129

ORGANIC MATERIALS DIRECT SERVICE PROVIDER AGREEMENT

BETWEEN

THE MEMBER AGENCIES OF THE SALINAS VALLEY SOLID WASTE

AUTHORITY, CITY OF SALINAS,

AND ATLAS ORGANICS

THIS AGREEMENT FOR SERVICES (herein “Agreement”) is made and entered into this 4th day of April, 2023 (“Effective Date”) by and between the Salinas Valley Solid Waste Authority Member Agencies, including the cities of Gonzales, Greenfield, King City, Soledad and Salinas, and the County of Monterey (“Member Agencies”) and Atlas Organics CU11, LLC (Processor). The Processor and Member Agencies may be collectively referred to as the “Parties” and individually as a “Party.” NOW, THEREFORE, the parties hereto agree as follows:

1. Purpose of Agreement: This Agreement sets forth the terms and conditions pursuant to which the Parties will cooperate to incentivize residents and solid waste rate payers of the Member Agencies (Public Purchasers) to acquire recovered organic waste product in the form of finished compost (“Compost”) or mulch (“Mulch”) from Processor on behalf of the Member Agencies to assist them in complying with the requirements of the California Code of Regulations (CCR), title 14, sections 18993.1 through 18993.4 (“SB 1383 Regulations”).

2. Term: The term of this Agreement shall commence on the Effective Date and remain in effect until December 31, 2023. The term of this Agreement may be extended by mutual agreement of the parties for three (3) optional, one (1) year extensions.

3. Services: Processor shall provide to Public Purchasers a discount which is equal to current Member Agencies Product Pricing (per cubic yard) for the purchase of Compost and/or Mulch, as applicable, as set forth in Exhibit A. Processor shall provide the Member Agencies, or their designated representative, monthly reports evidencing procurement of and payment for the Compost or Mulch for the Public Purchaser for annual reporting purposes. The reports shall include date of purchase, the name of each individual, entity, operation, or facility from whom the Compost was procured, and the amount in tons or cubic yards purchased (assuming one ton equals approximately

1.4 cubic yards or the equivalent conversion based on the Bill of Lading at the time of purchase, whichever is less), and type of Compost and/or Mulch purchased. Compost or Mulch purchased as a part of this agreement shall not exceed combined annual jurisdiction procurement targets for the respective Member Agencies, as set forth by

Page 2 of 10 ends

130

CalRecycle and listed in Exhibit B.

4. Payment: Processor will submit monthly invoices to the Member Agencies for reimbursement at the specified per cubic yard rate based on the current pricing listed in Exhibit A. All invoices shall be payable net forty-five (45) days of receipt.

5. Warranties: Processor warrants and covenants that all Compost or Mulch at the time of delivery conforms with the specifications in this Agreement, SB 1383 Regulations, particularly 14 CCR §§ 18993.1-18993.4, and complies with all federal, state, and local laws, regulations, and ordinances applicable to the manufacture, production and sale of Compost or Mulch.

6. Indemnity: Each Party (the “Indemnifying Party”) agrees to indemnify and hold the other party, including the parties’ parents, affiliates, and subsidiaries and each of their officers, employees, and agents (collectively, the “Indemnified Party”), harmless from and against all loss or damage, including reasonable attorneys’ fees, costs a nd expenses incurred by the Indemnified Party as a result of any claims related to or arising out of the Indemnifying Party’s performance of its duties hereunder, unless such loss or damage shall arise from the negligence or the intentional acts of the Indemnified Party. In the foregoing sentence, the words “loss or damage” include, but are not limited to, loss or damage arising directly or indirectly from any actions or omissions of any employee or authorized representative of either party.

7. Limitation of Liability. Notwithstanding anything to the contrary, EXCEPT IN the CASE OF FRAUD, under no circumstances shall EITHER PARTY be liable to THE OTHER PARTY, ITS PARENTS, AFFILIATES AND SUBSIDIARIES and EACH OF THEIR OFFICERS, MANAGERS, EMPLOYEES , CONTRACTORS, OR AGENTS for any LOSS OF

PROFITS, OR ANY SPECIAL, CONSEQUENTIAL OR INCIDENTAL DAMAGES, HOWEVER

CAUSED, KNOWN OR UNKNOWN, ANITICIPATED OR UNANTICIPATED, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE. THE PARTIES ACKNOWLEDGE

THAT THESE LIMITATIONS ON POTENTIAL DAMAGES WERE AN ESSENTIAL ELEMENT IN SETTING CONSIDERATION UNDER THIS AGREEMENT.

8. Governing Law, Venue: This Agreement shall be deemed to have been made in the County of Monterey, California. This Agreement shall be governed by and construed in accordance with the laws of the State of California. The Parties agree that any action or proceeding to enforce or relating to this Agreement shall be brought exclusively in the federal or state courts located in Monterey County, California, and the Parties hereto consent to the exercise of personal jurisdiction over them by any such courts for purposes of any such action or proceeding.

9. Independent Purchaser: A Public Purchaser shall act as an independent Purchaser in the performance of this A greement and in no respect shall a Public Purchaser be considered an agent or employee of the Member Agencies. No provisions of this Agreement shall be intended to create a partnership or joint venture between a

Page 3 of 10 ends

130

Public Purchaser, Processor, or the Member Agencies and no Party shall have the power to bind or obligate the other Parties, except as expressly set forth in this Agreement.

10. Entire Agreement: This Agreement contains the entire agreement between the Parties with respect to the subject matter of this Agreement and any agreement or representation with respect to the same or the obligations of any other Party with respect to the same which is not expressly provided in this Agreement or in a written document which is signed by the Party to be charged, shall be null and void.

IN WITNESS WHEREOF, the Parties have hereunto set their hands on the first day date above written.

Member Agency:

By:

City of Gonzales

Date:

Processor:

Atlas Organics CU11, LLC

By:

Approved as to Form

By:

Date:

Date:

Page 4 of 10 ends

130

Member Agency:

By:

City of King

Date:

Approved as to Form

By:

Date:

Processor:

Atlas Organics CU11, LLC

By:

Date:

Page 5 of 10 ends

5 Member Agency:

By:

City of Greenfield

Date:

Approved as to Form

By:

Date:

Processor:

Atlas Organics CU11, LLC

By:

Date:

Page 6 of 10 ends

6 Member Agency:

By:

City of Salinas

Date:

Approved as to Form

By:

Date:

Processor:

Atlas Organics CU11, LLC

By:

Date:

Page 7 of 10 ends

7 Member Agency:

By:

City of Soledad

Date:

Approved as to Form

By:

Date:

Processor:

Atlas Organics CU11, LLC

By:

Date:

Page 8 of 10 ends

136

Member Agency:

By:

County of Monterey

Date:

Approved as to Form

By:

Date:

Processor:

Atlas Organics CU11, LLC

By:

Date:

Page 9 of 10 ends

138

Exhibit A

Member Agencies Product Pricing
Mulch: $8.00 per cubic yard
Compost: $12.50 per cubic yard

Page 10 of 10 ends

138

Exhibit B

Member Agencies SB 1383 Procurement Targets

SVR Member
Agency

Population*

Procurement Targets*
(Tons)
Total Organic
Waste

Mulch

Compost
Salinas 160,206 12,816 12,816 7,433
Soledad 24,454 1,956 1,956 1,134
King City 14,977 1,198 1,198 695
Gonzales 8,490 679 679 394
Greenfield 18,402 1,472 1,472 854
Unincorp County^ 34,158 2,733 2,733 1,585
TOTALS: 20,854 12,095

1 ton of organic waste = 0.58 ton of compost
1 ton of organic waste = 1 ton of mulch
Conversion Factors:

City of Salinas
Legislation Text
200 Lincoln Ave., Salinas,
CA 93901
www.cityofsalinas.org
File #: ID#23-222, Version: 1
Award of Contract for the Hebbron Family Center Demolition and Site Improvements Approve a Resolution awarding a contract for the Hebbron Family Center demolition and site improvements to Randazzo Enterprises, Inc for the sum of $316,016.00.

City of Salinas Printed on 3/29/2023Page 1 of 1
powered by Legistar™

Page | 1

CITY OF SALINAS

COUNCIL STAFF REPORT

DATE: APRIL 4, 2023
DEPARTMENT: PUBLIC WORKS (PW)

LIBRARY AND COMMUNITY SERVICES (LCS)
FROM: DAVID JACOBS, PW DIRECTOR

KRISTAN LUNDQUIST, LCS DIRECTOR
TITLE: AWARD A CONTRACT FOR THE HEBBRON FAMILY CENTER

DEMOLITION AND SITE IMPROVEMENTS

RECOMMENDED MOTION:

A motion to approve a resolution awarding a contract for the Hebbron Family Center demolition and site improvements to Randazzo Enterprises, Inc for the sum of $316,016.00

RECOMMENDATION:

It is recommended that the City Council a pprove a resolution awarding a contract to Randazzo Enterprises, Inc for the Hebbron Family Center demolition for the sum of $316,016.00 EXECUTIVE SUMMARY:

On February 17, 2023, a Request for Proposals (“RFP”) for the Hebbron Family Center demolition and site improvements was published via PlanetBids, an online bidding tool. On March 1, 2023, a Bid walk for the project was conducted. On March 15 th Five (5) contractors submitted proposals for evaluation. An evaluation committee was formed to review the proposals for the demolition project. The selection Committee has selected Randazzo Enterprises, Inc. to be the contractor that met all the requirements an it the best responsive proposer of the RFP.

BACKGROUND:

In July of 2019, the Salinas City Council adopted the Parks, Recreation and Libraries Master Plan.

The Master Plan represents a community engagement effort that connected with thousands of residents and community leaders over eighteen (18) months. The plan assessed the state of our current park, recreation, and library facilities and engaged resident to prioritize the need for maintenance. The Hebbron Family Center is not only identified in the Master Plan to have “no architectural value” but scored and ran ked the highest in priorities due to its current structural condition as well as community feedback. In addition, the Alisal Vibrancy Plan (AVP) also Page | 2
adopted by the City Council in 2019, is an action-oriented, comprehensive strategy for the City of Salinas’ (City’s) East Salinas (Alisal) neighborhoods. Created with equity at its core, the AVP is a community-driven plan to alleviate and reverse decades of neglect and underinvestment in the 95% Hispanic/Latino Alisal neighborhoods of the City and to improve the quality of life for residents by building upon the social and cultural wealth of the Alisal. Rebuilding the Hebbron Family Center was identified by the community as a top priority in the AVP as a vital community resource that is in serious disrepair.

The Hebbron Family Center has served residents since the 1960 ’s. The Center was once a community church and then repurposed as a community center in the 1970s. The center has provided many critical programs and services for the community, including after-school recreation and homework assistance programs, a teen lounge, martial arts training, food bank distribution, citizenship classes, a pre-kinder program, and much more. Unfortunately, the Hebbron Community Center closed in 2020 due to the ongoing pandem ic and critical safety issues such as roof leaks, potential mold, and significant foundation problems.

Following the recommendations of the Master Plan, staff has worked diligently to secure funding sources to rebuild the Hebbron Family Center. In 2019 a nd 2020, LCS submitted a Prop 68 application to the Office of Grants and Local Services (OGALS) but was unsuccessful in securing funds for the renovation of the Hebron Family Center. In addition to seeking grant funding, the City submitted a direct request for funds from the State of California through Assemblymember Rivas’ office. The City was notified in September 2021 that the Hebbron Family Center Revitalization Project would receive $8.1 Million from the State.

In April 2022, the LCS and PW Departments made an inquiry to the CDD about the availability of HUD CDBG Entitlement Funds to support the project’s pre -development costs. CDD staff reviewed the request in consultation with HUD staff and have deemed the project as an eligible activity to receive CDBG Entitlement Funds as the project satisfies the National Objective of benefiting a Low Mod Area where 51% of the residents fall within the low- and moderate-income categories. The ability to allocate CDBG funds to support the Hebbron Family Center project will result from prior Council action following a required public hearing to consider the submission of two proposed Substantial Amendments to the City’s FY 20 -21 AAP and FY 21-22 AAP on May 24, 2022.

On May 24, 2022 a Professional Service Ag reement was entered into with Griffin Structures for Project Management services for the Hebbron Family Center. Along with Griffin, the City and community have been working on the development of a final design for this facility.

Page | 3
CEQA CONSIDERATION:

Categorical Exemption. The City of Salinas has determined that the project is exempt from the California Environmental Quality Act (CEQA) Guideline (Section 15300, Class 2) because it involves replacement and reconstruction of an existing structure.

No Significant Impact. The City of Salinas has determined that the project is of no significant impact under 24 CFR 58.32 – National Environmental Policy Act. N o factors were found to be significant on a stand-alone basis.

STRATEGIC PLAN INITIATIVE:

This item relates to the City Council’s Strategic Plan of Infrastructure and Environmental Sustainability as well as Youth and Seniors.

DEPARTMENTAL COORDINATION:

The Public Works Department , Library & Community Services and Community Development Departments worked together to develop the RFQ, rate and rank the statements of qualifications.

FISCAL AND SUSTAINABILITY IMPACT:

Sufficient funds for the demolition are available in the American Rescue Plan Act Fund (ARPA), CIP number 3911.55.9165.

Originally the ARPA funds were designated as a contingency fund in case the original $8.1 million grant fell short. As we progress through the design stage of the project it has become apparent that $8.1 million will not be sufficient. There is also a deadline on the ARPA funds of December 2024.

Therefore, the ARPA funds need to be used.

ATTACHMENTS:

Resolution
Draft Agreement for Services
Randazzo Enterprises, Inc proposal
1 RESOLUTION NO. (N.C.S.)

A RESOLUTION OF THE SALINAS CITY COUNCIL AWARDING THE HEBBRON

FAMILY CENTER DEMOLITION AND SITE IMPROVEMENTS CONTRACT TO RANDAZZO ENTERPRISES, INC.

WHEREAS, on February 17, 2023 the City issued a request for proposals (“RFP”) for The Hebbron Family Center Demolition and Site Improvements; and

WHEREAS, proposals were received through PlanetBids until 2:00pm on March 15 , 2023; and

WHEREAS, a total of five contractors submitted proposals for evaluation; and

WHEREAS, an evaluation committee, comprised of four, cross-departmental City staff members and one consultant, conducted a thorough evaluation and scoring of the proposals based on the criteria set forth in the RFP.

NOW, THEREFORE, BE IT RESOLVED that the Salinas City Council, pursuant to Salinas Municipal Code Section 12 -21, in reference to The Hebbron Family Center Demolition and Site Improvements contract, that all said proposals are rejected except the proposal from Randazzo Enterprises Inc., being the most qualified which is hereby accepted. The subject contract agreement is hereby awarded to Randazzo Enterprises Inc for the sum of $316,016.

PASSED AND APPROVED this 4th day of April 2023, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

APPROVED:

________________________
Kimbley Craig, Mayor

ATTEST:
2 _________________________
Patricia M. Barajas, City Clerk

AGREEMENT
(To be completed and submitted for project award)
THIS AGREEMENT, made and entered into this day of , 20 , by and between CITY OF SALINAS, a municipal corporation of the State of California, hereinafter called "City", and Randazzo Enterprises, Inc., hereinafter called "Contractor",

W I T N E S S E T H
FIRST: Contractor hereby covenants and agrees to furnish and provide all labor, materials, tools, appliances, equipment, plant and transportation, and all other things required or necessary to be furnished, provide or done, and build, erect, construct and complete the work at the time and in the manner provided, and in strict accordance with, the Plans and Specifications therefore, for SECOND: HEBBRON FAMILY CENTER DEMOLITION AND SITE IMPROVEMENTS PROJECT NO. 9336
adopted by the Council of the City of Salinas on , 20 , and identified by the signature of Contractor and the signature of the Mayor of the City of Salinas.

THIRD: It is expressly understood and agreed that this Contract consists of the following documents, all of which are incorporated into this agreement and made a part hereof as fully and completely as if set forth herein verbatim, to wit:
a. Notice Inviting Sealed Proposals;
b. Signed and executed Bid and Proposal of Contractor, and if any signed Addendum, a s accepted by City;
c. Bidder’s Statement of Financial Responsibility, Technical Ability and Experience; d. Bidder’s Statement of Subcontractors – Part I;
e. Bidder’s Statement of Subcontractors – Part II;
f. Insurance Certification;
g. Completely executed and signed all required Federal and City of Salinas forms; h. Instructions to Successful Bidder and General conditions; i. Bond of Faithful Performance;
j. Payment Bond (Labor and Materials Bond);
k. Certificate of Insurance;
l. The aforesaid Plans and Specifications;
m. Current California Building Standard Code;
n. Design Standards and Standard Specifications and Standard Plans, 2008 Edition, or as amended, or otherwise indicated in the specifications; and o. This Agreement.

FOURTH: That said Contractor agrees to receive and accept the following prices as full compensation for furnishing all materials and for doing all the work embraced and contemplated in this Agreement and as set forth in the Proposal adopted by the City of Salinas, a true copy thereof hereto attached; also, for all loss or damage arising out of the nature of said work or from the action of the elements or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the wor k until the acceptance thereof by the City of Salinas and for all risk connected with the work, and for well and faithfully completing the work, and the whole thereof, in the manner and according to the said Plans and Specifications and the provisions of t his agreement, and the requirements of the City Engineer under them, to wit: The prices as set forth in the Proposal of said Contractor for the work to be constructed and completed under this Agreement, which prices shall be considered as though repeated herein.

The Contractor and City hereby agree that the Contractor shall perform the work, and be paid the amount of bid items No.1 through 8 specified in the Proposal of the Contractor, for the as total price of three hundred sixteen thousand and sixteen dollars ($316,016).

The undersigned Contractor further agrees to so plan the work and to prosecute it with such diligence that said work, and all of it, shall be completed on or before the expiration of the time specified in the Proposal after execution of the Contract on behalf of the City of Salinas and the receipt from the City of Salinas of a notice to proceed with the work.

FIFTH: The City of Salinas hereby promise and agrees with said Contractor to employ, and does hereby employ, said Contractor to provide th e materials and to do the work according to the terms and conditions herein contained and referred to, for the price aforesaid, and hereby Contracts to pay the same at the time, in the manner and upon the conditions set forth in the Specifications and the said parties, for themselves, their heirs, executors, administrators, successors, and assigns, do hereby agree to the full performance of the covenants herein contained.

SIXTH: No interest in this agreement shall be transferred by the Contractor to any other part y, and any such transfer shall cause the annulment of this Contract, so far as the City of Salinas is concerned. All rights of action, however, for any breach of this Contract are reserved to City.

SEVENTH: The Contractor shall keep harmless and indemnify the City of Salinas, its officers and employees and agents, from all loss, damage, cost or expense that arises or is set up for infringement of patent rights of anyone for use by the City of Salinas, its officers, employees or agents, or articles supplied by the Contractor under this Contract of which he/she is not entitled to use or sell. Contractor agrees to, at his/her own cost and expense, defend in court the City, its officers, agents and employees, in any action which may be commenced or maintained against them or any of the, on account of any claimed infringement of patent rights, arising out of this agreement.

Contractor shall indemnify and save the City of Salinas and its officers, agents, and employees harmless against all claims for damages to person or property arising out of Contractor's execution of the work, or otherwise by the conduct of the Contractor or its employees, agents, Subcontractors, or others (including the active and passive negligence of the City, its officers, agents, and employees) in connection with the execution of the work covered by this Contract and any and all costs, expenses, attorney's fees and liability incurred by the City, its officers, agents, and employees) in connection with the execution of the work covered by this Contract and any and all costs, expenses, attorneys' fees and liability incurred by the City, its officers, agents, or employees in defending against such claims, whether the same proceed to judgment or not, except only those claims arising from the sole negligence or willful conduct of the City, its officers, agents, or employees. Further, Contractor at its own expense shall, upon written request by the City, defend any such suit or action brought against the City, its officers, agents, or employees.

Contractor shall reimburse the City of Salinas for all costs and expense (including but not limited to fees and charge of architects, engineers, attorneys, and other professional and court costs) incurred by the City in enforcing the provisions of this Section.

EIGHTH: The Contractor agrees to immediately repair and replace all defective material and workmanship discovered within 1 year after acceptance of final payment by Contractor and to indemnify said City of Salinas against all loss and damage occasioned by any such def ect, discovered within said 1 year, even though the damage or loss may not be ascertained until after the expiration thereof. Provided, however, that if such failure of the Contractor to perform should not, by reasonable diligence, be discoverable or discovered within said 1 year, then the obligation of the Contractor to repair and replace said defective material or workmanship shall continue until one year after the actual discovery thereof.

NINTH: The Contractor agrees at all times during the progress of the wor k to carry with insurance carriers approved by the City of Salinas full coverage workmen's compensation and public liability insurance in the form and to the extent called for in Section 7 -1.12 of both the Standard Specifications, State of California, May 2006, and the Design Standards and Standard Specifications, Public Works Department, City of Salinas, 2008 Edition. Certificates of Insurance must specify whether coverage is on a "claims occurrence" or "claims made" form. If the policy is "claims made", Contractor will be required to obtain a bond which must remain in effect until 12 months following work completions.

Contractor shall also advise the insurance carrier to inform the city of the unpaid limits of the policy. Such insurance policy shall co ntain an endorsement that the same shall not be canceled nor the amount of coverage be reduced until at least 30 days after receipt by the City of Salinas by certified or registered mail of a written notice of such cancellation or reduction in coverage.

It is acknowledged by the parties to this agreement that insurance coverage required to be provided by the Contractor or any other party in favor of the City/additional insured is intended to apply first on a primary and non-contributing basis in relation to any other insurance of self-insurance (primary or excess) available to the City and any employee of the City. The Contractor agrees to have its policies endorsed accordingly.

In addition, Contractor also accepts to provide commercial general liability ( CGL) endorsement form CG 20 10 11 85. An acceptable alternative would be the use of two ISO forms together: the CG 20 10 07 04 (“ongoing operations”) and the CG 20 37 10 01 (“completed operations”). The City may also accept any other comparable endorseme nt, which does not further limit coverage and which may be approved and accepted by the City’s Risk Management staff.

TENTH: Contractor agrees to comply with all applicable federal, state and municipal laws and regulations, including but not limited to California Labor Code Division 2, Part 7, and Chapter 1.

Apprenticeship utilization: The contractor agrees to comply with the Department of Apprenticeship Standards of the California Labor Code Section 1777.5, and the following:

Prior to commencing work on the awarded contract, the Contractor shall submit contract award information (form DAS 140) to all applicable apprenticeship program(s) that can supply apprentices to the site of the public work. A copy of this information shal l also be provided to the City of Salinas.

The ratio of work performed by apprentices to journeyman employed in a particular craft or trade on the public work shall be no less than one hour of apprentice work for every five hours of journeyman work.

At the end of each month of work on the contract, the Contractor and Subcontractors shall submit a record of utilization of apprentices for the previous months work.

Within 75 days after concluding work on the contract, each contractor and subcontractor shall submit to the City of Salinas and to the apprenticeship program a verified statement of the journeyman and apprentice hours performed on the contract.

IN WITNESS WHEREOF, City has caused this instrument to be executed and its corporate name and seal to be hereunto attached by its Mayor, pursuant to resolution theretofore duly adopted by the Council of the City of Salinas, and Contractor has caused this instrument to be executed, the day and year first hereinabove written.

CITY OF SALINAS, A Municipal Corporation
ATTEST: BY
Mayor
City Clerk

(Attach Notary Acknowledgment) Contractor (signature in blue ink) NOTE: Please refer to the “General Instructions to Selected Bidder” for specific signature requirements.

I hereby approved the form of the foregoing Contract this day of , 20 .

Attorney for the City of Salinas
Checked by the City Engineer on

City Engineer
ALL SIGNATURES SHALL BE NOTARIZED EXCEPT THOSE OF CITY OFFICIALS’

City of Salinas
Legislation Text
200 Lincoln Ave., Salinas,
CA 93901
www.cityofsalinas.org
File #: ID#23-226, Version: 1
a. Anticipated Litigation - California Government Code Section 54956.9(e)(3)), significant exposure to litigation one (1) potential case.
b. Existing Litigation - California Government Code Section 54956.9(d)(1)), conference with legal counsel regarding, Jeffrey Mackay v. City of Salinas, et al. (Northern District of California Case No. 5:19- cv-02257-LHK)
c. Existing Litigation - California Government Code Section 54956.9(a), conference with legal counsel regarding, Jesus Orozco vs. City of Salinas, Workers’ Compensation Appeals Board Case Numbers:

ADJ10228400, ADJ10228398, ADJ10228399.
d. Labor Negotiations - California Government Code Section 54957.6, with its designated labor representatives Steven S. Carrigan, City Manager; Jim Pia, Assistant City Manager; Christopher A.

Callihan, City Attorney; Katherine Hogan, Assistant City Attorney; Mark Roberts, Finance Director; Marina Horta-Gallegos, Human Resources Director; Sylvia Enriquez, Senior Human Resources Analyst; Che Johnson, Liebert Cassidy Whitmore, regarding labor relations with Service Employees International Union (SEIU), SEIU Supervisors, Salinas Municipal Employees Association/SEIU, Association of Management Personnel, Police Officers Association, Police Management Association, International Association of Firefighters, Fire Supervisors Association, Confidential Management Employees, Confidential Non- Management Employees, and Department Directors.
e. Pending Litigation - California Government Code Section 54956.9(d)(1), conference with legal counsel regarding, Santa Rita Union High School District, et al. v. City of Salinas et al., Monterey County Superior Court Case No. 20CV000242.
f. Pending Litigation - California Government Code Section 54956.9(d)(1), conference with legal counsel regarding, Alisal Union School District, et al. v. City of Salinas, et al., Monterey County Superior Court Case No. 20CV00340.
g. Performance Evaluation and Labor - California Government Code §54957 and §54957.6, public employee performance evaluation and labor relations with unrepresented employee (City Manager).

City of Salinas Printed on 3/29/2023Page 1 of 1