Attachment 1 Ranked SRTS projects.pdf

Salinas City Council
April 18, 2023

Document
Attachment 1 Ranked SRTS projects.pdf
Meeting
April 18, 2023
Body
Salinas City Council
Original file
1.1 MB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
1 Sherwood
Elementary
SE013 Consider protected pedestrian
phases at Alisal/Woods,
Alisal/Madeira, and Alisal/Hebbron.

Install High-Visibility crosswalks
and protected bike lanes as
outlined in Alisal Vibrancy Plan.

E Alisal St Kern St Skyway Blvd 30 15 20 15 20 100 $1,480,680 2 Dr. Martin Luther
King Jr.

Elementary
MLKA008 Short term: install class II bike lanes
between Laurel/Del Monte. Long
term: widen sidewalk to create
multi-use path between Laurel to
Garner. Install bike conflict
markings at Recreation Center
entrance/edit driveways. Install
raised median with pedestrian
refuge islands.

Sanborn Rd Del Monte Ave Laurel Dr 30 15 20 15 10 90 $1,799,520 2 El Sausal Middle ESM001 Install roadway reconfiguration and class IV bikeway per corridor plans.

Remove on-street parking in front
of school and shift bus drop-off
from Towt to Alisal.

E Alisal Work St Skyway Blvd 30 15 20 15 10 90 $1,236,340 2 Jesse G. Sanchez
Elementary
JGSE012 Short term: install class II bike lanes
between Laurel/Del Monte. Long
term: widen sidewalk to create
multi-use path between Laurel to
Garner. Install bike conflict
markings at Recreation Center
entrance/edit driveways
Sanborn Rd Del Monte Ave Laurel Dr 30 15 20 15 10 90 $1,799,520 5 Carr Lake
Community Day
CLCD005 Consolidate bike lanes to one side
of the road for a two-way cycle
track or multi-use path. Upgrade
bike lanes on Natividad between
Bernal and Boronda to Class IV
separated bikeways and install
protected intersection treatments
at Bernal to facilitate transition to
cycle track.

Sherwood Drive Bernal St Rossi St 21 15 15 15 20 86 $12,541,180 5 Mount Toro High MTH005 Consolidate bike lanes to one side of the road for a two-way cycle
track or multi-use path. Upgrade
bike lanes on Natividad between
Bernal and Boronda to Class IV
separated bikeways and install
protected intersection treatments
at Bernal to facilitate transition to
cycle track.

Sherwood Drive Bernal St Rossi St 21 15 15 15 20 86 $12,541,180 7 Creekside
Elementary
CE016 Upgrade Class II bike lane to Class
IV
Constitution Blvd Boronda Rd Independence 30 15 15 15 10 85 $5,458,680 7 Henry F.

Kammann
HFK006 Install Class IV separated bikeways
or Class I multi-use path
W Laurel Dr Davis Rd N Main St 30 15 15 15 10 85 $1,200,000 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
7 Los Padres
Elementary
LPE002 Install raised median for entire
length of John St with
landscaping/lighting. Consider
other opportunities for traffic
calming.

John St Salinas St E Alisal St 30 15 20 0 20 85 $3,879,220 7 Sherwood
Elementary
SE012 Install curb extensions and ramps
along John St
John St 30 15 20 0 20 85 $3,102,000
7 Virginia Rocca
Barton
Elementary
VRBE021 Upgrade existing bike lane to Class
IV separated bikeway
Constitution Blvd Freedom Parkway Manchester Cir 30 15 15 15 10 85 $3,885,840 12 Fremont
Elementary
FE014 Install traffic calming, sharrow
marking and bike boulevard
signage
Towt St Market St Laurel Dr 11 15 20 15 20 81 $550,800
13 Santa Rita
Elementary
SRE002 Consider bike boulevard with traffic
calming between Main St and Van
Buren Ave. Consider Street trees.

Consider sidewalk widening on
south side to install multi-use path
E Bolivar St Main St Van Buren Ave 14 15 15 15 20 79 $1,099,800 13 Virginia Rocca
Barton
Elementary
VRBE020 Install Traffic Calming (chicanes and
removal of parking at those
locations), sharrow markings and
bike route signage
Del Monte Ave Rider Ave Williams Rd 29 10 20 0 20 79 $1,815,600 15 El Sausal Middle ESM012 Install traffic calming and speed humps and create bike boulevard.

Install loading zone curb markings
and signage along the west side of
Towt St. for drop-off and pick-up.

Install formal pedestrian entrance
to campus from Towt St. Consider
shade trees, landscaping and wider
sidewalk.

Towt St E Alisal St Market St 8 15 20 15 20 78 $957,295 16 El Puente EP005 Consolidate bike lanes to one side
of the road for a two-way cycle
track or multi-use path. Upgrade
bike lanes on Natividad between
Bernal and Boronda to Class IV
separated bikeways and install
protected intersection treatments
at Bernal to facilitate transition to
cycle track.

Sherwood Drive Bernal St Rossi St 21 15 15 15 10 76 $12,541,180 16 El Sausal Middle ESM005 Resurface street. Install traffic calming and create bike boulevard
Eucalyptus Dr East Alisal St Market St 6 15 20 15 20 76 $2,021,925 16 Salinas High SH002 Install traffic calming such as
chicanes or mid-block medians and
install bike boulevard and street
trees
Clay St Main St Iverson St 11 10 20 15 20 76 $1,102,200 19 Washington
Middle
WM011 Install traffic calming and install
bike boulevard
Acacia St Main St Alisal St 25 15 0 15 20 75 $2,917,200 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
20 Bardin
Elementary
BE008 Install High-Visibility crosswalk
across side streets with curb
extensions and curb ramps per
Bardin SRTS project. Install marked
crosswalks across Bardin Road at
Toro Ave and Countryside Drive
Bardin Rd Alisal Rd Williams Rd 3 15 20 15 20 73 Project Funded 20 Salinas High SH012 Install Class IIB buffered bike lanes Lincoln Ave Alisal St Avenue A 8 10 20 15 20 73 $236,070 22 Alisal
Community
AC004 Additional School Zone Signage
Assembly A
Del Monte Ave Williams Rd Towt St 20 10 20 0 20 70 $3,400 22 Alisal
Community
AC010 Perform intersection sight distance
analysis and consider installation of
red curb at intersections.

Del Monte Ave Williams Rd Towt St 20 10 20 0 20 70 $700 22 Dr. Martin Luther
King Jr.

Elementary
MLKA009 Install traffic calming, sharrow
marking and bicycle boulevard
signage.

Garner Ave Sanborn Rd end of street (to
the north)
30 0 20 0 20 70 $938,400
22 Loma Vista
Elementary
LVE011 Install protected bike lanes Natividad Rd Boronda Rd Sherwood Dr 30 0 15 15 10 70 $2,313,000 22 Los Padres
Elementary
LPE008 Repave and widen alleyway path.

Repair and/or re-install fencing.

Install landscaping to shield path
from golf course. Consider opening
school gate to allow access to
campus. Install pedestrian scale
lighting
Alleyway behind
school
John Beverly 0 15 20 15 20 70 $183,800
22 Roosevelt
Elementary
RE003 Conduct feasibility study for bike
lanes or bike boulevard. Consider
expanding sidewalk adjacent to
Central Park to create multi-use
path
Central Ave Davis Rd Main St 30 15 0 15 10 70 $93,000
22 Salinas High SH003 Install Complete Streets
improvements such as raised
median. If Caltrans is unable to
construct improvements, consider
relinquishment of Main Street to
City of Salinas. Consider speed
feedback signs on either side of
school. Consider lane width
reduction to match downtown
section of Main Street.

Main St John St Geil St 30 0 20 0 20 70 $94,200
22 Virginia Rocca
Barton
Elementary
VRBE001 Improve Creek Trail to a shared use
path with pedestrian scale lighting
Creek Trail Freedom Parkway Garner Ave 0 15 20 15 20 70 $1,260,000 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
30 Roosevelt
Elementary
RE004 Consider curb extensions at
intersections with Homestead Ave,
Lorimer St, West St, Riker St, and
Capitol St. Extend downtown
lighting along Central. Consider
curb extensions with pedestrian
refuge island at Central/Villa. Install
street trees where feasible.

Central Ave Villa St Capitol St 14 15 20 0 20 69 $1,518,000 31 Creekside
Elementary
CE004 Add High-Visibility crosswalks to all
side streets
Beacon Hill Dr Constitution Blvd Constitution Blvd 3 15 15 15 20 68 $112,000 31 Lincoln
Elementary
LE006 Install separated bikeways as
proposed in Active Transportation
Plan
Pajaro St E Blanco Rd E Market St 18 5 20 15 10 68 $6,522,660 31 Salinas High SH017 Install Class IV bikeway Pajaro St Market St Romie Ln 18 5 20 15 10 68 $6,522,660 34 Cesar E. Chavez
Elementary
CECE001 Install traffic calming if requested
and supported by neighborhood
residents.

Towt St Freedom Parkway Del Monte Ave 11 15 20 0 20 66 $510,000 34 Natividad
Elementary
NE011 Consider bike boulevard with traffic
calming and/or additional speed
humps
Chaparral St Main St Natividad Rd 26 5 0 15 20 66 $2,162,400 36 Carr Lake
Community Day
CLCD001 Fill in existing sidewalk gaps on
north side near Sherwood Dr
Sherwood Pl Sherwood Dr Cul-de-sac 0 15 15 15 20 65 $60,000 36 Carr Lake
Community Day
CLCD010 Install High-Visibility crosswalk to
connect sidewalk with front of
campus
El Puente
Campus
Sherwood Pl
(South Side)
0 15 15 15 20 65 $4,000
36 El Gabilan
Elementary
EGE008 Install buffered or separated bike
lanes.

Laurel Drive N Main St Natividad 30 10 0 15 10 65 $17,069,940 36 El Puente EP001 Fill existing sidewalk gaps on north side near Sherwood Dr
Sherwood Pl Sherwood Dr Cul-de-sac 0 15 15 15 20 65 $60,000 36 El Puente EP010 Install High-Visibility crosswalk to connect sidewalk with front of
campus
El Puente
Campus
Sherwood Pl 0 15 15 15 20 65 $4,000
36 Laurel Wood
Elementary
LWE005 Install marked crossing with curb
extensions and/or other crosswalk
enhancements to connect Rossi
Linear Park
Rico St Rossi Linear Park 0 15 15 15 20 65 $104,000
36 Mount Toro High MTH001 Fill in existing sidewalk gaps on north side near Sherwood Dr
Sherwood Pl Sherwood Dr Cul-de-sac 0 15 15 15 20 65 $60,000 36 Mount Toro High MTH007 Install striping and signage to create a recommended path of
travel through parking lot
Mount Toro
parking lot west
entrance
Sherwood Pl 0 15 15 15 20 65 $15,700
36 Roosevelt
Elementary
RE006 Conduct stop warrant at
intersection. If stop is warranted,
install marked crosswalk and shift
school bus loading zone to the
south to increase visibility at the
corner.

Capitol St Gabilan St 0 10 20 15 20 65 $14,700
36 Sherwood
Elementary
SE009 Open back entrance to school at
Hebbron and/or Pearl St
S Hebbron St S Pearl St/58
Hebbron ST
0 10 20 15 20 65 $8,500
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
46 Roosevelt
Elementary
RE001 Enforce loading zones at school
frontage on Capitol Street and add
loading zone on an adjacent side
street like Central Avenue
Capitol St /
Central Ave
West St Gabilan St 14 10 20 0 20 64 $1,700
46 Santa Rita
Elementary
SRE003 Construct curb ramps and/or curb
extensions along Bolivar for
sidewalk connectivity.

E Bolivar St Main St Van Buren Ave 14 15 15 0 20 64 $969,000 48 El Sausal Middle ESM004 Upgrade raised crosswalk with yellow high-visibility crossing.

Construct curb extensions and add
crossing across Connely St. Add
school crossing signage on both
sides of street assembly A. Ensure
the corner radius is tightened with
curb extensions.

Eucalyptus Dr Connely St 3 10 15 15 20 63 $159,700
48 Frank Paul
Elementary
FPE007 Install additional school zone
signage
Rider Ave Freedom Parkway Amarillo Way 8 15 20 0 20 63 $3,400 48 Virginia Rocca
Barton Elementary
VRBE011 Upgrade to High-Visibility
crosswalk yellow across Las Casitas
Las Casitas Dr Constitution Blvd 8 5 15 15 20 63 $5,000 51 Alisal
Community
AC001 Install yellow High-Visibility
crosswalks per planned redesign of
Williams Rd. Implement Lead
Pedestrian Interval and install
pedestrian countdown signal heads
Williams Rd Del Monte Ave 12 10 20 0 20 62 $218,140
51 Alisal
Community
AC005 Consider pedestrian crossing
enhancements per City policy.

Del Monte Ave Williams Rd Burke St 12 10 20 0 20 62 $10,000 51 Alisal High AH002 Install yellow High-Visibility
crosswalks per redesign of Williams
Rd. Implement Lead Pedestrian
Interval and install pedestrian
countdown signal heads
Williams Rd Del Monte Ave 12 10 20 0 20 62 $218,140
51 Virginia Rocca
Barton
Elementary
VRBE017 Install traffic calming. Perform
intersection sight distance analysis
and consider installation of red
curb at intersections.

Las Casitas Dr Constitution Blvd Rider Ave 11 10 20 0 20 61 $520,600 55 El Gabilan
Elementary
EGE009 Install separated bikeway Natividad Rd Laurel Dr Old Stage Rd 30 0 5 15 10 60 $19,429,200 55 El Sausal Middle ESM011 Install curb extensions and
formalize pedestrian island both to
narrow the intersection. Install
High-Visibility crosswalks and curb
ramps across Myrtle.

Towt St Myrtle St 0 5 20 15 20 60 $230,000
55 Fremont
Elementary
FE012 Install High-Visibility crosswalk,
curb ramps and curb extensions
across Cooper Ave
Towt St Cooper Ave 5 0 20 15 20 60 $130,000
55 Lincoln
Elementary
LE009 Widen sidewalk on school side to
create multi-use path. Install
continuous sidewalk at
intersections.

California St John St Romie Ln 5 10 20 15 10 60 $300,000 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
55 Los Padres
Elementary
LPE007 Consider multi-use path with
lighting along Alisal Creek
Alisal Creek Fairview Ave Roy Diaz St 0 5 20 15 20 60 $4,892,800 55 Los Padres
Elementary
LPE009 Consider acquiring right-of-way for
pedestrian access to school campus
from Mayfair Dr
Mayfair Dr 100 Mayfair Dr 0 5 20 15 20 60 N/A
55 North Salinas
High
NSH011 Remove on-street parking to install
Class IV bikeway and accompanying
signage and striping
Main St E Alvin Dr Laurel Dr 30 5 0 15 10 60 $2,729,340 55 Rancho San Juan
High
RSJH011 Construct sidewalk on both sides of
street
San Juan Grade
Road
Boronda Rd Russell Rd 10 0 15 15 20 60 $910,000
55 University Park
Elementary
UPE011 Conduct feasibility study for bike
lanes or bike boulevard. Consider
expanding sidewalk adjacent to
Central Park to create multi-use
path
Central Ave Davis Rd Main St 30 15 0 15 0 60 $93,000
55 Virginia Rocca
Barton
Elementary
VRBE007 Widen sidewalk (narrow travel
lanes to create wider sidewalk)
Las Casitas Dr South of school
entrance
Creek Trail 0 5 20 15 20 60 $18,200
55 Virginia Rocca
Barton Elementary
VRBE008 Install raised crosswalk to help
delineate pedestrian travel as well
as stop parents from trying to
enter staff lot
School Parking
Lot
Teacher parking
lot entry
0 10 15 15 20 60 $145,000
66 Roosevelt
Elementary
RE002 Install curb extensions and High-
Visibility crosswalks
Capitol St Central Ave 9 10 20 0 20 59 $216,000
66 Santa Rita
Elementary
SRE012 Consider off-street path between
North Main and Santa Rita,
potentially extending to Russell Rd
Drainage parallel
to Sucre Ct
N Main St Russell Rd 14 15 15 15 0 59 $130,000
68 Alisal
Community
AC007 Install High-Visibility yellow
crosswalk across Dallas Ave
Del Monte Ave Dallas Ave 3 0 20 15 20 58 $4,000
68 Alisal
Community
AC008 Install High-Visibility yellow
crosswalk across New Deal Ave
Del Monte Ave New Deal Ave 3 0 20 15 20 58 $4,000
68 Carr Lake
Community Day
CLCD008 Create Class I shared use path on
service roads/ROW adjacent to
canal (this trail/shared use path is
part of a large proposed network
that goes behind the school and
will connect to the trail in
recommendation above)
Existing service
roads near canal
Rossi St (crosses
main street
following canal)
Sherwood Dr 13 5 15 15 10 58 $1,800,000
68 Cesar E. Chavez
Elementary
CECE015 Install High-Visibility crosswalk and
construct curb extensions w/ curb
ramps across Galindo
Galindo St Del Monte Ave 3 0 20 15 20 58 $130,000
68 Dr. Martin Luther
King Jr.

Elementary
MLKA003 Install new High-Visibility crosswalk
yellow across Sieber St
Garner Ave Sieber St. 3 0 20 15 20 58 $4,000
68 El Puente EP008 Create Class I shared-use path on
service roads/ROW adjacent to
canal (this trail/shared-use path is
part of a large proposed network
that goes behind the school and
will connect to the trail in
recommendation above)
Existing service
roads near canal
Rossi St (crosses
main street
following canal)
Sherwood Dr 13 5 15 15 10 58 $1,800,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
68 Los Padres
Elementary
LPE003 Intersection redesign including but
not limited to slip lane closure,
sight distance analysis, squaring of
vehicle approaches and pedestrian
crossings, construction of curb
extensions
Alisal St John St /
Williams Rd
8 10 20 0 20 58 $701,000
68 Mount Toro High MTH009 Create Class I shared use path on service roads/ROW adjacent to
canal (this trail/shared use path is
part of a large proposed network
that goes behind the school and
will connect to the trail in
recommendation above)
Existing service
roads near canal
Rossi St (crosses
main street
following canal)
Sherwood Dr 13 5 15 15 10 58 $1,800,000
68 Salinas High SH013 Install Class III bikeway Salinas St Alisal St Clay St 8 10 20 0 20 58 $14,700 68 Virginia Rocca
Barton
Elementary
VRBE027 Install traffic calming if requested
and supported by neighborhood
residents.

Ranchero Dr Las Casitas Dr La Honda Ct 3 15 20 0 20 58 $244,800 68 Washington
Middle
WM003 Eliminate center turn land to create
drop-off lane. Widen sidewalk on
school side to create multi-use
path with landscaping separating
bike/peds from street. Study
options to separate
bike/pedestrian travel. Maintain
24' for 2 travel lanes. Install bike
boulevard signage and striping on
Los Olivos between Blanco and San
Blanco Dr
Iverson St Clay St W Acacia St 13 10 0 15 20 58 $912,400 79 Sherwood
Elementary
SE002 Consider hardened centerline to
prevent U-turns and traffic calming
measures. Consider curb
extensions, chicanes, speed humps.

S Wood St E Alisal St John St 12 5 20 0 20 57 $846,400
80 Dr. Martin Luther
King Jr.

Elementary
MLKA004 Upgrade to High-Visibility
crosswalk yellow on all legs. Install
curb extension at NE corner to
reduce crossing distance on Garner
Ave.

Garner Ave Sanborn Rd 21 0 15 0 20 56 $66,000
81 Alisal
Community
AC011 Install High-Visibility crosswalk and
curb extension across Cortez St
Towt St Cortez St 0 0 20 15 20 55 $204,000
81 Alisal High AH001 Install buffered bike lanes on
Williams Rd between Freedom and
Bardin. Allow for loading and
unloading only and restrict long
term parking on Williams Road in
front of Alisal High. Install raised
median with street trees between
Del Monte Avenue and Monte
Bella Boulevard. Replace missing
street trees.

Williams Rd Del Monte Ave Freedom Parkway 15 10 20 0 10 55 $513,380 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
81 Bardin
Elementary
BE003 Install new sidewalk on the south
side of the roadway and multi-use
path between Margaret St and
Bardin Road per Bardin SRTS
project. Long term: extend multi-
use path from Margaret St to
Skyway Blvd
E Alisal St Sconberg Parkway Tampa St 0 15 15 15 10 55 Project Funded 81 Carr Lake
Community Day
CLCD007 Install trails or shared-use paths to
connect to Sherwood, Laurel Dr,
and Madeira Ave
Behind school Laurel Dr Madeira Ave 0 15 15 15 10 55 $2,100,000 81 Cesar E. Chavez
Elementary
CECE007 Install High-Visibility crosswalks
and construct curb extensions
across Mae Ave
Mae Ave Del Monte Ave 0 0 20 15 20 55 $208,000
81 Cesar E. Chavez
Elementary
CECE008 Install raised high-visibility
crosswalk across C St and construct
curb ramps
Mae Ave C St 0 0 20 15 20 55 $175,000
81 Cesar E. Chavez
Elementary
CECE009 Install raised High-Visibility
crosswalks across D St and
construct curb ramps
Mae Ave D St 0 0 20 15 20 55 $175,000
81 Cesar E. Chavez
Elementary
CECE010 Upgrade crosswalks to High-
Visibility, construct curb extensions
with ramps
Josephine St D St 0 0 20 15 20 55 $268,000
81 Cesar E. Chavez
Elementary
CECE011 Install High-Visibility crosswalk
across C St and construct curb
ramps
Gallindo St C St 0 0 20 15 20 55 $30,000
81 Cesar E. Chavez
Elementary
CECE012 Install High-Visibility crosswalk
across D St and construct curb
ramps
Gallindo St D St 0 0 20 15 20 55 $30,000
81 Cesar E. Chavez
Elementary
CECE013 Install raised High-Visibility
crosswalk across Josephine St and
construct curb ramps
Josephine St C St 0 0 20 15 20 55 $175,000
81 Cesar E. Chavez
Elementary
CECE014 Install High-Visibility crosswalk and
construct curb extensions w/ curb
ramps across Kilbreth Ave
Kilbreth Ave Del Monte Ave 0 0 20 15 20 55 $130,000
81 Dr. Martin Luther
King Jr.

Elementary
MLKA001 Install planned all-way stop with
high-visibility crosswalks and
nearside bus bulbouts/curb
extensions.

Garner Ave Pacific Ave 0 0 20 15 20 55 $119,400
81 Dr. Martin Luther
King Jr.

Elementary
MLKA002 Install new High-Visibility crosswalk
yellow across Atlantic
Garner Ave Atlantic St 0 0 20 15 20 55 $4,000
81 El Puente EP007 Install trails/shared use paths to
connect to Sherwood, Laurel, and
Madeira Ave
Behind school Laurel Dr Madeira Ave 0 15 15 15 10 55 $2,100,000 81 Fremont
Elementary
FE006 Install white High-Visibility
crosswalk across Laurel Dr
Laurel Dr Williams Rd 0 0 20 15 20 55 $8,000
81 Fremont
Elementary
FE011 Install High-Visibility crosswalk,
curb ramps and curb extensions
across Oregon St
Towt St Oregon St 0 0 20 15 20 55 $140,000
81 Fremont
Elementary
FE015 Install curb extensions across Towt
and install High-Visibility crosswalk
across Kentucky Ave
Towt St Kentucky Ave 0 0 20 15 20 55 $104,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
81 Fremont
Elementary
FE016 Evaluate for marked crosswalk Towt St Oregon St 0 0 20 15 20 55 $10,000 81 Harden Middle HM002 Evaluate for possible road
reconfiguration (road diet) and
Class IV bike lanes.

Harden Parkway Main St El Dorado Dr 30 10 0 15 0 55 $4,903,560 81 John E. Steinbeck
Elementary
JESE016 Improve trail network behind
school with improved paved
pathway and pedestrian-scale
lighting and other improvements
per Urban Greening Plan
Trail network
behind school
Nantucket Blvd Independence
Blvd
5 15 0 15 20 55 $264,000
81 John Gutierrez
Middle
JGM002 Consider buffered bike lanes or
separated two-way bike facility on
Rogge Rd between Natividad Rd
and San Juan Grade. Include bike
lane conflict markings at
intersections
Rogge Rd Natividad Rd San Juan Grade 0 15 5 15 20 55 $1,480,320 81 John Gutierrez
Middle
JGM003 Widen sidewalk, reconstruct
broken sidewalk, and fill sidewalk
gaps between San Juan Grade Rd
and Rancho San Juan High School
Rogge Rd San Juan Grade
Rd
Rancho San Juan
High School east
border
0 15 5 15 20 55 $590,000
81 La Joya
Elementary
LJE002 Widen sidewalk on east side of
Bollenbacher Dr to allow for
student bicycle access.

Bollenbacher Dr Penzance St Rogge Rd 0 15 5 15 20 55 $80,000 81 Los Padres
Elementary
LPE001 Install curb extensions and
pedestrian refuge island
John St school frontage 0 15 20 0 20 55 $200,000
81 Mission Park
Elementary
MPE004 Consider bike boulevard. Study
options to widen sidewalk to
create multi-use path.

W Acacia St S Davis Rd S Main St 25 15 0 15 0 55 $4,347,200 81 Mount Toro High MTH008 Install trails/shared use paths to connect to Sherwood, Laurel, and
Madeira Ave
Behind school Laurel Dr Madeira Ave 0 15 15 15 10 55 $2,100,000 81 Rancho San Juan
High
RSJH005 Widen sidewalk, reconstruct
buckling sidewalk, and fill sidewalk
gaps between San Juan Grade Rd
and Rancho San Juan High School
Rogge Rd San Juan Grade
Road
Rancho San Juan
High School west
border
0 15 5 15 20 55 $590,000
81 Salinas High SH015 Consider bike boulevard Acacia St Main St Alisal St 25 15 0 15 0 55 $1,978,800 81 Santa Rita
Elementary
SRE001 Update curb ramps, update
existing crosswalk to High-Visibility
and add High-Visibility crossing
across Santa Rita. Consider curb
extensions at this corner for
visibility. Conduct all-way stop
warrant analysis
E Bolivar St Santa Rita St 0 5 15 15 20 55 $139,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
81 Santa Rita
Elementary
SRE004 Construct curb extensions and
consider pedestrian facility per City
policy across Bolivar St at
Roundtree Dr to connect to ped
path/bridge that accesses the back
of campus. Make sure this access is
open during morning and
afternoon arrival and departure
times
E Bolivar St Roundtree Dr 0 5 15 15 20 55 $110,000
81 Santa Rita
Elementary
SRE008 Make sure this access is open
during morning and afternoon
arrival and departure times.

Reconstruct sidewalk where
buckling
Jackson St Swaner Ave Van Buren Ave 0 5 15 15 20 55 $133,500 81 Santa Rita
Elementary
SRE009 Construct curb extensions with
updated curb ramps and stripe
High-Visibility crossing across
Lamar St at this corner.

Santa Rita St E Lamar St 0 5 15 15 20 55 $130,000
81 University Park
Elementary
UPE010 Consider bike boulevard and curb
extensions at Camden Way
W Acacia Davis Rd S Main St 25 15 0 15 0 55 $3,117,200
81 Virginia Rocca
Barton Elementary
VRBE014 Consider raised crosswalk and
upgrade to High-Visibility crosswalk
yellow across Nogal Dr
Las Casitas Dr Nogal Dr 0 0 20 15 20 55 $149,000
116
Carr Lake
Community Day
CLCD009 Consider redesign of Casentini
St/Main St intersection to
incorporate bicycle crossing.

Consider removing parking and
installing a raised shared-use path
on both sides of Main St to connect
the Class I path to the Casentini
intersection.

Existing service
road near canal
Main St 13 0 15 15 10 53 $305,000
116
Creekside
Elementary
CE003 Install traffic calming if requested
and supported by neighborhood
residents. Install sharrow markings
and signage
Beacon Hill Dr Constitution Blvd Constitution Blvd 3 15 15 0 20 53 $244,800 116
Creekside
Elementary
CE015 Install conflict striping across
intersections to connect bike lanes
or future Class IV. Pedestrian
refuge island on north leg. Consider
for protected intersection
treatments.

Beacon Hill Dr Constitution
(west
intersection)
3 0 15 15 20 53 $1,412,660
116
El Puente EP009 Consider redesign of Casentini
St/Main St intersection to
incorporate bicycle crossing.

Consider removing parking and
installing a raised shared-use path
on both sides of Main St to connect
the Class I path to the Casentini
intersection.

Existing service
road near canal
Main St 13 0 15 15 10 53 $305,000
116
Fremont
Elementary
FE007 Install class IV bikeway and
recommended roadway
reconfiguration
Laurel Dr Williams Rd Sanborn Rd 3 5 20 15 10 53 $2,914,380 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
116
Mount Toro High MTH010 Consider redesign of Casentini
St/Main St intersection to
incorporate bicycle crossing.

Consider removing parking and
installing a raised shared-use path
on both sides of Main St to connect
the Class I path to the Casentini
intersection.

Existing service
road near canal
Main St 13 0 15 15 10 53 $305,000
116
Salinas High SH007 Install traffic calming to create bike boulevard with striping and signage
Giel St Main St Iverson St 8 10 0 15 20 53 $918,000
116
Sherwood
Elementary
SE006 Install planned rectangular rapid
flashing beacon and yellow High-
Visibility crosswalk. Consider
continuous sidewalk
S Wood St Santa Maria St 3 10 20 0 20 53 $48,500
124
Henry F.

Kammann
HFK001 Develop Park and Walk program
with drop-off at this location.

Consider bike boulevard with traffic
calming on Tyler
Tyler St behind
school
4th St Cul-de-sac 12 10 15 15 0 52 $1,387,200
125
El Sausal Middle ESM003 Install loading zone curb markings and signage along the east side of
Eucalyptus Dr. for drop-off and pick-
up. Install formal pedestrian
entrance to campus from
Eucalyptus. Consider shade trees,
landscaping and wider sidewalk.

Eucalyptus Dr Parkway Rd E Alisal 6 10 15 0 20 51 $185,165 125 Sherwood
Elementary
SE008 Conduct stop warrant evaluations
at all intersections.

Smith St E Alisal St James St 6 5 20 0 20 51 $5,000
127
Alisal
Community
AC002 Install traffic calming (chicanes and
removal of parking at those
locations), sharrow markings and
bike route signage
Del Monte Ave Williams Rd Towt St 20 10 20 0 0 50 $652,800 127
Bardin
Elementary
BE005 Install high-visibility crosswalk, curb
extensions, and rectangular rapid
flashing beacon along with
E Alisal St Margaret St 0 0 15 15 20 50 Project Funded
127
Bardin
Elementary
BE009 Install High-Visibility crosswalks
and upgrade curb ramps at three of
the corners. Include curb
extensions at southwest corners
and remove dedicated right turn
pocket/lane per Bardin SRTS plan.

Install conflict area striping for the
buffered bike lane approach to the
intersection. Evaluate intersection
for Lead Pedestrian Interval
feasibility.

Bardin Rd Williams Rd 0 10 20 0 20 50 Project Funded
127
Bardin
Elementary
BE011 Install traffic calming if requested
and supported by neighborhood
residents.

Paloma Ave Quilla St Margaret St 0 15 15 0 20 50 $754,800 127
Carr Lake
Community Day
CLCD002 Upgrade stormwater
retention/runoff reduction along
Sherwood Place.

Sherwood Pl Sherwood Dr Cul-de-sac 0 15 15 0 20 50 $2,000,000 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
127
Carr Lake
Community Day
CLCD003 Update crosswalk to High-Visibility
and construct curb extensions on
either side. Add yield lines and
school crossing signage assembly A.

Sherwood Pl existing mid-
block crosswalk
0 15 15 0 20 50 $109,700
127
Creekside
Elementary
CE025 Install path to connect back
entrance to school with Declaration
Street
Creekbridge
Neighborhood
Park
Middle east side
of school yard
0 15 0 15 20 50 $20,000
127
El Puente EP002 Upgrade stormwater
retention/runoff reduction along
Sherwood Place.

Sherwood Pl Sherwood Dr Cul-de-sac 0 15 15 0 20 50 $2,000,000 127
El Puente EP003 Update crosswalk to High-Visibility
and construct curb extensions on
either side. Add yield lines and
school crossing signage assembly A.

Sherwood Pl existing mid-
block crosswalk
0 15 15 0 20 50 $109,700
127
Fremont
Elementary
FE001 Install High-Visibility crosswalk and
curb extensions or consider
installing a neighorhood traffic
circle
2nd St Quilla St 0 0 15 15 20 50 $216,000
127
Fremont
Elementary
FE017 Install traffic calming measures if
requested and supported by
neighborhood residents or
consider speed enforcement on
Oregon St
Oregon St Towt St Sanborn Rd 5 5 20 0 20 50 $15,000
127
Jesse G. Sanchez
Elementary
JGSE001 Upgrade to High-Visibility
crosswalk yellow across Mohar St
Sanborn Rd Mohar St 0 10 20 0 20 50 $4,000
127
Jesse G. Sanchez
Elementary
JGSE005 Optimize signal timing and improve
coordination with nearby signals.

Upgrade to High-Visibility
crosswalk for both legs. Install
leading pedestrian interval and
consider protected left turn from
Sanborn to Kimmel.

Sanborn Rd Kimmel St 0 15 15 0 20 50 $188,000
127
Jesse G. Sanchez
Elementary
JGSE011 Install Right Turn Only signage Sanborn Rd Driveway Entrance/Exit
Loop Near
Mohar
0 15 15 0 20 50 $850
127
John E. Steinbeck
Elementary
JESE018 Install additional school entrance at
back of campus to allow access to
school from trail.

School campus Near Rear Zig-
Zag Path
0 15 0 15 20 50 $8,500
127
John Gutierrez
Middle
JGM001 Install curb ramps and High-
Visibility crossings at all three
approaches. Consider curb
extensions. Curb extensions must
be designed to accommodate bus
turning radius. Assign crossing
guard to this corner.

Rogge Rd Bollenbacher Dr 0 10 5 15 20 50 $127,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
127
Laurel Wood
Elementary
LWE002 Consider bike boulevard with traffic
calming measures. Install curb
extensions at all side streets along
Victor from Geneva to Larkin.

Install raised crossing/continuous
sidewalk across Victor at Rossi
Linear Park
Victor St Victor Wy Larkin St 0 15 0 15 20 50 $1,928,500 127
Laurel Wood
Elementary
LWE004 Install marked crosswalk and ADA
compliant curb ramps across Rico
Circle
Rico Cir Larkin St 0 0 15 15 20 50 $30,000
127
Los Padres
Elementary
LPE004 Perform intersection sight distance
analysis and consider installation of
red curb to daylight intersections
of McGowan Dr and John Circle.

Side streets
along John St
John Cir /
McGowan Dr
0 10 20 0 20 50 $1,000
127
McKinnon
Elementary
MKE002 Install improvements per West
Area Specific Plan: Class II bike
lanes, street trees, and multi-use
community path on east side of
street to provide access to school.

McKinnon St. front of school 0 10 5 15 20 50 $176,400
127
Monte Bella
Elementary
MBLE009 Open back gate to campus to
provide an alternative to the traffic
in front of the school.

Back of School Monte Bella
Community Park
0 15 0 15 20 50 $8,500
127
Mount Toro High MTH002 Upgrade stormwater
retention/runoff reduction along
Sherwood Place.

Sherwood Pl Sherwood Dr Cul-de-sac 0 15 15 0 20 50 $2,000,000 127
Mount Toro High MTH003 Update crosswalk to High-Visibility and construct curb extensions on
either side. Add yield lines and
school crossing signage assembly A.

Sherwood Pl existing mid-
block crosswalk
0 15 15 0 20 50 $109,700
127
Rancho San Juan
High
RSJH003 Install curb ramps and High-
Visibility crossings at all three
approaches. Consider curb
extensions. Curb extensions must
be designed to accommodate bus
turning radius. Assign crossing
guard to this corner
Rogge Rd Bollenbacher 0 10 5 15 20 50 $127,000
127
Rancho San Juan
High
RSJH004 Buffered bike lanes or separated
two-way bike facility on Rogge Rd
between Natividad Rd and San
Juan Grade. Include bike lane
conflict markings at major and
minor intersections
Rogge Rd Natividad Rd San Juan Grade
Rd
0 15 0 15 20 50 $1,480,320
127
Roosevelt
Elementary
RE005 Install curb extensions and traffic
calming measures if requested and
supported by neighborhood
residents
Gabilan St Capitol St Lincoln Ave 0 10 20 0 20 50 $961,000 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
127
Santa Rita
Elementary
SRE007 Construct curb ramps and raised
crossing across Swaner Ave at
Pierce St, to connect to pedestrian
path that accesses the back of
campus. Make sure this access is
open during morning and
afternoon arrival and departure
times
Swaner Ave Pierce St 0 0 15 15 20 50 $171,000
127
Santa Rita
Elementary
SRE015 Consider bike boulevard with traffic
calming, speed cushions between
Santa Rita and Van Buren. Update
ADA ramps at all intersections.

Swaner Ave Santa Rita St Van Buren Ave 0 0 15 15 20 50 $1,042,600 127
Virginia Rocca
Barton Elementary
VRBE003 Improve Creek Trail access with
stairs or graded switchback include
pedestrian lighting
Creek Trail
entrance
Ranchero Dr 0 0 15 15 20 50 $1,478,400
156
Everett Alvarez
High
EAH004 Consider reducing roadway to two
lanes and upgrading existing bike
lanes to Class IV separated
bikeway. Conduct queueing
analysis and bicycle and pedestrian
counts and consider options
including installation of right turn
lane for northbound traffic into
school loop or drop-off lane
adjacent to school frontage.

Independence
Blvd
Boronda Rd Constitution Blvd 19 5 0 15 10 49 $5,123,340 156
John E. Steinbeck
Elementary
JESE004 Consider reducing roadway to two
lanes and upgrading existing bike
lanes to Class IV separated
bikeway. Implement conflict
striping at bus stop areas.

Independence
Blvd
Boronda Rd Constitution Blvd 19 5 0 15 10 49 $5,042,340 156 McKinnon
Elementary
MKE004 Expand sidewalk to Class I shared
use path
E Boronda Rd Dartmouth Hemingway 19 0 5 15 10 49 $2,415,000 156
Monterey Park
Elementary
MPKE001 Consider bike boulevard on San
Miguel Ave. Consider widening the
sidewalk along Claremont Manor
Park to create multi-use path.

San Miguel Ave Main St Turn in San
Miguel Ave (Near
San Bruno Wy)
9 15 0 15 10 49 $967,400
160
Alisal
Community
AC013 Install traffic calming if requested
and supported by neighborhood
residents.

New Deal Ave Del Monte Ave Cortez St 8 0 20 0 20 48 $157,800 160
Bardin
Elementary
BE006 Reconfigure roadway to one lane in
each direction with a center turn
lane per Bardin SRTS project
Bardin Rd Sconberg Parkway Williams Rd 3 15 20 0 10 48 Project Funded 160
Bardin
Elementary
BE010 Install Class II buffered bikeway
along with accompanying striping
per Bardin SRTS project
Bardin Rd Alisal Rd Williams Rd 3 15 20 0 10 48 Project Funded 160
Lincoln
Elementary
LE007 Install planned road diet to provide
space for buffered bike lanes
E Romie Ln S Main St Abbott Pl 23 0 0 15 10 48 $1,099,080 160 Mission Park
Elementary
MPE005 Consider bike boulevard Riker St Alisal St Kipling St 8 15 0 15 10 48 $2,713,200 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
160
Monterey Park
Elementary
MPKE006 Install planned road diet to provide
space for buffered bike lanes
E Romie Ln Abott St S Main St 23 0 0 15 10 48 $1,099,080 160
Salinas High SH011 Install traffic calming to create bike boulevard with striping and signage
connect to future Class IV bikeway
on Pajaro St
Chestnut St S Main St California St 3 10 0 15 20 48 $550,800 160
Santa Rita
Elementary
SRE011 Upgrade pedestrian heads to
include leading pedestrian interval
and countdown.

E Bolivar St N Main St 8 5 15 0 20 48 $200,140
160
Virginia Rocca
Barton
Elementary
VRBE004 Upgrade existing bike lane to Class
IIB buffered bike lane
Las Casitas Dr Constitution Blvd School Entrance 8 10 20 0 10 48 $170,280 160
Virginia Rocca
Barton
Elementary
VRBE005 Install bike lane treatments in
conflict zones
Las Casitas Dr Constitution Blvd School Entrance 8 10 20 0 10 48 $4,500 160
Washington
Middle
WM019 Expand pedestrian pathway to
separate path from staff driveway.

Consider striping and potential
pavement materials to differentiate
space
Staff parking lot
entrance
Iverson St
between Lang St
and Giel St
3 10 0 15 20 48 $5,000
171
Boronda
Meadows
Elementary
BME003 Install multi-use path on west side
of Davis Road to connect to
Marina/Salinas Multi-Modal
Corridor. Consider street
trees/landscaping
N Davis Rd Larkin Rd Rossi St 6 15 0 15 10 46 $235,000
171
Henry F.

Kammann
HFK007 Consider bike boulevard with curb
extensions and High-Visibility
crosswalks at all intersections from
1st St to Tyler St
Curtis St 1st St Tyler St 6 5 0 15 20 46 $1,160,000
173
Alisal
Community
AC003 Upgrade crosswalks to High-
Visibility, construct curb extensions
with ramps
Del Monte Ave Towt St 5 0 20 0 20 45 $268,000
173
Alisal High AH012 Construct formal pedestrian
pathway through eastern driveway
into campus. Consider removing
parking spaces next to portables
and repurpose space for pedestrian
path.

School parking
lot
Williams Rd Back entrance to
school, along
driveway on east
side
0 10 0 15 20 45 $10,000
173 Bardin
Elementary
BE001 Install High-Visibility crosswalk
yellow across entrance
Alisal Rd school parking
lot entrance
0 10 0 15 20 45 $4,000
173
Carr Lake
Community Day
CLCD004 Relocate bus stop to north side of
Sherwood Pl to enhance visibility at
intersection and construct bus
pullout on north side of
intersection
Sherwood Drive Sherwood Pl 0 10 15 0 20 45 $75,000
173
Carr Lake
Community Day
CLCD006 Re-evaluate ICE analysis to study
options for intersection control.

Sherwood Drive Sherwood Pl 0 10 15 0 20 45 $40,000
173
Cesar E. Chavez
Elementary
CECE003 Upgrade crosswalks to High-
Visibility and construct curb
extensions with ramps
Towt St Del Monte Ave 5 0 20 0 20 45 $268,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
173
Creekside
Elementary
CE017 Install crossing on third leg of
intersection to connect to trail that
connects to Massachusetts Drive.

Add pedestrian refuge island and
conflict striping across intersection.

Freedom
Parkway
Constitution Blvd 10 0 0 15 20 45 $105,000
173
Dr. Martin Luther
King Jr.

Elementary
MLK010 Repair sidewalk. Acosta Plaza Garner Ave school entrance 0 5 20 0 20 45 $180,000 173
El Puente EP004 Relocate bus stop to north side of
Sherwood Pl to enhance visibility at
intersection and construct bus
pullout on north side of
intersection
Sherwood Drive Sherwood Pl 0 10 15 0 20 45 $75,000
173
El Puente EP006 Re-evaluate ICE analysis to study
options for intersection control.

Sherwood Drive Sherwood Pl 0 10 15 0 20 45 $40,000
173 Fremont
Elementary
FE002 Install School Zone signage
assembly A
Cooper Ave Towt St 2nd Ave 5 0 20 0 20 45 $1,700
173
Harden Middle HM010 Install curb extensions and High-
Visibility crosswalk on all side
streets
Westminster Dr McKinnon St Cambridge Ct 5 5 0 15 20 45 $728,000 173
Jesse G. Sanchez
Elementary
JGSE002 Explore prohibiting left turn into
Rec Center (Bread Box) driveway
during school pick-up/drop-off
times
Sanborn Rd Mohar St 0 10 15 0 20 45 $850
173
Laurel Wood
Elementary
LWE009 Consider pedestrian facility across
Victor St per City policy to provide
access to park and school
Victor St Van Ness Ct 0 10 0 15 20 45 $10,000
173
Lincoln
Elementary
LE002 Install pedestrian countdown signal
heads and evaluate for leading
pedestrian interval
California St John St 5 0 20 0 20 45 $200,000
173
Loma Vista
Elementary
LVE004 Reopen back entrance with gate
that could be unlocked and opened
during drop off and pickup hours.

Encourage parent drop off at this
location
Back entrance of
school
Compton Way /
Glendora Way
0 10 0 15 20 45 $8,500
173
Monte Bella
Elementary
MBLE003 Install raised crosswalk to align
with Tuscany way crossing.

Remove speed humps. Remove "no
left turn" unless roundabout is
installed. Make eastern driveway
exit only.

School parking
lot
Tuscany Blvd /
Tuscany Wy
0 10 0 15 20 45 $151,500
173
Monte Bella
Elementary
MBLE006
Add high visibility yellow crosswalk
across Canelli Ct. Consider other
pedestrian crossing enhancements
per City policy.

Tuscany Blvd Canelli Ct 5 5 0 15 20 45 $4,000
173 Monte Bella
Elementary
MBLE007 Install raised crosswalk. Tuscany Blvd Tuscany Wy 0 10 0 15 20 45 $145,000 173
Mount Toro High MTH004 Relocate bus stop to the north side of Sherwood Pl to enhance visibility
at intersection and construct bus
pullout on north side of
intersection
Sherwood Dr Sherwood Pl 0 10 15 0 20 45 $75,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
173
Mount Toro High MTH006 Re-evaluate ICE analysis to study options for intersection control.

Sherwood Drive Sherwood Pl 0 10 15 0 20 45 $40,000
173 Sherwood
Elementary
SE007 Consider continuous sidewalk
across San Benito
S Wood St San Benito St 0 0 20 15 10 45 $4,500
173
University Park
Elementary
UPE001 Consider pedestrian facility per City
policy across West Acacia St near
location of sidewalk/access route
into campus. Propose drop-off
along school side of W Acacia.

Construct ped access
path/sidewalk across lawn and
parking lot
W Acacia St School Path
(Across Street
from 826/830
Acacia)
0 10 0 15 20 45 $32,920
173
University Park
Elementary
UPE004 Open gate to campus at this
location. Provide crossing guard
before and after school. Upgrade
crosswalks and construct curb
extensions & ramps. Consider
rectangular rapid flashing beacon.

University Ave Palma Dr 0 10 0 15 20 45 $178,500
173
Virginia Rocca
Barton Elementary
VRBE009 Modify design to limit to circular
pattern, remove arrows point to
smaller segment of lot to the north
and small lane between angle
parking, to reduce conflicts.

Vehicles, should stay in line even
after dropping off student,
consider flex posts to create drop
off lane.

School Parking
Lot
School Campus
(Near main
Building)
0 10 15 0 20 45 $6,000
198
Alisal
Community
AC012 Install traffic calming if requested
and supported by neighborhood
residents.

Dallas Ave Del Monte Ave Cortez St 3 0 20 0 20 43 $157,800 198 Bardin
Elementary
BE004 Install buffered bike lanes per
Bardin SRTS project
E Alisal St Bardin Rd Skyway Blvd 3 15 15 0 10 43 Project Funded 198
El Gabilan
Elementary
EGE003 Install yellow, high-visibility
crosswalks on all four legs of
intersection with pedestrian refuge
islands at both Linwood Dr
crossings. Install school assembly
signage.

Linwood Dr Chaparral St 8 0 0 15 20 43 $216,850
198
El Sausal Middle ESM006 Consider pedestrian facility per City policy. Consider median to restrict
left turns out of Eucalyptus.

Upgrade existing crosswalk across
Eucalyptus Dr to High-Visibility and
construct curb extensions.

Eucalyptus Dr E Alisal St 3 0 20 0 20 43 $114,500
198
Everett Alvarez
High
EAH001 Upgrade bike lanes to buffered
bike lanes or Class IV separated
bikeway
Boronda Rd Natividad Rd Hemingway Dr 13 0 5 15 10 43 $4,626,000 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
198
Fremont
Elementary
FE013 Upgrade to High-Visibility
crosswalk yellow and curb ramps -
ensure consideration of new Laurel
St configuration
Towt St Laurel Dr 3 0 20 0 20 43 $68,000
198
Gavilan View
Middle
GVM001 Consider bike boulevard on Van
Buren Ave. Consider pedestrian
facility per City policy on Van Buren
between Bolivar and Russell Rd
Van Buren Ave San Juan Grade
Rd
End of road (by
school)
3 5 0 15 20 43 $1,975,600
198
Harden Middle HM005 Install speed feedback signs north
and south of school campus
McKinnon St Harden Parkway E Alvin Dr 18 5 0 0 20 43 $1,700 198
Jesse G. Sanchez
Elementary
JGSE003 Optimize signal timing and improve
coordination with nearby signals.

Conduct traffic modeling to
evaluate impacts of pedestrian
exclusive signal phase. Upgrade to
High-Visibility crosswalk yellow all
legs.

Sanborn Rd Acosta Pl 3 5 15 0 20 43 $31,750
198
McKinnon
Elementary
MKE003 Install planned changes re:

Boronda Road Congestion Relief
Project, including high-visibility
crosswalks, buffered bike lanes,
and protected intersection.

Boronda Rd McKinnon St 3 0 5 15 20 43 Project Funded
198 Mission Park
Elementary
MPE006 Consider bike boulevard Iverson St Clay St /
Homestead Ave
San Blanco Dr 13 15 0 15 0 43 $1,407,600
198
Salinas High SH001 Install Class III bikeway and traffic calming if requested and supported
by neighborhood residents.

Riker St Alisal St Blanco Rd 8 15 0 0 20 43 $2,142,000
198
Santa Rita
Elementary
SRE006 Curb extensions, curb ramps and
High-Visibility crossings at all 3
approaches
E Bolivar St Van Buren Ave 3 5 0 15 20 43 $158,000
198
Sherwood
Elementary
SE003 Upgrade crosswalks to high
visibility and install ADA curb ramp
at northwest corner. Install school
assembly signage and advance stop
bars in advance of crosswalks.

Consider roundabout or consider
removing painted pork chop islands
and installing curb extensions to
shorten crossing distances.

S Wood St John St 3 0 20 0 20 43 $209,850
198 Sherwood
Elementary
SE004 Relocate existing speed limit sign
to more visible location.

S Wood St James St John St 3 0 20 0 20 43 $850
198 Sherwood
Elementary
SE010 Install curb extensions and ramps
along Hebbron
Hebbron St E Alisal St John St 3 0 20 0 20 43 $1,203,500 198
Virginia Rocca
Barton Elementary
VRBE018 Upgrade to High-Visibility
crosswalk. Review to see if curb
extension can be construct due
potential conflict with bus stop
locations
Rider Ave Del Monte Ave 3 0 20 0 20 43 $108,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
215
La Paz Middle LPM018 Upgrade existing Class II bike lane to Class IV separated bikeway.

Include conflict striping at
intersections. Consider future Class
IV or buffered bike lane west of Del
Monte Ave with 2-way center turn
lane.

Sanborn Rd Del Monte Ave Buckhorn Dr 7 0 20 15 0 42 $3,469,500 216
Everett Alvarez
High
EAH007 Conduct warrant study for traffic
signal or pedestrian hybrid beacon.

If traffic signal is warranted, install
marked crosswalks on all legs of
intersection. Allow right-turn
access only in and out of Danbury
St.

Independence
Blvd
Danbury St 6 0 0 15 20 41 $83,850
216
La Paz Middle LPM017 Upgrade to High-Visibility yellow
crosswalk across Sherwood Ln.

Expand center median further west
of this intersection to prevent U-
turns
Sanborn Rd Sherwood Ln 1 0 20 0 20 41 $6,000
216
Rancho San Juan
High
RSJH014 When development is constructed,
install bike lanes and 8' sidewalks
on both sides of street as outlined
in West Area Specific Plan
Natividad Rd Boronda Rd Rogge Rd 11 0 5 15 10 41 $1,200,800 219
Creekside
Elementary
CE024 Install High-Visibility crosswalks
and curb extensions on three legs
of intersection
Kittery St Beacon Hill Dr 0 5 0 15 20 40 $162,000
219 Dr. Oscar Loya
Elementary
DOLA002 Install traffic calming and create
bike boulevard
Buckhorn Dr Rider Ave Falcon Dr 0 5 0 15 20 40 $1,081,200 219
El Sausal Middle ESM009 Upgrade crosswalk at E Alisal St with yellow high-visibility crossing.

Towt St E Alisal 0 0 20 0 20 40 $8,000
219
Frank Paul
Elementary
FPE008 Upgrade crosswalk with High-
Visibility yellow and install curb
extensions across Amarillo Way
Rider Ave Amarillo Way 0 0 20 0 20 40 $204,000
219
Frank Paul
Elementary
FPE013 Install raised crosswalks with High-
Visibility yellow crosswalk striping
across South intersection with La
Cuesta Ct
Antigua Ave La Cuesta Ct
(South
intersection)
0 5 0 15 20 40 $149,000
219 Frank Paul
Elementary
FPE014 Install High-Visibility yellow
crosswalk across Antigua Cir
Antigua Ave Antigua Cir 0 5 0 15 20 40 $4,000
219
Frank Paul
Elementary
FPE017 Install raised crosswalks with High-
Visibility yellow crosswalk striping
across North intersection with La
Cuesta Ct
Antigua Ave La Cuesta Ct
(North
intersection)
0 5 0 15 20 40 $149,000
219
Fremont
Elementary
FE003 Evaluate ped crossing demand. If
this is the highest use crosswalk,
upgrade to yellow High-Visibility
crosswalk and install curb ramps
and RRFB.

Laurel Dr 2nd Ave 0 0 20 0 20 40 $54,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
219
Fremont
Elementary
FE004 Evaluate ped crossing demand. If
lower than 2nd Ave, consider
crosswalk removal to direct
pedestrian to the safest crosswalk.

Laurel Dr Midway Ave 0 0 20 0 20 40 $14,000
219
Fremont
Elementary
FE010 Reconstruct the slip lane to provide
pedestrian crossing and include
conflict striping. Upgrade all legs of
the intersection to High-Visibility
crosswalks.

Market St Williams Rd 5 0 15 0 20 40 $270,000
219
Gavilan View
Middle
GVM005 Construct ADA curb ramps and
upgrade to High-Visibility crossings.

Install leading pedestrian interval
and pedestrian countdown signal
heads. Consider protected
intersection treatments or curb
extensions, taking truck and bus
turning radii into account.

Russell Rd San Juan Grade
Rd
0 0 5 15 20 40 $1,515,105
219
Harden Middle HM003 Conduct intersection control
evaluation for possible traffic signal
or roundabout. Upgrade to High-
Visibility crosswalks and add a
marked crosswalk to the fourth leg
of the intersection
Harden Parkway McKinnon St 0 5 0 15 20 40 $215,000
219 Jesse G. Sanchez
Elementary
JGSE004 Upgrade to High-Visibility
crosswalk all legs
Sanborn Rd Laurel Dr 0 0 20 0 20 40 $18,000
219 Jesse G. Sanchez
Elementary
JGSE006 Upgrade to High-Visibility
crosswalk all legs
Sanborn Rd Madeira
Ave/Oregon St
5 0 15 0 20 40 $16,000
219 Jesse G. Sanchez
Elementary
JGSE007 Upgrade to High-Visibility
crosswalk across Machado Way
Machado Way Acosta Pl 0 0 20 0 20 40 $4,000
219
Jesse G. Sanchez
Elementary
JGSE010 Upgrade to High-Visibility
crosswalk all legs and curb ramps
across Machado Way
Machado Way Kimmel St 0 0 20 0 20 40 $60,000
219
John E. Steinbeck
Elementary
JESE013 Evaluate for an all-way stop. If
warranted, install marked crossing
across Provincetown Drive.

Upgrade to High-Visibility
crosswalk and curb extensions
across Lexington Dr
Provincetown Dr Lexington Dr 0 5 0 15 20 40 $109,000
219
John E. Steinbeck
Elementary
JESE017 Evaluate pedestrian demand and
consider formalized connection
between Crestview and
Provincetown (high school
recommendation)
Trail network
behind school
Snug Harbor School 0 5 0 15 20 40 $150,000
219
John Gutierrez
Middle
JGM004 Install multi-use path along south
side of Rogge Rd between
Natividad Rd and Rancho San Juan
High School
Rogge Rd Natividad Rd Rancho San Juan
High School east
border
0 0 5 15 20 40 $560,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
219
John Gutierrez
Middle
JGM005 Construct curb extensions with
ADA ramps. Consider roundabout
or signal warrant analysis. Consider
removal of long right turn only lane
on northbound San Juan Grade
Road between Cornwall and Rogge
Village Way and use space to
upgrade bike lane to Class IIB
buffered or Class IV separated
bikeway.

Rogge Rd San Juan Grade
Rd
0 0 5 15 20 40 $335,000
219
John Gutierrez
Middle
JGM006 Consider traffic calming measures
between San Juan Grade Rd and
Rancho San Juan High School such
as lane width reduction.

Rogge Rd San Juan Grade
Rd
Rancho San Juan
High School east
border
0 15 5 0 20 40 $77,880
219
La Joya
Elementary
LJE005 Construct curb extensions with
ADA ramps and install High-
Visibility crosswalks across San
Juan Rd and both sides of Cornwall
St. Include rectangular rapid
flashing beacon and median
pedestrian refuge for San Juan
Grade Rd crossing
Cornwall St San Juan Grade
Rd
0 0 5 15 20 40 $396,000
219
La Joya
Elementary
LJE008 Install curb ramps, curb extensions
and marked crosswalk across
Kelton at Rogge. Perform
intersection sight distance analysis
and consider installation of red
curb at intersection.

Kelton Dr Rogge Rd 0 0 5 15 20 40 $114,790
219
La Joya
Elementary
LJE012 Install curb extensions with ADA
ramps and High-Visibility crossings
across cross streets between Paul
Ave and Jade Dr
Penzance St Paul Ave Jade Dr 0 0 5 15 20 40 $1,682,000
219
La Paz Middle LPM007 Install raised crossing with High- Visibility yellow crosswalk across La
Cuesta Ct (South Intersection)
Antigua Ave La Cuesta Ct
(South
intersection)
0 5 0 15 20 40 $149,000
219 La Paz Middle LPM008 Install High-Visibility yellow crosswalk across Antigua Cir
Antigua Ave Antigua Cir 0 5 0 15 20 40 $4,000
219
La Paz Middle LPM010 Install raised crosswalk with High- Visibility yellow crosswalk across
Vera Cruz Cir. and construct curb
extensions
Antigua Ave Vera Cruz Cir 5 0 20 15 0 40 $249,000
219
Laurel Wood
Elementary
LWE007 Encourage parent drop off at this
location to alleviate front of school
traffic. Install curb extensions and
High-Visibility crossing across
Victor. Consider marked crosswalk
across Larkin St.

Victor St Larkin St 0 5 0 15 20 40 $108,000
219
Los Padres
Elementary
LPE005 Install planned School Assembly B
signage in advance of existing
crosswalk.

McGowan Dr Near John St 0 0 20 0 20 40 $850
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
219
Monte Bella
Elementary
MBLE004 Consider traffic calming for two
vehicular travel lanes that does not
impact existing bike lanes
Tuscany Blvd Freedom Parkway Monte Bella Blvd 5 15 0 0 20 40 $255,000 219
Monte Bella
Elementary
MBLE008 Evaluate for all-way stop control. If
warranted, install marked high-
visibility crosswalks across all legs
and ADA comliant ramps. If not
warranted, consider pedestrian
facility per City policy.

Monte Bella Blvd Palermo Dr
(north leg)
0 5 0 15 20 40 $53,000
219
Monterey Park
Elementary
MPKE002 Install curb extensions, ADA ramps
and/or continuous sidewalks on
San Miguel Ave at San Pedro, San
Juan, Alameda, Wilgart, San
Fernando, Via Paraiso, and Los
Palos.

San Miguel Ave San Pedro St Los Palos Dr 0 15 0 15 10 40 $1,287,000 219
Monterey Park
Elementary
MPKE005 Install curb extensions on all
corners, pedestrian refuge island,
high-visibility crosswalks, and curb
ramps. Widen pedestrian entrance
to school at this location
San Miguel Ave Alameda Ave 0 15 0 15 10 40 $247,000
219
New Republic
Elementary
NRE002 Conduct all-way stop warrant.

Consider marked crosswalk across
Arcadia Way
Arcadia Way Kent St 0 5 0 15 20 40 $13,000
219
Rancho San Juan
High
RSJH002 Conduct neighborhood traffic
calming plan and consider bike
boulevard treatments. Consider
Bollenbacher Dr, Jade St and
Penzance St as possible locations
for traffic calming.

Neighborhood
around La Joya
Area 0 15 5 0 20 40 $45,000
219
Rancho San Juan
High
RSJH006 Install multi-use path along south
side of Rogge Rd between
Natividad Rd and Rancho San Juan
High School
Rogge Rd (south
Side)
Natividad Rd Rancho San Juan
High School
0 0 5 15 20 40 $560,000
219
Rancho San Juan
High
RSJH007 Construct curb extensions with
ADA ramps. Consider roundabout
or signal warrant analysis.

Consider removal of long right turn
only trap lane on northbound San
Juan Grade between Cornwall and
Rogge Village Way and use space to
upgrade and widen bike lane to
Class IIB buffered or Class IV
separated bikeway.

Rogge Rd San Juan Grade
Rd
0 0 5 15 20 40 $335,000
219
Rancho San Juan
High
RSJH008 Consider traffic calming measures
between San Juan Grade Rd and
Rancho San Juan High School such
as lane width reduction.

Rogge Rd San Juan Grade
Road
Rancho San Juan
High School
0 15 5 0 20 40 $77,880
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
219
Rancho San Juan
High
RSJH012 Construct curb extensions with
ADA ramps and install High-
Visibility crosswalks across San
Juan Rd and on both sides of
Penzance St./Cornwall. Include
RRFB and median ped refuge for
San Juan Grade Rd crossing
San Juan Grade
Road
Penzance and
Cornwall
0 0 5 15 20 40 $826,000
219
Rancho San Juan
High
RSJH013 Install High-Visibility crosswalks
across school driveways
School
Driveways
Rogge Rd 0 0 5 15 20 40 $16,000
219
Salinas High SH019 Evaluate pedestrian crossing
demand to determine whether
crosswalk across Clay is warranted.

Construct curb extensions to
narrow crossing distance on Capitol
St. and install high-visibility
crosswalk across Capitol.

Clay St Capitol St 0 5 0 15 20 40 $218,000
219
Virginia Rocca
Barton Elementary
VRBE002 Install raised crosswalk across Las
Casitas to improve Creek Trail
crossing to school. Include bike trail
signage to warn about crossing to
disembark and walk bicycle across
Las Casitas Dr School Entrance 0 5 15 0 20 40 $146,700
219
Virginia Rocca
Barton Elementary
VRBE006 Upgrade to High-Visibility
crosswalk yellow all legs
Las Casitas Dr School Entrance 0 5 15 0 20 40 $8,000
219
Virginia Rocca
Barton Elementary
VRBE016 Install High-Visibility crosswalk
yellow and construct curb
extensions across Las Casitas Dr
Las Casitas Dr Rider Ave 0 0 20 0 20 40 $104,000
219
Virginia Rocca
Barton Elementary
VRBE019 Upgrade to High-Visibility
crosswalk white and curb ramps
Del Monte Ave Pacific Ave 0 0 20 0 20 40 $68,000
219
Virginia Rocca
Barton Elementary
VRBE028 Consider location for crossing
guard
Las Casitas Dr School Entrance 0 5 15 0 20 40 N/A
265
Frank Paul
Elementary
FPE002 Install bike lane. Transition to bike
boulevard west of Mazatlan.

Rider Ave Freedom Parkway Mazatlan Way 8 15 0 15 0 38 $947,400 265
Harden Middle HM004 Install Class IV bikeway or Class I shared-use path
and conflict striping at
intersections and driveways
McKinnon St Harden Parkway E Alvin Dr 18 5 0 15 0 38 $1,080,000 265
Henry F.

Kammann
HFK003 Consider constructing a center
median with street trees on Rochex
Ave to slow traffic. Consolidate the
number of driveways onto campus.

Rochex Ave Tyler St N 4th St 3 15 0 0 20 38 $26,960
265
Henry F.

Kammann
HFK005 Upgrade curb ramps and install
High-Visibility crosswalks and
advance limit lines. Upgrade
pedestrian heads at signal to
include leading pedestrian interval
Tyler St W Laurel Dr 3 0 15 0 20 38 $268,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
265
Henry F.

Kammann
HFK014 Consider extending SRTS corridor
on E Alvin and installing buffered
bike lanes and high-visibility
crossings.

W Alvin Dr Cherokee Dr N Main St 8 5 0 15 10 38 $1,361,580 265
New Republic
Elementary
NRE001 Install traffic calming measures if
requested and supported by
neighborhood residents
Arcadia Way El Dorado Dr Natividad Rd 3 15 0 0 20 38 $540,600 265 Washington
Middle
WM021 Install bicycle boulevard signage
and striping
Homestead Ave Clay St Wilson St 3 15 5 15 0 38 $1,407,600 272
Henry F.

Kammann
HFK008 Consider bike boulevard. Consider
road closure with bike/pedestrian
access at Ebro Circle to reduce cut-
through traffic
Cherokee Dr Tulane N Main St 12 10 0 15 0 37 $3,060,000 273 Harden Middle HM007 Repair broken sidewalk McKinnon St Harden Parkway E Alvin Dr 6 5 5 0 20 36 $125,000 273 Henry F.

Kammann
HFK012 Consider bike boulevard with curb
extensions and tree wells.

N 1st St Curtis St Cherokee Dr 16 5 0 15 0 36 $3,447,200 273
Laurel Wood
Elementary
LWE001 Consider bike boulevard with traffic
calming measures along Larkin
between N Davis Rd and Victor St.

Consider crosswalk across Larkin St
at Victor St, O'Farrell Ct, and/or
Sherman Dr. Install curb extensions
at intersections along Larkin from
Mason Way to Victor St to shorten
crossing distance on side streets
Larkin St N Davis Rd Victor St 6 15 0 15 0 36 $2,032,000 276
Alisal High AH011 Install High-Visibility crosswalk and construct curb extensions with
curb ramps across Estrella
Freedom
Parkway
Estrella Way 0 0 0 15 20 35 $130,000
276
Carr Lake
Community Day
CLCD011 Install lead pedestrian interval and
conduct counts to determine if
protected phase is needed
Sherwood Drive Bernal St 0 0 15 0 20 35 $240,000
276
Creekside
Elementary
CE002 Implement loading zone curb
markings and signage for drop off
and pick up (side adjacent to the
school)
Beacon Hill Dr Declaration St Kittery St 0 15 0 0 20 35 $4,100 276
Creekside
Elementary
CE005 Add speed feedback sign Beacon Hill Dr Declaration St Kittery St 0 15 0 0 20 35 $10,700 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
276
Creekside
Elementary
CE014 Evaluate pedestrian crossing
opportunities between
Massachusetts neighborhood and
Creekbridge neighborhood. Install
conflict striping across
intersections to connect bike
lanes/future Class IV
Constitution Blvd Nantucket Freedom
Parkway
0 0 0 15 20 35 $22,660
276
Creekside
Elementary
CE021 Provide access to the school from
the back side of campus to allow
students to avoid school drop-off
traffic
School Campus Middle east side
of school yard
0 15 0 0 20 35 $8,500
276
DIAS DIAS002 Reconstruct fencing and establish
path through empty lot to allow
bridge access without accessing
school property. Explore potential
to expand staff parking lot. Pursue
easement to allow access to
Apostolic Lane if necessary
Empty parcel
behind school
Service road on
east side of
school
0 0 0 15 20 35 $24,450
276
DIAS DIAS003 Install gate connecting school
campus to foot bridge
Back entrance Calle del Adobe 0 0 0 15 20 35 $8,500
276
DIAS DIAS004 Install curb extensions and marked
crossing across Addington Lane and
Fontes Lane. Alternate
recommendation: shift bus stops to
Calle Del Adobe
Fontes Ln Addington Ln 0 0 0 15 20 35 $112,000
276
Dr. Oscar Loya
Elementary
DOLA010 Add loading zone signage on Elk
Drive and Falcon Drive and
encourage drop-off on these
streets.

Elk Dr / Falcon Dr Buckhorn Dr Cougar Dr 0 15 0 0 20 35 $850 276
El Gabilan
Elementary
EGE002 Install pedestrian refuge island and
yellow high-visibility crosswalk
across Linwood and high-visibility
crosswalk across Sequoia. Install
School Assembly signage.

Linwood Dr Sequoia St 0 0 0 15 20 35 $4,850
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
276
El Gabilan
Elementary
EGE005 Install yellow, high-visibility
crosswalks on three legs of the
intersection with pedestrian refuge
island at the Linwood Dr crossing.

Install School Assembly signage.

Linwood Dr Elwood St 0 0 0 15 20 35 $112,850
276
El Puente EP011 Install lead pedestrian interval and
conduct counts to determine if
protected phase is needed
Sherwood Drive Bernal St 0 0 15 0 20 35 $240,000
276
El Sausal Middle ESM007 Reconstruct driveway entrances to staff parking lot and redesign
parking lot with reconfigured stalls
restricted to teachers only. Because
it’s a rolled curb the
street/sidewalk may need to be
reconfigured as well.

Eucalyptus Dr Parking lot
driveway
0 0 15 0 20 35 $96,600
276
Everett Alvarez
High
EAH013 Evaluate pedestrian demand and
consider formalized connection
between Crestview St and
Provincetown Dr
Trail network
behind Steinbeck
Elementary
Snug Harbor school 0 0 0 15 20 35 $1,000,000
276
Frank Paul
Elementary
FPE004 Conduct warrant study for stop
sign. If not warranted, evaluate
crosswalk for a rectangular rapid
flashing beacon. Upgrade crosswalk
with High-Visibility yellow and
install curb ramp on south side of
Rider Ave. Install yield markings
and curb extensions to shorten
Rider Ave Mazatlan Way 0 15 0 0 20 35 $164,000
276
Frank Paul
Elementary
FPE010 Widen sidewalk Antigua Ave Palmera Ave Sanborn Rd 0 15 0 0 20 35 $30,000 276
Frank Paul
Elementary
FPE016 Install raised crosswalk with High-
Visibility yellow crosswalk and curb
extensions across Vera Cruz Cir.

Antigua Ave Vera Cruz Cir 0 0 0 15 20 35 $249,000
276
Gavilan View
Middle
GVM002 Install curb extensions, curb ramps,
High-Visibility crossings, leading
pedestrian intervals, protected
pedestrian signal phase, and
pedestrian countdown signal
heads. Consider protected
intersection treatments.

Russell Rd Van Buren Ave 0 0 0 15 20 35 $1,917,140
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
276
Gavilan View
Middle
GVM003 Install sidewalk or pedestrian path
to ensure continuous sidewalk on
one or both sides of the street.

Russell Rd North Main Street San Juan Grade
Road
0 0 0 15 20 35 $1,320,000
276
Gavilan View
Middle
GVM007 Consider possible marked crossing
on Russell Road between
Eisenhower St and Paul St. Evaluate
pedestrian crossing demand and
MUTCD compliance.

Russell Rd Halfway
between
Eistenhower St
and Paul St
0 0 0 15 20 35 $14,000
276 Henry F.

Kammann
HFK009 Install curb extensions and High-
Visibility crosswalks
Cherokee Dr Inca Way 0 0 0 15 20 35 $216,000
276
John E. Steinbeck
Elementary
JESE001 Install traffic calming measures if
requested and supported by
neighborhood residents
Burlington Dr Provincetown Dr end of street 0 15 0 0 20 35 $204,000 276
John E. Steinbeck
Elementary
JESE012 Install signs in advance of drop-off
loop: "stay in car until drop-off
zone"
Parking lot Burlington Dr 0 15 0 0 20 35 $850
276
John E. Steinbeck
Elementary
JESE015 Install wayfinding from trail to
school entrance (and have bike
parking located near entrance)
School Trail network 0 15 0 0 20 35 $12,250
276 La Joya
Elementary
LJE006 Install sidewalk or multi-use path
on north side of the street
Cornwall St Bellinzona Ave Kelton Dr 0 0 0 15 20 35 $495,000 276
La Joya
Elementary
LJE010 Construct sidewalks along
segments where no sidewalk exists
between Russell Rd and Rogge
Village Wy. Consider multi-use path
for bicycle use.

San Juan Grade
Rd
Russell Rd Rogge Village Wy 0 0 0 15 20 35 $750,000
276
La Paz Middle LPM002 Install High-Visibility crosswalk
yellow and construct curb
extensions across Estrella Way
Freedom
Parkway
Estrella Way 0 0 0 15 20 35 $104,000
276 Lincoln
Elementary
LE005 Consider pedestrian facilities per
City policy.

Maple St Front St 5 10 0 0 20 35 $10,000
276
Loma Vista
Elementary
LVE002 Consider continuous sidewalk at
Redondo Way, Coventry St, and
back entrance to campus
Glendora Way Compton Way 0 10 0 15 10 35 $13,500
276
Loma Vista
Elementary
LVE005 Install marked crosswalks across
side streets. Install curb extensions
at intersections of Los Coches and
Sausal.

Pescadero Dr Las Coches Ave Compton Way 0 0 0 15 20 35 $232,000 276
Loma Vista
Elementary
LVE007 Consider continuous
sidewalk/raised crosswalk in front
of school
Cambrian Dr Sausal Dr 0 10 0 15 10 35 $5,000
276 Loma Vista
Elementary
LVE009 Install curb extension and High-
Visibility crosswalk
Los Coches Ave Cambrian Dr 0 0 0 15 20 35 $104,000
276
Monterey Park
Elementary
MPKE003 Install curb extensions with
tightened curb radii and ADA
ramps. Install high-visibility
crosswalks
San Miguel Ave San Juan Dr 0 0 0 15 20 35 $216,000
276
Mount Toro High MTH011 Install lead pedestrian interval and conduct counts to determine if
protected phase is needed
Sherwood Drive Bernal St 0 0 15 0 20 35 $440,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
276
Natividad
Elementary
NE009 Consider street trees and traffic
calming if requested and supported
by neighborhood residents
Modoc Ave Alvin Dr Rainier Dr 0 15 0 0 20 35 $284,600
276
North Salinas
High
NSH012 Widen pathway between staff
parking lot and trail entrance to
allow for bicycle access. Consider
narrowing staff lot to create
additional space. Look into
complete streets treatments to
separate between pedestrian/bike
space and vehicle space at path
entrance/parking lot exit.

School campus trail entrance 0 0 0 15 20 35 $53,350
276
Rancho San Juan
High
RSJH009 Install sidewalk or pedestrian path
to ensure continous sidewalk on
one or both sides of the street.

Multi-use path or protected two-
way bike facility along Russell Rd
(south side has few driveways)
Russell Road North Main San Juan Grade
Rd
0 0 0 15 20 35 $1,320,000
276
Rancho San Juan
High
RSJH010 Construct sidewalks along
segments where no sidewalk exists
between Russell Rd and Rogge
Village Wy. Consider multi-use path
for bicycle use. Install traffic
calming including narrowed travel
lanes.

San Juan Grade
Rd
Russell Rd Rogge Village Wy 0 0 0 15 20 35 $750,000
276
Salinas High SH023 Install curb extensions, yellow High- Visibility crosswalk across Capitol
Geil St Capitol St 0 0 0 15 20 35 $104,000
276
Santa Rita
Elementary
SRE013 Consider bike boulevard with traffic
calming between Bolivar St and
Swaner Ave. Consider speed
cushions, curb extensions, street
Santa Rita St Bolivar St Swaner Ave 0 5 15 15 0 35 $666,400 276
Virginia Rocca
Barton Elementary
VRBE022 Install curb extension and upgrade
to High-Visibility crosswalk across
Atlantic St
Atlantic St Del Monte Ave 0 0 20 15 0 35 $104,000
276
Virginia Rocca
Barton Elementary
VRBE023 Install curb extension and upgrade
to High-Visibility crosswalk across
Carl Court
Atlantic St Carl Court 0 0 20 15 0 35 $104,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
276
Virginia Rocca
Barton Elementary
VRBE024 Install curb extension and upgrade
to High-Visibility crosswalk across
Caoba Way
Nogal Drive Caoba Way 0 0 20 15 0 35 $104,000
276
Virginia Rocca
Barton Elementary
VRBE025 Install curb extension and upgrade
to High-Visibility crosswalk across
Nogal Circle
Nogal Drive Nogal Circle 0 0 20 15 0 35 $104,000
276
Washington
Middle
WM005 Reopen back gate to allow student
ingress & egress
College Dr
(Terminus)
Back Entrance to
school
0 0 0 15 20 35 $8,500
276
Washington
Middle
WM006 Install High-Visibility yellow
crosswalks and construct curb
extensions and ramps
College Dr Marion Ave 0 0 0 15 20 35 $268,000
276
Washington
Middle
WM007 Install traffic calming and speed
humps or consider bike boulevard
College Dr Alisal St back entrance to
school
0 0 0 15 20 35 $550,800
276
Washington
Middle
WM012 Install High-Visibility crosswalk
across Lorimer St and curb
extensions to square intersection.

Homestead Ave Lorimer St 0 0 0 15 20 35 $104,000
276 Washington
Middle
WM018 Install High-Visibility crosswalk
across Marion
Homestead Ave Marion Ave 0 0 0 15 20 35 $4,000
326 Harden Middle HM006 Install Class II buffered bike lane McKinnon St Boronda Rd Harden Parkway 24 5 5 0 0 34 $255,420 327
Creekside
Elementary
CE018 Install High-Visibility crosswalk and
curb extensions across Cape Cod
Way and install conflict striping for
bike lane or future Class IV
Constitution Blvd Cape Cod Way 3 5 0 15 10 33 $110,720
327
El Gabilan
Elementary
EGE001 Install planned buffered bike lanes
and traffic calming on Linwood.

Plant trees in the median for street
enclosure and tree canopy. Trim
vegetation that obstructs existing
school speed limit signs.

Linwood Dr Laurel Dr Alvin Dr 13 0 0 0 20 33 $10,000
327
Everett Alvarez
High
EAH011 Upgrade bike lanes to buffered
bike lanes or Class IV separated
bikeway
Nantucket Blvd Independence
Blvd
Constitution Blvd 8 0 0 15 10 33 $3,700,800
327
Harden Middle HM001 Evaluate intersection for leading
pedestrian interval or split signal
phasing.

E Alvin Dr McKinnon St 13 0 0 0 20 33 $200,000
327 North Salinas
High
NSH015 Install key card activated gate for
staff parking
Staff Parking lot
entrance
McKinnon St 13 0 0 0 20 33 $1,000
332
Everett Alvarez
High
EAH003 Install a Class I multi-use path along
Gabilan Creek. Include crossing at
Danbury St
Gabilan Creek Boronda Rd Lexington Dr 6 0 0 15 10 31 $1,200,000 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
332
La Paz Middle LPM019 Add additional bus only signage at entry on Sherwood Lane. At the
end of the bus drop-off lane, install
flexible posts to narrow the exit
and install exit only/one way road
signage to prevent vehicles from
turning incorrectly into the bus
lane and provide additional
protection for pedestrians using
the crosswalk
Bus driveway/
drop-off zone
Sherwood Ln School entrance
off of Sanborn Rd
1 10 0 0 20 31 $3,050
332
McKinnon
Elementary
MKE001 Install traffic calming and buffered
bike lanes or two-way protected
bikeway.

McKinnon St in
neighborhood
Boronda Rd Harden Parkway 6 5 5 15 0 31 $1,595,970
332
Natividad
Elementary
NE012 Upgrade bike lanes to Class IV
separated bikeway, buffered bike
lane, or two-way cycle track
El Dorado Dr E Alvin Dr E Boronda Rd 6 5 5 15 0 31 $3,562,020 332
New Republic
Elementary
NRE006 Upgrade bike lanes to separated
bikeway, buffered bike lane, or two-
way cycle track
El Dorado Dr E Alvin Dr E Boronda Rd 6 5 5 15 0 31 $3,562,020 337
Boronda
Meadows
Elementary
BME001 Consider installing a roundabout in
school parking lot intersection
School parking
lot
Larkin St
(Terminus)
0 10 0 0 20 30 $195,000
337
Cesar E. Chavez
Elementary
CECE002 Upgrade crosswalks to High-
Visibility and construct curb
extensions with ramps
Towt St Moreno St 0 10 0 0 20 30 $268,000
337
Creekside
Elementary
CE001 Install school crossing signs on
both sides of Kittery St (crossing
assembly A)
Kittery St Crestview St 0 10 0 0 20 30 $1,700
337
DIAS DIAS001 Restripe parking lot to allow access
to parking spaces adjacent to street
without driving through the loop
adjacent to school. Establish
preferred walking route through
parking lot with painted walkways,
quick-build materials, or
constructed sidewalk
Parking lot Fontes Ln 0 10 0 0 20 30 $104,000
337
Dr. Martin Luther
King Jr.

Elementary
MLKA006 Optimize signal timing and improve
coordination with nearby signals.

Upgrade to high-visibility
crosswalks for both legs. Install
leading pedestrian interval and
consider protected left turn from
Sanborn to Kimmel.

Sanborn Rd Kimmel St 0 15 15 0 0 30 $188,000
337
Dr. Martin Luther
King Jr.

Elementary
MLKA007 Upgrade to High-Visibility
crosswalk yellow across Montana
Sanborn Rd Montana St 0 15 15 0 0 30 $4,000
337
Dr. Oscar Loya
Elementary
DOLA004 Install traffic calming if requested
and supported by neighborhood
residents and additional school
zone signage
Cougar Dr Freedom
Parkway
Elk Dr 0 10 0 0 20 30 $122,400
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
337 Dr. Oscar Loya
Elementary
DOLA005 Install curb extensions to improve
crossing
Cougar Dr Badger Way 0 10 0 0 20 30 $100,000
337 Dr. Oscar Loya
Elementary
DOLA006 Install school crossing signage
assembly B
Cougar Dr Badger Way 0 10 0 0 20 30 $1,700
337 El Gabilan
Elementary
EGE007 Install protected pedestrian signal
phasing
Laurel Dr Maryal Dr 5 5 0 0 20 30 $200,000
337
Fremont
Elementary
FE009 Bus Stop no parking signage needs
to be installed so vehicle do not
block bus parking space
Market St School Entrance
area
0 10 20 0 0 30 $850
337
Harden Middle HM011 Install traffic calming measures if requested and supported by
neighborhood residents and bicycle
route sharrows and signage
Westminster Dr McKinnon St Cambridge Ct 5 5 0 0 20 30 $612,000 337
John E. Steinbeck
Elementary
JESE010 Install traffic calming measures if
requested and supported by
neighborhood residents
New Salem Dr Burlington Dr end of street 0 10 0 0 20 30 $158,100 337
Laurel Wood
Elementary
LWE003 Close Lombard St at Rossi Linear
Park and extend greenway
Lombard St Rossi Linear Park 0 15 0 15 0 30 N/A
337
Laurel Wood
Elementary
LWE006 Install High-Visibility crosswalks,
curb extensions, and updated
ramps
Larkin St Flint Way 0 10 0 0 20 30 $268,000
337
Laurel Wood
Elementary
LWE008 Encourage use of this as drop-off
location to ease traffic on Larkin St.

Reconstruct sidewalk and replace
street trees.

Flint Way Colton Dr 0 10 0 0 20 30 $190,000
337
Lincoln
Elementary
LE001 Install traffic calming measures if
requested and supported by
neighborhood residents on the
blocks near the school. Install curb
extensions and High-Visibility
crossings on California at Maple,
Chesnut, Willow, and Pine
California St Maple St Pine St 0 10 0 0 20 30 $1,270,200 337 Lincoln
Elementary
LE010 Install raised crosswalk across
Carmel Ave at Maple Ave
Carmel Ave Maple St 0 5 0 15 10 30 $145,000
337
Loma Vista
Elementary
LVE001 Consider moving bus drop off to
alternate location (El Sausal Drive
across from the school could be a
good place) and letting parents
drop off in the loop
School drop-off
loop
Sausal Dr /
Cambrian Dr
0 10 0 0 20 30 $75,000
337
Loma Vista
Elementary
LVE003 Reconstruct sidewalk where
needed on Compton Wy and
Glendora Wy
Sidewalk back of school 0 10 0 0 20 30 $125,000
337
Mission Park
Elementary
MPE002 Install stop sign at school driveway
exit. Redesign school driveway exit
to restrict left turns (for example,
see New Republic Elementary)
School exit
driveway
Acacia St /
Marion Ave
0 10 0 0 20 30 $2,170
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
337
Mission Park
Elementary
MPE003 Upgrade crosswalk to yellow high-
visibility crosswalk and install
pedestrian island and advance yield
ulines. Trim vegetation to increase
visibility.

W Acacia St Marion St 0 10 0 0 20 30 $109,800
337
Monte Bella
Elementary
MBLE001 Consider road diet on Freedom
from Tuscany and installation of
Class IV separated bikeways.

Freedom
Parkway
Tuscany Blvd Padova Dr
(eventually to
Sconberg
Parkway)
0 5 0 15 10 30 $462,600
337
Monterey Park
Elementary
MPKE004 Install High-Visibility crosswalks
and construct curb extensions
San Miguel Ave San Fernando Dr 0 5 0 15 10 30 $216,000
337 Natividad
Elementary
NE010 Install curb extensions at all
intersections
Glacier Dr Modoc Av Plumas Way 0 10 0 0 20 30 $400,000
337
Salinas High SH020 Install curb extensions and yellow
High-Visibility crosswalks on all legs
of the intersection and school
crossing signage assembly A.

Coordinate any changes with
Salinas Fire Department
Clay St Riker St 0 5 0 15 10 30 $219,400
337
Santa Rita
Elementary
SRE014 Construct curb extensions, curb
ramps, High-Visibility crossings
across Jackson St/Jackson Circle.

Replace faded street sign. Repave
or resurface for cracks on
pavement
Swaner Ave Jackson St 0 0 15 15 0 30 $310,550
337
University Park
Elementary
UPE006 Consider bike boulevards and curb
extensions at all intersections
University Ave Ambrose Dr Archer St 0 10 5 15 0 30 $2,766,800 337
Washington
Middle
WM014 Install traffic calming if requested
and supported by neighborhood
residents.

Marion Ave Acacia St Homestead Ave 0 10 0 0 20 30 $346,800 366 Henry F.

Kammann
HFK015 Consider bike lanes or bike
boulevard
Madrid St Cherokee Dr Mall entrance
driveway
14 0 0 15 0 29 $408,000
367
Cesar E. Chavez
Elementary
CECE004 Upgrade crosswalks to High-
Visibility and construct curb
extensions with ramps
Towt St Paseo Grande 3 5 0 0 20 28 $268,000
368
Dr. Oscar Loya
Elementary
DOLA020 Install Class II buffered bikeway and
conflict striping. Consider
upgrading to Class IV bikeway
Williams Rd Freedom
Parkway
Boronda Rd 3 0 0 15 10 28 $1,850,400
368
Henry F.

Kammann
HFK016 Install planned rectangular rapid
flashing beacon and pedestrian
refuge island at Laurel/Parkside.

W Laurel Dr Parkside St 3 5 0 0 20 28 $140,000
368
Loma Vista
Elementary
LVE012 Update crosswalks to high-visibility
and consider center median
pedestrian refuges and curb
extensions, protected pedestrian
phasing, leading pedestrian
interval, and pedestrian
countdown signal heads
Natividad Rd Los Coches Ave 8 0 0 0 20 28 $766,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
368
Salinas High SH010 Install curb extensions, yellow High- Visibility crosswalks, and school
crossing signage assembly A
Riker St W Acacia St 8 0 0 0 20 28 $219,400
368
Virginia Rocca
Barton Elementary
VRBE012 Consider raised crosswalk and
upgrade to High-Visibility crosswalk
yellow across Ranchero Dr
Las Casitas Dr Ranchero Dr 3 5 20 0 0 28 $149,000
373
Cesar E. Chavez
Elementary
CECE006 Install class II bike lanes Towt St Freedom
Parkway
Paseo Grande 6 5 0 15 0 26 $42,240
373
Everett Alvarez
High
EAH014 Consider installing additional
entrance to school parking lot from
Nantucket Blvd
Nantucket Blvd South entrance
to school parking
lot
6 0 0 0 20 26 $8,500
375
Bardin
Elementary
BE002 Install double roundabout
configuration at intersection,
include new striping plan and
roadway reconfiguration per Alisal
Vibrancy Plan and current Bardin
SRTS project
E Alisal St Bardin Rd 0 0 15 0 10 25 Project Funded
375
Creekside
Elementary
CE006 Install raised crosswalk with High-
Visibility crosswalk with yield
signage and striping
Fitzgerald St greenway path
crossing
0 0 0 15 10 25 $154,700
375
Creekside
Elementary
CE007 Install raised crosswalk with High-
Visibility crosswalk with yield
signage and striping
Snug Harbor St greenway path
crossing
0 0 0 15 10 25 $154,700
375
Creekside
Elementary
CE008 Install raised crosswalk with High-
Visibility crosswalk with yield
signage and striping
Crestview St greenway path
crossing
0 0 0 15 10 25 $154,700
375
Creekside
Elementary
CE009 Install raised crosswalk with High-
Visibility crosswalk with yield
signage and striping
Newington St greenway path
crossing
0 0 0 15 10 25 $154,700
375
Creekside
Elementary
CE019 Create bicycle boulevard by
installing traffic calming, sharrow
markings and signage and connect
to greenway path
Crestview St Kittery St Great Island St 0 10 0 15 0 25 $244,800 375
Creekside
Elementary
CE022 Install High-Visibility crosswalk and
curb extensions across Fitzgerald.

Upgrade to High-Visibility
crosswalk and install curb
extensions across Kittery St
Kittery St Fitzgerald St 0 10 0 15 0 25 $112,000
375 Dr. Oscar Loya
Elementary
DOLA011 Evaluate all way stop or consider
traffic circle
Falcon Dr Buckhorn Dr 0 5 0 0 20 25 $200,000
375
Dr. Oscar Loya
Elementary
DOLA013 Install traffic calming if requested
and supported by neighborhood
residents.

Falcon Dr Bison Way Buckhorn Dr 0 5 0 0 20 25 $122,400
375 El Gabilan
Elementary
EGE004 Upgrade crosswalks to yellow high-
visibility.

Linwood Dr Rainier Dr 5 0 0 0 20 25 $16,000
375 El Sausal Middle ESM010 Add school crossing signage on both sides of street assembly A
Towt St 1st Ave 0 10 15 0 0 25 $1,700
375 Everett Alvarez
High
EAH009 Consider pedestrian facility per City
policy.

Nantucket Blvd Independence
Blvd
Hemingway Dr 5 0 0 0 20 25 $10,000
375 Frank Paul
Elementary
FPE003 Upgrade crosswalk with High-
Visibility yellow markings.

Rider Ave Antigua Ave 0 5 0 0 20 25 $4,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
375
Frank Paul
Elementary
FPE015 Consider raised intersection with
High-Visibility crosswalks on all
legs, or install High-Visibility yellow
crosswalk and construct curb
extension all legs and raised
crosswalks across Bernardo Ave
Antigua Ave Bernardo Ave 0 5 0 0 20 25 $796,000
375 Fremont
Elementary
FE018 Consider pedestrian crossing
enhancements per City policy.

Williams Rd Grandhaven St 5 0 20 0 0 25 $10,000
375
Gavilan View
Middle
GVM006 Install multi-use path or protected
two-way bike facility along Russell
Rd (the south side has few
driveways)
Russell Rd North Main Street San Juan Grade
Road
0 0 0 15 10 25 $2,035,440
375
Harden Middle HM008 Install rectangular rapid flashing
beacon for McKinnon St crossing
and assembly B signage to
complement existing assembly A.

Upgrade to High-Visibility
crosswalk and curb extensions
across Westminster Dr. Include
bikeway conflict striping through
the intersection.

McKinnon St Westminster Dr 5 0 0 0 20 25 $149,480
375
Harden Middle HM009 Redesign school driveway exit to
discourage left turns and install
right-turn only signage
School Driveway
Exit
McKinnon St 5 0 0 0 20 25 $2,850
375
Henry F.

Kammann
HFK004 Install traffic calming if requested
and supported by neighborhood
residents. Install curb extensions to
shorten crossing distance and
increase visibility and consider
rectangular rapid flashing beacon
and/or raised crossing. Install ADA
compliant curb ramps.
4th St Rochex Ave 0 5 0 0 20 25 $456,520
375 Jesse G. Sanchez
Elementary
JGSE009 Install curb ramps Machado Way Montana St 5 0 20 0 0 25 $52,000 375
John E. Steinbeck
Elementary
JESE014 Repair broken sidewalk sections Provincetown Dr Lexington Dr Lexington Dr 0 5 0 0 20 25 $125,000 375
La Joya
Elementary
LJE001 Update existing crosswalk to yellow
High-Visibility and add High-
Visibility crosswalk across Pingree
Wy. Construct curb extensions with
ADA ramps on all corners, with
wide curb extension at school
frontage to prevent parking in red
zone.

Bollenbacher Dr Pingree Way 0 0 5 0 20 25 $224,000
375
La Joya
Elementary
LJE003 Construct curb extensions with
ADA ramps and install High-
Visibility crossings on all legs of the
intersection
Bollenbacher Dr Penzance St 0 0 5 0 20 25 $132,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
375
La Joya
Elementary
LJE004 Construct curb extensions with
ADA ramps and install High-
Visibility crosswalks across San
Juan Rd and on both sides of
Penzance St. Include rectangular
rapid flashing beacon and median
pedestrian refuge for San Juan
Grade Rd crossing
Penzance St San Juan Grade
Rd
0 0 5 0 20 25 $396,000
375
La Paz Middle LPM009 Consider raised intersection with
High-Visibility crosswalks on all
legs, or install High-Visibility yellow
crosswalks, curb extension all legs
of the intersection, and raised
crosswalks across Bernardo Ave
Antigua Ave Bernardo Ave 0 5 0 0 20 25 $796,000
375
La Paz Middle LPM012 Upgrade to High-Visibility yellow
crosswalk across Estella Way
Paseo Grande Estrella Way 0 5 0 0 20 25 $4,000
375
Loma Vista
Elementary
LVE008 Consider bike boulevard. Install
marked High-Visibility crosswalk
across side streets (Saucito and El
Sur) and consider continuous
sidewalks.

Cambrian Dr Saucito Ave 0 0 0 15 10 25 $910,600
375 Mission Park
Elementary
MPE008 Install curb ramps and high-
visibility crosswalk across Bruce
W Acacia St Bruce Ave 0 10 0 15 0 25 $30,000
375
Mission Park
Elementary
MPE011 Square intersection, close slip
lanes, shorten crossing distances
with curb extensions. Consider
neighborhood traffic circle
W Acacia St Iverson St 5 0 0 0 20 25 $645,000
375
Natividad
Elementary
NE004 Upgrade crosswalks to yellow high-
visibility (per Linwood SRTS project)
Linwood Dr Rainier Dr 5 0 0 0 20 25 Project Funded
375
North Salinas
High
NSH005 Install High-Visibility crosswalks
and curb extension on all legs of
the intersection
Maryal Dr Chaparral St 0 0 0 15 10 25 $216,000
375
North Salinas
High
NSH006 Install traffic calming and create
Class III bike route with green-
backed sharrows and signage
Maryal Dr Chaparral St Laurel Dr 5 10 0 0 10 25 $652,800 375
Oasis Charter OC004 Conduct feasibility analysis for
bicycle/pedestrian overcrossing
over SR 101 at Alvin Drive
W Alvin Dr
extension
Cherokee Dr Davis Rd 0 0 0 15 10 25 $10,000
375
Salinas High SH014 Consider removing existing slip
lane and reconstructing
intersection. Install High-Visibility
crosswalk and construct curb
extensions.

Lincoln Ave Clay St 0 5 0 0 20 25 $466,000
375
Salinas High SH016 Upgrade to High-Visibility
crosswalk and install curb
extension across Church St
Clay St Church St 0 5 0 0 20 25 $108,000
375 Santa Rita
Elementary
SRE005 Traffic Circle E Bolivar St Perez St 0 10 15 0 0 25 $195,000 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
375
Washington
Middle
WM004 Square intersection, remove slip
lane, install High-Visibility
crosswalk markings, construct curb
extensions to shorten crossing
distance. Consider neighborhood
traffic circle in reconstruction to
manage speed.

Iverson St W Acacia St 5 0 0 0 20 25 $657,000
375
Washington
Middle
WM023 Evaluate for possible time of day
loading zone on Roosevelt Street
near La Paz Park to provide space
for parent drop-off/pick-up at bus
stop.

Roosevelt St Wood St West edge of
park
0 5 20 0 0 25 $13
413
Alisal High AH005 Conduct ICE analysis to study
installation of roundabout.

Upgrade to yellow High-Visibility
crosswalks
Williams Rd Freedom
Parkway
3 0 0 0 20 23 $60,000
413 Alisal High AH006 Install additional school zone
signage assembly A
Williams Rd Freedom
Parkway
3 0 0 0 20 23 $1,700
413
Boronda
Meadows
Elementary
BME002 Conduct traffic analysis at this
intersection. Upgrade crosswalks to
yellow High-Visibility
N Davis Rd Larkin St 3 0 0 0 20 23 $18,750
413
Cesar E. Chavez
Elementary
CECE005 Construct curb extensions with
curb ramps across Towt St. Include
appropriate yield signage and
striping
Towt St Freedom
Parkway
3 0 0 0 20 23 $128,850
413
La Paz Middle LPM014 Update signal to include leading
pedestrian interval and install
pedestrian signal heads
Sanborn Rd Freedom
Parkway
3 0 0 0 20 23 $400,000
413
La Paz Middle LPM016 Upgrade to High-Visibility
crosswalk and conflict striping for
proposed Class IV bikeway
Sanborn Rd Del Monte Ave 3 0 20 0 0 23 $5,000
413
La Paz Middle LPM021 Widen sidewalk on west side of
street to create multi-use path.

Install signage and safety
improvements to designate
Antigua, Sanborn, Paseo Grande,
Moreno, and Camarillo Court as a
SRTS route.

Paseo Grande Sanborn Rd Towt St 3 5 0 15 0 23 $121,700
413
North Salinas
High
NSH001 Install intersection improvement
per Alvin Dr/Linwood SRTS project,
including High-Visibility yellow
crosswalks yellow. Evaluate
intersection for leading pedestrian
interval, split signal phasing, or
pedestrian exclusive signal phasing.

E Alvin Dr McKinnon St 13 0 0 0 10 23 $200,000
413
Salinas High SH004 Adjust signal operations to
separate pedestrian and vehicle
traffic. Consider protected
pedestrian phase, leading
pedestrian interval, and no right on
red.

Main St Chestnut St 3 0 0 0 20 23 $200,850
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
413
Washington
Middle
WM001 Install RFFB, curb extensions,
yellow High-Visibility crosswalks,
school crossing signage assembly A
Iverson St Lang St 3 0 0 0 20 23 $150,550
423
Henry F.

Kammann
HFK010 Consider bike boulevard with curb
extensions and High-Visibility
crosswalks at all intersections
Tulane St Cherokee Dr Rochex Ave 6 0 0 15 0 21 $1,178,400 424 Alisal
Community
AC009 Install High-Visibility yellow
crosswalk across Burke St
Del Monte Ave Burke St 0 0 20 0 0 20 $4,000
424
Alisal High AH003 Upgrade existing crosswalks with
High-Visibility yellow crosswalk.

Continue to restrict left turns into
the high school at Monte Bella Blvd
from Williams Rd.

Williams Rd Monte Bella Blvd 0 0 0 0 20 20 $14,000
424
Alisal High AH004 Enhance crosswalk with pedestrian
hybrid beacon and pedestrian
refuge island. Note: crosswalk
markings should be removed until
the planned enhancements are
installed and operational.

Williams Rd Existing mid-
block crosswalk
in front of
Football Field
0 0 0 0 20 20 $800,000
424
Alisal High AH009 Improve lighting and connection
from Burke to make it ADA
accessible.

Burke St Back entrance to
school
0 0 0 0 20 20 $39,000
424
Alisal High AH015 Install traffic calming if requested
and supported by neighborhood
residents.

Gaviota Dr Paseo Grande Tecopa Way 0 0 0 0 20 20 $214,200 424
Alisal High AH016 Add pedestrian-scale lighting to
improve existing back entrance to
school
Camarillo Court Back entrance 0 0 0 0 20 20 $83,200
424
Bardin
Elementary
BE012 Work with neighborhood to
develop access control plan that
includes pedestrian safety
improvements and additional
intersection control.

Paloma Ave Market St / Toro
Ave
0 5 15 0 0 20 $40,000
424
Bardin
Elementary
BE013 Install Class II bike lane and signage
(extended project further with new
development)
Sconberg
Parkway
Alisal Rd Monte Bella Blvd 0 10 0 0 10 20 $46,580
424
Dr. Oscar Loya
Elementary
DOLA001 Install raised High-Visibility
crosswalk and curb extension
across Bison Way
Buckhorn Dr Bison Way 0 5 0 15 0 20 $249,000
424
Dr. Oscar Loya
Elementary
DOLA016 Install planned Pedestrian Hybrid
Beacon and upgrade to High-
Visibility crosswalks yellow across
Buckhorn Drive
Sanborn Rd Buckhorn Dr 0 0 0 0 20 20 $708,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
424
Dr. Oscar Loya
Elementary
DOLA017 Consider Crossing guard support Sanborn Rd Buckhorn Dr 0 0 0 0 20 20 N/A 424
El Gabilan
Elementary
EGE006 Upgrade crosswalks to high-
visibility and reconstruct
pedestrian curb ramps. Install
pedestrian refuge island at
Linwood Dr crossing. Implement
leading pedestrian interval
Laurel Dr Linwood St 0 0 0 0 20 20 $299,000
424 Everett Alvarez
High
EAH010 Install additional school signage Nantucket Blvd New Haven Way 0 0 0 0 20 20 $3,400 424
Everett Alvarez
High
EAH015 Remove the traffic diverters on
Inglewood and Coventry Streets to
enable right-turn only at Danbury
and Independence Streets.

Conduct neighborhood outreach
prior to changes and consider
neighborhood traffic calming
measures if requested and
supported by neighborhood
residents.

Danbury St Independence
Blvd
0 0 0 0 20 20 $30,000
424
Frank Paul
Elementary
FPE006 Upgrade crosswalk to High-
Visibility. Install curb ramp on
south side of Rider Ave and install
curb extension to shorten crossing
distance on Mimbrera Way
Rider Ave Mimbrera Way 0 0 0 0 20 20 $117,000
424
Frank Paul
Elementary
FPE011 Conduct warrant for traffic signal
or installation of Pedestrian Hybrid
Beacon signal. If neither is
warranted, install pedestrian
refuge island, upgrade to High-
Visibility yellow crosswalk, and add
an additional flashing beacon to
refuge island. Include appropriate
yield signage and striping
Sanborn Rd Antigua Ave 0 0 0 0 20 20 $737,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
424
Gavilan View
Middle
GVM004 Install school zone speed limit
signage, speed feedback sign, and
consider traffic calming (speed
reduction markings). Consider
channelized drop off lane on north
side of Russell Road adjacent to
school.

Russell Rd N Main St San Juan Grade
Rd
0 0 0 0 20 20 $29,600
424 Jesse G. Sanchez
Elementary
JGSE008 Install curb ramps Machado Way Mohar St 0 0 20 0 0 20 $52,000 424
La Joya
Elementary
LJE007 Consider bike boulevard on Kelton
Dr between Penzance and Rogge
Kelton Dr Penzance St Rogge Rd 0 0 5 15 0 20 $255,000
424 La Joya
Elementary
LJE009 Install traffic calming including
narrowed travel lanes
San Juan Grade
Rd
Russell Rd Rogge Rd 0 0 0 0 20 20 $166,320
424 La Paz Middle LPM003 Widen sidewalk Antigua Ave Palmera Ave Sanborn Rd 0 0 0 0 20 20 $30,000 424
La Paz Middle LPM004 Conduct warrant for traffic signal or installation of Pedestrian Hybrid
Beacon signal. If neither is
warranted, install pedestrian
refuge island and add an additional
flashing beacon to refuge island.

Include appropriate yield signage
and striping
Sanborn Rd Antigua Ave 0 0 0 0 20 20 $737,000
424
La Paz Middle LPM005 Extend median to prevent left
turns onto Paseo Grande. Extend
the queue space for the left turn
pocket at Sanborn/Antigua
Sanborn Rd Paseo Grande 0 0 0 0 20 20 $500
424 La Paz Middle LPM013 Consider pedestrian facility per City policy
Paseo Grande Estrella Way 0 5 0 15 0 20 $10,000
424
La Paz Middle LPM015 Install curb extensions across Paseo Grande and upgrade to raised High-
Visibility yellow crosswalk
Sanborn Rd Paseo Grande 0 0 0 0 20 20 $249,000
424
La Paz Middle LPM020 Include exit only signage and
consider narrowing the exit with
delineators to limit the ability for
vehicles to enter from Paseo
Grande
Parking lot
entrance
Paseo Grande 0 0 0 0 20 20 $1,150
424
La Paz Middle LPM022 Install raised crossing with High- Visibility yellow crosswalk across La
Cuesta Ct (North Intersection)
Antigua Ave La Cuesta Ct
(North
intersection)
0 5 0 15 0 20 $149,000
424 Lincoln
Elementary
LE004 Consider pedestrian facilities per
City policy.

Chestnut St Pajaro St 0 0 0 0 20 20 $10,000
424 Loma Vista
Elementary
LVE010 Conduct all-way stop warrant
analysis
Cambrian Dr Atherton Way 0 0 0 0 20 20 $5,000
424 McKinnon
Elementary
MKE006 Install High-Visibility crosswalk
across Chardonnay Dr
Chardonnay Dr McKinnon St 0 5 0 15 0 20 $4,000
424
Mission Park
Elementary
MPE010 Install curb extensions, tighten
curb radii, and install high-visibility
crosswalks. Consider neighborhood
traffic circle
W Acacia St San Vicente Ave 0 0 0 0 20 20 $411,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
424 Mission Park
Elementary
MPE014 Install protected pedestrian signal
phasing
Blanco Rd Iverson St 0 0 0 0 20 20 $200,000
424 Natividad
Elementary
NE005 Update crosswalks to yellow High-
Visibility
Rainier Dr Modoc Ave 0 0 0 0 20 20 $8,000
424
Natividad
Elementary
NE006 Install curb extensions and
pedestrian refuge island with
additional rectangular rapid
flashing beacon signage in center
median
Modoc Ave Alvin Dr 0 0 0 0 20 20 $200,850
424
Natividad
Elementary
NE008 Install wide curb extension to
narrow crossing distance and
prevent parking in red zone
Modoc Ave Glacier Dr 0 0 0 0 20 20 $100,000
424
North Salinas
High
NSH002 Install traffic calming and create
Class III bike route with sharrows
and signage to connect to
trail/alley and to bikeways on
Maryal Dr and Chaparral Ave.

Repair broken sidewalk.

Kip Dr E Alvin Dr Block Ave/shared
use path
0 0 0 0 20 20 $315,200
424 North Salinas
High
NSH014 Install improved lighting Trail /Alley Kip Dr Maryal Dr 0 0 0 0 20 20 $62,400 424
Salinas High SH008 Install curb extensions and update
existing crosswalks to High-
Visibility. Evaluate for additional
pedestrian facilities per City policy.

Riker St Lang St 0 0 0 0 20 20 $226,000
424
Salinas High SH009 Conduct an all-way stop warrant
study. Install curb extensions and
update existing crosswalks to High-
Visibility. Evaluate for additional
pedestrian facilities per City policy.

Riker St Giel St 0 0 0 0 20 20 $231,000
424
Salinas High SH018 Evaluate pedestrian crossing
demand to determine whether
crosswalk across Clay is warranted.

Construct curb extensions to
narrow crossing distance on
Cayuga St. and install high-visibility
crosswalk across Cayuga.

Clay St Cayuga St 0 5 0 15 0 20 $218,000
424 Salinas High SH022 Add access to school campus Cayuga St Back entrance to school
0 5 0 15 0 20 $8,500
424 University Park
Elementary
UPE003 Evaluate all-way stop. Install curb
extensions
University Ave Ambrose Dr 0 0 0 0 20 20 $105,000
424
Virginia Rocca
Barton Elementary
VRBE010 Develop Park and Walk/Park and
Ride program to encourage parent
drop-off in parking lot. Utilize Creek
Trail for trips between parking lot
and school.

Off-site parking
lot for Natividad
Creek Park
Las Casitas Dr 0 5 15 0 0 20 N/A
424
Virginia Rocca
Barton Elementary
VRBE013 Consider raised crosswalk and
upgrade to High-Visibility crosswalk
yellow across Pino Way
Las Casitas Dr Pino Way 0 0 20 0 0 20 $149,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
424
Virginia Rocca
Barton Elementary
VRBE015 Consider raised crosswalk and
upgrade to High-Visibility crosswalk
yellow across Alamo Way
Las Casitas Dr Alamo Way 0 0 20 0 0 20 $149,000
424
Virginia Rocca
Barton Elementary
VRBE026 Install curb extension and upgrade
to High-Visibility crosswalk across
Amarillo Way
Nogal Drive Amarillo Way 0 5 0 15 0 20 $104,000
424 Washington
Middle
WM017 Install raised High-Visibility
crosswalk across Crespi Way
Acacia St Crespi Way 0 0 0 0 20 20 $149,000
424
Washington
Middle
WM020 Trim hedge to increase visibility
and add striping and signage about
pedestrians crossing
Parking lot
entrance
(driveway to the
back lot)
Iverson St 0 0 0 0 20 20 $9,500
424
Washington
Middle
WM022 Consider installing a traffic circle,
include High-Visibility crosswalks
and school crossing signage
assembly A. If not a traffic circle,
Curb extensions, yellow High-
Visibility crosswalks, and school
crossing signage assembly.

Homestead Ave Clay St / Iverson St 0 0 0 0 20 20 $305,550 473
Santa Rita
Elementary
SRE010 Remove or upgrade crosswalk.

Direct pedestrians to Bolivar St
crossing
North Main St E Lamar St 4 0 15 0 0 19 $2,170
474
Dr. Oscar Loya
Elementary
DOLA018 Install Class IV separate bikeway or
Class IIB buffered bike lanes and
conflict striping
Sanborn Rd Freedom
Parkway
Boronda Rd 3 0 0 15 0 18 $1,665,360
475 El Sausal Middle ESM002 Install stop or yield signs at driveway exits
Eucalyptus Dr Parking lot
driveway
3 0 15 0 0 18 $1,700
476 Everett Alvarez
High
EAH002 Install planned roundabout Boronda Rd Natividad Rd 8 0 0 0 10 18 $5,000,000 477
Monterey Park
Elementary
MPKE007 Consider installing high-visibility
crosswalks and ADA ramps per City
policy
E Romie Ln Los Palos Dr 3 0 0 15 0 18 $70,000
478 North Salinas
High
NSH007 Install class III bike route green-
backed sharrows and signage
Chaparral St Maryal Dr Linwood Dr 8 0 0 0 10 18 $14,000 479
Washington
Middle
WM024 Evaluate possible bicycle and
pedestrian improvements on East
and West Blanco Road
Blanco Road Davis Rd Abbot St 6 0 0 0 10 16 $250
480
DIAS DIAS006 Install or update curb ramps and
install marked crossings across side
streets
Fontes Nancy Dr Randall Rd 0 0 0 15 0 15 $22,000
481
Dr. Martin Luther
King Jr.

Elementary
MLKA005 Upgrade to High-Visibility
crosswalk yellow across Alma
Sanborn Rd Alma Ave 0 0 15 0 0 15 $4,000
482
Dr. Oscar Loya
Elementary
DOLA003 Install raised crosswalks and High-
Visibility crosswalks on side streets
Buckhorn Dr Saguaro Dr Sanborn Rd 0 0 0 15 0 15 $1,043,000 483
Everett Alvarez
High
EAH012 Consider roundabout or traffic
circle at Nantucket and Hemingway
as future development is
constructed.

Nantucket Blvd Hemingway Dr 0 5 0 0 10 15 $2,500,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
484
Frank Paul
Elementary
FPE005 Maintain crossing guard even after
installation of recommendations.

This intersection is the main
conflict point for students/vehicles
Rider Ave Mazatlan Way 0 15 0 0 0 15 N/A
485 Frank Paul
Elementary
FPE009 Create a bicycle route with signage
and sharrow markings
Antigua Ave Rider Ave Sanborn Rd 0 15 0 0 0 15 $19,600
486 La Paz Middle LPM001 Create a bicycle route with signage and sharrow markings
Antigua Ave Rider Ave Sanborn Rd 0 15 0 0 0 15 $19,600
487
Lincoln
Elementary
LE003 Restripe parking lot to reduce drop-
off area to one lane. Trim
vegetation to maintain visibility at
exit.

Drop off loop in
school parking
lot
Maple St 5 10 0 0 0 15 $6,440
488
Mission Park
Elementary
MPE012 Install curb ramps and continuous
sidewalk with high-visibility
crosswalk across Junipero
W Acacia St Junipero Way 0 0 0 15 0 15 $34,500
489
Monte Bella
Elementary
MBLE005 Install loading zone curb markings
and signage at curb along school
frontage
Tuscany Blvd Spoleto St Freedom Pkwy 0 15 0 0 0 15 $5,700 490
New Republic
Elementary
NRE003 Install curb extensions, High-
Visibility crossings, and rectangular
rapid flashing beacons
Arcadia Way El Dorado Dr 0 0 0 15 0 15 $148,000
491 New Republic
Elementary
NRE004 Install marked crosswalk across
Klamath Dr
Arcadia Way Klamath Dr 0 0 0 15 0 15 $4,000
492
New Republic
Elementary
NRE007 Install "Do not enter" pavement
markings across driveway entrance
and larger/more frequent "Do not
enter/bus only" signage. Install
drop-off zone at curb along
Emerald Dr on school side of street
Emerald Dr Stratford Ct
(North
Intersection)
Stratford Ct
(South
Intersection)
0 15 0 0 0 15 $15,530
493 North Salinas
High
NSH004 Install High-Visibility crosswalk and
curb extensions
Shires Way Block Ave 0 0 0 15 0 15 $158,000
494
North Salinas
High
NSH008 Install High-Visibility crosswalk and
curb extensions across Amador Cir
Rainier Dr Amador Cir 0 0 0 15 0 15 $104,000
495
North Salinas
High
NSH009 Install High-Visibility crosswalk and
curb extensions across Parsons Ave
Rainier Dr Parsons Ave 0 0 0 15 0 15 $104,000
496
North Salinas
High
NSH010 Upgrade crosswalks to High-
Visibility per Linwood SRTS project.

Consider installing a traffic circle
Rainier Dr Linwood Dr 5 0 0 0 10 15 $211,000
497
Salinas High SH021 Install curb extensions, yellow High- Visibility crosswalk across West
Clay St West St 0 0 0 15 0 15 $104,000
498 University Park
Elementary
UPE007 Consider bike boulevards and curb
extensions at intersections
Ambrose Dr Carmelita Dr University Ave 0 0 0 15 0 15 $524,400 499 Washington
Middle
WM002 Remove marked crosswalk to
encourage crossing at Lang St.

Iverson St Geil 5 10 0 0 0 15 $4,000
500
Washington
Middle
WM008 Install High-Visibility crosswalk and
curb extensions across Bruce Ave
College Dr Bruce Ave 0 0 0 15 0 15 $208,000
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
501
Washington
Middle
WM009 Install High-Visibility crosswalk and
curb extensions across San
Vincente Ave
College Dr San Vincente Ave 0 0 0 15 0 15 $208,000
502
Washington
Middle
WM010 Install High-Visibility crosswalk and
curb extensions across Amherst Dr
College Dr Amherst Dr 0 0 0 15 0 15 $104,000
503 Washington
Middle
WM013 Install High-Visibility crosswalk
across Talbot St
Homestead Ave Talbot St 0 0 0 15 0 15 $4,000
504 Washington
Middle
WM015 Install raised High-Visibility
crosswalk across Junipero Way
Acacia St Junipero Way 0 0 0 15 0 15 $149,000
505 Washington
Middle
WM016 Install raised High-Visibility
crosswalk across Capistrano Dr
Acacia St Capistrano Dr 0 0 0 15 0 15 $149,000
506
Alisal High AH008 Install bike lane conflict striping
across right turn lane transition,
and conflict striping across the
intersection to match receiving
buffered bike lane
Freedom
Parkway
Williams Rd 3 0 0 0 10 13 $18,000
507
New Republic
Elementary
NRE005 Consider re-grading roadway to
remove large grade-break at center
of crosswalk (near center median).

Widen median to provide
pedestrian refuge island. Upgrade
crossings to High-Visibility.

Natividad Rd Arcadia Way 3 0 0 0 10 13 $118,000
508
Salinas High SH005 Consider removal of left turn
pocket and installation of
pedestrian median island. Conduct
analysis for pedestrian hybrid
beacon or rectangular rapid
flashing beacon in center median
Main St Maple St 11 0 0 0 0 11 $141,320
509
Salinas High SH006 Consider crosswalk removal – this
crosswalk is less than 300' from
John Street. Work with community
to determine need for left turns
from Winham and Clay and
consider right turn only.

Main St Winham St/Clay
St
11 0 0 0 0 11 $15,040
510 Bardin
Elementary
BE007 Install no parking signage to reduce
parent parking in loop
Bardin Rd school drop-off
loop
0 10 0 0 0 10 $850
511
Creekside
Elementary
CE010 Upgrade crosswalks to High-
Visibility and construct curb
extensions across side streets
Kittery St Snug Harbor 0 10 0 0 0 10 $104,000
512
Creekside
Elementary
CE011 Upgrade crosswalks to High-
Visibility and construct curb
extensions across side streets
Kittery St Crestview St 0 10 0 0 0 10 $104,000
513
Creekside
Elementary
CE012 Upgrade crosswalks to High-
Visibility and construct curb
extensions across side streets
Kittery St Newington St 0 10 0 0 0 10 $104,000
514 Creekside
Elementary
CE020 Upgrade bike racks/bike cage on
campus
School Campus front of school 0 10 0 0 0 10 $8,000
515
DIAS DIAS005 Work with neighboring property
owners to cut back vegetation to
remove sidewalk obstructions
Fontes Lane Randall Rd Boronda Rd 0 10 0 0 0 10 $3,800
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
516 Dr. Oscar Loya
Elementary
DOLA014 Upgrade 'Do Not Enter' sign at
parking lot exit to standard sign
Cougar Dr Parking lot exit 0 10 0 0 0 10 $850
517 Dr. Oscar Loya
Elementary
DOLA019 Install planned Roundabout Sanborn Rd Boronda Rd 0 0 0 0 10 10 $2,500,000 518 Everett Alvarez
High
EAH005 Install planned roundabout Independence
Blvd
Boronda Rd 0 0 0 0 10 10 $8,000,000
519
Everett Alvarez
High
EAH008 Consider roundabout to improve
traffic flow and pedestrian safety
Independence
Blvd
Nantucket Blvd 0 0 0 0 10 10 $195,000
520
John E. Steinbeck
Elementary
JESE009 Upgrade crosswalk with yellow
High-Visibility crossing across New
Britain Cir
New Salem Dr New Britain Cir 0 10 0 0 0 10 $4,000
521
Loma Vista
Elementary
LVE006 Evaluate sight distance criteria and
consider daylighting intersections
or installing curb extensions to
improve visibility
Pescadero Dr Compton Way 0 0 0 0 10 10 $101,525
522 Loma Vista
Elementary
LVE013 Consider pedestrian crossing
enhancements per City policy.

Saratoga Drive Cambrian Drive 0 0 0 0 10 10 $10,000
523 McKinnon
Elementary
MKE008 Upgrade crosswalks to High-
Visibility
Boronda Rd San Juan Grade
Rd
0 0 0 0 10 10 $28,000
524
Monte Bella
Elementary
MBLE002 Consider study for roundabout.

Restripe the bikeway approach and
right-hand turn conflict area, the
right turn lane outside of dedicated
bikeway is not the best design (flip
placement, make the crossover
further north of the intersection
and cross over would include
conflict striping). Add conflict
striping across Freedom Pkwy.

Freedom
Parkway
Tuscany Blvd 0 0 0 0 10 10 $45,400
525 Monte Bella
Elementary
MBLE010 Consider pedestrian crossing
enhancements per City policy.

Tuscany Blvd Canelli Ct 5 5 0 0 0 10 $10,000
526
Natividad
Elementary
NE002 Consider converting to drop-off
loop, keeping the back spaces for
staff parking
Parking lot on
north end of
campus
Modoc Av 0 10 0 0 0 10 $2,640
527
North Salinas
High
NSH003 Consider restricting traffic on Kip
Dr to one way northbound
between Block Dr and school loop
exit and restrict access between
Kip and Block to biking/walking
only. Coordinate with Fire
Department and follow
neighborhood traffic management
process.

Kip Dr Block Ave Parsons Ave 0 0 0 0 10 10 N/A
528 Oasis Charter OC001 Install Class III bikeway and traffic calming
Westridge
Parkway
Salinas City limits Boronda Rd 0 10 0 0 0 10 $173,400
529 Oasis Charter OC003 Consider road diet and/or Class IIB buffered bike lanes
Westridge Pkwy Davis Rd Salinas City
Limits
0 10 0 0 0 10 $199,320
530 University Park
Elementary
UPE008 Curb extensions at all intersections Columbia Ave W Acacia St Hastings Ave 0 10 0 0 0 10 $500,000 Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
531
Alisal High AH007 Upgrade existing class II bike lane
to buffered bike lanes. Evaluate for
potential reduction in the number
of lanes, Class IV cycle track, and
pedestrian crossing locations.

Freedom
Parkway
Constitution Williams 9 0 0 0 0 9 $426,740
532
Frank Paul
Elementary
FPE001 Conduct intersection control
evaluation analysis to study
installation of a roundabout.

Rider Ave Freedom
Parkway
8 0 0 0 0 8 $235,000
533
John E. Steinbeck
Elementary
JESE003 Mark safe route to school along
north side of the intersection with
signage or decorative crosswalk
(school would need to sponsor and
maintain decorative crosswalk).

Independence
Blvd
Provincetown Dr 3 5 0 0 0 8 $5,850
534
McKinnon
Elementary
MKE007 When roundabout is installed,
share information with parents on
how to use roundabouts and
station crossing guard at this
intersection.

McKinnon St Boronda Rd 3 0 5 0 0 8 N/A
535
Alisal High AH014 Add bike route signage, sharrow
striping and install traffic calming if
requested and supported by
neighborhood residents.

Camarillo Court Moreno Dr 0 5 0 0 0 5 $550,800
536 Dr. Oscar Loya
Elementary
DOLA012 Install curb extensions across Elk. Falcon Dr Elk Dr 0 5 0 0 0 5 $100,000 537 Henry F.

Kammann
HFK011 Consider neighborhood traffic
circle
4th St W Curtis St 0 5 0 0 0 5 $195,000
538
John E. Steinbeck
Elementary
JESE002 Install traffic circle and include High-
Visibility crosswalks and signage.

Consider shifting crossing across
Provincetown drive to Lexington if
all-way stop control is
implemented at Lexington Drive.

Burlington Dr Provincetown Dr 0 5 0 0 0 5 $214,400
539
John E. Steinbeck
Elementary
JESE005 Upgrade to raised High-Visibility
crosswalk across Provincetown
Lexington Dr Provincetown Dr
(furthest west)
0 5 0 0 0 5 $149,000
540
Monterey Park
Elementary
MPKE008 Install traffic calming measures if
requested and supported by
neighborhood residents.

La Mesa Dr Pajaro St San Angelo St 0 5 0 0 0 5 $897,000 541
Henry F.

Kammann
HFK002 Install curb ramps and/or curb
extensions to align curbs, High-
Visibility yellow crosswalks, and
advance stop bars
Rochex Ave Tyler St 3 0 0 0 0 3 $276,000
542 McKinnon
Elementary
MKE005 Update crosswalks to High-Visibility McKinnon St Pennsylvania Dr 3 0 0 0 0 3 $4,000 543 Alisal
Community
AC006 Consider this location for a.m.
crossing guard station
Program N/A N/A N/A N/A N/A 0 N/A
544
Cesar E. Chavez
Elementary
CECE016 Implement valet program or park
and walk program to campus.

Program N/A N/A N/A N/A N/A 0 N/A
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
545
Dr. Oscar Loya
Elementary
DOLA015 Consider working with parent
volunteers/PTA on valet drop-off
program in main school loop. Close
middle entrance/exit to loop to
shift traffic away from main school
crosswalk.

Program N/A N/A N/A N/A N/A 0 $8,500
546
El Sausal Middle ESM008 Work with nearby churches to
establish park and walk programs -
Vineyard Christian, Iglesia Bautista
Del Sur
Program N/A N/A N/A N/A N/A 0 N/A
547
La Joya
Elementary
LJE011 Conduct neighborhood traffic
calming plan and consider bike
boulevard treatments. Consider
Bollenbacher Dr, Jade St and
Penzance St as possible locations
for traffic calming.

General N/A N/A N/A N/A N/A 0 $45,000
548
Lincoln
Elementary
LE008 Implement Park and Walk program
to ease congestion at school
frontage and utilize surrounding
areas and side streets
Program N/A N/A N/A N/A N/A 0 N/A
549
Los Padres
Elementary
LPE006 Implement rolling drop-off
program. Hire people and/or
recruit volunteers to supervise
drop-off and pick-up.

Program N/A N/A N/A N/A N/A 0 N/A
550
Mission Park
Elementary
MPE001 Consider rolling drop-off program
and drop-off monitors to
streamline student drop-off and
pick-up.

Program N/A N/A N/A N/A N/A 0 N/A
551
Natividad
Elementary
NE001 Work with churches on Alvin Drive
to develop park and walk program
General N/A N/A N/A N/A N/A 0 N/A
552
Natividad
Elementary
NE003 Implement staggered start times or
incentive program for early arrival
Program N/A N/A N/A N/A N/A 0 N/A
553 Oasis Charter OC002 Continue current drop-off/pick-up system
Program N/A N/A N/A N/A N/A 0 N/A
554
Rancho San Juan
High
RSJH001 Implement school carpooling
program focused on students who
live too far to walk or bike to
school.

Program N/A N/A N/A N/A N/A 0 N/A
555
Sherwood
Elementary
SE001 Develop drop-off loop according to
existing plans. Consider
implementing rolling drop-off
program to facilitate efficient drop-
off and pick-up in the loop.

Program N/A N/A N/A N/A N/A 0 N/A
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
556
Alisal High AH013 Consider creating a new right turn-
only lane from the school parking
lot and closing driveway access at
Monte Bella Blvd to reduce
conflicts with students crossing.

Evaluate Williams Road crosswalk
location and signal operations with
any changes to lane configurations.

Direct drop-off to school campus.

School parking
lot
Monte Bella Blvd
/ Williams Rd
(North side of
Intersection)
0 0 0 0 0 0 $11,700
557
Creekside
Elementary
CE013 Upgrade crosswalks to High-
Visibility and construct curb
extensions (where not in conflict
with bike lanes or future Class IV)
Nantucket Declaration St 0 0 0 0 0 0 $216,000
558 Dr. Oscar Loya
Elementary
DOLA007 Install curb extensions across Elk Cougar Dr Elk Dr 0 0 0 0 0 0 $100,000 559 Dr. Oscar Loya
Elementary
DOLA008 Install curb extensions across
Cougar Way
Cougar Dr Cougar Way 0 0 0 0 0 0 $100,000
560 Dr. Oscar Loya
Elementary
DOLA009 Install curb extensions across
Raven Ct both legs
Cougar Dr Raven Ct 0 0 0 0 0 0 $200,000
561
El Gabilan
Elementary
EGE010 Install planned crosswalk
improvements (rectangular rapid
flashing beacon and pedestrian
refuge island)
Natividad Rd Pacheco St 0 0 0 0 0 0 $160,000
562 Henry F.

Kammann
HFK013 Consider neighborhood traffic
circle
N 1st St Navajo Dr 0 0 0 0 0 0 $195,000
563
John E. Steinbeck
Elementary
JESE006 Upgrade to raised High-Visibility
crosswalk across Hancock St
Lexington Dr Hancock St (both
intersections)
0 0 0 0 0 0 $298,000
564
John E. Steinbeck
Elementary
JESE007 Upgrade to raised crosswalk and
High-Visibility crosswalk across
Newport
Lexington Dr Newport Ct
(both
intersections)
0 0 0 0 0 0 $298,000
565
John E. Steinbeck
Elementary
JESE008 Upgrade to raised crosswalk and
High-Visibility crosswalk across
Waterbury Way
Lexington Dr Waterbury Way 0 0 0 0 0 0 $149,000
566
John E. Steinbeck
Elementary
JESE011 Upgrade to High-Visibility
crosswalk, construct curb extension
and ramps
New Salem Dr New Haven Way 0 0 0 0 0 0 $147,000
567 La Paz Middle LPM011 Install planned roundabout and appropriate striping
Sanborn Rd Boronda Rd 0 0 0 0 0 0 $5,000,000
568 McKinnon
Elementary
MKE009 Remove traffic diverters on
Dartmouth Way
Dartmouth Way Pennsylvania Dr 0 0 0 0 0 0 $3,800
569
Mission Park
Elementary
MPE007 Install curb extensions to shorten
crossing distance across Sierra
Madre
W Acacia St Sierra Madre 0 0 0 0 0 0 $200,000
570 Mission Park
Elementary
MPE009 Install curb extensions at all four
corners of the intersection
San Vicente Ave Palma Dr 0 0 0 0 0 0 $200,000
571
Mission Park
Elementary
MPE013 Install curb ramps and continuous
sidewalk with high-visibility
crosswalk across Crespi
W Acacia St Crespi Way 0 0 0 0 0 0 $34,500
Rank
School Rec ID Code Recommendation Street Cross Street 1 Cross Street 2 Safety Access to key
destinations
Equity Connectivity
and
Low Stress
Network
Community-
Identified
Need
Total Score Cost Estimate
572
North Salinas
High
NSH013 Upgrade bike parking on campus
and create signed route from Kip
Dr to bike parking
School campus Kip Dr 0 0 0 0 0 0 $8,000
573
University Park
Elementary
UPE002 Refresh crosswalks with High-
Visibility striping, construct curb
extensions and ramps
W Acacia St University Ave 0 0 0 0 0 0 $251,000
574 University Park
Elementary
UPE005 Conduct feasibility study for
neighborhood traffic circle
University Ave Central Ave 0 0 0 0 0 0 $195,000
575
University Park
Elementary
UPE009 Curb extensions at intersections of
Carmelita Drive and San Simeon Dr
Palma Carmelita Dr San
Simeon Dr
0 0 0 0 0 0 $400,000