Cities Index.
Exhibit A - Agreement for Services - Attachment C

Salinas City Council
January 23, 2024

Document
Exhibit A - Agreement for Services - Attachment C
Meeting
January 23, 2024
Body
Salinas City Council
Original file
320 KB
Text extracted from the city's file for reading and search. Open the original on legistar2.granicus.com. That file is the official record.

All of the Proposal items below shall include all labor, materials, tools, equipment, and incidental costs for each item complete or
complete-in-place.

ALISAL
GREENING AND BEAUTIFICATION, PROJECT NO. 9345,
CLEAN CALIFORNIA LOCAL GRANT PROGRAM CCL-5045-038

PROPOSAL ITEMS

BASE BID
Item
No. Sec. Item Description Qty UOM Unit Price Total
1 Mobilization 1 LS
2 Traffic Control 1 LS
3 Clearing and Grubbing 1 LS
4 Construction Best Management Practices 1 LS
5 Plant 5-gal Shrubs (Complete-in-place) 476 EA
6 Furnish and Install Modern Collection Blu 80 mm
Techo-Bloc Pavers (Or Approved Equal), Color:

Shale Grey) (Complete-in-place)
2,538 SF
7 Furnish and Install Bus Stop Shelter and
Accessories (15’ Tolar Signature Sunset Shelter
(39643-00), solar powered LED illumination, 8’
perforated metal bench, and 32-gallon perforated
metal trash receptacle (Complete-in-place)
1 LS
8 Furnish and Install 15-gal Street Tree (Complete-in-
place) 31 EA
9 Furnish and Install Irrigation System (745 N.

Sanborn Rd., Complete-in-place) (Includes
Premanufactured Backflow Preventer Enclosure)
1 LS
10 Refurbish and Paint Existing Benches 8 EA
11 Furnish and Install Trash/Recycling Receptacle 37 EA 12 Minor Concrete (Sidewalk) 680 SF
13 Plant Establishment (Type II) Period (90 Days) 1 LS
14 Furnish and Install Signs onto Existing and or New
Poles/Posts (Complete-in-place) 1 LS
Total Base Bid (Items 1- 14) $

ADDITIVE ALTERNATE
Item
No. Item Description Qty UOM Unit Price Total
1 Furnish and Install Decomposed Granite/ Non-
Stabilized 3/8” Minus 6,617 SF
Total Additive Alternate (Item 1) $
December 15, 2023
Coastal Paving and Excavation Cost Proposal for the Alisal Greening and Beautification Project Construction is estimated to be completed within 75 working days.

← All documents from this meeting