FREEDOM PKWY
TUSCANYBLVDPADOVADR
PARKINGNOANYTIMER26 (CA)12" X 18"
SALINASCALIFORNIA
N
ITEM DESCRIPTIONQTYUNIT OFMEASURESHEET TOTAL
MATCH LINE "A"
SIGN CHARTLEGEND
IS
MATCH LINE "B" (SEE SHEET 8)
MATCH LINE "A"
SHEET NOTES
DESIGNED BY:CAD BY:
PROJECT ENGINEER / MANAGER:CONSTRUCTION INSPECTION SUPERVISOR:CITY OF SALINAS
SALINAS
CALIFORNIA
DATEREVISIONAPP.PROJ. NO(S)SHEET NO.
FILE NO.OF
File Path:I:\PWTra\Construction Projects\Freedom Pkwy and Sconberg Pkwy\Freedom Pkwy and Sconberg Pkwy_Rev 1r.dwgPlot By:ANDREW EASTERLINGPlot Date:8/10/2022 2:55 PM PUBLIC WORKS DEPARTMENTDATEAPPROVED FOR CONSTRUCTION:REVIEWED BY:DATE
TRAFFICANDREW EASTERLING
STATE OF CALIFORNIA
REGISTERED PROFESSIONAL ENGINEER NO. 2824
REGISTERED PROFESSIONAL ENGINEER
STATE OF CALIFORNIA
CIVILNO. 69142ANDREW EASTERLING, P.E., T.E.TRAFFIC ENGINEER
ADRIANA ROBLES
ADRIANA ROBLES, P.E.CITY ENGINEER
JONATHAN HERNANDEZJONATHAN HERNANDEZTBDANDREW EASTERLINGSIGNING AND STRIPING PLANFREEDOM PKWY/SCONBERG PKWY -TUSCANY BLVD TO MONTE BELLA BLVD-1-2 BIKE LANER81 (CA)12" X 8" ISP
SALINASCALIFORNIA
N
SCALE: 1" = 40'
MONTE BELLABLVD
SCONBERG PKWY
PAVIAWAY
SALINAS
CALIFORNIA
N
SALINAS
CALIFORNIA
N
SALINAS
CALIFORNIA
N
PARKINGNOANYTIMER26 (CA)12" X 18"
ITEM DESCRIPTIONQTYUNIT OFMEASURESHEET TOTALSIGN CHART
MATCH LINE "B"(SEE SHEET 7)
MATCH LINE "C"
MATCH LINE "C"
MATCH LINE "D"
MATCH LINE "D"
1.ALL LINES AND MARKINGS SHALL CONFORM TO THE CALTRANS STANDARD SPECIFICATIONS DESIGN STANDARDS ANDSTANDARD PLANS (2018 EDITION).2.REMOVAL OF ALL CONFLICTING LINES AND MARKINGS SHALL BE BY GRINDING OR PRE-APPROVED EQUAL.3.LANE WIDTHS ARE MEASURED BETWEEN THE CENTERLINES OF EACH ADJACENT SINGLE OR DOUBLE STRIPE OR THE TOP OFCURB AS APPROPRIATE.4.ALL PAVEMENT DELINEATION IS THERMOPLASTIC UNLESS OTHERWISE STATED.5.ALL CROSSWALKS AND LIMIT LINES SHALL BE 12" WHITE LINES UNLESS OTHERWISE NOTED.6.ALL REFLECTIVE MARKERS SHALL BE RAISED.7.ALL LANE STRIPING AT INTERSECTIONS WITHOUT CROSSWALKS SHALL END 10' FROM THE EXTENSION OF THE INTERSECTIONCURB LINE.
SHEET NOTES
DESIGNED BY:CAD BY:
PROJECT ENGINEER / MANAGER:CONSTRUCTION INSPECTION SUPERVISOR:CITY OF SALINAS
SALINAS
CALIFORNIA
DATEREVISIONAPP.PROJ. NO(S)SHEET NO.
FILE NO.OF
File Path:I:\PWTra\Construction Projects\Freedom Pkwy and Sconberg Pkwy\Freedom Pkwy and Sconberg Pkwy_Rev 1r.dwgPlot By:ANDREW EASTERLINGPlot Date:8/10/2022 2:57 PM PUBLIC WORKS DEPARTMENTDATEAPPROVED FOR CONSTRUCTION:REVIEWED BY:DATE
TRAFFICANDREW EASTERLING
STATE OF CALIFORNIA
REGISTERED PROFESSIONAL ENGINEER NO. 2824
REGISTERED PROFESSIONAL ENGINEER
STATE OF CALIFORNIA
CIVILNO. 69142ANDREW EASTERLING, P.E., T.E.TRAFFIC ENGINEER
ADRIANA ROBLES
ADRIANA ROBLES, P.E.CITY ENGINEER
JONATHAN HERNANDEZJONATHAN HERNANDEZTBDANDREW EASTERLINGSIGNING AND STRIPING PLANFREEDOM PKWY/SCONBERG PKWY -TUSCANY BLVD TO MONTE BELLA BLVD----2####2 BIKE LANER81 (CA)12" X 8"
SCALE: 1" = 40'
LEGEND
ISISP