BID TABULATION
Cesar Chavez Park Soccer Field; Project No. 9005
Drawing No. 8250
Item # Item Description Unit of Measure Quantity Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total 1 Construction Coordination/Mobilization  LS 1 $71,454.00  $71,454.00  $6,700.00  $6,700.00  $124,500.00  $124,500.00  $185,000.00  $185,000.00 2 SWPPP Development LS 1 $5,000.00  $5,000.00  $24,500.00  $24,500.00  $1,200.00  $1,200.00  $24,000.00  $24,000.00 3 SWPPP Implementation LS 1 $10,000.00  $10,000.00  $14,500.00  $14,500.00  $52,300.00  $52,300.00  $37,756.97  $37,756.97 4 Clear and Grub entire Area SF 140000 $0.25  $35,000.00  $0.11  $15,400.00  $0.95  $133,000.00  $0.89  $124,600.00 5 Demolish/Salvage Irrigation LS 1 $3,000.00  $3,000.00  $17,600.00  $17,600.00  $34,400.00  $34,400.00  $15,927.47  $15,927.47 6 Miscellaneous Demolition LS 1 $3,000.00  $3,000.00  $2,500.00  $2,500.00  $7,100.00  $7,100.00  $15,433.20  $15,433.20 7 Off Haul/Excavation – Turf Field CY 1500 $40.00  $60,000.00  $36.56  $54,840.00  $61.00  $91,500.00  $23.15  $34,725.00 8 Off Haul/Excavation – Trench CY 150 $40.00  $6,000.00  $47.19  $7,078.50  $170.00  $25,500.00  $37.79  $5,668.50 9 Survey Staking SF 67000 $0.60  $40,200.00  $0.13  $8,710.00  $0.22  $14,740.00  $1.22  $81,740.00 10 Rough Grading CY 1350 $40.00  $54,000.00  $26.90  $36,315.00  $56.00  $75,600.00  $6.54  $8,829.00 11 Soil Stabilization (Lime Treated) SF 62000 $2.25  $139,500.00  $1.73  $107,260.00  $2.00  $124,000.00  $1.12  $69,440.00 12 Fine Grading SF 67000 $0.50  $33,500.00  $0.55  $36,850.00  $0.76  $50,920.00  $0.66  $44,220.00 13 Turf Field Base Rock – Class 2 (3” depth) TN 865 $55.00  $47,575.00  $84.83  $73,377.95  $80.00  $69,200.00  $50.64  $43,803.60 14 Trench Rock TN 250 $60.00  $15,000.00  $158.69  $39,672.50  $108.00  $27,000.00  $69.67  $17,417.50 15 Impermeable Liner SF 62000 $0.25  $15,500.00  $0.48  $29,760.00  $0.50  $31,000.00  $1.52  $94,240.00 16 Synthetic Turf and Infill SF 62000 $8.00  $496,000.00  $5.72  $354,640.00  $4.55  $282,100.00  $13.70  $849,400.00 17 Performance Pad SF 62000 $1.50  $93,000.00  $2.09  $129,580.00  $1.85  $114,700.00  $4.88  $302,560.00 18 Perimeter Curb with Nailer LF 1030 $25.00  $25,750.00  $38.73  $39,891.90  $69.50  $71,585.00  $42.78  $44,063.40 19 Turf – Hydroseed  SF 73425 $0.35  $25,698.75  $1.21  $88,844.25  $1.00  $73,425.00  $0.84  $61,677.00 20 Bioretention Planting with Pea Gravel SF 5500 $6.00  $33,000.00  $5.79  $31,845.00  $4.80  $26,400.00  $5.97  $32,835.00 21 Split Rail Fence (At Bioretention Area) LF 140 $50.00  $7,000.00  $253.50  $35,490.00  $200.00  $28,000.00  $53.83  $7,536.20 22 Adjust Existing Utility Boxes in Field LS 1 $2,560.00  $2,560.00  $1,500.00  $1,500.00  $1,500.00  $1,500.00  $441.60  $441.60 23 Irrigation SF 73425 $1.00  $73,425.00  $1.21  $88,844.25  $1.00  $73,425.00  $2.32  $170,346.00 24 8” Plastic Perforated Pipe LF 810 $65.00  $52,650.00  $15.59  $12,627.90  $32.00  $25,920.00  $65.66  $53,184.60 25 Plastic Pipe (8” HDPE) LF 141 $95.00  $13,395.00  $75.03  $10,579.23  $133.00  $18,753.00  $72.96  $10,287.36 26 Cleanout EA 7 $150.00  $1,050.00  $500.00  $3,500.00  $735.00  $5,145.00  $2,460.00  $17,220.00 27 Storm Drain Pipe (12” RCP) LF 42 $250.00  $10,500.00  $76.47  $3,211.74  $230.00  $9,660.00  $95.26  $4,000.92 28 Bubbler Box EA 3 $4,200.00  $12,600.00  $2,600.00  $7,800.00  $2,650.00  $7,950.00  $2,336.86  $7,010.58 29 Overflow Inlet EA 1 $4,800.00  $4,800.00  $3,800.00  $3,800.00  $6,650.00  $6,650.00  $8,215.30  $8,215.30 30 Type “A” SDMH EA 1 $10,800.00  $10,800.00  $13,100.00  $13,100.00  $22,650.00  $22,650.00  $4,351.20  $4,351.20 31 Off Haul/Excavation – Bioretention Area CY 653 $100.00  $65,300.00  $69.20  $45,187.60  $60.00  $39,180.00  $6.66  $4,348.98 32 Bioretention Soil Mix (24” depth) CY 190 $80.00  $15,200.00  $168.72  $32,056.80  $243.00  $46,170.00  $81.62  $15,507.80 33 Class 2 Permeable Material (22” depth) CY 174 $70.00  $12,180.00  $196.45  $34,182.30  $217.00  $37,758.00  $28.48  $4,955.52 34 Cobblestone Energy Dissipater CY 6 $150.00  $900.00  $990.00  $5,940.00  $1,530.00  $9,180.00  $1,256.79  $7,540.74 35 Relocate Lighting/Electrical Facilities including Conduit with Conductors (2 Conduits) and pull boxes LS 1 $6,000.00  $6,000.00  $39,000.00  $39,000.00  $42,750.00  $42,750.00  $35,526.34  $35,526.34 $1,500,537.75  $1,456,684.92  $1,804,861.00  $2,443,809.78 Granite Rock Company
5225 Hellyer Avenue, Suite 220
San Jose, CA 95138
408‐574‐1400
Norcal Contractor
260 Espinosa Road
Salinas, CA 93907
831‐238‐1513
Bid awarded on ________, 2023 by Salinas City Council by Resolution No.____________ (NCS) to ________ for the sum of $___________ for Items ___________. All other bids were rejected and bid bonds returned.

Dated this ___ day of _____, 2023.
_____________________________________________
City Clerk
Bid Opening: 4/07/2023 @ 2:00 PM, Electronic
Project Engineer: Elise Ramirez, P.E.  Landscape Pros ML Inc Cupertino, CA 95014
408‐920‐7718
Project Coordinator: Josie Lantaca  20432/5B Silverado Avenue PROPOSAL ITEMS:

Engineer's Estimate
Total Bid (Items 1‐35)(For Comparison Only)
1 of 2 J:\p\9005 Cesar Chavez Park Soccer Field\Bid Documents\90 05 Bid Tab BID TABULATION
Cesar Chavez Park Soccer Field; Project No. 9005
Drawing No. 8250
Granite Rock Company
5225 Hellyer Avenue, Suite 220
San Jose, CA 95138
408‐574‐1400
Norcal Contractor
260 Espinosa Road
Salinas, CA 93907
831‐238‐1513
Bid Opening: 4/07/2023 @ 2:00 PM, Electronic
Project Engineer: Elise Ramirez, P.E.  Landscape Pros ML Inc Cupertino, CA 95014
408‐920‐7718
Project Coordinator: Josie Lantaca  20432/5B Silverado Avenue Engineer's Estimate

8.  BIDDER'S STATEMENT OF SUBCONTRACTORS PART II
ITEMS TO BE SUBMITTED WITH PROPOSAL ON BID OPENING DATE:

4.  INSURANCE CERTIFICATION YES YES Incomplete

5.  NON‐COLLUSION DECLARATION OF CONTRACTOR YES YES Incomplete

6.  BIDDER'S STATEMENT OF SUBCONTRACTORS PART 1 YES YES YES
YES
YES
YES
YES
YES
YES
YES

1.  FULLY COMPLETED & SIGNED PROPOSAL FORM Incomplete

3.  BIDDER'S STATEMENT OF FINANCIAL RESPONSIBILITY, TECHNICAL ABILITY, AND EXPERIENCE ITEMS TO BE SUBMITTED BY LOWEST BIDDER AND SECOND LOWEST BIDDER WITHIN 5 WORKING DAYS AFTER BID OPENING DATE:

Incomplete

2.  BIDDER'S BOND NO
Incomplete

7.  ADDENDUM NO. 1 YES

9.  NON‐COLLUSION DECLARATION OF SUB‐CONTRACTOR

11. BIDDER'S LIST FOR THE CITY OF SALINAS PUBLIC WORKS DEPARTMENT

10. BIDDER'S STATEMENT OF GOOD FAITH EFFORT FOR LOCAL HIRE 2 of 2 J:\p\9005 Cesar Chavez Park Soccer Field\Bid Documents\90 05 Bid Tab