 5 4 3 0 12 0 0
0 0 0 0 0 0
West North South
7:00 AM 9 3 2
0 289 0 0 1,174 247 0 283 1 147 0 0 0
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
- 1% 1% 2% - - - - 2%
Peak
Hour
All 0 0 850
490 0 491 2 251 0
14 2 0 13 0 3 0 0 0 0 67 0
0 2,991 0
HV 0 0 16 19 0
Count Total 0 0 1,489 537 0 0 1,967 0 0 0 5,227 0
0 0 197 41 0 74 1 31 0 0 0 0 600 2,702
0 0 0 591 2,924
8:45 AM 0 0 196 60
52 0 55 0 34 0
723 2,991
8:30 AM 0 0 193 77 0 0 180
0 0 252 49 0 72 0 39 0 0 0 0
0 0 0 788 2,823
8:15 AM 0 0 225 86
61 0 86 1 39 0
822 2,525
8:00 AM 0 0 224 61 0 0 316
0 0 346 60 0 80 0 36 0 0 0 0
0 0 0 658 0
7:45 AM 0 0 236 64
77 0 45 0 33 0
555 0
7:30 AM 0 0 165 78 0 0 260
0 0 217 76 0 49 0 20 0 0 0 0
0 0 0 490 0
7:15 AM 0 0 132 61
7:00 AM 0 0 118 50 0 0 199 74 0 30 0 19 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
W Laurel Dr W Laurel Dr US-101 NB Off Ramp US-101 NB On Ramp 15-min
Total

UT LT TH RT
Date: 05-22-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
SB - -
TOTAL 2.2% 0.91
TH RT
WB 1.1% 0.88
NB 3.7% 0.86
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 3.1% 0.92
0 0
0 0
00 00
0 0
0 0
3 7
0 0
N
US-101 NB Off Ramp
W Laurel Dr
W Laurel Dr
US-101 NB Off
Ramp
W Laurel DrUS-101 NB On Ramp
TEV: 2,991
PHF: 0.91
0 0
0 0
248
0 247
1,174
0 1,421
997
0 147
1 283
289
431
0 289
850
0 1,139
1,457
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 1 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
0 0 0 0 1 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 1 0 0 0 0 0 1 1
0 0
8:45 AM
0 0 0 0
0 8:30 AM
0 0 0 0 0 0 0
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 0 0
RT
67 0
Interval
Start
W Laurel Dr W Laurel Dr US-101 NB Off Ramp US-101 NB On Ramp 15-min
Total
Rolling
One Hour
0 0 14 2 0 13 0 3 0 0 0 0

LT TH RT RT LT TH RT
0 0 0 131 0
Peak Hour 0 0 16 19
Count Total 0 0 37 31 0 0 24 11 0 25 0 3 0
0 0 3 5 0 4 0 0 0 0 0 0 19 74
0 0 0 19 76
8:45 AM 0 0 5 2
2 0 3 0 0 0
17 67
8:30 AM 0 0 5 7 0 0 2
0 0 3 0 0 3 0 0 0 0 0 0
0 0 0 19 62
8:15 AM 0 0 6 5
1 0 4 0 2 0
21 57
8:00 AM 0 0 2 5 0 0 5
0 0 5 0 0 5 0 0 0 0 0 0
0 0 0 10 0
7:45 AM 0 0 5 6
1 0 1 0 1 0
12 0
7:30 AM 0 0 3 3 0 0 1
0 0 2 2 0 3 0 0 0 0 0 0
0 0 0 14 0
7:15 AM 0 0 5 0
0 0 2 0 0 0
TH RT
7:00 AM 0 0 6 3 0 0 3

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
W Laurel Dr W Laurel Dr US-101 NB Off Ramp US-101 NB On Ramp 15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
4 4
2 1
2 1
2 1
17 0 0 1 0 0 3 3 6
7 10
Peak Hour 17 4 18 0 39 1 0
Count Total 28 16 36 0 80 1 0 0 0 1 0 0
5:45 PM 3 1 3 0 7 0 0 0 0 0 0 0 0 1
0 0 0 0 1 1
1 5:30 PM 3 1 2 0 6 0 0 0
0 0 1 0 0 0
2 0
5:15 PM 4 2 4 0 10 1 0
0 0 0 0 0 0
0 1 0
5:00 PM 7 0 9 0 16 0
0 0 0 0 0 0
0 1 1
3 4:30 PM 3 4 5 0 12 0 0 0
0 0 0 0 0 1
0 11 0
EB WB NB SB Total East
4:45 PM 2 1 6 0 9
0 0 0
HV% - 0% 0% 3% - - 4% 0%
1 3
4:15 PM 4 3 2 0 9 0 0
0 0 0 0 0 0
West North South
4:00 PM 2 4 5
0 389 0 0 934 229 0 418 3 357 0 0 0
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
- 0% 0% 0% - - - - 1%
Peak
Hour
All 0 1 1,314
463 0 851 5 667 0
4 0 0 18 0 0 0 0 0 0 39 0
0 3,645 0
HV 0 0 5 12 0
Count Total 0 1 2,396 731 0 0 1,820 0 0 0 6,934 0
0 0 239 49 0 88 0 74 0 0 0 0 882 3,645
0 0 0 916 3,635
5:45 PM 0 0 354 78
64 0 93 1 85 0
972 3,545
5:30 PM 0 1 335 93 0 0 244
0 0 209 72 0 122 0 102 0 0 0 0
0 0 0 875 3,316
5:15 PM 0 0 345 122
44 0 115 2 96 0
872 3,289
5:00 PM 0 0 280 96 0 0 242
0 0 231 55 0 117 0 94 0 0 0 0
0 0 0 826 0
4:45 PM 0 0 292 83
73 0 109 1 84 0
743 0
4:30 PM 0 0 257 93 0 0 209
0 0 211 52 0 93 1 65 0 0 0 0
0 0 0 848 0
4:15 PM 0 0 245 76
4:00 PM 0 0 288 90 0 0 235 54 0 114 0 67 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
W Laurel Dr W Laurel Dr US-101 NB Off Ramp US-101 NB On Ramp 15-min
Total

UT LT TH RT
Date: 05-22-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
SB - -
TOTAL 1.1% 0.94
TH RT
WB 0.3% 0.94
NB 2.3% 0.87
Peak Hour: 5:00 PM 6:00 PM
HV %: PHF
EB 1.0% 0.91
0 1
0 0
00 00
0 0
0 0
3 3
0 0
N
US-101 NB Off Ramp
W Laurel Dr
W Laurel Dr
US-101 NB Off
Ramp
W Laurel DrUS-101 NB On Ramp
TEV: 3,645
PHF: 0.94
0 0
0 0
233
0 229
934
0 1,163
1,671
0 357
3 418
389
778
0 389
1,314
1 1,704
1,352
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 1 0 0 0 0
0 1 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 1
0 0 0 0 1 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 1
0 1
5:45 PM
0 0 0 0
1 5:30 PM
0 0 0 0 0 0 1
0 0
5:15 PM
0 0 0
0 1 0
0 0 0
0 0 0
0 5:00 PM
0 0 0 0
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
4:00 PM 0 0
RT
39 0
Interval
Start
W Laurel Dr W Laurel Dr US-101 NB Off Ramp US-101 NB On Ramp 15-min
Total
Rolling
One Hour
0 0 4 0 0 18 0 0 0 0 0 0

LT TH RT RT LT TH RT
0 0 0 80 0
Peak Hour 0 0 5 12
Count Total 0 0 10 18 0 0 14 2 0 35 0 1 0
0 0 1 0 0 3 0 0 0 0 0 0 7 39
0 0 0 6 41
5:45 PM 0 0 2 1
0 0 2 0 0 0
10 47
5:30 PM 0 0 0 3 0 0 1
0 0 2 0 0 4 0 0 0 0 0 0
0 0 0 16 46
5:15 PM 0 0 1 3
0 0 9 0 0 0
9 41
5:00 PM 0 0 2 5 0 0 0
0 0 1 0 0 6 0 0 0 0 0 0
0 0 0 12 0
4:45 PM 0 0 1 1
2 0 5 0 0 0
9 0
4:30 PM 0 0 1 2 0 0 2
0 0 3 0 0 2 0 0 0 0 0 0
0 0 0 11 0
4:15 PM 0 0 2 2
0 0 4 0 1 0
TH RT
4:00 PM 0 0 1 1 0 0 4

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
W Laurel Dr W Laurel Dr US-101 NB Off Ramp US-101 NB On Ramp 15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
3 3
2 2
1 2
1 2
16 0 0 0 0 0 2 5 7
6 10
Peak Hour 49 25 0 23 97 0 0
Count Total 94 46 0 52 192 0 0 0 0 0 0 0
8:45 AM 14 7 0 4 25 0 0 0 0 0 0 0 1 1
0 0 0 0 0 1
1 8:30 AM 17 4 0 10 31 0 0 0
0 0 0 0 0 1
0 1
8:15 AM 11 5 0 10 26 0 0
0 0 0 0 0 0
0 1 1
8:00 AM 16 9 0 6 31 0
0 0 0 0 0 0
0 0 2
3 7:30 AM 11 2 0 0 13 0 0 0
0 0 0 0 0 0
9 19 0
EB WB NB SB Total East
7:45 AM 11 9 0 7 27
0 0 0
HV% - - 3% 6% - - - -
3 0
7:15 AM 8 6 0 6 20 0 0
0 0 0 0 0 0
West North South
7:00 AM 6 4 0
0 325 0 0 1,201 256 0 0 0 0 0 210 0
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
- 2% 0% - - 0% - 6% 3%
Peak
Hour
All 0 0 946
420 0 0 0 0 0
25 0 0 0 0 0 0 1 0 22 97 0
360 3,298 0
HV 0 0 31 18 0
Count Total 0 0 1,666 579 0 0 2,024 386 0 646 5,721 0
0 0 227 35 0 0 0 0 0 44 0 64 650 2,968
41 0 80 655 3,221
8:45 AM 0 0 204 76
31 0 0 0 0 0
816 3,298
8:30 AM 0 0 240 54 0 0 209
0 0 320 47 0 0 0 0 0 51 0 68
57 0 91 847 3,087
8:15 AM 0 0 261 69
51 0 0 0 0 0
903 2,753
8:00 AM 0 0 237 76 0 0 335
0 0 314 87 0 0 0 0 0 64 0 106
38 0 95 732 0
7:45 AM 0 0 240 92
71 0 0 0 0 0
605 0
7:30 AM 0 0 208 88 0 0 232
0 0 205 54 0 0 0 0 0 46 0 79
45 0 63 513 0
7:15 AM 0 0 154 67
7:00 AM 0 0 122 57 0 0 182 44 0 0 0 0 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
W Laurel Dr W Laurel Dr US-101 SB On Ramp US-101 SB Ramps 15-min
Total

UT LT TH RT
Date: 05-22-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 4.0% 0.84
TOTAL 2.9% 0.91
TH RT
WB 1.7% 0.91
NB - -
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 3.9% 0.96
0 0
0 0
00 00
0 0
0 0
2 5
0 0
N
US-101 SB On Ramp
W Laurel Dr
W Laurel Dr
US-101 SB On
Ramp
W Laurel DrUS-101 SB Ramps
TEV: 3,298
PHF: 0.91
360
0 210
570
256
0 256
1,201
0 1,457
1,156
0 0
00 325
0 0
325
946
0 1,271
1,561
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 0
0 0
8:45 AM
0 0 0 0
0 8:30 AM
0 0 0 0 0 0 0
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 0 0
RT
97 0
Interval
Start
W Laurel Dr W Laurel Dr US-101 SB On Ramp US-101 SB Ramps 15-min
Total
Rolling
One Hour
0 0 25 0 0 0 0 0 0 1 0 22

LT TH RT RT LT TH RT
9 0 43 192 0
Peak Hour 0 0 31 18
Count Total 0 0 58 36 0 0 45 1 0 0 0 0 0
0 0 7 0 0 0 0 0 0 0 0 4 25 113
2 0 8 31 115
8:45 AM 0 0 7 7
0 0 0 0 0 0
26 97
8:30 AM 0 0 10 7 0 0 4
0 0 5 0 0 0 0 0 0 0 0 10
0 0 6 31 91
8:15 AM 0 0 8 3
0 0 0 0 0 0
27 79
8:00 AM 0 0 8 8 0 0 9
0 0 9 0 0 0 0 0 0 1 0 6
0 0 0 13 0
7:45 AM 0 0 7 4
0 0 0 0 0 0
20 0
7:30 AM 0 0 8 3 0 0 2
0 0 6 0 0 0 0 0 0 2 0 4
4 0 5 19 0
7:15 AM 0 0 4 4
1 0 0 0 0 0
TH RT
7:00 AM 0 0 6 0 0 0 3

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
W Laurel Dr W Laurel Dr US-101 SB On Ramp US-101 SB Ramps 15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
1 3
3 0
1 4
2 1
15 0 0 2 0 1 4 3 8
8 6
Peak Hour 38 24 0 13 75 2 0
Count Total 63 52 0 26 141 2 0 0 0 2 0 1
5:45 PM 5 5 0 4 14 0 0 0 0 0 0 0 0 1
0 0 0 0 2 0
2 5:30 PM 8 4 0 1 13 0 0 0
0 0 2 0 1 1
1 0
5:15 PM 10 7 0 2 19 2 0
0 0 0 0 0 0
0 0 0
5:00 PM 15 8 0 6 29 0
0 0 0 0 0 0
0 2 1
2 4:30 PM 6 7 0 3 16 0 0 0
0 0 0 0 0 1
3 19 0
EB WB NB SB Total East
4:45 PM 4 7 0 5 16
0 0 0
HV% - - 1% 5% - - - -
1 0
4:15 PM 8 5 0 2 15 0 0
0 0 0 0 0 0
West North South
4:00 PM 7 9 0
0 472 0 0 1,239 137 0 0 0 0 0 388 0
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
- 2% 1% - - 0% - 3% 2%
Peak
Hour
All 0 0 1,429
284 0 0 0 0 0
22 2 0 0 0 0 0 1 0 12 75 0
360 4,025 0
HV 0 0 16 22 0
Count Total 0 0 2,690 914 0 0 2,430 789 0 698 7,805 0
0 0 294 35 0 0 0 0 0 93 0 100 986 4,025
100 0 88 969 3,988
5:45 PM 0 0 345 119
37 0 0 0 0 0
1,048 3,978
5:30 PM 0 0 329 109 0 0 306
0 0 324 30 0 0 0 0 0 91 0 78
104 0 94 1,022 3,848
5:15 PM 0 0 396 129
35 0 0 0 0 0
949 3,780
5:00 PM 0 0 359 115 0 0 315
0 0 303 42 0 0 0 0 0 110 0 102
99 0 77 959 0
4:45 PM 0 0 300 92
31 0 0 0 0 0
918 0
4:30 PM 0 0 366 110 0 0 276
0 0 282 29 0 0 0 0 0 98 0 68
94 0 91 954 0
4:15 PM 0 0 309 132
4:00 PM 0 0 286 108 0 0 330 45 0 0 0 0 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
W Laurel Dr W Laurel Dr US-101 SB On Ramp US-101 SB Ramps 15-min
Total

UT LT TH RT
Date: 05-22-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 1.7% 0.94
TOTAL 1.9% 0.96
TH RT
WB 1.7% 0.97
NB - -
Peak Hour: 5:00 PM 6:00 PM
HV %: PHF
EB 2.0% 0.91
0 2
0 0
00 00
0 0
0 0
4 3
1 0
N
US-101 SB On Ramp
W Laurel Dr
W Laurel Dr
US-101 SB On
Ramp
W Laurel DrUS-101 SB Ramps
TEV: 4,025
PHF: 0.96
360
0 388
748
137
0 137
1,239
0 1,376
1,817
0 0
00 472
0 0
472
1,429
0 1,901
1,599
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 2 0 0 0 0
0 2 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 2
0 0 0 0 2 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 2
0 2
5:45 PM
0 0 0 0
2 5:30 PM
0 0 0 0 0 0 2
0 0
5:15 PM
0 0 0
0 2 0
0 0 0
0 0 0
0 5:00 PM
0 0 0 0
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
4:00 PM 0 0
RT
75 0
Interval
Start
W Laurel Dr W Laurel Dr US-101 SB On Ramp US-101 SB Ramps 15-min
Total
Rolling
One Hour
0 0 22 2 0 0 0 0 0 1 0 12

LT TH RT RT LT TH RT
3 0 23 141 0
Peak Hour 0 0 16 22
Count Total 0 0 26 37 0 0 48 4 0 0 0 0 0
0 0 4 1 0 0 0 0 0 0 0 4 14 75
1 0 0 13 77
5:45 PM 0 0 3 2
1 0 0 0 0 0
19 80
5:30 PM 0 0 2 6 0 0 3
0 0 7 0 0 0 0 0 0 0 0 2
0 0 6 29 76
5:15 PM 0 0 4 6
0 0 0 0 0 0
16 66
5:00 PM 0 0 7 8 0 0 8
0 0 6 1 0 0 0 0 0 0 0 5
1 0 2 16 0
4:45 PM 0 0 2 2
0 0 0 0 0 0
15 0
4:30 PM 0 0 2 4 0 0 7
0 0 5 0 0 0 0 0 0 0 0 2
1 0 2 19 0
4:15 PM 0 0 4 4
1 0 0 0 0 0
TH RT
4:00 PM 0 0 2 5 0 0 8

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
W Laurel Dr W Laurel Dr US-101 SB On Ramp US-101 SB Ramps 15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
1 0
2 4
0 1
6 3
17 0 0 1 2 1 4 0 7
7 3
Peak Hour 26 43 31 17 117 0 1
Count Total 42 82 53 27 204 0 1 0 1 2 4 3
8:45 AM 5 8 8 4 25 0 0 0 0 0 0 0 2 1
0 0 1 2 1 2
0 8:30 AM 5 13 7 4 29 0 0 0
0 0 0 0 0 1
0 0
8:15 AM 5 11 6 1 23 0 0
1 0 0 1 0 0
1 2 0
8:00 AM 6 14 11 7 38 0
0 0 0 0 0 1
0 1 0
0 7:30 AM 11 4 4 3 22 0 0 0
0 0 0 0 0 0
0 16 0
EB WB NB SB Total East
7:45 AM 4 14 10 6 34
0 0 1
HV% - 3% 8% 22% 0% - 4% 2%
0 0
7:15 AM 3 8 4 2 17 0 0
0 0 1 1 1 0
West North South
7:00 AM 3 10 3
18 9 1 845 441 294 0 23 280 790 0 158 282
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
2% 4% 3% 3% - 6% 2% 3% 3%
Peak
Hour
All 0 29 284
520 0 33 508 1,405 0
16 9 0 1 6 24 0 10 6 1 117 0
29 3,465 0
HV 0 1 23 2 0
Count Total 0 40 473 14 1 1,486 669 299 491 44 5,983 0
0 147 71 73 0 4 62 173 0 51 69 4 711 3,183
37 47 4 707 3,407
8:45 AM 0 5 50 2
62 0 1 82 187 0
862 3,465
8:30 AM 0 4 49 2 0 169 63
0 182 91 94 0 0 81 207 0 49 69 7
44 60 6 903 3,195
8:15 AM 0 9 68 5
81 0 11 70 172 0
935 2,800
8:00 AM 0 7 74 2 0 236 140
0 233 144 69 0 8 72 209 0 34 78 4
31 75 12 765 0
7:45 AM 0 8 74 2
50 0 4 57 202 0
592 0
7:30 AM 0 5 68 0 1 194 66
0 164 46 52 0 4 55 131 0 33 47 4
20 46 3 508 0
7:15 AM 0 2 54 0
7:00 AM 0 0 36 1 0 161 48 39 0 1 29 124 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Calle Del Adobe W Laurel Dr N Davis Rd N Davis Rd
15-min
Total

UT LT TH RT
Date: 05-22-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 3.6% 0.94
TOTAL 3.4% 0.93
TH RT
WB 2.7% 0.86
NB 2.8% 0.95
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 8.1% 0.96
0 0
0 0
00 00
0 0
1 0
4 0
1 2
N
N Davis Rd
Calle Del Adobe
W Laurel Dr
N Davis Rd
Calle Del Adobe
N Davis Rd
TEV: 3,465
PHF: 0.93
29 282
158
469
603
0 294
441
845
1,581
1,233
1 280790
23 1,136
1,093
0 9
284
29 322
493
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 1 0
0 0 0 0 1 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 1
0 0 0
0 0
0 1 0
0 0 0
0 LT TH
0 0 0 0 0 0 1
0 0 0 1 2 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 1
0 1
8:45 AM
0 0 0 0
1 8:30 AM
0 0 0 0 0 0 0
1 1
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
1 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 1 0
RT
117 0
Interval
Start
Calle Del Adobe W Laurel Dr N Davis Rd N Davis Rd
15-min
Total
Rolling
One Hour
0 18 16 9 0 1 6 24 0 10 6 1

LT TH RT RT LT TH RT
18 7 2 204 0
Peak Hour 0 1 23 2
Count Total 0 1 39 2 0 39 28 15 0 2 8 43 0
0 2 5 1 0 1 0 7 0 4 0 0 25 115
2 1 1 29 124
8:45 AM 0 0 5 0
2 0 0 1 6 0
23 117
8:30 AM 0 0 5 0 0 9 2
0 6 1 4 0 0 1 5 0 0 1 0
5 1 1 38 111
8:15 AM 0 0 4 1
0 0 0 1 10 0
34 89
8:00 AM 0 0 5 1 0 7 7
0 3 6 5 0 1 2 7 0 4 2 0
1 2 0 22 0
7:45 AM 0 0 4 0
0 0 0 2 2 0
17 0
7:30 AM 0 1 10 0 0 2 2
0 6 2 0 0 0 1 3 0 2 0 0
0 0 0 16 0
7:15 AM 0 0 3 0
3 0 0 0 3 0
TH RT
7:00 AM 0 0 3 0 0 4 3

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Calle Del Adobe W Laurel Dr N Davis Rd N Davis Rd
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
6 2
4 5
1 3
1 1
23 0 1 2 0 3 1 2 6
4 4
Peak Hour 23 39 18 9 89 0 1
Count Total 34 76 34 16 160 0 1 0 2 3 6 9
5:45 PM 2 8 5 0 15 0 0 0 1 1 0 1 0 0
0 0 0 0 1 0
2 5:30 PM 7 4 4 3 18 0 0 0
0 0 1 0 1 0
0 0
5:15 PM 7 13 3 2 25 0 1
0 0 0 0 0 1
1 0 0
5:00 PM 7 14 6 4 31 0
0 0 0 1 1 4
2 0 1
0 4:30 PM 3 10 2 2 17 0 0 0
0 0 0 1 0 1
0 13 0
EB WB NB SB Total East
4:45 PM 3 13 2 2 20
0 0 1
HV% 0% 0% 6% 29% - 0% 0% 0%
2 1
4:15 PM 1 7 10 3 21 0 0
0 0 0 0 0 3
West North South
4:00 PM 4 7 2
7 7 0 676 348 497 2 10 497 902 0 499 491
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
1% 8% 1% 2% - 1% 1% 0% 2%
Peak
Hour
All 1 27 327
987 2 23 965 1,679 0
28 4 0 0 0 18 0 3 6 0 89 0
31 4,315 0
HV 0 0 21 2 0
Count Total 1 62 594 14 0 1,357 689 968 967 71 8,379 0
0 170 83 121 1 3 118 219 0 127 128 12 1,072 4,315
118 112 3 1,083 4,134
5:45 PM 0 6 82 2
130 0 3 139 225 0
1,123 4,078
5:30 PM 1 7 86 4 0 165 90
0 165 83 141 0 2 130 254 0 132 119 10
122 132 6 1,037 4,058
5:15 PM 0 7 79 1
105 1 2 110 204 0
891 4,064
5:00 PM 0 7 80 0 0 176 92
0 187 89 117 0 3 94 116 0 101 118 8
124 106 8 1,027 0
4:45 PM 0 6 52 0
122 0 2 126 247 0
1,103 0
4:30 PM 0 7 74 1 0 133 77
0 186 78 116 0 3 123 214 0 136 130 18
108 122 6 1,043 0
4:15 PM 0 18 79 2
4:00 PM 0 4 62 4 0 175 97 135 0 5 125 200 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Calle Del Adobe W Laurel Dr N Davis Rd N Davis Rd
15-min
Total

UT LT TH RT
Date: 05-22-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.9% 0.96
TOTAL 2.1% 0.96
TH RT
WB 2.6% 0.98
NB 1.3% 0.91
Peak Hour: 5:00 PM 6:00 PM
HV %: PHF
EB 6.4% 0.92
0 0
0 1
00 00
0 1
0 0
1 2
3 0
N
N Davis Rd
Calle Del Adobe
W Laurel Dr
N Davis Rd
Calle Del Adobe
N Davis Rd
TEV: 4,315
PHF: 0.96
31 491
499
1,021
1,021
0 497
348
676
1,521
1,728
0 497902
10 1,176
1,411
2 7
327
27 362
390
1 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
1 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 1
0 0 0 0 0 1
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 1 2
0 0 0 1 3 0
0 0
0 0
Peak Hour
Count Total 1 0
0 0 0 0 0 0 0 1 1 2
0 2
5:45 PM
0 0 0 0
2 5:30 PM
0 0 0 0 0 0 1
0 1
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 1
1 5:00 PM
0 0 0 1
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
4:00 PM 0 0
RT
89 0
Interval
Start
Calle Del Adobe W Laurel Dr N Davis Rd N Davis Rd
15-min
Total
Rolling
One Hour
0 7 28 4 0 0 0 18 0 3 6 0

LT TH RT RT LT TH RT
4 10 2 160 0
Peak Hour 0 0 21 2
Count Total 0 0 32 2 0 15 56 5 0 0 1 33 0
0 0 7 1 0 0 0 5 0 0 0 0 15 89
1 2 0 18 94
5:45 PM 0 0 2 0
0 0 0 0 4 0
25 93
5:30 PM 0 0 5 2 0 1 3
0 4 6 3 0 0 0 3 0 0 2 0
2 2 0 31 89
5:15 PM 0 0 7 0
0 0 0 0 6 0
20 71
5:00 PM 0 0 7 0 0 2 12
0 4 8 1 0 0 0 2 0 0 1 1
1 1 0 17 0
4:45 PM 0 0 3 0
0 0 0 0 2 0
21 0
4:30 PM 0 0 3 0 0 1 9
0 2 5 0 0 0 1 9 0 0 2 1
0 0 0 13 0
4:15 PM 0 0 1 0
0 0 0 0 2 0
TH RT
4:00 PM 0 0 4 0 0 1 6

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Calle Del Adobe W Laurel Dr N Davis Rd N Davis Rd
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
2 1
2 2
1 3
0 0
11 0 0 1 1 3 2 2 8
3 3
Peak Hour 16 49 24 12 101 0 1
Count Total 37 83 35 25 180 0 1 0 0 1 1 4
8:45 AM 3 6 3 5 17 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 8:30 AM 6 10 3 2 21 0 0 0
0 0 1 1 0 2
0 0
8:15 AM 5 20 3 3 31 0 1
0 0 0 0 0 1
0 0 2
8:00 AM 2 14 6 4 26 0
0 0 0 0 0 0
2 0 0
1 7:30 AM 7 4 9 2 22 0 0 0
0 0 0 0 0 0
3 16 0
EB WB NB SB Total East
7:45 AM 2 11 6 3 22
0 0 0
HV% - 4% 5% 0% - - 10% 1%
1 0
7:15 AM 8 11 3 3 25 0 0
0 0 0 0 0 1
West North South
7:00 AM 4 7 2
27 4 0 846 446 303 0 30 289 768 0 163 369
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
3% 4% 2% 2% - 2% 2% 3% 3%
Peak
Hour
All 0 24 300
524 0 39 582 1,386 0
17 5 0 3 4 17 0 3 8 1 101 0
38 3,580 0
HV 0 1 15 0 0
Count Total 0 45 468 13 0 1,508 686 285 596 52 6,184 0
0 167 64 78 0 3 94 135 0 49 65 3 699 3,281
40 65 6 765 3,500
8:45 AM 0 6 33 2
66 0 2 97 213 0
892 3,580
8:30 AM 0 9 46 2 0 161 58
0 205 89 114 0 5 71 178 0 57 78 4
35 105 12 925 3,332
8:15 AM 0 9 81 1
84 0 14 83 176 0
918 2,903
8:00 AM 0 6 66 1 0 207 136
0 198 119 57 0 8 77 207 0 38 120 16
33 66 6 845 0
7:45 AM 0 6 71 1
48 0 3 58 207 0
644 0
7:30 AM 0 3 82 1 0 236 102
0 181 62 48 0 1 57 155 0 22 62 3
11 35 2 496 0
7:15 AM 0 5 45 3
7:00 AM 0 1 44 2 0 153 56 29 0 3 45 115 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Calle Del Adobe Laurel Dr Davis Rd Davis Rd
15-min
Total

UT LT TH RT
Date: 09-24-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 2.1% 0.82
TOTAL 2.8% 0.97
TH RT
WB 3.1% 0.93
NB 2.2% 0.93
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 4.9% 0.90
0 0
0 0
00 00
0 0
1 0
2 2
3 1
N
Davis Rd
Calle Del Adobe
Laurel Dr
Davis Rd
Calle Del Adobe
Davis Rd
TEV: 3,580
PHF: 0.97
38 369
163
570
616
0 303
446
846
1,595
1,231
0 289768
30 1,219
1,087
0 4
300
24 328
514
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 1 0
0 0 0 0 1 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 1
0 0 0 0 1 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 1
0 1
8:45 AM
0 0 0 0
1 8:30 AM
0 0 0 0 0 0 1
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 1 0
0 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 0 0
RT
101 0
Interval
Start
Calle Del Adobe Laurel Dr Davis Rd Davis Rd
15-min
Total
Rolling
One Hour
0 27 17 5 0 3 4 17 0 3 8 1

LT TH RT RT LT TH RT
8 16 1 180 0
Peak Hour 0 1 15 0
Count Total 0 1 35 1 0 51 25 7 0 6 7 22 0
0 4 1 1 0 1 1 1 0 1 4 0 17 95
0 2 0 21 100
8:45 AM 0 0 3 0
0 0 1 0 2 0
31 101
8:30 AM 0 0 5 1 0 7 3
0 15 3 2 0 0 0 3 0 1 2 0
1 3 0 26 95
8:15 AM 0 1 4 0
1 0 1 1 4 0
22 85
8:00 AM 0 0 2 0 0 3 10
0 7 3 1 0 1 1 4 0 0 2 1
1 1 0 22 0
7:45 AM 0 0 2 0
1 0 1 2 6 0
25 0
7:30 AM 0 0 7 0 0 2 1
0 8 3 0 0 0 1 2 0 3 0 0
1 2 0 16 0
7:15 AM 0 0 8 0
1 0 1 1 0 0
TH RT
7:00 AM 0 0 4 0 0 5 1

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Calle Del Adobe Laurel Dr Davis Rd Davis Rd
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
3 8
6 4
5 6
5 4
41 1 1 2 1 5 8 6 20
10 10
Peak Hour 13 23 9 12 57 0 0
Count Total 33 62 34 26 155 0 0 3 1 4 8 13
5:45 PM 4 6 13 3 26 0 0 0 0 0 3 0 0 1
1 1 0 1 3 1
4 5:30 PM 3 6 2 1 12 0 0 0
1 0 1 0 0 2
2 0
5:15 PM 3 4 2 7 16 0 0
0 0 0 0 0 3
1 1 1
5:00 PM 3 6 3 2 14 0
0 0 0 0 0 1
2 0 2
1 4:30 PM 8 7 0 4 19 0 0 2
0 0 0 1 5 1
4 26 0
EB WB NB SB Total East
4:45 PM 4 7 2 2 15
0 2 2
HV% - 0% 4% 0% - 0% 0% 1%
1 0
4:15 PM 5 14 5 3 27 0 0
0 0 0 0 1 1
West North South
4:00 PM 3 12 7
9 13 0 684 432 516 1 17 514 985 0 490 554
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
1% 3% 0% 1% - 0% 2% 0% 1%
Peak
Hour
All 0 24 342
993 1 28 988 1,910 1
12 2 0 0 3 6 0 2 10 0 57 0
40 4,612 0
HV 0 0 13 0 0
Count Total 0 52 622 27 0 1,386 751 959 1,068 74 8,860 0 0 190 77 104 0 4 117 266 0 130 121 6 1,088 4,543
134 142 9 1,184 4,612
5:45 PM 0 9 61 3
117 0 2 137 256 0
1,131 4,477
5:30 PM 0 8 84 7 0 181 107
0 156 106 121 0 3 125 237 0 122 167 13
104 119 10 1,140 4,417
5:15 PM 0 5 74 2
123 1 7 124 251 0
1,157 4,317
5:00 PM 0 6 103 1 0 180 111
0 167 108 155 0 5 128 241 0 130 126 8
123 129 13 1,049 0
4:45 PM 0 5 81 3
125 0 3 113 208 0
1,071 0
4:30 PM 0 3 78 5 0 168 81
0 185 84 124 0 2 116 244 0 97 132 9
119 132 6 1,040 0
4:15 PM 0 6 71 1
4:00 PM 0 10 70 5 0 159 77 124 0 2 128 207 1

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Calle Del Adobe Laurel Dr Davis Rd Davis Rd
15-min
Total

UT LT TH RT
Date: 09-24-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 1.1% 0.90
TOTAL 1.2% 0.97
TH RT
WB 1.4% 0.95
NB 0.6% 0.96
Peak Hour: 4:45 PM 5:45 PM
HV %: PHF
EB 3.4% 0.86
0 0
0 0
10 01
0 0
0 0
8 6
5 1
N
Davis Rd
Calle Del Adobe
Laurel Dr
Davis Rd
Calle Del Adobe
Davis Rd
TEV: 4,612
PHF: 0.97
40 554
490
1,084
1,054
0 516
432
684
1,632
1,817
0 514985
17 1,252
1,517
1 13
342
24 379
489
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 1 0 0 1 0 2
0 3 0 0 4 0
1 0
0 0
Peak Hour
Count Total 0 1
0 0 0 0 0 0 0 0 0 2
1 2
5:45 PM
0 0 0 0
3 5:30 PM
0 1 0 0 0 0 1
0 2
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
2 5:00 PM
0 0 0 0
2 0
4:45 PM
0 2 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
4:00 PM 0 0
RT
57 0
Interval
Start
Calle Del Adobe Laurel Dr Davis Rd Davis Rd
15-min
Total
Rolling
One Hour
0 9 12 2 0 0 3 6 0 2 10 0

LT TH RT RT LT TH RT
6 20 0 155 0
Peak Hour 0 0 13 0
Count Total 0 1 31 1 0 15 42 5 0 2 10 22 0
0 2 3 1 0 1 4 8 0 1 2 0 26 68
0 1 0 12 57
5:45 PM 0 1 3 0
2 0 0 0 2 0
16 64
5:30 PM 0 0 3 0 0 2 2
0 2 2 0 0 0 2 0 0 0 7 0
1 1 0 14 75
5:15 PM 0 0 3 0
0 0 0 1 2 0
15 87
5:00 PM 0 0 3 0 0 3 3
0 2 5 0 0 0 0 2 0 1 1 0
2 2 0 19 0
4:45 PM 0 0 4 0
0 0 0 0 0 0
27 0
4:30 PM 0 0 7 1 0 2 5
0 2 11 1 0 1 0 4 0 1 2 0
0 4 0 26 0
4:15 PM 0 0 5 0
1 0 0 3 4 0
TH RT
4:00 PM 0 0 3 0 0 0 11

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Calle Del Adobe Laurel Dr Davis Rd Davis Rd
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
0 0
0 1
7 0
3 2
13 0 0 0 0 8 0 0 8
0 1
Peak Hour 42 18 6 0 66 0 0
Count Total 63 31 9 1 104 0 0 1 0 1 0 12
8:45 AM 6 7 2 1 16 0 0 0 0 0 0 2 0 0
0 0 0 2 0 1
0 8:30 AM 5 1 1 0 7 0 0 0
0 0 0 0 0 0
0 0
8:15 AM 7 0 0 0 7 0 0
0 0 0 0 0 7
1 0 0
8:00 AM 13 10 2 0 25 0
0 0 0 0 0 0
0 0 0
0 7:30 AM 16 2 1 0 19 0 0 0
0 0 0 0 0 0
0 7 0
EB WB NB SB Total East
7:45 AM 6 6 3 0 15
0 0 0
HV% - - 11% 10% 0% - 2% 5%
0 0
7:15 AM 5 3 0 0 8 0 0
0 1 0 1 0 0
West North South
7:00 AM 5 2 0
3 164 2 166 249 39 0 111 22 17 0 60 39
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
2% 5% 8% 18% - 0% 0% - 6%
Peak
Hour
All 0 0 233
68 0 167 40 27 0
12 3 0 2 1 3 0 0 0 0 66 0
0 1,102 0
HV 0 0 25 17 0
Count Total 0 0 345 238 3 239 383 121 65 1 1,697 0
0 22 39 11 0 13 4 3 0 16 3 0 157 908
9 7 1 167 1,052
8:45 AM 0 0 29 17
9 0 18 11 4 0
264 1,102
8:30 AM 0 0 35 22 0 18 33
0 40 46 10 0 26 7 2 0 7 15 0
10 9 0 320 977
8:15 AM 0 0 61 50
13 0 32 10 5 0
301 789
8:00 AM 0 0 69 41 1 31 99
1 66 65 5 0 31 5 8 0 18 6 0
25 9 0 217 0
7:45 AM 0 0 59 37
11 0 22 0 2 0
139 0
7:30 AM 0 0 44 36 0 29 39
1 22 26 5 0 10 2 1 0 18 6 0
18 10 0 132 0
7:15 AM 0 0 29 19
7:00 AM 0 0 19 16 0 11 36 4 0 15 1 2 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Calle Del Adobe Calle Del Adobe Post Dr El Rancho Way
15-min
Total

UT LT TH RT
Date: 05-22-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 0.0% 0.73
TOTAL 6.0% 0.86
TH RT
WB 3.9% 0.79
NB 4.0% 0.80
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 10.6% 0.89
0 0
0 0
00 00
0 0
0 0
0 0
8 0
N
Post Dr
Calle Del Adobe
Calle Del Adobe
Post Dr
Calle Del Adobe
El Rancho Way
TEV: 1,102
PHF: 0.86
0 39
60 99
61 0
39 249
166
456
312
2 2217
111
369
150
0 164
233
0 397
360
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 1 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
0 1 0 0 1 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 0
0 0
8:45 AM
0 0 0 0
0 8:30 AM
0 0 0 0 0 0 0
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
1 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 1 0
RT
66 0
Interval
Start
Calle Del Adobe Calle Del Adobe Post Dr El Rancho Way
15-min
Total
Rolling
One Hour
0 3 12 3 0 2 1 3 0 0 0 0

LT TH RT RT LT TH RT
1 0 0 104 0
Peak Hour 0 0 25 17
Count Total 0 0 39 24 0 5 23 3 0 5 1 3 0
0 0 7 0 0 2 0 0 0 1 0 0 16 55
0 0 0 7 54
8:45 AM 0 0 4 2
0 0 1 0 0 0
7 66
8:30 AM 0 0 4 1 0 0 1
0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 25 67
8:15 AM 0 0 6 1
1 0 0 1 1 0
15 49
8:00 AM 0 0 6 7 0 2 7
0 1 5 0 0 2 0 1 0 0 0 0
0 0 0 19 0
7:45 AM 0 0 3 3
2 0 0 0 1 0
8 0
7:30 AM 0 0 10 6 0 0 0
0 2 1 0 0 0 0 0 0 0 0 0
0 0 0 7 0
7:15 AM 0 0 3 2
0 0 0 0 0 0
TH RT
7:00 AM 0 0 3 2 0 0 2

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Calle Del Adobe Calle Del Adobe Post Dr El Rancho Way
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
1 2
1 1
2 8
4 0
19 0 0 1 0 9 1 5 15
2 7
Peak Hour 30 26 8 0 64 1 0
Count Total 45 49 13 0 107 2 1 0 0 3 0 10
5:45 PM 2 3 0 0 5 0 1 0 0 1 0 0 0 0
0 0 0 1 1 2
1 5:30 PM 3 2 3 0 8 0 0 0
0 0 1 0 7 0
0 2
5:15 PM 12 7 0 0 19 1 0
0 0 0 0 0 0
1 0 0
5:00 PM 11 11 3 0 25 0
0 0 0 0 0 0
0 0 1
0 4:30 PM 3 6 2 0 11 1 0 0
0 0 0 0 1 1
0 13 0
EB WB NB SB Total East
4:45 PM 4 6 2 0 12
0 1 0
HV% - 0% 10% 8% 0% - 8% 0%
0 1
4:15 PM 5 8 1 0 14 0 0
0 0 0 0 0 0
West North South
4:00 PM 5 6 2
3 85 2 116 175 71 0 100 49 42 0 52 29
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
3% 13% 0% 0% - 0% 0% 0% 7%
Peak
Hour
All 0 6 233
149 0 189 103 80 0
23 0 0 8 0 0 0 0 0 0 64 0
1 961 0
HV 0 0 23 7 0
Count Total 0 11 420 171 7 227 322 124 54 2 1,859 0
2 21 30 20 0 18 13 7 0 21 9 0 205 932
14 8 1 253 961
5:45 PM 0 1 46 17
18 0 26 15 10 0
240 927
5:30 PM 0 4 62 19 0 33 43
1 29 43 19 0 23 11 11 0 14 5 0
14 6 0 234 935
5:15 PM 0 0 65 19
21 0 23 6 11 0
234 927
5:00 PM 0 1 56 26 1 28 41
0 26 48 13 0 28 17 10 0 10 10 0
13 4 0 219 0
4:45 PM 0 1 50 21
15 0 23 14 15 0
248 0
4:30 PM 0 1 47 23 0 38 26
2 28 45 19 0 25 17 13 0 21 6 0
17 6 1 226 0
4:15 PM 0 2 47 23
4:00 PM 0 1 47 23 1 24 46 24 0 23 10 3 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Calle Del Adobe Calle Del Adobe Post Dr El Rancho Way
15-min
Total

UT LT TH RT
Date: 05-22-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.0% 0.89
TOTAL 6.7% 0.95
TH RT
WB 7.1% 0.97
NB 4.2% 0.87
Peak Hour: 4:45 PM 5:45 PM
HV %: PHF
EB 9.3% 0.95
0 1
0 0
00 00
0 0
0 0
1 5
9 0
N
Post Dr
Calle Del Adobe
Calle Del Adobe
Post Dr
Calle Del Adobe
El Rancho Way
TEV: 961
PHF: 0.95
1 29
52 82
126
0 71
175
116
364
329
2 4942
100
230
191
0 85
233
6 324
276
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 1 0
0 1 0 0 0 0
1 1 0 0 1 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 1
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 1
0 0 0 0 3 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 1 2
0 1
5:45 PM
0 0 0 0
2 5:30 PM
0 0 0 0 0 0 1
0 1
5:15 PM
0 0 0
0 1 0
0 0 0
0 0 0
1 5:00 PM
0 0 0 0
1 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
4:00 PM 0 0
RT
64 0
Interval
Start
Calle Del Adobe Calle Del Adobe Post Dr El Rancho Way
15-min
Total
Rolling
One Hour
0 3 23 0 0 8 0 0 0 0 0 0

LT TH RT RT LT TH RT
0 0 0 107 0
Peak Hour 0 0 23 7
Count Total 0 0 33 12 0 3 46 0 0 13 0 0 0
0 0 3 0 0 0 0 0 0 0 0 0 5 57
0 0 0 8 64
5:45 PM 0 0 1 1
0 0 3 0 0 0
19 67
5:30 PM 0 0 3 0 0 0 2
0 2 5 0 0 0 0 0 0 0 0 0
0 0 0 25 62
5:15 PM 0 0 8 4
0 0 3 0 0 0
12 50
5:00 PM 0 0 9 2 0 1 10
0 0 6 0 0 2 0 0 0 0 0 0
0 0 0 11 0
4:45 PM 0 0 3 1
0 0 2 0 0 0
14 0
4:30 PM 0 0 2 1 0 0 6
0 0 8 0 0 1 0 0 0 0 0 0
0 0 0 13 0
4:15 PM 0 0 3 2
0 0 2 0 0 0
TH RT
4:00 PM 0 0 4 1 0 0 6

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Calle Del Adobe Calle Del Adobe Post Dr El Rancho Way
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
1 1
3 2
1 1
0 0
9 0 0 0 1 4 1 1 7
2 1
Peak Hour 22 5 28 24 79 0 0
Count Total 28 6 53 43 130 0 0 0 0 0 1 5
8:45 AM 1 1 10 2 14 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
1 8:30 AM 1 0 9 10 20 0 0 0
0 0 0 0 0 0
0 0
8:15 AM 2 0 7 6 15 0 0
0 0 0 0 0 1
0 1 0
8:00 AM 9 2 6 10 27 0
0 0 0 0 0 1
3 0 0
0 7:30 AM 6 2 3 3 14 0 0 0
0 0 0 0 1 0
2 4 0
EB WB NB SB Total East
7:45 AM 5 1 12 5 23
0 0 0
HV% - 6% 7% 6% - 0% 2% 3%
1 0
7:15 AM 3 0 5 5 13 0 0
0 0 0 0 0 0
West North South
7:00 AM 1 0 1
0 310 0 60 9 91 2 162 949 12 0 120 953
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
0% 0% 5% 0% - 3% 2% 5% 3%
Peak
Hour
All 0 34 28
186 2 292 1,680 32 1
0 5 0 4 24 0 0 3 20 1 79 0
19 2,749 0
HV 0 2 2 18 0
Count Total 0 75 41 455 0 108 18 225 1,616 54 4,785 0
0 11 2 23 0 40 200 10 1 24 147 21 539 2,542
35 164 9 611 2,741
8:45 AM 0 22 0 38
28 0 47 244 4 0
739 2,749
8:30 AM 0 10 7 43 0 15 5
0 24 3 24 1 37 247 8 0 33 227 8
34 228 5 653 2,493
8:15 AM 0 12 7 108
15 1 44 220 1 0
738 2,243
8:00 AM 0 11 6 69 0 16 3
0 13 3 18 0 52 255 2 0 32 271 1
21 227 5 619 0
7:45 AM 0 5 7 79
34 0 29 227 1 0
483 0
7:30 AM 0 6 8 54 0 7 0
0 10 1 18 0 18 166 5 0 25 184 2
21 168 3 403 0
7:15 AM 0 7 3 44
7:00 AM 0 2 3 20 0 12 1 26 0 25 121 1 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Post Dr Driveway N Davis Rd N Davis Rd
15-min
Total

UT LT TH RT
Date: 05-22-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 2.2% 0.90
TOTAL 2.9% 0.93
TH RT
WB 3.1% 0.78
NB 2.5% 0.91
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 5.9% 0.73
0 0
0 0
00 00
0 0
0 0
1 1
4 1
N
N Davis Rd
Post Dr
Driveway
N Davis Rd
Post Dr N Davis Rd
TEV: 2,749
PHF: 0.93
19 953
120
1,092
1,074
0 91
9 60
160
160
0 12
162
949
1,325
1,125
2 310
28 34
372
190
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 0
0 0
8:45 AM
0 0 0 0
0 8:30 AM
0 0 0 0 0 0 0
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 0 0
RT
79 0
Interval
Start
Post Dr Driveway N Davis Rd N Davis Rd
15-min
Total
Rolling
One Hour
0 0 0 5 0 4 24 0 0 3 20 1

LT TH RT RT LT TH RT
4 38 1 130 0
Peak Hour 0 2 2 18
Count Total 0 2 3 23 0 0 1 5 0 7 44 2 0
0 0 1 0 0 1 7 2 0 0 2 0 14 76
1 9 0 20 85
8:45 AM 0 0 0 1
0 0 2 7 0 0
15 79
8:30 AM 0 0 0 1 0 0 0
0 0 0 0 0 0 7 0 0 0 6 0
1 8 1 27 77
8:15 AM 0 0 0 2
2 0 0 6 0 0
23 54
8:00 AM 0 2 0 7 0 0 0
0 0 0 1 0 3 9 0 0 1 4 0
1 2 0 14 0
7:45 AM 0 0 1 4
2 0 1 2 0 0
13 0
7:30 AM 0 0 1 5 0 0 0
0 0 0 0 0 0 5 0 0 0 5 0
0 2 0 4 0
7:15 AM 0 0 1 2
0 0 0 1 0 0
TH RT
7:00 AM 0 0 0 1 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Post Dr Driveway N Davis Rd N Davis Rd
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
4 1
4 11
1 3
4 3
31 0 0 0 3 7 4 5 19
4 7
Peak Hour 9 2 19 16 46 0 0
Count Total 15 4 45 24 88 0 0 0 0 0 7 13
5:45 PM 0 0 5 0 5 0 0 0 0 0 0 2 0 1
0 0 0 2 1 1
0 5:30 PM 0 1 7 5 13 0 0 0
0 0 0 1 0 2
0 0
5:15 PM 5 0 2 3 10 0 0
0 0 0 0 0 1
4 1 4
5:00 PM 3 1 8 4 16 0
0 0 0 0 0 2
2 0 1
0 4:30 PM 4 0 4 1 9 0 0 0
0 0 0 0 1 0
4 10 0
EB WB NB SB Total East
4:45 PM 1 0 2 4 7
0 0 1
HV% - 0% 3% 4% - 0% 4% 1%
0 0
4:15 PM 1 1 13 3 18 0 0
0 0 0 0 3 1
West North South
4:00 PM 1 1 4
0 211 0 106 11 174 1 202 1,074 16 1 209 882
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
0% 0% 1% 0% 0% 0% 2% 0% 2%
Peak
Hour
All 0 90 29
364 5 390 2,153 48 2
0 2 0 8 11 0 0 1 15 0 46 0
40 3,046 0
HV 0 0 1 8 0
Count Total 0 185 63 380 0 183 25 432 1,682 88 6,000 0
0 13 2 51 2 39 239 9 0 66 222 2 719 3,007
53 215 8 761 3,046
5:45 PM 0 21 8 45
63 1 53 263 3 0
766 3,009
5:30 PM 0 15 5 59 0 19 4
0 29 1 57 0 47 277 3 1 54 214 7
51 224 7 761 2,983
5:15 PM 0 18 10 48
17 0 40 288 1 0
758 2,993
5:00 PM 0 37 10 51 0 32 3
0 26 3 37 0 62 246 9 0 51 229 18
52 162 14 724 0
4:45 PM 0 20 4 53
43 1 52 298 7 1
740 0
4:30 PM 0 36 8 38 0 10 2
0 27 7 47 1 56 261 7 0 47 199 14
58 217 18 771 0
4:15 PM 0 22 10 42
4:00 PM 0 16 8 44 0 27 3 49 0 41 281 9 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Post Dr Driveway N Davis Rd N Davis Rd
15-min
Total

UT LT TH RT
Date: 05-22-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 1.4% 0.95
TOTAL 1.5% 0.99
TH RT
WB 0.7% 0.84
NB 1.5% 0.98
Peak Hour: 4:45 PM 5:45 PM
HV %: PHF
EB 2.7% 0.84
0 0
0 0
00 00
0 0
0 0
4 5
7 3
N
N Davis Rd
Post Dr
Driveway
N Davis Rd
Post Dr N Davis Rd
TEV: 3,046
PHF: 0.99
40 882
209
1,132
1,339
1 174
11 106
291
254
0 16
1,074
202
1,200
1,293
1 211
29 90
330
253
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 0
0 0
5:45 PM
0 0 0 0
0 5:30 PM
0 0 0 0 0 0 0
0 0
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0 5:00 PM
0 0 0 0
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
4:00 PM 0 0
RT
46 0
Interval
Start
Post Dr Driveway N Davis Rd N Davis Rd
15-min
Total
Rolling
One Hour
0 0 0 2 0 8 11 0 0 1 15 0

LT TH RT RT LT TH RT
1 23 0 88 0
Peak Hour 0 0 1 8
Count Total 0 2 3 10 0 0 1 3 0 17 27 1 0
0 0 0 0 0 1 4 0 0 0 0 0 5 44
0 5 0 13 46
5:45 PM 0 0 0 0
1 0 3 4 0 0
10 42
5:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0 2 0 0 0 3 0
1 3 0 16 50
5:15 PM 0 0 1 4
1 0 3 5 0 0
7 44
5:00 PM 0 0 0 3 0 0 0
0 0 0 0 0 2 0 0 0 0 4 0
0 1 0 9 0
4:45 PM 0 0 0 1
0 0 3 1 0 0
18 0
4:30 PM 0 2 1 1 0 0 0
0 0 0 1 0 4 8 1 0 0 3 0
0 4 0 10 0
4:15 PM 0 0 0 1
0 0 1 3 0 0
TH RT
4:00 PM 0 0 1 0 0 0 1

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Post Dr Driveway N Davis Rd N Davis Rd
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
0 1
0 0
0 0
0 1
2 1 2 3 0 0 0 0 0
0 0
Peak Hr 0 19 27 41 87 0 0
Count Total 0 31 60 84 175 0 0 1 3 4 2 0
8:45 AM 0 3 9 10 22 0 0 0 1 1 1 0 0 0
0 0 0 0 0 0
0 8:30 AM 0 2 5 16 23 0 0 0
0 1 1 0 0 0
0 0
8:15 AM 0 6 10 19 35 0 0
0 1 1 2 0 0
0 0 0
8:00 AM 0 6 7 5 18 0
0 0 0 0 0 0
0 0 0
0 7:30 AM 0 3 4 9 16 0 0 0
0 0 0 1 0 0
5 17 0
EB WB NB SB Total East
7:45 AM 0 4 6 8 18
0 0 0
HV% - - - - - - - 2%
0 0
7:15 AM 0 2 12 12 26 0 0
0 0 0 0 0 0
West North South
7:00 AM 0 5 7
14 0 0 595 0 130 0 0 918 486 4 202 1,160
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
2% - 4% 2% 0% 2% 3% - 2%
Peak
Hour
All 0 0 0
234 0 0 1,650 784 6
0 5 0 0 19 8 0 4 37 0 87 0
0 3,495 0
HV 0 0 0 0 0
Count Total 0 0 0 0 0 1,027 0 340 1,989 0 6,030 0
0 82 0 50 0 0 198 86 0 44 200 0 660 3,074
51 215 0 694 3,346
8:45 AM 0 0 0 0
19 0 0 228 79 1
846 3,495
8:30 AM 0 0 0 0 0 101 0
0 121 0 36 0 0 249 129 2 60 249 0
46 257 0 874 3,315
8:15 AM 0 0 0 0
45 0 0 215 132 0
932 2,956
8:00 AM 0 0 0 0 0 179 0
0 149 0 24 0 0 254 129 0 60 316 0
36 338 0 843 0
7:45 AM 0 0 0 0
25 0 0 200 96 2
666 0
7:30 AM 0 0 0 0 0 146 0
0 115 0 19 0 0 180 83 1 27 241 0
16 173 0 515 0
7:15 AM 0 0 0 0
7:00 AM 0 0 0 0 0 134 0 16 0 0 126 50 0
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
0 Rossi St Davis Rd Davis Rd
15-min
Total

UT LT TH RT
SB 3.0% 0.91
TOTAL 2.5% 0.94

UT LT TH RT UT LT TH RT
WB 2.6% 0.81
NB 1.9% 0.92
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB - -
Date: 09-24-2019
N Peak Hour Count Period: 7:00 AM 9:00 AM
Davis Rd
Rossi St
Rossi St
Davis Rd
Davis Rd
TEV: 3,495
PHF: 0.94
1,160
202 1,366
1,052
4 130
595 725
688
0 918486
1,755
1,404
0 20 1
0 0
0 0
0 0
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.

Peak Hour 0 0 0 0 0 0 0 1 0 0 2 0 3 0
Count Total 0 0 0 0 0 0 0 1 0 1 2 0 4 0
0 0 1 0 0 1 4
0 3
8:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 1 3
8:30 AM 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 1
0 0 1 0 2 2
0 8:00 AM 0 0 0 0 0 0 0 1
0 0 0 0 0 0
0 0
7:45 AM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0
7:30 AM 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
7:15 AM 0 0 0 0 0
0 0 0 0 0 0

TH RT LT TH RT
7:00 AM 0 0 0 0
Westbound Northbound Southbound

LT TH RT LT TH RT LT
87 0
Interval
Start
0 Rossi St Davis Rd Davis Rd
15-min
Total
Rolling
One Hour Eastbound
0 14 0 5 0 0 19 8 0 4 37 0
10 74 0 175 0
Peak Hour 0 0 0 0
Count Total 0 0 0 0 0 24 0 7 0 0 46 14 0
0 3 0 0 0 0 6 3 0 1 9 0 22 98
3 13 0 23 94
8:45 AM 0 0 0 0
0 0 0 5 0 0
35 87
8:30 AM 0 0 0 0 0 2 0
0 4 0 2 0 0 6 4 0 3 16 0
1 4 0 18 78
8:15 AM 0 0 0 0
0 0 0 6 1 0
18 77
8:00 AM 0 0 0 0 0 6 0
0 4 0 0 0 0 5 1 0 0 8 0
0 9 0 16 0
7:45 AM 0 0 0 0
3 0 0 2 2 0
26 0
7:30 AM 0 0 0 0 0 0 0
0 1 0 1 0 0 11 1 0 2 10 0
0 5 0 17 0
7:15 AM 0 0 0 0
1 0 0 5 2 0
TH RT
7:00 AM 0 0 0 0 0 4 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
0 Rossi St Davis Rd Davis Rd
15-min
Total
Rolling
One Hour Eastbound Westbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
0 1
0 0
1 1
3 0
6 2 0 2 1 1 0 0 2
0 0
Peak Hr 0 8 24 28 60 0 0
Count Total 0 18 64 50 132 0 0 4 0 4 3 3
5:45 PM 0 2 8 5 15 0 0 1 0 1 0 0 0 0
0 0 2 1 0 0
0 5:30 PM 0 3 10 4 17 0 0 0
0 0 0 1 0 0
0 0
5:15 PM 0 2 8 13 23 0 0
0 0 0 0 0 1
0 0 0
5:00 PM 0 4 7 6 17 0
0 0 2 0 2 0
0 0 0
0 4:30 PM 0 1 4 5 10 0 0 0
1 0 1 0 1 0
8 25 0
EB WB NB SB Total East
4:45 PM 0 1 5 4 10
0 0 0
HV% - - - - - - - 1%
0 0
4:15 PM 0 1 9 5 15 0 0
0 0 0 0 0 0
West North South
4:00 PM 0 4 13
6 0 0 428 0 225 0 0 1,282 678 0 144 1,012
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
1% - 1% 1% - 7% 2% - 2%
Peak
Hour
All 0 0 0
405 0 0 2,376 1,233 8
0 2 0 0 14 10 0 10 18 0 60 0
0 3,769 0
HV 0 0 0 0 0
Count Total 0 0 0 0 0 762 0 290 1,986 0 7,060 0
0 85 0 30 0 0 251 150 1 32 253 0 802 3,657
41 243 0 862 3,769
5:45 PM 0 0 0 0
47 0 0 282 156 0
1,037 3,769
5:30 PM 0 0 0 0 0 93 0
0 128 0 40 0 0 328 200 0 41 300 0
29 221 0 956 3,546
5:15 PM 0 0 0 0
59 0 0 331 178 0
914 3,403
5:00 PM 0 0 0 0 0 138 0
0 81 0 60 0 0 343 152 0 37 241 0
37 250 0 862 0
4:45 PM 0 0 0 0
66 0 0 280 148 0
814 0
4:30 PM 0 0 0 0 0 81 0
0 83 0 49 0 0 287 126 6 29 234 0
44 244 0 813 0
4:15 PM 0 0 0 0
4:00 PM 0 0 0 0 0 73 0 54 0 0 274 123 1
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
0 Rossi St Davis Rd Davis Rd
15-min
Total

UT LT TH RT
SB 2.4% 0.85
TOTAL 1.6% 0.91

UT LT TH RT UT LT TH RT
WB 1.2% 0.83
NB 1.2% 0.93
Peak Hour: 4:30 PM 5:30 PM
HV %: PHF
EB - -
Date: 09-24-2019
N Peak Hour Count Period: 4:00 PM 6:00 PM
Davis Rd
Rossi St
Rossi St
Davis Rd
Davis Rd
TEV: 3,769
PHF: 0.91
1,012
144 1,156
1,507
0 225
428 653
822
0 678
1,282
1,440
1,960
0 00 1
1 0
0 0
0 1
1 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any.

Peak Hour 0 0 0 0 0 0 0 1 1 0 0 0 2 0
Count Total 0 0 0 0 0 0 0 3 1 0 0 0 4 0
1 0 0 0 0 1 1
0 2
5:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 2
5:30 PM 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 3
3 5:00 PM 0 0 0 0 0 0 0 0
1 1 0 0 0 2
0 0
4:45 PM 0 0 0 0 0 0 0
0 0 0 0 0 0
0 1 0
4:30 PM 0 0 0 0 0 0
0 0 1 0 0 0
0 0 0 0
4:15 PM 0 0 0 0 0
0 0 0 0 0 0

TH RT LT TH RT
4:00 PM 0 0 0 0
Westbound Northbound Southbound

LT TH RT LT TH RT LT
60 0
Interval
Start
0 Rossi St Davis Rd Davis Rd
15-min
Total
Rolling
One Hour Eastbound
0 6 0 2 0 0 14 10 0 10 18 0
15 34 0 132 0
Peak Hour 0 0 0 0
Count Total 0 0 0 0 0 14 0 4 0 0 49 15 1
0 1 0 1 0 0 6 2 0 1 4 0 15 72
1 3 0 17 67
5:45 PM 0 0 0 0
0 0 0 8 2 0
23 60
5:30 PM 0 0 0 0 0 3 0
0 1 0 1 0 0 4 4 0 2 11 0
3 3 0 17 52
5:15 PM 0 0 0 0
0 0 0 5 2 0
10 60
5:00 PM 0 0 0 0 0 4 0
0 0 0 1 0 0 2 3 0 2 2 0
3 2 0 10 0
4:45 PM 0 0 0 0
0 0 0 3 1 0
15 0
4:30 PM 0 0 0 0 0 1 0
0 1 0 0 0 0 9 0 0 1 4 0
2 5 0 25 0
4:15 PM 0 0 0 0
1 0 0 12 1 1
TH RT
4:00 PM 0 0 0 0 0 3 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
0 Rossi St Davis Rd Davis Rd
15-min
Total
Rolling
One Hour Eastbound Westbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
7 5
10 17
11 2
7 9
68 0 0 0 6 15 7 12 40
11 21
Peak Hour 11 19 16 25 71 0 0
Count Total 28 33 33 42 136 0 0 1 1 2 14 22
8:45 AM 3 3 1 4 11 0 0 0 1 1 3 4 1 1
0 0 3 1 2 1
0 8:30 AM 9 2 6 7 24 0 0 0
0 0 0 0 2 0
2 1
8:15 AM 4 4 6 10 24 0 0
0 0 0 0 3 5
3 4 7
8:00 AM 1 4 3 7 15 0
0 0 0 0 0 3
5 1 4
5 7:30 AM 4 7 3 4 18 0 0 0
0 0 0 0 0 0
2 8 0
EB WB NB SB Total East
7:45 AM 2 4 4 4 14
0 0 0
HV% - 0% 2% 2% - - 4% 2%
1 2
7:15 AM 4 8 6 4 22 0 0
0 1 0 1 2 2
West North South
7:00 AM 1 1 4
3 264 0 142 315 97 0 113 591 56 0 135 1,145
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
2% 4% 4% 5% - 3% 1% 2% 2%
Peak
Hour
All 0 140 322
228 0 195 1,076 107 0
12 4 0 4 9 3 0 4 16 5 71 0
224 3,544 0
HV 0 0 6 5 0
Count Total 0 246 544 424 0 284 565 224 1,870 389 6,152 0 0 39 52 49 0 30 152 10 0 25 212 33 724 3,133
24 202 38 708 3,430
8:45 AM 0 29 63 30
42 0 22 134 15 0
790 3,544
8:30 AM 0 26 65 57 0 30 53
0 29 66 22 0 27 153 15 0 32 217 69
34 256 70 911 3,396
8:15 AM 0 35 79 46
30 0 32 156 14 0
1,021 3,019
8:00 AM 0 34 86 67 0 41 91
0 36 73 24 0 33 174 19 0 39 390 43
30 282 42 822 0
7:45 AM 0 38 68 84
21 0 21 108 8 0
642 0
7:30 AM 0 33 89 67 0 36 85
0 42 75 19 0 20 95 13 0 18 175 50
22 136 44 534 0
7:15 AM 0 31 59 45
7:00 AM 0 20 35 28 0 31 70 21 0 10 104 13 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Rossi St Rossi St Main St Main St
15-min
Total

UT LT TH RT
Date: 09-24-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 1.7% 0.80
TOTAL 2.0% 0.87
TH RT
WB 3.4% 0.85
NB 2.1% 0.84
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 1.5% 0.96
0 0
0 0
00 00
0 0
0 0
7 12
15 6
N
Main St
Rossi St
Rossi St
Main St
Rossi St Main St
TEV: 3,544
PHF: 0.87
224
1,145
135
1,504
828
0 97
315
142
554
513
0 56
113
591
1,551
760
0 264
322
140
726
652
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 1 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
0 0 1 0 2 0
0 0
1 0
Peak Hour
Count Total 1 0
0 0 0 0 0 0 0 0 1 1
0 0
8:45 AM
0 0 0 0
0 8:30 AM
0 0 0 0 0 0 0
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
1 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 1 0
RT
71 0
Interval
Start
Rossi St Rossi St Main St Main St
15-min
Total
Rolling
One Hour
0 3 12 4 0 4 9 3 0 4 16 5

LT TH RT RT LT TH RT
9 27 6 136 0
Peak Hour 0 0 6 5
Count Total 0 3 15 10 0 9 16 8 0 6 20 7 0
0 3 0 0 0 0 1 0 0 1 3 0 11 74
1 5 1 24 77
8:45 AM 0 0 2 1
0 0 0 4 2 0
24 71
8:30 AM 0 3 3 3 0 1 1
0 1 3 0 0 1 3 2 0 0 8 2
2 3 2 15 69
8:15 AM 0 0 1 3
1 0 0 3 0 0
14 62
8:00 AM 0 0 0 1 0 1 2
0 1 2 1 0 2 2 0 0 1 2 1
1 3 0 18 0
7:45 AM 0 0 2 0
2 0 1 1 1 0
22 0
7:30 AM 0 0 3 1 0 0 5
0 2 3 3 0 2 3 1 0 2 2 0
1 1 0 8 0
7:15 AM 0 0 3 1
1 0 0 3 1 0
TH RT
7:00 AM 0 0 1 0 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Rossi St Rossi St Main St Main St
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
12 14
11 15
3 13
12 19
99 3 1 4 16 8 4 15 43
12 36
Peak Hour 9 7 9 9 34 0 0
Count Total 16 19 28 17 80 1 0 6 1 8 29 22
5:45 PM 2 1 4 1 8 0 0 0 0 0 5 3 4 7
0 1 3 2 0 7
2 5:30 PM 2 1 1 2 6 0 0 1
2 1 3 7 3 1
1 0
5:15 PM 1 2 4 2 9 0 0
0 0 0 0 2 0
3 2 6
5:00 PM 2 1 4 3 10 0
0 0 0 0 0 4
3 1 3
8 4:30 PM 1 4 4 3 12 0 0 0
1 0 1 3 3 0
3 9 1
EB WB NB SB Total East
4:45 PM 4 3 0 2 9
0 0 4
HV% - 0% 0% 6% - 0% 1% 1%
3 3
4:15 PM 4 4 8 1 17 0 0
0 2 0 3 1 5
West North South
4:00 PM 0 3 3
1 126 0 130 285 236 1 165 1,230 131 0 177 791
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
1% 1% 1% 1% - 1% 1% 1% 1%
Peak
Hour
All 0 227 340
490 1 335 2,338 204 0
4 2 0 1 7 1 0 1 7 1 34 0
157 3,996 0
HV 0 1 1 7 0
Count Total 0 446 683 260 0 270 540 364 1,609 306 7,846 0 0 34 56 56 0 34 264 22 0 50 214 33 941 3,980
40 199 27 988 3,996
5:45 PM 0 63 87 28
54 0 41 312 30 0
1,012 3,994
5:30 PM 0 60 86 33 0 28 78
0 31 68 61 1 37 296 29 0 51 227 44
38 187 54 1,039 3,948
5:15 PM 0 52 83 32
66 0 45 335 39 0
957 3,866
5:00 PM 0 50 90 33 0 36 66
0 35 73 55 0 42 287 33 0 48 178 32
44 205 37 986 0
4:45 PM 0 65 81 28
65 0 43 302 13 0
966 0
4:30 PM 0 54 91 36 0 38 58
0 35 73 77 0 44 263 18 0 49 200 42
44 199 37 957 0
4:15 PM 0 52 80 33
4:00 PM 0 50 85 37 0 33 68 56 0 49 279 20 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Rossi St Rossi St Main St Main St
15-min
Total

UT LT TH RT
Date: 09-24-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.8% 0.87
TOTAL 0.9% 0.96
TH RT
WB 1.1% 0.97
NB 0.6% 0.91
Peak Hour: 4:45 PM 5:45 PM
HV %: PHF
EB 1.3% 0.97
0 0
0 0
10 03
0 0
0 0
4 15
8 16
N
Main St
Rossi St
Rossi St
Main St
Rossi St Main St
TEV: 3,996
PHF: 0.96
157
791
177
1,125
1,693
0 236
285
130
651
648
0 131
1,230
165
1,048
1,527
1 126
340
227
693
607
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 1 0 0 0
0 0 1 0
0 0
0 0 0
0 LT TH
0 0 0 2 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 3 0 0 1 0 4
0 6 0 0 8 0
0 0
0 0
Peak Hour
Count Total 0 1
0 0 0 0 0 0 0 0 0 4
1 4
5:45 PM
0 1 0 0
3 5:30 PM
0 2 0 0 1 0 3
0 1
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
4 5:00 PM
0 0 0 0
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 1 0 0 0 0 1
0 0
0 0 0
4:00 PM 3 0
RT
34 0
Interval
Start
Rossi St Rossi St Main St Main St
15-min
Total
Rolling
One Hour
0 1 4 2 0 1 7 1 0 1 7 1

LT TH RT RT LT TH RT
1 12 4 80 0
Peak Hour 0 1 1 7
Count Total 0 2 6 8 0 8 9 2 0 8 16 4 0
0 0 1 0 0 2 2 0 0 0 1 0 8 33
0 1 1 6 34
5:45 PM 0 0 2 0
0 0 0 0 1 0
9 40
5:30 PM 0 0 0 2 0 0 1
0 0 1 1 0 0 4 0 0 0 2 0
0 3 0 10 48
5:15 PM 0 0 0 1
1 0 1 3 0 0
9 47
5:00 PM 0 0 0 2 0 0 0
0 1 2 0 0 0 0 0 0 1 1 0
0 1 2 12 0
4:45 PM 0 1 1 2
0 0 1 2 1 0
17 0
4:30 PM 0 0 0 1 0 2 2
0 2 2 0 0 3 4 1 0 0 1 0
0 2 1 9 0
4:15 PM 0 1 3 0
0 0 1 1 1 0
TH RT
4:00 PM 0 0 0 0 0 3 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Rossi St Rossi St Main St Main St
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
0 0
0 0
0 0
0 0
0 1 0 1 0 0 0 0 0
0 0
Peak Hour 29 50 11 0 90 0 0
Count Total 65 88 31 0 184 0 0 1 0 1 0 0
8:45 AM 15 12 6 0 33 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 8:30 AM 11 10 8 0 29 0 0 0
1 0 1 0 0 0
0 0
8:15 AM 8 16 3 0 27 0 0
0 0 0 0 0 0
0 0 0
8:00 AM 5 11 3 0 19 0
0 0 0 0 0 0
0 0 0
0 7:30 AM 11 10 3 0 24 0 0 0
0 0 0 0 0 0
0 11 0
EB WB NB SB Total East
7:45 AM 5 13 2 0 20
0 0 0
HV% - - 5% 6% - - 3% -
0 0
7:15 AM 9 9 3 0 21 0 0
0 0 0 0 0 0
West North South
7:00 AM 1 7 3
13 142 0 98 344 3 0 154 0 174 0 7 2
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
13% 11% 0% 4% - 0% 0% - 7%
Peak
Hour
All 0 0 451
5 0 299 0 289 0
37 0 0 4 0 7 0 0 0 0 90 0
0 1,375 0
HV 0 0 21 8 0
Count Total 0 1 746 255 0 206 656 9 3 1 2,470 0
0 27 68 1 0 20 0 24 0 1 0 1 270 1,158
0 0 0 285 1,306
8:45 AM 0 0 91 37
1 0 18 0 44 0
301 1,375
8:30 AM 0 0 88 32 0 30 72
0 22 78 1 0 29 0 30 0 2 1 0
0 0 0 302 1,344
8:15 AM 0 0 108 30
0 0 29 0 40 0
418 1,312
8:00 AM 0 0 81 39 0 27 86
0 21 85 2 0 49 0 63 0 4 1 0
1 0 0 354 0
7:45 AM 0 0 152 41
0 0 47 0 41 0
270 0
7:30 AM 0 0 110 32 0 28 95
0 22 83 0 0 47 0 24 0 0 0 0
1 1 0 270 0
7:15 AM 0 0 68 26
7:00 AM 0 1 48 18 0 29 89 0 0 60 0 23 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Market St Market St SB Davis Rd Ramps Market Cir
15-min
Total

UT LT TH RT
Date: 09-26-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 0.0% 0.45
TOTAL 6.5% 0.82
TH RT
WB 11.2% 0.90
NB 3.4% 0.73
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 4.9% 0.77
0 0
0 0
00 00
1 0
0 0
0 0
0 0
N
SB Davis Rd Ramps
Market St
Market St
SB Davis Rd
Ramps
Market St Market Cir
TEV: 1,375
PHF: 0.82
0 2
7 9
3 0
3 344
98 445
632
0 174
0 154
242
328
0 142
451
0 593
498
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 1 0 0 0 1
0 0 1 0 1 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 1
0 1
8:45 AM
0 0 0 0
1 8:30 AM
0 0 1 0 0 0 1
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 0 0
RT
90 0
Interval
Start
Market St Market St SB Davis Rd Ramps Market Cir
15-min
Total
Rolling
One Hour
0 13 37 0 0 4 0 7 0 0 0 0

LT TH RT RT LT TH RT
0 0 0 184 0
Peak Hour 0 0 21 8
Count Total 0 0 44 21 0 17 71 0 0 11 0 20 0
0 1 11 0 0 2 0 4 0 0 0 0 33 108
0 0 0 29 95
8:45 AM 0 0 9 6
0 0 0 0 8 0
27 90
8:30 AM 0 0 7 4 0 1 9
0 6 10 0 0 1 0 2 0 0 0 0
0 0 0 19 84
8:15 AM 0 0 7 1
0 0 1 0 2 0
20 76
8:00 AM 0 0 4 1 0 3 8
0 2 11 0 0 0 0 2 0 0 0 0
0 0 0 24 0
7:45 AM 0 0 4 1
0 0 2 0 1 0
21 0
7:30 AM 0 0 6 5 0 2 8
0 2 7 0 0 3 0 0 0 0 0 0
0 0 0 11 0
7:15 AM 0 0 6 3
0 0 2 0 1 0
TH RT
7:00 AM 0 0 1 0 0 0 7

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Market St Market St SB Davis Rd Ramps Market Cir
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
0 1
0 0
0 0
0 0
1 0 0 1 0 0 0 0 0
1 0
Peak Hour 70 36 15 0 121 1 0
Count Total 130 74 41 0 245 1 1 0 0 2 0 0
5:45 PM 21 13 2 0 36 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 5:30 PM 18 6 6 0 30 0 0 0
0 0 0 0 0 0
0 0
5:15 PM 13 6 7 0 26 0 0
0 0 0 1 0 0
0 0 0
5:00 PM 21 6 3 0 30 1
0 0 0 0 0 0
0 0 0
0 4:30 PM 18 9 3 0 30 0 0 0
0 0 1 0 0 1
0 29 0
EB WB NB SB Total East
4:45 PM 18 15 2 0 35
0 0 0
HV% - - 6% 14% 0% - 4% 0%
0 0
4:15 PM 7 11 11 0 29 0 1
0 0 0 0 0 0
West North South
4:00 PM 14 8 7
4 145 1 87 369 4 0 85 2 164 0 5 0
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
5% 9% 0% 7% - 0% - 0% 7%
Peak
Hour
All 0 0 813
9 0 159 2 314 0
32 0 0 3 0 12 0 0 0 0 121 0
1 1,676 0
HV 0 0 50 20 0
Count Total 0 0 1,473 287 1 186 675 11 0 1 3,118 0
0 27 73 0 0 15 0 34 0 0 0 0 338 1,544
3 0 0 362 1,623
5:45 PM 0 0 145 44
3 0 14 0 34 0
428 1,676
5:30 PM 0 0 175 30 0 26 77
0 18 80 1 0 23 0 47 0 2 0 0
1 0 1 416 1,615
5:15 PM 0 0 218 39
1 0 21 1 44 0
417 1,574
5:00 PM 0 0 207 31 1 24 84
0 21 96 0 0 14 1 35 0 0 0 0
2 0 0 415 0
4:45 PM 0 0 207 43
2 0 27 0 38 0
367 0
4:30 PM 0 0 181 32 0 24 109
0 22 78 1 0 21 0 38 0 1 0 0
2 0 0 375 0
4:15 PM 0 0 171 35
4:00 PM 0 0 169 33 0 24 78 1 0 24 0 44 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Market St Market St SB Davis Rd Ramps Market Cir
15-min
Total

UT LT TH RT
Date: 09-26-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.0% 0.75
TOTAL 7.2% 0.98
TH RT
WB 7.8% 0.85
NB 6.0% 0.90
Peak Hour: 4:30 PM 5:30 PM
HV %: PHF
EB 7.3% 0.93
1 0
0 0
00 00
0 0
0 0
0 0
0 0
N
SB Davis Rd Ramps
Market St
Market St
SB Davis Rd
Ramps
Market St Market Cir
TEV: 1,676
PHF: 0.98
1 0
5 6
6 0
4 369
87 461
983
1 164
2 85
232
251
0 145
813
0 958
455
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 1 0 0 0
0 0 1 0 1 0
0 0 0 0
1 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 1 0
0 LT TH
0 0 0 0 0 0 1
0 0 0 0 2 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 1
0 1
5:45 PM
0 0 0 0
1 5:30 PM
0 0 0 0 0 0 0
1 2
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
1 5:00 PM
0 0 0 0
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 1
0 0
0 0 0
4:00 PM 0 0
RT
121 0
Interval
Start
Market St Market St SB Davis Rd Ramps Market Cir
15-min
Total
Rolling
One Hour
0 4 32 0 0 3 0 12 0 0 0 0

LT TH RT RT LT TH RT
0 0 0 245 0
Peak Hour 0 0 50 20
Count Total 0 0 92 38 0 9 65 0 0 7 0 34 0
0 1 12 0 0 1 0 1 0 0 0 0 36 122
0 0 0 30 121
5:45 PM 0 0 14 7
0 0 0 0 6 0
26 121
5:30 PM 0 0 12 6 0 0 6
0 1 5 0 0 2 0 5 0 0 0 0
0 0 0 30 124
5:15 PM 0 0 7 6
0 0 0 0 3 0
35 123
5:00 PM 0 0 17 4 0 0 6
0 2 13 0 0 0 0 2 0 0 0 0
0 0 0 30 0
4:45 PM 0 0 11 7
0 0 1 0 2 0
29 0
4:30 PM 0 0 15 3 0 1 8
0 1 10 0 0 2 0 9 0 0 0 0
0 0 0 29 0
4:15 PM 0 0 4 3
0 0 1 0 6 0
TH RT
4:00 PM 0 0 12 2 0 3 5

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Market St Market St SB Davis Rd Ramps Market Cir
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
1 2
0 0
0 0
2 2
7 0 0 1 0 0 0 0 0
5 2
Peak Hour 29 44 15 0 88 1 0
Count Total 64 91 30 1 186 1 0 0 0 1 0 0
8:45 AM 10 14 6 0 30 0 0 0 0 0 0 0 2 0
0 0 0 0 1 1
0 8:30 AM 16 10 6 0 32 0 0 0
0 0 1 0 0 0
0 0
8:15 AM 10 15 5 0 30 1 0
0 0 0 0 0 0
0 0 0
8:00 AM 7 10 5 0 22 0
0 0 0 0 0 0
0 0 0
1 7:30 AM 6 10 2 0 18 0 0 0
0 0 0 0 0 1
1 14 0
EB WB NB SB Total East
7:45 AM 6 9 3 0 18
0 0 0
HV% - 0% 5% 4% - - 10% 0%
1 0
7:15 AM 7 12 3 0 22 0 0
0 0 0 0 0 0
West North South
7:00 AM 2 11 0
5 93 0 164 340 3 0 97 1 105 0 1 1
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
3% 11% 33% 5% - 0% 0% - 7%
Peak
Hour
All 0 1 530
4 0 165 2 206 0
38 1 0 10 0 5 0 0 0 0 88 0
0 1,336 0
HV 0 0 25 4 0
Count Total 0 2 892 150 0 281 702 2 1 0 2,407 0
0 46 83 0 0 17 0 20 0 0 0 0 282 1,199
0 0 0 293 1,302
8:45 AM 0 0 96 20
0 0 16 0 32 0
308 1,336
8:30 AM 0 0 112 16 0 30 87
0 38 78 0 0 22 0 26 0 0 1 0
1 0 0 316 1,291
8:15 AM 0 0 116 27
1 0 28 0 31 0
385 1,208
8:00 AM 0 1 105 16 0 51 82
0 41 85 1 0 25 1 26 0 0 0 0
0 0 0 327 0
7:45 AM 0 0 179 27
1 0 22 0 22 0
263 0
7:30 AM 0 0 130 23 0 34 95
0 22 85 0 0 25 1 23 0 0 0 0
1 0 0 233 0
7:15 AM 0 1 92 14
7:00 AM 0 0 62 7 0 19 107 1 0 10 0 26 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Market St Market St NB Davis Rd Ramps Driveway
15-min
Total

UT LT TH RT
Date: 09-26-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 0.0% 0.50
TOTAL 6.6% 0.87
TH RT
WB 8.7% 0.95
NB 7.4% 0.86
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 4.6% 0.76
0 1
0 0
00 00
0 0
0 0
0 0
0 0
N
NB Davis Rd Ramps
Market St
Market St
NB Davis Rd
Ramps
Market St
Driveway
TEV: 1,336
PHF: 0.87
0 1
1 2
5 0
3 340
164
507
636
0 105
1 97
258
203
0 93
530
1 624
437
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 1 0 0 0 0
0 1 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 1
0 0 0 0 1 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 1
0 1
8:45 AM
0 0 0 0
1 8:30 AM
0 0 0 0 0 0 1
0 0
8:15 AM
0 0 0
0 1 0
0 0 0
0 0 0
0 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 0 0
RT
88 0
Interval
Start
Market St Market St NB Davis Rd Ramps Driveway
15-min
Total
Rolling
One Hour
0 5 38 1 0 10 0 5 0 0 0 0

LT TH RT RT LT TH RT
1 0 0 186 0
Peak Hour 0 0 25 4
Count Total 0 0 59 5 0 19 71 1 0 17 0 13 0
0 4 10 0 0 4 0 2 0 0 0 0 30 114
0 0 0 32 102
8:45 AM 0 0 10 0
0 0 1 0 5 0
30 88
8:30 AM 0 0 15 1 0 2 8
0 2 13 0 0 3 0 2 0 0 0 0
0 0 0 22 80
8:15 AM 0 0 8 2
1 0 3 0 2 0
18 72
8:00 AM 0 0 6 1 0 1 8
0 0 9 0 0 3 0 0 0 0 0 0
0 0 0 18 0
7:45 AM 0 0 5 1
0 0 1 0 1 0
22 0
7:30 AM 0 0 6 0 0 2 8
0 4 8 0 0 2 0 1 0 0 0 0
1 0 0 14 0
7:15 AM 0 0 7 0
0 0 0 0 0 0
TH RT
7:00 AM 0 0 2 0 0 4 7

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Market St Market St NB Davis Rd Ramps Driveway
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
1 0
0 0
0 1
2 0
4 0 0 0 0 0 0 1 1
1 3
Peak Hour 63 32 16 0 111 0 0
Count Total 126 69 38 0 233 0 0 1 0 1 0 0
5:45 PM 14 10 9 0 33 0 0 0 0 0 0 0 0 0
0 0 0 0 0 2
1 5:30 PM 19 10 2 0 31 0 0 0
0 0 0 0 0 0
0 0
5:15 PM 11 6 1 0 18 0 0
0 0 0 0 0 0
0 0 0
5:00 PM 21 8 2 0 31 0
0 0 0 0 0 0
0 0 0
0 4:30 PM 17 7 5 0 29 0 0 0
1 0 1 0 0 0
0 30 0
EB WB NB SB Total East
4:45 PM 14 11 8 0 33
0 0 0
HV% - 0% 8% 2% - - 13% -
1 0
4:15 PM 12 11 5 0 28 0 0
0 0 0 0 0 0
West North South
4:00 PM 18 6 6
7 270 0 363 388 0 0 80 0 67 0 0 3
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
2% 6% - 9% - - 0% - 6%
Peak
Hour
All 0 1 713
1 0 146 0 142 0
25 0 0 10 0 6 0 0 0 0 111 0
0 1,885 0
HV 0 0 58 5 0
Count Total 0 1 1,323 475 0 635 725 2 3 0 3,453 0
0 63 80 0 0 21 0 28 0 1 0 0 370 1,774
0 0 0 419 1,849
5:45 PM 0 0 135 42
1 0 12 0 17 0
487 1,885
5:30 PM 0 0 158 59 0 85 87
0 115 85 0 0 17 0 10 0 0 0 0
0 1 0 498 1,787
5:15 PM 0 0 184 76
0 0 18 0 7 0
445 1,679
5:00 PM 0 0 193 72 0 116 91
0 65 93 0 0 29 0 21 0 0 1 0
0 1 0 455 0
4:45 PM 0 0 166 70
0 0 16 0 29 0
389 0
4:30 PM 0 1 170 52 0 67 119
0 61 92 0 0 13 0 13 0 1 0 0
0 0 0 390 0
4:15 PM 0 0 150 59
4:00 PM 0 0 167 45 0 63 78 0 0 20 0 17 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Market St Market St NB Davis Rd Ramps Driveway
15-min
Total

UT LT TH RT
Date: 09-26-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.0% 0.75
TOTAL 5.9% 0.95
TH RT
WB 4.3% 0.91
NB 10.9% 0.74
Peak Hour: 4:30 PM 5:30 PM
HV %: PHF
EB 6.4% 0.93
0 0
0 0
00 00
0 0
0 0
0 1
0 0
N
NB Davis Rd Ramps
Market St
Market St
NB Davis Rd
Ramps
Market St
Driveway
TEV: 1,885
PHF: 0.95
0 3
0 3
1 0
0 388
363
751
780
0 67
0 80
636
147
0 270
713
1 984
468
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
1 0 0 0 1 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 0
0 0
5:45 PM
0 0 0 0
0 5:30 PM
0 0 0 0 0 0 0
0 1
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
1 5:00 PM
0 0 0 0
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 1 0 0 0 0 0 1
0 0
0 0 0
4:00 PM 0 0
RT
111 0
Interval
Start
Market St Market St NB Davis Rd Ramps Driveway
15-min
Total
Rolling
One Hour
0 7 25 0 0 10 0 6 0 0 0 0

LT TH RT RT LT TH RT
0 0 0 233 0
Peak Hour 0 0 58 5
Count Total 0 0 114 12 0 18 50 1 0 24 0 14 0
0 2 8 0 0 6 0 3 0 0 0 0 33 113
0 0 0 31 113
5:45 PM 0 0 13 1
1 0 2 0 0 0
18 111
5:30 PM 0 0 16 3 0 4 5
0 2 4 0 0 1 0 0 0 0 0 0
0 0 0 31 121
5:15 PM 0 0 10 1
0 0 1 0 1 0
33 120
5:00 PM 0 0 20 1 0 3 5
0 1 10 0 0 5 0 3 0 0 0 0
0 0 0 29 0
4:45 PM 0 0 12 2
0 0 3 0 2 0
28 0
4:30 PM 0 0 16 1 0 1 6
0 3 8 0 0 3 0 2 0 0 0 0
0 0 0 30 0
4:15 PM 0 0 11 1
0 0 3 0 3 0
TH RT
4:00 PM 0 0 16 2 0 2 4

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Market St Market St NB Davis Rd Ramps Driveway
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
1 0
0 0
0 0
0 0
1 0 1 2 0 0 0 0 0
0 0
Peak Hour 23 33 16 30 102 0 1
Count Total 42 71 35 63 211 0 1 0 2 3 1 0
8:45 AM 5 11 6 10 32 0 0 0 0 0 0 0 0 0
1 1 0 0 0 0
0 8:30 AM 4 10 7 11 32 0 0 0
0 1 1 0 0 0
0 0
8:15 AM 9 8 5 5 27 0 0
0 0 0 0 0 0
0 0 0
8:00 AM 3 10 3 6 22 0
0 1 0 0 1 0
0 0 0
0 7:30 AM 6 9 4 14 33 0 0 0
0 0 0 0 0 0
5 19 0
EB WB NB SB Total East
7:45 AM 5 6 4 5 20
0 0 0
HV% - 1% 2% 17% - - 15% 4%
0 0
7:15 AM 4 10 5 7 26 0 0
0 0 0 0 1 0
West North South
7:00 AM 6 7 1
3 29 0 129 553 236 0 40 258 70 0 174 359
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
2% 4% 4% 0% - 3% 4% 2% 3%
Peak
Hour
All 0 501 647
430 0 66 471 113 0
21 9 0 6 10 0 0 5 13 12 102 0
579 3,575 0
HV 0 3 15 5 0
Count Total 0 856 1,027 40 1 238 1,071 309 677 1,191 6,490 0 0 15 126 54 0 4 42 16 0 43 57 116 693 3,216
51 65 151 753 3,425
8:45 AM 0 91 128 1
58 0 9 70 11 0
845 3,575
8:30 AM 0 87 109 4 1 11 126
0 27 161 48 0 6 57 13 0 46 85 148
49 98 140 925 3,477
8:15 AM 0 91 156 7
59 0 11 57 18 0
902 3,274
8:00 AM 0 141 163 12 0 39 138
0 24 125 66 0 9 85 17 0 45 85 132
34 91 159 903 0
7:45 AM 0 127 180 7
63 0 14 59 22 0
747 0
7:30 AM 0 142 148 3 0 39 129
0 33 115 44 0 7 68 5 0 23 93 164
18 103 181 722 0
7:15 AM 0 104 87 4
7:00 AM 0 73 56 2 0 50 151 38 0 6 33 11 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Blanco Rd Blanco Rd Davis Rd Davis Rd
15-min
Total

UT LT TH RT
Date: 09-26-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 2.7% 0.97
TOTAL 2.9% 0.97
TH RT
WB 3.6% 0.97
NB 4.3% 0.83
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 2.0% 0.93
0 0
0 1
00 00
0 0
0 1
0 0
0 0
N
Davis Rd
Blanco Rd
Blanco Rd
Davis Rd
Blanco Rd
Davis Rd
TEV: 3,575
PHF: 0.97
579
359
174
1,112
995
0 236
553
129
918
891
0 70
258
40 517
368
0 29
647
501
1,177
1,172
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 1 0 0
0 0 0 1 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 1 2
0 0 0 2 3 0
0 1
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 2
1 3
8:45 AM
0 0 0 0
2 8:30 AM
0 0 0 0 0 1 1
0 1
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
1 8:00 AM
0 0 0 1
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
1 0 0
7:00 AM 0 0
RT
102 0
Interval
Start
Blanco Rd Blanco Rd Davis Rd Davis Rd
15-min
Total
Rolling
One Hour
0 3 21 9 0 6 10 0 0 5 13 12

LT TH RT RT LT TH RT
13 30 20 211 0
Peak Hour 0 3 15 5
Count Total 0 9 27 6 0 3 47 21 0 14 20 1 0
0 0 7 4 0 3 3 0 0 2 4 4 32 113
4 6 1 32 101
8:45 AM 0 2 3 0
3 0 0 6 1 0
27 102
8:30 AM 0 2 2 0 0 0 7
0 0 5 3 0 0 5 0 0 1 1 3
1 1 4 22 101
8:15 AM 0 3 4 2
2 0 2 1 0 0
20 98
8:00 AM 0 0 3 0 0 0 8
0 1 3 2 0 2 2 0 0 0 3 2
3 8 3 33 0
7:45 AM 0 0 3 2
2 0 2 2 0 0
26 0
7:30 AM 0 0 5 1 0 2 5
0 0 6 4 0 4 1 0 0 0 4 3
2 3 0 19 0
7:15 AM 0 2 1 1
1 0 1 0 0 0
TH RT
7:00 AM 0 0 6 0 0 0 6

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Blanco Rd Blanco Rd Davis Rd Davis Rd
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
0 0
0 0
0 2
0 0
2 0 0 0 1 0 0 1 2
0 1
Peak Hour 26 27 14 32 99 0 0
Count Total 57 57 32 67 213 0 0 0 0 0 1 0
5:45 PM 6 8 3 11 28 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
1 5:30 PM 9 8 5 12 34 0 0 0
0 0 0 1 0 0
0 0
5:15 PM 4 7 1 6 18 0 0
0 0 0 0 0 0
0 0 0
5:00 PM 6 3 2 9 20 0
0 0 0 0 0 0
0 0 0
0 4:30 PM 7 6 2 6 21 0 0 0
0 0 0 0 0 0
9 27 0
EB WB NB SB Total East
4:45 PM 7 9 6 5 27
0 0 0
HV% - 2% 3% 9% - - 26% 2%
0 0
4:15 PM 13 9 7 9 38 0 0
0 0 0 0 0 0
West North South
4:00 PM 5 7 6
2 11 0 78 677 264 0 34 284 150 0 222 257
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
3% 2% 3% 0% - 5% 7% 1% 3%
Peak
Hour
All 0 467 628
489 0 64 538 298 0
16 9 0 9 5 0 0 11 18 3 99 0
506 3,578 0
HV 0 8 17 1 0
Count Total 0 1,042 1,216 23 0 153 1,152 432 524 989 6,920 0 0 20 103 50 0 6 68 37 0 64 69 120 804 3,503
68 52 129 863 3,578
5:45 PM 0 133 131 3
63 0 10 53 40 0
929 3,563
5:30 PM 0 113 158 4 0 18 155
0 27 185 56 0 12 73 49 0 53 75 134
62 75 118 907 3,498
5:15 PM 0 111 152 2
59 0 4 90 28 0
879 3,417
5:00 PM 0 105 165 3 0 15 183
0 18 154 86 0 8 68 33 0 39 55 125
40 68 125 848 0
4:45 PM 0 138 153 2
46 0 6 67 32 0
864 0
4:30 PM 0 158 150 2 0 23 131
0 19 113 59 0 11 52 48 0 53 56 114
53 74 124 826 0
4:15 PM 0 172 164 3
4:00 PM 0 112 143 4 0 13 128 70 0 7 67 31 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Blanco Rd Blanco Rd Davis Rd Davis Rd
15-min
Total

UT LT TH RT
Date: 09-26-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 3.2% 0.94
TOTAL 2.8% 0.96
TH RT
WB 2.6% 0.95
NB 3.0% 0.87
Peak Hour: 4:45 PM 5:45 PM
HV %: PHF
EB 2.4% 0.94
0 0
0 0
00 00
0 0
0 0
0 1
0 1
N
Davis Rd
Blanco Rd
Blanco Rd
Davis Rd
Blanco Rd
Davis Rd
TEV: 3,578
PHF: 0.96
506
257
222
985
1,015
0 264
677
78 1,019
1,000
0 284150
34 346
468
0 11
628
467
1,106
1,217
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 0
0 0
5:45 PM
0 0 0 0
0 5:30 PM
0 0 0 0 0 0 0
0 0
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
0 5:00 PM
0 0 0 0
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
4:00 PM 0 0
RT
99 0
Interval
Start
Blanco Rd Blanco Rd Davis Rd Davis Rd
15-min
Total
Rolling
One Hour
0 2 16 9 0 9 5 0 0 11 18 3

LT TH RT RT LT TH RT
26 36 5 213 0
Peak Hour 0 8 17 1
Count Total 0 15 34 8 0 3 38 16 0 18 13 1 0
0 0 6 2 0 2 1 0 0 4 7 0 28 100
6 6 0 34 99
5:45 PM 0 2 2 2
3 0 2 3 0 0
18 86
5:30 PM 0 2 6 1 0 0 5
0 1 4 2 0 1 0 0 0 2 4 0
3 5 1 20 106
5:15 PM 0 1 3 0
1 0 1 1 0 0
27 113
5:00 PM 0 0 6 0 0 0 2
0 1 5 3 0 5 1 0 0 0 3 2
4 2 0 21 0
4:45 PM 0 5 2 0
1 0 1 1 0 0
38 0
4:30 PM 0 1 6 0 0 0 5
0 1 7 1 0 4 2 1 0 3 5 1
4 4 1 27 0
4:15 PM 0 3 8 2
3 0 2 4 0 0
TH RT
4:00 PM 0 1 1 3 0 0 4

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Blanco Rd Blanco Rd Davis Rd Davis Rd
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
7 13
32 59
23 15
9 6
164
0 0 1 9 6 10 104 129
19 120
Peak Hour 6 11 14 9 40 0 1
Count Total 12 28 27 16 83 0 1 0 1 2 15 10
8:45 AM 0 3 4 0 7 0 0 0 0 0 0 1 0 5
1 1 4 1 3 1
10 8:30 AM 2 6 4 1 13 0 0 0
0 0 0 1 2 2
3 15
8:15 AM 2 0 5 3 10 0 0
1 0 0 1 4 1
1 5 50
8:00 AM 1 2 1 1 5 0
0 0 0 0 0 3
2 0 29
9 7:30 AM 2 4 5 2 13 0 0 0
0 0 0 2 0 2
2 12 0
EB WB NB SB Total East
7:45 AM 1 5 3 3 12
0 0 1
HV% - 1% 1% 3% - 0% 3% 2%
4 1
7:15 AM 3 3 1 4 11 0 0
0 0 0 0 0 2
West North South
7:00 AM 1 5 4
3 97 0 289 293 257 1 31 406 346 1 208 538
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
1% 2% 1% 2% 0% 1% 1% 0% 1%
Peak
Hour
All 0 107 383
365 7 59 727 533 3
5 3 0 1 7 6 0 3 6 0 40 0
83 3,040 0
HV 0 1 2 3 0
Count Total 0 188 514 175 0 536 428 291 972 144 4,942 0 0 58 29 22 2 7 116 52 1 20 138 23 532 2,651
33 127 15 605 2,994
8:45 AM 0 25 24 15
43 1 6 112 62 1
644 3,040
8:30 AM 0 16 40 19 0 79 51
0 61 62 55 0 8 129 61 0 31 111 17
55 145 32 870 2,824
8:15 AM 0 25 69 15
88 0 14 122 105 1
875 2,291
8:00 AM 0 29 84 20 0 78 97
0 72 90 57 1 4 84 104 0 73 168 18
49 114 16 651 0
7:45 AM 0 25 149 30
57 0 5 71 76 0
428 0
7:30 AM 0 28 81 32 0 78 44
0 62 30 21 3 8 46 40 0 18 94 13
12 75 10 337 0
7:15 AM 0 27 38 28
7:00 AM 0 13 29 16 0 48 25 22 0 7 47 33 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Alvin Dr Alvin Dr Main St Main St
15-min
Total

UT LT TH RT
Date: 09-26-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 1.1% 0.80
TOTAL 1.3% 0.87
TH RT
WB 1.3% 0.80
NB 1.8% 0.81
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 1.0% 0.72
0 0
0 0
00 00
0 0
1 0
10 104
6 9
N
Main St
Alvin Dr
Alvin Dr
Main St
Alvin Dr Main St
TEV: 3,040
PHF: 0.87
83 538
208
830
771
1 257
293
289
839
937
0 406346
31 925
784
1 97
383
107
587
407
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 1 0
0 0 0 0 1 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 1 0
0 0 0
0 LT TH
0 0 0 0 0 0 1
0 0 0 1 2 0
0 1
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 2
1 2
8:45 AM
0 0 0 0
1 8:30 AM
0 0 0 0 0 0 0
1 1
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 0 0
RT
40 0
Interval
Start
Alvin Dr Alvin Dr Main St Main St
15-min
Total
Rolling
One Hour
0 3 5 3 0 1 7 6 0 3 6 0

LT TH RT RT LT TH RT
7 8 1 83 0
Peak Hour 0 1 2 3
Count Total 0 1 4 7 0 11 10 7 0 1 16 10 0
0 3 0 0 0 0 4 0 0 0 0 0 7 35
1 0 0 13 40
8:45 AM 0 0 0 0
1 0 0 3 1 0
10 40
8:30 AM 0 0 0 2 0 3 2
0 0 0 0 0 1 2 2 0 0 3 0
0 1 0 5 41
8:15 AM 0 0 1 1
0 0 0 1 0 0
12 48
8:00 AM 0 1 0 0 0 1 1
0 0 3 2 0 0 3 0 0 1 2 0
2 0 0 13 0
7:45 AM 0 0 0 1
1 0 0 1 4 0
11 0
7:30 AM 0 0 1 1 0 2 1
0 0 2 1 0 0 1 0 0 2 2 0
1 0 1 12 0
7:15 AM 0 0 1 2
2 0 0 1 3 0
TH RT
7:00 AM 0 0 1 0 0 2 1

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Alvin Dr Alvin Dr Main St Main St
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
23 23
21 25
5 7
18 9
131
1 0 2 19 12 10 17 58
31 37
Peak Hour 1 1 3 13 18 0 1
Count Total 3 1 5 24 33 1 1 3 1 6 33 30
5:45 PM 0 0 1 0 1 1 0 0 1 2 4 2 1 2
0 0 3 6 5 4
4 5:30 PM 0 0 0 2 2 0 0 0
0 0 0 0 2 1
0 2
5:15 PM 0 0 0 3 3 0 0
1 1 0 2 1 2
4 3 5
5:00 PM 0 0 0 3 3 0
0 0 0 0 0 13
4 6 6
7 4:30 PM 0 1 2 3 6 0 0 0
0 0 0 6 3 7
2 4 0
EB WB NB SB Total East
4:45 PM 1 0 1 4 6
0 0 5
HV% - 0% 0% 0% - 0% 0% 0%
8 7
4:15 PM 1 0 0 7 8 0 0
0 2 0 2 1 7
West North South
4:00 PM 1 0 1
0 60 0 215 215 234 9 98 931 235 8 173 1,074
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
0% 0% 0% 0% 0% 1% 1% 0% 0%
Peak
Hour
All 0 194 215
415 19 185 1,857 458 11
1 0 0 0 3 0 0 1 12 0 18 0
217 3,878 0
HV 0 0 1 0 0
Count Total 0 397 390 148 0 449 405 345 1,968 407 7,454 0 0 56 46 48 2 24 218 61 0 44 212 52 905 3,854
49 251 40 967 3,877
5:45 PM 0 70 51 21
38 2 24 263 59 2
1,015 3,878
5:30 PM 0 51 44 29 0 59 56
0 52 52 65 2 25 243 75 2 41 279 54
42 251 61 967 3,733
5:15 PM 0 43 61 21
64 2 17 223 57 2
928 3,600
5:00 PM 0 45 58 13 0 61 71
0 48 50 62 2 23 223 47 3 42 271 44
48 273 58 968 0
4:45 PM 0 48 52 13
43 3 33 242 56 1
870 0
4:30 PM 0 58 44 13 0 54 42
0 58 38 50 3 15 228 53 0 37 241 47
42 190 51 834 0
4:15 PM 0 40 44 16
4:00 PM 0 42 36 22 0 61 50 45 3 24 217 50 1

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Alvin Dr Alvin Dr Main St Main St
15-min
Total

UT LT TH RT
Date: 09-26-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.9% 0.97
TOTAL 0.5% 0.96
TH RT
WB 0.2% 0.85
NB 0.2% 0.92
Peak Hour: 4:30 PM 5:30 PM
HV %: PHF
EB 0.2% 0.94
0 0
0 0
00 01
0 0
1 0
10 17
12 19
N
Main St
Alvin Dr
Alvin Dr
Main St
Alvin Dr Main St
TEV: 3,878
PHF: 0.96
217
1,074
173
1,472
1,367
8 234
215
215
664
623
0 931235
98 1,358
1,273
9 60
215
194
469
530
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 1 0
0 1 0 0 1 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 1 1 0 0 0 0
0 0 0
0 0
0 1 0
0 0 0
0 LT TH
0 1 0 0 0 0 2
1 2 0 0 6 0
0 0
0 1
Peak Hour
Count Total 0 1
0 0 1 0 0 0 0 0 2 4
0 2
5:45 PM
0 0 0 0
2 5:30 PM
0 0 0 0 0 0 0
2 2
5:15 PM
0 1 0
0 0 0
0 0 0
0 0 0
2 5:00 PM
0 0 0 0
0 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
4:00 PM 2 0
RT
18 0
Interval
Start
Alvin Dr Alvin Dr Main St Main St
15-min
Total
Rolling
One Hour
0 0 1 0 0 0 3 0 0 1 12 0

LT TH RT RT LT TH RT
2 21 1 33 0
Peak Hour 0 0 1 0
Count Total 0 0 1 2 0 0 1 0 0 0 5 0 0
0 0 0 0 0 0 1 0 0 0 0 0 1 9
0 2 0 2 14
5:45 PM 0 0 0 0
0 0 0 0 0 0
3 18
5:30 PM 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 3 0
1 2 0 3 23
5:15 PM 0 0 0 0
0 0 0 0 0 0
6 24
5:00 PM 0 0 0 0 0 0 0
0 0 0 0 0 0 1 0 0 0 4 0
0 3 0 6 0
4:45 PM 0 0 1 0
0 0 0 2 0 0
8 0
4:30 PM 0 0 0 0 0 0 1
0 0 0 0 0 0 0 0 0 1 5 1
0 2 0 4 0
4:15 PM 0 0 0 1
0 0 0 1 0 0
TH RT
4:00 PM 0 0 0 1 0 0 0

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Alvin Dr Alvin Dr Main St Main St
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
2 5
5 8
10 5
2 4
41 0 0 0 10 3 7 8 28
9 14
Peak Hour 14 9 22 12 57 0 0
Count Total 25 16 36 25 102 0 0 0 0 0 12 6
8:45 AM 1 3 6 4 14 0 0 0 0 0 1 0 1 2
0 0 1 0 0 1
3 8:30 AM 2 2 1 3 8 0 0 0
0 0 0 2 0 0
2 1
8:15 AM 3 3 8 4 18 0 0
0 0 0 0 5 2
1 4 2
8:00 AM 3 4 4 3 14 0
0 0 0 0 0 1
0 1 2
2 7:30 AM 4 1 4 0 9 0 0 0
0 0 0 0 2 1
4 14 0
EB WB NB SB Total East
7:45 AM 4 1 6 5 16
0 0 2
HV% - 2% 2% 4% - 8% 7% 3%
0 1
7:15 AM 4 0 3 2 9 0 0
0 0 0 0 0 1
West North South
7:00 AM 4 2 4
2 95 0 132 547 88 12 59 488 112 7 185 736
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
2% 1% 2% 1% 0% 1% 1% 1% 2%
Peak
Hour
All 0 175 389
154 25 112 870 183 10
5 2 1 4 16 1 0 2 9 1 57 0
158 3,183 0
HV 0 4 6 4 0
Count Total 0 283 674 158 0 211 909 268 1,285 296 5,438 0 0 22 89 24 9 16 140 21 1 29 157 40 656 2,838
28 153 25 631 3,075
8:45 AM 0 24 69 15
27 3 16 111 14 1
746 3,183
8:30 AM 0 46 81 14 0 25 87
0 29 105 29 5 21 120 25 2 32 172 39
52 172 47 805 2,980
8:15 AM 0 46 90 31
28 2 17 112 30 4
893 2,600
8:00 AM 0 42 83 18 0 39 159
0 33 167 17 3 14 152 31 0 55 195 40
46 197 32 739 0
7:45 AM 0 41 124 21
14 2 7 104 26 1
543 0
7:30 AM 0 46 92 25 0 31 116
0 16 104 4 0 8 73 24 1 17 145 31
9 94 42 425 0
7:15 AM 0 16 83 21
7:00 AM 0 22 52 13 0 16 82 11 1 13 58 12 0

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Laurel Dr Laurel Dr Main St Main St
15-min
Total

UT LT TH RT
Date: 09-26-2019
Peak Hour Count Period: 7:00 AM 9:00 AM
SB 1.1% 0.94
TOTAL 1.8% 0.89
TH RT
WB 1.2% 0.85
NB 3.3% 0.84
Peak Hour: 7:30 AM 8:30 AM
HV %: PHF
EB 2.1% 0.89
0 0
0 0
00 00
0 0
0 0
7 8
3 10
N
Main St
Laurel Dr
Laurel Dr
Main St
Laurel Dr Main St
TEV: 3,183
PHF: 0.89
158
736
185
1,086
758
7 88
547
132
767
686
0 488112
59 975
671
12 95
389
175
659
764
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 0 0
0 0
8:45 AM
0 0 0 0
0 8:30 AM
0 0 0 0 0 0 0
0 0
8:15 AM
0 0 0
0 0 0
0 0 0
0 0 0
0 8:00 AM
0 0 0 0
0 0
7:45 AM
0 0 0 0
0 7:30 AM
7:15 AM 0 0 0 0 0 0 0 0
0 0
0 0 0
7:00 AM 0 0
RT
57 0
Interval
Start
Laurel Dr Laurel Dr Main St Main St
15-min
Total
Rolling
One Hour
0 2 5 2 1 4 16 1 0 2 9 1

LT TH RT RT LT TH RT
4 18 3 102 0
Peak Hour 0 4 6 4
Count Total 0 5 12 8 0 4 10 2 1 6 28 1 0
0 1 2 0 0 0 6 0 0 1 3 0 14 54
0 3 0 8 56
8:45 AM 0 0 0 1
0 0 0 1 0 0
18 57
8:30 AM 0 0 2 0 0 1 1
0 0 2 1 1 0 7 0 0 0 4 0
0 3 0 14 48
8:15 AM 0 2 0 1
1 0 2 1 1 0
16 48
8:00 AM 0 0 3 0 0 2 1
0 0 1 0 0 2 4 0 0 2 2 1
0 0 0 9 0
7:45 AM 0 0 2 2
0 0 0 4 0 0
9 0
7:30 AM 0 2 1 1 0 0 1
0 0 0 0 0 2 1 0 0 0 2 0
1 1 2 14 0
7:15 AM 0 0 3 1
0 0 0 4 0 0
TH RT
7:00 AM 0 1 1 2 0 0 2

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Laurel Dr Laurel Dr Main St Main St
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
to
to
Two-Hour Count Summaries
Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count.

Total
16 16
28 18
15 21
16 20
150
0 0 0 25 27 5 13 70
17 29
Peak Hour 2 3 2 10 17 0 0
Count Total 13 6 7 21 47 1 1 0 0 2 50 54
5:45 PM 7 0 1 0 8 0 1 0 0 1 7 7 2 4
0 0 3 8 1 4
3 5:30 PM 0 0 0 1 1 0 0 0
0 0 0 7 9 2
1 0
5:15 PM 2 1 0 4 7 0 0
0 0 0 0 9 5
5 1 6
5:00 PM 0 0 0 2 2 0
0 0 0 0 0 6
8 5 7
2 4:30 PM 0 0 2 2 4 1 0 0
0 0 0 3 9 2
5 10 0
EB WB NB SB Total East
4:45 PM 0 2 2 3 7
0 1 8
HV% - 0% 0% 0% - 0% 1% 0%
3 3
4:15 PM 0 2 2 4 8 0 0
0 0 0 0 7 3
West North South
4:00 PM 4 1 0
1 81 0 160 494 168 25 113 880 184 17 280 835
0 Interval
Start
Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total
1% 0% 0% 0% 0% 0% 1% 1% 0%
Peak
Hour
All 0 216 611
360 51 228 1,655 364 24
2 0 0 1 1 0 0 0 7 3 17 0
202 4,266 0
HV 0 0 2 0 0
Count Total 0 419 1,193 193 0 315 972 577 1,614 403 8,368 0 0 30 128 46 4 34 167 49 2 74 171 40 994 4,240
77 180 46 1,092 4,266
5:45 PM 0 56 160 33
43 2 31 227 59 4
1,073 4,231
5:30 PM 0 65 170 25 0 38 125
0 37 128 37 9 19 234 38 3 67 241 44
68 196 59 1,081 4,222
5:15 PM 0 30 163 23
42 8 36 232 41 4
1,020 4,128
5:00 PM 0 60 149 21 0 41 124
0 44 117 46 6 27 187 46 6 68 218 53
85 219 62 1,057 0
4:45 PM 0 61 129 12
46 9 28 201 40 1
1,064 0
4:30 PM 0 43 140 32 0 35 116
0 50 103 52 5 31 217 50 2 75 212 57
63 177 42 987 0
4:15 PM 0 53 141 16
4:00 PM 0 51 141 31 0 40 131 48 8 22 190 41 2

UT LT TH RT UT LT
Rolling
One Hour Eastbound Westbound Northbound Southbound

UT LT TH RT
Interval
Start
Laurel Dr Laurel Dr Main St Main St
15-min
Total

UT LT TH RT
Date: 09-26-2019
Peak Hour Count Period: 4:00 PM 6:00 PM
SB 0.7% 0.94
TOTAL 0.4% 0.98
TH RT
WB 0.4% 0.99
NB 0.2% 0.94
Peak Hour: 4:45 PM 5:45 PM
HV %: PHF
EB 0.2% 0.87
0 0
0 0
00 00
0 0
0 0
5 13
27 25
N
Main St
Laurel Dr
Laurel Dr
Main St
Laurel Dr Main St
TEV: 4,266
PHF: 0.98
202
835
280
1,334
1,281
17 168
494
160
822
1,075
0 113
880184
1,101
1,202
25 81
611
216
908
809
0 Project Manager: (415) 310-6469 [email protected] www.idaxdata.com
Two-Hour Count Summaries - Heavy Vehicles
Two-Hour Count Summaries - Bikes
Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0
0 0 0
0 0 0
0 0 0
0 1 0
0 0 0 0 0 0
0 1 0 0 1 0
0 0 0 0
0 0
0 0 0
1 LT TH
0 0 0 0 0 0 0 0
0 0 0
0 0
0 0 0
0 0 0
0 LT TH
0 0 0 0 0 0 0
0 0 0 0 2 0
0 0
0 0
Peak Hour
Count Total 0 0
0 0 0 0 0 0 0 0 1 1
0 0
5:45 PM
0 0 0 0
1 5:30 PM
0 0 0 0 0 0 0
0 1
5:15 PM
0 0 0
0 0 0
0 0 0
0 0 0
1 5:00 PM
0 0 0 0
1 0
4:45 PM
0 0 0 0
0 4:30 PM
4:15 PM 0 0 0 0 0 0 0 0
0 0
0 0 0
4:00 PM 0 0
RT
17 0
Interval
Start
Laurel Dr Laurel Dr Main St Main St
15-min
Total
Rolling
One Hour
0 1 2 0 0 1 1 0 0 0 7 3

LT TH RT RT LT TH RT
3 13 5 47 0
Peak Hour 0 0 2 0
Count Total 0 0 9 4 0 1 5 0 0 3 4 0 0
0 0 0 0 0 0 1 0 0 0 0 0 8 18
0 1 0 1 17
5:45 PM 0 0 6 1
0 0 0 0 0 0
7 20
5:30 PM 0 0 0 0 0 0 0
0 0 1 0 0 0 0 0 0 0 4 0
0 2 0 2 21
5:15 PM 0 0 2 0
0 0 0 0 0 0
7 29
5:00 PM 0 0 0 0 0 0 0
0 1 1 0 0 1 1 0 0 0 0 3
0 2 0 4 0
4:45 PM 0 0 0 0
0 0 1 1 0 0
8 0
4:30 PM 0 0 0 0 0 0 0
0 0 2 0 0 1 1 0 0 2 2 0
1 2 2 10 0
4:15 PM 0 0 0 0
0 0 0 0 0 0
TH RT
4:00 PM 0 0 1 3 0 0 1

UT LT TH RT UT LT
Northbound Southbound

UT LT TH RT UT LT TH RT
Interval
Start
Laurel Dr Laurel Dr Main St Main St
15-min
Total
Rolling
One Hour Eastbound Westbound
Eastbound Westbound Northbound Southbound
Project Manager: (415) 310-6469 [email protected] Appendix D
Volume Count
Comparison
Volume Comparison
Intersection 4 - North Davis Road / Calle Del Adobe - West Laurel Drive Left Through Right Left Through Right Left Through Right Left Through Right 5/22/2019 23 280 790 158 282 29 29 284 9 846 441 294 3,4659/24/2019 30 289 768 163 369 38 24 300 4 846 446 303 3,580 Difference 7 9 -22 5 87 9 -5 16 -5 0 5 9 115 3.32%
Balanced 23 280 809 178 282 29 29 284 9 845 441 294 3,503 Difference 7 9 -41 -15 87 9 -5 16 -5 1 5 9 77 2.20%
Left Through Right Left Through Right Left Through Right Left Through Right 5/22/2019 12 497 902 499 491 31 28 327 7 676 348 497 4,3159/24/2019 18 514 985 490 554 40 24 342 13 684 432 516 4,612 Difference 6 17 83 -9 63 9 -4 15 6 8 84 19 297 6.88%
Balanced 12 497 1,045 529 491 31 28 327 7 724 348 527 4,566 Difference 6 17 -60 -39 63 9 -4 15 6 -40 84 -11 46 1.01% %
Difference
%
Difference
AM
PM
Count
Northbound Southbound Eastbound Westbound
TotalTotal
Count
Northbound Southbound Eastbound Westbound
Appendix E
Level of Service
Calculations
Existing
Conditions

HCM Signalized Intersection Capacity Analysis Existing AM 1: W Laurel Dr & Adams St
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (vph) 210 804 1008 17 21 432
Future Volume (vph) 210 804 1008 17 21 432
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 2% 3% 0%
Total Lost time (s) 3.9 3.5 3.5 3.5 3.1
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00
Frt 1.00 1.00 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00
Satd. Flow (prot) 1752 3504 3477 1770 1583
Flt Permitted 0.15 1.00 1.00 0.95 1.00
Satd. Flow (perm) 282 3504 3477 1770 1583
Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91
Adj. Flow (vph) 231 884 1108 19 23 475
RTOR Reduction (vph) 0 0 0 0 0 174
Lane Group Flow (vph) 231 884 1127 0 23 301
Turn Type pm+pt NA NA Prot Perm
Protected Phases 5 2 6 8
Permitted Phases 2 8
Actuated Green, G (s) 58.0 58.0 44.9 18.0 18.0
Effective Green, g (s) 58.7 59.1 46.0 18.7 19.1
Actuated g/C Ratio 0.69 0.70 0.54 0.22 0.23
Clearance Time (s) 4.6 4.6 4.6 4.2 4.2
Vehicle Extension (s) 3.0 4.0 4.0 2.5 2.5
Lane Grp Cap (vph) 354 2442 1886 390 356
v/s Ratio Prot c0.07 0.25 0.32 0.01
v/s Ratio Perm c0.38 c0.19
v/c Ratio 0.65 0.36 0.60 0.06 0.85
Uniform Delay, d1 9.1 5.2 13.1 26.1 31.4
Progression Factor 1.84 0.38 1.00 1.00 1.00
Incremental Delay, d2 4.0 0.1 0.6 0.0 16.5
Delay (s) 20.7 2.1 13.7 26.1 48.0
Level of Service C A B C D
Approach Delay (s) 5.9 13.7 46.9
Approach LOS A B D
Intersection Summary
HCM 2000 Control Delay 16.6 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.73
Actuated Cycle Length (s) 84.8 Sum of lost time (s) 11.6 Intersection Capacity Utilization 61.8% ICU Level of Service B Analysis Period (min) 15
c Critical Lane Group
HCM Signalized Intersection Capacity Analysis Existing AM 2: NB 101 Ramps & W Laurel Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (vph) 0 867 0 0 1193 247 283 1 147 0 0 0 Future Volume (vph) 0 867 0 0 1193 247 283 1 147 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 3% 3% 3% 3%
Total Lost time (s) 3.5 3.5 3.5 3.5 3.5
Lane Util. Factor 0.95 0.95 0.95 0.95 1.00
Frt 1.00 0.97 1.00 1.00 0.85
Flt Protected 1.00 1.00 0.95 0.95 1.00
Satd. Flow (prot) 3452 3397 1624 1629 1530
Flt Permitted 1.00 1.00 0.95 0.95 1.00
Satd. Flow (perm) 3452 3397 1624 1629 1530
Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 0 953 0 0 1311 271 311 1 162 0 0 0
RTOR Reduction (vph) 0 0 0 0 0 0 0 0 126 0 0 0
Lane Group Flow (vph) 0 953 0 0 1582 0 155 157 36 0 0 0 Heavy Vehicles (%) 3% 3% 3% 2% 2% 2% 4% 4% 4% 2% 2% 2%
Turn Type NA NA Split NA Perm
Protected Phases 2 6 4 4
Permitted Phases 6 4
Actuated Green, G (s) 58.0 44.9 18.0 18.0 18.0
Effective Green, g (s) 59.1 46.0 18.7 18.7 18.7
Actuated g/C Ratio 0.70 0.54 0.22 0.22 0.22
Clearance Time (s) 4.6 4.6 4.2 4.2 4.2
Vehicle Extension (s) 4.0 4.0 3.0 3.0 3.0
Lane Grp Cap (vph) 2405 1842 358 359 337
v/s Ratio Prot c0.28 c0.47 0.10 c0.10
v/s Ratio Perm 0.02
v/c Ratio 0.40 0.86 0.43 0.44 0.11
Uniform Delay, d1 5.4 16.6 28.5 28.5 26.4
Progression Factor 1.00 0.67 1.00 1.00 1.00
Incremental Delay, d2 0.1 3.4 0.8 0.9 0.1
Delay (s) 5.5 14.5 29.3 29.4 26.5
Level of Service A B C C C
Approach Delay (s) 5.5 14.5 28.4 0.0
Approach LOS A B C A
Intersection Summary
HCM 2000 Control Delay 13.9 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.72
Actuated Cycle Length (s) 84.8 Sum of lost time (s) 12.3 Intersection Capacity Utilization 55.4% ICU Level of Service B Analysis Period (min) 15
c Critical Lane Group
HCM 2010 Signalized Intersection Summary Existing AM
3: W Laurel Dr & SB 101 Offramp
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 0 946 1220 0 210 360
Future Volume (veh/h) 0 946 1220 0 210 360
Number 5 2 6 16 7 14
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 0 1800 1835 0 1800 1800
Adj Flow Rate, veh/h 0 1040 1341 0 231 396
Adj No. of Lanes 022021
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91
Percent Heavy Veh, % 042044
Cap, veh/h 0 1656 1689 0 1119 515
Arrive On Green 0.00 0.48 0.48 0.00 0.34 0.34
Sat Flow, veh/h 0 3599 3670 0 3325 1530
Grp Volume(v), veh/h 0 1040 1341 0 231 396
Grp Sat Flow(s),veh/h/ln 0 1710 1743 0 1662 1530
Q Serve(g_s), s 0.0 9.7 13.9 0.0 2.1 10.0
Cycle Q Clear(g_c), s 0.0 9.7 13.9 0.0 2.1 10.0
Prop In Lane 0.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 1656 1689 0 1119 515
V/C Ratio(X) 0.00 0.63 0.79 0.00 0.21 0.77
Avail Cap(c_a), veh/h 0 2455 2503 0 1653 761
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00 0.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 8.2 9.3 0.0 10.2 12.8
Incr Delay (d2), s/veh 0.0 0.1 0.6 0.0 0.1 2.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 4.5 6.7 0.0 1.0 4.5
LnGrp Delay(d),s/veh 0.0 8.4 9.9 0.0 10.2 15.0
LnGrp LOS A A B B
Approach Vol, veh/h 1040 1341 627
Approach Delay, s/veh 8.4 9.9 13.2
Approach LOS A A B
Timer 12345678
Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 25.0 18.1 25.0
Change Period (Y+Rc), s 5.1 4.6 5.1
Max Green Setting (Gmax), s 29.9 20.4 29.9
Max Q Clear Time (g_c+I1), s 11.7 12.0 15.9
Green Ext Time (p_c), s 3.1 1.5 4.0
Intersection Summary
HCM 2010 Ctrl Delay 10.1
HCM 2010 LOS B
HCM 2010 Signalized Intersection Summary Existing AM
4: N Davis Rd & Calle Del Adobe/W Laurel Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 29 284 9 845 441 294 23 280 809 178 282 29 Future Volume (veh/h) 29 284 9 845 441 294 23 280 809 178 282 29 Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1742 1742 1881 1826 1826 1826 1826 1826 1826 1809 1809 1881 Adj Flow Rate, veh/h 31 305 10 909 474 0 25 301 870 191 303 31 Adj No. of Lanes 120221122220
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 888333333444
Cap, veh/h 59 464 15 1144 1545 815 54 632 1421 266 728 74 Arrive On Green 0.04 0.14 0.15 0.34 0.45 0.00 0.03 0.18 0.18 0.08 0.23 0.24 Sat Flow, veh/h 1659 3270 107 3374 3470 1552 1739 3470 2717 3342 3150 320 Grp Volume(v), veh/h 31 154 161 909 474 0 25 301 870 191 164 170 Grp Sat Flow(s),veh/h/ln 1659 1655 1723 1687 1735 1552 1739 1735 1359 1671 1718 1752 Q Serve(g_s), s 1.7 8.0 8.1 22.3 8.0 0.0 1.3 7.1 6.3 5.1 7.4 7.5 Cycle Q Clear(g_c), s 1.7 8.0 8.1 22.3 8.0 0.0 1.3 7.1 6.3 5.1 7.4 7.5 Prop In Lane 1.00 0.06 1.00 1.00 1.00 1.00 1.00 0.18
Lane Grp Cap(c), veh/h 59 235 245 1144 1545 815 54 632 1421 266 397 405 V/C Ratio(X) 0.52 0.66 0.66 0.79 0.31 0.00 0.47 0.48 0.61 0.72 0.41 0.42 Avail Cap(c_a), veh/h 132 827 861 1366 2862 1404 114 1321 1961 329 710 724 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 43.3 37.1 37.1 27.3 16.3 0.0 43.6 33.5 4.2 41.1 29.9 29.8 Incr Delay (d2), s/veh 2.6 6.5 6.3 3.7 0.2 0.0 2.3 0.6 0.4 8.8 0.7 0.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 4.1 4.3 10.9 3.9 0.0 0.7 3.4 3.2 2.7 3.6 3.7 LnGrp Delay(d),s/veh 45.9 43.6 43.4 31.1 16.5 0.0 45.9 34.0 4.6 49.9 30.6 30.5 LnGrp LOS DDDCB DCADCC
Approach Vol, veh/h 346 1383 1196 525
Approach Delay, s/veh 43.7 26.1 12.9 37.6
Approach LOS D C B D
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 37.0 18.5 8.8 27.1 8.8 46.7 13.3 22.7 Change Period (Y+Rc), s 6.0 5.5 6.0 6.0 5.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 37.0 45.7 6.0 37.8 7.3 75.4 9.0 34.8 Max Q Clear Time (g_c+I1), s 24.3 10.1 3.3 9.5 3.7 10.0 7.1 9.1 Green Ext Time (p_c), s 6.7 2.9 0.0 1.3 0.0 5.4 0.2 6.9 Intersection Summary
HCM 2010 Ctrl Delay 25.0
HCM 2010 LOS C
HCM 2010 TWSC Existing AM
5: Post Dr/El Rancho Way & Calle Del Adobe
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Intersection
Int Delay, s/veh 18.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 0 233 164 168 249 39 111 22 17 60 39 0 Future Vol, veh/h 0 233 164 168 249 39 111 22 17 60 39 0 Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - Yield
Storage Length 70 - 85 175 - 0 0 - - - - 110
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 2 - - 0 - - 0 - - 0 -
Peak Hour Factor 86 86 86 86 86 86 86 86 86 86 86 86
Heavy Vehicles, % 11 11 11 444444222
Mvmt Flow 0 271 191 195 290 45 129 26 20 70 45 0
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 335 0 0 462 0 0 996 996 271 1070 1142 290 Stage 1 - - - - - - 271 271 - 680 680 -
Stage 2 - - - - - - 725 725 - 390 462 -
Critical Hdwy 4.21 - - 4.14 - - 7.14 6.54 6.24 7.12 6.52 6.22 Critical Hdwy Stg 1 - ----- 6.14 5.54 - 6.12 5.52 -
Critical Hdwy Stg 2 - ----- 6.14 5.54 - 6.12 5.52 -
Follow-up Hdwy 2.299 - - 2.236 - - 3.536 4.036 3.336 3.518 4.018 3.318 Pot Cap-1 Maneuver 1176 - - 1089 - - 221 242 763 199 200 749 Stage 1 - - - - - - 730 682 - 441 451 -
Stage 2 - - - - - - 413 427 - 634 565 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1176 - - 1089 - - 151 199 763 151 164 749 Mov Cap-2 Maneuver - - - - - - 151 199 - 151 164 -
Stage 1 - - - - - - 730 682 - 441 370 -
Stage 2 - - - - - - 297 351 - 594 565 -
Approach EB WB NB SB
HCM Control Delay, s 0 3.3 77.1 74.7

HCM LOS F F
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2 Capacity (veh/h) 151 294 1176 - - 1089 - - 156 -
HCM Lane V/C Ratio 0.855 0.154 - - - 0.179 - - 0.738 -
HCM Control Delay (s) 97.3 19.5 0 - - 9 - - 74.7 0
HCM Lane LOS F C A - - A - - F A
HCM 95th %tile Q(veh) 5.7 0.5 0 - - 0.7 - - 4.5 -
HCM 2010 Signalized Intersection Summary Existing AM
6: N Davis Rd & Post Dr/Commercial Dwy
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 34 28 310 60 9 91 164 987 12 120 953 19 Future Volume (veh/h) 34 28 310 60 9 91 164 987 12 120 953 19 Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1792 1792 1792 1900 1845 1845 1845 1845 1900 1863 1863 1863 Adj Flow Rate, veh/h 34 35 333 65 10 98 176 1061 13 129 1025 20 Adj No. of Lanes 111011130121
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 666333333222
Cap, veh/h 388 407 346 140 21 142 190 1700 21 160 1111 495 Arrive On Green 0.23 0.23 0.23 0.11 0.09 0.09 0.11 0.33 0.33 0.09 0.31 0.31 Sat Flow, veh/h 1707 1792 1522 1532 236 1563 1757 5128 63 1774 3539 1577 Grp Volume(v), veh/h 34 35 333 75 0 98 176 695 379 129 1025 20 Grp Sat Flow(s),veh/h/ln 1707 1792 1522 1768 0 1563 1757 1679 1833 1774 1770 1577 Q Serve(g_s), s 1.5 1.4 20.0 3.7 0.0 5.6 9.2 16.1 16.1 6.6 25.9 0.8 Cycle Q Clear(g_c), s 1.5 1.4 20.0 3.7 0.0 5.6 9.2 16.1 16.1 6.6 25.9 0.8 Prop In Lane 1.00 1.00 0.87 1.00 1.00 0.03 1.00 1.00
Lane Grp Cap(c), veh/h 388 407 346 161 0 142 190 1113 608 160 1111 495 V/C Ratio(X) 0.09 0.09 0.96 0.47 0.00 0.69 0.93 0.62 0.62 0.80 0.92 0.04 Avail Cap(c_a), veh/h 388 407 346 478 0 423 190 1113 608 211 1149 512 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.2 28.2 35.3 39.2 0.0 40.7 40.8 26.0 26.0 41.2 30.6 22.0 Incr Delay (d2), s/veh 0.1 0.1 38.6 2.1 0.0 5.8 44.7 1.1 2.0 15.3 12.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.7 12.1 1.9 0.0 2.7 6.8 7.6 8.5 3.9 14.4 0.4 LnGrp Delay(d),s/veh 28.3 28.2 73.9 41.3 0.0 46.5 85.6 27.1 28.0 56.5 42.6 22.1 LnGrp LOS C C E D D F C C E D C
Approach Vol, veh/h 402 173 1250 1174
Approach Delay, s/veh 66.1 44.3 35.6 43.8
Approach LOS E D D D
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 27.0 16.0 35.0 14.4 14.4 36.6
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 21.0 10.0 30.0 25.0 11.0 29.0 Max Q Clear Time (g_c+I1), s 22.0 11.2 27.9 7.6 8.6 18.1 Green Ext Time (p_c), s 0.0 0.0 1.2 0.6 0.1 3.8
Intersection Summary
HCM 2010 Ctrl Delay 43.4
HCM 2010 LOS D
Notes
HCM 2010 Signalized Intersection Summary Existing AM
7: N Davis Rd & W Rossi St
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 595 0 130 0 918 486 206 1160 0 Future Volume (veh/h) 0 0 0 595 0 130 0 918 486 206 1160 0 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1900 1863 1900 1845 1845 1900 0 1863 1863 1845 1845 1900 Adj Flow Rate, veh/h 0 0 0 633 0 138 0 977 517 219 1234 0 Adj No. of Lanes 010210021120
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 222333022333
Cap, veh/h 0 452 0 1106 0 380 0 1316 589 268 2110 0
Arrive On Green 0.00 0.00 0.00 0.24 0.00 0.24 0.00 0.37 0.37 0.15 0.60 0.00 Sat Flow, veh/h 0 1863 0 3408 0 1568 0 3632 1583 1757 3597 0 Grp Volume(v), veh/h 0 0 0 633 0 138 0 977 517 219 1234 0 Grp Sat Flow(s),veh/h/ln 0 1863 0 1704 0 1568 0 1770 1583 1757 1752 0 Q Serve(g_s), s 0.0 0.0 0.0 8.9 0.0 3.8 0.0 12.3 15.7 6.2 11.1 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 8.9 0.0 3.8 0.0 12.3 15.7 6.2 11.1 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 452 0 1106 0 380 0 1316 589 268 2110 0 V/C Ratio(X) 0.00 0.00 0.00 0.57 0.00 0.36 0.00 0.74 0.88 0.82 0.58 0.00 Avail Cap(c_a), veh/h 0 579 0 1339 0 487 0 1316 589 273 2110 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 18.1 0.0 16.2 0.0 14.0 15.1 21.1 6.3 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 0.5 0.0 0.6 0.0 3.8 16.9 17.1 1.2 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 4.2 0.0 1.7 0.0 6.7 9.5 4.3 5.7 0.0 LnGrp Delay(d),s/veh 0.0 0.0 0.0 18.6 0.0 16.8 0.0 17.8 31.9 38.2 7.5 0.0 LnGrp LOS B B B C D A
Approach Vol, veh/h 0 771 1494 1453
Approach Delay, s/veh 0.0 18.3 22.7 12.1
Approach LOS B C B
Timer 12345678
Assigned Phs 1 2468
Phs Duration (G+Y+Rc), s 11.9 23.1 16.5 35.0 16.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 8.0 19.0 16.0 31.0 16.0
Max Q Clear Time (g_c+I1), s 8.2 17.7 0.0 13.1 10.9
Green Ext Time (p_c), s 0.0 1.0 0.0 8.5 1.6
Intersection Summary
HCM 2010 Ctrl Delay 17.7
HCM 2010 LOS B
HCM 2010 Signalized Intersection Summary Existing AM
8: N Main St (SR 183) & W Rossi St/E Rossi St
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 140 322 264 142 315 97 113 591 56 135 1145 224 Future Volume (veh/h) 140 322 264 142 315 97 113 591 56 135 1145 224 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1845 1845 1845 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 161 370 303 163 362 0 130 679 64 155 1316 0 Adj No. of Lanes 211111121121
Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 222333222222
Cap, veh/h 200 393 329 186 478 406 151 1324 588 191 1404 628 Arrive On Green 0.06 0.21 0.21 0.11 0.26 0.00 0.08 0.37 0.37 0.11 0.40 0.00 Sat Flow, veh/h 3442 1863 1556 1757 1845 1568 1774 3539 1571 1774 3539 1583 Grp Volume(v), veh/h 161 370 303 163 362 0 130 679 64 155 1316 0 Grp Sat Flow(s),veh/h/ln 1721 1863 1556 1757 1845 1568 1774 1770 1571 1774 1770 1583 Q Serve(g_s), s 4.1 17.5 17.1 8.2 16.2 0.0 6.5 13.3 2.4 7.6 32.0 0.0 Cycle Q Clear(g_c), s 4.1 17.5 17.1 8.2 16.2 0.0 6.5 13.3 2.4 7.6 32.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 200 393 329 186 478 406 151 1324 588 191 1404 628 V/C Ratio(X) 0.81 0.94 0.92 0.87 0.76 0.00 0.86 0.51 0.11 0.81 0.94 0.00 Avail Cap(c_a), veh/h 200 393 329 186 478 406 151 1324 588 305 1423 637 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 41.7 34.8 34.6 39.4 30.6 0.0 40.4 21.7 18.3 39.1 25.9 0.0 Incr Delay (d2), s/veh 20.9 30.7 30.5 33.8 6.8 0.0 37.0 0.3 0.1 8.5 11.9 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.5 12.3 10.1 5.7 9.2 0.0 4.7 6.6 1.0 4.2 17.8 0.0 LnGrp Delay(d),s/veh 62.6 65.5 65.1 73.2 37.4 0.0 77.5 22.0 18.4 47.6 37.8 0.0 LnGrp LOS EEEED ECBDD
Approach Vol, veh/h 834 525 873 1471
Approach Delay, s/veh 64.8 48.5 30.0 38.8
Approach LOS E D C D
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 14.1 38.0 14.0 23.4 12.1 40.0 9.7 27.7 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 15.4 28.2 9.5 18.9 7.6 36.0 5.2 23.2 Max Q Clear Time (g_c+I1), s 9.6 15.3 10.2 19.5 8.5 34.0 6.1 18.2 Green Ext Time (p_c), s 0.2 4.0 0.0 0.0 0.0 1.6 0.0 0.9 Intersection Summary
HCM 2010 Ctrl Delay 44.0
HCM 2010 LOS D
HCM 2010 Signalized Intersection Summary Existing AM
9: Davis SB Ramps/Market Cir & W Market St (SR 183)
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 451 142 98 344 3 154 0 174 7 2 0 Future Volume (veh/h) 0 451 142 98 344 3 154 0 174 7 2 0 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1810 1810 1900 1712 1712 1900 1900 1845 1845 1900 1863 1900 Adj Flow Rate, veh/h 0 550 173 120 420 4 188 0 212 9 2 0 Adj No. of Lanes 120120011010
Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Percent Heavy Veh, % 5 5 5 11 11 11 333222
Cap, veh/h 3 719 225 151 1514 14 680 0 576 425 82 0
Arrive On Green 0.00 0.28 0.28 0.09 0.46 0.46 0.37 0.00 0.37 0.37 0.37 0.00 Sat Flow, veh/h 1723 2578 808 1630 3301 31 1471 0 1568 812 224 0 Grp Volume(v), veh/h 0 366 357 120 207 217 188 0 212 11 0 0 Grp Sat Flow(s),veh/h/ln 1723 1719 1667 1630 1626 1706 1471 0 1568 1036 0 0 Q Serve(g_s), s 0.0 10.1 10.2 3.7 4.1 4.1 0.0 0.0 5.1 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.0 10.1 10.2 3.7 4.1 4.1 3.9 0.0 5.1 4.0 0.0 0.0 Prop In Lane 1.00 0.48 1.00 0.02 1.00 1.00 0.82 0.00
Lane Grp Cap(c), veh/h 3 480 465 151 746 782 680 0 576 507 0 0 V/C Ratio(X) 0.00 0.76 0.77 0.80 0.28 0.28 0.28 0.00 0.37 0.02 0.00 0.00 Avail Cap(c_a), veh/h 167 598 580 299 746 782 680 0 576 507 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 0.0 17.1 17.1 23.0 8.7 8.7 11.6 0.0 12.0 10.5 0.0 0.0 Incr Delay (d2), s/veh 0.0 4.5 4.8 9.2 0.2 0.2 1.0 0.0 1.8 0.1 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 5.4 5.3 2.1 1.8 1.9 2.1 0.0 2.5 0.1 0.0 0.0 LnGrp Delay(d),s/veh 0.0 21.6 21.9 32.2 8.9 8.9 12.6 0.0 13.8 10.6 0.0 0.0 LnGrp LOS C C C A A B B B
Approach Vol, veh/h 723 544 400 11
Approach Delay, s/veh 21.8 14.0 13.2 10.6
Approach LOS C B B B
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 23.5 9.3 18.9 23.5 0.0 28.2
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 19.0 9.5 18.0 19.0 5.0 22.5 Max Q Clear Time (g_c+I1), s 7.1 5.7 12.2 6.0 0.0 6.1
Green Ext Time (p_c), s 1.4 0.1 2.3 0.0 0.0 2.3
Intersection Summary
HCM 2010 Ctrl Delay 17.1
HCM 2010 LOS B
HCM 2010 Signalized Intersection Summary Existing AM
10: Davis NB Ramps/Private Dwy & W Market St (SR 183)
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 1 554 97 164 346 3 99 1 106 1 1 0 Future Volume (veh/h) 1 554 97 164 346 3 99 1 106 1 1 0 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1810 1810 1900 1743 1743 1900 1900 1776 1776 1900 1863 1900 Adj Flow Rate, veh/h 1 637 111 189 398 3 114 1 122 1 1 0 Adj No. of Lanes 120120011010
Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 555999777222
Cap, veh/h 3 808 141 233 1398 11 597 5 508 316 285 0
Arrive On Green 0.00 0.28 0.28 0.14 0.42 0.42 0.34 0.34 0.34 0.34 0.34 0.00 Sat Flow, veh/h 1723 2929 510 1660 3369 25 1383 14 1509 644 847 0 Grp Volume(v), veh/h 1 373 375 189 196 205 115 0 122 2 0 0 Grp Sat Flow(s),veh/h/ln 1723 1719 1720 1660 1656 1739 1397 0 1509 1491 0 0 Q Serve(g_s), s 0.0 11.0 11.0 6.0 4.3 4.3 0.0 0.0 3.2 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.0 11.0 11.0 6.0 4.3 4.3 2.6 0.0 3.2 2.6 0.0 0.0 Prop In Lane 1.00 0.30 1.00 0.01 0.99 1.00 0.50 0.00
Lane Grp Cap(c), veh/h 3 474 475 233 687 722 601 0 508 601 0 0 V/C Ratio(X) 0.32 0.79 0.79 0.81 0.28 0.28 0.19 0.00 0.24 0.00 0.00 0.00 Avail Cap(c_a), veh/h 158 566 566 307 700 735 601 0 508 601 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 27.3 18.3 18.3 22.8 10.6 10.6 12.9 0.0 13.1 12.0 0.0 0.0 Incr Delay (d2), s/veh 49.4 6.2 6.3 11.6 0.2 0.2 0.7 0.0 1.1 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 6.0 6.0 3.5 2.0 2.1 1.3 0.0 1.5 0.0 0.0 0.0 LnGrp Delay(d),s/veh 76.6 24.5 24.6 34.4 10.8 10.8 13.6 0.0 14.2 12.1 0.0 0.0 LnGrp LOS E C C C B B B B B
Approach Vol, veh/h 749 590 237 2
Approach Delay, s/veh 24.6 18.4 13.9 12.1
Approach LOS C B B B
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 22.9 12.2 19.6 22.9 4.6 27.2
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 18.4 10.1 18.0 18.4 5.0 23.1 Max Q Clear Time (g_c+I1), s 5.2 8.0 13.0 4.6 2.0 6.3
Green Ext Time (p_c), s 0.8 0.1 2.1 0.0 0.0 2.1
Intersection Summary
HCM 2010 Ctrl Delay 20.6
HCM 2010 LOS C
HCM 2010 Signalized Intersection Summary Existing AM
11: Davis Rd & Blanco Rd
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 501 647 29 129 553 236 40 258 70 174 359 579 Future Volume (veh/h) 501 647 29 129 553 236 40 258 70 174 359 579 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1827 1827 1827 1827 1827 1900 1845 1845 1845 Adj Flow Rate, veh/h 516 667 30 133 570 0 41 266 72 179 370 0 Adj No. of Lanes 220121120111
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 222444444333
Cap, veh/h 609 982 44 167 706 316 67 691 183 217 627 533 Arrive On Green 0.18 0.28 0.28 0.10 0.20 0.00 0.04 0.25 0.25 0.12 0.34 0.00 Sat Flow, veh/h 3442 3450 155 1740 3471 1553 1740 2714 721 1757 1845 1568 Grp Volume(v), veh/h 516 342 355 133 570 0 41 168 170 179 370 0 Grp Sat Flow(s),veh/h/ln 1721 1770 1835 1740 1736 1553 1740 1736 1700 1757 1845 1568 Q Serve(g_s), s 10.8 12.8 12.8 5.6 11.7 0.0 1.7 6.0 6.2 7.4 12.4 0.0 Cycle Q Clear(g_c), s 10.8 12.8 12.8 5.6 11.7 0.0 1.7 6.0 6.2 7.4 12.4 0.0 Prop In Lane 1.00 0.08 1.00 1.00 1.00 0.42 1.00 1.00
Lane Grp Cap(c), veh/h 609 504 522 167 706 316 67 442 433 217 627 533 V/C Ratio(X) 0.85 0.68 0.68 0.80 0.81 0.00 0.61 0.38 0.39 0.82 0.59 0.00 Avail Cap(c_a), veh/h 669 545 565 221 837 374 117 442 433 247 627 533 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 29.7 23.7 23.7 33.0 28.3 0.0 35.3 23.0 23.0 31.9 20.3 0.0 Incr Delay (d2), s/veh 9.2 3.1 3.0 13.8 5.0 0.0 8.8 2.5 2.7 17.9 4.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.9 6.6 6.8 3.3 6.0 0.0 1.0 3.2 3.2 4.7 7.0 0.0 LnGrp Delay(d),s/veh 39.0 26.7 26.7 46.8 33.4 0.0 44.2 25.5 25.7 49.8 24.4 0.0 LnGrp LOS DCCDC DCCDC
Approach Vol, veh/h 1213 703 379 549
Approach Delay, s/veh 31.9 35.9 27.6 32.7
Approach LOS CDCC
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 13.7 23.5 11.7 25.8 7.4 29.9 17.7 19.7 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 10.5 19.0 9.5 23.0 5.0 24.5 14.5 18.0 Max Q Clear Time (g_c+I1), s 9.4 8.2 7.6 14.8 3.7 14.4 12.8 13.7 Green Ext Time (p_c), s 0.1 1.4 0.1 2.7 0.0 1.6 0.4 1.5 Intersection Summary
HCM 2010 Ctrl Delay 32.5
HCM 2010 LOS C
HCM 2010 Signalized Intersection Summary Existing AM
12: N Main St & W Alvin Dr/E Alvin Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 107 383 97 289 293 257 32 406 346 209 538 83 Future Volume (veh/h) 107 383 97 289 293 257 32 406 346 209 538 83 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.85 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 123 440 111 332 337 295 37 467 398 240 618 95 Adj No. of Lanes 121111130231
Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 222222222222
Cap, veh/h 157 757 289 373 626 527 63 839 388 323 1555 479 Arrive On Green 0.09 0.21 0.21 0.21 0.34 0.34 0.04 0.25 0.25 0.09 0.31 0.31 Sat Flow, veh/h 1774 3539 1352 1774 1863 1569 1774 3390 1566 3442 5085 1568 Grp Volume(v), veh/h 123 440 111 332 337 295 37 467 398 240 618 95 Grp Sat Flow(s),veh/h/ln 1774 1770 1352 1774 1863 1569 1774 1695 1566 1721 1695 1568 Q Serve(g_s), s 5.2 8.6 5.4 14.0 11.3 11.8 1.6 9.2 19.0 5.2 7.4 3.4 Cycle Q Clear(g_c), s 5.2 8.6 5.4 14.0 11.3 11.8 1.6 9.2 19.0 5.2 7.4 3.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 157 757 289 373 626 527 63 839 388 323 1555 479 V/C Ratio(X) 0.79 0.58 0.38 0.89 0.54 0.56 0.59 0.56 1.03 0.74 0.40 0.20 Avail Cap(c_a), veh/h 254 830 317 405 626 527 136 839 388 336 1555 479 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 34.3 27.1 25.8 29.5 20.7 20.8 36.5 25.2 28.9 33.9 21.0 19.7 Incr Delay (d2), s/veh 8.4 0.9 0.8 20.1 0.9 1.3 8.4 2.7 52.6 8.3 0.8 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.9 4.2 2.1 8.9 6.0 5.3 0.9 4.6 13.7 2.8 3.5 1.6 LnGrp Delay(d),s/veh 42.6 27.9 26.7 49.5 21.6 22.2 44.8 27.8 81.5 42.2 21.8 20.6 LnGrp LOS DCCDCCDCFDCC
Approach Vol, veh/h 674 964 902 953
Approach Delay, s/veh 30.4 31.4 52.2 26.8
Approach LOS CCDC
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.7 23.5 20.6 20.9 7.2 28.0 11.3 30.3 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 7.5 19.0 17.5 18.0 5.9 20.6 11.0 24.5 Max Q Clear Time (g_c+I1), s 7.2 21.0 16.0 10.6 3.6 9.4 7.2 13.8 Green Ext Time (p_c), s 0.0 0.0 0.2 2.0 0.0 3.5 0.1 2.4 Intersection Summary
HCM 2010 Ctrl Delay 35.3
HCM 2010 LOS D
HCM 2010 Signalized Intersection Summary Existing AM
13: N Main St & W Laurel Dr/E Laurel Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 175 389 95 132 547 88 71 488 112 192 736 158 Future Volume (veh/h) 175 389 95 132 547 88 71 488 112 192 736 158 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1845 1845 1845 1863 1863 1900 Adj Flow Rate, veh/h 197 437 107 148 615 99 80 548 126 216 827 178 Adj No. of Lanes 120120221230
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 222222333222
Cap, veh/h 238 768 186 186 741 119 195 976 432 277 1267 271 Arrive On Green 0.13 0.27 0.27 0.10 0.24 0.24 0.06 0.28 0.28 0.08 0.30 0.30 Sat Flow, veh/h 1774 2820 685 1774 3051 490 3408 3505 1551 3442 4195 897 Grp Volume(v), veh/h 197 273 271 148 356 358 80 548 126 216 667 338 Grp Sat Flow(s),veh/h/ln 1774 1770 1735 1774 1770 1771 1704 1752 1551 1721 1695 1701 Q Serve(g_s), s 7.4 9.1 9.2 5.6 13.0 13.1 1.5 9.1 4.4 4.2 11.7 11.8 Cycle Q Clear(g_c), s 7.4 9.1 9.2 5.6 13.0 13.1 1.5 9.1 4.4 4.2 11.7 11.8 Prop In Lane 1.00 0.39 1.00 0.28 1.00 1.00 1.00 0.53
Lane Grp Cap(c), veh/h 238 482 472 186 430 430 195 976 432 277 1024 514 V/C Ratio(X) 0.83 0.57 0.57 0.80 0.83 0.83 0.41 0.56 0.29 0.78 0.65 0.66 Avail Cap(c_a), veh/h 247 482 473 231 467 467 250 976 432 277 1024 514 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.8 21.4 21.4 29.8 24.5 24.5 31.0 21.0 19.3 30.8 20.7 20.7 Incr Delay (d2), s/veh 19.7 1.5 1.7 14.3 11.2 11.4 1.4 2.3 1.7 13.1 3.2 6.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.9 4.6 4.6 3.4 7.7 7.7 0.8 4.7 2.1 2.5 5.9 6.5 LnGrp Delay(d),s/veh 48.4 22.9 23.1 44.1 35.7 35.9 32.4 23.4 21.0 43.9 23.9 27.2 LnGrp LOS DCCDDDCCCDCC
Approach Vol, veh/h 741 862 754 1221
Approach Delay, s/veh 29.8 37.2 23.9 28.4
Approach LOS CDCC
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 10.0 23.5 11.6 23.1 8.4 25.1 13.7 21.1 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.5 19.0 8.9 18.6 5.0 19.5 9.5 18.0 Max Q Clear Time (g_c+I1), s 6.2 11.1 7.6 11.2 3.5 13.8 9.4 15.1 Green Ext Time (p_c), s 0.0 2.5 0.0 2.0 0.0 3.1 0.0 1.3 Intersection Summary
HCM 2010 Ctrl Delay 29.9
HCM 2010 LOS C
HCM Signalized Intersection Capacity Analysis Existing PM 1: W Laurel Dr & Adams St
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (vph) 442 1343 878 30 37 309
Future Volume (vph) 442 1343 878 30 37 309
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 2% 3% 0%
Total Lost time (s) 3.9 3.5 3.5 3.5 3.1
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00
Frt 1.00 1.00 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00
Satd. Flow (prot) 1752 3504 3469 1770 1583
Flt Permitted 0.18 1.00 1.00 0.95 1.00
Satd. Flow (perm) 326 3504 3469 1770 1583
Peak-hour factor, PHF 0.99 0.99 0.99 0.99 0.99 0.99
Adj. Flow (vph) 446 1357 887 30 37 312
RTOR Reduction (vph) 0 0 0 0 0 238
Lane Group Flow (vph) 446 1357 917 0 37 74
Turn Type pm+pt NA NA Prot Perm
Protected Phases 5 2 6 8
Permitted Phases 2 8
Actuated Green, G (s) 58.4 58.4 37.3 19.6 19.6
Effective Green, g (s) 59.1 59.5 38.4 20.3 20.7
Actuated g/C Ratio 0.68 0.69 0.44 0.23 0.24
Clearance Time (s) 4.6 4.6 4.6 4.2 4.2
Vehicle Extension (s) 3.0 4.0 4.0 2.5 2.5
Lane Grp Cap (vph) 504 2401 1534 413 377
v/s Ratio Prot c0.18 0.39 0.26 0.02
v/s Ratio Perm c0.43 c0.05
v/c Ratio 0.88 0.57 0.60 0.09 0.20
Uniform Delay, d1 17.0 7.0 18.3 26.0 26.4
Progression Factor 1.10 0.56 1.00 1.00 1.00
Incremental Delay, d2 13.1 0.3 0.7 0.1 0.2
Delay (s) 31.8 4.2 19.1 26.1 26.6
Level of Service C A B C C
Approach Delay (s) 11.0 19.1 26.5
Approach LOS B B C
Intersection Summary
HCM 2000 Control Delay 15.2 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.74
Actuated Cycle Length (s) 86.8 Sum of lost time (s) 11.6 Intersection Capacity Utilization 65.5% ICU Level of Service C Analysis Period (min) 15
c Critical Lane Group
HCM Signalized Intersection Capacity Analysis Existing PM 2: NB 101 Ramps & W Laurel Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (vph) 0 1428 0 0 958 229 418 3 357 0 0 0 Future Volume (vph) 0 1428 0 0 958 229 418 3 357 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 3% 3% 3% 3%
Total Lost time (s) 3.5 3.5 3.5 3.5 3.5
Lane Util. Factor 0.95 0.95 0.95 0.95 1.00
Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00
Frt 1.00 0.97 1.00 1.00 0.85
Flt Protected 1.00 1.00 0.95 0.95 1.00
Satd. Flow (prot) 3486 3366 1656 1661 1560
Flt Permitted 1.00 1.00 0.95 0.95 1.00
Satd. Flow (perm) 3486 3366 1656 1661 1560
Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Adj. Flow (vph) 0 1519 0 0 1019 244 445 3 380 0 0 0
RTOR Reduction (vph) 0 0 0 0 0 0 0 0 57 0 0 0
Lane Group Flow (vph) 0 1519 0 0 1263 0 222 226 323 0 0 0 Confl. Peds. (#/hr) 3
Turn Type NA NA Split NA Perm
Protected Phases 2 6 4 4
Permitted Phases 6 4
Actuated Green, G (s) 58.4 37.3 19.6 19.6 19.6
Effective Green, g (s) 59.5 38.4 20.3 20.3 20.3
Actuated g/C Ratio 0.69 0.44 0.23 0.23 0.23
Clearance Time (s) 4.6 4.6 4.2 4.2 4.2
Vehicle Extension (s) 4.0 4.0 3.0 3.0 3.0
Lane Grp Cap (vph) 2389 1489 387 388 364
v/s Ratio Prot c0.44 c0.38 0.13 0.14
v/s Ratio Perm c0.21
v/c Ratio 0.64 0.85 0.57 0.58 0.89
Uniform Delay, d1 7.6 21.6 29.4 29.5 32.1
Progression Factor 1.00 0.45 1.00 1.00 1.00
Incremental Delay, d2 0.6 4.3 2.1 2.2 21.8
Delay (s) 8.2 13.9 31.5 31.7 53.9
Level of Service A B C C D
Approach Delay (s) 8.2 13.9 41.9 0.0
Approach LOS A B D A
Intersection Summary
HCM 2000 Control Delay 17.9 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.84
Actuated Cycle Length (s) 86.8 Sum of lost time (s) 12.3 Intersection Capacity Utilization 68.2% ICU Level of Service C Analysis Period (min) 15
c Critical Lane Group
HCM 2010 Signalized Intersection Summary Existing PM
3: W Laurel Dr & SB 101 Offramp
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 0 1429 1239 0 388 360
Future Volume (veh/h) 0 1429 1239 0 388 360
Number 5 2 6 16 7 14
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 0 1835 1835 0 1835 1835
Adj Flow Rate, veh/h 0 1489 1291 0 404 375
Adj No. of Lanes 022021
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 022022
Cap, veh/h 0 1816 1816 0 1062 489
Arrive On Green 0.00 0.52 0.52 0.00 0.31 0.31
Sat Flow, veh/h 0 3670 3670 0 3390 1560
Grp Volume(v), veh/h 0 1489 1291 0 404 375
Grp Sat Flow(s),veh/h/ln 0 1743 1743 0 1695 1560
Q Serve(g_s), s 0.0 16.6 13.1 0.0 4.3 10.1
Cycle Q Clear(g_c), s 0.0 16.6 13.1 0.0 4.3 10.1
Prop In Lane 0.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 1816 1816 0 1062 489
V/C Ratio(X) 0.00 0.82 0.71 0.00 0.38 0.77
Avail Cap(c_a), veh/h 0 2546 2546 0 1344 618
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00 0.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 9.3 8.5 0.0 12.4 14.4
Incr Delay (d2), s/veh 0.0 1.1 0.2 0.0 0.2 4.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 8.1 6.2 0.0 2.0 4.8
LnGrp Delay(d),s/veh 0.0 10.4 8.7 0.0 12.6 18.4
LnGrp LOS B A B B
Approach Vol, veh/h 1489 1291 779
Approach Delay, s/veh 10.4 8.7 15.4
Approach LOS B A B
Timer 12345678
Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 28.3 18.1 28.3
Change Period (Y+Rc), s 5.1 4.6 5.1
Max Green Setting (Gmax), s 32.9 17.4 32.9
Max Q Clear Time (g_c+I1), s 18.6 12.1 15.1
Green Ext Time (p_c), s 4.6 1.5 4.1
Intersection Summary
HCM 2010 Ctrl Delay 10.9
HCM 2010 LOS B
HCM 2010 Signalized Intersection Summary Existing PM
4: N Davis Rd & Calle Del Adobe/W Laurel Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 28 327 7 724 348 527 12 497 1045 529 491 31 Future Volume (veh/h) 28 327 7 724 348 527 12 497 1045 529 491 31 Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1775 1775 1881 1826 1826 1826 1844 1844 1844 1844 1844 1881 Adj Flow Rate, veh/h 29 341 7 754 362 0 12 518 1089 551 511 32 Adj No. of Lanes 120221122220
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 666333222222
Cap, veh/h 54 504 10 773 1203 812 29 835 1290 601 1333 83 Arrive On Green 0.03 0.15 0.16 0.23 0.35 0.00 0.02 0.24 0.24 0.18 0.40 0.41 Sat Flow, veh/h 1690 3379 69 3374 3470 1552 1756 3504 2759 3407 3349 209 Grp Volume(v), veh/h 29 170 178 754 362 0 12 518 1089 551 267 276 Grp Sat Flow(s),veh/h/ln 1690 1686 1762 1687 1735 1552 1756 1752 1379 1704 1752 1807 Q Serve(g_s), s 1.9 10.8 10.9 25.2 8.6 0.0 0.8 15.0 17.0 18.0 12.3 12.3 Cycle Q Clear(g_c), s 1.9 10.8 10.9 25.2 8.6 0.0 0.8 15.0 17.0 18.0 12.3 12.3 Prop In Lane 1.00 0.04 1.00 1.00 1.00 1.00 1.00 0.12
Lane Grp Cap(c), veh/h 54 251 263 773 1203 812 29 835 1290 601 697 719 V/C Ratio(X) 0.54 0.68 0.68 0.98 0.30 0.00 0.41 0.62 0.84 0.92 0.38 0.38 Avail Cap(c_a), veh/h 104 691 722 773 2003 1170 93 1050 1459 601 741 764 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 54.1 45.7 45.7 43.4 27.0 0.0 55.2 38.6 8.6 45.9 24.3 24.2 Incr Delay (d2), s/veh 3.1 6.6 6.4 26.5 0.3 0.0 3.4 0.8 4.3 19.8 0.3 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 5.5 5.8 14.6 4.2 0.0 0.4 7.4 7.1 10.1 6.0 6.2 LnGrp Delay(d),s/veh 57.3 52.3 52.0 69.9 27.3 0.0 58.6 39.4 12.9 65.7 24.6 24.6 LnGrp LOS E D D E C E D B E C C
Approach Vol, veh/h 377 1116 1619 1094
Approach Delay, s/veh 52.5 56.1 21.7 45.3
Approach LOS D E C D
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 32.0 22.4 7.9 51.2 9.1 45.3 26.0 33.0 Change Period (Y+Rc), s 6.0 5.5 6.0 6.0 5.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 26.0 46.5 6.0 48.0 7.0 65.5 20.0 34.0 Max Q Clear Time (g_c+I1), s 27.2 12.9 2.8 14.3 3.9 10.6 20.0 19.0 Green Ext Time (p_c), s 0.0 3.2 0.0 2.2 0.0 3.9 0.0 7.7 Intersection Summary
HCM 2010 Ctrl Delay 39.7
HCM 2010 LOS D
HCM 2010 TWSC Existing PM
5: Post Dr/El Rancho Way & Calle Del Adobe
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Intersection
Int Delay, s/veh 7.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 6 233 85 118 175 71 100 49 42 52 29 1 Future Vol, veh/h 6 233 85 118 175 71 100 49 42 52 29 1 Conflicting Peds, #/hr 1 06601900009
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - Yield
Storage Length 70 - 85 175 - 0 0 - - - - 110
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 2 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 9 99777444222
Mvmt Flow 6 245 89 124 184 75 105 52 44 55 31 1
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 260 0 0 340 0 0 757 771 251 783 785 194 Stage 1 - - - - - - 263 263 - 433 433 -
Stage 2 - - - - - - 494 508 - 350 352 -
Critical Hdwy 4.19 - - 4.17 - - 7.14 6.54 6.24 7.12 6.52 6.22 Critical Hdwy Stg 1 - ----- 6.14 5.54 - 6.12 5.52 -
Critical Hdwy Stg 2 - ----- 6.14 5.54 - 6.12 5.52 -
Follow-up Hdwy 2.281 - - 2.263 - - 3.536 4.036 3.336 3.518 4.018 3.318 Pot Cap-1 Maneuver 1265 - - 1192 - - 322 328 783 311 325 847 Stage 1 - - - - - - 738 687 - 601 582 -
Stage 2 - - - - - - 553 535 - 666 632 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1264 - - 1186 - - 268 290 779 233 288 840 Mov Cap-2 Maneuver - - - - - - 268 290 - 233 288 -
Stage 1 - - - - - - 731 680 - 597 520 -
Stage 2 - - - - - - 462 478 - 578 626 -
Approach EB WB NB SB
HCM Control Delay, s 0.1 2.7 21.9 26.5

HCM LOS C D
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2 Capacity (veh/h) 268 408 1264 - - 1186 - - 250 840
HCM Lane V/C Ratio 0.393 0.235 0.005 - - 0.105 - - 0.341 0.001 HCM Control Delay (s) 26.9 16.5 7.9 - - 8.4 - - 26.7 9.3 HCM Lane LOS D C A - - A - - D A
HCM 95th %tile Q(veh) 1.8 0.9 0 - - 0.4 - - 1.5 0
HCM 2010 Signalized Intersection Summary Existing PM
6: N Davis Rd & Post Dr/Commercial Dwy
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 90 29 211 106 11 174 203 1290 16 210 932 40 Future Volume (veh/h) 90 29 211 106 11 174 203 1290 16 210 932 40 Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1845 1845 1845 1900 1863 1863 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 60 72 213 107 11 176 205 1303 16 212 941 40 Adj No. of Lanes 111011130121
Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Percent Heavy Veh, % 333222222222
Cap, veh/h 291 306 258 237 24 231 239 1490 18 245 1032 458 Arrive On Green 0.17 0.17 0.17 0.16 0.15 0.15 0.13 0.29 0.29 0.14 0.29 0.29 Sat Flow, veh/h 1757 1845 1554 1616 166 1570 1774 5178 64 1774 3539 1572 Grp Volume(v), veh/h 60 72 213 118 0 176 205 853 466 212 941 40 Grp Sat Flow(s),veh/h/ln 1757 1845 1554 1782 0 1570 1774 1695 1851 1774 1770 1572 Q Serve(g_s), s 2.7 3.1 12.2 5.5 0.0 9.9 10.4 22.0 22.0 10.7 23.6 1.7 Cycle Q Clear(g_c), s 2.7 3.1 12.2 5.5 0.0 9.9 10.4 22.0 22.0 10.7 23.6 1.7 Prop In Lane 1.00 1.00 0.91 1.00 1.00 0.03 1.00 1.00
Lane Grp Cap(c), veh/h 291 306 258 262 0 231 239 976 533 245 1032 458 V/C Ratio(X) 0.21 0.24 0.83 0.45 0.00 0.76 0.86 0.87 0.87 0.86 0.91 0.09 Avail Cap(c_a), veh/h 382 401 338 485 0 427 251 1033 564 251 1078 479 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.1 33.3 37.1 35.2 0.0 37.7 38.9 31.1 31.1 38.7 31.4 23.7 Incr Delay (d2), s/veh 0.3 0.4 12.1 1.2 0.0 5.2 23.7 8.2 13.8 25.0 11.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.3 1.6 6.1 2.8 0.0 4.6 6.6 11.4 13.3 6.9 13.1 0.7 LnGrp Delay(d),s/veh 33.4 33.7 49.2 36.4 0.0 42.8 62.6 39.3 44.9 63.8 42.7 23.7 LnGrp LOS CCDD DEDDEDC
Approach Vol, veh/h 345 294 1524 1193
Approach Delay, s/veh 43.2 40.2 44.2 45.8
Approach LOS DDDD
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 21.2 18.4 32.8 19.5 18.7 32.4
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 20.0 13.0 28.0 25.0 13.0 28.0 Max Q Clear Time (g_c+I1), s 14.2 12.4 25.6 11.9 12.7 24.0 Green Ext Time (p_c), s 0.7 0.0 1.2 1.0 0.0 2.3
Intersection Summary
HCM 2010 Ctrl Delay 44.3
HCM 2010 LOS D
Notes
HCM 2010 Signalized Intersection Summary Existing PM
7: N Davis Rd & W Rossi St
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 0 428 0 225 0 1282 676 144 1012 0 Future Volume (veh/h) 0 0 0 428 0 225 0 1282 676 144 1012 0 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1900 1863 1900 1863 1863 1900 0 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 0 0 0 470 0 247 0 1409 743 158 1112 0 Adj No. of Lanes 010210021120
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, % 222222022222
Cap, veh/h 0 396 0 990 0 337 0 1646 736 190 2279 0
Arrive On Green 0.00 0.00 0.00 0.21 0.00 0.21 0.00 0.47 0.47 0.11 0.64 0.00 Sat Flow, veh/h 0 1863 0 3442 0 1583 0 3632 1583 1774 3632 0 Grp Volume(v), veh/h 0 0 0 470 0 247 0 1409 743 158 1112 0 Grp Sat Flow(s),veh/h/ln 0 1863 0 1721 0 1583 0 1770 1583 1774 1770 0 Q Serve(g_s), s 0.0 0.0 0.0 7.0 0.0 8.1 0.0 19.8 26.0 4.9 9.1 0.0 Cycle Q Clear(g_c), s 0.0 0.0 0.0 7.0 0.0 8.1 0.0 19.8 26.0 4.9 9.1 0.0 Prop In Lane 0.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 0 396 0 990 0 337 0 1646 736 190 2279 0 V/C Ratio(X) 0.00 0.00 0.00 0.47 0.00 0.73 0.00 0.86 1.01 0.83 0.49 0.00 Avail Cap(c_a), veh/h 0 533 0 1243 0 453 0 1646 736 190 2279 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 0.00 1.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 0.0 0.0 0.0 20.1 0.0 20.5 0.0 13.3 14.9 24.4 5.2 0.0 Incr Delay (d2), s/veh 0.0 0.0 0.0 0.4 0.0 4.1 0.0 5.9 35.4 25.4 0.7 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 3.3 0.0 3.9 0.0 10.9 18.3 3.7 4.6 0.0 LnGrp Delay(d),s/veh 0.0 0.0 0.0 20.4 0.0 24.6 0.0 19.2 50.3 49.8 5.9 0.0 LnGrp LOS C C B F D A
Approach Vol, veh/h 0 717 2152 1270
Approach Delay, s/veh 0.0 21.8 30.0 11.4
Approach LOS C C B
Timer 12345678
Assigned Phs 1 2468
Phs Duration (G+Y+Rc), s 10.0 30.0 15.9 40.0 15.9
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 6.0 26.0 16.0 36.0 16.0
Max Q Clear Time (g_c+I1), s 6.9 28.0 0.0 11.1 10.1
Green Ext Time (p_c), s 0.0 0.0 0.0 8.8 1.8
Intersection Summary
HCM 2010 Ctrl Delay 22.9
HCM 2010 LOS C
HCM 2010 Signalized Intersection Summary Existing PM
8: N Main St (SR 183) & W Rossi St/E Rossi St
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 227 340 126 130 285 236 166 1230 131 177 791 157 Future Volume (veh/h) 227 340 126 130 285 236 166 1230 131 177 791 157 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.98 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 236 354 131 135 297 0 173 1281 136 184 824 0 Adj No. of Lanes 211111121121
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 222222222222
Cap, veh/h 277 385 320 156 399 339 207 1370 600 208 1371 613 Arrive On Green 0.08 0.21 0.21 0.09 0.21 0.00 0.12 0.39 0.39 0.12 0.39 0.00 Sat Flow, veh/h 3442 1863 1549 1774 1863 1583 1774 3539 1551 1774 3539 1583 Grp Volume(v), veh/h 236 354 131 135 297 0 173 1281 136 184 824 0 Grp Sat Flow(s),veh/h/ln 1721 1863 1549 1774 1863 1583 1774 1770 1551 1774 1770 1583 Q Serve(g_s), s 6.1 16.7 6.6 6.7 13.3 0.0 8.5 31.1 5.3 9.2 16.7 0.0 Cycle Q Clear(g_c), s 6.1 16.7 6.6 6.7 13.3 0.0 8.5 31.1 5.3 9.2 16.7 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 277 385 320 156 399 339 207 1370 600 208 1371 613 V/C Ratio(X) 0.85 0.92 0.41 0.86 0.74 0.00 0.83 0.94 0.23 0.88 0.60 0.00 Avail Cap(c_a), veh/h 277 385 320 156 399 339 242 1387 608 208 1371 613 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 40.7 34.8 30.8 40.3 32.9 0.0 38.7 26.4 18.4 38.9 21.9 0.0 Incr Delay (d2), s/veh 21.9 26.9 0.8 35.9 7.4 0.0 19.2 11.8 0.2 33.2 0.7 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.7 11.4 2.9 4.9 7.7 0.0 5.3 17.4 2.3 6.4 8.3 0.0 LnGrp Delay(d),s/veh 62.5 61.8 31.6 76.2 40.3 0.0 57.9 38.2 18.6 72.1 22.6 0.0 LnGrp LOS E E C E D E D B E C
Approach Vol, veh/h 721 432 1590 1008
Approach Delay, s/veh 56.5 51.5 38.7 31.7
Approach LOS E D D C
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 15.0 39.2 12.4 23.0 15.0 39.2 11.7 23.7 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 10.5 35.1 7.9 18.5 12.2 33.4 7.2 19.2 Max Q Clear Time (g_c+I1), s 11.2 33.1 8.7 18.7 10.5 18.7 8.1 15.3 Green Ext Time (p_c), s 0.0 1.5 0.0 0.0 0.1 5.1 0.0 0.6 Intersection Summary
HCM 2010 Ctrl Delay 41.7
HCM 2010 LOS D
HCM 2010 Signalized Intersection Summary Existing PM
9: Davis SB Ramps/Market Cir & W Market St (SR 183)
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 813 145 89 375 4 85 2 164 5 0 1 Future Volume (veh/h) 0 813 145 89 375 4 85 2 164 5 0 1 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1776 1776 1900 1759 1759 1900 1900 1792 1792 1900 1863 1900 Adj Flow Rate, veh/h 0 830 148 91 383 4 87 2 167 5 0 1
Adj No. of Lanes 120120011010
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 777888666222
Cap, veh/h 3 986 176 114 1673 17 598 12 524 443 11 67
Arrive On Green 0.00 0.34 0.34 0.07 0.49 0.49 0.34 0.34 0.34 0.34 0.00 0.34 Sat Flow, veh/h 1691 2862 510 1675 3389 35 1365 36 1524 941 32 194 Grp Volume(v), veh/h 0 489 489 91 189 198 89 0 167 6 0 0 Grp Sat Flow(s),veh/h/ln 1691 1687 1686 1675 1671 1753 1401 0 1524 1167 0 0 Q Serve(g_s), s 0.0 14.9 14.9 3.0 3.6 3.6 0.0 0.0 4.5 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.0 14.9 14.9 3.0 3.6 3.6 2.0 0.0 4.5 2.0 0.0 0.0 Prop In Lane 1.00 0.30 1.00 0.02 0.98 1.00 0.83 0.17
Lane Grp Cap(c), veh/h 3 581 581 114 825 865 611 0 524 521 0 0 V/C Ratio(X) 0.00 0.84 0.84 0.80 0.23 0.23 0.15 0.00 0.32 0.01 0.00 0.00 Avail Cap(c_a), veh/h 152 635 635 196 825 865 611 0 524 521 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 0.0 16.8 16.8 25.5 8.0 8.0 12.6 0.0 13.4 12.0 0.0 0.0 Incr Delay (d2), s/veh 0.0 9.3 9.3 12.0 0.1 0.1 0.5 0.0 1.6 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 8.3 8.3 1.7 1.7 1.7 1.0 0.0 2.1 0.1 0.0 0.0 LnGrp Delay(d),s/veh 0.0 26.1 26.1 37.5 8.2 8.2 13.1 0.0 15.0 12.0 0.0 0.0 LnGrp LOS C C D A A B B B
Approach Vol, veh/h 978 478 256 6
Approach Delay, s/veh 26.1 13.7 14.3 12.0
Approach LOS C B B B
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 23.6 8.3 23.6 23.6 0.0 31.9
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 19.1 6.5 20.9 19.1 5.0 22.4 Max Q Clear Time (g_c+I1), s 6.5 5.0 16.9 4.0 0.0 5.6
Green Ext Time (p_c), s 0.8 0.0 2.3 0.0 0.0 2.0
Intersection Summary
HCM 2010 Ctrl Delay 20.9
HCM 2010 LOS C
HCM 2010 Signalized Intersection Summary Existing PM
10: Davis NB Ramps/Private Dwy & W Market St (SR 183)
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 1 715 270 363 388 0 80 0 67 0 3 0 Future Volume (veh/h) 1 715 270 363 388 0 80 0 67 0 3 0 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1792 1792 1900 1827 1827 1900 1900 1712 1712 1900 1863 1900 Adj Flow Rate, veh/h 1 753 284 382 408 0 84 0 71 0 3 0
Adj No. of Lanes 120120011010
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 6 6 6 4 4 4 11 11 11 2 2 2
Cap, veh/h 2 811 306 421 1998 0 414 0 364 0 465 0
Arrive On Green 0.00 0.33 0.33 0.24 0.58 0.00 0.25 0.00 0.25 0.00 0.25 0.00 Sat Flow, veh/h 1707 2420 913 1740 3563 0 1288 0 1455 0 1863 0 Grp Volume(v), veh/h 1 530 507 382 408 0 84 0 71 0 3 0
Grp Sat Flow(s),veh/h/ln 1707 1703 1630 1740 1736 0 1288 0 1455 0 1863 0 Q Serve(g_s), s 0.0 23.4 23.4 16.6 4.4 0.0 4.1 0.0 3.0 0.0 0.1 0.0 Cycle Q Clear(g_c), s 0.0 23.4 23.4 16.6 4.4 0.0 4.2 0.0 3.0 0.0 0.1 0.0 Prop In Lane 1.00 0.56 1.00 0.00 1.00 1.00 0.00 0.00
Lane Grp Cap(c), veh/h 2 570 546 421 1998 0 414 0 364 0 465 0 V/C Ratio(X) 0.43 0.93 0.93 0.91 0.20 0.00 0.20 0.00 0.20 0.00 0.01 0.00 Avail Cap(c_a), veh/h 109 578 553 457 1998 0 414 0 364 0 465 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 0.00 1.00 0.00 1.00 0.00 Uniform Delay (d), s/veh 38.9 25.0 25.1 28.7 8.0 0.0 23.6 0.0 23.1 0.0 22.0 0.0 Incr Delay (d2), s/veh 91.1 21.4 22.2 20.7 0.0 0.0 1.1 0.0 1.2 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 14.3 13.8 10.4 2.1 0.0 1.6 0.0 1.3 0.0 0.1 0.0 LnGrp Delay(d),s/veh 130.0 46.5 47.2 49.4 8.0 0.0 24.7 0.0 24.3 0.0 22.0 0.0 LnGrp LOS F D D D A C C C
Approach Vol, veh/h 1038 790 155 3
Approach Delay, s/veh 46.9 28.0 24.5 22.0
Approach LOS DCCC
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 24.0 23.4 30.6 24.0 4.6 49.4
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 19.5 20.5 26.5 19.5 5.0 42.0 Max Q Clear Time (g_c+I1), s 6.2 18.6 25.4 2.1 2.0 6.4
Green Ext Time (p_c), s 0.5 0.3 0.7 0.0 0.0 3.0
Intersection Summary
HCM 2010 Ctrl Delay 37.6
HCM 2010 LOS D
HCM 2010 Signalized Intersection Summary Existing PM
11: Davis Rd & Blanco Rd
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 467 628 11 78 677 264 34 284 150 222 257 506 Future Volume (veh/h) 467 628 11 78 677 264 34 284 150 222 257 506 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1845 1845 1845 1845 1845 1900 1845 1845 1845 Adj Flow Rate, veh/h 486 654 11 81 705 0 35 296 156 231 268 0 Adj No. of Lanes 220121120111
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 222333333333
Cap, veh/h 541 1156 19 104 793 355 59 550 283 254 657 558 Arrive On Green 0.16 0.32 0.32 0.06 0.23 0.00 0.03 0.25 0.25 0.14 0.36 0.00 Sat Flow, veh/h 3442 3562 60 1757 3505 1568 1757 2242 1152 1757 1845 1568 Grp Volume(v), veh/h 486 325 340 81 705 0 35 230 222 231 268 0 Grp Sat Flow(s),veh/h/ln 1721 1770 1852 1757 1752 1568 1757 1752 1641 1757 1845 1568 Q Serve(g_s), s 11.0 12.1 12.1 3.6 15.5 0.0 1.6 9.1 9.4 10.3 8.7 0.0 Cycle Q Clear(g_c), s 11.0 12.1 12.1 3.6 15.5 0.0 1.6 9.1 9.4 10.3 8.7 0.0 Prop In Lane 1.00 0.03 1.00 1.00 1.00 0.70 1.00 1.00
Lane Grp Cap(c), veh/h 541 574 601 104 793 355 59 430 403 254 657 558 V/C Ratio(X) 0.90 0.57 0.57 0.78 0.89 0.00 0.59 0.53 0.55 0.91 0.41 0.00 Avail Cap(c_a), veh/h 541 574 601 144 816 365 113 430 403 254 657 558 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 32.9 22.2 22.2 36.9 29.8 0.0 37.8 26.0 26.2 33.5 19.3 0.0 Incr Delay (d2), s/veh 17.7 1.3 1.2 16.8 11.6 0.0 8.9 4.7 5.4 33.4 1.9 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.5 6.1 6.3 2.2 8.7 0.0 0.9 4.9 4.9 7.4 4.7 0.0 LnGrp Delay(d),s/veh 50.6 23.5 23.4 53.7 41.4 0.0 46.8 30.7 31.5 66.8 21.1 0.0 LnGrp LOS DCCDD DCCEC
Approach Vol, veh/h 1151 786 487 499
Approach Delay, s/veh 34.9 42.7 32.3 42.3
Approach LOS CDCD
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 16.0 24.0 9.2 30.3 7.2 32.8 17.0 22.5 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 11.5 19.5 6.5 24.5 5.1 25.9 12.5 18.5 Max Q Clear Time (g_c+I1), s 12.3 11.4 5.6 14.1 3.6 10.7 13.0 17.5 Green Ext Time (p_c), s 0.0 1.7 0.0 3.0 0.0 1.3 0.0 0.5 Intersection Summary
HCM 2010 Ctrl Delay 37.8
HCM 2010 LOS D
HCM 2010 Signalized Intersection Summary Existing PM
12: N Main St & W Alvin Dr/E Alvin Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 194 215 60 215 215 234 107 931 235 181 1074 217 Future Volume (veh/h) 194 215 60 215 215 234 107 931 235 181 1074 217 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.97 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 202 224 62 224 224 244 111 970 245 189 1119 226 Adj No. of Lanes 121111130231
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 222222222222
Cap, veh/h 246 696 303 269 390 327 141 1241 313 277 1567 479 Arrive On Green 0.14 0.20 0.20 0.15 0.21 0.21 0.08 0.31 0.31 0.08 0.31 0.31 Sat Flow, veh/h 1774 3539 1542 1774 1863 1561 1774 4035 1016 3442 5085 1553 Grp Volume(v), veh/h 202 224 62 224 224 244 111 815 400 189 1119 226 Grp Sat Flow(s),veh/h/ln 1774 1770 1542 1774 1863 1561 1774 1695 1661 1721 1695 1553 Q Serve(g_s), s 7.6 3.7 2.3 8.4 7.4 10.0 4.2 15.0 15.0 3.6 13.3 8.0 Cycle Q Clear(g_c), s 7.6 3.7 2.3 8.4 7.4 10.0 4.2 15.0 15.0 3.6 13.3 8.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.61 1.00 1.00
Lane Grp Cap(c), veh/h 246 696 303 269 390 327 141 1043 511 277 1567 479 V/C Ratio(X) 0.82 0.32 0.20 0.83 0.57 0.75 0.78 0.78 0.78 0.68 0.71 0.47 Avail Cap(c_a), veh/h 312 933 407 325 505 423 169 1043 511 277 1567 479 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.6 23.5 23.0 28.1 24.2 25.3 30.8 21.5 21.6 30.5 20.9 19.1 Incr Delay (d2), s/veh 12.9 0.3 0.3 14.3 1.3 5.2 18.1 5.8 11.4 6.7 2.8 3.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.6 1.8 1.0 5.2 3.9 4.7 2.8 7.7 8.5 2.0 6.6 3.8 LnGrp Delay(d),s/veh 41.5 23.8 23.3 42.5 25.6 30.5 48.9 27.4 33.0 37.2 23.8 22.4 LnGrp LOS DCCDCCDCCDCC
Approach Vol, veh/h 488 692 1326 1534
Approach Delay, s/veh 31.0 32.8 30.9 25.2
Approach LOS CCCC
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 10.0 25.5 14.9 17.9 9.9 25.5 14.0 18.8 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.5 21.0 12.5 18.0 6.5 20.0 12.0 18.5 Max Q Clear Time (g_c+I1), s 5.6 17.0 10.4 5.7 6.2 15.3 9.6 12.0 Green Ext Time (p_c), s 0.0 2.7 0.1 1.2 0.0 3.2 0.1 1.2 Intersection Summary
HCM 2010 Ctrl Delay 29.1
HCM 2010 LOS C
HCM 2010 Signalized Intersection Summary Existing PM
13: N Main St & W Laurel Dr/E Laurel Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 216 611 81 160 494 168 138 880 184 297 835 202 Future Volume (veh/h) 216 611 81 160 494 168 138 880 184 297 835 202 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 0.99 1.00 0.98 1.00 0.98 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1863 1863 1863 1900 Adj Flow Rate, veh/h 220 623 83 163 504 171 141 898 188 303 852 206 Adj No. of Lanes 120120221230
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Percent Heavy Veh, % 222222222222
Cap, veh/h 256 802 107 194 573 193 215 1067 466 368 1410 339 Arrive On Green 0.14 0.26 0.26 0.11 0.22 0.22 0.06 0.30 0.30 0.11 0.35 0.35 Sat Flow, veh/h 1774 3134 417 1774 2595 876 3442 3539 1544 3442 4074 978 Grp Volume(v), veh/h 220 351 355 163 343 332 141 898 188 303 708 350 Grp Sat Flow(s),veh/h/ln 1774 1770 1782 1774 1770 1701 1721 1770 1544 1721 1695 1662 Q Serve(g_s), s 9.6 14.7 14.7 7.2 14.9 15.0 3.2 18.9 7.7 6.9 13.7 13.9 Cycle Q Clear(g_c), s 9.6 14.7 14.7 7.2 14.9 15.0 3.2 18.9 7.7 6.9 13.7 13.9 Prop In Lane 1.00 0.23 1.00 0.51 1.00 1.00 1.00 0.59
Lane Grp Cap(c), veh/h 256 453 456 194 391 376 215 1067 466 368 1173 575 V/C Ratio(X) 0.86 0.78 0.78 0.84 0.88 0.88 0.66 0.84 0.40 0.82 0.60 0.61 Avail Cap(c_a), veh/h 256 463 466 194 400 385 238 1067 466 368 1173 575 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 33.2 27.5 27.5 34.8 30.0 30.0 36.5 26.0 22.1 34.8 21.5 21.6 Incr Delay (d2), s/veh 24.0 7.9 8.0 26.7 19.0 20.6 5.6 8.0 2.6 14.1 2.3 4.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.4 8.1 8.2 4.9 9.3 9.2 1.7 10.4 3.6 4.0 6.8 7.1 LnGrp Delay(d),s/veh 57.2 35.4 35.5 61.5 48.9 50.6 42.0 34.0 24.7 48.9 23.8 26.3 LnGrp LOS E D D E DDDCCDCC
Approach Vol, veh/h 926 838 1227 1361
Approach Delay, s/veh 40.6 52.0 33.5 30.0
Approach LOS DDCC
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 13.0 28.5 13.2 24.9 9.5 32.0 16.0 22.1 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 8.5 24.0 8.7 20.8 5.5 27.0 11.5 18.0 Max Q Clear Time (g_c+I1), s 8.9 20.9 9.2 16.7 5.2 15.9 11.6 17.0 Green Ext Time (p_c), s 0.0 1.9 0.0 1.6 0.0 5.3 0.0 0.4 Intersection Summary
HCM 2010 Ctrl Delay 37.5
HCM 2010 LOS D
Appendix F
Casa Boronda
Driveway Counts

Casa Boronda Driveway Volumes
Driveway In's & Out's
16/Apr Hourly Totals Peak Hour
IDAX Data Solutions Time In's Out's In's Out's IB OB
7:00 1000 ‐
7:15 1000 ‐7:30 0001 ‐7:45 1 0 0 0 4<‐‐ Peak: 3 1
8:00 0000 38:15 0000 28:30 0000 18:45 1000 1
16:00 4103 ‐16:15 1202 ‐16:30 5100 ‐16:45 4 0 0 5 2817:00 4 0 0 3 2717:15 9 1 0 11 43 <‐‐ Peak: 22 2117:30 2 1 0 2 4217:45 5 2 0 1 41 AM Total 4001
PM Total 34 8 0 27Total 38 8 0 28
West Driveway East Driveway
Appendix G
Level of Service
Calculations
Existing Plus Project
Ag Housing
Conditions

HCM Signalized Intersection Capacity Analysis Existing Plus Project Ag AM 1: W Laurel Dr & Adams St
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (vph) 210 804 1008 17 21 432
Future Volume (vph) 210 804 1008 17 21 432
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 2% 3% 0%
Total Lost time (s) 3.9 3.5 3.5 3.5 3.1
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00
Frt 1.00 1.00 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00
Satd. Flow (prot) 1752 3504 3477 1770 1583
Flt Permitted 0.15 1.00 1.00 0.95 1.00
Satd. Flow (perm) 282 3504 3477 1770 1583
Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91
Adj. Flow (vph) 231 884 1108 19 23 475
RTOR Reduction (vph) 0 0 0 0 0 174
Lane Group Flow (vph) 231 884 1127 0 23 301
Turn Type pm+pt NA NA Prot Perm
Protected Phases 5 2 6 8
Permitted Phases 2 8
Actuated Green, G (s) 58.0 58.0 44.9 18.0 18.0
Effective Green, g (s) 58.7 59.1 46.0 18.7 19.1
Actuated g/C Ratio 0.69 0.70 0.54 0.22 0.23
Clearance Time (s) 4.6 4.6 4.6 4.2 4.2
Vehicle Extension (s) 3.0 4.0 4.0 2.5 2.5
Lane Grp Cap (vph) 354 2442 1886 390 356
v/s Ratio Prot c0.07 0.25 0.32 0.01
v/s Ratio Perm c0.38 c0.19
v/c Ratio 0.65 0.36 0.60 0.06 0.85
Uniform Delay, d1 9.1 5.2 13.1 26.1 31.4
Progression Factor 1.84 0.38 1.00 1.00 1.00
Incremental Delay, d2 4.0 0.1 0.6 0.0 16.5
Delay (s) 20.7 2.1 13.7 26.1 48.0
Level of Service C A B C D
Approach Delay (s) 5.9 13.7 46.9
Approach LOS A B D
Intersection Summary
HCM 2000 Control Delay 16.6 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.73
Actuated Cycle Length (s) 84.8 Sum of lost time (s) 11.6 Intersection Capacity Utilization 61.8% ICU Level of Service B Analysis Period (min) 15
c Critical Lane Group
HCM Signalized Intersection Capacity Analysis Existing Plus Project Ag AM 2: NB 101 Ramps & W Laurel Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (vph) 0 867 0 0 1193 247 283 1 147 0 0 0 Future Volume (vph) 0 867 0 0 1193 247 283 1 147 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 3% 3% 3% 3%
Total Lost time (s) 3.5 3.5 3.5 3.5 3.5
Lane Util. Factor 0.95 0.95 0.95 0.95 1.00
Frt 1.00 0.97 1.00 1.00 0.85
Flt Protected 1.00 1.00 0.95 0.95 1.00
Satd. Flow (prot) 3452 3397 1624 1629 1530
Flt Permitted 1.00 1.00 0.95 0.95 1.00
Satd. Flow (perm) 3452 3397 1624 1629 1530
Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Adj. Flow (vph) 0 953 0 0 1311 271 311 1 162 0 0 0
RTOR Reduction (vph) 0 0 0 0 0 0 0 0 126 0 0 0
Lane Group Flow (vph) 0 953 0 0 1582 0 155 157 36 0 0 0 Heavy Vehicles (%) 3% 3% 3% 2% 2% 2% 4% 4% 4% 2% 2% 2%
Turn Type NA NA Split NA Perm
Protected Phases 2 6 4 4
Permitted Phases 6 4
Actuated Green, G (s) 58.0 44.9 18.0 18.0 18.0
Effective Green, g (s) 59.1 46.0 18.7 18.7 18.7
Actuated g/C Ratio 0.70 0.54 0.22 0.22 0.22
Clearance Time (s) 4.6 4.6 4.2 4.2 4.2
Vehicle Extension (s) 4.0 4.0 3.0 3.0 3.0
Lane Grp Cap (vph) 2405 1842 358 359 337
v/s Ratio Prot c0.28 c0.47 0.10 c0.10
v/s Ratio Perm 0.02
v/c Ratio 0.40 0.86 0.43 0.44 0.11
Uniform Delay, d1 5.4 16.6 28.5 28.5 26.4
Progression Factor 1.00 0.67 1.00 1.00 1.00
Incremental Delay, d2 0.1 3.4 0.8 0.9 0.1
Delay (s) 5.5 14.5 29.3 29.4 26.5
Level of Service A B C C C
Approach Delay (s) 5.5 14.5 28.4 0.0
Approach LOS A B C A
Intersection Summary
HCM 2000 Control Delay 13.9 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.72
Actuated Cycle Length (s) 84.8 Sum of lost time (s) 12.3 Intersection Capacity Utilization 55.4% ICU Level of Service B Analysis Period (min) 15
c Critical Lane Group
HCM 2010 Signalized Intersection Summary Existing Plus Project Ag AM 3: W Laurel Dr & SB 101 Offramp
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 0 946 1220 0 210 361
Future Volume (veh/h) 0 946 1220 0 210 361
Number 5 2 6 16 7 14
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 0 1800 1835 0 1800 1800
Adj Flow Rate, veh/h 0 1040 1341 0 231 397
Adj No. of Lanes 022021
Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91
Percent Heavy Veh, % 042044
Cap, veh/h 0 1656 1688 0 1121 516
Arrive On Green 0.00 0.48 0.48 0.00 0.34 0.34
Sat Flow, veh/h 0 3599 3670 0 3325 1530
Grp Volume(v), veh/h 0 1040 1341 0 231 397
Grp Sat Flow(s),veh/h/ln 0 1710 1743 0 1662 1530
Q Serve(g_s), s 0.0 9.7 13.9 0.0 2.1 10.0
Cycle Q Clear(g_c), s 0.0 9.7 13.9 0.0 2.1 10.0
Prop In Lane 0.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 1656 1688 0 1121 516
V/C Ratio(X) 0.00 0.63 0.79 0.00 0.21 0.77
Avail Cap(c_a), veh/h 0 2451 2499 0 1651 759
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00 0.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 8.2 9.3 0.0 10.2 12.8
Incr Delay (d2), s/veh 0.0 0.1 0.6 0.0 0.1 2.3
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 4.5 6.7 0.0 1.0 4.5
LnGrp Delay(d),s/veh 0.0 8.4 9.9 0.0 10.2 15.1
LnGrp LOS A A B B
Approach Vol, veh/h 1040 1341 628
Approach Delay, s/veh 8.4 9.9 13.3
Approach LOS A A B
Timer 12345678
Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 25.0 18.1 25.0
Change Period (Y+Rc), s 5.1 4.6 5.1
Max Green Setting (Gmax), s 29.9 20.4 29.9
Max Q Clear Time (g_c+I1), s 11.7 12.0 15.9
Green Ext Time (p_c), s 3.1 1.5 4.0
Intersection Summary
HCM 2010 Ctrl Delay 10.1
HCM 2010 LOS B
HCM 2010 Signalized Intersection Summary Existing Plus Project Ag AM 4: N Davis Rd & Calle Del Adobe/W Laurel Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 29 284 9 846 441 294 23 280 809 178 282 29 Future Volume (veh/h) 29 284 9 846 441 294 23 280 809 178 282 29 Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1742 1742 1881 1826 1826 1826 1826 1826 1826 1809 1809 1881 Adj Flow Rate, veh/h 31 305 10 910 474 0 25 301 870 191 303 31 Adj No. of Lanes 120221122220
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 888333333444
Cap, veh/h 59 464 15 1145 1546 815 54 632 1422 266 728 74 Arrive On Green 0.04 0.14 0.15 0.34 0.45 0.00 0.03 0.18 0.18 0.08 0.23 0.24 Sat Flow, veh/h 1659 3270 107 3374 3470 1552 1739 3470 2717 3342 3150 320 Grp Volume(v), veh/h 31 154 161 910 474 0 25 301 870 191 164 170 Grp Sat Flow(s),veh/h/ln 1659 1655 1723 1687 1735 1552 1739 1735 1359 1671 1718 1752 Q Serve(g_s), s 1.7 8.0 8.1 22.3 8.0 0.0 1.3 7.1 6.3 5.1 7.4 7.5 Cycle Q Clear(g_c), s 1.7 8.0 8.1 22.3 8.0 0.0 1.3 7.1 6.3 5.1 7.4 7.5 Prop In Lane 1.00 0.06 1.00 1.00 1.00 1.00 1.00 0.18
Lane Grp Cap(c), veh/h 59 235 245 1145 1546 815 54 632 1422 266 397 405 V/C Ratio(X) 0.52 0.66 0.66 0.79 0.31 0.00 0.47 0.48 0.61 0.72 0.41 0.42 Avail Cap(c_a), veh/h 132 827 861 1365 2861 1403 114 1320 1961 329 710 724 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 43.3 37.1 37.1 27.3 16.3 0.0 43.6 33.5 4.2 41.1 29.9 29.9 Incr Delay (d2), s/veh 2.6 6.5 6.3 3.8 0.2 0.0 2.3 0.6 0.4 8.8 0.7 0.7 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.8 4.1 4.3 11.0 3.9 0.0 0.7 3.4 3.2 2.7 3.6 3.7 LnGrp Delay(d),s/veh 46.0 43.6 43.4 31.1 16.5 0.0 45.9 34.1 4.6 49.9 30.6 30.6 LnGrp LOS DDDCB DCADCC
Approach Vol, veh/h 346 1384 1196 525
Approach Delay, s/veh 43.7 26.1 12.9 37.6
Approach LOS D C B D
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 37.0 18.5 8.8 27.1 8.8 46.7 13.3 22.7 Change Period (Y+Rc), s 6.0 5.5 6.0 6.0 5.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 37.0 45.7 6.0 37.8 7.3 75.4 9.0 34.8 Max Q Clear Time (g_c+I1), s 24.3 10.1 3.3 9.5 3.7 10.0 7.1 9.1 Green Ext Time (p_c), s 6.7 2.9 0.0 1.3 0.0 5.4 0.2 6.9 Intersection Summary
HCM 2010 Ctrl Delay 25.0
HCM 2010 LOS C
HCM 2010 TWSC Existing Plus Project Ag AM
5: Post Dr/El Rancho Way & Calle Del Adobe
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Intersection
Int Delay, s/veh 18.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 0 233 164 168 249 39 111 22 17 60 39 0 Future Vol, veh/h 0 233 164 168 249 39 111 22 17 60 39 0 Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - Yield
Storage Length 70 - 85 175 - 0 0 - - - - 110
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 2 - - 0 - - 0 - - 0 -
Peak Hour Factor 86 86 86 86 86 86 86 86 86 86 86 86
Heavy Vehicles, % 11 11 11 444444222
Mvmt Flow 0 271 191 195 290 45 129 26 20 70 45 0
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 335 0 0 462 0 0 996 996 271 1070 1142 290 Stage 1 - - - - - - 271 271 - 680 680 -
Stage 2 - - - - - - 725 725 - 390 462 -
Critical Hdwy 4.21 - - 4.14 - - 7.14 6.54 6.24 7.12 6.52 6.22 Critical Hdwy Stg 1 - ----- 6.14 5.54 - 6.12 5.52 -
Critical Hdwy Stg 2 - ----- 6.14 5.54 - 6.12 5.52 -
Follow-up Hdwy 2.299 - - 2.236 - - 3.536 4.036 3.336 3.518 4.018 3.318 Pot Cap-1 Maneuver 1176 - - 1089 - - 221 242 763 199 200 749 Stage 1 - - - - - - 730 682 - 441 451 -
Stage 2 - - - - - - 413 427 - 634 565 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1176 - - 1089 - - 151 199 763 151 164 749 Mov Cap-2 Maneuver - - - - - - 151 199 - 151 164 -
Stage 1 - - - - - - 730 682 - 441 370 -
Stage 2 - - - - - - 297 351 - 594 565 -
Approach EB WB NB SB
HCM Control Delay, s 0 3.3 77.1 74.7

HCM LOS F F
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 SBLn2 Capacity (veh/h) 151 294 1176 - - 1089 - - 156 -
HCM Lane V/C Ratio 0.855 0.154 - - - 0.179 - - 0.738 -
HCM Control Delay (s) 97.3 19.5 0 - - 9 - - 74.7 0
HCM Lane LOS F C A - - A - - F A
HCM 95th %tile Q(veh) 5.7 0.5 0 - - 0.7 - - 4.5 -
HCM 2010 Signalized Intersection Summary Existing Plus Project Ag AM 6: N Davis Rd & Post Dr/Commercial Dwy
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 34 28 310 60 9 91 164 987 12 120 954 19 Future Volume (veh/h) 34 28 310 60 9 91 164 987 12 120 954 19 Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1792 1792 1792 1900 1845 1845 1845 1845 1900 1863 1863 1863 Adj Flow Rate, veh/h 34 35 333 65 10 98 176 1061 13 129 1026 20 Adj No. of Lanes 111011130121
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 666333333222
Cap, veh/h 388 407 346 140 21 142 190 1701 21 160 1111 495 Arrive On Green 0.23 0.23 0.23 0.11 0.09 0.09 0.11 0.33 0.33 0.09 0.31 0.31 Sat Flow, veh/h 1707 1792 1522 1532 236 1563 1757 5128 63 1774 3539 1577 Grp Volume(v), veh/h 34 35 333 75 0 98 176 695 379 129 1026 20 Grp Sat Flow(s),veh/h/ln 1707 1792 1522 1768 0 1563 1757 1679 1833 1774 1770 1577 Q Serve(g_s), s 1.5 1.4 20.0 3.7 0.0 5.6 9.2 16.1 16.1 6.6 25.9 0.8 Cycle Q Clear(g_c), s 1.5 1.4 20.0 3.7 0.0 5.6 9.2 16.1 16.1 6.6 25.9 0.8 Prop In Lane 1.00 1.00 0.87 1.00 1.00 0.03 1.00 1.00
Lane Grp Cap(c), veh/h 388 407 346 161 0 142 190 1114 608 160 1111 495 V/C Ratio(X) 0.09 0.09 0.96 0.47 0.00 0.69 0.93 0.62 0.62 0.80 0.92 0.04 Avail Cap(c_a), veh/h 388 407 346 478 0 423 190 1114 608 211 1148 512 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.2 28.2 35.3 39.2 0.0 40.7 40.9 26.0 26.0 41.2 30.6 22.0 Incr Delay (d2), s/veh 0.1 0.1 38.6 2.1 0.0 5.8 44.8 1.1 2.0 15.3 12.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.7 0.7 12.1 1.9 0.0 2.7 6.8 7.6 8.5 3.9 14.5 0.4 LnGrp Delay(d),s/veh 28.3 28.3 74.0 41.3 0.0 46.5 85.6 27.1 28.0 56.5 42.7 22.1 LnGrp LOS C C E D D F C C E D C
Approach Vol, veh/h 402 173 1250 1175
Approach Delay, s/veh 66.1 44.3 35.6 43.8
Approach LOS E D D D
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 27.0 16.0 35.0 14.4 14.4 36.7
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 21.0 10.0 30.0 25.0 11.0 29.0 Max Q Clear Time (g_c+I1), s 22.0 11.2 27.9 7.6 8.6 18.1 Green Ext Time (p_c), s 0.0 0.0 1.1 0.6 0.1 3.8
Intersection Summary
HCM 2010 Ctrl Delay 43.4
HCM 2010 LOS D
Notes
HCM 2010 Signalized Intersection Summary Existing Plus Project Ag AM 7: N Davis Rd & W Rossi St
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 0 2 595 1 130 4 918 486 206 1160 1 Future Volume (veh/h) 0 0 2 595 1 130 4 918 486 206 1160 1 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1845 1845 1845 1863 1863 1863 1845 1845 1900 Adj Flow Rate, veh/h 0 0 2 633 1 138 4 977 517 219 1234 1 Adj No. of Lanes 110211121120
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Percent Heavy Veh, % 222333222333
Cap, veh/h 3 0 85 731 600 510 8 1372 614 202 1790 1
Arrive On Green 0.00 0.00 0.05 0.21 0.33 0.33 0.00 0.39 0.39 0.11 0.50 0.50 Sat Flow, veh/h 1774 0 1583 3408 1845 1568 1774 3539 1583 1757 3594 3 Grp Volume(v), veh/h 0 0 2 633 1 138 4 977 517 219 602 633 Grp Sat Flow(s),veh/h/ln 1774 0 1583 1704 1845 1568 1774 1770 1583 1757 1752 1844 Q Serve(g_s), s 0.0 0.0 0.1 12.5 0.0 4.5 0.2 16.3 20.7 8.0 18.3 18.3 Cycle Q Clear(g_c), s 0.0 0.0 0.1 12.5 0.0 4.5 0.2 16.3 20.7 8.0 18.3 18.3 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00
Lane Grp Cap(c), veh/h 3 0 85 731 600 510 8 1372 614 202 873 919 V/C Ratio(X) 0.00 0.00 0.02 0.87 0.00 0.27 0.53 0.71 0.84 1.09 0.69 0.69 Avail Cap(c_a), veh/h 102 0 91 783 600 510 102 1372 614 202 873 919 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 0.0 0.0 31.2 26.4 15.9 17.4 34.6 18.1 19.4 30.8 13.4 13.4 Incr Delay (d2), s/veh 0.0 0.0 0.1 9.6 0.0 0.3 46.8 3.2 13.2 88.0 4.4 4.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 0.0 0.0 6.9 0.0 2.0 0.2 8.5 11.3 8.7 9.8 10.2 LnGrp Delay(d),s/veh 0.0 0.0 31.3 36.1 15.9 17.7 81.5 21.2 32.6 118.9 17.8 17.6 LnGrp LOS C D B B F C C F B B
Approach Vol, veh/h 2 772 1498 1454
Approach Delay, s/veh 31.3 32.7 25.3 32.9
Approach LOS CCCC
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 12.0 31.0 18.9 7.7 4.3 38.7 0.0 26.7 Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Max Green Setting (Gmax), s 8.0 27.0 16.0 4.0 4.0 31.0 4.0 16.0 Max Q Clear Time (g_c+I1), s 10.0 22.7 14.5 2.1 2.2 20.3 0.0 6.5 Green Ext Time (p_c), s 0.0 3.0 0.4 0.0 0.0 5.7 0.0 0.3 Intersection Summary
HCM 2010 Ctrl Delay 29.8
HCM 2010 LOS C
HCM 2010 Signalized Intersection Summary Existing Plus Project Ag AM 8: N Main St (SR 183) & W Rossi St/E Rossi St
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 140 322 264 142 316 97 113 591 56 135 1145 224 Future Volume (veh/h) 140 322 264 142 316 97 113 591 56 135 1145 224 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1845 1845 1845 1863 1863 1863 1863 1863 1863 Adj Flow Rate, veh/h 161 370 303 163 363 0 130 679 64 155 1316 0 Adj No. of Lanes 211111121121
Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 222333222222
Cap, veh/h 200 393 329 186 478 406 151 1324 588 191 1404 628 Arrive On Green 0.06 0.21 0.21 0.11 0.26 0.00 0.08 0.37 0.37 0.11 0.40 0.00 Sat Flow, veh/h 3442 1863 1556 1757 1845 1568 1774 3539 1571 1774 3539 1583 Grp Volume(v), veh/h 161 370 303 163 363 0 130 679 64 155 1316 0 Grp Sat Flow(s),veh/h/ln 1721 1863 1556 1757 1845 1568 1774 1770 1571 1774 1770 1583 Q Serve(g_s), s 4.1 17.5 17.1 8.2 16.2 0.0 6.5 13.3 2.4 7.6 32.0 0.0 Cycle Q Clear(g_c), s 4.1 17.5 17.1 8.2 16.2 0.0 6.5 13.3 2.4 7.6 32.0 0.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 200 393 329 186 478 406 151 1324 588 191 1404 628 V/C Ratio(X) 0.81 0.94 0.92 0.87 0.76 0.00 0.86 0.51 0.11 0.81 0.94 0.00 Avail Cap(c_a), veh/h 200 393 329 186 478 406 151 1324 588 305 1423 637 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 41.7 34.8 34.6 39.4 30.6 0.0 40.4 21.7 18.3 39.1 25.9 0.0 Incr Delay (d2), s/veh 20.9 30.7 30.5 33.8 7.0 0.0 37.0 0.3 0.1 8.5 11.9 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.5 12.3 10.1 5.7 9.2 0.0 4.7 6.6 1.0 4.2 17.8 0.0 LnGrp Delay(d),s/veh 62.6 65.5 65.1 73.2 37.5 0.0 77.5 22.0 18.4 47.6 37.8 0.0 LnGrp LOS EEEED ECBDD
Approach Vol, veh/h 834 526 873 1471
Approach Delay, s/veh 64.8 48.6 30.0 38.8
Approach LOS E D C D
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 14.1 38.0 14.0 23.4 12.1 40.0 9.7 27.7 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 15.4 28.2 9.5 18.9 7.6 36.0 5.2 23.2 Max Q Clear Time (g_c+I1), s 9.6 15.3 10.2 19.5 8.5 34.0 6.1 18.2 Green Ext Time (p_c), s 0.2 4.0 0.0 0.0 0.0 1.6 0.0 0.9 Intersection Summary
HCM 2010 Ctrl Delay 44.0
HCM 2010 LOS D
HCM 2010 Signalized Intersection Summary Existing Plus Project Ag AM 9: Davis SB Ramps/Market Cir & W Market St (SR 183)
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 0 452 142 98 344 3 155 0 174 7 2 0 Future Volume (veh/h) 0 452 142 98 344 3 155 0 174 7 2 0 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1810 1810 1900 1712 1712 1900 1900 1845 1845 1900 1863 1900 Adj Flow Rate, veh/h 0 551 173 120 420 4 189 0 212 9 2 0 Adj No. of Lanes 120120011010
Peak Hour Factor 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 Percent Heavy Veh, % 5 5 5 11 11 11 333222
Cap, veh/h 3 720 225 151 1514 14 680 0 576 424 82 0
Arrive On Green 0.00 0.28 0.28 0.09 0.46 0.46 0.37 0.00 0.37 0.37 0.37 0.00 Sat Flow, veh/h 1723 2579 807 1630 3301 31 1471 0 1568 810 224 0 Grp Volume(v), veh/h 0 367 357 120 207 217 189 0 212 11 0 0 Grp Sat Flow(s),veh/h/ln 1723 1719 1667 1630 1626 1706 1471 0 1568 1034 0 0 Q Serve(g_s), s 0.0 10.1 10.2 3.7 4.1 4.1 0.0 0.0 5.1 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.0 10.1 10.2 3.7 4.1 4.1 3.9 0.0 5.1 4.0 0.0 0.0 Prop In Lane 1.00 0.48 1.00 0.02 1.00 1.00 0.82 0.00
Lane Grp Cap(c), veh/h 3 480 466 151 746 783 680 0 576 506 0 0 V/C Ratio(X) 0.00 0.76 0.77 0.80 0.28 0.28 0.28 0.00 0.37 0.02 0.00 0.00 Avail Cap(c_a), veh/h 167 598 580 299 746 783 680 0 576 506 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 0.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 0.0 17.1 17.1 23.0 8.7 8.7 11.6 0.0 12.0 10.5 0.0 0.0 Incr Delay (d2), s/veh 0.0 4.6 4.9 9.2 0.2 0.2 1.0 0.0 1.8 0.1 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.0 5.4 5.3 2.1 1.9 2.0 2.1 0.0 2.5 0.1 0.0 0.0 LnGrp Delay(d),s/veh 0.0 21.6 22.0 32.2 8.9 8.9 12.6 0.0 13.8 10.6 0.0 0.0 LnGrp LOS C C C A A B B B
Approach Vol, veh/h 724 544 401 11
Approach Delay, s/veh 21.8 14.0 13.2 10.6
Approach LOS C B B B
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 23.5 9.3 18.9 23.5 0.0 28.2
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 19.0 9.5 18.0 19.0 5.0 22.5 Max Q Clear Time (g_c+I1), s 7.1 5.7 12.2 6.0 0.0 6.1
Green Ext Time (p_c), s 1.4 0.1 2.3 0.0 0.0 2.3
Intersection Summary
HCM 2010 Ctrl Delay 17.2
HCM 2010 LOS B
HCM 2010 Signalized Intersection Summary Existing Plus Project Ag AM 10: Davis NB Ramps/Private Dwy & W Market St (SR 183)
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 1 554 98 164 346 3 99 1 106 1 1 0 Future Volume (veh/h) 1 554 98 164 346 3 99 1 106 1 1 0 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1810 1810 1900 1743 1743 1900 1900 1776 1776 1900 1863 1900 Adj Flow Rate, veh/h 1 637 113 189 398 3 114 1 122 1 1 0 Adj No. of Lanes 120120011010
Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 555999777222
Cap, veh/h 3 807 143 233 1400 11 596 5 508 315 285 0
Arrive On Green 0.00 0.28 0.28 0.14 0.42 0.42 0.34 0.34 0.34 0.34 0.34 0.00 Sat Flow, veh/h 1723 2920 517 1660 3369 25 1383 14 1509 644 847 0 Grp Volume(v), veh/h 1 375 375 189 196 205 115 0 122 2 0 0 Grp Sat Flow(s),veh/h/ln 1723 1719 1718 1660 1656 1739 1397 0 1509 1491 0 0 Q Serve(g_s), s 0.0 11.0 11.1 6.0 4.3 4.3 0.0 0.0 3.2 0.0 0.0 0.0 Cycle Q Clear(g_c), s 0.0 11.0 11.1 6.0 4.3 4.3 2.6 0.0 3.2 2.6 0.0 0.0 Prop In Lane 1.00 0.30 1.00 0.01 0.99 1.00 0.50 0.00
Lane Grp Cap(c), veh/h 3 475 475 233 688 722 601 0 508 600 0 0 V/C Ratio(X) 0.32 0.79 0.79 0.81 0.28 0.28 0.19 0.00 0.24 0.00 0.00 0.00 Avail Cap(c_a), veh/h 158 566 565 306 699 734 601 0 508 600 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 27.3 18.3 18.3 22.8 10.6 10.6 12.9 0.0 13.1 12.1 0.0 0.0 Incr Delay (d2), s/veh 49.5 6.2 6.3 11.6 0.2 0.2 0.7 0.0 1.1 0.0 0.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.1 6.0 6.1 3.5 2.0 2.1 1.3 0.0 1.5 0.0 0.0 0.0 LnGrp Delay(d),s/veh 76.7 24.5 24.7 34.4 10.8 10.8 13.6 0.0 14.2 12.1 0.0 0.0 LnGrp LOS E C C C B B B B B
Approach Vol, veh/h 751 590 237 2
Approach Delay, s/veh 24.7 18.4 13.9 12.1
Approach LOS C B B B
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 22.9 12.2 19.6 22.9 4.6 27.2
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 18.4 10.1 18.0 18.4 5.0 23.1 Max Q Clear Time (g_c+I1), s 5.2 8.0 13.1 4.6 2.0 6.3
Green Ext Time (p_c), s 0.8 0.1 2.1 0.0 0.0 2.1
Intersection Summary
HCM 2010 Ctrl Delay 20.7
HCM 2010 LOS C
HCM 2010 Signalized Intersection Summary Existing Plus Project Ag AM 11: Davis Rd & Blanco Rd
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 502 647 29 129 553 237 40 259 70 174 359 580 Future Volume (veh/h) 502 647 29 129 553 237 40 259 70 174 359 580 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1827 1827 1827 1827 1827 1900 1845 1845 1845 Adj Flow Rate, veh/h 518 667 30 133 570 0 41 267 72 179 370 0 Adj No. of Lanes 220121120111
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Percent Heavy Veh, % 222444444333
Cap, veh/h 611 983 44 167 706 316 67 691 183 217 627 533 Arrive On Green 0.18 0.29 0.29 0.10 0.20 0.00 0.04 0.25 0.25 0.12 0.34 0.00 Sat Flow, veh/h 3442 3450 155 1740 3471 1553 1740 2717 719 1757 1845 1568 Grp Volume(v), veh/h 518 342 355 133 570 0 41 169 170 179 370 0 Grp Sat Flow(s),veh/h/ln 1721 1770 1835 1740 1736 1553 1740 1736 1700 1757 1845 1568 Q Serve(g_s), s 10.9 12.8 12.8 5.6 11.7 0.0 1.7 6.0 6.2 7.4 12.4 0.0 Cycle Q Clear(g_c), s 10.9 12.8 12.8 5.6 11.7 0.0 1.7 6.0 6.2 7.4 12.4 0.0 Prop In Lane 1.00 0.08 1.00 1.00 1.00 0.42 1.00 1.00
Lane Grp Cap(c), veh/h 611 504 523 167 706 316 67 441 432 217 627 533 V/C Ratio(X) 0.85 0.68 0.68 0.80 0.81 0.00 0.61 0.38 0.39 0.82 0.59 0.00 Avail Cap(c_a), veh/h 668 545 565 221 836 374 116 441 432 247 627 533 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.00 Uniform Delay (d), s/veh 29.7 23.7 23.7 33.1 28.4 0.0 35.4 23.0 23.1 31.9 20.4 0.0 Incr Delay (d2), s/veh 9.4 3.1 3.0 13.8 5.0 0.0 8.8 2.5 2.7 17.9 4.0 0.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 6.0 6.7 6.9 3.3 6.1 0.0 1.0 3.2 3.2 4.7 7.0 0.0 LnGrp Delay(d),s/veh 39.1 26.7 26.6 46.9 33.4 0.0 44.2 25.5 25.8 49.8 24.4 0.0 LnGrp LOS DCCDC DCCDC
Approach Vol, veh/h 1215 703 380 549
Approach Delay, s/veh 32.0 35.9 27.6 32.7
Approach LOS CDCC
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 13.7 23.5 11.7 25.8 7.4 29.9 17.8 19.7 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 10.5 19.0 9.5 23.0 5.0 24.5 14.5 18.0 Max Q Clear Time (g_c+I1), s 9.4 8.2 7.6 14.8 3.7 14.4 12.9 13.7 Green Ext Time (p_c), s 0.1 1.4 0.1 2.7 0.0 1.6 0.4 1.5 Intersection Summary
HCM 2010 Ctrl Delay 32.5
HCM 2010 LOS C
HCM 2010 Signalized Intersection Summary Existing Plus Project Ag AM 12: N Main St & W Alvin Dr/E Alvin Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 107 383 97 289 293 257 32 406 346 209 538 83 Future Volume (veh/h) 107 383 97 289 293 257 32 406 346 209 538 83 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.85 1.00 0.99 1.00 0.99 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1863 1863 1863 1863 1863 1863 1900 1863 1863 1863 Adj Flow Rate, veh/h 123 440 111 332 337 295 37 467 398 240 618 95 Adj No. of Lanes 121111130231
Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 Percent Heavy Veh, % 222222222222
Cap, veh/h 157 757 289 373 626 527 63 839 388 323 1555 479 Arrive On Green 0.09 0.21 0.21 0.21 0.34 0.34 0.04 0.25 0.25 0.09 0.31 0.31 Sat Flow, veh/h 1774 3539 1352 1774 1863 1569 1774 3390 1566 3442 5085 1568 Grp Volume(v), veh/h 123 440 111 332 337 295 37 467 398 240 618 95 Grp Sat Flow(s),veh/h/ln 1774 1770 1352 1774 1863 1569 1774 1695 1566 1721 1695 1568 Q Serve(g_s), s 5.2 8.6 5.4 14.0 11.3 11.8 1.6 9.2 19.0 5.2 7.4 3.4 Cycle Q Clear(g_c), s 5.2 8.6 5.4 14.0 11.3 11.8 1.6 9.2 19.0 5.2 7.4 3.4 Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 157 757 289 373 626 527 63 839 388 323 1555 479 V/C Ratio(X) 0.79 0.58 0.38 0.89 0.54 0.56 0.59 0.56 1.03 0.74 0.40 0.20 Avail Cap(c_a), veh/h 254 830 317 405 626 527 136 839 388 336 1555 479 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 34.3 27.1 25.8 29.5 20.7 20.8 36.5 25.2 28.9 33.9 21.0 19.7 Incr Delay (d2), s/veh 8.4 0.9 0.8 20.1 0.9 1.3 8.4 2.7 52.6 8.3 0.8 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.9 4.2 2.1 8.9 6.0 5.3 0.9 4.6 13.7 2.8 3.5 1.6 LnGrp Delay(d),s/veh 42.6 27.9 26.7 49.5 21.6 22.2 44.8 27.8 81.5 42.2 21.8 20.6 LnGrp LOS DCCDCCDCFDCC
Approach Vol, veh/h 674 964 902 953
Approach Delay, s/veh 30.4 31.4 52.2 26.8
Approach LOS CCDC
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.7 23.5 20.6 20.9 7.2 28.0 11.3 30.3 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 7.5 19.0 17.5 18.0 5.9 20.6 11.0 24.5 Max Q Clear Time (g_c+I1), s 7.2 21.0 16.0 10.6 3.6 9.4 7.2 13.8 Green Ext Time (p_c), s 0.0 0.0 0.2 2.0 0.0 3.5 0.1 2.4 Intersection Summary
HCM 2010 Ctrl Delay 35.3
HCM 2010 LOS D
HCM 2010 Signalized Intersection Summary Existing Plus Project Ag AM 13: N Main St & W Laurel Dr/E Laurel Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 175 389 95 132 547 88 71 488 112 192 736 158 Future Volume (veh/h) 175 389 95 132 547 88 71 488 112 192 736 158 Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 0.99 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1845 1845 1845 1863 1863 1900 Adj Flow Rate, veh/h 197 437 107 148 615 99 80 548 126 216 827 178 Adj No. of Lanes 120120221230
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 Percent Heavy Veh, % 222222333222
Cap, veh/h 238 768 186 186 741 119 195 976 432 277 1267 271 Arrive On Green 0.13 0.27 0.27 0.10 0.24 0.24 0.06 0.28 0.28 0.08 0.30 0.30 Sat Flow, veh/h 1774 2820 685 1774 3051 490 3408 3505 1551 3442 4195 897 Grp Volume(v), veh/h 197 273 271 148 356 358 80 548 126 216 667 338 Grp Sat Flow(s),veh/h/ln 1774 1770 1735 1774 1770 1771 1704 1752 1551 1721 1695 1701 Q Serve(g_s), s 7.4 9.1 9.2 5.6 13.0 13.1 1.5 9.1 4.4 4.2 11.7 11.8 Cycle Q Clear(g_c), s 7.4 9.1 9.2 5.6 13.0 13.1 1.5 9.1 4.4 4.2 11.7 11.8 Prop In Lane 1.00 0.39 1.00 0.28 1.00 1.00 1.00 0.53
Lane Grp Cap(c), veh/h 238 482 472 186 430 430 195 976 432 277 1024 514 V/C Ratio(X) 0.83 0.57 0.57 0.80 0.83 0.83 0.41 0.56 0.29 0.78 0.65 0.66 Avail Cap(c_a), veh/h 247 482 473 231 467 467 250 976 432 277 1024 514 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.8 21.4 21.4 29.8 24.5 24.5 31.0 21.0 19.3 30.8 20.7 20.7 Incr Delay (d2), s/veh 19.7 1.5 1.7 14.3 11.2 11.4 1.4 2.3 1.7 13.1 3.2 6.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.9 4.6 4.6 3.4 7.7 7.7 0.8 4.7 2.1 2.5 5.9 6.5 LnGrp Delay(d),s/veh 48.4 22.9 23.1 44.1 35.7 35.9 32.4 23.4 21.0 43.9 23.9 27.2 LnGrp LOS DCCDDDCCCDCC
Approach Vol, veh/h 741 862 754 1221
Approach Delay, s/veh 29.8 37.2 23.9 28.4
Approach LOS CDCC
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 10.0 23.5 11.6 23.1 8.4 25.1 13.7 21.1 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 5.5 19.0 8.9 18.6 5.0 19.5 9.5 18.0 Max Q Clear Time (g_c+I1), s 6.2 11.1 7.6 11.2 3.5 13.8 9.4 15.1 Green Ext Time (p_c), s 0.0 2.5 0.0 2.0 0.0 3.1 0.0 1.3 Intersection Summary
HCM 2010 Ctrl Delay 29.9
HCM 2010 LOS C
HCM Signalized Intersection Capacity Analysis Existing Plus Project Ag PM 1: W Laurel Dr & Adams St
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (vph) 443 1346 882 30 37 310
Future Volume (vph) 443 1346 882 30 37 310
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Grade (%) 2% 3% 0%
Total Lost time (s) 3.9 3.5 3.5 3.5 3.1
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00
Frt 1.00 1.00 1.00 1.00 0.85
Flt Protected 0.95 1.00 1.00 0.95 1.00
Satd. Flow (prot) 1752 3504 3469 1770 1583
Flt Permitted 0.18 1.00 1.00 0.95 1.00
Satd. Flow (perm) 323 3504 3469 1770 1583
Peak-hour factor, PHF 0.99 0.99 0.99 0.99 0.99 0.99
Adj. Flow (vph) 447 1360 891 30 37 313
RTOR Reduction (vph) 0 0 0 0 0 238
Lane Group Flow (vph) 447 1360 921 0 37 75
Turn Type pm+pt NA NA Prot Perm
Protected Phases 5 2 6 8
Permitted Phases 2 8
Actuated Green, G (s) 58.5 58.5 37.4 19.6 19.6
Effective Green, g (s) 59.2 59.6 38.5 20.3 20.7
Actuated g/C Ratio 0.68 0.69 0.44 0.23 0.24
Clearance Time (s) 4.6 4.6 4.6 4.2 4.2
Vehicle Extension (s) 3.0 4.0 4.0 2.5 2.5
Lane Grp Cap (vph) 502 2403 1536 413 377
v/s Ratio Prot c0.18 0.39 0.27 0.02
v/s Ratio Perm c0.43 c0.05
v/c Ratio 0.89 0.57 0.60 0.09 0.20
Uniform Delay, d1 17.2 7.0 18.4 26.1 26.5
Progression Factor 1.10 0.56 1.00 1.00 1.00
Incremental Delay, d2 13.9 0.3 0.7 0.1 0.2
Delay (s) 32.7 4.2 19.1 26.1 26.7
Level of Service C A B C C
Approach Delay (s) 11.3 19.1 26.6
Approach LOS B B C
Intersection Summary
HCM 2000 Control Delay 15.4 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.74
Actuated Cycle Length (s) 86.9 Sum of lost time (s) 11.6 Intersection Capacity Utilization 65.7% ICU Level of Service C Analysis Period (min) 15
c Critical Lane Group
HCM Signalized Intersection Capacity Analysis Existing Plus Project Ag PM 2: NB 101 Ramps & W Laurel Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (vph) 0 1432 0 0 963 229 420 3 357 0 0 0 Future Volume (vph) 0 1432 0 0 963 229 420 3 357 0 0 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 3% 3% 3% 3%
Total Lost time (s) 3.5 3.5 3.5 3.5 3.5
Lane Util. Factor 0.95 0.95 0.95 0.95 1.00
Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00
Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00
Frt 1.00 0.97 1.00 1.00 0.85
Flt Protected 1.00 1.00 0.95 0.95 1.00
Satd. Flow (prot) 3486 3367 1656 1661 1560
Flt Permitted 1.00 1.00 0.95 0.95 1.00
Satd. Flow (perm) 3486 3367 1656 1661 1560
Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Adj. Flow (vph) 0 1523 0 0 1024 244 447 3 380 0 0 0
RTOR Reduction (vph) 0 0 0 0 0 0 0 0 57 0 0 0
Lane Group Flow (vph) 0 1523 0 0 1268 0 223 227 323 0 0 0 Confl. Peds. (#/hr) 3
Turn Type NA NA Split NA Perm
Protected Phases 2 6 4 4
Permitted Phases 6 4
Actuated Green, G (s) 58.5 37.4 19.6 19.6 19.6
Effective Green, g (s) 59.6 38.5 20.3 20.3 20.3
Actuated g/C Ratio 0.69 0.44 0.23 0.23 0.23
Clearance Time (s) 4.6 4.6 4.2 4.2 4.2
Vehicle Extension (s) 4.0 4.0 3.0 3.0 3.0
Lane Grp Cap (vph) 2390 1491 386 388 364
v/s Ratio Prot c0.44 c0.38 0.13 0.14
v/s Ratio Perm c0.21
v/c Ratio 0.64 0.85 0.58 0.59 0.89
Uniform Delay, d1 7.6 21.6 29.5 29.6 32.2
Progression Factor 1.00 0.45 1.00 1.00 1.00
Incremental Delay, d2 0.6 4.4 2.1 2.2 21.8
Delay (s) 8.3 14.0 31.6 31.8 54.0
Level of Service A B C C D
Approach Delay (s) 8.3 14.0 41.9 0.0
Approach LOS A B D A
Intersection Summary
HCM 2000 Control Delay 18.0 HCM 2000 Level of Service B HCM 2000 Volume to Capacity ratio 0.84
Actuated Cycle Length (s) 86.9 Sum of lost time (s) 12.3 Intersection Capacity Utilization 68.4% ICU Level of Service C Analysis Period (min) 15
c Critical Lane Group
HCM 2010 Signalized Intersection Summary Existing Plus Project Ag PM 3: W Laurel Dr & SB 101 Offramp
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Volume (veh/h) 0 1437 1246 0 388 365
Future Volume (veh/h) 0 1437 1246 0 388 365
Number 5 2 6 16 7 14
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 0 1835 1835 0 1835 1835
Adj Flow Rate, veh/h 0 1497 1298 0 404 380
Adj No. of Lanes 022021
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, % 022022
Cap, veh/h 0 1818 1818 0 1066 491
Arrive On Green 0.00 0.52 0.52 0.00 0.31 0.31
Sat Flow, veh/h 0 3670 3670 0 3390 1560
Grp Volume(v), veh/h 0 1497 1298 0 404 380
Grp Sat Flow(s),veh/h/ln 0 1743 1743 0 1695 1560
Q Serve(g_s), s 0.0 16.9 13.3 0.0 4.4 10.4
Cycle Q Clear(g_c), s 0.0 16.9 13.3 0.0 4.4 10.4
Prop In Lane 0.00 0.00 1.00 1.00
Lane Grp Cap(c), veh/h 0 1818 1818 0 1066 491
V/C Ratio(X) 0.00 0.82 0.71 0.00 0.38 0.77
Avail Cap(c_a), veh/h 0 2515 2515 0 1327 611
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 0.00 1.00 1.00 0.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 9.4 8.6 0.0 12.5 14.6
Incr Delay (d2), s/veh 0.0 1.2 0.3 0.0 0.2 4.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 8.2 6.4 0.0 2.0 5.0
LnGrp Delay(d),s/veh 0.0 10.6 8.8 0.0 12.7 19.0
LnGrp LOS B A B B
Approach Vol, veh/h 1497 1298 784
Approach Delay, s/veh 10.6 8.8 15.8
Approach LOS B A B
Timer 12345678
Assigned Phs 2 4 6
Phs Duration (G+Y+Rc), s 28.6 18.4 28.6
Change Period (Y+Rc), s 5.1 4.6 5.1
Max Green Setting (Gmax), s 32.9 17.4 32.9
Max Q Clear Time (g_c+I1), s 18.9 12.4 15.3
Green Ext Time (p_c), s 4.6 1.4 4.1
Intersection Summary
HCM 2010 Ctrl Delay 11.1
HCM 2010 LOS B
HCM 2010 Signalized Intersection Summary Existing Plus Project Ag PM 4: N Davis Rd & Calle Del Adobe/W Laurel Dr
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Volume (veh/h) 28 327 7 736 348 527 12 498 1055 529 492 31 Future Volume (veh/h) 28 327 7 736 348 527 12 498 1055 529 492 31 Number 5 2 12 1 6 16 3 8 18 7 4 14
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1775 1775 1881 1826 1826 1826 1844 1844 1844 1844 1844 1881 Adj Flow Rate, veh/h 29 341 7 767 362 0 12 519 1099 551 512 32 Adj No. of Lanes 120221122220
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Percent Heavy Veh, % 666333222222
Cap, veh/h 53 504 10 771 1201 810 29 840 1292 599 1337 83 Arrive On Green 0.03 0.15 0.16 0.23 0.35 0.00 0.02 0.24 0.24 0.18 0.40 0.41 Sat Flow, veh/h 1690 3379 69 3374 3470 1552 1756 3504 2759 3407 3350 209 Grp Volume(v), veh/h 29 170 178 767 362 0 12 519 1099 551 267 277 Grp Sat Flow(s),veh/h/ln 1690 1686 1762 1687 1735 1552 1756 1752 1379 1704 1752 1807 Q Serve(g_s), s 1.9 10.8 10.9 25.8 8.7 0.0 0.8 15.0 17.2 18.1 12.3 12.3 Cycle Q Clear(g_c), s 1.9 10.8 10.9 25.8 8.7 0.0 0.8 15.0 17.2 18.1 12.3 12.3 Prop In Lane 1.00 0.04 1.00 1.00 1.00 1.00 1.00 0.12
Lane Grp Cap(c), veh/h 53 251 263 771 1201 810 29 840 1292 599 699 721 V/C Ratio(X) 0.54 0.68 0.68 0.99 0.30 0.00 0.41 0.62 0.85 0.92 0.38 0.38 Avail Cap(c_a), veh/h 104 689 720 771 1998 1167 93 1048 1456 599 739 763 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 54.2 45.8 45.8 43.8 27.1 0.0 55.4 38.6 8.6 46.1 24.2 24.2 Incr Delay (d2), s/veh 3.1 6.6 6.4 30.9 0.3 0.0 3.4 0.7 4.6 20.1 0.3 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 5.5 5.8 15.2 4.2 0.0 0.4 7.4 7.2 10.2 6.0 6.2 LnGrp Delay(d),s/veh 57.4 52.4 52.2 74.7 27.4 0.0 58.8 39.3 13.2 66.2 24.6 24.5 LnGrp LOS E D D E C E D B E C C
Approach Vol, veh/h 377 1129 1630 1095
Approach Delay, s/veh 52.7 59.6 21.8 45.5
Approach LOS D E C D
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 32.0 22.5 7.9 51.4 9.1 45.4 26.0 33.3 Change Period (Y+Rc), s 6.0 5.5 6.0 6.0 5.5 6.0 6.0 6.0 Max Green Setting (Gmax), s 26.0 46.5 6.0 48.0 7.0 65.5 20.0 34.0 Max Q Clear Time (g_c+I1), s 27.8 12.9 2.8 14.3 3.9 10.7 20.1 19.2 Green Ext Time (p_c), s 0.0 3.2 0.0 2.2 0.0 3.9 0.0 7.7 Intersection Summary
HCM 2010 Ctrl Delay 40.8
HCM 2010 LOS D
HCM 2010 TWSC Existing Plus Project Ag PM
5: Post Dr/El Rancho Way & Calle Del Adobe
Quattrin Ranch Synchro 10 Report
Keith Higgins Traffic Engineer
Intersection
Int Delay, s/veh 7.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations
Traffic Vol, veh/h 6 233 85 118 175 71 100 49 42 52 29 1 Future Vol, veh/h 6 233 85 118 175 71 100 49 42 52 29 1 Conflicting Peds, #/hr 1 06601900009
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - Yield
Storage Length 70 - 85 175 - 0 0 - - - - 110
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 2 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 9 99777444222
Mvmt Flow 6 245 89 124 184 75 105 52 44 55 31 1
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 260 0 0 340 0 0 757 771 251 783 785 194 Stage 1 - - - - - - 263 263 - 433 433 -
Stage 2 - - - - - - 494 508 - 350 352 -
Critical Hdwy 4.19 - - 4.17 - - 7.14 6.54 6.24 7.12 6.52 6.22 Critical Hdwy Stg 1 - ----- 6.14 5.54 - 6.12 5.52 -
Critical Hdwy Stg 2 - ----- 6.14 5.54 - 6.12 5.52 -
Follow-up Hdwy 2.281 - - 2.263 - - 3.536 4.036 3.336 3.518 4.018 3.318 Pot Cap-1 Maneuver 1265 - - 1192 - - 322 328 783 311 325 847 Stage 1 - - - - - - 738 687 - 601 582 -
Stage 2 - - - - - - 553 535 - 666 632 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1264 - - 1186 - - 268 290 779 233 288 840 Mov Cap-2 Maneuver - - - - - - 268 290 - 233 288 -
Stage 1 - - - - - - 731 680 - 597 520 -
Stage 2 - - - - - - 462 478 - 578 626 -
Approach EB WB NB SB
HCM Control Delay, s 0.1 2.7 21.9 26.5

← All documents from this meeting