Cities Index.
Attachment 3 Alisal Safe Routes to School Project Categorical Exemption

Salinas City Council
March 21, 2023

Document
Attachment 3 Alisal Safe Routes to School Project Categorical Exemption
Meeting
March 21, 2023
Body
Salinas City Council
Original file
2.5 MB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

Notice of Exemption
To: • Office of Planning and Research From: City of Salinas 1400 Tenth Street Community Development Department
Sacramento, CA 95814 65 West Alisal Street
Salinas, CA 93901
X County Clerk, County of Monterey
Project Title: Alisal Safe Routes to School Project (Project No. 8180) Project Location - Specific: Williams Road between Del Monte Avenue and Freedom Parkway Project Location: City of Salinas Project Location:_ County of Monterey Description of Nature, Purpose, and Beneficiaries of Project: The Alisal Safe Routes to School Project, includes the installation of pedestrian hybrid beacon (PHB), ADA-compliant curb ramps, pedestrian refugee island, pavement markings and signing, fiberoptic communications, street trees, and all incidental and appurtenant improvements and restorations specified on the attached plans.

Name of Public Agency Approving Project: City of Salinas - Public Works Department Name of Person or Agency Carrying Out Project: Adriana Robles, City Engineer Exempt Status: (Check One)
• Ministerial (Sec.21080(b)(1); 15268);
Declared Emergency (Sec. 21080(b)(3); 15269(a));
Emergency Project (Sec. 21080(b)(2)(4); 15269(b)(c)).

Categorical Exemption (Sec. 15301(c), Class 1) Existing Facilities.

Reasons why project is exempt: This project qualifies as an exemption because it involves negligible or no expansion of an existing use as identified in Categorical Exemption Class 1; Section 15301(c).

Lead Agency Contact Person: Adriana Robles, P.E. Telephone Number: - (831) 758-7241

COURTNEY GROSSMAN
Planning Manager
By: Date: March 2, 2023
Thomas Wiles
Senior Planner
Attachment: Plans for Alisal Safe Routes to School Project Date received for filing at OPR: N/A
I:ComDevlPlanning Share SpacelEnviromental ReviewsIER 2023-001\ER 2023-001.doc

ALISAL SAFE ROUTES TO SCHOOL PROJECT

SHEET INDEX WILLIAMS RD BETWEEN DEL MONTE AVE AND FREEDOM PKWY

COVER SMEET
PROJECT NO. 8180

SCOMONT CONTRCE PLAN

INTERCONNECT PLAN AND ELECTROCAL SERVICE PLAN
10 SYSTEM CLAÇRAN

ABBREVIATIONS

AMPERE LEFT

ACCRECATE FUSE LUM LUMTIARE

AVENUE HUNTING
DECIN CURSE orsT

BEGN CURB RETURN POLE (CIRCUIT BRZAKER)

ORIGILAL, CROUND

BACK OF WALK PONT OF INTERSECTION

BACK OF CURB PROPERTY LNT

BLVD BOULEVARD PORTLAND OMENT CONCRETE

WAR & CUTTER HOTO ELECIRIS UNT

CENTER LINE DORSTRAY PUSH BUTTON SALINAS

CLASS MINT CE TANGINAN

PROJECT AREA-
were were col
DINT CS VERTICAL INTERSGOTION |

CONTROL PONT

CEMENT TREATED BASE MEHT AP MAY

DECCMPOSED GRANITE ROLLER COMPACTED CONORETE
CAST RADIAL PONT MAZA APARIUENTS CAVEKAY 11

END CURVE ACTANINC

TARU ARAN MANHAS VICINITY MAP

FOCE OF PALEMENT SHALL FORN-FACTOR PLUCGABLE

END VERTICAL CURVE ELEVATION STREET UCHT

LOCATION MAP

SICHAL HAST ARN

EX, EXIST DESTINC INCE MOOL ABER OPTIC

TASHED GRADE

UTILITY REPRESENTATIVES

UTUTY COMPANY CONTACT PHONE/CUAL
FLUE cern CANTARY SHE CAN NIT
PROJECT DESCRIPTION ALAN TONG 408-725-2219
MBER OPTC STATON CECTRICY PCAt DAVO HOXIANA 831-882-7649

GRADE BREAK STANDARD
SIDEWALK VATER CALMATER PATRICK CARCIA 031-757-334
ICH DOINT TOP OF CURES SEWER/DRAINACE CITY OF SALINAS GARY CADRID. 851-759-7105 ONT POLE RAFTIC INDEX T.V. CABLE CONCAST MARK CELIN
AT FINA r

LOW PONT VERTICAL CURVE

NATER METER

WATER VALVE
SHEET TILE CV-O1
DATE
CITY OF SALINAS DATE . Ban, Po ALISAL SAFE ROUTES TO SCHOOL PROJECT 8180

PUBLIC WORKS DEPARTMENT DRAY NOMAN, DE COVER SHEET

SURVEYOR NOTES

1. NEAR DATE NINA CONE VERTICAL DATUM OF 1989 (SCE DELOW) TAMON NAUT AND DIVARON • 614%

TABLE ON THE CENTRE COORDINATES ARE GIVEN IN THE CONTROL POINT F0026
CD

WILLIAMS RD

CONTROL POINT TABLE
POINT • NORTHING PASTING STATION NESET ELEVATION DESCRIPTION LINE TABLE 2141918.4875798700.904 11+31.35 21.40' LT 107.35 UNE DESCRPTION LENCTH BEARNG 2141840.779 5743767.015 11+35.16 76.29' RT 107.97 "LAMS" 400.00 NS530'08.20°C 2142004.192| 5798836.S35 20.30 L7
2141984.909 5738957.614 13+73.06 33.56* RT 102.70
*STATION/OFFSET BASED ON "MILLIAMS" ALONVENT
CITY OF SALINAS * ALISAL SAFE ROUTES TO SCHOOL PROJECT
PUBLIC WORKS DEPARTMENT CITY ENONEERS, RIE LAND SURVETOR SURVEY CONTROL xxx WILLIAMS RD •DEPRESSED
114977 HAS JELL K2H8 MIS 1997 BI
0 107.93
118052 LANS 193A8P
1109247 2 10:25 WAS 2201L
J+2205 WMANS 2257L7-
1100052 MALAME 3NCаC
1119267 MANS SI
119402 LANS A 1O. 1
HANS 2010 8T
-BE MANS 218к1L
U=0201 MANS ZAGS
112283 AS 3 1015-

DEPRESSO D

WILLIAMS RD
DETAIL 1 DETAIL 2

WILLIAMS RD

CONSTRUCTION NOTES
11=0734 MILLAME 32-01 8T 121837 HAMS 620E RL. O GOD FEAST, CURE AND CUTTER, TORE C PER OTT OF SALIAS MILLANS RO 2] CONSTRUCT CURD: TYPE B PER CITY OF SALIAS STO PUN1.

E] CONSTRUCT SOCKEL: PER CITY OF SAUNAS STO PLAN 2.

A CONSTRUCT CUATI RANT. CASE A PER CALTRANS STO ASSU
ing Cac E) CONSTRUCT CURE RAUD: CASE 8 PER CALTRANS STO ARTU • DETECAL GUMENT TO BE REMOVED. SEE SHEET 7 FOR
11+8221 MAN LOVE ST CHE. EI SONAL COUPMONT. SEE SHECT 7 FOR DETALS 5 RETANING CURS PER CALTRANS STO ABBA.
38923 ane shar en •I DESTINO RAISEO MEGAN TO ROVAN.

KEYMAP
1-30
NOTES
1 EAT IN BACK OF WALK SHALL DE ASSUMED AS RIGHT OF LEGEND ME fAST CONCEITE HOTTEN
1145230 MAN 7645 91 HUA PAVOMENT (MATON DOSTAG OPTH)

MATAME MARNING CURRACE (E)

4. SEC SS-01 FOR SIGNING AND STOPING OCTAILS.

SANCUT

5. ETHERWISE NO CARED N MELAMS" LINE UNLESS
47272 Учиним 26.32° 81 EXISTING GRADE
11+92.32 HANS 23-4715-

PROPOSED CRADE
11+92.30 "МИЛАН" 2000 B-
DETAIL 3
CITY OF SALINAS ALISAL SAFE ROUTES TO SCHOOL PROJECT 8180

ADRIANA ROLES, PIC CONSTRUCTION DETAILS

PUBLIC WORKS DEPARTMENT

DEL MONTE AVE MONTE BELLA BLVD

VALLIAMS RD
GENERAL SEDIMENT CONTROL NOTES NDES REQUIREMENTS LEGEND:

ELET PROTE TOY MAY ORANGE PREN ON LIT OF CONSER MINO

2. EVERYING SHORN (C) IS TO RENAN.

CO TRION SITE BUP MALAL NU-SEA ON SITE PER CALTRANS
©) SHOP MORK AREA SICENALKS, AND STREETS ON A DALY BASIS. → SOME TO ME COMPLETON OF MORE AND EROSON CONTROL REFER TO THE FOLLOWING STORM WATER GUPS FOR USE AT PROUECT SITE * ONE CALTRANS STORMATER HANEROCK DETALS FOR STORUMATOR * COME OF WORK MATRICE HARD TRON PROCTOR THE PROP TO PACE TO STERN ENDIE LAD YELLOWN TORN ENORETED DATE
CITY OF SALINAS Latel ALISAL SAFE ROUTES TO SCHOOL PROJECT 6100 AORCASA ROBLES, PE HARRONAN, DE SEDIMENT CONTROL PLAN 00xx PUBC WORKS DEPARTMENT my GuaNaco
SN24-2(CA)LEFTO

DESTING DROWN DESTING BECA
4 3425 U5
Д*u
e5 ur D - 37 F
75 v 0] 35 u [Z)
-
2410 u(Д
1 s B
+ 5*24- 2(CA)(LEFT)

SIGNING NOTES STRIPING NOTES SIGN CHART
A PETAL NEW SO ON NEW POST. SIGN NOTED ON I INSTALL 12ª WHITE THERUOPLASTIC LNC.

ROVOVE DESTING SIGNS) FROW DESTING UGHT POLE.
2 LORE OF CURSONS ARE MEASURED FROM THE CENTER OF THE STRIPE OR STOP * ALL DOSTNO SIGNS TO ROLAN UNLESS OTHERNSE NOTIO. • DETALICO RE-1 BLANK-CUT SIGN. SEE SHEET 7 FOR NO BARKING

B PET A DEE N ASROM (L) POR CALTRANS STANDARD HERE ON
• PEN SON ON TRAITO SCHAL POLE SON NOTED ON BIKE
5 REMOVE EXISTING PEDESTRAN BARRICADE. • ROMOVE STRPING, LICTH SHOW ON PLANS. RED • MATIC PROR TO RSFALLATON OF PROPOSED STRONG AS SHONA E REVOVE PAVOVONT MARKING. LANE LEGEND

NEW ROADSDE SION
27-s
EXISTING ROADSIDE SIGN ENTAL CO. TENCE SEND TO GET RATRANS STANDARD 045 085 7 8 35 04 48 37 384
& FUTURE CONDITION OF STRIPING SHORN ON PLANS.

SHEET TILE: S6-01

SHOVED FOR CORTE
CITY OF SALINAS Balal AND ALISAL SAFE ROUTES TO SCHOOL PROJECT 8180 CITY ENINEERS, PE SIGNING AND STRIPING PLAN xxx
TO MoveSn
- 595

WILLIAMS RD

HAS TEAR ASS

WILLEMS RO
NOTES
E. SEE SAEET TRO FOR NOTES.

SOLAR PANEL

SIGNING NOTES
© REDBACK ASURY PER BETA SHES SHEEHT, AND MARISH AND STALL RAONE 584- 1(CA) 25MPH

RADAR FEEBACK SIGN
811 RADAR FEEDBACK ASSEMBLY DETAIL
NTS

WILLIAMS RD
NO. 2104 ALISAL SAFE ROUTES TO SCHOOL PROJECT 8180

CITY OF SALINAS
TRON RETS PIC ANDREW FASTERING, PE, T.E SIGNING AND STRIPING PLAN xxxx

DUNLIC WORKS DEPARTMENT

TRAFFIC SIGNAL SHEET NOTES
02345
* CONTRE ON DE OTAE SOIA PECE UNIT (PEU) FOR STREET LOHTS. PEU SHAL EC

2. AL NEW PURA BOXES SHAL DE NO E UAIES OTE ONE SACHA, ALL PULL BOX COVERS SHALL OE

TOX OF WALS WILLIAMS RD

10. NITEATETRA INDICA, PER BUS ALTRANE ADA D PAN EN PED SICHAL FACC MOCULE WITH GAGET '. NS RE AS CETE AS STACARO PLAN ESE OCTAE SAL PER MAUFACTUIOYS RCCGUNINDATON

O TRASNA CENAL DNE VACT ARU ANA MICAIE HAPAWARE CHALE AE PAINTEA PER COROSCAMONE

13. ALL NEW CONDUIT SWEEPS TO PULL BOVES SHALL BE 45 DEGREE, 36ª RADIUS MINNUM

TRAFFIC SIGNAL NOTES (INS SHEET ONLY)
NEMA ARINE ETOH CONTUARON OR"
FACE OF CURB - 2 NEW CON TROLER CAS NETED WS2 CONTROLLER, FUENSHED NETH LATEST SEPAC SOFTWARE, IN DETAIL A:

CABINET CEE SINGE DETAIL
GABILAN APARTMENTS DRIVEWAY NCHING, AND TA BARL COPER CONDUCTOR (N GINAL). 2RS CONDUCTORS (GABLAN E FOR DETAL B INSTALL PECESTRIAN HYBRO BEACON SICNAL ANO TV-1-T MOLINTING MAROMARE 3 KN APPROX. 2° RADIUS •I FER DETAL B INSTALL PEOSTRAN MTBEO BEACON SCHAL AND SV-1-T MOLNTING HAROWARE

PROPOSED ACTIVATION DIAGRAM SIGN CHART E FUSUR AN ENTAL DN CENDUCTORS (TO PEU AND TEB BARE COPPER CONDUCTOR

STEADY DEMAND SEQUENCE EO CHANDER TLDIDLE TANCROUC), SEE OETAL E GN SREF A CADSE, TRACER WRE, AND DHRCE

SUP ATTER CROSSWALK
11 FURIDI AND INSTALL PEDESTRIAN HYBRO BEACON SCNAL PER DETAIL B, THS SHCET.

AT REST T*CSACE CN P ACE ,% CROSSNC CLEARANCE STOP FARIS AND INSTALL RS-1 ACTIVATED BLANK OUT SOI (36" X 36) AND MOUNTNG UTROE 3-2
ON RED FURNISH AND INSTALL N4B PULL BOX. SEE SHEET 11 FOR DETAIL

RUICH IND INSTAL BIR-A CN CNAL MAST ARUI

HAST ARU OR PIPE TENON
ML DAK (BAKE PATEN DORNE REAO OE STE MA ARA OE COLL 25" SLACK OF FIBER CABLE IN PULLBOX.

R10-23 DECONE SEE CAFENOVED STREETUOHT, RECONSOURE COANECTION TO MANTAN REVOVE AND SALVAGE STRECTUCHT AND FOUNDATION. RDVOVE DESTINC SICNS.

ADORCK 3-5
FURNISH AND INSTALL ONC (1) 3ª SCHEDULE B0 HOPE CONDUIT.

DETAIL B: FURNISH AND INSTALL 384 CONDUCTORS (CONTROLLER CABINENT SERVICE).

PEDESTRIAN HYBRID EO) FURUDH AND INSTALL NO. EE PULL BOX SCE SHICET 11 FOR CETAL.

BEACON SIGNAL DETAIL GRAPNO SCALE IN PEETZO

NOT TO SCALE
SHEET TILE: T6-01

ALISAL SAFE ROUTES TO SCHOOL PROJECT

CITY OF SALINAS

PUBLIC WORKS DEPARTMENT CIV ENGINEER S, RE TRAFFIC SIGNAL PLAN CONDUCTOR AND CONDUIT SCHEDULE POLE AND EQUIPMENT SCHEDULE (2015 CALTRANS STANDARD) CONDUCTOR IN AAAAA STANDARD VEH SO MTG PED. SIG

LUM LOCATION REMARKS
CONDUTTSR IS SI DIST 1121 ARON

RANKOKTSIN
11 ALL TOLE AND SONU, EQLIPMENT & NEW

DIMENSIONS MEASURED FROM THE END DE THE MAST ARMS
FIRE AOTE ALL TRAFFIC SIONAL JACK PLATES SHALL BE SITTED WITH YELLOW REFLECTIVE TAPE. SEE SPECIFICATIONS ROR FURTHER DETAIL TOTA ONDA STORE = = = TRAFFIC SIGNAL POLES SHALL BE FITTED WITH DECORATIVE CLAMSHELL BASE. SEE SPECIRICATIONS FOR FURTHER DETAIL.

ARCINT HI%

CONDIT RUN

ALL CONDITS & CONDUCTORS AFE NEW
B.GR.

SYMBOL AND ABBRE MATON LEGEND POLE LOCATION DETAIL

NOT YO SCALE
. _- EXTERNAL CONDUCTOR

CO CRCLITIREAER CONDUCTOR CROUS

A AMPERE - BEFORE

CONTACTOR CON

M METEREO CONTACTOR, CONTACT NO

AMANNERED TERMINAL BLOGKS
DE SOLONTUTRA - н12CA RE11S NO 10
* CONTACTOR BONTNCTING

NO NORNALLYOPEN

NO NORMALLY CLOSEO - GROUND
630A2 CABILAN SICHAL (NEM)

EXISTING ELECTRICAL SERVICE WIRING DIAGRAM - MONTE BELLA BLVO AT WILLIAMS RD CITY OF SALINAS E* APP. ALISAL SAFE ROUTES TO SCHOOL PROJECT PUBLIC WORKS DEPARTMENT CITY A NEES, PE TRAFFIC SIGNAL PLAN xxx

DEL MONIE AVE
4 12

WILLIAMS RD
ShaNLandr

INTERCONNECT AND ELECTRICAL SERVICE GENERAL NOTES
-F12 ANS TRACER MRE (ORANGE) 3. ALL NEW CONDUIT SMCEPS TO PULL DOXES SHALL BE 45 DECREE, 36" RADUS MNNUU.

NEW PEER COIC CONDU (SEE PER PIAN
INTERCONNECT AND ELECTRICAL SERVICE NOTES.

ERNESY AND INSTALL ONE (1) 3 SOMEOLLE 8D HOPE CONYUT.

ANNE BE BETA CE I DES BREED SUO BRAVO CARE TRACE MERE, AND TRACE CLANDER REXRCE E FURNISH AND INSTALL 12-STRAND SWED CABLE, 1NS TRACER WIRE, AND CONCUIT INNERDUCT IN DISTNE CONDUIT, I COL 25 SLACK IN PULL BOX
FRER OPTIC CABLE! El CARICK AND INSTALL 12-PORT COMIC FRER TERNINATON PANEL AND TERINATE ALL 12 STRANOS FRCH BRANCH -HULE TAPE PULL ROPE (TYP.) E] FURNISH AND INSTALL NAS PULL DOX. SUE SHEET 11 FOR DETAL AT TADE/REE ROPE (P) EUP MOLES AND PATCH ADLE IT SHUT I FOR SYSTEM DAG UN TOILED CABINET. FURNISH AND ASTALL LE FONGY AS NSTALL CALTRANS NO. 5 PIEL NOX.

DI COPPER CONDUCTOR GROUNDNUCTORS (GABIAN SINAL), 2S CONDUCTORS (GASSAY UCHINE), AND IN BARE DETAIL A: DETAIL. B: DETAIL C: TYPICAL FIBER CONDUIT

NOT TO SCALE
I ROPER CONDUCTOR CONG) I EASING COME CA), 2AS CONBUCTORS (GAILAN LICHINE), AND TAS DARE [LE] FURNISH AND INSTALL SC PULL NOX. SEC SHECT 11 FOR OCTAK (CO) INSTALL, CONDUIT INTO DESTING PULL DOX.

CRASHE SONE IN LITOO
MEET TILE: 12-01
CITY OF SALINAS balal ALISAL SAFE ROUTES TO SCHOOL PROJECT URENDAN PITMAN, P.E. INTERCONNECT AND ELECTRICAL SERVICE PLAN

PUBUG WORKS DEPARTMENT KIMLEY HORN
[CONTROLLER CABNET E --- CONTROLLER CABINET (N) [ CONTROLLER CABINETE-

WILLIAMS RD AT DEL MONTE AVE) WILLIAMS RD AT GABILAN PLAZA (WILLIAMS RD AT MONTE BELLA BLVD)

APARTMENTS DRIVEWAY)

CONTROLLER CONTROLLER CONTROLLER
- . -

ACTELIS ACTELIS
MLS114D LA SHAN
MLSII4D

SWITCH SWITCH
-FIBER OPTIC FIBER OPTIC FIBER OPTIC

TERMINATION PANEL (N) TERMINATION PANEL (N) TERMINATION PANEL (N) (N)
. . J L....
- 12 STRAND SMFO BRANCI CABLE -12 STRAND SMFO BRANCH CABLE.

LEGEND

NS - NEW (CONTRACTOR FURNISMED)
_ ITERCOWNECT CABLE
._ REEAPATCH CARLE
- CATOA CABLE
SETE COO!
CITY OF SALINAS E* AI ALISAL SAFE ROUTES TO SCHOOL PROJECT 9180 CIY BNANEREB, PRE BRENDAN IITTMAN, PE.

PUBLIC WORKS DEPARTMENT SYSTEM DIAGRAM
NOTES (THIS SHEET ONLY).:.
ост пес-
2 EXER TO CUT ONES SHAL DE CUT BACK TO PROVEE STUD

1. SEE PLAN SHEETS FOR NUMBER AND SITE OF CONDUIT.

KOX 201
EGEND_ (DETAIL ONLY) : 22°t
• NO. EC PULL BOT LO.
2 CINDY UNION SOPT CONNIE ACCICCATE
• RIDI AND INSTALL CAPS OR DUCE PLUGS FOR ALL UNVID CONCUIT.| → SOME NTCACOARECT CHOLE COS AS RECURCO.

MICROSED PEGE CATO GRANDA DE TRUNION CONCUTE, E NEESCO ICE FUNG)

OLY HOLD
LEAD PULL BOX SMALL O0 COLDAIN MIN 28 UN OF SLACK CANE

BOO PARAN CUT INTANE SHALL BE ALENO TO DET TOP OF DEE PLE PLAN VIEW T LIC
DO RE A SALE PENNER PULL OX MESS 26" DEPTH → MARVENE TAPE (ICA SEN CONDUT RESTALDO IT TONGUE) -17°-

SECTION A-A SECTION B-B
DETAIL A: NO. 6E PULL BOX
COLAY NOOK 201 (Te)
(02) TrP.
at NOTE

PLAN VIEW LAN VIEW WITHOUT LID

ANY CANDLITE SHOWM
и NOT " LEGEND (DETAIL B ONLY:
• NECK OPTE CABLE SAUCE GLOSURE (F PAGNOCO)
© SIT LOOCAN TECE OPTE PULL BOR LO.

PEON OPIC CAREC (SCE MOTT 14)
O RADA HOOK ASSOMILY. (SCE NOTE 5)
• PEE MACCA VIC PEN CALTRANS STANDARS SACGNCATIENS TOR CONOUCTON

WARNING TASE (TOR NOW CONDUIT NETALLIO DY TACUO-NG)

SECTION C-C SECTION D-R
DETAIL B: N48 FIBER OPTIC PULL BOX

NOT TO OCALE

CITY OF SALINAS SATC AN ALISAL SAFE ROUTES TO SCHOOL PROJECT ADMANA RONES, PE. TEN THAN DE xxxx

PUBLIC WORKS DEPARTMENT CITY ENTER PULL BOX DETAIL
2 PRIVATE

DRIVEWAY
000002
8-

CLEAR KEEP
3 г

DEL MONTHLAYE

PRIVATE

DRIVEWAY

WILAMS RO
J0000 0000U
BUOBE

PRIVATE

DRIVEWAY

NOTES SIGNING NOTES MILAMS RD SENE
SEE SACET TRO FOR NOTES I GEAR AND CRUB DISTING TREE WELL CANO AND RENOSE STINO. * AL RATE VEL DE RECT TO A TA BE DIENE BEEN PLANT CAN BE ARCHIET IN NOTING E VESTA PRE UPER IN SIS PIA CALERY PEAR

I CONTSACTOR PULL MELO OR LOAN NO CRON TEA A LE CHANCES ACQURED SHAL BE COMPLETED AF HE CONTRACTOR'S EXPENSE AND SHALL BE COORTINATED VITH THE ENCINEER. • STAIRS ERNIE POOR SUL CODEGATO AT BE ANNE E CORECTED AND CHARLETO A DE LEGEND • DISING STACET TALE TO OC PROTECTED IN PACE 6 TO E

O NEU STACET TASC
CITY OF SALINAS ALISAL SAFE ROUTES TO SCHOOL PROJECT 8:80 G. A004CUE7...

LANDSCAPING PLAN xxx

PUBLC WORKS DEPARTMENT

← All documents from this meeting