AWP ACIP DATA SHEET 28 Sep 2020
Airport Name Salinas Municipal Airport Fiscal Year 2025 Shown On
ALP
Project
Type*
Project Description
Federal
Share
Local
Share
Total
Y D Design - Rwy 13 - 31 Lighting Upgrades 162,000 18,000 180,000
Design 8-26 Lighting Upgrades 112,500 12,500 125,000
Design Airfield Signage Upgrades 67,500 7,500 75,000
Design Perimeter Road Pavement 135,000 15,000 150,000
Rehabilitation
(four projects, same grant)
* D - Development; P - Planning; E - Environmental
PROVIDE THE FOLLOWING DETAILED INFORMATION FOR PROJECTS ANTICIPATED WITHIN 1-2 YEARS Detail Project Description (Square/Lineal Footage or Length/Width, Location identifier, e.g., RW ##, TW ##, Bldg #, Apron #) Design airfield signage and runway lighting upgrades conforming to FAA Advisory Circular 150/5340-18G Standards for Airport Sign Systems and FAA AC 150/5340-1M Standards for Airport Markings (or most current AC) and other appropriate FAA AC and Specifications.
Design approximately 9,500 SY of pavement rehabilitation of the perimeter roads. The existing perimeter road pavement is old and near failure.
Project Schedule (Anticipated date for bids or negotiated prices, consultant selection for planning or environmental projects, length of construction or design, planning or environmental process) 100% Design Submittal to be submitted in Q4 2025
Project to bid Q1 2026
Anticipated grant closeout prior to December 2026
NEPA Environmental Status (With grant application include copy of ROD, FONSI or CATEX letter of approval) CATEX to be submitted 2024
Land Title Status & Date of Exhibit "A" Status Date
Exhibit A Property Map was approved on 11/23/2010
Open AIP Funded Projects (include grant number and grant description) Expected Close-out Date AIP 3-06-0206-028: Rehabilitate 8/26 - December 2021
AIP 3-06-0206-029: ALCMS - December 2021
AIP 3-06-0206-030: AMPU - March 2023
Certification: To the best of my knowledge and belief, all information shown in the ACIP Data Sheet is true and correct and had been duly authorized by the Sponsor.
Brett Godown, Airport Manager, (831) 758-7214
Name and Title of Authorized Representative (Print or Type) Contact Name and Title (Print or Type)
11/8/2022
Signature Date Contact Phone (Print or Type)