Alisal Safe Routes to School, Project No. 9360
Item # Item Description QuantityMeasure Unit Price Item Total Unit Price Item Total Unit Price Item Total 1 Mobilization 1 LS $ 70,000.00 $ 70,000.00 $ 82,450.00 $ 82,450.00 $ 79,000.00 $ 79,000.00 2 Sediment Control and Storm Drain Inlet Protection1 LS $ 10,000.00 $ 10,000.00 $ 7,800.00 $ 7,800.00 $ 8,800.00 $ 8,800.00 3 Construction Area Signs 1 LS $ 10,000.00 $ 10,000.00 $ 4,520.00 $ 4,520.00 $ 12,300.00 $ 12,300.00 4 Construction Staking 1 LS $ 15,000.00 $ 15,000.00 $ 5,300.00 $ 5,300.00 $ 8,800.00 $ 8,800.00 5 Traffic Control System 1 LS $ 50,000.00 $ 50,000.00 $ 40,000.00 $ 40,000.00 $ 57,400.00 $ 57,400.00 6 Remove Asphalt Concrete and Aggregate Base (1' Depth)136 CF $ 10.00 $ 1,360.00 $ 10.00 $ 1,360.00 $ 29.00 $ 3,944.00 7 Remove Concrete 600 SF $ 8.00 $ 4,800.00 $ 36.00 $ 21,600.00 $ 17.00 $ 10,200.00 8 Hot Mix Asphalt (Type A) (1' Plug) 10 TON $ 325.00 $ 3,250.00 $ 1,100.00 $ 11,000.00 $ 714.00 $ 7,140.00 9 Minor Concrete (Curb) (Salinas Std. Plan No. 1) (Type B) 12 LF $ 60.00 $ 720.00 $ 35.00 $ 420.00 $ 70.00 $ 840.00 10 Minor Concrete (Curb and Gutter) (Salinas Std. Plan No. 1) (Type C) 70 LF $ 75.00 $ 5,250.00 $ 40.00 $ 2,800.00 $ 115.00 $ 8,050.00 11 Minor Concrete (Retaining Curb); Complete-In-Place20 LF $ 40.00 $ 800.00 $ 35.00 $ 700.00 $ 74.00 $ 1,480.00 12 Minor Concrete (Sidewalk); Complete-In-Place 305 SF $ 25.00 $ 7,625.00 $ 17.00 $ 5,185.00 $ 20.00 $ 6,100.00 13 Minor Concrete (Median Sidewalk); Complete-In-Place71 SF $ 25.00 $ 1,775.00 $ 35.00 $ 2,485.00 $ 14.00 $ 994.00 14 Curb Ramp (Caltrans Std Case A); Complete-In-Place1 EA $ 8,000.00 $ 8,000.00 $ 3,000.00 $ 3,000.00 $ 18,200.00 $ 18,200.00 15 Curb Ramp (Caltrans Std Case B); Complete-In-Place1 EA $ 8,000.00 $ 8,000.00 $ 3,000.00 $ 3,000.00 $ 20,200.00 $ 20,200.00 16 Signage and Striping Modification; Complete-In-Place1 LS $ 10,200.00 $ 10,200.00 $ 27,000.00 $ 27,000.00 $ 25,600.00 $ 25,600.00 17 Communications Infrastructure; Compete-In-Place1 LS $ 156,223.00 $ 156,223.00 $ 220,000.00 $ 220,000.00 $ 209,200.00 $ 209,200.00 18 Furnish and Install Pedestrian Hybrid Beacon (Complete-In- Place) 1 LS $ 400,500.00 $ 400,500.00 $ 345,000.00 $ 345,000.00 $ 316,400.00 $ 316,400.00 19 Furnish and Install Solar Radar Speed Feedback Assembly (Complete-In-Place) 2 EA $ 8,600.00 $ 17,200.00 $ 25,000.00 $ 50,000.00 $ 22,200.00 $ 44,400.00 20 Landscaping (Trees) 1 LS $ 9,800.00 $ 9,800.00 $ 22,200.00 $ 22,200.00 $ 22,300.00 $ 22,300.00 Bid Opening: September 26, 2023
Base Bid
Bid Total (Items 1-20) (For Comparison Only) $790,503
PROJECT MANAGER: Gerardo Rodriguez
Engineer's Estimate FBD Vanguard
Construction, Inc.
$855,820 $861,348
Precision Grade, Inc.
1 of 1 J:\p\9360 Alisal SRTS\Construction\1 Contract Documents\1.2 Bid Tab\Preliminary 9360 BidTab_Bid Submittals.xlsx
Attachment 4 Bid Tab.pdf
Salinas City Council
October 24, 2023
- Document
- Attachment 4 Bid Tab.pdf
- Meeting
- October 24, 2023
- Body
- Salinas City Council
- Original file
- 714 KB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.