BID OPENING:

November 15 2022
B I D T A B U L A T I O N PROJECT No. 9720
CITYWIDE SIDEWALK REPAIR PROJECT, CIP 9720 Drawing No.

Bid awarded on _______ by City Council to ___________ Project Engineer: Jonathan Esteban for the sum of __________ Project Manager: Jonathan Esteban All other bids were rejected and bid bonds returned.

Dated CONTRACTOR #1 CONTRACTOR #2 CONTRACTOR #3 CONTRACTOR #4 CONTRACTOR #5 City Clerk ENGINEER'S

ESTIMATE
ITEM APPROX. UNIT UNIT UNIT UNIT UNIT UNIT
NO. QUANTITY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL BASE BID NO. 1 - LOCATIONS 1 - 16
1 CONSTRUCTION COORDINATION / MOBILIZATION; COMPLETE-IN-PLACE 1 LS 50,000.00$ 50,000.00$ $24,000.00 24,000.00$ $340,000.00 340,000.00$ $85,000.00 85,000.00$ $454,360.00 454,360.00$ $245,656.00 245,656.00$ 2 FURNISH AND INSTALL TRAFFIC CONTROL AND ALL CONSTRUCTION AREA SIGNS AND HARDWARE (INCLUDING REMOVAL AT END OF PROJECT); COMPLETE-IN-PLACE 1 LS 50,000.00$ 50,000.00$ $30,000.00 30,000.00$ $102,700.00 102,700.00$ $140,000.00 140,000.00$ $255,800.00 255,800.00$ $81,500.00 81,500.00$ 3 FURNISH AND INSTALL EROSION AND SEDIMENT CONTROL PLAN; COMPLETE-IN-PLACE 1 LS 30,000.00$ 30,000.00$ $1,000.00 1,000.00$ $23,600.00 23,600.00$ $150,000.00 150,000.00$ $82,700.00 82,700.00$ $34,025.00 34,025.00$ 4 FURNISH AND INSTALL 15-GALLON TREE (INCLUDING 180 CALENDAR DAY TYPE II PLANT ESTABLISHMENT AND MAINTENANCE PERIOD); COMPLETE-IN-PLACE 42 EA 2,000.00$ 84,000.00$ $2,500.00 105,000.00$ $2,105.00 88,410.00$ $2,200.00 92,400.00$ $1,500.00 63,000.00$ $1,900.00 79,800.00$ 5 REMOVE AND DISPOSE EXISTING TREE, GRIND TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 117 EA 3,000.00$ 351,000.00$ $1,350.00 157,950.00$ $1,100.00 128,700.00$ $1,600.00 187,200.00$ $1,325.00 155,025.00$ $2,663.00 311,571.00$ 6 REMOVE AND DISPOSE EXISTING TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 22 EA 2,500.00$ 55,000.00$ $550.00 12,100.00$ $277.00 6,094.00$ $700.00 15,400.00$ $300.00 6,600.00$ $750.00 16,500.00$ 7 REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER 7676 LF 35.00$ 268,660.00$ $16.25 124,735.00$ $20.00 153,520.00$ $20.00 153,520.00$ $35.00 268,660.00$ $55.00 422,180.00$ 8 CONSTRUCT TYPE “C” CONCRETE CURB AND GUTTER, COMPLETE-IN-PLACE 7676 LF 90.00$ 690,840.00$ $90.10 691,607.60$ $50.00 383,800.00$ $88.00 675,488.00$ $98.00 752,248.00$ $111.00 852,036.00$ 9 REMOVE AND DISPOSE OF EXISTING CONCRETE HEAVY DUTY CURB AND GUTTER 20 LF 35.00$ 700.00$ $23.40 468.00$ $18.00 360.00$ $90.00 1,800.00$ $19.00 380.00$ $102.00 2,040.00$ 10 CONSTRUCT CONCRETE TYPE “C” HEAVY DUTY CURB AND GUTTER, COMPLETE-IN-PLACE 20 LF 90.00$ 1,800.00$ $106.35 2,127.00$ $45.00 900.00$ $202.00 4,040.00$ $96.00 1,920.00$ $180.00 3,600.00$ 11 REMOVE AND DISPOSE EXISTING CONCRETE SIDEWALK 43168 SF 15.00$ 647,520.00$ $7.25 312,968.00$ $12.00 518,016.00$ $9.00 388,512.00$ $8.00 345,344.00$ $11.00 474,848.00$ 12 CONSTRUCT CONCRETE SIDEWALK, COMPLETE-IN-PLACE 45559 SF 25.00$ 1,138,975.00$ $12.50 569,487.50$ $10.00 455,590.00$ $20.00 911,180.00$ $14.00 637,826.00$ $18.00 820,062.00$ 13 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE A” CALTRANS STANDARD, COMPLETE-IN-PLACE 45 EA 7,500.00$ 337,500.00$ $4,591.00 206,595.00$ $5,500.00 247,500.00$ $8,900.00 400,500.00$ $8,740.00 393,300.00$ $13,181.00 593,145.00$ 14 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE B” CALTRANS STANDARD, COMPLETE-IN-PLACE 44 EA 7,500.00$ 330,000.00$ $5,308.00 233,552.00$ $7,000.00 308,000.00$ $9,100.00 400,400.00$ $8,950.00 393,800.00$ $11,885.00 522,940.00$ 15 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE C” CALTRANS STANDARD, COMPLETE-IN-PLACE 30 EA 7,500.00$ 225,000.00$ $4,796.00 143,880.00$ $7,000.00 210,000.00$ $9,400.00 282,000.00$ $8,470.00 254,100.00$ $12,274.00 368,220.00$ 16 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE D” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 17 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE E” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 18 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE F” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 19 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE G” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 20 RELOCATE EXISTING SIGN AND POST, COMPLETE-IN-PLACE 1 EA 350.00$ 350.00$ $1,000.00 1,000.00$ $285.00 285.00$ $750.00 750.00$ $245.00 245.00$ $1,500.00 1,500.00$ 21 GRIND EXISTING SIDEWALK LIP FLUSH TO ADJACENT SIDEWALK SCORELINE, COMPLETE-IN-PLACE 2556 LF 25.00$ 63,900.00$ $21.00 53,676.00$ $52.00 132,912.00$ $24.00 61,344.00$ $68.00 173,808.00$ $28.00 71,568.00$ 22 REMOVE AND DISPOSE EXISTING CONCRETE RESIDENTIAL DRIVEWAY APPROACH 12361 SF 13.00$ 160,693.00$ $7.25 89,617.25$ $14.00 173,054.00$ $15.00 185,415.00$ $7.00 86,527.00$ $13.00 160,693.00$ 23 CONSTRUCT CONCRETE RESIDENTIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 12361 SF 23.00$ 284,303.00$ $18.95 234,240.95$ $12.00 148,332.00$ $30.00 370,830.00$ $19.00 234,859.00$ $24.00 296,664.00$ 24 REMOVE AND DISPOSE EXISTING CONCRETE COMMERCIAL DRIVEWAY APPROACH 152 SF 15.00$ 2,280.00$ $9.25 1,406.00$ $16.00 2,432.00$ $11.50 1,748.00$ $7.00 1,064.00$ $16.00 2,432.00$ 25 CONSTRUCT CONCRETE COMMERCIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 152 SF 24.00$ 3,648.00$ $28.50 4,332.00$ $14.00 2,128.00$ $35.00 5,320.00$ $20.00 3,040.00$ $29.00 4,408.00$ TOTAL BASE BID NO. 1 (ITEMS 1-25)
(FOR COMPARISON ONLY)
BASE BID NO. 2 - LOCATION 17: SAN MIGUEL AVE
26 CONSTRUCTION COORDINATION / MOBILIZATION; COMPLETE-IN-PLACE 1 LS 10,000.00$ 10,000.00$ $1,000.30 1,000.300$ $500.00 500.00$ $2,300.00 2,300.00$ $51,600.00 51,600.00$ $5,315.00 5,315.00$ 27 FURNISH AND INSTALL TRAFFIC CONTROL AND ALL CONSTRUCTION AREA SIGNS AND HARDWARE (INCLUDING REMOVAL AT END OF PROJECT); COMPLETE-IN-PLACE 1 LS 10,000.00$ 10,000.00$ $3,000.00 3,000.000$ $500.00 500.00$ $19,000.00 19,000.00$ $38,800.00 38,800.00$ $413.00 413.00$ 28 FURNISH AND INSTALL EROSION AND SEDIMENT CONTROL PLAN; COMPLETE-IN-PLACE 1 LS 6,000.00$ 6,000.00$ $500.00 500.000$ $100.00 100.00$ $7,500.00 7,500.00$ $8,730.00 8,730.00$ $2,084.00 2,084.00$ 29 FURNISH AND INSTALL 15-GALLON TREE (INCLUDING 180 CALENDAR DAY TYPE II PLANT ESTABLISHMENT AND MAINTENANCE PERIOD); COMPLETE-IN-PLACE 0 EA 2,000.00$ -$ $2,500.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 30 REMOVE AND DISPOSE EXISTING TREE, GRIND TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 6 EA 3,000.00$ 18,000.00$ $1,400.00 8,400.000$ $1,218.00 7,308.00$ $1,600.00 9,600.00$ $1,300.00 7,800.00$ $1,623.00 9,738.00$ 31 REMOVE AND DISPOSE EXISTING TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 1 EA 2,500.00$ 2,500.00$ $700.00 700.000$ $443.00 443.00$ $700.00 700.00$ $400.00 400.00$ $750.00 750.00$ 32 REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER 313 LF 35.00$ 10,955.00$ $16.25 5,086.250$ $20.00 6,260.00$ $23.00 7,199.00$ $38.00 11,894.00$ $58.00 18,154.00$ 33 CONSTRUCT TYPE “C” CONCRETE CURB AND GUTTER, COMPLETE-IN-PLACE 313 LF 90.00$ 28,170.00$ $90.10 28,201.300$ $50.00 15,650.00$ $95.00 29,735.00$ $91.00 28,483.00$ $110.00 34,430.00$ 34 REMOVE AND DISPOSE OF EXISTING CONCRETE HEAVY DUTY CURB AND GUTTER 20 LF 35.00$ 700.00$ $23.40 468.000$ $18.00 360.00$ $90.00 1,800.00$ $20.00 400.00$ $109.00 2,180.00$ 35 CONSTRUCT CONCRETE TYPE “C” HEAVY DUTY CURB AND GUTTER, COMPLETE-IN-PLACE 20 LF 90.00$ 1,800.00$ $106.35 2,127.000$ $45.00 900.00$ $202.00 4,040.00$ $96.00 1,920.00$ $174.00 3,480.00$ 36 REMOVE AND DISPOSE EXISTING CONCRETE SIDEWALK 2,505 SF 15.00$ 37,575.00$ $7.25 18,161.250$ $12.00 30,060.00$ $4.50 11,272.50$ $7.00 17,535.00$ $11.00 27,555.00$ 37 CONSTRUCT CONCRETE SIDEWALK, COMPLETE-IN-PLACE 2,505 SF 25.00$ 62,625.00$ $12.50 31,312.500$ $10.00 25,050.00$ $16.00 40,080.00$ $15.00 37,575.00$ $17.50 43,837.50$ 38 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE A” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 39 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE B” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 40 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE C” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 41 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE D” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 42 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE E” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 43 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE F” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 44 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE G” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 45 RELOCATE EXISTING SIGN AND POST, COMPLETE-IN-PLACE 0 EA 350.00$ -$ $1,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 46 GRIND EXISTING SIDEWALK LIP FLUSH TO ADJACENT SIDEWALK SCORELINE, COMPLETE-IN-PLACE 75 LF 25.00$ 1,875.00$ $21.00 1,575.000$ $52.00 3,900.00$ $24.00 1,800.00$ $61.00 4,575.00$ $30.00 2,250.00$ 47 REMOVE AND DISPOSE EXISTING CONCRETE RESIDENTIAL DRIVEWAY APPROACH 192 SF 13.00$ 2,496.00$ $7.25 1,392.000$ $14.00 2,688.00$ $9.00 1,728.00$ $9.00 1,728.00$ $13.00 2,496.00$ 48 CONSTRUCT CONCRETE RESIDENTIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 192 SF 23.00$ 4,416.00$ $18.95 3,638.400$ $12.00 2,304.00$ $43.00 8,256.00$ $20.00 3,840.00$ $23.00 4,416.00$ 49 REMOVE AND DISPOSE EXISTING CONCRETE COMMERCIAL DRIVEWAY APPROACH 0 SF 15.00$ -$ $9.25 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 50 CONSTRUCT CONCRETE COMMERCIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 0 SF 24.00$ -$ $28.50 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ TOTAL BASE BID NO. 2 (ITEMS 26-50)
(FOR COMPARISON ONLY)
Monterey Peninsula Engineering
192 Healy Ave, Marina, CA 93933
(831)384-4081
4,512,847.00$
145,010.50$ 215,280.00$

UNITDESCRIPTION
2,999,742.30$ 4,776,169.00$
197,112.00$
3,426,333.00$
Precion Grade Inc
5 San Juan Grade Rd, Ste 150, Salinas CA 93906
(831)800-1602
4,564,606.00$
FBD Vangaurd Construction
105,562.000$ 96,023.00$
1120 Ninth Ave, San Mateo, CA 94402
JJR Construction
(650)343-6109
550 Greenville Rd, Livermore, CA 94550
(925)245-1300
Granite Rock
5225 Hellyer Ave, Ste 220, San Jose, CA 95138
(408)574-1400
5,365,388.00$
157,098.50$
12/8/2022 4:48 PM J:\p\9720 - 3911.50.9720 - ARPA Sidewalk\BID OPERATIONS\Exhibit-A_BidTab Page 1 of 4 BID OPENING:

November 15 2022
B I D T A B U L A T I O N PROJECT No. 9720
CITYWIDE SIDEWALK REPAIR PROJECT, CIP 9720 Drawing No.

Bid awarded on _______ by City Council to ___________ Project Engineer: Jonathan Esteban for the sum of __________ Project Manager: Jonathan Esteban All other bids were rejected and bid bonds returned.

Dated CONTRACTOR #1 CONTRACTOR #2 CONTRACTOR #3 CONTRACTOR #4 CONTRACTOR #5 City Clerk ENGINEER'S

ESTIMATE
ITEM APPROX. UNIT UNIT UNIT UNIT UNIT UNIT
NO. QUANTITY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL Monterey Peninsula Engineering
192 Healy Ave, Marina, CA 93933
(831)384-4081

UNITDESCRIPTION
Precion Grade Inc
5 San Juan Grade Rd, Ste 150, Salinas CA 93906
(831)800-1602
FBD Vangaurd Construction
1120 Ninth Ave, San Mateo, CA 94402
JJR Construction
(650)343-6109
550 Greenville Rd, Livermore, CA 94550
(925)245-1300
Granite Rock
5225 Hellyer Ave, Ste 220, San Jose, CA 95138
(408)574-1400
BASE BID NO. 3 - LOCATION 18: PALMA DR
51 CONSTRUCTION COORDINATION / MOBILIZATION; COMPLETE-IN-PLACE 1 LS 10,000.00$ 10,000.00$ $2,000.60 2,000.60$ $500.00 500.00$ $2,300.00 2,300.00$ $54,600.00 54,600.00$ $19,943.00 19,943.00$ 52 FURNISH AND INSTALL TRAFFIC CONTROL AND ALL CONSTRUCTION AREA SIGNS AND HARDWARE (INCLUDING REMOVAL AT END OF PROJECT); COMPLETE-IN-PLACE 1 LS 10,000.00$ 10,000.00$ $5,500.00 5,500.00$ $500.00 500.00$ $24,000.00 24,000.00$ $53,000.00 53,000.00$ $850.00 850.00$ 53 FURNISH AND INSTALL EROSION AND SEDIMENT CONTROL PLAN; COMPLETE-IN-PLACE 1 LS 6,000.00$ 6,000.00$ $500.00 500.00$ $100.00 100.00$ $8,000.00 8,000.00$ $8,820.00 8,820.00$ $4,044.00 4,044.00$ 54 FURNISH AND INSTALL 15-GALLON TREE (INCLUDING 180 CALENDAR DAY TYPE II PLANT ESTABLISHMENT AND MAINTENANCE PERIOD); COMPLETE-IN-PLACE 5 EA 2,000.00$ 10,000.00$ $4,900.00 24,500.00$ $1,900.00 9,500.00$ $2,200.00 11,000.00$ $1,500.00 7,500.00$ $1,900.00 9,500.00$ 55 REMOVE AND DISPOSE EXISTING TREE, GRIND TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 6 EA 3,000.00$ 18,000.00$ $1,400.00 8,400.00$ $1,200.00 7,200.00$ $1,600.00 9,600.00$ $1,300.00 7,800.00$ $1,625.00 9,750.00$ 56 REMOVE AND DISPOSE EXISTING TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 1 EA 2,500.00$ 2,500.00$ $700.00 700.00$ $443.00 443.00$ $672.00 672.00$ $400.00 400.00$ $750.00 750.00$ 57 REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER 316 LF 35.00$ 11,060.00$ $16.25 5,135.00$ $20.00 6,320.00$ $24.00 7,584.00$ $40.00 12,640.00$ $60.00 18,960.00$ 58 CONSTRUCT TYPE “C” CONCRETE CURB AND GUTTER, COMPLETE-IN-PLACE 316 LF 90.00$ 28,440.00$ $90.10 28,471.60$ $50.00 15,800.00$ $100.00 31,600.00$ $95.00 30,020.00$ $121.00 38,236.00$ 59 REMOVE AND DISPOSE OF EXISTING CONCRETE HEAVY DUTY CURB AND GUTTER 0 LF 35.00$ -$ $23.40 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 60 CONSTRUCT CONCRETE TYPE “C” HEAVY DUTY CURB AND GUTTER, COMPLETE-IN-PLACE 0 LF 90.00$ -$ $106.35 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 61 REMOVE AND DISPOSE EXISTING CONCRETE SIDEWALK 1,404 SF 15.00$ 21,060.00$ $7.25 10,179.00$ $12.00 16,848.00$ $5.00 7,020.00$ $7.00 9,828.00$ $11.00 15,444.00$ 62 CONSTRUCT CONCRETE SIDEWALK, COMPLETE-IN-PLACE 1,404 SF 25.00$ 35,100.00$ $12.50 17,550.00$ $10.00 14,040.00$ $18.00 25,272.00$ $15.00 21,060.00$ $20.00 28,080.00$ 63 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE A” CALTRANS STANDARD, COMPLETE-IN-PLACE 13 EA 7,500.00$ 97,500.00$ $4,591.00 59,683.00$ $5,500.00 71,500.00$ $9,250.00 120,250.00$ $9,900.00 128,700.00$ $11,227.00 145,951.00$ 64 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE B” CALTRANS STANDARD, COMPLETE-IN-PLACE 4 EA 7,500.00$ 30,000.00$ $5,308.00 21,232.00$ $7,000.00 28,000.00$ $9,400.00 37,600.00$ $10,250.00 41,000.00$ $11,313.00 45,252.00$ 65 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE C” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 66 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE D” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 67 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE E” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 68 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE F” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 69 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE G” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 70 RELOCATE EXISTING SIGN AND POST, COMPLETE-IN-PLACE 1 EA 350.00$ 350.00$ $1,000.00 1,000.00$ $285.00 285.00$ $750.00 750.00$ $245.00 245.00$ $1,200.00 1,200.00$ 71 GRIND EXISTING SIDEWALK LIP FLUSH TO ADJACENT SIDEWALK SCORELINE, COMPLETE-IN-PLACE 100 LF 25.00$ 2,500.00$ $21.00 2,100.00$ $52.00 5,200.00$ $24.00 2,400.00$ $62.00 6,200.00$ $23.00 2,300.00$ 72 REMOVE AND DISPOSE EXISTING CONCRETE RESIDENTIAL DRIVEWAY APPROACH 319 SF 13.00$ 4,147.00$ $7.25 2,312.75$ $14.00 4,466.00$ $21.00 6,699.00$ $7.00 2,233.00$ $11.00 3,509.00$ 73 CONSTRUCT CONCRETE RESIDENTIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 319 SF 23.00$ 7,337.00$ $18.95 6,045.05$ $12.00 3,828.00$ $40.00 12,760.00$ $20.00 6,380.00$ $20.00 6,380.00$ 74 REMOVE AND DISPOSE EXISTING CONCRETE COMMERCIAL DRIVEWAY APPROACH 0 SF 15.00$ -$ $9.25 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 75 CONSTRUCT CONCRETE COMMERCIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 0 SF 24.00$ -$ $28.50 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ TOTAL BASE BID NO. 3 (ITEMS 51-75)
(FOR COMPARISON ONLY)
BASE BID NO. 4 - LOCATION 19: SAN VINCENTE AVE
76 CONSTRUCTION COORDINATION / MOBILIZATION; COMPLETE-IN-PLACE 1 LS 10,000.00$ 10,000.00$ $1,100.30 1,100.30$ $500.00 500.00$ $1,700.00 1,700.00$ $39,800.00 39,800.00$ $10,630.00 10,630.00$ 77 FURNISH AND INSTALL TRAFFIC CONTROL AND ALL CONSTRUCTION AREA SIGNS AND HARDWARE (INCLUDING REMOVAL AT END OF PROJECT); COMPLETE-IN-PLACE 1 LS 10,000.00$ 10,000.00$ $3,275.00 3,275.00$ $500.00 500.00$ $14,000.00 14,000.00$ $31,800.00 31,800.00$ $364.00 364.00$ 78 FURNISH AND INSTALL EROSION AND SEDIMENT CONTROL PLAN; COMPLETE-IN-PLACE 1 LS 6,000.00$ 6,000.00$ $500.00 500.00$ $100.00 100.00$ $5,000.00 5,000.00$ $8,820.00 8,820.00$ $1,185.00 1,185.00$ 79 FURNISH AND INSTALL 15-GALLON TREE (INCLUDING 180 CALENDAR DAY TYPE II PLANT ESTABLISHMENT AND MAINTENANCE PERIOD); COMPLETE-IN-PLACE 3 EA 2,000.00$ 6,000.00$ $4,900.00 14,700.00$ $1,900.00 5,700.00$ $2,200.00 6,600.00$ $1,500.00 4,500.00$ $1,900.00 5,700.00$ 80 REMOVE AND DISPOSE EXISTING TREE, GRIND TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 6 EA 3,000.00$ 18,000.00$ $1,400.00 8,400.00$ $1,218.00 7,308.00$ $1,600.00 9,600.00$ $1,300.00 7,800.00$ $1,623.00 9,738.00$ 81 REMOVE AND DISPOSE EXISTING TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 0 EA 2,500.00$ -$ $700.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 82 REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER 410 LF 35.00$ 14,350.00$ $16.25 6,662.50$ $20.00 8,200.00$ $19.00 7,790.00$ $37.00 15,170.00$ $78.50 32,185.00$ 83 CONSTRUCT TYPE “C” CONCRETE CURB AND GUTTER, COMPLETE-IN-PLACE 410 LF 90.00$ 36,900.00$ $90.10 36,941.00$ $50.00 20,500.00$ $98.00 40,180.00$ $89.00 36,490.00$ $158.00 64,780.00$ 84 REMOVE AND DISPOSE OF EXISTING CONCRETE HEAVY DUTY CURB AND GUTTER 0 LF 35.00$ -$ $23.40 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 85 CONSTRUCT CONCRETE TYPE “C” HEAVY DUTY CURB AND GUTTER, COMPLETE-IN-PLACE 0 LF 90.00$ -$ $106.35 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 86 REMOVE AND DISPOSE EXISTING CONCRETE SIDEWALK 1,276 SF 15.00$ 19,140.00$ $7.25 9,251.00$ $12.00 15,312.00$ $10.50 13,398.00$ $8.00 10,208.00$ $14.50 18,502.00$ 87 CONSTRUCT CONCRETE SIDEWALK, COMPLETE-IN-PLACE 1,276 SF 25.00$ 31,900.00$ $12.50 15,950.00$ $10.00 12,760.00$ $19.00 24,244.00$ $15.00 19,140.00$ $27.50 35,090.00$ 88 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE A” CALTRANS STANDARD, COMPLETE-IN-PLACE 2 EA 7,500.00$ 15,000.00$ $4,591.00 9,182.00$ $5,500.00 11,000.00$ $9,000.00 18,000.00$ $12,200.00 24,400.00$ $13,995.00 27,990.00$ 89 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE B” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 90 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE C” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 91 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE D” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 92 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE E” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 93 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE F” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 94 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE G” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 95 RELOCATE EXISTING SIGN AND POST, COMPLETE-IN-PLACE 0 EA 350.00$ -$ $1,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 96 GRIND EXISTING SIDEWALK LIP FLUSH TO ADJACENT SIDEWALK SCORELINE, COMPLETE-IN-PLACE 56 LF 25.00$ 1,400.00$ $21.00 1,176.00$ $52.00 2,912.00$ $24.00 1,344.00$ $62.00 3,472.00$ $41.00 2,296.00$ 97 REMOVE AND DISPOSE EXISTING CONCRETE RESIDENTIAL DRIVEWAY APPROACH 246 SF 13.00$ 3,198.00$ $7.25 1,783.50$ $14.00 3,444.00$ $16.00 3,936.00$ $7.00 1,722.00$ $14.00 3,444.00$ 98 CONSTRUCT CONCRETE RESIDENTIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 246 SF 23.00$ 5,658.00$ $18.95 4,661.70$ $12.00 2,952.00$ $47.00 11,562.00$ $21.00 5,166.00$ $28.00 6,888.00$ 99 REMOVE AND DISPOSE EXISTING CONCRETE COMMERCIAL DRIVEWAY APPROACH 0 SF 15.00$ -$ $9.25 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 100 CONSTRUCT CONCRETE COMMERCIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 0 SF 24.00$ -$ $28.50 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ TOTAL BASE BID NO. 4 (ITEMS 76-100)
(FOR COMPARISON ONLY)
208,488.00$ 177,546.00$ 113,583.00$ 91,188.00$ 157,354.00$ 390,426.00$ 293,994.00$ 195,309.00$ 184,530.00$ 307,507.00$ 350,149.00$ 218,792.00$
12/8/2022 4:48 PM J:\p\9720 - 3911.50.9720 - ARPA Sidewalk\BID OPERATIONS\Exhibit-A_BidTab Page 2 of 4 BID OPENING:

November 15 2022
B I D T A B U L A T I O N PROJECT No. 9720
CITYWIDE SIDEWALK REPAIR PROJECT, CIP 9720 Drawing No.

Bid awarded on _______ by City Council to ___________ Project Engineer: Jonathan Esteban for the sum of __________ Project Manager: Jonathan Esteban All other bids were rejected and bid bonds returned.

Dated CONTRACTOR #1 CONTRACTOR #2 CONTRACTOR #3 CONTRACTOR #4 CONTRACTOR #5 City Clerk ENGINEER'S

ESTIMATE
ITEM APPROX. UNIT UNIT UNIT UNIT UNIT UNIT
NO. QUANTITY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL Monterey Peninsula Engineering
192 Healy Ave, Marina, CA 93933
(831)384-4081

UNITDESCRIPTION
Precion Grade Inc
5 San Juan Grade Rd, Ste 150, Salinas CA 93906
(831)800-1602
FBD Vangaurd Construction
1120 Ninth Ave, San Mateo, CA 94402
JJR Construction
(650)343-6109
550 Greenville Rd, Livermore, CA 94550
(925)245-1300
Granite Rock
5225 Hellyer Ave, Ste 220, San Jose, CA 95138
(408)574-1400
BASE BID NO. 5 - LOCATION 20 & 21: W ACACIA ST
101 CONSTRUCTION COORDINATION / MOBILIZATION; COMPLETE-IN-PLACE 1 LS 10,000.00$ 10,000.00$ $3,270.80 3,270.80$ $500.00 500.00$ $1,700.00 1,700.00$ $82,100.00 82,100.00$ $15,945.00 15,945.00$ 102 FURNISH AND INSTALL TRAFFIC CONTROL AND ALL CONSTRUCTION AREA SIGNS AND HARDWARE (INCLUDING REMOVAL AT END OF PROJECT); COMPLETE-IN-PLACE 1 LS 10,000.00$ 10,000.00$ $9,525.50 9,525.50$ $500.00 500.00$ $13,000.00 13,000.00$ $65,300.00 65,300.00$ $1,555.00 1,555.00$ 103 FURNISH AND INSTALL EROSION AND SEDIMENT CONTROL PLAN; COMPLETE-IN-PLACE 1 LS 6,000.00$ 6,000.00$ $500.00 500.00$ $100.00 100.00$ $4,000.00 4,000.00$ $18,700.00 18,700.00$ $5,875.00 5,875.00$ 104 FURNISH AND INSTALL 15-GALLON TREE (INCLUDING 180 CALENDAR DAY TYPE II PLANT ESTABLISHMENT AND MAINTENANCE PERIOD); COMPLETE-IN-PLACE 4 EA 2,000.00$ 8,000.00$ $4,900.00 19,600.00$ $1,900.00 7,600.00$ $2,200.00 8,800.00$ $1,500.00 6,000.00$ $1,900.00 7,600.00$ 105 REMOVE AND DISPOSE EXISTING TREE, GRIND TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 13 EA 3,000.00$ 39,000.00$ $1,950.00 25,350.00$ $1,550.00 20,150.00$ $1,600.00 20,800.00$ $1,750.00 22,750.00$ $1,623.00 21,099.00$ 106 REMOVE AND DISPOSE EXISTING TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 1 EA 2,500.00$ 2,500.00$ $700.00 700.00$ $440.00 440.00$ $700.00 700.00$ $500.00 500.00$ $750.00 750.00$ 107 REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER 776 LF 35.00$ 27,160.00$ $16.25 12,610.00$ $20.00 15,520.00$ $30.00 23,280.00$ $44.00 34,144.00$ $70.00 54,320.00$ 108 CONSTRUCT TYPE “C” CONCRETE CURB AND GUTTER, COMPLETE-IN-PLACE 776 LF 90.00$ 69,840.00$ $90.10 69,917.60$ $50.00 38,800.00$ $100.00 77,600.00$ $89.00 69,064.00$ $134.00 103,984.00$ 109 REMOVE AND DISPOSE OF EXISTING CONCRETE HEAVY DUTY CURB AND GUTTER 0 LF 35.00$ -$ $23.40 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 110 CONSTRUCT CONCRETE TYPE “C” HEAVY DUTY CURB AND GUTTER, COMPLETE-IN-PLACE 0 LF 90.00$ -$ $106.35 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 111 REMOVE AND DISPOSE EXISTING CONCRETE SIDEWALK 2,606 SF 15.00$ 39,090.00$ $7.25 18,893.50$ $12.00 31,272.00$ $5.50 14,333.00$ $8.00 20,848.00$ $8.00 20,848.00$ 112 CONSTRUCT CONCRETE SIDEWALK, COMPLETE-IN-PLACE 2,606 SF 25.00$ 65,150.00$ $12.50 32,575.00$ $10.00 26,060.00$ $16.50 42,999.00$ $15.00 39,090.00$ $22.50 58,635.00$ 113 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE A” CALTRANS STANDARD, COMPLETE-IN-PLACE 14 EA 7,500.00$ 105,000.00$ $4,591.00 64,274.00$ $5,500.00 77,000.00$ $8,900.00 124,600.00$ $9,800.00 137,200.00$ $12,975.00 181,650.00$ 114 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE B” CALTRANS STANDARD, COMPLETE-IN-PLACE 4 EA 7,500.00$ 30,000.00$ $5,308.00 21,232.00$ $7,000.00 28,000.00$ $9,000.00 36,000.00$ $9,780.00 39,120.00$ $11,933.00 47,732.00$ 115 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE C” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $4,796.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 116 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE D” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 117 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE E” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 118 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE F” CALTRANS STANDARD, COMPLETE-IN-PLACE 2 EA 7,500.00$ 15,000.00$ $5,000.00 10,000.00$ $5,500.00 11,000.00$ $9,300.00 18,600.00$ $9,630.00 19,260.00$ $9,701.00 19,402.00$ 119 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE G” CALTRANS STANDARD, COMPLETE-IN-PLACE 3 EA 7,500.00$ 22,500.00$ $5,000.00 15,000.00$ $6,000.00 18,000.00$ $9,500.00 28,500.00$ $9,630.00 28,890.00$ $11,464.00 34,392.00$ 120 RELOCATE EXISTING SIGN AND POST, COMPLETE-IN-PLACE 5 EA 350.00$ 1,750.00$ $1,000.00 5,000.00$ $285.00 1,425.00$ $750.00 3,750.00$ $250.00 1,250.00$ $1,200.00 6,000.00$ 121 GRIND EXISTING SIDEWALK LIP FLUSH TO ADJACENT SIDEWALK SCORELINE, COMPLETE-IN-PLACE 345 LF 25.00$ 8,625.00$ $21.00 7,245.00$ $52.00 17,940.00$ $24.00 8,280.00$ $61.00 21,045.00$ $26.00 8,970.00$ 122 REMOVE AND DISPOSE EXISTING CONCRETE RESIDENTIAL DRIVEWAY APPROACH 558 SF 13.00$ 7,254.00$ $7.25 4,045.50$ $14.00 7,812.00$ $13.00 7,254.00$ $7.00 3,906.00$ $8.50 4,743.00$ 123 CONSTRUCT CONCRETE RESIDENTIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 558 SF 23.00$ 12,834.00$ $18.95 10,574.10$ $12.00 6,696.00$ $41.00 22,878.00$ $21.00 11,718.00$ $24.00 13,392.00$ 124 REMOVE AND DISPOSE EXISTING CONCRETE COMMERCIAL DRIVEWAY APPROACH 0 SF 15.00$ -$ $9.25 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 125 CONSTRUCT CONCRETE COMMERCIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 0 SF 24.00$ -$ $28.50 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ TOTAL BASE BID NO. 5 (ITEMS 101-125)
(FOR COMPARISON ONLY)
BASE BID NO. 6 - LOCATION 22: COLERIDGE DR
126 CONSTRUCTION COORDINATION / MOBILIZATION; COMPLETE-IN-PLACE 1 LS 10,000.00$ 10,000.00$ $168.54 168.54$ $500.00 500.00$ $1,700.00 1,700.00$ $8,700.00 8,700.00$ $5,315.00 5,315.00$ 127 FURNISH AND INSTALL TRAFFIC CONTROL AND ALL CONSTRUCTION AREA SIGNS AND HARDWARE (INCLUDING REMOVAL AT END OF PROJECT); COMPLETE-IN-PLACE 1 LS 10,000.00$ 10,000.00$ $490.88 490.88$ $500.00 500.00$ $12,000.00 12,000.00$ $6,910.00 6,910.00$ $500.00 500.00$ 128 FURNISH AND INSTALL EROSION AND SEDIMENT CONTROL PLAN; COMPLETE-IN-PLACE 1 LS 6,000.00$ 6,000.00$ $500.00 500.00$ $100.00 100.00$ $4,800.00 4,800.00$ $5,920.00 5,920.00$ $515.00 515.00$ 129 FURNISH AND INSTALL 15-GALLON TREE (INCLUDING 180 CALENDAR DAY TYPE II PLANT ESTABLISHMENT AND MAINTENANCE PERIOD); COMPLETE-IN-PLACE 0 EA 2,000.00$ -$ $2,500.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 130 REMOVE AND DISPOSE EXISTING TREE, GRIND TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 1 EA 3,000.00$ 3,000.00$ $1,500.00 1,500.00$ $1,100.00 1,100.00$ $1,600.00 1,600.00$ $1,500.00 1,500.00$ $1,623.00 1,623.00$ 131 REMOVE AND DISPOSE EXISTING TREE STUMP TO 36” BELOW GRADE; COMPLETE-IN-PLACE 0 EA 2,500.00$ -$ $700.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 132 REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER 60 LF 35.00$ 2,100.00$ $16.25 975.00$ $20.00 1,200.00$ $29.00 1,740.00$ $28.00 1,680.00$ $78.00 4,680.00$ 133 CONSTRUCT TYPE “C” CONCRETE CURB AND GUTTER, COMPLETE-IN-PLACE 60 LF 90.00$ 5,400.00$ $90.10 5,406.00$ $50.00 3,000.00$ $110.00 6,600.00$ $99.00 5,940.00$ $159.00 9,540.00$ 134 REMOVE AND DISPOSE OF EXISTING CONCRETE HEAVY DUTY CURB AND GUTTER 0 LF 35.00$ -$ $23.40 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 135 CONSTRUCT CONCRETE TYPE “C” HEAVY DUTY CURB AND GUTTER, COMPLETE-IN-PLACE 0 LF 90.00$ -$ $106.35 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 136 REMOVE AND DISPOSE EXISTING CONCRETE SIDEWALK 168 SF 15.00$ 2,520.00$ $7.25 1,218.00$ $12.00 2,016.00$ $10.00 1,680.00$ $5.00 840.00$ $14.50 2,436.00$ 137 CONSTRUCT CONCRETE SIDEWALK, COMPLETE-IN-PLACE 168 SF 25.00$ 4,200.00$ $12.50 2,100.00$ $10.00 1,680.00$ $20.50 3,444.00$ $15.00 2,520.00$ $30.00 5,040.00$ 138 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE A” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 139 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE B” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 140 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE C” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 141 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE D” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 142 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE E” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 143 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE F” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 144 CONSTRUCT ADA PEDESTRIAN CURB RAMP “CASE G” CALTRANS STANDARD, COMPLETE-IN-PLACE 0 EA 7,500.00$ -$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 145 RELOCATE EXISTING SIGN AND POST, COMPLETE-IN-PLACE 0 EA 350.00$ -$ $1,000.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 146 GRIND EXISTING SIDEWALK LIP FLUSH TO ADJACENT SIDEWALK SCORELINE, COMPLETE-IN-PLACE 0 LF 25.00$ -$ $21.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 147 REMOVE AND DISPOSE EXISTING CONCRETE RESIDENTIAL DRIVEWAY APPROACH 178 SF 13.00$ 2,314.00$ $7.25 1,290.50$ $14.00 2,492.00$ $10.00 1,780.00$ $7.00 1,246.00$ $22.00 3,916.00$ 148 CONSTRUCT CONCRETE RESIDENTIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 178 SF 23.00$ 4,094.00$ $18.95 3,373.10$ $12.00 2,136.00$ $41.00 7,298.00$ $20.00 3,560.00$ $31.00 5,518.00$ 149 REMOVE AND DISPOSE EXISTING CONCRETE COMMERCIAL DRIVEWAY APPROACH 0 SF 15.00$ -$ $9.25 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ 150 CONSTRUCT CONCRETE COMMERCIAL DRIVEWAY APPROACH, COMPLETE-IN-PLACE 0 SF 24.00$ -$ $28.50 -$ $0.00 -$ $0.00 -$ $0.00 -$ $0.00 -$ TOTAL BASE BID NO. 6 (ITEMS 126-150)
(FOR COMPARISON ONLY)
GRAND TOTAL BASE BID (ITEMS 1-150) 5,974,152.00$ 3,761,531.32$ 4,121,613.00$ 5,622,434.50$ 6,038,501.00$ 38,816.00$ 49,628.00$ 17,022.02$ 14,724.00$ 42,642.00$ 620,885.00$ 479,703.00$ 330,313.00$ 308,815.00$ 457,074.00$ 606,892.00$ 39,083.00$
6,737,402.50$
12/8/2022 4:48 PM J:\p\9720 - 3911.50.9720 - ARPA Sidewalk\BID OPERATIONS\Exhibit-A_BidTab Page 3 of 4 BID OPENING:

November 15 2022
B I D T A B U L A T I O N PROJECT No. 9720
CITYWIDE SIDEWALK REPAIR PROJECT, CIP 9720 Drawing No.

Bid awarded on _______ by City Council to ___________ Project Engineer: Jonathan Esteban for the sum of __________ Project Manager: Jonathan Esteban All other bids were rejected and bid bonds returned.

Dated CONTRACTOR #1 CONTRACTOR #2 CONTRACTOR #3 CONTRACTOR #4 CONTRACTOR #5 City Clerk ENGINEER'S

ESTIMATE
ITEM APPROX. UNIT UNIT UNIT UNIT UNIT UNIT
NO. QUANTITY PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL Monterey Peninsula Engineering
192 Healy Ave, Marina, CA 93933
(831)384-4081

UNITDESCRIPTION
Precion Grade Inc
5 San Juan Grade Rd, Ste 150, Salinas CA 93906
(831)800-1602
FBD Vangaurd Construction
1120 Ninth Ave, San Mateo, CA 94402
JJR Construction
(650)343-6109
550 Greenville Rd, Livermore, CA 94550
(925)245-1300
Granite Rock
5225 Hellyer Ave, Ste 220, San Jose, CA 95138
(408)574-1400
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
** Document under review
DISCLOSURE OF LOBBYING ACTIVITIES x x x x
DEBARMENT AND SUSPENSION CERTIFICATION x x x x
NON-LOBBYING CERTIFICATION FOR FEDERAL-AID CONTRACTS x x x x PUBLIC CONTRACT CODE SECTION 10232 STATEMENT x x x x
CONTRACTOR'S CERTIFICATION OF NON-SEGREGATED FACILITIES x x x x x x x
x x x

INSURANCE CERTIFICATION

BIDDER'S STATEMENT OF SUBCONTRACTORS - PART I
PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT
x x x
x x x
x
x x x
x
x x

BIDDER'S LIST FOR THE CITY OF SALINAS ENGINEERING AND TRANSPORTATION DEPARTMENT

NON-COLLUSION AFFIDAVIT
x
x
x
x

ITEMS TO BE SUBMITTED WITH PROPOSAL ON BID OPENING DATE x

PROPOSAL

BIDDER'S BOND
xSIGNED ADDENDUM NO. 1
x

BIDDER'S STATEMENT OF SUBCONTRACTORS - PART II
x
x

EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
x
xBIDDER'S STATEMENT OF FINANCIAL RESPONSIBILITY, TECHNICAL ABILITY, AND EXPERIENCE

CONTRACTOR DATA UNIVERSAL NUMBERING SYSTEM (D-U-N-S) NUMBER

NON-COLLUSION AFFIDAVIT OF SUBCONTRACTOR
EXIBIT-15G LOCAL AGENCY BIDDER DBE COMMITMENT (CONSTRUCTION CONTRACTS) x
ITEMS TO BE SUBMITTED BY LOW BIDDER AND SECOND LOWEST BIDDDER WITHIN 5 WORKING DAYS AFTER BID OPENING DATE PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE x

BUY AMERICA CERTIFICATION
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
SIGNED ADDENDUM NO. 1 x x x x x