Attachment 2 Bid Tab.pdf

Salinas City Council
September 6, 2022

Document
Attachment 2 Bid Tab.pdf
Meeting
September 6, 2022
Body
Salinas City Council
Original file
179 KB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

Front Street/Sherwood Dr Adaptive Traffic Control System, Project No. 9431 Item # Item Description Quantity Measure Unit Price Item Tota l Unit Price Item Tota l Unit Price Item Tota l Unit Price Item Tota l Unit Price Item Tota l 1 Mobilization 1 LS $ 37,000.00 $ 37,000.00 $ 5,000.00 $ 5,000.00 $ 16,561.00 $ 16,561.00 $ 36,500.00 $ 36,500.00 $ 30,0 00.00 $ 30,000.00 2 Furnish and Install Traffic Control and all Temporary Construction Area Signs and Hardware (Including Removal at End of Project)
1L S
$ 28,000.00 $ 28,000.00 $ 2,500.00 $ 2,500.00 $ 42,000.00 $ 42,000.00 $ 27,875.00 $ 27,875.00 $ 50,0 00.00 $ 50,000.00 3 Erosion & Sediment Control Plan 1 LS $ 5,000.00 $ 5,000.00 $ 750.00 $ 750.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 2,500.00 $ 10,000.00 $ 10,000.00 4 Remove Pull Box 14 EA $950 $ 13,300.00 $315 $ 4,410.00 $400 $ 5,600.00 $450 $ 6,300.00 $1,000 $ 14,000.00 5 Furnish and Install 4" Schedule 80 HDPE Conduit
(Directional Drill) 1,200 LF $95.25 $ 114,300.00 $75 $ 90,000.00 $95 $ 114,000.00 $85 $ 10 2,000.00 $117 $ 140,400.00 6 Furnish and Install No. 6E Pull Box 15 EA $3,188 $ 47,820.00 $2,470 $ 37,050.00 $3,200 $ 48,000.00 $2,650 $ 39,750.00 $1,400 $ 21,000.00 7 Furnish and Install N48 Pull Box 3 EA $3,795 $ 11,385.00 $3,620 $ 10,860.00 $4,100 $ 12,300.00 $4,150 $ 12,450.00 $2,300 $ 6,900.00 8 Furnish and Install 12-Strand Fiber Optic Cable 3,900 FT $7.55 $ 29,445.00 $5 $ 19,500.00 $5 $ 19,500.00 $10 $ 3 9,000.00 $12 $ 46,800.00 9 Furnish and Install Flexible Innerduct w/ Tracer Wire 3,300 LF $9.15 $ 30,195.00 $12.00 $ 39,600.00 $12.06 $ 39,798.00 $ 12.00 $ 39,600.00 $13.00 $ 42,900.00 10 Furnish and Install Fiber Termination Panel (12 port) 6 EA $750 $ 4,500.00 $1,700 $ 10,200.00 $1,020 $ 6,120.00 $3,650 $ 21,900.00 $2,000 $ 12,000.00 11 Furnish and Install Fiber Optic Edge Switch - include patch cables 5E A $4,770 $ 23,850.00 $7,200 $ 36,000.00 $5,000 $ 25,000.00 $9,265 $ 46,325.00 $6,300 $ 31,500.00 12 Make and Test Fiber Terminations 1 LS $25,300 $ 25,300.00 $11,000 $ 11,000.00 $14,400 $ 14,400. 00 $21,500 $ 21,500.00 $8,000 $ 8,000.00 13 System Testing 1 LS $25,300 $ 25,300.00 $5,000 $ 5,000.00 $4,260 $ 4,260. 00 $15,000 $ 15,000.00 $7,500 $ 7,500.00 14 Traffic Signal System Modifications - Front St and East San Luis St 1L S $75,463.75 $ 75,463.75 $95,000 $ 95,000.00 $75,000 $ 75,0 00.00 $85,000 $ 85,000.00 $112,000 $ 112,000.00 15 Traffic Signal System Modifications - Front St and East Market St 1L S $91,563 $ 91,563.00 $115,000 $ 115,000.00 $111,007 $ 111,007. 00 $53,000 $ 53,000.00 $143,500 $ 143,500.00 16 Traffic Signal System Modifications - Sherwood Dr and East Market St/Market Way 1L S $71,282.75 $ 71,282.75 $47,000 $ 47,000.00 $60,000 $ 60,0 00.00 $81,500 $ 81,500.00 $93,000 $ 93,000.00 17 Traffic Signal System Modifications - Sherwood Dr and West Rossi St/Calle Cebu 1L S $64,135.50 $ 64,135.50 $57,000 $ 57,000.00 $50,000 $ 50,0 00.00 $58,650 $ 58,650.00 $100,000 $ 100,000.00 $688,850
Monterey Peninsula
Engineering Estimate
$869,500
Bear Electrical Solutions,
Inc. Estimate
$585,870 $646,046
PROJECT MANAGER: Gerardo Rodriguez
Engineer's Estimate
Bid Opening: July 26, 2022
Base Bid
Bid Total (Items 1-17) (For Comparison Only) $697,840
PTM General Engineering
Service Estimate
Tennyson Electric, Inc.

Estimate
1 of 1 I:\PWTra\Construction Projects\9431‐Sherwood‐Front Corridor\BID\Preliminary 9431 BidTab_Bid Submittals.xlsx